Operation management system and operation management method Download PDF

Info

Publication number
JP6960798B2
JP6960798B2 JP2017155782A JP2017155782A JP6960798B2 JP 6960798 B2 JP6960798 B2 JP 6960798B2 JP 2017155782 A JP2017155782 A JP 2017155782A JP 2017155782 A JP2017155782 A JP 2017155782A JP 6960798 B2 JP6960798 B2 JP 6960798B2
Authority
JP
Japan
Prior art keywords
floor
atmospheric pressure
work
information
communication device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017155782A
Other languages
Japanese (ja)
Other versions
JP2019036044A (en
Inventor
実 長谷川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2017155782A priority Critical patent/JP6960798B2/en
Publication of JP2019036044A publication Critical patent/JP2019036044A/en
Application granted granted Critical
Publication of JP6960798B2 publication Critical patent/JP6960798B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、稼働管理システム、及び稼働管理方法に関する。 The present invention relates to an operation management system and an operation management method.

従来、高層階の構造物を施工する場合、施工の時期、その施工に必要な作業機器の種類や数を見積もり、見積もりに応じた作業機器をレンタルすることがある。また、作業現場からの要望に応じて不足する作業機器を追加してレンタルする場合もある。
一方、特許文献1には高層階の作業現場における作業車両のバッテリ残容量状況を管理するシステムとして、作業車両の通信装置が、各フロアに備えたID情報を有する発信装置からの電波を受信して管理サーバに送信することにより、当該作業車両の所在位置を把握する技術が開示されている。また、特許文献2には、機器の総稼働時間をユーザに通知するシステムとして各機器が電源オンの時刻および電源オフの時刻を親局装置に通知することにより親基地局が各機器の稼働時間を算出する技術が開示されている。
Conventionally, when constructing a high-rise structure, the timing of construction, the type and number of work equipment required for the construction may be estimated, and the work equipment according to the estimate may be rented. In addition, there are cases where insufficient work equipment is additionally rented in response to a request from the work site.
On the other hand, in Patent Document 1, as a system for managing the remaining battery capacity status of a work vehicle at a work site on a higher floor, a communication device of the work vehicle receives radio waves from a transmission device having ID information provided on each floor. The technology for grasping the location of the work vehicle by transmitting the information to the management server is disclosed. Further, in Patent Document 2, as a system for notifying the user of the total operating time of the device, the master base station notifies the master station device of the time when the power is turned on and the time when the power is turned off so that the master base station operates the device. The technique for calculating is disclosed.

特開2007−73017号公報JP-A-2007-73017 特開2012−69020号公報Japanese Unexamined Patent Publication No. 2012-69020

しかしながら、作業現場において作業機器が不足する場合には増やしてほしいという要望が上がるが、作業機器が過剰である場合には減らして欲しいという要望は上がりにくい。このため、作業機器は、過剰気味にレンタルされやすい傾向にあり、レンタルされた作業機器の稼働の実態が正確に把握することは手間がかかる。
特許文献1に記載の発明は作業車両のバッテリ残容量状況を把握するものであり、作業機器の所在位置を把握することができでも作業車両の稼働の実態を把握するものではない。また、特許文献2に記載の発明は、機器の稼働時間を把握するものであり、高層階の構造物における機器の所在位置を把握するものではない。
However, when there is a shortage of work equipment at the work site, there is a demand for an increase, but when there is an excess of work equipment, there is a low demand for a decrease. For this reason, work equipment tends to be rented in excess, and it is troublesome to accurately grasp the actual operation of the rented work equipment.
The invention described in Patent Document 1 grasps the battery remaining capacity status of the work vehicle, and even if the location position of the work equipment can be grasped, it does not grasp the actual operation of the work vehicle. Further, the invention described in Patent Document 2 grasps the operating time of the device, and does not grasp the location position of the device in the structure on the upper floor.

本発明は、このような事情に鑑みてなされたものであり、その目的は、作業機器が何処でどの位稼働しているかを判定することができる稼働管理システム、及び稼働管理方法を提供することである。 The present invention has been made in view of such circumstances, and an object of the present invention is to provide an operation management system and an operation management method capable of determining where and how much a work device is operating. Is.

上述した課題を解決するために本発明の一実施形態の稼働管理システムは、相互に通信可能な第1の通信装置、第2の通信装置、及び第3の通信装置を備える稼働管理システムであって、前記第1の通信装置は、多層の構造物を施工する際に使用される作業機器による作業が行われる場所の気圧を示す気圧情報、及び前記作業機器が稼働しているか否かを示す稼働情報を取得する第1の取得部と、前記気圧情報及び稼働情報を前記第3の通信装置に送信する第1の通信部とを有し、前記第2の通信装置は、前記構造物において高さ方向の基準となる基準階の気圧を示す基準階気圧情報を取得する第2の取得部と、前記基準階気圧情報を前記第3の通信装置に送信する第2の通信部とを有し、前記第3の通信装置は、前記気圧情報、前記稼働情報及び前記基準階気圧情報を受信する第3の通信部と、前記構造物における各階の高さに基づいて、少なくとも二つの前記基準階気圧情報それぞれに示される二つの基準階の気圧の差分を按分することにより前記二つの基準階の間に位置する階の気圧を導出し、導出した前記各階の気圧と前記気圧情報に示される気圧とを比較することにより、前記作業機器が何処に配置されているかを示す作業階を判定し、前記作業階に前記稼働情報を対応づけた作業階別稼働状況テーブルを生成する制御部とを有する。 In order to solve the above-mentioned problems, the operation management system according to the embodiment of the present invention is an operation management system including a first communication device, a second communication device, and a third communication device capable of communicating with each other. The first communication device indicates atmospheric pressure information indicating the atmospheric pressure at the place where the work is performed by the work equipment used when constructing the multi-layer structure, and whether or not the work equipment is in operation. It has a first acquisition unit for acquiring operation information and a first communication unit for transmitting the atmospheric pressure information and operation information to the third communication device, and the second communication device is in the structure. It has a second acquisition unit that acquires the reference floor pressure information indicating the pressure of the reference floor that serves as a reference in the height direction, and a second communication unit that transmits the reference floor pressure information to the third communication device. Then, the third communication device has at least two reference points based on the third communication unit that receives the atmospheric pressure information, the operation information, and the reference floor pressure information, and the height of each floor in the structure. By apportioning the difference between the atmospheric pressures of the two reference floors shown in each of the floor pressure information, the atmospheric pressure of the floor located between the two reference floors is derived, and it is shown in the derived atmospheric pressure of each floor and the atmospheric pressure information. By comparing with the atmospheric pressure, a control unit that determines a work floor indicating where the work equipment is arranged and generates an operation status table for each work floor in which the operation information is associated with the work floor. Have.

以上説明したように、この発明によれば、作業機器が何処でどの位稼働しているかを判定することができる。 As described above, according to the present invention, it is possible to determine where and how much the work equipment is operating.

実施形態における稼働管理システム1のシステム構成例を示す図である。It is a figure which shows the system configuration example of the operation management system 1 in embodiment. 実施形態における稼働情報通信モジュール3、基準階中継モジュール4、管理装置5それぞれの構成例、および稼働情報通信モジュール3における作業機器100に対する取り付けの例を示す図である。It is a figure which shows the configuration example of each of the operation information communication module 3, the reference floor relay module 4, and the management device 5 in the embodiment, and the example of attachment to the work equipment 100 in the operation information communication module 3. 実施形態における稼働情報管理テーブル、階別気圧テーブルを示す図である。It is a figure which shows the operation information management table and the atmospheric pressure table by floor in an embodiment. 実施形態における作業機器別稼働状況テーブル、作業階別稼働状況テーブルを示す図である。It is a figure which shows the operation status table by work equipment, and the operation status table by work floor in an embodiment. 実施形態の管理装置5の動作例を示すフローチャートである。It is a flowchart which shows the operation example of the management apparatus 5 of embodiment.

以下、実施形態の稼働管理システム、および稼働管理方法を、図面を参照して説明する。 Hereinafter, the operation management system and the operation management method of the embodiment will be described with reference to the drawings.

まず、実施形態における稼働管理システム1について、図1を参照して説明する。
図1は、実施形態における稼働管理システム1のシステム構成例を示す図である。稼働管理システム1は、例えば、多層の構造物2(以下、単に構造物2という)の建築現場において使用される。ここでの「層」とは、高さ方向に異なる多数の位置であればよく、フロアとして明確に構築されていなくともよい。例えば、階とその上の階との間の高さに構築される足場等が含まれてよい。また、高さ方向には、地上方向および地下方向の両方の方向が含まれる。
稼働管理システム1は、稼働情報通信モジュール3(稼働情報通信モジュール3‐1〜3−N)と、基準階中継モジュール4(基準階中継モジュール4−1、4−2)と、管理装置5とを備える。Nは任意の自然数である。ここで、稼働情報通信モジュール3は、「第1の通信装置」の一例である。また、基準階中継モジュール4は、「第2の通信装置」の一例である。また、管理装置5は、「第3の通信装置」の一例である。
First, the operation management system 1 in the embodiment will be described with reference to FIG.
FIG. 1 is a diagram showing a system configuration example of the operation management system 1 in the embodiment. The operation management system 1 is used, for example, at a construction site of a multi-layered structure 2 (hereinafter, simply referred to as a structure 2). The "layer" here may be a large number of positions different in the height direction, and may not be clearly constructed as a floor. For example, scaffolding built at a height between the floor and the floor above it may be included. In addition, the height direction includes both the above-ground direction and the underground direction.
The operation management system 1 includes an operation information communication module 3 (operation information communication module 3-1 to 3-N), a reference floor relay module 4 (reference floor relay modules 4-1 and 4-2), and a management device 5. To be equipped. N is an arbitrary natural number. Here, the operation information communication module 3 is an example of the "first communication device". Further, the reference floor relay module 4 is an example of a “second communication device”. The management device 5 is an example of a "third communication device".

図1の例において、稼働情報通信モジュール3は白い丸マークにて示され、基準階中継モジュール4はグレーの四角マークにて示され、管理装置5は白い四角マークにて示される。
稼働情報通信モジュール3は、構造物2を施工する際に使用される作業機器100(図2参照)に取り付けられて用いられる。図1の例において、稼働情報通信モジュール3は、各階における所定の場所に点在して配置されている。
In the example of FIG. 1, the operation information communication module 3 is indicated by a white circle mark, the reference floor relay module 4 is indicated by a gray square mark, and the management device 5 is indicated by a white square mark.
The operation information communication module 3 is used by being attached to a work device 100 (see FIG. 2) used when constructing the structure 2. In the example of FIG. 1, the operation information communication modules 3 are scattered and arranged at predetermined locations on each floor.

基準階中継モジュール4は、構造物2の建築現場において基準となる所定の階(以下、基準階という)に配置される。図1の例において、基準階中継モジュール4は、構造物2の1階(以下、階を「F」と記載する場合がある)、5F、10F、および工事事務所10に配置されている。以下においては、構造物2における基準階中継モジュール4が、一定の階数ごと(例えば、5階ごと)に配置される場合を例に説明するが、これに限定されることはなく、例えば、基準階中継モジュール4は、最上階(図1の例における11Fまたは屋上)や、最下階(図1の例におけるB2F)にそれぞれ配置されてもよいし、一定ではない階数ごと(例えば、1F、2F、6F、9F等)に配置されてもよい。また、基準階中継モジュール4は、構造物2の建築現場において少なくとも一つ配置されていればよく、複数の基準階中継モジュール4がそれぞれ配置されていてもよいし、一つの基準階中継モジュール4が配置されていてもよい。 The reference floor relay module 4 is arranged on a predetermined floor (hereinafter referred to as a reference floor) that serves as a reference at the construction site of the structure 2. In the example of FIG. 1, the reference floor relay module 4 is arranged on the first floor of the structure 2 (hereinafter, the floor may be referred to as “F”), 5F, 10F, and the construction office 10. In the following, a case where the reference floor relay module 4 in the structure 2 is arranged at a fixed number of floors (for example, every 5th floor) will be described as an example, but the present invention is not limited to this, and for example, the reference. The floor relay module 4 may be arranged on the top floor (11F or rooftop in the example of FIG. 1) or the bottom floor (B2F in the example of FIG. 1), or for each non-constant number of floors (for example, 1F, It may be arranged on the 2nd floor, 6th floor, 9th floor, etc.). Further, at least one reference floor relay module 4 may be arranged at the construction site of the structure 2, and a plurality of reference floor relay modules 4 may be arranged respectively, or one reference floor relay module 4 may be arranged. May be arranged.

管理装置5は、稼働情報通信モジュール3および基準階中継モジュール4と相互に通信可能な場所に配置される。図1の例において、管理装置5は、工事事務所10に配置されている。
また、図1の例において、鎖線による接続線は、相互に通信可能に接続されていることを示す。図1に示すように、稼働管理システム1においては、稼働情報通信モジュール3、基準階中継モジュール4、および管理装置5が相互に通信を行う。また、稼働管理システム1では、基準階中継モジュール4が、稼働情報通信モジュール3と管理装置5との間の通信を中継する。また、稼働管理システム1では、稼働情報通信モジュール3が、他の稼働情報通信モジュール3または基準階中継モジュール4と管理装置5との間の通信を中継する。
The management device 5 is arranged in a place where it can communicate with the operation information communication module 3 and the reference floor relay module 4. In the example of FIG. 1, the management device 5 is arranged in the construction office 10.
Further, in the example of FIG. 1, it is shown that the connecting lines by the chain lines are connected to each other so as to be communicable with each other. As shown in FIG. 1, in the operation management system 1, the operation information communication module 3, the reference floor relay module 4, and the management device 5 communicate with each other. Further, in the operation management system 1, the reference floor relay module 4 relays the communication between the operation information communication module 3 and the management device 5. Further, in the operation management system 1, the operation information communication module 3 relays communication between another operation information communication module 3 or the reference floor relay module 4 and the management device 5.

稼働管理システム1においては、稼働情報通信モジュール3と、基準階中継モジュール4と、管理装置5とが無線接続されたツリー型ネットワークを形成する。ここで、ツリー型ネットワークは、ネットワークの一部における接続が不良となっても、ネットワーク全体として所望の通信が維持されるネットワークである。図1の例で、稼働情報通信モジュール3−2により送信された情報が、稼働情報通信モジュール3−3、稼働情報通信モジュール3−4、および基準階中継モジュール4−4により中継されて管理装置5に受信される経路がある。
ここで、例えば、稼働情報通信モジュール3−3と稼働情報通信モジュール3−4との間に、鉄柱などの躯体が設置されるなどにより、モジュール間の通信が途絶えたとしても、稼働情報通信モジュール3−3と稼働情報通信モジュール3−5の間の通信が再構築され、稼働情報通信モジュール3−2により送信された情報が、稼働情報通信モジュール3−3、稼働情報通信モジュール3−5、基準階中継モジュール4−2、稼働情報通信モジュール3−9、および基準階中継モジュール4−4により中継されて管理装置5に受信される。
In the operation management system 1, an operation information communication module 3, a reference floor relay module 4, and a management device 5 are wirelessly connected to form a tree-type network. Here, the tree-type network is a network in which desired communication is maintained as the entire network even if the connection in a part of the network becomes poor. In the example of FIG. 1, the information transmitted by the operation information communication module 3-2 is relayed by the operation information communication module 3-3, the operation information communication module 3-4, and the reference floor relay module 4-4 to be a management device. There is a route to be received at 5.
Here, for example, even if the communication between the modules is interrupted due to the installation of a skeleton such as an iron pillar between the operation information communication module 3-3 and the operation information communication module 3-4, the operation information communication module The communication between 3-3 and the operation information communication module 3-5 is reconstructed, and the information transmitted by the operation information communication module 3-2 is the operation information communication module 3-3, the operation information communication module 3-5, It is relayed by the reference floor relay module 4-2, the operation information communication module 3-9, and the reference floor relay module 4-4 and received by the management device 5.

このように、稼働管理システム1においては、稼働情報通信モジュール3と、基準階中継モジュール4とが自動的に最適なツリー型ネットワークを構成し、それぞれが送信したい情報を管理装置5に対して協調しながら送信することにより、情報がより確実に管理装置5により受信されるように運用することができる。
また、稼働管理システム1における通信は、例えば、920MHz帯の特定小電力無線通信が用いられる。920MHz帯の特定小電力無線通信には、例えば、LoRa(Long Range)規格に基づく通信方式があり、この通信方式が採用されることで、少ない固定中継局で運用が可能となり、固定中継局を設置する手間や、設置にかかるコストを最小限に抑えながら、従来のWiFi(Wireless Fidelity)による通信で狭い領域に多数のWiFi基地局が設置された場合などに問題となる電波干渉による通信障害とは無関係に通信を行うことが可能となる。しかしながら、稼働管理システム1における通信はこれに限定されることはなく、セルラー網や無線LAN(Local Area Network)などの無線通信や、有線による通信で行われてもよい。
In this way, in the operation management system 1, the operation information communication module 3 and the reference floor relay module 4 automatically form an optimum tree-type network, and the information to be transmitted by each of them is coordinated with the management device 5. By transmitting the information while transmitting the information, the information can be operated so as to be received by the management device 5 more reliably.
Further, as the communication in the operation management system 1, for example, a specific low power wireless communication in the 920 MHz band is used. For specific low power wireless communication in the 920 MHz band, for example, there is a communication method based on the LoRa (Long Range) standard, and by adopting this communication method, it becomes possible to operate with a small number of fixed relay stations, and fixed relay stations can be used. Communication failure due to radio wave interference, which is a problem when a large number of WiFi base stations are installed in a narrow area by conventional WiFi (Wireless Fidelity) communication while minimizing the labor and cost of installation. Can communicate independently. However, the communication in the operation management system 1 is not limited to this, and may be performed by wireless communication such as a cellular network or wireless LAN (Local Area Network), or by wired communication.

稼働情報通信モジュール3は、例えば、各種センサを備えた通信機器である。
稼働情報通信モジュール3は、自身が取り付けられた作業機器100による作業が行われる場所における気圧を示す情報(以下、気圧情報という)を取得する。また、稼働情報通信モジュール3は、自身が取り付けられた作業機器100が稼働しているか否かを示す情報(以下、稼働情報という)を取得する。稼働情報通信モジュール3は、取得した気圧情報および稼働情報を、管理装置5に対して送信する。
The operation information communication module 3 is, for example, a communication device provided with various sensors.
The operation information communication module 3 acquires information (hereinafter, referred to as atmospheric pressure information) indicating the atmospheric pressure at the place where the work is performed by the work device 100 to which the module 3 is attached. In addition, the operation information communication module 3 acquires information (hereinafter, referred to as operation information) indicating whether or not the work device 100 to which the module 3 is attached is operating. The operation information communication module 3 transmits the acquired atmospheric pressure information and operation information to the management device 5.

基準階中継モジュール4は、例えば、各種センサを備えた通信機器である。
基準階中継モジュール4は、基準階における気圧を示す情報を取得する(以下、基準階気圧情報という)を取得する。基準階中継モジュール4は、取得した基準階気圧情報を、管理装置5に対して送信する。
The reference floor relay module 4 is, for example, a communication device provided with various sensors.
The reference floor relay module 4 acquires information indicating the atmospheric pressure in the reference floor (hereinafter, referred to as reference floor atmospheric pressure information). The reference floor relay module 4 transmits the acquired reference floor pressure information to the management device 5.

管理装置5は、稼働情報通信モジュール3または基準階中継モジュール4により管理装置5に対して送信された情報(気圧情報、稼働情報、および基準階気圧情報)を受信する。
管理装置5は、各基準階の高度と基準階中継モジュール4から受信した基準階気圧情報とに基づいて、各階の高度に対応する各階の気圧を算出する。そして、管理装置5は、それぞれの作業機器100に取り付けられた稼働情報通信モジュール3から受信した基準階気圧情報に基づいて、作業機器100が高さ方向の何処に配置されているかを示す作業階を判定する。
また、管理装置5は、判定した作業階ごとの作業機器100の稼働状況を示す作業階別稼働状況テーブルを生成する。作業階別稼働状況テーブルは、作業階と稼働情報とを対応づけたものである。
The management device 5 receives information (atmospheric pressure information, operation information, and reference floor pressure information) transmitted to the management device 5 by the operation information communication module 3 or the reference floor relay module 4.
The management device 5 calculates the atmospheric pressure of each floor corresponding to the altitude of each floor based on the altitude of each reference floor and the reference floor atmospheric pressure information received from the reference floor relay module 4. Then, the management device 5 indicates where the work equipment 100 is arranged in the height direction based on the reference floor pressure information received from the operation information communication module 3 attached to each work equipment 100. To judge.
Further, the management device 5 generates an operation status table for each work floor showing the operation status of the work equipment 100 for each determined work floor. The operation status table for each work floor associates the work floor with the operation information.

実施形態における稼働情報通信モジュール3の構成について、図2を参照して説明する。
図2は、実施形態における稼働情報通信モジュール3、基準階中継モジュール4、管理装置5それぞれの構成例、および稼働情報通信モジュール3における作業機器100に対する取り付けの例を示す図である。
図2に示すように、作業機器100は、電源部110を備える。
作業機器100は、例えば、高所作業車両や、高所作業台車など高所における作業に使用される機器である。作業機器100には、コンプレッサや照明機器、電動工具、測定器等、電力により動作する各種機器が含まれる。作業機器100は、例えば、多層の構造物2の建築現場においてレンタルにより調達される機器である。
電源部110は、例えば、高所作業車の電源バッテリである。電源部110は、作業機器100において種々の稼働が行われる際に、作業機器100の対応する駆動部(不図示)に電力を供給する。あるいは、電源部110は、商用電源等と接続し、作業機器100に電力を供給する電源供給ケーブル等であってもよい。
また、図2に示すように、稼働情報通信モジュール3は、稼働センサ30と、気圧センサ31と、制御部32と、通信部33と、電源部34とを備える。ここで、制御部32は、「第1の取得部」の一例である。また、通信部33は、「第1の通信部」の一例である。
The configuration of the operation information communication module 3 in the embodiment will be described with reference to FIG.
FIG. 2 is a diagram showing a configuration example of each of the operation information communication module 3, the reference floor relay module 4, and the management device 5 in the embodiment, and an example of attachment of the operation information communication module 3 to the work equipment 100.
As shown in FIG. 2, the work equipment 100 includes a power supply unit 110.
The work device 100 is a device used for work in a high place such as an aerial work platform or an aerial work platform. The work device 100 includes various devices operated by electric power, such as a compressor, a lighting device, a power tool, and a measuring instrument. The work equipment 100 is, for example, equipment procured by rental at the construction site of the multi-layer structure 2.
The power supply unit 110 is, for example, a power supply battery for an aerial work platform. The power supply unit 110 supplies electric power to the corresponding drive unit (not shown) of the work equipment 100 when various operations are performed on the work equipment 100. Alternatively, the power supply unit 110 may be a power supply cable or the like that is connected to a commercial power supply or the like and supplies power to the work equipment 100.
Further, as shown in FIG. 2, the operation information communication module 3 includes an operation sensor 30, a barometric pressure sensor 31, a control unit 32, a communication unit 33, and a power supply unit 34. Here, the control unit 32 is an example of the “first acquisition unit”. Further, the communication unit 33 is an example of the "first communication unit".

稼働センサ30は、例えば、クランプ300を有するクランプ型の電流センサである。稼働センサ30は、作業機器100の電源部110のプラス(+)端子をクランプ300により挟持することで、作業機器100に流れる電流値を検出する。稼働センサ30は、検出した電流値を制御部32に出力する。
気圧センサ31は、例えば、大気の圧力を検出する気圧計である。気圧センサ31は、例えば、稼働情報通信モジュール3に内蔵され、稼働情報通信モジュール3が取り付けられた作業機器100が配置される場所における大気の圧力を検出する。気圧センサ31は、検出した大気の圧力を示す情報を制御部32に出力する。
The operation sensor 30 is, for example, a clamp-type current sensor having a clamp 300. The operation sensor 30 detects the current value flowing through the work device 100 by sandwiching the positive (+) terminal of the power supply unit 110 of the work device 100 with the clamp 300. The operation sensor 30 outputs the detected current value to the control unit 32.
The barometric pressure sensor 31 is, for example, a barometer that detects atmospheric pressure. The atmospheric pressure sensor 31 is built in the operation information communication module 3, for example, and detects the atmospheric pressure at the place where the work equipment 100 to which the operation information communication module 3 is attached is arranged. The barometric pressure sensor 31 outputs information indicating the detected atmospheric pressure to the control unit 32.

通信部33は、自装置とは異なる他の稼働情報通信モジュール3、基準階中継モジュール4、および管理装置5と相互に通信を行う。通信部33は、例えば、制御部32の制御に基づいて、管理装置5に情報を送信する。また、通信部33は、他の稼働情報通信モジュール3および基準階中継モジュール4から管理装置5に送信された情報を中継する。例えば、通信部33は、受信した情報の送信先が管理装置5であった場合、当該情報を管理装置5に送信する。
電源部34は、稼働情報通信モジュール3の各構成要素に電力を供給する。図2では、電源部34は、作業機器100が有する電源部110から電力の供給を受ける場合の例を示している。しかしながら、これに限定されることはなく、例えば、電源部34は、稼働情報通信モジュール3に内蔵される蓄電池であってもよいし、稼働情報通信モジュール3に電力を供給する電源供給ケーブル等であってもよい。
The communication unit 33 communicates with another operation information communication module 3, the reference floor relay module 4, and the management device 5, which are different from the own device. The communication unit 33 transmits information to the management device 5, for example, based on the control of the control unit 32. Further, the communication unit 33 relays the information transmitted from the other operation information communication module 3 and the reference floor relay module 4 to the management device 5. For example, when the transmission destination of the received information is the management device 5, the communication unit 33 transmits the information to the management device 5.
The power supply unit 34 supplies electric power to each component of the operation information communication module 3. FIG. 2 shows an example in which the power supply unit 34 receives power from the power supply unit 110 included in the work equipment 100. However, the present invention is not limited to this, and for example, the power supply unit 34 may be a storage battery built in the operation information communication module 3, a power supply cable for supplying power to the operation information communication module 3, or the like. There may be.

制御部32は、例えば、稼働センサ30により検出された電流値に基づいて、作業機器100が稼働しているか否かを判定する。例えば、制御部32は、稼働センサ30により検出された電流値が、予め定めた所定の閾値以上である場合、作業機器100が稼働していると判定する。また、制御部32は、稼働センサ30により検出された電流値が、予め定めた所定の閾値未満である場合、作業機器100が稼働していないと判定する。
制御部32は、例えば、所定の間隔(例えば、10〜60分)(以下、管理時間という)毎の所定の時刻(以下、管理時刻という)に、作業機器100が稼働しているかを判定し、判定結果を稼働情報として取得する。そして、制御部32は、当該管理時刻において気圧センサ31により検出された大気の圧力を、圧力情報として取得する。
制御部32は、稼働情報を気圧情報と対応づけて、通信部33を介して管理装置5に対して送信する。
The control unit 32 determines, for example, whether or not the work equipment 100 is operating based on the current value detected by the operation sensor 30. For example, the control unit 32 determines that the work equipment 100 is operating when the current value detected by the operation sensor 30 is equal to or higher than a predetermined threshold value. Further, when the current value detected by the operation sensor 30 is less than a predetermined threshold value, the control unit 32 determines that the work equipment 100 is not operating.
The control unit 32 determines, for example, whether the work equipment 100 is operating at a predetermined time (hereinafter, referred to as management time) at a predetermined interval (for example, 10 to 60 minutes) (hereinafter, referred to as management time). , Acquire the judgment result as operation information. Then, the control unit 32 acquires the atmospheric pressure detected by the barometric pressure sensor 31 at the control time as pressure information.
The control unit 32 associates the operation information with the atmospheric pressure information and transmits the operation information to the management device 5 via the communication unit 33.

制御部32は、例えば、稼働情報通信モジュール3の記憶部(不図示)に記憶される稼働情報管理テーブル(図3(a)参照)に稼働情報等を書き込んでいくことにより管理装置5に対して送信する情報(以下、送信情報という)を生成する。
図3(a)は、稼働情報管理テーブルの一例を示す図である。図3(a)の例で、稼働情報管理テーブルは、管理時刻T、稼働情報W、送信判定Dのそれぞれの項目を有する。管理時刻Tには管理時間(例えば、60分)毎の所定の時刻、稼働情報Wには各管理時刻における稼働情報、送信判定Dには各管理時刻における情報の送信が成功したか否かがそれぞれ記憶される。なお、図3(a)の例では、管理時間が60分に設定された場合を示している。
For example, the control unit 32 writes operation information or the like to the operation information management table (see FIG. 3A) stored in the storage unit (not shown) of the operation information communication module 3 to the management device 5. Generates information to be transmitted (hereinafter referred to as transmission information).
FIG. 3A is a diagram showing an example of an operation information management table. In the example of FIG. 3A, the operation information management table has items of management time T, operation information W, and transmission determination D, respectively. The management time T is a predetermined time for each management time (for example, 60 minutes), the operation information W is the operation information at each management time, and the transmission determination D is whether or not the information at each management time is successfully transmitted. Each is memorized. In the example of FIG. 3A, the case where the management time is set to 60 minutes is shown.

以下、制御部32が管理時刻T(例えば、T=13)に対応する送信情報を生成する方法を例に説明する。
まず、制御部32は、管理時刻T(=13)になると、稼働センサ30により検出される電流値のモニタリングを開始する。
次に、制御部32は、モニタリングしている電流値が所定の閾値以上となった場合、管理時刻T(=13)に対応する稼働情報Wの欄に「1」を記憶させる。その後、制御部32は、次の管理時刻T(=14)まで、電流値のモニタリングを休止する。これにより、稼働情報通信モジュール3における消費電力の増大を抑制する。
そして、制御部32は、次の管理時刻T(=14)になると、その時刻に気圧センサ31により検出された気圧を気圧情報として取得する。そして、制御部32は、直前の管理時刻T(=13)における稼働情報W(=1)と、管理時刻T(=13)と、気圧情報とを稼働情報通信モジュール3の識別情報に対応づけることにより送信情報を生成する。
なお、制御部32は、例えば管理時刻T(=13)において開始した電流値のモニタリングが、次の管理時刻T(=14)となるまで継続され、その間にモニタリングしている電流値が所定の閾値未満であった場合、管理時刻T(=13)に対応する稼働情報の欄に「0」を記憶させる。そして、制御部32は、直前の管理時刻T(=13)における稼働情報W(=0)と、管理時刻T(=13)と、気圧情報とを稼働情報通信モジュール3の識別情報に対応づけることにより送信情報を生成する。
Hereinafter, a method in which the control unit 32 generates transmission information corresponding to the management time T (for example, T = 13) will be described as an example.
First, the control unit 32 starts monitoring the current value detected by the operation sensor 30 at the management time T (= 13).
Next, when the monitored current value exceeds a predetermined threshold value, the control unit 32 stores "1" in the operation information W column corresponding to the management time T (= 13). After that, the control unit 32 suspends the monitoring of the current value until the next management time T (= 14). As a result, the increase in power consumption in the operation information communication module 3 is suppressed.
Then, when the next management time T (= 14) is reached, the control unit 32 acquires the atmospheric pressure detected by the atmospheric pressure sensor 31 at that time as atmospheric pressure information. Then, the control unit 32 associates the operation information W (= 1) at the immediately preceding management time T (= 13), the management time T (= 13), and the atmospheric pressure information with the identification information of the operation information communication module 3. By doing so, transmission information is generated.
The control unit 32 continues monitoring the current value started at the management time T (= 13) until the next management time T (= 14), and the current value monitored during that time is predetermined. If it is less than the threshold value, "0" is stored in the operation information column corresponding to the management time T (= 13). Then, the control unit 32 associates the operation information W (= 0) at the immediately preceding management time T (= 13), the management time T (= 13), and the atmospheric pressure information with the identification information of the operation information communication module 3. By doing so, transmission information is generated.

また、制御部32は、送信情報の送信が成功した場合(例えば、送信に対応する応答に送信エラーが示されていない場合等)、管理時刻T(=13)に対応する送信判定Dの欄に「1」を記憶させる。
制御部32は、送信情報の送信が失敗した場合(例えば、送信に対応する応答に送信エラーが示されている場合等)、再度、送信情報を管理装置5に対して送信する。制御部32は、送信情報の送信が、所定の回数(例えば、3回)失敗した場合、管理時刻T(=13)に対応する送信判定Dの欄に「0」を記憶させる。
そして、制御部32は、さらに次の管理時刻T(=15)になると、直前の管理時刻T(=14)以前の管理時刻T(≦13)に対応する送信判定Dの欄を参照し、当該送信判定の欄に「0」が記憶されていた場合、その管理時刻Tにおける送信情報と、直前の管理時刻T(=14)における送信情報とを、それぞれ管理装置5に対して送信する。
Further, when the transmission information is successfully transmitted (for example, when a transmission error is not shown in the response corresponding to the transmission), the control unit 32 is in the transmission determination D column corresponding to the management time T (= 13). To memorize "1".
When the transmission of the transmission information fails (for example, when a transmission error is indicated in the response corresponding to the transmission), the control unit 32 transmits the transmission information to the management device 5 again. When the transmission of the transmission information fails a predetermined number of times (for example, three times), the control unit 32 stores "0" in the transmission determination D column corresponding to the management time T (= 13).
Then, when the next management time T (= 15) is reached, the control unit 32 refers to the column of the transmission determination D corresponding to the management time T (≦ 13) before the immediately preceding management time T (= 14). When "0" is stored in the transmission determination column, the transmission information at the management time T and the transmission information at the immediately preceding management time T (= 14) are transmitted to the management device 5, respectively.

基準階中継モジュール4は、気圧センサ40と、制御部41と、通信部42と、電源部43とを備える。ここで、制御部41は、「第2の取得部」の一例である。また、通信部42は、「第2の通信部」の一例である。 The reference floor relay module 4 includes a barometric pressure sensor 40, a control unit 41, a communication unit 42, and a power supply unit 43. Here, the control unit 41 is an example of the “second acquisition unit”. Further, the communication unit 42 is an example of the “second communication unit”.

気圧センサ40は、気圧センサ31と同様の機能を有する。気圧センサ40は、例えば、基準階中継モジュール4に内蔵され、基準階中継モジュール4が配置される場所における大気の圧力を検出する。気圧センサ40は、検出した大気の圧力を示す情報を制御部41に出力する。
通信部42は、稼働情報通信モジュール3、自装置とは異なる他の基準階中継モジュール4、および管理装置5と相互に通信を行う。通信部42は、例えば、制御部41の制御に基づいて、管理装置5に情報を送信する。また、通信部42は、他の稼働情報通信モジュール3および基準階中継モジュール4から管理装置5に送信された情報を中継する。例えば、通信部42は、受信した情報の送信先が自身ではなく管理装置5であった場合、当該情報を管理装置5に送信する。
電源部43は、例えば、基準階中継モジュール4に内蔵される蓄電池である。あるいは、電源部43は、基準階中継モジュール4に電力を供給する電源供給ケーブル等であってもよい。
The barometric pressure sensor 40 has the same function as the barometric pressure sensor 31. The barometric pressure sensor 40 is built in the reference floor relay module 4, for example, and detects the pressure of the atmosphere at the place where the reference floor relay module 4 is arranged. The barometric pressure sensor 40 outputs information indicating the detected atmospheric pressure to the control unit 41.
The communication unit 42 communicates with the operation information communication module 3, another reference floor relay module 4 different from the own device, and the management device 5. The communication unit 42 transmits information to the management device 5, for example, based on the control of the control unit 41. Further, the communication unit 42 relays the information transmitted from the other operation information communication module 3 and the reference floor relay module 4 to the management device 5. For example, when the transmission destination of the received information is the management device 5 instead of itself, the communication unit 42 transmits the information to the management device 5.
The power supply unit 43 is, for example, a storage battery built in the reference floor relay module 4. Alternatively, the power supply unit 43 may be a power supply cable or the like that supplies power to the reference floor relay module 4.

制御部41は、例えば、管理時刻になると、当該管理時刻において気圧センサ40により検出された大気の圧力を、基準階圧力情報として取得する。制御部41は、取得した基準階圧力情報と管理時刻とを基準階中継モジュール4の識別情報と対応付けた情報(以下、基準階送信情報という)を、通信部33を介して管理装置5に対して送信する。 For example, at the control time, the control unit 41 acquires the atmospheric pressure detected by the barometric pressure sensor 40 at the control time as the reference floor pressure information. The control unit 41 transmits the acquired reference floor pressure information and the management time to the management device 5 via the communication unit 33 with the information (hereinafter referred to as the reference floor transmission information) associated with the identification information of the reference floor relay module 4. Send to.

管理装置5は、通信部50と、制御部51と、記憶部52と、出力部53とを備える。ここで、制御部51は、「制御部」の一例である。通信部50は「第3の通信部」の一例である。 The management device 5 includes a communication unit 50, a control unit 51, a storage unit 52, and an output unit 53. Here, the control unit 51 is an example of a “control unit”. The communication unit 50 is an example of a "third communication unit".

通信部50は、稼働情報通信モジュール3、および基準階中継モジュール4と相互に通信を行う。通信部50は、例えば、稼働情報通信モジュール3、または基準階中継モジュール4により送信された情報を受信する。
記憶部52には、階別気圧テーブル(図3(b)参照)、作業機器別稼働状況テーブル(図4(a)参照)、および作業階別稼働状況テーブル(図4(b)参照)がそれぞれ記憶される。
The communication unit 50 communicates with the operation information communication module 3 and the reference floor relay module 4 with each other. The communication unit 50 receives, for example, the information transmitted by the operation information communication module 3 or the reference floor relay module 4.
The storage unit 52 has a barometric pressure table by floor (see FIG. 3 (b)), an operation status table by work equipment (see FIG. 4 (a)), and an operation status table by work floor (see FIG. 4 (b)). Each is memorized.

図3(b)は、階別気圧テーブルの例を示す表である。図3(b)の例で、階別気圧テーブルは、階、高さ[m]、基準階気圧[hPa]、階別気圧[hPa]のそれぞれの項目を有する。階には構造物2における各階の階数、高さ[m]には各階における基準(ここでは、1F)に対する高さ、基準階気圧[hPa]は基準階における気圧、階別気圧[hPa]には各階における気圧がそれぞれ記憶される。 FIG. 3B is a table showing an example of a barometric pressure table by floor. In the example of FIG. 3B, the floor pressure table has items of floor, height [m], reference floor pressure [hPa], and floor pressure [hPa]. The floor is the number of floors in the structure 2, the height [m] is the height relative to the standard (here, 1F) on each floor, the standard floor pressure [hPa] is the pressure on the reference floor, and the floor pressure [hPa] is Memorizes the atmospheric pressure on each floor.

図4(a)は、作業機器別稼働状況テーブルの例を示す図である。図4(a)の例で、作業機器別稼働状況テーブルは作業機器、日付、管理時刻T、稼働情報W、作業階F、受信判定R、のそれぞれの項目を有する。作業機器には作業機器100の管理番号、日付には稼働情報等が取得された日付、管理時刻Tには管理時間毎の所定の時刻、稼働情報Wには各管理時刻における稼働情報、作業階Fには対象の作業機器100が配置されている作業階、受信判定Rには各管理時刻における稼働情報等の受信が成功したか否かがそれぞれ記憶される。
図4(a)に示すように、作業機器別稼働状況テーブルでは、稼働情報及び作業階が、日ごと、作業機器100ごとに集計される。
FIG. 4A is a diagram showing an example of an operation status table for each work device. In the example of FIG. 4A, the operation status table for each work device has items of work device, date, management time T, operation information W, work floor F, and reception determination R. The work equipment is the management number of the work equipment 100, the date is the date when the operation information or the like is acquired, the management time T is the predetermined time for each management time, and the operation information W is the operation information at each management time and the work floor. The work floor on which the target work equipment 100 is arranged is stored in F, and whether or not the reception of the operation information or the like at each management time is successful is stored in the reception determination R.
As shown in FIG. 4A, in the operation status table for each work device, the operation information and the work floor are aggregated for each day and for each work device 100.

図4(b)は、作業階別稼働状況テーブルの例を示す図である。図4(b)の例で、作業階別稼働状況テーブルは、階、ID、台数、および稼働率のそれぞれの項目を有する。階には構造物2における各階の階数が記憶される。IDには使用中および未使用の項目があり、各階に配置された作業機器100の管理番号が稼働状況に応じてそれぞれの項目に記憶される。台数には使用中および未使用の各項目があり、各階に配置された作業機器100の台数が稼働状況に応じてそれぞれの項目に記憶される。稼働率には各階において作業する作業機器100の数に対する稼働している作業機器100の数の割合[%]がそれぞれ記憶される。
また、作業階別稼働状況テーブルの最下列には、構造物2においてその管理時間時刻に稼働している作業機器100の数、稼働していない作業機器100の数および構造物2全体の稼働率がそれぞれ記憶される。また、作業階別稼働状況テーブルは、管理時刻ごとに用意される。
FIG. 4B is a diagram showing an example of an operation status table for each work floor. In the example of FIG. 4B, the operation status table for each work floor has items of floor, ID, number of units, and operation rate. The number of floors of each floor in the structure 2 is stored in the floor. The ID has items that are in use and unused, and the control number of the work equipment 100 arranged on each floor is stored in each item according to the operating status. The number of units includes items that are in use and unused, and the number of work equipment 100 arranged on each floor is stored in each item according to the operating status. The ratio [%] of the number of working equipment 100 to the number of working equipment 100 working on each floor is stored in the operating rate.
Further, in the bottom row of the operation status table for each work floor, the number of work equipment 100 operating at the management time and time of the structure 2, the number of work equipment 100 not operating, and the operation rate of the entire structure 2 are displayed. Are memorized respectively. In addition, the operation status table for each work floor is prepared for each management time.

出力部53は、例えば、表示ディスプレイであり、記憶部52に記憶された階別気圧テーブル、作業機器別稼働状況テーブル、または作業階別稼働状況テーブルを表示ディスプレイに表示する。 The output unit 53 is, for example, a display, and displays the floor pressure table, the work equipment operation status table, or the work floor operation status table stored in the storage unit 52 on the display.

制御部51は、例えばCPU等のプロセッサがプログラムメモリに格納されたプログラムを実行することにより実現され、管理装置5を統括的に制御する。制御部51は、通信部50により受信された情報に基づいて、稼働情報通信モジュール3が取り付けられている作業機器100がどこに配置されているかを示す作業階を判定する。
まず、制御部51は、通信部50により受信された基準階送信情報に基づいて、その情報を送信した基準階中継モジュール4が配置されている基準階を判定する。制御部51は、例えば、基準階中継モジュール4により送信された基準階送信情報に含まれる識別情報に基づいて、予め定められた識別情報とその識別情報に対応する基準階中継モジュール4が配置された基準階の関係が記憶されたテーブル(不図示)を参照することにより、当該基準階中継モジュール4が配置されている基準階を判定する。
The control unit 51 is realized by, for example, a processor such as a CPU executing a program stored in the program memory, and controls the management device 5 in an integrated manner. Based on the information received by the communication unit 50, the control unit 51 determines the work floor indicating where the work equipment 100 to which the operation information communication module 3 is attached is located.
First, the control unit 51 determines the reference floor in which the reference floor relay module 4 that has transmitted the information is arranged, based on the reference floor transmission information received by the communication unit 50. In the control unit 51, for example, a reference floor relay module 4 corresponding to a predetermined identification information and the identification information is arranged based on the identification information included in the reference floor transmission information transmitted by the reference floor relay module 4. By referring to a table (not shown) in which the relationship between the reference floors is stored, the reference floor in which the reference floor relay module 4 is arranged is determined.

次に、制御部51は、基準階が判定された基準階送信情報に基づいて、その基準階における気圧を取得する。制御部51は、取得した基準階の気圧を、階別気圧テーブルの該当する欄に書き込んで記憶させる。制御部51は、例えば、基準階を判定した基準階送信情報に含まれる基準階気圧情報により示される気圧を、判定した基準階の気圧とする。図3(b)の例においては、基準階(1F、5F、および10F)それぞれの基準階気圧が、各々(1012.0[hPa]、1010.0[hPa]、および1007.8[hPa]である場合を示す。 Next, the control unit 51 acquires the atmospheric pressure at the reference floor based on the reference floor transmission information for which the reference floor has been determined. The control unit 51 writes and stores the acquired atmospheric pressure of the reference floor in the corresponding column of the atmospheric pressure table for each floor. For example, the control unit 51 sets the atmospheric pressure indicated by the reference floor pressure information included in the reference floor transmission information for determining the reference floor as the determined reference floor pressure. In the example of FIG. 3B, the reference floor pressures of the reference floors (1F, 5F, and 10F) are (1012.0 [hPa], 1010.0 [hPa], and 1007.8 [hPa], respectively. Indicates the case where.

次に、制御部51は、各基準階の気圧に基づいて、各階の気圧を導出する。
制御部51が各階の気圧を導出する方法には二つの方法がある。それぞれの方法を、各階の気圧を導出する第1の方法、第2の方法とし、以下、順に説明する。
各階の気圧を導出する第1の方法として、制御部51は、例えば、ある二つの基準階それぞれの気圧の差分を、それぞれの高さの差分で案分することにより、その二つの基準階の間に位置する階の気圧を導出する。図3(b)の例において、制御部51は、二つの基準階(例えば、10Fおよび5F)における気圧の差分(=1010−1007.8[hPa])を、それぞれの高さの差分(=39−19[m])で除算した値を、単位高さあたりの気圧変化量[hPa/m]として算出する。そして、制御部51は、算出した気圧変化量[hPa/m]に、基準階(例えば、10F)と各階(例えば、9F)との高さの差分(=39−35[m])を乗算した値を、その基準階(10F)の気圧(1007.8[hPa])に減算することにより、各階(9F)の気圧(=1008.2[hPa])を導出する。
各階の気圧を導出する第2の方法として、制御部は、例えば、ある基準階の気圧、予め定めた所定の気圧変化量(例えば、−0.112[hPa/m])、およびその基準階と各階の高さの差分に基づいて、各階の気圧を導出する。図3(b)の例において、制御部51は、ある基準階(例えば、1F)の気圧(1012.0[hPa]に、予め定めた所定の気圧変化量(例えば、−0.112[hPa/m])にその基準階(1F)と各階(例えば、B1F)の高さの差分(0−(−4)[m])を乗算した値を減算することにより、各階(B1F)の気圧(1012.4[hPa]を導出する。
Next, the control unit 51 derives the air pressure of each floor based on the air pressure of each reference floor.
There are two methods for the control unit 51 to derive the atmospheric pressure of each floor. Each method will be referred to as a first method and a second method for deriving the atmospheric pressure of each floor, and will be described below in order.
As a first method of deriving the atmospheric pressure of each floor, the control unit 51 divides the difference of the atmospheric pressure of each of the two reference floors by the difference of the height of the two reference floors, for example. Derivation of the air pressure of the floor located in between. In the example of FIG. 3B, the control unit 51 sets the difference in atmospheric pressure (= 1010-1007.8 [hPa]) between the two reference floors (for example, 10F and 5F) as the difference in height (=). The value divided by 39-19 [m]) is calculated as the amount of change in atmospheric pressure [hPa / m] per unit height. Then, the control unit 51 multiplies the calculated atmospheric pressure change amount [hPa / m] by the height difference (= 39-35 [m]) between the reference floor (for example, 10F) and each floor (for example, 9F). By subtracting the obtained value to the atmospheric pressure (1007.8 [hPa]) of the reference floor (10F), the atmospheric pressure (= 1008.2 [hPa]) of each floor (9F) is derived.
As a second method of deriving the atmospheric pressure of each floor, the control unit can, for example, control the atmospheric pressure of a certain reference floor, a predetermined amount of change in atmospheric pressure (for example, -0.112 [hPa / m]), and the reference floor thereof. And the atmospheric pressure of each floor is derived based on the difference in height of each floor. In the example of FIG. 3B, the control unit 51 changes the atmospheric pressure (1012.0 [hPa] of a certain reference floor (for example, 1F) to a predetermined predetermined atmospheric pressure change amount (for example, −0.112 [hPa]). / M]) multiplied by the difference in height (0- (-4) [m]) between the reference floor (1F) and each floor (for example, B1F), and the atmospheric pressure of each floor (B1F) is subtracted. (1012.4 [hPa] is derived.

制御部51は、例えば、二つの基準階の間に位置する階(例えば、図3(b)における1Fから10Fの間の各階のうち基準階を除いた階)の気圧を上記第1の方法により導出し、二つの基準階の間に位置しない階(例えば、図3(b)におけるB1F、およびB2F)の気圧を上記第2の方法により導出する。しかしながら、これに限定されることはなく、制御部51は、構造物2における基準階を除くすべての階を第1の方法により導出してもよいし、構造物2における基準階を除くすべての階を第2の方法により導出してもよい。制御部51は、導出した気圧を、気圧情報テーブルの階別気圧の項目の対応する箇所に記憶させる。
制御部51が基準階の気圧に基づいて、各階の気圧を導出することにより、大気の気圧が時間と供に変化する場合であっても、より精度よく作業階がどこであるかを判定することができる。なお、制御部51は、例えば、基準階中継モジュール4から情報を受信する度に、該当する基準階の気圧を更新し、更新した基準階の気圧に基づいて、各階の気圧を導出するようにしてもよいし、構造物2に配置したすべての基準階中継モジュール4から情報を受信し終えるタイミング(例えば、管理時刻から5分経過後等)で、各階の気圧を導出するようにしてもよい。
For example, the control unit 51 sets the atmospheric pressure of the floor located between the two reference floors (for example, the floor between the 1st floor and the 10th floor in FIG. 3B, excluding the reference floor) in the first method. The atmospheric pressure of the floor not located between the two reference floors (for example, B1F and B2F in FIG. 3B) is derived by the second method. However, the present invention is not limited to this, and the control unit 51 may derive all the floors in the structure 2 except the reference floor by the first method, or all the floors in the structure 2 except the reference floor. The floor may be derived by the second method. The control unit 51 stores the derived atmospheric pressure in the corresponding portion of the item of atmospheric pressure for each floor of the atmospheric pressure information table.
By the control unit 51 deriving the atmospheric pressure of each floor based on the atmospheric pressure of the reference floor, even if the atmospheric pressure of the atmosphere changes with time, it is possible to more accurately determine where the working floor is. Can be done. The control unit 51 updates the atmospheric pressure of the corresponding reference floor every time it receives information from the reference floor relay module 4, and derives the atmospheric pressure of each floor based on the updated atmospheric pressure of the reference floor. Alternatively, the air pressure on each floor may be derived at the timing when the information is completely received from all the reference floor relay modules 4 arranged in the structure 2 (for example, 5 minutes after the management time). ..

さらに、制御部51は、導出した各階の気圧に基づいて、稼働情報通信モジュール3が取り付けられている作業機器100の作業階がどこであるかを判定する。例えば、制御部51は、導出した各階の気圧と気圧情報に示される気圧とを比較することにより、稼働情報通信モジュール3が取り付けられている作業機器100の作業階がどこであるかを判定する。図3(b)の例において、制御部51は、送信情報に含まれる気圧情報により示される気圧が1010.8[hPa]である場合、階別気圧テーブルを参照し、各階における気圧との差分が最も小さい階(3F)を、当該送信情報を送信した稼働情報通信モジュール3が取り付けられている作業機器100の作業階がどこであるかを判定する。 Further, the control unit 51 determines where the work floor of the work equipment 100 to which the operation information communication module 3 is attached is based on the derived atmospheric pressure on each floor. For example, the control unit 51 determines where the work floor of the work equipment 100 to which the operation information communication module 3 is attached is by comparing the derived atmospheric pressure of each floor with the atmospheric pressure shown in the atmospheric pressure information. In the example of FIG. 3B, when the atmospheric pressure indicated by the atmospheric pressure information included in the transmission information is 1010.8 [hPa], the control unit 51 refers to the atmospheric pressure table for each floor and the difference from the atmospheric pressure in each floor. Determines on the smallest floor (3F) where the work floor of the work equipment 100 to which the operation information communication module 3 that transmitted the transmission information is attached is.

制御部51は、判定した作業階を稼働情報とともに識別情報と対応づけ、図4(a)の例に示す作業機器別稼働状況テーブルに書込んで記憶させる。また、制御部51は、作業機器別稼働状況テーブルに基づいて、図4(b)の例に示す作業階別稼働状況テーブルを生成する。
制御部51は、例えば、所定のタイミングで作業機器別稼働状況テーブルを参照し、作業階毎に、その階に配置されている作業機器100のうち、使用中である作業機器100の台数数、未使用の状態である作業機器100の台数をそれぞれ集計する。制御部51が、作業機器別稼働状況テーブルを参照するタイミングは、例えば、管理時刻に対応する送信情報および基準階送信情報を受信し終えることが想定される、管理時刻から所定の時間(例えば10分)が経過した時刻である。また、使用中の作業機器100の台数とは、作業機器別稼働状況テーブルにおいて稼働情報に「1」が記憶されている作業機器100の数である。また、未使用の状態である作業機器100とは、作業機器別稼働状況テーブルにおいて稼働情報に「0」が記憶されている作業機器100の数である。
制御部51は、各階ごとの使用中、および未使用それぞれの作業機器100の台数を、作業階別稼働状況テーブルの台数における「使用中」「未使用」それぞれの欄に書き込んで記憶させる。また、制御部51は、各階ごとの使用中、および未使用それぞれの作業機器100の管理番号を、作業階別稼働状況テーブルの管理番号における「使用中」「未使用」それぞれの欄に書き込んで記憶させる。
また、制御部51は、作業機器100の総和に対する使用中の作業機器100の台数の割合をパーセント表示した値を作業階別稼働状況テーブルの「稼働率」の欄に書き込んで記憶させる。
The control unit 51 associates the determined work floor with the identification information together with the operation information, and writes and stores the determined work floor in the operation status table for each work device shown in the example of FIG. 4A. Further, the control unit 51 generates an operation status table for each work floor shown in the example of FIG. 4B based on the operation status table for each work equipment.
For example, the control unit 51 refers to the operation status table for each work device at a predetermined timing, and for each work floor, the number of work devices 100 in use among the work devices 100 arranged on that floor, The number of unused work devices 100 is totaled. The timing at which the control unit 51 refers to the operation status table for each work device is, for example, a predetermined time from the management time (for example, 10) on which it is assumed that the control unit 51 finishes receiving the transmission information corresponding to the management time and the reference floor transmission information. Minutes) have passed. The number of work devices 100 in use is the number of work devices 100 in which "1" is stored in the operation information in the operation status table for each work device. Further, the unused work equipment 100 is the number of work equipment 100 in which "0" is stored in the operation information in the operation status table for each work equipment.
The control unit 51 writes and stores the number of used and unused work devices 100 for each floor in the "used" and "unused" columns in the number of operation status tables for each work floor. Further, the control unit 51 writes the control numbers of the used and unused work devices 100 for each floor in the "used" and "unused" columns in the control numbers of the operation status table for each work floor. Remember.
Further, the control unit 51 writes and stores a value in which the ratio of the number of working devices 100 in use to the total number of working devices 100 is displayed as a percentage in the "operation rate" column of the operation status table for each work floor.

ここで、実施形態の稼働管理システム1の動作例について、図5を参照して説明する。
図5は、実施形態の管理装置5の動作例を示すフローチャートである。
まず、管理装置5は、稼働情報通信モジュール3により送信された送信情報を受信し、送信情報に含まれる、稼働情報と気圧情報とを取得する(ステップS1)。
次に、管理装置5は、基準階中継モジュール4により送信された情報を受信し、その情報に含まれる基準階気圧情報を取得する(ステップS2)。
次に、管理装置5は、気圧情報に示される気圧と、基準階気圧情報に示される基準階気圧とに基づいて、送信情報を送信した作業機器100の作業階がどこであるかを判定する(ステップS3)。
そして、管理装置5は、判定した作業階と稼働情報を対応付けて稼働状況管理テーブルに記憶させる(ステップS4)。
Here, an operation example of the operation management system 1 of the embodiment will be described with reference to FIG.
FIG. 5 is a flowchart showing an operation example of the management device 5 of the embodiment.
First, the management device 5 receives the transmission information transmitted by the operation information communication module 3 and acquires the operation information and the atmospheric pressure information included in the transmission information (step S1).
Next, the management device 5 receives the information transmitted by the reference floor relay module 4 and acquires the reference floor pressure information included in the information (step S2).
Next, the management device 5 determines where the work floor of the work equipment 100 that has transmitted the transmission information is, based on the atmospheric pressure indicated in the atmospheric pressure information and the reference floor pressure indicated in the reference floor pressure information ( Step S3).
Then, the management device 5 stores the determined work floor and the operation information in the operation status management table in association with each other (step S4).

以上説明したように、実施形態の稼働管理システム1は、相互に通信可能な稼働情報通信モジュール3、基準階中継モジュール4、および管理装置5を備える稼働管理システムである。稼働情報通信モジュール3は、作業機器100による作業が行われる場所における気圧を示す気圧情報を取得する制御部32と、気圧情報を管理装置5に送信する通信部33とを有する。基準階中継モジュール4は、基準階における気圧を示す基準階気圧情報を取得する制御部41と、基準階気圧情報を管理装置5に送信する通信部42とを有する。管理装置5は、気圧情報および基準階気圧情報を受信する通信部50と、気圧情報および基準階気圧情報に基づいて作業機器100の作業階がどこであるかを判定する制御部51とを有する。
これにより、実施形態の稼働管理システム1では、上述した効果を奏する。管理装置5が、基準階気圧情報に基づいて各階の気圧を導出し、導出した各階の気圧と気圧情報に基づいて作業機器100の作業階がどこであるかを判定することができるためである。
As described above, the operation management system 1 of the embodiment is an operation management system including an operation information communication module 3, a reference floor relay module 4, and a management device 5 capable of communicating with each other. The operation information communication module 3 has a control unit 32 that acquires atmospheric pressure information indicating the atmospheric pressure at a place where the work by the work equipment 100 is performed, and a communication unit 33 that transmits the atmospheric pressure information to the management device 5. The reference floor relay module 4 has a control unit 41 that acquires reference floor pressure information indicating the atmospheric pressure in the reference floor, and a communication unit 42 that transmits the reference floor pressure information to the management device 5. The management device 5 has a communication unit 50 that receives atmospheric pressure information and reference floor pressure information, and a control unit 51 that determines where the work floor of the work equipment 100 is based on the atmospheric pressure information and the reference floor pressure information.
As a result, the operation management system 1 of the embodiment has the above-mentioned effect. This is because the management device 5 can derive the atmospheric pressure of each floor based on the reference floor atmospheric pressure information, and can determine where the working floor of the work equipment 100 is based on the derived atmospheric pressure and atmospheric pressure information of each floor.

ここで、比較例として、管理装置5が、稼働情報通信モジュール3から送信された気圧情報のみに基づいて作業機器100の作業階がどこであるかを判定する構成を考える。この場合、管理装置5は、例えば、1Fの気圧を1気圧として作業機器100の作業階がどこであるかを判定することが考えられる。しかしながら、構造物2が建設される場所が、そもそも高度が高い場所や、高度が低い場所である場合もあるため、1Fの気圧が1気圧となるとは限らず、作業階がどこであるかを正確に判定することができない。また、仮に作業階がどこであるか判定できた場合でも大気圧は時間とともに変化するため、大気の状態によって気圧が変動すれば作業機器100の作業階がどこであるかを正確に判定することができなくなってしまう。
これに対して、実施形態の稼働管理システム1では、管理装置5が、基準階気圧に基づいて、基準階の気圧、および各階の気圧を導出する。これにより、高度が高い場所や、高度が低い場所に構造物2が建設された場合であっても、正確に作業機器100の作業階がどこであるかを判定することができる。また、時間とともに大気圧が変化した場合であっても変化した後の基準階の気圧に基づいて各階の気圧を導出することができるため、正確に作業機器100の作業階がどこであるかを判定することができる。
Here, as a comparative example, consider a configuration in which the management device 5 determines where the work floor of the work equipment 100 is based only on the atmospheric pressure information transmitted from the operation information communication module 3. In this case, the management device 5 may determine where the work floor of the work equipment 100 is, for example, assuming that the atmospheric pressure on the 1st floor is 1 atm. However, since the place where the structure 2 is constructed may be a place where the altitude is high or a place where the altitude is low, the pressure on the 1st floor is not always 1 atm, and it is accurate where the work floor is. Cannot be determined. Further, even if it is possible to determine where the work floor is, the atmospheric pressure changes with time, so if the atmospheric pressure fluctuates depending on the atmospheric condition, it is possible to accurately determine where the work floor of the work equipment 100 is. It will disappear.
On the other hand, in the operation management system 1 of the embodiment, the management device 5 derives the atmospheric pressure of the reference floor and the atmospheric pressure of each floor based on the reference floor pressure. Thereby, even when the structure 2 is constructed in a place where the altitude is high or a place where the altitude is low, it is possible to accurately determine where the work floor of the work equipment 100 is. Further, even if the atmospheric pressure changes with time, the atmospheric pressure of each floor can be derived based on the atmospheric pressure of the reference floor after the change, so it is possible to accurately determine where the working floor of the work equipment 100 is. can do.

また、実施形態の稼働管理システム1は、制御部41により取得される基準階気圧情報には、少なくとも二つの基準階における基準階気圧情報が含まれ、制御部51は、構造物2における各階の高さに基づいて、二つの基準階気圧情報それぞれに示される二つの基準階の気圧の差分を按分することにより二つの基準階の間に位置する階の気圧を導出し、導出した各階の気圧と気圧情報に示される気圧とを比較することにより、作業階を判定する。
これにより、実施形態の稼働管理システム1は、上述した効果を奏する。管理装置5が、基準階気圧情報に基づいて各階の気圧を導出し、導出した各階の気圧と気圧情報に基づいて作業機器100の作業階がどこであるかを判定することができるためである。
Further, in the operation management system 1 of the embodiment, the reference floor pressure information acquired by the control unit 41 includes the reference floor pressure information in at least two reference floors, and the control unit 51 includes the reference floor pressure information of each floor in the structure 2. Based on the height, the atmospheric pressure of the floor located between the two reference floors is derived by apportioning the difference between the atmospheric pressures of the two reference floors shown in each of the two reference floor pressure information, and the derived atmospheric pressure of each floor is derived. The working floor is determined by comparing with the atmospheric pressure shown in the atmospheric pressure information.
As a result, the operation management system 1 of the embodiment has the above-mentioned effect. This is because the management device 5 can derive the atmospheric pressure of each floor based on the reference floor atmospheric pressure information, and can determine where the working floor of the work equipment 100 is based on the derived atmospheric pressure and atmospheric pressure information of each floor.

また、実施形態の稼働管理システム1では、制御部32は、作業機器100が稼働しているか否かを示す稼働情報を取得し、通信部33は稼働情報を気圧情報と対応づけて管理装置5に送信し、通信部50は稼働情報を受信し、制御部51は作業階に稼働情報を対応づけた作業階別稼働状況テーブルを生成する。
これにより、実施形態の稼働管理システム1では、上述した効果を奏する他、作業機器100の稼働状況を判定することができる。管理装置5が作業機器100の作業階がどこであるかを判定し、さらにその作業機器100の稼働情報を取得することにより、作業機器100が構造物2におけるどこの階に何台あり、そのうち何台が稼働しているかを集計することができるためである。つまり、従来と比較して、過剰気味とならずに最適な台数で作業機器100をレンタルすることができるため、コストダウンに繋がる。
従来、作業現場において作業機器100が不足する場合、構造物2の他の作業現場に稼働していない作業機器100があったとしてもその情報が共有されることがなく、稼働していない作業機器100を探し回る、あるいは稼働していない作業機器100があるにも拘らず、探し当てることができずに作業機器100が追加でレンタルされる場合が考えられた。
一方、実施形態の稼働管理システム1では、管理装置5が作業階別稼働状況テーブルを生成することで、作業機器100の現在の作業階と稼働状況とを、作業員に公開することができ、稼働していない作業機器100を探し回るようなことをしなくとも、稼働していない作業機器100がどこにあるか把握できる。また、作業機器100の現在の作業階と稼働状況とが作業員に公開されることで、稼働していない作業機器100があるにも拘らず、追加でレンタルされてしまうような状況を抑制することができる。
Further, in the operation management system 1 of the embodiment, the control unit 32 acquires the operation information indicating whether or not the work equipment 100 is operating, and the communication unit 33 associates the operation information with the atmospheric pressure information and manages the management device 5. The communication unit 50 receives the operation information, and the control unit 51 generates an operation status table for each work floor in which the operation information is associated with the work floor.
As a result, the operation management system 1 of the embodiment can obtain the above-mentioned effects and can determine the operation status of the work equipment 100. The management device 5 determines where the work floor of the work equipment 100 is, and further acquires the operation information of the work equipment 100, so that the work equipment 100 is located on which floor in the structure 2 and how many of them. This is because it is possible to count whether the machines are in operation. That is, as compared with the conventional case, the work equipment 100 can be rented in the optimum number without becoming excessive, which leads to cost reduction.
Conventionally, when the work equipment 100 is insufficient at the work site, even if there is a work equipment 100 that is not in operation at another work site of the structure 2, the information is not shared and the work equipment that is not in operation is not shared. It was conceivable that the work equipment 100 could not be found and the work equipment 100 was additionally rented even though there was a work equipment 100 that was searched around for 100 or was not in operation.
On the other hand, in the operation management system 1 of the embodiment, the management device 5 generates an operation status table for each work floor, so that the current work floor and the operation status of the work equipment 100 can be disclosed to the workers. It is possible to grasp where the non-operating work equipment 100 is without having to search around for the non-operating work equipment 100. In addition, by disclosing the current work floor and operating status of the work equipment 100 to the workers, it is possible to suppress a situation in which the work equipment 100 is additionally rented even though there is a work equipment 100 that is not in operation. be able to.

また、実施形態の稼働管理システム1では、制御部32は、作業機器100が稼働時において作業機器100に流れる稼働時電流値に基づいて作業機器100が稼働しているか否かを判定し、判定した判定結果に基づいて稼働情報を取得する。
これにより、実施形態の稼働管理システム1では、上述した効果を奏する他、制御部32が作業機器100の動作電流値を取得し、取得した電流値に基づいて容易に作業機器100が稼働しているか判定することができる。
また、実施形態の稼働管理システム1では、稼働情報通信モジュール3は複数であり、複数の稼働情報通信モジュール3と、基準階中継モジュール4と、管理装置5とが無線接続されたツリー型ネットワークを形成する。
これにより、実施形態の稼働管理システム1では、上述した効果を奏する他、稼働情報通信モジュール3と、基準階中継モジュール4と、管理装置5と間のネットワークがより強固に確立されることで、稼働情報通信モジュール3と、基準階中継モジュール4とにより送信される情報が、確実に管理装置5に受信されるため、正確に作業機器100の作業階がどこであるかを判定することができる。
Further, in the operation management system 1 of the embodiment, the control unit 32 determines whether or not the work equipment 100 is operating based on the operating current value flowing through the work equipment 100 when the work equipment 100 is in operation, and determines whether or not the work equipment 100 is operating. The operation information is acquired based on the judgment result.
As a result, in the operation management system 1 of the embodiment, in addition to achieving the above-mentioned effects, the control unit 32 acquires the operating current value of the work device 100, and the work device 100 easily operates based on the acquired current value. Can be determined.
Further, in the operation management system 1 of the embodiment, there are a plurality of operation information communication modules 3, and a tree-type network in which the plurality of operation information communication modules 3, the reference floor relay module 4, and the management device 5 are wirelessly connected is formed. Form.
As a result, in the operation management system 1 of the embodiment, in addition to the above-mentioned effects, the network between the operation information communication module 3, the reference floor relay module 4, and the management device 5 is more firmly established. Since the information transmitted by the operation information communication module 3 and the reference floor relay module 4 is reliably received by the management device 5, it is possible to accurately determine where the work floor of the work equipment 100 is.

なお、上述した実施形態においては、管理装置5が管理時刻ごとに作業階別稼働状況テーブルを生成する例について説明したが、管理装置5は、一日の就業時間(例えば、午前8時から午後5時まで)に含まれる管理時刻に対応する作業階別稼働状況テーブルを集計し、日別の作業階別稼働状況テーブルを生成してもよい。これにより、その日の作業機器100の作業階に偏りがある場合には、その偏りを明確にすることができ、その偏りを平準化するための移動計画や、レンタル機器の返却台数が明確になり、レンタルコスト及び配置スペースの削減を行うことができる。
また、管理装置5は、その日の終業時(例えば、午後5時)における、各作業機器100の作業階がどこであるかを集計するようにしてもよい。また、制御部51は、日別の作業階別稼働状況テーブルに基づいて、週別、月別の作業階別稼働状況テーブルを生成するようにしてもよい。これにより、週別の作業階と稼働状況から次週工程を考慮した作業計画を立案することができ、例えば、先行して作業機器100の次週の作業階に移動させておく等効率的な作業を推進することができる。また、月別の作業階と稼働状況から次月工程を考慮した作業計画を立案することができ、月単位で機器をレンタルする場合においては、月ごとにレンタル台数の過不足調整を実施できる。
また、管理装置5は、日別、週別、および月別の作業階と稼働状況とに基づいて、稼働していない不調な作業機器100を検知し、出力するようにしてもよい。これにより、不調な作業機器100がある場合に、その旨をレンタル会社に対して迅速に通知することで交換や修理などの対応が迅速に行われることが期待でき、効率よく作業機器100を稼働させることができる。
In the above-described embodiment, an example in which the management device 5 generates an operation status table for each work floor for each management time has been described, but the management device 5 has a working time of one day (for example, from 8:00 am to pm). The operation status table for each work floor corresponding to the management time included in (until 5 o'clock) may be aggregated to generate the operation status table for each work floor for each day. As a result, if there is a bias in the work floor of the work equipment 100 on that day, the bias can be clarified, and the movement plan for leveling the bias and the number of rental equipment returned can be clarified. , Rental cost and placement space can be reduced.
Further, the management device 5 may aggregate the work floors of the work devices 100 at the end of the day (for example, 5 pm). Further, the control unit 51 may generate a weekly or monthly work floor operation status table based on the daily work floor operation status table. As a result, it is possible to formulate a work plan considering the next week's process from the weekly work floor and operation status. For example, efficient work such as moving the work equipment 100 to the next week's work floor in advance can be performed. Can be promoted. In addition, it is possible to formulate a work plan considering the next month's process from the monthly work floor and operating status, and when renting equipment on a monthly basis, it is possible to adjust the excess or deficiency of the number of rental units on a monthly basis.
Further, the management device 5 may detect and output a malfunctioning work device 100 that is not in operation based on the daily, weekly, and monthly work floors and operating conditions. As a result, if there is a malfunctioning work equipment 100, it can be expected that the rental company will be notified promptly so that the work equipment 100 can be replaced or repaired promptly, and the work equipment 100 can be operated efficiently. Can be made to.

上述した実施形態における稼働管理システム1の全部または一部をコンピュータで実現するようにしてもよい。その場合、この機能を実現するためのプログラムをコンピュータ読み取り可能な記録媒体に記録して、この記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行することによって実現してもよい。なお、ここでいう「コンピュータシステム」とは、OSや周辺機器等のハードウェアを含むものとする。また、「コンピュータ読み取り可能な記録媒体」とは、フレキシブルディスク、光磁気ディスク、ROM、CD−ROM等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置のことをいう。さらに「コンピュータ読み取り可能な記録媒体」とは、インターネット等のネットワークや電話回線等の通信回線を介してプログラムを送信する場合の通信線のように、短時間の間、動的にプログラムを保持するもの、その場合のサーバやクライアントとなるコンピュータシステム内部の揮発性メモリのように、一定時間プログラムを保持しているものも含んでもよい。また上記プログラムは、前述した機能の一部を実現するためのものであってもよく、さらに前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるものであってもよく、FPGA等のプログラマブルロジックデバイスを用いて実現されるものであってもよい。 All or part of the operation management system 1 in the above-described embodiment may be realized by a computer. In that case, the program for realizing this function may be recorded on a computer-readable recording medium, and the program recorded on the recording medium may be read by the computer system and executed. The term "computer system" as used herein includes hardware such as an OS and peripheral devices. Further, the "computer-readable recording medium" refers to a portable medium such as a flexible disk, a magneto-optical disk, a ROM, or a CD-ROM, or a storage device such as a hard disk built in a computer system. Further, a "computer-readable recording medium" is a communication line for transmitting a program via a network such as the Internet or a communication line such as a telephone line, and dynamically holds the program for a short period of time. It may also include a program that holds a program for a certain period of time, such as a volatile memory inside a computer system that serves as a server or a client in that case. Further, the above program may be for realizing a part of the above-mentioned functions, and may be further realized for realizing the above-mentioned functions in combination with a program already recorded in the computer system. It may be realized by using a programmable logic device such as FPGA.

以上、この発明の実施形態について図面を参照して詳述してきたが、具体的な構成はこの実施形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計等も含まれる。
また、上述した実施形態において、構造物2の建築現場における通信環境の変化等により、稼働管理システム1の通信ネットワークから脱落する稼働情報通信モジュール3または基準階中継モジュール4がある場合、管理装置5は、その旨を警告するようにしてもよい。
管理装置5は、例えば、管理時刻ごとに受信した稼働情報通信モジュール3、および基準階中継モジュール4のそれぞれの識別情報を記憶部52に記憶させる。そして、管理装置5は、ある管理時刻において稼働情報通信モジュール3、または基準階中継モジュール4から送信された情報を受信しない場合には、そのモジュールにより送信された情報を直近に受信した日時、及びその情報に基づいて判定した作業階や基準階を出力部53に出力させることで表示させる。これを視認した作業員等により、当該モジュールの近傍に基準階中継モジュール4が設置される等の対策が行われることで、当該モジュールをネットワークへ復帰させることが可能となる。
Although the embodiments of the present invention have been described in detail with reference to the drawings, the specific configuration is not limited to this embodiment, and includes designs and the like within a range that does not deviate from the gist of the present invention.
Further, in the above-described embodiment, if there is an operation information communication module 3 or a reference floor relay module 4 that is dropped from the communication network of the operation management system 1 due to a change in the communication environment at the construction site of the structure 2, the management device 5 May warn to that effect.
The management device 5 stores, for example, the identification information of the operation information communication module 3 and the reference floor relay module 4 received at each management time in the storage unit 52. Then, when the management device 5 does not receive the information transmitted from the operation information communication module 3 or the reference floor relay module 4 at a certain management time, the date and time when the information transmitted by the module was most recently received, and The work floor and the reference floor determined based on the information are output to the output unit 53 to be displayed. By taking measures such as installing the reference floor relay module 4 in the vicinity of the module by a worker or the like who has visually recognized this, the module can be returned to the network.

1…稼働管理システム、2…構造物、3…稼働情報通信モジュール、30…稼働センサ、300…クランプ、31…気圧センサ、32…制御部、33…通信部、34…電源部、4…基準階中継モジュール、40…気圧センサ、41…制御部、42…通信部、43…電源部、5…管理装置、50…通信部、51…制御部、52…記憶部、53…出力部、10…工事事務所、100…作業機器、110…電源部 1 ... Operation management system, 2 ... Structure, 3 ... Operation information communication module, 30 ... Operation sensor, 300 ... Clamp, 31 ... Pressure sensor, 32 ... Control unit, 33 ... Communication unit, 34 ... Power supply unit, 4 ... Reference Floor relay module, 40 ... pressure sensor, 41 ... control unit, 42 ... communication unit, 43 ... power supply unit, 5 ... management device, 50 ... communication unit, 51 ... control unit, 52 ... storage unit, 53 ... output unit, 10 ... construction office, 100 ... work equipment, 110 ... power supply

Claims (5)

相互に通信可能な第1の通信装置、第2の通信装置、及び第3の通信装置を備える稼働管理システムであって、
前記第1の通信装置は、多層の構造物を施工する際に使用される作業機器による作業が行われる場所の気圧を示す気圧情報、及び前記作業機器が稼働しているか否かを示す稼働情報を取得する第1の取得部と、前記気圧情報及び稼働情報を前記第3の通信装置に送信する第1の通信部とを有し、
前記第2の通信装置は、前記構造物において高さ方向の基準となる基準階の気圧を示す基準階気圧情報を取得する第2の取得部と、前記基準階気圧情報を前記第3の通信装置に送信する第2の通信部とを有し、
前記第3の通信装置は、前記気圧情報、前記稼働情報及び前記基準階気圧情報を受信する第3の通信部と、前記構造物における各階の高さに基づいて、少なくとも二つの前記基準階気圧情報それぞれに示される二つの基準階の気圧の差分を按分することにより前記二つの基準階の間に位置する階の気圧を導出し、導出した前記各階の気圧と前記気圧情報に示される気圧とを比較することにより、前記作業機器が何処に配置されているかを示す作業階を判定し、前記作業階に前記稼働情報を対応づけた作業階別稼働状況テーブルを生成する制御部とを有する
稼働管理システム。
An operation management system including a first communication device, a second communication device, and a third communication device capable of communicating with each other.
The first communication device has atmospheric pressure information indicating the atmospheric pressure at a place where work is performed by the work equipment used when constructing a multi-layer structure, and operation information indicating whether or not the work equipment is operating. It has a first acquisition unit for acquiring the above-mentioned, and a first communication unit for transmitting the atmospheric pressure information and the operation information to the third communication device.
The second communication device communicates the reference floor pressure information with the second acquisition unit that acquires the reference floor pressure information indicating the reference floor pressure in the height direction in the structure and the third communication device. It has a second communication unit that transmits to the device,
The third communication device has at least two reference floor pressures based on a third communication unit that receives the atmospheric pressure information, the operation information, and the reference floor pressure information, and the height of each floor in the structure. By apportioning the difference between the atmospheric pressures of the two reference floors shown in each information, the atmospheric pressure of the floor located between the two reference floors is derived, and the derived atmospheric pressure of each floor and the atmospheric pressure shown in the atmospheric pressure information are used. By comparing the above, the work floor indicating where the work equipment is arranged is determined, and the operation has a control unit that generates an operation status table for each work floor in which the operation information is associated with the work floor. Management system.
前記制御部は、前記構造物における各階の高さと、少なくとも一つの前記基準階気圧情報に示される基準階の気圧とに基づいて前記各階の気圧を導出し、導出した各階の気圧と前記気圧情報に示される気圧とを比較することにより、前記作業階が何処であるかを判定する
請求項1に記載の稼働管理システム。
The control unit derives the atmospheric pressure of each floor based on the height of each floor in the structure and the atmospheric pressure of at least one reference floor indicated in the reference floor atmospheric pressure information, and the derived atmospheric pressure of each floor and the atmospheric pressure information. The operation management system according to claim 1, wherein the work floor is determined by comparing with the atmospheric pressure shown in the above.
前記第1の取得部は、前記作業機器が稼働時において作業機器に流れる電流値に基づいて前記作業機器が稼働しているか否かを判定し、判定した判定結果に基づいて前記稼働情報を取得する、
請求項1又は請求項のいずれか一項に記載の稼働管理システム。
The first acquisition unit determines whether or not the work equipment is operating based on the current value flowing through the work equipment when the work equipment is in operation, and acquires the operation information based on the determination result. do,
Operation management system according to any one of claims 1 or claim 2.
前記第1の通信装置は複数であり、複数の前記第1の通信装置と、前記第2の通信装置と、前記第3の通信装置とが無線接続されたツリー型ネットワークを形成する
請求項1から請求項のいずれか一項に記載の稼働管理システム。
A plurality of the first communication devices, and the first communication device, the second communication device, and the third communication device are wirelessly connected to form a tree-type network. The operation management system according to any one of claims 3.
相互に通信可能な第1の通信装置、第2の通信装置、及び第3の通信装置を備える稼働管理システムにおける稼働管理方法であって、
前記第1の通信装置が、多層の構造物を施工する際に使用される作業機器による作業が行われる場所の気圧を示す気圧情報、及び前記作業機器が稼働しているか否かを示す稼働情報を取得する工程と、前記気圧情報及び稼働情報を前記第3の通信装置に送信する工程とを有し、
前記第2の通信装置が、前記構造物において高さ方向の基準となる基準階の気圧を示す基準階気圧情報を取得する工程と、前記基準階気圧情報を前記第3の通信装置に送信する工程とを有し、
前記第3の通信装置が、前記気圧情報、前記稼働情報及び前記基準階気圧情報を受信する工程と、前記構造物における各階の高さに基づいて、少なくとも二つの前記基準階気圧情報それぞれに示される二つの基準階の気圧の差分を按分することにより前記二つの基準階の間に位置する階の気圧を導出し、導出した前記各階の気圧と前記気圧情報に示される気圧とを比較することにより、前記作業機器が何処に配置されているかを示す作業階が何処であるかを判定し、前記作業階に前記稼働情報を対応づけた作業階別稼働状況テーブルを生成する工程とを有する
稼働管理方法。
An operation management method in an operation management system including a first communication device, a second communication device, and a third communication device capable of communicating with each other.
Atmospheric pressure information indicating the atmospheric pressure at a place where work is performed by the work equipment used when the first communication device constructs a multi-layer structure, and operation information indicating whether or not the work equipment is operating. And a step of transmitting the atmospheric pressure information and the operation information to the third communication device.
The second communication device acquires a step of acquiring reference floor pressure information indicating a reference floor pressure as a reference in the height direction in the structure, and transmits the reference floor pressure information to the third communication device. Has a process and
Based on the step of receiving the atmospheric pressure information, the operation information, and the reference floor pressure information by the third communication device, and the height of each floor in the structure, at least two reference floor pressure information are shown. By apportioning the difference between the atmospheric pressures of the two reference floors, the atmospheric pressure of the floor located between the two reference floors is derived, and the derived atmospheric pressure of each floor is compared with the atmospheric pressure shown in the atmospheric pressure information. This includes a process of determining where the work floor indicating where the work equipment is arranged and generating an operation status table for each work floor in which the operation information is associated with the work floor. Management method.
JP2017155782A 2017-08-10 2017-08-10 Operation management system and operation management method Active JP6960798B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017155782A JP6960798B2 (en) 2017-08-10 2017-08-10 Operation management system and operation management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017155782A JP6960798B2 (en) 2017-08-10 2017-08-10 Operation management system and operation management method

Publications (2)

Publication Number Publication Date
JP2019036044A JP2019036044A (en) 2019-03-07
JP6960798B2 true JP6960798B2 (en) 2021-11-05

Family

ID=65637460

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017155782A Active JP6960798B2 (en) 2017-08-10 2017-08-10 Operation management system and operation management method

Country Status (1)

Country Link
JP (1) JP6960798B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7161446B2 (en) * 2019-06-05 2022-10-26 株式会社日立ビルシステム Escalator work management system
JP7628032B2 (en) * 2021-03-12 2025-02-07 株式会社中電工 Heights Work Safety Management System
JP7250860B2 (en) * 2021-07-26 2023-04-03 株式会社エスシー・マシーナリ Operating status detector, operating status management system, operating status detection method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4245797B2 (en) * 2000-12-20 2009-04-02 佐藤工業株式会社 Internet-based construction management system
JP4335126B2 (en) * 2004-12-10 2009-09-30 日本電信電話株式会社 Server device, electrification device, radio transmission device, management server, electrification device control system, power management method, computer program, and recording medium thereof
JP6474948B2 (en) * 2013-02-26 2019-02-27 シンフォニアテクノロジー株式会社 Work vehicle management system
JP6277637B2 (en) * 2013-09-05 2018-02-14 株式会社リコー Lending management system and terminal management device
WO2015128743A2 (en) * 2014-02-21 2015-09-03 Safety Key Solutions FZ-LLC Worksite monitoring and management systems and platforms
JP6365150B2 (en) * 2014-09-09 2018-08-01 株式会社大林組 Construction site management system,
US10763671B2 (en) * 2014-11-28 2020-09-01 Nec Corporation Power management apparatus, power management system, power management method, and non-transitory storage medium
JP6480801B2 (en) * 2015-05-01 2019-03-13 株式会社ハネロン Environmental management system

Also Published As

Publication number Publication date
JP2019036044A (en) 2019-03-07

Similar Documents

Publication Publication Date Title
JP6960798B2 (en) Operation management system and operation management method
US20120253674A1 (en) Information processing apparatus, information processing method, and electronic device
US10878352B2 (en) Mesh based system and method for tracking worksite events experienced by workers via a wearable sensor
US20180144427A1 (en) Worker data detection system, terminal device, and worker data detection method
US20180121861A1 (en) System and interfaces for managing workplace events
KR20180136295A (en) Method for providing path of movement based on workload and position information and system using the same
US20170205784A1 (en) Fall protection harness with location and inventor indicator
JP2020046791A5 (en)
US9871746B2 (en) Transmission apparatus and transmission method
JP2014164623A (en) Management system of work vehicle
EP1280030A1 (en) Method and system for converting positioning signals of different coordinate systems to prescribed coordinate systems
CN109559067B (en) Grain transportation scheduling system and method
JP2004127044A (en) Processing staff assignment method
KR20140048550A (en) System and method for tracing ship moving path
CN109548467B (en) Harvester monitoring device, harvester granary monitoring method and harvester
JP2009111861A (en) Wireless communication system and wireless terminal device
CN106304095A (en) A kind of dynamic spectrum management system and method
KR20170064295A (en) Method, wearable device for measuring cumulative vibration impact and method, server for monitoring cumulative vibration impact
JP7388144B2 (en) Information processing device, information processing system, and information processing program
JP2006245802A (en) Power line carrier communication system, communication device therefor, and power line carrier communication system construction method
JP2021157218A (en) Factory monitoring system
JP7083212B1 (en) Detection device, system, vibration tool, method
JP2000348277A (en) Emergency dispatch support system
JP6534718B2 (en) High pressure gas ordering system, ordering method and computer program
US20220285961A1 (en) Cooperative orchestration and scheduling of rechargeable energy-powered devices

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200701

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210730

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210803

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210909

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210921

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211012

R150 Certificate of patent or registration of utility model

Ref document number: 6960798

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150