- Publication number
- JP6842890B2 JP6842890B2 JP2016223468A JP2016223468A JP6842890B2 JP 6842890 B2 JP6842890 B2 JP 6842890B2 JP 2016223468 A JP2016223468 A JP 2016223468A JP 2016223468 A JP2016223468 A JP 2016223468A JP 6842890 B2 JP6842890 B2 JP 6842890B2
- Authority
- JP
- Japan
- Prior art keywords
- underground
- new
- retaining wall
- wall
- existing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 claims description 20
- 238000010276 construction Methods 0.000 description 17
- 229910000831 Steel Inorganic materials 0.000 description 8
- 239000003673 groundwater Substances 0.000 description 8
- 239000010959 steel Substances 0.000 description 8
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 7
- 239000002981 blocking agent Substances 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 239000004568 cement Substances 0.000 description 3
- 230000002093 peripheral effect Effects 0.000 description 3
- 239000002689 soil Substances 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 1
- 239000011162 core material Substances 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 239000008267 milk Substances 0.000 description 1
- 210000004080 milk Anatomy 0.000 description 1
- 235000013336 milk Nutrition 0.000 description 1
- 235000019353 potassium silicate Nutrition 0.000 description 1
- NTHWMYGWWRZVTN-UHFFFAOYSA-N sodium silicate Chemical compound [Na+].[Na+].[O-][Si]([O-])=O NTHWMYGWWRZVTN-UHFFFAOYSA-N 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Description
本発明は、山留め、及び山留めを利用した地下構造物の構築方法に関する。 The present invention relates to a mountain retainer and a method for constructing an underground structure using the mountain retainer.
新設の地下構造物の構築方法として、例えばオールケーシング工法(CD工法)等で地中障害物を撤去して、地中障害物の撤去部分に山留めを構築し、山留め内に新設の地下構造物を構築する構築方法が知られている。しかし、この構築方法では、地中障害物を撤去しながら新たに山留めを構築する必要があるため、建築コストがかかるとともに、工期が長くなる。 As a method of constructing a new underground structure, for example, an all-casing method (CD method) is used to remove underground obstacles, a pile is constructed at the removed part of the underground obstacle, and a new underground structure is constructed inside the pile. The construction method to build is known. However, with this construction method, it is necessary to construct a new retaining wall while removing underground obstacles, which increases the construction cost and the construction period.
この問題を解決するため、例えば特許文献1には、既存地下構造物の既存地下躯体(地下外壁及び地下底版)を全て残して山留めとして利用する地下構造物の施工法が開示されている。 In order to solve this problem, for example, Patent Document 1 discloses a construction method of an underground structure in which all the existing underground skeletons (underground outer wall and underground bottom slab) of the existing underground structure are left and used as a mountain retainer.
しかし、既存地下躯体(地下外壁及び地下底版)を全て残して山留めとして利用する場合、山留め内に構築された新設の地下構造物の大きさは、既存地下構造物の大きさより小さくなってしまう。すなわち、新設の地下構造物の大きさを自由に変えることができない。 However, when all the existing underground skeletons (underground outer wall and underground bottom slab) are left and used as a mountain retainer, the size of the new underground structure constructed in the mountain retainer will be smaller than the size of the existing underground structure. That is, the size of the newly constructed underground structure cannot be changed freely.
本発明は上記事実に鑑み、建築コストを削減し、工期を短縮することができるとともに、新設の地下構造物の大きさを自由に変えることができる山留め、及び地下構造物の構築方法を提供することを目的とする。 In view of the above facts, the present invention provides a method for constructing an underground structure and a pile retaining structure in which the construction cost can be reduced, the construction period can be shortened, and the size of the newly constructed underground structure can be freely changed. The purpose is.
第1態様に係る山留めは、少なくとも一部の地下外壁又は地下底版が撤去され、一部が残された既存地下躯体と、残された前記既存地下躯体の内側又は外側に設けられ、撤去された前記地下外壁又は前記地下底版が存在した部分へ作用する土圧を受ける新設山留め壁と、を有する。 The retaining wall according to the first aspect was provided and removed from the existing underground skeleton in which at least a part of the underground outer wall or the underground bottom slab was removed and a part was left, and the inside or outside of the remaining existing underground skeleton. It has an underground outer wall or a new retaining wall that receives earth pressure acting on the portion where the underground bottom slab was present.
上記構成によれば、残された既存地下躯体と新設山留め壁とで山留めを構成することで、既存地下躯体を全て残して山留めとする場合と比較して、新設の地下構造物の大きさを自由に変えることができる。また、新設山留め壁のみで山留めを構成する場合と比較して、建築コストを削減することができるとともに、工期を短縮することができる。 According to the above configuration, by constructing a mountain retaining wall with the remaining existing underground skeleton and the new retaining wall, the size of the new underground structure can be reduced as compared with the case where all the existing underground skeleton is left as a mountain retaining wall. You can change it freely. In addition, the construction cost can be reduced and the construction period can be shortened as compared with the case where the retaining wall is constructed only with the newly constructed retaining wall.
第2態様に係る山留めは、第1態様に係る山留めであって、前記既存地下躯体は、対面する地下外壁がそれぞれ撤去された2つの既存地下躯体であり、前記新設山留め壁は、前記2つの既存地下躯体の残された前記地下外壁に沿って設けられ、撤去された前記地下外壁に挟まれた部分へ作用する土圧を受ける。 The earth pressure according to the second aspect is the earth pressure according to the first aspect, the existing underground skeleton is two existing underground skeletons from which the facing underground outer walls are removed, and the new underground skeleton is the two. It is provided along the underground outer wall where the existing underground skeleton remains, and receives earth pressure acting on the portion sandwiched between the removed underground outer walls.
上記構成によれば、2つの既存地下躯体の対面する地下外壁をそれぞれ撤去し、2つの既存地下躯体の残された地下外壁に沿って新設山留め壁を設けることで、2つの既存地下躯体を1つの山留めとして利用することができ、山留め内に1つの大規模な新設の地下構造物を構築することができる。 According to the above configuration, the two existing underground skeletons are made into one by removing the facing underground outer walls of the two existing underground skeletons and providing a new retaining wall along the remaining underground outer walls of the two existing underground skeletons. It can be used as a single clasp, and one large new underground structure can be constructed within the clasp.
第3態様に係る地下構造物の構築方法は、撤去する一部の地下外壁の外側に新設山留め壁を構築する工程と、一部の前記地下外壁を撤去し、他の前記地下外壁を残して、既存地下構造物を撤去する工程と、前記新設山留め壁と前記地下外壁の内側に新設の地下構造物を構築する工程と、を有する。 The method for constructing the underground structure according to the third aspect is a step of constructing a new retaining wall outside a part of the underground outer wall to be removed, and removing the part of the underground outer wall and leaving the other underground outer wall. It has a step of removing an existing underground structure and a step of constructing a new underground structure inside the new retaining wall and the underground outer wall.
上記構成によれば、残された地下外壁と新設山留め壁とを、新設の地下構造物を構築する際の山留めとして利用することができる。このため、既存の地下外壁を全て残して山留めとする場合と比較して、新設の地下構造物の大きさを自由に変えることができる。また、新設山留め壁のみで山留めを構成する場合と比較して、建築コストを削減することができるとともに、工期を短縮することができる。 According to the above configuration, the remaining underground outer wall and the new retaining wall can be used as a retaining wall when constructing a new underground structure. For this reason, the size of the newly constructed underground structure can be freely changed as compared with the case where all the existing underground outer walls are left as a mountain retaining wall. In addition, the construction cost can be reduced and the construction period can be shortened as compared with the case where the retaining wall is constructed only with the newly constructed retaining wall.
本発明によれば、建築コストを削減し、工期を短縮することができるとともに、新設の地下構造物の大きさを自由に変えることができる。 According to the present invention, the construction cost can be reduced, the construction period can be shortened, and the size of the newly constructed underground structure can be freely changed.
(第1実施形態)
以下、本発明の第1実施形態に係る山留めについて、図1を用いて説明する。
(First Embodiment)
Hereinafter, the retaining pile according to the first embodiment of the present invention will be described with reference to FIG.
<構成>
図1(A)、図1(B)に示すように、第1実施形態の山留め10は、既存地下躯体12の地下外壁14と、新設山留め壁16とで構成されている。既存地下躯体12は、既存建物の地下空間Mを画定していたものであり、例えば鉄筋コンクリート(RC)造とされている。
<Structure>
As shown in FIGS. 1A and 1B, the retaining wall 10 of the first embodiment is composed of an underground outer wall 14 of an existing underground skeleton 12 and a new retaining wall 16. The existing underground skeleton 12 defines the underground space M of the existing building, and is made of, for example, a reinforced concrete (RC) structure.
また、既存地下躯体12は地下外壁14の一面14Aが解体及び撤去されており、3方を囲む平面視でコの字形の既存地下躯体12の地下外壁14B、14C、14Dと、既存地下躯体12の地下底版18と、が残されている。なお、図示を省略するが、既存建物の地上構造物及び地下の柱や梁等の既存地下構造物は解体及び撤去されている。 Further, in the existing underground skeleton 12, one surface 14A of the underground outer wall 14 has been dismantled and removed, and the underground outer walls 14B, 14C, 14D of the existing underground skeleton 12 having a U shape in a plan view surrounding three sides and the existing underground skeleton 12 Underground slab 18 and is left. Although not shown, the above-ground structures of existing buildings and existing underground structures such as underground columns and beams have been demolished and removed.
新設山留め壁16は、地下外壁14の撤去された一面14Aが存在した部分へ作用する土圧を受けるものであり、残された地下外壁14B、14C、14Dの外側、すなわち地下空間Mの外側に設けられている。また、新設山留め壁16は、一例として親杭横矢板工法によって形成されている。 The new retaining wall 16 receives earth pressure acting on the part where the removed one surface 14A of the underground outer wall 14 was present, and is outside the remaining underground outer walls 14B, 14C, 14D, that is, outside the underground space M. It is provided. Further, the new retaining wall 16 is formed by the main pile horizontal sheet pile method as an example.
具体的には、新設山留め壁16は、一定の間隔で地中に建込まれた複数のH形鋼からなる親杭20と、親杭のフランジ間に挿入された複数の木造の横矢板22とで構成されている。なお、図1(B)に示すように、新設山留め壁16の親杭20の下端部は、地下底版18より深い位置まで根入れされている。 Specifically, the new retaining wall 16 has a main pile 20 made of a plurality of H-shaped steels built in the ground at regular intervals and a plurality of wooden horizontal sheet piles 22 inserted between the flanges of the main pile. It is composed of and. As shown in FIG. 1 (B), the lower end of the main pile 20 of the new retaining wall 16 is rooted to a position deeper than the underground bottom slab 18.
また、図1(A)に示すように、新設山留め壁16は、撤去された一面14Aが接合されていた地下外壁14B、14Dの端部にそれぞれ連結されている。これにより、新設山留め壁16と地下外壁14B、14C、14Dとによって、地下空間Mより面積の大きな地下空間Nが画定されている。 Further, as shown in FIG. 1A, the newly constructed retaining wall 16 is connected to the ends of the underground outer walls 14B and 14D to which the removed one side 14A was joined, respectively. As a result, the underground space N having a larger area than the underground space M is defined by the newly constructed retaining wall 16 and the underground outer walls 14B, 14C, and 14D.
なお、新設山留め壁16に作用する土圧が低く、新設山留め壁16が自立可能な場合、及び地下水位が地下底版18より深い場合には、新設山留め壁16と地下外壁14B、14Dとを連結しなくてもよい。 If the earth pressure acting on the new retaining wall 16 is low and the new retaining wall 16 can stand on its own, or if the groundwater level is deeper than the underground bottom slab 18, the new retaining wall 16 and the underground outer walls 14B and 14D are connected. You don't have to.
一方、山留め10に作用する土圧が高い場合には、新設山留め壁16と地下外壁14B、14Dとを連結するとともに、既存建物の地下の柱や梁等の地下構造物を一部撤去せずに残したり、新たに切梁等を設けたりしてもよい。また、地下水位が地下底版18より浅い場合には、新設山留め壁16を遮水性を有する地盤改良壁(ソイルセメント壁)によって形成するとともに、新設山留め壁16と地下外壁14B、14Dとの間に薬液を注入して止水処理してもよい。 On the other hand, when the earth pressure acting on the retaining wall 10 is high, the new retaining wall 16 and the underground outer walls 14B and 14D are connected, and some underground structures such as underground columns and beams of the existing building are not removed. It may be left in the ground or a new girder or the like may be provided. When the groundwater level is shallower than the underground bottom slab 18, the new retaining wall 16 is formed by a ground improvement wall (soil cement wall) having water impermeability, and between the new retaining wall 16 and the underground outer walls 14B and 14D. A chemical solution may be injected to stop water.
<地下構造物の構築方法>
山留め10を利用して新設の地下構造物24を構築する場合には、まず、既存建物の図示しない地上構造物を解体及び撤去する。そして、既存建物の地下外壁14の一面14Aの外側、すなわち地下空間Mの外側に新設山留め壁16を構築する。
<How to build an underground structure>
When constructing a new underground structure 24 using the mountain retainer 10, first, the above-ground structure (not shown) of the existing building is dismantled and removed. Then, a new retaining wall 16 is constructed outside the one side 14A of the underground outer wall 14 of the existing building, that is, outside the underground space M.
次に、既存地下躯体12の地下外壁14B、14C、14D及び地下底版18を残して、既存建物の地下外壁14の一面14A、及びその他の図示しない既存地下構造物を解体及び撤去するとともに、地下外壁14の一面14Aと新設山留め壁16との間の地盤を掘削する。 Next, while leaving the underground outer walls 14B, 14C, 14D and the underground bottom slab 18 of the existing underground skeleton 12, one side 14A of the underground outer wall 14 of the existing building and other existing underground structures (not shown) are dismantled and removed, and underground. Excavate the ground between one side 14A of the outer wall 14 and the new retaining wall 16.
その後、新設山留め壁16と地下外壁14B、14C、14Dとによって構成された山留め10の内側、すなわち地下空間Nに、新設地下外壁や新設地下底版を含む新設の地下構造物24を構築する。なお、上記の工程手順は一例であり、順序が前後しても構わない。また、新設の地下構造物24を構築した後に、新設山留め壁16を撤去する工程を設けてもよい。 After that, a new underground structure 24 including a new underground outer wall and a new underground bottom slab is constructed inside the retaining wall 10 composed of the new retaining wall 16 and the underground outer walls 14B, 14C, and 14D, that is, in the underground space N. The above process procedure is an example, and the order may change. Further, after constructing the new underground structure 24, a step of removing the new retaining wall 16 may be provided.
<作用、効果>
本実施形態によれば、山留め10を構築した後に山留め10内に新設の地下構造物24を構築するため、山留め10によって土圧を受けることができる。また、山留め10を既存地下躯体12の地下外壁14B、14C、14Dと、地下外壁14B、14C、14Dの外側に設けられた新設山留め壁16とで構成している。
<Action, effect>
According to the present embodiment, since the new underground structure 24 is constructed in the retaining 10 after the retaining 10 is constructed, the earth pressure can be received by the retaining 10. Further, the retaining wall 10 is composed of underground outer walls 14B, 14C, 14D of the existing underground skeleton 12 and new retaining walls 16 provided outside the underground outer walls 14B, 14C, 14D.
このため、既存地下躯体12を全て残して山留めとする場合と比較して、既存地下構造物の面積より面積の大きい新設の地下構造物24を構築することができる。さらに、新設山留め壁16のみで山留めを構成する場合と比較して、建築コストを削減することができるとともに、工期を短縮することができる。 For this reason, it is possible to construct a new underground structure 24 having a larger area than the area of the existing underground structure, as compared with the case where all the existing underground skeleton 12 is left as a pile. Further, as compared with the case where the retaining wall 16 is used alone as the retaining wall, the construction cost can be reduced and the construction period can be shortened.
(第2実施形態)
次に、本発明の第2実施形態に係る山留めについて、図2を用いて説明する。
(Second Embodiment)
Next, the retaining pile according to the second embodiment of the present invention will be described with reference to FIG.
<構成>
第2実施形態では、図2(A)に示すように、2つの既存建物の地下空間P、Qをそれぞれ画定する2つの既存地下構造物26、28の既存地下躯体30、32が、間隔をあけて隣り合うように設けられている。また、図2(C)に示すように、2つの既存地下躯体30、32のうち、地下外壁34、36の対面する一面34A、36Aがそれぞれ解体及び撤去されている。
<Structure>
In the second embodiment, as shown in FIG. 2A, the existing underground skeletons 30 and 32 of the two existing underground structures 26 and 28 defining the underground spaces P and Q of the two existing buildings are spaced apart from each other. It is provided so that it is open and adjacent to each other. Further, as shown in FIG. 2C, of the two existing underground skeletons 30 and 32, the facing surfaces 34A and 36A of the underground outer walls 34 and 36 have been dismantled and removed, respectively.
一方、本実施形態の新設山留め壁38は、地下外壁34、36の撤去された一面34A、36Aに挟まれた部分へ作用する土圧を受けるものであり、残された地下外壁34、36の外側、すなわち地下空間P、Qの外側に設けられている。また、新設山留め壁38は、一例として地盤改良壁(ソイルセメント壁)によって形成されている。 On the other hand, the newly constructed retaining wall 38 of the present embodiment receives earth pressure acting on the portion sandwiched between the removed one surfaces 34A and 36A of the underground outer walls 34 and 36, and the remaining underground outer walls 34 and 36 It is provided on the outside, that is, outside the underground spaces P and Q. Further, the newly constructed retaining wall 38 is formed by a ground improvement wall (soil cement wall) as an example.
新設山留め壁38としての地盤改良壁は、外周部同士が互いにラップして一体化した複数の地盤改良柱で構成されており、地盤改良柱は、例えば地盤を掘削しながら掘削土とセメントミルク等の固化材とを混合撹拌することにより造成されている。なお、地盤改良柱の芯材として、図示しないH形鋼等が用いられていてもよい。 The ground improvement wall as the new retaining wall 38 is composed of a plurality of ground improvement pillars in which the outer peripheral portions are wrapped around each other and integrated, and the ground improvement pillars include, for example, excavated soil and cement milk while excavating the ground. It is created by mixing and stirring with the solidifying material of. In addition, H-shaped steel or the like (not shown) may be used as the core material of the ground improvement column.
また、新設山留め壁38は、残された地下外壁34、36に沿って設けられているとともに、撤去された一面34A、36Aが接合されていた地下外壁34、36の端部間をそれぞれ繋ぐように設けられている。これにより、新設山留め壁38と残された地下外壁34、36とによって山留め40が構築されているとともに、地下空間P、Qより面積の大きな地下空間Rが画定されている。 In addition, the new retaining wall 38 is provided along the remaining underground outer walls 34 and 36, and connects the ends of the underground outer walls 34 and 36 to which the removed one surfaces 34A and 36A are joined, respectively. It is provided in. As a result, the retaining wall 38 is constructed by the new retaining wall 38 and the remaining underground outer walls 34 and 36, and the underground space R having a larger area than the underground spaces P and Q is defined.
さらに、新設山留め壁38と地下外壁34、36の端部との隙間には、止水剤42が注入されている。止水剤42は、例えば水ガラス系グラウト材であり、地盤中に注入されることで、地盤の止水性を高めることができる。なお、地下水位が既存地下躯体30、32の図示しない地下底版より深い場合には、新設山留め壁38と地下外壁34、36の端部との隙間に止水剤42を注入しなくてもよい。 Further, the water blocking agent 42 is injected into the gap between the newly constructed retaining wall 38 and the ends of the underground outer walls 34 and 36. The water blocking agent 42 is, for example, a water glass grout material, and by being injected into the ground, the water stopping agent of the ground can be enhanced. If the groundwater level is deeper than the underground bottom slabs of the existing underground skeletons 30 and 32 (not shown), it is not necessary to inject the water blocking agent 42 into the gap between the new retaining wall 38 and the ends of the underground outer walls 34 and 36. ..
<地下構造物の構築方法>
山留め40を利用して新設の地下構造物44を構築する場合には、まず、2つの既存建物の図示しない地上構造物を解体及び撤去する。そして、図2(B)に示すように、2つの既存地下構造物26、28の地下外壁34、36の対面する一面34A、36Aの外側、すなわち地下空間P、Qの外側に新設山留め壁38を構築する。
<How to build an underground structure>
When constructing a new underground structure 44 using the mountain retaining 40, first, the above-ground structures (not shown) of the two existing buildings are dismantled and removed. Then, as shown in FIG. 2 (B), a new retaining wall 38 is provided on the outside of the facing surfaces 34A and 36A of the two existing underground structures 26 and 28, that is, on the outside of the underground spaces P and Q. To build.
次に、2つの既存地下構造物26、28の既存柱46及び既存梁48を全て解体及び撤去するとともに、図2(C)に示すように、既存地下躯体30、32の地下外壁34、36の一面34A、36Aを解体及び撤去する。また、地下外壁34、36の一面34A、36Aと新設山留め壁38とで囲まれた部分の地盤を掘削する。 Next, the existing columns 46 and the existing beams 48 of the two existing underground structures 26 and 28 are all dismantled and removed, and as shown in FIG. 2C, the underground outer walls 34 and 36 of the existing underground structures 30 and 32 are dismantled and removed. One side 34A and 36A are dismantled and removed. In addition, the ground of the portion surrounded by the one surfaces 34A and 36A of the underground outer walls 34 and 36 and the newly constructed retaining wall 38 will be excavated.
なお、第1実施形態と同様に、山留め40に作用する土圧が高い場合には、既存地下構造物26、28の既存柱46及び既存梁48を一部撤去せずに残したり、新たに切梁等を設けたりしてもよい。 As in the first embodiment, when the earth pressure acting on the retaining wall 40 is high, the existing columns 46 and the existing beams 48 of the existing underground structures 26 and 28 may be left without being partially removed, or newly. A girder or the like may be provided.
その後、新設山留め壁38と地下外壁34、36とによって構成された山留め40の内側、すなわち地下空間Rに、新設地下外壁や新設地下底版を含む新設の地下構造物44を構築する。なお、上記の工程手順は一例であり、順序が前後しても構わない。 After that, a new underground structure 44 including a new underground outer wall and a new underground bottom slab is constructed inside the retaining wall 40 composed of the new retaining wall 38 and the underground outer walls 34 and 36, that is, in the underground space R. The above process procedure is an example, and the order may change.
<作用、効果>
本実施形態によれば、山留め40を構築した後に山留め40内に新設の地下構造物44を構築するため、第1実施形態と同様に、山留め40によって土圧を受けることができる。
<Action, effect>
According to the present embodiment, since the new underground structure 44 is constructed in the retaining 40 after the retaining 40 is constructed, earth pressure can be received by the retaining 40 as in the first embodiment.
また、本実施形態では、新設山留め壁38を地盤改良壁によって形成するとともに、新設山留め壁38と地下外壁34、36の端部との隙間に止水剤42を注入している。このため、特に地下水位が既存地下躯体30、32の地下底版より浅い場合には、新設山留め壁38によって地下水を止水することができる。 Further, in the present embodiment, the new retaining wall 38 is formed by the ground improvement wall, and the water blocking agent 42 is injected into the gap between the new retaining wall 38 and the ends of the underground outer walls 34 and 36. Therefore, especially when the groundwater level is shallower than the underground bottom slabs of the existing underground skeletons 30 and 32, the groundwater can be stopped by the new retaining wall 38.
さらに、新設山留め壁38を地盤改良壁によって形成することで、第1実施形態のように新設山留め壁16を親杭横矢板工法によって形成する場合と比較して、地盤を改良することができる。 Further, by forming the new retaining wall 38 by the ground improvement wall, the ground can be improved as compared with the case where the new retaining wall 16 is formed by the main pile horizontal sheet pile method as in the first embodiment.
また、本実施形態によれば、2つの既存地下躯体30、32の地下外壁34、36の対面する一面34A、36Aをそれぞれ撤去し、残された2つの地下外壁34、36に沿って新設山留め壁38を設けている。このため、2つの地下外壁34、36と新設山留め壁38とによって1つの山留め40を構成することができるとともに、山留め40内に1つの大規模な新設の地下構造物44を構築することができる。 Further, according to the present embodiment, the two existing underground skeletons 30 and 32 are removed from the facing surfaces 34A and 36A of the underground outer walls 34 and 36, respectively, and new underground retaining is carried out along the remaining two underground outer walls 34 and 36. A wall 38 is provided. Therefore, one underground retaining wall 40 can be constructed by the two underground outer walls 34 and 36 and the new retaining wall 38, and one large-scale new underground structure 44 can be constructed in the retaining wall 40. ..
(第3実施形態)
次に、本発明の第3実施形態に係る山留めについて、図3を用いて説明する。
(Third Embodiment)
Next, the retaining pile according to the third embodiment of the present invention will be described with reference to FIG.
<構成>
第3実施形態の既存建物の既存地下躯体50は、図3(B)に示すように、地下外壁52、第1地下底版54A、及び第1地下底版54Aより深い位置に設けられた第2地下底版54Bを有しており、既存地下躯体50によって異なる階層(深さ)を有する地下空間Sが画定されている。
<Structure>
As shown in FIG. 3B, the existing underground skeleton 50 of the existing building of the third embodiment is provided at a position deeper than the underground outer wall 52, the first underground slab 54A, and the first underground slab 54A. It has a bottom slab 54B, and an underground space S having a different level (depth) is defined by the existing underground skeleton 50.
また、図3(A)、図3(B)に示すように、既存地下躯体50のうち、地下外壁52の一面52A、一面52Aにそれぞれ隣接する地下外壁52の対面する二面52B、52Cの一部、及び、一面52Aに隣接する第1地下底版54Aの一部がそれぞれ解体及び撤去されている。 Further, as shown in FIGS. 3 (A) and 3 (B), among the existing underground skeletons 50, the two surfaces 52B and 52C facing the underground outer wall 52 adjacent to the one surface 52A and the one surface 52A of the underground outer wall 52, respectively. A part and a part of the first underground slab 54A adjacent to one side 52A have been dismantled and removed, respectively.
残された地下外壁52の内側、すなわち地下空間Sの内側には、地下外壁52の残された二面52B、52Cの端部間を繋ぐように新設山留め壁56が設けられている。新設山留め壁56は、地下外壁52の撤去された一面52A、及び二面52B、52Cの一部が存在した部分へ作用する土圧を受けるものであり、新設山留め壁56と残された地下外壁52とによって山留め60が構築されているとともに、地下空間Sより面積の小さな地下空間Tが画定されている。 Inside the remaining underground outer wall 52, that is, inside the underground space S, a new retaining wall 56 is provided so as to connect the ends of the remaining two surfaces 52B and 52C of the underground outer wall 52. The new retaining wall 56 is subject to earth pressure acting on the part where the removed one side 52A and the two sides 52B and 52C of the underground outer wall 52 existed, and the new retaining wall 56 and the remaining underground outer wall An underground space T having a smaller area than the underground space S is defined along with the construction of the earth retaining wall 60 by the 52.
新設山留め壁56は、一例として複数の鋼矢板62(シートパイル)で構成されている。具体的には、鋼矢板62は断面波形状の形鋼であり、複数の鋼矢板62を互い違いに組み合わせ、両端に設けられた図示しない継手を繋ぎ合わせることで新設山留め壁56が構築されている。なお、図3(B)に示すように、新設山留め壁56(鋼矢板62)の下端部は、第1地下底版54Aより深く、かつ第2地下底版54Bより浅い位置まで根入れされている。 The new retaining wall 56 is composed of a plurality of steel sheet piles 62 (sheet piles) as an example. Specifically, the steel sheet pile 62 is a shaped steel having a corrugated cross section, and a new retaining wall 56 is constructed by alternately combining a plurality of steel sheet piles 62 and connecting joints (not shown) provided at both ends. .. As shown in FIG. 3B, the lower end of the new retaining wall 56 (steel sheet pile 62) is deeper than the first underground slab 54A and shallower than the second underground slab 54B.
<地下構造物の構築方法>
山留め60を利用して新設の地下構造物64を構築する場合には、まず、既存地下躯体50の地下外壁52の一面54Aの内側、すなわち地下空間Sの内側に新設山留め壁56を構築する。
<How to build an underground structure>
When constructing a new underground structure 64 using the retaining wall 60, first, the new retaining wall 56 is constructed inside the one side 54A of the underground outer wall 52 of the existing underground skeleton 50, that is, inside the underground space S.
次に、既存地下躯体50のうち、新設山留め壁56より外側の部分である地下外壁52の一面52A、地下外壁52の二面52B、52Cの一部、及び、第1地下底版54Aの一部を解体及び撤去する。なお、新設山留め壁56の外側に他の新設の構造物等を構築する必要がない場合には、地下外壁52の一面52A、地下外壁52の二面52B、52Cの一部、及び、第1地下底版54Aの一部を撤去せずに残しておいてもよい。 Next, of the existing underground skeleton 50, one side 52A of the underground outer wall 52, which is a part outside the new retaining wall 56, a part of the two sides 52B and 52C of the underground outer wall 52, and a part of the first underground bottom slab 54A. To be dismantled and removed. When it is not necessary to construct another new structure or the like on the outside of the new retaining wall 56, one side 52A of the underground outer wall 52, a part of the two sides 52B and 52C of the underground outer wall 52, and the first A part of the underground slab 54A may be left without being removed.
その後、新設山留め壁56と残された地下外壁52とによって構成された山留め60の内側、すなわち地下空間Tに、新設地下外壁や新設地下底版を含む新設の地下構造物64を構築する。なお、上記の工程手順は一例であり、順序が前後しても構わない。また、新設の地下構造物64を構築した後に、新設山留め壁56を撤去する工程を設けてもよい。 After that, a new underground structure 64 including a new underground outer wall and a new underground bottom slab is constructed inside the mountain retaining 60 composed of the new retaining wall 56 and the remaining underground outer wall 52, that is, in the underground space T. The above process procedure is an example, and the order may change. Further, after constructing the new underground structure 64, a step of removing the new retaining wall 56 may be provided.
<作用、効果>
本実施形態によれば、地下外壁52の撤去する一面54Aの内側に新設山留め壁56を設け、新設山留め壁56と残された地下外壁52とによって山留め60を構成している。
<Action, effect>
According to the present embodiment, a new retaining wall 56 is provided inside the one side 54A to be removed from the underground outer wall 52, and the retaining wall 60 is composed of the new retaining wall 56 and the remaining underground outer wall 52.
このため、既存地下躯体50の新設山留め壁56より外側の部分を解体及び撤去した後、既存建物の既存地下構造物より面積の小さい新設の地下構造物64を構築しつつ、撤去された既存地下躯体50が存在していた部分に他の構造物等を構築することができる。 Therefore, after dismantling and removing the part of the existing underground skeleton 50 outside the new retaining wall 56, the existing underground structure that was removed while constructing a new underground structure 64 having a smaller area than the existing underground structure of the existing building. Other structures and the like can be constructed in the portion where the skeleton 50 existed.
(第4実施形態)
次に、本発明の第4実施形態に係る山留めについて、図4を用いて説明する。
(Fourth Embodiment)
Next, the retaining pile according to the fourth embodiment of the present invention will be described with reference to FIG.
<構成>
第4実施形態では、図4に示すように、地下空間Uを画定する既存地下躯体66のうち、地下底版68の一部が解体及び撤去されており、鉛直方向に建込まれた新設山留め壁70の上端部が残された地下底版68の端部に連結されている。
<Structure>
In the fourth embodiment, as shown in FIG. 4, of the existing underground skeleton 66 defining the underground space U, a part of the underground bottom slab 68 has been dismantled and removed, and a new retaining wall built in the vertical direction. The upper end of 70 is connected to the end of the remaining underground slab 68.
新設山留め壁70は、撤去された地下底版68の一部が存在した部分へ作用する土圧や地下水圧を受けるものであり、新設山留め壁70、既存地下躯体66の地下外壁72、及び残された地下底版68によって山留め80が構築されている。また、山留め80によって、地下空間Uより深さが深い地下空間Vが画定されている。 The new retaining wall 70 receives earth pressure and groundwater pressure acting on the part where a part of the removed underground bottom slab 68 existed, and the new retaining wall 70, the underground outer wall 72 of the existing underground skeleton 66, and the remaining underground retaining wall 70. The ridge 80 is constructed by the underground slab 68. Further, the underground space V, which is deeper than the underground space U, is defined by the retaining 80.
なお、新設山留め壁70に作用する土圧や地下水圧が低い場合には、新設山留め壁70と残された地下底版68とを連結しなくてもよい。また、新設山留め壁70の上端部の位置は、水平方向から見て地下底版68の端部とラップする位置とされていればよく、新設山留め壁70の上端面の深さが地下底版68の上面の深さより浅くされていてもよい。 If the earth pressure or groundwater pressure acting on the new retaining wall 70 is low, it is not necessary to connect the new retaining wall 70 and the remaining underground bottom slab 68. Further, the position of the upper end portion of the new retaining wall 70 may be a position that wraps with the end portion of the underground bottom slab 68 when viewed from the horizontal direction, and the depth of the upper end surface of the new retaining wall 70 is the depth of the underground bottom slab 68. It may be shallower than the depth of the upper surface.
<地下構造物の構築方法>
山留め80を利用して新設の地下構造物82を構築する場合には、まず、既存建物の図示しない既存地下構造物を解体及び撤去しつつ、既存地下躯体66の地下底版68に図示しない貫通孔を形成する。
<How to build an underground structure>
When constructing a new underground structure 82 using the mountain retaining 80, first, while dismantling and removing the existing underground structure (not shown) of the existing building, a through hole (not shown) in the underground bottom slab 68 of the existing underground skeleton 66. To form.
そして、地下底版68の上に設置した図示しない杭打機によって貫通孔から地盤中に複数の鋼矢板等の杭を建て込むことにより、複数の杭によって新設山留め壁70を構築する。もしくは、杭の杭頭にヤットコ(仮杭)をかぶせ、ヤットコを用いて地上から杭を建て込むことにより、新設山留め壁70を構築する。 Then, by building a plurality of piles such as steel sheet piles in the ground from the through hole by a pile driver (not shown) installed on the underground bottom slab 68, a new pile retaining wall 70 is constructed by the plurality of piles. Alternatively, a new pile wall 70 is constructed by covering the pile head of the pile with a yatko (temporary pile) and building the pile from the ground using the yatko.
次に、新設山留め壁70より内側の部分にある一部の地下底版68を解体及び撤去する。そして、新設山留め壁70と地下外壁72とによって構成された山留め80の内側、すなわち地下空間Vにおいて、地下底版68より深い位置に新設の地下構造物82の新設地下底版を構築し、新設地下外壁等のその他の新設の地下構造物64を構築する。なお、上記の工程手順は一例であり、順序が前後しても構わない。 Next, a part of the underground slab 68 located inside the new retaining wall 70 is dismantled and removed. Then, in the inside of the retaining wall 80 composed of the new retaining wall 70 and the underground outer wall 72, that is, in the underground space V, a new underground bottom slab of the new underground structure 82 is constructed at a position deeper than the underground bottom slab 68, and the new underground outer wall is constructed. Other new underground structures such as 64 will be constructed. The above process procedure is an example, and the order may change.
<作用、効果>
本実施形態によれば、地下底版68の一部の撤去し、撤去した地下底版68の外側、すなわち地下空間Uの外側に新設山留め壁70を構築している。このため、撤去された地下底版68の一部が存在した部分へ作用する土圧や地下水圧を新設山留め壁70によって受けることができる。
<Action, effect>
According to the present embodiment, a part of the underground bottom slab 68 is removed, and a new retaining wall 70 is constructed outside the removed underground bottom slab 68, that is, outside the underground space U. Therefore, the earth pressure and the groundwater pressure acting on the part where a part of the removed underground bottom slab 68 existed can be received by the new retaining wall 70.
また、新設山留め壁70と地下外壁72とで構成された山留め80によって、地下空間Uより深さが深い地下空間Vが画定されている。このため、既存建物の既存地下構造物より深さの深い新設の地下構造物82を構築することができる。 Further, the underground space V deeper than the underground space U is defined by the earth retaining wall 80 composed of the newly constructed earth retaining wall 70 and the underground outer wall 72. Therefore, it is possible to construct a new underground structure 82 having a depth deeper than the existing underground structure of the existing building.
(その他の実施形態)
以上、本発明について実施形態の一例を説明したが、本発明はかかる実施形態に限定されるものではなく、本発明の範囲内にて他の種々の実施形態が可能である。
(Other embodiments)
Although an example of the embodiment of the present invention has been described above, the present invention is not limited to such an embodiment, and various other embodiments are possible within the scope of the present invention.
例えば、第1実施形態では、地下外壁14の一面14Aのみを撤去し、残された地下外壁14B、14C、14Dと新設山留め壁16とによって山留め10を構築していた。しかし、既存地下躯体12の撤去する範囲は、新設の地下構造物24の大きさ(面積又は深さ)に合わせて適宜定めることができる。 For example, in the first embodiment, only one surface 14A of the underground outer wall 14 was removed, and the retaining wall 10 was constructed by the remaining underground outer walls 14B, 14C, 14D and the newly constructed retaining wall 16. However, the range to be removed from the existing underground skeleton 12 can be appropriately determined according to the size (area or depth) of the newly constructed underground structure 24.
このため、例えば地下外壁14の三辺を撤去し、残された地下外壁14の一面と新設山留め壁16とによって山留め10を構築してもよい。また、既存地下躯体12の地下外壁14を全て撤去し、既存地下躯体12の地下底版18と新設山留め壁16とによって山留めを構築してもよい。 Therefore, for example, the three sides of the underground outer wall 14 may be removed, and the retaining wall 10 may be constructed by the remaining one surface of the underground outer wall 14 and the newly constructed retaining wall 16. Further, the underground outer wall 14 of the existing underground skeleton 12 may be completely removed, and the retaining wall may be constructed by the underground bottom slab 18 of the existing underground skeleton 12 and the new retaining wall 16.
同様に、第4実施形態では、既存地下躯体66の地下底版68の一部が撤去され、新設山留め壁70、地下外壁72、及び残された地下底版68によって山留め80が構築されていた。しかし、地下底版68を全て撤去し、新設山留め壁70と既存地下躯体66の地下外壁72とによって山留めを構築してもよい。 Similarly, in the fourth embodiment, a part of the underground bottom slab 68 of the existing underground skeleton 66 was removed, and the underground bottom slab 68 was constructed by the new underground retaining wall 70, the underground outer wall 72, and the remaining underground bottom slab 68. However, the underground bottom slab 68 may be completely removed, and the underground retaining wall 70 and the underground outer wall 72 of the existing underground skeleton 66 may be used to construct the retaining wall.
さらに、第2実施形態では、新設山留め壁38は地下外壁34、36の端部間をそれぞれ繋ぐように、地下外壁34、36に沿って直線状に設けられていた。しかし、新設山留め壁38の位置や大きさ、形状は、地下外壁34、36とともに山留め80を構築することができる範囲で、新設の地下構造物44の大きさに合わせて適宜定めることができる。 Further, in the second embodiment, the newly constructed retaining wall 38 is provided linearly along the underground outer walls 34 and 36 so as to connect the ends of the underground outer walls 34 and 36, respectively. However, the position, size, and shape of the new retaining wall 38 can be appropriately determined according to the size of the new underground structure 44 within the range in which the retaining wall 80 can be constructed together with the underground outer walls 34 and 36.
このため、例えば、新設山留め壁38を地下外壁34、36の外周方向にラップするように設けてもよく、また、新設山留め壁38を地下外壁34、36の外周方向に張出す形状としてもよい。 Therefore, for example, the new retaining wall 38 may be provided so as to wrap in the outer peripheral direction of the underground outer walls 34 and 36, or the new retaining wall 38 may be formed so as to project in the outer peripheral direction of the underground outer walls 34 and 36. ..
10、40、60、80 山留め
12、30、50、66 既存地下躯体
14、34、52、72 地下外壁
16、38、56、70 新設山留め壁
18、68 地下底版
24、44、64、82 新設の地下構造物
26 既存地下構造物
54A 第1地下底版(地下底版)
54B 第2地下底版(地下底版)
10, 40, 60, 80 Mountain retaining wall 12, 30, 50, 66 Existing underground skeleton 14, 34, 52, 72 Underground outer wall 16, 38, 56, 70 New underground retaining wall 18, 68 Underground slab 24, 44, 64, 82 New construction Underground structure 26 Existing underground structure 54A 1st underground slab (underground slab)
54B 2nd underground slab (underground slab)
Claims (2)
前記2つの既存地下躯体のそれぞれに残された地下外壁の互いに対面する左右端部同士をつなぐように設けられ、土圧を受ける新設山留め壁と、
前記2つの既存地下躯体の前記残された地下外壁と前記新設山留め壁との内側に形成され、新設の地下構造物が構築される地下空間と、
を有する山留め。 Two existing underground skeletons , which are arranged so as to be adjacent to each other at intervals and each of which has an underground outer wall facing each other removed,
A new retaining wall that is provided to connect the left and right ends of the underground outer walls left in each of the two existing underground skeletons facing each other and receives earth pressure, and
An underground space formed inside the remaining underground outer wall of the two existing underground skeletons and the new retaining wall, and a new underground structure is constructed.
With a mountain clasp.
前記2つの既存地下躯体のそれぞれに設けられ互いに対面する地下外壁をそれぞれ撤去する工程と、The process of removing the underground outer walls facing each other provided in each of the two existing underground skeletons, and
前記2つの既存地下躯体の残された地下外壁と前記新設山留め壁との内側に新設の地下構造物を構築する工程と、The process of constructing a new underground structure inside the remaining underground outer wall of the two existing underground skeletons and the new retaining wall, and
を有する地下構造物の構築方法。How to build an underground structure with.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016223468A JP6842890B2 (en) | 2016-11-16 | 2016-11-16 | How to build a mountain retaining and underground structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016223468A JP6842890B2 (en) | 2016-11-16 | 2016-11-16 | How to build a mountain retaining and underground structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2018080506A JP2018080506A (en) | 2018-05-24 |
| JP6842890B2 true JP6842890B2 (en) | 2021-03-17 |
Family
ID=62197548
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2016223468A Active JP6842890B2 (en) | 2016-11-16 | 2016-11-16 | How to build a mountain retaining and underground structure |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6842890B2 (en) |
-
2016
- 2016-11-16 JP JP2016223468A patent/JP6842890B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2018080506A (en) | 2018-05-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6274406B2 (en) | Construction method of new underground structure with dismantling of existing underground structure | |
| KR102135594B1 (en) | Retaining Wall Block System | |
| WO2011114507A1 (en) | Method of constructing underground structure to be newly built | |
| JP2015200173A (en) | Ground improvement foundation structure | |
| JP2000352296A (en) | Method o constructing passage just under underground structure | |
| JP5764245B2 (en) | Construction method of underground structure and underground structure | |
| JP6704801B2 (en) | Rebuilding building with existing underground outer wall | |
| JP2017110380A (en) | Underground construction method and earth retaining structure | |
| JP6842890B2 (en) | How to build a mountain retaining and underground structure | |
| JP4997207B2 (en) | Construction method for underground structures | |
| JP2016156216A (en) | Yamadome wall | |
| JP5875651B2 (en) | Underground structure and construction method of underground structure | |
| JP6768477B2 (en) | How to build an underground structure | |
| JP6827256B2 (en) | How to rebuild the building | |
| JP5512600B2 (en) | Retaining wall extension method and retaining wall structure | |
| JP6774774B2 (en) | Pile foundation structure | |
| JP6898728B2 (en) | Structure | |
| JP2018115483A (en) | How to dismantle existing underground structures | |
| JP6948908B2 (en) | Construction method of segments, buried structures and buried structures | |
| JP6764593B2 (en) | Structure with synthetic underground wall | |
| KR102586998B1 (en) | Underground continuous wall panel with reinforced connection part and its construction method | |
| JPH0654016B2 (en) | Underground space construction method | |
| JP6877612B2 (en) | Rebuilding building with existing underground outer wall | |
| JP7851261B2 (en) | Method for constructing connecting structures and underground structures | |
| JP5587725B2 (en) | Reinforcement method for existing foundations for structures |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20190925 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20200731 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20200804 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20200928 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20210216 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20210222 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6842890 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |