JP6905875B2 - Ground improvement evaluation test equipment and method - Google Patents
[go: Go Back, main page]

JP6905875B2 - Ground improvement evaluation test equipment and method - Google Patents

Ground improvement evaluation test equipment and method Download PDF

Info

Publication number
JP6905875B2
JP6905875B2 JP2017112260A JP2017112260A JP6905875B2 JP 6905875 B2 JP6905875 B2 JP 6905875B2 JP 2017112260 A JP2017112260 A JP 2017112260A JP 2017112260 A JP2017112260 A JP 2017112260A JP 6905875 B2 JP6905875 B2 JP 6905875B2
Authority
JP
Japan
Prior art keywords
injection
ground
simulated ground
diffusion space
injection material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017112260A
Other languages
Japanese (ja)
Other versions
JP2018204350A (en
Inventor
博靖 平山
博靖 平山
優介 細田
優介 細田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujimori Sangyo Co Ltd
Original Assignee
Fujimori Sangyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujimori Sangyo Co Ltd filed Critical Fujimori Sangyo Co Ltd
Priority to JP2017112260A priority Critical patent/JP6905875B2/en
Publication of JP2018204350A publication Critical patent/JP2018204350A/en
Application granted granted Critical
Publication of JP6905875B2 publication Critical patent/JP6905875B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

本発明は、地山の改良評価試験装置及び方法に関し、特に注入材による地山の改良効果を評価する試験装置及び試験方法に関する。 The present invention relates to a ground improvement evaluation test device and a method, and more particularly to a test device and a test method for evaluating the ground improvement effect by an injection material.

例えばトンネルや建物等の構造物を構築する場合、先受け工によって、脆弱な地山や緩んだ地山に注入材を注入することで、地盤改良することが知られている。
地山の性状は施工現場ごとに違うため、現場の地山に合った注入材を選定する必要がある。そこで、次のような評価試験が行なわれている。
For example, when constructing a structure such as a tunnel or a building, it is known that the ground is improved by injecting an injection material into a fragile ground or a loose ground by a pre-receiver.
Since the properties of the ground differ from construction site to construction site, it is necessary to select an injection material that matches the ground at the site. Therefore, the following evaluation tests are conducted.

まず、ドラム缶などの試験容器を用意する。試験容器の軸線に沿って注入管を配置する。注入管は、先受け工の先受け鋼管に相当するものであり、その管壁には軸方向及び周方向に分散して複数の注入穴が形成されている。注入管の上端は、試験容器の上方へ突出させておく。
次に、試験容器の内部に、地山に見立てた模擬地山を充填し、注入管を模擬地山内に埋める。模擬地山としては、例えば、適用現場の地山と同等の透水性の硅砂等を用いる。
次いで、注入管に注入材を供給する。注入材としては例えばウレタン系注入材やセメント系注入材等を用いる。注入材は、注入穴から吐出され、模擬地山の内部に浸み込んでいく。
注入材が硬化するまで養生した後、試験容器を割って、模擬地山を取り出す。そして、注入材で改良された部分の大きさ、形状、硬さ、その他の物性から所望の改良効果が得られるかどうかを評価する。
First, prepare a test container such as a drum. Place the injection tube along the axis of the test vessel. The injection pipe corresponds to a pre-received steel pipe of the pre-received work, and a plurality of injection holes are formed in the pipe wall dispersed in the axial direction and the circumferential direction. The upper end of the injection tube should protrude above the test vessel.
Next, the inside of the test container is filled with a simulated ground that looks like a ground, and the injection pipe is buried in the simulated ground. As the simulated ground, for example, permeable silica sand equivalent to the ground at the application site is used.
Then, the injection material is supplied to the injection tube. As the injection material, for example, a urethane-based injection material, a cement-based injection material, or the like is used. The injection material is discharged from the injection hole and penetrates into the simulated ground.
After curing until the injection material hardens, break the test container and take out the simulated ground. Then, it is evaluated whether or not the desired improvement effect can be obtained from the size, shape, hardness, and other physical characteristics of the portion improved by the injection material.

特開平06−287557号公報Japanese Unexamined Patent Publication No. 06-287557

従来の試験装置においては、注入材が、注入管の注入穴から模擬地山内に吐出された後、前記注入穴を中心にして放射状に延び広がるように浸透して行く。このため、浸透領域が注入穴の近くに偏って形成され、注入管の管軸方向及び周方向に浸透ムラが出来る。
一方、実際のトンネル構築現場における先受け工法等では、通常、掘削ビットが先受け鋼管より少し大径になっている。このため、先受け鋼管よりも少し大径の掘削孔が形成される。先受け鋼管の注入穴から吐出された注入材は、一旦、掘削孔の内周面と先受け鋼管の外周面との間に充填された後、地山の内部に浸み込む。このため、浸透ムラが出来にくい。
したがって、試験装置で作り出される浸透形態が、実際の施工時の浸透形態と異なっている。
本発明は、かかる事情に鑑み、注入材による地山の改良評価試験において、浸透ムラを低減して、実際の施工時になるべく近い浸透形態を作り出すことで、改良評価の信頼度を高めることを目的とする。
In the conventional test apparatus, the injection material is discharged from the injection hole of the injection pipe into the simulated ground, and then permeates so as to extend and spread radially around the injection hole. Therefore, the permeation region is unevenly formed near the injection hole, and permeation unevenness is formed in the tube axial direction and the circumferential direction of the injection tube.
On the other hand, in the pre-received construction method at an actual tunnel construction site, the excavation bit usually has a slightly larger diameter than the pre-received steel pipe. Therefore, a drill hole having a diameter slightly larger than that of the pre-received steel pipe is formed. The injection material discharged from the injection hole of the pre-received steel pipe is once filled between the inner peripheral surface of the excavation hole and the outer peripheral surface of the pre-received steel pipe, and then penetrates into the ground. Therefore, uneven penetration is unlikely to occur.
Therefore, the permeation form produced by the test device is different from the permeation form at the time of actual construction.
In view of such circumstances, it is an object of the present invention to increase the reliability of the improvement evaluation by reducing the permeation unevenness and creating a permeation form as close as possible to the actual construction in the improvement evaluation test of the ground using the injection material. And.

前記課題を解決するため、本発明装置は、注入材による地山の改良効果を評価する試験装置であって、
前記地山を模した模擬地山が収容される試験容器と、
前記注入材を吐出する注入穴を有し、前記試験容器内に配置された注入管と、
前記注入管の外周面との間に環状の拡散空間を画成するようにして前記注入管を囲む筒状の拡散空間画成部材と、
を備え、前記拡散空間画成部材には、前記注入材の透過を許容し前記模擬地山の通過を制限する多数の透孔が分散して形成されていることを特徴とする。
In order to solve the above problems, the apparatus of the present invention is a test apparatus for evaluating the improvement effect of the ground by the injection material.
A test container that houses a simulated ground that imitates the ground,
An injection tube having an injection hole for discharging the injection material and arranged in the test container,
A tubular diffusion space defining member that surrounds the injection tube so as to define an annular diffusion space with the outer peripheral surface of the injection tube.
The diffusion space imaging member is characterized in that a large number of through holes that allow the permeation of the injection material and restrict the passage of the simulated ground are dispersedly formed.

前記模擬地山としては、改良対象の地山と同様の透水性その他の物性ないしは性状を有する土砂を用いることが好ましい。
試験容器内に模擬地山を収容することで、注入管及び拡散空間画成部材が模擬地山内に埋まる。模擬地山が透孔から拡散空間内に入り込むのが制限されることで、拡散空間を残置できる。
注入材は、注入管の注入穴から吐出された後、拡散空間内に広がる。その後、拡散空間画成部材の透孔を透過して、模擬地山の内部に浸み込んでいく。これによって、注入材が注入穴の近くの模擬地山だけに偏って浸み込むのを防止でき、浸透ムラを低減できる。したがって、実際の地山での浸透形態に近づけることができ、改良評価の信頼性を高めることができる。
前記模擬地山に浸み込んだ注入材が硬化することで、模擬地山の改良体が得られる。該改良体の大きさ、形状、硬さ等から、前記注入材によって所望の改良効果が得られるかどうかを確認する。これによって、適用対象の地山に対する注入材の適合性を評価できる。
As the simulated ground, it is preferable to use earth and sand having the same permeability and other physical properties or properties as the ground to be improved.
By accommodating the simulated ground in the test container, the injection pipe and the diffusion space defining member are buried in the simulated ground. By restricting the simulated ground from entering the diffusion space through the through hole, the diffusion space can be left behind.
The injection material spreads in the diffusion space after being discharged from the injection hole of the injection tube. After that, it penetrates through the through hole of the diffusion space imaging member and penetrates into the simulated ground. As a result, it is possible to prevent the injection material from infiltrating only in the simulated ground near the injection hole, and it is possible to reduce the uneven penetration. Therefore, it is possible to approach the infiltration form in the actual ground, and the reliability of the improvement evaluation can be enhanced.
By hardening the injection material that has soaked into the simulated ground, an improved body of the simulated ground can be obtained. From the size, shape, hardness, etc. of the improved body, it is confirmed whether or not the desired improving effect can be obtained by the injection material. This makes it possible to evaluate the suitability of the injection material for the target ground.

前記透孔は、前記拡散空間画成部材の全域に分布して形成されていることが好ましい。
前記拡散空間画成部材が、網によって構成されていることが好ましい。これによって、浸透ムラを確実に低減できる。また、材料コストを安価にできる。
The through holes are preferably formed so as to be distributed over the entire area of the diffusion space imaging member.
It is preferable that the diffusion space imaging member is composed of a net. As a result, uneven penetration can be reliably reduced. In addition, the material cost can be reduced.

前記試験容器内における前記模擬地山の下側又は上側には、前記注入材の拡散抵抗が模擬地山よりも高い緩衝層が設けられていることが好ましい。
これによって、注入材が、模擬地山の下端部又は上端部まで拡散して緩衝層と接した後、模擬地山と緩衝層の界面に沿って注入材が急速に拡散するのを抑制できる。この結果、前記拡散空間画成部材による浸透ムラ低減効果と相俟って、評価に好適な改良体を確実に得ることができる。
It is preferable that a buffer layer having a higher diffusion resistance of the injection material than the simulated ground is provided below or above the simulated ground in the test container.
As a result, after the injection material diffuses to the lower end or the upper end of the simulated ground and comes into contact with the buffer layer, it is possible to prevent the injection material from rapidly diffusing along the interface between the simulated ground and the buffer layer. As a result, in combination with the effect of reducing permeation unevenness by the diffusion space imaging member, an improved body suitable for evaluation can be surely obtained.

本発明方法は、注入材による地山の改良効果を評価する試験方法であって、
前記の試験装置を用意し、
前記試験容器内に模擬地山を収容し、
前記注入材を、前記注入管に供給して前記注入穴から吐出させ、前記拡散空間画成部材を透して前記模擬地山に浸み込ませることを特徴とする。
The method of the present invention is a test method for evaluating the improvement effect of the ground by the injection material.
Prepare the above test equipment
A simulated ground is housed in the test container,
The injection material is supplied to the injection pipe, discharged from the injection hole, and penetrates into the simulated ground through the diffusion space imaging member.

本発明によれば、注入材による地山の改良評価試験において、浸透ムラを低減して、実際の地山への施工時と近い浸透形態を作り出すことができ、改良評価の信頼度を高めることができる。 According to the present invention, in an improvement evaluation test of a ground using an injection material, it is possible to reduce permeation unevenness and create a permeation form close to that at the time of actual construction on the ground, thereby increasing the reliability of the improvement evaluation. Can be done.

図1は、本発明の一実施形態に係る改良評価試験装置の正面断面図である。FIG. 1 is a front sectional view of an improved evaluation test apparatus according to an embodiment of the present invention. 図2は、図1の円部IIを拡大して示す正面図である。FIG. 2 is an enlarged front view showing the circle portion II of FIG. 図3は、図2のIII−III線に沿う平面断面図である。FIG. 3 is a plan sectional view taken along the line III-III of FIG. 図4は、前記改良評価試験装置における注入材の注入及び発泡段階を仮想線にして示す正面断面図である。FIG. 4 is a front sectional view showing the injection and foaming stages of the injection material in the improved evaluation test apparatus as virtual lines. 図5は、注入材の注入段階を示す、図4の円部Vの拡大正面図である。FIG. 5 is an enlarged front view of the circle portion V of FIG. 4, showing the injection stage of the injection material. 図6は、図5のVI−VI線に沿う平面断面図である。FIG. 6 is a plan sectional view taken along the line VI-VI of FIG. 図7は、前記改良評価試験装置によって得られた改良体の正面断面図である。FIG. 7 is a front sectional view of the improved body obtained by the improved evaluation test apparatus. 図8は、実施例1によって得られた改良体の写真である。FIG. 8 is a photograph of the improved body obtained in Example 1.

以下、本発明の一実施形態を図面にしたがって説明する。
本発明形態は、例えば、トンネル施工における長尺鋼管フォアパイリングないしはフォアポーリング等の先受け工の注入材選定に適用される。先受け工においては、トンネル前方の地山に、中空ボルト等の先受け鋼管を打ち込み、該先受け鋼管の注入孔から注入材を地山に注入することで、地山を安定させる。当該地山に適合する注入材を選定するために、事前に改良評価試験を行なう。
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
The embodiment of the present invention is applied to, for example, selection of an injection material for a pre-receiver such as long steel pipe fore-piling or fore-polling in tunnel construction. In the pre-received work, a pre-received steel pipe such as a hollow bolt is driven into the ground in front of the tunnel, and the injection material is injected into the ground through the injection hole of the pre-received steel pipe to stabilize the ground. An improvement evaluation test will be conducted in advance to select an injection material suitable for the ground.

図1は、本実施形態の改良評価試験装置1を示したものである。改良評価試験装置1は、試験容器10と、注入管20と、模擬地山30を備えている。
試験容器10は、例えば鋼製のドラム缶によって構成され、円筒状の周壁11と、底板12と、蓋板13を有している。周壁11には、複数の通気穴11dが形成されている。これら通気穴11dは、周壁11の周方向及び軸方向(上下)に互いに分散して配置されている。通気穴11dの数には特に限定が無く、1つだけであってもよい。
FIG. 1 shows the improved evaluation test apparatus 1 of the present embodiment. The improved evaluation test apparatus 1 includes a test container 10, an injection pipe 20, and a simulated ground 30.
The test container 10 is composed of, for example, a steel drum, and has a cylindrical peripheral wall 11, a bottom plate 12, and a lid plate 13. A plurality of ventilation holes 11d are formed in the peripheral wall 11. These ventilation holes 11d are arranged so as to be dispersed with each other in the circumferential direction and the axial direction (upper and lower) of the peripheral wall 11. The number of ventilation holes 11d is not particularly limited, and may be only one.

周壁11の内周面には、フィルタ16が設けられている。フィルタ16によって、通気穴11dが覆われている。フィルタ16は、気体及び液体の透過を許容し、固体の透過を阻止する。フィルタ16として、例えば不織布が用いられている。フィルタ16の試験容器10への貼り付け手段としては、粘着テープや接着剤が用いられている。 A filter 16 is provided on the inner peripheral surface of the peripheral wall 11. The vent hole 11d is covered by the filter 16. The filter 16 allows the permeation of gases and liquids and blocks the permeation of solids. As the filter 16, for example, a non-woven fabric is used. Adhesive tape or an adhesive is used as a means for attaching the filter 16 to the test container 10.

試験容器10の内部に注入管20が挿入配置されている。注入管20は、鋼管によって構成され、試験容器10の軸線に沿って上下に延びている。好ましくは、注入管20は、前記先受け工の先受け鋼管そのものか、それと同等の構造の管によって構成されている。
注入管20の上端部は、試験容器10の上方へ延び出ている。注入管20の下端部は、試験容器10の底部まで達し、かつ塞がっている。
注入管20の管壁には複数の注入穴20cが形成されている。各注入穴20cは、注入管20の内周面から外周面に貫通している。複数の注入穴20cは、注入管20の周方向及び軸方向(上下)に互いに分散して配置されている。
The injection tube 20 is inserted and arranged inside the test container 10. The injection pipe 20 is made of a steel pipe and extends vertically along the axis of the test container 10. Preferably, the injection pipe 20 is composed of the pre-received steel pipe itself of the pre-received work or a pipe having a structure equivalent thereto.
The upper end of the injection tube 20 extends above the test vessel 10. The lower end of the injection tube 20 reaches the bottom of the test container 10 and is closed.
A plurality of injection holes 20c are formed in the tube wall of the injection tube 20. Each injection hole 20c penetrates from the inner peripheral surface to the outer peripheral surface of the injection pipe 20. The plurality of injection holes 20c are arranged so as to be dispersed with each other in the circumferential direction and the axial direction (upper and lower) of the injection pipe 20.

図4に示すように、注入管20の上端部には、注入材3の供給管21A,21Bが接続されている。ここでは、注入材3として、ウレタン系注入材が用いられている。ウレタン系注入材の原料は、ポリオール等のA液と、ポリイソシアネート等のB液を含む。供給管21AにA液の供給源3Aが接続され、供給管21BにB液の供給源3Bが接続されている。 As shown in FIG. 4, the supply pipes 21A and 21B of the injection material 3 are connected to the upper end of the injection pipe 20. Here, a urethane-based injection material is used as the injection material 3. The raw material of the urethane-based injection material includes liquid A such as polyol and liquid B such as polyisocyanate. The supply source 3A of the liquid A is connected to the supply pipe 21A, and the supply source 3B of the liquid B is connected to the supply pipe 21B.

図1に示すように、注入管20における、試験容器10内の部分の外周には、拡散空間画成部材22が設けられている。拡散空間画成部材22は、注入管20を囲む長い筒状になっている。図3に示すように、拡散空間画成部材22と注入管20の外周面との間には、環状の拡散空間25が形成されている。
拡散空間画成部材22の直径は、注入管20の直径の1倍〜5倍程度が好ましい。
As shown in FIG. 1, a diffusion space imaging member 22 is provided on the outer periphery of a portion of the injection pipe 20 in the test container 10. The diffusion space defining member 22 has a long tubular shape surrounding the injection pipe 20. As shown in FIG. 3, an annular diffusion space 25 is formed between the diffusion space imaging member 22 and the outer peripheral surface of the injection pipe 20.
The diameter of the diffusion space defining member 22 is preferably about 1 to 5 times the diameter of the injection pipe 20.

図1に示すように、拡散空間画成部材22の上端部は、試験容器10内の上側部分に配置されている。拡散空間画成部材22の下端部は、注入管20の下端部付近まで達し、ひいては試験容器10の底部まで達している。 As shown in FIG. 1, the upper end portion of the diffusion space imaging member 22 is arranged in the upper portion in the test container 10. The lower end of the diffusion space imaging member 22 reaches the vicinity of the lower end of the injection pipe 20, and eventually reaches the bottom of the test container 10.

図2に示すように、拡散空間画成部材22は、透液性を有している。詳しくは、拡散空間画成部材22は、多数(複数)の透孔を有する多孔部材によって構成されている。好ましくは、拡散空間画成部材22は、網によって構成されている。多数(複数)の網目22c(透孔)が、拡散空間画成部材22の軸方向(上下)及び周方向の全域に分散して形成されている。網目22cを通して、拡散空間25が拡散空間画成部材22の外部と連通している。網目22cは、液状の注入材3の透過を許容する一方、模擬地山30の通過を制限する。 As shown in FIG. 2, the diffusion space imaging member 22 has liquid permeability. Specifically, the diffusion space imaging member 22 is composed of a perforated member having a large number (plurality) of through holes. Preferably, the diffusion space defining member 22 is composed of a net. A large number (plurality) of meshes 22c (through holes) are formed dispersed in the entire axial direction (upper and lower) and circumferential direction of the diffusion space imaging member 22. Through the mesh 22c, the diffusion space 25 communicates with the outside of the diffusion space imaging member 22. The mesh 22c allows the liquid injection material 3 to permeate, while restricting the passage of the simulated ground 30.

拡散空間画成部材22を構成する網線材22aは、金属であってもよく、樹脂であってもよい。好ましくは、拡散空間画成部材22は、模擬地山30の土圧を受けても拡散空間25を確保し得る強度を有している。
網線材22aの太さ(直径)は、0.05mm〜2mm程度が好ましい。
網目22cの大きさは、空隙率で10〜90%程度が好ましい。ここで、空隙率とは、拡散空間画成部材22の見かけの面積に対する網目22cすなわち空間部分の合計面積の割合を言う。
拡散空間画成部材22が、1枚の網を注入管20の周りに複数回巻き重ねた構造であってもよい。拡散空間画成部材22が、複数の筒状の網を含み、これら筒状の網を入れ子状に重ねた構造になっていてもよい。そうすることで、網目22cを細かくすることができる。
The net wire member 22a constituting the diffusion space imaging member 22 may be a metal or a resin. Preferably, the diffusion space imaging member 22 has a strength that can secure the diffusion space 25 even under the earth pressure of the simulated ground 30.
The thickness (diameter) of the net wire rod 22a is preferably about 0.05 mm to 2 mm.
The size of the mesh 22c is preferably about 10 to 90% in terms of porosity. Here, the porosity refers to the ratio of the mesh 22c, that is, the total area of the space portion to the apparent area of the diffusion space imaging member 22.
The diffusion space imaging member 22 may have a structure in which one net is wound around the injection pipe 20 a plurality of times. The diffusion space imaging member 22 may include a plurality of tubular nets and have a structure in which these tubular nets are stacked in a nested manner. By doing so, the mesh 22c can be made finer.

網目22cは、必ずしも模擬地山30の硅砂粒径より小さい必要はなく、模擬地山30の通過をある程度制限できる限り、網目22cの大きさが模擬地山30の硅砂粒径より多少大きくてもよい。模擬地山30の硅砂は、網目22cより粒径が小さくても、互いの摩擦等によって網目22cを通過するのが制限される。
前述したように、拡散空間画成部材22を網の巻重ね構造や入れ子構造にすることによって、実質的に網目22cが模擬地山30の硅砂粒径より小さくなるようにしてもよい。
The mesh 22c does not necessarily have to be smaller than the silica sand particle size of the simulated ground 30, and as long as the passage of the simulated ground 30 can be restricted to some extent, the size of the mesh 22c may be slightly larger than the silica sand particle size of the simulated ground 30. good. Even if the grain size of the silica sand of the simulated ground 30 is smaller than that of the mesh 22c, it is restricted from passing through the mesh 22c due to friction with each other.
As described above, the diffusion space imaging member 22 may have a network winding structure or a nested structure so that the mesh 22c is substantially smaller than the silica sand particle size of the simulated ground 30.

図1に示すように、拡散空間画成部材22の上端部と注入管20の外周面との間には、環状のシール部材23が設けられている。シール部材23の材質は、例えば発泡樹脂であるが、これに限定されるものではなく、ゴムや非発泡樹脂であってもよい。拡散空間25の上端部が、シール部材23によって液密に封止されている。 As shown in FIG. 1, an annular seal member 23 is provided between the upper end portion of the diffusion space imaging member 22 and the outer peripheral surface of the injection pipe 20. The material of the seal member 23 is, for example, foamed resin, but the material is not limited to this, and rubber or non-foamed resin may be used. The upper end of the diffusion space 25 is liquidtightly sealed by the sealing member 23.

試験容器10の内部には、下側から緩衝層31、模擬地山30、緩衝層32、押し蓋層33の順に積層されている。
模擬地山30は、地山を模したものであり、好ましくは施工現場の地山と物性や性状が近い土砂が用いられている。より好ましくは、模擬地山30として、施工現場の地山と同等の透水性を有する硅砂が用いられている。模擬地山30の厚さは、他の層31,32,33の厚さよりも十分に大きい。試験容器10内の大部分が模擬地山30によって占められている。
注入管20及び拡散空間画成部材22が、模擬地山30の中央部を上下に貫通している。更に、拡散空間25が、模擬地山30内を上下に貫通するように形成されている。
Inside the test container 10, the buffer layer 31, the simulated ground 30, the buffer layer 32, and the push lid layer 33 are laminated in this order from the bottom.
The simulated ground 30 imitates the ground, and preferably earth and sand having similar physical properties and properties to the ground at the construction site are used. More preferably, as the simulated ground 30, silica sand having water permeability equivalent to that of the ground at the construction site is used. The thickness of the simulated ground 30 is sufficiently larger than the thickness of the other layers 31, 32, 33. Most of the test container 10 is occupied by the simulated ground 30.
The injection pipe 20 and the diffusion space defining member 22 penetrate the central portion of the simulated ground 30 up and down. Further, the diffusion space 25 is formed so as to vertically penetrate the simulated ground 30.

模擬地山30の下側及び上側にそれぞれ緩衝層31,32が設けられている。
緩衝層31,32の材料としては、注入材3の拡散抵抗が模擬地山30よりも高い土砂が用いられており、好ましくは注入材3の浸透度が十分に低い極低浸透性土砂が用いられている。より好ましくは、緩衝層31,32は、模擬地山30より粒度が小さい硅砂又は粘土によって構成されている。
下側緩衝層31は、試験容器10の底板12(底部)と模擬地山30との間に介在されている。下側緩衝層31の上面が模擬地山30の下端部と接している。模擬地山30と下側緩衝層31の境においては、模擬地山30の下端部を構成する硅砂と、下側緩衝層31を構成する微細硅砂又は粘土とが混ざり合っていてもよい。模擬地山30と下側緩衝層31の界面が凸凹ないしは三次元状に入り組んでいてもよい。
注入管20の下端部が、下側緩衝層31内に埋まっている。拡散空間25の下端部が、下側緩衝層31によって塞がれている。
Buffer layers 31 and 32 are provided on the lower side and the upper side of the simulated ground 30, respectively.
As the material of the buffer layers 31 and 32, earth and sand having a diffusion resistance of the injection material 3 higher than that of the simulated ground 30 are used, and preferably ultra-low permeability earth and sand having a sufficiently low permeability of the injection material 3 are used. Has been done. More preferably, the buffer layers 31 and 32 are made of silica sand or clay having a particle size smaller than that of the simulated ground 30.
The lower buffer layer 31 is interposed between the bottom plate 12 (bottom) of the test container 10 and the simulated ground 30. The upper surface of the lower buffer layer 31 is in contact with the lower end of the simulated ground 30. At the boundary between the simulated ground 30 and the lower buffer layer 31, the silica sand forming the lower end of the simulated ground 30 and the fine silica sand or clay forming the lower buffer layer 31 may be mixed. The interface between the simulated ground 30 and the lower buffer layer 31 may be uneven or three-dimensionally intricate.
The lower end of the injection tube 20 is buried in the lower buffer layer 31. The lower end of the diffusion space 25 is closed by the lower buffer layer 31.

図1に示すように、模擬地山30の上端部には、上側緩衝層32の下面が接している。模擬地山30と上側緩衝層32の境においては、模擬地山30の上端部を構成する硅砂と、上側緩衝層32を構成する微細硅砂又は粘土とが混ざり合っていてもよい。模擬地山30と上側緩衝層32の界面が凸凹ないしは三次元状に入り組んでいてもよい。 As shown in FIG. 1, the lower surface of the upper buffer layer 32 is in contact with the upper end of the simulated ground 30. At the boundary between the simulated ground 30 and the upper buffer layer 32, the silica sand forming the upper end of the simulated ground 30 and the fine silica sand or clay forming the upper buffer layer 32 may be mixed. The interface between the simulated ground 30 and the upper buffer layer 32 may be uneven or three-dimensionally intricate.

模擬地山30の上方には、緩衝層32を介してモルタルからなる押し蓋層33が設けられている。押し蓋層33の上側に試験容器10の蓋板13が被さっている。 Above the simulated ground 30, a push lid layer 33 made of mortar is provided via a buffer layer 32. The lid plate 13 of the test container 10 covers the upper side of the push lid layer 33.

注入管20が、蓋板13、押し蓋層33、及び緩衝層32を貫通して、模擬地山30の内部に埋まっている。
シール部材23は、模擬地山30から緩衝層32を挟んで押し蓋層33へ跨っている。
The injection pipe 20 penetrates the lid plate 13, the push lid layer 33, and the buffer layer 32, and is buried inside the simulated ground 30 .
The seal member 23 straddles the push lid layer 33 with the buffer layer 32 sandwiched from the simulated ground 30.

改良評価試験は、次のようにして行う。
<改良評価試験装置1の作製工程>
図4に示すように、試験容器10には、通気穴11dを形成し、かつフィルタ16を貼り付けて通気穴11dを塞いでおく。
試験容器10の軸線に沿って注入管20を配置する。注入管20の周りには、拡散空間画成部材22を設けておく。
試験容器10の底部に緩衝層31を設ける。
緩衝層31の上側に模擬地山30を積層する。これによって、模擬地山30内に注入管20及び拡散空間画成部材22を埋め込む。模擬地山30は、網目22cを通過するのが制限される。したがって、拡散空間25が模擬地山30で埋まることなく空間として残される。
実際の地山は通常、水分を含んでいるため、模擬地山30に水を浸み込ませることで、実際の地山の状態に近づけることが好ましい。
模擬地山30の上側には、緩衝層32を積層する。
さらに緩衝層32の上側に押し蓋層33を積層する。
さらに、蓋板13を設置する。
The improvement evaluation test is conducted as follows.
<Manufacturing process of improved evaluation test device 1>
As shown in FIG. 4, a ventilation hole 11d is formed in the test container 10, and a filter 16 is attached to close the ventilation hole 11d.
The injection tube 20 is arranged along the axis of the test container 10. A diffusion space defining member 22 is provided around the injection pipe 20.
A buffer layer 31 is provided at the bottom of the test container 10.
A simulated ground 30 is laminated on the upper side of the buffer layer 31. As a result, the injection pipe 20 and the diffusion space imaging member 22 are embedded in the simulated ground 30. The simulated ground 30 is restricted from passing through the mesh 22c. Therefore, the diffusion space 25 is left as a space without being filled with the simulated ground 30.
Since the actual ground usually contains water, it is preferable to infiltrate the simulated ground 30 with water to bring it closer to the state of the actual ground.
A buffer layer 32 is laminated on the upper side of the simulated ground 30.
Further, the push lid layer 33 is laminated on the upper side of the buffer layer 32.
Further, the lid plate 13 is installed.

<注入材3の注入工程>
図4に示すように、ウレタン原料のA液及びB液をそれぞれ供給管21A,21Bから注入管20に供給する。
これらA液及びB液が混合されてウレタン系注入材3となり、各注入穴20cから吐出される。
図5及び図6において太線矢印にて示すように、注入材3は、注入管20の外周面に沿って拡散空間25の全域に広がる。また、シール部材23(図4)によって、注入材3が、拡散空間25の上端部から漏れるのを防止できる。
その後、注入材3は、拡散空間25の全域から網目22cを通して、模擬地山30の内部に浸み込んでいく。これによって、注入材3を、模擬地山30の上下方向及び周方向に偏りなく均等に浸み込ませることができる。つまり、注入材3が注入穴20cの近くの模擬地山30だけに浸み込むのを防止でき、浸透ムラが出来るのを防止できる。したがって、実際のトンネル施工現場での地山への浸透形態に近づけることができる。
<Injection process of injection material 3>
As shown in FIG. 4, the urethane raw materials A and B are supplied from the supply pipes 21A and 21B to the injection pipe 20, respectively.
The liquids A and B are mixed to form a urethane-based injection material 3, which is discharged from each injection hole 20c.
As shown by the thick arrow in FIGS. 5 and 6, the injection material 3 spreads over the entire diffusion space 25 along the outer peripheral surface of the injection pipe 20. Further, the sealing member 23 (FIG. 4) can prevent the injection material 3 from leaking from the upper end portion of the diffusion space 25.
After that, the injection material 3 infiltrates the inside of the simulated ground 30 from the entire area of the diffusion space 25 through the mesh 22c. As a result, the injection material 3 can be evenly and evenly infiltrated in the vertical direction and the circumferential direction of the simulated ground 30. That is, it is possible to prevent the injection material 3 from infiltrating only into the simulated ground 30 near the injection hole 20c, and it is possible to prevent uneven penetration. Therefore, it is possible to approach the form of penetration into the ground at the actual tunnel construction site.

ウレタン系注入材3は、注入穴20cから吐出された後、しばらくは液状になっている。図4において三点鎖線にて示すように、液状(未発泡)の注入材3’は、模擬地山30内を下方へ拡散していく。その一部は、模擬地山30の下端部に達し、下側緩衝層31と接し得る。該液状注入材3’は、僅かではあるが下側緩衝層31に浸み込み得る。また、模擬地山30と下側緩衝層31との境は少なからず凸凹に入り組んでいる。これによって、模擬地山30の下端面における液状注入材3’の拡散抵抗が高まり、注入材3’が模擬地山30の下端面に沿って急速に拡散するのを抑制できる。 The urethane-based injection material 3 is in a liquid state for a while after being discharged from the injection hole 20c. As shown by the alternate long and short dash line in FIG. 4, the liquid (unfoamed) injection material 3'diffuses downward in the simulated ground 30. A part of it reaches the lower end of the simulated ground 30 and may come into contact with the lower buffer layer 31. The liquid injection material 3'can infiltrate the lower buffer layer 31 to a small extent. In addition, the boundary between the simulated ground 30 and the lower buffer layer 31 is not a little intricate. As a result, the diffusion resistance of the liquid injection material 3'on the lower end surface of the simulated ground 30 increases, and it is possible to suppress the rapid diffusion of the injection material 3'along the lower end surface of the simulated ground 30.

ウレタン系注入材3は、吐出後しばらくして発泡を開始する。
図4において二点鎖線にて示すように、発泡中の注入材3”は、模擬地山30内を上方へ向けて拡散していく。その一部は、模擬地山30の上端部に達し、上側緩衝層32と接し得る。該発泡中の注入材3”は、僅かではあるが上側緩衝層32に浸み込み得る。また、模擬地山30と上側緩衝層32との境は少なからず凸凹に入り組んでいる。これによって、模擬地山30の上端面における注入材3”の拡散抵抗が高まり、注入材3”が模擬地山30の上端面に沿って急速に拡散するのを抑制できる。
この結果、模擬地山30の下端部及び上端部において注入材3の注入圧力が逃げるのを防止でき、模擬地山30の中間部に注入材3が十分に浸透するようにできる。
The urethane-based injection material 3 starts foaming shortly after being discharged.
As shown by the alternate long and short dash line in FIG. 4, the foaming injection material 3 ”diffuses upward in the simulated ground 30. A part of the injection material reaches the upper end of the simulated ground 30. , The injection material 3 "during foaming can penetrate the upper buffer layer 32, albeit slightly. In addition, the boundary between the simulated ground 30 and the upper buffer layer 32 is not a little intricate. As a result, the diffusion resistance of the injection material 3 "on the upper end surface of the simulated ground 30 is increased, and it is possible to suppress the rapid diffusion of the injection material 3" along the upper end surface of the simulated ground 30.
As a result, it is possible to prevent the injection pressure of the injection material 3 from escaping at the lower end portion and the upper end portion of the simulated ground 30, and the injection material 3 can be sufficiently permeated into the intermediate portion of the simulated ground 30.

注入材3の注入に伴って、試験容器10内の空気が、フィルタ16を透過し、通気穴11dから排出される。また、模擬地山30内の余剰の水分についても、フィルタ16を透過させて通気穴11dから押し出すことができる。これによって、注入材3を円滑に注入できる。
一方、模擬地山30の硅砂は、フィルタ16によって阻まれ、通気穴11dから漏れるのを防止できる。
With the injection of the injection material 3, the air in the test container 10 passes through the filter 16 and is discharged from the ventilation hole 11d. Further, the excess water in the simulated ground 30 can also be passed through the filter 16 and pushed out from the ventilation hole 11d. As a result, the injection material 3 can be smoothly injected.
On the other hand, the silica sand of the simulated ground 30 is blocked by the filter 16 and can be prevented from leaking from the ventilation hole 11d.

<養生工程>
注入工程後、注入材3が硬化するまで養生する。これによって、模擬地山30における注入材3の浸透部分が硬化し、改良体30X(図7)となる。模擬地山30の中間部に注入材3を十分に浸透させることで、評価に適した改良体30Xを得ることができる。
<取り出し工程>
その後、図7に示すように、試験容器10を解体して、改良体30Xを取り出す。
前記拡散空間画成部材22による浸透ムラ低減効果と、緩衝層31,32による拡散抑制効果とが相俟って、評価に適した、きれいな状態の改良体30Xを得ることができる。
<Curing process>
After the injection step, the injection material 3 is cured until it hardens. As a result, the permeated portion of the injection material 3 in the simulated ground 30 is hardened to become an improved body 30X (FIG. 7). By sufficiently infiltrating the injection material 3 into the middle portion of the simulated ground 30, an improved body 30X suitable for evaluation can be obtained.
<Removal process>
Then, as shown in FIG. 7, the test container 10 is disassembled and the improved body 30X is taken out.
The effect of reducing permeation unevenness by the diffusion space imaging member 22 and the effect of suppressing diffusion by the buffer layers 31 and 32 are combined, and an improved body 30X in a clean state suitable for evaluation can be obtained.

<評価工程>
そして、改良体30Xの大きさ、形状、硬さ、その他の物性から、注入材3によって所望の改良効果が得られるかどうかを評価する。すなわち、適用対象の地山に対する注入材3の適合性を評価する。
改良評価試験装置1によれば、評価に適した改良体30Xが得られるために、評価を容易に行なうことができる。特に、注入材3の浸透形態を実際の現場での浸透形態に近づけることができるから、改良評価の信頼性を高めることができる。
複数の改良評価試験装置1を用意し、互いに組成等が異なる注入材3を注入して、各改良体30Xを評価することで、適用対象の地山に合った注入材3を選定できる。
<Evaluation process>
Then, it is evaluated whether or not the desired improving effect can be obtained by the injection material 3 from the size, shape, hardness, and other physical properties of the improved body 30X. That is, the suitability of the injection material 3 with respect to the ground to be applied is evaluated.
According to the improved evaluation test apparatus 1, since the improved body 30X suitable for the evaluation can be obtained, the evaluation can be easily performed. In particular, since the permeation form of the injection material 3 can be brought close to the permeation form in the actual field, the reliability of the improvement evaluation can be enhanced.
By preparing a plurality of improved evaluation test devices 1, injecting the injection materials 3 having different compositions from each other, and evaluating each improved body 30X, the injection material 3 suitable for the target ground can be selected.

本発明は、前記実施形態に限定されるものではなく、その趣旨を逸脱しない範囲において種々の改変をなすことができる。
例えば、拡散空間画成部材22は、網に限られず、筒状の多孔板などによって構成してもよい。
注入材は、前記ウレタン系注入材に限られず、シリカレジン系注入材、セメント系注入材等を用いてもよい。シリカレジン系注入材は、特殊珪酸ソーダ(A液)と変性ポリイソシアネート(B液)を原料とする変性ポリウレタンである。
下側緩衝層31と上側緩衝層32との組成や成分(硅砂の粒径等)が互いに異なっていてもよい。
セメント系注入材は、模擬地山30内を主に下方へ拡散されるから、模擬地山30の少なくとも下側に緩衝層31を設けるとよい。上側の緩衝層32を省略してもよい。
前記ウレタン系注入材やシリカレジン系注入材等の発泡性注入材が、注入管20から吐出後、すぐに発泡して上方へ拡散される等の場合は、上側の緩衝層32だけを設け、下側の緩衝層31を省略してもよい。両側の緩衝層31,32を省略してもよい。
本発明は、切羽の上半アーチ外周から前方へ長尺先受け鋼管を打設する長尺先受け工法の注入材選定の他、切羽鏡部に鏡ボルトを打設する鏡ボルト工法の注入材選定などにも適用できる。
本発明は、トンネル構築時の地山への注入材の選定に限られず、他の地中構造物やビル等の建築構造物を構築する際の地盤改良材としての注入材の選定等にも適用できる。
The present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit of the present invention.
For example, the diffusion space imaging member 22 is not limited to the net, and may be formed of a tubular perforated plate or the like.
The injection material is not limited to the urethane-based injection material, and a silica resin-based injection material, a cement-based injection material, or the like may be used. The silica resin-based injection material is a modified polyurethane made from special sodium silicate (liquid A) and modified polyisocyanate (liquid B).
The composition and composition (particle size of silica sand, etc.) of the lower buffer layer 31 and the upper buffer layer 32 may be different from each other.
Since the cement-based injection material is mainly diffused downward in the simulated ground 30, it is preferable to provide a buffer layer 31 at least below the simulated ground 30. The upper buffer layer 32 may be omitted.
When the foamable injection material such as the urethane-based injection material or the silica resin-based injection material is immediately foamed and diffused upward after being discharged from the injection pipe 20, only the upper buffer layer 32 is provided and the lower part is provided. The side buffer layer 31 may be omitted. The buffer layers 31 and 32 on both sides may be omitted.
In the present invention, in addition to the selection of the injection material of the long tip receiving method in which the long tip receiving steel pipe is driven forward from the outer circumference of the upper half arch of the face, the injection material of the mirror bolt method in which the mirror bolt is placed in the face mirror portion. It can also be applied to selection.
The present invention is not limited to the selection of the injection material into the ground when constructing a tunnel, but also the selection of the injection material as a ground improvement material when constructing other underground structures or building structures such as buildings. Applicable.

実施例を説明する。ただし、本発明が以下の実施例に限定されるものではない。
図1と実質同等の改良評価試験装置1を作製した。
試験容器10としてドラム缶を用いた。試験容器10の高さは850mm、内径は570mmであった。
注入管20として、直径27.2mmの中空ボルトを用いた。
1枚の金網を注入管20の周りに数回巻き重ねることで、拡散空間画成部材22を形成した。拡散空間画成部材22の直径は、30〜35mm程度であった。
網線材22aの直径は、約0.2mmであった。
網目22cの大きさは、目開きが約1.2mmであり、18メッシュ程度であった。
模擬地山30として、2号硅砂(粒径2〜4mm、透水係数10〜10cm/s)を用いた。模擬地山30の高さ(厚み)は、650mmであった。
下側緩衝層31として、8号硅砂(粘土)を用いた。下側緩衝層31の厚みは、30mmであった。
上側緩衝層32として、8号硅砂(粘土)を用いた。上側緩衝層32の厚みは、30mmであった。
押し蓋層33は、モルタルであり、その厚みは、140mmであった。
注入材3として、旭有機材株式会社製ウレタン系注入材を用いた。注入材3の注入量は6.6kg、注入圧力は1〜2kg/min、想定発泡倍率は3.6倍であった。
An embodiment will be described. However, the present invention is not limited to the following examples.
An improved evaluation test apparatus 1 substantially equivalent to that in FIG. 1 was manufactured.
A drum can was used as the test container 10. The height of the test container 10 was 850 mm, and the inner diameter was 570 mm.
As the injection tube 20, a hollow bolt having a diameter of 27.2 mm was used.
The diffusion space imaging member 22 was formed by winding one wire mesh around the injection pipe 20 several times. The diameter of the diffusion space imaging member 22 was about 30 to 35 mm.
The diameter of the net wire rod 22a was about 0.2 mm.
The size of the mesh 22c was about 1.2 mm with a mesh opening of about 18 mesh.
As simulated natural ground 30, with a No. 2 Silica sand (particle size 2-4 mm, permeability 10 0 ~10 1 cm / s) . The height (thickness) of the simulated ground 30 was 650 mm.
No. 8 silica sand (clay) was used as the lower buffer layer 31. The thickness of the lower buffer layer 31 was 30 mm.
No. 8 silica sand (clay) was used as the upper buffer layer 32. The thickness of the upper buffer layer 32 was 30 mm.
The push lid layer 33 was a mortar, and its thickness was 140 mm.
As the injection material 3, a urethane-based injection material manufactured by Asahi Organic Materials Co., Ltd. was used. The injection amount of the injection material 3 was 6.6 kg, the injection pressure was 1 to 2 kg / min, and the assumed foaming ratio was 3.6 times.

注入材3の硬化度、試験容器10を解体して、改良体30Xを取り出した。該改良体30Xの写真を図8に示す。
改良長(改良体30Xの高さ)は、約600mmであった。改良幅(改良体30Xの直径)は平均して334.5mmであった。
The degree of curing of the injection material 3 and the test container 10 were disassembled, and the improved product 30X was taken out. A photograph of the improved body 30X is shown in FIG.
The improved length (height of the improved body 30X) was about 600 mm. The improved width (diameter of the improved body 30X) was 334.5 mm on average.

本発明は、例えばトンネル地山の地盤改良材の選定に適用できる。 The present invention can be applied to, for example, selection of a ground improvement material for a tunnel ground.

1 改良評価試験装置
3 注入材
3A A液供給源
3B B液供給源
10 試験容器
11 周壁
11d 通気穴
12 底板
13 蓋板
16 フィルタ
20 注入管
20c 注入穴
21A 供給管
21B 供給管
22 拡散空間画成部材
22a 網線材
22c 網目(透孔)
23 シール部材
25 拡散空間
30 模擬地山
30X 改良体
31 緩衝層
32 緩衝層
33 押し蓋層
1 Improved evaluation test equipment 3 Injection material 3A A Liquid supply source 3B B Liquid supply source 10 Test container 11 Peripheral wall 11d Ventilation hole 12 Bottom plate 13 Lid plate 16 Filter 20 Injection pipe 20c Injection hole 21A Supply pipe 21B Supply pipe 22 Diffusion space imaging Member 22a Net wire 22c Mesh (through hole)
23 Seal member 25 Diffusion space 30 Simulated ground 30X Improved body 31 Buffer layer 32 Buffer layer 33 Push lid layer

Claims (5)

注入材による地山の改良効果を評価する試験装置であって、
前記地山を模した模擬地山が収容される試験容器と、
前記試験容器内に配置され、前記模擬地山を貫くようにして前記模擬地山に埋設された注入管と、
前記注入管における前記模擬地山への埋設部分を連続して囲む筒状の拡散空間画成部材と、
を備え、
前記注入管の管壁には、前記注入材を吐出する注入穴が分散して形成され、
前記拡散空間画成部材は、前記注入管の外径より大きく、前記注入管の外周面との間に環状の拡散空間を画成し、
前記拡散空間画成部材には、前記注入材の透過を許容し前記模擬地山の通過を制限する多数の透孔が分散して形成され、
前記拡散空間画成部材の上端部と前記注入管の外周面との間に、環状のシール部材が介在されていることを特徴とする改良評価試験装置。
It is a test device that evaluates the improvement effect of the ground by the injection material.
A test container that houses a simulated ground that imitates the ground,
An injection pipe placed in the test container and embedded in the simulated ground so as to penetrate the simulated ground,
A tubular diffusion space defining member that continuously surrounds the buried portion of the injection pipe in the simulated ground,
With
Injection holes for discharging the injection material are dispersedly formed on the tube wall of the injection pipe.
The diffusion space defining member is larger than the outer diameter of the injection pipe and defines an annular diffusion space with the outer peripheral surface of the injection pipe.
A large number of through holes that allow the injectable material to permeate and restrict the passage of the simulated ground are dispersedly formed in the diffusion space defining member.
An improved evaluation test apparatus characterized in that an annular seal member is interposed between the upper end portion of the diffusion space imaging member and the outer peripheral surface of the injection pipe.
前記注入管は、トンネル施工において地山改良に用いられる実際の先受け鋼管またはそれと同等の構造の管によって構成されていることを特徴とする請求項1に記載の改良評価試験装置。 The improvement evaluation test apparatus according to claim 1, wherein the injection pipe is composed of an actual pre-received steel pipe used for ground improvement in tunnel construction or a pipe having a structure equivalent thereto. 前記拡散空間画成部材が、網によって構成されていることを特徴とする請求項1または2に記載の改良評価試験装置。 The improved evaluation test apparatus according to claim 1 or 2 , wherein the diffusion space imaging member is composed of a net. 前記試験容器内における前記模擬地山の下側又は上側には、前記注入材の拡散抵抗が模擬地山よりも高い緩衝層が設けられていることを特徴とする請求項1〜3の何れか1項に記載の改良評価試験装置。 Any one of claims 1 to 3, wherein a buffer layer having a diffusion resistance of the injection material higher than that of the simulated ground is provided below or above the simulated ground in the test container. The improved evaluation test apparatus described in. 注入材による地山の改良効果を評価する試験方法であって、
請求項1〜の何れか1項に記載の試験装置を用意し、
前記試験容器内に模擬地山を収容し、
前記注入材を、前記注入管に供給して前記注入穴から吐出させ、前記拡散空間画成部材を透して前記模擬地山に浸み込ませることを特徴とする改良評価試験方法。
It is a test method to evaluate the improvement effect of the ground by the injection material.
The test apparatus according to any one of claims 1 to 4 is prepared.
A simulated ground is housed in the test container,
An improved evaluation test method, characterized in that the injection material is supplied to the injection pipe, discharged from the injection hole, passed through the diffusion space imaging member, and infiltrated into the simulated ground.
JP2017112260A 2017-06-07 2017-06-07 Ground improvement evaluation test equipment and method Active JP6905875B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017112260A JP6905875B2 (en) 2017-06-07 2017-06-07 Ground improvement evaluation test equipment and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017112260A JP6905875B2 (en) 2017-06-07 2017-06-07 Ground improvement evaluation test equipment and method

Publications (2)

Publication Number Publication Date
JP2018204350A JP2018204350A (en) 2018-12-27
JP6905875B2 true JP6905875B2 (en) 2021-07-21

Family

ID=64955275

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017112260A Active JP6905875B2 (en) 2017-06-07 2017-06-07 Ground improvement evaluation test equipment and method

Country Status (1)

Country Link
JP (1) JP6905875B2 (en)

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4825767B1 (en) * 1970-09-07 1973-07-31
JPS5319846B2 (en) * 1974-05-10 1978-06-23
JP2984876B2 (en) * 1992-09-24 1999-11-29 東京電力株式会社 Grout wood
JPH09125364A (en) * 1995-10-27 1997-05-13 Shimizu Corp Chemical injection testing device and chemical injection propriety determination system using the same
JP4583263B2 (en) * 2005-07-11 2010-11-17 株式会社大林組 Chemical injection pipe and chemical injection method
ITBO20130070A1 (en) * 2013-02-19 2014-08-20 Elas Geotecnica Srl DEVICE, EQUIPMENT AND PROCEDURE FOR THE CONSOLIDATION OF LAND FOR INJECTION
JP6530934B2 (en) * 2015-03-19 2019-06-12 旭有機材株式会社 Geochemical solution for consolidation

Also Published As

Publication number Publication date
JP2018204350A (en) 2018-12-27

Similar Documents

Publication Publication Date Title
KR101070072B1 (en) Steel pipe multi-stage grouting device using double packer and its construction method
CA2955218C (en) Rapid pier
KR101586437B1 (en) grouting method sedment control dam including grouting filling hole
US12291830B2 (en) System and method for mitigation of liquefaction
MX2010013272A (en) Method for sealing off a water zone in a production well downhole and a sealing arrangement.
JP5971537B1 (en) Ground improvement method
JP2012202047A (en) Underfloor repair method
JP6905875B2 (en) Ground improvement evaluation test equipment and method
JP2006118130A (en) Packer and packing method
JP6905874B2 (en) Ground improvement evaluation test equipment
JP2009280959A (en) Anchor structure
KR100966382B1 (en) Waterproof method of construction
JP4097671B2 (en) Ground injection method
KR101188733B1 (en) Permeability rock stagnant water grouting method for bulk injection type
JP6885641B1 (en) Underfloor reinforcement structure and underfloor reinforcement structure reinforcement method
KR100766450B1 (en) Ground anchoring anchor structure consisting of anchorage support and anchor construction method in soft ground using same
KR20090130354A (en) Pressurized index anchoring method
JP3648299B2 (en) Consolidation promotion method for soft ground
JP6354614B2 (en) Bamboo pile, liquefaction countermeasure basic structure using bamboo pile, and method for manufacturing bamboo pile
JP4300326B2 (en) Ground improvement material injection method
JP2015124538A (en) Chemical injection method and chemical injection structure in the ground during chemical injection
KR20170090916A (en) Nailing apparatus of pressing type
JP6963917B2 (en) Permeability evaluation test method and equipment
JP2023114365A (en) Soil cement strength improving member and insertion member construction method
JP2011111874A (en) Water conducting structure and method for preventing flow inhibition of groundwater

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200319

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210218

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210302

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210423

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210622

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210628

R150 Certificate of patent or registration of utility model

Ref document number: 6905875

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250