JP6971731B2 - Inspection work support device, gap measurement method, and program - Google Patents
[go: Go Back, main page]

JP6971731B2 - Inspection work support device, gap measurement method, and program - Google Patents

Inspection work support device, gap measurement method, and program Download PDF

Info

Publication number
JP6971731B2
JP6971731B2 JP2017174771A JP2017174771A JP6971731B2 JP 6971731 B2 JP6971731 B2 JP 6971731B2 JP 2017174771 A JP2017174771 A JP 2017174771A JP 2017174771 A JP2017174771 A JP 2017174771A JP 6971731 B2 JP6971731 B2 JP 6971731B2
Authority
JP
Japan
Prior art keywords
column
gap
kilometer
unit
inspection work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017174771A
Other languages
Japanese (ja)
Other versions
JP2019049511A (en
Inventor
寿孝 曽我
宜久 高山
哲一 御▲崎▼
忠雅 中山
智弘 清水
修 内田
明寛 中澤
弘 五百蔵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asia Air Survey Co Ltd
West Japan Railway Co
Original Assignee
Asia Air Survey Co Ltd
West Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asia Air Survey Co Ltd, West Japan Railway Co filed Critical Asia Air Survey Co Ltd
Priority to JP2017174771A priority Critical patent/JP6971731B2/en
Publication of JP2019049511A publication Critical patent/JP2019049511A/en
Application granted granted Critical
Publication of JP6971731B2 publication Critical patent/JP6971731B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Length Measuring Devices By Optical Means (AREA)
  • Image Analysis (AREA)

Description

本発明は、防音壁などの設備の点検作業を支援する点検作業支援装置、隙間計測方法、及びプログラムに関し、特に、動画像を用いて防音壁の支柱とパネルの隙間を計測する技術に関する。 The present invention relates to an inspection work support device for supporting inspection work of equipment such as a soundproof wall, a gap measurement method, and a program, and more particularly to a technique for measuring a gap between a support and a panel of a soundproof wall using a moving image.

防音壁の支柱とパネルの隙間が拡大し、支柱との引っ掛かりがなくなると、パネル落下の恐れがある。そのため、パネル落下の恐れがある箇所を点検し、パネルを安定した状態に保持することは、列車運行上重要である。現状は、複数人1組での徒歩巡回による目視点検を行っている。 If the gap between the pillars of the soundproof wall and the panel is widened and the pillars are no longer caught, the panel may fall. Therefore, it is important for train operation to inspect the parts where the panel may fall and keep the panel in a stable state. Currently, we are conducting visual inspections by walking patrols with a group of multiple people.

なお、撮影機器等を用いた従来技術としては、撮影画像を用いた隙間計測においてスリット光を照射する方法がある(特許文献1参照)。切欠ベースを用いて撮影する方法もある(特許文献2参照)。測定機を直接隙間に挿入する方法もある(特許文献3参照)。 As a conventional technique using a photographing device or the like, there is a method of irradiating a slit light in a gap measurement using a photographed image (see Patent Document 1). There is also a method of photographing using a notch base (see Patent Document 2). There is also a method of inserting the measuring machine directly into the gap (see Patent Document 3).

特開2003−315020号公報Japanese Unexamined Patent Publication No. 2003-315020 特開2006−64597号公報Japanese Unexamined Patent Publication No. 2006-64597 特開2005−188993号公報Japanese Unexamined Patent Publication No. 2005-188993

徒歩巡回による目視点検では、点検作業に時間が掛かる(延べ26人日程度)。また、目視のため、その検査は定量的なものでない。 Visual inspection by walking patrol takes time for inspection work (a total of about 26 man-days). Also, the inspection is not quantitative because it is visual.

本発明は、上記課題を解決するため、防音壁などの設備の点検作業を支援する点検作業支援装置、点検作業支援方法、及びプログラムを提供することを目的とする。 An object of the present invention is to provide an inspection work support device, an inspection work support method, and a program for supporting inspection work of equipment such as a soundproof wall in order to solve the above problems.

本発明の一態様に係る点検作業支援装置は、設備の点検作業を支援する装置であって、上下線の設備を同時に撮影した動画像を登録する撮影動画像登録部と、前記撮影動画像登録部により登録された動画像から前記設備の支柱の画像を抽出する支柱抽出部と、前記支柱抽出部により抽出された支柱の画像をもとに前記設備の支柱とパネルの隙間を計測する隙間計測部とを備えたことを要旨とする。 The inspection work support device according to one aspect of the present invention is a device that supports the inspection work of the equipment, and is a shooting moving image registration unit for registering moving images obtained by simultaneously shooting the equipment of the upper and lower lines, and the shooting moving image registration. Gap measurement that measures the gap between the support column of the equipment and the panel based on the image of the support column extracted by the support column extraction unit and the support column extraction unit that extracts the image of the support column of the equipment from the moving image registered by the unit. The gist is that it has a department.

本発明の一態様に係る隙間計測方法は、設備の点検作業を支援する点検作業支援装置が前記設備の支柱とパネルの隙間を計測する方法であって、上下線の設備を同時に撮影した動画像を登録する撮影動画像登録ステップと、前記撮影動画像登録ステップで登録された動画像から前記設備の支柱の画像を抽出する支柱抽出ステップと、前記支柱抽出ステップで抽出された支柱の画像をもとに前記設備の支柱とパネルの隙間を計測する隙間計測ステップとを含むことを要旨とする。 The gap measuring method according to one aspect of the present invention is a method in which an inspection work support device that supports inspection work of equipment measures a gap between a support column and a panel of the equipment, and is a moving image of the equipment of the upper and lower lines taken at the same time. The shooting moving image registration step for registering the image, the support column extraction step for extracting the image of the support column of the equipment from the moving image registered in the shooting moving image registration step, and the support column image extracted in the support column extraction step. The gist is to include a gap measurement step for measuring the gap between the support column and the panel of the equipment.

本発明の一態様に係るプログラムは、前記点検作業支援装置としてコンピュータを機能させるためのプログラムであることを要旨とする。 The gist of the program according to one aspect of the present invention is that it is a program for operating a computer as the inspection work support device.

本発明によれば、防音壁などの設備の点検作業を支援する点検作業支援装置、点検作業支援方法、及びプログラムを提供することが可能である。 According to the present invention, it is possible to provide an inspection work support device, an inspection work support method, and a program for supporting inspection work of equipment such as a soundproof wall.

防音壁の説明図である。It is explanatory drawing of the soundproof wall. 防音壁の端部における支柱とパネルの隙間の説明図である。It is explanatory drawing of the gap between a support and a panel at an end of a soundproof wall. 防音壁の中間部における支柱とパネルの隙間の説明図である。It is explanatory drawing of the gap between a support and a panel in the middle part of a soundproof wall. 本発明の概要の説明図である。It is explanatory drawing of the outline of this invention. 図4に示される保守用車の説明図である。It is explanatory drawing of the maintenance vehicle shown in FIG. 上り線側キロ程銘板の写真である。It is a photograph of the name plate about the kilometer on the up line side. 上り線側キロ程銘板以外の上り線側の標識の写真である。It is a photograph of the sign on the up line side other than the name plate about the kilometer on the up line side. 下り線側キロ程銘板の写真である。It is a photograph of the name plate about the kilometer on the down line side. 下り線側キロ程銘板以外の下り線側の標識の写真である。It is a photograph of the sign on the down line side other than the name plate about the kilometer on the down line side. 第1の実施の形態に係る点検作業支援装置の機能ブロック図である。It is a functional block diagram of the inspection work support device which concerns on 1st Embodiment. 第1の実施の形態に係る点検作業支援装置の動作を示すフローチャートである。It is a flowchart which shows the operation of the inspection work support apparatus which concerns on 1st Embodiment. 第1の実施の形態に係る点検作業支援装置の動作を示すフローチャートである。It is a flowchart which shows the operation of the inspection work support apparatus which concerns on 1st Embodiment. 第1の実施の形態に係るキロ程銘板抽出処理、キロ程文字認識処理、キロ程誤り訂正処理の説明図である。It is explanatory drawing of the kilometer name plate extraction process, the kilometer character recognition process, and the kilometer error correction process according to the first embodiment. 第1の実施の形態に係る上り線下り線突合判定処理の説明図である。It is explanatory drawing of the up line down line collision determination processing which concerns on 1st Embodiment. 第1の実施の形態に係る下り線キロ程補間調整処理の説明図である。It is explanatory drawing of the down line kilometer interpolation adjustment processing which concerns on 1st Embodiment. 第2の実施の形態に係る点検作業支援装置の機能ブロック図である。It is a functional block diagram of the inspection work support device which concerns on 2nd Embodiment. 第2の実施の形態に係る点検作業支援装置の動作を示すフローチャートである。It is a flowchart which shows the operation of the inspection work support apparatus which concerns on 2nd Embodiment. 第2の実施の形態に係る点検作業支援装置の動作を示すフローチャートである。It is a flowchart which shows the operation of the inspection work support apparatus which concerns on 2nd Embodiment. 第2の実施の形態に係るH鋼支柱抽出処理の説明図である。It is explanatory drawing of the H steel column extraction process which concerns on 2nd Embodiment. 第2の実施の形態に係る隙間計測処理の説明図である。It is explanatory drawing of the gap measurement processing which concerns on 2nd Embodiment.

以下、本発明の実施の形態について図面を参照して詳細に説明する。なお、図面の記載において、同一または類似の部分には同一または類似の符号を付している。ただし、図面は模式的なものであり、厚みと平面寸法との関係、各層の厚みの比率などは現実のものとは異なることに留意すべきである。したがって、具体的な厚みや寸法は以下の説明を参酌して判断すべきものである。また、図面相互間においても互いの寸法の関係や比率が異なる部分が含まれていることは勿論である。 Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. In the description of the drawings, the same or similar parts are designated by the same or similar reference numerals. However, it should be noted that the drawings are schematic, and the relationship between the thickness and the plane dimensions, the ratio of the thickness of each layer, etc. are different from the actual ones. Therefore, the specific thickness and dimensions should be determined in consideration of the following explanation. In addition, it goes without saying that parts having different dimensional relationships and ratios are included between the drawings.

≪第1の実施の形態≫
まず、第1の実施の形態について説明する。第1の実施の形態では、動画像に距離標情報(線路内位置情報)を紐付けて管理する技術について説明する。
<< First Embodiment >>
First, the first embodiment will be described. In the first embodiment, a technique for associating and managing distance marker information (position information in a railroad track) with a moving image will be described.

[防音壁]
図1は、防音壁100の説明図である。この防音壁100は、防音効果、防雪効果、遮風効果などを担う半雪覆型の防音壁100である。具体的には、図1に示すように、H鋼支柱(以下、単に「支柱」という。)110をくの字型にすることで構造物上の積雪防止効果を期待したものである。防音壁パネル(以下、単に「パネル」という。)120には、コンクリートパネルを用いるのが一般的である。パネル120は、クサビ131によって支柱110に支えられている。
[Soundproof wall]
FIG. 1 is an explanatory diagram of the soundproof wall 100. The soundproof wall 100 is a semi-snow cover type soundproof wall 100 that has a soundproof effect, a snowproof effect, a windproof effect, and the like. Specifically, as shown in FIG. 1, the H-steel column (hereinafter, simply referred to as “support”) 110 is formed into a dogleg shape, which is expected to have an effect of preventing snow accumulation on the structure. A concrete panel is generally used for the soundproof wall panel (hereinafter, simply referred to as "panel") 120. The panel 120 is supported by a support 110 by a wedge 131.

既に説明したように、防音壁100の支柱110とパネル120の隙間が拡大し、支柱110との引っ掛かりがなくなると、パネル120がクサビ131から外れ、宙に浮いた状態となる(図中の丸印参照)。状態によっては、パネル120の自重を支えきれず、パネル落下につながる恐れがある。そのため、パネル落下の恐れがある箇所を点検し、パネルを安定した状態に保持することは、列車運行上重要である。現状は、複数人1組での徒歩巡回による目視点検を行っている。 As described above, when the gap between the support column 110 of the soundproof wall 100 and the panel 120 is widened and the support column 110 is no longer caught, the panel 120 is separated from the wedge 131 and floats in the air (circle in the figure). See mark). Depending on the state, the weight of the panel 120 cannot be supported, which may lead to the panel falling. Therefore, it is important for train operation to inspect the parts where the panel may fall and keep the panel in a stable state. Currently, we are conducting visual inspections by walking patrols with a group of multiple people.

[支柱とパネルの隙間]
図2は、防音壁100の端部における支柱110とパネル120の隙間141の説明図であり、図2(a)は模式図、図2(b)は実際の写真である。また、図3は、防音壁100の中間部における支柱110とパネル120の隙間141の説明図であり、図3(a)は模式図、図3(b)は実際の写真である。これらの図において、支柱110には、H鋼支柱(スチール)を例示している。H鋼支柱幅W1は、防音壁100の高さに応じて、150mm、175mm、200mm等の複数のタイプがある。図中の符号W2はH鋼支柱中心部幅、131はクサビ(ゴム)、132は間隔材(ゴム)、133は緩衝材(ゴム)、134は端部パッキン(ゴム)、141は隙間、142は掛かり量を示している。
[Gap between column and panel]
2A and 2B are explanatory views of a gap 141 between the support column 110 and the panel 120 at the end of the soundproof wall 100, FIG. 2A is a schematic view, and FIG. 2B is an actual photograph. Further, FIG. 3 is an explanatory view of a gap 141 between the support column 110 and the panel 120 in the intermediate portion of the soundproof wall 100, FIG. 3A is a schematic view, and FIG. 3B is an actual photograph. In these figures, the stanchion 110 exemplifies an H steel stanchion (steel). The H-steel column width W1 has a plurality of types such as 150 mm, 175 mm, and 200 mm depending on the height of the soundproof wall 100. In the figure, reference numeral W2 is the width of the center of the H-steel column, 131 is the wedge (rubber), 132 is the spacing material (rubber), 133 is the cushioning material (rubber), 134 is the end packing (rubber), 141 is the gap, 142. Indicates the amount of multiplication.

[概要]
図4は、本発明の概要の説明図である。線路内には、位置を管理するキロ程銘板(以下、「距離標銘板」と呼ぶ場合がある。)が設置されている。キロ程銘板の設置方法としては、銘板を打ち付けた杭を線路内に設置する方法や、防音壁100に貼り付ける方法などがある。
[Overview]
FIG. 4 is an explanatory diagram of an outline of the present invention. A kilometer-sized name plate (hereinafter, may be referred to as a "distance marker plate") that manages the position is installed on the track. As a method of installing a name plate of about a kilometer, there are a method of installing a pile on which a name plate is struck in a railroad track, a method of attaching it to a soundproof wall 100, and the like.

例えば、図4に示すように、上り線線路200A内には、上り線側キロ程銘板150Aが10m毎に設置されている(ただし、500m、1000mの地点には設置されていない)。上り線は、終点方から起点方の列車走行線路である。一方、下り線線路200B内には、下り線側キロ程銘板150Bが500m毎に設置されている。下り線は、起点方から終点方の列車走行線路である。 For example, as shown in FIG. 4, in the up line line 200A, the name plate 150A is installed every 10 m on the up line side kilometer (however, it is not installed at the points of 500 m and 1000 m). The up line is a train running line from the end point to the start point. On the other hand, in the down line line 200B, a name plate 150B about a kilometer on the down line side is installed every 500 m. The down line is a train running line from the starting point to the ending point.

図5は、図4に示される保守用車300の説明図である。本発明では、上り線線路200A、下り線線路200Bのいずれかの線路を保守用車300で走行し、上り線側と下り線側に向けて設置した2台のカメラ(防音壁撮影装置)310を用いて同時に撮影する。ここでいう「同時」は、時間完全同期を意味するものではなく、「一緒に」程度の意味である。保守用車300の走行線路や走行方向は、この例と逆でもよい。 FIG. 5 is an explanatory diagram of the maintenance vehicle 300 shown in FIG. In the present invention, the maintenance vehicle 300 travels on either the up line 200A or the down line 200B, and two cameras (soundproof wall photographing apparatus) 310 are installed toward the up line side and the down line side. Take pictures at the same time using. "Simultaneous" here does not mean complete time synchronization, but means "together". The traveling track and traveling direction of the maintenance vehicle 300 may be the opposite of this example.

図5中の1点鎖線は、カメラ310の撮影範囲を示している。撮影対象までの距離に応じて、カメラ310の使用レンズ(焦点距離)や配置、照明数などを適切に選択する。後述する点検作業支援装置において、撮影した動画像に写し込まれているキロ程銘板150を自動認識し、動画像に対して線路内位置情報(キロ程情報)を付与し、任意のフレームに対して線路内位置情報を決定するようになっている。 The alternate long and short dash line in FIG. 5 indicates the shooting range of the camera 310. The lens (focal length) to be used, the arrangement, the number of lights, and the like of the camera 310 are appropriately selected according to the distance to the shooting target. The inspection work support device, which will be described later, automatically recognizes the kilometer name plate 150 imprinted on the captured moving image, adds track position information (kilometer information) to the moving image, and applies it to any frame. The position information in the track is determined.

[標識]
図6は、上り線側キロ程銘板150Aの写真であり、図7は、上り線側キロ程銘板150A以外の上り線側の標識の写真である。上り線側の標識は黄色標識である。図6に示すように、上り線側キロ程銘板150Aには、黄色地に横書きの黒文字で「380」や「276K300M」等のキロ程が表示されている。
[Sign]
FIG. 6 is a photograph of the up line side kilometer name plate 150A, and FIG. 7 is a photograph of signs on the up line side other than the up line side kilometer name plate 150A. The sign on the up line side is a yellow sign. As shown in FIG. 6, on the up line side kilometer name plate 150A, kilometers such as "380" and "276K300M" are displayed in horizontal black letters on a yellow background.

図8は、下り線側キロ程銘板150Bの写真であり、図9は、下り線側キロ程銘板150B以外の下り線側の標識の写真である。下り線側の標識は白色標識である。図8に示すように、下り線側キロ程銘板150Bには、白色地に縦書きの黒文字で「278」や「276 1/2」等のキロ程が表示されている。 FIG. 8 is a photograph of the down line side kilometer name plate 150B, and FIG. 9 is a photograph of signs on the down line side other than the down line side kilometer name plate 150B. The sign on the down line side is a white sign. As shown in FIG. 8, on the down line side kilometer name plate 150B, kilometers such as "278" and "276 1/2" are displayed in vertical black characters on a white background.

[点検作業支援装置の構成]
図10は、第1の実施の形態に係る点検作業支援装置10の機能ブロック図である。この点検作業支援装置10は、防音壁100などの線路内設備の点検作業を支援する装置であって、機能的には、撮影動画像登録部11と、画像処理パラメータ登録部12と、キロ程銘板抽出部13と、キロ程銘板補正部14と、キロ程文字認識(OCR)部15と、記録部16と、キロ程誤り訂正部17と、上り線下り線整合部18と、動画像キロ程情報DB部19とを備える。上り線下り線整合部18には、上り線下り線突合判定部18−1と、下り線キロ程補間調整部18−2とが含まれる。
[Configuration of inspection work support device]
FIG. 10 is a functional block diagram of the inspection work support device 10 according to the first embodiment. This inspection work support device 10 is a device that supports inspection work of equipment in a railroad track such as a soundproof wall 100, and is functionally a shooting moving image registration unit 11, an image processing parameter registration unit 12, and a kilometer or so. The name plate extraction unit 13, the kilometer nameplate correction unit 14, the kilometer character recognition (OCR) unit 15, the recording unit 16, the kilometer error correction unit 17, the upline downline matching unit 18, and the moving image kilometer. The information DB unit 19 is provided. The up line down line matching unit 18 includes an up line down line collision determination unit 18-1 and a down line kilometer interpolation adjustment unit 18-2.

撮影動画像登録部11は、防音壁撮影装置310によって撮影された動画像を登録する。具体的には、撮影時の走行線区(0:上り線/1:下り線)、走行方向(0:起点方⇒終点方/1:終点方⇒起点方)、起点方駅名、終点方駅名、撮影防音壁(0:上り線側/1:下り線側)、開始キロ程、終了キロ程、画像解像度、画像左側端(0:起点方/1:終点方)、画像右側端(0:起点方/1:終点方)、回転表示(−1:左90度/0:0度/1:右90度)の情報を撮影動画像に登録する。 The photographing moving image registration unit 11 registers the moving image photographed by the soundproof wall photographing apparatus 310. Specifically, the running line section (0: up line / 1: down line), running direction (0: starting point ⇒ ending point / 1: ending point ⇒ starting point), starting point station name, ending point station name at the time of shooting , Shooting soundproof wall (0: up line side / 1: down line side), start kilometer, end kilometer, image resolution, left end of image (0: start point / 1: end point), right edge of image (0: Information on the start point / 1: end point) and the rotation display (-1: left 90 degrees / 0: 0 degrees / 1: right 90 degrees) is registered in the shooting moving image.

画像処理パラメータ登録部12は、画像処理パラメータを登録する。具体的には、キロ程銘板抽出処理やキロ程文字認識処理に必要な画像処理のパラメータ(キロ程銘板の大きさ、色など)を登録する。 The image processing parameter registration unit 12 registers the image processing parameters. Specifically, the parameters of image processing (size, color, etc. of the kilometer nameplate) required for the kilometer nameplate extraction process and the kilometer character recognition process are registered.

キロ程銘板抽出部13は、キロ程銘板抽出処理を行う。具体的には、画像処理パラメータ登録部12により登録された画像処理パラメータに基づき、撮影動画像登録部11により登録された動画像からキロ程銘板の画像を抽出する。また、抽出したキロ程銘板の画像が対象銘板の大きさに合致しているかどうか判定を行う。 The kilometer nameplate extraction unit 13 performs a kilometer nameplate extraction process. Specifically, based on the image processing parameters registered by the image processing parameter registration unit 12, an image of a kilometer name plate is extracted from the moving image registered by the shooting moving image registration unit 11. In addition, it is determined whether or not the image of the extracted kilometer name plate matches the size of the target name plate.

キロ程銘板補正部14は、キロ程銘板補正処理を行う。具体的には、キロ程銘板抽出部13により抽出された上り線側キロ程銘板150Aの画像に対して傾き補正を行う。一方、キロ程銘板抽出部13により抽出された下り線側キロ程銘板150Bの画像に対して左右分割・射影投影変換の画像補正を行う。 The kilometer nameplate correction unit 14 performs the kilometer nameplate correction process. Specifically, the tilt correction is performed on the image of the kilometer nameplate 150A on the upstream side extracted by the kilometer nameplate extraction unit 13. On the other hand, the image of the down line side kilometer nameplate 150B extracted by the kilometer nameplate extraction unit 13 is subjected to image correction of left-right division / projective projection conversion.

キロ程文字認識部15は、キロ程文字認識処理を行う。具体的には、キロ程銘板補正部14により補正された画像に対して、“0−9”の数値、“K、M”の文字、“−”記号の文字認識(OCR)を行い、キロ程を決定する。 The kilometer character recognition unit 15 performs kilometer character recognition processing. Specifically, the image corrected by the name plate correction unit 14 about kilometer is subjected to character recognition (OCR) of the numerical value of "0-9", the character of "K, M", and the character of "-" symbol, and kilogram. Determine the degree.

キロ程誤り訂正部17は、キロ程誤り訂正処理を行う。具体的には、キロ程文字認識部15により決定されたキロ程の数値が正しいかどうかを走行方向、走行速度、キロ程銘板の間隔等を考慮し、誤り部分を訂正する。 The kilometer error correction unit 17 performs a kilometer error correction process. Specifically, whether or not the value of the kilometer determined by the kilometer character recognition unit 15 is correct is corrected by considering the traveling direction, the traveling speed, the distance between the nameplates of the kilometer, and the like.

記録部16は、各種データを記録する記録装置である。 The recording unit 16 is a recording device that records various data.

上り線下り線整合部18は、上り線下り線整合処理を行う。具体的には、上り線下り線突合判定部18−1は、下り線のキロ程銘板抽出処理・キロ程文字認識処理の結果(キロ程)と上り線側で推定したキロ程とを突き合わせる。この突き合わせ結果が一致しなかった場合は、上り線側で推定したキロ程の方が正しいとみなし、その周辺で再び探索を行い、上り線側と下り線側を同時に撮影したときのフレームの同期ずれ(フレームのズレ)を判定する。また、下り線キロ程補間調整部18−2は、上り線下り線突合判定部18−1により判定された結果を用いて、下り線のキロ程情報に上り線側のキロ程情報から内挿補間を行い、下り線キロ程を調整する。同期ずれのフレーム値をもとに、上り線側で検出した10m単位のキロ程情報を下り線側に補間挿入するようになっている。 The up line down line matching unit 18 performs an up line down line matching process. Specifically, the up line down line collision determination unit 18-1 compares the result (kilo) of the down line kilometer name plate extraction process / kilometer character recognition process with the kilometer estimated on the upline side. .. If the matching results do not match, it is considered that the kilometer estimated on the up line side is correct, the search is performed again around it, and the frame synchronization when the up line side and the down line side are shot at the same time. Determine the deviation (frame deviation). Further, the down line kilometer interpolation adjustment unit 18-2 interpolates the down line kilometer information from the up line side kilometer information using the result determined by the up line down line collision determination unit 18-1. Interpolate and adjust the down line kilometer. Based on the frame value of the synchronization deviation, the information of about 10 m unit detected on the up line side is interpolated and inserted on the down line side.

動画像キロ程情報DB部19は、動画像にキロ程情報を紐付けて管理する。具体的には、上り線と下り線ごとに何フレーム目が何キロ何メートルであるかをDBに登録する。 The moving image kilometer information DB unit 19 manages the moving image by associating the kilometer information with the moving image. Specifically, the number of frames and the number of kilometers and meters are registered in the DB for each of the up line and the down line.

[点検作業支援装置の動作]
図11は、第1の実施の形態に係る点検作業支援装置10の動作を示すフローチャートである。以下、図11に従って、キロ程銘板抽出部13、キロ程銘板補正部14、キロ程文字認識部15の動作について説明する。
[Operation of inspection work support device]
FIG. 11 is a flowchart showing the operation of the inspection work support device 10 according to the first embodiment. Hereinafter, the operations of the kilometer name plate extraction unit 13, the kilometer nameplate correction unit 14, and the kilometer character recognition unit 15 will be described with reference to FIG.

まず、動画→静止画変換を行った後、RGB→HSI変換を行う(ステップS1→S2)。動画→静止画変換とは、防音壁撮影装置310によって撮影された動画像を静止画像に変換することである。RGB→HSI変換とは、キロ程銘板の特徴色(上り線側:黄色、下り線側:白色)を簡単に特定するために、RGB色空間からHSI色空間の画像に変換することである。 First, the moving image → still image conversion is performed, and then the RGB → HSI conversion is performed (step S1 → S2). The moving image → still image conversion is to convert a moving image taken by the soundproof wall photographing apparatus 310 into a still image. The RGB → HSI conversion is to convert from the RGB color space to an image in the HSI color space in order to easily identify the characteristic color (upline side: yellow, downline side: white) of the name plate.

HSI変換の他に、HSV変換、HSL変換などの方法も用いることができる。すなわち、HSIは、色相 (H:hue),彩度 (S:saturation),明度 (I:intensity)で記述する表色系のHSI色空間ことであり、HSV (V:value) や HSL (L:lightness) と呼ばれることもある。これは、intensity=value=Lightnessとほぼ同じに用いられるためである。 In addition to HSI conversion, methods such as HSV conversion and HSL conversion can also be used. That is, HSI is an HSI color space of a color system described by hue (H: hue), saturation (S: saturation), and lightness (I: intensity), and is HSV (V: value) or HSL (L). : lightness). This is because it is used almost the same as intensity = value = Lightness.

次いで、HSI変換された画像からキロ程銘板の画像を抽出し、指定色領域があるかどうかを判定する(ステップS3→S4)。上り線側撮影の場合は、黄色領域があるかどうかを判定し、下り線側撮影の場合は、白色領域があるかどうかを判定する。 Next, an image of a kilometer name plate is extracted from the HSI-converted image, and it is determined whether or not there is a designated color region (step S3 → S4). In the case of up line side photography, it is determined whether or not there is a yellow area, and in the case of down line side photography, it is determined whether or not there is a white area.

ここで、指定色領域がある場合は、指定色領域のサイズが正しいかどうかを判定する(ステップS5)。指定色領域のサイズが正しい場合は、抽出したキロ程銘板の画像を補正し、キロ程の文字認識を行い、指定文字記号が認識されたかどうかを判定する(ステップS6→S7→S8)。上り線側撮影の場合は、“0−9”の数値、“K、M”の文字が認識されたかどうかを判定し、下り線側撮影の場合は、“0−9”の数値、“−”記号が認識されたか判定する。 Here, if there is a designated color area, it is determined whether or not the size of the designated color area is correct (step S5). If the size of the designated color area is correct, the extracted image of the kilometer name plate is corrected, character recognition of the kilometer is performed, and it is determined whether or not the designated character symbol is recognized (step S6 → S7 → S8). In the case of up line side shooting, it is determined whether the numerical value of "0-9" and the character "K, M" are recognized, and in the case of down line side shooting, the numerical value of "0-9", "-" "Determine if the symbol is recognized.

ここで、指定文字記号が認識された場合は、キロ程内部出力を行う(ステップS9)。すなわち、複数のフレームで同じキロ程銘板が抽出され、OCRによりキロ程が得られる。キロ程内部出力とは、そのデータを内部出力することである。 Here, if the designated character symbol is recognized, internal output is performed for about a kilometer (step S9). That is, the same kilometer name plate is extracted from a plurality of frames, and the kilometer is obtained by OCR. The internal output of about a kilometer is the internal output of the data.

以下、上り線側のキロ程内部出力の一例を示す。左から順に、ファイル名,フレーム数,画像中央からの距離,銘板種別,OCR結果を示している。ここでいう距離は、画像上での距離であるため、単位はpixelである。画像中央を0とし、画像中央より左側に「−」、右側に「+」の符号を付している。 The following is an example of the internal output of the kilometer on the up line side. From left to right, the file name, number of frames, distance from the center of the image, name plate type, and OCR result are shown. Since the distance here is the distance on the image, the unit is pixel. The center of the image is set to 0, and a "-" sign is attached to the left side of the center of the image and a "+" sign is attached to the right side.

上り線側_C0003,1845,−107.50,黄色銘板,130
上り線側_C0003,1846,−62.50,黄色銘板,130
上り線側_C0003,1847,−16.00,黄色銘板,130
上り線側_C0003,1848,30.00,黄色銘板,130
上り線側_C0003,1849,77.22,黄色銘板,130
上り線側_C0003,1850,120.76,黄色銘板,130
次いで、同じキロ程であるどうかを判定し、同じキロ程でない場合は、一つ前のキロ程を仮DB出力する(ステップS10→S11)。「一つ前のキロ程を仮DB出力する」とは、「キロ程内部出力の結果」のうち、画像中央に最も近いフレームのキロ程結果を仮DBへ出力することである。この上り線側の一例の場合は、「上り線側_C0003,1847,−16.00,黄色銘板,130」を仮DB出力することになる(ステップS11)。
Up line side_C0003, 1845, -107.50, yellow name plate, 130
Up line side_C0003, 1846, -62.50, yellow name plate, 130
Up line side_C0003, 1847, -16.00, yellow name plate, 130
Up line side_C0003, 1848, 30.00, yellow name plate, 130
Up line side_C0003, 1849, 77.22, yellow name plate, 130
Up line side_C0003, 1850, 120.76, yellow name plate, 130
Next, it is determined whether or not the kilometer is the same, and if it is not the same kilometer, the previous kilometer is output as a temporary DB (step S10 → S11). "Outputting the previous kilometer to the temporary DB" means outputting the kilometer result of the frame closest to the center of the image to the temporary DB among the "results of the internal output of the kilometer". In the case of this example of the up line side, "up line side_C0003, 1847, -16.00, yellow name plate, 130" is output as a temporary DB (step S11).

同様に、下り線側のキロ程内部出力の一例を示す。この下り線側の一例の場合は、「下り線側_C0002,2545,30.21,白色銘板(左側),280」を仮DB出力することになる(ステップS10→S11)。 Similarly, an example of the internal output of about a kilometer on the down line side is shown. In the case of this example of the downlink side, "downline side_C0002, 2545, 30.21, white name plate (left side), 280" is output as a temporary DB (step S10 → S11).

下り線側_C0002,2544,191.42,白色銘板(左側),280
下り線側_C0002,2544,191.42,白色銘板(右側),280
下り線側_C0002,2545,30.21,白色銘板(左側),280
下り線側_C0002,2545,30.21,白色銘板(右側),280
下り線側_C0002,2546,−132.00,白色銘板(左側),280
下り線側_C0002,2546,−132.00,白色銘板(右側),280
次のフレームへ移り、同様の処理を繰り返す(ステップS12→S1→・・・)。最終フレームに達した場合は、次工程へ移る(ステップS12→S13)。上り線側撮影の場合は、キロ程誤り訂正処理へ移り、下り線側撮影の場合は、上り線下り線突合判定・補間調整処理へ移る。
Down line side_C0002, 2544, 191.42, white name plate (left side), 280
Down line side_C0002, 2544, 191.42, white name plate (right side), 280
Down line side_C0002, 2545, 30.21, white name plate (left side), 280
Down line side_C0002, 2545, 30.21, white name plate (right side), 280
Down line side_C0002, 2546, -132.00, white name plate (left side), 280
Down line side_C0002, 2546, -132.00, white name plate (right side), 280
The frame is moved to the next frame, and the same process is repeated (step S12 → S1 → ...). When the final frame is reached, the process proceeds to the next step (step S12 → S13). In the case of up line side shooting, the process moves to error correction processing for about a kilometer, and in the case of down line side shooting, it moves to up line down line collision determination / interpolation adjustment processing.

図12は、第1の実施の形態に係る点検作業支援装置10の動作を示すフローチャートである。以下、図12に従って、キロ程誤り訂正部17、上り線下り線整合部18の動作について説明する。 FIG. 12 is a flowchart showing the operation of the inspection work support device 10 according to the first embodiment. Hereinafter, the operation of the error correction section 17 and the upline / downline matching section 18 will be described with reference to FIG.

まず、キロ程誤り訂正部17は、仮DB出力された上り線側のキロ程情報について誤り訂正を行う(ステップS21→S22)。そして、誤り訂正を行った後の上り線側のキロ程情報をDBに出力するとともに(ステップS24)、誤り訂正を行った後の上り線側のキロ程情報のうち、推定500m、1kmのキロ程フレームを算出する(ステップS23)。 First, the kilometer error correction unit 17 corrects the error about the kilometer information on the upstream line output in the temporary DB (steps S21 → S22). Then, the kilometer information on the up line side after the error correction is output to the DB (step S24), and the estimated 500 m, 1 km kilometer of the kilometer information on the up line side after the error correction is performed. The information frame is calculated (step S23).

一方、上り線下り線整合部18は、仮DB出力された下り線側のキロ程情報について銘板抽出範囲の絞り込みによるキロ程チェックを行う(ステップS26→S27)。既に銘板抽出されているか、OCRが成功している場合は、上り線側の推定値と下り線側の抽出値とのフレーム差を算出する(ステップS28→S29)。そして、このフレーム差を考慮して、上り線側の10m毎、100m毎のキロ程を下り線側のキロ程に内挿補間する(ステップS25,S33)。このとき、上り線側と下り線側を同時に撮影したときのフレームの同期ずれを500m,1kmのキロ程区間で調整する(ステップS33)。最後に、このように調整された後の下り線側のキロ程情報をDBに出力する(ステップS34)。 On the other hand, the up line down line matching unit 18 checks the kilometer information by narrowing down the name plate extraction range for the kilometer information on the down line side output in the temporary DB (steps S26 → S27). If the name plate has already been extracted or the OCR is successful, the frame difference between the estimated value on the up line side and the extracted value on the down line side is calculated (step S28 → S29). Then, in consideration of this frame difference, interpolation interpolation is performed by interpolating about every 10 m and every 100 m on the up line side to about the kilometer on the down line side (steps S25 and S33). At this time, the synchronization shift of the frame when the up line side and the down line side are photographed at the same time is adjusted in a section of about 500 m and 1 km (step S33). Finally, the kilometer information on the down line side after being adjusted in this way is output to the DB (step S34).

なお、ステップS28においてNOと判定した場合は、再処理を行うようになっている(ステップS30)。再処理とは、限られたフレームでキロ程銘板抽出処理・キロ程文字認識処理を再度行うことである。再処理に成功した場合(ステップS31:YES)は、ステップS29に移り、再処理に失敗した場合(ステップS31:NO)は、上り線側の推定値と前後のフレーム差より算出し(ステップS32)、ステップS29に移る。 If NO is determined in step S28, reprocessing is performed (step S30). Reprocessing is to perform the kilometer name plate extraction process and the kilometer character recognition process again in a limited number of frames. If the reprocessing is successful (step S31: YES), the process proceeds to step S29, and if the reprocessing fails (step S31: NO), it is calculated from the estimated value on the uplink side and the frame difference before and after (step S32). ), Move to step S29.

[キロ程銘板抽出処理、キロ程文字認識処理]
図13は、第1の実施の形態に係るキロ程銘板抽出処理、キロ程文字認識処理、キロ程誤り訂正処理の説明図である。横軸には、キロ程銘板があると思われるフレーム位置(仮定)をチックマーク「|」で表記している。
[Kilo name plate extraction process, Kilo character recognition process]
FIG. 13 is an explanatory diagram of a kilometer name plate extraction process, a kilometer character recognition process, and a kilometer error correction process according to the first embodiment. On the horizontal axis, the frame position (assumed) where the name plate is thought to be about a kilometer is indicated by the tick mark "|".

以下、図13(a)に従って、上り線側撮影動画像の場合について説明する。 Hereinafter, the case of the up-line side photographed moving image will be described with reference to FIG. 13 (a).

まず、キロ程銘板抽出処理(処理1)を行う。すなわち、RGB→HSI変換による黄色領域(画像幅・高さのサイズで閾値を設定)のフレームを抽出する。黄色領域が抽出できた箇所を「○」で表示している。防音壁100には、キロ程銘板以外にも黄色領域の標識が設置されているが、画像サイズの設定閾値より小さいため、サイズ判定で除外される。ただし、剥がれによる銘板欠損箇所は当然抽出できない。 First, the name plate extraction process (process 1) is performed for about kilograms. That is, the frame in the yellow region (threshold value is set by the size of the image width / height) by RGB → HSI conversion is extracted. The part where the yellow area can be extracted is indicated by "○". On the soundproof wall 100, a sign in a yellow area is installed in addition to the name plate of about a kilometer, but since it is smaller than the setting threshold value of the image size, it is excluded by the size determination. However, it is not possible to extract the missing part of the name plate due to peeling.

次いで、キロ程文字認識処理(処理2−1)とキロ程誤り訂正処理(処理2−2)を行う。すなわち、抽出箇所(銘板)に対して0−9の数字とK、Mの英字の文字認識を行う。文字認識が成功した箇所を「○」、失敗した箇所を「×」で表示している。ただし、ここでは、間違った文字認識の箇所も「○」である。文字認識後のキロ程値を一時保持し、誤り訂正を行い、正しいキロ程値に修正する。さらに、文字認識ができなかった対象に関しては、文字認識が成功した箇所より、10m当たりのフレーム数から推定したフレーム値と抽出箇所が合致している場合、そのフレームにキロ程値を与えるなどの処理を行い、フレームとキロ程の対応を最終決定する。 Next, a kilometer character recognition process (process 2-1) and a kilometer error correction process (process 2-2) are performed. That is, the number 0-9 and the letters K and M are recognized for the extraction location (name plate). The part where character recognition was successful is indicated by "○", and the part where character recognition failed is indicated by "×". However, here, the part of incorrect character recognition is also "○". Temporarily retains the kilometer value after character recognition, corrects errors, and corrects to the correct kilometer value. Furthermore, for objects that could not recognize characters, if the frame value estimated from the number of frames per 10 m matches the extracted location from the location where character recognition was successful, a kilometer value is given to that frame. Process and finalize the correspondence between the frame and the kilometer.

次に、図13(b)に従って、下り線側撮影動画像の場合について説明する。 Next, a case of a moving image taken on the down line side will be described with reference to FIG. 13 (b).

まず、キロ程銘板抽出処理(処理3)を行う。すなわち、RGB→HSI変換による白色領域(画像幅・高さのサイズで閾値を設定)のフレームを抽出する。白色領域が抽出できた箇所を「○」で表示している。防音壁100には、キロ程銘板以外にも白色領域の標識が設置されているが、画像サイズの設定閾値より小さい場合、サイズ判定で除外される。 First, the name plate extraction process (process 3) is performed for about kilograms. That is, a frame in a white region (threshold value is set by the size of the image width / height) by RGB → HSI conversion is extracted. The part where the white area can be extracted is indicated by "○". On the soundproof wall 100, a sign in a white area is installed in addition to the name plate of about a kilometer, but if it is smaller than the setting threshold value of the image size, it is excluded by the size determination.

次いで、キロ程文字認識処理(処理4)を行う。すなわち、抽出箇所(銘板)に対して0−9の数字と−記号の文字認識を行う。文字認識が成功した箇所を「○」、失敗した箇所を「×」で表示している。ただし、ここでは、間違った文字認識の箇所も「○」である。そのため、後述するように、上り線から抽出した推定フレームと下り線の抽出フレームの突き合わせを行い、補間調整の処理を行う。 Next, a character recognition process (process 4) for about a kilometer is performed. That is, the character recognition of the number 0-9 and the-symbol is performed for the extraction point (name plate). The part where character recognition was successful is indicated by "○", and the part where character recognition failed is indicated by "×". However, here, the part of incorrect character recognition is also "○". Therefore, as will be described later, the estimation frame extracted from the up line and the extraction frame of the down line are matched, and the interpolation adjustment process is performed.

[上り線下り線突合判定処理]
ところで、防音壁撮影装置310において同時にシャッターを押し、撮影を開始しても、フレーム単位での時刻同期はできない。そのため、上り線側撮影動画像と下り線側撮影動画像の突き合わせを行い、フレーム単位の調整を行う。フレーム単位の時刻完全同期を行うためには、外部トリガーを制御する機器やカメラ側の外部機器入力など特殊な機材が必要になるが、本発明では、画像処理による対応処置を行うようにしている。
[Up line / Down line collision judgment processing]
By the way, even if the shutter is pressed at the same time in the soundproof wall photographing apparatus 310 and shooting is started, the time cannot be synchronized in frame units. Therefore, the up line side shooting moving image and the down line side shooting moving image are matched and adjusted in frame units. In order to perform perfect time synchronization in frame units, special equipment such as a device that controls an external trigger and an external device input on the camera side is required, but in the present invention, countermeasures are taken by image processing. ..

図14は、第1の実施の形態に係る上り線下り線突合判定処理の説明図である。横軸には、上り線側撮影動画像から推定した276K、276K500M、277K、277K500M、…のフレーム番号を示している。 FIG. 14 is an explanatory diagram of an up line / down line collision determination process according to the first embodiment. The horizontal axis shows the frame numbers of 276K, 276K500M, 277K, 277K500M, ... Estimated from the up-line side photographed moving image.

図14に示すように、上り線より推定したキロ程位置のフレーム番号と下り線の銘板抽出・OCRの結果を突き合わせて、±1秒以内(通常は±0.5秒以内)での差(フレーム換算で±30フレーム)であれば、下り線での銘板抽出ができていると判定する。さらに、OCRの結果も推定キロ程であれば、精度が高まる。銘板抽出はできているが、OCRができていない場合も推定値として採用する(太字の「277K500M」の箇所)。反対に、±30フレームのズレが発生している箇所は、キロ程以外の銘板が抽出されていると考えられるため、その箇所を除外する(細字の「277K500M」の箇所)。 As shown in FIG. 14, the difference (usually within ± 0.5 seconds) within ± 1 second (usually within ± 0.5 seconds) by comparing the frame number at the kilometer position estimated from the up line with the result of the name plate extraction / OCR of the down line (within ± 0.5 seconds). If it is ± 30 frames in terms of frames), it is determined that the name plate can be extracted on the down line. Furthermore, if the OCR result is about an estimated kilometer, the accuracy will be improved. Even if the name plate has been extracted but OCR has not been performed, it is used as an estimated value (the part in bold "277K500M"). On the other hand, the part where the deviation of ± 30 frames occurs is considered to have been extracted from the name plate other than about kilograms, so that part is excluded (the part of "277K500M" in fine print).

[下り線キロ程補間調整処理]
図15は、第1の実施の形態に係る下り線キロ程補間調整処理の説明図である。この図に示すように、上り線下り線突合判定処理後、下り線キロ程補間調整処理を行う。具体的には、上り線と下り線のフレーム差を考慮し、上り線側の10m単位のキロ程情報を下り線側へ線形内挿補間を行う。図中の白抜きの矢印は、補間前後の様子を示すための矢印であり、「…」は、補間された10m単位のキロ程情報を意味している。
[Downline kilometer interpolation adjustment processing]
FIG. 15 is an explanatory diagram of the downlink kilometer interpolation adjustment process according to the first embodiment. As shown in this figure, after the up line down line collision determination process, the down line kilometer interpolation adjustment process is performed. Specifically, in consideration of the frame difference between the up line and the down line, linear interpolation interpolation is performed for the kilometer information in units of 10 m on the up line side to the down line side. The white arrows in the figure are arrows for showing the state before and after the interpolation, and "..." means the interpolated information of about 10 m unit.

[まとめ]
以上のように、第1の実施の形態に係る点検作業支援装置10は、防音壁100の点検作業を支援する装置であって、上下線の防音壁100を同時に撮影した動画像を登録する撮影動画像登録部11と、撮影動画像登録部11により登録された動画像からキロ程銘板の画像を抽出するキロ程銘板抽出部13と、キロ程銘板抽出部13により抽出されたキロ程銘板の画像に対して文字認識を行い、キロ程情報を決定するキロ程文字認識部15と、撮影動画像登録部11により登録された動画像にキロ程文字認識部15により決定されたキロ程情報を紐付けて管理する動画像キロ程情報DB部19とを備える。これにより、上下線の防音壁100を同時に撮影した動画像に距離標情報を紐付けることができるため、この動画像を用いて防音壁100の点検作業を効率よく行うことが可能となる。
[summary]
As described above, the inspection work support device 10 according to the first embodiment is a device that supports the inspection work of the soundproof wall 100, and is a photographing device for registering a moving image obtained by simultaneously photographing the soundproof wall 100 of the upper and lower lines. The moving image registration unit 11, the kilometer name plate extraction unit 13 that extracts the image of the kilometer name plate from the moving image registered by the shooting video registration unit 11, and the kilometer nameplate extracted by the kilometer nameplate extraction unit 13. The kilometer character recognition unit 15 that recognizes characters on the image and determines the kilometer information, and the kilometer information determined by the kilometer character recognition unit 15 on the moving image registered by the shooting moving image registration unit 11. It is provided with a moving image kilometer information DB unit 19 that is linked and managed. As a result, the distance marker information can be associated with the moving image of the soundproof wall 100 of the upper and lower lines taken at the same time, so that the inspection work of the soundproof wall 100 can be efficiently performed using this moving image.

動画像の利用方法は特に限定されるものではないが、例えば、第2の実施の形態で説明する隙間計測方法に利用することが可能である(後述する)。もちろん、動画像をコンピュータで再生し、その動画像に基づいて作業者が目視で線路内設備を点検するようにしてもよい。動画像には距離標情報が紐付けられているため、不具合を見つけた場合はその線路内位置を容易に特定することができる。 The method of using the moving image is not particularly limited, but it can be used, for example, in the gap measuring method described in the second embodiment (described later). Of course, the moving image may be reproduced by a computer, and the operator may visually inspect the equipment in the track based on the moving image. Since the distance marker information is associated with the moving image, if a defect is found, the position in the track can be easily identified.

さらに、キロ程文字認識部15により文字認識された上り線側のキロ程情報と下り線側のキロ程情報の整合性を図る上り線下り線整合部18を備えてもよい。これにより、精度よく上り線側のキロ程情報と下り線側のキロ程情報を得ることができる。 Further, an up line / down line matching unit 18 may be provided to ensure consistency between the kilo information on the up line side and the kilo information on the down line side recognized by the character recognition unit 15. As a result, it is possible to accurately obtain information on the kilometer on the up line side and kilometer information on the down line side.

具体的には、上り線下り線整合部18は、下り線側のキロ程情報に対して上り線側のキロ程情報から内挿補間を行い、下り線側のキロ程情報を調整してもよい。これにより、同期ずれのフレーム値をもとに、上り線側で検出した10m単位のキロ程情報を下り線側に補間挿入することができる。 Specifically, even if the up line down line matching unit 18 interpolates the kilometer information on the down line side from the kilometer information on the up line side and adjusts the kilometer information on the down line side. good. As a result, based on the frame value of the synchronization deviation, the information of about 10 m unit detected on the up line side can be interpolated and inserted on the down line side.

さらに、キロ程銘板抽出部13により抽出された上り線側のキロ程銘板の画像と下り線側のキロ程銘板の画像に対して異なる手法で画像補正を行うキロ程銘板補正部14を備えてもよい。これにより、上り線側のキロ程銘板と下り線側のキロ程銘板それぞれの特徴に合わせた画像補正を行うことができる。 Further, the kilometer nameplate correction unit 14 is provided to perform image correction on the image of the kilometer nameplate on the up line side and the image of the kilometer nameplate on the downline side extracted by the kilometer nameplate extraction unit 13 by different methods. May be good. As a result, it is possible to perform image correction according to the characteristics of the kilometer name plate on the up line side and the kilometer name plate on the down line side.

さらに、キロ程文字認識部15により決定されたキロ程情報に誤りがある場合はその誤り部分を訂正するキロ程誤り訂正部17を備えてもよい。これにより、誤り部分が訂正されるため、正確なキロ程情報を得ることが可能となる。 Further, if there is an error in the kilometer information determined by the kilometer character recognition unit 15, the kilometer error correction unit 17 may be provided to correct the error portion. As a result, the error portion is corrected, and it is possible to obtain accurate information about the kilometer.

なお、本発明は、点検作業支援装置10として実現することができるだけでなく、点検作業支援装置10が備える特徴的な処理部をステップとする距離標情報管理方法として実現したり、点検作業支援装置10としてコンピュータを機能させるためのプログラムとして実現したりすることもできる。そして、そのようなプログラムは、CD−ROM等の記録媒体やインターネット等の伝送媒体を介して配信することができるのは言うまでもない。 The present invention can be realized not only as an inspection work support device 10, but also as a distance marker information management method using a characteristic processing unit included in the inspection work support device 10 as a step, or an inspection work support device. It can also be realized as a program for operating the computer as 10. Needless to say, such a program can be distributed via a recording medium such as a CD-ROM or a transmission medium such as the Internet.

≪第2の実施の形態≫
次に、第2の実施の形態について、第1の実施の形態と異なる点のみ説明する。第2の実施の形態では、動画像を用いて防音壁100の支柱110とパネル120の隙間141を正確に計測する技術について説明する。なお、以下の説明では、動画像に距離標情報が紐付けられていることを前提とする。動画像に距離標情報を紐付ける方法は、第1の実施の形態で説明した距離標情報管理方法でもよいし、それ以外の方法でもよい。
<< Second Embodiment >>
Next, only the differences between the second embodiment and the first embodiment will be described. In the second embodiment, a technique for accurately measuring the gap 141 between the support column 110 of the soundproof wall 100 and the panel 120 using a moving image will be described. In the following explanation, it is assumed that the distance marker information is associated with the moving image. The method of associating the distance marker information with the moving image may be the distance marker information management method described in the first embodiment, or may be another method.

[点検作業支援装置の構成]
図16は、第2の実施の形態に係る点検作業支援装置20の機能ブロック図である。この点検作業支援装置20は、防音壁100などの線路内設備の点検作業を支援する装置であって、機能的には、撮影動画像登録部21と、画像処理パラメータ登録部22と、動画像キロ程情報DB部23と、H鋼支柱抽出部24と、記録部25と、隙間計測部26と、隙間計測結果出力部27と、危険度判定部28と、隙間計測台帳出力部29とを備える。
[Configuration of inspection work support device]
FIG. 16 is a functional block diagram of the inspection work support device 20 according to the second embodiment. The inspection work support device 20 is a device that supports inspection work of equipment in the track such as a soundproof wall 100, and is functionally a shooting moving image registration unit 21, an image processing parameter registration unit 22, and a moving image. The kilometer information DB unit 23, the H-beam extraction unit 24, the recording unit 25, the gap measurement unit 26, the gap measurement result output unit 27, the risk determination unit 28, and the gap measurement ledger output unit 29. Be prepared.

撮影動画像登録部21は、防音壁撮影装置310によって撮影された動画像を登録する。具体的には、撮影時の走行線区(0:上り線/1:下り線)、走行方向(0:起点方⇒終点方/1:終点方⇒起点方)、起点方駅名、終点方駅名、撮影防音壁(0:上り線側/1:下り線側)、開始キロ程、終了キロ程、画像解像度、画像左側端(0:起点方/1:終点方)、画像右側端(0:起点方/1:終点方)、回転表示(−1:左90度/0:0度/1:右90度)の情報を撮影動画像に登録する。 The photographing moving image registration unit 21 registers the moving image photographed by the soundproof wall photographing apparatus 310. Specifically, the running line section (0: up line / 1: down line), running direction (0: starting point ⇒ ending point / 1: ending point ⇒ starting point), starting point station name, ending point station name at the time of shooting , Shooting soundproof wall (0: up line side / 1: down line side), start kilometer, end kilometer, image resolution, left end of image (0: start point / 1: end point), right edge of image (0: Information on the start point / 1: end point) and the rotation display (-1: left 90 degrees / 0: 0 degrees / 1: right 90 degrees) is registered in the shooting moving image.

画像処理パラメータ登録部22は、画像処理パラメータを登録する。具体的には、H鋼支柱抽出処理や隙間計測処理に必要な画像処理のパラメータ(二値化閾値、検出スコア閾値、支柱中心部幅、中心部二値化閾値)、及び支柱テンプレート画像(上り線側、下り線側、端部・中間部など)、H鋼支柱幅(mm)を登録する。 The image processing parameter registration unit 22 registers the image processing parameters. Specifically, the image processing parameters (binarization threshold value, detection score threshold value, column center width, center binarization threshold value) required for H steel column extraction processing and gap measurement processing, and column template image (uplink). Register the line side, down line side, end / intermediate part, etc.) and H steel column width (mm).

動画像キロ程情報DB部23は、第1の実施の形態における動画像キロ程情報DB部19に相当する。すなわち、動画像にキロ程情報を紐付けて管理する。具体的には、上り線と下り線ごとに何フレーム目が何キロ何メートルであるかをDBに登録する。 The moving image kilometer information DB unit 23 corresponds to the moving image kilometer information DB unit 19 in the first embodiment. That is, information about a kilometer is associated with a moving image for management. Specifically, the number of frames and the number of kilometers and meters are registered in the DB for each of the up line and the down line.

H鋼支柱抽出部24は、H鋼支柱抽出処理を行う。具体的には、画像処理パラメータ登録部22により登録された画像処理パラメータ(二値化閾値、検出スコア閾値、支柱中心部幅)、及び支柱テンプレート画像に従って、H鋼支柱の画像を抽出する。 The H-steel column extraction unit 24 performs an H-steel column extraction process. Specifically, the image of the H steel column is extracted according to the image processing parameters (binarization threshold value, detection score threshold value, column center width) registered by the image processing parameter registration unit 22 and the column template image.

記録部25は、各種データを記録する記録装置である。 The recording unit 25 is a recording device that records various data.

隙間計測部26は、隙間計測処理を行う。具体的には、H鋼支柱抽出部24により抽出されたH鋼支柱の画像をもとに、画像処理パラメータ登録部22により登録された画像処理パラメータ(支柱中心部幅、中心部二値化閾値)に従って、支柱110とパネル120の隙間141を計測する。 The gap measurement unit 26 performs the gap measurement process. Specifically, the image processing parameters (width of the center of the column, binarization threshold of the center) registered by the image processing parameter registration unit 22 based on the image of the H steel column extracted by the H steel column extraction unit 24. ), The gap 141 between the support column 110 and the panel 120 is measured.

隙間計測結果出力部27は、隙間計測結果出力処理を行う。具体的には、隙間計測部26により計測された隙間から掛かり量を算出し、算出した掛かり量から危険度を判定し、H鋼支柱単位に結果を出力する。例えば、掛かり量142は、(H鋼支柱幅W1−H鋼支柱中心部幅W2)÷2−隙間141により算出することができる(図2参照)。 The gap measurement result output unit 27 performs gap measurement result output processing. Specifically, the amount of hooking is calculated from the gap measured by the gap measuring unit 26, the degree of danger is determined from the calculated amount of hooking, and the result is output in units of H steel columns. For example, the hooking amount 142 can be calculated by (H steel column width W1-H steel column center width W2) ÷ 2-gap 141 (see FIG. 2).

危険度判定部28は、危険度判定処理を行う。具体的には、隙間計測部26により計測された隙間(掛かり量)をもとに危険度(工事優先度)を判定する。 The risk level determination unit 28 performs a risk level determination process. Specifically, the degree of danger (construction priority) is determined based on the gap (hanging amount) measured by the gap measuring unit 26.

隙間計測台帳出力部29は、隙間計測台帳出力処理を行う。具体的には、隙間計測結果出力部27および危険度判定部28により出力された結果を用いて、防音壁パネル単位(左右端部の支柱)の隙間、掛かり量、危険度などを台帳として帳票出力する。 The gap measurement ledger output unit 29 performs the gap measurement ledger output process. Specifically, using the results output by the gap measurement result output unit 27 and the risk level determination unit 28, a form is used as a ledger for the gap, the amount of hooking, the degree of risk, etc. of the soundproof wall panel unit (posts at the left and right ends). Output.

[点検作業支援装置の動作]
図17は、第2の実施の形態に係る点検作業支援装置20の動作を示すフローチャートである。ここでは、H鋼支柱抽出部24、隙間計測部26、隙間計測結果出力部27の動作について説明する。
[Operation of inspection work support device]
FIG. 17 is a flowchart showing the operation of the inspection work support device 20 according to the second embodiment. Here, the operations of the H-steel column extraction unit 24, the gap measurement unit 26, and the gap measurement result output unit 27 will be described.

まず、動画→静止画変換を行い、RGB→グレースケール変換を行い、グレースケールの画像に二値化処理を行う(ステップS41→S42→S43)。二値化処理は、H鋼支柱、コンクリートパネル、隙間などの区別を容易にするための処理である。 First, moving image → still image conversion is performed, RGB → gray scale conversion is performed, and a gray scale image is binarized (step S41 → S42 → S43). The binarization process is a process for facilitating the distinction between H-steel columns, concrete panels, gaps, and the like.

次いで、H鋼支柱テンプレートマッチングを行う(ステップS44)。H鋼支柱テンプレートマッチングとは、H鋼支柱テンプレート画像を用いて画像マッチングを行うことである。具体例については後に詳しく説明する。 Next, H-steel column template matching is performed (step S44). H-steel column template matching is to perform image matching using the H-steel column template image. Specific examples will be described in detail later.

次いで、H鋼支柱テンプレートマッチングの結果、検出スコアが閾値より大きい場合は、抽出H鋼支柱の判定を行う(ステップS45→S46)。ステップS46の抽出H鋼支柱の判定では、以下の処理(1)(2)を行うのが望ましい。 Next, if the detection score is larger than the threshold value as a result of the H steel column template matching, the extracted H steel column is determined (step S45 → S46). In the determination of the extracted H steel column in step S46, it is desirable to perform the following processes (1) and (2).

(1)支柱間隔(1.5m、2m、2.5m、3m)を考慮した支柱抽出
抽出した支柱フレーム番号からキロ程を算出し、設置している防音壁100のパネル幅(支柱110の間隔)より、次に出現する支柱110のフレーム位置を推定する。また、抽出した支柱110のキロ程と1つ前のキロ程の差を算出し、その差に基づいて抽出間違い(3mを超えた場合、1m未満など)を除外する。
(1) Extraction of columns in consideration of the interval between columns (1.5m, 2m, 2.5m, 3m) The panel width of the installed soundproof wall 100 (interval between columns 110) is calculated from the extracted column frame numbers. ), The frame position of the support column 110 that appears next is estimated. In addition, the difference between the kilometer of the extracted support column 110 and the kilometer immediately before is calculated, and extraction errors (when exceeding 3 m, less than 1 m, etc.) are excluded based on the difference.

(2)支柱位置高さの考慮
支柱位置高さはカントの影響によりある程度変化するが、ほぼ一定である。そこで、抽出した支柱位置高さはほぼ一定であることを考慮して抽出間違いを除去する。
(2) Consideration of strut position height The strut position height changes to some extent due to the influence of Kant, but it is almost constant. Therefore, taking into consideration that the height of the extracted column positions is almost constant, the extraction error is eliminated.

次いで、ステップS46の抽出H鋼支柱の判定条件を満たす場合は、抽出H鋼支柱の画像を出力し、その支柱中心部の中央位置を指定し、二値化閾値に基づいて二値化処理を行い、その画像の支柱中心部幅が所定の支柱中心部幅と同じであるかどうかを判定する(ステップS47→S48→S49→S50)。ここで、ステップS46における判定条件は、(1)支柱間隔が1.5m、2.0m、2.5m、3mに合致していることと、(2)抽出したH鋼支柱位置が左端部・中間部・右端部の一連のセットで、画像上高さの数値で極端な変化がないことである。すなわち、(1)1m以下や4m以上の支柱間隔の場合や、(2)抽出したH鋼支柱位置が左端部・中間部・右端部の一連のセットで、画像上高さの数値で極端な変化がある場合は、ステップS46においてNOと判定する。また、画像の支柱中心部幅が所定の支柱中心部幅と同じでない場合は、上下に二値化閾値をずらし再検索する(ステップS50→S51)。 Next, when the determination condition of the extracted H steel column in step S46 is satisfied, an image of the extracted H steel column is output, the central position of the center of the column is specified, and the binarization process is performed based on the binarization threshold value. Then, it is determined whether or not the width of the center of the column of the image is the same as the width of the center of the column (step S47 → S48 → S49 → S50). Here, the determination conditions in step S46 are (1) that the column spacings match 1.5 m, 2.0 m, 2.5 m, and 3 m, and (2) the extracted H-steel column position is at the left end. It is a series of sets of the middle part and the right end part, and there is no extreme change in the numerical value of the height on the image. That is, (1) in the case of a column spacing of 1 m or less or 4 m or more, or (2) the extracted H-steel column position is a series of sets of the left end part, the middle part, and the right end part, and the numerical value of the height on the image is extreme. If there is a change, it is determined as NO in step S46. If the width of the center of the column in the image is not the same as the width of the center of the column, the binarization threshold is shifted up and down and the search is performed again (step S50 → S51).

具体的には、支柱端部の中心部の幅のpixelを規定値とし、水平方向に1pixel幅で1ライン取得し、明るさの最大最小の中央値で二値化を行い、規定値のpixel数に近い輝度のピークが見つかったときはその位置を支柱の中心部とし、ピークが見つからなかったときは二値化閾値を上下にずらし、再度二値化処理を行う。これにより、光の影響などで支柱中心部幅が二値化処理をしたときに細くなったり太くなったりしている場合は、その影響を避けることができる。 Specifically, the value of the width of the center of the end of the column is set as the specified value, one line is acquired with the width of 1 pixel in the horizontal direction, and the binarization is performed at the median value of the maximum and minimum brightness. When a peak with brightness close to the number is found, that position is set as the center of the column, and when no peak is found, the binarization threshold is shifted up and down, and the binarization process is performed again. As a result, if the width of the center of the column becomes thinner or thicker when binarized due to the influence of light or the like, the influence can be avoided.

一方、所定の支柱中心部幅と同じである場合は、コンクリートパネル、隙間、支柱、隙間、コンクリートパネルのそれぞれを輝度値より区別する(ステップS50→S52)。具体的には、支柱端部の中心部を抽出し、抽出した中心部の位置からその両側に広がる輝度の低い部分を検索し、輝度が上がったところがパネル120と認識し、支柱端部からパネル120までを隙間とする。これにより、支柱110がH鋼支柱である場合に、H鋼支柱、パネル120、隙間141を正確に区別することができる。 On the other hand, when the width is the same as the predetermined width of the center of the column, each of the concrete panel, the gap, the column, the gap, and the concrete panel is distinguished from the brightness value (step S50 → S52). Specifically, the central part of the column end is extracted, the low-brightness part that spreads on both sides of the extracted central part is searched, and the part where the brightness is increased is recognized as the panel 120, and the panel is displayed from the column end. The gap is up to 120. Thereby, when the support column 110 is an H steel support column, the H steel support column, the panel 120, and the gap 141 can be accurately distinguished.

次いで、その区別位置から隙間を計測する(ステップS53)。このとき、画像の解像度を設定してピクセルから実寸を求める。さらに、H鋼支柱幅をもとに隙間から掛かり量を算出し、抽出支柱の隙間計測結果を出力する(ステップS54→S55)。 Next, the gap is measured from the distinction position (step S53). At this time, the resolution of the image is set and the actual size is obtained from the pixels. Further, the amount of hooking is calculated from the gap based on the width of the H steel column, and the gap measurement result of the extraction column is output (step S54 → S55).

次のフレームへ移り、同様の処理を繰り返す(ステップS56→S41→・・・)。最終フレームに達した場合は、次工程へ移る(ステップS57)。 The frame is moved to the next frame, and the same processing is repeated (step S56 → S41 → ...). When the final frame is reached, the process proceeds to the next step (step S57).

図18は、第2の実施の形態に係る点検作業支援装置20の動作を示すフローチャートである。ここでは、危険度判定部28、隙間計測台帳出力部29の動作について説明する。 FIG. 18 is a flowchart showing the operation of the inspection work support device 20 according to the second embodiment. Here, the operation of the risk level determination unit 28 and the gap measurement ledger output unit 29 will be described.

まず、抽出支柱隙間計測結果をもとに、防音壁パネルの左右端部支柱(起点方支柱と終点方支柱)を特定する(ステップS61→S62)。具体的には、テンプレートマッチング時の適用テンプレート(端部(左・右)、中間部)の情報と支柱数を加味し、起点方支柱と終点方支柱の組(左端部−中間部、中間部−中間部、中間部−右端部)を決定する。 First, the left and right end columns (starting point column and ending point column) of the soundproof wall panel are specified based on the extraction column clearance measurement result (step S61 → S62). Specifically, taking into account the information of the application template (end (left / right), middle part) at the time of template matching and the number of struts, the set of start point struts and end struts (left end-middle part, middle part) -Middle part, middle part-right end part) is decided.

次いで、危険度判定を行い、台帳出力する(ステップS63→S64)。危険度判定では、左右端部支柱の掛かり量、隙間の数値、及びパネル位置(端部から何番目のパネルか)に従って、複数段階の危険度(工事優先度)を判定する。例えば、5段階の危険度、及び問題なし(工事対象外)を判定するようにしてもよい。 Next, the degree of danger is determined and the ledger is output (step S63 → S64). In the risk level determination, a plurality of levels of risk level (construction priority) are determined according to the amount of hooking of the left and right end columns, the numerical value of the gap, and the panel position (the number of the panel from the end). For example, it may be determined that there are five levels of risk and no problem (not subject to construction).

以降は、最終パネルまで同様の処理を繰り返す(ステップS65→S66→S61)。 After that, the same process is repeated until the final panel (step S65 → S66 → S61).

[H鋼支柱抽出処理]
図19は、第2の実施の形態に係るH鋼支柱抽出処理の説明図である。図19(a)は、左端部テンプレート画像31と、中間部テンプレート画像32と、右端部テンプレート画像33の一例を示している。図19(b)は、これらテンプレート画像31〜33を用いてH鋼支柱テンプレートマッチングを行う様子を示している。
[H steel column extraction process]
FIG. 19 is an explanatory diagram of the H-steel column extraction process according to the second embodiment. FIG. 19A shows an example of the left end template image 31, the middle template image 32, and the right end template image 33. FIG. 19B shows how H-steel column template matching is performed using these template images 31 to 33.

防音壁100の支柱110は、左端部→中間部→右端部(或いは、その逆)の順に構成されている。そのため、左端部の次は中間部(稀に右端部)、中間部の次は中間部又は右端部、右端部の次は少し間を空けて左端部の支柱という順である。そのことを考慮し、テンプレート画像31〜33のうち、適用テンプレートを適時選択する。 The support column 110 of the soundproof wall 100 is configured in the order of left end portion → middle portion → right end portion (or vice versa). Therefore, the left end is followed by the middle part (rarely the right end), the middle part is followed by the middle or right end, and the right end is followed by the left end support with a short interval. In consideration of this, the applicable template is selected from the template images 31 to 33 in a timely manner.

例えば、図19(b)に示すように、初めは、左端部テンプレート画像31が選択され、左端部テンプレート画像31によりH鋼支柱の画像41が抽出されている。次は、中間部テンプレート画像32又は右端部テンプレート画像33が選択され、中間部テンプレート画像32によりH鋼支柱の画像42,43,44が順次抽出されている。次の画像45は、抽出高さが所定範囲内にないため、抽出間違いとして除外されている。次は、中間部テンプレート画像32又は右端部テンプレート画像33が選択され、中間部テンプレート画像32によりH鋼支柱の画像46が抽出されている。最後は、中間部テンプレート画像32又は右端部テンプレート画像33が選択され、右端部テンプレート画像33によりH鋼支柱の画像47が抽出されている。 For example, as shown in FIG. 19B, the left end template image 31 is initially selected, and the left end template image 31 extracts the image 41 of the H steel column. Next, the intermediate portion template image 32 or the right end portion template image 33 is selected, and the images 42, 43, 44 of the H steel column are sequentially extracted by the intermediate portion template image 32. The next image 45 is excluded as an extraction error because the extraction height is not within the predetermined range. Next, the intermediate portion template image 32 or the right end portion template image 33 is selected, and the image 46 of the H steel column is extracted by the intermediate portion template image 32. Finally, the intermediate portion template image 32 or the right end portion template image 33 is selected, and the image 47 of the H steel column is extracted by the right end portion template image 33.

[隙間計測処理]
図20は、第2の実施の形態に係る隙間計測処理の説明図である。以下、図20を用いて、隙間計測処理を更に詳しく説明する。
[Gap measurement processing]
FIG. 20 is an explanatory diagram of the gap measurement process according to the second embodiment. Hereinafter, the gap measurement process will be described in more detail with reference to FIG.

この図に示すように、支柱端部の中心部を抽出し、その位置からその両側に広がる輝度の低い部分を検索することとした。すなわち、まず支柱端部の中心部の幅のpixelを計測し、規定値とする。水平方向に1pixel幅で1ライン取得し、明るさの最大最小の中央値で二値化を行い、規定値のpixel数に近い輝度のピークがあれば、そこを支柱の中心部とする。規定の幅でピークが見つからなかったときは二値化閾値を中央値から上下にずらし、再度二値化処理を行う。支柱の中心部が抽出できたら、その両側に輝度の低い部分を計測し、輝度が上がったところをコンクリートパネルと認識し、そのコンクリートパネルまでを隙間としてpixel数を計測する。 As shown in this figure, it was decided to extract the central part of the end of the column and search for the low-brightness part spreading on both sides from that position. That is, first, the pixel of the width of the center of the end of the column is measured and set as a specified value. One line is acquired with a width of 1 pixel in the horizontal direction, binarization is performed at the median of the maximum and minimum brightness, and if there is a peak of brightness close to the specified number of pixels, that is used as the center of the column. If no peak is found within the specified width, the binarization threshold is shifted up and down from the median, and the binarization process is performed again. When the central part of the column can be extracted, the parts with low brightness are measured on both sides, the part where the brightness is increased is recognized as a concrete panel, and the number of pixels is measured with the concrete panel as a gap.

[まとめ]
以上のように、第2の実施の形態に係る点検作業支援装置20は、防音壁100の点検作業を支援する装置であって、上下線の防音壁100を同時に撮影した動画像を登録する撮影動画像登録部21と、撮影動画像登録部21により登録された動画像から防音壁100の支柱110の画像を抽出するH鋼支柱抽出部24と、H鋼支柱抽出部24により抽出された支柱110の画像をもとに防音壁100の支柱110とパネル120の隙間141を計測する隙間計測部26とを備える。これにより、動画像を用いて防音壁100の支柱110とパネル120の隙間141を正確に計測することができるため、防音壁100の点検作業を効率よく行うことが可能となる。
[summary]
As described above, the inspection work support device 20 according to the second embodiment is a device that supports the inspection work of the soundproof wall 100, and is a photographing device for registering a moving image obtained by simultaneously photographing the soundproof wall 100 of the upper and lower lines. The moving image registration unit 21, the H steel support column extraction unit 24 that extracts the image of the support column 110 of the soundproof wall 100 from the moving image registered by the shooting moving image registration unit 21, and the support column extracted by the H steel support column extraction unit 24. Based on the image of 110, the support column 110 of the soundproof wall 100 and the gap measuring unit 26 for measuring the gap 141 of the panel 120 are provided. As a result, the gap 141 between the support column 110 of the soundproof wall 100 and the panel 120 can be accurately measured using the moving image, so that the inspection work of the soundproof wall 100 can be efficiently performed.

なお、動画像には距離標情報が紐付けられていることが望ましい。動画像に距離標情報を紐付ける方法は、第1の実施の形態で説明した距離標情報管理方法でもよいし、それ以外の方法でもよい。 It is desirable that the distance marker information is associated with the moving image. The method of associating the distance marker information with the moving image may be the distance marker information management method described in the first embodiment, or may be another method.

また、隙間計測部26は、支柱端部の中心部を抽出し、抽出した中心部の位置からその両側に広がる輝度の低い部分を検索し、輝度が上がったところがパネル120と認識し、支柱端部からパネル120までを隙間としてもよい。これにより、支柱110がH鋼支柱である場合に、H鋼支柱、パネル120、隙間141を正確に区別することができる。 Further, the gap measuring unit 26 extracts the central portion of the column end, searches for low-brightness portions spreading on both sides of the extracted central portion, recognizes the increased brightness as the panel 120, and recognizes the column end. The gap from the portion to the panel 120 may be used as a gap. Thereby, when the support column 110 is an H steel support column, the H steel support column, the panel 120, and the gap 141 can be accurately distinguished.

また、隙間計測部26は、支柱端部の中心部の幅のpixelを規定値とし、水平方向に1pixel幅で1ライン取得し、明るさの最大最小の中央値で二値化を行い、規定値のpixel数に近い輝度のピークが見つかったときはその位置を支柱の中心部とし、ピークが見つからなかったときは二値化閾値を中央値から上下にずらしてもよい。これにより、光の影響などで支柱中心部幅が二値化処理をしたときに細くなったり太くなったりしている場合でも、その影響を受けにくい効果がある。 Further, the gap measuring unit 26 sets the pixel of the width of the central portion of the column end as a specified value, acquires one line with a width of 1 pixel in the horizontal direction, binarizes it at the median of the maximum and minimum brightness, and defines it. When a peak of brightness close to the number of peaks of the value is found, that position may be set as the center of the column, and when no peak is found, the binarization threshold value may be shifted up or down from the median. As a result, even if the width of the center of the column is thinned or thickened by the binarization process due to the influence of light or the like, there is an effect that the influence is less likely to be affected.

また、H鋼支柱抽出部24は、左端部、中間部、右端部の支柱のテンプレート画像31〜33を持ち、左端部、中間部、右端部の順、又は右端部、中間部、左端部の順にテンプレートマッチングを行ってもよい。これにより、防音壁100の構成に応じて適用テンプレートを適時選択することができる。 Further, the H-steel column extraction unit 24 has template images 31 to 33 of the columns at the left end portion, the intermediate portion, and the right end portion, and the left end portion, the intermediate portion, and the right end portion are in this order, or the right end portion, the intermediate portion, and the left end portion. Template matching may be performed in order. Thereby, the application template can be selected in a timely manner according to the configuration of the soundproof wall 100.

さらに、隙間計測部26により計測された隙間141から掛かり量を算出し、算出した掛かり量をもとに危険度を判定する危険度判定部28を備えてもよい。これにより、危険度をもとに工事の時期や必要性などを容易に判定することができる。 Further, a risk level determination unit 28 may be provided, which calculates the amount of hooking from the gap 141 measured by the gap measuring unit 26 and determines the degree of danger based on the calculated amount of hooking. This makes it possible to easily determine the timing and necessity of construction based on the degree of danger.

なお、本発明は、点検作業支援装置20として実現することができるだけでなく、点検作業支援装置20が備える特徴的な処理部をステップとする隙間計測方法として実現したり、点検作業支援装置20としてコンピュータを機能させるためのプログラムとして実現したりすることもできる。そして、そのようなプログラムは、CD−ROM等の記録媒体やインターネット等の伝送媒体を介して配信することができるのは言うまでもない。 The present invention can be realized not only as an inspection work support device 20, but also as a gap measurement method using a characteristic processing unit provided in the inspection work support device 20 as a step, or as an inspection work support device 20. It can also be realized as a program for operating a computer. Needless to say, such a program can be distributed via a recording medium such as a CD-ROM or a transmission medium such as the Internet.

また、上記の説明では、線路内設備として半雪覆型の防音壁100を例示したが、線路内設備は防音壁100に限定されるものではない。例えば、トンネル内など、防音壁100のないところでも、そのトンネル(線路内設備)内にキロ程銘板が設置されていれば、本発明を適用することが可能である。 Further, in the above description, the semi-snow-covered soundproof wall 100 is exemplified as the equipment inside the track, but the equipment inside the track is not limited to the soundproof wall 100. For example, the present invention can be applied even in a place where there is no soundproof wall 100, such as in a tunnel, as long as a kilometer name plate is installed in the tunnel (equipment in the track).

さらに、上記の説明では、設備の一例として線路内設備を挙げたが、本発明の適用範囲は線路内に限定されるものではない。例えば、高速道路や河川などにも距離標識(設備)が設置されていれば、本発明を適用することが可能である。 Further, in the above description, the in-line equipment is mentioned as an example of the equipment, but the scope of application of the present invention is not limited to the in-line equipment. For example, the present invention can be applied if a distance marker (equipment) is installed on a highway or a river.

≪その他の実施の形態≫
上記のように、いくつかの実施の形態を記載したが、開示の一部をなす論述および図面は例示的なものであり、各実施の形態を限定するものであると理解すべきではない。この開示から当業者には様々な代替実施の形態、実施例および運用技術が明らかとなろう。
<< Other embodiments >>
As mentioned above, some embodiments have been described, but the statements and drawings that form part of the disclosure are exemplary and should not be understood as limiting each embodiment. This disclosure will reveal to those skilled in the art various alternative embodiments, examples and operational techniques.

このように、各実施の形態は、ここでは記載していない様々な態様を含む。 As such, each embodiment includes various aspects not described herein.

10…点検作業支援装置
11…撮影動画像登録部
12…画像処理パラメータ登録部
13…キロ程銘板抽出部
14…キロ程銘板補正部
15…キロ程文字認識部
16…記録部
17…キロ程誤り訂正部
18…上り線下り線整合部
18−1…上り線下り線突合判定部
18−2…下り線キロ程補間調整部
19…動画像キロ程情報DB部
20…点検作業支援装置
21…撮影動画像登録部
22…画像処理パラメータ登録部
23…動画像キロ程情報DB部
24…H鋼支柱抽出部
25…記録部
26…隙間計測部
27…隙間計測結果出力部
28…危険度判定部
29…隙間計測台帳出力部
100…防音壁(線路内設備)
110…H鋼支柱(支柱)
120…防音壁パネル(パネル)
141…隙間
150…キロ程銘板(距離標銘板)
150A…上り線側キロ程銘板
150B…下り線側キロ程銘板
200A…上り線線路
200B…下り線線路
300…保守用車
310…防音壁撮影装置
10 ... Inspection work support device 11 ... Shooting video image registration unit 12 ... Image processing parameter registration unit 13 ... Kilo name plate extraction unit 14 ... Kilo name plate correction unit 15 ... Kilo character recognition unit 16 ... Recording unit 17 ... Kilo error Correction unit 18 ... Upline downline matching unit 18-1 ... Upline downline collation determination unit 18-2 ... Downline kilometer interpolation adjustment unit 19 ... Moving image kilometer information DB unit 20 ... Inspection work support device 21 ... Shooting Video registration unit 22 ... Image processing parameter registration unit 23 ... Video processing kilometer information DB unit 24 ... H steel column extraction unit 25 ... Recording unit 26 ... Gap measurement unit 27 ... Gap measurement result output unit 28 ... Danger level determination unit 29 … Gap measurement ledger output unit 100… Soundproof wall (equipment in the line)
110 ... H steel support (support)
120 ... Soundproof wall panel (panel)
141 ... Gap 150 ... Kilometer name plate (distance marker plate)
150A ... Up line side kilometer name plate 150B ... Down line side kilometer name plate 200A ... Up line line 200B ... Down line line 300 ... Maintenance car 310 ... Soundproof wall photographing device

Claims (7)

複数のH鋼支柱の間に嵌められたパネルを備える設備の点検作業を支援する点検作業支援装置であって、
上下線の設備を同時に撮影した動画像を登録する撮影動画像登録部と、
前記撮影動画像登録部により登録された動画像から前記H鋼支柱の画像を抽出する支柱抽出部と、
前記支柱抽出部により抽出された前記H鋼支柱の画像をもとに、前記H鋼支柱と前記パネルとの間の隙間を計測する隙間計測部と
を備え、
前記隙間計測部は、前記H鋼支柱の支柱端部の中心部を抽出し、抽出した中心部の位置からその両側に広がる輝度の低い部分を検索し、輝度が上がったところが前記パネルと認識し、前記支柱端部から前記パネルまでを前記隙間とする
ことを特徴とする点検作業支援装置。
It is an inspection work support device that supports the inspection work of equipment equipped with panels fitted between multiple H-steel columns.
A shooting moving image registration unit that registers moving images taken at the same time with the equipment of the upper and lower lines,
A column extraction unit that extracts an image of the H-steel column from a moving image registered by the photographed moving image registration unit, and a column extraction unit.
Based on the image of the H-steel column extracted by the column extraction unit, a gap measuring unit for measuring the gap between the H-steel column and the panel is provided.
The gap measuring unit extracts the central portion of the column end portion of the H-steel column, searches for low-luminance portions spreading on both sides of the extracted central portion, and recognizes the increased brightness as the panel. , An inspection work support device characterized in that the gap from the end of the support column to the panel is the gap.
前記隙間計測部は、前記支柱端部の中心部の幅のpixelを規定値とし、水平方向に1pixel幅で1ライン取得し、明るさの最大最小の中央値で二値化を行い、前記規定値のpixel数に近い輝度のピークが見つかったときはその位置を前記H鋼支柱の中心部とし、前記ピークが見つからなかったときは二値化閾値を上下にずらすことを特徴とする請求項に記載の点検作業支援装置。 The gap measuring unit takes a pinxel of the width of the center of the end of the column as a specified value, acquires one line with a width of 1 pinxel in the horizontal direction, binarizes it at the center value of the maximum and minimum brightness, and performs the above-mentioned specified value. claim when luminance peak close to pixel number value is found that position the center portion of the H steel struts, when the peak is not found, characterized in that shifting the binarization threshold vertically 1 Inspection work support device described in. 前記支柱抽出部は、左端部、中間部、右端部の前記H鋼支柱のテンプレート画像を持ち、左端部、中間部、右端部の順、又は右端部、中間部、左端部の順にテンプレートマッチングを行う請求項1からのいずれか1項に記載の点検作業支援装置。 The support column extraction unit has a template image of the H-steel column at the left end portion, the middle portion, and the right end portion, and template matching is performed in the order of the left end portion, the middle portion, and the right end portion, or in the order of the right end portion, the middle portion, and the left end portion. The inspection work support device according to any one of claims 1 to 2. さらに、前記隙間計測部により計測された隙間から(数式1)を用いて掛かり量を算出し、
掛かり量=(H鋼支柱幅−H鋼支柱中心部幅)÷2−隙間 (数式1)
前記算出した掛かり量をもとに危険度を判定する危険度判定部を備えたことを特徴とする請求項1からのいずれか1項に記載の点検作業支援装置。
Further, the amount of hooking is calculated from the gap measured by the gap measuring unit using (Formula 1).
Amount of engagement = (width of H steel column-width of center of H steel column) ÷ 2-gap (Formula 1)
Inspection support apparatus according to any one of claims 1 to 3, further comprising a risk determination unit for determining the risk based on the consuming amount the calculated.
前記設備は、半雪覆型の防音壁であることを特徴とする請求項1からのいずれか1項に記載の点検作業支援装置。 The inspection work support device according to any one of claims 1 to 4 , wherein the equipment is a semi-snow-covered soundproof wall. 複数のH鋼支柱の間に嵌められたパネルを備える設備の点検作業を支援する点検作業支援装置が前記H鋼支柱とパネルの間の隙間を計測する隙間計測方法であって、
上下線の設備を同時に撮影した動画像を登録する撮影動画像登録ステップと、
前記撮影動画像登録ステップで登録された動画像から前記H鋼支柱の画像を抽出する支柱抽出ステップと、
前記支柱抽出ステップで抽出された前記H鋼支柱の画像をもとに、前記H鋼支柱と前記パネルとの間の隙間を計測する隙間計測ステップと
を含み、
前記隙間計測ステップは、前記H鋼支柱の支柱端部の中心部を抽出し、抽出した中心部の位置からその両側に広がる輝度の低い部分を検索し、輝度が上がったところが前記パネルと認識し、前記支柱端部から前記パネルまでを前記隙間とする
ことを特徴とする隙間計測方法。
An inspection work support device that supports inspection work of equipment provided with a panel fitted between a plurality of H-steel columns is a gap measurement method for measuring the gap between the H-steel columns and the panel.
The shooting moving image registration step to register the moving image of the equipment of the upper and lower lines taken at the same time,
A column extraction step for extracting an image of the H-steel column from a moving image registered in the photographed moving image registration step, and a column extraction step.
Based on the image of the H steel strut extracted by the post extraction step, seen including a gap measuring step of measuring the gap between the steel H strut and the panel,
In the gap measurement step, the central portion of the column end portion of the H-steel column is extracted, the low-luminance portion spreading on both sides of the extracted central portion is searched, and the portion where the brightness is increased is recognized as the panel. , A gap measuring method, characterized in that the gap is set from the end of the support column to the panel.
請求項1からのいずれか1項に記載した点検作業支援装置としてコンピュータを機能させるためのプログラム。 A program for operating a computer as an inspection work support device according to any one of claims 1 to 5.
JP2017174771A 2017-09-12 2017-09-12 Inspection work support device, gap measurement method, and program Active JP6971731B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017174771A JP6971731B2 (en) 2017-09-12 2017-09-12 Inspection work support device, gap measurement method, and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017174771A JP6971731B2 (en) 2017-09-12 2017-09-12 Inspection work support device, gap measurement method, and program

Publications (2)

Publication Number Publication Date
JP2019049511A JP2019049511A (en) 2019-03-28
JP6971731B2 true JP6971731B2 (en) 2021-11-24

Family

ID=65905541

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017174771A Active JP6971731B2 (en) 2017-09-12 2017-09-12 Inspection work support device, gap measurement method, and program

Country Status (1)

Country Link
JP (1) JP6971731B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7101151B2 (en) * 2019-08-20 2022-07-14 公益財団法人鉄道総合技術研究所 Rail clearance measurement method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5602324B1 (en) * 2014-04-01 2014-10-08 阪神高速技術株式会社 Road measurement system
JP6810586B2 (en) * 2015-12-18 2021-01-06 中日本高速道路株式会社 Soundproof panel and soundproof wall

Also Published As

Publication number Publication date
JP2019049511A (en) 2019-03-28

Similar Documents

Publication Publication Date Title
JP6998710B2 (en) Inspection work support device, distance marker information management method, and program
TWI393074B (en) Apparatus and method for moving object detection
JP5602324B1 (en) Road measurement system
JP6713368B2 (en) Information processing device, display device, information processing method, and program
JPWO2019111976A1 (en) Object detection device, prediction model creation device, object detection method and program
CN113011283B (en) A real-time measurement method for relative displacement of non-contact rail sleepers based on video
JP2000341582A5 (en)
CN112444311A (en) Method for monitoring space-time load of bridge vehicle
KR20160100788A (en) Apparatus and method for measuring speed of moving object
CN105548205A (en) Tunnel surface defect positioning method and positioning system
CN109801216A (en) The quick joining method of Tunnel testing image
JP2015105905A (en) Correction method of tunnel cover surface image used for time series management of deformation
JP2019095358A (en) Railroad vehicle image generator and rolling stock visual inspection system
JP2019045922A (en) Deformed place detecting device, deformed place detecting program and deformed place detecting method
CN114708179A (en) Wheel tread splicing method based on multi-linear array camera
JP6908445B2 (en) Maintenance management method for change detectors and railway equipment parts
JP2018017101A (en) Information processing apparatus, information processing method, and program
JP7103975B2 (en) Structure detection device, structure detection method and structure detection program
JP6971731B2 (en) Inspection work support device, gap measurement method, and program
CN114830180B (en) Camera automatic inspection system
CN113744196A (en) A real-time monitoring method and system for engineering construction
CN116847192A (en) An automatic focusing system and method suitable for road surface disease detection system
JP6931316B2 (en) Environmental change detection method around the orbit
CN119233105A (en) Unmanned aerial vehicle-based evidence obtaining image real-time splicing method and system
CN111899512A (en) Vehicle track extraction method and system combined with skyline observation and storage medium

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200807

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210624

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210706

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210827

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20211005

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211102

R150 Certificate of patent or registration of utility model

Ref document number: 6971731

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250