Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6863724B2 - Hot water supply system - Google Patents
[go: Go Back, main page]

JP6863724B2 - Hot water supply system - Google Patents

Hot water supply system Download PDF

Info

Publication number
JP6863724B2
JP6863724B2 JP2016234728A JP2016234728A JP6863724B2 JP 6863724 B2 JP6863724 B2 JP 6863724B2 JP 2016234728 A JP2016234728 A JP 2016234728A JP 2016234728 A JP2016234728 A JP 2016234728A JP 6863724 B2 JP6863724 B2 JP 6863724B2
Authority
JP
Japan
Prior art keywords
hot water
water supply
combustion
temperature
heat exchanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2016234728A
Other languages
Japanese (ja)
Other versions
JP2018091542A (en
Inventor
磯崎 健
健 磯崎
太郎 中野
太郎 中野
Original Assignee
株式会社ガスター
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社ガスター filed Critical 株式会社ガスター
Priority to JP2016234728A priority Critical patent/JP6863724B2/en
Publication of JP2018091542A publication Critical patent/JP2018091542A/en
Application granted granted Critical
Publication of JP6863724B2 publication Critical patent/JP6863724B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)
  • Regulation And Control Of Combustion (AREA)
  • Control Of Combustion (AREA)
  • Control For Baths (AREA)
  • Instantaneous Water Boilers, Portable Hot-Water Supply Apparatuses, And Control Of Portable Hot-Water Supply Apparatuses (AREA)

Description

本発明は、給湯器と、該給湯器を熱源機とする放熱装置とを含む給湯システムに関する。 The present invention relates to a hot water supply system including a water heater and a heat radiating device using the water heater as a heat source device.

給湯用の第1熱交換器および第1バーナが設けられた第1燃焼室と、暖房回路などの循環経路を循環する流体を加熱するための第2熱交換器および第2バーナが設けられた第2燃焼室を備えた給湯器では、一般に、1つの燃焼ファンで第1燃焼室と第2燃焼室の双方に同時に燃焼用の空気を送り込む。あるいは、第1燃焼室と第2燃焼室のそれぞれに燃焼ファンを設ける場合でも、第1燃焼室からの燃焼ガスの排気経路と第2燃焼室からの燃焼ガスの排気経路が合流して1つの排気口から排気が排出される場合には、第1バーナと第2バーナの一方のみを燃焼させる場合でも、他方への排気の回り込みを防止するために各燃焼ファンを同時に作動させる制御が行われる(特許文献1参照)。 A first combustion chamber provided with a first heat exchanger and a first burner for hot water supply, and a second heat exchanger and a second burner for heating fluid circulating in a circulation path such as a heating circuit were provided. In a water heater provided with a second combustion chamber, generally, one combustion fan simultaneously sends combustion air to both the first combustion chamber and the second combustion chamber. Alternatively, even when combustion fans are provided in each of the first combustion chamber and the second combustion chamber, the combustion gas exhaust path from the first combustion chamber and the combustion gas exhaust path from the second combustion chamber merge into one. When the exhaust is discharged from the exhaust port, even if only one of the first burner and the second burner is burned, control is performed to operate each combustion fan at the same time in order to prevent the exhaust from sneaking into the other. (See Patent Document 1).

特開2005−337531号公報Japanese Unexamined Patent Publication No. 2005-337531

シャワー使用時の快適性を確保する等の観点から、給湯動作を停止してから一定時間(たとえば、5分)の経過前に給湯動作を再開した場合における出湯温度の変動が、たとえば、±3℃以内に収まるようにする機能(Q機能と呼ばれる)が望まれる。 From the viewpoint of ensuring comfort when using the shower, the fluctuation of the hot water supply temperature when the hot water supply operation is restarted before a certain period of time (for example, 5 minutes) has elapsed after the hot water supply operation is stopped is, for example, ± 3. A function (called a Q function) that keeps the temperature within ° C is desired.

しかしながら、給湯動作の停止後に、風呂の追い焚きや暖房のための燃焼が第2燃焼室で行われると、この燃焼のために燃焼ファンが作動するので、給湯側の第1燃焼室にも燃焼ファンからの空気が送り込まれ、給湯側の熱交換器が冷却されてしまう。そのため、給湯停止後の再給湯の際の出湯温度が著しく低下し、快適性や省エネルギー性が損なわれる。 However, if combustion for reheating or heating the bath is performed in the second combustion chamber after the hot water supply operation is stopped, the combustion fan operates for this combustion, so that the first combustion chamber on the hot water supply side also burns. Air from the fan is sent in, and the heat exchanger on the hot water supply side is cooled. Therefore, the hot water discharge temperature at the time of re-supplying hot water after the hot water supply is stopped is remarkably lowered, and comfort and energy saving are impaired.

本発明は、上記の問題を解決しようとするものであり、給湯停止後の一定時間内に給湯を再開した際の出湯温度が著しく低下することのない給湯システムを提供することを目的としている。 An object of the present invention is to solve the above problems, and an object of the present invention is to provide a hot water supply system in which the hot water supply temperature does not drop significantly when the hot water supply is restarted within a certain period of time after the hot water supply is stopped.

かかる目的を達成するための本発明の要旨とするところは、次の各項の発明に存する。 The gist of the present invention for achieving such an object lies in the inventions of the following items.

[1]給湯器と、前記給湯器を熱源とする放熱装置を備えた給湯システムであって、
前記給湯器は、
第1燃焼室と、
前記第1燃焼室に収められ、給湯用の配管が通る第1熱交換器と、
前記第1熱交換器を加熱する第1バーナと、
第2燃焼室と、
前記第2燃焼室に収められ、前記放熱装置の放熱器が介挿された所定の循環経路の配管が通る第2熱交換器と、
前記循環経路に設けられた循環ポンプと、
前記第2熱交換器を加熱する第2バーナと、
前記第1バーナと前記第2バーナの少なくとも一方が燃焼中に作動して前記第1燃焼室と前記第2燃焼室の双方に燃焼用の空気を送風する燃焼ファンと、
前記給湯用の配管に通水があるときに前記第1バーナを燃焼させて給湯設定温度の湯を供給する給湯動作、および、前記放熱装置からの動作要求に応じて行う、前記循環ポンプを作動させて前記循環経路を循環する流体を前記第2バーナで加熱する循環流体加熱動作を制御する制御部と、
前記放熱装置と通信する通信部と、
を備え、
前記制御部は、前記給湯動作の動作状態を示す給湯動作情報を前記通信部を用いて前記放熱装置に送信し、
前記放熱装置は、前記給湯器から受信した前記給湯動作情報に基づいて前記給湯器が前記給湯動作を停止した後の所定期間か否かを判別し、前記所定期間中は、前記動作要求を禁止する、もしくは、前記動作要求で要求する熱量を所定量以下に制限する
ことを特徴とする給湯システム。
[1] A hot water supply system including a water heater and a heat radiating device using the water heater as a heat source.
The water heater
The first combustion chamber and
A first heat exchanger housed in the first combustion chamber and through which a hot water supply pipe passes.
A first burner for heating the first heat exchanger and
The second combustion chamber and
A second heat exchanger housed in the second combustion chamber and through which a pipe of a predetermined circulation path through which the radiator of the heat radiating device is inserted passes.
A circulation pump provided in the circulation path and
A second burner for heating the second heat exchanger and
A combustion fan in which at least one of the first burner and the second burner operates during combustion to blow combustion air to both the first combustion chamber and the second combustion chamber.
When there is water flowing through the hot water supply pipe, the first burner is burned to supply hot water at a set temperature for hot water supply, and the circulation pump is operated in response to an operation request from the heat radiating device. A control unit that controls a circulating fluid heating operation in which the fluid circulating in the circulation path is heated by the second burner.
A communication unit that communicates with the heat dissipation device,
With
The control unit transmits hot water supply operation information indicating the operating state of the hot water supply operation to the heat radiating device using the communication unit.
The heat radiating device determines whether or not it is a predetermined period after the water heater stops the hot water supply operation based on the hot water supply operation information received from the water heater, and prohibits the operation request during the predetermined period. A hot water supply system characterized in that the amount of heat required by the operation request is limited to a predetermined amount or less.

上記発明では、給湯動作の停止後の所定期間は、放熱装置から給湯器への動作要求の送信を禁止等する。これにより、給湯動作の停止後、給湯動作が再開されなければ、燃焼ファンが停止した状態(あるいは小風量の状態)に維持され、燃焼ファンからの送風による給湯側熱交換器(第1熱交換器)の冷却が抑制されて、給湯再開時の出湯温度の著しい低下が防止される。 In the above invention, transmission of an operation request from the heat radiating device to the water heater is prohibited for a predetermined period after the hot water supply operation is stopped. As a result, if the hot water supply operation is not restarted after the hot water supply operation is stopped, the combustion fan is maintained in the stopped state (or the state of a small air volume), and the hot water supply side heat exchanger (first heat exchange) by blowing air from the combustion fan. The cooling of the vessel) is suppressed, and a significant decrease in the hot water discharge temperature when the hot water supply is restarted is prevented.

[2]前記所定期間は、前記給湯動作の停止後であって前記給湯動作の再開前かつ前記給湯動作の停止から所定時間が経過する前の期間である
ことを特徴とする[1]に記載の給湯システム。
[2] Described in [1], the predetermined period is a period after the stop of the hot water supply operation, before the restart of the hot water supply operation, and before the predetermined time elapses from the stop of the hot water supply operation. Hot water supply system.

[3]前記放熱装置は、自装置の稼動指示が前記所定期間の終了前から前記所定期間の終了後に継続しているときは、前記所定期間の終了後、補填指示を含む前記動作要求を行い、
前記給湯器は、前記補填指示を含む動作要求を受けた場合は、前記循環ポンプの動作速度を通常より高めて前記循環流体加熱動作を行う
ことを特徴とする[1]または[2]に記載の給湯システム。
[3] When the operation instruction of the own device continues from before the end of the predetermined period to after the end of the predetermined period, the heat radiating device makes the operation request including the compensation instruction after the end of the predetermined period. ,
[1] or [2], wherein the water heater performs the circulating fluid heating operation by increasing the operating speed of the circulation pump more than usual when receiving an operation request including the replenishment instruction. Hot water supply system.

上記発明では、放熱装置を稼動させているにもかかわらず、給湯動作停止後の所定期間において動作要求の送信を禁止等した場合は、該禁止等によって生じた加熱量の不足を補うために、禁止等を解除した後の循環流体加熱動作において循環ポンプの動作速度を通常より高める。 In the above invention, when the transmission of the operation request is prohibited in a predetermined period after the hot water supply operation is stopped even though the heat radiating device is operated, in order to compensate for the shortage of the heating amount caused by the prohibition or the like. Increase the operating speed of the circulation pump in the circulation fluid heating operation after the prohibition is lifted.

[4]前記放熱装置は、前記給湯動作情報に基づいて、前記給湯器が停止した給湯動作がシャワーを用途とするものか否かを判別し、シャワーを用途する給湯動作であった場合にのみ、該給湯動作を停止した後の所定期間中に前記動作要求の送信を禁止する、もしくは、前記動作要求で要求する熱量を所定量以下に制限する
ことを特徴とする[1]乃至[3]のいずれか1つに記載の給湯システム。
[4] The heat dissipation device, based on the hot water supply operation information, the hot water supply operation water heater is stopped, it is determined whether or not to use the shower, when was the hot water supply operation to use the shower Only, the transmission of the operation request is prohibited during a predetermined period after the hot water supply operation is stopped, or the amount of heat required by the operation request is limited to a predetermined amount or less [1] to [3]. ] The hot water supply system described in any one of.

上記発明では、給湯停止直前の給湯使用がシャワーであると推定される場合にのみ、動作要求の送信を禁止あるいは要求する熱量を制限する制御を行う。 In the above invention, control is performed to prohibit the transmission of the operation request or limit the required amount of heat only when it is presumed that the hot water supply is used immediately before the hot water supply is stopped by the shower.

[5]前記制御部は、前記所定期間は、前記給湯動作の停止に基づくポストファンを禁止する
ことを特徴とする[1]乃至[4]のいずれか1つに記載の給湯システム。
[5] The hot water supply system according to any one of [1] to [4], wherein the control unit prohibits a post fan based on the suspension of the hot water supply operation for the predetermined period.

[6]前記制御部は、前記給湯動作の停止後の所定期間内に前記循環流体加熱動作が予定されている場合は、前記給湯動作の停止に基づくポストファンを行わない
ことを特徴とする[1]乃至[5]のいずれか1つに記載の給湯システム。
[6] The control unit does not perform a post-fan based on the stop of the hot water supply operation when the circulating fluid heating operation is scheduled within a predetermined period after the stop of the hot water supply operation [6]. The hot water supply system according to any one of 1] to [5].

上記発明では、給湯動作の停止後の所定期間内に循環流体加熱動作の実行予定がある場合には、循環流体加熱動作に伴う燃焼ファンの動作で、給湯ポストファンを代用する。 In the above invention, when the circulation fluid heating operation is scheduled to be executed within a predetermined period after the hot water supply operation is stopped, the hot water supply post fan is substituted by the operation of the combustion fan accompanying the circulation fluid heating operation.

本発明に係る給湯システムによれば、給湯停止後の一定時間内に給湯を再開した際に、当初の出湯温度が著しく低下することがなく、快適性や省エネルギー性が向上する。 According to the hot water supply system according to the present invention, when the hot water supply is restarted within a certain period of time after the hot water supply is stopped, the initial hot water supply temperature does not drop significantly, and comfort and energy saving are improved.

本発明の実施の形態に係る給湯システムの概略の構成を示す図である。It is a figure which shows the schematic structure of the hot water supply system which concerns on embodiment of this invention. 燃焼ファンの動作の制御を示す流れ図である。It is a flow chart which shows the control of the operation of a combustion fan. 給湯器が行う給湯動作の動作状態を示す動作状態情報を送信する処理を示す流れ図である。It is a flow chart which shows the process of transmitting the operation state information which shows the operation state of the hot water supply operation performed by a water heater. 給湯器が放熱装置からの動作要求に応じて循環系動作を制御する処理を示す流れ図である。It is a flow chart which shows the process which the water heater controls the operation of a circulatory system in response to the operation request from a heat radiating device. 放熱装置が行う、動作要求の禁止・制限を設定解除する処理を示す流れ図である。It is a flow chart which shows the process of canceling the prohibition / restriction of an operation request performed by a heat radiating device. 放熱装置が、給湯器に動作要求を送信する処理を示す流れ図である。It is a flow chart which shows the process which a heat radiating device sends an operation request to a water heater. 給湯使用終了時のポストファンの制御を示す流れ図である。It is a flow chart which shows the control of a post fan at the end of use of hot water supply.

以下、図面に基づき本発明の実施の形態を説明する。 Hereinafter, embodiments of the present invention will be described with reference to the drawings.

図1は、本発明の実施の形態に係る給湯システム1の概略構成を示している。給湯システム1は、給湯器10と、該給湯器10を熱源とする放熱装置70および第2放熱装置80とを備えて構成される。給湯器10は、給水を加熱して浴室内のシャワーや台所の水栓等へお湯を供給(出湯)する給湯機能、浴槽2へ湯を落とし込む注湯機能、浴槽2内の湯水を追い焚きして昇温する追い焚き機能などを備えている。また、浴槽2に設定温度の湯を設定水位になるように自動的に湯張りし、湯張り完了後は設定水位・設定温度が所定時間(たとえば、4時間)に渡って維持されるように追い焚き等を行う風呂の自動運転機能を備えている。 FIG. 1 shows a schematic configuration of a hot water supply system 1 according to an embodiment of the present invention. The hot water supply system 1 includes a water heater 10, a heat radiating device 70 using the water heater 10 as a heat source, and a second heat radiating device 80. The water heater 10 has a hot water supply function that heats the water supply and supplies (exhausts) hot water to a shower in the bathroom, a faucet in the kitchen, etc., a hot water pouring function that drops hot water into the bathtub 2, and reheats the hot water in the bathtub 2. It is equipped with a reheating function that raises the temperature. In addition, hot water at the set temperature is automatically filled in the bathtub 2 so that the water level reaches the set water level, and after the hot water filling is completed, the set water level and the set temperature are maintained for a predetermined time (for example, 4 hours). It is equipped with an automatic operation function for baths that reheat.

さらに給湯器10は、放熱装置70や第2放熱装置80に、加熱した熱媒体流体(ここでは、温水とする)を循環させる熱源機能を備えている。たとえば、放熱装置70は、高温暖房端末であり、温風を送出して浴室を温める浴室暖房器である。第2放熱装置80は、低温暖房端末であり、たとえば、床材の下に設置された床暖房用の温水マットなどである。 Further, the water heater 10 has a heat source function of circulating a heated heat medium fluid (here, hot water) in the heat radiating device 70 and the second heat radiating device 80. For example, the heat radiating device 70 is a high-temperature heating terminal, which is a bathroom heater that sends warm air to warm the bathroom. The second heat radiating device 80 is a low-temperature heating terminal, for example, a hot water mat for floor heating installed under the floor material.

給湯器10は、燃焼ファン11、および該燃焼ファン11が送風する空気が下方から送り込まれ、上部に排気口12を備えた縦長筒状の燃焼室13を備えている。燃焼室13は、仕切り板で縦に仕切ることにより内部が第1燃焼室13aと第2燃焼室13bに分かれている。燃焼ファン11は、第1燃焼室13aと第2燃焼室13bで兼用されており、第1燃焼室13aと第2燃焼室13bの双方に同時に送風して燃焼用の空気を供給する。 The water heater 10 includes a combustion fan 11 and a vertically long tubular combustion chamber 13 having an exhaust port 12 at the upper part to which air blown by the combustion fan 11 is sent from below. The inside of the combustion chamber 13 is divided into a first combustion chamber 13a and a second combustion chamber 13b by vertically partitioning the combustion chamber 13. The combustion fan 11 is also used in the first combustion chamber 13a and the second combustion chamber 13b, and simultaneously blows air to both the first combustion chamber 13a and the second combustion chamber 13b to supply combustion air.

第1燃焼室13aの下部には第1バーナ14aが設けられ、その上方には給湯用の配管が通る第1熱交換器15が配置されている。第1熱交換器15は、潜熱熱交換器15aと顕熱熱交換器15bで構成される。第2燃焼室13bの下部には第2バーナ14bが設けられ、その上方には所定の循環経路を構成する配管が通る第2熱交換器16が配置されている。第2熱交換器16は、第2潜熱熱交換器16aと、第2顕熱熱交換器16bで構成される。なお、燃焼ファンは、第1燃焼室13aと第2燃焼室13bに個別に設けられてもよいが、この場合、第1バーナ14aと第2バーナ14bの少なくとも一方が燃焼しているときは、両方の燃焼ファンが作動するように制御される。 A first burner 14a is provided below the first combustion chamber 13a, and a first heat exchanger 15 through which a hot water supply pipe passes is arranged above the first burner 14a. The first heat exchanger 15 is composed of a latent heat exchanger 15a and a sensible heat exchanger 15b. A second burner 14b is provided below the second combustion chamber 13b, and a second heat exchanger 16 through which pipes forming a predetermined circulation path pass is arranged above the second burner 14b. The second heat exchanger 16 is composed of a second latent heat exchanger 16a and a second sensible heat exchanger 16b. The combustion fan may be provided separately in the first combustion chamber 13a and the second combustion chamber 13b. In this case, when at least one of the first burner 14a and the second burner 14b is burning, the combustion fan may be provided individually. Both combustion fans are controlled to operate.

ここでは、上記の循環経路は、基礎経路と、基礎経路から分岐して放熱装置70の放熱器71を経由する高温暖房経路と、基礎経路から分岐して第2放熱装置80の放熱器81を経由する低温暖房経路と、浴槽2の湯水を追い焚きするための追い焚き回路で構成される。 Here, the above circulation path includes a basic path, a high-temperature heating path branching from the basic path and passing through the radiator 71 of the heat sink 70, and a radiator 81 of the second heat sink 80 branching from the basic path. It is composed of a low-temperature heating path passing through and a reheating circuit for reheating the hot water of the bathtub 2.

基礎経路は、第2顕熱熱交換器16bの出側から、管路21、流量制御弁22、水―水熱交換器23の一次側配管、管路24、管路25を経由して第2潜熱熱交換器16aに至り、第2潜熱熱交換器16aの出側からシスターン17、循環ポンプ18を経た後、管路26を通じて第2顕熱熱交換器16bの入側に戻る経路で構成される。さらに基礎経路は、第2顕熱熱交換器16bの出側に接続された管路21と第1顕熱熱交換器15bの出側とシスターン17との間の管路26を接続する連結管38を有する。連結管38の途中には、流量調整弁39が設けてあり、この流量調整弁39をバイパスするバイパス管38bが設けてある。 The basic route is from the outlet side of the second sensible heat exchanger 16b, via the conduit 21, the flow control valve 22, the primary side piping of the water-water heat exchanger 23, the conduit 24, and the conduit 25. 2 It is composed of a path that reaches the latent heat exchanger 16a, passes through the systurn 17 and the circulation pump 18 from the exit side of the second latent heat exchanger 16a, and then returns to the entrance side of the second sensible heat exchanger 16b through the pipeline 26. Will be done. Further, the basic path is a connecting pipe connecting the pipeline 21 connected to the outlet side of the second sensible heat exchanger 16b and the conduit 26 between the outlet side of the first sensible heat exchanger 15b and the systurn 17. Has 38. A flow rate adjusting valve 39 is provided in the middle of the connecting pipe 38, and a bypass pipe 38b that bypasses the flow rate adjusting valve 39 is provided.

シスターン17は、基礎経路を循環する水が所定量貯水される大気開放の容器である。シスターン17には、シスターン17内の水位を検出する水位センサが設けてあり、水位が所定値以下になると、後述する注水管61を通じて給水が補給されるようになっている。 The systurn 17 is an air-open container in which a predetermined amount of water circulating in the basic route is stored. The systurn 17 is provided with a water level sensor that detects the water level in the systurn 17, and when the water level falls below a predetermined value, water is supplied through a water injection pipe 61 described later.

高温暖房経路は、管路21から分岐して放熱装置70が有する熱動弁72を介して放熱器71の入側に至る高温往き管31と、放熱器71の出側から合流部28のいずれか1つの入側接続口に至る高温戻り管32とから構成される。合流部28の出側に接続された管路29は、管路25と管路24の合流箇所に接続されて合流する。 The high-temperature heating path is either a high-temperature outgoing pipe 31 that branches from the pipeline 21 and reaches the entrance side of the radiator 71 via a thermal valve 72 of the heat sink 70, or a confluence portion 28 from the outlet side of the radiator 71. It is composed of a high temperature return pipe 32 leading to one entry side connection port. The pipeline 29 connected to the exit side of the confluence 28 is connected to the confluence of the conduit 25 and the conduit 24 and merges.

低温暖房経路は、循環ポンプ18の下流で管路26から分岐し、熱動弁33を経由してて第2放熱装置80の放熱器81の入側に至る低温往き管34と、放熱器81の出側から合流部28のいずれか1つの入側接続口に至る高温戻り管35とから構成される。 The low-temperature heating path is a low-temperature going pipe 34 that branches from the pipeline 26 downstream of the circulation pump 18 and reaches the entrance side of the radiator 81 of the second heat sink 80 via the thermal valve 33, and the radiator 81. It is composed of a high temperature return pipe 35 extending from the exit side of the merging portion 28 to any one of the entrance side connection ports of the merging portion 28.

追い焚き回路は、水―水熱交換器23の二次側の水管と、該二次側の水管の出側から浴槽2の循環口(出側)に至る風呂往き管36と、水―水熱交換器23の二次側の水管の入側から風呂循環ポンプ19を経由して浴槽2の循環口(入側)に至る風呂戻り管37とから構成される。 The reheating circuit includes a water pipe on the secondary side of the water-water heat exchanger 23, a bath going pipe 36 from the outlet side of the water pipe on the secondary side to the circulation port (exit side) of the bathtub 2, and water-water. It is composed of a bath return pipe 37 from the inlet side of the water pipe on the secondary side of the heat exchanger 23 to the circulation port (entrance side) of the bath 2 via the bath circulation pump 19.

第2顕熱熱交換器16bの出側に接続された管路21には、第2顕熱熱交換器16bから出る湯の温度を検出する熱交温度センサ41が設けてある。第2潜熱熱交換器16aの入側に接続された管路25には、第2潜熱熱交換器16aに戻る湯の温度を検出する戻り温度センサ42が設けてある。また風呂戻り管37には、風呂戻り温度センサ40が設けてある。循環ポンプ18の直ぐ下流の管路26には、低温暖房経路に送り出される湯温を検出する低温往き温度センサ49が設けてある。 A conduit 21 connected to the outlet side of the second sensible heat exchanger 16b is provided with a heat exchange temperature sensor 41 that detects the temperature of hot water discharged from the second sensible heat exchanger 16b. A return temperature sensor 42 for detecting the temperature of hot water returning to the second latent heat exchanger 16a is provided in the conduit 25 connected to the inlet side of the second latent heat exchanger 16a. Further, the bath return pipe 37 is provided with a bath return temperature sensor 40. A low temperature forward temperature sensor 49 for detecting the temperature of hot water sent to the low temperature heating path is provided in the pipeline 26 immediately downstream of the circulation pump 18.

給水元から給水の供給を受ける給水管51は、第1潜熱熱交換器15aの入側に接続され、第1潜熱熱交換器15aの出側は第1顕熱熱交換器15bの入側に接続され、第1顕熱熱交換器15bの出側には、出湯栓に通じる給湯管52が接続されている。給水管51の途中には、給水管51を流れる給水の水量を検出する水量センサ53が設けてあり、その下流隣には給水元からの給水量を調整(制限)するための水量サーボ54が設けてある。 The water supply pipe 51 that receives the supply of water from the water supply source is connected to the inlet side of the first latent heat exchanger 15a, and the outlet side of the first latent heat exchanger 15a is on the inlet side of the first sensible heat exchanger 15b. A hot water supply pipe 52 leading to a hot water tap is connected to the outlet side of the first sensible heat exchanger 15b. A water amount sensor 53 for detecting the amount of water supplied through the water supply pipe 51 is provided in the middle of the water supply pipe 51, and a water amount servo 54 for adjusting (restricting) the amount of water supplied from the water supply source is located downstream of the water amount sensor 53. It is provided.

水量サーボ54の下流の所定箇所で給水管51から分岐したバイパス管55は、給湯管52の所定箇所に合流し接続されている。バイパス管55の途中には、バイパス管55を通じて給水管51から給湯管52側に流す給水量を調整するためのバイパス混合弁56が設けてある。 The bypass pipe 55 branched from the water supply pipe 51 at a predetermined location downstream of the water amount servo 54 joins and is connected to the predetermined location of the hot water supply pipe 52. A bypass mixing valve 56 is provided in the middle of the bypass pipe 55 for adjusting the amount of water supplied from the water supply pipe 51 to the hot water supply pipe 52 side through the bypass pipe 55.

水量センサ53より上流側の給水管51には、給水の温度を検出する給水温度センサ43が設けてある。第1顕熱熱交換器15bの出側近傍の給湯管52には、第1顕熱熱交換器15b内の湯の温度を検出するための給湯熱交温度センサ44が設けてある。 The water supply pipe 51 on the upstream side of the water amount sensor 53 is provided with a water supply temperature sensor 43 that detects the temperature of the water supply. The hot water supply pipe 52 near the outlet side of the first sensible heat exchanger 15b is provided with a hot water supply heat exchange temperature sensor 44 for detecting the temperature of the hot water in the first sensible heat exchanger 15b.

さらに、風呂戻り温度センサ40が設けられた箇所の近傍の風呂戻り配管37と、バイパス管55の合流箇所より下流の所定箇所の給湯管52は、連結管57で接続されており、連結管57の途中には、該連結管57を開通状態と遮断状態とに切り替える注湯電磁弁58と、風呂戻り配管37側から給湯管52への逆流を防止するための逆止弁59が介挿されている。 Further, the bath return pipe 37 near the location where the bath return temperature sensor 40 is provided and the hot water supply pipe 52 at a predetermined location downstream from the confluence of the bypass pipe 55 are connected by a connecting pipe 57, and the connecting pipe 57 is connected. A hot water pouring electromagnetic valve 58 that switches the connecting pipe 57 between an open state and a shut off state, and a check valve 59 for preventing backflow from the bath return pipe 37 side to the hot water supply pipe 52 are inserted in the middle of the pipe. ing.

また、給水管51の途中で分岐した注水管61がシスターン17に通じており、該注水管61の途中には、注水管61を開通状態と遮断状態とに切り替える電磁弁62が介挿されている。電磁弁62を開くと、シスターン17に水が補充される。 Further, a water injection pipe 61 branched in the middle of the water supply pipe 51 leads to the systurn 17, and an electromagnetic valve 62 for switching the water injection pipe 61 between an open state and a shutoff state is inserted in the middle of the water injection pipe 61. There is. When the solenoid valve 62 is opened, the systurn 17 is replenished with water.

燃焼ガスの供給経路は次の様になっている。燃焼ガスの供給元に接続されるガス供給管64の途中には、供給元からの燃焼ガスを遮断するか否かを切り替える元ガス電磁弁65が設けられ、その下流には、供給する燃焼ガスの量を任意に調整するためのガス比例弁66が設けてある。ガス供給管64は、ガス比例弁66の下流で2つに分岐し、一方は、ガス電磁弁67を介して第1バーナ14aに接続され、他方は、ガス電磁弁68を介して第2バーナ14bに接続されている。 The supply path of combustion gas is as follows. A source gas solenoid valve 65 for switching whether or not to shut off the combustion gas from the supply source is provided in the middle of the gas supply pipe 64 connected to the combustion gas supply source, and the combustion gas to be supplied is provided downstream thereof. A gas proportional valve 66 for arbitrarily adjusting the amount of gas is provided. The gas supply pipe 64 branches into two downstream of the gas proportional valve 66, one is connected to the first burner 14a via the gas solenoid valve 67, and the other is connected to the second burner via the gas solenoid valve 68. It is connected to 14b.

このほか、給湯器10は、外気温を検出する外気温度センサ45を有する。さらに、給湯器10は、当該給湯器10の動作を制御する制御部40を備える。制御部40はCPU(Central Processing Unit)、ROM(Read Only Memory)、RAM(Random Access Memory)などを主要部とする回路で構成され、ROMに格納されたプログラムに従ってCPUが各種の処理を実行することで給湯器10としての動作が実現される。 In addition, the water heater 10 has an outside air temperature sensor 45 that detects the outside air temperature. Further, the water heater 10 includes a control unit 40 that controls the operation of the water heater 10. The control unit 40 is composed of circuits whose main parts are a CPU (Central Processing Unit), a ROM (Read Only Memory), a RAM (Random Access Memory), and the like, and the CPU executes various processes according to a program stored in the ROM. As a result, the operation as the water heater 10 is realized.

制御部40は通信部46を備えている。通信部46は、使用者から各種の設定や運転の指示を受ける機能、設定内容や運転状況を表示する機能等を備えたリモートコントローラ(リモコンと略称する)、および、放熱装置70や第2放熱装置80と通信する機能を果たす。ここでは、リモートコントローラとして、風呂に設置された風呂リモコン47と、台所等に設置されたメインリモコン48がある。 The control unit 40 includes a communication unit 46. The communication unit 46 includes a remote controller (abbreviated as a remote controller) having a function of receiving various settings and operation instructions from the user, a function of displaying the setting contents and the operation status, and a heat dissipation device 70 and a second heat dissipation device. It functions to communicate with the device 80. Here, as the remote controller, there are a bath remote controller 47 installed in the bath and a main remote controller 48 installed in the kitchen or the like.

放熱装置70は、放熱器71と、放熱器71で受熱した温風が吹き出し口から出るように放熱器71に向けて送風する送風ファン73と、放熱装置70の動作を制御する制御部74を備えている。制御部74は、給湯器10と通信するための通信部75を備えている。また、制御部75には、使用者から、暖房運転のオンオフ、暖房温度の設定等の操作を受ける操作パネル76が接続されている。放熱装置70は、周囲の温度を検出する室温センサ77を備えている。 The heat radiating device 70 includes a heat radiating device 71, a blower fan 73 that blows hot air received by the heat radiating device 71 toward the heat radiating device 71 so as to come out from an outlet, and a control unit 74 that controls the operation of the heat radiating device 70. I have. The control unit 74 includes a communication unit 75 for communicating with the water heater 10. Further, the control unit 75 is connected to an operation panel 76 that receives operations such as turning on / off the heating operation and setting the heating temperature from the user. The heat radiating device 70 includes a room temperature sensor 77 that detects the ambient temperature.

第2放熱装置80はリモコンを有するが、その記載は省略する。第2放熱装置80のリモコンも制御部40の通信部46に接続されている。 The second heat radiating device 80 has a remote controller, but the description thereof will be omitted. The remote controller of the second heat radiating device 80 is also connected to the communication unit 46 of the control unit 40.

次に、給湯システム1における注湯動作、追い焚き動作、暖房動作の概要を説明する。 Next, the outline of the hot water pouring operation, the reheating operation, and the heating operation in the hot water supply system 1 will be described.

<給湯動作>
出湯栓が開かれて給水管51内の通水を水量センサ53が検出すると、制御部40は、燃焼ファン11を作動させ、第1バーナ14aを点火し、第1バーナ14aで燃焼ガスを燃焼させる。給水元からの給水は、第1熱交換器15(第1潜熱熱交換器15aおよび第1顕熱熱交換器15b)を通る際に第1バーナ14aからの排気の熱を受けて加熱され、バイパス混合弁56が開いているときはさらにバイパス管55からの給水と混合された後、出湯栓へ出湯される。制御部40は、出湯温度が給湯設定温度になるように第1熱交換器15の燃焼量やバイパス混合弁56の開度等を制御する。水量センサ53が通水を検出しなくなると、第1熱交換器15への燃焼ガスの供給を遮断して第1熱交換器15の燃焼を停止させ、燃焼ファン11を停止させる。
<Hot water supply operation>
When the hot water tap is opened and the water amount sensor 53 detects the water flow in the water supply pipe 51, the control unit 40 operates the combustion fan 11, ignites the first burner 14a, and burns the combustion gas with the first burner 14a. Let me. The water supplied from the water supply source is heated by receiving the heat of the exhaust from the first burner 14a when passing through the first heat exchanger 15 (the first latent heat exchanger 15a and the first exposed heat exchanger 15b). When the bypass mixing valve 56 is open, it is further mixed with the water supply from the bypass pipe 55, and then the hot water is discharged to the hot water tap. The control unit 40 controls the combustion amount of the first heat exchanger 15, the opening degree of the bypass mixing valve 56, and the like so that the hot water outlet temperature becomes the hot water supply set temperature. When the water amount sensor 53 no longer detects the passage of water, the supply of the combustion gas to the first heat exchanger 15 is cut off, the combustion of the first heat exchanger 15 is stopped, and the combustion fan 11 is stopped.

<注湯動作>
注湯動作は、風呂リモコン47やメインリモコン48から、風呂の自動運転や注湯の指示を受けた場合に実行される。注湯動作では、制御部40は、注湯電磁弁58を開くと共に、燃焼ファン11を作動させ、第1バーナ14aを点火して燃焼ガスを燃焼させる。これにより、給湯動作と同様にして生成された湯が連結管57を通じて風呂戻り管37に流れ込み、該風呂戻り配管37および風呂往き管36を通じて浴槽2に落とし込まれる。浴槽2内の湯が設定された水位になったら注湯動作は停止される。具体的には、注湯電磁弁58を閉じると共に、第1バーナ14aへの燃焼ガスの供給を遮断し、燃焼ファン11を停止させる。
<Pouring operation>
The hot water pouring operation is executed when an instruction for automatic bath operation or hot water pouring is received from the bath remote controller 47 or the main remote controller 48. In the hot water pouring operation, the control unit 40 opens the hot water pouring solenoid valve 58, operates the combustion fan 11, and ignites the first burner 14a to burn the combustion gas. As a result, the hot water generated in the same manner as the hot water supply operation flows into the bath return pipe 37 through the connecting pipe 57, and is dropped into the bathtub 2 through the bath return pipe 37 and the bath going pipe 36. When the hot water in the bathtub 2 reaches the set water level, the pouring operation is stopped. Specifically, the pouring solenoid valve 58 is closed, the supply of combustion gas to the first burner 14a is cut off, and the combustion fan 11 is stopped.

<追い焚き動作>
追い焚き動作は、風呂の自動運転の指示に基づいて上記の注湯動作が行われて設定水位に湯張りされた後、浴槽2内の浴槽水の温度を風呂設定温度まで昇温させるとき、あるいは、風呂の自動運転中に浴槽2内の湯水を風呂設定温度に維持するために昇温するとき、あるいは、使用者から追い焚きの指示を受けた場合に実行される。風呂の自動運転中に浴槽2内の湯水を風呂設定温度に維持するための追い焚き動作は、たとえば、30分毎に定期的に行われる。
<Reheating operation>
The reheating operation is when the temperature of the bathtub water in the bathtub 2 is raised to the set temperature of the bath after the above-mentioned pouring operation is performed based on the instruction of the automatic operation of the bath and the water is filled with the set water level. Alternatively, it is executed when the temperature of the hot water in the bathtub 2 is raised to maintain the bath set temperature during the automatic operation of the bath, or when a reheating instruction is received from the user. The reheating operation for maintaining the hot water in the bathtub 2 at the bath set temperature during the automatic operation of the bath is performed periodically, for example, every 30 minutes.

追い焚き動作では、制御部40は、流量制御弁22を開き、循環ポンプ18および風呂循環ポンプ19を作動させると共に、燃焼ファン11を作動させ、第2バーナ14bを点火し、該第2バーナ14bで燃焼ガスを燃焼させる。循環ポンプ18の作用により、循環経路内の湯水が第2熱交換器16及び水―水熱交換器23を経由して循環する。すなわち、第2熱交換器16の第2顕熱熱交換器16bを出た湯水は、管路21の途中の分岐箇所から流量制御弁22、水―水熱交換器23の一次側を通り、その後、管路24、管路25、第2潜熱熱交換器16a、シスターン17、循環ポンプ18、管路26を経て第2顕熱熱交換器16bに至るようにして循環する。なお、流量調整弁39は閉じてあるが、第2顕熱熱交換器16bの出側の管路21を通る湯の一部は、連結管38およびバイパス管38bを通じてシスターン17の上流で管路26に流れ込む。 In the reheating operation, the control unit 40 opens the flow control valve 22, operates the circulation pump 18 and the bath circulation pump 19, operates the combustion fan 11, ignites the second burner 14b, and ignites the second burner 14b. Burn the combustion gas with. By the action of the circulation pump 18, hot water in the circulation path circulates via the second heat exchanger 16 and the water-water heat exchanger 23. That is, the hot water leaving the second sensible heat exchanger 16b of the second heat exchanger 16 passes through the flow control valve 22 and the primary side of the water-water heat exchanger 23 from the branch point in the middle of the pipeline 21. After that, it circulates through the conduit 24, the conduit 25, the second latent heat exchanger 16a, the systurn 17, the circulation pump 18, and the conduit 26 to reach the second sensible heat exchanger 16b. Although the flow rate adjusting valve 39 is closed, a part of the hot water passing through the pipeline 21 on the exit side of the second sensible heat exchanger 16b is routed upstream of the systurn 17 through the connecting pipe 38 and the bypass pipe 38b. It flows into 26.

上記の動作と並列に、風呂循環ポンプ19の作用により、浴槽2内の浴槽水は、風呂戻り管37から水―水熱交換器23の二次側の水管を通り、風呂往き管36を経て浴槽2に戻るように循環する。循環経路を循環する循環水は、第2熱交換器16によって加熱され、水―水熱交換器23の一次側を通る際にその熱が水―水熱交換器23の一次側を循環する浴槽水に移動して浴槽水を昇温させる。 In parallel with the above operation, due to the action of the bath circulation pump 19, the bathtub water in the bathtub 2 passes from the bath return pipe 37 through the water pipe on the secondary side of the water-water heat exchanger 23, and passes through the bath outbound pipe 36. It circulates back to bathtub 2. The circulating water circulating in the circulation path is heated by the second heat exchanger 16, and when passing through the primary side of the water-water heat exchanger 23, the heat circulates on the primary side of the water-water heat exchanger 23. Move to water to heat the bath water.

<暖房動作>
暖房動作(循環流体加熱動作)は、放熱装置0からの動作要求に基づいて行われる。放熱装置0は操作パネル6にて使用者から暖房運転をオンにする指示を受けると、操作パネル6にて設定されている暖房設定温度と室温センサ7が検出する室温を比較し、室温が暖房設定温度になるように暖房動作の動作要求を給湯器10に対して送信する。動作要求には、要求する熱量を示す情報が含まれる。放熱装置0から暖房動作の動作要求を受信した給湯器10の制御部4は、循環ポンプ1を作動させると共に、燃焼ファン11を作動させ、第2バーナ14bを点火して該第2バーナ14bで燃焼ガスを燃焼させる。循環ポンプ1の作用により、湯水が暖房回路内で循環する。循環する湯水は、第2熱交換器16を通る際に第2バーナ14bからの排気の熱を受けて昇温され、放熱装置70の放熱器71を通る際に放熱して送風ファン73からの空気を暖める。

<暖房動作>
暖房動作には、高温暖房経路に約80℃の湯を送り出して循環させる高温暖房動作と、低温暖房経路に約60℃湯を送り出して循環させる低温暖房動作がある。
<Heating operation>
The heating operation (circulating fluid heating operation) is performed based on the operation request from the heat radiating device 70. When the heat dissipation device 7 0 receives an instruction to turn on the heating operation from the user at the operation panel 7 6 compares the room temperature set heating temperature and room temperature sensor 7 7 that is set on the operation panel 7 6 detects , The operation request of the heating operation is transmitted to the water heater 10 so that the room temperature becomes the heating set temperature. The operation request includes information indicating the amount of heat required. Controller 4 0 water heater 10 receives the operation request heating operation from the heat radiator 7 0, actuates the circulation pump 1 8 actuates the combustion fan 11, second to ignite the second burner 14b The combustion gas is burned by the burner 14b. Hot water circulates in the heating circuit by the action of the circulation pump 18. The circulating hot water receives the heat of the exhaust gas from the second burner 14b when passing through the second heat exchanger 16, is heated, and dissipates heat when passing through the radiator 71 of the heat radiating device 70, and is dissipated from the blower fan 73. Warm the air.

<Heating operation>
The heating operation includes a high-temperature heating operation in which hot water of about 80 ° C. is sent out to the high-temperature heating path and circulated, and a low-temperature heating operation in which hot water of about 60 ° C. is sent out to the low-temperature heating path and circulated.

高温暖房動作では、たとえば、高温暖房端末である放熱装置70の操作パネル76で暖房運転がオンにされると、放熱装置70は熱動弁72に通電すると共に、暖房運転オンの指示(高温暖房要求)を給湯器10の制御部40に送信する。より詳細には、操作パネル76にて設定されている暖房設定温度と室温センサ77が検出する室温を比較し、室温が暖房設定温度になるように暖房動作の動作要求を給湯器10に対して送信する。動作要求には、要求する熱量を示す情報が含まれる。 In the high-temperature heating operation, for example, when the heating operation is turned on on the operation panel 76 of the heat-dissipating device 70, which is a high-temperature heating terminal, the heat-dissipating device 70 energizes the thermal valve 72 and instructs the heating operation to be turned on (high-temperature heating). The request) is transmitted to the control unit 40 of the water heater 10. More specifically, the heating set temperature set on the operation panel 76 and the room temperature detected by the room temperature sensor 77 are compared, and an operation request for heating operation is sent to the water heater 10 so that the room temperature becomes the heating set temperature. Send. The operation request includes information indicating the amount of heat required.

高温暖房の動作要求を受けた給湯器10は、循環ポンプ18をオンにして第2バーナ14bを燃焼させ、燃焼ファン11を作動させる。 Upon receiving the operation request for high-temperature heating, the water heater 10 turns on the circulation pump 18 to burn the second burner 14b and operates the combustion fan 11.

熱動弁72は、通電されても直ぐには開弁せず、たとえば、通電開始から約1分経過後に開弁する。そのため、当初は(なお、流量制御弁22、低温暖房経路の熱動弁33は閉じているものとする)、循環ポンプ18によって送り出された循環水は、第2熱交換器16の第2顕熱熱交換器16bで加熱された後、管路21から高温往き管31には向かわずに、連結管38およびバイパス管38bを通り、さらにシスターン17を経て循環ポンプ18に至る短い経路を循環する。そのため、最初の10秒ほどで熱交温度センサ41の検出温度が約80℃に達し、第2バーナ14bがオフになる。その後、熱動弁72が開弁するまでの間(たとえば、約50秒間)は、第2バーナ14bの燃焼をオフした状態になる。 The thermal valve 72 does not open immediately when energized, for example, it opens about 1 minute after the start of energization. Therefore, at the beginning (it is assumed that the flow control valve 22 and the thermal valve 33 of the low temperature heating path are closed), the circulating water sent out by the circulation pump 18 is the second heat exchanger 16 After being heated by the heat exchanger 16b, it circulates through the connecting pipe 38 and the bypass pipe 38b, and further through the systurn 17 to the circulation pump 18 without going from the pipeline 21 to the high temperature outgoing pipe 31. .. Therefore, the detection temperature of the heat exchange temperature sensor 41 reaches about 80 ° C. in the first 10 seconds, and the second burner 14b is turned off. After that, until the thermal valve 72 is opened (for example, about 50 seconds), the combustion of the second burner 14b is turned off.

熱動弁72が開弁すると、循環ポンプ18によって送り出された循環水は、第2熱交換器16の第2顕熱熱交換器16b、管路21、高温往き管31、放熱装置70の熱動弁72および放熱器71、高温戻り管32、合流部28、管路29、管路25、第2潜熱熱交換器16a、シスターン17を通って循環ポンプ18に至る経路を循環する。なお、第2顕熱熱交換器16bの出側の管路21を通る湯の一部は、連結管38およびバイパス管38bを通じてシスターン17の上流で管路26に流れ込む。 When the thermal valve 72 is opened, the circulating water sent out by the circulation pump 18 is the heat of the second exposed heat exchanger 16b of the second heat exchanger 16, the conduit 21, the high temperature going pipe 31, and the heat radiating device 70. It circulates through the valve 72, the radiator 71, the high temperature return pipe 32, the confluence 28, the pipeline 29, the conduit 25, the second latent heat exchanger 16a, and the systurn 17 to the circulation pump 18. A part of the hot water passing through the conduit 21 on the outlet side of the second sensible heat exchanger 16b flows into the conduit 26 upstream of the systurn 17 through the connecting pipe 38 and the bypass pipe 38b.

このような経路で循環を開始すると、給湯器10の機外にあった高温往き管31や高温戻り管32の中の冷たい循環水が給湯器10に入って来るので、給湯器10は、放熱装置70に向けて送り出す湯の温度(熱交温度センサ41の検出温度)を80℃に維持するために、第2バーナ14bの燃焼を開始する。その後、約5分位は連続で燃焼するが、浴室が暖まってくると、その後は、燃焼をオン/オフさせて熱交温度センサ41の検出温度を80℃に維持する。なお、流量制御弁22が開いている場合は、第2顕熱熱交換器16bから出て管路21を流れる循環水は分岐し、その一部は水―水熱交換器23の一次側を経て管路24、管路25に至るように流れる。 When circulation is started by such a route, the cold circulating water in the high-temperature outgoing pipe 31 and the high-temperature return pipe 32 outside the water heater 10 enters the water heater 10, so that the water heater 10 dissipates heat. Combustion of the second burner 14b is started in order to maintain the temperature of the hot water sent out to the device 70 (the temperature detected by the heat exchange temperature sensor 41) at 80 ° C. After that, it burns continuously for about 5 minutes, but when the bathroom warms up, after that, the combustion is turned on / off to maintain the detection temperature of the heat exchange temperature sensor 41 at 80 ° C. When the flow control valve 22 is open, the circulating water that comes out of the second sensible heat exchanger 16b and flows through the pipeline 21 branches, and a part of it branches on the primary side of the water-water heat exchanger 23. It flows through the pipeline 24 and the conduit 25.

低温暖房動作では、たとえば、低温暖房端末である第2放熱装置80のリモコン(たとえば、床暖房用のリモコン)で暖房運転オンの操作を受けると、該リモコンから低温暖房運転をオンにする指示(低温暖房の動作要求)が給湯器10の制御部40に送信される。この指示を受けた給湯器10は、熱動弁33への通電を開始すると共に、循環ポンプ18をオンにして第2バーナ14bを燃焼させ、燃焼ファン11を作動させる。 In the low-temperature heating operation, for example, when a remote controller (for example, a remote controller for floor heating) of the second heat radiating device 80, which is a low-temperature heating terminal, receives an operation to turn on the heating operation, the remote controller gives an instruction to turn on the low-temperature heating operation (for example). The operation request for low-temperature heating) is transmitted to the control unit 40 of the water heater 10. Upon receiving this instruction, the water heater 10 starts energizing the thermal valve 33, turns on the circulation pump 18, burns the second burner 14b, and operates the combustion fan 11.

なお、この場合も熱動弁33が通電当初は開弁しないので、高温暖房端末が稼動していないときには、循環ポンプ18によって送り出された循環水はすぐに目標温度に達し、給湯器10は、その後、熱動弁33が開弁するまで第2バーナ14bの燃焼をオフした状態で待機する。 In this case as well, since the thermal valve 33 does not open at the beginning of energization, when the high temperature heating terminal is not operating, the circulating water sent out by the circulation pump 18 immediately reaches the target temperature, and the water heater 10 receives the water heater 10. After that, the combustion of the second burner 14b is turned off until the thermal valve 33 is opened.

熱動弁33が開弁すると、循環ポンプ18によって送り出された循環水は、循環ポンプ18の下流で分岐し、一方は、熱動弁33、低温往き管34、第2放熱装置80の放熱器81、低温戻り管35、合流部28、管路29、第2熱交換器16の第2顕熱熱交換器16b、シスターン17を経て循環ポンプ18に至る経路に流れる。分岐した他方は、第2顕熱熱交換器16bで加熱された後、連結管38(バイパス管38bおよび流量調整弁39)を通り、シスターン17を経て循環ポンプ18に至るように流れる。 When the thermal valve 33 is opened, the circulating water sent out by the circulation pump 18 branches downstream of the circulation pump 18, one of which is the thermal valve 33, the low temperature outgoing pipe 34, and the radiator of the second heat dissipation device 80. It flows through the 81, the low temperature return pipe 35, the merging portion 28, the pipeline 29, the second exposed heat exchanger 16b of the second heat exchanger 16, and the systurn 17 to the circulation pump 18. The other branched portion is heated by the second sensible heat exchanger 16b, then flows through the connecting pipe 38 (bypass pipe 38b and the flow rate adjusting valve 39), passes through the systurn 17, and reaches the circulation pump 18.

低温暖房動作では、最初の30分間は、ホットダッシュ運転という、急速暖房が行われる。具体的には、ホットダッシュ運転中は、流量調整弁39を開弁して、高温往き管31に向かう湯に、第2顕熱熱交換器16bで加熱された熱い湯をより多く混合するようにすると共に、熱交温度センサ41の検出温度が80℃(あるいは90℃)になるように第2バーナ14bの燃焼量を制御する。一方、ホットダッシュ運転中終了後の通常の低温暖房動作では、流量調整弁39を閉弁(あるいは開度を少なく)し、循環ポンプ18の下流の低温往き温度センサ49の検出温度が60℃になるように第2バーナ14bの燃焼量を制御する。 In the low-temperature heating operation, rapid heating called hot dash operation is performed for the first 30 minutes. Specifically, during the hot dash operation, the flow rate adjusting valve 39 is opened so that more hot water heated by the second sensible heat exchanger 16b is mixed with the hot water directed to the high temperature outbound pipe 31. At the same time, the combustion amount of the second burner 14b is controlled so that the detection temperature of the heat exchange temperature sensor 41 becomes 80 ° C. (or 90 ° C.). On the other hand, in the normal low-temperature heating operation after the end of the hot dash operation, the flow rate adjusting valve 39 is closed (or the opening is reduced), and the detection temperature of the low-temperature forward temperature sensor 49 downstream of the circulation pump 18 becomes 60 ° C. The combustion amount of the second burner 14b is controlled so as to be.

給湯器10は、給湯動作と暖房動作や追い焚き動作を同時並行に実行できるが、本発明に係る給湯システム1では、給湯動作が終了した後の所定期間は、給湯動作を再開したときの出湯温度の低下を少なくするために、暖房動作や追い焚き動作(第2バーナ14bの燃焼)が行われないようにする等の制御(給湯側湯温保持制御)を行う。 The water heater 10 can simultaneously execute a hot water supply operation, a heating operation, and a reheating operation. However, in the hot water supply system 1 according to the present invention, hot water is discharged when the hot water supply operation is resumed for a predetermined period after the hot water supply operation is completed. In order to reduce the decrease in temperature, control (hot water supply side hot water temperature holding control) such as preventing heating operation and reheating operation (combustion of the second burner 14b) is performed.

すなわち、給湯動作の停止後、暖房動作や追い焚き動作による第2バーナ14bの燃焼があると、燃焼ファン11は給湯動作の停止後も動作を継続するので、給湯側の第1熱交換器15が燃焼ファン11からの送風によって冷却され、給湯再開時の出湯温度が著しく低下してしまう。一方、暖房動作や追い焚き動作は、短時間停止させても、加熱対象である室内の空気の温度はそれほど大きく変化しない。そこで、給湯動作の終了後の所定期間は暖房動作や追い焚き動作が行われないようにする等の給湯側湯温保持制御を行う。 That is, if the second burner 14b is burned by the heating operation or the reheating operation after the hot water supply operation is stopped, the combustion fan 11 continues to operate even after the hot water supply operation is stopped. Therefore, the first heat exchanger 15 on the hot water supply side Is cooled by the air blown from the combustion fan 11, and the hot water discharge temperature when the hot water supply is restarted is significantly lowered. On the other hand, even if the heating operation and the reheating operation are stopped for a short time, the temperature of the air in the room to be heated does not change so much. Therefore, the hot water temperature holding control on the hot water supply side is performed such that the heating operation and the reheating operation are not performed for a predetermined period after the hot water supply operation is completed.

以下、放熱装置70から動作要求に基づく暖房動作を抑制する場合の給湯側湯温保持制御について説明する。また、追い焚き動作や低温暖房の動作要求はないものとする。 Hereinafter, the hot water temperature holding control on the hot water supply side when the heating operation based on the operation request is suppressed from the heat radiating device 70 will be described. In addition, it is assumed that there is no requirement for reheating operation or low temperature heating operation.

給湯器10は、給湯動作の動作状況を示す給湯動作情報を放熱装置70に対して送信し、これを受信した放熱装置70は、給湯器10から受信した給湯動作情報に基づいて給湯器10の状態が給湯動作停止後の所定期間中か否かを判断する。そして、給湯動作停止後の所定期間中は、暖房動作の動作要求の送信を禁止する、あるいは、動作要求で要求する熱量を所定量以下に制限するといった制御(給湯側湯温保持制御)を行う。ここでは、給湯動作停止後の5分間は、給湯再開時の温度変化を±3℃以内(雰囲気温度は常温、給水温度は16℃にて)にするQ機能が満足されるように上記の制御を行う。 The water heater 10 transmits hot water supply operation information indicating the operation status of the hot water supply operation to the heat radiating device 70, and the heat radiating device 70 that receives this transmits the hot water supply operation information of the water heater 10 based on the hot water supply operation information received from the water heater 10. It is determined whether or not the state is during a predetermined period after the hot water supply operation is stopped. Then, during a predetermined period after the hot water supply operation is stopped, control such as prohibiting the transmission of the operation request for the heating operation or limiting the amount of heat required by the operation request to a predetermined amount or less (hot water supply side hot water temperature holding control) is performed. .. Here, the above control is performed so that the Q function of keeping the temperature change at the time of restarting the hot water supply within ± 3 ° C (atmosphere temperature at room temperature and water supply temperature at 16 ° C) is satisfied for 5 minutes after the hot water supply operation is stopped. I do.

また、Q機能による快適性向上の効果が顕著に表れるのは、給湯使用がシャワーの場合である。すなわち、シャワーを使用中に一度止めて再使用するとき、ユーザは出湯温度の変動を全身で感じるため、温度変動が大きいとユーザに与える不快感が大きい。一方、台所等の水栓に出湯する場合、手指に触れるだけなので、温度低下に対する不快感は少ない。そこで、直前の給湯使用がシャワーの場合だけ、給湯側湯温保持制御を実行する。これにより、給湯側湯温保持制御によって暖房動作が禁止や制限されるケースが限定されるので、放熱装置70による暖房効果に与える影響を少なく抑えることができる。 In addition, the effect of improving comfort by the Q function is noticeable when the hot water supply is used in the shower. That is, when the shower is stopped once during use and reused, the user feels the fluctuation of the hot water temperature with the whole body, and therefore, if the temperature fluctuation is large, the discomfort given to the user is great. On the other hand, when hot water is discharged to a faucet in a kitchen or the like, there is little discomfort due to a temperature drop because it is only touched by fingers. Therefore, the hot water temperature holding control on the hot water supply side is executed only when the hot water supply is used immediately before the shower. As a result, the cases where the heating operation is prohibited or restricted by the hot water temperature holding control on the hot water supply side are limited, so that the influence of the heat radiating device 70 on the heating effect can be suppressed to a small extent.

図2は、給湯器10が行う、燃焼ファン11の動作の制御を示す流れ図である。前述したように、暖房動作、追い焚き動作、給湯動作のいずれでも燃焼ファン11は作動する。詳細には、制御部40は、第1バーナ14aと第2バーナ14bのいずれか一方もしくは双方を燃焼させる場合(ステップS101;Yes)、燃焼量に応じた動作速度で燃焼ファン11を作動させる(ステップS102)。すなわち、燃焼量が少ないほど燃焼ファン11の動作速度を遅くし、燃焼量が多くなれば燃焼ファン11の動作速度を速くする制御を行う。その後、第1バーナ14aと第2バーナ14bの燃焼が共に停止した場合(ステップS103;Yes)、燃焼ファン11を停止させる。なお、上記のほか、所謂、ポストパージ、プリパージのために燃焼ファン11は動作するが、これらによる燃焼ファン11の動作については、後述する。 FIG. 2 is a flow chart showing control of the operation of the combustion fan 11 performed by the water heater 10. As described above, the combustion fan 11 operates in any of the heating operation, the reheating operation, and the hot water supply operation. Specifically, when the control unit 40 burns one or both of the first burner 14a and the second burner 14b (step S101; Yes), the control unit 40 operates the combustion fan 11 at an operating speed according to the combustion amount (step S101; Yes). Step S102). That is, the smaller the amount of combustion, the slower the operating speed of the combustion fan 11, and the larger the amount of combustion, the faster the operating speed of the combustion fan 11. After that, when the combustion of both the first burner 14a and the second burner 14b is stopped (step S103; Yes), the combustion fan 11 is stopped. In addition to the above, the combustion fan 11 operates for so-called post-purge and pre-purge, and the operation of the combustion fan 11 by these will be described later.

図3は、給湯器10の制御部40が給湯動作情報の送信に関して行う処理を示す流れ図である。給湯動作を開始したら(ステップS121;Yes)、給湯動作中を示す給湯動作情報を作成して放熱装置70に送信する(ステップS122)。その後、給湯動作が停止したら(ステップS123;Yes)、直前の給湯動作がシャワーを用途する出湯であったか否かを判定する。たとえば、直前の給湯使用量が、7L/min〜13L/min であれば、もしくは、シャワーの最低使用量と考えられる 7L/min 以上であれば、直前の給湯使用がシャワーであったと判定する。あるいは、直前の給湯使用量がシャワーでの使用量に相当し、かつ、風呂リモコン47に給湯設定温度を変更する優先権がある場合にシャワー使用であると判定する。 FIG. 3 is a flow chart showing a process performed by the control unit 40 of the water heater 10 regarding transmission of hot water supply operation information. When the hot water supply operation is started (step S121; Yes), hot water supply operation information indicating that the hot water supply operation is in progress is created and transmitted to the heat radiating device 70 (step S122). Thereafter, when the hot water supply operation is stopped (step S123; Yes), the immediately preceding hot water supply operation is determined whether a tapping to use the shower. For example, if the amount of hot water used immediately before is 7 L / min to 13 L / min, or if it is 7 L / min or more, which is considered to be the minimum amount of shower used, it is determined that the amount of hot water used immediately before was a shower. Alternatively, if the amount of hot water used immediately before corresponds to the amount used in the shower and the bath remote controller 47 has a priority to change the set temperature of hot water supply, it is determined that the shower is used.

直前の給湯動作がシャワー使用によるものであると判定した場合は(ステップS124;Yes)、給湯動作の停止と、該停止した給湯動作がシャワー使用である旨を示す給湯動作情報を作成して放熱装置70に送信する(ステップS125)。一方、直前の給湯動作がシャワーでないと判定した場合は(ステップS124;No)、給湯動作の停止と、該停止した給湯動作がシャワー使用でない旨を示す給湯動作情報を作成して放熱装置70に送信する(ステップS126)。 When it is determined that the immediately preceding hot water supply operation is due to the use of the shower (step S124; Yes), the hot water supply operation is stopped and the hot water supply operation information indicating that the stopped hot water supply operation is the shower use is created to dissipate heat. It is transmitted to the device 70 (step S125). On the other hand, when it is determined that the immediately preceding hot water supply operation is not a shower (step S124; No), the hot water supply operation is stopped and hot water supply operation information indicating that the stopped hot water supply operation is not using the shower is created in the heat radiating device 70. Transmit (step S126).

図4は、暖房動作に関して給湯器10が行う動作を示す流れ図である。放熱装置70から暖房動作の動作要求があるか否かを監視する(ステップS141)。放熱装置70から暖房動作の動作要求を受けたら(ステップS141;Yes)、該動作要求に補填指示が含まれるか否かを判断する(ステップS142)。補填指示が含まれていない場合は(ステップS142;No)、循環ポンプ18の動作速度を通常モードとし、要求された熱量に応じた燃焼量で暖房動作を実行し(ステップS143)、ステップS145に移行する。 FIG. 4 is a flow chart showing an operation performed by the water heater 10 with respect to the heating operation. It is monitored whether or not there is an operation request for the heating operation from the heat radiating device 70 (step S141). When the operation request for the heating operation is received from the heat radiating device 70 (step S141; Yes), it is determined whether or not the operation request includes the compensation instruction (step S142). If the compensation instruction is not included (step S142; No), the operating speed of the circulation pump 18 is set to the normal mode, the heating operation is executed with the combustion amount corresponding to the requested heat amount (step S143), and the step S145 is performed. Transition.

動作要求に補填指示が含まれる場合は(ステップS142;Yes)、循環ポンプ18の動作速度を通常よりも速い高速モードとし、要求された熱量に応じた燃焼量で暖房動作を実行し(ステップS143)、ステップS145に移行する。 When the operation request includes a compensation instruction (step S142; Yes), the operation speed of the circulation pump 18 is set to a higher speed mode than usual, and the heating operation is executed with the combustion amount according to the requested heat amount (step S143). ), The process proceeds to step S145.

ステップS145では、放熱装置70からの動作要求の受信を監視し、動作要求が継続していれば(ステップS145;No)、ステップS142に戻って処理を継続する。暖房動作の動作要求が終了した場合は(ステップS145;Yes)、暖房動作を停止する(ステップS146)。なお、図2に示したように、給湯動作中でなければ、暖房動作の停止により、第1バーナ14a、第2バーナ14bの双方の燃焼が停止するので、燃焼ファン11は停止する。 In step S145, the reception of the operation request from the heat radiating device 70 is monitored, and if the operation request continues (step S145; No), the process returns to step S142 to continue the process. When the operation request for the heating operation is completed (step S145; Yes), the heating operation is stopped (step S146). As shown in FIG. 2, if the hot water supply operation is not in progress, the combustion of both the first burner 14a and the second burner 14b is stopped by stopping the heating operation, so that the combustion fan 11 is stopped.

次に、放熱装置70が行う給湯側湯温保持制御について説明する。 Next, the hot water temperature holding control on the hot water supply side performed by the heat radiating device 70 will be described.

図5は、放熱装置70の制御部74が行う、給湯側湯温保持制御の流れを示している。給湯器10から受信される給湯動作情報に基づいて、給湯器10が給湯動作中から(ステップS201)、給湯動作が終了したと判断したら(ステップS202;Yes)、直前に停止した給湯動作がシャワー使用であったか否かを判定する(ステップS203)。シャワー使用でなければ(ステップS203;No)、ステップS201に戻る。 FIG. 5 shows the flow of hot water temperature holding control on the hot water supply side performed by the control unit 74 of the heat radiating device 70. Based on the hot water supply operation information received from the water heater 10, when it is determined that the hot water supply operation is completed (step S202; Yes) while the water heater 10 is in the hot water supply operation (step S201), the hot water supply operation stopped immediately before is a shower. It is determined whether or not it has been used (step S203). If the shower is not used (step S203; No), the process returns to step S201.

シャワー使用の場合は(ステップS203;Yes)、暖房動作の動作要求の送信を禁止もしくは要求する熱量を制限する状態(禁止・制限状態)に設定する(ステップS204)。そして、所定時間を計時するためのタイマーをスタートさせる(ステップS205)。このタイマーは、上記の禁止・制限状態を解除するまでの時間を計時する。給湯器10では、給湯動作終了後は第1バーナ14aが燃焼していないので、暖房動作の動作要求の送信を禁止すれば第2バーナ14bの燃焼が止まり、その結果、第1バーナ14a、第2バーナ14bの双方が燃焼しない状態になって燃焼ファン11が停止する。 In the case of using a shower (step S203; Yes), it is set to a state (prohibited / restricted state) in which transmission of an operation request for heating operation is prohibited or the required amount of heat is restricted (prohibited / restricted state). Then, a timer for measuring a predetermined time is started (step S205). This timer measures the time until the above-mentioned prohibited / restricted state is released. In the water heater 10, since the first burner 14a is not burned after the hot water supply operation is completed, if the transmission of the operation request for the heating operation is prohibited, the combustion of the second burner 14b is stopped, and as a result, the first burner 14a and the first burner 14a Both of the two burners 14b are in a non-combustion state, and the combustion fan 11 is stopped.

なお、放熱装置70は、暖房運転の指示を使用者から受けていなければ、そもそも暖房動作の動作要求を給湯器10に送信することはないが、暖房運転の指示を受けている場合であっても、禁止・制限状態が設定されていれば、この設定に従い、暖房運転の動作要求の送信を行わない、あるいは、暖房動作の動作要求で要求する熱量を制限する。 The heat radiating device 70 does not send an operation request for the heating operation to the water heater 10 unless the user has instructed the heating operation, but the heat radiating device 70 receives the instruction for the heating operation. However, if the prohibited / restricted state is set, the operation request for the heating operation is not transmitted or the amount of heat required for the operation request for the heating operation is limited according to this setting.

タイマーに設定する時間は、たとえば、3分あるいは5分等の予め定めた時間とする。この時間は、前述のQ機能の目標時間(5分)、もしくは、それよりも、ある程度短い時間にされる。 The time set in the timer is a predetermined time such as 3 minutes or 5 minutes. This time is set to the target time (5 minutes) of the above-mentioned Q function or a time shorter than that.

タイマーがタイプアップした場合は(ステップS206;Yes)、上記の禁止・制限状態を解除して(ステップS208)、ステップS201に戻る。上記タイマーがタイムアップする前に(ステップS206;No)、給湯使用が再開された場合は(ステップS207;Yes)、上記の禁止・制限状態を解除して(ステップS208)、ステップS101に戻る。 When the timer is typed up (step S206; Yes), the above-mentioned prohibited / restricted state is released (step S208), and the process returns to step S201. If the use of hot water supply is resumed before the timer expires (step S206; No) (step S207; Yes), the prohibited / restricted state is released (step S208), and the process returns to step S101.

図6は、放熱装置70が動作要求の送信に関して行う処理を示す流れ図である。暖房運転をオンにする指示(稼動指示)を使用者から受けるのを待ち(ステップS301;No)、稼動指示を受けたら(ステップS301;Yes)、図5に示す処理によって禁止・制限状態に設定されているか否か調べる(ステップS302)。 FIG. 6 is a flow chart showing a process performed by the heat radiating device 70 regarding transmission of an operation request. Waiting for the user to receive an instruction to turn on the heating operation (operation instruction) (step S301; No), and when receiving the operation instruction (step S301; Yes), the prohibited / restricted state is set by the process shown in FIG. It is checked whether or not it is done (step S302).

禁止・制限状態に設定されていなければ(ステップS302;No)、通常に動作要求を送信し(ステップS303)、稼動指示が終了したかを判断する(ステップS313)。稼動指示が終了した場合は(ステップS313;Yes)、暖房動作の動作要求の送信を停止して(ステップS314)、本処理を終了する。 If the prohibited / restricted state is not set (step S302; No), an operation request is normally transmitted (step S303), and it is determined whether the operation instruction is completed (step S313). When the operation instruction is completed (step S313; Yes), the transmission of the operation request for the heating operation is stopped (step S314), and this process is terminated.

稼動指示が継続していれば(ステップS313;No)、ステップS302に戻り、暖房動作の動作要求を行っている状態下で禁止・制限状態に変化したか否かを調べる。 If the operation instruction continues (step S313; No), the process returns to step S302, and it is checked whether or not the state has changed to the prohibited / restricted state while requesting the operation of the heating operation.

禁止・制限状態に設定されている場合は(ステップS302;Yes)、禁止・制限の内容を判断する(ステップS304)。動作要求の送信が禁止されている場合は(ステップS304:動作禁止)、動作要求の送信を停止して(ステップS305)、ステップS307に移行する。これにより、第2バーナ14bの燃焼が停止し、図2に示す制御により、燃焼ファン11が停止する。なお、暖房動作を停止した場合、循環ポンプ18の動作も停止する。 When the prohibited / restricted state is set (step S302; Yes), the content of the prohibited / restricted is determined (step S304). If the transmission of the operation request is prohibited (step S304: operation prohibited), the transmission of the operation request is stopped (step S305), and the process proceeds to step S307. As a result, the combustion of the second burner 14b is stopped, and the combustion fan 11 is stopped by the control shown in FIG. When the heating operation is stopped, the operation of the circulation pump 18 is also stopped.

要求する熱量を制限する設定がなされている場合は(ステップS304:制限)、要求する熱量を所定値以下に制限した動作要求を送信して(ステップ306)、ステップS307に移行する。この場合、給湯器10は、要求が示す制限された熱量に応じて第2バーナ14bの燃焼量を抑えて暖房動作を実行する。第2バーナ14bの燃焼量を少なく抑えることで、該燃焼量に応じて燃焼ファン11も小風量で動作する。 When the setting for limiting the required heat amount is made (step S304: limit), an operation request for limiting the required heat amount to a predetermined value or less is transmitted (step 306), and the process proceeds to step S307. In this case, the water heater 10 suppresses the combustion amount of the second burner 14b according to the limited amount of heat indicated by the request, and executes the heating operation. By suppressing the combustion amount of the second burner 14b to a small value, the combustion fan 11 also operates with a small air volume according to the combustion amount.

ステップS307では、禁止・制限状態が解除されたか否かを判断し、禁止・制限状態が解除される前に(ステップS307;No)、稼動指示(放熱装置70の運転オンの指示)が終了した場合は(ステップS308;Yes)、動作要求の送信を停止して(ステップS314)本処理を終了する。稼動指示が終了する前に(ステップS308;No)、禁止・制限状態が解除された場合は(ステップS307;Yes)、補填指示を含む動作要求を給湯器10に送信する(ステップS309)。なお、補填指示を含む動作要求を受けた場合、給湯器10は、要求熱量に応じた燃焼量で第2バーナ14bを燃焼させながら、循環ポンプ18をこの燃焼量に対応する回転数より高い回転数で作動させて暖房動作を実行する。これにより、暖房動作を禁止あるいは熱量を制限していたい期間における暖房効果の低下を早期に補填することができる。 In step S307, it is determined whether or not the prohibited / restricted state has been released, and the operation instruction (instruction to turn on the operation of the heat radiating device 70) is completed before the prohibited / restricted state is released (step S307; No). In that case (step S308; Yes), the transmission of the operation request is stopped (step S314), and this process is terminated. Before the operation instruction is completed (step S308; No), if the prohibited / restricted state is released (step S307; Yes), an operation request including the compensation instruction is transmitted to the water heater 10 (step S309). When an operation request including a compensation instruction is received, the water heater 10 rotates the circulation pump 18 at a rotation speed higher than the rotation speed corresponding to the combustion amount while burning the second burner 14b with a combustion amount corresponding to the required heat amount. Operate by number to perform heating operation. As a result, it is possible to compensate for the decrease in the heating effect at an early stage during the period in which the heating operation is prohibited or the amount of heat is desired to be limited.

補填指示を含む動作要求の送信を開始してから所定時間が経過する前に(ステップS310;No)、稼動指示が終了した場合は(ステップS311;Yes)、暖房動作の動作要求の送信を停止して(ステップS314)、本処理を終了する。 If a predetermined time elapses after the transmission of the operation request including the compensation instruction is started (step S310; No) and the operation instruction is completed (step S311; Yes), the transmission of the operation request for the heating operation is stopped. Then (step S314), this process ends.

補填指示を含む動作要求の送信を開始してから所定時間が経過したら(ステップS310;Yes)、補填指示を含まない通常の動作要求を送信する(ステップS312)。その後、稼動指示が終了したか否かを判断し、終了の場合は(ステップS313;Yes)、暖房動作の動作要求の送信を停止して(ステップS314)、本処理を終了する。 When a predetermined time has elapsed from the start of transmission of the operation request including the compensation instruction (step S310; Yes), the normal operation request not including the compensation instruction is transmitted (step S312). After that, it is determined whether or not the operation instruction is completed, and if it is terminated (step S313; Yes), the transmission of the operation request for the heating operation is stopped (step S314), and this process is terminated.

稼動指示が継続している場合は(ステップS313;No)、ステップS302に戻って処理を継続する。 If the operation instruction continues (step S313; No), the process returns to step S302 to continue the process.

このように、給湯動作が終了してから所定時間が経過するまでの間、暖房動作の動作要求の送信を禁止あるいは要求する熱量を制限することで、燃焼ファン11の動作が停止あるいは低速となり、燃焼ファン11からの送風によって第1熱交換器15の温度が低下してQ機能が損なわれることが防止・抑制される。 In this way, the operation of the combustion fan 11 is stopped or slowed down by prohibiting the transmission of the operation request for the heating operation or limiting the amount of heat required from the end of the hot water supply operation to the elapse of a predetermined time. It is prevented / suppressed that the temperature of the first heat exchanger 15 is lowered by the air blown from the combustion fan 11 and the Q function is impaired.

たとえば、外気温度7℃、暖房動作中に給湯使用(たとえば、シャワーを使用)し、給湯使用を停止してから4分後に給湯使用を再開した場合、上記の給湯側湯温保持制御を行わなければ、出湯温度が40℃から30℃に低下するところ、給湯側湯温保持制御(タイマー設定時間3分の場合)を行えば、出湯温度は40℃から37℃に低下するに留まり、顕著な効果を得ることができる。 For example, if the outside air temperature is 7 ° C., hot water supply is used during heating operation (for example, a shower is used), and hot water supply is resumed 4 minutes after the hot water supply is stopped, the above hot water supply side hot water temperature retention control must be performed. For example, where the hot water temperature drops from 40 ° C to 30 ° C, if the hot water temperature retention control on the hot water supply side (when the timer setting time is 3 minutes) is performed, the hot water temperature drops only from 40 ° C to 37 ° C, which is remarkable. The effect can be obtained.

なお、第2放熱装置80についても、放熱装置70と同様の給湯側湯温保持制御を行えばよい。追い焚き動作(あるいは追い焚き動作と第2放熱装置80による低温暖房動作)についての給湯側湯温保持制御は、給湯器10が第2バーナ14bの燃焼を禁止したりする、燃焼量を制限して行えばよい。 The second heat radiating device 80 may also be controlled to maintain the hot water temperature on the hot water supply side in the same manner as the heat radiating device 70. The hot water supply side hot water temperature holding control for the reheating operation (or the reheating operation and the low temperature heating operation by the second heat radiating device 80) limits the amount of combustion such that the water heater 10 prohibits the combustion of the second burner 14b. You can do it.

次に、ポストファンの制御について説明する。
給湯動作の停止後、ポストファン(燃焼を伴わない燃焼排ガス排出のための燃焼ファン11の駆動)を省略、又はポストファンの時間を短くすると、温かい燃焼排ガスが器具(燃焼室13)内に留まる(もしくは留まる量が多くなる)。すなわち、給湯ポストファン(給湯動作の停止に伴うポストファン)による送風により熱交換器が冷やされるのを防止しつつ、温かい燃焼排ガスも器具内に留まることで、次回の給湯動作が短時間後に行われた場合の給湯の効率が高くなる。
Next, the control of the post fan will be described.
If the post fan (driving the combustion fan 11 for discharging the combustion exhaust gas without combustion) is omitted or the post fan time is shortened after the hot water supply operation is stopped, the warm combustion exhaust gas stays in the appliance (combustion chamber 13). (Or more to stay). That is, while preventing the heat exchanger from being cooled by the air blown by the hot water supply post fan (post fan that accompanies the stop of the hot water supply operation), the warm combustion exhaust gas also stays in the appliance, so that the next hot water supply operation can be performed after a short time. The efficiency of hot water supply will be higher if it is damaged.

しかし、器具内に温かい燃焼排ガスを留めている内に、排気ガスの温度は低下する。この時、排気ガス中の水分が結露してしまうことがある。本来ならば、排気ガス中の水分が器具内で結露して、例えば点火系統に付着すると、イグナイタの高電圧が地絡することで点火不良を起こす場合があるのを防止するために、給湯ポストファンを十分に行って、結露の原因となる排気ガスを排出する。しかし、本実施の形態に係る給湯器10では、給湯使用による第1バーナ14aの燃焼を停止した後、すぐに燃焼ファン11を停止(給湯ポストファンを0秒にする)、又は給湯ポストファンの運転時間を短くする制御を行う。このため、結露が発生しやすくなる。 However, the temperature of the exhaust gas drops while the warm combustion exhaust gas is retained in the appliance. At this time, moisture in the exhaust gas may condense. Normally, if the moisture in the exhaust gas condenses inside the equipment and adheres to the ignition system, for example, the high voltage of the igniter may cause a ground fault, which may cause ignition failure. Fully run the fan to exhaust the exhaust gas that causes condensation. However, in the water heater 10 according to the present embodiment, after stopping the combustion of the first burner 14a due to the use of hot water supply, the combustion fan 11 is immediately stopped (the hot water supply post fan is set to 0 seconds), or the hot water supply post fan Control to shorten the operating time. Therefore, dew condensation is likely to occur.

そこで、給湯器10は、給湯単独使用時の給湯動作の停止(第1バーナ14aの燃焼停止)では、燃焼停止時にすぐに燃焼ファン11を停止させ、燃焼停止から5分間(Q機能を確保するための時間)は給湯動作の停止に伴うポストファンを禁止し、燃焼停止から5分後に給湯ポストファンを行うように制御する。これにより、結露しやすくなっている燃焼排ガスを、結露する前に器具外に排出、又は、結露してしまった水分を乾燥させて、地絡等点火不良の原因を取り除くことができる。なお、ポストファンを給湯動作の停止から5分後にすると、給湯熱交換器(第1熱交換器15)内の湯が保温材の代わりとなって、燃焼排ガスが結露しにくい状態をより長く維持することができる。 Therefore, when the water heater 10 stops the hot water supply operation (combustion stop of the first burner 14a) when the hot water supply is used alone, the combustion fan 11 is stopped immediately when the combustion is stopped, and the combustion fan 11 is stopped for 5 minutes (the Q function is secured). The time for this) is controlled so that the post fan due to the stop of the hot water supply operation is prohibited and the hot water supply post fan is performed 5 minutes after the combustion stop. As a result, the combustion exhaust gas that tends to condense can be discharged to the outside of the appliance before dew condensation, or the moisture that has condensed can be dried to eliminate the cause of ignition failure such as a ground fault. When the post fan is operated 5 minutes after the hot water supply operation is stopped, the hot water in the hot water supply heat exchanger (first heat exchanger 15) replaces the heat insulating material, and the state in which the combustion exhaust gas is less likely to condense is maintained for a longer period of time. can do.

他方、追い焚き動作や暖房動作と給湯動作が同時に行われる場合がある。給湯器10は、このような場合で、給湯動作が先に停止した時には、その後の所定時間において追い焚き動作や暖房動作の禁止または燃焼量の制限を行うと共に、給湯動作の停止に基づくポストファンを5分後に延期するので、燃焼ファン11からの送風によって給湯熱交換器(第1熱交換器15)が冷やされることが防止される。 On the other hand, the reheating operation, the heating operation, and the hot water supply operation may be performed at the same time. In such a case, when the hot water supply operation is stopped first, the water heater 10 prohibits the reheating operation and the heating operation or limits the amount of combustion in the subsequent predetermined time, and the post fan based on the stop of the hot water supply operation. Is postponed after 5 minutes, so that the hot water supply heat exchanger (first heat exchanger 15) is prevented from being cooled by the air blown from the combustion fan 11.

ところで、風呂の自動運転中に浴槽2内の湯水を風呂設定温度に維持するために昇温する動作(保温運転)を行う場合がある。すなわち、浴槽2の湯温を風呂設定温度に維持するために、例えば30分毎に、設定温度まで上昇させるための追い焚き動作が行われる。これにより、たとえば、風呂の自動運転中の4時間にわたり、浴槽2の湯は風呂設定温度に保温される。そのため、たとえば、給湯動作の停止と、予定されている追い焚き動作の開始時間とが近い場合がある。 By the way, during the automatic operation of the bath, the hot water in the bathtub 2 may be heated in order to maintain the bath set temperature (heat retention operation). That is, in order to maintain the hot water temperature of the bathtub 2 at the bath set temperature, a reheating operation for raising the temperature to the set temperature is performed, for example, every 30 minutes. As a result, for example, the hot water in the bathtub 2 is kept at the bath set temperature for 4 hours during the automatic operation of the bath. Therefore, for example, the stop of the hot water supply operation may be close to the scheduled start time of the reheating operation.

たとえば、30分毎の追い焚き動作の開始予定時刻の8分前に給湯使用が終わった場合には、給湯動作の停止から5分後に給湯ポストファンが行われ、さらに給湯動作の停止から8分後に追い焚き動作のために燃焼ファン11が動作することになる。追い焚き用の燃焼ファンと給湯用の燃焼ファンは共通なので、追い焚き動作のために燃焼ファン11が動作するならば、その直前に給湯ポストファンを行う必要はない。 For example, if the use of hot water is finished 8 minutes before the scheduled start time of the reheating operation every 30 minutes, the hot water supply post fan is performed 5 minutes after the stop of the hot water supply operation, and 8 minutes after the stop of the hot water supply operation. Later, the combustion fan 11 will operate for the reheating operation. Since the combustion fan for reheating and the combustion fan for hot water supply are common, if the combustion fan 11 operates for the reheating operation, it is not necessary to perform the hot water supply post fan immediately before that.

暖房運転についても同様で、設定温度に室温を維持するためにオンオフ燃焼が行われるが、燃焼オフ中の温度の低下状況から、次回の燃焼オンが何分後になるかを予測することができる。たとえば、給湯使用が終わってから7分後に次回の暖房運転による燃焼オンが予定されている場合がある。 The same applies to the heating operation, and on-off combustion is performed to maintain the room temperature at the set temperature, but it is possible to predict how many minutes later the next combustion will be on from the temperature drop state during the combustion off. For example, combustion may be turned on by the next heating operation 7 minutes after the use of hot water is finished.

そこで、給湯動作停止から所定時間以内(たとえば、10分以内)に、追い焚き動作や暖房動作が予定されている場合には、給湯動作の停止から5分後に通常は行われる給湯ポストファンを省略して行わないように制御する。すなわち、所定時間内に予定されている追い焚き動作や暖房動作の燃焼による燃焼ファン11の駆動で給湯ポストファンを代用する。 Therefore, if a reheating operation or a heating operation is scheduled within a predetermined time (for example, within 10 minutes) after the hot water supply operation is stopped, the hot water supply post fan that is normally performed 5 minutes after the hot water supply operation is stopped is omitted. And control not to do it. That is, the hot water supply post fan is substituted by driving the combustion fan 11 by burning the reheating operation or the heating operation scheduled within a predetermined time.

ただし、予定されていた追い焚き動作や暖房動作が中止される場合もある。たとえば、風呂の保温動作において風呂循環ポンプ19を駆動した結果、浴槽水の温度低下があまりみられず、予定していた次回の追い焚き動作を行わない決定がなされる場合がある。また、次回の追い焚き動作の予定時刻が来る前にユーザにより風呂の自動運転を停止する操作が行われる場合がある。そこで、給湯使用停止後の給湯ポストファンを省略する要因になった追い焚き動作や暖房動作の予定が消滅した場合には、その消滅時点を基点として(消滅時点が給湯停止から5分経過前であれば5分経過後に)給湯ポストファンを行うように制御する。 However, the scheduled reheating operation and heating operation may be canceled. For example, as a result of driving the bath circulation pump 19 in the heat retention operation of the bath, the temperature of the bathtub water does not drop so much, and it may be decided not to perform the scheduled next reheating operation. In addition, the user may perform an operation to stop the automatic operation of the bath before the scheduled time of the next reheating operation comes. Therefore, if the schedule for the reheating operation or heating operation that caused the omission of the hot water supply post fan after the hot water supply is stopped disappears, the point of disappearance is used as the base point (the time of disappearance is 5 minutes before the hot water supply is stopped). Control to run the hot water post fan (after 5 minutes, if any).

図7は、給湯使用終了後のポストファンの制御を示す流れ図である。
給湯器10の制御部40は、給湯使用が終了すると(ステップS401;Yes)、Q機能を確保するためのタイマ―がタイムアップするのを待つ(ステップS402;No)。このタイマーは、たとえば、5分間に設定される。なお、給湯器10は、給湯使用が終了すると給湯側湯温保持制御を行うが、ここでは、該給湯側湯温保持制御において、第2バーナ14bの燃焼を上記のタイマーと同じ時間だけ禁止するものとする。
FIG. 7 is a flow chart showing control of the post fan after the use of hot water supply is completed.
When the use of hot water supply is completed (step S401; Yes), the control unit 40 of the water heater 10 waits for the timer for securing the Q function to time up (step S402; No). This timer is set to, for example, 5 minutes. The water heater 10 performs hot water temperature holding control on the hot water supply side when the use of hot water is finished. Here, in the hot water temperature holding control on the hot water supply side, combustion of the second burner 14b is prohibited for the same time as the above timer. It shall be.

上記のタイマーがタイムアップする前に給湯使用が再開された場合は(ステップS403;Yes)、第1バーナ14aの燃焼のために燃焼ファン11が作動するので、給湯ポストファンは不要となるので、本処理を終了する。なお、Q機能のタイマーがタイムアップする前に追い焚き動作や暖房動作の要求に基づいて第2バーナ14bが燃焼した場合にも、本処理を終了する。例えば、ステップS205;Yesとなって第2バーナ14bの燃焼禁止が解除されて追い焚き動作が開始したような場合がこれに該当する。 If the use of hot water supply is resumed before the timer is timed up (step S403; Yes), the combustion fan 11 is operated for combustion of the first burner 14a, so that the hot water supply post fan is unnecessary. This process ends. Even if the second burner 14b burns based on the request for the reheating operation or the heating operation before the timer of the Q function expires, this process is also terminated. For example, this corresponds to the case where the combustion prohibition of the second burner 14b is lifted and the reheating operation is started in step S205; Yes.

また、Q機能のタイマーがタイムアップする前に給湯器10の運転がオフにされた場合は(ステップS404;Yes)、ポストファンを実行して(ステップS408)本処理を終了する。このポストファンは、給湯ポストファンではなく、運転オフに対応するポストファン(たとえば、給湯ポストファンより長い時間のポストファン)である。 If the operation of the water heater 10 is turned off before the timer of the Q function expires (step S404; Yes), the post fan is executed (step S408) to end this process. This post-fan is not a hot-water supply post-fan, but a post-fan that can be turned off (for example, a post-fan that has a longer time than the hot-water supply post-fan).

Q機能のタイマーがタイムアップすると(ステップS402;;Yes)、所定時間内に追い焚き動作や暖房動作に伴う第2バーナ14bの燃焼予定があるか否かを判断する(ステップS405)。所定時間はたとえば、5分等の時間に固定的に定める、あるいは、排気が結露するまでの残り時間を導出し、該残り時間もしくは該残り時間より少し短い時間を所定時間に設定する。この流れ図では、所定時間をQ機能のタイマーがタイムアップした以後の時間としたが、給湯動作の停止からの時間としてもよい。 When the timer of the Q function is timed up (step S402 ;; Yes), it is determined whether or not the second burner 14b is scheduled to be burned due to the reheating operation or the heating operation within a predetermined time (step S405). The predetermined time is fixedly set to, for example, 5 minutes, or the remaining time until the exhaust gas condenses is derived, and the remaining time or a time slightly shorter than the remaining time is set as the predetermined time. In this flow chart, the predetermined time is the time after the timer of the Q function has timed up, but it may be the time after the hot water supply operation is stopped.

所定時間内に第2バーナ14bの燃焼予定がなければ(ステップS405;No)、給湯器10は、給湯ポストファンを実行して(ステップS408)、本処理を終了する。 If the second burner 14b is not scheduled to burn within a predetermined time (step S405; No), the water heater 10 executes the hot water supply post fan (step S408), and ends this process.

所定時間内に第2バーナ14bの燃焼予定があれば(ステップS405;Yes)、給湯器10は、該燃焼予定に係る第2バーナ14bの燃焼が開始したとき(ステップS406;Yes)、本処理を終了する。給湯器10は、燃焼予定に係る第2バーナ14bの燃焼が開始する前にその燃焼予定が、運転オフや風呂自動運転、暖房運転のオフ等によって消滅した場合は(ステップS407;Yes)、ポストファンを実行して(ステップS408)、本処理を終了する。この際、給湯器10は、燃焼予定の消滅が風呂の自動運転や暖房運転のオフに由来するものであれば給湯ポストファンを行い、給湯器10の運転オフに由来する場合は、運転オフに対応するポストファン(たとえば、給湯ポストファンより長い時間のポストファン)を実行する。 If there is a combustion schedule for the second burner 14b within a predetermined time (step S405; Yes), the water heater 10 starts the combustion of the second burner 14b related to the combustion schedule (step S406; Yes). To finish. If the combustion schedule of the water heater 10 is extinguished by turning off the operation, automatic bath operation, turning off the heating operation, etc. before the combustion of the second burner 14b related to the combustion schedule starts (step S407; Yes), the post The fan is executed (step S408) to end this process. At this time, the water heater 10 performs a hot water supply post fan if the disappearance of the combustion schedule is caused by the automatic operation of the bath or the off of the heating operation, and if it is caused by the operation off of the water heater 10, the operation is turned off. Run the corresponding post fan (for example, a post fan for a longer time than a hot water post fan).

以上、本発明の実施の形態を図面によって説明してきたが、具体的な構成は実施の形態に示したものに限られるものではなく、本発明の要旨を逸脱しない範囲における変更や追加があっても本発明に含まれる。 Although the embodiment of the present invention has been described above with reference to the drawings, the specific configuration is not limited to that shown in the embodiment, and there are changes and additions within a range that does not deviate from the gist of the present invention. Is also included in the present invention.

実施の形態では、循環経路を暖房回路としたが、ミストサウナ用の熱媒体流体を循環させる回路等であってもかまわない。 In the embodiment, the circulation path is a heating circuit, but a circuit or the like that circulates the heat medium fluid for the mist sauna may be used.

実施の形態では、直前の給湯動作がシャワー使用の場合にのみ暖房動作の動作要求を禁止あるいは要求する熱量を制限するようにしたが、シャワー使用か否かにかかわらず給湯動作の停止後の所定期間は動作要求の送信の禁止や要求する熱量を制限するように構成されてもよい。 In the embodiment, the operation request of the heating operation is prohibited or the required heat amount is limited only when the immediately preceding hot water supply operation is the shower use, but the predetermined value after the hot water supply operation is stopped regardless of whether the shower is used or not. The period may be configured to prohibit the transmission of operation requests or limit the amount of heat required.

なお、放熱装置70は、暖房動作の動作要求の送信を禁止している状態では、送風ファン73を停止させる、あるいは送風ファン73の動作速度を低速にする。暖房動作の動作要求で要求する熱量を制限している場合は、送風ファン73の動作速度を低速に制限する。 The heat radiating device 70 stops the blower fan 73 or slows down the operation speed of the blower fan 73 when the transmission of the operation request for the heating operation is prohibited. When the amount of heat required by the operation request for the heating operation is limited, the operation speed of the blower fan 73 is limited to a low speed.

給湯器10が放熱装置70に対して、給湯器10の動作状況や各種センサの検出温度等の情報を送信する場合には、それらの情報に基づいて、禁止・制限状態を継続する所定時間の長さを変更するようにしてもよい。たとえば、外気温度、第1熱交換器15の温度、給湯器10の設置場所の風の強さなど情報に基づいて禁止・制限状態を継続する所定時間の長さを変更する。 When the water heater 10 transmits information such as the operating status of the water heater 10 and the detection temperature of various sensors to the heat radiating device 70, the prohibited / restricted state is continued for a predetermined time based on the information. You may change the length. For example, the length of the predetermined time for continuing the prohibited / restricted state is changed based on information such as the outside air temperature, the temperature of the first heat exchanger 15, and the wind strength at the place where the water heater 10 is installed.

詳細には、給湯器10が給湯熱交温度センサ44を有して給湯器10から放熱装置70へ第1熱交換器15の温度を通知する場合には、給湯動作停止後の第1熱交換器15の温度の低下度合いに基づいて禁止・制限状態を継続する所定時間の長さを変更する。具体的には、放熱装置70は、図5のステップS205においてタイマーに規定時間を設定する。その後、第1熱交換器15の温度低下の状況を監視し、温度低下の度合いが基準より少なければ、早期に燃焼ファン11の動作を再開させてもQ機能を満足できるので、タイマーがタイムアップするまでの残り時間を短く変更する。 Specifically, when the water heater 10 has the hot water supply heat exchange temperature sensor 44 and notifies the temperature of the first heat exchanger 15 from the water heater 10 to the heat radiating device 70, the first heat exchange after the hot water supply operation is stopped. The length of the predetermined time for continuing the prohibited / restricted state is changed based on the degree of decrease in the temperature of the vessel 15. Specifically, the heat radiating device 70 sets a specified time in the timer in step S205 of FIG. After that, the state of the temperature drop of the first heat exchanger 15 is monitored, and if the degree of the temperature drop is less than the standard, the Q function can be satisfied even if the operation of the combustion fan 11 is restarted early, so that the timer times up. Change the remaining time until it is shortened.

また、給湯器10が給湯熱交温度センサ44の検出温度を通知せず、外気温度センサ45が検出した外気温度、もしくは外気温度と設置場所での風の強さを放熱装置70に通知する場合には、外気温度あるいは外気温度と風の強さに基づいて、給湯動作停止後の第1熱交換器15の温度の低下度合いを推定し、温度の低下度合いが大きいほど、時間が長くなるように、タイマーに設定する時間を変更するようにしてもよい。 Further, when the water heater 10 does not notify the detection temperature of the hot water supply heat exchange temperature sensor 44, but notifies the heat dissipation device 70 of the outside air temperature detected by the outside air temperature sensor 45, or the outside air temperature and the wind strength at the installation location. Based on the outside air temperature or the outside air temperature and the strength of the wind, the degree of decrease in the temperature of the first heat exchanger 15 after the hot water supply operation is stopped is estimated, and the greater the degree of decrease in temperature, the longer the time. In addition, the time set in the timer may be changed.

たとえば、外気温度が高い夏場は、第1熱交換器15の温度の低下度合いが小さいので、タイマーに設定する時間を短くし、早期に禁止・制限状態が解除されて燃焼ファン11が動作しても、5分間経過までQ機能を達成することができる。設置場所での風の強さを考慮するのは、風が強い場合、この風が排気口から流入して第1熱交換器15が冷却されることによる。なお、風の影響で燃焼ファン11に加わる負荷が変わるので、風の強さは、給湯動作停止直前の給湯動作で燃焼ファン11を単位時間駆動するために要した電力や電流の大小に基づいて判断することができる。 For example, in the summer when the outside air temperature is high, the degree of decrease in the temperature of the first heat exchanger 15 is small, so the time set in the timer is shortened, the prohibited / restricted state is released early, and the combustion fan 11 operates. Also, the Q function can be achieved until the lapse of 5 minutes. The reason why the strength of the wind at the installation location is taken into consideration is that when the wind is strong, this wind flows in from the exhaust port to cool the first heat exchanger 15. Since the load applied to the combustion fan 11 changes due to the influence of the wind, the strength of the wind is based on the magnitude of the electric power and current required to drive the combustion fan 11 for a unit time in the hot water supply operation immediately before the hot water supply operation is stopped. You can judge.

なお、給湯器10は、第1潜熱熱交換器15a、第1顕熱熱交換器15b、第2潜熱熱交換器16a、第2顕熱熱交換器16bを有する潜熱回収型を例示したが、潜熱熱交換器を具備せず、顕熱熱交換器のみを有するタイプであってもかまわない。 Although the water supply device 10 exemplifies a latent heat recovery type having a first latent heat exchanger 15a, a first latent heat exchanger 15b, a second latent heat exchanger 16a, and a second latent heat exchanger 16b. A type that does not have a latent heat exchanger and has only a latent heat exchanger may be used.

1…給湯システム
2…浴槽
10…給湯器
11…燃焼ファン
12…排気口
13…燃焼室
13a…第1燃焼室
13b…第2燃焼室
14a…第1バーナ
14b…第2バーナ
15…第1熱交換器
15a…第1潜熱熱交換器
15b…第1顕熱熱交換器
16…第2熱交換器
16a…第2潜熱熱交換器
16b…第2顕熱熱交換器
17…シスターン
18…循環ポンプ
19…風呂循環ポンプ
21…管路
22…流量制御弁
23…水―水熱交換器
24…管路
25…管路
26…管路
28…合流部
31…高温往き管
32…高温戻り管
33…熱動弁
34…低温往き管
35…低温戻り管
36…風呂往き管
37…風呂戻り管
38…連結管
38b…バイパス管
39…流量調整弁
40…制御部
41…熱交温度センサ
42…戻り温度センサ
43…給水温度センサ
44…給湯熱交温度センサ
45…外気温度センサ
46…通信部
47…風呂リモコン
48…メインリモコン
49…低温往き温度センサ
51…給水管
52…給湯管
53…水量センサ
54…水量サーボ
55…バイパス管
56…バイパス混合弁
57…連結管
58…注湯電磁弁
59…逆止弁
61…注水管
62…電磁弁
64…ガス供給管
65…元ガス電磁弁
66…ガス比例弁
67…ガス電磁弁
68…ガス電磁弁
70…放熱装置
71…放熱器
72…熱動弁
73…送風ファン
75…通信部
76…操作パネル
77…室温センサ
80…第2放熱装置
81…放熱器
1 ... Hot water supply system 2 ... Bathtub 10 ... Water dispenser 11 ... Combustion fan 12 ... Exhaust port 13 ... Combustion chamber 13a ... 1st combustion chamber 13b ... 2nd combustion chamber 14a ... 1st burner 14b ... 2nd burner 15 ... 1st heat Exchanger 15a ... 1st latent heat exchanger 15b ... 1st visible heat exchanger 16 ... 2nd heat exchanger 16a ... 2nd latent heat exchanger 16b ... 2nd latent heat exchanger 17 ... Systurn 18 ... Circulation pump 19 ... Bath circulation pump 21 ... Pipe 22 ... Flow control valve 23 ... Water-water heat exchanger 24 ... Pipe 25 ... Pipe 26 ... Pipe 28 ... Confluence 31 ... High temperature outbound pipe 32 ... High temperature return pipe 33 ... Thermal valve 34 ... Low temperature return pipe 35 ... Low temperature return pipe 36 ... Bath return pipe 37 ... Bath return pipe 38 ... Connecting pipe 38b ... Bypass pipe 39 ... Flow control valve 40 ... Control unit 41 ... Heat exchange temperature sensor 42 ... Return temperature Sensor 43 ... Water supply temperature sensor 44 ... Hot water supply heat exchange temperature sensor 45 ... Outside air temperature sensor 46 ... Communication unit 47 ... Bath remote control 48 ... Main remote control 49 ... Low temperature going temperature sensor 51 ... Water supply pipe 52 ... Hot water supply pipe 53 ... Water volume sensor 54 ... Water volume servo 55 ... Bypass pipe 56 ... Bypass mixing valve 57 ... Connecting pipe 58 ... Hot water injection electromagnetic valve 59 ... Check valve 61 ... Water injection pipe 62 ... Electromagnetic valve 64 ... Gas supply pipe 65 ... Original gas electromagnetic valve 66 ... Gas proportional valve 67 ... Gas electromagnetic valve 68 ... Gas electromagnetic valve 70 ... Heat exchanger 71 ... Heat exchanger 72 ... Thermal valve 73 ... Blower fan 75 ... Communication unit 76 ... Operation panel 77 ... Room temperature sensor 80 ... Second heat exchanger 81 ... Heat exchanger

Claims (6)

給湯器と、前記給湯器を熱源とする放熱装置を備えた給湯システムであって、
前記給湯器は、
第1燃焼室と、
前記第1燃焼室に収められ、給湯用の配管が通る第1熱交換器と、
前記第1熱交換器を加熱する第1バーナと、
第2燃焼室と、
前記第2燃焼室に収められ、前記放熱装置の放熱器が介挿された所定の循環経路の配管が通る第2熱交換器と、
前記循環経路に設けられた循環ポンプと、
前記第2熱交換器を加熱する第2バーナと、
前記第1バーナと前記第2バーナの少なくとも一方が燃焼中に作動して前記第1燃焼室と前記第2燃焼室の双方に燃焼用の空気を送風する燃焼ファンと、
前記給湯用の配管に通水があるときに前記第1バーナを燃焼させて給湯設定温度の湯を供給する給湯動作、および、前記放熱装置からの動作要求に応じて行う、前記循環ポンプを作動させて前記循環経路を循環する流体を前記第2バーナで加熱する循環流体加熱動作を制御する制御部と、
前記放熱装置と通信する通信部と、
を備え、
前記制御部は、前記給湯動作の動作状態を示す給湯動作情報を前記通信部を用いて前記放熱装置に送信し、
前記放熱装置は、前記給湯器から受信した前記給湯動作情報に基づいて前記給湯器が前記給湯動作を停止した後の所定期間か否かを判別し、前記所定期間中は、前記動作要求の送信を禁止する、もしくは、前記動作要求で要求する熱量を所定量以下に制限する
ことを特徴とする給湯システム。
A hot water supply system equipped with a water heater and a heat radiating device using the water heater as a heat source.
The water heater
The first combustion chamber and
A first heat exchanger housed in the first combustion chamber and through which a hot water supply pipe passes.
A first burner for heating the first heat exchanger and
The second combustion chamber and
A second heat exchanger housed in the second combustion chamber and through which a pipe of a predetermined circulation path through which the radiator of the heat radiating device is inserted passes.
A circulation pump provided in the circulation path and
A second burner for heating the second heat exchanger and
A combustion fan in which at least one of the first burner and the second burner operates during combustion to blow combustion air to both the first combustion chamber and the second combustion chamber.
When there is water flowing through the hot water supply pipe, the first burner is burned to supply hot water at a set temperature for hot water supply, and the circulation pump is operated in response to an operation request from the heat radiating device. A control unit that controls a circulating fluid heating operation in which the fluid circulating in the circulation path is heated by the second burner.
A communication unit that communicates with the heat dissipation device,
With
The control unit transmits hot water supply operation information indicating the operating state of the hot water supply operation to the heat radiating device using the communication unit.
The heat radiating device determines whether or not it is a predetermined period after the water heater stops the hot water supply operation based on the hot water supply operation information received from the water heater, and transmits the operation request during the predetermined period. A hot water supply system characterized in that the amount of heat required by the operation request is limited to a predetermined amount or less.
前記所定期間は、前記給湯動作の停止後であって前記給湯動作の再開前かつ前記給湯動作の停止から所定時間が経過する前の期間である
ことを特徴とする請求項1に記載の給湯システム。
The hot water supply system according to claim 1, wherein the predetermined period is a period after the stop of the hot water supply operation, before the restart of the hot water supply operation, and before the predetermined time elapses from the stop of the hot water supply operation. ..
前記放熱装置は、自装置の稼動指示が前記所定期間の終了前から前記所定期間の終了後に継続しているときは、前記所定期間の終了後、補填指示を含む前記動作要求を行い、
前記給湯器は、前記補填指示を含む動作要求を受けた場合は、前記循環ポンプの動作速度を通常より高めて前記循環流体加熱動作を行う
ことを特徴とする請求項1または2に記載の給湯システム。
When the operation instruction of the own device continues from before the end of the predetermined period to after the end of the predetermined period, the heat radiating device makes the operation request including the compensation instruction after the end of the predetermined period.
The hot water supply according to claim 1 or 2, wherein when the water heater receives an operation request including the replenishment instruction, the operation speed of the circulation pump is increased more than usual to perform the circulation fluid heating operation. system.
前記放熱装置は、前記給湯動作情報に基づいて、前記給湯器が停止した給湯動作がシャワーを用途とするものか否かを判別し、シャワーを用途する給湯動作であった場合にのみ、該給湯動作を停止した後の所定期間中に前記動作要求の送信を禁止する、もしくは、前記動作要求で要求する熱量を所定量以下に制限する
ことを特徴とする請求項1乃至3のいずれか1つに記載の給湯システム。
The heat dissipation device, based on the hot water supply operation information, the hot water supply operation water heater is stopped, it is determined whether or not to use the shower, only if a hot water supply operation to use the shower, the Any one of claims 1 to 3, characterized in that transmission of the operation request is prohibited during a predetermined period after the hot water supply operation is stopped, or the amount of heat required by the operation request is limited to a predetermined amount or less. The hot water supply system described in one.
前記制御部は、前記所定期間は、前記給湯動作の停止に基づくポストファンを禁止する
ことを特徴とする請求項1乃至4のいずれか1つに記載の給湯システム。
The hot water supply system according to any one of claims 1 to 4, wherein the control unit prohibits a post fan based on the suspension of the hot water supply operation for the predetermined period.
前記制御部は、前記給湯動作の停止後の所定期間内に前記循環流体加熱動作が予定されている場合は、前記給湯動作の停止に基づくポストファンを行わない
ことを特徴とする請求項1乃至5のいずれか1つに記載の給湯システム。
The control unit does not perform a post-fan based on the stop of the hot water supply operation when the circulating fluid heating operation is scheduled within a predetermined period after the stop of the hot water supply operation. The hot water supply system according to any one of 5.
JP2016234728A 2016-12-02 2016-12-02 Hot water supply system Expired - Fee Related JP6863724B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016234728A JP6863724B2 (en) 2016-12-02 2016-12-02 Hot water supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016234728A JP6863724B2 (en) 2016-12-02 2016-12-02 Hot water supply system

Publications (2)

Publication Number Publication Date
JP2018091542A JP2018091542A (en) 2018-06-14
JP6863724B2 true JP6863724B2 (en) 2021-04-21

Family

ID=62565843

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016234728A Expired - Fee Related JP6863724B2 (en) 2016-12-02 2016-12-02 Hot water supply system

Country Status (1)

Country Link
JP (1) JP6863724B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7158174B2 (en) 2018-05-10 2022-10-21 シャープ株式会社 BASE STATION DEVICE, TERMINAL DEVICE, COMMUNICATION METHOD, AND INTEGRATED CIRCUIT
WO2020031358A1 (en) * 2018-08-09 2020-02-13 株式会社Nttドコモ User device and transmission method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0224030Y2 (en) * 1986-02-18 1990-07-02
JP3736897B2 (en) * 1996-03-29 2006-01-18 株式会社ガスター Combined water heater
JP3918330B2 (en) * 1998-11-24 2007-05-23 松下電器産業株式会社 Hot water heater
JP4231454B2 (en) * 2004-05-24 2009-02-25 パロマ工業株式会社 Combined combustion device

Also Published As

Publication number Publication date
JP2018091542A (en) 2018-06-14

Similar Documents

Publication Publication Date Title
JP6863724B2 (en) Hot water supply system
JP2018091541A (en) Water heater
JP5755532B2 (en) Hot water storage system
JP4880386B2 (en) Hot water supply equipment
JP5822671B2 (en) Heat medium supply device
JP5814643B2 (en) Hot water storage system
JP2002005528A (en) Hot water supply heat source device of storage type
JP2002054846A (en) Hot water supply heat source device of storage type
JP2002106861A (en) Water heater
JPH09273805A (en) Bath equipment
JP3916438B2 (en) Latent heat recovery type water heater
JP2015222137A (en) Heating heat source apparatus
JPH1073263A (en) Operation control method of dual temperature type hot water circulating device
JP2014047927A (en) Hot water circulation device
JP4257605B2 (en) Combined heat source machine
JP2002295908A (en) Heat medium circulation type heating device
JP2005147580A (en) Gas hot water heater
JP2025073930A (en) Hot water heater
JP2010286185A (en) Hot water storage hot water supply system and cogeneration system
JP7151205B2 (en) Heating heat source machine
JP2017122535A (en) Bath water heater
JP6218533B2 (en) Heating system
JP3163435B2 (en) Hot water circulation type heater
JPH11182865A (en) Hot water heater
JP4933783B2 (en) Heat medium supply equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190924

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20201026

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20201105

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20201214

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210304

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210401

R150 Certificate of patent or registration of utility model

Ref document number: 6863724

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees