Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6809289B2 - Elevator equipment lifting system and lifting method - Google Patents
[go: Go Back, main page]

JP6809289B2 - Elevator equipment lifting system and lifting method - Google Patents

Elevator equipment lifting system and lifting method Download PDF

Info

Publication number
JP6809289B2
JP6809289B2 JP2017034554A JP2017034554A JP6809289B2 JP 6809289 B2 JP6809289 B2 JP 6809289B2 JP 2017034554 A JP2017034554 A JP 2017034554A JP 2017034554 A JP2017034554 A JP 2017034554A JP 6809289 B2 JP6809289 B2 JP 6809289B2
Authority
JP
Japan
Prior art keywords
machine room
main body
beam member
elevator
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017034554A
Other languages
Japanese (ja)
Other versions
JP2018140846A (en
Inventor
宗一 中林
宗一 中林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Building Solutions Corp
Original Assignee
Mitsubishi Electric Building Techno Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Building Techno Service Co Ltd filed Critical Mitsubishi Electric Building Techno Service Co Ltd
Priority to JP2017034554A priority Critical patent/JP6809289B2/en
Publication of JP2018140846A publication Critical patent/JP2018140846A/en
Application granted granted Critical
Publication of JP6809289B2 publication Critical patent/JP6809289B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Description

この発明は、エレベーター機器の揚重システムおよび揚重方法に関する。 The present invention relates to a lifting system and lifting method for elevator equipment.

特許文献1は、エレベーター機器の揚重システムを開示する。当該揚重システムは、揚重装置を備える。当該揚重装置の本体は、エレベーター機器に対して鉛直投影面上の外側に配置される。このため、機械室の天井が低くても、エレベーター機器を引き上げ得る。 Patent Document 1 discloses a lifting system for elevator equipment. The lifting system includes a lifting device. The main body of the lifting device is arranged outside on the vertical projection plane with respect to the elevator equipment. Therefore, even if the ceiling of the machine room is low, the elevator equipment can be pulled up.

特許第5936503号公報Japanese Patent No. 5936503

しかしながら、特許文献1に記載の揚重システムにおいては、揚重システムの上部に揚重装置の本体を配置する必要がある。このため、機械室に設置されるエレベーター機器と機械室の天井との隙間が少ない場合にエレベーター機器を引き上げられないこともある。 However, in the lifting system described in Patent Document 1, it is necessary to arrange the main body of the lifting device on the upper part of the lifting system. Therefore, if the gap between the elevator equipment installed in the machine room and the ceiling of the machine room is small, the elevator equipment may not be pulled up.

この発明は、上述の課題を解決するためになされた。エレベーター機器をより確実に引き上げることができるエレベーター機器の揚重システムおよび揚重方法を提供することである。 The present invention has been made to solve the above-mentioned problems. It is to provide an elevator equipment lifting system and a lifting method capable of more reliably lifting the elevator equipment.

この発明に係るエレベーター機器の揚重システムは、エレベーターの機械室の床面において複数の角部それぞれ立てられる複数の支持部材と、前記複数の支持部材に対して隣接した支持部材の下部にそれぞれ連結される複数の連結具材と、前記複数の支持部材に対して隣接した支持部材の上部にそれぞれ連結される複数の梁部材と、前記機械室の上部において前記機械室の一側に配置された梁部材の一側に支持される第1の滑車装置と、前記機械室の上部において前記機械室の他側に配置された梁部材の一側に支持される第2の滑車装置と、前記機械室の上部において前記機械室の一側に配置された梁部材の他側と前記機械室の他側に配置された梁部材の他側とに隣接した梁部材の中央に支持される第3の滑車装置と、前記第1の滑車装置に対応して設けられる第1の揚重装置と、前記第2の滑車装置に対応して設けられる第2の揚重装置と、前記第3の滑車装置に対応して設けられる第3の揚重装置と、を備え、前記第1の揚重装置は、前記機械室の内部のエレベーター機器に対して鉛直投影面上の外側で前記第1の滑車装置の下方に配置される第1の本体と、前記第1の本体の下部に設けられ、前記機械室の一側に配置された梁部材の一側を支持する支持装置の下部に固定される第1の固定体と、前記第1の本体の上部から前記第1の滑車装置を介して前記エレベーター機器の上部の中央に連結される第1の引上体と、を備え、前記第2の揚重装置は、前記機械室の内部の前記エレベーター機器に対して鉛直投影面上の外側で前記第2の滑車装置の下方に配置される第2の本体と、前記第2の本体の下部に設けられ、前記機械室の他側に配置された梁部材の一側を支持する支持装置の下部に固定される第2の固定体と、前記第2の本体の上部から前記第2の滑車装置を介して前記エレベーター機器の上部の中央に連結される第2の引上体と、を備え、前記第3の揚重装置は、前記機械室の内部の前記エレベーター機器に対して鉛直投影面上の外側で前記第3の滑車装置よりも下方において前記機械室の一側に配置された梁部材の他側を支持する支持装置の側に寄って配置される第3の本体と、前記第3の本体の下部に設けられ、前記機械室の一側に配置された梁部材の他側を支持する支持装置の下部に固定される第3の固定体と、前記第3の本体の上部から前記第3の滑車装置を介して前記エレベーター機器の上部の中央に連結される第3の引上体と、を備えた。 Lifting systems elevator apparatus according to the present invention, respectively in the lower portion of the adjacent support member and a plurality of support members to be erected in a plurality of corners in the floor of the elevator machine room, to the plurality of support members A plurality of connecting members to be connected, a plurality of beam members connected to each of the upper portions of the support members adjacent to the plurality of support members, and a plurality of beam members arranged on one side of the machine chamber at the upper part of the machine chamber. A first sliding wheel device supported on one side of the beam member, a second sliding wheel device supported on one side of the beam member arranged on the other side of the machine chamber at the upper part of the machine chamber, and the above. A third supported in the center of a beam member adjacent to the other side of the beam member arranged on one side of the machine chamber and the other side of the beam member arranged on the other side of the machine chamber in the upper part of the machine chamber. The sliding wheel device, the first lifting device provided corresponding to the first sliding wheel device, the second lifting device provided corresponding to the second sliding wheel device, and the third sliding wheel. A third lifting device provided corresponding to the device is provided, and the first lifting device is the first pulley on the outside on a vertical projection plane with respect to the elevator equipment inside the machine room. It is fixed to a first main body arranged below the device and a lower part of a support device provided below the first main body and supporting one side of a beam member arranged on one side of the machine chamber. The second fixed body includes a first pulling body connected from the upper part of the first main body to the center of the upper part of the elevator device via the first pulley device. The lifting device is located on a second main body located outside the vertical projection plane with respect to the elevator device inside the machine room and below the second gliding device, and on a lower portion of the second main body. A second fixed body provided and fixed to the lower part of a support device that supports one side of a beam member arranged on the other side of the machine chamber, and the second pulley device from the upper part of the second main body. A second pulling body, which is connected to the center of the upper part of the elevator equipment via the above, is provided, and the third lifting device is on a vertical projection plane with respect to the elevator equipment inside the machine room. A third main body arranged closer to the side of a support device that supports the other side of the beam member arranged on one side of the machine chamber below the third pulley device, and the third body. A third fixed body provided at the lower part of the main body of the machine and fixed to the lower part of a support device for supporting the other side of the beam member arranged on one side of the machine chamber, and from the upper part of the third main body. The upper part of the elevator equipment via the third pulley device It was equipped with a third pulling body connected to the center .

この発明に係るエレベーター機器の揚重方法は、エレベーターの機械室の床面において複数の角部複数の支持部材それぞれ立てる支持部材設置工程と、前記複数の支持部材に対して隣接した支持部材の下部に複数の連結具材をそれぞれ連結する連結具材連結工程と、前記複数の支持部材に対して隣接した支持部材の上部に複数の梁部材をそれぞれ連結する梁部材連結工程と、前記機械室の上部において前記機械室の一側に配置された梁部材の一側で第1の滑車装置を支持する第1滑車装置支持工程と、前記機械室の上部において前記機械室の他側に配置された梁部材の一側で第2の滑車装置を支持する第2滑車装置支持工程と、前記機械室の上部において前記機械室の一側に配置された梁部材の他側と前記機械室の他側に配置された梁部材の他側とに隣接した梁部材の中央で第3の滑車装置を支持する第3滑車装置支持工程と、前記第1の滑車装置に対応させて第1の揚重装置を設ける第1揚重装置設置工程と、前記第2の滑車装置に対応させて第2の揚重装置を設ける第2揚重装置設置工程と、前記第3の滑車装置に対応させて第3の揚重装置を設ける第3揚重装置設置工程と、を備え、前記第1揚重装置設置工程は、第1の本体を前記機械室の内部のエレベーター機器に対して鉛直投影面上の外側で前記第1の滑車装置の下方に配置させる第1本体配置工程と、前記第1の本体の下部に設けられた第1の固定体を前記機械室の一側に配置された梁部材の一側を支持する支持装置の下部に固定する第1固定体固定工程と、第1の引上体を前記第1の本体の上部から前記第1の滑車装置を介して前記エレベーター機器の上部の中央に連結する第1引上体連結工程と、を備え、前記第2揚重装置設置工程は、第2の本体を前記機械室の内部の前記エレベーター機器に対して鉛直投影面上の外側で前記第2の滑車装置の下方に配置させる第2本体配置工程と、前記第2の本体の下部に設けられた第2の固定体を前記機械室の他側に配置された梁部材の一側を支持する支持装置の下部に固定する第2固定体固定工程と、第2の引上体を前記第2の本体の上部から前記第2の滑車装置を介して前記エレベーター機器の上部の中央に連結する第2引上体連結工程と、を備え、前記第3揚重装置設置工程は、第3の本体を前記機械室の内部の前記エレベーター機器に対して鉛直投影面上の外側で前記第3の滑車装置よりも下方において前記機械室の一側に配置された梁部材の他側を支持する支持装置の側に寄って配置させる第3本体配置工程と、前記第3の本体の下部に設けられた第3の固定体を前記機械室の一側に配置された梁部材の他側を支持する支持装置の下部に固定する第3固定体固定工程と、第3の引上体を前記第3の本体の上部から前記第3の滑車装置を介して前記エレベーター機器の上部の中央に連結する第3引上体連結工程と、を備えた。
Lifting methods elevator apparatus according to the present invention comprises a support member installation process make each a plurality of support members to a plurality of corners in the floor of the elevator machine room, the support member adjacent to said plurality of support members A connecting tool connecting step of connecting a plurality of connecting members to the lower part of the pulley, a beam member connecting step of connecting a plurality of beam members to the upper part of the supporting member adjacent to the plurality of supporting members, and the machine. The first pulley device support step of supporting the first pulley device on one side of the beam member arranged on one side of the machine chamber at the upper part of the chamber, and the other side of the machine chamber at the upper part of the machine chamber. The second pulley device support step of supporting the second pulley device on one side of the beam member, and the other side of the beam member arranged on one side of the machine chamber and the machine chamber at the upper part of the machine chamber. A third pulley device support step of supporting the third pulley device at the center of the beam member adjacent to the other side of the beam member arranged on the other side, and a first lifting corresponding to the first pulley device. A first lifting device installation step of providing a heavy device, a second lifting device installation step of providing a second lifting device corresponding to the second pulley device, and a corresponding third pulley device. A third lifting device installation step of providing a third lifting device is provided, and in the first lifting device installation step, the first main body is placed on a vertical projection plane with respect to the elevator equipment inside the machine room. A first main body placement step of arranging the outside of the first pulley device below the first pulley device, and a beam member in which the first fixed body provided in the lower part of the first main body is placed on one side of the machine chamber. The first fixed body fixing step of fixing to the lower part of the support device supporting one side, and the upper part of the elevator device from the upper part of the first main body via the first pulley device. The second lifting device installation step includes a first pulling body connecting step of connecting to the center of the machine chamber, and the second main body is outside the vertical projection plane with respect to the elevator device inside the machine room. A second main body arranging step of arranging the second pulley device below the second pulley device, and a beam member having a second fixed body provided at the lower part of the second main body placed on the other side of the machine chamber. A second fixed body fixing step of fixing to the lower part of the support device supporting the side, and a center of the upper part of the elevator device from the upper part of the second main body via the second pulley device. The third lifting device installation step comprises a second pulling body connecting step of connecting the third body to the pulley device inside the machine room on the outside of the vertical projection plane. Below the third pulley device A third main body arranging step of arranging the beam members on one side of the machine room closer to the side of the support device for supporting the other side, and a third fixing provided on the lower part of the third main body. A third fixed body fixing step of fixing the body to the lower part of a support device that supports the other side of the beam member arranged on one side of the machine room, and a third pulling body from the upper part of the third main body. It is provided with a third pull-up body connecting step of connecting to the center of the upper part of the elevator device via the third sliding wheel device.

これらの発明によれば、揚重装置の本体は、エレベーター機器に対して鉛直投影面上の外側で対応した滑車装置の下方に配置される。このため、揚重装置の本体を揚重システムの上部に配置する必要がない。その結果、エレベーター機器をより確実に引き上げることができる。 According to these inventions, the body of the lifting device is located below the pulley device corresponding to the elevator equipment on the outside on the vertical projection plane. Therefore, it is not necessary to arrange the main body of the lifting device on the upper part of the lifting system. As a result, the elevator equipment can be pulled up more reliably.

この発明の実施の形態1におけるエレベーター機器の揚重システムの正面図である。It is a front view of the lifting system of the elevator equipment in Embodiment 1 of this invention. この発明の実施の形態1におけるエレベーター機器の揚重システムの平面図である。It is a top view of the lifting system of the elevator equipment in Embodiment 1 of this invention. この発明の実施の形態1におけるエレベーター機器の揚重システムの滑車装置の側面図である。It is a side view of the pulley device of the lifting system of the elevator equipment in Embodiment 1 of this invention. この発明の実施の形態1におけるエレベーター機器の揚重システムによるエレベーター機器の設置手順を説明するためのフローチャートである。It is a flowchart for demonstrating the installation procedure of the elevator equipment by the lifting system of the elevator equipment in Embodiment 1 of this invention. この発明の実施の形態2におけるエレベーター機器の揚重システムの滑車装置の側面図である。It is a side view of the pulley device of the lifting system of the elevator equipment in Embodiment 2 of this invention.

この発明を実施するための形態について添付の図面に従って説明する。なお、各図中、同一または相当する部分には同一の符号が付される。当該部分の重複説明は適宜に簡略化ないし省略される。 A mode for carrying out the present invention will be described with reference to the accompanying drawings. In each figure, the same or corresponding parts are designated by the same reference numerals. The duplicate description of the relevant part will be simplified or omitted as appropriate.

実施の形態1.
図1はこの発明の実施の形態1におけるエレベーター機器の揚重システムの正面図である。図2はこの発明の実施の形態1におけるエレベーター機器の揚重システムの平面図である。
Embodiment 1.
FIG. 1 is a front view of a lifting system for elevator equipment according to the first embodiment of the present invention. FIG. 2 is a plan view of a lifting system for elevator equipment according to the first embodiment of the present invention.

図1と図2とにおいて、エレベーターの機械室1は、図示されない昇降路の上方に設けられる。支持台2は、機械室1の床面に設けられる。例えば、エレベーター機器3は、巻上機である。エレベーター機器3は、機械室1の内部において支持台2の上面に設置される。 In FIGS. 1 and 2, the elevator machine room 1 is provided above a hoistway (not shown). The support base 2 is provided on the floor surface of the machine room 1. For example, the elevator device 3 is a hoisting machine. The elevator device 3 is installed on the upper surface of the support base 2 inside the machine room 1.

エレベーター機器3が支持台2の上面に設置される際、エレベーター機器3の揚重システムは、機械室1に一時的に設置される。揚重システムは、支持装置4と梁装置5と複数の滑車装置6と複数の揚重装置7とを備える。 When the elevator device 3 is installed on the upper surface of the support base 2, the lifting system of the elevator device 3 is temporarily installed in the machine room 1. The lifting system includes a support device 4, a beam device 5, a plurality of pulley devices 6, and a plurality of lifting devices 7.

例えば、支持装置4は、4本の支持部材4aと4本の連結具材4bとを備える。4本の支持部材4aの各々は、鉛直方向に対して伸縮自在に設けられる。4本の支持部材4aの各々は、機械室1の床面において対応した角部に立てられる。4本の連結具材4bの各々は、隣接した支持部材4aの下部に連結される。4本の連結具材4bの各々は、隣接した支持部材4aの下部が互いに離れる方向に変形することを抑制し得るように設けられる。4本の連結具材4bは、支持装置4の全体の強度を向上させるように設けられる。 For example, the support device 4 includes four support members 4a and four connecting tool members 4b. Each of the four support members 4a is provided so as to be stretchable in the vertical direction. Each of the four support members 4a stands at the corresponding corners on the floor surface of the machine room 1. Each of the four connecting tool members 4b is connected to the lower part of the adjacent support member 4a. Each of the four connecting tool members 4b is provided so as to prevent the lower portions of the adjacent support members 4a from being deformed in a direction away from each other. The four connecting members 4b are provided so as to improve the overall strength of the support device 4.

例えば、梁装置5は、4本の梁部材5aを備える。例えば、4本の梁部材5aの各々は、H鋼部材である。複数の梁部材の各々は、複数の貫通孔を備える。4本の梁部材5aの各々は、隣接した支持部材4aの上部に連結される。この際、複数の貫通孔は、水平方向に並ぶ。4本の梁部材5aの各々は、4本の支持部材4aの伸縮に応じて鉛直方向の位置を変化させ得るように設けられる。4本の梁部材5aは、鉛直投影面上において四角形の各辺を形成するように設けられる。4本の梁部材5aは、支持装置4の全体の強度を向上させるように設けられる。 For example, the beam device 5 includes four beam members 5a. For example, each of the four beam members 5a is an H-steel member. Each of the plurality of beam members includes a plurality of through holes. Each of the four beam members 5a is connected to the upper part of the adjacent support member 4a. At this time, the plurality of through holes are arranged in the horizontal direction. Each of the four beam members 5a is provided so that the position in the vertical direction can be changed according to the expansion and contraction of the four support members 4a. The four beam members 5a are provided so as to form each side of the quadrangle on the vertical projection plane. The four beam members 5a are provided so as to improve the overall strength of the support device 4.

例えば、複数の滑車装置6の各々は、機械室1の上部において対応した梁装置5に支持される。複数の滑車装置6は、エレベーター機器3に対して鉛直投影面上の外側に配置される。例えば、第1の滑車装置6は、機械室1の一側において梁部材5aに支持される。例えば、第2の滑車装置6は、機械室1の他側において梁部材5aに支持される。例えば、第3の滑車装置6は、機械室1の奥側において梁部材5aに支持される。 For example, each of the plurality of pulley devices 6 is supported by a corresponding beam device 5 in the upper part of the machine room 1. The plurality of pulley devices 6 are arranged outside the vertical projection plane with respect to the elevator device 3. For example, the first pulley device 6 is supported by the beam member 5a on one side of the machine room 1. For example, the second pulley device 6 is supported by the beam member 5a on the other side of the machine room 1. For example, the third pulley device 6 is supported by the beam member 5a on the back side of the machine room 1.

例えば、複数の揚重装置7は、複数の滑車装置6の各々にそれぞれ対応して設けられる。例えば、複数の揚重装置は、チェーンブロックである。複数の揚重装置7の各々は、本体7aと固定体7bと引上体7cとを備える。本体7aは、エレベーター機器3に対して鉛直投影面上の外側で対応した滑車装置6の下方に配置される。固定体7bは、前記機械室1の下部において支持部材4aの下部に固定される。例えば、固定体7bの端部は、支持部材4aの足部に固定された支持部材に連結される。例えば、引上体7cは、ワイヤである。引上体7cは、本体7aの上部から対応した滑車装置6を介してエレベーター機器3に連結される。 For example, the plurality of lifting devices 7 are provided corresponding to each of the plurality of pulley devices 6. For example, the plurality of lifting devices is a chain block. Each of the plurality of lifting devices 7 includes a main body 7a, a fixed body 7b, and a pulling body 7c. The main body 7a is arranged below the pulley device 6 corresponding to the elevator device 3 on the outside on the vertical projection surface. The fixed body 7b is fixed to the lower part of the support member 4a in the lower part of the machine room 1. For example, the end portion of the fixed body 7b is connected to the support member fixed to the foot portion of the support member 4a. For example, the pulling body 7c is a wire. The pulling body 7c is connected to the elevator device 3 from the upper part of the main body 7a via the corresponding pulley device 6.

次に、図3を用いて、滑車装置6を説明する。
図3はこの発明の実施の形態1におけるエレベーター機器の揚重システムの滑車装置の側面図である。
Next, the pulley device 6 will be described with reference to FIG.
FIG. 3 is a side view of the pulley device of the lifting system of the elevator equipment according to the first embodiment of the present invention.

図3に示されるように、滑車装置6は、返し車6eと連結具6fと支持部材6gとナット6hとを備える。 As shown in FIG. 3, the pulley device 6 includes a return wheel 6e, a connector 6f, a support member 6g, and a nut 6h.

返し車6eは、梁部材5aに対して機械室1の中央の側に隣接する。返し車6eは、図示されない溝を備える。当該溝は、返し車6eの外周面に形成される。連結具6fは、返し車6eを回転自在に支持する。支持部材6gは、梁部材5aの貫通孔を貫通する。支持部材6gの頭部は、梁部材5aに対して機械室1の中央の側に配置される。支持部材6gの頭部は、連結具6fのフック部に連結される。ナット6hは、支持部材6gの他側にねじ込まれる。 The return wheel 6e is adjacent to the beam member 5a on the central side of the machine room 1. The return wheel 6e includes a groove (not shown). The groove is formed on the outer peripheral surface of the return wheel 6e. The connector 6f rotatably supports the return wheel 6e. The support member 6g penetrates the through hole of the beam member 5a. The head of the support member 6g is arranged on the central side of the machine room 1 with respect to the beam member 5a. The head of the support member 6g is connected to the hook portion of the connecting tool 6f. The nut 6h is screwed into the other side of the support member 6g.

滑車装置6に対し、引上体7cは、返し車6eの外周面の溝に巻き掛けられる。返し車6eは、引上体7cからの荷重を受ける。連結具6fは、返し車6eからの荷重を受ける。この際、連結具6fは、当該荷重に応じて位置を変化させる。 With respect to the pulley device 6, the pulling body 7c is wound around a groove on the outer peripheral surface of the return wheel 6e. The return wheel 6e receives the load from the pulling body 7c. The connector 6f receives the load from the return wheel 6e. At this time, the position of the connector 6f is changed according to the load.

次に、図4を用いて、エレベーター機器3の設置手順を説明する。
図4はこの発明の実施の形態1におけるエレベーター機器の揚重システムによるエレベーター機器の設置手順を説明するためのフローチャートである。
Next, the installation procedure of the elevator device 3 will be described with reference to FIG.
FIG. 4 is a flowchart for explaining an installation procedure of the elevator equipment by the lifting system of the elevator equipment according to the first embodiment of the present invention.

図4に示されるように、ステップS1では、支持装置設置工程が行われる。支持装置設置工程においては、支持装置4が機械室1の床面に立てられる。その後、ステップS2の手順が行われる。ステップS2では、梁装置支持工程が行われる。梁装置支持工程では、梁装置5が支持装置4の上部に支持される。その後、ステップS3の手順が行われる。ステップS3では、滑車装置支持工程が行われる。滑車装置支持工程においては、複数の滑車装置6が梁装置5に支持される。 As shown in FIG. 4, in step S1, a support device installation step is performed. In the support device installation process, the support device 4 is erected on the floor surface of the machine room 1. After that, the procedure of step S2 is performed. In step S2, the beam device support step is performed. In the beam device support step, the beam device 5 is supported on the upper part of the support device 4. After that, the procedure of step S3 is performed. In step S3, the pulley device support step is performed. In the pulley device support process, a plurality of pulley devices 6 are supported by the beam device 5.

その後、ステップS4の手順が行われる。ステップS4では、揚重装置設置工程が行われる。揚重装置設置工程では、本体配置工程と固定体固定工程と引上体連結工程が行われる。 After that, the procedure of step S4 is performed. In step S4, the lifting device installation step is performed. In the lifting device installation step, a main body arranging step, a fixed body fixing step, and a pulling body connecting step are performed.

本体配置工程においては、複数の揚重装置7の各々の本体7aがエレベーター機器3に対して鉛直投影面上の外側で対応した滑車装置6の下方に配置される。固定体固定工程においては、複数の揚重装置7の各々の固定体7bが機械室1の下部において固定される。引上体連結工程においては、複数の揚重装置7の各々の引上体7cが対応した滑車装置6を介してエレベーター機器3に連結される。 In the main body arranging step, each main body 7a of the plurality of lifting devices 7 is arranged below the pulley device 6 corresponding to the elevator device 3 on the outside on the vertical projection surface. In the fixed body fixing step, each fixed body 7b of the plurality of lifting devices 7 is fixed in the lower part of the machine room 1. In the pulling body connecting step, each pulling body 7c of the plurality of lifting devices 7 is connected to the elevator device 3 via the corresponding pulley device 6.

その後、ステップS5の手順が行われる。ステップS5では、支持装置伸長工程が行われる。支持装置伸長工程においては、支持装置4が鉛直方向に伸長される。この際、支持装置4は、梁装置5が機械室1の天井に接触するまで伸長される。その結果、揚重システムのねじれが抑制される。このため、揚重システムの強度が向上する。 After that, the procedure of step S5 is performed. In step S5, the support device extension step is performed. In the support device extension step, the support device 4 is extended in the vertical direction. At this time, the support device 4 is extended until the beam device 5 comes into contact with the ceiling of the machine room 1. As a result, the twisting of the lifting system is suppressed. Therefore, the strength of the lifting system is improved.

その後、ステップS6の手順が行われる。ステップS6では、エレベーター機器引上工程が行われる。エレベーター機器引上工程においては、複数の揚重装置7の各々の引上体7cが本体7aに巻き取られる。その結果、複数の引上体7cは、鉛直線に対して傾斜する方向であって互いに異なる方向にエレベーター機器3を引き合うことによりエレベーター機器3を引き上げながらエレベーター機器3の水平方向の位置を変化させる。 After that, the procedure of step S6 is performed. In step S6, the elevator equipment pulling process is performed. In the elevator equipment pulling process, each pulling body 7c of the plurality of lifting devices 7 is wound around the main body 7a. As a result, the plurality of pulling bodies 7c change the horizontal position of the elevator device 3 while pulling up the elevator device 3 by attracting the elevator devices 3 in directions that are inclined with respect to the vertical line and are different from each other. ..

その後、ステップS7の手順が行われる。ステップS7では、エレベーター機器設置工程が行われる。エレベーター機器設置工程においては、複数の揚重装置7の各々の引上体7cが支持台2の上方においてエレベーター機器3から切り離される。その結果、エレベーター機器3が支持台2に設置される。 After that, the procedure of step S7 is performed. In step S7, the elevator equipment installation process is performed. In the elevator equipment installation process, each of the pulling bodies 7c of the plurality of lifting devices 7 is separated from the elevator equipment 3 above the support base 2. As a result, the elevator device 3 is installed on the support base 2.

以上で説明した実施の形態1によれば、揚重装置7の本体7aは、エレベーター機器3に対して鉛直投影面上の外側で対応した滑車装置6の下方に配置される。このため、揚重装置7の本体7aを揚重システムの上部に配置する必要がない。その結果、機械室1に設置されるエレベーター機器3と機械室1の天井との間の隙間が少ない場合でも、エレベーター機器3の吊り代を最大限に確保することができる。このため、エレベーター機器3をより確実に引き上げることができる。 According to the first embodiment described above, the main body 7a of the lifting device 7 is arranged below the pulley device 6 corresponding to the elevator device 3 on the outside on the vertical projection surface. Therefore, it is not necessary to arrange the main body 7a of the lifting device 7 on the upper part of the lifting system. As a result, even when the gap between the elevator device 3 installed in the machine room 1 and the ceiling of the machine room 1 is small, the suspension allowance of the elevator device 3 can be secured to the maximum. Therefore, the elevator device 3 can be pulled up more reliably.

また、揚重装置7の固定体7bは、支持部材4aの下部に固定される。このため、機械室1に揚重装置7の固定体7bの固定部を設ける必要がない。その結果、揚重システムだけで揚重システムの強度を向上させることができる。 Further, the fixed body 7b of the lifting device 7 is fixed to the lower part of the support member 4a. Therefore, it is not necessary to provide the fixing portion of the fixing body 7b of the lifting device 7 in the machine room 1. As a result, the strength of the lifting system can be improved only by the lifting system.

また、連結具6fは、支持部材6gに移動を規制されるものの返し車6eからの荷重に応じて位置をある程度自由に変化させることができる。このため、固定体7bと引上体7cとに対して返し車6eを平行にすることができる。 Further, although the connector 6f is restricted from moving by the support member 6g, its position can be freely changed to some extent according to the load from the return wheel 6e. Therefore, the return wheel 6e can be made parallel to the fixed body 7b and the pulling body 7c.

実施の形態2.
図5はこの発明の実施の形態2におけるエレベーター機器の揚重システムの滑車装置の側面図である。なお、実施の形態1と同一または相当部分には、同一符号が付される。当該部分の説明は省略される。
Embodiment 2.
FIG. 5 is a side view of the pulley device of the lifting system of the elevator equipment according to the second embodiment of the present invention. The same or corresponding parts as those in the first embodiment are designated by the same reference numerals. The explanation of the relevant part is omitted.

図5に示されるように、滑車装置6は、返し車6aと台座6bとボルト6cとナット6dとを備える。 As shown in FIG. 5, the pulley device 6 includes a return wheel 6a, a pedestal 6b, a bolt 6c, and a nut 6d.

返し車6aは、梁部材5aに対して機械室1の中央の側に隣接する。返し車6aは、図示されない溝を備える。当該溝は、返し車6aの外周面に形成される。台座6bは、返し車6aを回転自在に支持する。ボルト6cは、梁部材5aのいずれかの貫通孔を貫通する。ボルト6cの一側は、台座6bに固定される。ナット6dは、ボルト6cの他側にねじ込まれる。 The return wheel 6a is adjacent to the beam member 5a on the central side of the machine room 1. The return wheel 6a includes a groove (not shown). The groove is formed on the outer peripheral surface of the return wheel 6a. The pedestal 6b rotatably supports the return wheel 6a. The bolt 6c penetrates any through hole of the beam member 5a. One side of the bolt 6c is fixed to the pedestal 6b. The nut 6d is screwed into the other side of the bolt 6c.

滑車装置6に対し、引上体7cは、返し車6aの外周面の溝に巻き掛けられる。返し車6aは、引上体7cからの荷重を受ける。台座6bは、返し車6aからの荷重を受ける。この際、台座6bは、当該荷重に応じてボルト6cを軸として回転する。 With respect to the pulley device 6, the pulling body 7c is wound around a groove on the outer peripheral surface of the return wheel 6a. The return wheel 6a receives the load from the pulling body 7c. The pedestal 6b receives the load from the return wheel 6a. At this time, the pedestal 6b rotates about the bolt 6c according to the load.

以上で説明した実施の形態2によれば、実施の形態1と同様にエレベーター機器3の吊り代を最大限に確保することができる。このため、エレベーター機器3をより確実に引き上げることができる。 According to the second embodiment described above, the suspension allowance of the elevator device 3 can be secured to the maximum as in the first embodiment. Therefore, the elevator device 3 can be pulled up more reliably.

なお、実施の形態1および実施の形態2の揚重システムを巻上機以外のエレベーター機器3に適用してもよい。この場合も、エレベーター機器3をより確実に引き上げることができる。 The lifting system of the first embodiment and the second embodiment may be applied to the elevator equipment 3 other than the hoisting machine. In this case as well, the elevator device 3 can be pulled up more reliably.

また、実施の形態1および実施の形態2において、2つの揚重装置7または4つ以上の揚重装置7を用いてエレベーター機器3を引き上げてもよい。この場合も、エレベーター機器3をより確実に引き上げることができる。 Further, in the first embodiment and the second embodiment, the elevator device 3 may be pulled up by using two lifting devices 7 or four or more lifting devices 7. In this case as well, the elevator device 3 can be pulled up more reliably.

また、実施の形態1および実施の形態2において、鉛直投影面上において四角形以外の多角形の各辺を形成するように複数の梁部材5aを設けてもよい。この場合も、エレベーター機器3をより確実に引き上げることができる。 Further, in the first embodiment and the second embodiment, a plurality of beam members 5a may be provided so as to form each side of a polygon other than a quadrangle on the vertical projection plane. In this case as well, the elevator device 3 can be pulled up more reliably.

1 機械室、 2 支持台、 3 エレベーター機器、 4 支持装置、 4a 支持部材、 4b 連結具材、 5 梁装置、 5a 梁部材、 6 滑車装置、 6a 返し車、 6b 台座、 6c ボルト、 6d ナット、 6e 返し車、 6f 連結具、 6g 支持部材、 6h ナット、 7 揚重装置、 7a 本体、 7b 固定体、 7c 引上体 1 Machine room, 2 Support base, 3 Elevator equipment, 4 Support device, 4a Support member, 4b Connecting material, 5 Beam device, 5a Beam member, 6 Sliding device, 6a Return wheel, 6b Pedestal, 6c bolt, 6d nut, 6e return wheel, 6f connector, 6g support member, 6h nut, 7 lifting device, 7a main body, 7b fixed body, 7c pulling body

Claims (2)

エレベーターの機械室の床面において複数の角部それぞれ立てられる複数の支持部材と、
前記複数の支持部材に対して隣接した支持部材の下部にそれぞれ連結される複数の連結具材と、
前記複数の支持部材に対して隣接した支持部材の上部にそれぞれ連結される複数の梁部材と、
前記機械室の上部において前記機械室の一側に配置された梁部材の一側に支持される第1の滑車装置と、
前記機械室の上部において前記機械室の他側に配置された梁部材の一側に支持される第2の滑車装置と、
前記機械室の上部において前記機械室の一側に配置された梁部材の他側と前記機械室の他側に配置された梁部材の他側とに隣接した梁部材の中央に支持される第3の滑車装置と、
前記第1の滑車装置に対応して設けられる第1の揚重装置と、
前記第2の滑車装置に対応して設けられる第2の揚重装置と、
前記第3の滑車装置に対応して設けられる第3の揚重装置と、
を備え、
前記第1の揚重装置は、
前記機械室の内部のエレベーター機器に対して鉛直投影面上の外側で前記第1の滑車装置の下方に配置される第1の本体と、
前記第1の本体の下部に設けられ、前記機械室の一側に配置された梁部材の一側を支持する支持装置の下部に固定される第1の固定体と、
前記第1の本体の上部から前記第1の滑車装置を介して前記エレベーター機器の上部の中央に連結される第1の引上体と、
を備え、
前記第2の揚重装置は、
前記機械室の内部の前記エレベーター機器に対して鉛直投影面上の外側で前記第2の滑車装置の下方に配置される第2の本体と、
前記第2の本体の下部に設けられ、前記機械室の他側に配置された梁部材の一側を支持する支持装置の下部に固定される第2の固定体と、
前記第2の本体の上部から前記第2の滑車装置を介して前記エレベーター機器の上部の中央に連結される第2の引上体と、
を備え、
前記第3の揚重装置は、
前記機械室の内部の前記エレベーター機器に対して鉛直投影面上の外側で前記第3の滑車装置よりも下方において前記機械室の一側に配置された梁部材の他側を支持する支持装置の側に寄って配置される第3の本体と、
前記第3の本体の下部に設けられ、前記機械室の一側に配置された梁部材の他側を支持する支持装置の下部に固定される第3の固定体と、
前記第3の本体の上部から前記第3の滑車装置を介して前記エレベーター機器の上部の中央に連結される第3の引上体と、
を備えたエレベーター機器の揚重システム。
A plurality of support members to be erected in a plurality of corners in the floor of the elevator machine room,
A plurality of connecting members connected to the lower part of the supporting member adjacent to the plurality of supporting members, and
A plurality of beam members connected to the upper portions of the support members adjacent to the plurality of support members, and
A first pulley device supported on one side of a beam member arranged on one side of the machine room in the upper part of the machine room.
A second pulley device supported on one side of a beam member arranged on the other side of the machine room in the upper part of the machine room.
A first supported in the center of a beam member adjacent to the other side of the beam member arranged on one side of the machine room and the other side of the beam member arranged on the other side of the machine room in the upper part of the machine room. 3 beam devices and
A first lifting device provided corresponding to the first pulley device, and
A second lifting device provided corresponding to the second pulley device, and
A third lifting device provided corresponding to the third pulley device, and
With
The first lifting device is
A first main body located outside the vertical projection plane with respect to the elevator equipment inside the machine room and below the first pulley device.
A first fixed body provided in the lower part of the first main body and fixed to the lower part of a support device for supporting one side of a beam member arranged on one side of the machine room.
A first pulling body connected from the upper part of the first main body to the center of the upper part of the elevator device via the first pulley device.
With
The second lifting device is
A second main body arranged below the second pulley device on the outside on the vertical projection plane with respect to the elevator equipment inside the machine room.
A second fixed body provided in the lower part of the second main body and fixed to the lower part of a support device for supporting one side of the beam member arranged on the other side of the machine room.
A second pulling body connected from the upper part of the second main body to the center of the upper part of the elevator device via the second pulley device.
With
The third lifting device is
A support device that supports the other side of a beam member arranged on one side of the machine room on the outside of the vertical projection plane with respect to the elevator device inside the machine room and below the third pulley device. The third main body, which is placed closer to the side,
A third fixed body provided in the lower part of the third main body and fixed to the lower part of a support device for supporting the other side of the beam member arranged on one side of the machine room.
A third pulling body connected from the upper part of the third main body to the center of the upper part of the elevator device via the third pulley device.
Elevator equipment lifting system equipped with.
エレベーターの機械室の床面において複数の角部複数の支持部材それぞれ立てる支持部材設置工程と、
前記複数の支持部材に対して隣接した支持部材の下部に複数の連結具材をそれぞれ連結する連結具材連結工程と、
前記複数の支持部材に対して隣接した支持部材の上部に複数の梁部材をそれぞれ連結する梁部材連結工程と、
前記機械室の上部において前記機械室の一側に配置された梁部材の一側で第1の滑車装置を支持する第1滑車装置支持工程と、
前記機械室の上部において前記機械室の他側に配置された梁部材の一側で第2の滑車装置を支持する第2滑車装置支持工程と、
前記機械室の上部において前記機械室の一側に配置された梁部材の他側と前記機械室の他側に配置された梁部材の他側とに隣接した梁部材の中央で第3の滑車装置を支持する第3滑車装置支持工程と、
前記第1の滑車装置に対応させて第1の揚重装置を設ける第1揚重装置設置工程と、
前記第2の滑車装置に対応させて第2の揚重装置を設ける第2揚重装置設置工程と、
前記第3の滑車装置に対応させて第3の揚重装置を設ける第3揚重装置設置工程と、
を備え、
前記第1揚重装置設置工程は、
第1の本体を前記機械室の内部のエレベーター機器に対して鉛直投影面上の外側で前記第1の滑車装置の下方に配置させる第1本体配置工程と、
前記第1の本体の下部に設けられた第1の固定体を前記機械室の一側に配置された梁部材の一側を支持する支持装置の下部に固定する第1固定体固定工程と、
第1の引上体を前記第1の本体の上部から前記第1の滑車装置を介して前記エレベーター機器の上部の中央に連結する第1引上体連結工程と、
を備え、
前記第2揚重装置設置工程は、
第2の本体を前記機械室の内部の前記エレベーター機器に対して鉛直投影面上の外側で前記第2の滑車装置の下方に配置させる第2本体配置工程と、
前記第2の本体の下部に設けられた第2の固定体を前記機械室の他側に配置された梁部材の一側を支持する支持装置の下部に固定する第2固定体固定工程と、
第2の引上体を前記第2の本体の上部から前記第2の滑車装置を介して前記エレベーター機器の上部の中央に連結する第2引上体連結工程と、
を備え、
前記第3揚重装置設置工程は、
第3の本体を前記機械室の内部の前記エレベーター機器に対して鉛直投影面上の外側で前記第3の滑車装置よりも下方において前記機械室の一側に配置された梁部材の他側を支持する支持装置の側に寄って配置させる第3本体配置工程と、
前記第3の本体の下部に設けられた第3の固定体を前記機械室の一側に配置された梁部材の他側を支持する支持装置の下部に固定する第3固定体固定工程と、
第3の引上体を前記第3の本体の上部から前記第3の滑車装置を介して前記エレベーター機器の上部の中央に連結する第3引上体連結工程と、
を備えたエレベーター機器の揚重方法。
The support member installation process in which multiple support members are erected at multiple corners on the floor of the elevator machine room,
A connecting tool connecting step of connecting a plurality of connecting tools to the lower part of the supporting member adjacent to the plurality of supporting members, respectively.
A beam member connecting step of connecting a plurality of beam members to the upper part of the support members adjacent to the plurality of support members, respectively.
A first pulley device support step of supporting the first pulley device on one side of a beam member arranged on one side of the machine room in the upper part of the machine room.
A second pulley device support step of supporting the second pulley device on one side of a beam member arranged on the other side of the machine room in the upper part of the machine room.
A third pulley at the center of the beam member adjacent to the other side of the beam member arranged on one side of the machine room and the other side of the beam member arranged on the other side of the machine room in the upper part of the machine room. The third pulley device support process that supports the device, and
A first lifting device installation step of providing a first lifting device corresponding to the first pulley device, and
A second lifting device installation step of providing a second lifting device corresponding to the second pulley device, and
A third lifting device installation step of providing a third lifting device corresponding to the third pulley device, and
With
The first lifting device installation process is
A first main body arranging step of arranging the first main body outside the vertical projection plane with respect to the elevator equipment inside the machine room and below the first pulley device.
A first fixed body fixing step of fixing the first fixed body provided in the lower part of the first main body to the lower part of a support device for supporting one side of a beam member arranged on one side of the machine room.
A first pulling body connecting step of connecting the first pulling body from the upper part of the first main body to the center of the upper part of the elevator device via the first pulley device.
With
The second lifting device installation process is
A second main body arranging step of arranging the second main body on the outside of the vertical projection plane and below the second pulley device with respect to the elevator equipment inside the machine room.
A second fixed body fixing step of fixing the second fixed body provided in the lower part of the second main body to the lower part of the support device for supporting one side of the beam member arranged on the other side of the machine room.
A second pulling body connecting step of connecting the second pulling body from the upper part of the second main body to the center of the upper part of the elevator device via the second pulley device.
With
The third lifting device installation process is
The third main body is placed on the outside of the vertical projection plane with respect to the elevator equipment inside the machine room, below the third pulley device, and on the other side of the beam member arranged on one side of the machine room. The third main body placement process of arranging the support device closer to the side of the support device,
A third fixed body fixing step of fixing the third fixed body provided in the lower part of the third main body to the lower part of the support device for supporting the other side of the beam member arranged on one side of the machine room.
A third pulling body connecting step of connecting the third pulling body from the upper part of the third main body to the center of the upper part of the elevator device via the third pulley device.
How to lift elevator equipment with.
JP2017034554A 2017-02-27 2017-02-27 Elevator equipment lifting system and lifting method Active JP6809289B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017034554A JP6809289B2 (en) 2017-02-27 2017-02-27 Elevator equipment lifting system and lifting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017034554A JP6809289B2 (en) 2017-02-27 2017-02-27 Elevator equipment lifting system and lifting method

Publications (2)

Publication Number Publication Date
JP2018140846A JP2018140846A (en) 2018-09-13
JP6809289B2 true JP6809289B2 (en) 2021-01-06

Family

ID=63527502

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017034554A Active JP6809289B2 (en) 2017-02-27 2017-02-27 Elevator equipment lifting system and lifting method

Country Status (1)

Country Link
JP (1) JP6809289B2 (en)

Also Published As

Publication number Publication date
JP2018140846A (en) 2018-09-13

Similar Documents

Publication Publication Date Title
EP3617127B1 (en) Jump elevator and jumping method
KR102037435B1 (en) Smart gondola supporting
EP2493803B1 (en) Fixing arrangement of a hoisting machine of an elevator and method for installing a hoisting machine of an elevator
KR101349298B1 (en) Crane apparatus for suspension bridge, and method for elevating bridge block for suspension bridge
JP6917948B2 (en) Lifting device for heavy objects and lifting method
JP6809289B2 (en) Elevator equipment lifting system and lifting method
JP6882019B2 (en) How to operate a tower crane
KR101696138B1 (en) Bridge bearing change method
KR101820954B1 (en) Foldable work stage for suspension scaffold
JP6016741B2 (en) Elevator counterweight frame connecting member and method for mounting the same
CN107235413A (en) A kind of component Current Collector Sleave
JP3107363B2 (en) Hanging type lifting device
KR102022512B1 (en) Apparatus for preventing twist of hanger cable
JP6514677B2 (en) In-furnace scaffolding system for boiler maintenance and its installation method
JP2016210605A (en) Occupant conveyor and its renewal method
JP6336225B2 (en) Elevator equipment
JP6845632B2 (en) Seismic isolation device installation method
JP5936503B2 (en) Elevator equipment lifting device and elevator equipment lifting method
JP6218483B2 (en) Elevator main rope fixing device and elevator repair method
JP2005212941A (en) Connecting device for elevator main rope
KR20150114712A (en) Top side lifting apparatus of marine structure
JP6647411B2 (en) Elevator suspension device and method of mounting suspension device
JP7176649B2 (en) Elevator controllers and elevator systems
JP2015006944A5 (en)
JP7358298B2 (en) How to attach a backstay for a boiler

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20191205

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200812

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200818

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200904

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20201110

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20201123

R150 Certificate of patent or registration of utility model

Ref document number: 6809289

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250