JP6915777B2 - Discharge jig and buried material discharge method - Google Patents
[go: Go Back, main page]

JP6915777B2 - Discharge jig and buried material discharge method - Google Patents

Discharge jig and buried material discharge method Download PDF

Info

Publication number
JP6915777B2
JP6915777B2 JP2017107295A JP2017107295A JP6915777B2 JP 6915777 B2 JP6915777 B2 JP 6915777B2 JP 2017107295 A JP2017107295 A JP 2017107295A JP 2017107295 A JP2017107295 A JP 2017107295A JP 6915777 B2 JP6915777 B2 JP 6915777B2
Authority
JP
Japan
Prior art keywords
loading platform
plate
buried material
discharge
jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017107295A
Other languages
Japanese (ja)
Other versions
JP2018202916A (en
Inventor
正浩 吉本
正浩 吉本
祐二 寺田
祐二 寺田
孝 大矢
孝 大矢
浩明 諏訪田
浩明 諏訪田
正喜 菅原
正喜 菅原
長岡 孝行
孝行 長岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Electric Power Co Holdings Inc
Original Assignee
Tokyo Electric Power Co Inc
Tokyo Electric Power Co Holdings Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Electric Power Co Inc, Tokyo Electric Power Co Holdings Inc filed Critical Tokyo Electric Power Co Inc
Priority to JP2017107295A priority Critical patent/JP6915777B2/en
Publication of JP2018202916A publication Critical patent/JP2018202916A/en
Application granted granted Critical
Publication of JP6915777B2 publication Critical patent/JP6915777B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Loading Or Unloading Of Vehicles (AREA)

Description

本発明は、ダンプトラックの荷台に取り付けられ荷台に積載された埋設材料を排出する排出治具、およびかかる排出治具を用いた埋設材料排出方法に関するものである。 The present invention relates to a discharge jig that is attached to the loading platform of a dump truck and discharges the buried material loaded on the loading platform, and a method for discharging the buried material using the discharging jig.

近年、都市における景観への配慮や安全性という観点から地中配線の普及が進んでいる。地中配線では、地中に配管を埋設し、かかる配管内に電力ケーブルや通信ケーブル等を敷設する。このような工事において用いられる工法の1つとして即日埋設工法が知られている。 In recent years, underground wiring has become widespread from the viewpoint of consideration for the landscape and safety in the city. In underground wiring, pipes are buried underground, and power cables, communication cables, etc. are laid in the pipes. The same-day burial method is known as one of the methods used in such works.

即日埋設工法では、まず敷設対象区間の舗装を壊し、舗装の下の土壌を掘削する。そして、掘削した箇所に土止めを設けた後に配管を設置し、掘削した箇所を砂や土等の埋設材料によって埋め戻す。その後、土止めを撤去し、道路を復旧する。このような地中配線に纏わる作業を1日で完了させる工法を即日埋設工法と称する。 In the same-day burial method, the pavement of the section to be laid is first broken and the soil under the pavement is excavated. Then, after providing a soil stopper at the excavated part, a pipe is installed, and the excavated part is backfilled with a buried material such as sand or soil. After that, the soil stopper will be removed and the road will be restored. The construction method that completes the work related to underground wiring in one day is called the same-day burial construction method.

上記の即日埋設工法では、バックホウを用いて掘削を行うが、かかるバックホウは埋め戻しの作業にも用いられる。詳細には、掘削した箇所を埋め戻す際の埋設材料は、ダンプトラックの荷台に積載され、作業現場まで搬送される。しかしながら、ダンプトラックの荷台の幅が、埋め戻しを行う掘削箇所の幅よりも広い場合、埋設材料を荷台から直接掘削箇所に投入しようとすると、掘削箇所の周囲に埋設材料が飛散してしまう。 In the above-mentioned same-day burial method, excavation is performed using a backhoe, and the backhoe is also used for backhoeing work. Specifically, the buried material for backfilling the excavated part is loaded on the loading platform of the dump truck and transported to the work site. However, when the width of the loading platform of the dump truck is wider than the width of the excavation site where the backfilling is performed, when the buried material is to be directly injected from the loading platform into the excavation site, the buried material is scattered around the excavation site.

このため、現状では、ダンプトラックの荷台に積載された埋設材料をバックホウで掬い取って掘削箇所に投入している。このように、掘削および埋戻しの両方にバックホウを用いる場合、一方の作業を行っている間は他方の作業を行うことができないため、作業効率が低下してしまう。 For this reason, at present, the buried material loaded on the loading platform of the dump truck is scooped up with a backhoe and put into the excavation site. As described above, when the backhoe is used for both excavation and backfilling, the work efficiency is lowered because the other work cannot be performed while one work is being performed.

即日埋設工法は道路上で交通規制を行い実施する工法であるため、一刻も早い道路解放が求められている。したがって、埋戻し作業時間の短縮が不可欠であり、それを達成するには、バックホウを本来の役割である掘削作業に専念させる必要がある。バックホウを掘削作業に専念させる、すなわち埋戻し作業にバックホウを使用しないようにする手段としては、埋設材料をダンプトラックの荷台から直接掘削箇所に投入することが考えられる。 Since the same-day burial method is a method of restricting traffic on the road and implementing it, it is required to release the road as soon as possible. Therefore, shortening the backfilling work time is indispensable, and in order to achieve this, it is necessary to concentrate the backhoe on the excavation work, which is the original role. As a means to concentrate the backhoe on the excavation work, that is, to prevent the backhoe from being used for the backhoeing work, it is conceivable to put the buried material directly from the loading platform of the dump truck into the excavation site.

例えば特許文献1には、ダンプ式の荷台に取り付けられる積荷排出補助ユニットが開示されている。特許文献1の積荷排出補助ユニットでは、ダンプ式の荷台の内部空間を、ガイド部材によって積載空間と非積載空間とに区画している。特許文献1の積荷排出補助ユニットを用いれば、荷台からの積荷の排出幅を狭められることができるため、周辺への積荷の飛散を抑制することができると考えられる。 For example, Patent Document 1 discloses a cargo discharge assisting unit attached to a dump truck. In the cargo discharge assisting unit of Patent Document 1, the internal space of the dump truck is divided into a loading space and a non-loading space by a guide member. By using the cargo discharge assisting unit of Patent Document 1, it is considered that the discharge width of the load from the loading platform can be narrowed, so that the scattering of the load to the surroundings can be suppressed.

特願2015−85929号公報Japanese Patent Application No. 2015-85929

特許文献1では、ガイド部材の一端に取り付けられた係合部材を荷台の側板に係止されることにより、ガイド部材を荷台に取り付けている。このような構成であると、荷台を傾斜させて積荷を荷台から排出する際、積荷の荷重によってガイド部材が下降し、あおり板の下方までずり下がってしまうことが懸念される。このため、特許文献1の技術には更なる改善の余地があった。 In Patent Document 1, the guide member is attached to the loading platform by locking the engaging member attached to one end of the guide member to the side plate of the loading platform. With such a configuration, when the loading platform is tilted and the load is discharged from the loading platform, there is a concern that the guide member is lowered by the load of the load and slides down to the lower part of the tilt plate. Therefore, there is room for further improvement in the technique of Patent Document 1.

本発明は、このような課題に鑑み、ダンクトラックの荷台に安定して取り付け可能であり、埋設材料をダンプトラックから直接投入できることで作業時間の短縮を図ることが排出治具および埋設材料排出方法を提供することを目的とする。 In view of such a problem, the present invention can be stably attached to the loading platform of a dunk truck, and the work time can be shortened by being able to directly load the buried material from the dump truck. The purpose is to provide.

上記課題を解決するために、本発明にかかる排出治具の代表的な構成は、ダンプトラックの荷台に取り付けられ荷台に積載された埋設材料を排出する排出治具であって、荷台の左右の側板それぞれに沿って配置される一対の脚材と、脚材の車両前方側の端部に回動可能に連結された一対の板材と、一対の板材の車両後方側の端部を連結し所定幅の開口を形成する連結材と、左右の側板の後端に差し渡される脱落防止部材と、を備え、荷台を傾斜させた状態において、脚材および板材の車両後方側の端部が脱落防止部材に当接することを特徴とする。 In order to solve the above problems, a typical configuration of the discharge jig according to the present invention is a discharge jig attached to the loading platform of the dump truck and discharging the buried material loaded on the loading platform, and is left and right of the loading platform. A pair of leg members arranged along each side plate, a pair of plate members rotatably connected to the front end of the leg member on the vehicle front side, and a predetermined end portion of the pair of plate materials on the vehicle rear side are connected to each other. It is provided with a connecting material that forms a width opening and a fall-off prevention member that is passed to the rear ends of the left and right side plates, and the legs and the rear end of the plate material are prevented from falling off when the loading platform is tilted. It is characterized in that it comes into contact with a member.

上記構成によれば、荷台を傾斜させると、脚材および板材の車両後方側の端部が脱落防止部材に当接する。これにより、荷台を傾斜させて埋設材料を排出する際、埋設材料の重みによって排出治具に対して下方に向かう荷重がかかっても、荷台の下方の外側への排出治具のずれが防がれる。したがって、排出治具をダンプトラックの荷台に安定して取り付けることができる。 According to the above configuration, when the loading platform is tilted, the end portions of the leg material and the plate material on the rear side of the vehicle come into contact with the dropout prevention member. As a result, when the buried material is discharged by tilting the loading platform, even if a downward load is applied to the discharging jig due to the weight of the buried material, the discharging jig is prevented from being displaced outward below the loading platform. Is done. Therefore, the discharge jig can be stably attached to the loading platform of the dump truck.

そして、荷台に排出治具を取り付けることにより、埋設材料を排出する幅は、積荷の車幅方向の幅ではなく、連結材の開口の幅となる。これにより、周囲に埋設材料を飛散させることなく、ダンプトラックから埋設材料を掘削箇所に直接投入することが可能となる。したがって、バックホウを掘削作業に専念させることができ、作業時間の短縮を図ることが可能となる。 Then, by attaching the discharge jig to the loading platform, the width for discharging the buried material is not the width in the vehicle width direction of the load but the width of the opening of the connecting material. As a result, the buried material can be directly injected into the excavation site from the dump truck without scattering the buried material around. Therefore, the backhoe can be devoted to the excavation work, and the work time can be shortened.

上記連結材は、板材との連結位置を調節可能であるとよい。かかる構成によれば、連結材の連結位置を調節することで、排出治具の幅を調整することが可能となる。したがって、荷台の幅が異なるダンプトラックであっても同一の排出治具を用いることができる。 It is preferable that the connecting material can adjust the connecting position with the plate material. According to such a configuration, the width of the discharge jig can be adjusted by adjusting the connecting position of the connecting material. Therefore, the same discharge jig can be used even for dump trucks having different loading platform widths.

上記脱落防止部材は、幅が調節可能であるとよい。かかる構成によれば、荷台の幅が異なるダンプトラックであっても共通の脱落防止部材を用いることができ、部品コストの削減を図ることが可能となる。 The width of the dropout prevention member may be adjustable. According to such a configuration, it is possible to use a common dropout prevention member even for dump trucks having different widths of the loading platform, and it is possible to reduce the cost of parts.

上記課題を解決するために、本発明にかかる埋設材料排出方法の代表的な構成は、ダンプトラックの荷台に取り付けられ荷台に積載された埋設材料を排出する埋設材料排出方法であって、上記の排出治具を荷台に取り付け、荷台に埋設材料を積載し、作業現場において荷台を傾斜させて排出治具の脚材および板材の車両後方側の端部を脱落防止部材に当接させ、荷台のあおり板を開状態として排出治具の開口から埋設材料を排出することを特徴とする。上述した排出治具における技術的思想に対応する構成要素やその説明は、当該埋設材料排出方法にも適用される。 In order to solve the above problems, a typical configuration of the buried material discharge method according to the present invention is a buried material discharge method that is attached to the loading platform of a dump truck and discharges the buried material loaded on the loading platform. The discharge jig is attached to the loading platform, the buried material is loaded on the loading platform, and the loading platform is tilted at the work site so that the leg material of the discharging jig and the end of the plate material on the rear side of the vehicle are brought into contact with the dropout prevention member of the loading platform. It is characterized in that the buried material is discharged from the opening of the discharge jig with the tilt plate in the open state. The components corresponding to the technical idea of the discharge jig described above and their explanations are also applied to the buried material discharge method.

本発明によれば、ダンクトラックの荷台に安定して取り付け可能であり、埋設材料をダンプトラックから直接投入できることで作業時間の短縮を図ることが排出治具および埋設材料排出方法を提供することができる。 According to the present invention, it is possible to provide a discharge jig and a method for discharging a buried material, which can be stably attached to a loading platform of a dunk truck and can shorten a working time by being able to directly load a buried material from a dump truck. can.

ダンプトラックについて説明する図である。It is a figure explaining the dump truck. 本実施形態にかかる排出治具を説明する図である。It is a figure explaining the discharge jig which concerns on this embodiment. 本実施形態にかかる排出治具の平面図である。It is a top view of the discharge jig which concerns on this embodiment. 荷台に排出治具を取り付けた状態を示す図である。It is a figure which shows the state which attached the discharge jig to the loading platform. 排出治具を用いた埋設材料排出方法について説明する図である。It is a figure explaining the buried material discharge method using the discharge jig.

以下に添付図面を参照しながら、本発明の好適な実施形態について詳細に説明する。かかる実施形態に示す寸法、材料、その他具体的な数値等は、発明の理解を容易とするための例示に過ぎず、特に断る場合を除き、本発明を限定するものではない。なお、本明細書および図面において、実質的に同一の機能、構成を有する要素については、同一の符号を付することにより重複説明を省略し、また本発明に直接関係のない要素は図示を省略する。 Preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings. The dimensions, materials, other specific numerical values, etc. shown in the embodiment are merely examples for facilitating the understanding of the invention, and do not limit the present invention unless otherwise specified. In the present specification and drawings, elements having substantially the same function and configuration are designated by the same reference numerals to omit duplicate description, and elements not directly related to the present invention are not shown. do.

図1は、ダンプトラック200について説明する図である。図1に示すように、ダンプトラック200の後部には、上方に向かって傾斜可能な荷台210が設けられている。荷台210は、前板212、底板214、左右一対の側板220a・220bおよびあおり板230を含んで構成される。 FIG. 1 is a diagram illustrating a dump truck 200. As shown in FIG. 1, a loading platform 210 that can be inclined upward is provided at the rear of the dump truck 200. The loading platform 210 includes a front plate 212, a bottom plate 214, a pair of left and right side plates 220a / 220b, and a tilt plate 230.

底板214の左右両側には、側板220a・220bがそれぞれ取り付けられている。側板220a・220bの後端にはあおり板230が取り付けられる。詳細には、側板220a・220bの後端の上部には側板側接続部222a・222bがそれぞれ設けられている。あおり板230の左右両端の上部にはあおり板側接続部232a・232bがそれぞれ設けられている。これらの側板側接続部222a・222bとあおり板側接続部232a・232bとを接続することにより、側板220a・220bの後端にあおり板230が上端を中心として回動可能に取り付けられる。 Side plates 220a and 220b are attached to the left and right sides of the bottom plate 214, respectively. A tilt plate 230 is attached to the rear ends of the side plates 220a and 220b. Specifically, side plate side connecting portions 222a and 222b are provided above the rear ends of the side plates 220a and 220b, respectively. The tilt plate side connecting portions 232a and 232b are provided on the upper portions of the left and right ends of the tilt plate 230, respectively. By connecting these side plate side connecting portions 222a / 222b and the tilting plate side connecting portions 232a / 232b, the tilting plate 230 is rotatably attached to the rear end of the side plate 220a / 220b with the upper end as the center.

上述した荷台210には埋設材料(不図示)が積載される。埋設材料としては、土、砂利、砕石等の土砂を例示することできる。図1に示すように荷台210を傾斜させた状態であおり板230を開くように回動させることにより、荷台210の側板220a・220bの後端とあおり板230との間から埋設材料が排出される。そして荷台210には、次に述べる排出治具100が取り付けられる。 A buried material (not shown) is loaded on the loading platform 210 described above. Examples of the burial material include earth and sand such as soil, gravel, and crushed stone. As shown in FIG. 1, by rotating the loading platform 210 so as to open the tilted plate 230, the buried material is discharged from between the rear ends of the side plates 220a and 220b of the loading platform 210 and the tilting plate 230. NS. Then, the discharge jig 100 described below is attached to the loading platform 210.

図2は、本実施形態にかかる排出治具100を説明する図である。図2に示す排出治具100は、荷台210に積載された埋設材料を排出する幅を制限するための治具である。図2(a)に示すように、排出治具100は、一対の脚材110a・110b、一対の板材120a・120b、連結材130および脱落防止部材140を含んで構成される。一対の脚材110a・110bは、荷台210の左右の側板220a・220bそれぞれに沿って配置される部材である。 FIG. 2 is a diagram illustrating a discharge jig 100 according to the present embodiment. The discharge jig 100 shown in FIG. 2 is a jig for limiting the width of discharging the buried material loaded on the loading platform 210. As shown in FIG. 2A, the discharge jig 100 includes a pair of leg members 110a / 110b, a pair of plate members 120a / 120b, a connecting member 130, and a dropout prevention member 140. The pair of leg members 110a and 110b are members arranged along the left and right side plates 220a and 220b of the loading platform 210, respectively.

一対の脚材110a・110bと一対の板材120a・120bは、車両前方側の端部の連結部122によって回動可能に連結される。したがって脚材110a・110bと板材120a・120bは、図(2)に示すように閉じて収納状態とすることができる。これにより、排出治具100は収納および運搬が容易となっている。 The pair of leg members 110a / 110b and the pair of plate members 120a / 120b are rotatably connected by a connecting portion 122 at the end on the front side of the vehicle. Therefore, the leg members 110a / 110b and the plate members 120a / 120b can be closed and stored as shown in FIG. (2). This makes it easy to store and transport the discharge jig 100.

また脚材110a・110bには板状の保持金具112が回転可能に取り付けられていて、板材120a・120bに取り付けられたピン126に引っ掛けられるようになっている。これにより脚材110a・110bと板材120a・120bを図2(a)に示すように開いて使用状態とした場合には、保持金具112をピン126に引っ掛けてつっかい棒にすることにより、埋設材料の重さで板材120bが閉じてしまうことを防止する。 Further, plate-shaped holding metal fittings 112 are rotatably attached to the leg members 110a and 110b so as to be hooked on pins 126 attached to the plate members 120a and 120b. As a result, when the leg members 110a / 110b and the plate members 120a / 120b are opened as shown in FIG. 2A and put into use, the holding metal fitting 112 is hooked on the pin 126 to form a stick. It prevents the plate material 120b from closing due to the weight of the material.

連結材130は、一対の板材120a・120bの車両後方側の後端の開口部を固定する部材である。連結材130は棒状の部材であって、右側の板材120bと連結される側には1つの右側連結部132を有し、左側の板材120aと連結される側には、複数(本実施形態では3つを例示)の左側連結部134a・134b・134cを有する。右側連結部132、左側連結部134a・134b・134cは、板材120a、120bの端部に設けられた通し穴124に連結される。 The connecting member 130 is a member for fixing the opening at the rear end of the pair of plate members 120a and 120b on the rear side of the vehicle. The connecting member 130 is a rod-shaped member, and has one right side connecting portion 132 on the side connected to the right side plate material 120b, and a plurality of connecting members 130 on the side connected to the left side plate material 120a (in the present embodiment). It has the left side connecting portions 134a, 134b, and 134c of (exemplify three). The right side connecting portion 132 and the left side connecting portions 134a, 134b, and 134c are connected to the through holes 124 provided at the ends of the plate members 120a and 120b.

図3は、本実施形態にかかる排出治具100の平面図である。図3(a)および図3(b)は荷台210の幅が異なるダンプトラック200の荷台210に取り付けた状態を図示している。 FIG. 3 is a plan view of the discharge jig 100 according to the present embodiment. 3 (a) and 3 (b) show a state in which the loading platform 210 is attached to the loading platform 210 of the dump truck 200 having a different width.

上記構成によれば、板材120aに対する連結材130の連結位置を変更することにより、板材120a、120bの間隔を変更して、排出治具100の幅を変更することができる。例えば、図3(a)では、板材120aを最も内側の左側連結部134aに連結している。一方、図3(b)では、板材120aを最も外側の左側連結部134cに連結している。これにより、排出治具100の開口幅は、図3(a)の状態よりも図3(b)の状態の方が広くなる。したがって、荷台210の幅が異なるダンプトラック200であっても同一の排出治具100を用いることができる。 According to the above configuration, the width of the discharge jig 100 can be changed by changing the interval between the plate members 120a and 120b by changing the connection position of the connecting member 130 with respect to the plate member 120a. For example, in FIG. 3A, the plate member 120a is connected to the innermost left side connecting portion 134a. On the other hand, in FIG. 3B, the plate member 120a is connected to the outermost left side connecting portion 134c. As a result, the opening width of the discharge jig 100 is wider in the state of FIG. 3 (b) than in the state of FIG. 3 (a). Therefore, the same discharge jig 100 can be used even for dump trucks 200 having different widths of the loading platform 210.

また上記のように連結材130と板材120aとの連結位置を調節可能であることにより、連結材130における開口の幅も調整することができる。すなわち、開口は、図3(a)に示すように最も内側の左側連結部134aにおいて板材120aを連結した際の幅W1よりも、図3(b)に示すように最も外側の左側連結部134cにおいて板材120aを連結した際の幅W2のほうが広くなる。これにより、連結材130に対する板材120aの連結位置を変更することにより、掘削箇所に応じて開口の幅を調整することが可能となる。 Further, since the connecting position between the connecting member 130 and the plate member 120a can be adjusted as described above, the width of the opening in the connecting member 130 can also be adjusted. That is, the opening is the outermost left side connecting portion 134c as shown in FIG. 3 (b) with respect to the width W1 when the plate material 120a is connected at the innermost left side connecting portion 134a as shown in FIG. 3 (a). The width W2 when the plate members 120a are connected is wider. As a result, the width of the opening can be adjusted according to the excavation location by changing the connection position of the plate member 120a with respect to the connecting member 130.

なお、本実施形態では、右側連結部を1つ、左側連結部を複数設ける構成を例示したが、これに限定するものではない。例えば、右側連結部を複数設け、左側連結部を1つ設ける構成としてもよいし、右側連結部および左側連結部ともに1つずつ、または複数設ける構成とすることも可能である。 In the present embodiment, a configuration in which one right-side connecting portion and a plurality of left-side connecting portions are provided has been illustrated, but the present invention is not limited to this. For example, a plurality of right side connecting portions may be provided and one left side connecting portion may be provided, or one or more right side connecting portions and one left side connecting portion may be provided.

また上記構成を実施する方法としては、連結材130の右側連結部132および左側連結部134a・134b・134cを、ピンまたは孔のいずれか一方とし、板材120a・120bの車両後方側の端部に他方を設けることを想定したが、これに限定するものではない。連結材130と板材120a・120bとの連結位置を調節可能する手法としては既知の他の構成を適用することも可能である。 Further, as a method of implementing the above configuration, the right side connecting portion 132 and the left connecting portion 134a, 134b, 134c of the connecting member 130 are made into either a pin or a hole, and the plate members 120a, 120b are attached to the rear end of the vehicle. It was assumed that the other would be provided, but it is not limited to this. It is also possible to apply other known configurations as a method for adjusting the connecting position between the connecting member 130 and the plate members 120a / 120b.

図4は、荷台210に排出治具100を取り付けた状態を示す図である。図4(a)は、荷台210に取り付けられた排出治具100の全体を示す図であり、図4(b)は、図4(a)の破線円内を荷台210の内側から観察した拡大斜視図である。 FIG. 4 is a diagram showing a state in which the discharge jig 100 is attached to the loading platform 210. FIG. 4 (a) is a diagram showing the entire discharge jig 100 attached to the loading platform 210, and FIG. 4 (b) is an enlargement of the inside of the broken line circle of FIG. 4 (a) observed from the inside of the loading platform 210. It is a perspective view.

図4(a)に示すように、脱落防止部材140は、荷台210の左右の側板220a・220bの後端に差し渡され、排出治具100が荷台の後方に脱落することを防止する。詳細には、脱落防止部材140は、棒状部142と、棒状部142の両端それぞれに固定される一対の係止部144a・144bを含んで構成される。図4(b)に示すように、係止部144bはL字状の部材であり(係止部144aも同様)、側板220bの側板側接続部222bに係止される。これにより、係止部144a・144bを介して脱落防止部材140が左右の側板220a・220bの間に差し渡された状態となる。 As shown in FIG. 4A, the drop-off prevention member 140 is delivered to the rear ends of the left and right side plates 220a and 220b of the loading platform 210 to prevent the discharge jig 100 from falling off behind the loading platform. Specifically, the dropout prevention member 140 includes a rod-shaped portion 142 and a pair of locking portions 144a and 144b fixed to both ends of the rod-shaped portion 142. As shown in FIG. 4B, the locking portion 144b is an L-shaped member (the same applies to the locking portion 144a), and is locked to the side plate side connecting portion 222b of the side plate 220b. As a result, the dropout prevention member 140 is passed between the left and right side plates 220a and 220b via the locking portions 144a and 144b.

図4(a)に示すように荷台210を傾斜させた状態において、排出治具100の脚材110a・110bおよび板材120a・120bの車両後方側の端部は脱落防止部材140に当接する。これにより、荷台210を傾斜させて埋設材料を排出する際、埋設材料の重みによって排出治具100に対して下方に向かう荷重がかかっても、脚材110a・110bおよび板材120a・120bの車両後方側の端部が脱落防止部材140に当接する。したがって、荷台210の外側、すなわち側板220a・220bの下端よりも下方への排出治具100のずれ(脱落)を防ぎ、排出治具100をダンプトラック200の荷台210に安定して取り付けることができる。 As shown in FIG. 4A, when the loading platform 210 is tilted, the legs 110a / 110b of the discharge jig 100 and the rear ends of the plate members 120a / 120b come into contact with the dropout prevention member 140. As a result, when the loading platform 210 is tilted to discharge the buried material, even if a downward load is applied to the discharging jig 100 due to the weight of the buried material, the leg members 110a / 110b and the plate members 120a / 120b are rearward of the vehicle. The end on the side comes into contact with the dropout prevention member 140. Therefore, the discharge jig 100 can be prevented from slipping (falling off) outside the loading platform 210, that is, below the lower ends of the side plates 220a and 220b, and the discharging jig 100 can be stably attached to the loading platform 210 of the dump truck 200. ..

上述したように、荷台210を傾斜させ、あおり板230を開くように回動させると、荷台210に積載された埋設材料が排出される。このとき、荷台210に排出治具100が取り付けられていることにより、埋設材料を排出する幅は、荷台210の車幅方向の幅ではなく、連結材130の開口の幅W1・W2(図3参照)となる。これにより、ダンプトラック200から埋設材料を掘削箇所に直接投入する場合であっても、掘削箇所の周囲に埋設材料が飛散することがない。したがって、バックホウを掘削作業に専念させることができ、作業時間の短縮を図ることが可能となる。 As described above, when the loading platform 210 is tilted and rotated so as to open the tilt plate 230, the buried material loaded on the loading platform 210 is discharged. At this time, since the discharge jig 100 is attached to the loading platform 210, the width for discharging the buried material is not the width in the vehicle width direction of the loading platform 210, but the widths W1 and W2 of the opening of the connecting member 130 (FIG. 3). See). As a result, even when the buried material is directly thrown into the excavated part from the dump truck 200, the buried material does not scatter around the excavated part. Therefore, the backhoe can be devoted to the excavation work, and the work time can be shortened.

更に本実施形態の排出治具100では、脱落防止部材140の幅を調節可能としている。詳細には、図4(b)に示すように、脱落防止部材140の係止部144a、144bはジャッキ146を備えている。すなわち係止部144a、144bは、ジャッキベースを利用して製作されている。 Further, in the discharge jig 100 of the present embodiment, the width of the dropout prevention member 140 can be adjusted. Specifically, as shown in FIG. 4B, the locking portions 144a and 144b of the dropout prevention member 140 are provided with jacks 146. That is, the locking portions 144a and 144b are manufactured using a jack base.

上記構成によれば、ジャッキ146のハンドルを回転させることによって、脱落防止部材140の幅を調整することができる。したがって、荷台210の幅が異なるダンプトラック200であっても共通の脱落防止部材140を用いることができ、部品コストの削減を図ることが可能となる。 According to the above configuration, the width of the fall prevention member 140 can be adjusted by rotating the handle of the jack 146. Therefore, even if the dump trucks 200 have different widths of the loading platform 210, the common dropout prevention member 140 can be used, and the component cost can be reduced.

次に、上述した排出治具100を用いた埋設材料排出方法について説明する。本実施形態の埋設材料排出方法では、ダンプトラック200の荷台210に取り付けられ、荷台210に積載された埋設材料を排出する。まず図1に示したように、上述した排出治具100を荷台210に取り付ける。そして荷台210を水平にした状態で、荷台210に埋設材料を積載し、作業現場まで運搬する。 Next, a method of discharging the buried material using the discharge jig 100 described above will be described. In the buried material discharge method of the present embodiment, the buried material attached to the loading platform 210 of the dump truck 200 and loaded on the loading platform 210 is discharged. First, as shown in FIG. 1, the above-mentioned discharge jig 100 is attached to the loading platform 210. Then, with the loading platform 210 horizontal, the buried material is loaded on the loading platform 210 and transported to the work site.

図5は上述した排出治具100を用いた埋設材料排出方法について説明する図である。配管310を埋設するための溝320は、掘削区画、配管区画、埋戻区画に分けられている。掘削区画では、バックホウ300によって溝320を掘削している。配管区画では、作業員330が配管310を設置し、仕切り340を設置して埋戻区画との境界(型枠)を形成している。 FIG. 5 is a diagram illustrating a method of discharging the buried material using the discharge jig 100 described above. The groove 320 for burying the pipe 310 is divided into an excavation section, a piping section, and a backfill section. In the excavation section, the groove 320 is excavated by the backhoe 300. In the pipe section, the worker 330 installs the pipe 310 and installs the partition 340 to form a boundary (form) with the backfill section.

そして埋戻区画においては、図5に示すように作業現場において荷台210を傾斜させ、荷台210のあおり板230を開状態として排出治具100の開口から埋設材料を排出する。このとき、本実施形態の埋設材料排出方法では、荷台210に排出治具100が取り付けられていることにより、埋設材料は、荷台210の全幅ではなく、板材120a、120bの開口のみから排出される。したがって、掘削箇所(溝320)の周囲に埋設材料を飛散させることなく、ダンプトラック200から埋設材料を掘削箇所に直接投入することができる。したがって、バックホウ300を掘削作業に専念させることができ、掘削作業、配管作業、および埋戻作業を平行することができるため、作業時間の短縮を図ることが可能となる。 Then, in the backfill section, as shown in FIG. 5, the loading platform 210 is tilted at the work site, the tilting plate 230 of the loading platform 210 is opened, and the buried material is discharged from the opening of the discharge jig 100. At this time, in the buried material discharging method of the present embodiment, since the discharging jig 100 is attached to the loading platform 210, the buried material is discharged not from the entire width of the loading platform 210 but only from the openings of the plate members 120a and 120b. .. Therefore, the buried material can be directly put into the excavated part from the dump truck 200 without scattering the buried material around the excavated part (groove 320). Therefore, the backhoe 300 can be devoted to the excavation work, and the excavation work, the piping work, and the backfilling work can be performed in parallel, so that the work time can be shortened.

以上、添付図面を参照しながら本発明の好適な実施形態について説明したが、本発明は係る例に限定されないことは言うまでもない。当業者であれば、特許請求の範囲に記載された範疇内において、各種の変更例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。 Although preferred embodiments of the present invention have been described above with reference to the accompanying drawings, it goes without saying that the present invention is not limited to such examples. It is clear that a person skilled in the art can come up with various modifications or modifications within the scope of the claims, which naturally belong to the technical scope of the present invention. Understood.

本発明は、ダンプトラックの荷台に取り付けられ荷台に積載された埋設材料を排出する排出治具、およびかかる排出治具を用いた埋設材料排出方法に利用することができる。 INDUSTRIAL APPLICABILITY The present invention can be used for a discharge jig attached to a loading platform of a dump truck and discharging a buried material loaded on the loading platform, and a method for discharging a buried material using such a discharge jig.

100…排出治具、110a…脚材、110b…脚材、112…保持金具、120a…板材、120b…板材、122…連結部、124…通し穴、126…ピン、130…連結材、132…右側連結部、134a…左側連結部、134b…左側連結部、134c…左側連結部、140…脱落防止部材、142…棒状部、144a…係止部、144b…係止部、146…調整部、200…ダンプトラック、210…荷台、212…前板、214…底板、220a…側板、220b…側板、222a…側板側接続部、222b…側板側接続部、230…あおり板、232a…あおり板側接続部、232b…あおり板側接続部、300…バックホウ、310…配管、320…溝、330…作業員、340…仕切り 100 ... Discharge jig, 110a ... Leg material, 110b ... Leg material, 112 ... Holding metal fitting, 120a ... Plate material, 120b ... Plate material, 122 ... Connecting part, 124 ... Through hole, 126 ... Pin, 130 ... Connecting material, 132 ... Right side connecting part, 134a ... Left side connecting part, 134b ... Left side connecting part, 134c ... Left side connecting part, 140 ... Fall prevention member, 142 ... Rod-shaped part, 144a ... Locking part, 144b ... Locking part, 146 ... Adjusting part, 200 ... Dump truck, 210 ... Loading platform, 212 ... Front plate, 214 ... Bottom plate, 220a ... Side plate, 220b ... Side plate, 222a ... Side plate side connection, 222b ... Side plate side connection, 230 ... Connection part, 232b ... Connection part on the tilt plate side, 300 ... Back ho, 310 ... Piping, 320 ... Groove, 330 ... Worker ... 340 ... Partition

Claims (3)

ダンプトラックの荷台に取り付けられ該荷台に積載された埋設材料を排出する排出治具であって、
前記荷台の左右の側板それぞれに沿って配置される一対の脚材と、
前記脚材の車両前方側の端部に回動可能に連結された一対の板材と、
前記一対の板材の車両後方側の端部を連結し所定幅の開口を形成する連結材と、
前記左右の側板の後端に差し渡される脱落防止部材と、
を備え、
前記脱落防止部材は、幅が調節可能であり、
前記荷台を傾斜させた状態において、前記脚材および前記板材の車両後方側の端部が脱落防止部材に当接することを特徴とする排出治具。
It is a discharge jig that is attached to the loading platform of a dump truck and discharges the buried material loaded on the loading platform.
A pair of leg timbers arranged along the left and right side plates of the loading platform,
A pair of plate members rotatably connected to the front end of the leg member on the vehicle front side,
A connecting material that connects the ends of the pair of plate materials on the rear side of the vehicle to form an opening having a predetermined width, and
The fall-out prevention member delivered to the rear ends of the left and right side plates,
With
The fall-prevention member has an adjustable width and is adjustable in width.
A discharge jig characterized in that the leg member and the end portion of the plate member on the rear side of the vehicle come into contact with the dropout prevention member in a state where the loading platform is tilted.
前記連結材は、前記板材との連結位置を調節可能であることを特徴とする請求項1に記載の排出治具。 The discharge jig according to claim 1, wherein the connecting material can adjust the connecting position with the plate material. ダンプトラックの荷台に取り付けられ該荷台に積載された埋設材料を排出する埋設材料排出方法であって、
請求項1または2に記載の排出治具を前記荷台に取り付け、
前記荷台に前記埋設材料を積載し、
作業現場において前記荷台を傾斜させて前記排出治具の脚材および板材の車両後方側の端部を脱落防止部材に当接させ、
前記荷台のあおり板を開状態として前記排出治具の開口から前記埋設材料を排出することを特徴とする埋設材料排出方法。
It is a buried material discharge method that is attached to the loading platform of a dump truck and discharges the buried material loaded on the loading platform.
Attach the discharge jig according to claim 1 or 2 to the loading platform,
The buried material is loaded on the loading platform,
At the work site, the loading platform is tilted so that the leg material of the discharge jig and the end portion of the plate material on the rear side of the vehicle are brought into contact with the dropout prevention member.
A method for discharging a buried material, which comprises discharging the buried material from an opening of the discharging jig with the tilting plate of the loading platform open.
JP2017107295A 2017-05-31 2017-05-31 Discharge jig and buried material discharge method Active JP6915777B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017107295A JP6915777B2 (en) 2017-05-31 2017-05-31 Discharge jig and buried material discharge method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017107295A JP6915777B2 (en) 2017-05-31 2017-05-31 Discharge jig and buried material discharge method

Publications (2)

Publication Number Publication Date
JP2018202916A JP2018202916A (en) 2018-12-27
JP6915777B2 true JP6915777B2 (en) 2021-08-04

Family

ID=64956144

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017107295A Active JP6915777B2 (en) 2017-05-31 2017-05-31 Discharge jig and buried material discharge method

Country Status (1)

Country Link
JP (1) JP6915777B2 (en)

Also Published As

Publication number Publication date
JP2018202916A (en) 2018-12-27

Similar Documents

Publication Publication Date Title
DE3603675A1 (en) COMBINATION OF A MILL AND A CONTAINER DESIGNED AS EARTHMOVER
JP6529378B2 (en) Invert construction method, tunnel construction method and Teruha crane for tunnel
JP6915777B2 (en) Discharge jig and buried material discharge method
US8449217B2 (en) Trench paver attachment
US20220275595A1 (en) Trench shoring apparatus
JP6891637B2 (en) Partition partition and pipe burying method
JP2003278498A (en) Tunnel invert construction method by mobile pier and mobile pier
EP3369863A1 (en) Safety barrier element
JP3357654B2 (en) Gantry used for tunnel excavation method
AU2014308543A1 (en) Service arch
US20080075571A1 (en) Construction Equipment with Excavation and Loading Function
JP5852536B2 (en) Dump manufacturing method and dump bed attachment
EP2662500B1 (en) Work tool lock extension
JP7121664B2 (en) drilling jetty
JP7578284B2 (en) Sandbag manufacturing equipment
JP2024115067A (en) Cargo platform fixture
JP3200671U (en) Unloading width limiter for load
JP4563873B2 (en) Clamshell bucket
JP4726260B2 (en) Overhang sidewalk structure
JP2025054815A (en) Construction method of invert structure
JP2001040697A (en) Laying and leveling equipment for trench excavation
KR102382424B1 (en) Rotatable link for excavator
US12404651B2 (en) Excavator bucket locking and security device for efficient transport
US2436440A (en) Loading platform
JP4138185B2 (en) Small section tunnel backfilling method

Legal Events

Date Code Title Description
RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20180413

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200421

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200616

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20200616

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20201215

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20201217

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210129

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210629

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210705

R150 Certificate of patent or registration of utility model

Ref document number: 6915777

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250