JP6818705B2 - Electric power transaction support device and electric power transaction support method - Google Patents
Electric power transaction support device and electric power transaction support method Download PDFInfo
- Publication number
- JP6818705B2 JP6818705B2 JP2018018188A JP2018018188A JP6818705B2 JP 6818705 B2 JP6818705 B2 JP 6818705B2 JP 2018018188 A JP2018018188 A JP 2018018188A JP 2018018188 A JP2018018188 A JP 2018018188A JP 6818705 B2 JP6818705 B2 JP 6818705B2
- Authority
- JP
- Japan
- Prior art keywords
- bid
- electric power
- tag
- support device
- interconnection line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/10—Energy trading, including energy flowing from end-user application to grid
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本発明は、電力の取引を支援する電力取引支援装置および電力取引支援方法に関する。 The present invention relates to an electric power transaction support device and an electric power transaction support method for supporting electric power transactions.
2016年に電力小売全面自由化が始まり、日本卸電力取引所(JEPX:Japan Electric Power Exchange)を通じた電力の取引量は増加の一途をたどっている。日本卸電力取引所では、翌日に受け渡す電力について、1日を30分単位の48個の取引枠に分割し、それぞれの取引枠で取引される電力を商品として取扱って、取引が行われる。 Full liberalization of electricity retailing began in 2016, and the volume of electricity traded through the Japan Electric Power Exchange (JEPX) is steadily increasing. At the Japan Electric Power Exchange, the electricity to be delivered the next day is divided into 48 trading slots in 30-minute units, and the power traded in each trading slot is handled as a commodity for trading.
日本卸電力取引所における市場には、一日前市場と、当日市場とも呼ばれる一時間前市場と、をはじめとした複数の市場がある。一日前市場では、翌日に受け渡す48個の取引枠のそれぞれについて入札を受付け、締切時間までに受け付けた入札に基づいて、翌日の1日分の約定価格および約定量がまとめて決定される。一方、当日市場では、30分単位の商品の対応する時間帯の1時間前まで入札を受付け、商品ごとにザラ場取引が行われる。日本卸電力取引所における上記取引は、コンピュータにより行われており、取引に参加する各電力事業者はインターネットなどを介して入札を行う。 There are several markets on the Japan Electric Power Exchange, including the one-day market and the one-hour market, which is also called the same-day market. In the one-day-ahead market, bids are accepted for each of the 48 trading slots delivered the next day, and the contract price and fixed amount for the next day are collectively determined based on the bids received by the deadline. On the other hand, in the market on the day, bids are accepted up to 1 hour before the corresponding time zone of the product in units of 30 minutes, and the rough market transaction is performed for each product. The above transactions on the Japan Electric Power Exchange are carried out by computer, and each electric power company participating in the transaction bids via the Internet or the like.
下記特許文献1には、一時間前市場への自動入札に関する技術が開示されている。特許文献1は、電力取引市場からの電力調達量の情報と、電力取引市場における約定価格予測と、に基づいて、電力取引市場における入札約定方式に適合した、入札価格と電力調達量との組からなる電力取引市場への入札データを生成する技術を開示している。 Patent Document 1 below discloses a technique relating to automatic bidding on the market one hour ago. Patent Document 1 describes a set of a bid price and an electric power procurement amount suitable for a bid execution method in the electric power trading market based on information on the electric power procurement amount from the electric power trading market and a contract price forecast in the electric power trading market. It discloses a technology for generating bid data for the electric power trading market consisting of.
各電力会社により管轄制御されるエリアをまたいで電力の送電を行う際には、エリア間を結ぶ連系線が用いられる。エリア間の電力の取引が活発化する一方で、連系線の容量の増強は遅れている。各連系線の空容量は電力広域的運営推進機関(以下、広域機関と呼ぶ)により管理されている。 When transmitting electric power across areas controlled by each electric power company, an interconnection line connecting the areas is used. While electricity trading between areas has become more active, the capacity increase of interconnection lines has been delayed. The free capacity of each interconnection line is managed by the OCCTO (hereinafter referred to as the OCCTO).
一時間前市場では、価格および注文量に関して約定条件を満たす売り入札と買い入札との組み合わせがある場合、当該売買に関する託送可否確認が行われる。託送可否確認は、当該売買に対応する電力が連系線を用いて送電可能であるかを日本卸電力取引所から広域機関へ問い合わせることにより行われる。託送可否確認により送電可となった場合、当該売買は約定する。託送可否確認により送電不可となった場合、すなわち対応する連系線に空きがない場合、当該売買は約定せず、対応する売り入札と買い入札とは市場に残る。 In the market one hour ago, if there is a combination of a sell bid and a buy bid that satisfy the contract conditions regarding the price and the order quantity, the possibility of consignment for the sale is confirmed. Confirmation of whether or not the consignment is possible is performed by inquiring from the Japan Electric Power Exchange to a wide-area organization whether the electric power corresponding to the sale or purchase can be transmitted using the interconnection line. If power transmission is possible after confirming the availability of consignment, the sale will be executed. If power transmission is not possible due to confirmation of consignment availability, that is, if there is no vacancy in the corresponding interconnection line, the sale is not executed and the corresponding sell bid and buy bid remain in the market.
一方、連系線の空容量は変化する可能性がある。したがって、上記の託送可否確認で連系線に空きがなく送電不可となった場合でも、その後に送電可能となる可能性がある。しかしながら、託送可否確認は、約定条件を満たす売り入札と買い入札との組み合わせがあると判断された時点でしか実施されないため、その後に、実際には連系線に空きが生じて送電可能となっても、当該売買は約定しないままとなる。このため、実際には約定可能であるにもかかわらず約定機会が失われてしまうという問題があった。 On the other hand, the free capacity of the interconnection line may change. Therefore, even if there is no vacancy in the interconnection line and power transmission is not possible due to the above confirmation of consignment availability, power transmission may be possible after that. However, since the confirmation of whether or not the item can be sent is performed only when it is determined that there is a combination of a sell bid and a buy bid that satisfy the contract conditions, the interconnection line actually becomes vacant and power transmission becomes possible. However, the sale remains uncontracted. For this reason, there is a problem that the contract opportunity is lost even though the contract can be actually executed.
本発明は、上記に鑑みてなされたものであって、電力取引において約定機会を増やすことができる電力取引支援装置を得ることを目的とする。 The present invention has been made in view of the above, and an object of the present invention is to obtain an electric power transaction support device capable of increasing contract opportunities in electric power transactions.
上述した課題を解決し、目的を達成するために、本発明にかかる電力取引支援装置は、第1の札が、電力取引市場に入札されてから一定時間経過するまでの間に約定しない場合、1つ以上の連系線の空容量を監視し、1つ以上の連系線の空容量に基づいて1つ以上の連系線の混雑状態の変化の有無を判断する空容量監視部、を備える。電力取引支援装置は、さらに、空容量監視部により、1つ以上の連系線の混雑状態が変化したと判断された場合、第1の札を再入札する再入札部、を備える。 In order to solve the above-mentioned problems and achieve the object, the electric power trading support device according to the present invention does not execute the contract within a certain period of time after the first bid is bid on the electric power trading market. An empty capacity monitoring unit that monitors the empty capacity of one or more interconnection lines and determines whether or not the congestion state of one or more interconnection lines has changed based on the empty capacity of one or more interconnection lines. Be prepared. The electric power transaction support device further includes a re-bidding unit that re-bids the first bid when it is determined by the empty capacity monitoring unit that the congestion state of one or more interconnection lines has changed.
本発明によれば、電力取引において約定機会を増やすことができるという効果を奏する。 According to the present invention, there is an effect that contract opportunities can be increased in electric power trading.
以下に、本発明の実施の形態にかかる電力取引支援装置および電力取引支援方法を図面に基づいて詳細に説明する。なお、この実施の形態によりこの発明が限定されるものではない。 Hereinafter, the electric power transaction support device and the electric power transaction support method according to the embodiment of the present invention will be described in detail with reference to the drawings. The present invention is not limited to this embodiment.
実施の形態1.
図1は、本発明の実施の形態1にかかる事業者システムを含む全体システムの構成例を示す図である。本実施の形態では、本発明にかかる電力取引支援装置が図1に示す事業者システム1内に設けられる例を説明する。
Embodiment 1.
FIG. 1 is a diagram showing a configuration example of an entire system including a business operator system according to a first embodiment of the present invention. In the present embodiment, an example in which the electric power transaction support device according to the present invention is provided in the business operator system 1 shown in FIG. 1 will be described.
図1に示す電力取引システム4は、電力の取引を行うシステムであり、日本卸電力取引所をはじめとした電力取引所により設置されて管理される。電力取引システム4は、1つ以上のコンピュータにより実現される。 The electric power trading system 4 shown in FIG. 1 is a system for trading electric power, and is installed and managed by the Japan Electric Power Exchange and other electric power exchanges. The power trading system 4 is realized by one or more computers.
電力取引システム4は、取引処理部41、通信部42および記憶部43を備える。通信部42は、通信回線3を介して他の装置との間で通信を行う。記憶部43は、電力取引に関する各種情報である取引情報、および連系線に関する情報である連系線情報を記憶可能である。取引処理部41は、電力取引市場における取引を実現する。また、取引処理部41は、広域機関システム5から連系線情報を受信し、連系線情報を記憶部43に格納する。連系線情報には、連系線ごとの空容量が含まれる。また、取引処理部41は、他の装置から、通信回線3および通信部42を介して受信した要求に応じて、連系線情報および取引情報のうちの少なくとも一部を、要求元の装置へ、通信部42および通信回線3を介して送信する。取引情報および取引処理部41による処理の詳細については後述する。
The electric power trading system 4 includes a transaction processing unit 41, a
図1に示す事業者システム1は、本発明にかかる電力取引支援装置を備えるシステムであり、電力取引市場に入札する電力事業者等により設置され管理される。事業者システム1は、通信回線3を介して電力取引システム4に接続される。通信回線3は、例えば、インターネットであるがインターネットに限定されず専用線ネットワークなどであってもよい。事業者システム1は、1つ以上のコンピュータにより実現される。 The business operator system 1 shown in FIG. 1 is a system including the electric power trading support device according to the present invention, and is installed and managed by an electric power business operator or the like who bids on the electric power trading market. The operator system 1 is connected to the electric power trading system 4 via the communication line 3. The communication line 3 is, for example, the Internet, but is not limited to the Internet and may be a dedicated line network or the like. The operator system 1 is realized by one or more computers.
図1に示す事業者システム2−1,2−2は、電力取引市場に入札する電力事業者等により設置され管理される。事業者システム1,2−1,2−2はそれぞれ別の事業者により設置される。事業者システム2−1,2−2は、通信回線3を介して電力取引システム4に接続される。事業者システム2−1,2−2は、それぞれ1つ以上のコンピュータにより実現される。事業者システム2−1,2−2は、電力取引システム4に対して、自動入札を行う機能を有していてもよいし、使用者からの入力により電力取引システム4にアクセス可能な一般的なコンピュータシステムであってもよい。また、事業者システム2−1,2−2のうちの少なくとも1つが事業者システム1と同様の機能を有していてもよい。 The operator systems 2-1 and 2-2 shown in FIG. 1 are installed and managed by an electric power operator or the like who bids on the electric power trading market. The operator systems 1, 2-1 and 2-2 are installed by different operators. The operator systems 2-1 and 2-2 are connected to the electric power trading system 4 via the communication line 3. The operator systems 2-1 and 2-2 are each realized by one or more computers. The business operator systems 2-1 and 2-2 may have a function of automatically bidding on the electric power trading system 4, and are generally accessible to the electric power trading system 4 by input from the user. Computer system may be used. Further, at least one of the operator systems 2-1 and 2-2 may have the same function as the operator system 1.
広域機関システム5は、広域機関により設置され管理される。広域機関システム5は、1つ以上のコンピュータにより実現される。広域機関システム5は、連系線管理部51、記憶部52および通信部53を備える。連系線管理部51は、各電力事業者より、発電、需要および連系線の利用に関する計画を受付け、受け付けた計画に基づいて各連系線に関する情報を連系線情報として記憶部52に格納する。連系線情報には、連系線ごとの空容量が含まれる。各電力事業者から計画を受け付ける方法は、通信により受信する方法であってもよいし、書面などにより提出された計画を広域機関システム5の運用者などが入力する方法であってもよい。通信部53は、電力取引システム4との間で通信を行う。広域機関システム5と電力取引システム4との間の通信回線は、専用回線であってもよいし、インターネットなどであってもよい。
The
また、広域機関システム5は、電力取引システム4から後述する託送可否確認を受信した場合、記憶部52に格納されている連系線情報に基づいて送電の可否を判定して、判定結果を電力取引システム4へ送信する。また、広域機関システム5は、電力取引システム4へ記憶部52に記憶されている連系線情報を送信する。広域機関システム5から電力取引システム4へ連系線情報が送信されるタイミングは、一定周期ごとであってもよいし、または連系線情報が更新されたときなどであってもよい。
Further, when the wide
図1に示した例では、電力取引システム4に3つの事業者システムが通信回線3を介して接続されているが、電力取引システム4に接続される事業者システムの数は3つに限定されず、本発明にかかる事業者システム1が電力取引システム4に1つ以上接続され、電力取引システム4に接続される事業者システムの数が複数であればよい。 In the example shown in FIG. 1, three business operator systems are connected to the electric power trading system 4 via the communication line 3, but the number of business operator systems connected to the electric power trading system 4 is limited to three. However, one or more business operator systems 1 according to the present invention may be connected to the electric power trading system 4, and the number of business operator systems connected to the electric power trading system 4 may be plural.
図2は、事業者システム1の構成例を示す図である。図2に示すように、入札処理装置11と電力取引支援装置12とを備える。入札処理装置11は、電力取引システム4に入札札に対応するデータを送信することにより電子的に入札を行い、電力取引システム4から入札の結果を受信する。入札処理装置11が行う入札の方法には特に制約はなく、どのような方法を用いてもよい。例えば、あらかじめ定めた条件に基づいて自動的に入札札に対応するデータを生成して、データを電力取引システム4へ送信する方法であってもよいし、事業者システム1の使用者からの入力を受け付けて、入力に基づいて入札札に対応するデータを生成して、データを電力取引システム4へ送信する方法であってもよい。
FIG. 2 is a diagram showing a configuration example of the operator system 1. As shown in FIG. 2, the
図3は、電力取引支援装置12の構成例を示す図である。電力取引支援装置12は、通信部121、板情報監視部122、空容量監視部123および再入札部124を備える。通信部121は、通信回線3を介して電力取引システム4との間で通信を行う。板情報監視部122は、通信部121および通信回線3を介して、電力取引システム4から、商品ごとの入札札の情報である板情報を取得し、取得した板情報を監視する。すなわち、板情報監視部122は、電力取引市場を監視する市場監視部である。空容量監視部123は、通信部121および通信回線3を介して、電力取引システム4から連系線情報を取得し、連系線情報に含まれる連系線の空容量を監視する。再入札部124は、空容量監視部123からの指示に基づいて再入札を行う。電力取引支援装置12における処理の詳細については後述する。
FIG. 3 is a diagram showing a configuration example of the electric power transaction support device 12. The electric power transaction support device 12 includes a
入札処理装置11と電力取引支援装置12とは、それぞれが個別のコンピュータシステムにより実現されてもよいし、1つのコンピュータにより入札処理装置11と電力取引支援装置12とが実現されてもよい。1つのコンピュータにより入札処理装置11と電力取引支援装置12とが実現される場合、電力取引支援装置12の通信部121と、入札処理装置11の図示しない通信部とは、1つの通信部により実現されてもよい。
The
ここで、本実施の形態の電力取引支援装置12を実現するコンピュータシステムについて説明する。本実施の形態の電力取引支援装置12は、コンピュータシステム上で、電力取引支援装置12における処理が記述されたプログラムである電力取引支援プログラムが実行されることにより、コンピュータシステムが電力取引支援装置12として機能する。図4は、本実施の形態の電力取引支援装置12を実現するコンピュータシステムの構成例を示す図である。図4に示すように、このコンピュータシステムは、制御部101と入力部102と記憶部103と表示部104と通信部105と出力部106とを備え、これらはシステムバス107を介して接続されている。
Here, a computer system that realizes the electric power transaction support device 12 of the present embodiment will be described. In the electric power transaction support device 12 of the present embodiment, the computer system is executed by the electric power transaction support device 12 which is a program in which the processing in the electric power transaction support device 12 is described on the computer system. Functions as. FIG. 4 is a diagram showing a configuration example of a computer system that realizes the electric power transaction support device 12 of the present embodiment. As shown in FIG. 4, this computer system includes a
図4において、制御部101は、例えば、CPU(Central Processing Unit)等であり、本実施の形態の電力取引支援装置12における処理が記述された電力取引支援プログラムを実行する。入力部102は、たとえばキーボード、マウスなどで構成され、コンピュータシステムの使用者が、各種情報の入力を行うために使用する。記憶部103は、RAM(Random Access Memory),ROM(Read Only Memory)などの各種メモリおよびハードディスクなどのストレージデバイスを含み、上記制御部101が実行すべきプログラム,処理の過程で得られた必要なデータ,などを記憶する。また、記憶部103は、プログラムの一時的な記憶領域としても使用される。表示部104は、LCD(液晶表示パネル)などで構成され、コンピュータシステムの使用者に対して各種画面を表示する。通信部105は、通信処理を実施する受信機および送信機である。出力部106は、プリンタなどである。なお、図4は、一例であり、コンピュータシステムの構成は図4の例に限定されない。
In FIG. 4, the
ここで、本実施の形態の電力取引支援プログラムが実行可能な状態になるまでのコンピュータシステムの動作例について説明する。上述した構成をとるコンピュータシステムには、たとえば、図示しないCD(Compact Disc)−ROMまたはDVD(Digital Versatile Disc)−ROMドライブにセットされたCD−ROMまたはDVD−ROMから、電力取引支援プログラムが記憶部103にインストールされる。そして、電力取引支援プログラムの実行時に、記憶部103から読み出された電力取引支援プログラムが記憶部103に格納される。この状態で、制御部101は、記憶部103に格納されたプログラムに従って、本実施の形態の電力取引支援装置12としての処理を実行する。
Here, an operation example of the computer system until the electric power transaction support program of the present embodiment becomes executable will be described. In the computer system having the above-described configuration, for example, a power transaction support program is stored from a CD-ROM or DVD-ROM set in a CD (Compact Disc) -ROM or DVD (Digital Versatile Disc) -ROM drive (not shown). It is installed in
なお、上記の説明においては、CD−ROMまたはDVD−ROMを記録媒体として、電力取引支援装置12における処理を記述したプログラムを提供しているが、これに限らず、コンピュータシステムの構成、提供するプログラムの容量などに応じて、たとえば、通信部105を経由してインターネットなどの伝送媒体により提供されたプログラムを用いることとしてもよい。
In the above description, a program describing processing in the power transaction support device 12 is provided using a CD-ROM or a DVD-ROM as a recording medium, but the present invention is not limited to this, and the configuration and provision of a computer system are provided. Depending on the capacity of the program and the like, for example, a program provided by a transmission medium such as the Internet via the
図3に示した板情報監視部122、空容量監視部123および再入札部124は、図4の制御部101により実現される。また、板情報監視部122、空容量監視部123および再入札部124の実現には、記憶部103も用いられる。図3に示した通信部121は、図4に示した通信部105により実現される。
The board
入札処理装置11、電力取引システム4および広域機関システム5についても、同様に、コンピュータシステムにより実現される。なお、入札処理装置11、電力取引支援装置12、電力取引システム4および広域機関システム5は、それぞれが複数のコンピュータシステムにより実現されてもよい。また、上述したように、入札処理装置11および電力取引支援装置12が1つのコンピュータにより実現されてもよい。
The
ここで、本実施の形態において前提となる電力取引について説明する。本実施の形態では、日本卸電力取引所により開設される当日市場のように、ザラ場方式により約定する電力取引市場を前提とする。ザラ場方式では、売り入札と買い入札とで、価格および注文量が合致すれば約定の処理に進む。電力取引の場合、売り入札と買い入札とで、価格および注文量が合致すると、この売買で用いられる連系線を用いて電力を送ることができるかどうかの確認である託送可否確認が行われ、託送可否確認より送電可となった場合に、約定する。 Here, the electric power transaction that is a prerequisite in the present embodiment will be described. In this embodiment, it is premised on an electric power trading market that is executed by the rough market method, such as the same-day market opened by the Japan Electric Power Exchange. In the Zaraba method, if the price and order quantity match between the sell bid and the buy bid, the execution process proceeds. In the case of electric power trading, if the price and order quantity match between the sell bid and the buy bid, a consignment availability confirmation is performed, which is a confirmation of whether or not electric power can be transmitted using the interconnection line used in this sale and purchase. , If power transmission is possible after confirming the availability of consignment, a contract will be made.
以下では、日本卸電力取引所により開設される一時間前市場を例に本実施の形態の動作を説明する。なお、本発明は、日本卸電力取引所により開設される当日市場に限定されず、ザラ場方式により約定する電力取引市場であり連系線を用いて電力を送ることができるかの確認が行われた後に約定する電力取引市場であれば、他の電力取引市場にも適用可能である。 In the following, the operation of this embodiment will be described by taking as an example the one-hour-old market opened by the Japan Electric Power Exchange. It should be noted that the present invention is not limited to the same-day market established by the Japan Electric Power Exchange, but it is a power trading market that is contracted by the rough field method, and it is confirmed whether power can be transmitted using an interconnection line. It can be applied to other electricity trading markets as long as it is a power trading market that is executed after it is closed.
図5は、一時間前市場における商品の一例を示す図である。図5に示すように、1日を30分単位の取引枠に分割し、各取引枠が1つの商品として扱われる。したがって、各商品は、日と時間帯によって識別される。図5では、日と時間帯により識別される取引枠を商品名と記載している。なお、以下では、日本卸電力取引所により開設される一時間前市場を前提として取引枠を30分単位としているが、取引枠が30分単位以外の単位であっても、本発明は適用可能である。 FIG. 5 is a diagram showing an example of a product in the market one hour ago. As shown in FIG. 5, one day is divided into trading slots in units of 30 minutes, and each trading slot is treated as one product. Therefore, each product is identified by day and time zone. In FIG. 5, the transaction quota identified by the day and time zone is described as the product name. In the following, the trading quota is set to 30-minute units on the premise of the market one hour before the opening by the Japan Electric Power Exchange, but the present invention can be applied even if the trading quota is a unit other than 30-minute units. Is.
次に、電力取引システム4の取引処理部41における処理について説明する。取引処理部41は、通信部42を介して、各商品に関する入札札を示すデータを事業者システム1,2−1,2−2から受信する。以下、入札札を示すデータを単に入札札とも称する。入札札には、売り入札の入札札と買い入札の入札札との2種類がある。商品ごとの入札札の一覧は板情報と呼ばれ、板情報は取引情報の一部として記憶部43に格納される。
Next, the processing in the transaction processing unit 41 of the electric power transaction system 4 will be described. The transaction processing unit 41 receives data indicating a bid tag for each product from the business operator systems 1, 2-1 and 2-2 via the
取引処理部41は、商品ごとの入札札を監視し、価格および量が合致する売り入札と買い入札との組み合わせがある場合、託送可否確認を行う。具体的には、取引処理部41は、通信部42を介して広域機関システム5へ当該売買に対応する電力を、連系線を用いて送ることができるかどうかを問い合わせ、問い合わせの結果を広域機関システム5から受信する。取引処理部41は、託送可否確認により送電可となった場合、当該売買を約定させ、入札札に基づいて、約定条件を満たす売買を約定させ、約定した旨を示す通知を、通信部42を介して対応する事業者システムに送信する。
The transaction processing unit 41 monitors the bid tags for each product, and if there is a combination of a sell bid and a buy bid that match the price and quantity, confirms whether or not the bid can be sent. Specifically, the transaction processing unit 41 inquires to the
図6は、板情報の一例を示す図である。図6には、2017/8/1の10:00−10:30の時間帯に関する板情報の一例が示されている。図6の1行が1つの入札札に対応している。図6に示される入札札のうち最上段の入札札である入札札Aは、事業者システム1により入札された入札札である。入札札Aは、売買の種別は売であり、注文量は50kWhであり、入札価格は13円/kWhである。図6に示される入札札のうち2段目の入札札は、事業者システム2−1により入札された入札札であり、売買の種別は買であり、注文量は50kWhであり、入札価格は13円/kWhである。図6に示される入札札のうち3段目の入札札は、事業者システム2−2により入札された入札札であり、売買の種別は売であり、注文量は50kWhであり、入札価格は15円/kWhである。図6に示した板情報では、最上段の入札札と2段目の入札札とは、価格すなわち入札価格と注文量とは合致しており、価格および注文量の観点からは約定可能である。また、各入札札には、図6で図示は省略しているが、入札した事業者を識別する情報と、入札した時刻である入札時刻とが含まれている。 FIG. 6 is a diagram showing an example of board information. FIG. 6 shows an example of board information regarding the time zone from 10:00 to 10:30 on August 1, 2017. One line in FIG. 6 corresponds to one bid tag. Among the bid tags shown in FIG. 6, the bid tag A, which is the uppermost bid tag, is a bid tag bid by the business operator system 1. The bid tag A has a type of sale, an order quantity of 50 kWh, and a bid price of 13 yen / kWh. Of the bids shown in FIG. 6, the second bid is a bid bid by the business operator system 2-1. The type of buying and selling is buy, the order quantity is 50 kWh, and the bid price is It is 13 yen / kWh. Of the bids shown in FIG. 6, the third bid is a bid bid by the business operator system 2-2, the type of sale is sell, the order amount is 50 kWh, and the bid price is It is 15 yen / kWh. In the board information shown in FIG. 6, the top bid and the second bid match the price, that is, the bid price and the order quantity, and can be executed from the viewpoint of the price and the order quantity. .. Further, although not shown in FIG. 6, each bid tag includes information for identifying the bidding business operator and a bidding time, which is the bidding time.
図7は、事業者システム1,2−1、電力取引システム4および広域機関システム5における電力取引処理の一例を示すシーケンス図である。広域機関システム5は、連系線情報を電力取引システム4へ送信する(ステップS1)。電力取引システム4は、連系線情報を受信すると記憶部43に格納する。電力取引システム4は、各事業者システムからの要求に応じて連系線情報を各事業者システムへ送信可能である。
FIG. 7 is a sequence diagram showing an example of electric power transaction processing in the operator systems 1 and 2, the electric power trading system 4, and the wide
事業者システム1の入札処理装置11が入札札Aを電力取引システム4へ送信する(ステップS2)。入札札Aは、図6に示す入札札Aであるとする。次に、事業者システム2−1は、入札札Bを電力取引システム4へ送信する(ステップS3)。入札札Bは図6に示す2段目の入札札であるとする。電力取引システム4は、入札札Aと入札札Bとが価格および注文量で約定条件が合致すると判断し(ステップS4)、当該売買に関する託送可否確認を行う(ステップS5)。具体的には、電力取引システム4は、入札札Aと入札札Bとに対応する事業者を特定し、この事業者間での電力の受け渡しに用いられる連系線で対応する注文量の電力を送ることができるかを広域機関システム5へ問合わせ、広域機関システム5から問い合わせの結果、すなわち送電可否の判定結果を受信する。なお、電力取引システム4は、託送可否確認では、注文量だけを指定して、全ての連系線に関する送電可否の判定結果を受領するようにしてもよいし、対応する連系線を指定して託送可否確認を行ってもよい。前者の場合、判定結果を受領すると、電力取引システム4は、受領した判定結果のうち、該当する売買に対応する連系線の判定結果に基づいて送電可否を判断する。
The
託送可否確認により送電可であった場合(ステップS6 Yes)、電力取引システム4は、入札札Aと入札札Bとに対応する売買を約定させる(ステップS7)。託送可否確認により送電不可であった場合(ステップS6 No)、電力取引システム4は、入札札Aと入札札Bとに対応する売買を約定させないため、入札札Aと入札札Bとは電力取引市場に残ったままとなる。その後、広域機関システム5は、再度、連系線情報を電力取引システム4へ送信する(ステップS8)。広域機関システム5は、上述した通り、定期的、または連系線情報に変化があったときなどに連系線情報を電力取引システム4へ送信する。
When power transmission is possible by confirming whether or not the item can be sent (step S6 Yes), the electric power trading system 4 makes a contract for the sale and purchase corresponding to the bid tag A and the bid tag B (step S7). When power transmission is not possible due to confirmation of consignment availability (step S6 No), the electric power trading system 4 does not execute the sale and purchase corresponding to the bid tag A and the bid tag B, so that the bid tag A and the bid tag B are used for electric power transaction. It remains on the market. After that, the wide
ここで、ステップS6でNoとなった場合に、その後、連系線の状態が変化し、入札札Aと入札札Bとに対応する売買で用いる連系線に空きが生じる場合がある。連系線の空容量は、約定の結果によっても変化するが、空容量が増えることもある。例えば、当日になって供給先における需要の減少が見込まれ、予定していた電力量よりも送電量を減らすことになった場合、発電所のトラブルにより予定していた送電ができなくなり送電量が減る場合などには連系線の空容量が増えることになる。これらの連系線の使用計画の変更は随時事業者から通知され、広域機関システム5における連系線情報に反映される。
Here, if No is obtained in step S6, the state of the interconnection line may change thereafter, and a vacancy may occur in the interconnection line used for trading corresponding to the bid tag A and the bid tag B. The free capacity of the interconnection line varies depending on the result of the contract, but the free capacity may increase. For example, if the demand at the supply destination is expected to decrease on the day and the amount of power transmission is reduced from the planned amount, the planned power transmission will not be possible due to a trouble at the power plant and the amount of power transmission will be reduced. If it decreases, the free capacity of the interconnection line will increase. Changes in the usage plan of these interconnection lines will be notified from the operator at any time and will be reflected in the interconnection line information in the
例えば、上記のステップS8で送信された連系線情報では、入札札Aと入札札Bとに対応する売買で用いる連系線の空容量が増えており、入札札Aと入札札Bとに対応する売買に対応する託送が可能な空容量となっていたとする。このような場合でも、電力取引システム4は、入札札Aと価格および注文量で約定条件が合致する入札札Bがあると判断した時点でしか、託送可否確認を行わないため、入札札Aと入札札Bとは約定せずに電力取引市場に残ったままとなる。 For example, in the interconnection line information transmitted in step S8 above, the empty capacity of the interconnection line used for trading corresponding to the bid tag A and the bid tag B is increasing, and the bid tag A and the bid tag B It is assumed that the empty capacity is available for consignment corresponding to the corresponding sale and purchase. Even in such a case, the electric power trading system 4 confirms whether or not the bid can be sent only when it is determined that there is a bid tag A and a bid tag B whose price and order quantity match the contract conditions. It remains in the electricity trading market without a contract with bid tag B.
本実施の形態では、上記のような場合に、約定する機会を増やせるように、電力取引支援装置12において連系線の空容量を監視し、空容量に基づいて、再入札を行う。具体的には、空容量監視部123は、第1の札が、電力取引市場に入札されてから一定時間経過するまでの間に約定しない場合、1つ以上の連系線の空容量を監視し、1つ以上の連系線の空容量に基づいて1つ以上の連系線の混雑状態の変化の有無を判断する。再入札部124は、空容量監視部123により、1つ以上の連系線の混雑状態が変化したと判断された場合、第1の札を再入札する。第1の札の一例は、事業者システム1により入札された買い入札または売り入札の入札札である。本実施の形態では、混雑状態の変化の判断の対象となる1つ以上の連系線は、電力取引市場における取引で用いられる可能性のある全ての連系線である。以下、本実施の形態の電力取引支援装置12の動作について説明する。 In the present embodiment, in the above case, the power transaction support device 12 monitors the free capacity of the interconnection line and re-bids based on the free capacity so that the chances of making a contract can be increased. Specifically, the free capacity monitoring unit 123 monitors the free capacity of one or more interconnection lines when the first tag is not executed within a certain period of time after being bid on the electric power trading market. Then, it is determined whether or not there is a change in the congestion state of one or more interconnection lines based on the empty capacity of one or more interconnection lines. The re-bid unit 124 re-bids the first bid when it is determined by the empty capacity monitoring unit 123 that the congestion state of one or more interconnection lines has changed. An example of the first bid is a bid bid or sell bid bid bid by the business operator system 1. In the present embodiment, the one or more interconnection lines to be determined for the change in the congestion state are all the interconnection lines that may be used in the transaction in the electric power trading market. Hereinafter, the operation of the electric power transaction support device 12 of the present embodiment will be described.
図8は、本実施の形態の電力取引支援装置12における処理手順の一例を示すフローチャートである。図8は、1つの商品に関する処理を示しているが、電力取引支援装置12は、商品ごとに図8に示した処理を実施する。まず、板情報監視部122は、1つの商品の板情報を監視する(ステップS11)。具体的には、板情報監視部122は、定期的にまたは板情報に変化があった場合に、板情報を電力取引システム4から取得する。板情報は、電力取引市場において入札されている入札札の情報であり、上述したように、電力取引システム4が保持している取引情報の一部である。電力取引システム4は、各事業者システムからの要求に応じて、対応する情報を要求元の事業者システムへ送信する。
FIG. 8 is a flowchart showing an example of a processing procedure in the electric power transaction support device 12 of the present embodiment. FIG. 8 shows the processing related to one product, but the electric power transaction support device 12 performs the processing shown in FIG. 8 for each product. First, the board
次に、板情報監視部122は、一定時間以上約定しない入札札、すなわち事業者システム1が入札してから一定時間以上経過しておりかつ約定していない入札札があるか否かを判断する(ステップS12)。板情報監視部122は、事業者システム1が入札した入札札に関する情報は、板情報から取得してもよいし、入札処理装置11から取得してもよい。
Next, the board
一定時間以上約定しない入札札がある場合(ステップS12 Yes)、板情報監視部122は、市場に約定条件と合致する札が有るかを判断する(ステップS13)。具体的には、板情報監視部122は、一定時間以上約定していないと判断された入札札と、価格および注文量において約定条件が合致する入札札が板情報にあるかを判断する。すなわち、板情報監視部122は、第1の札が、入札されてから一定時間経過するまでの間に約定しない場合、第1の札と約定条件が合致している第2の札が電力取引市場に存在するか否かを監視する。
When there is a bid bid that is not executed for a certain period of time or more (step S12 Yes), the board
市場に約定条件と合致する札が有る場合(ステップS13 Yes)、板情報監視部122は空容量監視部123へ連系線の空容量の監視を指示し、空容量監視部123が連系線の空容量を監視する(ステップS14)。具体的には、例えば、空容量監視部123は定期的に電力取引システム4から連系線情報を取得し、空容量の監視を指示されると、連系線情報に含まれる連系線の空容量の監視を開始する。
When there is a tag in the market that matches the contract conditions (step S13 Yes), the board
空容量監視部123は、監視の開始から、規定時間内に連系線の混雑が解消したか否かを判断する(ステップS15)。具体的には、空容量監視部123は、全連系線において、一定時間以上約定しない入札札である第1の札における注文量に対応する空容量が確保できた場合に連系線の混雑が解消したと判断する。すなわち、空容量監視部123は、全連系線の空容量が、それぞれ第1の札における注文量以上となった場合に、混雑状態が変化したと判断する。このように、ステップS15では、連系線の空容量に基づいて連系線の混雑状態の変化の有無を判断する。 The free capacity monitoring unit 123 determines whether or not the congestion of the interconnection line has been resolved within the specified time from the start of monitoring (step S15). Specifically, the empty capacity monitoring unit 123 is congested when the empty capacity corresponding to the order quantity in the first bid, which is a bid tag that is not executed for a certain period of time or more, can be secured in all the interconnection lines. Is determined to have been resolved. That is, the empty capacity monitoring unit 123 determines that the congestion state has changed when the empty capacity of all the interconnection lines exceeds the order amount in the first tag. As described above, in step S15, it is determined whether or not there is a change in the congestion state of the interconnection line based on the empty capacity of the interconnection line.
規定時間内に連系線の混雑が解消したと判断した場合(ステップS15 Yes)、空容量監視部123は再入札部124へ再入札を指示し、再入札部124が再入札を実施し(ステップS16)、処理を終了する。具体的には、再入札部124は、一定時間以上約定しない入札札を取り下げ、該入札札と同じ内容の入札札を再度電力取引システム4へ送信する。なお、再入札部124が取り下げおよび再入札を行うかわりに、空容量監視部123が再入札を入札処理装置11に指示し、入札処理装置11が、指示に基づいて取り下げおよび再入札を行ってもよい。
When it is determined that the congestion of the interconnection line has been resolved within the specified time (step S15 Yes), the empty capacity monitoring unit 123 instructs the re-bidding unit 124 to re-bid, and the re-bidding unit 124 re-bids (step S15 Yes). Step S16), the process ends. Specifically, the re-bid unit 124 withdraws the bid bids that are not executed for a certain period of time or longer, and transmits the bid bids having the same contents as the bid bids to the electric power trading system 4 again. Instead of the re-bidding unit 124 withdrawing and re-bidding, the empty capacity monitoring unit 123 instructs the
ステップS12でNoの場合、ステップS13でNoの場合、およびステップS15でNoの場合は、そのまま処理を終了する。 If No in step S12, No in step S13, and No in step S15, the process ends as it is.
なお、ステップS14で連系線の監視を行っている間も、板情報監視部122が板情報の監視を続け、一定時間以上約定しない入札札に約定条件が合致する入札札が板情報に存在しなくなった場合には、連系線の監視を停止するとともに、処理を終了してもよい。すなわち、第2の札が電力取引市場に存在しなくなると、空容量監視部123は、連系線の空容量の監視を停止するようにしてもよい。
While the interconnection line is being monitored in step S14, the board
次に、具体的を挙げて、電力取引支援装置12の動作を説明する。図6に示したように、2017/8/1の10:00−10:30の時間帯に関して、事業者システム1が、注文量50kWhおよび入札価格13円/kWhの売り入札である入札札Aを入札しており、その後に、板情報に図6の2段目に示すように、注文量50kWhおよび入札価格13円/kWhの買い入札の入札札Bが入札されたとする。入札札Bが入札されると、電力取引システム4は、上述したステップS4およびステップS5を実施する。 Next, the operation of the electric power transaction support device 12 will be described specifically. As shown in FIG. 6, for the time zone from 10:00 to 10:30 on August 1, 2017, the business operator system 1 bids A for a bid with an order quantity of 50 kWh and a bid price of 13 yen / kWh. After that, as shown in the second row of FIG. 6 in the board information, it is assumed that the bid tag B of the buy bid with the order amount of 50 kWh and the bid price of 13 yen / kWh is bid. When the bid tag B is bid, the electric power trading system 4 executes the above-mentioned steps S4 and S5.
図9は、図7に示すステップS5の託送可否確認における連系線の空容量の一例を示す図である。図9において、情報202は、2017/8/1の10:00−10:30の時間帯の各連系線の空容量を示す。図9に示すように、連系線#1から連系線#4のうち連系線#1および連系線#3は空容量が100kWであり、連系線#2は空容量が200kWであり、連系線#4は空容量が0kWであったとする。なお、以下では、連系線の総数が4であるとして説明するが、連系線の数はこれに限定されない。託送可否確認において、注文量50kWhを指定して、全ての連系線に関する送電可否の判定結果を受領する場合、電力取引システム4は図10に示す判定結果を広域機関システム5から受領することになる。
FIG. 9 is a diagram showing an example of the empty capacity of the interconnection line in the confirmation of whether or not the transfer is possible in step S5 shown in FIG. In FIG. 9,
図10は、託送可否確認における判定結果の一例を示す図である。図10に示すように、連系線#1から連系線#3までは、0.5時間(30分)×空容量が50kWh以上であるため、注文量50kWhの送電が可能であるが、連系線#4は注文量50kWhの送電ができない。したがって、入札札Aは約定せずに電力取引市場に残ったままとなる。本実施の形態の電力取引支援装置12は、このような場合、入札してから一定時間以上入札札Aが約定しないため、上述した通り、連系線の空容量を監視する。図11は、図9に示した状態から連系線の空容量が変化した後の連系線の空容量の一例を示す図である。図11に示した情報202では、図9に示した状態から連系線#4の空容量が変化しており、全ての連系線において注文量50kWhの送電が可能となっている。したがって、電力取引支援装置12は、上述したステップS15で、連系線の混雑が解消したと判断し、ステップS16として再入札が実施される。再入札の後、電力取引システム4は、上述した入札札Bが電力取引市場に残っている場合、再び、託送可否確認を行い、図12に示す判定結果を広域機関システム5から受領することになる。
FIG. 10 is a diagram showing an example of a determination result in confirmation of whether or not consignment is possible. As shown in FIG. 10, from interconnection line # 1 to interconnection line # 3, since 0.5 hours (30 minutes) x free capacity is 50 kWh or more, it is possible to transmit an order quantity of 50 kWh. Interconnection line # 4 cannot transmit the ordered quantity of 50kWh. Therefore, bid tag A remains in the electricity trading market without being executed. In such a case, the electric power transaction support device 12 of the present embodiment monitors the free capacity of the interconnection line as described above because the bid tag A is not executed for a certain period of time after bidding. FIG. 11 is a diagram showing an example of the empty capacity of the interconnection line after the empty capacity of the interconnection line has changed from the state shown in FIG. In the
図12は、再入札後における託送可否確認における判定結果の一例を示す図である。図12に示した例では、各連系線の空き容量は図11に示した空容量であるとする。上述したように、電力取引支援装置12は、図11に示した空容量に基づいて、入札札Aを取り下げて再入札を行う。入札札Aが再入札されると、入札札Bが電力取引市場に残っていれば、再び、託送可否確認を行う。このとき、図12に示すように、全連系線で注文量50kWhの送電が可能であると判定される。したがって、電力取引システム4は、再入札された入札札Aと入札札Bとを約定させる。 FIG. 12 is a diagram showing an example of a determination result in confirmation of whether or not the item can be sent after re-bidding. In the example shown in FIG. 12, the free capacity of each interconnection line is assumed to be the free capacity shown in FIG. As described above, the electric power transaction support device 12 withdraws the bid tag A and re-bids based on the empty capacity shown in FIG. When the bid tag A is re-bid, if the bid tag B remains in the electric power trading market, the possibility of consignment is confirmed again. At this time, as shown in FIG. 12, it is determined that the order amount of 50 kWh can be transmitted on all interconnection lines. Therefore, the electric power trading system 4 contracts the rebid A and the bid B.
上記の例では、事業者システム1が入札した入札札が売り入札である場合を説明したが、事業者システム1が買い入札の入札札を入札する場合も同様である。図13は、本実施の形態の板情報の別の一例を示す図である。図6に示した例では、事業者システム1が入札した入札札が売り入札であったが、図13に示す例では、事業者システム1が入札した入札札は、買い入札である入札札Cである。図13に示す板情報の一段目には、2017/8/1の10:00−10:30の時間帯に関して、事業者システム2−1が、注文量50kWhおよび入札価格13円/kWhの売り入札を入札しており、その後に、2段目に示すように、注文量50kWhおよび入札価格13円/kWhの買い入札の入札札Cを事業者システム1が入札したとする。この場合、入札札Cが入札されると、電力取引システム4は、上述したステップS4およびステップS5を実施する。ステップS5の託送可否確認で、送電が不可となった場合、入札札Cは約定せずに電力取引市場に残ったままとなる。本実施の形態の電力取引支援装置12は、このような場合も、入札してから一定時間以上入札札Cが約定しないため、上述した通り、連系線の空容量を監視する。そして、空容量が変化して、全ての連系線において注文量50kWhの送電が可能となると再入札が行われる。これにより、図13の一段目に示した事業者システム2−1の入札札が電力取引市場に残っていれば、入札札Cは約定することになる。 In the above example, the case where the bid bid bid by the business operator system 1 is a sell bid has been described, but the same applies to the case where the business operator system 1 bids a bid bid for a buy bid. FIG. 13 is a diagram showing another example of the board information of the present embodiment. In the example shown in FIG. 6, the bid bid bid by the business operator system 1 was a sell bid, but in the example shown in FIG. 13, the bid bid bid by the business operator system 1 is a bid bid C. Is. In the first stage of the board information shown in FIG. 13, the operator system 2-1 sells an order quantity of 50 kWh and a bid price of 13 yen / kWh during the time zone of 10:00 to 10:30 on August 1, 2017. It is assumed that the bidder is bidding, and then, as shown in the second row, the business operator system 1 bids the bid tag C for a buy bid with an order quantity of 50 kWh and a bid price of 13 yen / kWh. In this case, when the bid tag C is bid, the electric power trading system 4 executes the above-mentioned steps S4 and S5. If power transmission becomes impossible in step S5, the bid tag C remains in the electric power trading market without being executed. Even in such a case, the electric power transaction support device 12 of the present embodiment monitors the free capacity of the interconnection line as described above because the bid tag C is not executed for a certain period of time after bidding. Then, when the free capacity changes and it becomes possible to transmit an order amount of 50 kWh on all interconnection lines, a re-bid is performed. As a result, if the bid tag of the operator system 2-1 shown in the first stage of FIG. 13 remains in the electric power trading market, the bid tag C will be executed.
図8に示したフローチャートでは、ステップS12でYesと判定された後、ステップS13を実施しているが、ステップS12の後ステップS13を実施せずにステップS14に進んでもよい。すなわち、入札してから一定時間以上約定しない場合に、ステップS14以降の処理を実施してもよい。入札してから一定時間以上約定しない要因としては、注文量および価格の面で約定可能な入札札が存在しないという第1の要因、注文量および価格の面で約定可能な入札札が有るが託送可否確認で送電不可となったという第2の要因、の2つが考えられる。ステップS13を実施しない場合、第1の要因により一定時間以上約定しなくても、ステップS15でYesとなった場合に、再入札が行われることになるが、このような再入札が行われても特に問題はない。 In the flowchart shown in FIG. 8, after the determination in step S12 is Yes, step S13 is executed, but the process may proceed to step S14 without performing step S13 after step S12. That is, when the bid is not executed for a certain period of time or more, the processes after step S14 may be performed. The first factor that does not execute for a certain period of time after bidding is that there is no bid tag that can be executed in terms of order quantity and price, and there is a bid tag that can be executed in terms of order quantity and price, but it is consigned. There are two possible causes: the second factor is that power transmission was not possible after confirming the availability. If step S13 is not carried out, even if the contract is not executed for a certain period of time or more due to the first factor, if Yes is obtained in step S15, a re-bid will be performed. However, such a re-bid is performed. There is no particular problem.
以上のように、本実施の形態では、電力取引支援装置12は、入札してから一定時間以上約定しない場合に、連系線の空容量を監視し、全連系線で、該入札に対応する注文量が送電可能な空容量が確保された場合に、再入札を行うようにした。このため、電力取引において約定機会を増やすことができる。 As described above, in the present embodiment, the power transaction support device 12 monitors the free capacity of the interconnection line when the bid is not executed for a certain period of time or more, and responds to the bid on all the interconnection lines. When the free capacity that can transmit the order quantity is secured, the bid is re-bid. Therefore, it is possible to increase contract opportunities in electric power trading.
なお、以上説明した例では、電力取引支援装置12が事業者システム1内に設けられる例を説明した。すなわち、上述した第1の札を入札する事業者により設置される事業者システム1内に電力取引支援装置12が設けられる例を説明した。しかしながら、電力取引支援装置12の設けられる場所は、この例に限定されない。例えば、電力取引システム4内に電力取引支援装置12が設けられてもよい。または、電力取引支援装置12は、事業者システム1および電力取引システム4とは独立して別に設けられてもよい。電力取引支援装置12が、電力取引システム4内に設けられる場合または事業者システム1および電力取引システム4とは独立して設けられる場合、電力取引支援装置12が再入札の対象とする入札札は、特定の事業者の入札札ではなく、複数の事業者の入札札としてもよい。例えば入札に参加する全ての事業者の入札札を再入札の対象としてもよい。 In the example described above, an example in which the electric power transaction support device 12 is provided in the business operator system 1 has been described. That is, an example in which the electric power transaction support device 12 is provided in the business operator system 1 installed by the business operator who bids the first bill described above has been described. However, the place where the electric power transaction support device 12 is provided is not limited to this example. For example, the electric power trading support device 12 may be provided in the electric power trading system 4. Alternatively, the electric power transaction support device 12 may be provided separately from the business operator system 1 and the electric power transaction system 4. When the electric power transaction support device 12 is provided in the electric power transaction system 4, or when the electric power transaction support device 12 is provided independently of the operator system 1 and the electric power transaction system 4, the bid tag to be re-bid by the electric power transaction support device 12 is , It may be a bid tag of a plurality of businesses instead of a bid tag of a specific business operator. For example, the bid tags of all the companies participating in the bidding may be subject to re-bid.
実施の形態2.
図14は、本発明の実施の形態2にかかる電力取引支援装置における処理手順の一例を示すフローチャートである。本実施の形態の全体システムの構成、および各装置の構成は、電力取引支援装置12における空容量監視部123の機能が一部実施の形態1と異なる点を除き、実施の形態1と同様である。実施の形態1と同様の機能を有する構成要素は実施の形態1と同一の符号を付して説明し、実施の形態1と重複する説明を省略する。本実施の形態における広域機関システム5、電力取引システム4および事業者システム2−1,2−2の動作は実施の形態1と同様である。以下、実施の形態1と異なる点を主に説明する。
Embodiment 2.
FIG. 14 is a flowchart showing an example of a processing procedure in the electric power transaction support device according to the second embodiment of the present invention. The configuration of the entire system of the present embodiment and the configuration of each device are the same as those of the first embodiment except that the function of the free capacity monitoring unit 123 in the power transaction support device 12 is partially different from that of the first embodiment. is there. The components having the same functions as those of the first embodiment will be described with the same reference numerals as those of the first embodiment, and the description overlapping with the first embodiment will be omitted. The operations of the wide
本実施の形態では、空容量監視部123は、事業者システム1が入札を行うたびに、入札の通知を受け、事業者システム1が入札した時点で、連系線情報を電力取引システム4から取得し、取得した連系線情報のうち各連系線の空容量を示す情報を、入札札と対応付けて保持しておく。さらに、空容量監視部123は、事業者システム1が既に入札して板情報に含まれている入札札と約定条件が合致する入札札が板情報に追加された時点においても、連系線情報を電力取引システム4から取得し、取得した連系線情報のうち各連系線の空容量を示す情報を、入札札と対応付けて保持しておく。これにより、本実施の形態では、電力取引システム4が実施の形態1で述べたステップS5で託送可否確認を行った時点、すなわち、約定条件が合致する1組の入札が揃った時点、における各連系線の空容量を把握することができる。 In the present embodiment, the empty capacity monitoring unit 123 receives a bid notification each time the operator system 1 makes a bid, and when the operator system 1 bids, the interconnection line information is transmitted from the electric power trading system 4. Of the acquired interconnection line information, information indicating the free capacity of each interconnection line is stored in association with the bid tag. Further, the empty capacity monitoring unit 123 also provides interconnection line information even when the operator system 1 has already bid and a bid tag that matches the contract conditions with the bid tag included in the board information is added to the board information. Is acquired from the electric power trading system 4, and among the acquired interconnection line information, information indicating the free capacity of each interconnection line is stored in association with the bid tag. As a result, in the present embodiment, each at the time when the electric power trading system 4 confirms whether or not the consignment is possible in step S5 described in the first embodiment, that is, when a set of bids satisfying the contract conditions are prepared. It is possible to grasp the free capacity of the interconnection line.
または、空容量監視部123は、定期的に連系線情報を取得し、取得した連系線情報のうち各連系線の空容量の全てを取得した時刻とともに空容量情報として保持しておいてもよい。この場合も、各入札札の入札時刻と空容量情報とを用いることで、ステップS5で託送可否確認を行った時点における各連系線の空容量を推定することができる。なお、この場合、空容量情報は、一定時間ごとまたは空容量情報が一定容量を超えると、少なくとも一部が削除されてもよい。 Alternatively, the free capacity monitoring unit 123 periodically acquires the interconnection line information, and holds all the free capacity of each interconnection line among the acquired interconnection line information as the free capacity information together with the time of acquisition. You may. Also in this case, by using the bid time and the free capacity information of each bid tag, it is possible to estimate the free capacity of each interconnection line at the time when the consignment possibility is confirmed in step S5. In this case, at least a part of the free space information may be deleted at regular intervals or when the free space information exceeds a certain capacity.
図14に示すように、電力取引支援装置12は、実施の形態1と同様にステップS11からステップS13を実施する。ステップS13でYesとなった場合、空容量監視部123は、ステップS12で一定時間以上約定しないと判断された入札札である監視対象札の入札時刻における各連系線の空容量に基づいて、入札に紐付く連系線を特定する(ステップS17)。入札に紐付く連系線の特定とは、監視対象札が、約定条件が合致する入札札が電力取引市場に存在するにもかかわらず約定しない要因となっている連系線を特定することである。すなわち、電力取引システム4が実施の形態1で述べたステップS5で託送可否確認を行った時点において、全連系線のうち、注文量に対応する電力量を送電できない連系線を特定することである。このように、本実施の形態では、混雑状態の変化の判断の対象となる1つ以上の連系線は、上記のように入札に紐付く連系線、すなわち第1の札が約定できない要因となり得る連系線である。 As shown in FIG. 14, the electric power transaction support device 12 carries out steps S11 to S13 in the same manner as in the first embodiment. If Yes in step S13, the empty capacity monitoring unit 123 is based on the empty capacity of each interconnection line at the bidding time of the monitored bid, which is a bid tag determined not to be executed for a certain period of time or longer in step S12. The interconnection line associated with the bid is specified (step S17). The identification of the interconnection line associated with the bid is to identify the interconnection line that causes the monitored tag to not execute even though the bid tag that meets the contract conditions exists in the electric power trading market. is there. That is, at the time when the electric power trading system 4 confirms whether or not the consignment is possible in step S5 described in the first embodiment, the interconnection line that cannot transmit the electric energy corresponding to the ordered amount is specified among all the interconnection lines. Is. As described above, in the present embodiment, the one or more interconnection lines to be determined for the change in the congestion state are the interconnection lines linked to the bid as described above, that is, the factor that the first tag cannot be executed. It is an interconnection line that can be.
ステップS17では、事業者システム1が入札した時点で、既に該入札と約定条件が合致する入札札が板情報にある場合には、空容量監視部123は、事業者システム1が入札した時刻の各連系線の空容量に基づいて、託送可否確認と同様に、連系線ごとに送電可否の判定を実施する。そして、空容量監視部123は、送電不可と判定された連系線を、入札に紐付く連系線として特定する。例えば、事業者システム1の運用者が板情報を監視しており、約定のターゲットとする入札にあわせて入札する場合がこのケースに該当する。図15は、事業者システム1が入札した時点で、既に該入札と約定条件が合致する入札札が板情報にある場合の板情報の変化の一例を示す図である。図15の上段には、事業者システム2−1が入札した売り入札だけが板情報に含まれている。この状態で、事業者システム1が買い入札の入札札を入札すると、図15の下段に記載されているように、事業者システム2−1の売り入札と約定条件が合致する買い入札が板情報に追加される。このような場合には、ステップS17では、空容量監視部123は、事業者システム1が買い入札を入札した時刻における各連系線の空容量に基づいて、入札に紐付く連系線を特定する。事業者システム1が売り入札の入札札を入札した時点で、既に該入札と約定条件が合致する買い入札の入札札が板情報にある場合も同様である。 In step S17, when the business operator system 1 bids, if there is already a bid tag in the board information that matches the bid and the contract conditions, the empty capacity monitoring unit 123 has the time when the business operator system 1 bids. Based on the free capacity of each interconnection line, the availability of power transmission is determined for each interconnection line in the same manner as the confirmation of whether or not transmission is possible. Then, the empty capacity monitoring unit 123 specifies the interconnection line determined to be unable to transmit power as the interconnection line associated with the bid. For example, this case corresponds to the case where the operator of the business operator system 1 monitors the board information and bids according to the target bid of the contract. FIG. 15 is a diagram showing an example of a change in board information when there is already a bid tag in the board information that matches the bid and the contract conditions at the time when the business operator system 1 bids. In the upper part of FIG. 15, only the sell bids bid by the business operator system 2-1 are included in the board information. In this state, when the business operator system 1 bids the bid bid for the buy bid, as shown in the lower part of FIG. 15, the bid bid that matches the sell bid of the business operator system 2-1 and the contract conditions is the board information. Will be added to. In such a case, in step S17, the free capacity monitoring unit 123 identifies the interconnection line associated with the bid based on the free capacity of each interconnection line at the time when the operator system 1 bids the bid. To do. The same applies when there is already a bid bid for a buy bid that matches the contract conditions with the bid at the time when the business operator system 1 bids the bid bid for the sell bid.
一方、約定条件が合致する入札札が板情報にない状態で、事業者システム1が入札する場合は、ステップS17では、空容量監視部123は、該入札と約定条件の合致する入札がなされた時刻の各連系線の空容量に基づいて、託送可否確認と同様に、連系線ごとに送電可否の判定を実施する。そして、空容量監視部123は、送電不可と判定された連系線を、入札に紐付く連系線として特定する。図16は、約定条件が合致する入札札が板情報にない状態で、事業者システム1が入札する場合の板情報の変化の一例を示す図である。図16の上段には、事業者システム1が入札した買い入札だけが板情報に含まれている。この状態で、事業者システム2−1が売り入札の入札札を入札すると、図16の下段に記載されているように、事業者システム1の買い入札と約定条件が合致する売り入札が板情報に追加される。このような場合には、空容量監視部123は、ステップS17では、事業者システム2−1が売り入札を入札した時刻における各連系線の空容量に基づいて、入札に紐付く連系線を特定する。事業者システム1が売り入札の入札札を入札し、該入札と約定条件が合致する買い入札が他の事業者システムにより入札される場合も同様である。 On the other hand, when the business operator system 1 makes a bid when there is no bid tag that matches the contract conditions in the board information, in step S17, the empty capacity monitoring unit 123 makes a bid that matches the bid and the contract conditions. Based on the free capacity of each interconnection line at the time, the transmission availability is determined for each interconnection line in the same manner as the consignment availability confirmation. Then, the empty capacity monitoring unit 123 specifies the interconnection line determined to be unable to transmit power as the interconnection line associated with the bid. FIG. 16 is a diagram showing an example of a change in the board information when the business operator system 1 bids in a state where there is no bid tag that matches the contract conditions in the board information. In the upper part of FIG. 16, only the buy bid bid by the business operator system 1 is included in the board information. In this state, when the business operator system 2-1 bids the bid bid for the sell bid, as shown in the lower part of FIG. 16, the sell bid that matches the contract condition with the buy bid of the business operator system 1 is the board information. Will be added to. In such a case, in step S17, the free capacity monitoring unit 123 connects the interconnection line to the bid based on the free capacity of each interconnection line at the time when the operator system 2-1 bids the bid. To identify. The same applies when the business operator system 1 bids a bid bid for a sell bid and a buy bid that matches the bid and the contract conditions are bid by another business operator system.
すなわち、空容量監視部123は、一定時間以上約定しない入札札である第1の札の入札時刻、および第1の札に約定条件が合致する第2の札の入札時刻のうち遅い方の時刻に対応する連系線の空容量に基づいて、第1の札が約定できない要因となり得る連系線を特定する。 That is, the empty capacity monitoring unit 123 sets the later of the bid time of the first bid, which is a bid bid that is not executed for a certain period of time or longer, and the bid time of the second bid that matches the contract conditions with the first bid. Based on the free capacity of the interconnection line corresponding to, the interconnection line that can be a factor that the first tag cannot be executed is specified.
図17は、図14に示すステップS17で参照される各連系線の空容量と送電可否の判定結果の一例を示す図である。図17に示した例では、連系線#1から連系線#4のうち、連系線#1と連系線#3では、空容量が図15に示した入札札の注文量以上であり、連系線#2および連系線#4では、空容量が図15に示した入札札の注文量未満である。したがって、連系線#1と連系線#3では、図15に示した入札札の注文量の送電が可能であり、連系線#2および連系線#4では、図15に示した入札札の注文量の送電が不可である。この場合、ステップS17では、空容量監視部123は、連系線#2および連系線#4を、入札に紐付く連系線として特定する。 FIG. 17 is a diagram showing an example of the empty capacity of each interconnection line referred to in step S17 shown in FIG. 14 and the determination result of power transmission availability. In the example shown in FIG. 17, among the interconnection lines # 1 to the interconnection line # 4, the free capacity of the interconnection line # 1 and the interconnection line # 3 is equal to or larger than the order quantity of the bid bid shown in FIG. Yes, on the interconnection line # 2 and the interconnection line # 4, the empty capacity is less than the order quantity of the bid bid shown in FIG. Therefore, the interconnection line # 1 and the interconnection line # 3 can transmit the order amount of the bid tag shown in FIG. 15, and the interconnection line # 2 and the interconnection line # 4 are shown in FIG. It is not possible to transmit the order quantity of bid tags. In this case, in step S17, the empty capacity monitoring unit 123 specifies the interconnection line # 2 and the interconnection line # 4 as the interconnection line associated with the bid.
図14の説明に戻り、ステップS17の後、空容量監視部123は、当該連系線、すなわち、入札に紐付く連系線として特定された連系線、の空き容量を監視する(ステップS18)。空容量監視部123は、監視の開始から、規定時間内に連系線の混雑が解消したか否かを判断する(ステップS19)。具体的には、空容量監視部123は、監視対象の全連系線において、一定時間以上約定しない入札札における注文量に対応する空容量が確保できた場合に連系線の混雑が解消したと判断する。規定時間内に連系線の混雑が解消したと判断した場合(ステップS19 Yes)、ステップS16へ進む。ステップS16は実施の形態1と同様である。ステップS19でNoの場合は、処理を終了する。 Returning to the description of FIG. 14, after step S17, the free capacity monitoring unit 123 monitors the free capacity of the interconnection line, that is, the interconnection line specified as the interconnection line associated with the bid (step S18). ). The free capacity monitoring unit 123 determines whether or not the congestion of the interconnection line has been resolved within the specified time from the start of monitoring (step S19). Specifically, the empty capacity monitoring unit 123 eliminated the congestion of the interconnection line when the free capacity corresponding to the order quantity of the bid bids that were not executed for a certain period of time or more could be secured in all the interconnection lines to be monitored. Judge. If it is determined that the congestion of the interconnection line has been resolved within the specified time (step S19 Yes), the process proceeds to step S16. Step S16 is the same as in the first embodiment. If No in step S19, the process ends.
本実施の形態においても、実施の形態1と同様に、ステップS18で連系線の監視を行っている間も、板情報監視部122が板情報の監視を続け、一定時間以上約定しない入札札に約定条件が合致する入札札が板情報に存在しなくなった場合には、連系線の監視を停止するとともに、処理を終了してもよい。
Also in the present embodiment, as in the first embodiment, the board
図18は、図17に示した状態から空容量が変化した後の各連系線の空容量と送電可否の判定結果の一例を示す図である。図17に示した状態から空容量が変化し、監視の開始から、規定時間以内に、図18に示す状態となったとする。この場合、連系線#2および連系線#4で図15に示した入札札の注文量の送電が可となる。一方、図18に示した状態では、連系線#1は、図15に示した入札札の注文量の送電が不可となっている。しかしながら、連系線#1は、ステップS17で特定された連系線ではないため、ステップS19ではYesと判断される。実施の形態1で述べた全連系線を監視対象とする場合には、図18に示した状態では、混雑と判定され、再入札は行われないが、本実施の形態では、監視対象の連系線を絞っているため、再入札を行う機会を実施の形態1に比べ増やすことができる。 FIG. 18 is a diagram showing an example of a determination result of the empty capacity of each interconnection line and the power transmission availability after the empty capacity has changed from the state shown in FIG. It is assumed that the free capacity has changed from the state shown in FIG. 17 and the state shown in FIG. 18 has been reached within a specified time from the start of monitoring. In this case, it is possible to transmit the order amount of the bid tag shown in FIG. 15 on the interconnection line # 2 and the interconnection line # 4. On the other hand, in the state shown in FIG. 18, the interconnection line # 1 is unable to transmit the order amount of the bid tag shown in FIG. However, since the interconnection line # 1 is not the interconnection line specified in step S17, it is determined to be Yes in step S19. When all the interconnection lines described in the first embodiment are to be monitored, in the state shown in FIG. 18, it is determined that the bid is congested and re-bidding is not performed. However, in the present embodiment, the monitoring target is used. Since the interconnection line is narrowed down, the chances of re-bidding can be increased as compared with the first embodiment.
なお、本実施の形態では、事業者システム1が入札した時点で、既に該入札と約定条件が合致する入札札が板情報にある場合と、約定条件が合致する入札札が板情報にない状態で、事業者システム1が入札する場合との両方に対応可能なように、両方に対応した動作を実施する例を説明した。しかしながら、これらのうちのいずれか一方のみに対応した動作を行うようにしてもよい。 In the present embodiment, when the business operator system 1 bids, there are already bids in the board information that match the bid and the contract conditions, and there are no bids in the board information that match the contract conditions. Then, an example of carrying out an operation corresponding to both of the cases where the business operator system 1 bids can be described has been described. However, the operation corresponding to only one of these may be performed.
なお、以上の説明では、空容量監視部123は、監視対象の全連系線において、注文量に対応する空容量が確保できた場合に連系線の混雑が解消したすなわち混雑状態が変化したと判断するようにしたが、監視対象の連系線のうちの少なくとも1つにおいて注文量に対応する空容量が確保できた場合に連系線の混雑が解消したと判断してもよい。この場合、例えば、ステップS17において、図17に示した状態の連系線の空容量であった場合に、規定時間以内に連系線#2は注文量に対応する空容量が確保でき、連系線#4は注文量に対応する空容量が確保できていなかった場合も、ステップS19でYesと判断することになる。実際に、対応する売買で用いられる連系線が連系線#2であった場合、対応する入札が電力取引市場に残っている場合には、再入札により約定されるが、実際に、対応する売買で用いられる連系線が連系線#4であった場合には、再入札しても約定できない。ただし、このような場合も、再び図14に示す処理を実施し、注文量に対応する空容量が確保できても再入札によって約定できなかった連系線である連系線#2を、ステップS17で特定する連系線からはずすことにより、順次、対応する連系線を絞り込んでいくことができる。このように、連系線を絞り込んで監視することにより、再入札時における約定の可能性を高めることができる。 In the above description, the free capacity monitoring unit 123 eliminated the congestion of the interconnection line when the free capacity corresponding to the ordered quantity could be secured in all the interconnection lines to be monitored, that is, the congestion state changed. However, it may be determined that the congestion of the interconnection line has been eliminated when the free capacity corresponding to the order quantity can be secured in at least one of the interconnection lines to be monitored. In this case, for example, in step S17, when the free capacity of the interconnection line in the state shown in FIG. 17 is available, the free capacity of the interconnection line # 2 can be secured corresponding to the ordered quantity within the specified time, and the connection can be secured. Even if the free capacity corresponding to the ordered quantity cannot be secured for the system line # 4, it is determined as Yes in step S19. In fact, if the interconnection line used in the corresponding sale is interconnection line # 2, and the corresponding bid remains in the power trading market, it will be executed by re-bid, but in fact, it will correspond. If the interconnection line used for trading is interconnection line # 4, it cannot be executed even if the bid is re-bid. However, even in such a case, the process shown in FIG. 14 is performed again, and the interconnection line # 2, which is an interconnection line that could not be executed by re-bidding even if the free capacity corresponding to the order quantity can be secured, is stepped. By removing from the interconnection line specified in S17, the corresponding interconnection line can be sequentially narrowed down. By narrowing down and monitoring the interconnection lines in this way, it is possible to increase the possibility of execution at the time of re-bid.
また、空容量監視部123は、単に、全ての連系線の各々の空容量のうちの少なくとも1つが変化した場合に、混雑状態が変化したと判断してもよい。また、空容量監視部123は、全ての連系線の各々の空容量のうちの少なくとも1つが増加した場合に、混雑状態が変化したと判断してもよい。 Further, the empty capacity monitoring unit 123 may simply determine that the congestion state has changed when at least one of the empty capacities of all the interconnection lines has changed. Further, the empty capacity monitoring unit 123 may determine that the congestion state has changed when at least one of the empty capacities of all the interconnection lines increases.
また、本実施の形態においても、ステップS13の処理を実施せずに、ステップS12でYesの場合に、ステップS17に進むようにしてもよい。この場合、どの時点で約定条件が合致する1組の入札が揃ったかを把握することができないが、例えば、事業者システム1が入札を行った時点における各連系線の空容量を元にステップS17を実施する。 Further, also in the present embodiment, if the process of step S13 is not performed and the step S12 is Yes, the process may proceed to step S17. In this case, it is not possible to grasp at what point in time a set of bids that match the contract conditions have been completed, but for example, a step is made based on the free capacity of each interconnection line at the time when the operator system 1 makes a bid. Carry out S17.
以上のように、本実施の形態では、約定条件と合致する入札が行われた時点における空容量に基づいて、入札に紐付く連系線を特定し、特定した連系線の空容量を監視するようにした。そして、監視している連系線の混雑が解消した場合に、再入札を行うようにした。これにより、実施の形態1と同様の効果を奏することができる。さらに、本実施の形態では、実施の形態1より監視対象を減らすことができるとともに、実施の形態1に比べ約定の機会を増やすことができる。 As described above, in the present embodiment, the interconnection line associated with the bid is specified based on the free capacity at the time when the bid that matches the contract condition is made, and the free capacity of the specified interconnection line is monitored. I tried to do it. Then, when the congestion of the monitored interconnection line is resolved, the bid is re-bid. As a result, the same effect as that of the first embodiment can be obtained. Further, in the present embodiment, the number of monitoring targets can be reduced as compared with the first embodiment, and the chances of contracting can be increased as compared with the first embodiment.
また、実施の形態1では、全連系線の混雑が解消した場合に再入札を実施し、実施の形態2では、入札に紐付く連系線を特定し、特定した連系線の混雑が解消した場合に再入札を実施したが、連系線の空容量に基づく再入札の方法はこれらに限定されない。例えば、一定時間以上約定されない入札がある場合に、連系線の監視を開始し、監視の開始後、全連系線のうち少なくとも1つの空容量に変化があった場合に、再入札を行うようにしてもよい。また、一定時間以上約定されない入札がある場合に、連系線の監視を開始し、監視の開始後、全連系線のうち少なくとも1つの空容量が増える方向に変化した場合に、再入札を行うようにしてもよい。 Further, in the first embodiment, re-bidding is carried out when the congestion of all the interconnection lines is resolved, and in the second embodiment, the interconnection line associated with the bid is specified, and the congestion of the specified interconnection line is caused. Re-bidding was carried out when the bid was resolved, but the method of re-bidding based on the free capacity of the interconnection line is not limited to these. For example, if there is a bid that has not been executed for a certain period of time, monitoring of the interconnection line is started, and after the start of monitoring, if there is a change in the free capacity of at least one of all the interconnection lines, a rebid is performed. You may do so. In addition, if there is a bid that is not executed for a certain period of time, monitoring of the interconnection line is started, and after the start of monitoring, if the free capacity of at least one of all interconnection lines changes in the direction of increasing, rebid You may do so.
なお、本実施の形態の電力取引支援装置12は、実施の形態1の電力取引支援装置12と同様に、電力取引システム4内に設けられてもよいし、事業者システム1および電力取引システム4とは独立して別に設けられてもよい。 The electric power transaction support device 12 of the present embodiment may be provided in the electric power transaction system 4 as in the electric power transaction support device 12 of the first embodiment, and the operator system 1 and the electric power transaction system 4 may be provided. It may be provided separately from.
実施の形態3.
図19は、本発明の実施の形態3にかかる電力取引支援装置12aの構成例を示す図である。本実施の形態の全体システムの構成は、事業者システム1が電力取引支援装置12の代わりに電力取引支援装置12aを備える以外は実施の形態1と同様である。また、全体システムを構成する各装置の構成は、電力取引支援装置12aの構成を除き、実施の形態1と同様である。実施の形態1と同様の機能を有する構成要素は実施の形態1と同一の符号を付して説明し、実施の形態1と重複する説明を省略する。本実施の形態における広域機関システム5、電力取引システム4および事業者システム2−1,2−2の動作は実施の形態1と同様である。以下、実施の形態1と異なる点を主に説明する。
Embodiment 3.
FIG. 19 is a diagram showing a configuration example of the electric power
電力取引支援装置12aは、通信部121、板情報監視部122aおよび再入札部124aを備える。通信部121は、実施の形態1の通信部121と同様である。板情報監視部122aは、実施の形態1のステップS11からS13までの処理を実施し、ステップS13でYesの場合、再入札部124aに再入札を指示する。すなわち、板情報監視部122aは、第1の札が、電力取引市場に入札されてから一定時間経過するまでの間に約定しない場合、第1の札と約定条件が合致している第2の札が電力取引市場に存在するか否かを監視する市場監視部である。再入札部124aは、板情報監視部122aにより第2の札が電力取引市場に存在すると判断された場合に、第1の札を再入札する。具体的には、板情報監視部122aから再入札を指示されると、一定時間ごとに、再入札を実施する。再入札部124aが、一定時間ごとに再入札を実施する回数は1回以上であればよい。これにより、各連系線の混雑の解消を待たずに、再入札を行うことができ、連系線の監視を不要としつつ約定できる機会を増やすことができる。また、連系線の混雑の解消を確認してから再入札を行う場合より、速やかに再入札を行うことができる可能性がある。
The electric power
なお、一定時間ごとに、再入札を繰り返している間も、板情報監視部122aが板情報の監視を続け、一定時間以上約定しない入札札に約定条件が合致する入札札が板情報に存在しなくなった場合には、再入札をやめて処理を終了してもよい。また、本実施の形態においても、電力取引支援装置12aは、ステップS13を実施せずに、ステップS12でYesとなった場合に再入札を行うようにしてもよい。
In addition, even while re-bids are repeated at regular intervals, the board information monitoring unit 122a continues to monitor the board information, and there are bids in the board information that match the contract conditions with the bids that are not contracted for a certain period of time or longer. If it runs out, you may stop re-bidding and end the process. Further, also in the present embodiment, the electric power
なお、本実施の形態の電力取引支援装置12aは、実施の形態1の電力取引支援装置12と同様に、電力取引システム4内に設けられてもよいし、事業者システム1および電力取引システム4とは独立して別に設けられてもよい。
The electric power
以上の実施の形態に示した構成は、本発明の内容の一例を示すものであり、別の公知の技術と組み合わせることも可能であるし、本発明の要旨を逸脱しない範囲で、構成の一部を省略、変更することも可能である。 The configuration shown in the above-described embodiment shows an example of the content of the present invention, can be combined with another known technique, and is one of the configurations without departing from the gist of the present invention. It is also possible to omit or change the part.
1,2−1,2−2 事業者システム、3 通信回線、4 電力取引システム、5 広域機関システム、11 入札処理装置、12,12a 電力取引支援装置、41 取引処理部、42,53,121 通信部、43,52 記憶部、51 連系線管理部、122,122a 板情報監視部、123 空容量監視部、124,124a 再入札部。 1,2-1,2-2 Business system, 3 communication line, 4 power transaction system, 5 wide area engine system, 11 bid processing device, 12,12a power transaction support device, 41 transaction processing department, 42,53,121 Communication unit, 43,52 storage unit, 51 interconnection line management unit, 122,122a board information monitoring unit, 123 free capacity monitoring unit, 124,124a re-bidding unit.
Claims (14)
前記空容量監視部により、前記1つ以上の連系線の混雑状態が変化したと判断された場合、前記第1の札を再入札する再入札部と、
を備えることを特徴とする電力取引支援装置。 If the first tag is not executed within a certain period of time after it is bid on the electricity trading market, the free capacity of one or more interconnection lines is monitored and the empty capacity of the one or more interconnection lines is monitored. An empty capacity monitoring unit that determines whether or not there is a change in the congestion state of one or more interconnection lines based on the capacity.
When the empty capacity monitoring unit determines that the congestion state of the one or more interconnection lines has changed, the re-bidding unit for re-bidding the first bid and the re-bidding unit.
An electric power transaction support device characterized by being equipped with.
を備え、
前記空容量監視部は、前記市場監視部により前記第2の札が前記電力取引市場に存在すると判断された場合に、前記1つ以上の連系線の空容量の監視を開始することを特徴とする請求項1に記載の電力取引支援装置。 If the first tag is not executed within a certain period of time after bidding, whether or not there is a second tag in the electric power trading market that matches the contract conditions with the first tag. Market monitoring department to monitor
With
The free capacity monitoring unit is characterized in that when the market monitoring unit determines that the second tag exists in the electric power trading market, the free capacity monitoring unit starts monitoring the free capacity of the one or more interconnection lines. The electric power transaction support device according to claim 1.
を備え、
前記空容量監視部は、前記市場監視部により前記第2の札が前記電力取引市場に存在すると判断された場合に、前記第1の札の入札時刻および前記第2の札の入札時刻のうち遅い方の時刻に対応する前記1つ以上の連系線の空容量に基づいて、前記第1の札が約定できない要因となり得る連系線を特定し、特定した連系線の空容量の監視を開始し、特定した連系線の空容量のうち少なくとも1つが変化した場合に前記混雑状態が変化したと判断することを特徴とする請求項1に記載の電力取引支援装置。 If the first tag is not executed within a certain period of time after bidding, whether or not there is a second tag in the electric power trading market that matches the contract conditions with the first tag. Market monitoring department to monitor
With
When the market monitoring unit determines that the second tag exists in the electric power trading market, the empty capacity monitoring unit has a bid time of the first tag and a bid time of the second tag. Based on the free capacity of the one or more interconnection lines corresponding to the later time, the interconnection line that may cause the first tag to be uncontractable is identified, and the free capacity of the specified interconnection line is monitored. The power transaction support device according to claim 1, wherein the congestion state is determined to have changed when at least one of the free capacity of the specified interconnection line changes.
前記市場監視部により前記第2の札が前記電力取引市場に存在すると判断された場合に、前記第1の札を再入札する再入札部と、
を備えることを特徴とする電力取引支援装置。 If the first tag is not executed within a certain period of time after it is bid on the electric power trading market, a second tag that matches the contract conditions with the first tag exists in the electric power trading market. The market monitoring department that monitors whether or not to do
When the market monitoring unit determines that the second bid exists in the electric power trading market, the rebid section rebids the first bid.
An electric power transaction support device characterized by being equipped with.
第1の札が、電力取引市場に入札されてから一定時間経過するまでの間に約定しない場合、1つ以上の連系線の空容量を監視する第1のステップと、
前記1つ以上の連系線の空容量に基づいて前記1つ以上の連系線の混雑状態の変化の有無を判断する第2のステップと、
前記第2のステップにより、前記1つ以上の連系線の混雑状態が変化したと判断された場合、前記第1の札を再入札する第3のステップと、
を含むことを特徴とする電力取引支援方法。 It is a power transaction support method in the power transaction support device.
If the first tag is not executed within a certain period of time after it is bid on the electricity trading market, the first step of monitoring the free capacity of one or more interconnection lines and
A second step of determining whether or not there is a change in the congestion state of the one or more interconnection lines based on the empty capacity of the one or more interconnection lines, and
When it is determined that the congestion state of the one or more interconnection lines has changed by the second step, the third step of re-bidding the first bid and the third step.
A power trading support method characterized by including.
第1の札が、電力取引市場に入札されてから一定時間経過するまでの間に約定しない場合、前記第1の札と約定条件が合致している第2の札が前記電力取引市場に存在するか否かを監視する第1のステップと、
前記第1のステップにより前記第2の札が前記電力取引市場に存在すると判断された場合に、前記第1の札を再入札する第2のステップと、
を含むことを特徴とする電力取引支援方法。 It is a power transaction support method in the power transaction support device.
If the first tag is not executed within a certain period of time after it is bid on the electric power trading market, a second tag that matches the contract conditions with the first tag exists in the electric power trading market. The first step to monitor whether or not to do
When it is determined by the first step that the second bill exists in the electric power trading market, the second step of re-bidding the first bill and the second step.
A power trading support method characterized by including.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2018018188A JP6818705B2 (en) | 2018-02-05 | 2018-02-05 | Electric power transaction support device and electric power transaction support method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2018018188A JP6818705B2 (en) | 2018-02-05 | 2018-02-05 | Electric power transaction support device and electric power transaction support method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2019135592A JP2019135592A (en) | 2019-08-15 |
| JP6818705B2 true JP6818705B2 (en) | 2021-01-20 |
Family
ID=67624213
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2018018188A Active JP6818705B2 (en) | 2018-02-05 | 2018-02-05 | Electric power transaction support device and electric power transaction support method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6818705B2 (en) |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3795381B2 (en) * | 2001-11-14 | 2006-07-12 | Kddi株式会社 | Auction method, apparatus and program |
| NL1021394C2 (en) * | 2002-09-04 | 2004-03-05 | Amsterdam Power Exchange Spotm | Method and computer program for regulating energy flow in an energy network as well as a system for electronic auctioning of energy. |
| JP2006215758A (en) * | 2005-02-02 | 2006-08-17 | Hitachi Ltd | Power transaction mediation system, power transaction mediation method, and power transaction mediation program |
| JP6254109B2 (en) * | 2015-01-15 | 2017-12-27 | 株式会社日立製作所 | Power transaction management system and power transaction management method |
| JP6758881B2 (en) * | 2016-03-31 | 2020-09-23 | 株式会社東芝 | Power supply and demand management support system, power supply and demand management support method and power supply and demand management support program |
| CN108510158B (en) * | 2018-03-07 | 2020-12-18 | 南方电网科学研究院有限责任公司 | A method and device for formulating an inter-regional power transmission and reception plan |
-
2018
- 2018-02-05 JP JP2018018188A patent/JP6818705B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2019135592A (en) | 2019-08-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR102389617B1 (en) | Digitally encrypted securities platform and methods and systems therefor | |
| US7747481B2 (en) | Extreme capacity management in an electronic marketplace environment | |
| KR102480673B1 (en) | Server and system for providing steel products trade service | |
| US20050131785A1 (en) | Method and apparatus for management, financing and supply in an integrated supply chain system | |
| JP2009514044A (en) | Electrodynamic pricing transactions | |
| KR102219261B1 (en) | System and its method for online auction of the insolvency stock | |
| JP2008233989A (en) | Securities trading order management device and securities trading order management method | |
| JP6818705B2 (en) | Electric power transaction support device and electric power transaction support method | |
| KR20010049220A (en) | Method and apparatus for determining priority order of transactions, transaction system and recording medium | |
| WO2001035286A1 (en) | Auctioning system, auctioning apparatus, auctioning method, and information processing system and method | |
| KR20210016676A (en) | Reverse auction method for ensuring data security and integrity based on blockchain | |
| JP2005018287A (en) | Stock buying/selling order making system and method | |
| JP4915910B2 (en) | Trading order processing system and trading order processing method | |
| JP4026305B2 (en) | Production planning transaction system | |
| JP3930006B2 (en) | Securities settlement management system and program | |
| JP2002133228A (en) | Repair management support system, repair management support device, electronic market system, repair information management method, and recording medium | |
| KR20140124430A (en) | Game item transaction method | |
| KR101658199B1 (en) | System for Data Exchange using data subscription and method therefor | |
| JP5586971B2 (en) | VWAP trading market system and VWAP trading method | |
| JP2002063515A (en) | On-line account transfer system and transaction method using the same | |
| JP2004213546A (en) | Dealing order processing system and its method for simultaneously ordering two or more dealing orders | |
| JP2009217294A (en) | Exchange transaction support device | |
| AU2002365544B2 (en) | Method and apparatus for management, financing and supply in an integrated supply chain system | |
| JP2004118750A (en) | Electronic commerce method, electronic commerce system, central device, and computer program | |
| JP2009181169A (en) | Securities trading order system, securities trading order processing method, and program |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20191126 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20200911 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20200923 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20201201 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20201228 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6818705 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |