JP6949690B2 - Floating body mooring method and floating body - Google Patents
Floating body mooring method and floating body Download PDFInfo
- Publication number
- JP6949690B2 JP6949690B2 JP2017232727A JP2017232727A JP6949690B2 JP 6949690 B2 JP6949690 B2 JP 6949690B2 JP 2017232727 A JP2017232727 A JP 2017232727A JP 2017232727 A JP2017232727 A JP 2017232727A JP 6949690 B2 JP6949690 B2 JP 6949690B2
- Authority
- JP
- Japan
- Prior art keywords
- floating body
- chain
- column
- mooring line
- pulling machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/727—Offshore wind turbines
Landscapes
- Wind Motors (AREA)
Description
本発明は、浮体係留方法および浮体に関する。 The present invention relates to a floating body anchored method and floating.
従来、洋上に係留される浮体として、海底の掘削装置が設置される浮遊式の氷海構造物が知られている(特許文献1参照)。浮遊式の氷海構造物は、海底のアンカーに係留索を介して洋上に浮いた状態で係留される。
このような氷海構造物は、例えば探査目的の場合、掘削装置を用いて海底を掘削した後、係留位置を変更し、別の場所にて掘削することとなる。このため、氷海構造物には、一般に、係留索を引き上げる引上げ機と、引上げ機によって引き上げた係留索を格納する格納部とが設けられる。
Conventionally, as a floating body moored at sea, a floating ice-sea structure in which an excavator on the seabed is installed is known (see Patent Document 1). Floating ice-sea structures are moored to anchors on the seabed while floating on the ocean via mooring lines.
For such an ice-sea structure, for example, for exploration purposes, after excavating the seabed using an excavator, the mooring position is changed and the ice-sea structure is excavated at another location. For this reason, the ice-sea structure is generally provided with a pulling machine for pulling up the mooring line and a storage unit for storing the mooring line pulled up by the pulling machine.
ところで、浮体に設置される構造物が風力発電装置などでは浮体に引上げ機を設置しないことがある。これは、浮体の係留位置を後に変更する必要がないので、海象の影響を受けて劣化する動力機械である引上げ機の点検、メンテナンス等の手間を省くためである。この場合には、クレーン船などの作業船によって係留索を引き上げ、その後に係留索を浮体に取り付けることによって、係留索の張力を調整する。
しかし、作業船は、浮体よりも海象の影響を大きく受けて揺れ動く。このため、浮体に設置した引上げ機によって係留索を引き上げる場合と比べて、係留索の引上げ作業可能な海象条件の制約が大きい。従って、海象条件を満たさない日数が増えると係留作業が長期化するおそれがある。
By the way, if the structure installed on the floating body is a wind power generator or the like, the pulling machine may not be installed on the floating body. This is because it is not necessary to change the mooring position of the floating body later, so that it is not necessary to inspect and maintain the pulling machine, which is a power machine that deteriorates due to the influence of sea conditions. In this case, the tension of the mooring line is adjusted by pulling up the mooring line by a work ship such as a crane vessel and then attaching the mooring line to the floating body.
However, the workboat sways under the influence of sea conditions more than the floating body. For this reason, there are more restrictions on the sea conditions under which the mooring line can be pulled up than when the mooring line is pulled up by a pulling machine installed on the floating body. Therefore, if the number of days that do not meet the sea condition is increased, the mooring work may be prolonged.
揺動を抑制する特殊な作業船として、船体姿勢を制御可能な作業船が知られている(特許文献2参照)。この作業船は、船体位置を計測するセンサと、センサから出力された情報に基づいて船体を制御する船体制御機構とを備える(特許文献2参照)。
作業船を利用した場合には、船体姿勢を制御して安定させることで、係留索の引上げ作業を行える海象条件を緩和できる。
As a special work vessel that suppresses rocking, a work vessel capable of controlling the hull attitude is known (see Patent Document 2). This work ship includes a sensor for measuring the hull position and a hull control mechanism for controlling the hull based on the information output from the sensor (see Patent Document 2).
When a work ship is used, the sea conditions for pulling up the mooring line can be relaxed by controlling and stabilizing the hull attitude.
しかし、特許文献2に記載の作業船は、特殊な作業船であるので、前述したセンサ、船体制御機構を備えていない汎用の作業船と比べて、船体数が少なく手配困難である。また、特殊な作業船の利用は、汎用の作業船を利用する場合と比べてコストがかかる。
また、前述した汎用の作業船を用いて係留索を引き上げて浮体に固定する場合には、特許文献2に記載の作業船を用いる場合と比べて、海象条件の制約が大きく、浮体の係留作業が長期化するおそれがある。
However, since the work vessel described in
Further, when the mooring line is pulled up and fixed to the floating body by using the above-mentioned general-purpose work boat, the restrictions on the sea condition are larger than in the case of using the work boat described in
本発明の目的は、特殊な作業船が不要であり、浮体の係留作業の長期化を抑えることができる浮体係留方法および浮体を提供することにある。 An object of the present invention is a special work boats unnecessary to provide a floating body anchored method and floating Ru can be suppressed prolonged floating mooring operations.
本発明の浮体係留方法は、洋上構造物が設置される浮体本体と、前記浮体本体に設置される係留索ガイドと、前記浮体本体のデッキに取外し可能に装着され且つ前記係留索ガイドに掛けられる係留索に接続される引上げ機と、を備える浮体を、洋上に係留する浮体係留方法であって、前記係留索の一端側を海底に配置し、前記係留索の他端側を前記係留索ガイドに掛け渡して前記引上げ機に接続し、前記引上げ機により前記係留索を引き上げて当該係留索の張力を調整し、張力調整後、前記引上げ機を前記浮体本体のデッキ上から取り外すことを特徴とする。 In the floating body mooring method of the present invention, a floating body main body on which an offshore structure is installed, a mooring rope guide installed on the floating body main body, and a detachably attached to the deck of the floating body main body and hung on the mooring rope guide. A floating body mooring method in which a floating body including a pulling machine connected to a mooring line is moored at sea, one end side of the mooring line is arranged on the sea floor, and the other end side of the mooring line is the mooring line guide. The mooring line is pulled up by the pulling machine to adjust the tension of the mooring line, and after the tension is adjusted, the pulling machine is removed from the deck of the floating body main body. do.
本発明の浮体係留方法によれば、クレーン船などの汎用の作業船よりも海象の影響が小さい浮体本体のデッキに装着された引上げ機によって係留索を引き上げることができる。このため、汎用の作業船を用いて係留索を引き上げる場合と比べて、海象条件の制約を緩和でき、海象条件を満たさない日数を減らすことができて、係留作業の長期化を抑えることができる。 According to the floating body mooring method of the present invention, the mooring line can be pulled up by a pulling machine mounted on the deck of the floating body body, which is less affected by sea conditions than a general-purpose work ship such as a crane ship. Therefore, as compared with the case where the mooring line is pulled up using a general-purpose work boat, the restrictions on the sea condition can be relaxed, the number of days when the sea condition is not satisfied can be reduced, and the mooring work can be suppressed from being prolonged. ..
また、船体姿勢を制御する特殊な作業船を用いる必要がないので、この特殊な作業船の手配に時間や手間を要することがなく、また、特殊な作業船の利用によってコストが増すことを抑制できる。 In addition, since it is not necessary to use a special work vessel that controls the attitude of the hull, it does not take time and effort to arrange this special work vessel, and the cost increase due to the use of the special work vessel is suppressed. can.
さらに、係留索を引き上げて張力を調整した後、動力機械である引上げ機を浮体本体のデッキから取り外すことで、洋上における引上げ機の点検、メンテナンス等の手間を省くことができる。 Further, by pulling up the mooring line to adjust the tension and then removing the pulling machine, which is a power machine, from the deck of the floating body body, it is possible to save the trouble of inspection and maintenance of the pulling machine at sea.
本発明の浮体係留方法では、前記浮体の浮体本体は、前記洋上構造物が設置される設置コラムと、前記設置コラムの左舷に配置される左舷コラムと、前記設置コラムの右舷に配置される右舷コラムと、前記左舷コラム、前記右舷コラムおよび前記設置コラムを接続するロワーハルとを備え、前記係留索ガイドは、前記左舷コラムおよび前記右舷コラムにそれぞれ設置され、前記引上げ機は、前記左舷コラムのデッキおよび前記右舷コラムのデッキにそれぞれ取外し可能に装着されており、海底に配置される前記係留索は、仮係留索と、第一係留索と、第二係留索と、第三係留索とによって構成され、前記設置コラムに前記第一係留索を固定し、前記仮係留索を曳船によって牽引して、前記第一係留索を張りつつ前記浮体本体を係留計画位置に配置し、前記浮体本体の配置後、前記左舷コラムにおける前記係留索ガイドに前記第二係留索を掛け渡して前記引上げ機に接続し、当該引上げ機によって前記第二係留索を引き上げ、前記浮体本体の配置後、前記右舷コラムにおける前記係留索ガイドに前記第三係留索を掛け渡して前記引上げ機に接続し、当該引上げ機によって前記第三係留索を引き上げることが好ましい。 In the floating body mooring method of the present invention, the floating body of the floating body is the installation column on which the offshore structure is installed, the left-side column arranged on the left side of the installation column, and the right-side side arranged on the right side of the installation column. The column is provided with a column, a lower hull connecting the left column, the right column and the installation column, the mooring line guide is installed in the left column and the right column, respectively, and the pulling machine is a deck of the left column. The mooring line, which is detachably attached to the deck of the right side column and is arranged on the seabed, is composed of a temporary mooring line, a first mooring line, a second mooring line, and a third mooring line. The first mooring line is fixed to the installation column, the temporary mooring line is towed by a towboat, the floating body body is placed at the mooring planned position while the first mooring line is stretched, and the floating body body is arranged. Later, the second mooring rope is hung on the mooring rope guide in the left-side column to connect to the pulling machine, the second mooring rope is pulled up by the pulling machine, and after the floating body main body is arranged, the right-side column It is preferable that the third mooring rope is hung on the mooring rope guide and connected to the pulling machine, and the third mooring rope is pulled up by the pulling machine.
このような構成によれば、設置コラムに引上げ機を装着することなく浮体を係留でき、風車等の洋上構造物を設置したため引上げ機を設置することができない場合でも浮体を係留することが可能となる。また、設置コラムに引上げ機を装着する場合と比べて、引上げ機を取り外す手間を軽減でき、係留作業期間を短縮できる。 According to such a configuration, the floating body can be moored without attaching the pulling machine to the installation column, and the floating body can be moored even when the pulling machine cannot be installed because the offshore structure such as a wind turbine is installed. Become. Further, as compared with the case where the pulling machine is attached to the installation column, the time and effort for removing the pulling machine can be reduced, and the mooring work period can be shortened.
本発明の浮体は、前述した本発明の浮体係留方法に用いられる浮体であって、洋上構造物が設置される浮体本体と、前記浮体本体に設置される係留索ガイドと、前記係留索ガイドに掛けられる係留索に接続される引上げ機とを備え、前記引上げ機は、前記浮体本体のデッキに取外し可能に装着されることを特徴とする。 The floating body of the present invention is a floating body used in the above-mentioned floating body mooring method of the present invention, and is used on a floating body main body on which an offshore structure is installed, a mooring line guide installed on the floating body main body, and the mooring line guide. It is provided with a pulling machine connected to a mooring line to be hung, and the pulling machine is detachably mounted on a deck of the floating body main body.
本発明の浮体によれば、次の手順によって浮体を洋上に係留できる。先ず、係留索の一端側を海底に配置し、係留索の他端側を浮体の係留索ガイドに掛け渡して引上げ機に接続する。次に、引上げ機により係留索を引き上げて当該係留索の張力を調整する。張力調整後、引上げ機を浮体本体のデッキ上から取り外す。 According to the floating body of the present invention, the floating body can be moored at sea by the following procedure. First, one end side of the mooring line is arranged on the seabed, and the other end side of the mooring line is hung on the mooring line guide of the floating body and connected to the pulling machine. Next, the mooring line is pulled up by a pulling machine to adjust the tension of the mooring line. After adjusting the tension, remove the puller from the deck of the floating body.
このように浮体を洋上に係留することで、クレーン船などの汎用の作業船よりも海象の影響が小さい浮体本体のデッキに装着された引上げ機によって係留索を引き上げることができる。このため、汎用の作業船を用いて係留索を引き上げる場合と比べて、海象条件の制約を緩和でき、海象条件を満たさない日数を減らすことができて、係留作業の長期化を抑えることができる。 By mooring the floating body at sea in this way, the mooring line can be pulled up by a pulling machine mounted on the deck of the floating body body, which is less affected by sea conditions than a general-purpose work ship such as a crane vessel. Therefore, as compared with the case where the mooring line is pulled up using a general-purpose work boat, the restrictions on the sea condition can be relaxed, the number of days when the sea condition is not satisfied can be reduced, and the mooring work can be suppressed from being prolonged. ..
また、船体姿勢を制御する特殊な作業船を用いる必要がないので、この特殊な作業船の手配に時間や手間を要することがなく、また、特殊な作業船の利用によってコストが増すことを抑制できる。 In addition, since it is not necessary to use a special work vessel that controls the attitude of the hull, it does not take time and effort to arrange this special work vessel, and the cost increase due to the use of the special work vessel is suppressed. can.
さらに、係留索を引き上げて張力を調整した後、動力機械である引上げ機を浮体本体のデッキから取り外すことで、洋上における引上げ機の点検、メンテナンス等の手間を省くことができる。 Further, by pulling up the mooring line to adjust the tension and then removing the pulling machine, which is a power machine, from the deck of the floating body body, it is possible to save the trouble of inspection and maintenance of the pulling machine at sea.
本発明の浮体では、前記引上げ機は、引上げ機本体と、回転架台とを備え、前記引上げ機本体と前記浮体本体のデッキとの間には、回転架台が設置され、前記係留索ガイドは、前記引上げ機の周囲に複数配置されることが好ましい。 In the floating body of the present invention, the pulling machine includes a pulling machine main body and a rotary stand, and a rotary stand is installed between the pulling machine main body and the deck of the floating body main body. It is preferable that a plurality of them are arranged around the pulling machine.
このような構成によれば、回転架台によって引上げ機本体を回転することで当該引上げ機による係留索の引上げ向きを変更できる。このため、引上げ機の周囲に配置された複数の係留索ガイドに掛けられる係留索をそれぞれ引き上げることができる。このように複数の係留索の引き上げに引上げ機を共用でき、浮体本体のデッキスペースが狭小であっても複数の係留索を引上げ可能な浮体を構成できる。 According to such a configuration, the pulling direction of the mooring line by the pulling machine can be changed by rotating the pulling machine main body by the rotary stand. Therefore, the mooring lines hung on the plurality of mooring line guides arranged around the pulling machine can be pulled up. In this way, the pulling machine can be shared for pulling up a plurality of mooring lines, and a floating body capable of pulling up a plurality of mooring lines can be configured even if the deck space of the floating body body is small.
本発明の浮体では、前記浮体本体は、前記洋上構造物が設置される設置コラムと、前記設置コラムの左舷に配置される左舷コラムと、前記設置コラムの右舷に配置される右舷コラムと、前記左舷コラム、前記右舷コラムおよび前記設置コラムを接続するロワーハルとを備え、前記係留索ガイドは、前記左舷コラムおよび前記右舷コラムにそれぞれ設置され、前記引上げ機は、前記左舷コラムのデッキおよび前記右舷コラムのデッキにそれぞれ取外し可能に装着されることが好ましい。 In the floating body of the present invention, the floating body body includes an installation column on which the offshore structure is installed, a port column arranged on the port side of the installation column, a starboard column arranged on the starboard side of the installation column, and the above. A port column, a lower hull connecting the starboard column and the installation column are provided, the mooring line guide is installed on the port column and the starboard column, respectively, and the pulling machine is a deck of the port column and the starboard column. It is preferable that they are detachably attached to each of the decks.
このような構成によれば、例えば、次の手順によって浮体を洋上に係留できる。先ず、海底に配置する係留索のうち設置コラムに引き上げる係留索の端部は作業船が移動することなく引き上げられるよう予め端部を引き寄せて配置する。また、ドック内や岸壁など海象条件の影響を受けない場所で予め設置コラムに係留索の他端側を取り付けておく。その際、設置コラムに取り付ける係留索は、張力導入後の最終長さに調整し設置コラムに取り付けておく。洋上において浮体本体を係留索端部を引き寄せた場所に曳航し、作業船上に海底から端部を引き上げ、設置コラムに取り付けた係留索の端部も作業船上に取り込み、作業船上で両者を接続する。その後、浮体を係留計画位置まで移動し、次に、設置コラムと同様に左舷コラムに取り付けた係留索の端部を作業船上に取り込み、海底に設置した係留索の端部も作業船上に引き上げ、作業船上で接続する。接続部を海中に戻しコラム上に設置した引上げ機で所定の長さまで係留索を引き上げることで張力を調整する。右舷コラムも同様の作業により張力を調整する。作業の順は左舷コラム、右舷コラムにおいて順不同である。最後に、左舷コラムおよび右舷コラムに係留索をそれぞれ固定し、各引上げ機を左舷コラムおよび右舷コラムのデッキからそれぞれ取り外す。 According to such a configuration, the floating body can be moored at sea by the following procedure, for example. First, of the mooring ropes to be placed on the seabed, the ends of the mooring ropes to be pulled up to the installation column are arranged by pulling the ends in advance so that the work boat can be pulled up without moving. In addition, the other end of the mooring line should be attached to the installation column in advance in a place that is not affected by sea conditions such as inside the dock or on the quay. At that time, the mooring line to be attached to the installation column is adjusted to the final length after the tension is introduced and attached to the installation column. Tow the main body of the floating body at sea to the place where the end of the mooring rope is pulled, pull up the end from the seabed on the work ship, take in the end of the mooring rope attached to the installation column on the work ship, and connect the two on the work ship. .. After that, the floating body was moved to the planned mooring position, then the end of the mooring rope attached to the port column was taken into the work ship as in the installation column, and the end of the mooring rope installed on the seabed was also pulled up to the work ship. Connect on the work boat. The tension is adjusted by returning the connection part to the sea and pulling up the mooring line to a predetermined length with a pulling machine installed on the column. Adjust the tension of the starboard column by the same work. The order of work is random in the port column and starboard column. Finally, the mooring lines are fixed to the port and starboard columns, respectively, and each pull-up machine is removed from the decks of the port and starboard columns, respectively.
このように、設置コラムに引上げ機を装着することなく浮体を係留でき、風車等の洋上構造物を設置したため引上げ機を設置することができない場合でも浮体を係留することが In this way, the floating body can be moored without attaching a pulling machine to the installation column, and the floating body can be moored even if the pulling machine cannot be installed because an offshore structure such as a wind turbine is installed.
可能となる。また、設置コラムに引上げ機を装着する場合と比べて、引上げ機を取り外す手間を軽減でき、係留作業期間を短縮できる。It will be possible. Further, as compared with the case where the pulling machine is attached to the installation column, the time and effort for removing the pulling machine can be reduced, and the mooring work period can be shortened.
参考例としての浮体係留装置は、洋上構造物が設置される浮体本体に設置可能な係留索ガイドと、前記係留索ガイドに掛けられる係留索と、前記係留索に接続される引上げ機とを備え、前記引上げ機は、前記浮体本体のデッキに装着および取外し可能に構成されることを特徴とする。
この浮体係留装置によれば、浮体本体に係留索ガイドを設置し、引上げ機を浮体本体のデッキに装着することによって、係留索を係留索ガイドに掛けて引き上げることができる。このため、クレーン船などの汎用の作業船によって係留索を引き上げる場合よりも、海象条件を緩和でき、海象条件を満たさない日数を減らすことができて、係留作業の長期化を抑えることができる。
また、船体姿勢を制御する特殊な作業船を用いる必要がないので、この特殊な作業船の手配に時間や手間を要することがなく、また、特殊な作業船の利用によってコストが増すことを抑制できる。
さらに、係留索を引き上げて張力を調整した後、動力機械である引上げ機を浮体本体のデッキから取り外すことで、洋上における引上げ機の点検、メンテナンス等の手間を省くことができる。
The floating body mooring device as a reference example includes a mooring line guide that can be installed on a floating body main body on which an offshore structure is installed, a mooring line that is hung on the mooring line guide, and a pulling machine that is connected to the mooring line. The pulling machine is characterized in that it can be mounted on and removed from the deck of the floating body body.
According to the floating mooring This established a mooring guides floating body, by attaching a pulling machine to the floating body deck can be pulled over the mooring to mooring guides. Therefore, the sea condition can be relaxed, the number of days when the sea condition is not satisfied can be reduced, and the mooring work can be suppressed from being prolonged, as compared with the case where the mooring line is pulled up by a general-purpose work boat such as a crane vessel.
In addition, since it is not necessary to use a special work vessel that controls the attitude of the hull, it does not take time and effort to arrange this special work vessel, and the cost increase due to the use of the special work vessel is suppressed. can.
Further, by pulling up the mooring line to adjust the tension and then removing the pulling machine, which is a power machine, from the deck of the floating body body, it is possible to save the trouble of inspection and maintenance of the pulling machine at sea.
参考例としての浮体係留装置では、前記引上げ機は、引上げ機本体と、回転架台とを備え、前記引上げ機本体と前記浮体本体のデッキとの間には、回転架台が設置され、前記係留索ガイドは、前記引上げ機の周囲に配置される複数の係留索ガイドによって構成されることが好ましい。
このような構成によれば、回転架台を浮体本体のデッキに取り付けることで、引上げ機をデッキ上に回転可能に設置でき、回転によって引上げ機による係留索の引上げ向きを変更できる。このため、引上げ機の周囲に配置される複数の係留索ガイドに掛けられる係留索をそれぞれ引き上げることができる。このように複数の係留索の引き上げに引上げ機を共用でき、浮体本体のデッキスペースが狭小であっても複数の係留索を引上げ可能な浮体を構成できる。
In the floating body mooring device as a reference example, the pulling machine includes a pulling machine main body and a rotary stand, and a rotary stand is installed between the pulling machine main body and the deck of the floating body main body, and the mooring line is provided. The guide is preferably composed of a plurality of mooring line guides arranged around the pulling machine.
According to such a configuration, by attaching the rotary stand to the deck of the floating body body, the pulling machine can be rotatably installed on the deck, and the pulling direction of the mooring line by the pulling machine can be changed by the rotation. Therefore, the mooring lines hung on the plurality of mooring line guides arranged around the pulling machine can be pulled up. In this way, the pulling machine can be shared for pulling up a plurality of mooring lines, and a floating body capable of pulling up a plurality of mooring lines can be configured even if the deck space of the floating body body is small.
本発明によれば、特殊な作業船が不要であり、浮体の係留作業の長期化を抑えることができる浮体係留方法および浮体を提供できる。 According to the present invention, a special work boats unwanted, can provide a floating body anchored method and floating Ru can be suppressed prolonged floating mooring operations.
[本実施形態の構成]
以下、本発明の実施形態を図面に基づいて説明する。
図1,図2において、本実施形態に係る浮体1は、洋上構造物である風力発電装置2が設置され、洋上に浮上した状態で、係留索であるチェーン3によって係留されるものである。
[Structure of the present embodiment]
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
In FIGS. 1 and 2, the floating
浮体1は、浮体本体10と、チェーンシーブ20(係留索ガイド)と、チェーンストッパー30(係留索ストッパー)と、引上げ機40と、方向変更ウインチ50とを備える。
The floating
浮体本体10は、ポートサイドコラム11(左舷コラム)と、スターボードサイドコラム12(右舷コラム)と、センターコラム13と、ロワーハル14(14A,14B)とを備える。ポートサイドコラム11は、ロワーハル14Aによってセンターコラム13に接続され、センターコラム13の左舷に配置される。スターボードサイドコラム12は、ロワーハル14Bによってセンターコラム13に接続され、センターコラム13の右舷に配置される。
この浮体本体10は、平面視略V字状に形成され、海水の内部への出し入れによって浮力調整可能に構成される。
The floating
The floating
ポートサイドコラム11、スターボードサイドコラム12およびセンターコラム13は、デッキ111,121,131(コラムデッキ)をそれぞれ備える。
ポートサイドコラム11のデッキ111とスターボードサイドコラム12のデッキ121には、チェーンシーブ20と、引上げ機40と、方向変更ウインチ50とが設置される。
また、ポートサイドコラム11の側面とスターボードサイドコラム12の側面には、サイドデッキ15がそれぞれ設けられる。各サイドデッキ15には、チェーン3を挿通可能な三つの孔16がそれぞれ形成される。各孔16は、チェーンストッパー30を上方から嵌め込み可能に構成される。なお、各孔16の下方には、フェアリーダー17が設けられる。
なお、本実施形態では、前述したチェーンストッパー30は、サイドデッキ15に載せられているが、これに限られず、例えばデッキ111,121に載せられていてもよい。
The
A
Further,
In the present embodiment, the
センターコラム13は、デッキ131に風力発電装置2が設置される設置コラムとして構成される。
センターコラム13の側面にはサイドデッキ15が設けられており、サイドデッキ15には、チェーン3を挿通可能な二つの孔16が形成される。各孔16には、チェーンストッパー30を嵌め込み可能に構成される。なお、各孔16の下方には、フェアリーダー17が設けられる。
The
A
チェーンシーブ20(20A,20B,20C)は、ポートサイドコラム11のデッキ111に三つ設置されており、各々のチェーン引上げ方向が交差する位置に配置される。本実施形態では、各チェーンシーブ20、各孔16および各フェアリーダー17は、鉛直線上に沿って配置される。
Three chain sheaves 20 (20A, 20B, 20C) are installed on the
チェーンストッパー30は、チェーン3を挟み込み可能な半割体301,302によって構成される。半割体301,302は、チェーン3を挟み込んだ状態で孔16に上方から嵌め込まれることによって、チェーン3の下方への繰り出しを停止する。
The
引上げ機40は、ポートサイドコラム11のデッキ111に設置される。引上げ機40は、チェーンシーブ20A,20B,20Cのチェーン引上げ方向がそれぞれ交差する一つの交差点上に配置される。従って、引上げ機40の周囲にはチェーンシーブ20A,20B,20Cが配置される。
The pulling
引上げ機40は、チェーンウインチ41(引上げ機本体)と、回転架台42とを備える。回転架台42は、チェーンウインチ41とデッキ111との間に配置される。デッキ111にボルト止めなどによって固定される。回転架台42は、ボルト抜き出しなどによってデッキ111から取り外し可能である。
The pulling
チェーンウインチ41は、回転架台42上に配置されるので、デッキ111に対して鉛直軸を中心として回転方向Rに回転可能である。ここで、チェーンウインチ41自体をデッキ111にボルト止めなどによって固定することで、引上げ機40によるチェーン引上げ方向を固定可能である。また、前記ボルト抜き出しなどによってチェーン引上げ方向の固定を解除可能である。
Since the
方向変更ウインチ50は、図2に示すように、ポートサイドコラム11のデッキ111に設置される。
方向変更ウインチ50は、図3に示すように、引上げ機40にワイヤー51を掛け回し、このワイヤー51を巻き取ることによって引上げ機40を回転方向Rに回転可能に構成される。これにより、引上げ機40のチェーン引上げ方向をチェーンシーブ20A,20B,20Cのいずれかのチェーン引上げ方向を向くように、引上げ機40のチェーン引上げ方向を変更する。
また、方向変更ウインチ50は、ワイヤー51を逆向きに掛け回し、方向変更ウインチ50によってワイヤー51を巻き取ることによって引上げ機40を回転方向Rにおいて前記回転とは逆向きに回転可能に構成される。
なお、方向変更ウインチ50は、デッキ111にボルト止めなどによって固定されており、ボルト抜き出しなどによってデッキ111への固定を解除可能である。
The
As shown in FIG. 3, the
Further, the
The
なお、チェーンシーブ20(20A,20B,20C)、チェーンストッパー30、引上げ機40および方向変更ウインチ50は、スターボードサイドコラム12にも同様に設置されるので詳細な説明を省略する。
Since the chain sheave 20 (20A, 20B, 20C), the
[浮体係留方法]
以下、本実施形態に係る浮体1の浮体係留方法について説明する。
本浮体係留方法は、アンカーチェーン敷設工程と、浮体準備工程と、浮体仮係留工程と、浮体係留工程と、機材撤去工程とを有する。
[Floating body mooring method]
Hereinafter, the floating body mooring method of the floating
This floating body mooring method includes an anchor chain laying step, a floating body preparation step, a floating body temporary mooring step, a floating body mooring step, and an equipment removal step.
アンカーチェーン敷設工程は、次の通りである。
浮体1を係留する現場海域において、作業船によって本係留用の所定数のアンカーを所定の海底位置に配置する。各アンカーにはチェーン3の一端を接続しておき、他端は海面に浮かぶフローターにワイヤーを介して接続する。また、図5に示す仮係留索4(4A,4B)も仮係留用のアンカーに一端を接続し、他端をフローターにワイヤーを介して接続する。
本実施形態では、本係留用のアンカーは8個、仮係留用のアンカーは2個である。本係留用のチェーン3には、センターコラム13に接続されるための第一チェーン31,32と、ポートサイドコラム11に接続されるための第二チェーン33,34,35と、スターボードサイドコラム12に接続されるための第三チェーン36,37,38とがある(図8参照)。
相対してアンカーチェーンの端部2本を作業船上に引き上げ、船上に設置したチェーンプーラー等チェーンに張力を生じさせる機器を用いて設計上の最大荷重で引き、満足することを確認する。このアンカー引張試験により最終アンカー位置が決まるので、必要張力を発揮するためにチェーンストッパー30に止めなければならないチェーン長を算出することが可能となる。
センターコラム13に接続される二本のチェーン3の端部は移動することなく作業船7で引き上げられるよう所定の位置に引き寄せておく。
なお、アンカーチェーン敷設工程は、浮体仮係留工程までに完了していればよい。
The anchor chain laying process is as follows.
In the site sea area where the floating
In the present embodiment, there are eight anchors for main mooring and two anchors for temporary mooring. The mooring chain 3 includes
On the other hand, pull up the two ends of the anchor chain onto the work ship and pull them with the maximum design load using a device that creates tension in the chain, such as a chain puller installed on the ship, and confirm that they are satisfied. Since the final anchor position is determined by this anchor tension test, it is possible to calculate the chain length that must be stopped at the
The ends of the two chains 3 connected to the
The anchor chain laying process may be completed by the floating body temporary mooring process.
浮体準備工程は、次の通りである。
先ず、図4に示す例では、浮体本体10のスターボードサイドコラム12およびセンターコラム13を岸壁8に沿って配置する。この浮体本体10のポートサイドコラム11、スターボードサイドコラム12には、チェーンシーブ20およびチェーンストッパー30が予め設置されている。またセンターコラム13にはチェーンストッパー30が予め設置されている。次に、プレリグチェーン3A(図2参照)、風力発電装置2、引上げ機40および方向変更ウインチ50を、浮体本体10に取り付ける。各チェーンウインチ41は、そのチェーン引上げ方向を各チェーンシーブ20Bのチェーン引上げ方向に向けて配置し、デッキ111,121にボルトなどによって固定する。この作業はドック内で実施することも可能であり、場所は特定しない。
The floating body preparation process is as follows.
First, in the example shown in FIG. 4, the
プレリグチェーン3Aは、各チェーンシーブ20に掛けられ、各孔16に挿通され、各フェアリーダー17に掛けられる。センターコラム13に取り付けられるプレリグチェーン3Aは、予め張力導入後の最終長さに調整し、チェーンストッパー30によって当該センターコラム13に係止した状態とされる。また、ポートサイドコラム11およびスターボードサイドコラム12に設置されたチェーンシーブ20Bに掛けられるプレリグチェーン3Aのうち現場海域で最初に引き上げるチェーンは、各引上げ機40に接続し現場海域ですぐに引き上げられる状態とされる。
風力発電装置2は、センターコラム13のデッキ131上に設置される。
引上げ機40および方向変更ウインチ50は、ポートサイドコラム11のデッキ111およびスターボードサイドコラム12のデッキ121にそれぞれ設置される。具体的には、引上げ機40および方向変更ウインチ50は、クレーン船などの作業船7によって持ち上げられ、デッキ111,121に降ろされて配置され、前述したようにボルト止め等によってデッキ111,121に固定される。
なお、デッキ111,121には、発電機なども設置される。
The
The
The pulling
A generator or the like is also installed on the
浮体仮係留工程は、次の通りである。
浮体準備工程において準備した浮体1を、曳船によって、アンカーやチェーン3、仮係留索4が敷設された現場海域まで曳航し、図5に示すように、浮体1を係留する係留計画位置Xから所定距離を離間した初期位置に配置する。
次に、仮係留索4Aを作業船によって引き上げ、スターボードサイドコラム12に接続する。また、仮係留索4Bを作業船によって引き上げ、ポートサイドコラム11に接続する。かかる仮係留索4A,4Bは、図5に示すように交差して張られる。そして、浮体1は、ロワーハル14A,14Bが作業船7に連結索を介して接続され、当該作業船7によって仮係留索4A,4Bから離間方向に向かう引張力が加えられる。なお、本実施形態では、作業船7にはクレーン船を採用している。
このようにして、浮体1は初期位置に仮係留される。
The floating body temporary mooring process is as follows.
The floating
Next, the
In this way, the floating
浮体係留工程は、次の通りである。
先ず、予め引き寄せておいた第一チェーン31,32を浮体本体10のセンターコラム13に張設する。具体的には、作業船7を連結索によって浮体本体10に連結する前に、
当該作業船7によって第一チェーン31,32を海底から引き上げておき、図6に示すように、第一チェーン31,32をセンターコラム13に浮体準備工程において取り付けられた各プレリグチェーン3Aも作業船7に取り込み、作業船7上で両者を接続し、接続したチェーンを海中に戻す。続いて、図7に示すように、作業船7と浮体本体10とを繋ぐ連結索を浮体本体10から外し、曳船によって浮体本体10を係留計画位置Xまで牽引する。この牽引によって、第一チェーン31,32は引っ張られて正規の方向に向けて張設される。
第一チェーン31,32の長さは所定の張力を導入した時のカテナリー計算により張力導入後の長さに調整しておく。また、仮係留索4A,4Bは、曳船によって浮体本体10を牽引する前に浮体本体10から取り外す。
なお、後述する各チェーン33〜38の引上げ、接続手順は、第一チェーン31,32の引上げ、接続手順と同様であるので説明を省略する。
The floating body mooring process is as follows.
First, the
The
The lengths of the
The procedure for pulling up and connecting the
次に、第二チェーン34をポートサイドコラム11に張設する。具体的には、第二チェーン34を図8に実線で示す作業船7によって海底から引き上げ、作業船7に取り込まれたポートサイドコラム11に取り付けられたプレリグチェーン3A端部と接続する。ここで、第二チェーン34が接続されるプレリグチェーン3Aは、チェーンシーブ20Bに掛け渡されて引上げ機40に接続した状態のものである。
第二チェーン34のプレリグチェーン3Aへの接続後、接続部を海中に戻した後、引上げ機40によって第二チェーン34を巻き上げる。これにより、第二チェーン34は引き上げられて所定のカテナリー曲線を形成し、チェーン張力が調整される。チェーン張力の調整後、第二チェーン34はチェーンストッパー30によってポートサイドコラム11に係止される。引き上げた余剰チェーンはチェーンストッパー30の上部位置で切断後作業船7上に回収する。
Next, the
After connecting the
次に、第三チェーン37をスターボードサイドコラム12に張設する。具体的には、第三チェーン37を図8に点線で示す作業船7によって海底から引き上げ、作業船7に取り込まれたスターボードサイドコラム12に取り付けられたプレリグチェーン3A端部と接続する。ここで、第三チェーン37が接続されるプレリグチェーン3Aは、チェーンシーブ20Bに掛け渡されて引上げ機40に接続した状態のものである。
第三チェーン37のプレリグチェーン3Aへの接続後、接続部を海中に戻した後、図9に示すように、引上げ機40によって第三チェーン37を巻き上げる。これにより、第三チェーン37は引き上げられて所定のカテナリー曲線を形成し、チェーン張力が調整される。チェーン張力の調整後、第三チェーン37はチェーンストッパー30によってスターボードサイドコラム12に係止される。引き上げた余剰チェーンはチェーンストッパー30上部位置で切断後作業船7上に回収する。回収途中、切断したチェーン3端部が引上げ機40のドラム手前に来たところで当該チェーン3を止め、チェーン3が作業船7に向かう側のチェーン3も適切な位置で切断することにより引上げ機40内にチェーン3が残った状態とする。なお、第二チェーン34の接続作業と第三チェーン37の接続作業は順不同である。
Next, the
After connecting the
第一チェーン31,32、第二チェーン34および第三チェーン37の張設によって、浮体本体10は四方に係留された状態となる。この状態からさらに、図10に示すように第三チェーン36,38をスターボードサイドコラム12に追加張設し、かつ、図11に示すように第二チェーン33,35をポートサイドコラム11に追加張設する。
By stretching the
第三チェーン36のスターボードサイドコラム12への張設手順は次の通りである。先ず、チェーンウインチ41とデッキ121とのボルトなどによる固定を解除し、チェーンウインチ41を回転可能状態とする。続いて、方向変更ウインチ50によって前述した通りに引上げ機40を回転方向Rに回転し、引上げ機40のチェーン引上げ方向を、チェーンシーブ20Bのチェーン引上げ方向からチェーンシーブ20Cのチェーン引上げ方向に変更する。そして、チェーンウインチ41をデッキ121に再び固定し、チェーンシーブ20Cに掛け渡されたプレリグチェーン3Aを引上げ機40内に残したチェーンと接続する。
The procedure for attaching the
次に、第三チェーン36を作業船7によって海底から引き上げ、スターボードサイドコラム12のチェーンシーブ20Cに掛け渡されたプレリグチェーン3Aの端部も作業船7上に取り込み、作業船7上で両者を接続する。
第三チェーン36のプレリグチェーン3Aへの接続後、接続部を海中に戻し、引上げ機40によって第三チェーン36を巻き上げる。これにより、第三チェーン36は引き上げられて所定のカテナリー曲線を形成し、チェーン張力が調整される。チェーン張力の調整後、第三チェーン36はチェーンストッパー30によってスターボードサイドコラム12に係止される。引き上げた余剰チェーンはチェーンストッパー30の上部位置で切断後作業船7上に回収する。回収途中、切断したチェーン3端部が引上げ機40のドラム手前に来たところで当該チェーン3を止め、チェーン3が作業船7に向かう側のチェーン3も適切な位置で切断することにより引上げ機40内にチェーン3が残った状態とする。
Next, the
After connecting the
次に、第三チェーン38をスターボードサイドコラム12へ張設する。具体的には、先ず、チェーンウインチ41とデッキ121との固定を解除し、チェーンウインチ41を回転可能状態とする。続いて、方向変更ウインチ50によって前述した通りに引上げ機40を回転方向Rにおいて逆回転し、引上げ機40のチェーン引上げ方向を、チェーンシーブ20Cのチェーン引上げ方向からチェーンシーブ20Aのチェーン引上げ方向に変更する。そして、チェーンウインチ41をデッキ121に再び固定し、チェーンシーブ20Aに掛け渡されたプレリグチェーン3Aを引上げ機40内に残したチェーンと接続する。
Next, the
次に、第三チェーン38を作業船7によって海底から引き上げ、スターボードサイドコラム12のチェーンシーブ20Aに掛け渡されたプレリグチェーン3Aの端部も作業船7上に取り込み、作業船7上を接続する。
第三チェーン38のプレリグチェーン3Aへの接続後、接続部を海中に戻し、引上げ機40によって第三チェーン38を巻き上げる。これにより、第三チェーン38は引き上げられて所定のカテナリー曲線を形成し、チェーン張力が調整される。チェーン張力の調整後、第三チェーン38はチェーンストッパー30によってスターボードサイドコラム12に係止される。引き上げた余剰チェーンはチェーンストッパー30の上部位置で切断後作業船7上に全量回収する。
Next, the
After connecting the
本実施形態では、第三チェーン36,38の張設後に、第二チェーン33,35を張設する。
第二チェーン33のポートサイドコラム11への張設手順は次の通りである。先ず、チェーンウインチ41とデッキ111とのボルトなどによる固定を解除し、チェーンウインチ41を回転可能状態とする。続いて、方向変更ウインチ50によって前述した通りに引上げ機40を回転方向Rに回転し、引上げ機40のチェーン引上げ方向を、チェーンシーブ20Bのチェーン引上げ方向からチェーンシーブ20Aのチェーン引上げ方向に変更する。そして、チェーンウインチ41をデッキ111に再び固定し、チェーンシーブ20Aに掛け渡されたプレリグチェーン3Aを引上げ機40内に残したチェーンと接続する。
In the present embodiment, the
The procedure for attaching the
次に、第二チェーン33を作業船7によって海底から引き上げ、ポートサイドコラム11のチェーンシーブ20Aに掛け渡されたプレリグチェーン3Aの端部も作業船7上に取り込み、作業船7上で両者を接続する。
第二チェーン33のプレリグチェーン3Aへの接続後、接続部を海中に戻し、引上げ機40によって第二チェーン33を巻き上げる。これにより、第二チェーン33は引き上げられて所定のカテナリー曲線を形成し、チェーン張力が形成される。チェーン張力の調整後、第二チェーン33はチェーンストッパー30によってポートサイドコラム11に係止される。引き上げた余剰チェーンはチェーンストッパー30の上部位置で切断後作業船7上に回収する。回収途中、切断したチェーン3端部が引上げ機40のドラム手前に来たところで当該チェーン3を止め、チェーン3が作業船7に向かう側のチェーン3も適切な位置で切断することにより引上げ機40内にチェーン3が残った状態とする。
Next, the
After connecting the
次に、第二チェーン35をポートサイドコラム11へ張設する。具体的には、先ず、チェーンウインチ41とデッキ111との固定を解除し、チェーンウインチ41を回転可能状態とする。続いて、方向変更ウインチ50によって前述した通りに引上げ機40を回転方向Rにおいて逆回転し、引上げ機40のチェーン引上げ方向を、チェーンシーブ20Aのチェーン引上げ方向からチェーンシーブ20Cのチェーン引上げ方向に変更する。そして、チェーンウインチ41をデッキ111に再び固定し、チェーンシーブ20Cに掛け渡されたプレリグチェーン3Aを引上げ機40内に残したチェーンと接続する。
Next, the
次に、第二チェーン35を作業船7によって海底から引き上げ、ポートサイドコラム11のチェーンシーブ20Cに掛け渡されたプレリグチェーン3Aの端部も作業船7上に取り込み、作業船7上で両者を接続する。
第二チェーン35のプレリグチェーン3Aへの接続後、接続部を海中に戻し、引上げ機40によって第二チェーン35を巻き上げる。これにより、第二チェーン35は引き上げられて所定のカテナリー曲線を形成し、チェーン張力が調整される。チェーン張力の調整後、第二チェーン35はチェーンストッパー30によってポートサイドコラム11に係止される。引き上げた余剰チェーンはチェーンストッパー30の上部位置で切断後作業船7上に全量回収する。
Next, the
After connecting the
ここで、従来のチェーン引上げ作業は、洋上風力を行う外洋(港外)において、浮体本体10よりも海象の影響を受けて揺れやすい作業船7によって行われる。このため、作業船7によるチェーン引上げ作業が可能な気象・海象条件は、例えば、有義波高1.0m以下、平均風速10m/s以下に制約される。
これに対し、前述した第二チェーン33〜35および第三チェーン36〜38の引上げ作業は、作業船7よりも海象の影響を受けにくく揺れにくい浮体本体10に設置された引上げ機40によって行われる。このため、チェーン引上げ作業が可能な海象条件は、例えば、有義波高2.0m以下に緩和できる。
Here, the conventional chain pulling operation is performed by the
On the other hand, the above-mentioned pulling work of the
機材撤去工程は、次の通りである。
本実施形態では、先ず、ポートサイドコラム11のデッキ111上の機材を撤去し、次に、スターボードサイドコラム12のデッキ121上の機材を撤去する。
デッキ111上の機材の撤去は次の通りである。引上げ機40をボルト抜き出しなどによってデッキ111への固定を解除する。続いて、図12に示すように、作業船7によって引上げ機40を持ち上げ、デッキ111上から撤去する。
また、方向変更ウインチ50も、デッキ111への固定を解除し、作業船7によって持ち上げてデッキ111上から撤去する。
なお、図示しないが、デッキ111上に設置された発電機なども撤去する。
The equipment removal process is as follows.
In the present embodiment, first, the equipment on the
The removal of equipment on
Further, the
Although not shown, the generator installed on the
デッキ121上の引上げ機40、方向変更ウインチ50、発電機などの撤去は、デッキ111上の引上げ機40、方向変更ウインチ50、発電機などの撤去と同様に行うので詳細な説明を省略する。
以上のようにして、浮体1を洋上に係留する。
Since the removal of the pulling
As described above, the floating
[本実施形態の効果]
(1)本実施形態では、浮体1は、風力発電装置2が設置される浮体本体10と、浮体本体10に設置されるチェーンシーブ20と、チェーンシーブ20に掛けられるチェーン3に接続される引上げ機40とを備え、引上げ機40は、浮体本体10のデッキ111,121に取外し可能に装着されることを特徴とする。
上記構成を有するため、先ず、チェーン3の一端側を海底に配置し、チェーン3の他端側をドック内や岸壁など海象条件の影響を受けない場所で予め浮体1のチェーンシーブ20に掛け渡して引上げ機40に接続し、引上げ機40によりチェーン3を引き上げて当該チェーン3の張力を調整し、チェーン張力の調整後、引上げ機40を浮体本体10のデッキ111,121上から取り外すことで、浮体1を洋上に係留できる。
このように浮体1を洋上に係留することで、汎用の作業船7よりも海象の影響が小さい浮体本体10のデッキ111,121に装着された引上げ機40によってチェーン3を引き上げることができる。このため、汎用の作業船7を用いてチェーン3を引き上げる場合と比べて、海象条件の制約を緩和でき、海象条件を満たさない日数を減らすことができて、係留作業の長期化を抑えることができる。
また、船体姿勢を制御する特殊な作業船を用いる必要がないので、特殊な作業船の手配に時間や手間を要することがなく、また、特殊な作業船の利用によってコストが増すことを抑制できる。
さらに、チェーン3を引き上げて張力を調整した後、動力機械である引上げ機40を浮体本体10のデッキ111,121から取り外すことで、洋上における引上げ機40の点検、メンテナンス等の手間を省くことができる。
さらに、本実施形態では、以下の各効果を発揮できる。
[Effect of this embodiment]
(1) In the present embodiment, the floating
Since it has the above configuration, first, one end side of the chain 3 is arranged on the seabed, and the other end side of the chain 3 is previously hung on the
By mooring the floating
In addition, since it is not necessary to use a special work vessel that controls the attitude of the hull, it does not take time and effort to arrange a special work vessel, and it is possible to suppress an increase in cost due to the use of the special work vessel. ..
Further, by pulling up the chain 3 to adjust the tension and then removing the pulling
Further, in the present embodiment, the following effects can be exhibited.
(2)引上げ機40は、チェーンウインチ41と、回転架台42とを備え、チェーンウインチ41と浮体本体10のデッキ111(デッキ121)との間には、回転架台42が設置され、チェーンシーブ20は、引上げ機40の周囲に複数配置される。このため、回転架台42によってチェーンウインチ41を回転することで引上げ機40によるチェーン3の引上げ向きを変更できる。このため、引上げ機40の周囲に配置された複数のチェーンシーブ20(20A,20B,20C)に掛けられるチェーン3をそれぞれ引き上げることができる。このように複数のチェーン3の引き上げに引上げ機40を共用でき、浮体本体10のデッキスペースが狭小であっても複数のチェーン3を引上げ可能な浮体1を構成できる。
(2) The pulling
(3)浮体1は、浮体本体10に設置されるチェーンストッパー30を備える。このため、引上げ機40によるチェーン3の引上げ後に当該チェーン3をチェーンストッパー30によって簡単に浮体本体10に固定でき、かつ、チェーンストッパー30によってチェーン3を浮体本体10に固定することで、チェーン3と引上げ機40との接続を簡単に解除できる。このため、引上げ機40の取外し作業を容易にできる。
(3) The floating
(4)浮体本体10は、風力発電装置2が設置されるセンターコラム13と、センターコラム13の左舷に配置されるポートサイドコラム11と、センターコラム13の右舷に配置されるスターボードサイドコラム12と、ポートサイドコラム11、スターボードサイドコラム12およびセンターコラム13を接続するロワーハル14(14A,14B)とを備え、チェーンシーブ20は、ポートサイドコラム11およびスターボードサイドコラム12にそれぞれ設置され、引上げ機40は、ポートサイドコラム11のデッキ111およびスターボードサイドコラム12のデッキ121にそれぞれ取外し可能に装着される。このため、先ず、ドック内や岸壁など海象条件の影響を受けない場所で予めセンターコラム13に緊張後のチェーン長さに調整されたチェーン3の他端側を取り付け、予め海底に設置しておいたチェーン3の端部と洋上において接続する。次に、洋上において浮体本体10を係留計画位置Xまで移動し、次に、ポートサイドコラム11およびスターボードサイドコラム12のチェーンシーブ20にチェーン3の他端側を掛けて各引上げ機40に接続し、各引上げ機40によってチェーン3を引き上げることで張力を調整し、最後に、ポートサイドコラム11およびスターボードサイドコラム12にチェーン3をそれぞれ固定し、各引上げ機40をポートサイドコラム11およびスターボードサイドコラム12のデッキ111,121からそれぞれ取り外すことで、浮体1を洋上に係留できる。
このように、センターコラム13に引上げ機40を装着することなく浮体1を係留でき、センターコラム13に引上げ機40を装着する場合と比べて、引上げ機40を取り外す手間を軽減でき、係留作業期間を短縮できる。
(4) The floating
In this way, the floating
(5)本実施形態では、風力発電装置2が設置される浮体本体10に設置可能なチェーンシーブ20と、チェーンシーブ20に掛けられるチェーン3と、チェーン3に接続される引上げ機40とを備え、引上げ機40は、浮体本体10のデッキ111(デッキ121)に装着および取外し可能に構成される浮体係留装置を構成できる。この浮体係留装置によれば、前述した浮体1と同様の作用効果を発揮できる。
(5) In the present embodiment, the
[変形例]
本発明は、以上の実施形態で説明した構成のものに限定されず、本発明の目的を達成できる範囲での変形例は、本発明に含まれる。
例えば、前記実施形態では、引上げ機40は、ポートサイドコラム11のデッキ111およびスターボードサイドコラム12のデッキ121にそれぞれ装着されるが、これに限定されず、デッキ111,121の一方だけに装着されてもよい。
また、センターコラム13のデッキ131には、引上げ機40の装着スペースは設けられてなく、引上げ機40は装着されていないが、例えば、デッキ131に前記装着スペースを設け、当該デッキ131に引上げ機40を装着してもよい。この場合、デッキ111,121の一方または双方に引上げ機40が装着されていなくてもよい。
[Modification example]
The present invention is not limited to the configuration described in the above embodiments, and modifications within the range in which the object of the present invention can be achieved are included in the present invention.
For example, in the above embodiment, the pulling
Further, the
前記実施形態では、一つの引上げ機40の周囲に複数のチェーンシーブ20(20A,20B,20C)が配置されているが、これに限られず、例えば、一つのチェーンシーブ20だけが引上げ機40の周囲に配置されてもよい。この場合には、引上げ機40は、チェーン引上げ方向を変更する必要がないので、回転架台42の構成を省略してもよい。また、この場合、方向変更ウインチ50も省略してよい。
In the above embodiment, a plurality of chain sheaves 20 (20A, 20B, 20C) are arranged around one pulling
前記実施形態では、チェーンシーブ20A,20B,20Cに対して一つの引上げ機40を共用しているが、これに限られず、例えば、チェーンシーブ20A,20B,20Cのそれぞれに対応した個数の小型引上げ機を設置してもよい。
In the above embodiment, one pulling
前記実施形態では、浮体本体10は、平面視略V字状に形成されるが、この形状に限定されず、平面視Y字状や平面視多角形状(平面視八角形状)などであってもよい。
In the above embodiment, the floating
前記実施形態では、チェーンストッパー30は、孔16に嵌め込み可能な半割体301,302によって構成されるが、チェーン3を係止できる形状であればよく、前記構成に限定されない。
In the above embodiment, the
前記実施形態では、第一チェーン31,32の張設後、第二チェーン34,第三チェーン37、第三チェーン36、第三チェーン38、第二チェーン33、第二チェーン35の順に張設するが、これに限定されず、張設する順は、現場状況(風や波の向きなどの状況)や作業船7の移動等を考慮して適宜変更可能である。
例えば、第三チェーン37を第二チェーン34よりも先に張設してもよく、この場合には、第二チェーン33,35は、第三チェーン36,38よりも先に張設してもよい。
また、第二チェーン33〜35同士の張設順や第三チェーン36〜38同士の張設順も、現場状況や作業船7の移動等を考慮して適宜変更可能である。
In the above embodiment, after the
For example, the
Further, the order in which the
前記実施形態では、チェーンシーブ20が仮係留ガイドとされるが、これに限られず、例えば、滑りガイドを仮係留ガイドとしてしてもよい。
In the above embodiment, the
前記実施形態では、仮係留索4によって浮体本体10を仮係留するが、これに限られず、曳船によって浮体本体10を初期位置に位置決めできる場合には、仮係留索を用いて仮係留しなくてもよい。
In the above embodiment, the floating
前記実施形態では、作業船7にクレーン船を採用しているが、これに限られず、クレーンを備えず、チェーン3を引き上げるウインチなどを備える作業船であってもよい。この場合、機材撤去工程では、前記作業船とは別個に、引上げ機40を持ち上げて撤去するためにクレーン船を利用する。
In the above embodiment, the crane vessel is adopted as the
前記実施形態では、浮体1には、風力発電装置2が洋上構造物として設置されるが、これに限定されず、いったん係留した後の係留位置の変更が必要とされない洋上構造物であればよく、例えば、風力発電装置2にケーブルなどによって接続されるサブステーションが設置されてもよい。
In the above embodiment, the wind
1…浮体、10…浮体本体、11…ポートサイドコラム(左舷コラム)、111,121,131…デッキ、12…スターボードサイドコラム(右舷コラム)、13…センターコラム(設置コラム)、14(14A,14B)…ロワーハル、15…サイドデッキ、16…孔、17…フェアリーダー、2…風力発電装置(洋上構造物)、20(20A,20B,20C)…チェーンシーブ(係留索ガイド)、3(3A,31〜38)…チェーン(係留索)、30…チェーンストッパー(係留索ストッパー)、301,302…半割体、4(4A,4B)…仮係留索、40…引上げ機、41…チェーンウインチ(引上げ機本体)、42…回転架台、50…方向変更ウインチ、51…ワイヤー、7…作業船、8…岸壁、R…回転方向、X…係留計画位置。 1 ... Floating body, 10 ... Floating body body, 11 ... Port side column (port column), 111, 121, 131 ... Deck, 12 ... Starboard side column (starboard column), 13 ... Center column (installation column), 14 (14A) , 14B) ... Lower hull, 15 ... Side deck, 16 ... Hole, 17 ... Fair leader, 2 ... Wind power generator (offshore structure), 20 (20A, 20B, 20C) ... Chain sheave (mooring line guide), 3 ( 3A, 31-38) ... Chain (mooring line), 30 ... Chain stopper (mooring line stopper), 301, 302 ... Half split, 4 (4A, 4B) ... Temporary mooring line, 40 ... Puller, 41 ... Chain Winch (puller body), 42 ... rotary stand, 50 ... direction change winch, 51 ... wire, 7 ... work boat, 8 ... quay, R ... rotation direction, X ... mooring planned position.
Claims (5)
前記係留索の一端側を海底に配置し、 Place one end of the mooring line on the seabed
前記係留索の他端側を前記係留索ガイドに掛け渡して前記引上げ機に接続し、 The other end side of the mooring line is hung on the mooring line guide and connected to the pulling machine.
前記引上げ機により前記係留索を引き上げて当該係留索の張力を調整し、 The mooring line is pulled up by the pulling machine to adjust the tension of the mooring line.
張力調整後、前記引上げ機を前記浮体本体のデッキ上から取り外す After adjusting the tension, remove the pulling machine from the deck of the floating body.
ことを特徴とする浮体係留方法。 A floating body mooring method characterized by that.
前記浮体の浮体本体は、前記洋上構造物が設置される設置コラムと、前記設置コラムの左舷に配置される左舷コラムと、前記設置コラムの右舷に配置される右舷コラムと、前記左舷コラム、前記右舷コラムおよび前記設置コラムを接続するロワーハルとを備え、前記係留索ガイドは、前記左舷コラムおよび前記右舷コラムにそれぞれ設置され、前記引上げ機は、前記左舷コラムのデッキおよび前記右舷コラムのデッキにそれぞれ取外し可能に装着されており、 The floating body of the floating body includes an installation column on which the offshore structure is installed, a port column arranged on the port side of the installation column, a starboard column arranged on the starboard side of the installation column, the port column, and the above. A right-side column and a lower hull connecting the installation column are provided, the mooring line guide is installed on the port-side column and the starboard-side column, respectively, and the pulling machine is installed on the deck of the port-side column and the deck of the starboard column, respectively. It is attached to be removable and is attached.
海底に配置される前記係留索は、仮係留索と、第一係留索と、第二係留索と、第三係留索とによって構成され、 The mooring line arranged on the seabed is composed of a temporary mooring line, a first mooring line, a second mooring line, and a third mooring line.
前記設置コラムに前記第一係留索を固定し、 The first mooring line is fixed to the installation column,
前記仮係留索を曳船によって牽引して、前記第一係留索を張りつつ前記浮体本体を係留計画位置に配置し、 The temporary mooring line is towed by a tugboat, and the floating body main body is placed at the mooring planned position while the first mooring line is stretched.
前記浮体本体の配置後、前記左舷コラムにおける前記係留索ガイドに前記第二係留索を掛け渡して前記引上げ機に接続し、当該引上げ機によって前記第二係留索を引き上げ、 After arranging the floating body body, the second mooring line is hung on the mooring line guide in the port column to be connected to the pulling machine, and the second mooring line is pulled up by the pulling machine.
前記浮体本体の配置後、前記右舷コラムにおける前記係留索ガイドに前記第三係留索を掛け渡して前記引上げ機に接続し、当該引上げ機によって前記第三係留索を引き上げる After arranging the floating body main body, the third mooring line is hung on the mooring line guide in the starboard column, connected to the pulling machine, and the third mooring line is pulled up by the pulling machine.
ことを特徴とする浮体係留方法。 A floating body mooring method characterized by that.
洋上構造物が設置される浮体本体と、
前記浮体本体に設置される係留索ガイドと、
前記係留索ガイドに掛けられる係留索に接続される引上げ機とを備え、
前記引上げ機は、前記浮体本体のデッキに取外し可能に装着される
ことを特徴とする浮体。 A floating body used in the floating body mooring method according to claim 1 or 2.
Floating body where offshore structures are installed and
The mooring line guide installed on the floating body and
It is equipped with a pulling machine connected to the mooring line hung on the mooring line guide.
The pulling machine is a floating body characterized in that it is detachably mounted on the deck of the floating body main body.
前記引上げ機は、引上げ機本体と、回転架台とを備え、
前記引上げ機本体と前記浮体本体のデッキとの間には、回転架台が設置され、
前記係留索ガイドは、前記引上げ機の周囲に複数配置される
ことを特徴とする浮体。 In the floating body according to claim 3,
The pulling machine includes a pulling machine main body and a rotary stand.
A rotary stand is installed between the pulling machine main body and the deck of the floating body main body.
A plurality of the mooring line guides are arranged around the pulling machine.
前記浮体本体は、前記洋上構造物が設置される設置コラムと、前記設置コラムの左舷に配置される左舷コラムと、前記設置コラムの右舷に配置される右舷コラムと、前記左舷コラム、前記右舷コラムおよび前記設置コラムを接続するロワーハルとを備え、
前記係留索ガイドは、前記左舷コラムおよび前記右舷コラムにそれぞれ設置され、
前記引上げ機は、前記左舷コラムのデッキおよび前記右舷コラムのデッキにそれぞれ取外し可能に装着される
ことを特徴とする浮体。 In the floating body according to claim 3 or 4.
The floating body includes an installation column on which the offshore structure is installed, a port column arranged on the port side of the installation column, a starboard column arranged on the starboard side of the installation column, a port column, and a starboard column. And with a lower hull to connect the installation column
The mooring line guides are installed in the port column and the starboard column, respectively.
The pulling machine is a floating body that is detachably mounted on the deck of the port column and the deck of the starboard column, respectively.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2017232727A JP6949690B2 (en) | 2017-12-04 | 2017-12-04 | Floating body mooring method and floating body |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2017232727A JP6949690B2 (en) | 2017-12-04 | 2017-12-04 | Floating body mooring method and floating body |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2019098963A JP2019098963A (en) | 2019-06-24 |
| JP6949690B2 true JP6949690B2 (en) | 2021-10-13 |
Family
ID=66975418
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2017232727A Active JP6949690B2 (en) | 2017-12-04 | 2017-12-04 | Floating body mooring method and floating body |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6949690B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7219680B2 (en) * | 2019-07-11 | 2023-02-08 | 日立造船株式会社 | Installation method of mooring system and installation method of mooring floating body |
| JP7365298B2 (en) * | 2020-07-13 | 2023-10-19 | 日立造船株式会社 | How to install a mooring system and how to install a mooring floating body |
| CN116902139A (en) * | 2023-07-31 | 2023-10-20 | 中海油深圳海洋工程技术服务有限公司 | Limiting and winding and unwinding method for mooring anchor chain of floating wind power platform |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2385584A1 (en) * | 1977-04-01 | 1978-10-27 | Elf Aquitaine | ANCHOR LINES TENSIONING DEVICE |
| JPS58126279A (en) * | 1982-01-20 | 1983-07-27 | Mitsui Eng & Shipbuild Co Ltd | Mooring device for floating structure on frozen sea |
| JPH1082042A (en) * | 1996-09-06 | 1998-03-31 | Maeda Corp | Drawing-in method of caisson |
| NL1026131C2 (en) * | 2004-05-06 | 2005-11-08 | Marine Structure Consul | Anchor system for a floating construction. |
| CN104066979B (en) * | 2011-12-05 | 2017-04-05 | 三菱重工业株式会社 | Floating body type wind power generation device |
| JP6215846B2 (en) * | 2013-01-21 | 2017-10-18 | エムエイチアイ ヴェスタス オフショア ウィンド エー/エス | Maintenance method for floating wind turbine generator |
| JP6185299B2 (en) * | 2013-06-19 | 2017-08-23 | 五洋建設株式会社 | Hoist ship and swing suppression method |
-
2017
- 2017-12-04 JP JP2017232727A patent/JP6949690B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2019098963A (en) | 2019-06-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20160185427A1 (en) | Anchor line tensioning method | |
| KR20130140828A (en) | Fairlead latch device | |
| JP6820698B2 (en) | How to add mooring lines, how to moor floating structures and how to construct floating offshore wind turbines | |
| JP2009013829A (en) | Catamaran for offshore wind turbine generator installation method and offshore wind turbine generator installation method | |
| EP3837159A1 (en) | Mooring and tensioning methods, systems, and apparatus | |
| US20030159638A1 (en) | Method and system for mooring | |
| JP6949690B2 (en) | Floating body mooring method and floating body | |
| KR101702516B1 (en) | Anchoring apparatus and floating offshore structure having the same | |
| US20100098498A1 (en) | Anchor system for offshore dynamically positioned drilling platform | |
| JP6820697B2 (en) | Mooring method of floating structure and construction method of floating offshore wind power generation facility | |
| CN104097748A (en) | Parking craning method for vibration sinking construction of steel cylinders | |
| CN113386902B (en) | Mooring method and mooring system of ship and ship | |
| NO20170862A1 (en) | A mooring system | |
| JPH0656076A (en) | Submarine cable laying construction method and laying work ship thereof | |
| JP6983640B2 (en) | Floating body, floating body mooring device and floating body mooring method | |
| WO2004050470A2 (en) | Mooring windlass/winch system | |
| CN110949612A (en) | Single-point anchoring system suitable for deep open sea culture ship | |
| KR102769494B1 (en) | Method for longitudinal cross-tensioning of mooring lines and mooring systems | |
| JP7853868B2 (en) | Method for installing a tension-moored floating structure and installation structure for a tension-moored floating structure | |
| KR102662433B1 (en) | Spread mooring method for weather vaning | |
| NO346197B1 (en) | Floating construction with mooring system and mooring method | |
| JP7728933B1 (en) | Anchor laying vessel | |
| JP2668040B2 (en) | Facility and method for installing large offshore structures | |
| CN220577462U (en) | A device arranged on the stern deck suitable for recovering anchors and submersible marks in deep sea | |
| CN110601090A (en) | Pre-laying anchor cable auxiliary ship-moving method and system composition of long-distance sandbar section |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20200812 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20210520 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20210601 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20210730 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20210831 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20210922 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6949690 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |