Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6949690B2 - Floating body mooring method and floating body - Google Patents
[go: Go Back, main page]

JP6949690B2 - Floating body mooring method and floating body - Google Patents

Floating body mooring method and floating body Download PDF

Info

Publication number
JP6949690B2
JP6949690B2 JP2017232727A JP2017232727A JP6949690B2 JP 6949690 B2 JP6949690 B2 JP 6949690B2 JP 2017232727 A JP2017232727 A JP 2017232727A JP 2017232727 A JP2017232727 A JP 2017232727A JP 6949690 B2 JP6949690 B2 JP 6949690B2
Authority
JP
Japan
Prior art keywords
floating body
chain
column
mooring line
pulling machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017232727A
Other languages
Japanese (ja)
Other versions
JP2019098963A (en
Inventor
政弘 萩原
政弘 萩原
弘一 藤原
弘一 藤原
哲次 白枝
哲次 白枝
哲郎 堀
哲郎 堀
後藤 真志
真志 後藤
勝公 清水
勝公 清水
康介 井元
康介 井元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Nippon Steel Engineering Co Ltd
Original Assignee
Shimizu Corp
Nippon Steel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp, Nippon Steel Engineering Co Ltd filed Critical Shimizu Corp
Priority to JP2017232727A priority Critical patent/JP6949690B2/en
Publication of JP2019098963A publication Critical patent/JP2019098963A/en
Application granted granted Critical
Publication of JP6949690B2 publication Critical patent/JP6949690B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/727Offshore wind turbines

Landscapes

  • Wind Motors (AREA)

Description

本発明は、浮体係留方法および浮体に関する。 The present invention relates to a floating body anchored method and floating.

従来、洋上に係留される浮体として、海底の掘削装置が設置される浮遊式の氷海構造物が知られている(特許文献1参照)。浮遊式の氷海構造物は、海底のアンカーに係留索を介して洋上に浮いた状態で係留される。
このような氷海構造物は、例えば探査目的の場合、掘削装置を用いて海底を掘削した後、係留位置を変更し、別の場所にて掘削することとなる。このため、氷海構造物には、一般に、係留索を引き上げる引上げ機と、引上げ機によって引き上げた係留索を格納する格納部とが設けられる。
Conventionally, as a floating body moored at sea, a floating ice-sea structure in which an excavator on the seabed is installed is known (see Patent Document 1). Floating ice-sea structures are moored to anchors on the seabed while floating on the ocean via mooring lines.
For such an ice-sea structure, for example, for exploration purposes, after excavating the seabed using an excavator, the mooring position is changed and the ice-sea structure is excavated at another location. For this reason, the ice-sea structure is generally provided with a pulling machine for pulling up the mooring line and a storage unit for storing the mooring line pulled up by the pulling machine.

ところで、浮体に設置される構造物が風力発電装置などでは浮体に引上げ機を設置しないことがある。これは、浮体の係留位置を後に変更する必要がないので、海象の影響を受けて劣化する動力機械である引上げ機の点検、メンテナンス等の手間を省くためである。この場合には、クレーン船などの作業船によって係留索を引き上げ、その後に係留索を浮体に取り付けることによって、係留索の張力を調整する。
しかし、作業船は、浮体よりも海象の影響を大きく受けて揺れ動く。このため、浮体に設置した引上げ機によって係留索を引き上げる場合と比べて、係留索の引上げ作業可能な海象条件の制約が大きい。従って、海象条件を満たさない日数が増えると係留作業が長期化するおそれがある。
By the way, if the structure installed on the floating body is a wind power generator or the like, the pulling machine may not be installed on the floating body. This is because it is not necessary to change the mooring position of the floating body later, so that it is not necessary to inspect and maintain the pulling machine, which is a power machine that deteriorates due to the influence of sea conditions. In this case, the tension of the mooring line is adjusted by pulling up the mooring line by a work ship such as a crane vessel and then attaching the mooring line to the floating body.
However, the workboat sways under the influence of sea conditions more than the floating body. For this reason, there are more restrictions on the sea conditions under which the mooring line can be pulled up than when the mooring line is pulled up by a pulling machine installed on the floating body. Therefore, if the number of days that do not meet the sea condition is increased, the mooring work may be prolonged.

揺動を抑制する特殊な作業船として、船体姿勢を制御可能な作業船が知られている(特許文献2参照)。この作業船は、船体位置を計測するセンサと、センサから出力された情報に基づいて船体を制御する船体制御機構とを備える(特許文献2参照)。
作業船を利用した場合には、船体姿勢を制御して安定させることで、係留索の引上げ作業を行える海象条件を緩和できる。
As a special work vessel that suppresses rocking, a work vessel capable of controlling the hull attitude is known (see Patent Document 2). This work ship includes a sensor for measuring the hull position and a hull control mechanism for controlling the hull based on the information output from the sensor (see Patent Document 2).
When a work ship is used, the sea conditions for pulling up the mooring line can be relaxed by controlling and stabilizing the hull attitude.

特開昭58−126279号公報Japanese Unexamined Patent Publication No. 58-126279 特開2015−003540号公報JP 2015-003540

しかし、特許文献2に記載の作業船は、特殊な作業船であるので、前述したセンサ、船体制御機構を備えていない汎用の作業船と比べて、船体数が少なく手配困難である。また、特殊な作業船の利用は、汎用の作業船を利用する場合と比べてコストがかかる。
また、前述した汎用の作業船を用いて係留索を引き上げて浮体に固定する場合には、特許文献2に記載の作業船を用いる場合と比べて、海象条件の制約が大きく、浮体の係留作業が長期化するおそれがある。
However, since the work vessel described in Patent Document 2 is a special work vessel, the number of hulls is small and it is difficult to arrange the work vessel as compared with the general-purpose work vessel not provided with the above-mentioned sensor and hull control mechanism. In addition, the use of a special work vessel is more costly than the use of a general-purpose work vessel.
Further, when the mooring line is pulled up and fixed to the floating body by using the above-mentioned general-purpose work boat, the restrictions on the sea condition are larger than in the case of using the work boat described in Patent Document 2, and the mooring work of the floating body is performed. May be prolonged.

本発明の目的は、特殊な作業船が不要であり、浮体の係留作業の長期化を抑えることができる浮体係留方法および浮体を提供することにある。 An object of the present invention is a special work boats unnecessary to provide a floating body anchored method and floating Ru can be suppressed prolonged floating mooring operations.

本発明の浮体係留方法は、洋上構造物が設置される浮体本体と、前記浮体本体に設置される係留索ガイドと、前記浮体本体のデッキに取外し可能に装着され且つ前記係留索ガイドに掛けられる係留索に接続される引上げ機と、を備える浮体を、洋上に係留する浮体係留方法であって、前記係留索の一端側を海底に配置し、前記係留索の他端側を前記係留索ガイドに掛け渡して前記引上げ機に接続し、前記引上げ機により前記係留索を引き上げて当該係留索の張力を調整し、張力調整後、前記引上げ機を前記浮体本体のデッキ上から取り外すことを特徴とする。 In the floating body mooring method of the present invention, a floating body main body on which an offshore structure is installed, a mooring rope guide installed on the floating body main body, and a detachably attached to the deck of the floating body main body and hung on the mooring rope guide. A floating body mooring method in which a floating body including a pulling machine connected to a mooring line is moored at sea, one end side of the mooring line is arranged on the sea floor, and the other end side of the mooring line is the mooring line guide. The mooring line is pulled up by the pulling machine to adjust the tension of the mooring line, and after the tension is adjusted, the pulling machine is removed from the deck of the floating body main body. do.
本発明の浮体係留方法によれば、クレーン船などの汎用の作業船よりも海象の影響が小さい浮体本体のデッキに装着された引上げ機によって係留索を引き上げることができる。このため、汎用の作業船を用いて係留索を引き上げる場合と比べて、海象条件の制約を緩和でき、海象条件を満たさない日数を減らすことができて、係留作業の長期化を抑えることができる。 According to the floating body mooring method of the present invention, the mooring line can be pulled up by a pulling machine mounted on the deck of the floating body body, which is less affected by sea conditions than a general-purpose work ship such as a crane ship. Therefore, as compared with the case where the mooring line is pulled up using a general-purpose work boat, the restrictions on the sea condition can be relaxed, the number of days when the sea condition is not satisfied can be reduced, and the mooring work can be suppressed from being prolonged. ..
また、船体姿勢を制御する特殊な作業船を用いる必要がないので、この特殊な作業船の手配に時間や手間を要することがなく、また、特殊な作業船の利用によってコストが増すことを抑制できる。 In addition, since it is not necessary to use a special work vessel that controls the attitude of the hull, it does not take time and effort to arrange this special work vessel, and the cost increase due to the use of the special work vessel is suppressed. can.
さらに、係留索を引き上げて張力を調整した後、動力機械である引上げ機を浮体本体のデッキから取り外すことで、洋上における引上げ機の点検、メンテナンス等の手間を省くことができる。 Further, by pulling up the mooring line to adjust the tension and then removing the pulling machine, which is a power machine, from the deck of the floating body body, it is possible to save the trouble of inspection and maintenance of the pulling machine at sea.

本発明の浮体係留方法では、前記浮体の浮体本体は、前記洋上構造物が設置される設置コラムと、前記設置コラムの左舷に配置される左舷コラムと、前記設置コラムの右舷に配置される右舷コラムと、前記左舷コラム、前記右舷コラムおよび前記設置コラムを接続するロワーハルとを備え、前記係留索ガイドは、前記左舷コラムおよび前記右舷コラムにそれぞれ設置され、前記引上げ機は、前記左舷コラムのデッキおよび前記右舷コラムのデッキにそれぞれ取外し可能に装着されており、海底に配置される前記係留索は、仮係留索と、第一係留索と、第二係留索と、第三係留索とによって構成され、前記設置コラムに前記第一係留索を固定し、前記仮係留索を曳船によって牽引して、前記第一係留索を張りつつ前記浮体本体を係留計画位置に配置し、前記浮体本体の配置後、前記左舷コラムにおける前記係留索ガイドに前記第二係留索を掛け渡して前記引上げ機に接続し、当該引上げ機によって前記第二係留索を引き上げ、前記浮体本体の配置後、前記右舷コラムにおける前記係留索ガイドに前記第三係留索を掛け渡して前記引上げ機に接続し、当該引上げ機によって前記第三係留索を引き上げることが好ましい。 In the floating body mooring method of the present invention, the floating body of the floating body is the installation column on which the offshore structure is installed, the left-side column arranged on the left side of the installation column, and the right-side side arranged on the right side of the installation column. The column is provided with a column, a lower hull connecting the left column, the right column and the installation column, the mooring line guide is installed in the left column and the right column, respectively, and the pulling machine is a deck of the left column. The mooring line, which is detachably attached to the deck of the right side column and is arranged on the seabed, is composed of a temporary mooring line, a first mooring line, a second mooring line, and a third mooring line. The first mooring line is fixed to the installation column, the temporary mooring line is towed by a towboat, the floating body body is placed at the mooring planned position while the first mooring line is stretched, and the floating body body is arranged. Later, the second mooring rope is hung on the mooring rope guide in the left-side column to connect to the pulling machine, the second mooring rope is pulled up by the pulling machine, and after the floating body main body is arranged, the right-side column It is preferable that the third mooring rope is hung on the mooring rope guide and connected to the pulling machine, and the third mooring rope is pulled up by the pulling machine.
このような構成によれば、設置コラムに引上げ機を装着することなく浮体を係留でき、風車等の洋上構造物を設置したため引上げ機を設置することができない場合でも浮体を係留することが可能となる。また、設置コラムに引上げ機を装着する場合と比べて、引上げ機を取り外す手間を軽減でき、係留作業期間を短縮できる。 According to such a configuration, the floating body can be moored without attaching the pulling machine to the installation column, and the floating body can be moored even when the pulling machine cannot be installed because the offshore structure such as a wind turbine is installed. Become. Further, as compared with the case where the pulling machine is attached to the installation column, the time and effort for removing the pulling machine can be reduced, and the mooring work period can be shortened.

本発明の浮体は、前述した本発明の浮体係留方法に用いられる浮体であって、洋上構造物が設置される浮体本体と、前記浮体本体に設置される係留索ガイドと、前記係留索ガイドに掛けられる係留索に接続される引上げ機とを備え、前記引上げ機は、前記浮体本体のデッキに取外し可能に装着されることを特徴とする。 The floating body of the present invention is a floating body used in the above-mentioned floating body mooring method of the present invention, and is used on a floating body main body on which an offshore structure is installed, a mooring line guide installed on the floating body main body, and the mooring line guide. It is provided with a pulling machine connected to a mooring line to be hung, and the pulling machine is detachably mounted on a deck of the floating body main body.
本発明の浮体によれば、次の手順によって浮体を洋上に係留できる。先ず、係留索の一端側を海底に配置し、係留索の他端側を浮体の係留索ガイドに掛け渡して引上げ機に接続する。次に、引上げ機により係留索を引き上げて当該係留索の張力を調整する。張力調整後、引上げ機を浮体本体のデッキ上から取り外す。 According to the floating body of the present invention, the floating body can be moored at sea by the following procedure. First, one end side of the mooring line is arranged on the seabed, and the other end side of the mooring line is hung on the mooring line guide of the floating body and connected to the pulling machine. Next, the mooring line is pulled up by a pulling machine to adjust the tension of the mooring line. After adjusting the tension, remove the puller from the deck of the floating body.
このように浮体を洋上に係留することで、クレーン船などの汎用の作業船よりも海象の影響が小さい浮体本体のデッキに装着された引上げ機によって係留索を引き上げることができる。このため、汎用の作業船を用いて係留索を引き上げる場合と比べて、海象条件の制約を緩和でき、海象条件を満たさない日数を減らすことができて、係留作業の長期化を抑えることができる。 By mooring the floating body at sea in this way, the mooring line can be pulled up by a pulling machine mounted on the deck of the floating body body, which is less affected by sea conditions than a general-purpose work ship such as a crane vessel. Therefore, as compared with the case where the mooring line is pulled up using a general-purpose work boat, the restrictions on the sea condition can be relaxed, the number of days when the sea condition is not satisfied can be reduced, and the mooring work can be suppressed from being prolonged. ..
また、船体姿勢を制御する特殊な作業船を用いる必要がないので、この特殊な作業船の手配に時間や手間を要することがなく、また、特殊な作業船の利用によってコストが増すことを抑制できる。 In addition, since it is not necessary to use a special work vessel that controls the attitude of the hull, it does not take time and effort to arrange this special work vessel, and the cost increase due to the use of the special work vessel is suppressed. can.
さらに、係留索を引き上げて張力を調整した後、動力機械である引上げ機を浮体本体のデッキから取り外すことで、洋上における引上げ機の点検、メンテナンス等の手間を省くことができる。 Further, by pulling up the mooring line to adjust the tension and then removing the pulling machine, which is a power machine, from the deck of the floating body body, it is possible to save the trouble of inspection and maintenance of the pulling machine at sea.

本発明の浮体では、前記引上げ機は、引上げ機本体と、回転架台とを備え、前記引上げ機本体と前記浮体本体のデッキとの間には、回転架台が設置され、前記係留索ガイドは、前記引上げ機の周囲に複数配置されることが好ましい。 In the floating body of the present invention, the pulling machine includes a pulling machine main body and a rotary stand, and a rotary stand is installed between the pulling machine main body and the deck of the floating body main body. It is preferable that a plurality of them are arranged around the pulling machine.
このような構成によれば、回転架台によって引上げ機本体を回転することで当該引上げ機による係留索の引上げ向きを変更できる。このため、引上げ機の周囲に配置された複数の係留索ガイドに掛けられる係留索をそれぞれ引き上げることができる。このように複数の係留索の引き上げに引上げ機を共用でき、浮体本体のデッキスペースが狭小であっても複数の係留索を引上げ可能な浮体を構成できる。 According to such a configuration, the pulling direction of the mooring line by the pulling machine can be changed by rotating the pulling machine main body by the rotary stand. Therefore, the mooring lines hung on the plurality of mooring line guides arranged around the pulling machine can be pulled up. In this way, the pulling machine can be shared for pulling up a plurality of mooring lines, and a floating body capable of pulling up a plurality of mooring lines can be configured even if the deck space of the floating body body is small.

本発明の浮体では、前記浮体本体は、前記洋上構造物が設置される設置コラムと、前記設置コラムの左舷に配置される左舷コラムと、前記設置コラムの右舷に配置される右舷コラムと、前記左舷コラム、前記右舷コラムおよび前記設置コラムを接続するロワーハルとを備え、前記係留索ガイドは、前記左舷コラムおよび前記右舷コラムにそれぞれ設置され、前記引上げ機は、前記左舷コラムのデッキおよび前記右舷コラムのデッキにそれぞれ取外し可能に装着されることが好ましい。 In the floating body of the present invention, the floating body body includes an installation column on which the offshore structure is installed, a port column arranged on the port side of the installation column, a starboard column arranged on the starboard side of the installation column, and the above. A port column, a lower hull connecting the starboard column and the installation column are provided, the mooring line guide is installed on the port column and the starboard column, respectively, and the pulling machine is a deck of the port column and the starboard column. It is preferable that they are detachably attached to each of the decks.
このような構成によれば、例えば、次の手順によって浮体を洋上に係留できる。先ず、海底に配置する係留索のうち設置コラムに引き上げる係留索の端部は作業船が移動することなく引き上げられるよう予め端部を引き寄せて配置する。また、ドック内や岸壁など海象条件の影響を受けない場所で予め設置コラムに係留索の他端側を取り付けておく。その際、設置コラムに取り付ける係留索は、張力導入後の最終長さに調整し設置コラムに取り付けておく。洋上において浮体本体を係留索端部を引き寄せた場所に曳航し、作業船上に海底から端部を引き上げ、設置コラムに取り付けた係留索の端部も作業船上に取り込み、作業船上で両者を接続する。その後、浮体を係留計画位置まで移動し、次に、設置コラムと同様に左舷コラムに取り付けた係留索の端部を作業船上に取り込み、海底に設置した係留索の端部も作業船上に引き上げ、作業船上で接続する。接続部を海中に戻しコラム上に設置した引上げ機で所定の長さまで係留索を引き上げることで張力を調整する。右舷コラムも同様の作業により張力を調整する。作業の順は左舷コラム、右舷コラムにおいて順不同である。最後に、左舷コラムおよび右舷コラムに係留索をそれぞれ固定し、各引上げ機を左舷コラムおよび右舷コラムのデッキからそれぞれ取り外す。 According to such a configuration, the floating body can be moored at sea by the following procedure, for example. First, of the mooring ropes to be placed on the seabed, the ends of the mooring ropes to be pulled up to the installation column are arranged by pulling the ends in advance so that the work boat can be pulled up without moving. In addition, the other end of the mooring line should be attached to the installation column in advance in a place that is not affected by sea conditions such as inside the dock or on the quay. At that time, the mooring line to be attached to the installation column is adjusted to the final length after the tension is introduced and attached to the installation column. Tow the main body of the floating body at sea to the place where the end of the mooring rope is pulled, pull up the end from the seabed on the work ship, take in the end of the mooring rope attached to the installation column on the work ship, and connect the two on the work ship. .. After that, the floating body was moved to the planned mooring position, then the end of the mooring rope attached to the port column was taken into the work ship as in the installation column, and the end of the mooring rope installed on the seabed was also pulled up to the work ship. Connect on the work boat. The tension is adjusted by returning the connection part to the sea and pulling up the mooring line to a predetermined length with a pulling machine installed on the column. Adjust the tension of the starboard column by the same work. The order of work is random in the port column and starboard column. Finally, the mooring lines are fixed to the port and starboard columns, respectively, and each pull-up machine is removed from the decks of the port and starboard columns, respectively.
このように、設置コラムに引上げ機を装着することなく浮体を係留でき、風車等の洋上構造物を設置したため引上げ機を設置することができない場合でも浮体を係留することが In this way, the floating body can be moored without attaching a pulling machine to the installation column, and the floating body can be moored even if the pulling machine cannot be installed because an offshore structure such as a wind turbine is installed.
可能となる。また、設置コラムに引上げ機を装着する場合と比べて、引上げ機を取り外す手間を軽減でき、係留作業期間を短縮できる。It will be possible. Further, as compared with the case where the pulling machine is attached to the installation column, the time and effort for removing the pulling machine can be reduced, and the mooring work period can be shortened.

参考例としての浮体係留装置は、洋上構造物が設置される浮体本体に設置可能な係留索ガイドと、前記係留索ガイドに掛けられる係留索と、前記係留索に接続される引上げ機とを備え、前記引上げ機は、前記浮体本体のデッキに装着および取外し可能に構成されることを特徴とする。
の浮体係留装置によれば、浮体本体に係留索ガイドを設置し、引上げ機を浮体本体のデッキに装着することによって、係留索を係留索ガイドに掛けて引き上げることができる。このため、クレーン船などの汎用の作業船によって係留索を引き上げる場合よりも、海象条件を緩和でき、海象条件を満たさない日数を減らすことができて、係留作業の長期化を抑えることができる。
また、船体姿勢を制御する特殊な作業船を用いる必要がないので、この特殊な作業船の手配に時間や手間を要することがなく、また、特殊な作業船の利用によってコストが増すことを抑制できる。
さらに、係留索を引き上げて張力を調整した後、動力機械である引上げ機を浮体本体のデッキから取り外すことで、洋上における引上げ機の点検、メンテナンス等の手間を省くことができる。
The floating body mooring device as a reference example includes a mooring line guide that can be installed on a floating body main body on which an offshore structure is installed, a mooring line that is hung on the mooring line guide, and a pulling machine that is connected to the mooring line. The pulling machine is characterized in that it can be mounted on and removed from the deck of the floating body body.
According to the floating mooring This established a mooring guides floating body, by attaching a pulling machine to the floating body deck can be pulled over the mooring to mooring guides. Therefore, the sea condition can be relaxed, the number of days when the sea condition is not satisfied can be reduced, and the mooring work can be suppressed from being prolonged, as compared with the case where the mooring line is pulled up by a general-purpose work boat such as a crane vessel.
In addition, since it is not necessary to use a special work vessel that controls the attitude of the hull, it does not take time and effort to arrange this special work vessel, and the cost increase due to the use of the special work vessel is suppressed. can.
Further, by pulling up the mooring line to adjust the tension and then removing the pulling machine, which is a power machine, from the deck of the floating body body, it is possible to save the trouble of inspection and maintenance of the pulling machine at sea.

参考例としての浮体係留装置では、前記引上げ機は、引上げ機本体と、回転架台とを備え、前記引上げ機本体と前記浮体本体のデッキとの間には、回転架台が設置され、前記係留索ガイドは、前記引上げ機の周囲に配置される複数の係留索ガイドによって構成されることが好ましい。
このような構成によれば、回転架台を浮体本体のデッキに取り付けることで、引上げ機をデッキ上に回転可能に設置でき、回転によって引上げ機による係留索の引上げ向きを変更できる。このため、引上げ機の周囲に配置される複数の係留索ガイドに掛けられる係留索をそれぞれ引き上げることができる。このように複数の係留索の引き上げに引上げ機を共用でき、浮体本体のデッキスペースが狭小であっても複数の係留索を引上げ可能な浮体を構成できる。
In the floating body mooring device as a reference example, the pulling machine includes a pulling machine main body and a rotary stand, and a rotary stand is installed between the pulling machine main body and the deck of the floating body main body, and the mooring line is provided. The guide is preferably composed of a plurality of mooring line guides arranged around the pulling machine.
According to such a configuration, by attaching the rotary stand to the deck of the floating body body, the pulling machine can be rotatably installed on the deck, and the pulling direction of the mooring line by the pulling machine can be changed by the rotation. Therefore, the mooring lines hung on the plurality of mooring line guides arranged around the pulling machine can be pulled up. In this way, the pulling machine can be shared for pulling up a plurality of mooring lines, and a floating body capable of pulling up a plurality of mooring lines can be configured even if the deck space of the floating body body is small.

本発明によれば、特殊な作業船が不要であり、浮体の係留作業の長期化を抑えることができる浮体係留方法および浮体を提供できる。 According to the present invention, a special work boats unwanted, can provide a floating body anchored method and floating Ru can be suppressed prolonged floating mooring operations.

本発明の実施形態に係る浮体を示す斜視図。The perspective view which shows the floating body which concerns on embodiment of this invention. 前記実施形態に係る浮体の要部を示す斜視図。The perspective view which shows the main part of the floating body which concerns on the said Embodiment. 前記実施形態に係る浮体の要部の動作を示す斜視図。The perspective view which shows the operation of the main part of the floating body which concerns on the said Embodiment. 前記実施形態に係る浮体の浮体準備工程を示す説明図。The explanatory view which shows the floating body preparation process of the floating body which concerns on the said embodiment. 前記実施形態に係る浮体の仮係留工程を示す説明図。The explanatory view which shows the temporary mooring process of the floating body which concerns on the said embodiment. 前記実施形態に係る浮体のチェーン接続を示す説明図。The explanatory view which shows the chain connection of the floating body which concerns on the said embodiment. 前記実施形態に係る浮体のセンターコラム係留を示す説明図。Explanatory drawing which shows the center column mooring of the floating body which concerns on the said embodiment. 前記実施形態に係る浮体の第二、第三チェーン接続を示す説明図。Explanatory drawing which shows the 2nd and 3rd chain connection of the floating body which concerns on the said embodiment. 前記実施形態に係る浮体のチェーン引上げを示す説明図。The explanatory view which shows the chain pull-up of the floating body which concerns on the said embodiment. 前記実施形態に係る浮体の第三チェーン接続を示す説明図。The explanatory view which shows the 3rd chain connection of the floating body which concerns on the said embodiment. 前記実施形態に係る浮体の第二チェーン接続を示す説明図。The explanatory view which shows the 2nd chain connection of the floating body which concerns on the said embodiment. 前記実施形態に係る浮体の機材撤去工程を示す説明図。The explanatory view which shows the equipment removal process of the floating body which concerns on the said Embodiment.

[本実施形態の構成]
以下、本発明の実施形態を図面に基づいて説明する。
図1,図2において、本実施形態に係る浮体1は、洋上構造物である風力発電装置2が設置され、洋上に浮上した状態で、係留索であるチェーン3によって係留されるものである。
[Structure of the present embodiment]
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
In FIGS. 1 and 2, the floating body 1 according to the present embodiment is moored by a chain 3 which is a mooring line in a state where a wind power generation device 2 which is an offshore structure is installed and floats on the offshore.

浮体1は、浮体本体10と、チェーンシーブ20(係留索ガイド)と、チェーンストッパー30(係留索ストッパー)と、引上げ機40と、方向変更ウインチ50とを備える。 The floating body 1 includes a floating body main body 10, a chain sheave 20 (mooring rope guide), a chain stopper 30 (mooring rope stopper), a pulling machine 40, and a direction changing winch 50.

浮体本体10は、ポートサイドコラム11(左舷コラム)と、スターボードサイドコラム12(右舷コラム)と、センターコラム13と、ロワーハル14(14A,14B)とを備える。ポートサイドコラム11は、ロワーハル14Aによってセンターコラム13に接続され、センターコラム13の左舷に配置される。スターボードサイドコラム12は、ロワーハル14Bによってセンターコラム13に接続され、センターコラム13の右舷に配置される。
この浮体本体10は、平面視略V字状に形成され、海水の内部への出し入れによって浮力調整可能に構成される。
The floating body body 10 includes a port side column 11 (port column), a starboard side column 12 (starboard column), a center column 13, and a lower hull 14 (14A, 14B). The port side column 11 is connected to the center column 13 by the lower hull 14A and is arranged on the port side of the center column 13. The starboard side column 12 is connected to the center column 13 by the lower hull 14B and is arranged on the starboard side of the center column 13.
The floating body body 10 is formed in a substantially V-shape in a plan view, and is configured so that the buoyancy can be adjusted by taking in and out of seawater.

ポートサイドコラム11、スターボードサイドコラム12およびセンターコラム13は、デッキ111,121,131(コラムデッキ)をそれぞれ備える。
ポートサイドコラム11のデッキ111とスターボードサイドコラム12のデッキ121には、チェーンシーブ20と、引上げ機40と、方向変更ウインチ50とが設置される。
また、ポートサイドコラム11の側面とスターボードサイドコラム12の側面には、サイドデッキ15がそれぞれ設けられる。各サイドデッキ15には、チェーン3を挿通可能な三つの孔16がそれぞれ形成される。各孔16は、チェーンストッパー30を上方から嵌め込み可能に構成される。なお、各孔16の下方には、フェアリーダー17が設けられる。
なお、本実施形態では、前述したチェーンストッパー30は、サイドデッキ15に載せられているが、これに限られず、例えばデッキ111,121に載せられていてもよい。
The port side column 11, the starboard side column 12, and the center column 13 include decks 111, 121, and 131 (column decks), respectively.
A chain sheave 20, a pulling machine 40, and a direction changing winch 50 are installed on the deck 111 of the port side column 11 and the deck 121 of the starboard side column 12.
Further, side decks 15 are provided on the side surfaces of the port side column 11 and the side surfaces of the starboard side column 12, respectively. Each side deck 15 is formed with three holes 16 through which the chain 3 can be inserted. Each hole 16 is configured so that the chain stopper 30 can be fitted from above. A fair leader 17 is provided below each hole 16.
In the present embodiment, the chain stopper 30 described above is mounted on the side deck 15, but the present invention is not limited to this, and the chain stopper 30 may be mounted on the decks 111 and 121, for example.

センターコラム13は、デッキ131に風力発電装置2が設置される設置コラムとして構成される。
センターコラム13の側面にはサイドデッキ15が設けられており、サイドデッキ15には、チェーン3を挿通可能な二つの孔16が形成される。各孔16には、チェーンストッパー30を嵌め込み可能に構成される。なお、各孔16の下方には、フェアリーダー17が設けられる。
The center column 13 is configured as an installation column in which the wind power generation device 2 is installed on the deck 131.
A side deck 15 is provided on the side surface of the center column 13, and the side deck 15 is formed with two holes 16 through which the chain 3 can be inserted. A chain stopper 30 can be fitted into each hole 16. A fair leader 17 is provided below each hole 16.

チェーンシーブ20(20A,20B,20C)は、ポートサイドコラム11のデッキ111に三つ設置されており、各々のチェーン引上げ方向が交差する位置に配置される。本実施形態では、各チェーンシーブ20、各孔16および各フェアリーダー17は、鉛直線上に沿って配置される。 Three chain sheaves 20 (20A, 20B, 20C) are installed on the deck 111 of the port side column 11, and are arranged at positions where the chain pulling directions intersect. In this embodiment, each chain sheave 20, each hole 16, and each fair leader 17 are arranged along a vertical line.

チェーンストッパー30は、チェーン3を挟み込み可能な半割体301,302によって構成される。半割体301,302は、チェーン3を挟み込んだ状態で孔16に上方から嵌め込まれることによって、チェーン3の下方への繰り出しを停止する。 The chain stopper 30 is composed of half-split bodies 301 and 302 capable of sandwiching the chain 3. The halves 301 and 302 are fitted into the holes 16 from above with the chain 3 sandwiched therein, thereby stopping the downward feeding of the chain 3.

引上げ機40は、ポートサイドコラム11のデッキ111に設置される。引上げ機40は、チェーンシーブ20A,20B,20Cのチェーン引上げ方向がそれぞれ交差する一つの交差点上に配置される。従って、引上げ機40の周囲にはチェーンシーブ20A,20B,20Cが配置される。 The pulling machine 40 is installed on the deck 111 of the port side column 11. The pulling machine 40 is arranged on one intersection where the chain pulling directions of the chain sheaves 20A, 20B, and 20C intersect. Therefore, the chain sheaves 20A, 20B, and 20C are arranged around the pulling machine 40.

引上げ機40は、チェーンウインチ41(引上げ機本体)と、回転架台42とを備える。回転架台42は、チェーンウインチ41とデッキ111との間に配置される。デッキ111にボルト止めなどによって固定される。回転架台42は、ボルト抜き出しなどによってデッキ111から取り外し可能である。 The pulling machine 40 includes a chain winch 41 (a pulling machine main body) and a rotary stand 42. The rotary base 42 is arranged between the chain winch 41 and the deck 111. It is fixed to the deck 111 by bolting or the like. The rotary base 42 can be removed from the deck 111 by pulling out bolts or the like.

チェーンウインチ41は、回転架台42上に配置されるので、デッキ111に対して鉛直軸を中心として回転方向Rに回転可能である。ここで、チェーンウインチ41自体をデッキ111にボルト止めなどによって固定することで、引上げ機40によるチェーン引上げ方向を固定可能である。また、前記ボルト抜き出しなどによってチェーン引上げ方向の固定を解除可能である。 Since the chain winch 41 is arranged on the rotary base 42, the chain winch 41 can rotate in the rotation direction R about the vertical axis with respect to the deck 111. Here, by fixing the chain winch 41 itself to the deck 111 by bolting or the like, the chain pulling direction by the pulling machine 40 can be fixed. Further, the fixing in the chain pulling direction can be released by pulling out the bolt or the like.

方向変更ウインチ50は、図2に示すように、ポートサイドコラム11のデッキ111に設置される。
方向変更ウインチ50は、図3に示すように、引上げ機40にワイヤー51を掛け回し、このワイヤー51を巻き取ることによって引上げ機40を回転方向Rに回転可能に構成される。これにより、引上げ機40のチェーン引上げ方向をチェーンシーブ20A,20B,20Cのいずれかのチェーン引上げ方向を向くように、引上げ機40のチェーン引上げ方向を変更する。
また、方向変更ウインチ50は、ワイヤー51を逆向きに掛け回し、方向変更ウインチ50によってワイヤー51を巻き取ることによって引上げ機40を回転方向Rにおいて前記回転とは逆向きに回転可能に構成される。
なお、方向変更ウインチ50は、デッキ111にボルト止めなどによって固定されており、ボルト抜き出しなどによってデッキ111への固定を解除可能である。
The direction change winch 50 is installed on the deck 111 of the port side column 11 as shown in FIG.
As shown in FIG. 3, the direction change winch 50 is configured so that the pulling machine 40 can be rotated in the rotation direction R by winding the wire 51 around the pulling machine 40 and winding the wire 51. As a result, the chain pulling direction of the pulling machine 40 is changed so that the chain pulling direction of the pulling machine 40 faces the chain pulling direction of any one of the chain sheaves 20A, 20B, and 20C.
Further, the direction changing winch 50 is configured to rotate the wire 51 in the opposite direction and wind the wire 51 by the direction changing winch 50 so that the pulling machine 40 can rotate in the rotation direction R in the direction opposite to the rotation. ..
The direction change winch 50 is fixed to the deck 111 by bolting or the like, and can be released from being fixed to the deck 111 by removing the bolt or the like.

なお、チェーンシーブ20(20A,20B,20C)、チェーンストッパー30、引上げ機40および方向変更ウインチ50は、スターボードサイドコラム12にも同様に設置されるので詳細な説明を省略する。 Since the chain sheave 20 (20A, 20B, 20C), the chain stopper 30, the pulling machine 40, and the direction change winch 50 are similarly installed on the starboard side column 12, detailed description thereof will be omitted.

[浮体係留方法]
以下、本実施形態に係る浮体1の浮体係留方法について説明する。
本浮体係留方法は、アンカーチェーン敷設工程と、浮体準備工程と、浮体仮係留工程と、浮体係留工程と、機材撤去工程とを有する。
[Floating body mooring method]
Hereinafter, the floating body mooring method of the floating body 1 according to the present embodiment will be described.
This floating body mooring method includes an anchor chain laying step, a floating body preparation step, a floating body temporary mooring step, a floating body mooring step, and an equipment removal step.

アンカーチェーン敷設工程は、次の通りである。
浮体1を係留する現場海域において、作業船によって本係留用の所定数のアンカーを所定の海底位置に配置する。各アンカーにはチェーン3の一端を接続しておき、他端は海面に浮かぶフローターにワイヤーを介して接続する。また、図5に示す仮係留索4(4A,4B)も仮係留用のアンカーに一端を接続し、他端をフローターにワイヤーを介して接続する。
本実施形態では、本係留用のアンカーは8個、仮係留用のアンカーは2個である。本係留用のチェーン3には、センターコラム13に接続されるための第一チェーン31,32と、ポートサイドコラム11に接続されるための第二チェーン33,34,35と、スターボードサイドコラム12に接続されるための第三チェーン36,37,38とがある(図8参照)。
相対してアンカーチェーンの端部2本を作業船上に引き上げ、船上に設置したチェーンプーラー等チェーンに張力を生じさせる機器を用いて設計上の最大荷重で引き、満足することを確認する。このアンカー引張試験により最終アンカー位置が決まるので、必要張力を発揮するためにチェーンストッパー30に止めなければならないチェーン長を算出することが可能となる。
センターコラム13に接続される二本のチェーン3の端部は移動することなく作業船7で引き上げられるよう所定の位置に引き寄せておく。
なお、アンカーチェーン敷設工程は、浮体仮係留工程までに完了していればよい。
The anchor chain laying process is as follows.
In the site sea area where the floating body 1 is moored, a predetermined number of anchors for main mooring are arranged at a predetermined seabed position by a work boat. One end of the chain 3 is connected to each anchor, and the other end is connected to a floater floating on the sea surface via a wire. Further, one end of the temporary mooring rope 4 (4A, 4B) shown in FIG. 5 is also connected to the anchor for temporary mooring, and the other end is connected to the floater via a wire.
In the present embodiment, there are eight anchors for main mooring and two anchors for temporary mooring. The mooring chain 3 includes first chains 31, 32 for connecting to the center column 13, second chains 33, 34, 35 for connecting to the port side column 11, and a starboard side column. There are third chains 36, 37, 38 for connecting to 12 (see FIG. 8).
On the other hand, pull up the two ends of the anchor chain onto the work ship and pull them with the maximum design load using a device that creates tension in the chain, such as a chain puller installed on the ship, and confirm that they are satisfied. Since the final anchor position is determined by this anchor tension test, it is possible to calculate the chain length that must be stopped at the chain stopper 30 in order to exert the required tension.
The ends of the two chains 3 connected to the center column 13 are pulled to a predetermined position so that they can be pulled up by the work boat 7 without moving.
The anchor chain laying process may be completed by the floating body temporary mooring process.

浮体準備工程は、次の通りである。
先ず、図4に示す例では、浮体本体10のスターボードサイドコラム12およびセンターコラム13を岸壁8に沿って配置する。この浮体本体10のポートサイドコラム11、スターボードサイドコラム12には、チェーンシーブ20およびチェーンストッパー30が予め設置されている。またセンターコラム13にはチェーンストッパー30が予め設置されている。次に、プレリグチェーン3A(図2参照)、風力発電装置2、引上げ機40および方向変更ウインチ50を、浮体本体10に取り付ける。各チェーンウインチ41は、そのチェーン引上げ方向を各チェーンシーブ20Bのチェーン引上げ方向に向けて配置し、デッキ111,121にボルトなどによって固定する。この作業はドック内で実施することも可能であり、場所は特定しない。
The floating body preparation process is as follows.
First, in the example shown in FIG. 4, the starboard side column 12 and the center column 13 of the floating body body 10 are arranged along the quay 8. A chain sheave 20 and a chain stopper 30 are previously installed on the port side column 11 and the starboard side column 12 of the floating body body 10. A chain stopper 30 is installed in advance on the center column 13. Next, the pre-rig chain 3A (see FIG. 2), the wind power generator 2, the pull-up machine 40, and the direction change winch 50 are attached to the floating body body 10. Each chain winch 41 is arranged with its chain pulling direction facing the chain pulling direction of each chain sheave 20B, and is fixed to decks 111 and 121 with bolts or the like. This work can also be done in the dock and is not location specific.

プレリグチェーン3Aは、各チェーンシーブ20に掛けられ、各孔16に挿通され、各フェアリーダー17に掛けられる。センターコラム13に取り付けられるプレリグチェーン3Aは、予め張力導入後の最終長さに調整し、チェーンストッパー30によって当該センターコラム13に係止した状態とされる。また、ポートサイドコラム11およびスターボードサイドコラム12に設置されたチェーンシーブ20Bに掛けられるプレリグチェーン3Aのうち現場海域で最初に引き上げるチェーンは、各引上げ機40に接続し現場海域ですぐに引き上げられる状態とされる。
風力発電装置2は、センターコラム13のデッキ131上に設置される。
引上げ機40および方向変更ウインチ50は、ポートサイドコラム11のデッキ111およびスターボードサイドコラム12のデッキ121にそれぞれ設置される。具体的には、引上げ機40および方向変更ウインチ50は、クレーン船などの作業船7によって持ち上げられ、デッキ111,121に降ろされて配置され、前述したようにボルト止め等によってデッキ111,121に固定される。
なお、デッキ111,121には、発電機なども設置される。
The pre-rig chain 3A is hung on each chain sheave 20, inserted through each hole 16, and hung on each fair leader 17. The pre-rig chain 3A attached to the center column 13 is adjusted to the final length after tension is introduced in advance, and is locked to the center column 13 by the chain stopper 30. Of the pre-rig chains 3A hung on the chain sheave 20B installed on the port side column 11 and the starboard side column 12, the chain to be pulled up first in the field sea area is connected to each pulling machine 40 and immediately pulled up in the field sea area. It is said that it will be in a state of being.
The wind power generator 2 is installed on the deck 131 of the center column 13.
The pulling machine 40 and the direction change winch 50 are installed on the deck 111 of the port side column 11 and the deck 121 of the starboard side column 12, respectively. Specifically, the pulling machine 40 and the direction change winch 50 are lifted by a work boat 7 such as a crane vessel, lowered onto the decks 111 and 121, and arranged on the decks 111 and 121 by bolting or the like as described above. It is fixed.
A generator or the like is also installed on the decks 111 and 121.

浮体仮係留工程は、次の通りである。
浮体準備工程において準備した浮体1を、曳船によって、アンカーやチェーン3、仮係留索4が敷設された現場海域まで曳航し、図5に示すように、浮体1を係留する係留計画位置Xから所定距離を離間した初期位置に配置する。
次に、仮係留索4Aを作業船によって引き上げ、スターボードサイドコラム12に接続する。また、仮係留索4Bを作業船によって引き上げ、ポートサイドコラム11に接続する。かかる仮係留索4A,4Bは、図5に示すように交差して張られる。そして、浮体1は、ロワーハル14A,14Bが作業船7に連結索を介して接続され、当該作業船7によって仮係留索4A,4Bから離間方向に向かう引張力が加えられる。なお、本実施形態では、作業船7にはクレーン船を採用している。
このようにして、浮体1は初期位置に仮係留される。
The floating body temporary mooring process is as follows.
The floating body 1 prepared in the floating body preparation process is towed by a tugboat to the site sea area where the anchor, the chain 3, and the temporary mooring line 4 are laid, and as shown in FIG. Place it in the initial position separated by a distance.
Next, the temporary mooring line 4A is pulled up by the work boat and connected to the starboard side column 12. Further, the temporary mooring line 4B is pulled up by the work boat and connected to the port side column 11. The temporary mooring lines 4A and 4B are crossed and stretched as shown in FIG. Then, in the floating body 1, the lower hulls 14A and 14B are connected to the work vessel 7 via a connecting rope, and the work vessel 7 applies a tensile force in the direction away from the temporary mooring ropes 4A and 4B. In this embodiment, a crane vessel is used as the work vessel 7.
In this way, the floating body 1 is temporarily moored at the initial position.

浮体係留工程は、次の通りである。
先ず、予め引き寄せておいた第一チェーン31,32を浮体本体10のセンターコラム13に張設する。具体的には、作業船7を連結索によって浮体本体10に連結する前に、
当該作業船7によって第一チェーン31,32を海底から引き上げておき、図6に示すように、第一チェーン31,32をセンターコラム13に浮体準備工程において取り付けられた各プレリグチェーン3Aも作業船7に取り込み、作業船7上で両者を接続し、接続したチェーンを海中に戻す。続いて、図7に示すように、作業船7と浮体本体10とを繋ぐ連結索を浮体本体10から外し、曳船によって浮体本体10を係留計画位置Xまで牽引する。この牽引によって、第一チェーン31,32は引っ張られて正規の方向に向けて張設される。
第一チェーン31,32の長さは所定の張力を導入した時のカテナリー計算により張力導入後の長さに調整しておく。また、仮係留索4A,4Bは、曳船によって浮体本体10を牽引する前に浮体本体10から取り外す。
なお、後述する各チェーン33〜38の引上げ、接続手順は、第一チェーン31,32の引上げ、接続手順と同様であるので説明を省略する。
The floating body mooring process is as follows.
First, the first chains 31 and 32 that have been drawn in advance are stretched on the center column 13 of the floating body body 10. Specifically, before connecting the work vessel 7 to the floating body body 10 by the connecting rope,
The first chains 31 and 32 are pulled up from the seabed by the work vessel 7, and as shown in FIG. 6, each prerig chain 3A attached to the center column 13 in the floating body preparation process also works. It is taken into the ship 7, connected to each other on the work ship 7, and the connected chain is returned to the sea. Subsequently, as shown in FIG. 7, the connecting rope connecting the work boat 7 and the floating body main body 10 is removed from the floating body main body 10, and the floating body main body 10 is towed to the mooring planned position X by the tugboat. By this traction, the first chains 31 and 32 are pulled and stretched in the normal direction.
The lengths of the first chains 31 and 32 are adjusted to the length after the tension is introduced by the catenary calculation when the predetermined tension is introduced. Further, the temporary mooring lines 4A and 4B are removed from the floating body main body 10 before being towed by the tugboat.
The procedure for pulling up and connecting the chains 33 to 38, which will be described later, is the same as the procedure for pulling up and connecting the first chains 31 and 32, and thus the description thereof will be omitted.

次に、第二チェーン34をポートサイドコラム11に張設する。具体的には、第二チェーン34を図8に実線で示す作業船7によって海底から引き上げ、作業船7に取り込まれたポートサイドコラム11に取り付けられたプレリグチェーン3A端部と接続する。ここで、第二チェーン34が接続されるプレリグチェーン3Aは、チェーンシーブ20Bに掛け渡されて引上げ機40に接続した状態のものである。
第二チェーン34のプレリグチェーン3Aへの接続後、接続部を海中に戻した後、引上げ機40によって第二チェーン34を巻き上げる。これにより、第二チェーン34は引き上げられて所定のカテナリー曲線を形成し、チェーン張力が調整される。チェーン張力の調整後、第二チェーン34はチェーンストッパー30によってポートサイドコラム11に係止される。引き上げた余剰チェーンはチェーンストッパー30の上部位置で切断後作業船7上に回収する。
Next, the second chain 34 is stretched on the port side column 11. Specifically, the second chain 34 is pulled up from the seabed by the work vessel 7 shown by the solid line in FIG. 8 and connected to the end of the pre-rig chain 3A attached to the port side column 11 taken into the work vessel 7. Here, the pre-rig chain 3A to which the second chain 34 is connected is in a state of being hung on the chain sheave 20B and connected to the pulling machine 40.
After connecting the second chain 34 to the pre-rig chain 3A, the connecting portion is returned to the sea, and then the second chain 34 is wound up by the pulling machine 40. As a result, the second chain 34 is pulled up to form a predetermined catenary curve, and the chain tension is adjusted. After adjusting the chain tension, the second chain 34 is locked to the port side column 11 by the chain stopper 30. The pulled-up excess chain is cut at the upper position of the chain stopper 30 and then collected on the work vessel 7.

次に、第三チェーン37をスターボードサイドコラム12に張設する。具体的には、第三チェーン37を図8に点線で示す作業船7によって海底から引き上げ、作業船7に取り込まれたスターボードサイドコラム12に取り付けられたプレリグチェーン3A端部と接続する。ここで、第三チェーン37が接続されるプレリグチェーン3Aは、チェーンシーブ20Bに掛け渡されて引上げ機40に接続した状態のものである。
第三チェーン37のプレリグチェーン3Aへの接続後、接続部を海中に戻した後、図9に示すように、引上げ機40によって第三チェーン37を巻き上げる。これにより、第三チェーン37は引き上げられて所定のカテナリー曲線を形成し、チェーン張力が調整される。チェーン張力の調整後、第三チェーン37はチェーンストッパー30によってスターボードサイドコラム12に係止される。引き上げた余剰チェーンはチェーンストッパー30上部位置で切断後作業船7上に回収する。回収途中、切断したチェーン3端部が引上げ機40のドラム手前に来たところで当該チェーン3を止め、チェーン3が作業船7に向かう側のチェーン3も適切な位置で切断することにより引上げ機40内にチェーン3が残った状態とする。なお、第二チェーン34の接続作業と第三チェーン37の接続作業は順不同である。
Next, the third chain 37 is stretched on the starboard side column 12. Specifically, the third chain 37 is pulled up from the seabed by the work vessel 7 shown by the dotted line in FIG. 8 and connected to the end of the pre-rig chain 3A attached to the starboard side column 12 taken into the work vessel 7. Here, the pre-rig chain 3A to which the third chain 37 is connected is in a state of being hung on the chain sheave 20B and connected to the pulling machine 40.
After connecting the third chain 37 to the pre-rig chain 3A, the connecting portion is returned to the sea, and then the third chain 37 is wound up by the pulling machine 40 as shown in FIG. As a result, the third chain 37 is pulled up to form a predetermined catenary curve, and the chain tension is adjusted. After adjusting the chain tension, the third chain 37 is locked to the starboard side column 12 by the chain stopper 30. The surplus chain pulled up is collected on the work vessel 7 after being cut at the upper position of the chain stopper 30. During the collection, the chain 3 is stopped when the end of the cut chain 3 comes to the front of the drum of the pulling machine 40, and the chain 3 on the side where the chain 3 faces the work boat 7 is also cut at an appropriate position to pull the pulling machine 40. It is assumed that the chain 3 remains inside. The connection work of the second chain 34 and the connection work of the third chain 37 are in no particular order.

第一チェーン31,32、第二チェーン34および第三チェーン37の張設によって、浮体本体10は四方に係留された状態となる。この状態からさらに、図10に示すように第三チェーン36,38をスターボードサイドコラム12に追加張設し、かつ、図11に示すように第二チェーン33,35をポートサイドコラム11に追加張設する。 By stretching the first chains 31, 32, the second chain 34, and the third chain 37, the floating body body 10 is moored in all directions. From this state, the third chains 36 and 38 are additionally stretched to the starboard side column 12 as shown in FIG. 10, and the second chains 33 and 35 are additionally stretched to the port side column 11 as shown in FIG. It will be stretched.

第三チェーン36のスターボードサイドコラム12への張設手順は次の通りである。先ず、チェーンウインチ41とデッキ121とのボルトなどによる固定を解除し、チェーンウインチ41を回転可能状態とする。続いて、方向変更ウインチ50によって前述した通りに引上げ機40を回転方向Rに回転し、引上げ機40のチェーン引上げ方向を、チェーンシーブ20Bのチェーン引上げ方向からチェーンシーブ20Cのチェーン引上げ方向に変更する。そして、チェーンウインチ41をデッキ121に再び固定し、チェーンシーブ20Cに掛け渡されたプレリグチェーン3Aを引上げ機40内に残したチェーンと接続する。 The procedure for attaching the third chain 36 to the starboard side column 12 is as follows. First, the chain winch 41 and the deck 121 are released from being fixed by bolts or the like to make the chain winch 41 rotatable. Subsequently, the pulling machine 40 is rotated in the rotation direction R by the direction change winch 50 as described above, and the chain pulling direction of the pulling machine 40 is changed from the chain pulling direction of the chain sheave 20B to the chain pulling direction of the chain sheave 20C. .. Then, the chain winch 41 is fixed to the deck 121 again, and the pre-rig chain 3A hung on the chain sheave 20C is connected to the chain left in the pulling machine 40.

次に、第三チェーン36を作業船7によって海底から引き上げ、スターボードサイドコラム12のチェーンシーブ20Cに掛け渡されたプレリグチェーン3Aの端部も作業船7上に取り込み、作業船7上で両者を接続する。
第三チェーン36のプレリグチェーン3Aへの接続後、接続部を海中に戻し、引上げ機40によって第三チェーン36を巻き上げる。これにより、第三チェーン36は引き上げられて所定のカテナリー曲線を形成し、チェーン張力が調整される。チェーン張力の調整後、第三チェーン36はチェーンストッパー30によってスターボードサイドコラム12に係止される。引き上げた余剰チェーンはチェーンストッパー30の上部位置で切断後作業船7上に回収する。回収途中、切断したチェーン3端部が引上げ機40のドラム手前に来たところで当該チェーン3を止め、チェーン3が作業船7に向かう側のチェーン3も適切な位置で切断することにより引上げ機40内にチェーン3が残った状態とする。
Next, the third chain 36 is pulled up from the seabed by the work vessel 7, and the end of the pre-rig chain 3A hung on the chain sheave 20C of the starboard side column 12 is also taken into the work vessel 7 and on the work vessel 7. Connect both.
After connecting the third chain 36 to the pre-rig chain 3A, the connection portion is returned to the sea, and the third chain 36 is wound up by the pulling machine 40. As a result, the third chain 36 is pulled up to form a predetermined catenary curve, and the chain tension is adjusted. After adjusting the chain tension, the third chain 36 is locked to the starboard side column 12 by the chain stopper 30. The pulled-up excess chain is cut at the upper position of the chain stopper 30 and then collected on the work vessel 7. During the collection, the chain 3 is stopped when the end of the cut chain 3 comes to the front of the drum of the pulling machine 40, and the chain 3 on the side where the chain 3 faces the work boat 7 is also cut at an appropriate position to pull the pulling machine 40. It is assumed that the chain 3 remains inside.

次に、第三チェーン38をスターボードサイドコラム12へ張設する。具体的には、先ず、チェーンウインチ41とデッキ121との固定を解除し、チェーンウインチ41を回転可能状態とする。続いて、方向変更ウインチ50によって前述した通りに引上げ機40を回転方向Rにおいて逆回転し、引上げ機40のチェーン引上げ方向を、チェーンシーブ20Cのチェーン引上げ方向からチェーンシーブ20Aのチェーン引上げ方向に変更する。そして、チェーンウインチ41をデッキ121に再び固定し、チェーンシーブ20Aに掛け渡されたプレリグチェーン3Aを引上げ機40内に残したチェーンと接続する。 Next, the third chain 38 is stretched to the starboard side column 12. Specifically, first, the chain winch 41 and the deck 121 are released from being fixed, and the chain winch 41 is brought into a rotatable state. Subsequently, the pulling machine 40 is rotated in the reverse direction in the rotation direction R by the direction change winch 50 as described above, and the chain pulling direction of the pulling machine 40 is changed from the chain pulling direction of the chain sheave 20C to the chain pulling direction of the chain sheave 20A. do. Then, the chain winch 41 is fixed to the deck 121 again, and the pre-rig chain 3A hung on the chain sheave 20A is connected to the chain left in the pulling machine 40.

次に、第三チェーン38を作業船7によって海底から引き上げ、スターボードサイドコラム12のチェーンシーブ20Aに掛け渡されたプレリグチェーン3Aの端部も作業船7上に取り込み、作業船7上を接続する。
第三チェーン38のプレリグチェーン3Aへの接続後、接続部を海中に戻し、引上げ機40によって第三チェーン38を巻き上げる。これにより、第三チェーン38は引き上げられて所定のカテナリー曲線を形成し、チェーン張力が調整される。チェーン張力の調整後、第三チェーン38はチェーンストッパー30によってスターボードサイドコラム12に係止される。引き上げた余剰チェーンはチェーンストッパー30の上部位置で切断後作業船7上に全量回収する。
Next, the third chain 38 is pulled up from the seabed by the work vessel 7, and the end of the pre-rig chain 3A hung on the chain sheave 20A of the starboard side column 12 is also taken into the work vessel 7 and mounted on the work vessel 7. Connecting.
After connecting the third chain 38 to the pre-rig chain 3A, the connection portion is returned to the sea, and the third chain 38 is wound up by the pulling machine 40. As a result, the third chain 38 is pulled up to form a predetermined catenary curve, and the chain tension is adjusted. After adjusting the chain tension, the third chain 38 is locked to the starboard side column 12 by the chain stopper 30. After cutting the excess chain pulled up at the upper position of the chain stopper 30, the entire amount is collected on the work vessel 7.

本実施形態では、第三チェーン36,38の張設後に、第二チェーン33,35を張設する。
第二チェーン33のポートサイドコラム11への張設手順は次の通りである。先ず、チェーンウインチ41とデッキ111とのボルトなどによる固定を解除し、チェーンウインチ41を回転可能状態とする。続いて、方向変更ウインチ50によって前述した通りに引上げ機40を回転方向Rに回転し、引上げ機40のチェーン引上げ方向を、チェーンシーブ20Bのチェーン引上げ方向からチェーンシーブ20Aのチェーン引上げ方向に変更する。そして、チェーンウインチ41をデッキ111に再び固定し、チェーンシーブ20Aに掛け渡されたプレリグチェーン3Aを引上げ機40内に残したチェーンと接続する。
In the present embodiment, the second chains 33 and 35 are stretched after the third chains 36 and 38 are stretched.
The procedure for attaching the second chain 33 to the port side column 11 is as follows. First, the chain winch 41 and the deck 111 are released from being fixed by bolts or the like to make the chain winch 41 rotatable. Subsequently, the pulling machine 40 is rotated in the rotation direction R by the direction change winch 50 as described above, and the chain pulling direction of the pulling machine 40 is changed from the chain pulling direction of the chain sheave 20B to the chain pulling direction of the chain sheave 20A. .. Then, the chain winch 41 is fixed to the deck 111 again, and the pre-rig chain 3A hung on the chain sheave 20A is connected to the chain left in the pulling machine 40.

次に、第二チェーン33を作業船7によって海底から引き上げ、ポートサイドコラム11のチェーンシーブ20Aに掛け渡されたプレリグチェーン3Aの端部も作業船7上に取り込み、作業船7上で両者を接続する。
第二チェーン33のプレリグチェーン3Aへの接続後、接続部を海中に戻し、引上げ機40によって第二チェーン33を巻き上げる。これにより、第二チェーン33は引き上げられて所定のカテナリー曲線を形成し、チェーン張力が形成される。チェーン張力の調整後、第二チェーン33はチェーンストッパー30によってポートサイドコラム11に係止される。引き上げた余剰チェーンはチェーンストッパー30の上部位置で切断後作業船7上に回収する。回収途中、切断したチェーン3端部が引上げ機40のドラム手前に来たところで当該チェーン3を止め、チェーン3が作業船7に向かう側のチェーン3も適切な位置で切断することにより引上げ機40内にチェーン3が残った状態とする。
Next, the second chain 33 is pulled up from the seabed by the work vessel 7, and the end of the pre-rig chain 3A hung on the chain sheave 20A of the port side column 11 is also taken into the work vessel 7 and both are taken on the work vessel 7. To connect.
After connecting the second chain 33 to the pre-rig chain 3A, the connecting portion is returned to the sea, and the second chain 33 is wound up by the pulling machine 40. As a result, the second chain 33 is pulled up to form a predetermined catenary curve, and a chain tension is formed. After adjusting the chain tension, the second chain 33 is locked to the port side column 11 by the chain stopper 30. The pulled-up excess chain is cut at the upper position of the chain stopper 30 and then collected on the work vessel 7. During the collection, the chain 3 is stopped when the end of the cut chain 3 comes to the front of the drum of the pulling machine 40, and the chain 3 on the side where the chain 3 faces the work boat 7 is also cut at an appropriate position to pull the pulling machine 40. It is assumed that the chain 3 remains inside.

次に、第二チェーン35をポートサイドコラム11へ張設する。具体的には、先ず、チェーンウインチ41とデッキ111との固定を解除し、チェーンウインチ41を回転可能状態とする。続いて、方向変更ウインチ50によって前述した通りに引上げ機40を回転方向Rにおいて逆回転し、引上げ機40のチェーン引上げ方向を、チェーンシーブ20Aのチェーン引上げ方向からチェーンシーブ20Cのチェーン引上げ方向に変更する。そして、チェーンウインチ41をデッキ111に再び固定し、チェーンシーブ20Cに掛け渡されたプレリグチェーン3Aを引上げ機40内に残したチェーンと接続する。 Next, the second chain 35 is stretched to the portside column 11. Specifically, first, the chain winch 41 and the deck 111 are released from being fixed, and the chain winch 41 is brought into a rotatable state. Subsequently, the pulling machine 40 is rotated in the reverse direction in the rotation direction R by the direction change winch 50 as described above, and the chain pulling direction of the pulling machine 40 is changed from the chain pulling direction of the chain sheave 20A to the chain pulling direction of the chain sheave 20C. do. Then, the chain winch 41 is fixed to the deck 111 again, and the pre-rig chain 3A hung on the chain sheave 20C is connected to the chain left in the pulling machine 40.

次に、第二チェーン35を作業船7によって海底から引き上げ、ポートサイドコラム11のチェーンシーブ20Cに掛け渡されたプレリグチェーン3Aの端部も作業船7上に取り込み、作業船7上で両者を接続する。
第二チェーン35のプレリグチェーン3Aへの接続後、接続部を海中に戻し、引上げ機40によって第二チェーン35を巻き上げる。これにより、第二チェーン35は引き上げられて所定のカテナリー曲線を形成し、チェーン張力が調整される。チェーン張力の調整後、第二チェーン35はチェーンストッパー30によってポートサイドコラム11に係止される。引き上げた余剰チェーンはチェーンストッパー30の上部位置で切断後作業船7上に全量回収する。
Next, the second chain 35 is pulled up from the seabed by the work vessel 7, and the end of the pre-rig chain 3A hung on the chain sheave 20C of the port side column 11 is also taken into the work vessel 7 and both are taken on the work vessel 7. To connect.
After connecting the second chain 35 to the pre-rig chain 3A, the connecting portion is returned to the sea, and the second chain 35 is wound up by the pulling machine 40. As a result, the second chain 35 is pulled up to form a predetermined catenary curve, and the chain tension is adjusted. After adjusting the chain tension, the second chain 35 is locked to the port side column 11 by the chain stopper 30. After cutting the excess chain pulled up at the upper position of the chain stopper 30, the entire amount is collected on the work vessel 7.

ここで、従来のチェーン引上げ作業は、洋上風力を行う外洋(港外)において、浮体本体10よりも海象の影響を受けて揺れやすい作業船7によって行われる。このため、作業船7によるチェーン引上げ作業が可能な気象・海象条件は、例えば、有義波高1.0m以下、平均風速10m/s以下に制約される。
これに対し、前述した第二チェーン33〜35および第三チェーン36〜38の引上げ作業は、作業船7よりも海象の影響を受けにくく揺れにくい浮体本体10に設置された引上げ機40によって行われる。このため、チェーン引上げ作業が可能な海象条件は、例えば、有義波高2.0m以下に緩和できる。
Here, the conventional chain pulling operation is performed by the work vessel 7 which is more easily affected by the sea conditions than the floating body body 10 in the open ocean (outside the port) where the offshore wind power is applied. Therefore, the weather and sea conditions under which the chain can be pulled up by the work vessel 7 are restricted to, for example, a significant wave height of 1.0 m or less and an average wind speed of 10 m / s or less.
On the other hand, the above-mentioned pulling work of the second chains 33 to 35 and the third chains 36 to 38 is performed by the pulling machine 40 installed on the floating body body 10 which is less affected by the sea conditions and less likely to shake than the work boat 7. .. Therefore, the sea conditions under which the chain can be pulled up can be relaxed to, for example, a significant wave height of 2.0 m or less.

機材撤去工程は、次の通りである。
本実施形態では、先ず、ポートサイドコラム11のデッキ111上の機材を撤去し、次に、スターボードサイドコラム12のデッキ121上の機材を撤去する。
デッキ111上の機材の撤去は次の通りである。引上げ機40をボルト抜き出しなどによってデッキ111への固定を解除する。続いて、図12に示すように、作業船7によって引上げ機40を持ち上げ、デッキ111上から撤去する。
また、方向変更ウインチ50も、デッキ111への固定を解除し、作業船7によって持ち上げてデッキ111上から撤去する。
なお、図示しないが、デッキ111上に設置された発電機なども撤去する。
The equipment removal process is as follows.
In the present embodiment, first, the equipment on the deck 111 of the port side column 11 is removed, and then the equipment on the deck 121 of the starboard side column 12 is removed.
The removal of equipment on deck 111 is as follows. The pulling machine 40 is released from being fixed to the deck 111 by pulling out bolts or the like. Subsequently, as shown in FIG. 12, the pulling machine 40 is lifted by the work boat 7 and removed from the deck 111.
Further, the direction change winch 50 is also released from being fixed to the deck 111, lifted by the work boat 7, and removed from the deck 111.
Although not shown, the generator installed on the deck 111 will also be removed.

デッキ121上の引上げ機40、方向変更ウインチ50、発電機などの撤去は、デッキ111上の引上げ機40、方向変更ウインチ50、発電機などの撤去と同様に行うので詳細な説明を省略する。
以上のようにして、浮体1を洋上に係留する。
Since the removal of the pulling machine 40, the direction changing winch 50, the generator, etc. on the deck 121 is performed in the same manner as the removal of the pulling machine 40, the direction changing winch 50, the generator, etc. on the deck 111, detailed description thereof will be omitted.
As described above, the floating body 1 is moored at sea.

[本実施形態の効果]
(1)本実施形態では、浮体1は、風力発電装置2が設置される浮体本体10と、浮体本体10に設置されるチェーンシーブ20と、チェーンシーブ20に掛けられるチェーン3に接続される引上げ機40とを備え、引上げ機40は、浮体本体10のデッキ111,121に取外し可能に装着されることを特徴とする。
上記構成を有するため、先ず、チェーン3の一端側を海底に配置し、チェーン3の他端側をドック内や岸壁など海象条件の影響を受けない場所で予め浮体1のチェーンシーブ20に掛け渡して引上げ機40に接続し、引上げ機40によりチェーン3を引き上げて当該チェーン3の張力を調整し、チェーン張力の調整後、引上げ機40を浮体本体10のデッキ111,121上から取り外すことで、浮体1を洋上に係留できる。
このように浮体1を洋上に係留することで、汎用の作業船7よりも海象の影響が小さい浮体本体10のデッキ111,121に装着された引上げ機40によってチェーン3を引き上げることができる。このため、汎用の作業船7を用いてチェーン3を引き上げる場合と比べて、海象条件の制約を緩和でき、海象条件を満たさない日数を減らすことができて、係留作業の長期化を抑えることができる。
また、船体姿勢を制御する特殊な作業船を用いる必要がないので、特殊な作業船の手配に時間や手間を要することがなく、また、特殊な作業船の利用によってコストが増すことを抑制できる。
さらに、チェーン3を引き上げて張力を調整した後、動力機械である引上げ機40を浮体本体10のデッキ111,121から取り外すことで、洋上における引上げ機40の点検、メンテナンス等の手間を省くことができる。
さらに、本実施形態では、以下の各効果を発揮できる。
[Effect of this embodiment]
(1) In the present embodiment, the floating body 1 is pulled up connected to a floating body main body 10 on which the wind power generation device 2 is installed, a chain sheave 20 installed on the floating body main body 10, and a chain 3 hung on the chain sheave 20. The pulling machine 40 is provided with the machine 40, and is characterized in that the pulling machine 40 is detachably mounted on the decks 111 and 121 of the floating body body 10.
Since it has the above configuration, first, one end side of the chain 3 is arranged on the seabed, and the other end side of the chain 3 is previously hung on the chain sheave 20 of the floating body 1 in a place not affected by sea conditions such as inside a dock or a quay. The chain 3 is pulled up by the pulling machine 40 to adjust the tension of the chain 3, and after adjusting the chain tension, the pulling machine 40 is removed from the decks 111 and 121 of the floating body body 10. Floating body 1 can be moored at sea.
By mooring the floating body 1 at sea in this way, the chain 3 can be pulled up by the pulling machine 40 mounted on the decks 111 and 121 of the floating body body 10 which is less affected by sea conditions than the general-purpose work vessel 7. Therefore, as compared with the case where the chain 3 is pulled up by using the general-purpose work vessel 7, the restrictions on the sea condition can be relaxed, the number of days when the sea condition is not satisfied can be reduced, and the mooring work can be suppressed from being prolonged. can.
In addition, since it is not necessary to use a special work vessel that controls the attitude of the hull, it does not take time and effort to arrange a special work vessel, and it is possible to suppress an increase in cost due to the use of the special work vessel. ..
Further, by pulling up the chain 3 to adjust the tension and then removing the pulling machine 40 which is a power machine from the decks 111 and 121 of the floating body body 10, it is possible to save the trouble of inspection and maintenance of the pulling machine 40 at sea. can.
Further, in the present embodiment, the following effects can be exhibited.

(2)引上げ機40は、チェーンウインチ41と、回転架台42とを備え、チェーンウインチ41と浮体本体10のデッキ111(デッキ121)との間には、回転架台42が設置され、チェーンシーブ20は、引上げ機40の周囲に複数配置される。このため、回転架台42によってチェーンウインチ41を回転することで引上げ機40によるチェーン3の引上げ向きを変更できる。このため、引上げ機40の周囲に配置された複数のチェーンシーブ20(20A,20B,20C)に掛けられるチェーン3をそれぞれ引き上げることができる。このように複数のチェーン3の引き上げに引上げ機40を共用でき、浮体本体10のデッキスペースが狭小であっても複数のチェーン3を引上げ可能な浮体1を構成できる。 (2) The pulling machine 40 includes a chain winch 41 and a rotary stand 42, and a rotary stand 42 is installed between the chain winch 41 and the deck 111 (deck 121) of the floating body body 10, and the chain sheave 20 Are arranged around the pulling machine 40. Therefore, the pulling direction of the chain 3 by the pulling machine 40 can be changed by rotating the chain winch 41 by the rotary stand 42. Therefore, the chains 3 hung on the plurality of chain sheaves 20 (20A, 20B, 20C) arranged around the pulling machine 40 can be pulled up. In this way, the pulling machine 40 can be shared for pulling up the plurality of chains 3, and the floating body 1 capable of pulling up the plurality of chains 3 can be configured even if the deck space of the floating body main body 10 is small.

(3)浮体1は、浮体本体10に設置されるチェーンストッパー30を備える。このため、引上げ機40によるチェーン3の引上げ後に当該チェーン3をチェーンストッパー30によって簡単に浮体本体10に固定でき、かつ、チェーンストッパー30によってチェーン3を浮体本体10に固定することで、チェーン3と引上げ機40との接続を簡単に解除できる。このため、引上げ機40の取外し作業を容易にできる。 (3) The floating body 1 includes a chain stopper 30 installed on the floating body main body 10. Therefore, after the chain 3 is pulled up by the pulling machine 40, the chain 3 can be easily fixed to the floating body main body 10 by the chain stopper 30, and the chain 3 can be fixed to the floating body main body 10 by the chain stopper 30. The connection with the pulling machine 40 can be easily released. Therefore, the pulling machine 40 can be easily removed.

(4)浮体本体10は、風力発電装置2が設置されるセンターコラム13と、センターコラム13の左舷に配置されるポートサイドコラム11と、センターコラム13の右舷に配置されるスターボードサイドコラム12と、ポートサイドコラム11、スターボードサイドコラム12およびセンターコラム13を接続するロワーハル14(14A,14B)とを備え、チェーンシーブ20は、ポートサイドコラム11およびスターボードサイドコラム12にそれぞれ設置され、引上げ機40は、ポートサイドコラム11のデッキ111およびスターボードサイドコラム12のデッキ121にそれぞれ取外し可能に装着される。このため、先ず、ドック内や岸壁など海象条件の影響を受けない場所で予めセンターコラム13に緊張後のチェーン長さに調整されたチェーン3の他端側を取り付け、予め海底に設置しておいたチェーン3の端部と洋上において接続する。次に、洋上において浮体本体10を係留計画位置Xまで移動し、次に、ポートサイドコラム11およびスターボードサイドコラム12のチェーンシーブ20にチェーン3の他端側を掛けて各引上げ機40に接続し、各引上げ機40によってチェーン3を引き上げることで張力を調整し、最後に、ポートサイドコラム11およびスターボードサイドコラム12にチェーン3をそれぞれ固定し、各引上げ機40をポートサイドコラム11およびスターボードサイドコラム12のデッキ111,121からそれぞれ取り外すことで、浮体1を洋上に係留できる。
このように、センターコラム13に引上げ機40を装着することなく浮体1を係留でき、センターコラム13に引上げ機40を装着する場合と比べて、引上げ機40を取り外す手間を軽減でき、係留作業期間を短縮できる。
(4) The floating body 10 includes a center column 13 in which the wind power generator 2 is installed, a port side column 11 arranged on the port side of the center column 13, and a starboard side column 12 arranged on the starboard side of the center column 13. And lower hulls 14 (14A, 14B) connecting the port side column 11, the starboard side column 12 and the center column 13, and the chain sheave 20 is installed on the port side column 11 and the starboard side column 12, respectively. The pulling machine 40 is detachably mounted on the deck 111 of the port side column 11 and the deck 121 of the starboard side column 12, respectively. For this reason, first, the other end side of the chain 3 adjusted to the tensioned chain length is attached to the center column 13 in advance in a place not affected by sea conditions such as in a dock or a quay, and installed on the seabed in advance. It connects to the end of the existing chain 3 at sea. Next, the floating body body 10 is moved to the planned mooring position X at sea, and then the chain sheave 20 of the port side column 11 and the starboard side column 12 is hung on the other end side of the chain 3 and connected to each pulling machine 40. Then, the tension is adjusted by pulling up the chain 3 by each pulling machine 40, and finally, the chain 3 is fixed to the port side column 11 and the starboard side column 12, respectively, and each pulling machine 40 is attached to the port side column 11 and the star. The floating body 1 can be moored offshore by removing it from the decks 111 and 121 of the board side column 12, respectively.
In this way, the floating body 1 can be moored without attaching the pulling machine 40 to the center column 13, and the time and effort for removing the pulling machine 40 can be reduced as compared with the case where the pulling machine 40 is attached to the center column 13, and the mooring work period. Can be shortened.

(5)本実施形態では、風力発電装置2が設置される浮体本体10に設置可能なチェーンシーブ20と、チェーンシーブ20に掛けられるチェーン3と、チェーン3に接続される引上げ機40とを備え、引上げ機40は、浮体本体10のデッキ111(デッキ121)に装着および取外し可能に構成される浮体係留装置を構成できる。この浮体係留装置によれば、前述した浮体1と同様の作用効果を発揮できる。 (5) In the present embodiment, the chain sheave 20 that can be installed on the floating body main body 10 on which the wind power generation device 2 is installed, the chain 3 that is hung on the chain sheave 20, and the pulling machine 40 that is connected to the chain 3 are provided. The pulling machine 40 can form a floating body mooring device that can be attached to and removed from the deck 111 (deck 121) of the floating body main body 10. According to this floating body mooring device, the same effect as that of the floating body 1 described above can be exhibited.

[変形例]
本発明は、以上の実施形態で説明した構成のものに限定されず、本発明の目的を達成できる範囲での変形例は、本発明に含まれる。
例えば、前記実施形態では、引上げ機40は、ポートサイドコラム11のデッキ111およびスターボードサイドコラム12のデッキ121にそれぞれ装着されるが、これに限定されず、デッキ111,121の一方だけに装着されてもよい。
また、センターコラム13のデッキ131には、引上げ機40の装着スペースは設けられてなく、引上げ機40は装着されていないが、例えば、デッキ131に前記装着スペースを設け、当該デッキ131に引上げ機40を装着してもよい。この場合、デッキ111,121の一方または双方に引上げ機40が装着されていなくてもよい。
[Modification example]
The present invention is not limited to the configuration described in the above embodiments, and modifications within the range in which the object of the present invention can be achieved are included in the present invention.
For example, in the above embodiment, the pulling machine 40 is mounted on the deck 111 of the port side column 11 and the deck 121 of the starboard side column 12, respectively, but is not limited to this, and is mounted on only one of the decks 111 and 121. May be done.
Further, the deck 131 of the center column 13 is not provided with a mounting space for the pulling machine 40, and the pulling machine 40 is not mounted. However, for example, the deck 131 is provided with the mounting space and the deck 131 is provided with the pulling machine. 40 may be attached. In this case, the pulling machine 40 may not be mounted on one or both of the decks 111 and 121.

前記実施形態では、一つの引上げ機40の周囲に複数のチェーンシーブ20(20A,20B,20C)が配置されているが、これに限られず、例えば、一つのチェーンシーブ20だけが引上げ機40の周囲に配置されてもよい。この場合には、引上げ機40は、チェーン引上げ方向を変更する必要がないので、回転架台42の構成を省略してもよい。また、この場合、方向変更ウインチ50も省略してよい。 In the above embodiment, a plurality of chain sheaves 20 (20A, 20B, 20C) are arranged around one pulling machine 40, but the present invention is not limited to this, and for example, only one chain sheave 20 is the pulling machine 40. It may be arranged around. In this case, since it is not necessary for the pulling machine 40 to change the chain pulling direction, the configuration of the rotary stand 42 may be omitted. Further, in this case, the direction change winch 50 may also be omitted.

前記実施形態では、チェーンシーブ20A,20B,20Cに対して一つの引上げ機40を共用しているが、これに限られず、例えば、チェーンシーブ20A,20B,20Cのそれぞれに対応した個数の小型引上げ機を設置してもよい。 In the above embodiment, one pulling machine 40 is shared for the chain sheaves 20A, 20B, 20C, but the present invention is not limited to this, and for example, the number of small pulling machines corresponding to each of the chain sheaves 20A, 20B, 20C is small. You may install a machine.

前記実施形態では、浮体本体10は、平面視略V字状に形成されるが、この形状に限定されず、平面視Y字状や平面視多角形状(平面視八角形状)などであってもよい。 In the above embodiment, the floating body body 10 is formed in a substantially V-shape in a plan view, but is not limited to this shape, and may be a Y-shape in a plan view, a polygonal shape in a plan view (octagonal shape in a plan view), or the like. good.

前記実施形態では、チェーンストッパー30は、孔16に嵌め込み可能な半割体301,302によって構成されるが、チェーン3を係止できる形状であればよく、前記構成に限定されない。 In the above embodiment, the chain stopper 30 is composed of half-split bodies 301 and 302 that can be fitted into the holes 16, but the chain stopper 30 is not limited to the above configuration as long as it has a shape that can lock the chain 3.

前記実施形態では、第一チェーン31,32の張設後、第二チェーン34,第三チェーン37、第三チェーン36、第三チェーン38、第二チェーン33、第二チェーン35の順に張設するが、これに限定されず、張設する順は、現場状況(風や波の向きなどの状況)や作業船7の移動等を考慮して適宜変更可能である。
例えば、第三チェーン37を第二チェーン34よりも先に張設してもよく、この場合には、第二チェーン33,35は、第三チェーン36,38よりも先に張設してもよい。
また、第二チェーン33〜35同士の張設順や第三チェーン36〜38同士の張設順も、現場状況や作業船7の移動等を考慮して適宜変更可能である。
In the above embodiment, after the first chains 31 and 32 are stretched, the second chain 34, the third chain 37, the third chain 36, the third chain 38, the second chain 33, and the second chain 35 are stretched in this order. However, the order is not limited to this, and the order of installation can be changed as appropriate in consideration of the site conditions (conditions such as the direction of wind and waves) and the movement of the work boat 7.
For example, the third chain 37 may be stretched before the second chain 34, and in this case, the second chains 33 and 35 may be stretched before the third chains 36 and 38. good.
Further, the order in which the second chains 33 to 35 are stretched and the order in which the third chains 36 to 38 are stretched can be changed as appropriate in consideration of the site situation, the movement of the work boat 7, and the like.

前記実施形態では、チェーンシーブ20が仮係留ガイドとされるが、これに限られず、例えば、滑りガイドを仮係留ガイドとしてしてもよい。 In the above embodiment, the chain sheave 20 is used as a temporary mooring guide, but the present invention is not limited to this, and for example, a sliding guide may be used as a temporary mooring guide.

前記実施形態では、仮係留索4によって浮体本体10を仮係留するが、これに限られず、曳船によって浮体本体10を初期位置に位置決めできる場合には、仮係留索を用いて仮係留しなくてもよい。 In the above embodiment, the floating body body 10 is temporarily moored by the temporary mooring line 4, but the present invention is not limited to this, and when the floating body body 10 can be positioned at the initial position by the tugboat, the floating body body 10 is not temporarily moored by using the temporary mooring line. May be good.

前記実施形態では、作業船7にクレーン船を採用しているが、これに限られず、クレーンを備えず、チェーン3を引き上げるウインチなどを備える作業船であってもよい。この場合、機材撤去工程では、前記作業船とは別個に、引上げ機40を持ち上げて撤去するためにクレーン船を利用する。 In the above embodiment, the crane vessel is adopted as the work vessel 7, but the present invention is not limited to this, and the work vessel may be a work vessel not provided with a crane and provided with a winch or the like for pulling up the chain 3. In this case, in the equipment removal step, a crane vessel is used to lift and remove the pulling machine 40 separately from the work vessel.

前記実施形態では、浮体1には、風力発電装置2が洋上構造物として設置されるが、これに限定されず、いったん係留した後の係留位置の変更が必要とされない洋上構造物であればよく、例えば、風力発電装置2にケーブルなどによって接続されるサブステーションが設置されてもよい。 In the above embodiment, the wind power generation device 2 is installed as an offshore structure on the floating body 1, but the present invention is not limited to this, and any offshore structure that does not require a change in the mooring position after mooring may be used. For example, a substation connected to the wind power generation device 2 by a cable or the like may be installed.

1…浮体、10…浮体本体、11…ポートサイドコラム(左舷コラム)、111,121,131…デッキ、12…スターボードサイドコラム(右舷コラム)、13…センターコラム(設置コラム)、14(14A,14B)…ロワーハル、15…サイドデッキ、16…孔、17…フェアリーダー、2…風力発電装置(洋上構造物)、20(20A,20B,20C)…チェーンシーブ(係留索ガイド)、3(3A,31〜38)…チェーン(係留索)、30…チェーンストッパー(係留索ストッパー)、301,302…半割体、4(4A,4B)…仮係留索、40…引上げ機、41…チェーンウインチ(引上げ機本体)、42…回転架台、50…方向変更ウインチ、51…ワイヤー、7…作業船、8…岸壁、R…回転方向、X…係留計画位置。 1 ... Floating body, 10 ... Floating body body, 11 ... Port side column (port column), 111, 121, 131 ... Deck, 12 ... Starboard side column (starboard column), 13 ... Center column (installation column), 14 (14A) , 14B) ... Lower hull, 15 ... Side deck, 16 ... Hole, 17 ... Fair leader, 2 ... Wind power generator (offshore structure), 20 (20A, 20B, 20C) ... Chain sheave (mooring line guide), 3 ( 3A, 31-38) ... Chain (mooring line), 30 ... Chain stopper (mooring line stopper), 301, 302 ... Half split, 4 (4A, 4B) ... Temporary mooring line, 40 ... Puller, 41 ... Chain Winch (puller body), 42 ... rotary stand, 50 ... direction change winch, 51 ... wire, 7 ... work boat, 8 ... quay, R ... rotation direction, X ... mooring planned position.

Claims (5)

洋上構造物が設置される浮体本体と、前記浮体本体に設置される係留索ガイドと、前記浮体本体のデッキに取外し可能に装着され且つ前記係留索ガイドに掛けられる係留索に接続される引上げ機と、を備える浮体を、洋上に係留する浮体係留方法であって、 A floating body on which an offshore structure is installed, a mooring line guide installed on the floating body, and a pulling machine that is detachably attached to the deck of the floating body and connected to a mooring line hung on the mooring line guide. This is a floating body mooring method in which a floating body equipped with and is moored at sea.
前記係留索の一端側を海底に配置し、 Place one end of the mooring line on the seabed
前記係留索の他端側を前記係留索ガイドに掛け渡して前記引上げ機に接続し、 The other end side of the mooring line is hung on the mooring line guide and connected to the pulling machine.
前記引上げ機により前記係留索を引き上げて当該係留索の張力を調整し、 The mooring line is pulled up by the pulling machine to adjust the tension of the mooring line.
張力調整後、前記引上げ機を前記浮体本体のデッキ上から取り外す After adjusting the tension, remove the pulling machine from the deck of the floating body.
ことを特徴とする浮体係留方法。 A floating body mooring method characterized by that.
請求項1に記載の浮体係留方法において、 In the floating body mooring method according to claim 1,
前記浮体の浮体本体は、前記洋上構造物が設置される設置コラムと、前記設置コラムの左舷に配置される左舷コラムと、前記設置コラムの右舷に配置される右舷コラムと、前記左舷コラム、前記右舷コラムおよび前記設置コラムを接続するロワーハルとを備え、前記係留索ガイドは、前記左舷コラムおよび前記右舷コラムにそれぞれ設置され、前記引上げ機は、前記左舷コラムのデッキおよび前記右舷コラムのデッキにそれぞれ取外し可能に装着されており、 The floating body of the floating body includes an installation column on which the offshore structure is installed, a port column arranged on the port side of the installation column, a starboard column arranged on the starboard side of the installation column, the port column, and the above. A right-side column and a lower hull connecting the installation column are provided, the mooring line guide is installed on the port-side column and the starboard-side column, respectively, and the pulling machine is installed on the deck of the port-side column and the deck of the starboard column, respectively. It is attached to be removable and is attached.
海底に配置される前記係留索は、仮係留索と、第一係留索と、第二係留索と、第三係留索とによって構成され、 The mooring line arranged on the seabed is composed of a temporary mooring line, a first mooring line, a second mooring line, and a third mooring line.
前記設置コラムに前記第一係留索を固定し、 The first mooring line is fixed to the installation column,
前記仮係留索を曳船によって牽引して、前記第一係留索を張りつつ前記浮体本体を係留計画位置に配置し、 The temporary mooring line is towed by a tugboat, and the floating body main body is placed at the mooring planned position while the first mooring line is stretched.
前記浮体本体の配置後、前記左舷コラムにおける前記係留索ガイドに前記第二係留索を掛け渡して前記引上げ機に接続し、当該引上げ機によって前記第二係留索を引き上げ、 After arranging the floating body body, the second mooring line is hung on the mooring line guide in the port column to be connected to the pulling machine, and the second mooring line is pulled up by the pulling machine.
前記浮体本体の配置後、前記右舷コラムにおける前記係留索ガイドに前記第三係留索を掛け渡して前記引上げ機に接続し、当該引上げ機によって前記第三係留索を引き上げる After arranging the floating body main body, the third mooring line is hung on the mooring line guide in the starboard column, connected to the pulling machine, and the third mooring line is pulled up by the pulling machine.
ことを特徴とする浮体係留方法。 A floating body mooring method characterized by that.
請求項1または請求項2に記載の浮体係留方法に用いられる浮体であって、
洋上構造物が設置される浮体本体と、
前記浮体本体に設置される係留索ガイドと、
前記係留索ガイドに掛けられる係留索に接続される引上げ機とを備え、
前記引上げ機は、前記浮体本体のデッキに取外し可能に装着される
ことを特徴とする浮体。
A floating body used in the floating body mooring method according to claim 1 or 2.
Floating body where offshore structures are installed and
The mooring line guide installed on the floating body and
It is equipped with a pulling machine connected to the mooring line hung on the mooring line guide.
The pulling machine is a floating body characterized in that it is detachably mounted on the deck of the floating body main body.
請求項に記載の浮体において、
前記引上げ機は、引上げ機本体と、回転架台とを備え、
前記引上げ機本体と前記浮体本体のデッキとの間には、回転架台が設置され、
前記係留索ガイドは、前記引上げ機の周囲に複数配置される
ことを特徴とする浮体。
In the floating body according to claim 3,
The pulling machine includes a pulling machine main body and a rotary stand.
A rotary stand is installed between the pulling machine main body and the deck of the floating body main body.
A plurality of the mooring line guides are arranged around the pulling machine.
請求項または請求項に記載の浮体において、
前記浮体本体は、前記洋上構造物が設置される設置コラムと、前記設置コラムの左舷に配置される左舷コラムと、前記設置コラムの右舷に配置される右舷コラムと、前記左舷コラム、前記右舷コラムおよび前記設置コラムを接続するロワーハルとを備え、
前記係留索ガイドは、前記左舷コラムおよび前記右舷コラムにそれぞれ設置され、
前記引上げ機は、前記左舷コラムのデッキおよび前記右舷コラムのデッキにそれぞれ取外し可能に装着される
ことを特徴とする浮体。
In the floating body according to claim 3 or 4.
The floating body includes an installation column on which the offshore structure is installed, a port column arranged on the port side of the installation column, a starboard column arranged on the starboard side of the installation column, a port column, and a starboard column. And with a lower hull to connect the installation column
The mooring line guides are installed in the port column and the starboard column, respectively.
The pulling machine is a floating body that is detachably mounted on the deck of the port column and the deck of the starboard column, respectively.
JP2017232727A 2017-12-04 2017-12-04 Floating body mooring method and floating body Active JP6949690B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017232727A JP6949690B2 (en) 2017-12-04 2017-12-04 Floating body mooring method and floating body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017232727A JP6949690B2 (en) 2017-12-04 2017-12-04 Floating body mooring method and floating body

Publications (2)

Publication Number Publication Date
JP2019098963A JP2019098963A (en) 2019-06-24
JP6949690B2 true JP6949690B2 (en) 2021-10-13

Family

ID=66975418

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017232727A Active JP6949690B2 (en) 2017-12-04 2017-12-04 Floating body mooring method and floating body

Country Status (1)

Country Link
JP (1) JP6949690B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7219680B2 (en) * 2019-07-11 2023-02-08 日立造船株式会社 Installation method of mooring system and installation method of mooring floating body
JP7365298B2 (en) * 2020-07-13 2023-10-19 日立造船株式会社 How to install a mooring system and how to install a mooring floating body
CN116902139A (en) * 2023-07-31 2023-10-20 中海油深圳海洋工程技术服务有限公司 Limiting and winding and unwinding method for mooring anchor chain of floating wind power platform

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2385584A1 (en) * 1977-04-01 1978-10-27 Elf Aquitaine ANCHOR LINES TENSIONING DEVICE
JPS58126279A (en) * 1982-01-20 1983-07-27 Mitsui Eng & Shipbuild Co Ltd Mooring device for floating structure on frozen sea
JPH1082042A (en) * 1996-09-06 1998-03-31 Maeda Corp Drawing-in method of caisson
NL1026131C2 (en) * 2004-05-06 2005-11-08 Marine Structure Consul Anchor system for a floating construction.
CN104066979B (en) * 2011-12-05 2017-04-05 三菱重工业株式会社 Floating body type wind power generation device
JP6215846B2 (en) * 2013-01-21 2017-10-18 エムエイチアイ ヴェスタス オフショア ウィンド エー/エス Maintenance method for floating wind turbine generator
JP6185299B2 (en) * 2013-06-19 2017-08-23 五洋建設株式会社 Hoist ship and swing suppression method

Also Published As

Publication number Publication date
JP2019098963A (en) 2019-06-24

Similar Documents

Publication Publication Date Title
US20160185427A1 (en) Anchor line tensioning method
KR20130140828A (en) Fairlead latch device
JP6820698B2 (en) How to add mooring lines, how to moor floating structures and how to construct floating offshore wind turbines
JP2009013829A (en) Catamaran for offshore wind turbine generator installation method and offshore wind turbine generator installation method
EP3837159A1 (en) Mooring and tensioning methods, systems, and apparatus
US20030159638A1 (en) Method and system for mooring
JP6949690B2 (en) Floating body mooring method and floating body
KR101702516B1 (en) Anchoring apparatus and floating offshore structure having the same
US20100098498A1 (en) Anchor system for offshore dynamically positioned drilling platform
JP6820697B2 (en) Mooring method of floating structure and construction method of floating offshore wind power generation facility
CN104097748A (en) Parking craning method for vibration sinking construction of steel cylinders
CN113386902B (en) Mooring method and mooring system of ship and ship
NO20170862A1 (en) A mooring system
JPH0656076A (en) Submarine cable laying construction method and laying work ship thereof
JP6983640B2 (en) Floating body, floating body mooring device and floating body mooring method
WO2004050470A2 (en) Mooring windlass/winch system
CN110949612A (en) Single-point anchoring system suitable for deep open sea culture ship
KR102769494B1 (en) Method for longitudinal cross-tensioning of mooring lines and mooring systems
JP7853868B2 (en) Method for installing a tension-moored floating structure and installation structure for a tension-moored floating structure
KR102662433B1 (en) Spread mooring method for weather vaning
NO346197B1 (en) Floating construction with mooring system and mooring method
JP7728933B1 (en) Anchor laying vessel
JP2668040B2 (en) Facility and method for installing large offshore structures
CN220577462U (en) A device arranged on the stern deck suitable for recovering anchors and submersible marks in deep sea
CN110601090A (en) Pre-laying anchor cable auxiliary ship-moving method and system composition of long-distance sandbar section

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200812

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210520

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210601

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210730

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210831

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210922

R150 Certificate of patent or registration of utility model

Ref document number: 6949690

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250