Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6807550B2 - Power management system, power conversion system, program - Google Patents
[go: Go Back, main page]

JP6807550B2 - Power management system, power conversion system, program - Google Patents

Power management system, power conversion system, program Download PDF

Info

Publication number
JP6807550B2
JP6807550B2 JP2017095019A JP2017095019A JP6807550B2 JP 6807550 B2 JP6807550 B2 JP 6807550B2 JP 2017095019 A JP2017095019 A JP 2017095019A JP 2017095019 A JP2017095019 A JP 2017095019A JP 6807550 B2 JP6807550 B2 JP 6807550B2
Authority
JP
Japan
Prior art keywords
input
schedule
output
power
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017095019A
Other languages
Japanese (ja)
Other versions
JP2018191491A (en
Inventor
祐一郎 寺本
祐一郎 寺本
晃 吉武
晃 吉武
恭一 高埜
恭一 高埜
政志 小田
政志 小田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Intellectual Property Management Co Ltd
Original Assignee
Panasonic Intellectual Property Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Intellectual Property Management Co Ltd filed Critical Panasonic Intellectual Property Management Co Ltd
Priority to JP2017095019A priority Critical patent/JP6807550B2/en
Publication of JP2018191491A publication Critical patent/JP2018191491A/en
Application granted granted Critical
Publication of JP6807550B2 publication Critical patent/JP6807550B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/14Energy storage units

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、電力系統に対する入出力を制御する電力管理システム、電力変換システム、プログラムに関する。 The present invention relates to a power management system, a power conversion system, and a program that control input / output to a power system.

太陽電池および蓄電池は電力変換装置を介して電力系統に接続される。例えば、電力変換装置は、太陽電池で発電された直流電力を交流電力に変換してから電力系統に出力する。電力変換装置は、リモートコントローラ、EMS(Energy Management System)を介して外部サーバに接続する。EMSは、外部サーバから出力抑制メッセージを受信し、出力抑制メッセージをリモートコントローラに出力する。リモートコントローラは、出力抑制メッセージにしたがって電力変換装置からの出力を制御する(例えば、特許文献1参照)。 Solar cells and storage batteries are connected to the power system via a power converter. For example, the power converter converts the DC power generated by the solar cell into AC power and then outputs it to the power system. The power conversion device is connected to an external server via a remote controller and an EMS (Energy Management System). The EMS receives the output suppression message from the external server and outputs the output suppression message to the remote controller. The remote controller controls the output from the power converter according to the output suppression message (see, for example, Patent Document 1).

国際公開第16/136912号International Publication No. 16/136912

特許文献1では、1つの上位システムである外部サーバに電力変換装置が接続されており、当該上位システムからのスケジュールであって、かつ出力抑制メッセージが含まれたスケジュールにしたがって、電力変換装置が交流電力を電力系統に出力する。ここで、互いに異なった目的に応じた入出力制御を実行するための複数の上位システムに電力変換装置が接続される場合もある。このような構成において、複数の上位システムから受信したスケジュールが異なる場合に、電力変換装置をどのように制御すればよいか分からなくなってしまう。 In Patent Document 1, a power conversion device is connected to an external server, which is one higher-level system, and the power conversion device exchanges power according to a schedule from the higher-level system and a schedule including an output suppression message. Output power to the power system. Here, the power conversion device may be connected to a plurality of higher-level systems for executing input / output control according to different purposes. In such a configuration, when the schedules received from a plurality of higher-level systems are different, it becomes difficult to know how to control the power conversion device.

本発明はこうした状況に鑑みなされたものであり、その目的は、複数の上位システムから受信した入出力制御が異なる場合であっても、入出力を正常に実行させる技術を提供することにある。 The present invention has been made in view of such a situation, and an object of the present invention is to provide a technique for normally executing input / output even when input / output control received from a plurality of higher-level systems is different.

上記課題を解決するために、本発明のある態様の電力管理システムは、需要家における電力系統との間の電力の入出力を制御する電力管理システムであって、第1上位システムから入出力制御の第1スケジュールを受信する第1受信部と、第1上位システムとは異なった第2上位システムから入出力制御の第2スケジュールを受信する第2受信部と、第1受信部が受信した第1スケジュールでの入出力制御の内容の範囲に、第2受信部が受信した第2スケジュールでの入出力制御の内容が含まれる時間帯に対する第1制御指令であって、かつ第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容を満たす第1制御指令を出力する出力部とを備える。出力部は、第1スケジュールでの入出力制御の内容の範囲外に、第2スケジュールでの入出力制御の内容が対応する時間帯に対する第2制御指令であって、かつ第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容のいずれか一方から外れた第2制御指令を出力する。 In order to solve the above problems, the power management system of a certain aspect of the present invention is a power management system that controls the input / output of power to and from the power system in the consumer, and the input / output control is performed from the first higher system. The first receiving unit that receives the first schedule of the above, the second receiving unit that receives the second schedule of input / output control from the second upper system different from the first higher system, and the first receiving unit that receives the first schedule. It is the first control command for the time zone in which the content of the input / output control in the first schedule includes the content of the input / output control in the second schedule received by the second receiver, and is in the first schedule. It includes an output unit that outputs a first control command that satisfies the contents of the input / output control and the contents of the input / output control in the second schedule. The output unit is a second control command for a time zone corresponding to the contents of the input / output control in the second schedule outside the range of the contents of the input / output control in the first schedule, and is input in the first schedule. A second control command that deviates from either the content of the output control or the content of the input / output control in the second schedule is output.

本発明の別の態様は、電力変換システムである。この電力変換システムは、需要家に設置された発電装置および蓄電装置と電力系統とに接続された電力変換装置と、電力変換装置における電力系統側の電力の入出力を制御する電力管理システムとを備える。電力管理システムは、第1上位システムから需要家における電力系統との間の入出力制御の第1スケジュールを受信する第1受信部と、第1上位システムとは異なった第2上位システムから需要家における電力系統との間の入出力制御の第2スケジュールを受信する第2受信部と、第1受信部が受信した第1スケジュールでの入出力制御の内容の範囲に、第2受信部が受信した第2スケジュールでの入出力制御の内容が含まれる時間帯に対する第1制御指令であって、かつ第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容を満たす第1制御指令を出力する出力部とを備える。出力部は、第1スケジュールでの入出力制御の内容の範囲外に、第2スケジュールでの入出力制御の内容が対応する時間帯に対する第2制御指令であって、かつ第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容のいずれか一方から外れた第2制御指令を出力する。 Another aspect of the present invention is a power conversion system. This power conversion system includes a power conversion device connected to a power generation device and a power storage device installed in a customer and a power system, and a power management system that controls power input / output on the power system side in the power conversion device. Be prepared. The power management system consists of a first receiver that receives the first schedule of input / output control between the first host system and the power system in the consumer, and a second host system that is different from the first host system. The second receiving unit receives the second receiving unit that receives the second schedule of the input / output control between the power system and the power system, and the second receiving unit receives the input / output control in the range of the contents of the input / output control in the first schedule received by the first receiving unit. It is the first control command for the time zone including the contents of the input / output control in the second schedule, and satisfies the contents of the input / output control in the first schedule and the contents of the input / output control in the second schedule. 1 It is provided with an output unit that outputs a control command. The output unit is a second control command for a time zone corresponding to the contents of the input / output control in the second schedule outside the range of the contents of the input / output control in the first schedule, and is input in the first schedule. A second control command that deviates from either the content of the output control or the content of the input / output control in the second schedule is output.

なお、以上の構成要素の任意の組合せ、本発明の表現を方法、装置、システム、コンピュータプログラム、またはコンピュータプログラムを記録した記録媒体などの間で変換したものもまた、本発明の態様として有効である。 It should be noted that any combination of the above components and the conversion of the expression of the present invention between a method, a device, a system, a computer program, a recording medium on which a computer program is recorded, or the like is also effective as an aspect of the present invention. is there.

本発明によれば、複数の上位システムから受信した入出力制御が異なる場合であっても、入出力を正常に実行させることができる。 According to the present invention, even when the input / output controls received from a plurality of higher-level systems are different, the input / output can be normally executed.

実施例1に係る配電システムの構成を示す図である。It is a figure which shows the structure of the power distribution system which concerns on Example 1. FIG. 図1の配電システムの別の構成を示す図である。It is a figure which shows another configuration of the power distribution system of FIG. 図3(a)−(c)は、図1の電力管理システムサーバの動作概要を示す図である。3 (a)-(c) are diagrams showing an outline of the operation of the power management system server of FIG. 図1の電力管理システムサーバによる制御手順を示すフローチャートである。It is a flowchart which shows the control procedure by the power management system server of FIG. 実施例2に係る電力管理システムサーバの構成を示す図である。It is a figure which shows the structure of the power management system server which concerns on Example 2. FIG. 図5の電力管理システムサーバによる制御手順を示すフローチャートである。It is a flowchart which shows the control procedure by the power management system server of FIG. 図5の電力管理システムサーバによる別の制御手順を示すフローチャートである。It is a flowchart which shows another control procedure by the power management system server of FIG.

(実施例1)
本発明の実施例を具体的に説明する前に、実施例の基礎となった知見を説明する。実施例は、需要家に設置された創蓄連携システムにおける電力の入出力を制御する電力管理システムに関する。需要家は、電力会社等からの電力の供給を受けている施設であり、例えば、住宅(需要家宅)、事務所、店舗、工場、公園などである。また、創蓄連携システムは、太陽電池と蓄電装置とを組み合わせるとともに、電力変換装置を介してこれらを電力会社等の電力系統に接続するシステムである。創蓄連携システムは、例えば、日中において太陽電池で発電した電力を電力系統に出力するが、夜間において電力を電力系統に出力しない。このような創蓄連携システムが複数の需要家に設置される場合、これらから電力系統に出力される電力の変動が大きくなる。その変動に電力会社の発電所が追従できなくなると、大規模停電が発生するおそれがある。
(Example 1)
Before concretely explaining the examples of the present invention, the findings on which the examples are based will be described. An embodiment relates to a power management system that controls the input / output of power in a creation / storage cooperation system installed in a customer. A consumer is a facility that receives electric power from an electric power company or the like, and is, for example, a house (customer's house), an office, a store, a factory, a park, or the like. In addition, the creation and storage cooperation system is a system that combines a solar cell and a power storage device and connects them to a power system of an electric power company or the like via a power conversion device. For example, the creation and storage cooperation system outputs the electric power generated by the solar cell to the electric power system during the daytime, but does not output the electric power to the electric power system at nighttime. When such a creation and storage cooperation system is installed in a plurality of consumers, the fluctuation of the electric power output from these to the electric power system becomes large. If the power plant of the electric power company cannot keep up with the fluctuation, a large-scale power outage may occur.

大規模停電の発生を抑制するために、遠隔出力制御システムが、各需要家の電力管理システムにネットワーク経由で接続される。遠隔出力制御システムは、創蓄連携システムの発電量が多い時間帯において電力の出力を抑制させるような入出力制御のスケジュールを各電力管理システムに送信する。電力管理システムは、受信したスケジュールにしたがって電力の出力を制御するので、複数の需要家から電力系統に出力される電力のピークが小さくなり、当該電力の変動が小さくなる。このような遠隔出力制御システムは、創蓄連携システムに対する上位システムであるといえる。 In order to suppress the occurrence of a large-scale power outage, a remote output control system is connected to each consumer's power management system via a network. The remote output control system transmits an input / output control schedule that suppresses the output of electric power to each electric power management system during a time period when the amount of power generation of the creation and storage cooperation system is large. Since the power management system controls the output of electric power according to the received schedule, the peak of the electric power output from a plurality of consumers to the electric power system becomes small, and the fluctuation of the electric power becomes small. It can be said that such a remote output control system is a higher-level system for the creation and storage cooperation system.

一方、電力管理システムは、遠隔出力制御システムとは異なった上位システムに接続されることもある。そのような上位システムの一例が、バーチャルパワープラント(Virtual Power Plant)(以下、「VPP」という)である。VPPは、点在する小規模な再生可能エネルギー発電装置、蓄電池、燃料電池等の小規模発電設備と、電力の需要を管理するネットワークシステムをまとめて制御する。つまり、VPPは、複数の小規模発電設備、ネットワークシステム等を1つの発電所のようにまとめて機能させる。この小規模発電設備に創蓄連携システムが含まれる。VPPは、売電あるいは買電を制御させるような入出力制御のスケジュールを各電力管理システムに送信する。電力管理システムは、受信したスケジュールにしたがって売電あるいは買電を実行するように電力の入出力を制御する。 On the other hand, the power management system may be connected to a higher-level system different from the remote output control system. An example of such a host system is a virtual power plant (hereinafter referred to as "VPP"). The VPP collectively controls small-scale power generation facilities such as scattered small-scale renewable energy power generation devices, storage batteries, and fuel cells, and a network system that manages the demand for electric power. That is, the VPP makes a plurality of small-scale power generation facilities, a network system, etc. function as one power plant. This small-scale power generation facility includes a creation and storage cooperation system. The VPP transmits an input / output control schedule for controlling power sale or purchase to each power management system. The power management system controls the input / output of power so as to sell or buy power according to the received schedule.

遠隔出力制御システムとVPPの両方に電力管理システムが接続される場合、遠隔出力制御システムとVPPは別々の制御を実行しているので、それぞれから受信したスケジュールに含まれた入出力制御の内容が同一時間帯で異なることもある。特に、一方の入出力制御にしたがうと他方の入出力制御にしたがえない場合に、電力管理システムは、電力の入出力をどのように制御すればよいか分からなくなってしまう。 When the power management system is connected to both the remote output control system and the VPP, the remote output control system and the VPP are executing separate controls, so the contents of the input / output control included in the schedule received from each are It may be different at the same time. In particular, when one input / output control is not followed and the other input / output control is not followed, the power management system does not know how to control the input / output of power.

図1は、実施例1に係る配電システム100の構成を示す。配電システム100は、発電装置10、蓄電装置12、電力変換装置14、分電盤16、負荷18、計測器20、電力系統22、電力管理システムサーバ24、第1上位システム26、第2上位システム28を含む。電力変換装置14は、第1変換部30、第2変換部32、第3変換部34、第1変換制御部40、第2変換制御部42、第3変換制御部44を含む。電力管理システムサーバ24は、通信部50、処理部52、出力部54を含み、通信部50は、第1受信部60、第2受信部62を含む。ここで、電力変換装置14、電力管理システムサーバ24は、電力変換システム70に含まれ、発電装置10、蓄電装置12、電力変換装置14は、創蓄連携システム72に含まれる。発電装置10から計測器20、電力管理システムサーバ24は、需要家に設置される。ただし、電力管理システムサーバ24の機能の一部は、需要家の外に設置され、第1上位システム26および第2上位システム28に接続されたサーバが備えていてもよい。 FIG. 1 shows the configuration of the power distribution system 100 according to the first embodiment. The power distribution system 100 includes a power generation device 10, a power storage device 12, a power conversion device 14, a distribution board 16, a load 18, a measuring instrument 20, a power system 22, a power management system server 24, a first upper system 26, and a second upper system. Includes 28. The power conversion device 14 includes a first conversion unit 30, a second conversion unit 32, a third conversion unit 34, a first conversion control unit 40, a second conversion control unit 42, and a third conversion control unit 44. The power management system server 24 includes a communication unit 50, a processing unit 52, and an output unit 54, and the communication unit 50 includes a first receiving unit 60 and a second receiving unit 62. Here, the power conversion device 14 and the power management system server 24 are included in the power conversion system 70, and the power generation device 10, the power storage device 12, and the power conversion device 14 are included in the creation and storage cooperation system 72. The power generation device 10, the measuring instrument 20, and the power management system server 24 are installed in the customer. However, a part of the functions of the power management system server 24 may be provided by a server installed outside the customer and connected to the first higher system 26 and the second higher system 28.

発電装置10は、再生可能エネルギー発電装置であり、ここでは一例として太陽電池である。太陽電池は、光起電力効果を利用し、光エネルギーを直接電力に変換する。太陽電池として、シリコン太陽電池、化合物半導体などを素材にした太陽電池、色素増感型(有機太陽電池)等が使用される。発電装置10は、第1変換部30に接続され、発電した直流電力を第1変換部30に出力する。 The power generation device 10 is a renewable energy power generation device, and here, as an example, a solar cell. Solar cells utilize the photovoltaic effect to directly convert light energy into electricity. As the solar cell, a silicon solar cell, a solar cell made of a compound semiconductor or the like, a dye-sensitized type (organic solar cell), or the like is used. The power generation device 10 is connected to the first conversion unit 30 and outputs the generated DC power to the first conversion unit 30.

第1変換部30は、DC−DCコンバータであり、発電装置10から出力される直流電力を、所望の電圧値の直流電力に変換し、変換した直流電力を直流バス110に出力する。直流バス110は、後述の第3変換部34に接続される。第1変換部30は、例えば、昇圧チョッパで構成される。 The first conversion unit 30 is a DC-DC converter, converts the DC power output from the power generation device 10 into DC power having a desired voltage value, and outputs the converted DC power to the DC bus 110. The DC bus 110 is connected to a third conversion unit 34, which will be described later. The first conversion unit 30 is composed of, for example, a step-up chopper.

第1変換制御部40は、第1変換部30に接続され、第1変換部30を制御する。第1変換制御部40は、基本制御として、発電装置10の出力電力が最大になるよう第1変換部30をMPPT(Maximum Power Point Tracking)制御する。具体的には第1変換制御部40は、発電装置10の出力電圧および出力電流である、第1変換部30の入力電圧および入力電流を計測して発電装置10の発電電力を推定する。第1変換制御部40は、計測した発電装置10の出力電圧と推定した発電電力をもとに、発電装置10の発電電力を最大電力点(最適動作点)にするための指令値を生成する。例えば、山登り法にしたがい動作点電圧を所定のステップ幅で変化させて最大電力点を探索し、最大電力点を維持するように指令値を生成する。第1変換部30は、生成された指令値に基づく駆動信号に応じてスイッチング動作する。 The first conversion control unit 40 is connected to the first conversion unit 30 and controls the first conversion unit 30. As a basic control, the first conversion control unit 40 controls the first conversion unit 30 by MPPT (Maximum Power Point Tracking) so that the output power of the power generation device 10 is maximized. Specifically, the first conversion control unit 40 measures the input voltage and input current of the first conversion unit 30, which are the output voltage and output current of the power generation device 10, and estimates the generated power of the power generation device 10. The first conversion control unit 40 generates a command value for setting the generated power of the power generation device 10 to the maximum power point (optimal operating point) based on the measured output voltage of the power generation device 10 and the estimated generated power. .. For example, the operating point voltage is changed by a predetermined step width according to the hill climbing method to search for the maximum power point, and a command value is generated so as to maintain the maximum power point. The first conversion unit 30 performs a switching operation in response to a drive signal based on the generated command value.

蓄電装置12は、電力を充放電可能な蓄電池であり、リチウムイオン蓄電池、ニッケル水素蓄電池、鉛蓄電池、電気二重層キャパシタ、リチウムイオンキャパシタ等を含む。蓄電装置12は第2変換部32に接続される。 The power storage device 12 is a storage battery capable of charging and discharging electric power, and includes a lithium ion storage battery, a nickel hydrogen storage battery, a lead storage battery, an electric double layer capacitor, a lithium ion capacitor, and the like. The power storage device 12 is connected to the second conversion unit 32.

第2変換部32は、蓄電装置12と直流バス110の間に接続され、蓄電装置12を充放電する双方向コンバータである。第2変換制御部42は、第2変換部32に接続され、第2変換部32を制御する。第2変換制御部42は、基本制御として、所定の指令値をもとに第2変換部32を制御して、蓄電装置12を定電流(CC)/定電圧(CV)で充電/放電する。 The second conversion unit 32 is a bidirectional converter connected between the power storage device 12 and the DC bus 110 to charge and discharge the power storage device 12. The second conversion control unit 42 is connected to the second conversion unit 32 and controls the second conversion unit 32. As basic control, the second conversion control unit 42 controls the second conversion unit 32 based on a predetermined command value to charge / discharge the power storage device 12 with a constant current (CC) / constant voltage (CV). ..

第3変換部34は双方向インバータである。第3変換部34は、直流バス110から入力される直流電力を交流電力に変換し、変換した交流電力を配電線120に出力する。配電線120は、分電盤16、計測器20を介して電力系統22に接続される。また第3変換部34は、電力系統22から供給される交流電力を直流電力に変換し、変換した直流電力を直流バス110に出力する。直流バス110には、平滑用の電解コンデンサ(不図示)が接続されている。 The third conversion unit 34 is a bidirectional inverter. The third conversion unit 34 converts the DC power input from the DC bus 110 into AC power, and outputs the converted AC power to the distribution line 120. The distribution line 120 is connected to the power system 22 via the distribution board 16 and the measuring instrument 20. Further, the third conversion unit 34 converts the AC power supplied from the power system 22 into DC power, and outputs the converted DC power to the DC bus 110. An electrolytic capacitor (not shown) for smoothing is connected to the DC bus 110.

第3変換制御部44は、第3変換部34に接続され、第3変換部34を制御する。第3変換制御部44は、基本制御として、直流バス110の電圧が第1しきい値電圧を維持するように第3変換部34を制御する。具体的には第3変換制御部44は、直流バス110の電圧を検出し、検出したバス電圧を第1しきい値電圧に一致させるための指令値を生成する。第3変換制御部44は、直流バス110の電圧が第1しきい値電圧より高い場合に第3変換部34のデューティ比を上げるための指令値を生成し、直流バス110の電圧が第1しきい値電圧より低い場合に第3変換部34のデューティ比を下げるための指令値を生成する。第3変換部34は、生成された指令値に基づく駆動信号に応じてスイッチング動作する。 The third conversion control unit 44 is connected to the third conversion unit 34 and controls the third conversion unit 34. As basic control, the third conversion control unit 44 controls the third conversion unit 34 so that the voltage of the DC bus 110 maintains the first threshold voltage. Specifically, the third conversion control unit 44 detects the voltage of the DC bus 110 and generates a command value for matching the detected bus voltage with the first threshold voltage. The third conversion control unit 44 generates a command value for increasing the duty ratio of the third conversion unit 34 when the voltage of the DC bus 110 is higher than the first threshold voltage, and the voltage of the DC bus 110 is the first. When the voltage is lower than the threshold voltage, a command value for lowering the duty ratio of the third conversion unit 34 is generated. The third conversion unit 34 performs a switching operation in response to a drive signal based on the generated command value.

ここで、第1変換制御部40と第3変換制御部44間は通信線130で接続され、両者の間で所定のシリアル通信規格(例えば、例えばRS−485規格、TCP−IP規格)に準拠した通信が行われる。また、第2変換制御部42と第3変換制御部44間は通信線132で接続され、これらの間でもシリアル通信規格に準拠した通信が行われる。 Here, the first conversion control unit 40 and the third conversion control unit 44 are connected by a communication line 130, and both conform to a predetermined serial communication standard (for example, RS-485 standard, TCP-IP standard). Communication is performed. Further, the second conversion control unit 42 and the third conversion control unit 44 are connected by a communication line 132, and communication conforming to the serial communication standard is also performed between them.

分電盤16は、配電線120に接続されるとともに、負荷18を接続する。分電盤16は、負荷18に電力を供給する。負荷18は、配電線120を介して供給される電力を消費する機器である。負荷18は、冷蔵庫、エアコン、照明等の機器を含む。ここでは、分電盤16に1つの負荷18が接続されているが、分電盤16に複数の負荷18が接続されてもよい。 The distribution board 16 is connected to the distribution line 120 and the load 18. The distribution board 16 supplies electric power to the load 18. The load 18 is a device that consumes electric power supplied via the distribution line 120. The load 18 includes equipment such as a refrigerator, an air conditioner, and lighting. Here, one load 18 is connected to the distribution board 16, but a plurality of loads 18 may be connected to the distribution board 16.

計測器20は、配電線120において、分電盤16と電力系統22との間に配置される。計測器20は、通過する電力の電力値を計測する。ここで、通過する電力には、需要家から電力系統22に出力される電力と、電力系統22から需要家に入力される電力とが含まれる。前者が売電に相当し、後者が買電に相当する。また、電力値の計測には公知の技術が使用されればよいので、ここでは説明を省略する。計測器20は、計測した電力値を第3変換制御部44に出力する。 The measuring instrument 20 is arranged between the distribution board 16 and the power system 22 on the distribution line 120. The measuring instrument 20 measures the electric power value of the passing electric power. Here, the electric power passing through includes the electric power output from the consumer to the electric power system 22 and the electric power input from the electric power system 22 to the electric power system 22. The former corresponds to selling power and the latter corresponds to buying power. Further, since a known technique may be used for measuring the power value, the description thereof will be omitted here. The measuring instrument 20 outputs the measured power value to the third conversion control unit 44.

電力管理システムサーバ24は、電力管理システムのサーバであり、第3変換制御部44に接続されるとともに、第1上位システム26、第2上位システム28にも接続される。電力管理システムサーバ24は、電力変換装置14における電力系統22側、つまり配電線120での入出力を制御する。これにより、電力管理システムサーバ24は、需要家における電力系統22との間の電力の入出力、つまり計測器20と電力系統22との間の電力の入出力を制御する。電力管理システムサーバ24、第1上位システム26、第2上位システム28の構成を説明する前に、図2を使用しながらこれらの接続を説明する。 The power management system server 24 is a server of the power management system, and is connected to the third conversion control unit 44 and also to the first upper system 26 and the second upper system 28. The power management system server 24 controls the input / output on the power system 22 side of the power conversion device 14, that is, the distribution line 120. As a result, the power management system server 24 controls the input / output of power between the power system 22 and the measuring instrument 20 in the consumer, that is, the input / output of power between the measuring instrument 20 and the power system 22. Before explaining the configurations of the power management system server 24, the first upper system 26, and the second upper system 28, these connections will be described with reference to FIG.

図2は、配電システム100の別の構成を示す。配電システム100は、第1上位システム26、第2上位システム28、ネットワーク82、電力管理システムサーバ24と総称される第1電力管理システムサーバ24a、第2電力管理システムサーバ24b、第N電力管理システムサーバ24nを含む。第1電力管理システムサーバ24aは、例えば、図1の電力管理システムサーバ24に相当し、第1需要家80aに設置される。第1需要家80aには、図示しない創蓄連携システム72も設置される。第2需要家80bには、第1需要家80aと同様に、第2電力管理システムサーバ24b、図示しない創蓄連携システム72が設置される。第N需要家80nも同様である。 FIG. 2 shows another configuration of the power distribution system 100. The power distribution system 100 includes a first upper system 26, a second upper system 28, a network 82, a first power management system server 24a collectively referred to as a power management system server 24, a second power management system server 24b, and an Nth power management system. Includes server 24n. The first power management system server 24a corresponds to, for example, the power management system server 24 of FIG. 1 and is installed in the first consumer 80a. A creation and storage cooperation system 72 (not shown) is also installed in the first customer 80a. Similar to the first customer 80a, the second customer 80b is provided with the second power management system server 24b and the creation and storage cooperation system 72 (not shown). The same applies to the Nth consumer 80n.

第1電力管理システムサーバ24aから第N電力管理システムサーバ24nは、ネットワーク82を介して第1上位システム26と第2上位システム28に接続される。第1上位システム26は、前述の遠隔出力制御システムのサーバであり、電力系統22の安定化のために需要家80から電力系統22への出力を計画的に制御する。一方、第2上位システム28は、前述のVPPのサーバであり、地域単位の電力需要を予測し、その予測に基づき蓄電装置12の充放電を計画的に制御する。なお、第1上位システム26と第2上位システム28における制御については公知の技術が使用されればよいので、ここでは説明を省略する。第1上位システム26と第2上位システム28は、ネットワーク82を介して複数の電力管理システムサーバ24に、制御の結果であるスケジュールを送信する。図1に戻る。 The first power management system server 24a to the Nth power management system server 24n are connected to the first higher system 26 and the second higher system 28 via the network 82. The first host system 26 is a server of the above-mentioned remote output control system, and systematically controls the output from the consumer 80 to the power system 22 in order to stabilize the power system 22. On the other hand, the second higher-level system 28 is the server of the above-mentioned VPP, predicts the power demand in each region, and systematically controls the charge / discharge of the power storage device 12 based on the prediction. As for the control in the first upper system 26 and the second upper system 28, a known technique may be used, and thus description thereof will be omitted here. The first upper system 26 and the second upper system 28 transmit a schedule as a result of control to a plurality of power management system servers 24 via the network 82. Return to FIG.

第1受信部60は、第1上位システム26から、需要家80における電力系統22との間の入出力制御の第1スケジュールを受信する。第1上位システム26は遠隔出力制御システムであるので、第1スケジュールでは、入出力制御の内容として、需要家80からの出力の抑制に関する情報が示される。これは、需要家80からの出力における上限値が示されることに相当する。図3(a)−(c)は、電力管理システムサーバ24の動作概要を示す。図3(a)は、第1スケジュールのデータ構造を示す。第1スケジュールでは、時刻T1からT2における入出力制御の内容として「0%抑制」が示される。これは、出力を抑制しないことを示し、最大出力が例えば「4kW」である場合、出力の上限値が4kWであることに相当する。そのため、出力は4kW以下であればよい。 The first receiving unit 60 receives the first schedule of input / output control between the first host system 26 and the electric power system 22 in the consumer 80. Since the first host system 26 is a remote output control system, in the first schedule, information regarding suppression of output from the consumer 80 is shown as the content of the input / output control. This corresponds to the upper limit of the output from the consumer 80 being shown. FIGS. 3A to 3C show an outline of the operation of the power management system server 24. FIG. 3A shows the data structure of the first schedule. In the first schedule, "0% suppression" is indicated as the content of the input / output control from time T1 to T2. This indicates that the output is not suppressed, and when the maximum output is, for example, "4 kW", it corresponds to the upper limit of the output being 4 kW. Therefore, the output may be 4 kW or less.

また、時刻T2からT3における入出力制御の内容として「50%抑制」が示される。これは、出力を50%抑制することを示し、出力の上限値が2kWであることに相当する。さらに、時刻T3からT4における入出力制御の内容として「100%抑制」が示される。これは、出力を100%抑制することを示し、出力の上限値が0kWであることに相当する。図3(b)−(c)は後述し、図1に戻る。 Further, "50% suppression" is shown as the content of the input / output control from the time T2 to T3. This indicates that the output is suppressed by 50%, which corresponds to the upper limit of the output being 2 kW. Further, "100% suppression" is shown as the content of the input / output control from the time T3 to T4. This indicates that the output is suppressed by 100%, which corresponds to the upper limit of the output being 0 kW. 3 (b)-(c) will be described later, and the process returns to FIG.

第2受信部62は、第2上位システム28から、需要家80における電力系統22との間の入出力制御の第2スケジュールを受信する。第2上位システム28はVPPであるので、第2スケジュールでは、入出力制御の内容として、電力系統22に対して売電あるいは買電すべき電力値が示される。これは入出力の電力値が示されることに相当する。図3(b)は、第2スケジュールのデータ構造を示す。第2スケジュールでは、時刻T1からT2における入出力制御の内容として「2kW売電」が示される。これは、需要家80から電力系統22に電力値2kWの電力を出力することに相当する。また、時刻T2からT3における入出力制御の内容として「1kW売電」が示される。これは、需要家80から電力系統22に電力値1kWの電力を出力することに相当する。さらに、時刻T4からT5における入出力制御の内容として「1kW買電」が示される。これは、電力系統22から需要家80に電力値1kWの電力を入力することに相当する。図3(c)は後述し、図1に戻る。 The second receiving unit 62 receives the second schedule of input / output control between the second higher-level system 28 and the electric power system 22 in the consumer 80. Since the second higher-level system 28 is a VPP, in the second schedule, the power value to be sold or purchased for the power system 22 is indicated as the content of the input / output control. This corresponds to showing the input and output power values. FIG. 3B shows the data structure of the second schedule. In the second schedule, "2 kW power sale" is indicated as the content of the input / output control from the time T1 to T2. This corresponds to outputting electric power having a power value of 2 kW from the consumer 80 to the electric power system 22. Further, "1 kW power sale" is shown as the content of the input / output control from the time T2 to T3. This corresponds to outputting electric power having a power value of 1 kW from the consumer 80 to the electric power system 22. Further, "1 kW power purchase" is indicated as the content of the input / output control from the time T4 to T5. This corresponds to inputting electric power having a electric power value of 1 kW from the electric power system 22 to the consumer 80. FIG. 3C will be described later, and the process returns to FIG.

処理部52は、第1受信部60から第1スケジュールを受けつけるとともに、第2受信部62から第2スケジュールを受けつける。処理部52は、第1スケジュールと第2スケジュールとを比較する。処理部52は、第1スケジュールでの入出力制御の内容の範囲に、第2スケジュールでの入出力制御の内容が含まれる時間帯が存在する場合、第1制御指令を生成する。第1スケジュールでの入出力制御の内容の範囲に、第2スケジュールでの入出力制御の内容が含まれる時間帯は、例えば、図3(a)−(b)の時刻T1からT2、時刻T2からT3、時刻T4からT5、時刻T5からT6に相当する。時刻T1からT2では、第1スケジュールでの出力が4kW以下とされており、第2スケジュールでの出力が2kWとされているので、後者が前者に含まれる。時刻T2からT3では、第1スケジュールでの出力が2kW以下とされており、第2スケジュールでの出力が1kWとされているので、後者が前者に含まれる。 The processing unit 52 receives the first schedule from the first receiving unit 60 and the second schedule from the second receiving unit 62. The processing unit 52 compares the first schedule with the second schedule. The processing unit 52 generates the first control command when there is a time zone in which the contents of the input / output control in the second schedule are included in the range of the contents of the input / output control in the first schedule. The time zone in which the content of the input / output control in the first schedule includes the content of the input / output control in the second schedule is, for example, time T1 to T2 and time T2 in FIGS. 3 (a)-(b). Corresponds to T3, time T4 to T5, and time T5 to T6. From time T1 to T2, the output in the first schedule is 4 kW or less, and the output in the second schedule is 2 kW, so the latter is included in the former. From time T2 to T3, the output in the first schedule is 2 kW or less, and the output in the second schedule is 1 kW, so the latter is included in the former.

時刻T4からT5では、第1スケジュールでの出力が2kW以下とされており、第2スケジュールでの入力が1kWとされているので、後者が前者に含まれる。時刻T5からT6では、第1スケジュールでの出力が2kW以下とされており、第2スケジュールでの出力が1kWとされているので、後者が前者に含まれる。つまり、第1スケジュールでの入出力制御の内容の範囲に、第2スケジュールでの入出力制御の内容が含まれる時間帯とは、第1スケジュールでの上限値以下の範囲に、第2スケジュールでの入出力の電力値が含まれる時間帯であるといえる。このような場合、第2スケジュールの入出力制御の内容にしたがえば、第1スケジュールの入出力制御の内容にしたがうことになる。そのため、処理部52は、第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容を満たす第1制御指令であって、かつ第2スケジュールでの入出力の電力値に応じた第1制御指令を生成する。このような第1制御指令は、図3(c)に示される。 From time T4 to T5, the output in the first schedule is 2 kW or less, and the input in the second schedule is 1 kW, so the latter is included in the former. From time T5 to T6, the output in the first schedule is 2 kW or less, and the output in the second schedule is 1 kW, so the latter is included in the former. That is, the time zone in which the content of the input / output control in the first schedule includes the content of the input / output control in the second schedule is within the range below the upper limit in the first schedule in the second schedule. It can be said that this is the time zone in which the input / output power values of are included. In such a case, according to the contents of the input / output control of the second schedule, the contents of the input / output control of the first schedule are followed. Therefore, the processing unit 52 is a first control command that satisfies the contents of the input / output control in the first schedule and the contents of the input / output control in the second schedule, and sets the input / output power value in the second schedule. The corresponding first control command is generated. Such a first control command is shown in FIG. 3 (c).

一方、処理部52は、第1スケジュールでの入出力制御の内容の範囲外に、第2スケジュールでの入出力制御の内容が対応する時間帯が存在する場合、第2制御指令を生成する。第1スケジュールでの入出力制御の内容の範囲外に、第2スケジュールでの入出力制御の内容が対応する時間帯は、図3(a)−(b)の時刻T3からT4に相当する。時刻T3からT4では、第1スケジュールでの出力が0kW以下とされており、第2スケジュールでの出力が2kWとされているので、一方を満たせば他方を満たさなくなる。つまり、第1スケジュールでの入出力制御の内容の範囲外に、第2スケジュールでの入出力制御の内容が対応する時間帯が存在する場合とは、第1スケジュールでの上限値よりも、第2スケジュールでの出力の電力値が大きい場合であるといえる。 On the other hand, the processing unit 52 generates the second control command when there is a time zone corresponding to the contents of the input / output control in the second schedule outside the range of the contents of the input / output control in the first schedule. The time zone corresponding to the contents of the input / output control in the second schedule outside the range of the contents of the input / output control in the first schedule corresponds to the times T3 to T4 in FIGS. 3 (a)-(b). From time T3 to T4, the output in the first schedule is 0 kW or less, and the output in the second schedule is 2 kW. Therefore, if one is satisfied, the other is not satisfied. That is, when there is a time zone corresponding to the contents of the input / output control in the second schedule outside the range of the contents of the input / output control in the first schedule, the first is higher than the upper limit value in the first schedule. It can be said that this is the case when the output power value in the two schedules is large.

このような場合、処理部52は、第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容のいずれか一方から外れた第2制御指令を生成する。この第2制御指令は、第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容のいずれか一方に応じている。例えば、処理部52は、第1スケジュールでの上限値に応じた第2制御指令を生成する。このような第2制御指令は、図3(c)に示される。なお、処理部52は、第1上位システム26からの入出力制御にしたがわなかった場合のペナルティに関する情報と、第2上位システム28からの入出力制御にしたがわなかった場合のペナルティに関する情報を記憶してもよい。その際、処理部52は、ペナルティが大きい方の入出力制御にしたがうような第2制御指令を生成する。 In such a case, the processing unit 52 generates a second control command that deviates from either the content of the input / output control in the first schedule or the content of the input / output control in the second schedule. This second control command corresponds to either the content of the input / output control in the first schedule or the content of the input / output control in the second schedule. For example, the processing unit 52 generates a second control command according to the upper limit value in the first schedule. Such a second control command is shown in FIG. 3 (c). The processing unit 52 stores information on the penalty when the input / output control from the first upper system 26 is not followed and information on the penalty when the input / output control from the second upper system 28 is not followed. You may. At that time, the processing unit 52 generates a second control command that follows the input / output control having the larger penalty.

処理部52は、図3(c)のように生成した第1制御指令、第2制御指令を出力部54に出力する。ここで、第1制御指令、第2制御指令は制御指令と総称される。出力部54は、処理部52から受けつけた制御指令を電力変換装置14に出力する。 The processing unit 52 outputs the first control command and the second control command generated as shown in FIG. 3C to the output unit 54. Here, the first control command and the second control command are collectively referred to as control commands. The output unit 54 outputs the control command received from the processing unit 52 to the power conversion device 14.

電力変換装置14の第3変換制御部44は、出力部54からの制御指令を受けつける。第1制御指令のように入出力の電力値(以下、「指示値」という)が示されている場合、第3変換制御部44は、計測器20において計測した電力値(以下、「計測値」という)が、指示値に近くなるような制御を実行する。一方、第2制御指令のように上限値が示されている場合、第3変換制御部44は、計測値が上限値以下になるような制御を実行する。なお、第3変換制御部44は、制御の内容を第1変換制御部40と第2変換制御部42に通知する。第1変換制御部40と第2変換制御部42は、通知された内容に応じた制御を実行する。 The third conversion control unit 44 of the power conversion device 14 receives a control command from the output unit 54. When the input / output power value (hereinafter referred to as "instructed value") is indicated as in the first control command, the third conversion control unit 44 measures the power value measured by the measuring instrument 20 (hereinafter referred to as "measured value"). ”) Is executed so that it is close to the indicated value. On the other hand, when the upper limit value is indicated as in the second control command, the third conversion control unit 44 executes control so that the measured value becomes equal to or less than the upper limit value. The third conversion control unit 44 notifies the first conversion control unit 40 and the second conversion control unit 42 of the content of the control. The first conversion control unit 40 and the second conversion control unit 42 execute control according to the notified content.

これらの制御には公知の技術が使用されればよいが、ここでは一例として電力変換装置14から電力系統22への出力を抑制するための制御を説明する。第3変換制御部44は、第3変換部34の出力が所定の上限電流値または上限電力値を超えないように第3変換部34を制御する。出力抑制中は、直流バス110の電圧を第1しきい値電圧に維持するように制御するバス電圧の安定化制御は停止する。これにより、第3変換部34の出力電力に対して第3変換部34の入力電力が過多となり、直流バス110の電圧が上昇する。より具体的には直流バス110に接続された電解コンデンサに電荷が蓄積されていく。第2変換制御部42は、直流バス110の電圧が第2しきい値電圧を超えないように第2変換部32を制御する。この制御は、所定の指令値に出力を合わせる制御に対して優先する。第2しきい値電圧は第1しきい値電圧より高い値に設定される。第1変換制御部40は、直流バス110の電圧が第3しきい値電圧を超えないように第1変換部30を制御する。この制御は、MPPT制御に対して優先する。第3しきい値電圧は第2しきい値電圧より高い値に設定される。 A known technique may be used for these controls, but here, as an example, the control for suppressing the output from the power conversion device 14 to the power system 22 will be described. The third conversion control unit 44 controls the third conversion unit 34 so that the output of the third conversion unit 34 does not exceed a predetermined upper limit current value or upper limit power value. While the output is suppressed, the bus voltage stabilization control that controls the voltage of the DC bus 110 to be maintained at the first threshold voltage is stopped. As a result, the input power of the third conversion unit 34 becomes excessive with respect to the output power of the third conversion unit 34, and the voltage of the DC bus 110 rises. More specifically, electric charges are accumulated in the electrolytic capacitor connected to the DC bus 110. The second conversion control unit 42 controls the second conversion unit 32 so that the voltage of the DC bus 110 does not exceed the second threshold voltage. This control takes precedence over the control that adjusts the output to a predetermined command value. The second threshold voltage is set to a value higher than the first threshold voltage. The first conversion control unit 40 controls the first conversion unit 30 so that the voltage of the DC bus 110 does not exceed the third threshold voltage. This control takes precedence over MPPT control. The third threshold voltage is set to a value higher than the second threshold voltage.

なお、電力管理システムサーバ24が、電力変換装置14に接続された例を示したが、さらに負荷18に接続されていてもよい。このとき、電力管理システムサーバ24は、電力変換装置14および負荷18を制御することによって、需要家80における電力系統22との間の電力の入出力を制御する。電力変換装置14に対する制御指令と、負荷18に対する制御指令は別々に生成される。電力変換装置14に対する制御指令と、負荷18に対する制御指令との組合せによって、図3(c)に示された制御が実現されればよい。処理部52は、図3(c)のように生成した第1制御指令、第2制御指令を出力部54に出力する。出力部54は、処理部52から受けつけた制御指令を電力変換装置14と負荷18に出力する。負荷18が、制御指令を受け付けた場合の制御には公知の技術が使用されればよいので、ここでは説明を省略する。なお、電力管理システムサーバ24が負荷18を制御せず、電力変換装置14だけを制御する場合、制御指令は電力変換装置14だけに出力される。 Although the example in which the power management system server 24 is connected to the power conversion device 14 is shown, it may be further connected to the load 18. At this time, the power management system server 24 controls the input / output of electric power to / from the electric power system 22 in the consumer 80 by controlling the electric power conversion device 14 and the load 18. The control command for the power conversion device 14 and the control command for the load 18 are generated separately. The control shown in FIG. 3C may be realized by the combination of the control command for the power conversion device 14 and the control command for the load 18. The processing unit 52 outputs the first control command and the second control command generated as shown in FIG. 3C to the output unit 54. The output unit 54 outputs the control command received from the processing unit 52 to the power conversion device 14 and the load 18. Since a known technique may be used for control when the load 18 receives a control command, the description thereof will be omitted here. When the power management system server 24 does not control the load 18 and controls only the power conversion device 14, the control command is output only to the power conversion device 14.

また、電力管理システムサーバ24が、負荷18に接続されている場合、需要家80には、必ずしも蓄電装置12が設置されていなくてもよい。需要家80に蓄電装置12が設置されてない場合、電力変換装置14は、発電装置10からの電力を変換する機能として、第1変換部30、第1変換制御部40、第3変換部34、および第3変換制御部44を備えていれば足りる。 Further, when the power management system server 24 is connected to the load 18, the power storage device 12 does not necessarily have to be installed in the consumer 80. When the power storage device 12 is not installed in the consumer 80, the power conversion device 14 has a function of converting the electric power from the power generation device 10, the first conversion unit 30, the first conversion control unit 40, and the third conversion unit 34. , And a third conversion control unit 44 suffices.

本開示における装置、システム、または方法の主体は、コンピュータを備えている。このコンピュータがプログラムを実行することによって、本開示における装置、システム、または方法の主体の機能が実現される。コンピュータは、プログラムにしたがって動作するプロセッサを主なハードウェア構成として備える。プロセッサは、プログラムを実行することによって機能を実現することができれば、その種類は問わない。プロセッサは、半導体集積回路(IC)、またはLSI(Large Scale Integration)を含む1つまたは複数の電子回路で構成される。複数の電子回路は、1つのチップに集積されてもよいし、複数のチップに設けられてもよい。複数のチップは1つの装置に集約されていてもよいし、複数の装置に備えられていてもよい。プログラムは、コンピュータが読み取り可能なROM、光ディスク、ハードディスクドライブなどの非一時的記録媒体に記録される。プログラムは、記録媒体に予め格納されていてもよいし、インターネット等を含む広域通信網を介して記録媒体に供給されてもよい。 The subject of the device, system, or method in the present disclosure comprises a computer. By executing the program by this computer, the function of the subject of the device, system, or method in the present disclosure is realized. A computer has a processor that operates according to a program as a main hardware configuration. The type of processor does not matter as long as the function can be realized by executing the program. The processor is composed of one or more electronic circuits including a semiconductor integrated circuit (IC) or an LSI (Large Scale Integration). The plurality of electronic circuits may be integrated on one chip or may be provided on a plurality of chips. The plurality of chips may be integrated in one device, or may be provided in a plurality of devices. The program is recorded on a non-temporary recording medium such as a computer-readable ROM, optical disc, or hard disk drive. The program may be stored in the recording medium in advance, or may be supplied to the recording medium via a wide area communication network including the Internet or the like.

以上の構成による配電システム100の動作を説明する。図4は、電力管理システムサーバ24による制御手順を示すフローチャートである。第1受信部60は第1スケジュールを受信し(S10)、第2受信部62は第2スケジュールを受信する(S12)。第1スケジュールでの上限値以下の範囲に、第2スケジュールでの入出力の電力値が含まれる場合(S14のY)、処理部52は、入出力の電力値に応じた第1制御指令を生成する(S16)。出力部54は、第1制御指令を出力する(S18)。第1スケジュールでの上限値以下の範囲に、第2スケジュールでの入出力の電力値が含まれない場合(S14のN)、処理部52は、上限値に応じた第2制御指令を生成する(S20)。出力部54は、第2制御指令を出力する(S22)。 The operation of the power distribution system 100 with the above configuration will be described. FIG. 4 is a flowchart showing a control procedure by the power management system server 24. The first receiving unit 60 receives the first schedule (S10), and the second receiving unit 62 receives the second schedule (S12). When the input / output power value in the second schedule is included in the range below the upper limit value in the first schedule (Y in S14), the processing unit 52 issues the first control command according to the input / output power value. Generate (S16). The output unit 54 outputs the first control command (S18). When the input / output power value in the second schedule is not included in the range below the upper limit value in the first schedule (N in S14), the processing unit 52 generates a second control command according to the upper limit value. (S20). The output unit 54 outputs the second control command (S22).

本実施例によれば、第1スケジュールでの入出力制御の内容の範囲に、第2スケジュールでの入出力制御の内容が含まれる時間帯において、これらの入出力制御の内容を満たす第1制御指令を出力するので、複数の上位システムからの入出力制御に応じた入出力を実行させることができる。また、第1スケジュールでの入出力制御の内容の範囲外に、第2スケジュールでの入出力制御の内容が対応する時間帯において、いずれか一方から外れた第2制御指令を出力するので、複数の上位システムからの入出力制御が異なる場合であっても、入出力を正常に実行させることができる。また、第1スケジュールでの入出力制御の内容の範囲外に、第2スケジュールでの入出力制御の内容が対応する時間帯において、第1スケジュールと第2スケジュールのいずれか一方の入出力制御の内容に応じた第2制御指令を生成するので、第2制御指令を容易に生成できる。 According to this embodiment, the first control that satisfies the contents of the input / output control in the time zone in which the contents of the input / output control in the first schedule include the contents of the input / output control in the second schedule. Since the command is output, it is possible to execute input / output according to input / output control from a plurality of higher-level systems. Further, since the second control command deviating from one of the two is output in the time zone corresponding to the contents of the input / output control in the second schedule outside the range of the contents of the input / output control in the first schedule, a plurality of them are output. Even if the input / output control from the host system is different, the input / output can be executed normally. Further, in a time zone corresponding to the contents of the input / output control in the second schedule outside the range of the contents of the input / output control in the first schedule, the input / output control of either the first schedule or the second schedule is performed. Since the second control command is generated according to the content, the second control command can be easily generated.

また、第1スケジュールでは、出力における上限値が示され、第2スケジュールでは、入出力の電力値が示されるので、遠隔出力制御システムとVPPからの入出力制御に応じた処理を実行できる。また、第1スケジュールでの上限値以下の範囲に、第2スケジュールでの入出力の電力値が含まれる時間帯において、第2スケジュールでの入出力の電力値に応じた第1制御指令を出力するので、VPPからの入出力制御に応じた処理を実行できる。また、第1スケジュールでの上限値よりも、第2スケジュールでの出力の電力値が大きい場合、第1スケジュールでの上限値に応じた第2制御指令を出力するので、遠隔出力制御システムからの入出力制御に応じた処理を実行できる。 Further, since the upper limit value in the output is shown in the first schedule and the input / output power value is shown in the second schedule, the processing corresponding to the input / output control from the remote output control system and the VPP can be executed. Further, in the time zone in which the input / output power value in the second schedule is included in the range below the upper limit value in the first schedule, the first control command corresponding to the input / output power value in the second schedule is output. Therefore, it is possible to execute the process according to the input / output control from the VPP. Further, when the power value of the output in the second schedule is larger than the upper limit value in the first schedule, the second control command corresponding to the upper limit value in the first schedule is output, so that the remote output control system can be used. Processing can be executed according to input / output control.

本発明の一態様の概要は、次の通りである。本発明のある態様の電力管理システムサーバ24は、需要家80における電力系統22との間の電力の入出力を制御する電力管理システムサーバ24であって、第1上位システム26から入出力制御の第1スケジュールを受信する第1受信部60と、第1上位システム26とは異なった第2上位システム28から入出力制御の第2スケジュールを受信する第2受信部62と、第1受信部60が受信した第1スケジュールでの入出力制御の内容の範囲に、第2受信部62が受信した第2スケジュールでの入出力制御の内容が含まれる時間帯に対する第1制御指令であって、かつ第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容を満たす第1制御指令を出力する出力部54とを備える。出力部54は、第1スケジュールでの入出力制御の内容の範囲外に、第2スケジュールでの入出力制御の内容が対応する時間帯に対する第2制御指令であって、かつ第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容のいずれか一方から外れた第2制御指令を出力する。 The outline of one aspect of the present invention is as follows. The power management system server 24 of a certain aspect of the present invention is a power management system server 24 that controls input / output of power to / from the power system 22 in the consumer 80, and controls input / output from the first higher-level system 26. The first receiving unit 60 that receives the first schedule, the second receiving unit 62 that receives the second schedule of input / output control from the second higher system 28 different from the first higher system 26, and the first receiving unit 60. Is a first control command for a time zone in which the content of the input / output control in the first schedule received by the second receiver 62 includes the content of the input / output control in the second schedule received by the second receiving unit 62. It includes an output unit 54 that outputs a first control command that satisfies the contents of the input / output control in the first schedule and the contents of the input / output control in the second schedule. The output unit 54 is a second control command for a time zone corresponding to the contents of the input / output control in the second schedule outside the range of the contents of the input / output control in the first schedule, and is in the first schedule. A second control command that deviates from either the content of the input / output control or the content of the input / output control in the second schedule is output.

出力部54は、第1スケジュールでの入出力制御の内容の範囲外に、第2スケジュールでの入出力制御の内容が対応する時間帯において、第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容のいずれか一方に応じた第2制御指令を出力してもよい。 The output unit 54 has the contents of the input / output control in the first schedule and the second in the time zone corresponding to the contents of the input / output control in the second schedule outside the range of the contents of the input / output control in the first schedule. A second control command may be output according to one of the contents of the input / output control in the schedule.

第1受信部60が受信した第1スケジュールでは、入出力制御の内容として、出力における上限値が示され、第2受信部62が受信した第2スケジュールでは、入出力制御の内容として、入出力の電力値が示され、出力部54は、第1スケジュールでの上限値以下の範囲に、第2スケジュールでの入出力の電力値が含まれる時間帯において、第2スケジュールでの入出力の電力値に応じた第1制御指令を出力し、出力部54は、第1スケジュールでの上限値よりも、第2スケジュールでの出力の電力値が大きい場合、第1スケジュールでの上限値に応じた第2制御指令を出力してもよい。 In the first schedule received by the first receiving unit 60, the upper limit value in the output is shown as the content of the input / output control, and in the second schedule received by the second receiving unit 62, the input / output is input / output as the content of the input / output control. The power value of is shown, and the output unit 54 outputs the input / output power of the second schedule in the time zone in which the input / output power value of the second schedule is included in the range below the upper limit value of the first schedule. The first control command corresponding to the value is output, and when the power value of the output in the second schedule is larger than the upper limit value in the first schedule, the output unit 54 corresponds to the upper limit value in the first schedule. The second control command may be output.

本発明の別の態様は、電力変換システム70である。この電力変換システム70は、需要家80に設置された発電装置10および蓄電装置12と電力系統22とに接続された電力変換装置14と、電力変換装置14における電力系統22側の電力の入出力を制御する電力管理システムサーバ24とを備える。電力管理システムサーバ24は、第1上位システム26から需要家80における電力系統22との間の入出力制御の第1スケジュールを受信する第1受信部60と、第1上位システム26とは異なった第2上位システム28から需要家80における電力系統22との間の入出力制御の第2スケジュールを受信する第2受信部62と、第1受信部60が受信した第1スケジュールでの入出力制御の内容の範囲に、第2受信部62が受信した第2スケジュールでの入出力制御の内容が含まれる時間帯に対する第1制御指令であって、かつ第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容を満たす第1制御指令を出力する出力部54とを備える。出力部54は、第1スケジュールでの入出力制御の内容の範囲外に、第2スケジュールでの入出力制御の内容が対応する時間帯に対する第2制御指令であって、かつ第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容のいずれか一方から外れた第2制御指令を出力する。 Another aspect of the present invention is the power conversion system 70. The power conversion system 70 is a power conversion device 14 connected to the power generation device 10 and the power storage device 12 installed in the consumer 80 and the power system 22, and the input / output of power on the power system 22 side in the power conversion device 14. It is provided with a power management system server 24 that controls the above. The power management system server 24 is different from the first receiving unit 60 that receives the first schedule of input / output control between the first higher system 26 and the power system 22 in the consumer 80, and the first higher system 26. The second receiving unit 62 that receives the second schedule of input / output control between the second higher system 28 and the power system 22 in the consumer 80, and the input / output control in the first schedule received by the first receiving unit 60. This is the first control command for the time zone in which the content of the input / output control in the second schedule received by the second receiving unit 62 is included in the range of the content of, and the content of the input / output control in the first schedule. It includes an output unit 54 that outputs a first control command that satisfies the contents of the input / output control in the second schedule. The output unit 54 is a second control command for a time zone corresponding to the contents of the input / output control in the second schedule outside the range of the contents of the input / output control in the first schedule, and is in the first schedule. A second control command that deviates from either the content of the input / output control or the content of the input / output control in the second schedule is output.

(実施例2)
次に、実施例2を説明する。実施例2も、実施例1と同様に、需要家に設置された創蓄連携システムにおける電力の入出力を制御する電力管理システムに関する。ここでは、需要家において制御指令を実行できない場合の処理に関する。制御指令を実行できない場合とは、例えば、制御指令によって買電を指示すべき場合であるが、蓄電装置の空き容量が少なくなっている場合、制御指令によって売電を指示すべき場合であるが、天気が晴れではなく発電量が少ない場合である。実施例2に係る配電システム100は、図1と同様のタイプである。ここでは、実施例1との差異を中心に説明する。
(Example 2)
Next, Example 2 will be described. The second embodiment also relates to a power management system that controls the input / output of electric power in the creation / storage cooperation system installed in the consumer, as in the first embodiment. Here, it relates to the processing when the control command cannot be executed by the consumer. The case where the control command cannot be executed is, for example, the case where the power purchase should be instructed by the control command, but when the free capacity of the power storage device is low, the power sale should be instructed by the control command. , When the weather is not sunny and the amount of power generation is small. The power distribution system 100 according to the second embodiment is the same type as in FIG. Here, the differences from the first embodiment will be mainly described.

図5は、実施例2に係る電力管理システムサーバ24の構成を示す。図1と比較して、電力管理システムサーバ24は取得部56をさらに含み、通信部50は第3受信部64をさらに含む。また、第3受信部64は天気予報サーバ90に接続される。 FIG. 5 shows the configuration of the power management system server 24 according to the second embodiment. Compared to FIG. 1, the power management system server 24 further includes an acquisition unit 56, and the communication unit 50 further includes a third reception unit 64. Further, the third receiving unit 64 is connected to the weather forecast server 90.

前述のごとく、第1受信部60は第1上位システム26から第1スケジュールを受信し、第2受信部62は第2上位システム28から第2スケジュールを受信する。ここでは、第1スケジュールでの上限値以下の範囲に、第2スケジュールでの入力の電力値が含まれる時間帯、つまり処理部52において第2スケジュールでの入出力の電力値に応じた第1制御指令を生成すべき場合を説明の対象にする。なお、第1スケジュールでの上限値以下の範囲に、第2スケジュールでの入力の電力値が含まれない時間帯、つまり処理部52において第1スケジュールでの上限値に応じた第2制御指令を生成すべき場合においても同様の処理が実行されればよい。 As described above, the first receiving unit 60 receives the first schedule from the first higher system 26, and the second receiving unit 62 receives the second schedule from the second higher system 28. Here, in the time zone in which the power value of the input in the second schedule is included in the range below the upper limit value in the first schedule, that is, the first processing unit 52 corresponds to the power value of the input / output in the second schedule. The case where a control command should be generated is the subject of explanation. It should be noted that the time zone in which the input power value in the second schedule is not included in the range below the upper limit value in the first schedule, that is, the processing unit 52 issues the second control command according to the upper limit value in the first schedule. The same process may be executed even when it should be generated.

第2スケジュールでは、入出力制御の内容として、入力における電力値、例えば、1kWhの買電が示される。第2変換制御部42は、図示しない蓄電装置12の残量あるいは空き容量の情報を取得する。これには公知の技術が使用されればよいので、ここでは説明を省略する。取得部56は、第2変換制御部42に接続され、第2変換制御部42から空き容量の情報を取得する。空き容量情報では、例えば、0.5kWhが示される。 In the second schedule, as the content of the input / output control, the power value at the input, for example, the purchase of 1 kWh of power is shown. The second conversion control unit 42 acquires information on the remaining amount or free capacity of the power storage device 12 (not shown). Since a known technique may be used for this, the description thereof will be omitted here. The acquisition unit 56 is connected to the second conversion control unit 42, and acquires free space information from the second conversion control unit 42. In the free space information, for example, 0.5 kWh is shown.

処理部52は、蓄電装置12の空き容量と、第2スケジュールで示された入力の電力値とを比較する。処理部52は、前者が後者よりも少ない場合、つまり入力した電力を蓄電装置12が充電不可能である場合、第1制御指令の代わりに、第2スケジュールでの入力の電力値とは異なった第3制御指令を生成する。これは、蓄電装置12の空き容量が0.5kWhであり、入力の電力値が1kWhである場合に相当する。第3制御指令では、第1スケジュールでの50%抑制が示されたり、蓄電装置12の空き容量に応じた0.5kWhが示されたりする。 The processing unit 52 compares the free capacity of the power storage device 12 with the power value of the input shown in the second schedule. When the former is less than the latter, that is, when the power storage device 12 cannot charge the input power, the processing unit 52 is different from the input power value in the second schedule instead of the first control command. Generate a third control command. This corresponds to the case where the free capacity of the power storage device 12 is 0.5 kWh and the input power value is 1 kWh. In the third control command, 50% suppression in the first schedule is indicated, or 0.5 kWh is indicated according to the free capacity of the power storage device 12.

また、第2スケジュールでは、入出力制御の内容として、出力における電力値、例えば、2kWの売電が示される。天気予報サーバ90は、天気予報の情報を提供するためのサーバであり、第3受信部64は、天気予報サーバ90から天気予報の情報を受けつける。処理部52は、天気予報の情報と、発電装置10が発電可能な電力との対応関係が示されたテーブルを予め記憶する。処理部52は、第2スケジュールにおいて売電が示されている場合、テーブルを参照しながら、第3受信部64が受けつけた天気予報の情報に対応した発電可能な電力を導出する。処理部52は、導出した発電可能な電力値と、第2スケジュールで示された出力の電力値とを比較する。処理部52は、前者が後者よりも小さい場合、つまり当該電力値の電力を発電装置10が発電不可能である場合、第1制御指令の代わりに、第2スケジュールでの出力の電力値とは異なった第3制御指令を生成する。これは、発電可能な電力値が1kWであり、出力の電力値が2kWである場合に相当する。出力部54は、処理部52から受けつけた第3制御指令を電力変換装置14と負荷18に出力する。 Further, in the second schedule, the power value at the output, for example, 2 kW of power sale is shown as the content of the input / output control. The weather forecast server 90 is a server for providing weather forecast information, and the third receiving unit 64 receives the weather forecast information from the weather forecast server 90. The processing unit 52 stores in advance a table showing the correspondence between the weather forecast information and the electric power that the power generation device 10 can generate. When the power sale is indicated in the second schedule, the processing unit 52 derives the power that can be generated corresponding to the weather forecast information received by the third receiving unit 64 while referring to the table. The processing unit 52 compares the derived power value that can generate power with the power value of the output shown in the second schedule. When the former is smaller than the latter, that is, when the power generation device 10 cannot generate the power of the power value, the processing unit 52 uses the power value of the output in the second schedule instead of the first control command. Generate a different third control command. This corresponds to the case where the power value capable of generating power is 1 kW and the power value of the output is 2 kW. The output unit 54 outputs the third control command received from the processing unit 52 to the power conversion device 14 and the load 18.

以上の構成による配電システム100の動作を説明する。図6は、電力管理システムサーバ24による制御手順を示すフローチャートである。これは、第1制御指令あるいは第2制御指令によって電力の入力を指示すべき場合に相当する。蓄電装置12が充電可能であれば(S50のY)、処理部52は、第1制御指令あるいは第2制御指令を生成し(S52)、出力部54は、生成した第1制御指令あるいは第2制御指令を出力する(S54)。蓄電装置12が充電可能でなければ(S50のN)、処理部52は、第3制御指令を生成し(S56)、出力部54は、生成した第3制御指令を出力する(S58)。 The operation of the power distribution system 100 with the above configuration will be described. FIG. 6 is a flowchart showing a control procedure by the power management system server 24. This corresponds to the case where the input of electric power should be instructed by the first control command or the second control command. If the power storage device 12 can be charged (Y in S50), the processing unit 52 generates the first control command or the second control command (S52), and the output unit 54 generates the generated first control command or the second control command. A control command is output (S54). If the power storage device 12 is not rechargeable (N in S50), the processing unit 52 generates a third control command (S56), and the output unit 54 outputs the generated third control command (S58).

図7は、電力管理システムサーバ24による別の制御手順を示すフローチャートである。これは、第1制御指令あるいは第2制御指令によって電力の出力を指示すべき場合に相当する。発電装置10が発電可能であれば(S100のY)、処理部52は、第1制御指令あるいは第2制御指令を生成し(S102)、出力部54は、生成した第1制御指令あるいは第2制御指令を出力する(S104)。発電装置10が発電可能でなければ(S100のN)、処理部52は、第3制御指令を生成し(S106)、出力部54は、生成した第3制御指令を出力する(S108)。 FIG. 7 is a flowchart showing another control procedure by the power management system server 24. This corresponds to the case where the output of electric power should be instructed by the first control command or the second control command. If the power generation device 10 can generate power (Y in S100), the processing unit 52 generates the first control command or the second control command (S102), and the output unit 54 generates the generated first control command or the second control command. A control command is output (S104). If the power generation device 10 is not capable of generating power (N in S100), the processing unit 52 generates a third control command (S106), and the output unit 54 outputs the generated third control command (S108).

本実施例によれば、第1制御指令あるいは第2制御指令により電力の入力を指示すべき場合であっても、入力した電力を蓄電装置12が充電不可能である場合、第3制御指令を出力するので、充電できない電力を入力することを回避できる。また、第1制御指令あるいは第2制御指令により電力の出力を指示すべき場合であっても、当該指示すべき電力値の電力を発電装置10が発電不可能である場合、第3制御指令を出力するので、発電できない電力を出力することを回避できる。 According to this embodiment, even if the input of electric power should be instructed by the first control command or the second control command, if the power storage device 12 cannot charge the input electric power, the third control command is issued. Since it is output, it is possible to avoid inputting power that cannot be charged. Further, even if the output of electric power should be instructed by the first control command or the second control command, if the power generation device 10 cannot generate the electric power of the instructed electric power value, the third control command is issued. Since it is output, it is possible to avoid outputting power that cannot be generated.

本発明の一態様の概要は、次の通りである。出力部54は、第1制御指令あるいは第2制御指令により電力の入力を指示すべき場合であっても、入力した電力を蓄電装置12が充電不可能である場合、第3制御指令を出力してもよい。 The outline of one aspect of the present invention is as follows. The output unit 54 outputs a third control command when the power storage device 12 cannot charge the input power even when the input of electric power should be instructed by the first control command or the second control command. You may.

出力部54は、第1制御指令あるいは第2制御指令により電力の出力を指示すべき場合であっても、当該指示すべき電力値の電力を発電装置10が発電不可能である場合、第3制御指令を出力してもよい。 Even if the output unit 54 should instruct the output of electric power by the first control command or the second control command, the output unit 54 is the third when the power generation device 10 cannot generate the electric power of the instructed electric power value. A control command may be output.

以上、本発明を実施例をもとに説明した。この実施例は例示であり、それらの各構成要素あるいは各処理プロセスの組合せにいろいろな変形例が可能なこと、またそうした変形例も本発明の範囲にあることは当業者に理解されるところである。 The present invention has been described above based on examples. This embodiment is an example, and it is understood by those skilled in the art that various modifications are possible for each of these components or combinations of each processing process, and that such modifications are also within the scope of the present invention. ..

10 発電装置、 12 蓄電装置、 14 電力変換装置、 16 分電盤、 18 負荷、 20 計測器、 22 電力系統、 24 電力管理システムサーバ、 26 第1上位システム、 28 第2上位システム、 30 第1変換部、 32 第2変換部、 34 第3変換部、 40 第1変換制御部、 42 第2変換制御部、 44 第3変換制御部、 50 通信部、 52 処理部、 54 出力部、 60 第1受信部、 62 第2受信部、 70 電力変換システム、 72 創蓄連携システム、 100 配電システム。 10 Power generation device, 12 Power storage device, 14 Power converter, 16 Distribution board, 18 Load, 20 Measuring instrument, 22 Power system, 24 Power management system server, 26 1st upper system, 28 2nd upper system, 30 1st Conversion unit, 32 2nd conversion unit, 34 3rd conversion unit, 40 1st conversion control unit, 42 2nd conversion control unit, 44 3rd conversion control unit, 50 communication unit, 52 processing unit, 54 output unit, 60th 1 receiver, 62 second receiver, 70 power conversion system, 72 creation and storage cooperation system, 100 distribution system.

Claims (7)

需要家における電力系統との間の電力の入出力を制御する電力管理システムであって、
第1上位システムから入出力制御の第1スケジュールを受信する第1受信部と、
前記第1上位システムとは異なった第2上位システムから入出力制御の第2スケジュールを受信する第2受信部と、
前記第1受信部が受信した第1スケジュールでの入出力制御の内容の範囲に、前記第2受信部が受信した第2スケジュールでの入出力制御の内容が含まれる時間帯に対する第1制御指令であって、かつ第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容を満たす第1制御指令を出力する出力部とを備え、
前記出力部は、第1スケジュールでの入出力制御の内容の範囲外に、第2スケジュールでの入出力制御の内容が対応する時間帯に対する第2制御指令であって、かつ第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容のいずれか一方から外れた第2制御指令を出力することを特徴とする電力管理システム。
A power management system that controls the input and output of power to and from the power system of consumers.
The first receiver that receives the first schedule of input / output control from the first host system, and
A second receiving unit that receives a second schedule of input / output control from a second higher system different from the first higher system, and
The first control command for the time zone in which the content of the input / output control in the first schedule received by the first receiving unit includes the content of the input / output control in the second schedule received by the second receiving unit. Moreover, it is provided with an output unit that outputs a first control command that satisfies the contents of the input / output control in the first schedule and the contents of the input / output control in the second schedule.
The output unit is a second control command for a time zone corresponding to the contents of the input / output control in the second schedule outside the range of the contents of the input / output control in the first schedule, and is in the first schedule. A power management system characterized by outputting a second control command that deviates from either the content of input / output control or the content of input / output control in the second schedule.
前記出力部は、第1スケジュールでの入出力制御の内容の範囲外に、第2スケジュールでの入出力制御の内容が対応する時間帯において、第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容のいずれか一方に応じた第2制御指令を出力することを特徴とする請求項1に記載の電力管理システム。 The output unit is outside the range of the contents of the input / output control in the first schedule, and in the time zone corresponding to the contents of the input / output control in the second schedule, the contents of the input / output control in the first schedule and the second The power management system according to claim 1, wherein a second control command corresponding to any one of the contents of input / output control in the schedule is output. 前記第1受信部が受信した第1スケジュールでは、入出力制御の内容として、出力における上限値が示され、
前記第2受信部が受信した第2スケジュールでは、入出力制御の内容として、入出力の電力値が示され、
前記出力部は、第1スケジュールでの上限値以下の範囲に、第2スケジュールでの入出力の電力値が含まれる時間帯において、第2スケジュールでの入出力の電力値に応じた第1制御指令を出力し、
前記出力部は、第1スケジュールでの上限値よりも、第2スケジュールでの出力の電力値が大きい場合、第1スケジュールでの上限値に応じた第2制御指令を出力することを特徴とする請求項1に記載の電力管理システム。
In the first schedule received by the first receiving unit, the upper limit value in the output is shown as the content of the input / output control.
In the second schedule received by the second receiving unit, the input / output power value is shown as the content of the input / output control.
The output unit is the first control according to the input / output power value in the second schedule in the time zone in which the input / output power value in the second schedule is included in the range below the upper limit value in the first schedule. Output the command,
The output unit is characterized in that when the power value of the output in the second schedule is larger than the upper limit value in the first schedule, the output unit outputs a second control command according to the upper limit value in the first schedule. The power management system according to claim 1.
前記出力部は、第1制御指令あるいは第2制御指令により電力の入力を指示すべき場合であっても、入力した電力を蓄電装置が充電不可能である場合、第3制御指令を出力することを特徴とする請求項3に記載の電力管理システム。 The output unit outputs a third control command when the power storage device cannot charge the input power even when the input of electric power should be instructed by the first control command or the second control command. The power management system according to claim 3. 前記出力部は、第1制御指令あるいは第2制御指令により電力の出力を指示すべき場合であっても、当該指示すべき電力値の電力を発電装置が発電不可能である場合、第3制御指令を出力することを特徴とする請求項3に記載の電力管理システム。 Even if the output unit should instruct the output of electric power by the first control command or the second control command, if the power generation device cannot generate the electric power of the instructed electric power value, the third control The power management system according to claim 3, wherein a command is output. 需要家に設置された発電装置および蓄電装置と電力系統とに接続された電力変換装置と、
前記電力変換装置における電力系統側の電力の入出力を制御する電力管理システムとを備え、
前記電力管理システムは、
第1上位システムから需要家における電力系統との間の入出力制御の第1スケジュールを受信する第1受信部と、
前記第1上位システムとは異なった第2上位システムから需要家における電力系統との間の入出力制御の第2スケジュールを受信する第2受信部と、
前記第1受信部が受信した第1スケジュールでの入出力制御の内容の範囲に、前記第2受信部が受信した第2スケジュールでの入出力制御の内容が含まれる時間帯に対する第1制御指令であって、かつ第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容を満たす第1制御指令を出力する出力部とを備え、
前記出力部は、第1スケジュールでの入出力制御の内容の範囲外に、第2スケジュールでの入出力制御の内容が対応する時間帯に対する第2制御指令であって、かつ第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容のいずれか一方から外れた第2制御指令を出力することを特徴とする電力変換システム。
Power generation equipment and power storage equipment installed in consumers, power conversion equipment connected to the power system, and
It is provided with a power management system that controls the input / output of power on the power system side in the power conversion device.
The power management system
The first receiver that receives the first schedule of input / output control from the first host system to the power system in the consumer,
A second receiving unit that receives a second schedule of input / output control between the second upper system different from the first upper system and the electric power system in the consumer.
The first control command for the time zone in which the content of the input / output control in the first schedule received by the first receiving unit includes the content of the input / output control in the second schedule received by the second receiving unit. Moreover, it is provided with an output unit that outputs a first control command that satisfies the contents of the input / output control in the first schedule and the contents of the input / output control in the second schedule.
The output unit is a second control command for a time zone corresponding to the contents of the input / output control in the second schedule outside the range of the contents of the input / output control in the first schedule, and is in the first schedule. A power conversion system characterized by outputting a second control command that deviates from either the content of input / output control or the content of input / output control in the second schedule.
需要家における電力系統との間の電力の入出力を制御する電力管理システムでのプログラムであって、
第1上位システムから入出力制御の第1スケジュールを受信するステップと、
前記第1上位システムとは異なった第2上位システムから入出力制御の第2スケジュールを受信するステップと、
第1スケジュールでの入出力制御の内容の範囲に、第2スケジュールでの入出力制御の内容が含まれる時間帯に対する第1制御指令であって、かつ第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容を満たす第1制御指令を出力するステップと、
第1スケジュールでの入出力制御の内容の範囲外に、第2スケジュールでの入出力制御の内容が対応する時間帯に対する第2制御指令であって、かつ第1スケジュールでの入出力制御の内容と第2スケジュールでの入出力制御の内容のいずれか一方から外れた第2制御指令を出力するステップとをコンピュータに実行させるためのプログラム。
A program in a power management system that controls the input and output of power to and from the power system of consumers.
The step of receiving the first schedule of input / output control from the first host system,
A step of receiving a second schedule of input / output control from a second higher system different from the first higher system, and
It is the first control command for the time zone in which the content of the input / output control in the first schedule includes the content of the input / output control in the second schedule, and the content of the input / output control in the first schedule. The step of outputting the first control command that satisfies the contents of the input / output control in the second schedule, and
The content of the input / output control in the second schedule is a second control command for the corresponding time zone outside the range of the content of the input / output control in the first schedule, and the content of the input / output control in the first schedule. A program for causing the computer to execute a step of outputting a second control command that deviates from one of the contents of the input / output control in the second schedule.
JP2017095019A 2017-05-11 2017-05-11 Power management system, power conversion system, program Active JP6807550B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017095019A JP6807550B2 (en) 2017-05-11 2017-05-11 Power management system, power conversion system, program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017095019A JP6807550B2 (en) 2017-05-11 2017-05-11 Power management system, power conversion system, program

Publications (2)

Publication Number Publication Date
JP2018191491A JP2018191491A (en) 2018-11-29
JP6807550B2 true JP6807550B2 (en) 2021-01-06

Family

ID=64479103

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017095019A Active JP6807550B2 (en) 2017-05-11 2017-05-11 Power management system, power conversion system, program

Country Status (1)

Country Link
JP (1) JP6807550B2 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5701730B2 (en) * 2011-09-30 2015-04-15 株式会社東芝 Charge / discharge determination device, charge / discharge determination method, and charge / discharge determination program
JP2014207793A (en) * 2013-04-15 2014-10-30 株式会社東芝 Request control device, method, and program
US11196294B2 (en) * 2016-11-28 2021-12-07 Kyocera Corporation Power management method, power management server, local control apparatus, and power management system

Also Published As

Publication number Publication date
JP2018191491A (en) 2018-11-29

Similar Documents

Publication Publication Date Title
Diaz et al. Fuzzy-logic-based gain-scheduling control for state-of-charge balance of distributed energy storage systems for DC microgrids
US20170256952A1 (en) Power management system and power management method
KR20130104771A (en) Energy storage system and control method thereof
EP3823152A1 (en) Power conversion system, conversion circuit control method and program
JP2013085459A (en) Power storage system and control method therefor
JPWO2020161765A1 (en) DC power supply system
US20120228950A1 (en) Stabilization system, power supply system, control method of the master management device and program for the master management device
KR20110085781A (en) Energy storage system, and energy storage system control method
US11329488B2 (en) Power conversion system, method for controlling converter circuit, and program
JP6166338B2 (en) Energy storage system
KR101859939B1 (en) EMS of PV/ESS device Tracking Generation Referenceand its Control Method
WO2019131227A1 (en) Power control device, power control method, and program
Luna et al. Generation-side power scheduling in a grid-connected DC microgrid
JP2015233403A (en) Power charging and feeding apparatus
WO2018088568A1 (en) Electric power converting device, electric power converting system, and electric power converting method
JP2017123747A (en) Power management equipment
JP6187920B2 (en) Power supply control device and power distribution system
JP7026419B1 (en) Power supply system
JP2017099235A (en) Power conversion system and control device
JP2020018108A (en) Power storage system
Luna et al. Online energy management system for distributed generators in a grid-connected microgrid
JP6478032B2 (en) Control device and power distribution system using the same
JP6807550B2 (en) Power management system, power conversion system, program
JP7203325B2 (en) power system
JP6468948B2 (en) Power system

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20180417

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20191216

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200904

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20201104

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20201120

R151 Written notification of patent or utility model registration

Ref document number: 6807550

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151