Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6921039B2 - Unit control device and program - Google Patents
[go: Go Back, main page]

JP6921039B2 - Unit control device and program - Google Patents

Unit control device and program Download PDF

Info

Publication number
JP6921039B2
JP6921039B2 JP2018133112A JP2018133112A JP6921039B2 JP 6921039 B2 JP6921039 B2 JP 6921039B2 JP 2018133112 A JP2018133112 A JP 2018133112A JP 2018133112 A JP2018133112 A JP 2018133112A JP 6921039 B2 JP6921039 B2 JP 6921039B2
Authority
JP
Japan
Prior art keywords
heat source
increase
decrease
water supply
source machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018133112A
Other languages
Japanese (ja)
Other versions
JP2020012564A (en
Inventor
洋人 高橋
洋人 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Building Solutions Corp
Original Assignee
Mitsubishi Electric Building Techno Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Building Techno Service Co Ltd filed Critical Mitsubishi Electric Building Techno Service Co Ltd
Priority to JP2018133112A priority Critical patent/JP6921039B2/en
Publication of JP2020012564A publication Critical patent/JP2020012564A/en
Application granted granted Critical
Publication of JP6921039B2 publication Critical patent/JP6921039B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Air Conditioning Control Device (AREA)

Description

本発明は、台数制御装置及びプログラム、特に負荷に冷温水を供給する熱源機の運転台数の制御に関する。 The present invention relates to a number control device and a program, particularly to control the number of operating heat source machines that supply cold and hot water to a load.

セントラル空調において空調機等の負荷に冷温水を供給する熱源機の運転台数の台数制御を行っているときに台数制御だけでは要求に対する適切な台数で運転していない場合、熱源機の増減段制御を行うことで台数を追加で増減させる場合がある。 In central air conditioning, when controlling the number of operating heat source units that supply cold and hot water to the load of the air conditioner, etc., if the number of heat source units is not operating at an appropriate number according to the demand, the number of heat source units can be increased or decreased. The number of units may be increased or decreased by performing.

例えば、従来においては、熱源機から負荷に供給される送水温度の値を参照することによって熱源機の運転台数の増減段を行う技術が提案されている(例えば、特許文献1)。 For example, conventionally, a technique has been proposed in which the number of operating heat source machines is increased or decreased by referring to the value of the water supply temperature supplied from the heat source machine to the load (for example, Patent Document 1).

特開2014−77621号公報Japanese Unexamined Patent Publication No. 2014-77621 特開2003−294290号公報Japanese Unexamined Patent Publication No. 2003-294290 特開2000−18672号公報Japanese Unexamined Patent Publication No. 2000-18672 特開平8−261544号公報Japanese Unexamined Patent Publication No. 8-261544 特開昭61−225533号公報Japanese Unexamined Patent Publication No. 61-225533

しかしながら、従来技術のように送水温度のみを参照して熱源機の増減段数を設定していると、例えばハンチングが発生したりするなど適切な熱源機の増減段制御を行うことができない場合があった。すなわち、負荷に供給される送水温度が負荷側の要求を満たせない場合があった。 However, if the number of stages of increase / decrease of the heat source machine is set by referring only to the water supply temperature as in the prior art, it may not be possible to appropriately control the increase / decrease stage of the heat source machine, for example, hunting may occur. rice field. That is, the water supply temperature supplied to the load may not meet the demand on the load side.

本発明は、送水温度及び還水温度を参照することによってより適切な増減段制御を行うことを目的とする。 An object of the present invention is to perform more appropriate increase / decrease stage control by referring to the water supply temperature and the return water temperature.

本発明に係る台数制御装置は、負荷の状態に応じて前記負荷に冷温水を供給する熱源機の運転台数を決定する台数制御を行う台数制御手段と、前記負荷に供給される冷温水の送水温度と目標送水温度との差異を解消するのに要求される前記熱源機の能力を示す要求度であって送水温度の変化に応じて連続的に変化する要求度を取得する第1取得手段と、前記負荷を通過した冷温水の還水温度と目標還水温度との差異を解消するのに要求される前記熱源機の能力を示す要求度であって還水温度の変化に応じて連続的に変化する要求度を取得する第2取得手段と、前記各取得手段により要求度が取得されると、その取得された要求度の合計値に基づき前記熱源機の増減台数を設定する設定手段と、前記台数制御手段が決定する前記熱源機の運転台数を前記設定手段が設定する増減台数で補正し、その補正後の前記熱源機の運転台数に応じて前記熱源機の運転を制御する運転制御手段と、を有することを特徴とする。 The number control device according to the present invention includes a number control means for controlling the number of operating heat source machines that supply cold / hot water to the load according to the load state, and a hot / cold water supply to the load. A first acquisition means for acquiring a requirement indicating the ability of the heat source machine required to eliminate the difference between the temperature and the target water supply temperature, which continuously changes according to a change in the water supply temperature. , It is a requirement indicating the ability of the heat source machine required to eliminate the difference between the return water temperature of the cold / hot water that has passed the load and the target return water temperature, and is continuous according to the change of the return water temperature. A second acquisition means for acquiring the required degree that changes to, and a setting means for setting the increase / decrease number of the heat source machine based on the total value of the acquired required degree when the required degree is acquired by each of the acquired means. Operation control that corrects the operating number of the heat source machine determined by the number control means by the increase / decrease number set by the setting means, and controls the operation of the heat source machine according to the corrected operating number of the heat source machine. It is characterized by having means and.

また、前記設定手段は、前記熱源機に対する要求度と前記熱源機の増減台数との関係が設定された台数増減情報に基づき前記各取得手段が取得した要求度の合計値に対応する前記熱源機の増減台数を設定することを特徴とする。 Further, the setting means is the heat source machine corresponding to the total value of the demands acquired by each acquisition means based on the number increase / decrease information in which the relationship between the demand for the heat source machine and the increase / decrease number of the heat source machines is set. It is characterized by setting the number of units to be increased or decreased.

また、前記設定手段は、所定の条件を満たす場合に前記熱源機の増減台数を設定することを特徴とする。 Further, the setting means is characterized in that the number of heat source machines is increased or decreased when a predetermined condition is satisfied.

また、前記所定の条件には、前記負荷を通過した冷温水の流量が所定の閾値以上となる状態が所定時間継続することが含まれていることを特徴とする。 Further, the predetermined condition is characterized in that the state in which the flow rate of the cold / hot water passing through the load becomes equal to or higher than a predetermined threshold value continues for a predetermined time.

また、前記設定手段は、前記所定の条件を満たさない状態が所定時間継続した場合、前記熱源機の増減台数の設定を止めることを特徴とする。 Further, the setting means is characterized in that when the state of not satisfying the predetermined condition continues for a predetermined time, the setting of the increase / decrease number of the heat source machines is stopped.

また、前記運転制御手段は、前記設定手段が運転させる前記熱源機を増加又は減少させることを所定時間継続して設定するまで前記台数制御手段が決定する前記熱源機の台数を補正しないことを特徴とする。 Further, the operation control means does not correct the number of the heat source machines determined by the number control means until it is continuously set for a predetermined time to increase or decrease the heat source machines operated by the setting means. And.

本発明に係るプログラムは、コンピュータを、負荷の状態に応じて前記負荷に冷温水を供給する熱源機の運転台数を決定する台数制御を行う台数制御手段、前記負荷に供給される冷温水の送水温度と目標送水温度との差異を解消するのに要求される前記熱源機の能力を示す要求度であって送水温度の変化に応じて連続的に変化する要求度を取得する第1取得手段、前記負荷を通過した冷温水の還水温度と目標還水温度との差異を解消するのに要求される前記熱源機の能力を示す要求度であって還水温度の変化に応じて連続的に変化する要求度を取得する第2取得手段、前記各取得手段により要求度が取得されると、その取得された要求度の合計値に基づき前記熱源機の増減台数を設定する設定手段、前記台数制御手段が決定する前記熱源機の運転台数を前記設定手段が設定する増減台数で補正し、その補正後の前記熱源機の運転台数に応じて前記熱源機の運転を制御する運転制御手段、として機能させる。 The program according to the present invention is a unit control means for controlling the number of operating units of a heat source machine that supplies cold / hot water to the load according to a load state, and a water supply of cold / hot water supplied to the load. The first acquisition means for acquiring the requirement indicating the ability of the heat source machine required to eliminate the difference between the temperature and the target water supply temperature and continuously changing according to the change in the water supply temperature. It is a requirement indicating the ability of the heat source machine required to eliminate the difference between the return water temperature of the cold / hot water that has passed the load and the target return water temperature, and is continuously corresponding to the change of the return water temperature. A second acquisition means for acquiring a changing requirement, a setting means for setting an increase / decrease in the number of heat source machines based on the total value of the acquired requirements when the requirement is acquired by each acquisition means, the number of units. As an operation control means that corrects the operating number of the heat source machine determined by the control means by the increase / decrease number set by the setting means, and controls the operation of the heat source machine according to the corrected operating number of the heat source machine. Make it work.

本発明によれば、送水温度及び還水温度を参照することによってより適切な増減段制御を行うことができる。 According to the present invention, more appropriate increase / decrease stage control can be performed by referring to the water supply temperature and the return water temperature.

また、熱源機の過剰な増減段が繰り返し行われることに伴うハンチングを防止することができる。 In addition, it is possible to prevent hunting due to repeated excessive increase / decrease stages of the heat source machine.

本実施の形態における熱源システムの概略的な全体構成図である。It is a schematic overall block diagram of the heat source system in this embodiment. 本実施の形態における制御装置のブロック構成図である。It is a block block diagram of the control device in this embodiment. 本実施の形態における増減段制御処理を示すフローチャートである。It is a flowchart which shows the increase / decrease stage control process in this embodiment. 本実施の形態において送水温度と要求度との関係をグラフ形式にて示す図である。It is a figure which shows the relationship between the water supply temperature and the required degree in a graph form in this embodiment. 本実施の形態において還水温度と要求度との関係をグラフ形式にて示す図である。It is a figure which shows the relationship between the return water temperature and the required degree in a graph form in this embodiment. 本実施の形態において合計要求度と運転させる熱源機の増減台数との関係をグラフ形式にて示す図である。It is a figure which shows the relationship between the total demand degree and the increase / decrease number of heat source machines to operate in this embodiment in a graph format.

以下、図面に基づいて、本発明の好適な実施の形態について説明する。 Hereinafter, preferred embodiments of the present invention will be described with reference to the drawings.

図1は、本実施の形態における熱源システムの概略的な全体構成図である。図1には、負荷1、熱源機2、熱媒(冷温水)を蓄積するヘッダ3〜6、熱源機2の補機としてのポンプ7、二次ポンプ8、送水路9、還水路10、ヘッダ4とヘッダ5の間をバイパスする連通管11が示されている。なお、図1では、熱源機2やポンプ7等、同等の機能を有する構成に関しては、代表して1つの構成のみに符号を付ける。 FIG. 1 is a schematic overall configuration diagram of a heat source system according to the present embodiment. In FIG. 1, a load 1, a heat source machine 2, headers 3 to 6 for storing a heat medium (cold / hot water), a pump 7 as an auxiliary machine of the heat source machine 2, a secondary pump 8, a water supply channel 9, and a return water channel 10 are shown. A communication pipe 11 that bypasses between the header 4 and the header 5 is shown. In FIG. 1, only one configuration is designated as a representative for configurations having equivalent functions such as the heat source machine 2 and the pump 7.

負荷1は、空調機や給湯機等冷温水の温度を利用して所定の機能を発揮する1又は複数の機器で構成される。図1では、負荷1として複数のAHU(Air Handling Unit)を例示している。熱源機2は、負荷1に供給する冷温水に冷熱を与える熱源手段である。本実施の形態では、熱源手段として複数の熱源機2を設けており、負荷1に対して並列に接続する。熱源機2としては、用途に応じて冷凍機や温水発生機(冷温水発生機、ヒートポンプ、ボイラー等)が適用可能である。 The load 1 is composed of one or a plurality of devices that perform a predetermined function by utilizing the temperature of cold / hot water such as an air conditioner or a water heater. In FIG. 1, a plurality of AHUs (Air Handling Units) are illustrated as the load 1. The heat source machine 2 is a heat source means for applying cold heat to the cold / hot water supplied to the load 1. In the present embodiment, a plurality of heat source machines 2 are provided as heat source means, and are connected in parallel to the load 1. As the heat source machine 2, a refrigerator or a hot water generator (cold / hot water generator, heat pump, boiler, etc.) can be applied depending on the application.

また、熱源機2の入口側(冷温水の流れからみて上流側)及び出口側の各水路、ヘッダ4、ヘッダ3とヘッダ4の間の水路及びヘッダ6における温度を検出する温度計(温度検出器、配管温度検出器)12〜16がそれぞれ設けられている。また、ヘッダ3とヘッダ4の間には流量計17、ヘッダ5とヘッダ6の間にはバイパス弁18及び差圧検出器19、還水路10には制御弁20、連通管11にはバイパス弁21、がそれぞれ設けられている。 Further, a thermometer (temperature detection) that detects the temperature in each of the inlet side (upstream side when viewed from the flow of cold / hot water) and the outlet side of the heat source machine 2, the header 4, the water channel between the header 3 and the header 4, and the header 6. A device and a pipe temperature detector) 12 to 16 are provided, respectively. Further, a flow meter 17 is between the header 3 and the header 4, a bypass valve 18 and a differential pressure detector 19 are between the header 5 and the header 6, a control valve 20 is used for the return water channel 10, and a bypass valve is used for the communication pipe 11. 21 and are provided respectively.

以上の構成において、ポンプ7により圧送された送水は、熱源機2を介してヘッダ5に送られ、二次ポンプ8により圧送されてヘッダ6を介して送水路9に供給される。そして、負荷1を介して還水路10により還水としてヘッダ3に至り、ヘッダ4を介してポンプ7に送られ、再び圧送される。以上のようにして、冷温水は、図示した水路を循環する。なお、二次ポンプ8は、流量計17からの負荷側流量により台数制御が行われ、ヘッダ5とヘッダ6の間のバイパス弁18は、差圧検出器19による検出値(差圧)に基づき送水圧力が一定になるように制御される。 In the above configuration, the water pumped by the pump 7 is sent to the header 5 via the heat source machine 2, is pumped by the secondary pump 8, and is supplied to the water supply channel 9 via the header 6. Then, the return water reaches the header 3 through the return water channel 10 via the load 1, is sent to the pump 7 via the header 4, and is pumped again. As described above, the cold / hot water circulates in the illustrated water channel. The number of secondary pumps 8 is controlled by the load-side flow rate from the flow meter 17, and the bypass valve 18 between the header 5 and the header 6 is based on the value (differential pressure) detected by the differential pressure detector 19. The water supply pressure is controlled to be constant.

本実施の形態における熱源システムの構成自体は、従前からある構成をそのまま利用してもよい。そして、制御装置30は、図示しない信号線(制御信号線、データ信号線)により上記各構成1〜21を接続し、熱源システム全体の動作を制御する。具体的には、負荷1に供給される冷温水の温度(以下、「送水温度」)が負荷側の要求によって決定される目標送水温度に一致するように熱源機2の冷温水出口設定温度を設定する送水温度制御を行う他、ポンプ7の回転数制御、ヘッダ4とヘッダ5との間の差圧に基づくバイパス弁21の弁開度制御等を行う。更に、制御装置30は、負荷1の状態に応じて熱源機2の運転台数を決定する台数制御、そして本実施の形態において特徴的な増減段制御を行う。 As the configuration itself of the heat source system in the present embodiment, the existing configuration may be used as it is. Then, the control device 30 connects each of the above configurations 1 to 21 by signal lines (control signal lines, data signal lines) (not shown) to control the operation of the entire heat source system. Specifically, the cold / hot water outlet set temperature of the heat source machine 2 is set so that the temperature of the cold / hot water supplied to the load 1 (hereinafter, “water supply temperature”) matches the target water supply temperature determined by the request on the load side. In addition to controlling the water supply temperature to be set, it also controls the rotation speed of the pump 7, controls the valve opening degree of the bypass valve 21 based on the differential pressure between the header 4 and the header 5. Further, the control device 30 performs unit number control for determining the number of operating heat source machines 2 according to the state of the load 1, and step-up / down control characteristic of the present embodiment.

制御装置30は、例えばコンピュータにより実現され、コンピュータは、従前から存在する汎用的なハードウェア構成で実現できる。すなわち、制御装置30は、CPU、ROM、RAM、記憶手段としてハードディスクドライブ(HDD)、通信手段としてネットワークインタフェース(IF)9を有する。また、必要に応じて、ユーザインタフェースとして入力手段及び表示手段を設けてもよい。 The control device 30 is realized by, for example, a computer, and the computer can be realized by a general-purpose hardware configuration that has existed in the past. That is, the control device 30 has a CPU, a ROM, a RAM, a hard disk drive (HDD) as a storage means, and a network interface (IF) 9 as a communication means. Further, if necessary, an input means and a display means may be provided as a user interface.

図2は、本実施の形態における制御装置30のブロック構成図である。制御装置30は、情報管理部31、台数制御部32、増減段制御部33、運転制御部34及び記憶部35を有している。なお、本実施の形態の説明において用いない構成要素については、図から省略している。情報管理部31は、熱源システムから送られてくるデータ等を含む各種情報を受信し、記憶部35に保存することによって情報を管理する。受信するデータには、各温度計12〜16が検出した温度、特に温度計16により検出される送水温度及び温度計15により検出される負荷1を通過した冷温水の温度(以下、「還水温度」)が含まれる。また、負荷側から要求される送水温度(以下、「目標送水温度」)及び負荷側から要求される還水温度(以下、「目標送水温度」)が含まれる。 FIG. 2 is a block configuration diagram of the control device 30 according to the present embodiment. The control device 30 includes an information management unit 31, a number control unit 32, an increase / decrease stage control unit 33, an operation control unit 34, and a storage unit 35. The components not used in the description of the present embodiment are omitted from the drawings. The information management unit 31 manages the information by receiving various information including data sent from the heat source system and storing the information in the storage unit 35. The received data includes the temperature detected by each thermometer 12 to 16, particularly the water supply temperature detected by the thermometer 16 and the temperature of the cold / hot water passing through the load 1 detected by the thermometer 15 (hereinafter, "return water"). Temperature ") is included. In addition, the water supply temperature required from the load side (hereinafter, "target water supply temperature") and the return water temperature required from the load side (hereinafter, "target water supply temperature") are included.

台数制御部32は、情報管理部31が取得したデータを参照して熱源機2の運転台数を決定する台数制御を行う。台数制御部32が実施する台数制御は、熱量台数制御や流量台数制御等従前から行われている台数制御を行えばよい。なお、熱量台数制御とは、熱源側で作成される熱量が負荷側の消費熱量を上回るように、熱源側の熱源機2の運転台数を決定する制御方法である。一方、流量台数制御とは、負荷側の必要とする流量を上回るように熱源側の熱源機2の運転台数を決定する制御方法である。 The number control unit 32 controls the number of units to determine the number of operating units of the heat source machine 2 with reference to the data acquired by the information management unit 31. The number control performed by the number control unit 32 may be the number control that has been conventionally performed such as calorific value control and flow rate control. The calorific value control is a control method for determining the number of operating heat source machines 2 on the heat source side so that the heat generated on the heat source side exceeds the heat consumption on the load side. On the other hand, the flow rate number control is a control method for determining the number of operating heat source machines 2 on the heat source side so as to exceed the flow rate required on the load side.

増減段制御部33は、情報管理部31が取得したデータを参照して台数制御部32が決定した熱源機2の運転台数を送水温度及び環水温度に基づいて増加若しくは減少させる熱源機2の台数を決定する。増減段制御部33は、要求度取得部331及び増減台数設定部332を含む。要求度取得部331は、送水温度と目標送水温度との差異を解消するのに要求される熱源機2の能力を示す要求度であって送水温度の変化に応じて連続的に変化する要求度を取得する第1取得手段として機能する。更に、還水温度と目標還水温度との差異を解消するのに要求される熱源機2の能力を示す要求度であって還水温度の変化に応じて連続的に変化する要求度を取得する第2取得手段として機能する。増減台数設定部332は、要求度取得部331により各要求度が取得されると、その取得された要求度の合計値に基づき熱源機2の増減台数を設定する設定手段として機能する。 The increase / decrease stage control unit 33 increases or decreases the number of operating heat source machines 2 determined by the number control unit 32 with reference to the data acquired by the information management unit 31 based on the water supply temperature and the ring water temperature. Determine the number of units. The increase / decrease stage control unit 33 includes a request degree acquisition unit 331 and an increase / decrease number setting unit 332. The requirement acquisition unit 331 is a requirement indicating the ability of the heat source machine 2 required to eliminate the difference between the water supply temperature and the target water supply temperature, and is a requirement level that continuously changes according to a change in the water supply temperature. Functions as a first acquisition means for acquiring. Furthermore, the requirement level indicating the ability of the heat source machine 2 required to eliminate the difference between the return water temperature and the target return water temperature, which changes continuously according to the change in the return water temperature, is acquired. It functions as a second acquisition means. When each requirement is acquired by the requirement acquisition unit 331, the increase / decrease number setting unit 332 functions as a setting means for setting the increase / decrease number of the heat source machine 2 based on the total value of the acquired requirements.

運転制御部34は、台数制御部32が決定する熱源機2の運転台数を増減台数設定部332が設定する増減台数で補正し、その補正後の熱源機2の運転台数に応じて熱源機2の運転を制御する。 The operation control unit 34 corrects the number of operating heat source machines 2 determined by the number control unit 32 by the increase / decrease number set by the increase / decrease number setting unit 332, and the heat source machine 2 is corrected according to the corrected number of operating heat source machines 2. Control the operation of.

記憶部35には、前述したように情報管理部31が取得する各種情報が保存される。本実施の形態では、情報の記憶手段として便宜的に1つの記憶部35のみを図示したが、情報の種類や使用目的等に応じて情報を適宜分類して保存するように構成してもよい。 As described above, the storage unit 35 stores various information acquired by the information management unit 31. In the present embodiment, only one storage unit 35 is shown for convenience as a means of storing information, but the information may be appropriately classified and stored according to the type of information, the purpose of use, and the like. ..

制御装置30における各構成要素31〜34は、制御装置30を形成するコンピュータと、コンピュータに搭載されたCPUで動作するプログラムとの協調動作により実現される。また、記憶部35は、制御装置30に搭載されたHDDにて実現される。あるいは、RAM又は外部にある記憶手段をネットワーク経由で利用してもよい。 Each component 31 to 34 in the control device 30 is realized by a cooperative operation of a computer forming the control device 30 and a program operated by a CPU mounted on the computer. Further, the storage unit 35 is realized by the HDD mounted on the control device 30. Alternatively, RAM or an external storage means may be used via the network.

また、本実施の形態で用いるプログラムは、通信手段により提供することはもちろん、CD−ROMやUSBメモリ等のコンピュータ読み取り可能な記録媒体に格納して提供することも可能である。通信手段や記録媒体から提供されたプログラムは制御装置30にインストールされ、制御装置30のCPUがプログラムを順次実行することで各種処理が実現される。 Further, the program used in the present embodiment can be provided not only by communication means but also by storing it in a computer-readable recording medium such as a CD-ROM or a USB memory. The programs provided by the communication means and the recording medium are installed in the control device 30, and various processes are realized by sequentially executing the programs by the CPU of the control device 30.

次に、本実施の形態における制御装置30の動作について、特に増減段制御部33が実施する増減段制御処理について図3に示すフローチャートを用いて説明する。なお、台数制御部32は、ここで説明する増減段制御処理とは独立して台数制御処理を実行して熱源機2の運転台数を決定している。 Next, the operation of the control device 30 in the present embodiment will be described with reference to the flow chart shown in FIG. 3 regarding the increase / decrease stage control process performed by the increase / decrease stage control unit 33. The number control unit 32 executes the number control process independently of the increase / decrease stage control process described here to determine the number of operating units of the heat source machine 2.

図3に示すように、増減段制御部33は、起動されると制御の停止を指示されない限り、以下の説明する処理(ステップ101〜116)を繰り返し処理する。まず、増減段制御部33は、増段用のタイマと減段用のタイマとをそれぞれ利用するが、処理の開始に伴い各タイマをリセットする(ステップ101)。 As shown in FIG. 3, the increase / decrease stage control unit 33 repeats the following processes (steps 101 to 116) unless it is instructed to stop the control when it is started. First, the increase / decrease stage control unit 33 uses the timer for increasing the stage and the timer for decreasing the stage, respectively, and resets each timer with the start of the process (step 101).

続いて、要求度取得部331は、情報管理部31から送水温度を取得すると、次のようにして送水温度による要求度を取得する(ステップ102)。 Subsequently, when the demand degree acquisition unit 331 acquires the water supply temperature from the information management unit 31, the demand degree acquisition unit 331 acquires the demand degree based on the water supply temperature as follows (step 102).

図4は、本実施の形態において送水温度と要求度との関係をグラフ形式にて示す図である。図4は、負荷(AHU)1が暖房運転時におけるグラフである。冷房運転時の場合、図5に示すように傾きが逆になる。送水温度における設定値は、代表的には目標送水温度である。本実施の形態においても目標送水温度が設定されているものとして説明する。 FIG. 4 is a graph showing the relationship between the water supply temperature and the required degree in the present embodiment. FIG. 4 is a graph when the load (AHU) 1 is in the heating operation. In the case of cooling operation, the inclination is reversed as shown in FIG. The set value at the water supply temperature is typically the target water supply temperature. It will be described as assuming that the target water supply temperature is set also in this embodiment.

送水温度のみに着目した場合、送水温度が目標送水温度に一致している場合には、送水温度と目標送水温度とに差異はないのだから、その差異を解消するために台数制御により決定された熱源機2の運転台数を増減させる必要はない。つまり、熱源機2の運転台数を増減させる必要はなく、この場合の要求度を0とする。図4において送水温度の設定値に対応する要求度は0となっているが、図4では、このことを示している。 When focusing only on the water supply temperature, if the water supply temperature matches the target water supply temperature, there is no difference between the water supply temperature and the target water supply temperature. It is not necessary to increase or decrease the number of heat source machines 2 in operation. That is, it is not necessary to increase or decrease the number of heat source machines 2 in operation, and the degree of demand in this case is set to 0. In FIG. 4, the degree of requirement corresponding to the set value of the water supply temperature is 0, and FIG. 4 shows this.

ここで、仮に温度計16により測定された送水温度(以下、「実測送水温度」)が設定値より高い場合、暖房運転では、熱源機2の運転台数を減らして熱源機2全体における発熱能力(熱量)を抑えることによって送水温度を下降させ、実測送水温度が設定値(目標送水温度)に近づくよう送水温度を制御することが好ましい。従って、図4において実測送水温度が設定値より大きい値(T1)になると、要求度は熱源機2の運転台数を減らしたいことを意味する0より小さい負の値(R1)になる。 Here, if the water supply temperature measured by the thermometer 16 (hereinafter, “measured water supply temperature”) is higher than the set value, the number of heat source machines 2 in operation is reduced in the heating operation to reduce the heat generation capacity of the entire heat source machine 2 (hereinafter, “measured water supply temperature”). It is preferable to lower the water supply temperature by suppressing the amount of heat) and control the water supply temperature so that the measured water supply temperature approaches the set value (target water supply temperature). Therefore, when the actually measured water supply temperature becomes a value (T1) larger than the set value in FIG. 4, the required degree becomes a negative value (R1) smaller than 0, which means that the number of operating heat source machines 2 is to be reduced.

この逆に、温度計16による実測送水温度が設定値より低い場合、暖房運転では、熱源機2の運転台数を増やすことで熱源機2全体における発熱能力を向上させて送水温度を上昇させ、実測送水温度が設定値(目標送水温度)に近づくよう送水温度を制御することが好ましい。従って、図4において実測送水温度が設定値より小さい値(T2)になると、要求度は運転台数を増やしたいことを意味する0より大きい正の値(R2)になる。 On the contrary, when the actual water supply temperature measured by the thermometer 16 is lower than the set value, in the heating operation, the heat generation capacity of the entire heat source machine 2 is improved by increasing the number of operating heat source machines 2 to raise the water supply temperature, and the actual measurement is performed. It is preferable to control the water supply temperature so that the water supply temperature approaches the set value (target water supply temperature). Therefore, when the measured water supply temperature becomes a value (T2) smaller than the set value in FIG. 4, the required degree becomes a positive value (R2) larger than 0, which means that the number of operating units is desired to be increased.

ここで、本実施の形態において特徴的なことは、熱源機2に要求する能力を、±1台、±2台という熱源機2の台数で表すのではなく、要求度という指標にて表すようにしたことである。もちろん、最終的には熱源機2の台数で増減段数(「増減台数」と同義)を示すことになるが、最終的な増減段数を求める過程においては要求度を用いるようにした。このために、本実施の形態においては、図4に示すように送水温度の変化に応じて連続的に変化する要求度が得られるようにした。なお、図4において上下限(±300%)近傍に示すように要求度が変化しない部分を持たせてもよい。 Here, what is characteristic of this embodiment is that the capacity required for the heat source machine 2 is not expressed by the number of heat source machines 2 such as ± 1 and ± 2, but is expressed by an index called the degree of requirement. That's what I did. Of course, in the end, the number of heat source machines 2 indicates the number of stages of increase / decrease (synonymous with the number of units of increase / decrease), but the degree of requirement is used in the process of obtaining the final number of stages of increase / decrease. Therefore, in the present embodiment, as shown in FIG. 4, it is possible to obtain a requirement that continuously changes according to a change in the water supply temperature. As shown in the vicinity of the upper and lower limits (± 300%) in FIG. 4, a portion where the degree of requirement does not change may be provided.

送水温度と要求度の関係は、送水温度の変化に応じて要求度が連続的に変化するような関係であればよい。なお、本実施の形態では、要求度を整数とする。図4では、送水温度と要求度が比例関係(図4においては負の比例関係)にある場合を例にして説明したが、送水温度の上昇に伴い要求度が漸減すればよいので、図4に例示したように直線的な変化(単調減少)ではなく曲線的に変化するようにしてもよい。あるいは、数多くの段数とすれば、階段状に変化するようにしてもよい。 The relationship between the water supply temperature and the required degree may be such that the required degree continuously changes according to the change in the water supply temperature. In this embodiment, the degree of requirement is an integer. In FIG. 4, the case where the water supply temperature and the required degree are in a proportional relationship (negative proportional relationship in FIG. 4) has been described as an example, but since the required degree may be gradually reduced as the water supply temperature rises, FIG. As illustrated in the above, the change may be curved rather than linear (monotonic decrease). Alternatively, if the number of steps is large, the number of steps may be changed in a stepped manner.

本実施の形態では、要求度が±100%の場合は1台の熱源機2の増減段を、要求度が±200%の場合は2台の熱源機2の増減段を、それぞれ要求することを想定している。従って、図4では、要求度の取り得る範囲が±300%の場合を図示しているので、増減段数が最大±3台の場合に対応可能なグラフであるが、要求度の取り得る範囲は、熱源機2の設置台数に応じて適宜設定すればよい。以下に説明する還水温度と要求度の関係においても同様である。 In the present embodiment, when the demand level is ± 100%, one heat source machine 2 increase / decrease stage is requested, and when the demand level is ± 200%, two heat source machine 2 increase / decrease stages are requested. Is assumed. Therefore, in FIG. 4, since the case where the required degree can be taken is ± 300%, it is a graph that can correspond to the case where the maximum number of stages of increase / decrease is ± 3, but the possible range of the required degree is , It may be set appropriately according to the number of installed heat source machines 2. The same applies to the relationship between the return water temperature and the degree of requirement described below.

続いて、要求度取得部331は、情報管理部31から還水温度を取得すると、次のようにして還水温度による要求度を取得する(ステップ103)。 Subsequently, when the demand degree acquisition unit 331 acquires the return water temperature from the information management unit 31, the demand degree acquisition unit 331 acquires the demand degree based on the return water temperature as follows (step 103).

図5は、本実施の形態において還水温度と要求度との関係をグラフ形式にて示す図である。図5は、負荷(AHU)1が暖房運転時におけるグラフである。冷房運転時の場合には、図4に示すように傾きが逆になる。還水温度における設定値は、代表的には目標還水温度である。本実施の形態においても目標還水温度が設定されているものとして説明する。 FIG. 5 is a graph showing the relationship between the return water temperature and the required degree in the present embodiment. FIG. 5 is a graph when the load (AHU) 1 is in the heating operation. In the case of cooling operation, the inclination is reversed as shown in FIG. The set value at the return water temperature is typically the target return water temperature. It is assumed that the target return water temperature is set also in this embodiment.

還水温度のみに着目した場合、還水温度が目標還水温度に一致している場合には、還水温度と目標還水温度とに差異はないのだから、その差異を解消するために台数制御により決定された熱源機2の運転台数を増減させる必要はない。つまり、熱源機2の運転台数を増減させる必要はなく、この場合の要求度を0とする。図5において還水温度の設定値に対応する要求度は0となっているが、図5では、このことを示している。 When focusing only on the return water temperature, if the return water temperature matches the target return water temperature, there is no difference between the return water temperature and the target return water temperature. It is not necessary to increase or decrease the number of operating heat source machines 2 determined by control. That is, it is not necessary to increase or decrease the number of heat source machines 2 in operation, and the degree of demand in this case is set to 0. In FIG. 5, the degree of requirement corresponding to the set value of the return water temperature is 0, which is shown in FIG.

ここで、仮に温度計15により測定された還水温度(以下、「実測還水温度」)が設定値より高い場合、暖房運転では、負荷1に供給する流量が不足したことが原因と判断する。すなわち、熱源機2の運転台数を増やすことで熱源機2全体における冷温水の出水能力を向上させて負荷1に供給する流量を増やし、実測還水温度が設定値(目標還水温度)に近づくよう還水温度を制御することが好ましい。従って、図5において実測還水温度が設定値より大きい値(T3)になると、要求度は運転台数を増やしたいことを意味する0より大きい正の値(R3)になる。 Here, if the return water temperature measured by the thermometer 15 (hereinafter, “measured return water temperature”) is higher than the set value, it is determined that the cause is that the flow rate supplied to the load 1 is insufficient in the heating operation. .. That is, by increasing the number of operating heat source machines 2, the discharge capacity of cold and hot water in the entire heat source machine 2 is improved, the flow rate supplied to the load 1 is increased, and the measured return water temperature approaches the set value (target return water temperature). It is preferable to control the return water temperature. Therefore, when the measured return water temperature becomes a value (T3) larger than the set value in FIG. 5, the required degree becomes a positive value (R3) larger than 0, which means that the number of operating units is desired to be increased.

この逆に、温度計15による実測還水温度が設定値より低い場合、暖房運転では、負荷1に供給する流量が過剰であったことが原因と判断する。すなわち、熱源機2の運転台数を減らして熱源機2全体における冷温水の出水能力を低下させて負荷1に供給する流量を減らし、実測還水温度が設定値(目標還水温度)に近づくよう還水温度を制御することが好ましい。従って、図5において実測還水温度が設定値より小さい値(T4)になると、要求度は運転台数を減らしたいことを意味する0より小さい負の値(R4)になる。 On the contrary, when the actual return water temperature measured by the thermometer 15 is lower than the set value, it is determined that the cause is that the flow rate supplied to the load 1 is excessive in the heating operation. That is, the number of operating heat source machines 2 is reduced to reduce the discharge capacity of cold and hot water in the entire heat source machine 2 to reduce the flow rate supplied to the load 1 so that the measured return water temperature approaches the set value (target return water temperature). It is preferable to control the return water temperature. Therefore, when the measured return water temperature becomes a value smaller than the set value (T4) in FIG. 5, the required degree becomes a negative value (R4) smaller than 0, which means that the number of operating units is to be reduced.

なお、環水温度と要求度の関係に関しては、図4を用いて説明した送水温度と要求度の関係と同様に、還水温度と要求度の関係は、還水温度の変化に応じて要求度が連続的に変化するような関係であればよい。図5では、還水温度と要求度が比例関係(図5においては正の比例関係)にある場合を例にして説明したが、還水温度の上昇に伴い要求度が漸増すればよいので、図5に例示したように直線的な変化(単調増加)ではなく曲線的に変化するようにしてもよい。あるいは、数多くの段数とすれば、階段状に変化するようにしてもよい。 Regarding the relationship between the ring water temperature and the required degree, the relationship between the return water temperature and the required degree is required according to the change in the returned water temperature, similar to the relationship between the water supply temperature and the required degree explained with reference to FIG. The relationship may be such that the degree changes continuously. In FIG. 5, the case where the return water temperature and the required degree are in a proportional relationship (positive proportional relationship in FIG. 5) has been described as an example, but the required degree may be gradually increased as the returned water temperature rises. As illustrated in FIG. 5, the change may be curved rather than linear (monotonic increase). Alternatively, if the number of steps is large, the number of steps may be changed in a stepped manner.

要求度取得部331は、以上のようにして送水温度及び還水温度それぞれから要求度を取得するが、図4(図5)に示す送水温度(還水温度)と要求度の関係を示す情報は、増減段制御部33又は制御装置30の内部に保持してもよいし、必要時に制御装置30の外部にある情報を参照するように構成してもよい。また、本実施の形態では、送水温度による要求度を先に取得するようにしたが、還水温度による要求度を先に取得するようにしてもよい。 The demand degree acquisition unit 331 acquires the demand degree from each of the water supply temperature and the return water temperature as described above, and the information showing the relationship between the water supply temperature (return water temperature) and the demand degree shown in FIG. 4 (FIG. 5). May be held inside the increase / decrease stage control unit 33 or the control device 30, or may be configured to refer to information outside the control device 30 when necessary. Further, in the present embodiment, the required degree based on the water supply temperature is acquired first, but the required degree based on the return water temperature may be acquired first.

以上のようにして、要求度取得部331により各要求度が取得されると、増減段制御部33は、各要求度の合計値(以下、「合計要求度」)を算出し(ステップ104)、その合計要求度を一時保持する(ステップ105)。 When each requirement is acquired by the requirement acquisition unit 331 as described above, the increase / decrease stage control unit 33 calculates the total value of each requirement (hereinafter, “total requirement”) (step 104). , The total demand is temporarily retained (step 105).

ところで、ステップ102,103において、仮に、送水温度及び環水温度に対して前述した要求度ではなくそれぞれ熱源機2の増減段数(±1台、±2台という熱源機2の台数)を求めるとする。例えば、送水温度に基づく熱源機2の増減段数の算出値は、0台と1台の中間当たりだが0台若しくは1台に振り分けるとするならば1台増加が得られたとする。また、環水温度に基づく熱源機2の増減段数は、0台と1台の中間当たりだが0台若しくは1台に振り分けるとするならば1台増加が得られたとする。すなわち、送水温度及び環水温度それぞれに基づき得られる増減段数は、増加する台数を合算することで熱源機2の2台増加となる。しかしながら、それぞれにおいて0台と1台の中間当たりというのであれば、送水温度に基づく増減段数と環水温度に基づく増減段数とを合算して1台と計上するのが好ましいと考えられる。本実施の形態においては、このような場合を考慮して送水温度による要求度と環水温度による要求度の合計値(合計要求度)を求めるようにした。これにより、過剰な熱源機2の増加若しくは減少を回避することができるため、ハンチングの防止を図ることができる。 By the way, in steps 102 and 103, if the number of stages of increase / decrease of the heat source machine 2 (the number of heat source machines 2 of ± 1 and ± 2) is obtained instead of the above-mentioned requirements for the water supply temperature and the ring water temperature, respectively. do. For example, the calculated value of the number of stages of increase / decrease of the heat source machine 2 based on the water supply temperature is between 0 and 1 unit, but if it is distributed to 0 or 1 unit, it is assumed that an increase of 1 unit is obtained. Further, it is assumed that the number of stages of increase / decrease of the heat source machine 2 based on the ring water temperature is between 0 and 1 unit, but if it is distributed to 0 or 1 unit, an increase of 1 unit is obtained. That is, the number of increment / decrement stages obtained based on each of the water supply temperature and the ring water temperature is increased by 2 units of the heat source unit 2 by adding up the increasing number of units. However, if it is between 0 and 1 in each case, it is preferable to add up the number of stages of increase / decrease based on the water supply temperature and the number of stages of increase / decrease based on the ring water temperature and count it as 1 unit. In the present embodiment, in consideration of such a case, the total value (total requirement) of the requirement based on the water supply temperature and the requirement based on the ring water temperature is obtained. As a result, it is possible to avoid an excessive increase or decrease in the heat source machine 2, so that hunting can be prevented.

合計要求度がプラスの場合、熱源機2を増段させる、すなわち熱源機2の運転台数を増やすことを意味する。その一方、合計要求度がマイナスの場合、熱源機2を減段させる、すなわち熱源機2の運転台数を減らすことを意味する。なお、各要求度を合計することによって送水温度による要求度はプラスでも還水温度による要求度がマイナスであることからその合計値がマイナスになることがあり得る。 When the total requirement is positive, it means that the number of heat source machines 2 is increased, that is, the number of operating heat source machines 2 is increased. On the other hand, when the total requirement is negative, it means that the number of heat source machines 2 is reduced, that is, the number of operating heat source machines 2 is reduced. By summing each requirement, even if the requirement due to the water supply temperature is positive, the requirement due to the return water temperature is negative, so that the total value may be negative.

ここで、合計要求度がプラスの場合(ステップ106でY)、増減段制御部33は、ステップ105において一時保持しておいた直前の合計要求度を参照し、直前の合計要求度がプラス、すなわち直前も増段を示していたかどうかを確認する。ここで、直前の合計要求度が増段を示していない場合(ステップ107でN)、増段タイマによる計時を開始する(ステップ108)。そして、直前では減段を示している場合を想定して減段タイマによる計時を停止し0にリセットする(ステップ109)。一方、直前の合計要求度が増段を示している場合(ステップ107でY)、増減段制御部33は、増段タイマが所定時間、例えば10分に達したかどうかを確認する。所定時間経過していない場合(ステップ110でN)、ステップ102に戻る。なお、所定時間に達したということは、ステップ102〜106,107,110の処理を所定時間繰り返し実行したことを意味する。 Here, when the total demand is positive (Y in step 106), the increase / decrease stage control unit 33 refers to the total demand immediately before being temporarily held in step 105, and the total demand immediately before is positive. That is, it is confirmed whether or not the step has been increased immediately before. Here, when the total demand immediately before does not indicate the step increase (N in step 107), the time counting by the step increase timer is started (step 108). Then, assuming that the step reduction is indicated immediately before, the time counting by the step reduction timer is stopped and reset to 0 (step 109). On the other hand, when the total demand immediately before indicates an increase in stage (Y in step 107), the increase / decrease stage control unit 33 confirms whether or not the stage increase timer has reached a predetermined time, for example, 10 minutes. If the predetermined time has not elapsed (N in step 110), the process returns to step 102. The fact that the predetermined time has been reached means that the processes of steps 102 to 106, 107 and 110 have been repeatedly executed for a predetermined time.

合計要求度がプラスでない場合(ステップ106でN)、この場合、合計要求度はマイナス又は0のいずれかであるが、0の場合(ステップ111でN)、増減段制御部33は、熱源機2の運転台数の増減段を要求しないものとしてステップ101に戻る。この場合、運転制御部34は、台数制御部32が決定した運転台数に従って熱源機2の運転を制御することになる。合計要求度がマイナスの場合(ステップ111でY)、増減段制御部33は、合計要求度がプラスの場合と同様に処理する。すなわち、増減段制御部33は、ステップ105において一時保持しておいた直前の合計要求度を参照し、直前の合計要求度がマイナス、すなわち直前も減段を示していたかどうかを確認する。直前の合計要求度が減段を示していない場合(ステップ112でN)、減段タイマによる計時を開始する(ステップ113)。そして、直前では増段を示している場合を想定して増段タイマによる計時を停止し0にリセットする(ステップ114)。一方、直前の合計要求度が減段を示している場合(ステップ112でY)、増減段制御部33は、減段タイマが所定時間、例えば10分に達したかどうかを確認する。所定時間経過していない場合(ステップ110でN)、ステップ102に戻る。なお、合計要求度がマイナスの場合において所定時間に達したということは、ステップ102〜106,111,112、110の処理を所定時間繰り返し実行したことを意味する。 If the total requirement is not positive (N in step 106), in this case the total requirement is either negative or 0, but if it is 0 (N in step 111), the increase / decrease stage control unit 33 is a heat source machine. The process returns to step 101 assuming that the step of increasing / decreasing the number of operating units in 2 is not required. In this case, the operation control unit 34 controls the operation of the heat source machine 2 according to the number of operations determined by the number control unit 32. When the total demand is negative (Y in step 111), the increase / decrease stage control unit 33 processes in the same manner as when the total demand is positive. That is, the increase / decrease stage control unit 33 refers to the total demand level immediately before being temporarily held in step 105, and confirms whether the total demand level immediately before is negative, that is, whether or not the stage is also reduced immediately before. If the previous total requirement does not indicate step reduction (N in step 112), the time counting by the step reduction timer is started (step 113). Then, assuming that the stage increase is indicated immediately before, the time counting by the stage increase timer is stopped and reset to 0 (step 114). On the other hand, when the total demand immediately before indicates a step reduction (Y in step 112), the step reduction timer 33 confirms whether or not the step reduction timer has reached a predetermined time, for example, 10 minutes. If the predetermined time has not elapsed (N in step 110), the process returns to step 102. When the total requirement is negative, the fact that the predetermined time is reached means that the processes of steps 102 to 106, 111, 112, and 110 are repeatedly executed for the predetermined time.

本実施の形態においては、前述したように合計要求度が増段若しくは減段を示したからといって熱源機2の運転台数を即座に増減段させずに、所定時間(例えば10分間)継続して増段若しくは減段を示した場合に増段若しくは減段するようにした。これにより、ハンチングの防止を図ることができる。 In the present embodiment, even if the total required degree indicates an increase or decrease as described above, the number of operating heat source machines 2 is not immediately increased or decreased, and is continued for a predetermined time (for example, 10 minutes). When the stage is increased or decreased, the stage is increased or decreased. As a result, hunting can be prevented.

合計要求度が増段若しくは減段を所定時間継続した場合(ステップ110でY)、増減台数設定部332は、合計要求度に基づき熱源機2の増減台数を次のようにして設定する(ステップ115)。 When the total required degree continues to increase or decrease for a predetermined time (Y in step 110), the increase / decrease number setting unit 332 sets the increase / decrease number of the heat source machine 2 based on the total required degree as follows (step). 115).

図6は、本実施の形態において合計要求度と運転させる熱源機2の増減台数との関係を示す台数増減情報をグラフ形式にて示す図である。図6に示す台数増減情報は、増減台数設定部332又は制御装置30の内部に保持してもよいし、必要時に制御装置30の外部にある情報を参照するように構成してもよい。図6に示すグラフにおいて、横軸は合計要求度であり、縦軸は増減台数である。増減台数設定部332は、図6に示す合計要求度と増減台数との関係を参照して、合計要求度に対応する増減台数を取得する。例えば、合計要求度が−50から+50の範囲の場合、増減台数設定部332は、増減台数を0台と設定する。合計要求度が−51から−75までの範囲の場合、増減台数設定部332は、増減台数を−1台と設定する。これは、運転中の熱源機2を1台停止させることを意味する。合計要求度が+51から+75までの範囲の場合、増減台数設定部332は、増減台数を+1台と設定する。これは、停止中の熱源機2を1台起動させ運転を開始させることを意味する。そして、合計要求度が−76以下の場合の増減台数は−2台と、合計要求度が+76以上の場合の増減台数は+2台と、それぞれ設定する。なお、図6では、増減可能な台数を±2台としたが、これは一例であって実際の熱源機2の設置台数に応じて台数増減情報を用意すればよい。 FIG. 6 is a graph showing the number increase / decrease information showing the relationship between the total required degree and the increase / decrease number of the heat source machines 2 to be operated in the present embodiment. The number increase / decrease information shown in FIG. 6 may be held inside the increase / decrease number setting unit 332 or the control device 30, or may be configured to refer to information outside the control device 30 when necessary. In the graph shown in FIG. 6, the horizontal axis represents the total demand, and the vertical axis represents the increase / decrease in the number of units. The increase / decrease number setting unit 332 acquires the increase / decrease number corresponding to the total request degree by referring to the relationship between the total request degree and the increase / decrease number shown in FIG. For example, when the total demand is in the range of -50 to +50, the increase / decrease number setting unit 332 sets the increase / decrease number to 0. When the total demand is in the range of -51 to -75, the increase / decrease number setting unit 332 sets the increase / decrease number to -1. This means that one heat source machine 2 in operation is stopped. When the total demand is in the range of +51 to +75, the increase / decrease number setting unit 332 sets the increase / decrease number to +1. This means that one of the stopped heat source machines 2 is started and the operation is started. Then, when the total demand level is −76 or less, the increase / decrease number is set to -2, and when the total request level is +76 or more, the increase / decrease number is set to +2. In FIG. 6, the number of units that can be increased or decreased is ± 2, but this is just an example, and information on the increase or decrease of the number of units may be prepared according to the actual number of installed heat source machines 2.

本実施の形態では、増減台数を切り替える合計要求度の閾値として±51、±76を設定した例を示しているが、この数値は一例だってこれに限る必要はない。ただ、本実施の形態では、図6に例示したように閾値の幅を一定にするのではなく、増減台数が0台とする幅を相対的に大きくすることでハンチング防止を図り、要求度が0から離れるに連れ閾値の幅が小さくなるように設定するようにした。 In the present embodiment, an example in which ± 51 and ± 76 are set as the threshold values of the total demand for switching the number of units to be increased or decreased is shown, but this numerical value is not limited to this as an example. However, in the present embodiment, instead of keeping the threshold width constant as illustrated in FIG. 6, hunting is prevented by relatively increasing the width at which the number of units increased or decreased to 0, and the degree of demand is increased. The threshold width is set to decrease as the distance from 0 increases.

なお、本実施の形態では、熱源機2の増減台数の設定に用いる合計要求度は最新値、すなわち合計要求度がプラス若しくはマイナスとなってから所定時間経過した時点の合計要求度を用いるようにした。ただ、これに限らず、例えば所定時間内において一時保持された合計要求度の平均値、中央値、最大値等を用いてもよい。 In the present embodiment, the total requirement used for setting the increase / decrease number of the heat source machine 2 is the latest value, that is, the total requirement when a predetermined time elapses after the total requirement becomes positive or negative. bottom. However, the present invention is not limited to this, and for example, the average value, the median value, the maximum value, or the like of the total requiredness temporarily held within a predetermined time may be used.

また、本実施の形態では、所定時間(上記例の10分)が経過した時点で熱源機2の後増減台数を求めるようにした。ただ、例えば、プラスを示す合計要求度が0に収束するように遷移している場合、更なる時間の経過により熱源機2の運転台数を増加させなくてよくなる可能性がある。本実施の形態においては、この合計要求度の遷移を観察するためにも所定時間を設定しているが、時間の経過だけでなく合計要求度の遷移を参照して、熱源機2の運転台数を増減させるかどうかを判断するようにしてもよい。 Further, in the present embodiment, when a predetermined time (10 minutes in the above example) has elapsed, the number of units to be increased or decreased after the heat source machine 2 is obtained. However, for example, when the total requirement indicating a plus has transitioned to converge to 0, there is a possibility that the number of operating heat source machines 2 does not need to be increased with the passage of further time. In the present embodiment, a predetermined time is set to observe the transition of the total demand, but the number of operating units of the heat source machine 2 is referred to not only with the passage of time but also with the transition of the total demand. You may decide whether to increase or decrease.

以上のようにして増減台数設定部332が熱源機2の増減台数を設定すると、運転制御部34は、台数制御部32が決定した熱源機2の運転台数を、増減台数設定部332が設定した熱源機2の増減台数で補正する(ステップ116)。そして、運転制御部34は、補正後の熱源機2の運転台数に応じて熱源機2の運転を制御することになる。なお、熱源機2の運転制御は、従前と同じ手法で行えばよいので説明を省略する。 When the increase / decrease number setting unit 332 sets the increase / decrease number of the heat source machine 2 as described above, the operation control unit 34 sets the operation number of the heat source machine 2 determined by the number control unit 32 by the increase / decrease number setting unit 332. This is corrected by increasing or decreasing the number of heat source machines 2 (step 116). Then, the operation control unit 34 controls the operation of the heat source machine 2 according to the number of operating heat source machines 2 after the correction. Since the operation control of the heat source machine 2 may be performed by the same method as before, the description thereof will be omitted.

以上説明したように、本実施の形態では、実測送水温度と目標送水温度との差及び実測還水温度と目標還水温度との差に基づき熱源機2に対する要求度(合計要求度)を算出し、この要求度に応じて熱源機2の増減台数を求めるようにした。このように、実測値と目標値との差から熱源機2の増減台数を直接求めるのではなく、送水温度に基づく要求度と還水温度に基づく要求度とを合算した要求度から熱源機2の増減台数を求めるようにしたので、過剰な熱源機2の運転台数の増減を抑えることができ、これにより、ハンチング防止効果を向上させることができる。 As described above, in the present embodiment, the requirement (total requirement) for the heat source machine 2 is calculated based on the difference between the measured water supply temperature and the target water supply temperature and the difference between the measured return water temperature and the target return water temperature. Then, the number of heat source machines 2 to be increased or decreased is calculated according to the degree of demand. In this way, instead of directly obtaining the increase / decrease in the number of heat source machines 2 from the difference between the measured value and the target value, the heat source machine 2 is obtained from the total requirement of the requirement based on the water supply temperature and the requirement based on the return water temperature. Since the increase / decrease in the number of units of the heat source unit 2 is obtained, it is possible to suppress an excessive increase / decrease in the number of operating heat source machines 2, and thereby the hunting prevention effect can be improved.

ところで、上記説明では、増減段制御部33は、増減段処理を常時実行するようにし、台数制御部32が決定した熱源機2の運転台数を補正する増減台数を設定できるようにした。ただ、所定の条件に合致する場合にのみ補正できるようにしてもよい。所定の条件として複数の条件を含めるようにしてもよい。例えば、所定の条件として、負荷1を通過した冷温水(還水)の流量が所定の閾値以上となる状態が所定時間継続することを含めてもよい。還水の流量が少ないということは、動作中の負荷(AHU)1の台数が1台など相対的に少ないということである。この場合に増減段制御を実行させても効率的でない。なお、この場合、閾値には、還水の流量が動作中の負荷1が少ないと判断しうる値を設定する。 By the way, in the above description, the increase / decrease stage control unit 33 is made to always execute the increase / decrease stage processing, and the increase / decrease number for correcting the operating number of the heat source machine 2 determined by the number control unit 32 can be set. However, the correction may be made only when a predetermined condition is met. A plurality of conditions may be included as predetermined conditions. For example, as a predetermined condition, a state in which the flow rate of the cold / hot water (returned water) that has passed through the load 1 becomes equal to or higher than a predetermined threshold value may be included for a predetermined time. The fact that the flow rate of the return water is small means that the number of load (AHU) 1 during operation is relatively small, such as one. In this case, it is not efficient to execute the increase / decrease stage control. In this case, the threshold value is set to a value at which it can be determined that the flow rate of the return water is small for the load 1 during operation.

また、所定の条件として、二次ポンプ8が少なくとも1台動作していることを含めてもよい。二次ポンプ8が動作していないときには、負荷1に供給する送水の流量は少ない。送水の流量が少ないということは、動作中の負荷1(AHU)の台数が1台など相対的に少ないということである。 Further, as a predetermined condition, it may be included that at least one secondary pump 8 is operating. When the secondary pump 8 is not operating, the flow rate of the water supply to the load 1 is small. A small flow rate of water supply means that the number of loads 1 (AHU) during operation is relatively small, such as one.

以上の所定の条件が成立しているかどうかは、増減段処理の開始時、例えばステップ102の直前に行うようにしてもよいし、増減台数を求めるステップ115の直前に行うようにしてもよい。また、所定の条件が成立しているときには増減台数を設定するが、増減台数をいったん設定するようになれば、その後、所定の条件が成立しないようになった時点で即座に増減台数の設定を止めるのではなく、所定時間継続して成立しないようになった場合に増減台数の設定を止めるようにしてもよい。 Whether or not the above-mentioned predetermined conditions are satisfied may be determined at the start of the increase / decrease stage processing, for example, immediately before step 102, or immediately before step 115 for obtaining the increase / decrease number of units. In addition, the increase / decrease number is set when the predetermined condition is satisfied, but once the increase / decrease number is set, the increase / decrease number is set immediately when the predetermined condition is not satisfied. Instead of stopping, the setting of the increase / decrease number may be stopped when it is not established continuously for a predetermined time.

1 負荷、2 熱源機、3,4,5,6 ヘッダ、7 ポンプ、8 二次ポンプ、9 送水路、10 還水路、11 連通管、12,13,14,15,16 温度計、17 流量計、18,21 バイパス弁、19 差圧検出器、20 制御弁、30 制御装置、31 情報管理部、32 台数制御部、33 増減段制御部、34 運転制御部、35 記憶部、331 要求度取得部、332 増減台数設定部。
1 load, 2 heat source machine, 3, 4, 5, 6 header, 7 pump, 8 secondary pump, 9 water supply channel, 10 return channel, 11 communication pipe, 12, 13, 14, 15, 16 thermometer, 17 flow rate Total, 18, 21 Bypass valve, 19 Differential pressure detector, 20 Control valve, 30 Control device, 31 Information management unit, 32 Unit control unit, 33 Increase / decrease stage control unit, 34 Operation control unit, 35 Storage unit, 331 Requirement Acquisition unit, 332 increase / decrease number setting unit.

Claims (7)

負荷の状態に応じて前記負荷に冷温水を供給する熱源機の運転台数を決定する台数制御を行う台数制御手段と、
前記負荷に供給される冷温水の送水温度と目標送水温度との差異を解消するのに要求される前記熱源機の能力を示す要求度であって送水温度の変化に応じて連続的に変化する要求度を取得する第1取得手段と、
前記負荷を通過した冷温水の還水温度と目標還水温度との差異を解消するのに要求される前記熱源機の能力を示す要求度であって還水温度の変化に応じて連続的に変化する要求度を取得する第2取得手段と、
前記各取得手段により要求度が取得されると、その取得された要求度の合計値に基づき前記熱源機の増減台数を設定する設定手段と、
前記台数制御手段が決定する前記熱源機の運転台数を前記設定手段が設定する増減台数で補正し、その補正後の前記熱源機の運転台数に応じて前記熱源機の運転を制御する運転制御手段と、
を有することを特徴とする台数制御装置。
A number control means for controlling the number of heat source machines that supply cold / hot water to the load according to the load condition, and a number control means for controlling the number of operating heat source machines.
It is a requirement indicating the capacity of the heat source machine required to eliminate the difference between the water supply temperature of the cold / hot water supplied to the load and the target water supply temperature, and continuously changes according to the change in the water supply temperature. The first acquisition means to acquire the degree of requirement and
It is a requirement indicating the ability of the heat source machine required to eliminate the difference between the return water temperature of the cold / hot water that has passed the load and the target return water temperature, and is continuously corresponding to the change of the return water temperature. A second acquisition method for acquiring changing demands,
When the required degree is acquired by each of the acquired means, the setting means for setting the increase / decrease number of the heat source machines based on the total value of the acquired required degree, and the setting means.
An operation control means that corrects the operating number of the heat source machine determined by the number control means by the increase / decrease number set by the setting means, and controls the operation of the heat source machine according to the corrected operating number of the heat source machine. When,
A unit control device characterized by having.
前記設定手段は、前記熱源機に対する要求度と前記熱源機の増減台数との関係が設定された台数増減情報に基づき前記各取得手段が取得した要求度の合計値に対応する前記熱源機の増減台数を設定することを特徴とする請求項1に記載の台数制御装置。 The setting means increases or decreases the number of heat source machines corresponding to the total value of the requirements acquired by each acquisition means based on the number increase / decrease information in which the relationship between the degree of demand for the heat source machine and the number of increase / decrease units of the heat source unit is set. The number control device according to claim 1, wherein the number of units is set. 前記設定手段は、所定の条件を満たす場合に前記熱源機の増減台数を設定することを特徴とする請求項1に記載の台数制御装置。 The number control device according to claim 1, wherein the setting means sets an increase / decrease in the number of heat source machines when a predetermined condition is satisfied. 前記所定の条件には、前記負荷を通過した冷温水の流量が所定の閾値以上となる状態が所定時間継続することが含まれていることを特徴とする請求項3に記載の台数制御装置。 The number control device according to claim 3, wherein the predetermined condition includes a state in which the flow rate of the cold / hot water passing through the load continues to be equal to or higher than a predetermined threshold value for a predetermined time. 前記設定手段は、前記所定の条件を満たさない状態が所定時間継続した場合、前記熱源機の増減台数の設定を止めることを特徴とする請求項3又は4に記載の台数制御装置。 The number control device according to claim 3 or 4, wherein the setting means stops setting the number of heat source machines to be increased or decreased when the state of not satisfying the predetermined condition continues for a predetermined time. 前記運転制御手段は、前記設定手段が運転させる前記熱源機を増加又は減少させることを所定時間継続して設定するまで前記台数制御手段が決定する前記熱源機の台数を補正しないことを特徴とする請求項1に記載の台数制御装置。 The operation control means is characterized in that the number of the heat source machines determined by the number control means is not corrected until it is continuously set for a predetermined time to increase or decrease the heat source machines operated by the setting means. The number control device according to claim 1. コンピュータを、
負荷の状態に応じて前記負荷に冷温水を供給する熱源機の運転台数を決定する台数制御を行う台数制御手段、
前記負荷に供給される冷温水の送水温度と目標送水温度との差異を解消するのに要求される前記熱源機の能力を示す要求度であって送水温度の変化に応じて連続的に変化する要求度を取得する第1取得手段、
前記負荷を通過した冷温水の還水温度と目標還水温度との差異を解消するのに要求される前記熱源機の能力を示す要求度であって還水温度の変化に応じて連続的に変化する要求度を取得する第2取得手段、
前記各取得手段により要求度が取得されると、その取得された要求度の合計値に基づき前記熱源機の増減台数を設定する設定手段、
前記台数制御手段が決定する前記熱源機の運転台数を前記設定手段が設定する増減台数で補正し、その補正後の前記熱源機の運転台数に応じて前記熱源機の運転を制御する運転制御手段、
として機能させるためのプログラム。
Computer,
A number control means for controlling the number of heat source machines that supply cold / hot water to the load according to the load condition.
It is a requirement indicating the capacity of the heat source machine required to eliminate the difference between the water supply temperature of the cold / hot water supplied to the load and the target water supply temperature, and continuously changes according to the change in the water supply temperature. The first acquisition means to acquire the degree of requirement,
It is a requirement indicating the ability of the heat source machine required to eliminate the difference between the return water temperature of the cold / hot water that has passed the load and the target return water temperature, and is continuously corresponding to the change of the return water temperature. Second acquisition means to acquire changing requirements,
When the required degree is acquired by each of the acquired means, the setting means for setting the increase / decrease number of the heat source machines based on the total value of the acquired required degree,
An operation control means that corrects the operating number of the heat source machine determined by the number control means by the increase / decrease number set by the setting means, and controls the operation of the heat source machine according to the corrected operating number of the heat source machine. ,
A program to function as.
JP2018133112A 2018-07-13 2018-07-13 Unit control device and program Active JP6921039B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018133112A JP6921039B2 (en) 2018-07-13 2018-07-13 Unit control device and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018133112A JP6921039B2 (en) 2018-07-13 2018-07-13 Unit control device and program

Publications (2)

Publication Number Publication Date
JP2020012564A JP2020012564A (en) 2020-01-23
JP6921039B2 true JP6921039B2 (en) 2021-08-18

Family

ID=69170741

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018133112A Active JP6921039B2 (en) 2018-07-13 2018-07-13 Unit control device and program

Country Status (1)

Country Link
JP (1) JP6921039B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3882524B1 (en) * 2020-03-16 2023-11-08 Mitsubishi Electric Corporation Air conditioning system
JP7407070B2 (en) * 2020-05-26 2023-12-28 東京瓦斯株式会社 Refrigerator system
CN113639493B (en) * 2021-08-13 2023-04-14 广东纽恩泰新能源科技发展有限公司 Module control method of low-temperature air source heat pump system
CN119333900B (en) * 2024-10-22 2025-10-17 珠海格力电器股份有限公司 Air conditioning system, control method thereof, controller and computer storage medium

Also Published As

Publication number Publication date
JP2020012564A (en) 2020-01-23

Similar Documents

Publication Publication Date Title
JP6921039B2 (en) Unit control device and program
CN111023433B (en) A multi-line undercooled medium control method, device, storage medium and air conditioning system
CN107036256B (en) Exhaust temperature control method, exhaust temperature control device, and air conditioner
CN108870633B (en) Control method and device of air conditioning system
US10352293B2 (en) Fluid system
JP5515166B2 (en) Heat source system
CN111141075B (en) Air conditioner control method and device, air conditioner and storage medium
JP5951397B2 (en) Air conditioner
JP6288496B2 (en) Heat source machine operation number control device, heat source system, control method and program
CN113432354B (en) Air source heat pump control method and device, air source heat pump and storage medium
WO2009107261A1 (en) Heat-pump hot water apparatus
CN113154638B (en) Method and device for controlling condensation prevention of air conditioner and air conditioner
CN106524582B (en) Compressor load control method and device suitable for water-side parallel air-cooled heat pump unit
CN107664368B (en) Air conditioning system and control method and device for electronic expansion valve thereof
JP3652974B2 (en) Primary pump heat source variable flow rate system
CN108489011B (en) Operation control method and device, air-conditioning water machine system and storage medium
CN104913445A (en) Fan tap position control method, fan tap position control system and air conditioner
JPWO2017158782A1 (en) Heat pump water heater
CN114911158B (en) Steam turbine unit sliding pressure optimization method, device, equipment, and storage medium
JP2010255984A (en) Heat source system operating method and heat source system
CN114963296B (en) Heating equipment control method and control device
CN110186150B (en) Operation control method, control device, air conditioner, and computer-readable storage medium
JP5261153B2 (en) Heat source system
CN110594991A (en) Heating bias flow control method and system for multi-split air conditioner and multi-split air conditioner system
JP2009019842A (en) Water supply control system and water supply control method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200924

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210623

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210629

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210727

R150 Certificate of patent or registration of utility model

Ref document number: 6921039

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250