Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6908444B2 - Power Demand Forecasting Device, Power Demand Forecasting Method and Program - Google Patents
[go: Go Back, main page]

JP6908444B2 - Power Demand Forecasting Device, Power Demand Forecasting Method and Program - Google Patents

Power Demand Forecasting Device, Power Demand Forecasting Method and Program Download PDF

Info

Publication number
JP6908444B2
JP6908444B2 JP2017112451A JP2017112451A JP6908444B2 JP 6908444 B2 JP6908444 B2 JP 6908444B2 JP 2017112451 A JP2017112451 A JP 2017112451A JP 2017112451 A JP2017112451 A JP 2017112451A JP 6908444 B2 JP6908444 B2 JP 6908444B2
Authority
JP
Japan
Prior art keywords
demand
information
classification
unit
prediction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2017112451A
Other languages
Japanese (ja)
Other versions
JP2018206172A (en
Inventor
美喜 植嶋
美喜 植嶋
一史 湯淺
一史 湯淺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NTT Facilities Inc
Original Assignee
NTT Facilities Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NTT Facilities Inc filed Critical NTT Facilities Inc
Priority to JP2017112451A priority Critical patent/JP6908444B2/en
Publication of JP2018206172A publication Critical patent/JP2018206172A/en
Application granted granted Critical
Publication of JP6908444B2 publication Critical patent/JP6908444B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、電力需要予測装置、電力需要予測方法およびプログラムに関する。 The present invention relates to a power demand forecasting device, a power demand forecasting method and a program.

小売電気事業において、需要予測機能は事業の収支を左右する重要な機能であり、需要予測機能の向上が求められている。そのため、各種の需要を予測するシステムや、需要を予測する方法などが提案されている(例えば、特許文献1参照。)。 In the retail electricity business, the demand forecasting function is an important function that influences the income and expenditure of the business, and improvement of the demand forecasting function is required. Therefore, various demand forecasting systems and demand forecasting methods have been proposed (see, for example, Patent Document 1).

特開2013−066318号公報Japanese Unexamined Patent Publication No. 2013-066318

特許文献1に記載された電力需要予測システムでは、記録媒体などに記憶されているカレンダーなどの情報を読み込み、読み込んだ情報等に基づいて需要予測モデルを構築する技術が開示されている。 The power demand forecast system described in Patent Document 1 discloses a technique of reading information such as a calendar stored in a recording medium or the like and constructing a demand forecast model based on the read information or the like.

上述のようにカレンダーの情報を用いることにより、曜日や祝祭日によって施設の電力需要の変化を予測することが可能となる。
しかしながら、特に定休日が一般的な休日(土日や祝祭日等)とは異なる施設において、カレンダーの情報が適切に設定されていないと電力需要の予測精度低下につながる課題があった。つまり、カレンダーの情報に誤りが含まれていたり、カレンダー情報の更新が適切に行われていなかったりすると、カレンダーの情報に基づく電力需要の予測精度が低下してしまうという問題があった。
By using the calendar information as described above, it is possible to predict changes in the power demand of the facility depending on the day of the week and public holidays.
However, especially in facilities where regular holidays are different from general holidays (Saturdays, Sundays, national holidays, etc.), there is a problem that the accuracy of forecasting power demand is lowered if the calendar information is not set appropriately. That is, if the calendar information contains an error or the calendar information is not updated properly, there is a problem that the prediction accuracy of the power demand based on the calendar information is lowered.

本発明は、上記の課題を解決するためになされたものであって、電力需要の予測精度を確保しやすくする電力需要予測装置、電力需要予測方法およびプログラムを提供することを目的とする。 The present invention has been made to solve the above problems, and an object of the present invention is to provide a power demand forecasting device, a power demand forecasting method, and a program that facilitates ensuring the prediction accuracy of power demand.

上記目的を達成するために、本発明は、以下の手段を提供する。
本発明の第1の態様に係る電力需要予測装置は、所定期間に計測された電力需要の情報である需要実績情報を複数取得する取得部と、取得した複数の前記需要実績情報に基づいて複数の需要パターンを求める分析部と、求められた前記複数の需要パターンを、予め定められた複数の区分に割り当てる区分部と、前記複数の需要実績情報のそれぞれが、前記複数の需要パターンのいずれに対応するか判定する比較部と、前記複数の需要実績情報のそれぞれについて、前記比較部において対応すると判定された前記需要パターンに割り当てられた前記区分を選択する選択部と、前記需要実績情報に対応する前記所定期間に対して、選択された前記区分、および、当該区分に紐付けされた前記電力需要の情報である区分パターンを割り当てた実績テーブルを設定する実績テーブル設定部と、が設けられていることを特徴とする。
In order to achieve the above object, the present invention provides the following means.
The electric power demand forecasting device according to the first aspect of the present invention includes an acquisition unit that acquires a plurality of demand actual information which is information on electric power demand measured in a predetermined period, and a plurality of acquired electric power demand forecasting devices based on the acquired plurality of the acquired actual demand information. The analysis unit for obtaining the demand pattern of the above, the division unit for allocating the obtained plurality of demand patterns to a plurality of predetermined divisions, and each of the plurality of demand actual information can be assigned to any of the plurality of demand patterns. Corresponds to the comparison unit for determining whether or not to correspond, the selection unit for selecting the category assigned to the demand pattern determined to correspond to each of the plurality of demand record information, and the demand record information. For the predetermined period to be performed, the selected division and the actual table setting unit for setting the actual table to which the division pattern which is the information of the electric power demand associated with the division is assigned are provided. It is characterized by being.

本発明の第2の態様に係る電力需要予測方法は、所定期間に計測された電力需要の情報である需要実績情報を複数取得する取得ステップと、取得した複数の前記需要実績情報に基づいて複数の需要パターンを求める分析ステップと、求められた前記複数の需要パターンを、予め定められた複数の区分に割り当てる区分ステップと、前記複数の需要実績情報のそれぞれが、前記複数の需要パターンのいずれに対応するか判定する比較ステップと、前記複数の需要実績情報のそれぞれについて、前記比較ステップにおいて対応すると判定された前記需要パターンに割り当てられた前記区分を選択する選択ステップと、前記需要実績情報に対応する前記所定期間に対して、選択された前記区分、および、当該区分に紐付けされた前記電力需要の情報である区分パターンを割り当てた実績テーブルを設定する実績テーブル設定ステップと、を有することを特徴とする。 The electric power demand forecasting method according to the second aspect of the present invention includes a plurality of acquisition steps for acquiring a plurality of demand actual information which is information on electric power demand measured in a predetermined period, and a plurality of acquired power demand forecast methods based on the acquired plurality of the acquired actual demand information. An analysis step for obtaining the demand pattern of the above, a division step for allocating the obtained plurality of demand patterns to a plurality of predetermined categories, and each of the plurality of demand actual information can be assigned to any of the plurality of demand patterns. Corresponds to the comparison step for determining whether to correspond, the selection step for selecting the category assigned to the demand pattern determined to correspond in the comparison step for each of the plurality of demand actual information, and the demand actual information. To have the selected division and the actual table setting step for setting the actual table to which the division pattern which is the information of the electric power demand associated with the division is assigned for the predetermined period. It is a feature.

本発明の第3の態様に係るプログラムは、コンピュータに、所定期間に計測された電力需要の情報である需要実績情報を複数取得する取得機能と、取得した複数の前記需要実績情報に基づいて複数の需要パターンを求める分析機能と、求められた前記複数の需要パターンを、予め定められた複数の区分に割り当てる区分機能と、前記複数の需要実績情報のそれぞれが、前記複数の需要パターンのいずれに対応するか判定する比較機能と、前記複数の需要実績情報のそれぞれについて、前記比較ステップにおいて対応すると判定された前記需要パターンに割り当てられた前記区分を選択する選択機能と、前記需要実績情報に対応する前記所定期間に対して、選択された前記区分、および、当該区分に紐付けされた前記電力需要の情報である区分パターンを割り当てた実績テーブルを設定する実績テーブル設定機能と、を実現させることを特徴とする。 A plurality of programs according to a third aspect of the present invention include an acquisition function for acquiring a plurality of demand record information which is information on electric power demand measured in a predetermined period, and a plurality of programs based on the acquired plurality of the acquired demand record information. The analysis function for obtaining the demand pattern of the above, the division function for allocating the obtained plurality of demand patterns to a plurality of predetermined categories, and each of the plurality of demand actual information can be assigned to any of the plurality of demand patterns. Corresponds to the comparison function for determining whether to correspond, the selection function for selecting the category assigned to the demand pattern determined to correspond in the comparison step for each of the plurality of demand actual information, and the demand actual information. To realize the selected division and the achievement table setting function for setting the achievement table to which the division pattern which is the information of the electric power demand associated with the division is assigned for the predetermined period. It is characterized by.

本発明の第1の態様に係る電力需要予測装置、第2の態様に係る電力需要予測方法、および、第3の態様に係るプログラムによれば、電力需要の予測に用いるテーブルとして、計測された電力需要の情報に基づいて作成した実績テーブルを作成することができる。この実績テーブルを用いて施設の電力需要を予測することにより、カレンダーの情報に依存することなく電力需要を予測することができる。 According to the power demand forecasting device according to the first aspect of the present invention, the power demand forecasting method according to the second aspect, and the program according to the third aspect, the measurement was performed as a table used for forecasting the power demand. It is possible to create a performance table created based on the information of power demand. By predicting the power demand of the facility using this performance table, it is possible to predict the power demand without depending on the information in the calendar.

なお、区分としては平日や休日などの分け方を例示することができ、さらには平日を更に分割して第1平日、第2平日などのように分けてもよい。また、所定期間の長さとしては24時間や12時間や6時間などを例示することができる。さらに、予測テーブルとしては、1週間の日数に相当する数の所定期間を有するもの、2週間の日数に相当する数の所定期間を有するもの、1月の日数に相当する数の所定期間を有するものなどを例示することができる。 As the classification, a method of dividing such as weekdays and holidays can be exemplified, and further, weekdays may be further divided into first weekday, second weekday, and the like. Further, as the length of the predetermined period, 24 hours, 12 hours, 6 hours and the like can be exemplified. Further, the prediction table has a predetermined period corresponding to the number of days in one week, a predetermined period corresponding to the number of days in two weeks, and a predetermined period corresponding to the number of days in January. Things can be exemplified.

上記発明の第1の態様においては、前記実績テーブルに基づいて、前記電力需要の予測を行う前記所定期間である予測期間の前記区分を求め、前記所定期間に紐付けされた前記区分に関連する区分情報に基づいて、前記予測期間における前記区分を推定し、前記実績テーブルに基づく区分および前記区分情報に基づく区分が異なる場合には、前記予測期間に前記区分情報に基づく区分を割り当てた予測テーブルを設定する予測テーブル設定部が更に設けられていることが好ましい。さらに、前記所定期間に紐付けされた前記区分情報は、外部から取得することが好ましい。 In the first aspect of the present invention, the division of the forecast period, which is the predetermined period for forecasting the power demand, is obtained based on the actual table, and the division is related to the division associated with the predetermined period. A forecast table that estimates the category in the forecast period based on the category information, and assigns the category based on the category information to the forecast period when the category based on the actual table and the category based on the category information are different. It is preferable that a prediction table setting unit for setting is further provided. Further, it is preferable to acquire the classification information associated with the predetermined period from the outside.

上記発明の第2の態様においては、前記実績テーブルに基づいて、前記電力需要の予測を行う前記所定期間である予測期間の前記区分を求め、前記所定期間に紐付けされた前記区分に関連する区分情報に基づいて、前記予測期間における前記区分を推定し、前記実績テーブルに基づく区分および前記区分情報に基づく区分が異なる場合には、前記予測期間に前記区分情報に基づく区分を割り当てた予測テーブルを設定する予測テーブル設定ステップを、を更に有することが好ましい。さらに、前記所定期間に紐付けされた前記区分情報は、外部から取得することが好ましい。 In the second aspect of the present invention, the division of the forecast period, which is the predetermined period for forecasting the power demand, is obtained based on the actual table, and the division is related to the division associated with the predetermined period. The forecast table that estimates the category in the forecast period based on the category information, and assigns the category based on the category information to the forecast period when the category based on the actual table and the category based on the category information are different. It is preferable to further have a prediction table setting step for setting. Further, it is preferable to acquire the classification information associated with the predetermined period from the outside.

このようにすることにより、電力需要の予測に用いるテーブルとして、計測された電力需要の情報に基づいて作成した実績テーブルを修正した予測テーブルを作成することができる。例えば、予測区間に実績テーブルから反映が困難なイベントが含まれている場合には、当該イベントに対応する区分情報に基づくことにより、イベントを反映した予測テーブルが作成できる。そのため、実績テーブルに基づく場合と比較して、予測テーブルに基づく電力需要を予測することで予測精度を確保しやすくなる。 By doing so, as a table used for forecasting the power demand, it is possible to create a forecast table obtained by modifying the actual table created based on the measured power demand information. For example, when the prediction interval includes an event that is difficult to reflect from the actual table, a prediction table that reflects the event can be created based on the classification information corresponding to the event. Therefore, it becomes easier to secure the prediction accuracy by predicting the power demand based on the prediction table as compared with the case based on the actual table.

本発明の電力需要予測装置、電力需要予測方法およびプログラムによれば、電力需要の予測に用いるテーブルとして、計測された電力需要の情報に基づいて実績テーブルを作成することにより、電力需要の予測精度を確保しやすくできるという効果を奏する。 According to the electric power demand forecasting device, the electric power demand forecasting method and the program of the present invention, the electric power demand forecasting accuracy is obtained by creating an actual table based on the measured electric power demand information as a table used for the electric power demand forecasting. It has the effect of making it easier to secure.

本発明の一実施形態に係る電力需要予測装置の構成を説明するブロック図である。It is a block diagram explaining the structure of the electric power demand forecasting apparatus which concerns on one Embodiment of this invention. 図1の電力需要予測装置における実績テーブルおよび予測テーブルを作成する演算処理を説明するフローチャートである。It is a flowchart explaining the arithmetic process which creates the performance table and the forecast table in the electric power demand forecasting apparatus of FIG. 分類された複数の需要パターンを説明する模式図である。It is a schematic diagram explaining a plurality of classified demand patterns. 需要パターンが割り当てられた1月分に相当するテーブル、および、区分パターンが割り当てられた1月分に相当する実績テーブルを示す模式図である。It is a schematic diagram which shows the table corresponding to the January part to which the demand pattern is assigned, and the actual table corresponding to the January part to which a division pattern is assigned. 予測テーブル設定部により設定される予測テーブルを示す模式図である。It is a schematic diagram which shows the prediction table set by the prediction table setting part. カレンダー情報の更新処理を説明するフローチャートである。It is a flowchart explaining the update process of calendar information.

この発明の一実施形態に係る電力需要予測装置10について、図1から図6を参照しながら説明する。電力需要予測装置10は、小売電気事業における電力の需要を予測するものである。本実施形態では電力需要予測装置10が、CPU(中央演算処理ユニット)、ROM、RAM、入出力インタフェース等を有する情報処理機器である例に適用して説明する。 The electric power demand forecasting device 10 according to the embodiment of the present invention will be described with reference to FIGS. 1 to 6. The electric power demand forecasting device 10 predicts the electric power demand in the retail electricity business. In the present embodiment, the power demand forecasting device 10 will be described by applying it to an example in which the power demand forecasting device 10 is an information processing device having a CPU (central processing unit), a ROM, a RAM, an input / output interface, and the like.

上述のROM等の記憶装置に記憶されているプログラムは、CPU、ROM、RAM、入出力インタフェースを協働させて取得部11、記憶部12、分析部13、区分部14、比較部15、選択部16、実績テーブル設定部17、および予測テーブル設定部18として機能させるものである。 The program stored in the storage device such as the ROM described above is the acquisition unit 11, the storage unit 12, the analysis unit 13, the division unit 14, the comparison unit 15, and the selection unit 15 in cooperation with the CPU, ROM, RAM, and input / output interface. It functions as a unit 16, a performance table setting unit 17, and a prediction table setting unit 18.

取得部11は、入力部51、外部システム60、および、設備70との間で情報の通信が可能に接続されたものである。ここで、入力部51は、小売電気事業の運用者が適宜設定する情報であるユーザ設定値の情報を電力需要予測装置10に入力するものである。取得部11は、入力部51からユーザ設定値の情報が入力可能に接続されている。 The acquisition unit 11 is connected to the input unit 51, the external system 60, and the equipment 70 so that information can be communicated with each other. Here, the input unit 51 inputs the information of the user set value, which is the information appropriately set by the operator of the retail electric power business, to the electric power demand forecasting device 10. The acquisition unit 11 is connected so that the information of the user set value can be input from the input unit 51.

外部システム60は、顧客管理システム61、電力会社のサーバなどの情報処理装置62、および、気象会社のサーバなどの情報処理装置63を含むものである。顧客管理システム61には、少なくとも、小売電気事業から電力の供給を受ける顧客におけるイベントの情報や、休日の情報などを含むカレンダー情報(区分情報)が記憶されている。電力会社の情報処理装置62には、少なくとも、顧客が供給を受けた電力に関する情報である需要実績情報が供給を受けた日時の情報と紐付けされて記憶されている。気象会社の情報処理装置63には、少なくとも、日時の情報と紐付けされた天候や温度の情報である気象情報が記憶されている。入力部51は、顧客管理システム61からカレンダー情報を取得可能に接続され、電力会社の情報処理装置62から需要実績情報を取得可能に接続され、気象会社の情報処理装置63から気象情報を取得可能に接続されている。 The external system 60 includes a customer management system 61, an information processing device 62 such as a server of an electric power company, and an information processing device 63 such as a server of a meteorological company. The customer management system 61 stores at least calendar information (classification information) including event information and holiday information for customers who receive electric power from the retail electric power business. In the information processing device 62 of the electric power company, at least, the demand record information, which is the information about the electric power supplied by the customer, is stored in association with the information of the date and time when the supply was received. The information processing device 63 of the meteorological company stores at least meteorological information which is weather and temperature information associated with date and time information. The input unit 51 is connected so that calendar information can be acquired from the customer management system 61, is connected so that demand record information can be acquired from the information processing device 62 of the electric power company, and can acquire weather information from the information processing device 63 of the meteorological company. It is connected to the.

設備70は、電気設備に関する情報である設備情報を記憶するデータベース部71、および、建物設備に関する情報である建物情報を記憶するデータベース部72を含むものである。設備情報は、顧客が所有する電気設備であって小売電気事業からの電力を使用する電気設備の種類、容量などを含む情報である。建物情報は、電気設備が設置されている建築物に関する情報であって、築年数や、床面積などの情報を含むものである。入力部51は、電気設備に関するデータベース部71から設備情報を取得可能に接続され、建物設備に関するデータベース部72から建物情報を取得可能に接続されている。 The equipment 70 includes a database unit 71 that stores equipment information that is information about electrical equipment, and a database unit 72 that stores building information that is information about building equipment. The equipment information is information including the type and capacity of the electric equipment owned by the customer and using the electric power from the retail electric power business. Building information is information about a building in which electrical equipment is installed, and includes information such as age and floor area. The input unit 51 is connected so that equipment information can be acquired from the database unit 71 related to electrical equipment, and can be connected so that building information can be acquired from the database unit 72 related to building equipment.

記憶部12は、取得部11により取得された各種の情報を記憶するものであり、分析部13や比較部15において情報処理が行われる際に、当該処理において用いられる情報を出力するものである。 The storage unit 12 stores various types of information acquired by the acquisition unit 11, and outputs information used in the processing when information processing is performed by the analysis unit 13 and the comparison unit 15. ..

分析部13は、電力会社の情報処理装置62から取得した実績情報に基づいて、当該実績情報に含まれる顧客における電力の消費パターンを分析し、複数の需要パターンに分類する演算処理を行うものである。 The analysis unit 13 analyzes the power consumption pattern of the customer included in the performance information based on the performance information acquired from the information processing device 62 of the electric power company, and performs arithmetic processing to classify the power consumption patterns into a plurality of demand patterns. be.

また、本実施形態では、顧客における所定期間である1日(24時間)の電力の消費であって、時間の経過に伴う消費量の変化を表すパターンである消費パターンを分析する例に適用して説明する。また、分析および分類する演算処理にあたって、1週間に相当する7個の実績情報に基づいて、当該実績情報に含まれる消費パターンに基づいて演算処理を行う例に適用して説明する。 Further, in the present embodiment, it is applied to an example of analyzing a consumption pattern, which is a pattern of power consumption of a customer for a predetermined period of one day (24 hours) and representing a change in consumption with the passage of time. I will explain. Further, in the arithmetic processing for analysis and classification, an example of performing arithmetic processing based on the consumption pattern included in the actual information based on seven actual information corresponding to one week will be described.

なお、所定期間は、上述のように24時間であってもよいし、24時間よりも長くてもよいし、短くてもよい。さらに、分析および分類する演算処理にあたって用いる実績情報の数は、1週間に相当する7個であってもよいし、それよりも長い2週間に相当する数であってもよいし、1月に相当する数であってもよい。また、1週間に相当する7個よりも少ない数であってもよい。 The predetermined period may be 24 hours as described above, may be longer than 24 hours, or may be shorter. Furthermore, the number of performance information used in the arithmetic processing for analysis and classification may be seven, which corresponds to one week, or may be the number corresponding to two weeks, which is longer than that, in January. It may be a corresponding number. Further, the number may be less than 7, which corresponds to one week.

区分部14は、求められた複数の需要パターンを、予め定められた平日および休日の区分に割り当てる演算処理を行うものである。割り当てを行う演算処理としては、公知の演算処理の手法を用いることができ、特に限定するものではない。 The division unit 14 performs arithmetic processing for allocating a plurality of obtained demand patterns to predetermined weekday and holiday divisions. As the arithmetic processing for assigning, a known arithmetic processing method can be used and is not particularly limited.

比較部15は、需要実績情報に含まれる消費パターンが、分析部13において分類された複数の需要パターンのいずれに対応するか判定する演算処理を行うものである。
選択部16は、比較部15において需要パターンと対応付けされた需要実績情報に含まれる消費パターンに対して、当該需要パターンに割り当てられた区分を選択する演算処理を行うものである。
The comparison unit 15 performs arithmetic processing for determining which of the plurality of demand patterns classified by the analysis unit 13 corresponds to the consumption pattern included in the demand record information.
The selection unit 16 performs arithmetic processing for selecting the division assigned to the demand pattern for the consumption pattern included in the demand record information associated with the demand pattern in the comparison unit 15.

実績テーブル設定部17は、選択部16において選択された区分、および、当該区分に紐付けされた電力需要の情報である区分パターンを割り当てたテーブルである実績テーブルを設定するものである。区分パターンは、平日や休日など該当する区分における時間の経過に伴う電力の消費量の典型的な変化を表す予め定められたパターンである。 The actual table setting unit 17 sets the actual table, which is a table to which the division selected by the selection unit 16 and the division pattern which is the information of the power demand associated with the division are assigned. The classification pattern is a predetermined pattern that represents a typical change in power consumption with the passage of time in the corresponding classification such as weekdays and holidays.

予測テーブル設定部18は、電力需要の予測を行う予測期間に区分情報に基づく区分を割り当てた予測テーブルを設定する演算処理を行うものである。予測テーブルを設定する演算処理の詳細については後述する。 The forecast table setting unit 18 performs arithmetic processing for setting a forecast table to which a category based on the category information is assigned during the forecast period for forecasting the electric power demand. The details of the arithmetic processing for setting the prediction table will be described later.

次に、本実施形態の電力需要予測装置10における電力の需要予測に関する処理について説明する。まず、電力需要予測装置10により実績テーブルおよび予測テーブルを作成する演算処理について図2のフローチャートを参照しながら説明する。 Next, processing related to power demand forecasting in the power demand forecasting device 10 of the present embodiment will be described. First, the arithmetic processing for creating the actual table and the forecast table by the electric power demand forecasting device 10 will be described with reference to the flowchart of FIG.

図2に示すように、電力需要予測装置10の取得部11は、直近の1週間の間に計測された過去の電力需要の情報である複数の需要実績情報を取得する処理を行う(S101:取得ステップ)。具体的には、電力会社の情報処理装置62に対して直近の1週間に計測された複数の需要実績情報を出力させるよう要求する信号を出力し、電力会社の情報処理装置62から出力された当該複数の需要実績情報を取得する処理を行う。取得された複数の需要実績情報は記憶部12に記憶される。 As shown in FIG. 2, the acquisition unit 11 of the electric power demand forecasting device 10 performs a process of acquiring a plurality of demand actual information which is information on the past electric power demand measured in the last week (S101: Acquisition step). Specifically, it outputs a signal requesting the information processing device 62 of the electric power company to output a plurality of actual demand information measured in the last week, and is output from the information processing device 62 of the electric power company. The process of acquiring the plurality of demand record information is performed. The acquired plurality of demand record information is stored in the storage unit 12.

次いで、電力需要予測装置10の分析部13は、電力会社の情報処理装置62から取得した複数の需要実績情報に基づいて複数の需要パターンを求めるパターン化処理を行う(S102:分析ステップ)。具体的には、記憶部12から記憶された複数の需要実績情報に含まれる顧客における電力の消費パターンに基づいてクラスタ分析を行い、複数の需要パターンに分類する演算処理を行う。ここでは、図3に示すように、パターン1からパターンN(Nは自然数)のN種類の需要パターンに分類される例に適用して説明する。 Next, the analysis unit 13 of the electric power demand forecasting device 10 performs a patterning process for obtaining a plurality of demand patterns based on the plurality of demand actual information acquired from the information processing apparatus 62 of the electric power company (S102: analysis step). Specifically, cluster analysis is performed based on the power consumption pattern of the customer included in the plurality of demand record information stored from the storage unit 12, and arithmetic processing for classifying into the plurality of demand patterns is performed. Here, as shown in FIG. 3, it will be described by applying it to an example of being classified into N types of demand patterns from pattern 1 to pattern N (N is a natural number).

なお、分析部13において消費パターンを分析し、複数の需要パターンに分類する演算としては、クラスタ分析など公知の分析手法を用いることができ、特に分析手法を限定するものではない。 As the calculation in which the analysis unit 13 analyzes the consumption pattern and classifies it into a plurality of demand patterns, a known analysis method such as cluster analysis can be used, and the analysis method is not particularly limited.

複数の需要パターンが求められると、電力需要予測装置10の区分部14は、求められた複数の需要パターンを、予め定められた平日または休日の区分に割り当てる命名処理を行う(S103:区分ステップ)。例えば、上述のパターン1等に対して平日の区分を割り当て、パターン2等に休日の区分を割り当てる演算処理を行う。 When a plurality of demand patterns are obtained, the division unit 14 of the electric power demand forecasting device 10 performs a naming process of assigning the obtained plurality of demand patterns to predetermined weekday or holiday divisions (S103: classification step). .. For example, a calculation process is performed in which a weekday division is assigned to the above-mentioned pattern 1 and the like, and a holiday division is assigned to the pattern 2 and the like.

なお、本実施形態では、複数の需要パターンを平日および休日の2つの区分に割り当てる例に適用して説明するが、平日の区分を第1平日および第2平日の区分とする3つの区分としてもよいし、平日の区分をさらに増やしてもよいし、休日の区分を複数に増やしてもよい。 In this embodiment, a plurality of demand patterns are assigned to two categories, weekdays and holidays, to be described. However, the weekday categories may be divided into three categories, the first weekday and the second weekday. You may increase the number of weekday divisions, or increase the number of holiday divisions.

次いで電力需要予測装置10の比較部15は、取得した需要実績情報に含まれる消費パターンが、分析部13において分類された複数の需要パターンのいずれに対応するか判定する比較処理を行う(S104:比較ステップ)。判定する演算処理としては、平均二乗誤差(RMSE)に基づく判定手法など、公知の判定手法を用いることができる。 Next, the comparison unit 15 of the power demand forecasting device 10 performs a comparison process of determining which of the plurality of demand patterns classified by the analysis unit 13 corresponds to the consumption pattern included in the acquired demand record information (S104: Comparison step). As the calculation process for determination, a known determination method such as a determination method based on the mean square error (RMSE) can be used.

比較部15において需要パターンと消費パターンとが対応付けされると、選択部16は、当該消費パターンに対して当該需要パターンに割り当てられた区分を選択するパターン選択処理を行う(S105:選択ステップ)。 When the demand pattern and the consumption pattern are associated with each other in the comparison unit 15, the selection unit 16 performs a pattern selection process for selecting the division assigned to the demand pattern for the consumption pattern (S105: selection step). ..

区分の選択が行われると、実績テーブル設定部17は、需要実績情報に含まれる消費パターンに紐付けされた日時情報に基づいて、選択部16において選択された区分、および、当該区分に紐付けされた電力需要の情報である区分パターンを割り当てたテーブルである実績テーブルを設定する実績テーブル設定処理を行う(S106:実績テーブル設定ステップ)。 When the classification is selected, the performance table setting unit 17 links the classification selected in the selection unit 16 and the classification to the classification based on the date and time information linked to the consumption pattern included in the demand performance information. Performs the actual table setting process for setting the actual table, which is the table to which the division pattern which is the information of the power demand is assigned (S106: actual table setting step).

本実施形態では、図4の下側のテーブルとして示す区分パターンが割り当てられた1月分の実績テーブルが設定される例に適用して説明する。図4の上側のテーブルは、需要パターンが割り当てられた1月分に相当するテーブルである。なお、設定される実績テーブルは、上述のように1月分の区分パターンが割り当てられたものであってもよいし、1月分よりも数の少ない1〜3週間分の区分パターンが割り当てられたものであってもよいし、数か月分の区分パターンが割り当てられたものであってもよい。 In the present embodiment, the example in which the actual table for January to which the division pattern shown as the lower table in FIG. 4 is assigned is set will be described. The upper table in FIG. 4 is a table corresponding to January to which the demand pattern is assigned. The performance table to be set may be assigned the division pattern for January as described above, or the division pattern for 1 to 3 weeks, which is less than that for January, is assigned. It may be the one to which the division pattern for several months is assigned.

実績テーブルが設定されると、予測テーブル設定部18は、電力需要の予測を行う予測期間に区分情報に基づく区分を割り当てた予測テーブルを設定する予測テーブル設定処理を行う(S107:予測テーブル設定ステップ)。具体的には、実績テーブル設定部17により作成された実績テーブルに基づいて、予測期間の区分を求める演算処理と、当該予測期間を含むカレンダー情報である当該予測期間に紐付けされた区分に関連する区分情報に基づいて、予測期間における区分を推定する演算処理と、実績テーブルに基づく区分および区分情報に基づく区分が異なる場合には、予測期間に区分情報に基づく区分を割り当てた予測テーブルを設定する演算処理を行う。 When the actual table is set, the forecast table setting unit 18 performs a forecast table setting process for setting a forecast table to which a category based on the category information is assigned to the forecast period for forecasting the power demand (S107: forecast table setting step). ). Specifically, it is related to the arithmetic processing for obtaining the classification of the forecast period based on the performance table created by the performance table setting unit 17, and the classification associated with the prediction period, which is the calendar information including the prediction period. If the arithmetic processing that estimates the classification in the forecast period based on the classification information to be performed and the classification based on the actual table and the classification based on the classification information are different, set the prediction table that assigns the classification based on the classification information to the prediction period. Perform arithmetic processing.

図5を参照しながら説明すると、予測テーブル設定部18は、図5の上側に示す実績テーブル設定部17により作成された1月の実績テーブルに基づき、予測期間である翌月(2月)の区分を求める演算処理を行う。さらに、1月のカレンダー情報に基づく平日、休日の出現傾向(区分情報)から2月の平日、休日の出現傾向(区分情報)を推定する演算処理を行う。 Explaining with reference to FIG. 5, the prediction table setting unit 18 divides the next month (February), which is the prediction period, based on the January performance table created by the performance table setting unit 17 shown on the upper side of FIG. Performs arithmetic processing to obtain. Further, arithmetic processing is performed to estimate the appearance tendency (classification information) of weekdays and holidays in February from the appearance tendency (classification information) of weekdays and holidays based on the calendar information in January.

その後、1月の実績テーブルに基づいて求めた2月の区分と、推定した2月の平日、休日の出現傾向から求めた区分をと比較し、両者が異なる場合には、推定した2月の平日、休日の出現傾向から求めた区分を割り当てた予測テーブルを設定する演算処理を行う。図5では、2月末の3日における区分が平日と休日で異なり、推定した2月の平日、休日の出現傾向から求めた区分である平日を割り当てた予測テーブルを設定している。 After that, the February classification calculated based on the January performance table is compared with the estimated February weekday and holiday appearance trends, and if they are different, the estimated February classification is compared. Performs arithmetic processing to set a prediction table to which the categories obtained from the appearance tendency of weekdays and holidays are assigned. In FIG. 5, the classification on the 3rd day of the end of February differs between weekdays and holidays, and a forecast table is set in which weekdays, which are the classifications obtained from the estimated tendency of appearance of weekdays and holidays in February, are assigned.

なお、S107において用いる予測区間である翌月の区分を求める際に、次に説明する演算処理により求められたカレンダー情報を用いてもよい。まず、図6のフローチャートに示すように、顧客管理システム61から予測区間である翌月についての顧客カレンダー情報を取得する演算処理を行う(S201)。 In addition, when obtaining the division of the next month which is the prediction interval used in S107, the calendar information obtained by the arithmetic processing described below may be used. First, as shown in the flowchart of FIG. 6, an arithmetic process for acquiring customer calendar information for the next month, which is a prediction interval, is performed from the customer management system 61 (S201).

記憶部12に記憶されているカレンダー情報をS201で取得された顧客カレンダー情報に更新する演算処理が行われる(S202)。
更新の演算処理が完了したら、記憶部12に記憶されているカレンダー情報に基づいて予測テーブルを設定する予測テーブル設定処理が行われる(S107)。
An arithmetic process is performed to update the calendar information stored in the storage unit 12 to the customer calendar information acquired in S201 (S202).
When the update calculation process is completed, the prediction table setting process for setting the prediction table based on the calendar information stored in the storage unit 12 is performed (S107).

上記の構成の電力需要予測装置10によれば、電力需要の予測に用いるテーブルとして、計測された電力需要の情報に基づいて作成した実績テーブルを作成することができる。この実績テーブルを用いて施設の電力需要を予測することにより、カレンダーの情報に依存することなく電力需要を予測することができる。 According to the power demand forecasting device 10 having the above configuration, it is possible to create a performance table created based on the measured power demand information as a table used for forecasting the power demand. By predicting the power demand of the facility using this performance table, it is possible to predict the power demand without depending on the information in the calendar.

さらに、電力需要の予測に用いるテーブルとして、計測された電力需要の情報に基づいて作成した実績テーブルを修正した予測テーブルを作成することができる。例えば、予測区間に実績テーブルから反映が困難なイベントが含まれている場合には、当該イベントに対応する区分情報に基づくことにより、イベントを反映した予測テーブルが作成できる。そのため、実績テーブルに基づく場合と比較して、予測テーブルを基づく電力需要を予測することで予測精度を確保しやすくなる。 Further, as a table used for forecasting the power demand, it is possible to create a forecast table obtained by modifying the actual table created based on the measured power demand information. For example, when the prediction interval includes an event that is difficult to reflect from the actual table, a prediction table that reflects the event can be created based on the classification information corresponding to the event. Therefore, it becomes easier to secure the prediction accuracy by predicting the power demand based on the prediction table as compared with the case based on the actual table.

10…電力需要予測装置、11…取得部、13…分析部、14…区分部、16…選択部、17…実績テーブル設定部、18…予測テーブル設定部、S101…取得ステップ、S102…分析ステップ、S103…区分ステップ、S104…比較ステップ、S105…選択ステップ、S106…実績テーブル設定ステップ、S107…予測テーブル設定ステップ 10 ... Power demand forecasting device, 11 ... Acquisition unit, 13 ... Analysis unit, 14 ... Classification unit, 16 ... Selection unit, 17 ... Actual table setting unit, 18 ... Forecast table setting unit, S101 ... Acquisition step, S102 ... Analysis step , S103 ... Classification step, S104 ... Comparison step, S105 ... Selection step, S106 ... Actual table setting step, S107 ... Forecast table setting step

Claims (5)

所定期間に計測された電力需要の情報である需要実績情報を複数取得する取得部と、
取得した複数の前記需要実績情報に基づいて複数の需要パターンを求める分析部と、
求められた前記複数の需要パターンを、予め定められた複数の区分に割り当てる区分部と、
前記複数の需要実績情報のそれぞれが、前記複数の需要パターンのいずれに対応するか判定する比較部と、
前記複数の需要実績情報のそれぞれについて、前記比較部において対応すると判定された前記需要パターンに割り当てられた前記区分を選択する選択部と、
前記需要実績情報に対応する前記所定期間に対して、選択された前記区分、および、当該区分に紐付けされた前記電力需要の情報である区分パターンを割り当てた実績テーブルを設定する実績テーブル設定部と、
前記実績テーブルに基づいて、前記電力需要の予測を行う前記所定期間である予測期間の複数の前記区分を求め、
前記所定期間に紐付けされた複数の前記区分に関連する区分情報に基づいて、前記予測期間における複数の前記区分を推定し、
前記実績テーブルに基づく区分および前記区分情報に基づく区分が異なる場合には、前記予測期間に前記区分情報に基づく区分を割り当てた予測テーブルを設定する予測テーブル設定部と、
が設けられていることを特徴とする電力需要予測装置。
An acquisition unit that acquires a plurality of actual demand information, which is information on electric power demand measured in a predetermined period, and
An analysis unit that obtains multiple demand patterns based on the acquired multiple demand record information,
A division unit that allocates the obtained plurality of demand patterns to a plurality of predetermined divisions, and
A comparison unit that determines which of the plurality of demand patterns each of the plurality of demand record information corresponds to.
For each of the plurality of demand record information, a selection unit for selecting the category assigned to the demand pattern determined to correspond to the comparison unit, and a selection unit.
A performance table setting unit that sets a performance table to which the selected classification and the classification pattern that is the information of the power demand associated with the classification are assigned to the predetermined period corresponding to the demand performance information. When,
Based on the performance table, a plurality of said categories of the forecast period, which is the predetermined period for forecasting the power demand, are obtained.
Based on the classification information associated with a plurality of said section is tied to the predetermined period, estimating a plurality of said section in the prediction period,
When the classification based on the performance table and the classification based on the classification information are different, the prediction table setting unit that sets the prediction table to which the classification based on the classification information is assigned to the prediction period, and the prediction table setting unit .
It characterized in that are provided power demand prediction unit.
前記所定期間に紐付けされた前記区分情報は、外部から取得することを特徴とする請求項記載の電力需要予測装置。 Wherein said sorting information that is tied to a predetermined time period, the power demand prediction apparatus according to claim 1, characterized in that the externally acquired. 取得部、分析部、区分部、比較部、選択部、実績テーブル設定部、および、予測テーブル設定部が設けられた電力需要予測装置により電力の需要予測を行う方法であって、
前記取得部が、所定期間に計測された電力需要の情報である需要実績情報を複数取得する取得ステップと、
前記分析部が、取得した複数の前記需要実績情報に基づいて複数の需要パターンを求める分析ステップと、
前記区分部が、求められた前記複数の需要パターンを、予め定められた複数の区分に割り当てる区分ステップと、
前記比較部が、前記複数の需要実績情報のそれぞれが、前記複数の需要パターンのいずれに対応するか判定する比較ステップと、
前記選択部が、前記複数の需要実績情報のそれぞれについて、前記比較ステップにおいて対応すると判定された前記需要パターンに割り当てられた前記区分を選択する選択ステップと、
前記実績テーブル設定部が、前記需要実績情報に対応する前記所定期間に対して、選択された前記区分、および、当該区分に紐付けされた前記電力需要の情報である区分パターンを割り当てた実績テーブルを設定する実績テーブル設定ステップと、
前記予測テーブル設定部が、前記実績テーブルに基づいて、前記電力需要の予測を行う前記所定期間である予測期間の複数の前記区分を求め、
前記所定期間に紐付けされた複数の前記区分に関連する区分情報に基づいて、前記予測期間における複数の前記区分を推定し、
前記実績テーブルに基づく区分および前記区分情報に基づく区分が異なる場合には、前記予測期間に前記区分情報に基づく区分を割り当てた予測テーブルを設定する予測テーブル設定ステップと、
を有することを特徴とする電力需要予測方法。
It is a method of forecasting power demand by a power demand forecasting device provided with an acquisition unit, an analysis unit, a division unit, a comparison unit, a selection unit, a performance table setting unit, and a forecast table setting unit.
An acquisition step in which the acquisition unit acquires a plurality of actual demand information, which is information on electric power demand measured in a predetermined period.
An analysis step in which the analysis unit obtains a plurality of demand patterns based on the plurality of acquired demand record information, and
A division step in which the division unit assigns the obtained plurality of demand patterns to a plurality of predetermined divisions.
A comparison step in which the comparison unit determines which of the plurality of demand patterns each of the plurality of demand record information corresponds to.
A selection step in which the selection unit selects the category assigned to the demand pattern determined to correspond in the comparison step for each of the plurality of demand record information.
The actual table setting unit assigns the selected division and the division pattern which is the information of the electric power demand associated with the division to the predetermined period corresponding to the demand actual information. Achievement table setting step to set
The forecast table setting unit obtains a plurality of the divisions of the forecast period, which is the predetermined period for forecasting the electric power demand, based on the actual table.
Based on the classification information associated with a plurality of said section is tied to the predetermined period, estimating a plurality of said section in the prediction period,
When the classification based on the performance table and the classification based on the classification information are different, the prediction table setting step for setting the prediction table to which the classification based on the classification information is assigned to the prediction period, and the prediction table setting step .
It is that power demand prediction method, comprising a.
前記所定期間に紐付けされた前記区分情報は、外部から取得することを特徴とする請求項記載の電力需要予測方法。 The power demand forecasting method according to claim 3 , wherein the classification information associated with the predetermined period is acquired from the outside. コンピュータに、
所定期間に計測された電力需要の情報である需要実績情報を複数取得する取得機能と、
取得した複数の前記需要実績情報に基づいて複数の需要パターンを求める分析機能と、
求められた前記複数の需要パターンを、予め定められた複数の区分に割り当てる区分機能と、
前記複数の需要実績情報のそれぞれが、前記複数の需要パターンのいずれに対応するか判定する比較機能と、
前記複数の需要実績情報のそれぞれについて、前記比較機能において対応すると判定された前記需要パターンに割り当てられた前記区分を選択する選択機能と、
前記需要実績情報に対応する前記所定期間に対して、選択された前記区分、および、当該区分に紐付けされた前記電力需要の情報である区分パターンを割り当てた実績テーブルを設定する実績テーブル設定機能と、
前記実績テーブルに基づいて、前記電力需要の予測を行う前記所定期間である予測期間の複数の前記区分を求め、
前記所定期間に紐付けされた複数の前記区分に関連する区分情報に基づいて、前記予測期間における複数の前記区分を推定し、
前記実績テーブルに基づく区分および前記区分情報に基づく区分が異なる場合には、前記予測期間に前記区分情報に基づく区分を割り当てた予測テーブルを設定する予測テーブル設定機能と、
を実現させることを特徴とするプログラム。
On the computer
An acquisition function that acquires multiple actual demand information, which is information on power demand measured during a predetermined period,
An analysis function that obtains multiple demand patterns based on the acquired multiple demand record information, and
A division function that assigns the required plurality of demand patterns to a plurality of predetermined divisions, and
A comparison function for determining which of the plurality of demand patterns each of the plurality of demand record information corresponds to, and
For each of the plurality of demand record information, a selection function for selecting the category assigned to the demand pattern determined to correspond in the comparison function, and a selection function.
A performance table setting function that sets a performance table to which the selected classification and the classification pattern which is the information of the power demand associated with the classification are assigned to the predetermined period corresponding to the demand performance information. When,
Based on the performance table, a plurality of said categories of the forecast period, which is the predetermined period for forecasting the power demand, are obtained.
Based on the classification information related to the plurality of divisions associated with the predetermined period, the plurality of the divisions in the prediction period are estimated.
When the classification based on the performance table and the classification based on the classification information are different, the prediction table setting function for setting the prediction table to which the classification based on the classification information is assigned to the prediction period, and the prediction table setting function.
A program characterized by realizing.
JP2017112451A 2017-06-07 2017-06-07 Power Demand Forecasting Device, Power Demand Forecasting Method and Program Expired - Fee Related JP6908444B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017112451A JP6908444B2 (en) 2017-06-07 2017-06-07 Power Demand Forecasting Device, Power Demand Forecasting Method and Program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017112451A JP6908444B2 (en) 2017-06-07 2017-06-07 Power Demand Forecasting Device, Power Demand Forecasting Method and Program

Publications (2)

Publication Number Publication Date
JP2018206172A JP2018206172A (en) 2018-12-27
JP6908444B2 true JP6908444B2 (en) 2021-07-28

Family

ID=64957303

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017112451A Expired - Fee Related JP6908444B2 (en) 2017-06-07 2017-06-07 Power Demand Forecasting Device, Power Demand Forecasting Method and Program

Country Status (1)

Country Link
JP (1) JP6908444B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7277254B2 (en) * 2019-05-21 2023-05-18 三菱電機ビルソリューションズ株式会社 Power consumption prediction device

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001188772A (en) * 1999-12-28 2001-07-10 Ishikawajima Harima Heavy Ind Co Ltd Plant demand forecasting method and apparatus
US20150294329A1 (en) * 2014-04-11 2015-10-15 Nissan North America, Inc. System and method of predicting usage of a charging station
JP2016019358A (en) * 2014-07-08 2016-02-01 住友電気工業株式会社 Demand forecasting device, computer program, smart meter and power storage device
JP6356523B2 (en) * 2014-07-29 2018-07-11 株式会社デンソーウェーブ Electricity consumption change pattern prediction device
JP6625839B2 (en) * 2015-07-08 2019-12-25 株式会社東芝 Load actual data determination device, load prediction device, actual load data determination method, and load prediction method

Also Published As

Publication number Publication date
JP2018206172A (en) 2018-12-27

Similar Documents

Publication Publication Date Title
Calegari et al. Forecasting daily volume and acuity of patients in the emergency department
Aman et al. Holistic measures for evaluating prediction models in smart grids
JP5300761B2 (en) Energy distribution calculation device
JP7010674B2 (en) Power Demand Forecasting Device, Power Demand Forecasting Method and Program
CN111210056A (en) Electricity price scheme determination method and device, computer equipment and storage medium
US20180107965A1 (en) Methods and systems related to allocating field engineering resources for power plant maintenance
WO2012155194A1 (en) Structure modelling and maintenance scheduling
JP7099805B2 (en) Predictors, prediction systems, prediction methods and programs
JP4448226B2 (en) Demand prediction apparatus, method, and computer-readable storage medium
CN110580544B (en) Traffic prediction method based on periodic dependence
KR20180028583A (en) A customized electronic power scheduling system for consumer in an environment of intelligent power usage
JP2016115157A (en) Sale prediction program provision method, sale prediction program provision program, and sale prediction program provision device
JP2019211922A (en) Data prediction system, data prediction method, and data prediction device
CN118521239A (en) An e-commerce logistics distribution optimization system and method based on big data
CN112257962A (en) Transformer area line loss prediction method and device
Erden et al. Solving integrated process planning, dynamic scheduling, and due date assignment using metaheuristic algorithms
JP6908444B2 (en) Power Demand Forecasting Device, Power Demand Forecasting Method and Program
JP6220940B1 (en) Improvement action instruction system and improvement action instruction program
JP2022189386A (en) Information processing apparatus, information processing method, and program
CN113837782A (en) Method and device for optimizing periodic item parameters of time series model and computer equipment
JP2020102042A (en) Management device, management method, and management program
JP7311270B2 (en) Scheduling system, schedule generator, preference value calculator, program, and method thereof
KR20240029384A (en) Method and apparatus for predicting volume of orders
CN118195671A (en) Article sales predicting method and device, storage medium and electronic equipment
CN110097211B (en) Logistics service prediction method and system based on Monte Carlo combination

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200131

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20201028

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20201117

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20201214

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210629

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210701

R150 Certificate of patent or registration of utility model

Ref document number: 6908444

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees