JP6969212B2 - Support layer arrival judgment method and judgment support system - Google Patents
[go: Go Back, main page]

JP6969212B2 - Support layer arrival judgment method and judgment support system - Google Patents

Support layer arrival judgment method and judgment support system Download PDF

Info

Publication number
JP6969212B2
JP6969212B2 JP2017153621A JP2017153621A JP6969212B2 JP 6969212 B2 JP6969212 B2 JP 6969212B2 JP 2017153621 A JP2017153621 A JP 2017153621A JP 2017153621 A JP2017153621 A JP 2017153621A JP 6969212 B2 JP6969212 B2 JP 6969212B2
Authority
JP
Japan
Prior art keywords
value
depth
section
graph
index value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017153621A
Other languages
Japanese (ja)
Other versions
JP2019031839A (en
Inventor
由訓 萩原
義彦 森尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2017153621A priority Critical patent/JP6969212B2/en
Publication of JP2019031839A publication Critical patent/JP2019031839A/en
Application granted granted Critical
Publication of JP6969212B2 publication Critical patent/JP6969212B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

本発明は、杭を設置する杭孔の支持層到達を判定する支持層到達判定方法及び判定支援システムに関する。 The present invention relates to a support layer arrival determination method and a determination support system for determining the arrival of a support layer in a pile hole in which a pile is installed.

構造物を建設する場合、複数の杭を支持層に打ち込み、杭を介して、支持層において構造物の荷重を支える工法がある。このため、杭を挿入する杭孔を支持層にまで必ず到達させる。しかし、掘削工法の制約上、支持層への到達確認は、経験による主観的判断に依存することが多く、客観的な判定が難しい。 When constructing a structure, there is a construction method in which a plurality of piles are driven into a support layer and the load of the structure is supported in the support layer through the piles. Therefore, the pile hole into which the pile is inserted must reach the support layer. However, due to the restrictions of the excavation method, confirmation of arrival at the support layer often depends on subjective judgment based on experience, and objective judgment is difficult.

通常、構造物を建設する前に、支持層の深さ(位置)等を特定するための地盤調査が行なわれている。そして、地盤調査における標準貫入試験によって、地盤の固さを示す指標のN値を取得する。 Usually, before constructing a structure, a ground survey is conducted to identify the depth (position) of the support layer. Then, the N value of the index indicating the hardness of the ground is obtained by the standard penetration test in the ground survey.

しかし、構造物を建設する現場全体において、地質構造が同じとは限らない。また、地盤調査には費用や手間がかかるため、すべての杭孔位置で地盤調査を行なうことは難しい。また、取得したN値は、同じ値であっても地質が異なる場合がある。そのため、地盤調査に基づく柱状図及びN値を把握しても、各杭の杭孔の支持層への到達の判定は難しかった。 However, the geological structure is not always the same at the entire site where the structure is constructed. In addition, it is difficult to conduct a ground survey at all pile hole positions because the ground survey is costly and time-consuming. Further, even if the acquired N values are the same, the geology may be different. Therefore, even if the columnar chart and N value based on the ground survey are grasped, it is difficult to determine the arrival of the pile hole of each pile to the support layer.

そこで、従来、掘削時の地盤の固さに応じた抵抗値(削孔トルクを出力するための電流値)を削孔深度毎に積分した積分電流値を用いて、杭孔の支持層到達を判定する技術が検討されている(例えば、特許文献1参照)。この特許文献1においては、地盤を削孔する掘削機のオーガを駆動するオーガ駆動用モータの掘削時における電流値を検出し、オーガの上下方向移動距離を検出する。そして、掘削機による掘削開始と同時にオーガの電流データと掘削深度の測定を開始し、これらと、予めボーリング調査して得たN値を同一画面に表示する。 Therefore, conventionally, the resistance value (current value for outputting the drilling torque) according to the hardness of the ground at the time of excavation is integrated for each drilling depth to reach the support layer of the pile hole. A technique for determining is being studied (see, for example, Patent Document 1). In Patent Document 1, the current value at the time of excavation of the auger drive motor that drives the auger of the excavator that drills the ground is detected, and the vertical movement distance of the auger is detected. Then, at the same time as the start of excavation by the excavator, the current data of the auger and the measurement of the excavation depth are started, and these and the N value obtained by the boring survey in advance are displayed on the same screen.

特開平5−287721号公報Japanese Unexamined Patent Publication No. 5-287721

上述した特許文献1においても、地質構造によっては、支持層到達の判定は難しい。例えば、N値が高い泥岩の上に、N値が高い細砂層が積層していることがある。ここで、泥岩を支持層として用いる場合にも、上層の細砂層において、N値や積層電流値が高く検出され、支持層までの削孔を誤判定する可能性がある。 Even in Patent Document 1 described above, it is difficult to determine the arrival of the support layer depending on the geological structure. For example, a fine sand layer with a high N value may be laminated on a mudstone with a high N value. Here, even when the mudstone is used as the support layer, the N value and the stacking current value are detected high in the fine sand layer of the upper layer, and there is a possibility that the drilling to the support layer is erroneously determined.

なお、本出願人は、杭孔の掘削時の掘削速度についての速度指標値や掘削時の振動の周波数分析を用いて判定する方法を発明し、特願2017−003676及び特願2017−003677を出願している。 The applicant has invented a method for determining the excavation speed at the time of excavation of a pile hole by using a speed index value and a frequency analysis of vibration at the time of excavation. I have applied.

・上記課題を解決するための支持層到達判定方法は、杭孔において杭の支持層への到達を判定する支持層到達判定方法であって、前記杭孔の掘削時の地盤の固さに関する値を取得し、前記固さに関する値を、前記掘削時の前記杭孔の深さと関連付け、前記固さに関する値において、計算対象深さの第1区間における第1統計値と、前記第1区間に隣接又は前記第1区間を包含し、前記第1区間と異なる前記第1区間の長さ以上の第2区間における第2統計値とを算出し、前記第1統計値と前記第2統計値との比較に基づいて判断指標値を算出し、前記判断指標値に基づいて、前記支持層への到達を判定する。 -The support layer arrival determination method for solving the above problems is a support layer arrival determination method for determining the arrival of a pile at a pile hole in a pile hole, and is a value relating to the hardness of the ground at the time of excavation of the pile hole. Is obtained, and the value related to the hardness is associated with the depth of the pile hole at the time of excavation, and in the value related to the hardness, the first statistical value in the first section of the calculation target depth and the first section The second statistical value in the second section that includes the adjacent or the first section and is different from the first section and is longer than the length of the first section is calculated, and the first statistical value and the second statistical value are calculated. The judgment index value is calculated based on the comparison of the above, and the arrival at the support layer is determined based on the judgment index value.

本発明によれば、杭孔の支持層到達を、効率的に判断することができる。 According to the present invention, the arrival of the support layer of the pile hole can be efficiently determined.

第1の実施形態における杭孔を掘削する掘削装置の説明図であって、(a)は掘削装置の概略正面図、(b)は削孔管理システムの構成を示す構成図。It is explanatory drawing of the excavation apparatus for excavating a pile hole in 1st Embodiment, (a) is the schematic front view of the excavation apparatus, (b) is the block diagram which shows the structure of the drilling management system. 第1の実施形態の各記憶部に記憶されたデータの構成を説明する説明図であって、(a)は判定基準情報記憶部、(b)は掘削状況情報記憶部。It is explanatory drawing explaining the structure of the data stored in each storage part of 1st Embodiment, (a) is a judgment standard information storage part, (b) is excavation situation information storage part. 第1の実施形態の処理工程の処理手順を説明する流れ図。The flow chart explaining the processing procedure of the processing process of 1st Embodiment. 第1の実施形態における計測値の評価処理を説明する説明図であって、(a)は計測値グラフ、(b)は削孔時間帯を抽出したグラフ、(c)は削孔時間帯の計測値を連結したグラフ、(d)は処理手順の流れ図。It is explanatory drawing explaining the evaluation process of the measured value in 1st Embodiment, (a) is the measured value graph, (b) is the graph which extracted the drilling time zone, (c) is the drilling time zone. A graph concatenating the measured values, (d) is a flow chart of the processing procedure. 第1の実施形態における判断指標値算出処理を説明する説明図であって、(a)は判断指標値の算出方法の説明図、(b)は処理手順の流れ図。It is explanatory drawing explaining the judgment index value calculation processing in 1st Embodiment, (a) is the explanatory diagram of the judgment index value calculation method, (b) is the flow diagram of the processing procedure. 第1の実施形態におけるグラフの説明図であり、(a)は柱状図と深度に応じたN値、(b)は深度−積分電流値グラフ、(c)は深度−削孔速度グラフ、(d)は削孔速度の判断指標値グラフを示す。It is explanatory drawing of the graph in 1st Embodiment, (a) is a columnar figure and N value corresponding to a depth, (b) is a depth-integral current value graph, (c) is a depth-drilling speed graph, ( d) shows a judgment index value graph of a drilling speed. 第1の実施形態におけるグラフの説明図であり、(a)は柱状図と深度に応じたN値、(b)は深度−積分電流値グラフ、(c)は深度−振動解析グラフ、(d)は振動の判断指標値グラフを示す。It is explanatory drawing of the graph in 1st Embodiment, (a) is a columnar figure and N value corresponding to a depth, (b) is a depth-integral current value graph, (c) is a depth-vibration analysis graph, (d). ) Indicates a vibration judgment index value graph. 第1の実施形態における第2区間の設定を説明する説明図であって、(a)は第2区間の長さを1mとした場合の判断指標値、(b)は第2区間の長さを2mとした場合の判断指標値、(c)は第2区間の長さを5mとした場合の判断指標値を示す。It is explanatory drawing explaining the setting of the 2nd section in 1st Embodiment, (a) is the judgment index value when the length of the 2nd section is 1m, (b) is the length of the 2nd section. Is 2 m, and (c) is a judgment index value when the length of the second section is 5 m. 第2の実施形態における判断指標値算出処理を説明する説明図であって、(a)はt検定の確率、(b)はt検定の確率の対数値、(c)はt検定の確率の逆数値、(d)はt検定の逆数の対数値、(e)は第1統計値と第2統計値との大小関係に応じた正負の符号を付したt検定の逆数の対数値である。It is explanatory drawing explaining the judgment index value calculation process in 2nd Embodiment, (a) is the probability of t-test, (b) is the logarithm of the probability of t-test, (c) is the probability of t-test. Inverse value, (d) is the logarithmic value of the inverse number of the t-test, and (e) is the logarithmic value of the inverse number of the t-test with positive and negative signs according to the magnitude relationship between the first statistical value and the second statistical value. .. 第2の実施形態における判断指標値算出処理の処理手順の流れ図。The flow chart of the processing procedure of the judgment index value calculation processing in the 2nd Embodiment. 第2の実施形態におけるグラフの説明図であり、(a)は柱状図と深度に応じたN値、(b)は深度−削孔速度グラフ、(c)はt検定による削孔速度の判断指標値グラフ、(d)は第1実施形態の除算における削孔速度の判断指標値グラフを示す。It is explanatory drawing of the graph in 2nd Embodiment, (a) is a columnar figure and N value corresponding to the depth, (b) is a depth-drilling speed graph, (c) is the judgment of the drilling speed by t-test. The index value graph, (d) shows the judgment index value graph of the drilling speed in the division of the first embodiment. 第2の実施形態におけるグラフの説明図であり、(a)は柱状図と深度に応じたN値、(b)は深度−振動解析グラフ、(c)はt検定による振動の判断指標値グラフ、(d)は第1実施形態の除算による振動の判断指標値グラフを示す。It is explanatory drawing of the graph in 2nd Embodiment, (a) is a column chart and N value corresponding to a depth, (b) is a depth-vibration analysis graph, (c) is a judgment index value graph of vibration by t-test. , (D) show the judgment index value graph of the vibration by the division of the 1st Embodiment. 変形例における第2区間の設定長に応じた判断指標値を説明する図であって、(a)は第2区間を小さくした場合、(b)は第2区間を大きくした場合、(c)は第2区間を地上から計算対象深さまでの範囲とした場合を示す。It is a figure explaining the judgment index value according to the set length of the 2nd section in the modification, (a) is the case where the 2nd section is made small, (b) is the case where the 2nd section is made large, (c). Shows the case where the second section is the range from the ground to the calculation target depth.

<第1の実施形態>
以下、図1〜図8を用いて、支持層到達判定方法及び判定支援システムを具体化した第1の実施形態を説明する。本実施形態では、杭孔の掘削時の地盤の固さに関する値(固さ情報)として、削孔速度についての速度指標値及び振動の周波数分析値を用いる。更に、削孔速度についての速度指標値として、経過時間に応じた削孔速度(1分間の平均掘削深さ)を用いる。本実施形態では、掘削中に計測器から取得した削孔速度及び振動の判断指標値と、判定基準を作成するための先行掘削において取得した判断指標値(判定基準値)とを用いて、掘削中の削孔の支持層への到達を判定する。
<First Embodiment>
Hereinafter, the first embodiment in which the support layer arrival determination method and the determination support system are embodied will be described with reference to FIGS. 1 to 8. In this embodiment, the velocity index value for the drilling speed and the frequency analysis value for vibration are used as the value (stiffness information) regarding the hardness of the ground at the time of excavation of the pile hole. Further, as a speed index value for the drilling speed, the drilling speed (average drilling depth for 1 minute) according to the elapsed time is used. In this embodiment, excavation is performed using the judgment index values of drilling speed and vibration acquired from the measuring instrument during excavation and the judgment index values (judgment standard values) acquired in the preceding excavation for creating the judgment criteria. It is determined that the drilling inside reaches the support layer.

図1(a)には、建物の杭を設置する杭孔h0を掘削する掘削装置としての掘削機10を示している。掘削機10は、ベースマシン11、マスト14、及びオーガマシン16を備えている。ベースマシン11は、クローラ12を含む下部走行体と、操作室13を含む上部旋回体とを備えている。 FIG. 1A shows an excavator 10 as an excavator for excavating a pile hole h0 in which a pile of a building is installed. The excavator 10 includes a base machine 11, a mast 14, and an auger machine 16. The base machine 11 includes a lower traveling body including a crawler 12 and an upper turning body including an operation chamber 13.

マスト14は、ベースマシン11に立設されている。マスト14内には、深度・速度計計測用のワイヤが設けられている。マスト14には、昇降可能にオーガマシン16が取り付けられている。オーガマシン16は、ボックス内に収容された駆動モータと、この駆動モータで回転駆動される掘削ロッド17とを備えている。掘削ロッド17の先端(下端)には、掘削ヘッド18が取り付けられている。掘削ヘッド18は、揺動する一対(2つ)の掘削腕の先端に掘削刃が形成されている。なお、掘削ヘッド18の昇降は、操作室13の操作者により制御される。 The mast 14 is erected on the base machine 11. A wire for measuring the depth / velocity meter is provided in the mast 14. An auger machine 16 is attached to the mast 14 so as to be able to move up and down. The auger machine 16 includes a drive motor housed in a box and an excavation rod 17 that is rotationally driven by the drive motor. An excavation head 18 is attached to the tip (lower end) of the excavation rod 17. The excavation head 18 has an excavation blade formed at the tip of a pair (two) of excavating arms that swing. The raising and lowering of the excavation head 18 is controlled by the operator of the operation room 13.

また、掘削機10には、掘削ヘッド18に掘削水を供給する掘削水供給装置(図示せず)が連結されている。この掘削水の水量は、掘削状況に応じて、操作室13の操作者により調整される。 Further, an excavator water supply device (not shown) for supplying excavation water to the excavation head 18 is connected to the excavator 10. The amount of this excavated water is adjusted by the operator of the operation room 13 according to the excavation situation.

図1(b)に示すように、掘削機10は、削孔管理システム20を備える。この削孔管理システム20は、コンピュータ端末30、削孔深度計測器21、流量計測器22、電流計測器23、振動計測器24、入力部25及び表示部26を備えている。各計測器(21〜24)は、常時、計測を行ない、計測値をコンピュータ端末30に送信する。ここで、削孔深度計測器21が、速度指標値を計測する計測部として機能する。 As shown in FIG. 1 (b), the excavator 10 includes a drilling management system 20. The drilling management system 20 includes a computer terminal 30, a drilling depth measuring instrument 21, a flow rate measuring instrument 22, a current measuring instrument 23, a vibration measuring instrument 24, an input unit 25, and a display unit 26. Each measuring instrument (21 to 24) constantly performs measurement and transmits the measured value to the computer terminal 30. Here, the drilling depth measuring instrument 21 functions as a measuring unit for measuring the velocity index value.

削孔深度計測器21は、マスト14内のワイヤの繰り出し量を計測し、掘削ヘッド18の位置に応じた削孔深度(深さ)を計測する。
流量計測器22は、掘削水供給装置から供給した掘削水の注入流量を計測する。
電流計測器23は、オーガマシン16の駆動モータの負荷電流を計測する。
振動計測器24は、振動計測部として機能し、取付場所における振動を測定する。本実施形態では、振動計測器24は、操作室13内、操作室13の屋根や操作室13内の操作レバーに取り付けられる。この振動計測器24は、上下方向の振動と水平方向の振動を計測する。
The drilling depth measuring instrument 21 measures the amount of wire drawn out in the mast 14, and measures the drilling depth (depth) according to the position of the excavation head 18.
The flow rate measuring instrument 22 measures the injection flow rate of the excavated water supplied from the excavated water supply device.
The current measuring instrument 23 measures the load current of the drive motor of the auger machine 16.
The vibration measuring instrument 24 functions as a vibration measuring unit and measures vibration at the mounting location. In the present embodiment, the vibration measuring instrument 24 is attached to the operation room 13, the roof of the operation room 13, or the operation lever in the operation room 13. The vibration measuring instrument 24 measures vertical vibration and horizontal vibration.

入力部25は、操作室13内に配置されるキーボードやポインティングデバイス等を備え、各種データをコンピュータ端末30に入力するために用いる。
表示部26は、操作室13内に配置されるディスプレイ等を備え、各種データを表示する。
The input unit 25 includes a keyboard, a pointing device, and the like arranged in the operation room 13, and is used for inputting various data to the computer terminal 30.
The display unit 26 includes a display or the like arranged in the operation room 13 and displays various data.

コンピュータ端末30は、各計測器(21〜24)からの各計測値データを取得する。コンピュータ端末30は、制御部31、判定基準情報記憶部35、計測情報記憶部としての掘削状況情報記憶部36を備えている。 The computer terminal 30 acquires each measured value data from each measuring instrument (21 to 24). The computer terminal 30 includes a control unit 31, a determination standard information storage unit 35, and an excavation status information storage unit 36 as a measurement information storage unit.

制御部31は、制御手段(CPU、RAM、ROM等)を備え、後述する処理(基準登録段階、測定値管理段階、振動解析段階、判断指標値算出段階、出力管理段階等の各処理)を行なう。そのために、メモリに記憶された削孔管理プログラムを実行することにより、制御部31は、基準登録部311、測定値管理部312、振動解析部313、判断指標値算出部314及び出力管理部315として機能する。 The control unit 31 includes control means (CPU, RAM, ROM, etc.) and performs processes described later (each process such as a reference registration stage, a measured value management stage, a vibration analysis stage, a judgment index value calculation stage, and an output management stage). Do it. Therefore, by executing the drilling management program stored in the memory, the control unit 31 has the reference registration unit 311, the measured value management unit 312, the vibration analysis unit 313, the judgment index value calculation unit 314, and the output management unit 315. Functions as.

基準登録部311は、判定基準情報を判定基準情報記憶部35に登録する処理を実行する。
測定値管理部312は、記録部として機能し、各計測器(21〜24)から取得した計測値をメモリに蓄積し、所定時間毎の計測値を評価して、評価結果を特定する。具体的には、測定値管理部312は、実際に掘り進んだ時間帯(削孔時間帯)における速度指標値、電流値及び振動特性値を特定する。掘削ヘッド18は、固い地層等においては、掘り下げる直前に一旦、引き揚げられることがある。このため、掘削ヘッド18の実際の削孔深度は、図4(a)に示すように、経過時間に従って削孔深度が単調に増加するとは限らない。そこで、測定値管理部312は、掘削ヘッド18の引き揚げや停止の期間(図4(b)の網掛けの時間帯)を全体の作業時間から削除し、削孔のために実質的に用いられた削孔時間帯の計測値を特定する。測定値管理部312は、特定した削孔時間帯における計測値を連結して、図4(c)に示すグラフを生成する。
The reference registration unit 311 executes a process of registering the determination reference information in the determination reference information storage unit 35.
The measured value management unit 312 functions as a recording unit, stores the measured values acquired from each measuring instrument (21 to 24) in a memory, evaluates the measured value at predetermined time intervals, and specifies the evaluation result. Specifically, the measured value management unit 312 specifies the velocity index value, the current value, and the vibration characteristic value in the time zone (drilling time zone) actually dug. The excavation head 18 may be temporarily withdrawn immediately before digging in a hard stratum or the like. Therefore, as shown in FIG. 4A, the actual drilling depth of the excavation head 18 does not always increase monotonically with the elapsed time. Therefore, the measured value management unit 312 removes the period of lifting and stopping of the excavation head 18 (the shaded time zone of FIG. 4B) from the total working time, and is substantially used for drilling. Specify the measured value of the drilling time zone. The measured value management unit 312 concatenates the measured values in the specified drilling time zone to generate the graph shown in FIG. 4 (c).

振動解析部313は、振動計測器24で計測した振動の周波数分析を行なうことにより、振動特性の解析処理を実行する。本実施形態では、振動解析部313は、測定した水平方向及び上下方向の振動の周波数帯毎に、振動の大きさ(例えば、最大振幅や最大加速度等)を特定する。そして、振動解析部313は、これら水平方向及び上下方向の全周波数の振動の大きさの平均を算出する。更に、振動解析部313は、振動の大きさをグラフにおいて濃度で表示するために、濃度特定テーブルを記憶している。 The vibration analysis unit 313 executes the analysis process of the vibration characteristics by performing the frequency analysis of the vibration measured by the vibration measuring instrument 24. In the present embodiment, the vibration analysis unit 313 specifies the magnitude of vibration (for example, maximum amplitude, maximum acceleration, etc.) for each of the measured horizontal and vertical vibration frequency bands. Then, the vibration analysis unit 313 calculates the average of the magnitudes of the vibrations of all the frequencies in the horizontal direction and the vertical direction. Further, the vibration analysis unit 313 stores a concentration specifying table in order to display the magnitude of vibration as a density in a graph.

判断指標値算出部314は、削孔速度及び振動の判断指標値を算出する処理を実行する。本実施形態では、判断指標値として、削孔速度(又は振動の大きさ)の第1統計値(STA:短時間平均)を、削孔速度(又は振動の大きさ)の第2統計値(LTA:長時間平均)で除算した値を用いる。ここで、図5(a)に示すように、短時間平均及び長時間平均は、第1区間Δd及び第2区間ΔDにおける平均値である。第1区間Δd、第2区間ΔDは、杭孔において、それぞれ予め定められた距離の区間である。第2区間ΔDは、第1区間Δdよりも長く(大きく)しておく。そして、第1区間Δdと第2区間ΔDとを隣接して設定する。本実施形態では、深さが深くなる方向を正とし、第1区間Δdを、計算対象深さd以上の範囲(計算対象深さdが第1区間Δdの最小値)、第2区間ΔDを、計算対象深さd以下の範囲(計算対象深さdが第2区間ΔDの最大値)に設定する。ここでは、第1区間Δdは、計算対象深さdから「d+0.5m」までの範囲、第2区間ΔDは、計算対象深さdから「d−2m」までの範囲を用いる。更に、計算対象深さdは、判断指標値を算出している対象の深さ(位置)であって、本実施形態では、10cm幅(ピッチ)に設定する。第2区間ΔDの範囲(長さ)の決定方法については後述する。
なお、本実施形態では、振動の判断指標値として、第1区間Δd及び第2区間ΔDにおける全周波数の振動の大きさを用いて算出する。
出力管理部315は、出力部として機能し、掘削時における各計測値や、算出した深度に応じた計測値を記載したグラフ等を、表示部26に表示する。
The judgment index value calculation unit 314 executes a process of calculating the judgment index values of the drilling speed and vibration. In the present embodiment, the first statistical value (STA: short-time average) of the drilling speed (or the magnitude of vibration) is used as the judgment index value, and the second statistical value (or the magnitude of vibration) of the drilling speed (or the magnitude of vibration) is used. LTA: Long-term average) divided by the value is used. Here, as shown in FIG. 5A, the short-term average and the long-term average are average values in the first section Δd and the second section ΔD. The first section Δd and the second section ΔD are sections of the pile hole having predetermined distances, respectively. The second section ΔD is made longer (larger) than the first section Δd. Then, the first section Δd and the second section ΔD are set adjacent to each other. In the present embodiment, the direction in which the depth becomes deep is positive, and the first section Δd is the range of the calculation target depth d or more (the calculation target depth d is the minimum value of the first section Δd) and the second section ΔD. , The calculation target depth d or less (the calculation target depth d is the maximum value of the second section ΔD) is set. Here, the first section Δd uses the range from the calculation target depth d to “d + 0.5 m”, and the second section ΔD uses the range from the calculation target depth d to “d-2 m”. Further, the calculation target depth d is the depth (position) of the target for which the judgment index value is calculated, and is set to a width (pitch) of 10 cm in the present embodiment. The method of determining the range (length) of the second section ΔD will be described later.
In this embodiment, the magnitude of vibration at all frequencies in the first section Δd and the second section ΔD is used as the vibration judgment index value.
The output management unit 315 functions as an output unit, and displays on the display unit 26 a graph or the like that describes each measured value at the time of excavation and the measured value according to the calculated depth.

図2(a)に示すように、判定基準情報記憶部35は、支持層への到達を判定するために用いる判定基準情報350を記憶する。本実施形態では、この判定基準情報350には、現場識別子に関連付けて、柱状図351、深度−N値グラフ352及び判定基準グラフ355が含まれる。 As shown in FIG. 2A, the determination standard information storage unit 35 stores the determination standard information 350 used for determining the arrival at the support layer. In the present embodiment, the determination criterion information 350 includes a histogram 351 and a depth-N value graph 352 and a determination criterion graph 355 associated with the site identifier.

柱状図351は、杭孔を掘削する工事現場において、ボーリング調査において取得した土試料に基づいて作成される。深度−N値グラフ352は、このボーリング調査において取得した標準貫入試験データに基づいて作成される。
ここでは、図6(a)及び図7(a)に示す柱状図351及び深度−N値グラフ352が記録される。
The histogram 351 is created based on the soil sample obtained in the boring survey at the construction site where the pile hole is excavated. The depth-N value graph 352 is created based on the standard penetration test data acquired in this boring survey.
Here, the histogram 351 and the depth-N value graph 352 shown in FIGS. 6 (a) and 7 (a) are recorded.

判定基準グラフ355は、杭孔が支持層に到達したか否かを判定する際に用いる計測値の基準値を、深度に対応させて示したグラフである。この判定基準グラフ355は、この現場識別子によって特定される現場において、ボーリング調査の近傍で先行して行なわれる先行掘削工程(例えば、最初の杭孔の掘削工程)において生成されて登録される。判定基準グラフ355には、深度−経過時間基準グラフR1、深度−削孔速度基準グラフR2、深度−積分電流値基準グラフR5、深度−振動解析基準グラフR6、削孔速度の判断指標基準グラフR12,振動の判断指標基準グラフR16が含まれる。各基準グラフ(R1,R2,R5,R6,R12,R16)は、対応する後述するグラフ(361,362,365,366,372,376)の変化の基準として用いられる。 The determination reference graph 355 is a graph showing the reference value of the measured value used when determining whether or not the pile hole has reached the support layer, in correspondence with the depth. The determination criterion graph 355 is generated and registered in a preceding excavation process (eg, the first pile hole excavation process) performed in the vicinity of the boring survey at the site specified by the site identifier. The judgment reference graph 355 includes a depth-elapsed time reference graph R1, a depth-drilling speed reference graph R2, a depth-integrated current value reference graph R5, a depth-vibration analysis reference graph R6, and a drilling speed judgment index reference graph R12. , Vibration determination index reference graph R16 is included. Each reference graph (R1, R2, R5, R6, R12, R16) is used as a reference for change of the corresponding graph (361, 362, 365, 366, 372, 376) described later.

図2(b)に示すように、掘削状況情報記憶部36は、杭孔の掘削状況に関する掘削状況情報360が記憶される。この掘削状況情報360には、現場識別子及び杭番号に関連付けて、深度−経過時間グラフ361、深度−削孔速度グラフ362、深度−積分電流値グラフ365、深度−振動解析グラフ366、削孔速度の判断指標値グラフ372、振動の判断指標値グラフ376が含まれる。これらグラフ(361,362,365,366,372,376)の各計測値は、後述する測定値管理処理において、掘削中に取得する度に追加記録される。 As shown in FIG. 2B, the excavation status information storage unit 36 stores excavation status information 360 regarding the excavation status of the pile hole. The excavation status information 360 includes a depth-elapsed time graph 361, a depth-drilling speed graph 362, a depth-integrated current value graph 365, a depth-vibration analysis graph 366, and a drilling speed in association with the site identifier and the pile number. The judgment index value graph 372 of the above and the judgment index value graph 376 of the vibration are included. Each measured value of these graphs (361, 362, 365, 366, 372, 376) is additionally recorded each time it is acquired during excavation in the measured value management process described later.

図4(c)に示すように、深度−経過時間グラフ361は、掘削深さ(削孔深度)を縦軸に、経過時間(削孔時間)を横軸にしたグラフである。
図6(c)に示すように、深度−削孔速度グラフ362は、削孔深度を縦軸に、削孔速度を横軸にしたグラフである。この深度−削孔速度グラフ362は、一定掘削範囲(例えば、深さ30cm毎)を、この一定掘削範囲の削孔に要した時間で除算することにより算出される。
As shown in FIG. 4C, the depth-elapsed time graph 361 is a graph in which the excavation depth (drilling depth) is on the vertical axis and the elapsed time (drilling time) is on the horizontal axis.
As shown in FIG. 6 (c), the depth-drilling speed graph 362 is a graph in which the drilling depth is on the vertical axis and the drilling speed is on the horizontal axis. The depth-drilling velocity graph 362 is calculated by dividing a constant drilling range (eg, every 30 cm in depth) by the time required for drilling in this constant drilling range.

図6(b)及び図7(b)に示すように、深度−積分電流値グラフ365は、削孔深度を縦軸に、積分電流値を横軸にしたグラフである。
図7(c)に示すように、深度−振動解析グラフ366は、削孔深度に応じた振動特性値に関するグラフである。この深度−振動解析グラフ366は、削孔深度を縦軸に、周波数を横軸に用い、各周波数の振動の大きさに応じた濃度で表される。本実施形態では、水平方向の振動の大きさ及び上下方向の振動の大きさの平均値を濃度で示す。
As shown in FIGS. 6 (b) and 7 (b), the depth-integrated current value graph 365 is a graph in which the drilling depth is on the vertical axis and the integrated current value is on the horizontal axis.
As shown in FIG. 7 (c), the depth-vibration analysis graph 366 is a graph relating to vibration characteristic values according to the drilling depth. In this depth-vibration analysis graph 366, the drilling depth is used on the vertical axis and the frequency is used on the horizontal axis, and the graph is represented by a concentration corresponding to the magnitude of vibration at each frequency. In the present embodiment, the average value of the magnitude of the vibration in the horizontal direction and the magnitude of the vibration in the vertical direction is shown by the concentration.

図6(d)に示すように、削孔速度の判断指標値グラフ372は、削孔深度(深さ)を縦軸に、削孔速度の判断指標値を横軸にしたグラフである。
図7(d)に示すように、振動の判断指標値グラフ376は、削孔深度(深さ)を縦軸に、振動の判断指標値を横軸にしたグラフである。
As shown in FIG. 6D, the drilling speed judgment index value graph 372 is a graph in which the drilling depth (depth) is on the vertical axis and the drilling speed judgment index value is on the horizontal axis.
As shown in FIG. 7D, the vibration judgment index value graph 376 is a graph in which the drilling depth (depth) is on the vertical axis and the vibration judgment index value is on the horizontal axis.

〔第2区間ΔDの長さの決定方法〕
次に、図8を用いて、第2区間ΔDの長さの決定方法について説明する。ここでは、支持層や地層境界に到達したかの判定に用いる判断指標値が、支持層や地層境界に対応する深さにおいて、他の部分に比べて顕在化した値となるように第2区間ΔDの長さを決定する。
[Method of determining the length of the second section ΔD]
Next, a method of determining the length of the second section ΔD will be described with reference to FIG. Here, the second section is such that the judgment index value used for determining whether or not the support layer or the boundary of the stratum has been reached is a value that is more apparent than the other parts at the depth corresponding to the support layer or the boundary of the stratum. Determine the length of ΔD.

図8は、第2区間ΔDを変更したときの判断指標値グラフを示している。図8(a)、図8(b)及び図8(c)は、第2区間ΔDを、それぞれ、計算対象深さdから「d−1m」、「d−2m」、「d−5m」までの範囲としたときの判断指標値を示している。この判断指標値においては、第1区間Δdを、計算対象深さdから「d+0.5m」までの範囲と設定している。
図中において、白三角形で示した深さは、柱状図351及び深度−N値グラフ352に対応して地層境界と判定された深さ(位置)であり、黒三角形で示した深さは、柱状図351及び深度−N値グラフ352に対応して支持層に到達したと判定された深さ(位置)である。
FIG. 8 shows a judgment index value graph when the second section ΔD is changed. 8 (a), 8 (b) and 8 (c) show the second section ΔD as “d-1 m”, “d-2 m” and “d-5 m” from the calculation target depth d, respectively. The judgment index value when the range is up to is shown. In this judgment index value, the first section Δd is set as a range from the calculation target depth d to “d + 0.5 m”.
In the figure, the depth indicated by the white triangle is the depth (position) determined to be the boundary of the stratum corresponding to the columnar chart 351 and the depth-N value graph 352, and the depth indicated by the black triangle is It is a depth (position) determined to have reached the support layer corresponding to the columnar chart 351 and the depth −N value graph 352.

図8(a)の判断指標値は、図8(b)に比べて、地層境界の深さよりも浅い部分から判断指標値が徐々に大きくなっている。図8(c)の判断指標値は、図8(b)に比べて、全体的に、深くなるに従って判断指標値が小さくなるように変化している。このため、図8(a)〜図8(c)のうち図8(b)において、地層境界及び支持層の位置における判断指標値が他の位置の判断指標値に比べて明確になっている。そこで、本実施形態では、第2区間ΔDを、計算対象深さdから「d−2m」までの範囲と設定する。 As for the judgment index value in FIG. 8A, the judgment index value gradually increases from the portion shallower than the depth of the stratum boundary as compared with FIG. 8B. The judgment index value in FIG. 8 (c) is generally changed so that the judgment index value becomes smaller as the depth becomes deeper than in FIG. 8 (b). Therefore, in FIG. 8 (b) of FIGS. 8 (a) to 8 (c), the judgment index values at the positions of the stratum boundary and the support layer are clearer than the judgment index values at other positions. .. Therefore, in the present embodiment, the second section ΔD is set as a range from the calculation target depth d to “d-2m”.

<掘削>
次に、図3〜図7に従って、以上のように構成された掘削機10を用いて、杭孔を掘削する処理について説明する。ここでは、工事現場の敷地において、複数の杭孔を掘削する場合を想定する。
<Excavation>
Next, a process of excavating a pile hole will be described with reference to FIGS. 3 to 7 using the excavator 10 configured as described above. Here, it is assumed that a plurality of pile holes are excavated on the site of the construction site.

(ボーリング調査工程)
まず、図3に示すように、掘削を行なう前に、ボーリング調査工程を実行する。このボーリング調査工程においては、公知のように、工事現場の敷地において、地質調査を行なう。この地質調査の際に取得した深度に応じた土試料の種類に応じて柱状図を生成する。また、予め定めた所定深度毎のN値を取得し、深度−N値グラフを生成する。
(Boring survey process)
First, as shown in FIG. 3, a boring survey step is performed before excavation. In this boring survey process, as is known, a geological survey is conducted on the site of the construction site. Columnar charts are generated according to the type of soil sample according to the depth obtained during this geological survey. In addition, the N value for each predetermined depth is acquired, and a depth-N value graph is generated.

そして、コンピュータ端末30の制御部31を用いて、柱状図と深度−N値の登録処理を実行する(ステップS1−1)。具体的には、制御部31の基準登録部311は、基準値登録画面を表示部26に出力する。この基準値登録画面には、柱状図に関するデータと、深度に応じたN値のグラフデータとを登録する入力欄が含まれる。建築現場の管理者は、基準値登録画面に、現場識別子、柱状図及び深度に応じたN値のグラフを入力する。コンピュータ端末30の制御部31は、入力された現場識別子、柱状図351及び深度−N値グラフ352を記録した判定基準情報350を生成し、判定基準情報記憶部35に登録する。 Then, the control unit 31 of the computer terminal 30 is used to execute the registration process of the columnar chart and the depth −N value (step S1-1). Specifically, the reference registration unit 311 of the control unit 31 outputs the reference value registration screen to the display unit 26. This reference value registration screen includes an input field for registering data related to the histogram and graph data of N values according to the depth. The manager of the construction site inputs the site identifier, the histogram, and the graph of the N value according to the depth on the reference value registration screen. The control unit 31 of the computer terminal 30 generates the determination reference information 350 in which the input site identifier, the column chart 351 and the depth −N value graph 352 are recorded, and registers the determination reference information 350 in the determination reference information storage unit 35.

(掘削工程)
その後、各杭孔の掘削工程を行なう。この場合、判定基準グラフ355を生成する先行掘削工程と、生成した判定基準グラフ355を用いて支持層到達を判定する後続掘削工程とがある。先行掘削工程においては、ボーリング調査を行なった地点の近傍の杭孔を掘削する。以下では、まず、先行掘削工程について説明し、その後に、後続掘削工程について説明する。
(Excavation process)
After that, the excavation process of each pile hole is performed. In this case, there is a preceding excavation step for generating the determination criterion graph 355 and a subsequent excavation step for determining the arrival of the support layer using the generated determination criterion graph 355. In the preliminary excavation process, a pile hole near the point where the boring survey was conducted is excavated. In the following, the preceding excavation process will be described first, and then the subsequent excavation process will be described.

<先行掘削工程>
この先行掘削処理において、削孔管理システム20のコンピュータ端末30は、オーガマシン16の駆動モータの回転を開始し、掘削ヘッド18を地中に挿入させて削孔を開始する。
<Advance excavation process>
In this preliminary excavation process, the computer terminal 30 of the drilling management system 20 starts the rotation of the drive motor of the auger machine 16 and inserts the drilling head 18 into the ground to start drilling.

この場合、まず、コンピュータ端末30の制御部31は、判定基準情報の出力処理を実行する(ステップS2−1)。具体的には、制御部31の出力管理部315は、表示部26のディスプレイに、各グラフ(361,362,365,366,372,376)を表示する表示領域を含む出力画面を表示する。 In this case, first, the control unit 31 of the computer terminal 30 executes the output processing of the determination reference information (step S2-1). Specifically, the output management unit 315 of the control unit 31 displays an output screen including a display area for displaying each graph (361, 362, 365, 366, 372, 376) on the display of the display unit 26.

更に、出力管理部315は、この出力画面において、各グラフ(361〜376)の深度に対応させて、判定基準情報350の柱状図351及び深度−N値グラフ352を出力する。 Further, the output management unit 315 outputs a column chart 351 and a depth −N value graph 352 of the determination reference information 350 corresponding to the depth of each graph (361-376) on this output screen.

次に、コンピュータ端末30の制御部31は、計測値の取得処理を実行する(ステップS2−2)。具体的には、制御部31の測定値管理部312は、所定時間毎に、各計測器(21〜24)において計測された計測値を取得する。なお、計測値の取得処理(ステップS2−2)を実行する度に、ステップS2−3〜S2−5の処理を実行する。 Next, the control unit 31 of the computer terminal 30 executes the measurement value acquisition process (step S2-2). Specifically, the measured value management unit 312 of the control unit 31 acquires the measured values measured by each measuring instrument (21 to 24) at predetermined time intervals. Each time the measurement value acquisition process (step S2-2) is executed, the processes of steps S2-3 to S2-5 are executed.

次に、コンピュータ端末30の制御部31を用いて、計測値の評価処理を実行する(ステップS2−3)。具体的には、制御部31は、各計測器(21,23,24)から取得した各計測値から、削孔時間帯における速度指標値、振動特性値、積分電流値及び判断指標値を算出する。この処理の詳細については、後述する。 Next, the evaluation process of the measured value is executed by using the control unit 31 of the computer terminal 30 (step S2-3). Specifically, the control unit 31 calculates a velocity index value, a vibration characteristic value, an integrated current value, and a judgment index value in the drilling time zone from each measured value acquired from each measuring instrument (21, 23, 24). do. The details of this process will be described later.

次に、コンピュータ端末30の制御部31は、評価結果の出力処理を実行する(ステップS2−4)。具体的には、制御部31の出力管理部315は、ステップS2−3において特定した削孔時間帯における削孔深度を、深度−経過時間グラフ361に追加する。更に、出力管理部315は、ステップS2−3においてメモリに記憶した削孔深度に関連付けた削孔速度、積分電流値及び判断指標値を、それぞれ、各グラフ(361〜376)に追加する。 Next, the control unit 31 of the computer terminal 30 executes the output processing of the evaluation result (step S2-4). Specifically, the output management unit 315 of the control unit 31 adds the drilling depth in the drilling time zone specified in step S2-3 to the depth-elapsed time graph 361. Further, the output management unit 315 adds the drilling speed, the integrated current value, and the determination index value associated with the drilling depth stored in the memory in step S2-3 to each graph (361-376), respectively.

そして、コンピュータ端末30の制御部31を用いて、支持層への到達判定処理を実行する(ステップS2−5)。具体的には、表示部26のディスプレイに表示された各計測値の変化と、判定基準情報350の柱状図351とを比較して出力する。そして、操作者が、柱状図351と対応させた判断指標値を用いて、支持層に到達した場合の判断指標値を判定する。 Then, the control unit 31 of the computer terminal 30 is used to execute the arrival determination process to the support layer (step S2-5). Specifically, the change in each measured value displayed on the display of the display unit 26 is compared with the columnar diagram 351 of the determination reference information 350 and output. Then, the operator determines the judgment index value when the support layer is reached by using the judgment index value corresponding to the columnar diagram 351.

そして、支持層に到達したと判定した場合には、掘削ヘッド18を杭孔から引き抜く。
ここで、掘削ヘッド18の引き抜きに応じた上昇を検知した場合、コンピュータ端末30の制御部31は、判定基準グラフの登録処理を実行する(ステップS2−6)。具体的には、制御部31の基準登録部311は、掘削状況情報記憶部36に登録した各グラフ(361〜376)を、判定基準グラフ355の各グラフ(R1〜R16)として、判定基準情報記憶部35に記録する。
Then, when it is determined that the support layer has been reached, the excavation head 18 is pulled out from the pile hole.
Here, when the rise corresponding to the withdrawal of the excavation head 18 is detected, the control unit 31 of the computer terminal 30 executes the registration process of the determination reference graph (step S2-6). Specifically, the reference registration unit 311 of the control unit 31 uses each graph (361 to 376) registered in the excavation status information storage unit 36 as each graph (R1 to R16) of the determination reference graph 355 as the determination reference information. Record in the storage unit 35.

<後続掘削工程>
次に、判定基準グラフ355を用いて支持層到達を判定する後続掘削工程について説明する。
<Subsequent excavation process>
Next, the subsequent excavation process for determining the arrival of the support layer will be described using the determination criterion graph 355.

この後続掘削処理において、削孔管理システム20のコンピュータ端末30は、オーガマシン16の駆動モータの回転を開始し、掘削ヘッド18を地中に挿入させて削孔を開始する。 In this subsequent excavation process, the computer terminal 30 of the drilling management system 20 starts rotating the drive motor of the auger machine 16 and inserts the drilling head 18 into the ground to start drilling.

この場合、まず、コンピュータ端末30の制御部31は、判定基準情報の出力処理を実行する(ステップS3−1)。具体的には、制御部31の出力管理部315は、ステップS2−1と同様に、表示部26のディスプレイに、各グラフ(361〜376)を表示する表示領域と、各グラフ(361〜376)の深度に対応させた柱状図351及び深度−N値グラフ352を含む出力画面を表示する。 In this case, first, the control unit 31 of the computer terminal 30 executes the output processing of the determination reference information (step S3-1). Specifically, the output management unit 315 of the control unit 31 has a display area for displaying each graph (361-376) on the display of the display unit 26 and each graph (361-376), as in step S2-1. ) Is displayed, and the output screen including the columnar diagram 351 corresponding to the depth and the depth −N value graph 352 is displayed.

更に、出力管理部315は、この出力画面において、判定基準情報350の判定基準グラフ355の各グラフ(R1〜R16)を、各グラフ(361〜376)に対応させるように表示する。 Further, the output management unit 315 displays each graph (R1 to R16) of the determination reference graph 355 of the determination reference information 350 so as to correspond to each graph (361-376) on this output screen.

次に、コンピュータ端末30の制御部31は、ステップS2−2〜S2−5と同様に、計測値の取得処理(ステップS3−2)、計測値の評価処理(ステップS3−3)、評価結果の出力処理(ステップS3−4)、支持層への到達判定処理(ステップS3−5)を実行する。この支持層への到達判定処理(ステップS3−5)においては、操作者が、柱状図351に対応させた判定基準グラフ355と、新たに取得した判断指標値グラフ372,376とを比較して、支持層に到達したかどうかを判定する。なお、ステップS3−3〜S3−5の処理は、計測値の取得処理(ステップS3−2)を実行する度に実行される。そして、支持層に到達したと判定した場合には、掘削ヘッド18を杭孔から引き抜く。 Next, the control unit 31 of the computer terminal 30 performs the measurement value acquisition process (step S3-2), the measurement value evaluation process (step S3-3), and the evaluation result, as in steps S2-2 to S2-5. Output processing (step S3-4) and arrival determination processing to the support layer (step S3-5) are executed. In the arrival determination process for the support layer (step S3-5), the operator compares the determination standard graph 355 corresponding to the histogram 351 with the newly acquired determination index value graphs 372 and 376. , Determine if the support layer has been reached. The processes of steps S3-3 to S3-5 are executed each time the measured value acquisition process (step S3-2) is executed. Then, when it is determined that the support layer has been reached, the excavation head 18 is pulled out from the pile hole.

〔計測値の評価処理〕
次に、図4(d)を用いて、上述した計測値の評価処理(ステップS2−3)の詳細について説明する。
[Measured value evaluation process]
Next, the details of the above-mentioned measurement value evaluation process (step S2-3) will be described with reference to FIG. 4 (d).

まず、コンピュータ端末30の制御部31は、掘削ヘッドの削孔深度の取得処理を実行する(ステップS4−1)。具体的には、制御部31の測定値管理部312は、削孔深度計測器21から計測した削孔深度を取得し、取得した計測時刻とともにメモリに一時記憶する。 First, the control unit 31 of the computer terminal 30 executes the process of acquiring the drilling depth of the excavation head (step S4-1). Specifically, the measured value management unit 312 of the control unit 31 acquires the drilling depth measured from the drilling depth measuring instrument 21, and temporarily stores it in the memory together with the acquired measurement time.

そして、コンピュータ端末30の制御部31は、削孔時間帯の抽出処理を実行する(ステップS4−2)。具体的には、制御部31の測定値管理部312は、メモリに一時記憶された削孔深度において、掘削状況情報記憶部36に記録された過去の削孔深度の中で最大値以上の深度で、深度が単調増加している削孔時間帯を特定する。なお、掘削ヘッド18を引き揚げた場合には、再度、掘削ヘッド18が孔底に達した時刻から削孔時間帯に加える。 Then, the control unit 31 of the computer terminal 30 executes the extraction process of the drilling time zone (step S4-2). Specifically, the measured value management unit 312 of the control unit 31 has a depth of more than the maximum value among the past drilling depths recorded in the excavation status information storage unit 36 in the drilling depth temporarily stored in the memory. To identify the drilling time zone where the depth is monotonically increasing. When the excavation head 18 is pulled up, it is added again to the drilling time zone from the time when the excavation head 18 reaches the hole bottom.

次に、コンピュータ端末30の制御部31は、削孔時間帯の計測値の特定処理を実行する(ステップS4−3)。具体的には、制御部31の測定値管理部312は、削孔時間帯における削孔深度を連結して、削孔深度に応じた経過時間を算出する。そして、測定値管理部312は、削孔時間帯における削孔速度を算出する。そして、測定値管理部312は、削孔時間帯における瞬間電流値を特定し、その前の計測時刻の積算電流値に加算して、積算電流値を算出する。 Next, the control unit 31 of the computer terminal 30 executes the process of specifying the measured value in the drilling time zone (step S4-3). Specifically, the measured value management unit 312 of the control unit 31 connects the drilling depths in the drilling time zone and calculates the elapsed time according to the drilling depth. Then, the measured value management unit 312 calculates the drilling speed in the drilling time zone. Then, the measured value management unit 312 specifies the instantaneous current value in the drilling time zone, adds it to the integrated current value at the measurement time before that, and calculates the integrated current value.

次に、コンピュータ端末30の制御部31は、周波数解析処理を実行する(ステップS4−4)。具体的には、制御部31の振動解析部313は、削孔時間帯における振動について周波数解析を行ない、周波数帯毎の振動の大きさ(振動特性値)を特定する。そして、測定値管理部312は、特定した振動の大きさに応じた濃度を、濃度特定テーブルにおいて特定する。 Next, the control unit 31 of the computer terminal 30 executes the frequency analysis process (step S4-4). Specifically, the vibration analysis unit 313 of the control unit 31 performs frequency analysis on the vibration in the drilling time zone, and specifies the magnitude (vibration characteristic value) of the vibration for each frequency band. Then, the measured value management unit 312 specifies the concentration according to the magnitude of the specified vibration in the concentration specifying table.

次に、コンピュータ端末30の制御部31は、判断指標値算出処理を実行する(ステップS4−5)。本実施形態においては、削孔速度の判断指標値と、振動の判断指標値とを算出する。この処理については、後述する。 Next, the control unit 31 of the computer terminal 30 executes the judgment index value calculation process (step S4-5). In the present embodiment, the judgment index value of the drilling speed and the judgment index value of the vibration are calculated. This process will be described later.

次に、コンピュータ端末30の制御部31は、判断指標値等と、深度との関連付け処理を実行する(ステップS4−6)。具体的には、制御部31の測定値管理部312は、計測時刻を介して、削孔速度、積分電流値、振動特性値(周波数帯毎の振動の大きさに応じた濃度)と、削孔深度とを関連付けて、メモリに記憶する。更に、測定値管理部312は、計測時刻を介して、削孔速度の判断指標値及び振動の判断指標値と、削孔深度とを関連付けて、メモリに記憶する。 Next, the control unit 31 of the computer terminal 30 executes an association process between the determination index value and the like and the depth (step S4-6). Specifically, the measured value management unit 312 of the control unit 31 determines the drilling speed, the integrated current value, the vibration characteristic value (concentration according to the magnitude of vibration in each frequency band), and the drilling through the measurement time. It is stored in the memory in association with the hole depth. Further, the measured value management unit 312 associates the drilling speed determination index value and the vibration determination index value with the drilling depth and stores them in the memory via the measurement time.

〔判断指標値算出処理〕
次に、図5(b)を用いて、判断指標値算出処理について説明する。
まず、コンピュータ端末30の制御部31は、長時間平均の算出処理を実行する(ステップS5−1)。具体的には、制御部31の判断指標値算出部314は、計算対象深さdの第2区間ΔDにおける削孔速度を算出する。
[Judgment index value calculation process]
Next, the judgment index value calculation process will be described with reference to FIG. 5 (b).
First, the control unit 31 of the computer terminal 30 executes a long-term average calculation process (step S5-1). Specifically, the judgment index value calculation unit 314 of the control unit 31 calculates the drilling speed in the second section ΔD of the calculation target depth d.

次に、コンピュータ端末30の制御部31は、短時間平均の算出処理を実行する(ステップS5−2)。具体的には、制御部31の判断指標値算出部314は、計算対象深さdの第1区間Δdにおける削孔速度を算出する。 Next, the control unit 31 of the computer terminal 30 executes a short-time average calculation process (step S5-2). Specifically, the judgment index value calculation unit 314 of the control unit 31 calculates the drilling speed in the first section Δd of the calculation target depth d.

そして、コンピュータ端末30の制御部31は、短時間平均の長時間平均での除算処理を実行する(ステップS5−3)。具体的には、制御部31の判断指標値算出部314は、ステップS5−2で算出した短時間平均を、ステップS5−1で算出した長時間平均で除算して判断指標値を算出する。 Then, the control unit 31 of the computer terminal 30 executes the division process of the short-time average by the long-term average (step S5-3). Specifically, the judgment index value calculation unit 314 of the control unit 31 divides the short-time average calculated in step S5-2 by the long-term average calculated in step S5-1 to calculate the judgment index value.

<判断指標値と、柱状図及び深度に応じたN値との関係>
図6(a)及び図7(a)は、同じ図であり、柱状図と深度に応じたN値を示している。図6(b)及び図7(b)は、同じ図であり、深度−積分電流値グラフを示している。図6(c)は、深度−削孔速度グラフ、図6(d)は削孔速度の判断指標値グラフを示している。図7(c)は、深度−振動解析グラフ、図7(d)は、振動の判断指標値グラフを示している。
<Relationship between the judgment index value and the N value according to the histogram and depth>
6 (a) and 7 (a) are the same figures, showing a histogram and N values according to the depth. 6 (b) and 7 (b) are the same figures, showing a depth-integrated current value graph. FIG. 6C shows a depth-drilling speed graph, and FIG. 6D shows a judgment index value graph of the drilling speed. FIG. 7 (c) shows a depth-vibration analysis graph, and FIG. 7 (d) shows a vibration judgment index value graph.

図6(a)及び図7(a)の柱状図及びN値に基づくと、約5.5m〜約9.5mは、「細砂」層、約9.5m〜約10.5mは「細砂・硬質シルト」層、約10.5mより深い部分は「泥岩」層である。 Based on the histograms and N values of FIGS. 6 (a) and 7 (a), about 5.5 m to about 9.5 m is a "fine sand" layer, and about 9.5 m to about 10.5 m is "fine". The "sand / hard silt" layer, deeper than about 10.5 m, is the "mudstone" layer.

図6(b)及び図7(b)の深度−積分電流値グラフの積分電流値に基づくと、約11.5mで支持層となる「泥岩」層に到達したと判断できる。
図6(c)に示すように、深度約11m過ぎにおいて、削孔速度が小さくなっている。固い層支持層を掘削する場合には、削孔速度が小さくなることがある。このため、この深度あたりで、固い層に到達したと判定することが可能である。
Based on the integrated current values in the depth-integrated current value graphs of FIGS. 6 (b) and 7 (b), it can be determined that the "mudstone" layer, which is the support layer, has been reached at about 11.5 m.
As shown in FIG. 6 (c), the drilling speed is low at a depth of about 11 m. When excavating a hard layer support layer, the drilling speed may be low. Therefore, it is possible to determine that the hard layer has been reached around this depth.

更に、図6(d)の削孔速度の判断指標値に基づくと、深度約11m過ぎ(図中に黒三角形で示した深さ)において、「1」よりもかなり小さい値における変曲点がある。この変曲点は、柱状図351に対応している。すなわち、掘削対象の層(削孔条件)の変更によって、削孔速度が急激に小さくなり、柔らかい層から、支持層となる固い「泥岩」層に到達したと判定することができる。従って、図中の黒三角形で示した深さが支持層に到達した支持層到達した位置である。
なお、この削孔速度の判断指標値を用いることにより、約9.5mあたり(図中に白三角形で示した深さ)の地層の変化も、柱状図351に対応して判定することができる。従って、図中に白三角形で示した深さが地層境界の位置である。
Furthermore, based on the judgment index value of the drilling speed in FIG. 6 (d), the inflection point at a value considerably smaller than "1" is found at a depth of about 11 m (the depth indicated by the black triangle in the figure). be. This inflection corresponds to the histogram 351. That is, it can be determined that the drilling speed suddenly decreases due to the change of the layer to be excavated (drilling conditions), and the soft layer reaches the hard "mudstone" layer to be the support layer. Therefore, the depth indicated by the black triangle in the figure is the position where the support layer has reached the support layer.
By using the judgment index value of the drilling speed, the change of the stratum around about 9.5 m (the depth indicated by the white triangle in the figure) can also be judged corresponding to the columnar diagram 351. .. Therefore, the depth indicated by the white triangle in the figure is the position of the stratum boundary.

一方、図7(c)の深度−振動解析グラフにおいては、深度約11m過ぎにおいて、振動の大きさが小さくなっている。掘削刃が固い泥岩を掘削する場合には、掘削に用いる水により泥岩が泥になり掘削刃が滑り振動が急に小さくなることがある。このため、この深度あたりで、固い層に到達したと判定することが可能である。 On the other hand, in the depth-vibration analysis graph of FIG. 7 (c), the magnitude of vibration becomes small after the depth of about 11 m. When excavating hard mudstone with an excavation blade, the water used for excavation may turn the mudstone into mudstone, causing the excavation blade to slip and the vibration to suddenly decrease. Therefore, it is possible to determine that the hard layer has been reached around this depth.

更に、図7(d)の振動の判断指標値に基づくと、深度約11m過ぎ(図中に黒三角形で示した位置)において、「1」よりもかなり小さい値において変曲点が示されている。この変曲点は、柱状図351に対応している。すなわち、掘削対象の層(削孔条件)の変更によって、振動が急激に変化し、柔らかい層から、支持層となる固い「泥岩」層に到達したと判定することができる。なお、この振動の判断指標値を用いることにより、約9.5mあたり(図中に白三角形で示した位置)の地層の変化も、柱状図351に対応して判定することができる。 Furthermore, based on the vibration judgment index value in FIG. 7 (d), an inflection point is shown at a value considerably smaller than "1" at a depth of about 11 m (the position indicated by the black triangle in the figure). There is. This inflection corresponds to the histogram 351. That is, it can be determined that the vibration changes abruptly due to the change of the layer to be excavated (drilling conditions), and the soft layer reaches the hard "mudstone" layer to be the support layer. By using this vibration judgment index value, the change in the stratum around about 9.5 m (the position indicated by the white triangle in the figure) can also be judged corresponding to the columnar chart 351.

本実施形態によれば、以下のような効果を得ることができる。
(1−1)本実施形態では、コンピュータ端末30の制御部31は、算出した削孔速度の判断指標値を、削孔速度の判断指標値グラフ372に含めて表示する。これにより、削孔速度の判断指標値を用いて、削孔速度の変化を効率的に把握することができる。従って、支持層到達を的確に判断することができる。
According to this embodiment, the following effects can be obtained.
(1-1) In the present embodiment, the control unit 31 of the computer terminal 30 includes the calculated drilling speed judgment index value in the drilling speed judgment index value graph 372 and displays it. As a result, the change in the drilling speed can be efficiently grasped by using the judgment index value of the drilling speed. Therefore, it is possible to accurately determine the arrival of the support layer.

(1−2)本実施形態では、コンピュータ端末30の制御部31は、算出した振動の判断指標値を、振動の判断指標値グラフ376に含めて表示する。これにより、振動の判断指標値を用いて、掘削時に発生する振動の変化を効率的に把握することができる。従って、支持層到達を的確に判断することができる。 (1-2) In the present embodiment, the control unit 31 of the computer terminal 30 includes the calculated vibration judgment index value in the vibration judgment index value graph 376 and displays it. As a result, it is possible to efficiently grasp the change in vibration generated during excavation by using the vibration judgment index value. Therefore, it is possible to accurately determine the arrival of the support layer.

(1−3)本実施形態では、コンピュータ端末30の制御部31は、短時間平均を長時間平均で除算した値を、判断指標値として特定する。これにより、第1区間Δdよりも長い第2区間ΔDにおける値の変動を考慮して、第1区間Δdの変動を把握できる。従って、掘削対象の層の変化を効率的に判定することができる。 (1-3) In the present embodiment, the control unit 31 of the computer terminal 30 specifies a value obtained by dividing the short-time average by the long-term average as a judgment index value. Thereby, the fluctuation of the first section Δd can be grasped in consideration of the fluctuation of the value in the second section ΔD longer than the first section Δd. Therefore, the change in the layer to be excavated can be efficiently determined.

(1−4)本実施形態では、第1区間Δdを、計算対象深さd以上の範囲とし、第2区間ΔDは、計算対象深さd以下の範囲とする。これにより、計算対象深さdまでに掘削した削孔の削孔速度及び振動と、計算対象深さdより深く掘削した削孔の削孔速度及び振動とを比較するので、計算対象深さdにおいて、掘削対象の層の固さが変動したことを効率的に判定することができる。 (1-4) In the present embodiment, the first section Δd is in the range of the calculation target depth d or more, and the second section ΔD is in the range of the calculation target depth d or less. As a result, the drilling speed and vibration of the drilling holes drilled to the calculation target depth d and the drilling speed and vibration of the drilling drilled deeper than the calculation target depth d are compared. In, it is possible to efficiently determine that the hardness of the layer to be excavated has changed.

(1−5)本実施形態では、削孔管理システム20の制御部31は、先行掘削工程において特定した判断基準値(372,376)を、削孔速度の判断指標基準グラフR12,振動の判断指標基準グラフR16として判定基準グラフ355に含める。そして、後続掘削工程においては、削孔速度の判断指標基準グラフR12,振動の判断指標基準グラフR16を表示する。これにより、同じ工事現場において実際に既に取得した判断指標値の変曲点の値や深さを用いて、削孔の支持層への到達を判定することができる。 (1-5) In the present embodiment, the control unit 31 of the drilling management system 20 uses the determination reference value (372,376) specified in the preceding excavation process as the drilling speed determination index reference graph R12 and vibration determination. It is included in the judgment standard graph 355 as the index standard graph R16. Then, in the subsequent excavation process, the judgment index reference graph R12 for the drilling speed and the judgment index reference graph R16 for the vibration are displayed. As a result, it is possible to determine the arrival of the drilled hole in the support layer by using the value and depth of the inflection point of the judgment index value actually already acquired at the same construction site.

(1−6)本実施形態では、削孔管理システム20の制御部31は、柱状図351及び深度−N値グラフ352を含む出力画面を表示し、この出力画面において、判定基準情報350の判定基準グラフ355の各グラフ(R1〜R16)を表示する。これにより、異なる性質の計測値の複数の変化や判断指標値から削孔の支持層への到達を判定するので、より確実に削孔の支持層への到達を判定することができる。 (1-6) In the present embodiment, the control unit 31 of the drilling management system 20 displays an output screen including the columnar chart 351 and the depth −N value graph 352, and the determination of the determination reference information 350 is determined on this output screen. Each graph (R1 to R16) of the reference graph 355 is displayed. As a result, the arrival of the drilled hole in the support layer can be determined more reliably from a plurality of changes in the measured values having different properties and the judgment index value.

<第2の実施形態>
次に、図1〜図4、図9〜図12を用いて、支持層到達判定方法及び判定支援システムを具体化した第2の実施形態について説明する。第1の実施形態では、判断指標値を、第1統計値を第2統計値で除算して算出したが、本実施形態においては、t検定の確率を用いて算出する。このため、本実施形態において、上記第1実施形態と同様な部分については、同一の符号を付し、その詳細な説明は省略する。
<Second embodiment>
Next, a second embodiment in which the support layer arrival determination method and the determination support system are embodied will be described with reference to FIGS. 1 to 4 and 9 to 12. In the first embodiment, the judgment index value is calculated by dividing the first statistical value by the second statistical value, but in the present embodiment, it is calculated by using the probability of the t-test. Therefore, in the present embodiment, the same parts as those in the first embodiment are designated by the same reference numerals, and detailed description thereof will be omitted.

本実施形態においては、図1のコンピュータ端末30の制御部31の判断指標値算出部314は、t検定を用いて、削孔速度(又は振動の大きさ)の第1統計値(STA:短時間平均)と、削孔速度(又は振動の大きさ)の第2統計値(LTA:長時間平均)とが同じである確率(%)を算出し、この確率の逆数の対数値を、判断指標値として用いる。本実施形態では、掘削対象の層の性質が変化し、掘削速度や振動が急変した箇所を支持層に到達したと判定する。このため、第1統計値と第2統計値とが等しいと仮定した場合の確率が、極めて低い深度(深さ)を特定し、この深度において削孔が支持層に到達したと判定する。 In the present embodiment, the judgment index value calculation unit 314 of the control unit 31 of the computer terminal 30 in FIG. 1 uses the t-test to obtain the first statistical value (STA: short) of the drilling speed (or the magnitude of vibration). Calculate the probability (%) that the time average) and the second statistic (LTA: long-term average) of the drilling speed (or the magnitude of vibration) are the same, and determine the logarithmic value of the reciprocal of this probability. Used as an index value. In the present embodiment, it is determined that the portion where the properties of the layer to be excavated changes and the excavation speed or vibration suddenly changes reaches the support layer. Therefore, the probability of assuming that the first statistic and the second statistic are equal specifies an extremely low depth (depth), and it is determined that the drilling has reached the support layer at this depth.

図9(a)は、t検定を用いて算出した確率を示している。図9(b)は、この確率の対数値を示している。図9(c)は、確率の逆数を示している。図9(d)は、確率の逆数の対数値を示している。図9(e)は、確率の逆数の対数値に符号を付した値を示している。この図9(e)においては、第1統計値が第2統計値より大きい場合(削孔速度や振動が大きくなった場合)を「正」とし、第1統計値が第2統計値より小さい場合(削孔速度や振動が小さくなった場合)を「負」として付している。
図9(b)、図9(c)及び図9(d)においては、深さ11m過ぎに、大きな値における変曲点がある。そして、図9(e)に示す値(第1統計値と第2統計値との大小関係に応じた正負を付したt検定の逆数の対数の値)を、本実施形態では、判断指標値として用いる。
FIG. 9A shows the probabilities calculated using the t-test. FIG. 9B shows the logarithmic value of this probability. FIG. 9 (c) shows the reciprocal of the probability. FIG. 9D shows the reciprocal logarithmic value of the probability. FIG. 9 (e) shows a value obtained by adding a sign to the logarithmic value of the reciprocal of the probability. In FIG. 9 (e), the case where the first statistic is larger than the second statistic (when the drilling speed or vibration becomes large) is regarded as “positive”, and the first statistic is smaller than the second statistic. The case (when the drilling speed or vibration becomes small) is marked as "negative".
In FIGS. 9 (b), 9 (c) and 9 (d), there is an inflection point at a large value after a depth of 11 m. Then, in the present embodiment, the value shown in FIG. 9 (e) (the logarithm value of the reciprocal of the t-test with positive and negative values according to the magnitude relationship between the first statistic and the second statistic) is used as a judgment index value. Used as.

図10は、本実施形態の判断指標値算出処理の処理手順を示している。
この処理において、まず、コンピュータ端末30の制御部31は、ステップS5−1,S5−2と同様に、長時間平均の算出処理(ステップS6−1)、短時間平均の算出処理(ステップS6−2)を実行する。
FIG. 10 shows a processing procedure of the judgment index value calculation processing of the present embodiment.
In this process, first, the control unit 31 of the computer terminal 30 performs a long-term average calculation process (step S6-1) and a short-time average calculation process (step S6-), as in steps S5-1 and S5-2. 2) is executed.

そして、コンピュータ端末30の制御部31は、t検定の確率の算出処理を実行する(ステップS6−3)。具体的には、制御部31の判断指標値算出部314は、ステップS6−2で算出した短時間平均が、ステップS6−1と同じと判断できる確率p(%)を、公知のt検定を用いて算出する。 Then, the control unit 31 of the computer terminal 30 executes the calculation process of the probability of the t-test (step S6-3). Specifically, the judgment index value calculation unit 314 of the control unit 31 uses a known t-test to determine the probability p (%) that the short-time average calculated in step S6-2 can be determined to be the same as step S6-1. Calculate using.

次に、コンピュータ端末30の制御部31は、符号を付した確率pの逆数の対数の算出処理を実行する(ステップS6−4)。具体的には、制御部31の判断指標値算出部314は、ステップS6−3で算出した確率pの逆数(1/p)を対数とし、第1統計値と第2統計値との大小関係に応じた正負の符号を付した値を、判断指標値として特定する。 Next, the control unit 31 of the computer terminal 30 executes a process of calculating the logarithm of the reciprocal of the signed probability p (step S6-4). Specifically, the judgment index value calculation unit 314 of the control unit 31 uses the reciprocal (1 / p) of the probability p calculated in step S6-3 as a logarithm, and the magnitude relationship between the first statistic and the second statistic. A value with a positive or negative sign corresponding to the above is specified as a judgment index value.

<判断指標値と、柱状図及び深度に応じたN値との関係>
図11(a)及び図12(a)は、図6(a)と同じ図であり、柱状図と深度に応じたN値を示している。図11(b)は、深度−削孔速度グラフを示しており、図6(c)と同じ図である。図11(c)は、本実施形態における削孔速度の判断指標値グラフを示している。なお、比較のために、図11(d)に、第1実施形態において算出した削孔速度の判断指標値グラフ(図6(d))を示している。
<Relationship between the judgment index value and the N value according to the histogram and depth>
11 (a) and 12 (a) are the same views as in FIG. 6 (a), and show a histogram and N values according to the depth. FIG. 11B shows a depth-drilling velocity graph, which is the same as FIG. 6C. FIG. 11C shows a judgment index value graph of the drilling speed in the present embodiment. For comparison, FIG. 11 (d) shows a graph of judgment index values of the drilling speed calculated in the first embodiment (FIG. 6 (d)).

また、図12(b)は、深度−振動解析グラフを示しており、図7(c)と同じ図である。図12(c)は、本実施形態における振動の判断指標値グラフを示している。なお、比較のために、図12(d)に、第1実施形態において算出した振動の判断指標値グラフ(図7(d))を示している。 Further, FIG. 12 (b) shows a depth-vibration analysis graph, which is the same as FIG. 7 (c). FIG. 12C shows a vibration judgment index value graph in the present embodiment. For comparison, FIG. 12 (d) shows a vibration judgment index value graph (FIG. 7 (d)) calculated in the first embodiment.

図11(c)に示す本実施形態の判断指標値においても、深度約11m過ぎ(図中に黒三角形で示した位置)において、マイナス側で大きな値の変曲点がある。この変曲点は、柱状図351に対応している。従って、この変曲点により、支持層となる「泥岩」層に到達したと判定することができる。なお、この削孔速度の判断指標値を用いることで、約9.5mあたり(図中に白三角形で示した位置)の地層の変化も、柱状図351に対応して判定することができる。なお、図11(c)で示した黒三角形及び白三角形で示した深さと、図11(d)で示したそれぞれの深さとは、ほぼ同じである。 Even in the judgment index value of the present embodiment shown in FIG. 11 (c), there is a large inflection point on the minus side at a depth of about 11 m (position indicated by a black triangle in the figure). This inflection corresponds to the histogram 351. Therefore, it can be determined from this inflection that the "mudstone" layer, which is the support layer, has been reached. By using the judgment index value of the drilling speed, the change of the stratum around about 9.5 m (the position indicated by the white triangle in the figure) can also be judged corresponding to the columnar diagram 351. The depths shown by the black triangle and the white triangle shown in FIG. 11 (c) and the respective depths shown in FIG. 11 (d) are almost the same.

更に、図12(c)の振動の判断指標値においても、深度約11m過ぎ(図中に黒三角形で示した位置)において、マイナスの値において変曲点がある。この変曲点は、柱状図351に対応している。従って、このあたりで、支持層となる「泥岩」層に到達したと判定することができる。なお、この振動の判断指標値を用いることで、約9.5mあたり(図中に白三角形で示した位置)の地層の変化も判定することができる。なお、図12(c)で示した黒三角形及び白三角形で示した深さと、図12(d)で示したそれぞれの深さとは、ほぼ同じである。 Further, also in the vibration judgment index value of FIG. 12 (c), there is an inflection point at a negative value at a depth of about 11 m (position indicated by a black triangle in the figure). This inflection corresponds to the histogram 351. Therefore, it can be determined that the "mudstone" layer, which is the support layer, has been reached around this point. By using this vibration judgment index value, it is possible to judge the change of the stratum around about 9.5 m (the position indicated by the white triangle in the figure). The depths shown by the black triangle and the white triangle shown in FIG. 12 (c) and the respective depths shown in FIG. 12 (d) are almost the same.

本実施形態によれば、上記(1−1)、(1−2)、(1−4)〜(1−6)と同様な効果に加えて、以下のような効果を得ることができる。
(2−1)本実施形態では、コンピュータ端末30の制御部31は、t検定を用いて算出した短時間平均と長時間平均とが同じである確率pを用いた値を、判断指標値として用いる。この確率pが低い場合には、短時間平均が長時間平均と異なっていることにより、削孔速度や振動が急変したことを判定することができる。従って、掘削対象の層の性質が変化したことを効率的に把握することができる。
According to the present embodiment, in addition to the same effects as the above (1-1), (1-2), (1-4) to (1-6), the following effects can be obtained.
(2-1) In the present embodiment, the control unit 31 of the computer terminal 30 uses a value using the probability p that the short-time average and the long-term average calculated by using the t-test are the same as the judgment index value. Use. When this probability p is low, it can be determined that the drilling speed or vibration has suddenly changed because the short-time average is different from the long-time average. Therefore, it is possible to efficiently grasp that the properties of the layer to be excavated have changed.

(2−2)本実施形態では、コンピュータ端末30の制御部31は、t検定を用いて算出した短時間平均(STA)が長時間平均(LTA)と同じである確率(%)の逆数の対数値に、第1統計値と第2統計値との大小関係に応じた正負を付した値を、判断指標値として用いる。これにより、逆数により確率が低い場合に違いを強調し、対数により大きな値に制限をかけることができ、正負の符号により大小関係を把握することができる。 (2-2) In the present embodiment, the control unit 31 of the computer terminal 30 has the reciprocal of the probability (%) that the short-term average (STA) calculated by using the t-test is the same as the long-term average (LTA). A value obtained by adding a positive or negative value to the logarithmic value according to the magnitude relationship between the first statistical value and the second statistical value is used as the judgment index value. As a result, the difference can be emphasized when the probability is low by the reciprocal, a large value can be limited by the logarithm, and the magnitude relationship can be grasped by the sign of positive or negative.

また、上記各実施形態は以下のように変更してもよい。
・上記各実施形態において、制御部31の判断指標値算出部314は、削孔速度の判断指標値を算出した。削孔速度についての速度指標値に関する判断指標値は、これに限られない。例えば、水量変化について同様に判断指標値を算出して表示してもよい。また、上記実施形態では、削孔速度として、1分間の平均掘削深さを用いたが、削孔速度はこれに限定されず、数分間の平均掘削深さでもよいし、数十秒の平均掘削深さでもよい。
Further, each of the above embodiments may be changed as follows.
-In each of the above embodiments, the judgment index value calculation unit 314 of the control unit 31 has calculated the judgment index value of the drilling speed. The judgment index value regarding the speed index value regarding the drilling speed is not limited to this. For example, the judgment index value may be calculated and displayed in the same manner for the change in the amount of water. Further, in the above embodiment, the average drilling depth for 1 minute is used as the drilling speed, but the drilling speed is not limited to this, and the average drilling depth for several minutes may be used, or the average drilling depth for several tens of seconds. The excavation depth may be used.

・上記各実施形態において、制御部31の判断指標値算出部314は、振動の判断指標値として、全周波数の振動の大きさの平均値を算出した。振動の判断指標値は、このような全周波数の振動を用いる代わりに、上下方向のみの振動や水平方向のみの振動を用いてもよいし、特定周波数帯の振動を用いてもよい。
また、杭孔の掘削時の地盤の固さに関する値(固さ情報)であれば、削孔速度等の速度指標値や振動の周波数分析値に限られず、それ以外の値を用いてもよい。
-In each of the above embodiments, the judgment index value calculation unit 314 of the control unit 31 calculates the average value of the magnitudes of vibrations of all frequencies as the judgment index value of vibration. As the vibration determination index value, instead of using such vibrations of all frequencies, vibrations only in the vertical direction or vibrations in the horizontal direction may be used, or vibrations in a specific frequency band may be used.
Further, as long as it is a value related to the hardness of the ground at the time of excavation of a pile hole (hardness information), it is not limited to a speed index value such as a drilling speed or a frequency analysis value of vibration, and other values may be used. ..

・上記各実施形態において、制御部31の判断指標値算出部314は、計算対象深さdを最小値として含む第1区間Δdにおける平均値と、計算対象深さdを最大値として含む第2区間ΔDにおける平均値とを用いて、判断指標値を算出した。ここで、第1区間Δdは、計算対象深さdを最小値として含む場合に限られず、計算対象深さdに関連した値であればよい。例えば、第1区間Δdは、計算対象深さdを最小値とした第2区間ΔDに包含される第1区間Δdであってもよいし、計算対象深さdを中央値とした第1区間Δdであってもよい。また、第2区間ΔDは、第1区間Δdと異なる第1区間Δdの長さ以上の長さで、かつ浅い範囲であればよい。この場合、第2区間ΔDを、一定範囲とせずに、地上から計算対象深さdまでの範囲として第2統計値を算出してもよい。 In each of the above embodiments, the judgment index value calculation unit 314 of the control unit 31 includes the average value in the first section Δd including the calculation target depth d as the minimum value, and the second calculation target depth d as the maximum value. The judgment index value was calculated using the average value in the interval ΔD. Here, the first interval Δd is not limited to the case where the calculation target depth d is included as the minimum value, and may be a value related to the calculation target depth d. For example, the first section Δd may be the first section Δd included in the second section ΔD having the calculation target depth d as the minimum value, or the first section Δd having the calculation target depth d as the median value. It may be Δd. Further, the second section ΔD may have a length equal to or longer than the length of the first section Δd different from the first section Δd, and may be in a shallow range. In this case, the second statistic may be calculated as a range from the ground to the calculation target depth d without setting the second section ΔD as a fixed range.

・上記各実施形態において、第1区間Δdを計算対象深さdから+0.5mの範囲、第2区間ΔDを計算対象深さdから−2mの範囲と設定した。これら第1区間Δd及び第2区間ΔDの大きさは、現場の状況に応じて、適宜、変更してもよい。図13(a)及び図13(b)には、支持層が深度50m程度にある場合に、第2区間ΔDを計算対象深さdから−3mの範囲と短くした場合と、計算対象深さdから−10mの範囲と長くした場合とを示す。この現場においては、第2区間ΔDを小さくした場合のほうが、支持層を示す判断指標値の変曲点が把握し易い。また、図13(c)は、第2区間ΔDを0m(地上)から計算対象深さdまでとした場合の判断指標値を示す。 -In each of the above embodiments, the first section Δd is set as a range of +0.5 m from the calculation target depth d, and the second section ΔD is set as a range of the calculation target depth d to -2 m. The sizes of the first section Δd and the second section ΔD may be appropriately changed according to the situation at the site. In FIGS. 13 (a) and 13 (b), when the support layer is at a depth of about 50 m, the second section ΔD is shortened to a range of -3 m from the calculation target depth d, and the calculation target depth is shown. The range of -10 m from d and the case of lengthening are shown. At this site, it is easier to grasp the inflection point of the judgment index value indicating the support layer when the second section ΔD is made smaller. Further, FIG. 13C shows a judgment index value when the second section ΔD is set from 0 m (ground) to the calculation target depth d.

・上記各実施形態において、制御部31の判断指標値算出部314は、第1区間Δd及び第2区間ΔDにおける平均値を用いた。判断指標値算出部314が判断指標値に用いる第1統計値及び第2統計値は、平均値に限られず、例えば中央値等、各区間における統計値であればよい。
・上記実施形態では、支持層が固い泥岩であるため、振動が急に小さくなった深さ(位置)、すなわち判断指標値が大きなマイナス値における変曲点に対応する深さを支持層と判定した。判断指標値を用いて支持層に到達したか否かの判定は、マイナス値に限られない。例えば、支持層が砂や礫を含む層の場合は、振動が急激に大きくなると考えられる。従って、このような支持層の場合には、振動の判断指標値が、大きなプラス値における変曲点に対応する深さにおいて支持層に到達したと判定する。
-In each of the above embodiments, the judgment index value calculation unit 314 of the control unit 31 uses the average value in the first section Δd and the second section ΔD. The first statistical value and the second statistical value used by the judgment index value calculation unit 314 for the judgment index value are not limited to the average value, and may be statistical values in each section such as the median value.
-In the above embodiment, since the support layer is hard mudstone, the depth (position) where the vibration suddenly becomes small, that is, the depth corresponding to the inflection at the negative value where the judgment index value is large is determined as the support layer. bottom. Judgment as to whether or not the support layer is reached using the judgment index value is not limited to the negative value. For example, when the support layer is a layer containing sand or gravel, the vibration is considered to increase rapidly. Therefore, in the case of such a support layer, it is determined that the vibration determination index value has reached the support layer at a depth corresponding to the inflection point at a large positive value.

・上記第1実施形態において、制御部31の判断指標値算出部314は、短時間平均を、長時間平均で除算した値を判断指標値として用いた。また、第2実施形態において、判断指標値算出部314は、t検定で算出した確率の逆数の対数に符号を付した値を、判断指標値として用いた。判断指標値は、計算対象深さdの第1統計値と、この第1統計値以上の長さの区間における第2統計値との比較に基づく値であれば、上述した値に限られない。例えば、長時間平均と短時間平均との差を用いてもよいし、t検定を用いた確率の対数を用いてもよい。更に、判断指標値算出部314は、t検定以外の手法を用いて、第1統計値と第2統計値とが同じである仮定が成り立つ確率を用いた値を、判断指標値として算出してもよい。 In the first embodiment, the judgment index value calculation unit 314 of the control unit 31 uses a value obtained by dividing the short-time average by the long-term average as the judgment index value. Further, in the second embodiment, the judgment index value calculation unit 314 uses a value obtained by adding a sign to the logarithm of the reciprocal of the probability calculated by the t-test as the judgment index value. The judgment index value is not limited to the above-mentioned value as long as it is a value based on the comparison between the first statistic of the calculation target depth d and the second statistic in the section having a length longer than the first statistic. .. For example, the difference between the long-term average and the short-term average may be used, or the logarithm of the probability using the t-test may be used. Further, the judgment index value calculation unit 314 calculates as the judgment index value a value using the probability that the assumption that the first statistic and the second statistic are the same is established by using a method other than the t-test. May be good.

・上記実施形態においては、削孔管理システム20の制御部31は、削孔速度の判断指標値グラフ372、振動の判断指標値グラフ376を、表示部26のディスプレイに出力する。ここで、グラフを表示して判定させる代わりに、コンピュータ端末30の制御部31が、判断指標値グラフ(372,376)や判断指標基準グラフ(R12,R16)に基づいて、削孔の支持層への到達を判定してもよい。具体的には、制御部31は、掘削中の削孔速度の判断指標値グラフ372における変曲点の値及びそのときの深さ(計算対象深さd)と、掘削速度の判断指標基準グラフR12で支持層に到達したと判定した変曲点の値及び深さとを比較する。また、制御部31は、掘削中における振動の判断指標値グラフ376における変曲点の値及び計算対象深さdと、振動の判断指標基準グラフR16で支持層に到達したと判定した変曲点の値及び深さとを比較する。そして、比較した結果、掘削中の変曲点が、予め定めた所定範囲内で一致する場合には、制御部31は、支持層に到達したと判定する。
・上記実施形態では、削孔の掘削中に判断指標値を算出して表示して、削孔が支持層に到達したか否かを判断した。判断指標値の算出は、掘削中ではなく、掘削終了後に行なってもよい。この場合には、他の速度指標値等によって削孔が支持層に到達したことを、更に確認することができる。
In the above embodiment, the control unit 31 of the drilling management system 20 outputs the drilling speed determination index value graph 372 and the vibration determination index value graph 376 to the display of the display unit 26. Here, instead of displaying the graph and causing the determination, the control unit 31 of the computer terminal 30 determines the support layer for drilling based on the judgment index value graph (372,376) and the judgment index reference graph (R12, R16). You may determine the arrival at. Specifically, the control unit 31 determines the value of the inflection point in the judgment index value graph 372 of the drilling speed during excavation, the depth at that time (calculation target depth d), and the judgment index reference graph of the excavation speed. The value and depth of the inflection point determined to have reached the support layer by R12 are compared. Further, the control unit 31 determines that the inflection point value and the calculation target depth d in the vibration judgment index value graph 376 during excavation and the inflection point determined to have reached the support layer in the vibration judgment index reference graph R16. Compare the value and depth of. Then, as a result of comparison, when the inflection points during excavation match within a predetermined range, the control unit 31 determines that the support layer has been reached.
-In the above embodiment, the judgment index value is calculated and displayed during the excavation of the hole, and it is determined whether or not the hole has reached the support layer. The judgment index value may be calculated not during excavation but after excavation is completed. In this case, it can be further confirmed that the drilled hole has reached the support layer by another velocity index value or the like.

・上記各実施形態においては、振動計測器24を、操作室13内、操作室13の屋根や操作室13内の操作レバーに取り付けた。振動計測器24の取付位置は、掘削に応じた振動を検出できる箇所であれば、場所は限定されるものではなく、例えば、掘削ロッド17等であってもよい。 -In each of the above embodiments, the vibration measuring instrument 24 is attached to the operation room 13, the roof of the operation room 13, or the operation lever in the operation room 13. The mounting position of the vibration measuring instrument 24 is not limited as long as it can detect vibration corresponding to excavation, and may be, for example, an excavation rod 17.

次に、上記実施形態及び別例から把握できる技術的思想について、それらの効果とともに以下に追記する。
(a)杭孔において杭の支持層への到達を判定する支持層到達判定方法であって、
前記杭孔の掘削時の掘削速度についての速度指標値を取得し、
前記速度指標値を、前記掘削時の前記杭孔の深さと関連付け、
前記速度指標値において、計算対象深さの第1区間における第1統計値と、前記第1区間に隣接又は前記第1区間を包含し、前記第1区間と異なる前記第1区間の長さ以上の第2区間における第2統計値とを算出し、
前記第1統計値と前記第2統計値との比較に基づいて判断指標値を算出し、
前記判断指標値に基づいて、前記支持層への到達を判定することを特徴とする支持層到達判定方法。
従って、この(a)に記載の発明によれば、杭孔の支持層到達を、効率的に判断することができる。
Next, the technical ideas that can be grasped from the above embodiment and other examples will be added below together with their effects.
(A) A support layer arrival determination method for determining the arrival of a pile at a support layer in a pile hole.
Obtain the speed index value for the excavation speed at the time of excavation of the pile hole, and
The velocity index value is associated with the depth of the pile hole at the time of excavation,
In the velocity index value, the first statistical value in the first section of the calculation target depth and the length of the first section that is adjacent to the first section or includes the first section and is different from the first section or more. Calculated with the second statistic in the second section of
The judgment index value is calculated based on the comparison between the first statistic and the second statistic.
A support layer arrival determination method, characterized in that the arrival at the support layer is determined based on the determination index value.
Therefore, according to the invention described in (a), it is possible to efficiently determine the arrival of the support layer of the pile hole.

(b)杭孔において杭の支持層への到達を判定する支持層到達判定方法であって、
杭孔の掘削装置に取り付けた振動計測器において、掘削時の振動を計測し、
前記振動の周波数分析を行なった周波数分析結果を、掘削時の前記杭孔の深さと関連付け、
前記周波数分析結果において、計算対象深さの第1区間における第1統計値と、前記第1区間に隣接又は前記第1区間を包含し、前記第1区間と異なる前記第1区間の長さ以上の第2区間における第2統計値とを算出し、
前記第1統計値と前記第2統計値との比較に基づいて判断指標値を算出し、
前記判断指標値に基づいて、前記支持層への到達を判定することを特徴とする支持層到達判定方法。
従って、この(b)に記載の発明によれば、杭孔の支持層到達を、効率的に判断することができる。
(B) A support layer arrival determination method for determining the arrival of a pile at a support layer in a pile hole.
With a vibration measuring instrument attached to the excavator of the pile hole, the vibration during excavation is measured and
The frequency analysis result obtained by performing the frequency analysis of the vibration is associated with the depth of the pile hole at the time of excavation.
In the frequency analysis result, the first statistical value in the first section of the calculation target depth and the length of the first section that is adjacent to the first section or includes the first section and is different from the first section or more. Calculated with the second statistical value in the second section of
The judgment index value is calculated based on the comparison between the first statistic and the second statistic.
A support layer arrival determination method, characterized in that the arrival at the support layer is determined based on the determination index value.
Therefore, according to the invention described in (b), it is possible to efficiently determine the arrival of the support layer of the pile hole.

d…計算対象深さ、p…確率、Δd…第1区間、ΔD…第2区間、h0…杭孔、R1…深度−経過時間基準グラフ、R2…深度−削孔速度基準グラフ、R5…深度−積分電流値基準グラフ、R6…深度−振動解析基準グラフ、R12…判断指標基準グラフ、R16…判断指標基準グラフ、10…掘削機、11…ベースマシン、12…クローラ、13…操作室、14…マスト、16…オーガマシン、17…掘削ロッド、18…掘削ヘッド、20…削孔管理システム、21…削孔深度計測器、22…流量計測器、23…電流計測器、24…振動計測器、25…入力部、26…表示部、30…コンピュータ端末、31…制御部、35…判定基準情報記憶部、36…掘削状況情報記憶部、311…基準登録部、312…測定値管理部、313…振動解析部、314…判断指標値算出部、315…出力管理部、350…判定基準情報、355…判定基準グラフ、360…掘削状況情報、361…深度−経過時間グラフ、362…深度−削孔速度グラフ、365…深度−積分電流値グラフ、366…深度−振動解析グラフ、372…判断指標値グラフ、376…判断指標値グラフ。 d ... Calculation target depth, p ... Probability, Δd ... 1st section, ΔD ... 2nd section, h0 ... Pile hole, R1 ... Depth-elapsed time reference graph, R2 ... Depth-Drilling speed reference graph, R5 ... Depth -Integrated current value reference graph, R6 ... Depth-Vibration analysis reference graph, R12 ... Judgment index reference graph, R16 ... Judgment index reference graph, 10 ... Excavator, 11 ... Base machine, 12 ... Crawler, 13 ... Operation room, 14 ... Mast, 16 ... Auger machine, 17 ... Drilling rod, 18 ... Drilling head, 20 ... Drilling management system, 21 ... Drilling depth measuring instrument, 22 ... Flow measuring instrument, 23 ... Current measuring instrument, 24 ... Vibration measuring instrument , 25 ... Input unit, 26 ... Display unit, 30 ... Computer terminal, 31 ... Control unit, 35 ... Judgment standard information storage unit, 36 ... Excavation status information storage unit, 311 ... Standard registration unit, 312 ... Measurement value management unit, 313 ... Vibration analysis unit, 314 ... Judgment index value calculation unit, 315 ... Output management unit, 350 ... Judgment standard information, 355 ... Judgment standard graph, 360 ... Excavation status information, 361 ... Depth-elapsed time graph, 362 ... Depth- Drilling speed graph, 365 ... Depth-integrated current value graph, 366 ... Depth-vibration analysis graph, 372 ... Judgment index value graph, 376 ... Judgment index value graph.

Claims (4)

杭孔において杭の支持層への到達を判定する支持層到達判定方法であって、
前記杭孔の掘削時の地盤の固さに関する値を取得し、
前記固さに関する値を、前記掘削時の前記杭孔の深さと関連付け、
前記固さに関する値において、計算対象深さから深い範囲の第1区間における第1統計値と、前記第1区間に隣接し前記計算対象深さより浅く前記第1区間より長い第2区間、又は前記第1区間に隣接し前記計算対象深さ以下の浅い区間と前記第1区間とを包含する第2区間における第2統計値とを算出し、
前記第1統計値と前記第2統計値との比較に基づく前記計算対象深さに応じた判断指標値を順次、算出し、
前記順次、算出した前記判断指標値の変化に基づいて、前記支持層への到達を判定することを特徴とする支持層到達判定方法。
It is a support layer arrival determination method for determining the arrival of a pile at a pile hole in a pile hole.
Obtain the value related to the hardness of the ground at the time of excavation of the pile hole,
The value related to the hardness is associated with the depth of the pile hole at the time of excavation,
Regarding the values related to the hardness, the first statistical value in the first section in the range deep from the calculation target depth, the second section adjacent to the first section, shallower than the calculation target depth, and longer than the first section, or the above. The second statistical value in the second section adjacent to the first section and including the shallow section below the calculation target depth and the first section is calculated.
A determination index value corresponding to the calculated target depth rather based on a comparison between the second statistical value and the first statistical value sequentially calculated,
A support layer arrival determination method, characterized in that the arrival at the support layer is determined based on the sequentially calculated changes in the determination index value.
前記第1統計値を前記第2統計値で除算した値を、前記判断指標値として算出することを特徴とする請求項1に記載の支持層到達判定方法。 Wherein a value obtained by dividing the second statistic a first statistic, a support layer arrival determination method according to claim 1, characterized in that calculated as the determining index value. 前記第1統計値と前記第2統計値とが同じである仮定が成り立つ確率を用いた値を、前記判断指標値として算出することを特徴とする請求項1に記載の支持層到達判定方法。 The value of using a first statistical value and the second statistics the probability that the assumption holds the same, the support layer arrival determination method according to claim 1, characterized in that calculated as the determining index value. 杭孔について杭の支持層への到達の判定を支援するための判定支援システムであって、
前記杭孔の掘削時の地盤の固さに関する値を計測する計測部と、
前記固さに関する値を、前記掘削時の前記杭孔の深さと関連付けて計測情報記憶部に記録する記録部と、
前記固さに関する値において、計算対象深さから深い範囲の第1区間における第1統計値と、前記第1区間に隣接し前記計算対象深さより浅く前記第1区間より長い第2区間、又は前記第1区間に隣接し前記計算対象深さ以下の浅い区間と前記第1区間とを包含する第2区間における第2統計値とを算出し、前記第1統計値と前記第2統計値との比較に基づく前記計算対象深さに応じた判断指標値を順次、算出する制御部と、
前記制御部が前記順次、算出した前記判断指標値の変化を出力する出力部とを備えることを特徴とする判定支援システム。
It is a judgment support system to support the judgment of the arrival of the pile at the support layer of the pile hole.
A measuring unit that measures the value related to the hardness of the ground when excavating the pile hole,
A recording unit that records the value related to the hardness in the measurement information storage unit in association with the depth of the pile hole at the time of excavation.
Regarding the values related to the hardness, the first statistical value in the first section in the range deep from the calculation target depth, the second section adjacent to the first section, shallower than the calculation target depth, and longer than the first section, or the above. The second statistical value in the second section adjacent to the first section and including the shallow section below the calculation target depth and the first section is calculated, and the first statistical value and the second statistical value are calculated. comparing sequentially the determination index value corresponding to the calculated target depth rather based, and a control unit that calculates,
A determination support system, characterized in that the control unit includes an output unit that outputs changes in the determined determination index values sequentially calculated.
JP2017153621A 2017-08-08 2017-08-08 Support layer arrival judgment method and judgment support system Active JP6969212B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017153621A JP6969212B2 (en) 2017-08-08 2017-08-08 Support layer arrival judgment method and judgment support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017153621A JP6969212B2 (en) 2017-08-08 2017-08-08 Support layer arrival judgment method and judgment support system

Publications (2)

Publication Number Publication Date
JP2019031839A JP2019031839A (en) 2019-02-28
JP6969212B2 true JP6969212B2 (en) 2021-11-24

Family

ID=65523189

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017153621A Active JP6969212B2 (en) 2017-08-08 2017-08-08 Support layer arrival judgment method and judgment support system

Country Status (1)

Country Link
JP (1) JP6969212B2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7188768B2 (en) * 2019-11-25 2022-12-13 東洋テクノ株式会社 Support layer determination system
US20220018240A1 (en) * 2020-07-14 2022-01-20 Landmark Graphics Corporation Predicting and reducing vibrations during downhole drilling operations
JP7564441B2 (en) * 2020-12-22 2024-10-09 ジャパンパイル株式会社 Management device, management program and management system
JP7597324B2 (en) * 2021-03-30 2024-12-10 株式会社大林組 Method and system for determining reach to support group
CN115704212A (en) * 2021-08-11 2023-02-17 中国水电基础局有限公司 Hole forming method of vibroflotation gravel pile machine
CN114134879A (en) * 2021-12-02 2022-03-04 成都雅蓝特科技有限公司 Method for determining compaction current and vibration retention time of vibroflotation construction
JP7757784B2 (en) * 2021-12-27 2025-10-22 株式会社大林組 Judgment support system and judgment support method
CN119308292B (en) * 2024-12-13 2025-03-14 广东华亮建设有限公司 Construction method of supporting structure for foundation pit construction with ground-connected wall and guide wall
CN120212848B (en) * 2025-04-28 2025-11-07 中煤江南建设发展集团有限公司 A method, system, and equipment for real-time calculation of sediment thickness based on dynamic electrical tilt angle feedback.

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0788746B2 (en) * 1986-06-09 1995-09-27 株式会社竹中工務店 Method of detecting support layer by ground drilling
JPS6361440U (en) * 1986-10-03 1988-04-23
JP2735734B2 (en) * 1992-04-07 1998-04-02 日本コンクリート工業株式会社 Pile support layer detection method
JP2878255B1 (en) * 1998-01-14 1999-04-05 鹿島建設株式会社 Geological survey method
JP3405207B2 (en) * 1998-07-03 2003-05-12 株式会社大林組 Judgment method of ground supported by excavator
JP5249874B2 (en) * 2009-08-07 2013-07-31 大成建設株式会社 Ground evaluation apparatus and ground evaluation method
JP5616244B2 (en) * 2011-01-21 2014-10-29 西松建設株式会社 Foundation judgment method by underground drilling data analysis

Also Published As

Publication number Publication date
JP2019031839A (en) 2019-02-28

Similar Documents

Publication Publication Date Title
JP6969212B2 (en) Support layer arrival judgment method and judgment support system
JP7311244B2 (en) Ground evaluation system and ground evaluation method
JP6874378B2 (en) Support layer arrival judgment method and judgment support system
JP6911356B2 (en) Support layer arrival judgment method and judgment support system
JP6748566B2 (en) Casting construction management device, casting construction management method, and casting construction management program
JP5846592B1 (en) Construction support information calculation device, construction support information calculation system, vibratory hammer construction machine and program
JP5819152B2 (en) Support layer arrival estimation method and support layer arrival estimation support device used in pile embedding method
CN207749499U (en) A kind of dynamic penetrometer
JP7079186B2 (en) Ground strength calculation device and ground strength calculation program
JP2005307607A (en) Pile construction management device
JP2026040673A (en) Excavation work management method
JP4753132B2 (en) Pile hole drilling method
JP2021070931A (en) Stratum depth estimation system and method
JP7400383B2 (en) Ground hardness estimation system and ground hardness estimation method
JP7332004B2 (en) Ground evaluation system and ground evaluation method
JP6799253B2 (en) How to excavate the ground
JP7188768B2 (en) Support layer determination system
JP2017115457A (en) Ground investigation method and ground investigation device
CN117514127A (en) A method and device for quality inspection of rotary excavation pile foundation construction
JP7303720B2 (en) Strata structure analysis system and program
JP7597324B2 (en) Method and system for determining reach to support group
Nagy et al. Quality control of deep vibro compaction based on the vibrator movement
JP2020020176A (en) Anchor selection method, anchor construction method, and anchor layer distribution 3d model at anchor construction site
JP2014218824A (en) Ground evaluation method
JP7802586B2 (en) Support layer verification device, verification system, verification method, and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200706

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210526

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210601

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210802

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210928

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211011

R150 Certificate of patent or registration of utility model

Ref document number: 6969212

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150