JP6850589B2 JP2016222700A JP2016222700A JP6850589B2 JP 6850589 B2 JP6850589 B2 JP 6850589B2 JP 2016222700 A JP2016222700 A JP 2016222700A JP 2016222700 A JP2016222700 A JP 2016222700A JP 6850589 B2 JP6850589 B2 JP 6850589B2
Authority
JP
Japan
Prior art keywords
frame
stand
block
roof frame
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016222700A
Other languages
Japanese (ja)
Other versions
JP2018080490A (en
Inventor
伸明 竹永
伸明 竹永
茂臣 深沢
茂臣 深沢
秀実 ▲柳▼澤
秀実 ▲柳▼澤
岡 日出夫
日出夫 岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP2016222700A priority Critical patent/JP6850589B2/en
Publication of JP2018080490A publication Critical patent/JP2018080490A/en
Application granted granted Critical
Publication of JP6850589B2 publication Critical patent/JP6850589B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

本発明は、屋根架構の構築方法に関する。 The present invention relates to a method for constructing a roof frame.

特許文献1には、中間層鉄骨トラベリング工法に関する技術が開示されている。この先行技術では、地組みした中間層鉄骨トラスの1ユニットを躯体妻側から所定の奥位置の両小梁間に架載置し、次いで同じユニットの地組み完了後これを所定の手前位置に同様に載置して両ユニットを桁方向梁により連結してブロックを形成する。そして、ブロックの1スパン分のスライドを行い順次ユニットを追加して大規模ブロックを形成後、屋根トラスの下にスライドさせて最終定着する。 Patent Document 1 discloses a technique relating to an intermediate layer steel frame traveling method. In this prior art, one unit of the grounded intermediate steel truss is mounted between the two beams at a predetermined back position from the skeleton gable side, and then after the grounding of the same unit is completed, this is similarly placed in the predetermined front position. Both units are connected by a girder beam to form a block. Then, slide one span of the block, add units in sequence to form a large-scale block, and then slide it under the roof truss to finally fix it.

ここで、アリーナや体育館等の内部に広い空間を有する構造物の躯体に架設する屋根架構の構築に、スライド工法が採用されることがある。スライド工法は、あらかじめ作業しやすい作業床上で屋根架構を構成する複数の架構ユニットを1架構ユニットずつ組み立てた後、1架構ユニットずつ走行レールに載せて、一方側から他方側に順次スライドしていき、屋根架構全体を組み立てる工法である。 Here, the slide method may be adopted for constructing a roof frame to be erected on the skeleton of a structure having a large space inside such as an arena or a gymnasium. In the slide method, after assembling multiple frame units that make up the roof frame on the work floor that is easy to work in advance, one frame unit is placed on the traveling rail and slides sequentially from one side to the other. , It is a construction method to assemble the entire roof frame.

しかし、このスライド工法の場合、最初に組み立てた1架構ユニットが躯体の他端部に到達するまで、すなわち屋根架構を構成する各架構ユニットが全て完成して繋がるまで、屋根架構を躯体に固定する工事を行うことができない。よって、屋根架構を躯体に早期に固定し、工期を短縮することが望まれている。 However, in the case of this slide method, the roof frame is fixed to the frame until the first assembled frame unit reaches the other end of the frame, that is, until all the frame units constituting the roof frame are completed and connected. Construction cannot be done. Therefore, it is desired to fix the roof frame to the frame at an early stage and shorten the construction period.

特許4497341号Patent No. 4497341

本発明は、上記事実を鑑み、屋根架構を早期に躯体に固定することが目的である。 In view of the above facts, an object of the present invention is to fix the roof frame to the skeleton at an early stage.

第一態様は、構造物の躯体に架設され、複数の架構ブロックで構成された屋根架構の構築方法であって、前記構造物の前記躯体の一方側の外側に設けられた作業ステージで前記架構ブロックを作製する工程と、前記作業ステージで作製された前記架構ブロックを、前記躯体の一方側と他方側との間に架設されたレールで他方側にスライドさせ、前記躯体に固定する工程と、を備える屋根架構の構築工法である。 The first aspect is a method of constructing a roof frame that is erected on the frame of a structure and is composed of a plurality of frame blocks, and the frame is a work stage provided on the outside of one side of the frame of the structure. A step of manufacturing a block, a step of sliding the frame block manufactured in the work stage to the other side by a rail erected between one side and the other side of the frame, and fixing the frame block to the frame. It is a construction method of a roof frame equipped with.

第一態様の屋根架構の構築工法では、構造物の躯体の一方側の外側に設けられた作業ステージで作製された架構ブロックを、躯体の一方側と他方側との間に架設されたレールで他方側にスライドさせ躯体に固定する。よって、屋根架構全体の構築が完了する前に、先行して架構ブロックを躯体に早期に固定できる。したがって、効率的に工事を進捗させることができるので、構造物を構築する工期が短縮する。 In the construction method of the roof frame of the first aspect, the frame block produced by the work stage provided on the outside of one side of the frame of the structure is erected between one side and the other side of the frame. Slide it to the other side and fix it to the frame. Therefore, the frame block can be fixed to the frame at an early stage before the construction of the entire roof frame is completed. Therefore, the construction can be carried out efficiently, and the construction period for constructing the structure is shortened.

本発明によれば、屋根架構を早期に躯体に固定することができる。 According to the present invention, the roof frame can be fixed to the skeleton at an early stage.

図6の構造物の施工工程を説明する工程図であって、スタンドの一方側部の構築及び作業ステージの組立を行っている工程の図である。It is a process drawing explaining the construction process of the structure of FIG. 6, and is the figure of the process of constructing one side portion of a stand, and assembling a work stage. 図1の後の工程を示す工程図であって、先行架構ブロックの作製及びスタンドの他方側部の構築を行っている工程の図である。It is a process diagram which shows the process after FIG. 1, and is the figure of the process of manufacturing the leading frame block and constructing the other side portion of the stand. 図2の後の工程を示す工程図であって、先行架構ブロックを他方側にスライドしてスタンドに固定する工事及び後行架構ブロックの作製を行っている工程の図である。It is a process diagram which shows the process after FIG. 2, and is the figure of the process of sliding the leading frame block to the other side and fixing it to the stand, and manufacturing the trailing frame block. 図3の後の工程を示す工程図であって、先行架構ブロックを他方側にスライドしてスタンドに固定する工事及び後行架構ブロックの作製を行っている工程の図である。It is a process diagram which shows the process after FIG. 3, and is the figure of the process of sliding the leading frame block to the other side and fixing it to the stand, and manufacturing the trailing frame block. 図4の後の工程を示す工程図であって、後行架構ブロックをスライドさせてスタンドに固定すると共に先行架構ブロックと接合して一体化する工程の図である。It is a process diagram which shows the process after FIG. 4, and is the figure of the process which slides the trailing frame block and fixes it to a stand, and joins and integrates with the preceding frame block. 本実施形態の構築工法で屋根架構が構築された構造物を模式的に示す図7の6−6線に沿った垂直断面図である。It is a vertical cross-sectional view along line 6-6 of FIG. 7 which shows typically the structure in which the roof frame was constructed by the construction method of this embodiment. 図6の構造物の屋根架構を模式的に示す伏図である。It is a plan which shows typically the roof frame of the structure of FIG.

<実施形態>
本発明の一実施形態の屋根架構の構築工法について説明する。なお、各図において、鉛直方向を矢印Zで示し、水平方向の直交する二方向を矢印X及び矢印Yで示している。また、各図におけるX方向の右側を一方側とし、左側を他方側とする。また、図1〜図6は構造物の垂直断面を示しているが、断面を示す斜線(ハッチング)は、図が煩雑になるのを避けるためスタンドのみ図示している。
<Embodiment>
A method for constructing a roof frame according to an embodiment of the present invention will be described. In each figure, the vertical direction is indicated by an arrow Z, and the two orthogonal directions in the horizontal direction are indicated by an arrow X and an arrow Y. Further, the right side in the X direction in each figure is one side, and the left side is the other side. Further, FIGS. 1 to 6 show a vertical cross section of the structure, but the diagonal line (hatching) showing the cross section shows only the stand in order to avoid complicating the figure.

[構造]
まず、本実施形態の構築工法で屋根架構が構築された構造物の構造について説明する。
[Construction]
First, the structure of the structure in which the roof frame is constructed by the construction method of the present embodiment will be described.

図6及び図7に示すように、本実施形態の構造物10は、躯体の一例としての傾斜した階段状のスタンド20によって外周又は略外周が囲まれた所謂アリーナである。また、このスタンド20で囲まれたた内側が、競技を行うアリーナ床12(図6参照)となっている。 As shown in FIGS. 6 and 7, the structure 10 of the present embodiment is a so-called arena whose outer circumference or substantially outer circumference is surrounded by an inclined stepped stand 20 as an example of the skeleton. Further, the inside surrounded by the stand 20 is the arena floor 12 (see FIG. 6) for the competition.

構造物10の屋根14を構成する屋根架構100がスタンド20の上端部22に架設されている。なお、符号20Aはスタンド20の一方側半分を構成する一方側部であり、符号20Bはスタンド20の他方側半分を構成する他方側部である。また、符号22Aはスタンド20の一方側部20Aの他端の上端部であり、符号22Bはスタンド20の他方側部20Bの他端の上端部である。 A roof frame 100 constituting the roof 14 of the structure 10 is erected on the upper end portion 22 of the stand 20. Reference numeral 20A is a one-sided portion forming one half of the stand 20, and reference numeral 20B is a other side portion forming the other half of the stand 20. Further, reference numeral 22A is an upper end portion of the other end of the one side portion 20A of the stand 20, and reference numeral 22B is an upper end portion of the other end of the other side portion 20B of the stand 20.

屋根架構100は、Y方向を長手方向とする複数の架構ユニット110が、X方向に並び接合された構造となっている。なお、架構ユニット110に斜材を設けトラス構造としてもよい。また、後述するように、屋根架構100は、他方側半分を構成する先行架構ブロック120と一方側半分を構成する後行架構ブロック130とに分割されて作製され、これらが中央接合部125で接合されて一体化されている。 The roof frame 100 has a structure in which a plurality of frame units 110 having the Y direction as the longitudinal direction are arranged and joined in the X direction. The frame unit 110 may be provided with a diagonal member to form a truss structure. Further, as will be described later, the roof frame 100 is manufactured by being divided into a leading frame block 120 forming the other half and a trailing frame block 130 forming one half, and these are joined at the central joint 125. It is integrated.

[構築工法]
次に、本実施形態の構造物10のスタンド20の上端部22に架設された屋根架構100の構築工法の一例について説明する。
[Construction method]
Next, an example of the construction method of the roof frame 100 erected on the upper end portion 22 of the stand 20 of the structure 10 of the present embodiment will be described.

図1に示すように、スタンド20の一方側部20Aを構築する。また、スタンド20の一方側部20Aの外側に隣接して仮設の作業ステージ200を組み立てる。 As shown in FIG. 1, one side portion 20A of the stand 20 is constructed. Further, a temporary work stage 200 is assembled adjacent to the outside of one side portion 20A of the stand 20.

図2に示すように、クレーン300で資材を持ち上げて作業ステージ200の上で架構ユニット110を組み立て、屋根架構100の他方側半分を構成する先行架構ブロック120(図6及び図7も参照)を作製していく。また、同時にスタンド20の他方側部20Bも構築する。 As shown in FIG. 2, the material is lifted by the crane 300, the frame unit 110 is assembled on the work stage 200, and the leading frame block 120 (see also FIGS. 6 and 7) constituting the other half of the roof frame 100 is assembled. I will make it. At the same time, the other side portion 20B of the stand 20 is also constructed.

図3に示すように、スタンド20の一方側部20Aの上端部22Aと他方側部20Bの上端部22Bとの間にレール150を架設し、作製が完了した他方側の先行架構ブロック120を、レール150に載せて他方側にスライドさせる。なお、レール150の一方側は、仮設の支柱210によって支持されている。 As shown in FIG. 3, the rail 150 is erected between the upper end portion 22A of the one side portion 20A of the stand 20 and the upper end portion 22B of the other side portion 20B, and the leading frame block 120 on the other side for which the production is completed is laid. It is placed on the rail 150 and slid to the other side. One side of the rail 150 is supported by a temporary support column 210.

図3及び図4に示すように、他方側に移動した先行架構ブロック120をスタンド20の他方側部20Bに固定する工事等を行うと共に、同時に作業ステージ200の上で架構ユニット110を組み立て、屋根架構100の他方側半分を構成する後行架構ブロック130(図6及び図7も参照)を作製していく。 As shown in FIGS. 3 and 4, the leading frame block 120 moved to the other side is fixed to the other side 20B of the stand 20, and at the same time, the frame unit 110 is assembled on the work stage 200 to form a roof. The trailing frame block 130 (see also FIGS. 6 and 7) constituting the other half of the frame 100 is manufactured.

図5に示すように、一方側の後行架構ブロック130の作製が完了すると、レール150に載せて他方側にスライドさせる。そして、スタンド20の一方側部20Aに固定する工事等を行うと共に、中央接合部125で接合して先行架構ブロック120と後行架構ブロック130とを一体化する。 As shown in FIG. 5, when the production of the trailing frame block 130 on one side is completed, it is placed on the rail 150 and slid to the other side. Then, while performing work such as fixing to one side portion 20A of the stand 20, the leading frame block 120 and the trailing frame block 130 are integrated by joining at the central joint portion 125.

図6に示すように、レール150、仮設の作業ステージ200及び仮設の支柱210を撤去すると共に、他の工事を行い、構造物10を完成させる。 As shown in FIG. 6, the rail 150, the temporary work stage 200, and the temporary support column 210 are removed, and other construction is performed to complete the structure 10.

なお、説明はしていないが、屋根架構100の構築工事と同時に、他の工事も行っている。 Although not explained, other works are being carried out at the same time as the construction work of the roof frame 100.

[作用及び効果]
次に、本実施形態の作用及び効果について説明する。
[Action and effect]
Next, the operation and effect of this embodiment will be described.

構造物10のスタンド20の一方側部20Aの外側に仮設された作業ステージ200で作製された先行架構ブロック120を、スタンド20の一方側部20Aの上端部22Aと他方側部20Bの上端部22Bとの間に架設されたレール150に載せて他方側にスライドさせ、スタンド20の他方側部20Bに固定する。 The leading frame block 120 produced by the work stage 200 temporarily provided outside the one side portion 20A of the stand 20 of the structure 10 is provided with the upper end portion 22A of the one side portion 20A of the stand 20 and the upper end portion 22B of the other side portion 20B. It is placed on the rail 150 erected between the two and slid to the other side, and fixed to the other side 20B of the stand 20.

よって、屋根架構100全体の組み立てが完了する前に、先行して先行架構ブロック120をスタンド20の他方側部20Bに早期に固定する工事等を行うことができると共に同時に後行架構ブロック130の作製を行うことができる。 Therefore, before the assembly of the entire roof frame 100 is completed, the work of fixing the leading frame block 120 to the other side portion 20B of the stand 20 at an early stage can be performed, and at the same time, the trailing frame block 130 is manufactured. It can be performed.

したがって、従来のスライド工法のように屋根架構100全体が完成するまでスタンド20に固定する工事等を行うことができない場合と比較し、屋根架構10を早期にスタンド20に固定することができる。したがって、屋根架構100と取り合う外壁などの工事を早期に着手することができるので、効率的に工事を進捗させることができ、この結果、構造物10を構築する工期が短縮する。 Therefore, the roof frame 10 can be fixed to the stand 20 at an early stage as compared with the case where the work of fixing the roof frame 100 to the stand 20 cannot be performed until the entire roof frame 100 is completed as in the conventional slide method. Therefore, since the construction of the outer wall and the like that are in contact with the roof frame 100 can be started at an early stage, the construction can be efficiently progressed, and as a result, the construction period for constructing the structure 10 is shortened.

<その他>
尚、本発明は上記実施形態に限定されない。
<Others>
The present invention is not limited to the above embodiment.

例えば、上記実施形態では、構造物10は、傾斜した階段状のスタンド20によって外周又は略外周が囲まれた所謂アリーナであったが、これに限定されるものではない。例えば、構造物は、内部に柱が無い又は柱が殆ど無い広い空間を有する倉庫や体育館であってもよい。 For example, in the above embodiment, the structure 10 is a so-called arena whose outer circumference or substantially outer circumference is surrounded by an inclined stepped stand 20, but the structure 10 is not limited thereto. For example, the structure may be a warehouse or a gymnasium having a large space with no pillars or almost no pillars inside.

また、例えば、上記実施形態の構造物10では、先行架構ブロック120及び後行架構ブロック130を載せてスライドさせるレール150は、屋根架構100の構築が完了したのち撤去した。しかし、レール150を撤去しないで、そのまま残す構造であってもよい。 Further, for example, in the structure 10 of the above embodiment, the rail 150 on which the leading frame block 120 and the trailing frame block 130 are placed and slid is removed after the construction of the roof frame 100 is completed. However, the structure may be such that the rail 150 is not removed and is left as it is.

また、例えば、上記実施形態では、屋根架構100はフラットな形状であるが、湾曲した複雑な構造であってもよい。なお、屋根架構100が湾曲した複雑な構造の場合は、各架構ユニット110がそれぞれ異なる構造となり、従来のスライド工法のように順次繋げてスライドすると、変形やひずみが生じ易い。しかし、本発明を適用すると、左右対称の先行架構ブロック120と後行架構ブロック130とに分割することで、中央接合部125で接合し一体化する際に、変形やひずみ等を調整することができるので、好適である。 Further, for example, in the above embodiment, the roof frame 100 has a flat shape, but may have a curved and complicated structure. In the case of a complicated structure in which the roof frame 100 is curved, each frame unit 110 has a different structure, and if they are sequentially connected and slid as in the conventional slide method, deformation and distortion are likely to occur. However, when the present invention is applied, by dividing into a symmetrical leading frame block 120 and a trailing frame block 130, it is possible to adjust deformation, strain, etc. when joining and integrating at the central joint portion 125. It is suitable because it can be done.

また、例えば、上記実施形態では、屋根架構100を先行架構ブロック120と後行架構ブロック130との二つに分割したが、これに限定されない。屋根架構100を三つ以上の架構ブロックに分割してもよい。 Further, for example, in the above embodiment, the roof frame 100 is divided into two, a leading frame block 120 and a trailing frame block 130, but the present invention is not limited to this. The roof frame 100 may be divided into three or more frame blocks.

また、本発明の要旨を逸脱しない範囲において種々なる態様で実施し得ることは言うまでもない。 Needless to say, it can be carried out in various modes without departing from the gist of the present invention.

10 構造物
20 スタンド(躯体の一例)
100 屋根架構
120 先行架構ブロック(架構ブロックの一例)
130 後行架構ブロック(架構ブロックの一例)
150 レール
200 作業ステージ
10 Structure 20 Stand (Example of skeleton)
100 Roof frame 120 Leading frame block (an example of frame block)
130 Trailing frame block (an example of frame block)
150 rail 200 work stage

Claims (2)

構造物の躯体に架設され、複数の架構ブロックで構成された屋根架構の構築方法であって、
前記構造物の前記躯体の一方側の外側に作業ステージを地面よりも高い位置に設ける工程と、
前記作業ステージに資材を持ち上げ、前記作業ステージの上で前記架構ブロックを作製する工程と、
前記作業ステージで作製された前記架構ブロックを、前記躯体の一方側と他方側との間に架設されたレールで他方側にスライドさせ、前記躯体に固定する工程と、
を備え
前記躯体の一方側と他方側との間に前記レールを架設する前に、前記作業ステージで前記架構ブロックの作製を開始する
屋根架構の構築工法。
It is a method of constructing a roof frame that is erected on the frame of a structure and is composed of multiple frame blocks.
A step of providing a work stage at a position higher than the ground on the outside of one side of the skeleton of the structure, and
The process of lifting the material to the work stage and producing the frame block on the work stage,
A step of sliding the frame block produced in the work stage to the other side by a rail erected between one side and the other side of the frame and fixing the frame block to the frame.
Equipped with a,
Before erection of the rail between one side and the other side of the skeleton, the production of the frame block is started on the work stage.
Roof frame construction method.
前記作業ステージを撤去する工程を有する、
請求項1に記載の屋根架構の構築工法。
It has a step of removing the work stage.
The roof frame construction method according to claim 1.
JP2016222700A 2016-11-15 2016-11-15 Roof frame construction method Active JP6850589B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016222700A JP6850589B2 (en) 2016-11-15 2016-11-15 Roof frame construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016222700A JP6850589B2 (en) 2016-11-15 2016-11-15 Roof frame construction method

Publications (2)

Publication Number Publication Date
JP2018080490A JP2018080490A (en) 2018-05-24
JP6850589B2 true JP6850589B2 (en) 2021-03-31

Family

ID=62198645

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016222700A Active JP6850589B2 (en) 2016-11-15 2016-11-15 Roof frame construction method

Country Status (1)

Country Link
JP (1) JP6850589B2 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6237439A (en) * 1985-08-09 1987-02-18 株式会社竹中工務店 Traveling method
JPH07259191A (en) * 1994-03-22 1995-10-09 Taisei Corp All-weather construction method for structures
JP3151137B2 (en) * 1995-11-30 2001-04-03 株式会社巴コーポレーション Horizontal drawing method

Also Published As

Publication number Publication date
JP2018080490A (en) 2018-05-24

Similar Documents

Publication Publication Date Title
CN110667801B (en) Sectional manufacturing method for deck of dome of LNG ship
CN102691420B (en) Installation and construction method for multilayer large-span steel truss
JP4937838B2 (en) How to build a bridge
WO2017030159A1 (en) Building structure, building, and building construction method
JP6339923B2 (en) How to build a building frame
CN102277929B (en) Profiled complex V-shaped connecting steel column and method for fabricating same
JP6850589B2 (en) Roof frame construction method
CN107109836A (en) folding prefab structure
JP7020046B2 (en) How to repair existing structures
JP6736226B2 (en) Structure and construction method of the structure constructed on the tower-shaped building
JP6234704B2 (en) Tower structure and construction method of tower
JP2022089706A (en) Building inside staircase preceding construction method
CN208010367U (en) A kind of tunnel shaped steel arch spatial cooperation support system
JP6353678B2 (en) Beam-shaped member construction method
JP2017186857A (en) Roof structure of building and construction method of building roof structure
JP7161924B2 (en) Construction method of roof frame
JP6893134B2 (en) Building construction method
CN105442456A (en) Assembling type heavy steel tube supporting device
JP6465758B2 (en) Construction method of roof structure
CN116084696B (en) Construction method of large-span spiral stepped truss
CN104532989A (en) Construction method of steel plate shear wall
CN111424814B (en) A kind of construction method of steel frame structure of greenhouse
JP7229857B2 (en) building construction method
CN205421028U (en) Standard module and bridge steel case roof beam assembly bed -jig of bridge steel case roof beam assembly bed -jig
JP6086606B2 (en) Business building and its construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190925

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200807

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200818

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200917

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20201110

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210107

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210302

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210308

R150 Certificate of patent or registration of utility model

Ref document number: 6850589

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150