JP6905479B2 - Sensor for CP method, casing pipe for SCP method, sand pile strength evaluation method and construction management method for SCP method - Google Patents
Sensor for CP method, casing pipe for SCP method, sand pile strength evaluation method and construction management method for SCP method Download PDFInfo
- Publication number
- JP6905479B2 JP6905479B2 JP2018017085A JP2018017085A JP6905479B2 JP 6905479 B2 JP6905479 B2 JP 6905479B2 JP 2018017085 A JP2018017085 A JP 2018017085A JP 2018017085 A JP2018017085 A JP 2018017085A JP 6905479 B2 JP6905479 B2 JP 6905479B2
- Authority
- JP
- Japan
- Prior art keywords
- sand
- pile
- electrodes
- sand pile
- casing pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Geophysics And Detection Of Objects (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Description
本発明は、SCP工法用センサ、このセンサを有するSCP工法用ケーシングパイプ、このセンサを用いた砂杭強度評価方法およびSCP工法の施工管理方法に関する。 The present invention relates to a sensor for the SCP construction method, a casing pipe for the SCP construction method having this sensor, a sand pile strength evaluation method using this sensor, and a construction management method for the SCP construction method.
サンドコンパクションパイル工法(以下、「SCP工法」ともいう。)は、振動を用いて砂または類似の材料をケーシングパイプ(鋼製中空管)により軟弱地盤に圧入することにより、締め固められた大径の砂杭(サンドコンパクションパイル)を軟弱地盤内に造成する地盤改良工法である。SCP工法における品質および出来形の管理基準は、たとえば、港湾工事共通仕様書で規定され、以下の通りである。
・品質管理基準:砂(材質:外観、種類、品質及び粒度、シルト以下の細粒分含有率)
・出来形管理基準:サンドコンパクションパイル(位置、天端高・先端深度、砂の投入量、盛上り量)
The sand compaction pile method (hereinafter, also referred to as the "SCP method") is a large compaction method in which sand or a similar material is press-fitted into soft ground with a casing pipe (hollow pipe made of steel) using vibration. This is a ground improvement method that creates sand piles (sand compaction piles) with a diameter in soft ground. The quality and form control standards in the SCP construction method are specified in the common specifications for port construction, for example, and are as follows.
-Quality control standard: sand (material: appearance, type, quality and particle size, content of fine particles below silt)
・ Finished shape management standard: Sand compaction pile (position, top height / tip depth, sand input amount, swelling amount)
SCP工法による軟弱粘性土における地盤改良の目的として、締め固めた砂杭と軟弱粘性土からなる複合地盤を形成し、上載荷重に対する支持力の増強、ドレーン効果を含めた地盤全体の剛性の増加、すべり抵抗の増加、沈下の低減を図ること等が挙げられる。しかし、砂杭強度については品質および出来形の管理基準がないのが現状であり、次の問題点がある。 For the purpose of ground improvement in soft clay by the SCP method, a composite ground consisting of compacted sand piles and soft clay is formed to increase the bearing capacity against the loading load, and the rigidity of the entire ground including the drain effect is increased. Examples include increasing slip resistance and reducing settlement. However, the current situation is that there is no quality and finished form control standard for sand pile strength, and there are the following problems.
(1)従来の管理方法では施工中の管理は砂面計と深度計を用いて投入砂の体積変化率を確認するものとなっており、砂杭強度を直接計測し確認することはできない。
(2)砂杭の強度確認として砂杭造成後に調査ボーリングを行っているが、全数調査ではない。
(3)調査ボーリングは造成した砂杭中にボーリングロッドを貫入するため砂杭密度に影響を及ぼす恐れがある。
(4)事後調査時に設計強度に満たない箇所が確認されても砂杭造成後の手直しをすることが非常に難しい。
(1) In the conventional management method, the management during construction is to confirm the volume change rate of the input sand using a sand level gauge and a depth gauge, and it is not possible to directly measure and confirm the sand pile strength.
(2) A survey boring is conducted after the sand piles are constructed to confirm the strength of the sand piles, but this is not a 100% survey.
(3) Survey Boring may affect the sand pile density because the boring rod penetrates into the created sand pile.
(4) It is very difficult to repair after sand pile construction even if a part that does not meet the design strength is confirmed during the ex-post survey.
特許文献1は、センサ部材に対して多数の電極部材を配置して構成し、電極部材のうちの2つの間で地盤の比抵抗の測定に用いる他に、任意の電気的な測定等に対応させ得るようにした地盤比抵抗測定センサを開示するが、SCP工法による砂杭の強度を測定し評価可能なものではない。
本発明は、上述のような従来技術の問題に鑑み、SCP工法による施工中に砂杭強度をリアルタイムで確認し評価可能なSCP工法用センサ、このセンサを有するSCP工法用ケーシングパイプ、このセンサを用いた砂杭強度評価方法およびSCP工法の施工管理方法を提供することを目的とする。 In view of the above-mentioned problems of the prior art, the present invention provides an SCP construction sensor capable of confirming and evaluating the sand pile strength in real time during construction by the SCP construction method, an SCP construction casing pipe having this sensor, and this sensor. It is an object of the present invention to provide a method for evaluating the strength of sand piles used and a method for managing construction of the SCP method.
上記目的を達成するためのサンドコンパクションパイル工法用センサは、サンドコンパクションパイル工法用ケーシングパイプの下部の径方向に並べられた複数の電極を備え、前記複数の電極は、前記ケーシングパイプにより地盤に造成される砂杭の上端面に接するように設けられ、前記砂杭の上端面から所定の深さにおける砂杭内部の比抵抗値を計測し、前記計測された比抵抗値に基づいて前記砂杭の強度を評価するためのものである。 The sensor for the sand compaction pile method for achieving the above object includes a plurality of electrodes arranged in the radial direction below the casing pipe for the sand compaction pile method, and the plurality of electrodes are formed on the ground by the casing pipe. The sand pile is provided so as to be in contact with the upper end surface of the sand pile, and the specific resistance value inside the sand pile at a predetermined depth from the upper end surface of the sand pile is measured, and the sand pile is based on the measured specific resistance value. It is for evaluating the strength of.
このSCP工法用センサによれば、SCP工法においてケーシングパイプの下部の径方向に並んだ複数の電極がケーシングパイプにより地盤に造成される砂杭(または造成中の砂杭の一部)の上端面に接することで、砂杭の上端面から所定の深さにおける砂杭内部の比抵抗値を砂杭の造成途中や造成直後に計測することができる。この計測された比抵抗値に基づいて砂杭強度を評価するので、SCP工法による施工中に砂杭強度をリアルタイムにかつ非破壊的に確認し評価することができる。このため、砂杭の全数について砂杭強度を評価でき、また、砂杭強度の評価結果に応じて砂の再投入や締め固めを行うことができる。なお、電極は、ウェンナー配置により配置されることが好ましい。 According to this SCP construction sensor, the upper end surface of a sand pile (or part of a sand pile under construction) in which multiple radially aligned electrodes at the bottom of the casing pipe are created in the ground by the casing pipe in the SCP construction method. By contacting with, the specific resistance value inside the sand pile at a predetermined depth from the upper end surface of the sand pile can be measured during or immediately after the construction of the sand pile. Since the sand pile strength is evaluated based on the measured resistivity value, the sand pile strength can be confirmed and evaluated in real time and non-destructively during the construction by the SCP method. Therefore, the sand pile strength can be evaluated for the total number of sand piles, and sand can be refilled or compacted according to the evaluation result of the sand pile strength. The electrodes are preferably arranged in a Wenner arrangement.
上記SCP工法用センサにおいて、前記複数の電極の中から電極を組み合わせて前記計測を行うように構成し、前記電極の組み合わせを変更することで前記砂杭の上端面からの測定深さを変えるように構成できる。電極を組み合わせることで電極間隔を変えることができ、様々な深度で砂杭内部の比抵抗値を計測できる。 In the sensor for the SCP method, the electrodes are combined from the plurality of electrodes to perform the measurement, and the measurement depth from the upper end surface of the sand pile is changed by changing the combination of the electrodes. Can be configured in. By combining the electrodes, the electrode spacing can be changed, and the resistivity value inside the sand pile can be measured at various depths.
また、前記複数の電極は、前記ケーシングパイプの下端で第1の径方向に直列して第1の電極配置で配置され、さらに前記第1の径方向と異なる第2の径方向に直列して第2の電極配置で配置されるように構成できる。この場合、前記第1の電極配置における電極間隔と、前記第2の電極配置における電極間隔とを相違させることで、前記砂杭の上端面からの測定深さを変えるように構成できる。 Further, the plurality of electrodes are arranged in series with the first radial direction at the lower end of the casing pipe in a first electrode arrangement, and further connected in series with a second radial direction different from the first radial direction. It can be configured to be arranged in a second electrode arrangement. In this case, the measurement depth from the upper end surface of the sand pile can be changed by making the electrode spacing in the first electrode arrangement different from the electrode spacing in the second electrode arrangement.
上記目的を達成するためのサンドコンパクションパイル工法用ケーシングパイプは、地盤に砂杭を造成するサンドコンパクションパイル工法に用いられるケーシングパイプであって、上述のサンドコンパクションパイル工法用センサを備える。このケーシングパイプによれば、SCP工法により砂杭を造成し、かつ、この砂杭造成時に砂杭強度を評価することができる。 The casing pipe for the sand compaction pile method for achieving the above object is a casing pipe used for the sand compaction pile method for forming sand piles on the ground, and includes the above-mentioned sensor for the sand compaction pile method. According to this casing pipe, a sand pile can be constructed by the SCP method, and the strength of the sand pile can be evaluated at the time of constructing the sand pile.
上記SCP工法用ケーシングパイプにおいてケーシングパイプ下端に径方向に延びる鋼板を有し、前記鋼板に前記複数の電極を設けることが好ましい。なお、計測誤差の低減を図るために前記ケーシングパイプの下端から所定の高さ範囲まで電気絶縁材料で被覆することが好ましい。また、電気絶縁被覆膜に凹部を設け、この凹部内に電極を配置することで、電極保護を図るようにしてもよい。 It is preferable that the casing pipe for the SCP method has a steel plate extending in the radial direction at the lower end of the casing pipe, and the steel plate is provided with the plurality of electrodes. In order to reduce the measurement error, it is preferable to cover the casing pipe with an electrically insulating material from the lower end to a predetermined height range. Further, the electrode may be protected by providing a recess in the electrically insulating coating film and arranging the electrode in the recess.
上記目的を達成するための砂杭強度評価方法は、上述のサンドコンパクションパイル工法用センサを用いて前記ケーシングパイプにより地盤に造成される砂杭の強度を評価する方法であって、前記砂杭の造成に用いる砂からなる供試体を、間隙率を変えて作製し、前記供試体により前記砂の比抵抗値を測定し、前記砂の比抵抗値と前記間隙率との関係式を求め、前記砂杭に要求される強度に基づいて相対密度を決定し、前記相対密度から間隙率を求め、前記求めた間隙率と前記関係式とから比抵抗値を求め、前記センサにより前記砂杭の比抵抗値を計測し、前記求めた比抵抗値と前記計測された比抵抗値とを比較することで、前記砂杭の強度を評価する。 The sand pile strength evaluation method for achieving the above object is a method of evaluating the strength of the sand pile formed on the ground by the casing pipe using the sand compaction pile method sensor described above, and is a method of evaluating the strength of the sand pile. A specimen made of sand used for preparation was prepared by changing the gap ratio, the specific resistance value of the sand was measured by the specimen, and the relational expression between the specific resistance value of the sand and the gap ratio was obtained. The relative density is determined based on the strength required for the sand pile, the gap ratio is obtained from the relative density, the specific resistance value is obtained from the obtained gap ratio and the relational expression, and the ratio of the sand pile is obtained by the sensor. The strength of the sand pile is evaluated by measuring the resistance value and comparing the obtained specific resistance value with the measured specific resistance value.
この砂杭強度評価方法によれば、上述のセンサにより計測された砂杭の比抵抗値と、上述のようにして求められた比抵抗値との比較結果により、砂杭強度を評価するので、SCP工法による施工途中に砂杭強度をリアルタイムにかつ非破壊的に評価することができる。 According to this sand pile strength evaluation method, the sand pile strength is evaluated based on the comparison result between the specific resistance value of the sand pile measured by the above-mentioned sensor and the specific resistance value obtained as described above. The sand pile strength can be evaluated in real time and non-destructively during construction by the SCP method.
上記目的を達成するためのサンドコンパクションパイル工法の施工管理方法は、上述のセンサ、または、上述の砂杭強度評価方法を用いて、前記ケーシングパイプによる砂杭造成時に砂杭の強度を評価することでサンドコンパクションパイル工法の施工を管理する。 The construction management method of the sand compaction pile method for achieving the above object is to evaluate the strength of the sand pile at the time of sand pile construction by the casing pipe by using the above-mentioned sensor or the above-mentioned sand pile strength evaluation method. Manage the construction of the sand compaction pile method.
この施工管理方法によれば、SCP工法の施工途中に砂杭強度を評価する工程を組み入れることで、SCP工法において施工途中に砂杭強度をリアルタイムにかつ非破壊的に評価でき、また、砂杭の全数について砂杭強度を評価でき、さらに、砂杭強度の評価結果に応じて砂の再投入や締め固めを行うことができる。このため、地盤に造成される砂杭の強度品質に関する施工管理を確実に行うことができ、高品質な砂杭を造成できる。 According to this construction management method, by incorporating a process of evaluating the sand pile strength during the construction of the SCP method, the sand pile strength can be evaluated in real time and non-destructively during the construction of the SCP method, and the sand pile can also be evaluated. The sand pile strength can be evaluated for all of the sand piles, and sand can be refilled or compacted according to the evaluation result of the sand pile strength. Therefore, it is possible to surely perform construction management regarding the strength quality of the sand piles to be created on the ground, and it is possible to create high quality sand piles.
本発明によれば、SCP工法による施工中に砂杭強度をリアルタイムで確認し評価可能なSCP工法用センサ、このセンサを有するSCP工法用ケーシングパイプ、このセンサを用いた砂杭強度評価方法およびSCP工法の施工管理方法を提供することができる。 According to the present invention, a sensor for the SCP construction method that can confirm and evaluate the sand pile strength in real time during construction by the SCP construction method, a casing pipe for the SCP construction method having this sensor, a sand pile strength evaluation method using this sensor, and an SCP. It is possible to provide a construction management method of a construction method.
以下、本発明を実施するための形態について図面を用いて説明する。図1は本実施形態による砂杭の比抵抗値を計測するためのセンサを備えるSCP工法用ケーシングパイプの要部縦断面図(a)およびB-B線方向から見た底面図(b)である。 Hereinafter, embodiments for carrying out the present invention will be described with reference to the drawings. FIG. 1 is a vertical cross-sectional view (a) of a main part of a casing pipe for SCP construction method provided with a sensor for measuring a specific resistance value of a sand pile according to the present embodiment, and a bottom view (b) seen from the BB line direction.
図1(a)(b)のように、SCP工法用ケーシングパイプ10は、鋼製中空管から構成され、SCP工法により地盤に砂杭SCを造成するもので、その下端11には鋼板12a,12bが互いに直交するように径方向に配置され、鋼板12aに複数の電極21,22,23,24が直列に配置され、鋼板12bに複数の電極25,26,27,28が直列に配置されている。複数の電極21〜24と複数の電極25〜28とから、SCP工法により地盤に造成される砂杭SCの比抵抗値を計測するためのSCP工法用センサ20が構成される。なお、複数の電極21〜24のうち電極21,24が電流電極で、電極22,23が電位電極であり、複数の電極25〜28のうち電極25,28が電流電極で、電極26,27が電位電極である。
As shown in FIGS. 1A and 1B, the
図1(a)のように、ケーシングパイプ10の下部には、地盤内に貫入中に原地盤の粘性土等がケーシングパイプ10内に流入するのを防ぐために閉塞版13が設置されており,その閉塞版13の上下には閉塞版13の脱落防止用の補強部材14,12が配置されている。補強部材12は、十字状に配置された鋼板12a,12bから構成され、補強部材14も同様に十字状に配置された2枚の鋼板から構成されている。このように、電極21〜24,電極25〜28は、閉塞版13の下側の補強部材12の鋼板12a、12bの下面に配置されているので、ケーシングパイプ10により下端11の下部に造成される砂杭SCの上端面SSに接することで、砂杭SCの比抵抗値が計測できる。この比抵抗値の計測により、造成された砂杭SCを乱すことなく非破壊的に強度評価が可能となる。
As shown in FIG. 1A, a
図1(a)(b)のように、電極21,22の間隔、電極22,23の間隔、電極23,24の間隔は、それぞれ一定であり、その間隔aは、たとえば、300mmである。また、電極25,26の間隔、電極26,27の間隔、電極27,28の間隔は、それぞれ一定であり、その間隔bは、間隔aよりも小さく、たとえば、200mmである。
As shown in FIGS. 1A and 1B, the distance between the
上述のように各電極を配置することで、複数の電極21〜24により砂杭SCの上端面SSから深さaにおける砂杭SCの内部の比抵抗値を計測でき、また、複数の電極25〜28により砂杭SCの上端面SSから深さbにおける砂杭SCの内部の比抵抗値を計測できる。このように、電極の間隔を適宜変更することで、任意の深度における砂杭内部の比抵抗値を計測可能である。なお、砂杭の計測深度が一定でよい場合には、電極21〜24および電極25〜28のいずれか一方の組を省略してもよい。また、間隔a,bを等間隔に設定してもよく、これにより、比抵抗値測定の信頼性を向上させることができる。
By arranging each electrode as described above, the specific resistance value inside the sand pile SC at the depth a from the upper end surface SS of the sand pile SC can be measured by the plurality of
次に、図2により電極配置の別の例について説明する。図2は、本実施形態による別の電極配置としたセンサを備えるSCP工法用ケーシングパイプの要部縦断面図(a)および底面図(b)である。 Next, another example of the electrode arrangement will be described with reference to FIG. FIG. 2 is a vertical cross-sectional view (a) and a bottom view (b) of a main part of a casing pipe for SCP construction method including a sensor having a different electrode arrangement according to the present embodiment.
図2(a)(b)の電極配置例は、鋼板12aに複数の電極31〜40を直列に配置したものである。複数の電極31〜40の両端の電極31,40を電流電極とし、その間の電極32〜39を電位電極として種々組み合わせることで砂杭の計測深度を様々に変えることができる。たとえば、電極31,35,36,40の組み合わせにより図2(a)の深さ位置a1での計測、電極31,34,37,40の組み合わせにより図2(a)の深さ位置a2での計測、電極31,33,38,40の組み合わせにより、図2(a)の深さ位置a3での計測、および、電極31,32,39,40の組み合わせにより、図2(a)の深さ位置a4での計測がそれぞれ可能である。ここで、深さ位置a1,a2,a3,a4は、この順で深くなる。
In the electrode arrangement example of FIGS. 2A and 2B, a plurality of
図2のように、両端の電極を電流電極31,40とし、電位電極32〜39の中から2つの電位電極の組み合わせを変更することで、砂杭の様々な深度での比抵抗値が計測可能である。なお、図2では、鋼板12aのみに電極を配置したが、鋼板12bにも電極を配置してもよく、たとえば、鋼板12aと同様の電極配置とすることで、計測精度を向上でき、また、電極の配置数や配置間隔を変えることで、さらに計測深度を様々に変更できる。
As shown in FIG. 2, the electrodes at both ends are
次に、図1,図2のような電極配置による砂杭内部の比抵抗の測定原理について図3,図4を参照して説明する。図3は、複数の電極を等間隔に配置したウェンナー配置による電極配置例を示す概略図である。図4は、複数の電極を電位電極の間隔が大きくなるように配置した別の電極配置例を示す概略図である。 Next, the principle of measuring the specific resistance inside the sand pile by the electrode arrangement as shown in FIGS. 1 and 2 will be described with reference to FIGS. 3 and 4. FIG. 3 is a schematic view showing an example of electrode arrangement by the Wenner arrangement in which a plurality of electrodes are arranged at equal intervals. FIG. 4 is a schematic view showing another electrode arrangement example in which a plurality of electrodes are arranged so that the distance between the potential electrodes is large.
地盤に電極を配置して地盤の比抵抗を測定するための電極配置は、ポール・ポール法(二極法)、ポール・ダイポール法(三極法)、ダイポール・ダイポール法(四極法)、ウェンナー法、シャランベルジャー法などが知られているが、本実施形態では、これらのうち、電極の配置としてウェンナー法を採用した。次の理由からである。
(1)電極配置係数が小さいため、電位差が大きく測定しやすい。
(2)感度分布が大きく、電極系中央部で順感度の大きい領域を示す。
つまり、ウェンナー法によれば、測定が容易で、対象としている測定位置での感度が良好であるためである。
The electrode arrangements for arranging electrodes on the ground and measuring the specific resistance of the ground are pole-pole method (bipolar method), pole-dipole method (tripolar method), dipole-dipole method (quadrupole method), and Wenner. The method, the Sharamberger method, and the like are known, but in the present embodiment, the Wenner method is adopted as the arrangement of the electrodes. The reason is as follows.
(1) Since the electrode placement coefficient is small, the potential difference is large and it is easy to measure.
(2) The sensitivity distribution is large, and a region with large forward sensitivity is shown in the central part of the electrode system.
That is, according to the Wenner method, the measurement is easy and the sensitivity at the target measurement position is good.
図3の例は、電極C1,P1,P2,C2を等間隔aで並べ、両端の電流電極C1,C2と内側の電位電極P1,P2とによりウェンナー配置としたものである。ウェンナー配置では見かけの探査深さが電位電極の間隔と一致する。すなわち、図3のように、電位電極P1,P2の間隔aと、砂杭SCの表面SSから内部位置D1までの深さa(見かけの測定深さa)が一致し、このような特徴を利用して砂杭内部の所定深度の比抵抗を測定することができる。 In the example of FIG. 3, the electrodes C1, P1, P2, and C2 are arranged at equal intervals a, and the current electrodes C1 and C2 at both ends and the potential electrodes P1 and P2 on the inner side form a Wenner arrangement. In the Wenner arrangement, the apparent exploration depth coincides with the spacing of the potential electrodes. That is, as shown in FIG. 3, the distance a between the potential electrodes P1 and P2 coincides with the depth a (apparent measurement depth a) from the surface SS of the sand pile SC to the internal position D1. It can be used to measure the specific resistance at a predetermined depth inside a sand pile.
図3において、電流電極C1,C2に電流Iを流し、電位電極P1,P2で電位差Vを測定した場合、比抵抗値ρRは、次の式(1)から求める。
ρR=G(V/I) (1)
ここで、Gは、電極配置係数(ウェンナー配置ではG=2πa)で、電極配置により変化する。
In FIG. 3, when a current I is passed through the current electrodes C1 and C2 and the potential difference V is measured by the potential electrodes P1 and P2, the resistivity value ρ R is obtained from the following equation (1).
ρ R = G (V / I) (1)
Here, G is an electrode arrangement coefficient (G = 2πa in the Wenner arrangement) and changes depending on the electrode arrangement.
また、各種条件のため図3のような電極の等間隔配置ができない場合、次の式(2)により電極配置係数Gを求めることで比抵抗の測定が可能となる。
G=2π{(1/C1P1)−(1/C1P2)−(1/C2P1)+(1/C2P2)}-1 (2)
ここで、C1P1:電極C1と電極P1との間隔
C1P2:電極C1と電極P2との間隔
C2P1:電極C2と電極P1との間隔
C2P2:電極C2と電極P2との間隔
Further, when the electrodes cannot be arranged at equal intervals as shown in FIG. 3 due to various conditions, the specific resistance can be measured by obtaining the electrode arrangement coefficient G by the following equation (2).
G = 2π {(1 / C 1 P 1 ) − (1 / C 1 P 2 ) − (1 / C 2 P 1 ) + (1 / C 2 P 2 )} -1 (2)
Here, C 1 P 1 : Distance between the electrode C1 and the electrode P1
C 1 P 2 : Distance between electrode C1 and electrode P2
C 2 P 1 : Distance between electrode C2 and electrode P1
C 2 P 2 : Distance between electrode C2 and electrode P2
図4のように、電流電極C1,C2と電位電極P1,P2とを配置し、電位電極P1,P2の間隔3a(=3×a)が、見かけの測定深さ(表面SSから内部位置D2までの深さ)となり、その電極配置係数Gは、式(2)から次の式(3)により求めることができ、その比抵抗値ρRは、式(1)から次の式(4)により得ることができる。
G=2π{(1/a)−(1/4a)−(1/4a)+(1/a)}-1=(4/3)πa (3)
ρR=G(V/I)=(4/3)πa(V/I) (4)
As shown in FIG. 4, the current electrodes C1 and C2 and the potential electrodes P1 and P2 are arranged, and the
G = 2π {(1 / a)-(1 / 4a)-(1 / 4a) + (1 / a)} -1 = (4/3) πa (3)
ρ R = G (V / I) = (4/3) πa (V / I) (4)
なお、図1の電極配置は、図3のような等間隔配置であり、図2の電極配置は、図3,図4からわかるように、電位電極P1,P2の間隔を小さくから大きくして、見かけの測定深さを浅くから深くしたものである。 The electrode arrangement in FIG. 1 is an evenly spaced arrangement as shown in FIG. 3, and the electrode arrangement in FIG. 2 increases the distance between the potential electrodes P1 and P2 from small to large, as can be seen from FIGS. 3 and 4. , The apparent measurement depth is changed from shallow to deep.
次に、本実施形態による計測した砂杭内部の比抵抗値に基づいて砂杭の強度を評価するまでの工程(S01〜S14)について図5〜図8を参照して説明する。図5は、本実施形態による計測した砂杭内部の比抵抗値に基づいて砂杭の強度を評価するまでの工程(S01〜S14)を説明するためのフローチャートである。図6は、砂からなる供試体の比抵抗値を測定する実験装置の模式図である。図7は、間隙率n(%)と比抵抗係数Fとの関係を示すグラフである。図8は、N値と相対密度の関係を示す表である。 Next, the steps (S01 to S14) until the strength of the sand pile is evaluated based on the specific resistance value inside the sand pile measured according to the present embodiment will be described with reference to FIGS. 5 to 8. FIG. 5 is a flowchart for explaining the steps (S01 to S14) until the strength of the sand pile is evaluated based on the specific resistance value inside the sand pile measured according to the present embodiment. FIG. 6 is a schematic view of an experimental device for measuring the specific resistance value of a specimen made of sand. FIG. 7 is a graph showing the relationship between the pore space in soil n (%) and the resistivity coefficient F. FIG. 8 is a table showing the relationship between the N value and the relative density.
図5を参照して説明すると、まず、室内実験により、図6に示す実験装置の容器内に、計測対象の砂杭に使用する砂を飽和状態で投入する(S01)。このとき、砂の間隙率を一定に管理する。 Explaining with reference to FIG. 5, first, by a laboratory experiment, the sand used for the sand pile to be measured is put into the container of the experimental apparatus shown in FIG. 6 in a saturated state (S01). At this time, the pore space in soil is controlled to be constant.
次に、図6のように、供試体に両側の電極から一定の電流を流し,その時の電位差を内部の一対の電極で測定する(S02)。 Next, as shown in FIG. 6, a constant current is passed through the specimen from the electrodes on both sides, and the potential difference at that time is measured by a pair of internal electrodes (S02).
次に、次の式(5)により用いた砂の比抵抗値を求める(S03)。
ρR=(SA/ΔL)・(ΔV/I) (5)
ここで、ρR:土の比抵抗、SA:供試体の断面積、ΔL:電位差測定区間長さ、ΔV:測定電位差、I:電流値、である。
Next, the specific resistance value of the sand used by the following formula (5) is obtained (S03).
ρ R = (S A / ΔL ) · (ΔV / I) (5)
Here, [rho R: specific resistance of the soil, S A: sectional area of specimen, [Delta] L: potentiometric measurement interval length, [Delta] V: measuring the potential difference, I: current value is.
次に、供試体の砂の間隙率を変更し、上記工程S01〜S03を繰り返して行う(S04)。 Next, the gap ratio of sand in the specimen is changed, and the above steps S01 to S03 are repeated (S04).
次に、Archieの式(次の式(6))を用いて砂の比抵抗値と間隙率との関係を明らかにする(S05)。
ρR=an-m・S-l・ρw (6)
ここで、ρw:水の比抵抗(計測値)、n:間隙率(孔隙率),S:飽和度、a,m,l:土の性質に依存する定数で、a:迂回係数、m:膠結係数、l:飽和係数、である。
Next, the relationship between the specific resistance value of sand and the pore space is clarified using Archie's equation (the following equation (6)) (S05).
ρ R = an -m・ S -l・ ρ w (6)
Here, ρ w : specific resistance of water (measured value), n: porosity (porosity), S: saturation, a, m, l: constants depending on the properties of soil, a: detour coefficient, m : Cementation coefficient, l: Saturation coefficient.
また、飽和度が100%のとき、比抵抗係数F(フォーメーションファクタ)は、次の式(7)のように定義される。
F=ρR/ρw=an-m (7)
式(7)より、図7のように間隙率n(%)と比抵抗係数Fとの関係を示すグラフが作成でき、定数a,mが明らかになる。
When the saturation is 100%, the resistivity coefficient F (formation factor) is defined by the following equation (7).
F = ρ R / ρ w = an -m (7)
From the equation (7), a graph showing the relationship between the pore space in soil n (%) and the resistivity coefficient F can be created as shown in FIG. 7, and the constants a and m become clear.
一方、図8に示す表から砂杭に要求される強度(N値)を設定し(S06)、この強度(N値)に相当する相対密度を決定する(S07)。 On the other hand, the strength (N value) required for the sand pile is set from the table shown in FIG. 8 (S06), and the relative density corresponding to this strength (N value) is determined (S07).
また、土粒子の密度試験(JIS A 1202)により砂杭に使用する砂試料の土粒子密度を測定する(S08)。 In addition, the soil particle density of the sand sample used for the sand pile is measured by the soil particle density test (JIS A 1202) (S08).
次に、砂の最小密度・最大密度試験(JIS A 1224)により砂杭に使用する砂試料の最小密度ρdminおよび最大密度ρdmaxを測定し、次の式(8)から砂の最大間隙比emaxおよび最小間隙比eminを求める(S09)。
emax(min)={(ρS/ρdmin(max))−1} (8)
Next, the minimum density ρdmin and the maximum density ρdmax of the sand sample used for the sand pile are measured by the minimum density / maximum density test of sand (JIS A 1224), and the maximum gap ratio emax and the maximum gap ratio of sand are measured from the following equation (8). The minimum gap ratio emin is obtained (S09).
emax (min) = {(ρS / ρdmin (max))-1} (8)
また、工程S09で求めた最大間隙比emax、最小間隙比emin、および工程S07で決定した相対密度Drを用いて、次の式(9)から間隙比eを求め(S10)、次の式(10)を用いて間隙率nに変換する(S11)。
Dr=(emax−e)/(emax−emin) (9)
n=100×e/(1+e) (10)
Further, using the maximum porosity e max obtained in step S09, the minimum porosity e min , and the relative density D r determined in step S07, the porosity e is obtained from the following equation (9) (S10), and then (10) is used to convert to a porosity n (S11).
D r = (e max −e) / (e max −e min ) (9)
n = 100 × e / (1 + e) (10)
次に、工程S11で求めた間隙率nを工程S05で得た式(7)に代入し、造成する砂杭に要求される比抵抗値を決定する(S12)。この比抵抗値は、図8の相対密度Drの範囲に対応して所定範囲に決定される。 Next, the pore space in soil n obtained in step S11 is substituted into the formula (7) obtained in step S05 to determine the specific resistance value required for the sand pile to be created (S12). This specific resistance value is determined in a predetermined range corresponding to the range of the relative density Dr in FIG.
一方、図1,図2のようにケーシングパイプ10に複数の電極を配置したセンサ20を用いて、ケーシングパイプ10により実際に地盤に造成している砂杭SCの内部の比抵抗値を測定する(S13)。
On the other hand, as shown in FIGS. 1 and 2, a
次に、工程S13で計測した砂杭SCの比抵抗値が、工程S01〜S12のような室内試験結果に基づいて決定された比抵抗値の範囲と比較し、この比抵抗値の範囲を満たすかを確認することで、造成中の砂杭SCの強度(N値)が設計強度を満足しているか評価する(S14)。 Next, the specific resistance value of the sand pile SC measured in the step S13 is compared with the range of the specific resistance value determined based on the laboratory test results as in the steps S01 to S12, and the range of the specific resistance value is satisfied. By confirming this, it is evaluated whether the strength (N value) of the sand pile SC under construction satisfies the design strength (S14).
なお、既往の研究(国松直、神宮司元治「砂地盤の原位置での相対密度計測方法」土木学会第55回年次学術講演会(平成12年9月))によると、砂地盤における比抵抗値と相対密度との間には一定の相関関係があることが確認されているが、使用する砂試料により比抵抗値が異なる可能性があるので、図5の本実施形態のように、比抵抗値ρRと間隙率nとの関係を事前に求める必要がある。 According to previous research (Nao Kunimatsu, Motoharu Jingu "Method of measuring relative density at in-situ of sand ground" 55th Annual Scientific Lecture Meeting of the Society of Civil Engineers (September 2000)), resistivity in sand ground It has been confirmed that there is a certain correlation between the value and the relative density, but since the resistivity value may differ depending on the sand sample used, the ratio is as shown in the present embodiment of FIG. It is necessary to obtain the relationship between the resistance value ρ R and the resistivity n in advance.
以上のように、本実施形態による砂杭強度の評価方法によれば、飽和した地盤の場合、比抵抗値と相対密度の相関関係が高いことに着目し、実験結果に基づいてArchieの式等により相対密度を予め算出しておき、砂杭造成時において、ケーシングパイプに設けた複数の電極により砂杭の比抵抗値を計測し、この計測した比抵抗値に基づいて造成中の砂杭強度をリアルタイムに評価することができる。 As described above, according to the sand pile strength evaluation method according to the present embodiment, in the case of saturated ground, attention is paid to the high correlation between the resistivity value and the relative density, and Archie's equation and the like are based on the experimental results. The relative density is calculated in advance by, and at the time of sand pile construction, the specific resistance value of the sand pile is measured by a plurality of electrodes provided on the casing pipe, and the sand pile strength during construction is measured based on the measured specific resistance value. Can be evaluated in real time.
次に、本実施形態による比抵抗値の計測システムについて図9を参照して説明する。図9は、本実施形態による比抵抗値の計測システムを概略的に示すブロック図である。 Next, the specific resistance value measurement system according to the present embodiment will be described with reference to FIG. FIG. 9 is a block diagram schematically showing a specific resistance value measurement system according to the present embodiment.
図9のように、計測システム50は、図1のケーシングパイプ10の下端11に配置された複数の電極21〜24,25〜28と配線Lを通して電気接続する接続部51と、接続部51と有線で電気接続をする計測側接続部52と、電極22,23と電極26,27とを切り替える電極切替装置53と、電位電極22,23または26,27により測定された電位差に基づいて比抵抗を測定する比抵抗測定装置54と、電流電極21,24または25,28に定電流を供給する電源装置55と、を備える。複数の電極21〜24,25〜28と接続部51とがケーシングパイプ10側に設置され、計測側接続部52と電極切替装置53と比抵抗測定装置54と電源装置55とが、たとえば、作業船の操作室に設置されることで、計測システム50により、水底で造成中の砂杭内部の比抵抗値を計測することができる。
As shown in FIG. 9, the
なお、複数の電極21〜24,25〜28と接続部51とを電気接続する配線Lは、たとえば、ケーシングパイプ10の側面に設けられる空気圧送用配管内を通すようにできる。また、図2のような電極配置とした場合、電極切替装置53は、電位電極32〜39の中から2つの電位電極の組み合わせを変更するように切り替える。また、図9の接続部51と計測側接続部52を省略し、配線Lを作業船の操作室まで延長し、電極切替装置53と電源装置55とに直接接続するようにしてもよい。また、図9の接続部51と計測側接続部52とを無線通信で接続するようにしてもよい。
The wiring L for electrically connecting the plurality of
次に、本実施形態による砂杭の造成時における砂杭の強度評価に基づくSCP工法の施工管理方法について図10,図11を参照して説明する。図10は、本実施形態による砂杭の造成工程(a)〜(g)を示す概略図である。図11は、図10の砂杭造成工程と砂杭強度の評価工程とを含む施工管理工程S21〜S28を説明するためのフローチャートである。 Next, the construction management method of the SCP method based on the strength evaluation of the sand pile at the time of creating the sand pile according to the present embodiment will be described with reference to FIGS. 10 and 11. FIG. 10 is a schematic view showing sand pile construction steps (a) to (g) according to the present embodiment. FIG. 11 is a flowchart for explaining the construction management steps S21 to S28 including the sand pile construction step and the sand pile strength evaluation step of FIG. 10.
図10のように、本実施形態は、表層の軟弱粘性土層G1とその下層の支持層G2とを有する水底地盤GG内にSCP工法によりケーシングパイプ10を用いて砂杭SCを造成するものである。作業船SPは、砂杭の貫入・造成のためのSCP施工機械15を搭載し、SCP施工機械15は、ケーシングパイプ10やその付属部を駆動し、バイブロハンマ16でケーシングパイプ10を振動させながら表層G1から地中に貫入させ、その砂供給口10aから供給される砂を地盤中に圧入し、締め固められた砂杭を地盤内に略鉛直方向に造成する。本実施形態のSCP工法の施工管理方法は、SCP工法の施工途中・直後に砂杭強度を評価する工程を組み入れたものである。
As shown in FIG. 10, in the present embodiment, a sand pile SC is constructed by a
まず、図10(a)のように、作業船SPを用いてSCP施工機械15によりケーシングパイプ10を砂杭の造成位置に設定する(S21)。
First, as shown in FIG. 10A, the
次に、図10(b)のように、SCP施工機械15によりケーシングパイプ10を表層の軟弱粘性土層G1に打ち込み貫入させる(S22)。
Next, as shown in FIG. 10B, the
次に、図10(c)のように、ケーシングパイプ10の先端が支持層G2に達したら、砂供給口10aから砂SDを投入しケーシングパイプ内に供給する(S23)。
Next, as shown in FIG. 10C, when the tip of the
次に、図10(d)のように、SCP施工機械15によりケーシングパイプ10を引き抜く(S24)。
Next, as shown in FIG. 10D, the
次に、図10(e)のように、SCP施工機械15によりケーシングパイプ10を打ち戻しバイブロハンマ16で上下に振動を与えながら砂SDを締め固めることで、下側に締め固められた大径の砂杭の一部SC1をつくる(S25)。必要に応じて、砂投入工程S23,ケーシングパイプ10の引き抜き工程S24、打ち戻し(締め固め)工程S25を繰り返す。
Next, as shown in FIG. 10 (e), the
次に、工程S25の打ち戻しによる締め固めを中断し、図1の複数の電極21〜24,25〜28からなるセンサ20により図9の計測システム50を用いて砂杭の一部SC1の内部の比抵抗値を計測し(S26)、図5のようにして砂杭強度を評価し、その評価の結果、砂杭強度が目標値を満足していない場合(S27)、打ち戻し(締め固め)工程S25に戻り、砂杭強度が目標値を満足するまで、工程S25〜S27を繰り返す。
Next, the compaction due to the backlash in step S25 is interrupted, and the inside of a part of the sand pile SC1 is used by the
次に、砂杭造成を次の深度まで行う場合(S28)、工程S23に戻り、同様の工程を経て、図10(f)のように大径の砂杭の一部SC2(図10(e)の砂杭の一部SC1よりも高さが高い)をつくり、比抵抗値の計測工程(S26)を経て砂杭強度が目標値を満足することを確認する。 Next, when the sand pile is constructed to the next depth (S28), the process returns to step S23, and through the same step, a part SC2 of a large-diameter sand pile as shown in FIG. 10 (f) (FIG. 10 (e). ) Is partly higher than SC1), and it is confirmed that the sand pile strength satisfies the target value through the specific resistance value measurement step (S26).
以上の工程を経て砂杭SCを、図10(g)のように、表層の軟弱粘性土層G1内に造成し、砂杭SCの比抵抗値の計測工程(S26)を経て砂杭強度が目標値を満足することを確認する。本実施形態では、図10(e)〜(g)の砂杭の一部(SC1,SC2)を造成した途中の段階および砂杭SCが完成した段階で比抵抗値の計測による砂杭強度の評価を実行し目標値を満足することを確認するので、地盤に造成される砂杭の強度品質に関する施工管理を確実に行うことができ、高品質な砂杭を造成できる。また、砂杭強度の評価結果に基づいて砂杭造成の諸施工条件(たとえば、砂投入量や砂杭造成長)を施工途中で見直して適宜変更できるので、適切な施工管理が可能となる。 Through the above steps, a sand pile SC is formed in the soft cohesive soil layer G1 of the surface layer as shown in FIG. 10 (g), and the sand pile strength is increased through the step of measuring the specific resistance value of the sand pile SC (S26). Confirm that the target value is satisfied. In the present embodiment, the strength of the sand pile is measured by measuring the specific resistance value at the stage where a part (SC1, SC2) of the sand pile (SC1, SC2) shown in FIGS. Since the evaluation is executed and it is confirmed that the target value is satisfied, the construction management regarding the strength quality of the sand pile to be constructed on the ground can be surely performed, and the high quality sand pile can be constructed. In addition, various construction conditions for sand pile construction (for example, sand input amount and sand pile construction growth) can be reviewed and appropriately changed during construction based on the evaluation result of sand pile strength, so that appropriate construction management becomes possible.
以上のように、本実施形態によるSCP工法の施工管理方法によれば、次の効果を奏する。
(1)従来までは砂杭造成時における砂杭強度の評価ができなかったのに対し、砂杭造成時にリアルタイムで砂杭強度(N値)の評価・確認が可能である。
(2)砂杭造成時に強度評価を行っているので全数調査が可能であり、また、事後調査でボーリングを行う際の抽出方法として、計測した比抵抗値に基づく砂杭強度(N値)の評価で強度が比較的弱い砂杭を抽出することで事後調査ボーリングの数量を減らすことができ、省力化が可能になる。
(3)造成した砂杭の上端面にパイプケーシングの下端を押し当てるだけで比抵抗値の計測を行うことができるので、砂杭の造成部分を乱すことなく強度評価ができ、砂杭強度の非破壊検査が可能になる。
(4)砂杭をたとえば約1m造成する度に強度評価・確認を行うことができるので、設計値を満たしていない箇所を早期に発見することができ、砂の再投入や締固めを行うことで即座に補修を行うことができ、高品質の砂杭を造成することが可能になる。従来まで困難であった砂杭造成後の手直しは不要となる。
As described above, according to the construction management method of the SCP method according to the present embodiment, the following effects are obtained.
(1) In the past, it was not possible to evaluate the sand pile strength during sand pile construction, but it is possible to evaluate and confirm the sand pile strength (N value) in real time during sand pile construction.
(2) Since the strength is evaluated at the time of sand pile construction, 100% survey is possible, and as an extraction method when boring in the ex-post survey, the sand pile strength (N value) based on the measured specific resistance value By extracting sand piles with relatively weak strength in the evaluation, the number of post-survey boring can be reduced and labor can be saved.
(3) Since the specific resistance value can be measured simply by pressing the lower end of the pipe casing against the upper end surface of the created sand pile, the strength can be evaluated without disturbing the created part of the sand pile, and the strength of the sand pile can be evaluated. Non-destructive inspection becomes possible.
(4) Since the strength can be evaluated and confirmed every time a sand pile is constructed, for example, about 1 m, it is possible to find a part that does not meet the design value at an early stage, and refill or compact the sand. It can be repaired immediately and high quality sand piles can be created. Rework after sand pile construction, which was difficult in the past, is no longer necessary.
次に、本実施形態によるSCP工法用ケーシングパイプに設けられる電極の電気絶縁を図るための構成について図12を参照して説明する。図12は、電気絶縁材料による被覆膜を有するSCP工法用ケーシングパイプの要部縦断面図(a)、底面図(b)および電極近傍の一部縦断面図(c)である。 Next, a configuration for electrically insulating the electrodes provided on the casing pipe for the SCP method according to the present embodiment will be described with reference to FIG. FIG. 12 is a vertical cross-sectional view (a), a bottom view (b), and a partial vertical cross-sectional view (c) of a casing pipe for SCP construction method having a coating film made of an electrically insulating material.
砂杭の比抵抗値計測のための電極は指向性がなく、ケーシングパイプ等の金属部材の影響を受ける懸念がある。そこで、図12(a)(b)のケーシングパイプ10Aは、計測誤差の低減を図るために電気絶縁性材料で被覆した被覆膜60(ハッチングで示す)を有する。被覆膜60の被覆範囲は計測に影響のある範囲が好ましく、たとえば、電流電極21,24の間隔と同程度である。
The electrodes for measuring the specific resistance value of sand piles have no directivity, and there is a concern that they may be affected by metal members such as casing pipes. Therefore, the
また、電極21〜24,25〜28は、ケーシングパイプ貫入時や砂杭締固め時に大きな力を受けると考えられることから、図12(c)のように被覆膜60に凹部61を設け、電極21の一部が被覆膜60内に埋め込まれるように電極21を配置する。他の電極22〜24,25〜28も同様の構造とする。
Further, since the
被覆膜60の被覆厚さは、図12(c)のように電極の埋め込みが可能な範囲でできる限り薄い構造とする。たとえば、ケーシングパイプ10Aの下端11から1m程度の範囲でケーシングパイプ10Aの全体を覆うように被覆厚さ10mmの被覆とし、電極21〜24,25〜28が位置する下側の鋼板12a,12bについては電極の埋め込みの都合上、厚さ25mmの被覆を行う。
The coating thickness of the
以上のように本発明を実施するための形態について説明したが、本発明はこれらに限定されるものではなく、本発明の技術的思想の範囲内で各種の変形が可能である。たとえば、図10(e)〜(g)、図11では、砂杭の一部SC1,SC2および砂杭SCについて比抵抗値の計測による砂杭強度の評価を実行し目標値を満足することを確認するが、さらに多段階に多くの深度で、所定の高さ(たとえば1m)毎に行ってもよい。また、図11では、図2の電極配置により比抵抗値の計測を行ってもよいことはもちろんである。 Although the embodiments for carrying out the present invention have been described above, the present invention is not limited to these, and various modifications can be made within the scope of the technical idea of the present invention. For example, in FIGS. 10 (e) to 10 (g) and 11, it is determined that the sand pile strength is evaluated by measuring the specific resistance value of some of the sand piles SC1 and SC2 and the sand pile SC to satisfy the target value. To confirm, it may be performed at a predetermined height (for example, 1 m) at many depths in multiple stages. Further, in FIG. 11, it goes without saying that the specific resistance value may be measured by the electrode arrangement of FIG.
また、図10は、砂杭を水底に造成する例を示すが、本発明はこれに限定されず、陸上の飽和地盤に砂杭を造成する場合にも適用できることはもちろんである。 Further, FIG. 10 shows an example of creating a sand pile on the bottom of the water, but the present invention is not limited to this, and of course, it can be applied to the case of creating a sand pile on saturated ground on land.
また、図1,図2の鋼板12a、12bに設けられた電極からなるセンサは、鋼板とともに取り外されて、他のケーシングパイプに転用し繰り返して使用してもよい。
Further, the sensor composed of the electrodes provided on the
本発明によれば、SCP工法による地盤での砂杭造成中および直後に砂杭強度を非破壊的にリアルタイムで確認し評価できるので、高品質の砂杭造成が可能となる。 According to the present invention, the strength of the sand pile can be confirmed and evaluated in real time in a non-destructive manner during and immediately after the sand pile is constructed on the ground by the SCP method, so that high quality sand pile can be constructed.
10,10A SCP工法用ケーシングパイプ、ケーシングパイプ
10a 砂供給口
12 補強部材
12a,12b 鋼板
20 SCP工法用センサ、センサ
21〜24 電極
21,24 電流電極
22,23 電位電極
25〜28 電極
25,28 電流電極
26,27 電位電極
31〜40 電極
31,40 電流電極
50 計測システム
60 被覆膜
61 凹部
a,b 電極の間隔
C1,C2 電流電極
P1,P2 電位電極
GG 水底地盤
G1 軟弱粘性土層、表層
G2 支持層
L 配線
SC 砂杭
SC1,SC2 砂杭の一部
SS 上端面、表面
10,10A SCP construction casing pipe,
Claims (8)
前記複数の電極は、前記ケーシングパイプにより地盤に造成される砂杭の上端面に接するように設けられ、前記砂杭の上端面から所定の深さにおける砂杭内部の比抵抗値を計測し、
前記計測された比抵抗値に基づいて前記砂杭の強度を評価するためのサンドコンパクションパイル工法用センサ。 It has multiple electrodes arranged in the radial direction at the bottom of the casing pipe for the sand compaction pile method.
The plurality of electrodes are provided so as to be in contact with the upper end surface of the sand pile created in the ground by the casing pipe, and the specific resistance value inside the sand pile at a predetermined depth from the upper end surface of the sand pile is measured.
A sensor for the sand compaction pile method for evaluating the strength of the sand pile based on the measured resistivity value.
前記鋼板に前記複数の電極を設けた請求項5に記載のサンドコンパクションパイル工法用ケーシングパイプ。 It has a steel plate extending in the radial direction at the lower end of the casing pipe.
The casing pipe for the sand compaction pile method according to claim 5, wherein the steel plate is provided with the plurality of electrodes.
前記砂杭の造成に用いる砂からなる供試体を、間隙率を変えて作製し、
前記供試体により前記砂の比抵抗値を測定し、前記砂の比抵抗値と前記間隙率との関係式を求め、
前記砂杭に要求される強度に基づいて相対密度を決定し、
前記相対密度から間隙率を求め、
前記求めた間隙率と前記関係式とから比抵抗値を求め、
前記センサにより前記砂杭の比抵抗値を計測し、
前記求めた比抵抗値と前記計測された比抵抗値とを比較することで、前記砂杭の強度を評価する砂杭強度評価方法。 A method for evaluating the strength of a sand pile formed on the ground by the casing pipe using the sensor for the sand compaction pile method according to any one of claims 1 to 4.
Specimens made of sand used for the construction of the sand piles were prepared by changing the pore space.
The specific resistance value of the sand was measured with the specimen, and the relational expression between the specific resistance value of the sand and the pore space was obtained.
The relative density is determined based on the strength required for the sand pile.
Obtain the porosity from the relative density
The specific resistance value was obtained from the obtained clearance ratio and the relational expression.
The resistivity value of the sand pile is measured by the sensor.
A sand pile strength evaluation method for evaluating the strength of a sand pile by comparing the obtained specific resistance value with the measured specific resistance value.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2018017085A JP6905479B2 (en) | 2018-02-02 | 2018-02-02 | Sensor for CP method, casing pipe for SCP method, sand pile strength evaluation method and construction management method for SCP method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2018017085A JP6905479B2 (en) | 2018-02-02 | 2018-02-02 | Sensor for CP method, casing pipe for SCP method, sand pile strength evaluation method and construction management method for SCP method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2019132096A JP2019132096A (en) | 2019-08-08 |
| JP6905479B2 true JP6905479B2 (en) | 2021-07-21 |
Family
ID=67545853
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2018017085A Active JP6905479B2 (en) | 2018-02-02 | 2018-02-02 | Sensor for CP method, casing pipe for SCP method, sand pile strength evaluation method and construction management method for SCP method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6905479B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7508188B1 (en) | 2023-12-19 | 2024-07-01 | 株式会社不動テトラ | Method for estimating ground strength using compaction method |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3893572B2 (en) * | 1997-03-12 | 2007-03-14 | 国土総合建設株式会社 | Sand pile construction method |
| JPH10268061A (en) * | 1997-03-26 | 1998-10-09 | Koa Kaihatsu Kk | Base relative resistance measurement sensor |
| JP5936285B2 (en) * | 2014-12-08 | 2016-06-22 | 株式会社不動テトラ | Ground improvement method and small measuring device used in this ground improvement method |
| SG11201811523WA (en) * | 2016-06-28 | 2019-01-30 | Univ Kyushu Nat Univ Corp | Resistivity sensing device using ground improvement blade |
-
2018
- 2018-02-02 JP JP2018017085A patent/JP6905479B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2019132096A (en) | 2019-08-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Vennapusa et al. | Comparison of light weight deflectometer measurements for pavement foundation materials | |
| Kumar et al. | Bearing capacity tests of strip footings on reinforced layered soil | |
| Alnuaim et al. | Performance of micropiled raft in clay subjected to vertical concentrated load: centrifuge modeling | |
| Ganju et al. | Algorithm for generation of stratigraphic profiles using cone penetration test data | |
| Henke et al. | Field measurements regarding the influence of the installation method on soil plugging in tubular piles | |
| Elsaied et al. | Behavior of circular footing resting on laterally confined granular reinforced soil | |
| Chang et al. | Construction effect on load transfer along bored piles | |
| JP6905479B2 (en) | Sensor for CP method, casing pipe for SCP method, sand pile strength evaluation method and construction management method for SCP method | |
| De Beer et al. | The multidepth deflectometer (MDD) system for determining the effective elastic moduli of pavement layers | |
| Norkus et al. | Experimental study on bearing resistance of short displacement pile groups in dense sands | |
| Fattah et al. | Load sharing between shaft and tip of pile group in saturated and unsaturated soil | |
| Hong et al. | Load transfer curve analyses of drilled shafts using crosshole sonic logging test | |
| JP7042635B2 (en) | Sensor for CP method, casing pipe for SCP method, sand pile shape evaluation method and construction management method for CP method | |
| Ghali et al. | Laboratory simulator for geotechnical penetration tests | |
| Zourmpakis et al. | Case study of a loess collapse field trial in Kent, SE England | |
| Gregory et al. | Correlation of California bearing ratio with shear strength parameters | |
| Jayamohan et al. | Additional settlement of footing due to loads acting on adjacent foundation | |
| Ansari et al. | Evaluation of improved ground characteristics of displacement type sand compaction piles: an experimental approach | |
| Latvala et al. | Determining soil moisture content and material properties with dynamic cone penetrometer | |
| RU2310039C2 (en) | Method and device for ground testing by rod punch | |
| Nikudel et al. | Using Miniature Cone Penetration Test (Mini-CPT) to determine engineering properties of sandy soils | |
| Mansour et al. | Use of lightweight dynamic cone penetrometer for compaction control of cohesionless soils | |
| Fellenius et al. | Increase of CPT Cone Resistance in Sand Due to Installation of Press-in Piles | |
| Look | Strength and modulus changes associated with compaction of residual soils and weathered rock | |
| Memar et al. | A laboratory study on the lateral resistance of single piles with different cross-section shapes in a sandy soil |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20181122 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20200828 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20210609 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20210622 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20210625 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6905479 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |