Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6987311B2 - Economic indicator forecasting device, production planning device, forecasting model generator and forecasting model generation method - Google Patents
[go: Go Back, main page]

JP6987311B2 - Economic indicator forecasting device, production planning device, forecasting model generator and forecasting model generation method - Google Patents

Economic indicator forecasting device, production planning device, forecasting model generator and forecasting model generation method Download PDF

Info

Publication number
JP6987311B2
JP6987311B2 JP2021530126A JP2021530126A JP6987311B2 JP 6987311 B2 JP6987311 B2 JP 6987311B2 JP 2021530126 A JP2021530126 A JP 2021530126A JP 2021530126 A JP2021530126 A JP 2021530126A JP 6987311 B2 JP6987311 B2 JP 6987311B2
Authority
JP
Japan
Prior art keywords
history
economic indicator
information
target
information indicating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2021530126A
Other languages
Japanese (ja)
Other versions
JPWO2021059480A1 (en
Inventor
慧思 中川
諭 志賀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Mitsubishi Electric Building Solutions Corp
Original Assignee
Mitsubishi Electric Corp
Mitsubishi Electric Building Techno Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp, Mitsubishi Electric Building Techno Service Co Ltd filed Critical Mitsubishi Electric Corp
Publication of JPWO2021059480A1 publication Critical patent/JPWO2021059480A1/en
Application granted granted Critical
Publication of JP6987311B2 publication Critical patent/JP6987311B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N20/00Machine learning
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • G06Q10/06375Prediction of business process outcome or impact based on a proposed change

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Marketing (AREA)
  • Game Theory and Decision Science (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • Software Systems (AREA)
  • Educational Administration (AREA)
  • Artificial Intelligence (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Data Mining & Analysis (AREA)
  • Evolutionary Computation (AREA)
  • Medical Informatics (AREA)
  • Computing Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Mathematical Physics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、経済指標予測装置、生産計画装置、予測用モデル生成装置及び予測用モデル生成方法に関する。 The present invention relates to an economic indicator prediction device, a production planning device, a prediction model generation device, and a prediction model generation method.

従来、経済指標が公表されるよりも先に、この経済指標の予測値を知りたいというニーズがある。これに対して、複数個の携帯情報端末の位置を示す情報(以下「位置情報」という。)を用いて経済指標の予測値を算出する技術が開発されている(例えば、特許文献1参照。)。特許文献1記載の技術は、位置情報の入力を受け付けて経済指標の予測値を出力する数理モデルを用いるものである。予測用の数理モデルは、機械学習により生成されるものである。 Conventionally, there is a need to know the predicted value of this economic indicator before the economic indicator is published. On the other hand, a technique for calculating a predicted value of an economic index using information indicating the positions of a plurality of mobile information terminals (hereinafter referred to as "position information") has been developed (see, for example, Patent Document 1). ). The technique described in Patent Document 1 uses a mathematical model that accepts input of position information and outputs predicted values of economic indicators. Mathematical models for prediction are generated by machine learning.

特開2019−46376号公報Japanese Unexamined Patent Publication No. 2019-46376

以下、統計又は機械学習による数理モデルを単に「モデル」という。モデルを用いて経済指標の予測値を算出するにあたり、予測対象となる経済指標に対して高い相関を有する情報をモデルに対する入力に用いることにより、予測値の信頼度の向上を図ることができると考えられる。他方、予測対象となる経済指標に対して低い相関を有する情報をモデルに対する入力に用いることにより、予測値の信頼度が低下すると考えられる。 Hereinafter, a mathematical model by statistics or machine learning is simply referred to as a "model". When calculating the predicted value of an economic indicator using a model, it is possible to improve the reliability of the predicted value by using information that has a high correlation with the economic indicator to be predicted as input to the model. Conceivable. On the other hand, it is considered that the reliability of the predicted value is lowered by using the information having a low correlation with the economic indicator to be predicted as the input to the model.

ここで、位置情報は、個々の携帯情報端末の所持者の移動状態、すなわち多数の人間の移動状態に対応している。この点において、位置情報は、経済指標と相関するようにも思われる。しかしながら、通常、個々の携帯情報端末の所持者による移動の目的は様々である。位置情報には、かかる様々な目的による移動に対応する情報が混在している。このため、位置情報は、必ずしも特定の経済指標に対して高い相関を有しているとは限らない。特許文献1記載の技術においては、位置情報が予測対象となる経済指標に対して低い相関を有するものであるとき、予測値の信頼度が低いという問題があった。 Here, the location information corresponds to the moving state of the owner of each mobile information terminal, that is, the moving state of a large number of people. In this respect, location information also seems to correlate with economic indicators. However, the purpose of movement by the owner of each mobile information terminal is usually various. The location information is a mixture of information corresponding to movements for such various purposes. For this reason, location information does not always have a high correlation with a particular economic indicator. In the technique described in Patent Document 1, there is a problem that the reliability of the predicted value is low when the position information has a low correlation with the economic index to be predicted.

本発明は、上記のような課題を解決するためになされたものであり、モデルを用いて経済指標の予測値を算出するにあたり、予測値の信頼度の向上を図ることを目的とする。 The present invention has been made to solve the above-mentioned problems, and an object of the present invention is to improve the reliability of predicted values when calculating predicted values of economic indicators using a model.

本発明の経済指標予測装置は、対象昇降機の稼働状態を示す稼働情報を取得する稼働情報取得部と、稼働情報の入力を受け付けて対象経済指標の予測値を出力する予測用モデルを用いて、対象経済指標の予測をする経済指標予測部と、を備えるものである。 The economic indicator prediction device of the present invention uses an operation information acquisition unit that acquires operation information indicating the operation state of the target elevator and a prediction model that accepts input of operation information and outputs a predicted value of the target economic indicator. It is equipped with an economic indicator prediction unit that predicts target economic indicators.

本発明によれば、上記のように構成したので、モデルを用いて経済指標の予測値を算出するにあたり、予測値の信頼度の向上を図ることができる。 According to the present invention, since it is configured as described above, it is possible to improve the reliability of the predicted value when calculating the predicted value of the economic indicator using the model.

実施の形態1に係る経済指標予測装置の要部を示すブロック図である。It is a block diagram which shows the main part of the economic indicator prediction apparatus which concerns on Embodiment 1. 実施の形態1に係る予測用モデル生成装置の要部を示すブロック図である。It is a block diagram which shows the main part of the model generation apparatus for prediction which concerns on Embodiment 1. FIG. 実施の形態1に係る経済指標予測装置のハードウェア構成を示すブロック図である。It is a block diagram which shows the hardware composition of the economic indicator prediction apparatus which concerns on Embodiment 1. 実施の形態1に係る経済指標予測装置の他のハードウェア構成を示すブロック図である。It is a block diagram which shows the other hardware composition of the economic indicator predictor which concerns on Embodiment 1. FIG. 実施の形態1に係る予測用モデル生成装置のハードウェア構成を示すブロック図である。It is a block diagram which shows the hardware composition of the prediction model generation apparatus which concerns on Embodiment 1. FIG. 実施の形態1に係る予測用モデル生成装置の他のハードウェア構成を示すブロック図である。It is a block diagram which shows the other hardware configuration of the prediction model generation apparatus which concerns on Embodiment 1. FIG. 実施の形態1に係る経済指標予測装置の動作を示すフローチャートである。It is a flowchart which shows the operation of the economic indicator prediction apparatus which concerns on Embodiment 1. 実施の形態1に係る予測用モデル生成装置の動作を示すフローチャートである。It is a flowchart which shows the operation of the prediction model generation apparatus which concerns on Embodiment 1. FIG. トレンド抽出処理の実行前における第1時系列データの例を示す説明図である。It is explanatory drawing which shows the example of the 1st time series data before the execution of the trend extraction process. トレンド抽出処理の実行後における第1時系列データの例を示す説明図である。It is explanatory drawing which shows the example of the 1st time series data after execution of a trend extraction process. 第1時系列データと第2時系列データとの相互相関の例を示す説明図である。It is explanatory drawing which shows the example of the cross-correlation between the 1st time series data and the 2nd time series data. 実施の形態1に係る他の経済指標予測装置の要部を示すブロック図である。It is a block diagram which shows the main part of the other economic indicator prediction apparatus which concerns on Embodiment 1. FIG. 実施の形態1に係る他の予測用モデル生成装置の要部を示すブロック図である。It is a block diagram which shows the main part of another prediction model generation apparatus which concerns on Embodiment 1. FIG. 実施の形態1に係る他の経済指標予測装置の要部を示すブロック図である。It is a block diagram which shows the main part of the other economic indicator prediction apparatus which concerns on Embodiment 1. FIG. 実施の形態1に係る他の経済指標予測装置の要部を示すブロック図である。It is a block diagram which shows the main part of the other economic indicator prediction apparatus which concerns on Embodiment 1. FIG. 実施の形態2に係る経済指標予測装置の要部を示すブロック図である。It is a block diagram which shows the main part of the economic indicator prediction apparatus which concerns on Embodiment 2. 実施の形態2に係る予測用モデル生成装置の要部を示すブロック図である。It is a block diagram which shows the main part of the model generation apparatus for prediction which concerns on Embodiment 2. FIG. 実施の形態2に係る経済指標予測装置の動作を示すフローチャートである。It is a flowchart which shows the operation of the economic indicator prediction apparatus which concerns on Embodiment 2. 実施の形態2に係る予測用モデル生成装置の動作を示すフローチャートである。It is a flowchart which shows the operation of the prediction model generation apparatus which concerns on Embodiment 2. 実施の形態2に係る他の経済指標予測装置の要部を示すブロック図である。It is a block diagram which shows the main part of the other economic indicator prediction apparatus which concerns on Embodiment 2. FIG. 実施の形態2に係る他の予測用モデル生成装置の要部を示すブロック図である。It is a block diagram which shows the main part of another prediction model generation apparatus which concerns on Embodiment 2. FIG. 実施の形態2に係る他の経済指標予測装置の要部を示すブロック図である。It is a block diagram which shows the main part of the other economic indicator prediction apparatus which concerns on Embodiment 2. FIG. 実施の形態2に係る他の経済指標予測装置の要部を示すブロック図である。It is a block diagram which shows the main part of the other economic indicator prediction apparatus which concerns on Embodiment 2. FIG. 実施の形態3に係る生産計画装置の要部を示すブロック図である。It is a block diagram which shows the main part of the production planning apparatus which concerns on Embodiment 3. 実施の形態3に係る生産計画装置のハードウェア構成を示すブロック図である。It is a block diagram which shows the hardware composition of the production planning apparatus which concerns on Embodiment 3. 実施の形態3に係る生産計画装置の他のハードウェア構成を示すブロック図である。It is a block diagram which shows the other hardware configuration of the production planning apparatus which concerns on Embodiment 3. FIG. 実施の形態3に係る生産計画装置の動作を示すフローチャートである。It is a flowchart which shows the operation of the production planning apparatus which concerns on Embodiment 3. 実施の形態3に係る他の生産計画装置の要部を示すブロック図である。It is a block diagram which shows the main part of the other production planning apparatus which concerns on Embodiment 3.

以下、この発明をより詳細に説明するために、この発明を実施するための形態について、添付の図面に従って説明する。 Hereinafter, in order to explain the present invention in more detail, embodiments for carrying out the present invention will be described with reference to the accompanying drawings.

実施の形態1.
図1は、実施の形態1に係る経済指標予測装置の要部を示すブロック図である。図1を参照して、実施の形態1に係る経済指標予測装置について説明する。
Embodiment 1.
FIG. 1 is a block diagram showing a main part of the economic indicator prediction device according to the first embodiment. The economic indicator prediction device according to the first embodiment will be described with reference to FIG.

いま、1個の昇降機Eが1個の施設Fに設置されている。または、複数個の昇降機Eが1個の施設Fに設置されている。または、複数個の昇降機Eが複数個の施設Fに設置されている。個々の昇降機Eは、例えば、荷物用の昇降機又は人荷用の昇降機により構成されている。個々の施設Fは、例えば、オフィスビル、工場又は商業施設である。以下、1個の昇降機E、複数個の昇降機E、又は複数個の昇降機Eのうちの選択された1個以上の昇降機Eを総称して「対象昇降機」という。 Now, one elevator E is installed in one facility F. Alternatively, a plurality of elevators E are installed in one facility F. Alternatively, a plurality of elevators E are installed in a plurality of facilities F. Each elevator E is composed of, for example, an elevator for luggage or an elevator for human cargo. The individual facility F is, for example, an office building, a factory or a commercial facility. Hereinafter, one or more selected elevators E among one elevator E, a plurality of elevators E, or a plurality of elevators E are collectively referred to as "target elevators".

以下、経済指標予測装置100による予測対象となる経済指標を「対象経済指標」という。対象経済指標は、1個の指標I又は複数個の指標Iを含むものである。 Hereinafter, the economic indicator to be predicted by the economic indicator prediction device 100 is referred to as a “target economic indicator”. The target economic indicator includes one indicator I or a plurality of indicators I.

ここで、個々の指標Iは、公的機関(例えば官公庁又は中央銀行)により作成及び公表された指標又は指数を用いたものであっても良い。または、個々の指標Iは、民間企業(例えば経済指標予測装置100の製造者、経済指標予測装置100の使用者、経済指標予測装置100を用いた役務の提供者、又は経済指標予測装置100を用いた役務の利用者)により作成された指標又は指数を用いたものであっても良い。 Here, the individual index I may be an index or index prepared and published by a public institution (for example, a government office or a central bank). Alternatively, the individual indicator I may be a private company (for example, a manufacturer of the economic indicator predictor 100, a user of the economic indicator predictor 100, a service provider using the economic indicator predictor 100, or an economic indicator predictor 100). It may be an index or index created by the user of the service used).

また、個々の指標Iは、金利に関する指標(例えば政策金利)を用いたものであっても良い。または、個々の指標Iは、景気に関する指標(例えばGDP、景況感調査又は消費動向)を用いたものであっても良い。または、個々の指標Iは、雇用に関する指標(例えば雇用統計)を用いたものであっても良い。または、個々の指標Iは、物価に関する指標(例えば物価上昇率)を用いたものであっても良い。または、個々の指標Iは、貿易に関する指標(例えば貿易赤字)を用いたものであっても良い。 Further, the individual index I may use an index related to an interest rate (for example, a policy interest rate). Alternatively, the individual index I may use an index related to the economy (for example, GDP, business sentiment survey or consumption trend). Alternatively, the individual index I may use an index related to employment (for example, employment statistics). Alternatively, the individual index I may use an index related to prices (for example, the rate of price increase). Alternatively, the individual index I may use an index related to trade (for example, a trade deficit).

また、個々の指標Iは、いわゆる「先行指数」を用いたものであっても良い。または、個々の指標Iは、いわゆる「一致指数」を用いたものであっても良い。または、個々の指標Iは、いわゆる「遅行指数」を用いたものであっても良い。 Further, each index I may use a so-called "leading index". Alternatively, the individual index I may use a so-called “match index”. Alternatively, the individual index I may use a so-called “lagging index”.

また、個々の指標Iは、特定の地域に係る指標又は指数を用いたものであっても良い。 Further, the individual index I may be an index or an index related to a specific area.

また、個々の指標Iは、特定の業種に係る指標又は指数を用いたものであっても良い。 Further, the individual index I may be an index or an index related to a specific industry.

このように、個々の指標Iは、如何なる指標又は指数を用いたものであっても良い。 As described above, the individual index I may be any index or index.

図1に示す如く、経済指標予測装置100は、稼働情報取得部11、データ前処理部12、指標情報取得部13及び経済指標予測部14を有している。 As shown in FIG. 1, the economic indicator prediction device 100 has an operation information acquisition unit 11, a data preprocessing unit 12, an index information acquisition unit 13, and an economic indicator prediction unit 14.

稼働情報取得部11は、対象昇降機の稼働状態を示す情報(以下「稼働情報」という。)を取得するものである。稼働情報は、例えば、サーバ装置(不図示)から取得される。稼働情報取得部11は、当該取得された稼働情報をデータ前処理部12に出力するものである。 The operation information acquisition unit 11 acquires information indicating the operation state of the target elevator (hereinafter referred to as “operation information”). The operation information is acquired from, for example, a server device (not shown). The operation information acquisition unit 11 outputs the acquired operation information to the data preprocessing unit 12.

稼働情報は、例えば、時系列データD1により構成されている。時系列データD1は、直近の所定の期間(例えば1年)T1における所定の期間(例えば1か月)T2毎の対象昇降機の稼働状態を示すものである。具体的には、例えば、時系列データD1は、期間T2毎の個々の昇降機Eの稼働回数、走行距離、走行時間、積載重量又は搭乗者数を示すものである。 The operation information is composed of, for example, time-series data D1. The time-series data D1 indicates the operating state of the target elevator for each predetermined period (for example, one month) T2 in the latest predetermined period (for example, one year) T1. Specifically, for example, the time-series data D1 indicates the number of times the individual elevators E have been operated, the distance traveled, the travel time, the load weight, or the number of passengers for each period T2.

すなわち、時系列データD1は、複数個の値V1により構成されている。複数個の値V1の各々は、複数個の期間T2のうちの対応する1個の期間T2における対象昇降機の稼働状態を示すものである。具体的には、例えば、複数個の値V1の各々は、対応する1個の期間T2における個々の昇降機Eの稼働回数、走行距離、走行時間、積載重量又は搭乗者数を示すものである。 That is, the time series data D1 is composed of a plurality of values V1. Each of the plurality of values V1 indicates the operating state of the target elevator in the corresponding one period T2 of the plurality of period T2. Specifically, for example, each of the plurality of values V1 indicates the number of times the individual elevators E have been operated, the distance traveled, the travel time, the load weight, or the number of passengers in the corresponding period T2.

データ前処理部12は、稼働情報取得部11により出力された稼働情報を取得するものである。データ前処理部12は、当該取得された稼働情報に対する前処理を実行するものである。データ前処理部12は、かかる前処理が実行された稼働情報を経済指標予測部14に出力するものである。 The data pre-processing unit 12 acquires the operation information output by the operation information acquisition unit 11. The data pre-processing unit 12 executes pre-processing for the acquired operation information. The data pre-processing unit 12 outputs the operation information on which such pre-processing has been executed to the economic indicator prediction unit 14.

通常、稼働情報における時系列データD1は、季節変動を有している。データ前処理部12により実行される前処理は、時系列データD1における季節変動を除去する処理を含むものである。かかる処理が実行されることにより、いわゆる「トレンド」が抽出される。以下、かかる処理を「トレンド抽出処理」という。トレンドの抽出には、公知の種々の技術を用いることができる。これらの技術についての詳細な説明は省略する。 Normally, the time series data D1 in the operation information has seasonal fluctuations. The preprocessing executed by the data preprocessing unit 12 includes a process of removing seasonal fluctuations in the time series data D1. By executing such a process, a so-called "trend" is extracted. Hereinafter, such processing is referred to as "trend extraction processing". Various known techniques can be used for trend extraction. Detailed description of these techniques will be omitted.

ここで、季節変動における「季節」は、統計に係る技術分野における広義の「季節」を意味している。すなわち、季節変動は、いわゆる「四季」による変動を含み得るのはもちろんのこと、そのほかの種々の要因による変動を含み得るものである。例えば、季節変動は、月毎に日の総数が異なることによる変動、月毎に日曜日の個数か異なることによる変動、各月における連休(例えば年末休暇又は年始休暇)の有無による変動、及び各月における賞与の支給の有無による変動などを含み得るものである。 Here, "season" in seasonal fluctuation means "season" in a broad sense in the technical field related to statistics. That is, seasonal fluctuations can include not only fluctuations due to so-called "four seasons" but also fluctuations due to various other factors. For example, seasonal fluctuations are due to the fact that the total number of days is different for each month, the number of Sundays for each month is different, the fluctuations are due to the presence or absence of consecutive holidays (for example, year-end holidays or New Year holidays) in each month, and each month. It may include fluctuations due to the presence or absence of bonus payments in.

指標情報取得部13は、対象経済指標を示す情報(以下「指標情報」という。)を取得するものである。指標情報は、例えば、サーバ装置(不図示)から取得される。指標情報取得部13は、当該取得された指標情報を経済指標予測部14に出力するものである。指標情報は、個々の指標Iの最新の値V2を含むものである。 The index information acquisition unit 13 acquires information indicating the target economic index (hereinafter referred to as “index information”). The index information is acquired from, for example, a server device (not shown). The index information acquisition unit 13 outputs the acquired index information to the economic indicator prediction unit 14. The index information includes the latest value V2 of each index I.

経済指標予測部14は、データ前処理部12により出力された稼働情報を取得するとともに、指標情報取得部13により出力された指標情報を取得するものである。経済指標予測部14は、当該取得された稼働情報及び当該取得された指標情報を用いて、対象経済指標の予測値PV1を算出するものである。経済指標予測部14は、当該算出された予測値PV1を出力するものである。 The economic indicator prediction unit 14 acquires the operation information output by the data preprocessing unit 12, and also acquires the index information output by the index information acquisition unit 13. The economic indicator prediction unit 14 calculates the predicted value PV1 of the target economic indicator by using the acquired operation information and the acquired index information. The economic indicator prediction unit 14 outputs the calculated predicted value PV1.

すなわち、経済指標予測部14は、1個の指標Iの予測値PV1又は複数個の指標Iの各々の予測値PV1を算出するものである。予測値PV1は、個々の指標Iの最新の値V2に対する予測値である。換言すれば、予測値PV1は、将来に作成又は作成及び公表されるべき個々の指標Iの予測値である。予測値PV1の算出には、以下のようなモデル(以下「予測用モデル」という。)が用いられる。 That is, the economic indicator prediction unit 14 calculates the predicted value PV1 of one index I or the predicted value PV1 of each of the plurality of indexes I. The predicted value PV1 is a predicted value for the latest value V2 of each index I. In other words, the predicted value PV1 is a predicted value of each index I to be prepared, prepared and published in the future. The following model (hereinafter referred to as "prediction model") is used for calculating the predicted value PV1.

対象経済指標が1個の指標Iを含むものである場合、予測用モデルは、1個の指標Iに対応する1個のモデルMを含むものである。1個のモデルMは、稼働情報及び指標情報の入力を受け付けて、1個の指標Iの予測値PV1を出力するものである。他方、対象経済指標が複数個の指標Iを含むものである場合、予測用モデルは、複数個の指標Iに対応する複数個のモデルMを含むものである。複数個のモデルMの各々は、稼働情報及び指標情報の入力を受け付けて、複数個の指標Iのうちの対応する1個の指標Iの予測値PV1を出力するものである。予測用モデルの具体例については、図7〜図9を参照して後述する。 When the target economic indicator includes one indicator I, the forecasting model includes one model M corresponding to one indicator I. One model M accepts inputs of operation information and index information, and outputs a predicted value PV1 of one index I. On the other hand, when the target economic indicator includes a plurality of indicators I, the forecasting model includes a plurality of models M corresponding to the plurality of indicators I. Each of the plurality of models M accepts input of operation information and index information, and outputs a predicted value PV1 of one index I corresponding to the plurality of indexes I. Specific examples of the prediction model will be described later with reference to FIGS. 7 to 9.

以下、稼働情報取得部11により実行される処理を総称して「稼働情報取得処理」ということがある。また、データ前処理部12により実行される処理を総称して「データ前処理」ということがある。また、指標情報取得部13により実行される処理を総称して「指標情報取得処理」ということがある。また、経済指標予測部14により実行される処理を総称して「経済指標予測処理」ということがある。 Hereinafter, the processes executed by the operation information acquisition unit 11 may be collectively referred to as “operation information acquisition processing”. Further, the processes executed by the data pre-processing unit 12 may be collectively referred to as "data pre-processing". Further, the processes executed by the index information acquisition unit 13 may be collectively referred to as "index information acquisition process". In addition, the processing executed by the economic indicator prediction unit 14 may be collectively referred to as "economic indicator prediction processing".

図2は、実施の形態1に係る予測用モデル生成装置の要部を示すブロック図である。図2を参照して、実施の形態1に係る予測用モデル生成装置について説明する。 FIG. 2 is a block diagram showing a main part of the prediction model generation device according to the first embodiment. The prediction model generation device according to the first embodiment will be described with reference to FIG.

図2に示す如く、予測用モデル生成装置200は、履歴情報取得部21、データ前処理部22及び予測用モデル生成部23を有している。 As shown in FIG. 2, the prediction model generation device 200 has a history information acquisition unit 21, a data preprocessing unit 22, and a prediction model generation unit 23.

履歴情報取得部21は、対象昇降機の稼働状態の履歴を示す情報(以下「第1履歴情報」という。)を取得するとともに、対象経済指標の履歴を示す情報(以下「第2履歴情報」という。)を取得するものである。第1履歴情報及び第2履歴情報は、例えば、サーバ装置(不図示)から取得される。履歴情報取得部21は、当該取得された第1履歴情報をデータ前処理部22に出力するとともに、当該取得された第2履歴情報を予測用モデル生成部23に出力するものである。 The history information acquisition unit 21 acquires information indicating the history of the operating state of the target elevator (hereinafter referred to as “first history information”) and information indicating the history of the target economic indicator (hereinafter referred to as “second history information”). .) Is to be acquired. The first history information and the second history information are acquired from, for example, a server device (not shown). The history information acquisition unit 21 outputs the acquired first history information to the data preprocessing unit 22, and outputs the acquired second history information to the prediction model generation unit 23.

第1履歴情報は、例えば、時系列データ(以下「第1時系列データ」という。)d1により構成されている。第1時系列データd1は、直近の所定の期間(例えば5年)t1における所定の期間(例えば1か月)t2毎の対象昇降機の稼働状態を示すものである。具体的には、例えば、第1時系列データd1は、期間t2毎の個々の昇降機Eの稼働回数、走行距離、走行時間、積載重量又は搭乗者数を示すものである。すなわち、第1履歴情報における第1時系列データd1は、稼働情報における時系列データD1に対して、異なる期間における同様のデータである。 The first history information is composed of, for example, time-series data (hereinafter referred to as "first time-series data") d1. The first time-series data d1 indicates the operating state of the target elevator for each predetermined period (for example, one month) t2 in the latest predetermined period (for example, 5 years) t1. Specifically, for example, the first time-series data d1 indicates the number of operating times, the mileage, the traveling time, the load weight, or the number of passengers of each elevator E for each period t2. That is, the first time-series data d1 in the first history information is the same data in different periods with respect to the time-series data D1 in the operation information.

第1時系列データd1は、複数個の値v1により構成されている。複数個の値v1の各々は、複数個の期間t2のうちの対応する1個の期間t2における対象昇降機の稼働状態を示すものである。具体的には、例えば、複数個の値v1の各々は、対応する1個の期間t2における個々の昇降機Eの稼働回数、走行距離、走行時間、積載重量又は搭乗者数を示すものである。 The first time series data d1 is composed of a plurality of values v1. Each of the plurality of values v1 indicates the operating state of the target elevator in the corresponding one period t2 of the plurality of periods t2. Specifically, for example, each of the plurality of values v1 indicates the number of times the individual elevators E have been operated, the distance traveled, the travel time, the load weight, or the number of passengers in the corresponding period t2.

第2履歴情報は、例えば、時系列データ(以下「第2時系列データ」という。)d2により構成されている。第2時系列データd2は、直近の所定の期間(例えば5年)t3における対象経済指標の履歴を示すものである。すなわち、第2時系列データd2は、直近の期間t3における個々の指標Iの履歴を示すものである。 The second history information is composed of, for example, time-series data (hereinafter referred to as “second time-series data”) d2. The second time-series data d2 shows the history of the target economic indicators in the most recent predetermined period (for example, 5 years) t3. That is, the second time series data d2 shows the history of each index I in the latest period t3.

データ前処理部22は、履歴情報取得部21により出力された第1履歴情報を取得するものである。データ前処理部22は、当該取得された第1履歴情報に対する前処理を実行するものである。データ前処理部22は、かかる前処理が実行された第1履歴情報を予測用モデル生成部23に出力するものである。 The data pre-processing unit 22 acquires the first history information output by the history information acquisition unit 21. The data pre-processing unit 22 executes pre-processing on the acquired first history information. The data pre-processing unit 22 outputs the first history information in which the pre-processing is executed to the prediction model generation unit 23.

ここで、第1時系列データd1には、異常値が含まれていることがある。具体的には、例えば、地震等の天災に起因する異常値が含まれていることがある。そこで、データ前処理部22により実行される前処理は、第1時系列データd1に含まれる異常値を除去する処理(以下「異常値除去処理」という。)を含むものである。異常値の除去には、公知の種々の技術を用いることができる。これらの技術についての詳細な説明は省略する。 Here, the first time-series data d1 may include an abnormal value. Specifically, for example, an abnormal value caused by a natural disaster such as an earthquake may be included. Therefore, the pre-processing executed by the data pre-processing unit 22 includes a process of removing an abnormal value included in the first time-series data d1 (hereinafter referred to as "abnormal value removing process"). Various known techniques can be used to remove the outliers. Detailed description of these techniques will be omitted.

例えば、データ前処理部22は、期間t1又は期間t3における地震等の天災の発生時期を示す情報を取得する。データ前処理部22は、当該取得された情報を用いて、地震等の天災に起因する異常値を除去する。または、例えば、データ前処理部22は、第1時系列データd1に含まれる複数個の値v1に対する統計処理を実行することにより異常値を除去する。 For example, the data preprocessing unit 22 acquires information indicating the time of occurrence of a natural disaster such as an earthquake in the period t1 or the period t3. The data preprocessing unit 22 uses the acquired information to remove abnormal values caused by natural disasters such as earthquakes. Alternatively, for example, the data preprocessing unit 22 removes abnormal values by executing statistical processing on a plurality of values v1 included in the first time series data d1.

また、通常、第1時系列データd1は、時系列データD1における季節変動と同様の季節変動を含むものである。そこで、データ前処理部22により実行される前処理は、データ前処理部12により実行されるトレンド抽出処理と同様のトレンド抽出処理を含むものである。すなわち、データ前処理部22により実行される前処理は、第1時系列データd1における季節変動を除去する処理を含むものである。 Further, usually, the first time-series data d1 includes seasonal fluctuations similar to the seasonal fluctuations in the time-series data D1. Therefore, the preprocessing executed by the data preprocessing unit 22 includes the same trend extraction processing as the trend extraction processing executed by the data preprocessing unit 12. That is, the pre-processing executed by the data pre-processing unit 22 includes a process of removing seasonal fluctuations in the first time-series data d1.

予測用モデル生成部23は、データ前処理部22により出力された第1履歴情報を取得するとともに、履歴情報取得部21により取得された第2履歴情報を取得するものである。予測用モデル生成部23は、当該取得された第1履歴情報及び当該取得された第2履歴情報を用いて、予測用モデルを生成するものである。予測用モデル生成部23は、当該生成された予測用モデルを出力するものである。当該出力された予測用モデルは、経済指標予測装置100の経済指標予測部14に用いられる。 The prediction model generation unit 23 acquires the first history information output by the data preprocessing unit 22, and also acquires the second history information acquired by the history information acquisition unit 21. The prediction model generation unit 23 generates a prediction model by using the acquired first history information and the acquired second history information. The prediction model generation unit 23 outputs the generated prediction model. The output prediction model is used by the economic indicator prediction unit 14 of the economic indicator prediction device 100.

すなわち、予測用モデル生成部23は、1個の指標Iに対応する1個のモデルM又は複数個の指標Iに対応する複数個のモデルMを生成するものである。予測用モデルの具体例については、図7〜図9を参照して後述する。 That is, the prediction model generation unit 23 generates one model M corresponding to one index I or a plurality of models M corresponding to the plurality of indexes I. Specific examples of the prediction model will be described later with reference to FIGS. 7 to 9.

以下、履歴情報取得部21により実行される処理を総称して「履歴情報取得処理」ということがある。また、データ前処理部22により実行される処理を総称して「データ前処理」ということがある。また、予測用モデル生成部23により実行される処理を総称して「予測用モデル生成処理」ということがある。 Hereinafter, the processes executed by the history information acquisition unit 21 may be collectively referred to as “history information acquisition process”. Further, the processes executed by the data pre-processing unit 22 may be collectively referred to as "data pre-processing". Further, the processes executed by the prediction model generation unit 23 may be collectively referred to as "prediction model generation processing".

次に、図3を参照して、経済指標予測装置100の要部のハードウェア構成について説明する。 Next, with reference to FIG. 3, the hardware configuration of the main part of the economic indicator prediction device 100 will be described.

図3Aに示す如く、経済指標予測装置100は、プロセッサ31及びメモリ32を有している。メモリ32には、稼働情報取得部11、データ前処理部12、指標情報取得部13及び経済指標予測部14の機能を実現するためのプログラムが記憶されている。かかるプログラムをプロセッサ31が読み出して実行することにより、稼働情報取得部11、データ前処理部12、指標情報取得部13及び経済指標予測部14の機能が実現される。 As shown in FIG. 3A, the economic indicator prediction device 100 has a processor 31 and a memory 32. The memory 32 stores a program for realizing the functions of the operation information acquisition unit 11, the data preprocessing unit 12, the index information acquisition unit 13, and the economic indicator prediction unit 14. When the processor 31 reads out and executes such a program, the functions of the operation information acquisition unit 11, the data preprocessing unit 12, the index information acquisition unit 13, and the economic indicator prediction unit 14 are realized.

または、図3Bに示す如く、経済指標予測装置100は、処理回路33を有している。この場合、稼働情報取得部11、データ前処理部12、指標情報取得部13及び経済指標予測部14の機能は、専用の処理回路33により実現される。 Alternatively, as shown in FIG. 3B, the economic indicator prediction device 100 has a processing circuit 33. In this case, the functions of the operation information acquisition unit 11, the data preprocessing unit 12, the index information acquisition unit 13, and the economic indicator prediction unit 14 are realized by the dedicated processing circuit 33.

または、経済指標予測装置100は、プロセッサ31、メモリ32及び処理回路33を有している(不図示)。この場合、稼働情報取得部11、データ前処理部12、指標情報取得部13及び経済指標予測部14の機能のうちの一部の機能がプロセッサ31及びメモリ32により実現されるとともに、残余の機能が専用の処理回路33により実現される。 Alternatively, the economic indicator prediction device 100 includes a processor 31, a memory 32, and a processing circuit 33 (not shown). In this case, some of the functions of the operation information acquisition unit 11, the data preprocessing unit 12, the index information acquisition unit 13, and the economic indicator prediction unit 14 are realized by the processor 31 and the memory 32, and the remaining functions are realized. Is realized by a dedicated processing circuit 33.

プロセッサ31は、1個又は複数個のプロセッサにより構成されている。個々のプロセッサは、例えば、CPU(Central Processing Unit)、GPU(Graphics Processing Unit)、マイクロプロセッサ、マイクロコントローラ又はDSP(Digital Signal Processor)を用いたものである。 The processor 31 is composed of one or a plurality of processors. The individual processor uses, for example, a CPU (Central Processing Unit), a GPU (Graphics Processing Unit), a microprocessor, a microprocessor, or a DSP (Digital Signal Processor).

メモリ32は、1個又は複数個の不揮発性メモリにより構成されている。または、メモリ32は、1個又は複数個の不揮発性メモリ及び1個又は複数個の揮発性メモリにより構成されている。すなわち、メモリ32は、1個又は複数個のメモリにより構成されている。個々のメモリは、例えば、半導体メモリ、磁気ディスク、光ディスク、光磁気ディスク又は磁気テープを用いたものである。より具体的には、個々の揮発性メモリは、例えば、RAM(Random Access Memory)を用いたものである。また、個々の不揮発性メモリは、例えば、ROM(Read Only Memory)、フラッシュメモリ、EPROM(Erasable Programmable Read Only Memory)、EEPROM(Electrically Erasable Programmable Read Only Memory)、ソリッドステートドライブ、ハードディスクドライブ、フレキシブルディスク、コンパクトディスク、DVD(Digital Versatile Disc)、ブルーレイディスク又はミニディスクを用いたものである。 The memory 32 is composed of one or a plurality of non-volatile memories. Alternatively, the memory 32 is composed of one or a plurality of non-volatile memories and one or a plurality of volatile memories. That is, the memory 32 is composed of one or a plurality of memories. The individual memory uses, for example, a semiconductor memory, a magnetic disk, an optical disk, a magneto-optical disk, or a magnetic tape. More specifically, each volatile memory uses, for example, a RAM (Random Access Memory). Further, the individual non-volatile memory is, for example, a ROM (Read Only Memory), a flash memory, an EPROM (Erasable Programmable Read Only Memory), an EEPROM (Electrically Erasable Advanced Memory), a hard disk, a solid drive A compact disc, a DVD (Digital Vertical Disc), a Blu-ray disc, or a mini disc is used.

処理回路33は、1個又は複数個のデジタル回路により構成されている。または、処理回路33は、1個又は複数個のデジタル回路及び1個又は複数個のアナログ回路により構成されている。すなわち、処理回路33は、1個又は複数個の処理回路により構成されている。個々の処理回路は、例えば、ASIC(Application Specific Integrated Circuit)、PLD(Programmable Logic Device)、FPGA(Field Programmable Gate Array)、SoC(System on a Chip)又はシステムLSI(Large Scale Integration)を用いたものである。 The processing circuit 33 is composed of one or a plurality of digital circuits. Alternatively, the processing circuit 33 is composed of one or a plurality of digital circuits and one or a plurality of analog circuits. That is, the processing circuit 33 is composed of one or a plurality of processing circuits. The individual processing circuits are, for example, ASIC (Application Specific Integrated Circuit), PLD (Programmable Logic Device), FPGA (Field Programmable Gate Array), System LSI (System) System Is.

次に、図4を参照して、予測用モデル生成装置200の要部のハードウェア構成について説明する。 Next, with reference to FIG. 4, the hardware configuration of the main part of the prediction model generator 200 will be described.

図4Aに示す如く、予測用モデル生成装置200は、プロセッサ41及びメモリ42を有している。メモリ42には、履歴情報取得部21、データ前処理部22及び予測用モデル生成部23の機能を実現するためのプログラムが記憶されている。かかるプログラムをプロセッサ41が読み出して実行することにより、履歴情報取得部21、データ前処理部22及び予測用モデル生成部23の機能が実現される。 As shown in FIG. 4A, the predictive model generator 200 has a processor 41 and a memory 42. The memory 42 stores a program for realizing the functions of the history information acquisition unit 21, the data preprocessing unit 22, and the prediction model generation unit 23. When the processor 41 reads and executes such a program, the functions of the history information acquisition unit 21, the data preprocessing unit 22, and the prediction model generation unit 23 are realized.

または、図4Bに示す如く、予測用モデル生成装置200は、処理回路43を有している。この場合、履歴情報取得部21、データ前処理部22及び予測用モデル生成部23の機能は、専用の処理回路43により実現される。 Alternatively, as shown in FIG. 4B, the prediction model generation device 200 has a processing circuit 43. In this case, the functions of the history information acquisition unit 21, the data preprocessing unit 22, and the prediction model generation unit 23 are realized by the dedicated processing circuit 43.

または、予測用モデル生成装置200は、プロセッサ41、メモリ42及び処理回路43を有している(不図示)。この場合、履歴情報取得部21、データ前処理部22及び予測用モデル生成部23の機能のうちの一部の機能がプロセッサ41及びメモリ42により実現されるとともに、残余の機能が処理回路43により実現される。 Alternatively, the predictive model generator 200 has a processor 41, a memory 42, and a processing circuit 43 (not shown). In this case, some of the functions of the history information acquisition unit 21, the data preprocessing unit 22, and the prediction model generation unit 23 are realized by the processor 41 and the memory 42, and the remaining functions are realized by the processing circuit 43. It will be realized.

プロセッサ41は、1個又は複数個のプロセッサにより構成されている。個々のプロセッサは、例えば、CPU、GPU、マイクロプロセッサ、マイクロコントローラ又はDSPを用いたものである。 The processor 41 is composed of one or a plurality of processors. The individual processors use, for example, CPUs, GPUs, microprocessors, microcontrollers or DSPs.

メモリ42は、1個又は複数個の不揮発性メモリにより構成されている。または、メモリ42は、1個又は複数個の不揮発性メモリ及び1個又は複数個の揮発性メモリにより構成されている。すなわち、メモリ42は、1個又は複数個のメモリにより構成されている。個々のメモリは、例えば、半導体メモリ、磁気ディスク、光ディスク、光磁気ディスク又は磁気テープを用いたものである。より具体的には、個々の揮発性メモリは、例えば、RAMを用いたものである。また、個々の不揮発性メモリは、例えば、ROM、フラッシュメモリ、EPROM、EEPROM、ソリッドステートドライブ、ハードディスクドライブ、フレキシブルディスク、コンパクトディスク、DVD、ブルーレイディスク又はミニディスクを用いたものである。 The memory 42 is composed of one or a plurality of non-volatile memories. Alternatively, the memory 42 is composed of one or a plurality of non-volatile memories and one or a plurality of volatile memories. That is, the memory 42 is composed of one or a plurality of memories. The individual memory uses, for example, a semiconductor memory, a magnetic disk, an optical disk, a magneto-optical disk, or a magnetic tape. More specifically, each volatile memory uses, for example, RAM. Further, as the individual non-volatile memory, for example, ROM, flash memory, EPROM, EEPROM, solid state drive, hard disk drive, flexible disk, compact disk, DVD, Blu-ray disk or mini disk are used.

処理回路43は、1個又は複数個のデジタル回路により構成されている。または、処理回路43は、1個又は複数個のデジタル回路及び1個又は複数個のアナログ回路により構成されている。すなわち、処理回路43は、1個又は複数個の処理回路により構成されている。個々の処理回路は、例えば、ASIC、PLD、FPGA、SoC又はシステムLSIを用いたものである。 The processing circuit 43 is composed of one or a plurality of digital circuits. Alternatively, the processing circuit 43 is composed of one or a plurality of digital circuits and one or a plurality of analog circuits. That is, the processing circuit 43 is composed of one or a plurality of processing circuits. The individual processing circuits use, for example, an ASIC, PLD, FPGA, SoC or system LSI.

次に、図5のフローチャートを参照して、経済指標予測装置100の動作について説明する。 Next, the operation of the economic indicator prediction device 100 will be described with reference to the flowchart of FIG.

まず、稼働情報取得部11が稼働情報取得処理を実行する(ステップST1)。次いで、データ前処理部12がデータ前処理を実行する(ステップST2)。次いで、指標情報取得部13が指標情報取得処理を実行する(ステップST3)。次いで、経済指標予測部14が経済指標予測処理を実行する(ステップST4)。 First, the operation information acquisition unit 11 executes the operation information acquisition process (step ST1). Next, the data pre-processing unit 12 executes the data pre-processing (step ST2). Next, the index information acquisition unit 13 executes the index information acquisition process (step ST3). Next, the economic indicator prediction unit 14 executes the economic indicator prediction process (step ST4).

なお、稼働情報取得処理、データ前処理及び指標情報取得処理の実行順は、図5に示す例に限定されるものではない。稼働情報取得処理は、経済指標予測処理が実行されるよりも先に実行されるものであれば良い。データ前処理は、稼働情報取得処理が実行された後、経済指標予測処理が実行されるよりも先に実行されるものであれば良い。指標情報取得処理は、経済指標予測処理が実行されるよりも先に実行されるものであれば良い。 The execution order of the operation information acquisition process, the data preprocessing, and the index information acquisition process is not limited to the example shown in FIG. The operation information acquisition process may be executed before the economic indicator prediction process is executed. The data pre-processing may be performed as long as it is executed after the operation information acquisition process is executed and before the economic indicator prediction process is executed. The index information acquisition process may be executed before the economic indicator prediction process is executed.

次に、図6のフローチャートを参照して、予測用モデル生成装置200の動作について説明する。 Next, the operation of the prediction model generation device 200 will be described with reference to the flowchart of FIG.

まず、履歴情報取得部21が履歴情報取得処理を実行する(ステップST11)。次いで、データ前処理部22がデータ前処理を実行する(ステップST12)。次いで、予測用モデル生成部23が予測用モデル生成処理を実行する(ステップST13)。 First, the history information acquisition unit 21 executes the history information acquisition process (step ST11). Next, the data pre-processing unit 22 executes the data pre-processing (step ST12). Next, the prediction model generation unit 23 executes the prediction model generation process (step ST13).

次に、図7〜図9を参照して、予測用モデルの具体例について説明する。また、予測用モデル生成処理の具体例、及び経済指標予測処理の具体例などについて説明する。 Next, a specific example of the prediction model will be described with reference to FIGS. 7 to 9. In addition, a specific example of the model generation process for prediction and a specific example of the economic indicator prediction process will be described.

以下、図7〜図9を参照した説明において、対象昇降機は、1個の昇降機Eを含むものである。1個の昇降機Eは、オフィスビルに設置されている。稼働情報における時系列データD1は、1か月毎の1個の昇降機Eの稼働回数を示すものである。第1履歴情報における第1時系列データd1も、1か月毎の1個の昇降機Eの稼働回数を示すものである。対象経済指標は、1個の指標Iを含むものである。1個の指標Iは、任意の一致指数を用いたものである。予測用モデルは、1個の指標Iに対応する1個のモデルMを含むものである。 Hereinafter, in the description with reference to FIGS. 7 to 9, the target elevator includes one elevator E. One elevator E is installed in an office building. The time-series data D1 in the operation information indicates the number of operations of one elevator E every month. The first time-series data d1 in the first history information also indicates the number of times of operation of one elevator E every month. The target economic indicator includes one indicator I. One index I uses an arbitrary concordance index. The prediction model includes one model M corresponding to one index I.

通常、オフィスビルに設置された昇降機Eは、オフィスワーカーにより使用される。このため、オフィスビルに設置された昇降機Eの稼働回数は、経済指標に対して高い相関を有すると考えられる。また、オフィスビルに設置された昇降機Eの稼働回数の時間変動は、任意の一致指数の時間変動に対して先行すると考えられる。これは、オフィスビルに設置された昇降機Eの走行距離、走行時間、積載重量及び搭乗者数についても同様である。 Normally, the elevator E installed in an office building is used by an office worker. Therefore, it is considered that the number of times of operation of the elevator E installed in the office building has a high correlation with the economic index. Further, it is considered that the time variation of the number of times of operation of the elevator E installed in the office building precedes the time variation of any coincidence index. This also applies to the mileage, travel time, load weight and number of passengers of the elevator E installed in the office building.

そこで、以下のようにして、第1履歴情報が示す稼働回数の履歴と第2履歴情報が示す指標Iの履歴との時間的ずれ量nに基づくモデルMが生成される。すなわち、第1時系列データd1と第2時系列データd2との時間的な相関関係に基づくモデルMが生成される。具体的には、例えば、第1時系列データd1と第2時系列データd2との相互相関に基づくモデルMが生成される。 Therefore, as follows, a model M based on the time difference n between the history of the number of operations indicated by the first history information and the history of the index I indicated by the second history information is generated. That is, a model M based on the temporal correlation between the first time-series data d1 and the second time-series data d2 is generated. Specifically, for example, a model M based on the cross-correlation between the first time-series data d1 and the second time-series data d2 is generated.

まず、予測用モデル生成装置200にて、履歴情報取得処理及びデータ前処理が実行される。上記のとおり、予測用モデル生成装置200におけるデータ前処理は、異常値除去処理及びトレンド抽出処理を含むものである。ここで、図7は、トレンド抽出処理の実行前における第1時系列データd1の例を示している。図7に示す如く、トレンド抽出処理の実行前における第1時系列データd1は、季節変動を有するものである。これに対して、図8は、トレンド抽出処理の実行後における第1時系列データd1の例を示している。図8に示す如く、第1時系列データd1における季節変動が除去されることにより、トレンドが抽出されている。 First, the prediction model generation device 200 executes history information acquisition processing and data preprocessing. As described above, the data pre-processing in the prediction model generation device 200 includes an outlier removal process and a trend extraction process. Here, FIG. 7 shows an example of the first time series data d1 before the execution of the trend extraction process. As shown in FIG. 7, the first time-series data d1 before the execution of the trend extraction process has seasonal fluctuations. On the other hand, FIG. 8 shows an example of the first time series data d1 after the execution of the trend extraction process. As shown in FIG. 8, the trend is extracted by removing the seasonal variation in the first time series data d1.

次いで、予測用モデル生成装置200にて、予測用モデル生成処理が実行される。このとき、予測用モデル生成部23は、トレンド抽出処理の実行後における第1時系列データd1と、第2時系列データd2との相互相関を演算する。これにより、予測用モデル生成部23は、第1時系列データd1と第2時系列データd2との相関値Cが極大となる時間的ずれ量nを算出する。図9は、ずれ量nに対する相関値Cの例を示している。図9に示す例においては、ずれ量nが7か月であるとき(すなわちn=+7であるとき)、相関値Cが極大となる。これは、昇降機Eの稼働回数の時間変動が指標Iの時間変動に対して7か月先行することを示している。 Next, the prediction model generation device 200 executes the prediction model generation process. At this time, the prediction model generation unit 23 calculates the cross-correlation between the first time-series data d1 and the second time-series data d2 after the trend extraction process is executed. As a result, the prediction model generation unit 23 calculates the amount of time lag n at which the correlation value C between the first time-series data d1 and the second time-series data d2 becomes maximum. FIG. 9 shows an example of the correlation value C with respect to the deviation amount n. In the example shown in FIG. 9, when the deviation amount n is 7 months (that is, when n = +7), the correlation value C becomes maximum. This indicates that the time variation of the number of times of operation of the elevator E precedes the time variation of the index I by 7 months.

予測用モデル生成部23は、当該算出されたずれ量nに基づき、以下の式(1)によるモデルMを生成する。すなわち、予測用モデル生成部23は、関数f(x)によるモデルMを生成する。 The prediction model generation unit 23 generates a model M according to the following equation (1) based on the calculated deviation amount n. That is, the prediction model generation unit 23 generates the model M by the function f (x).

f(x)=a×x (1) f (x) = a × x (1)

ここで、関数f(x)における係数aは、経済指標予測処理において、指標情報に含まれる値V2が代入されるものである。すなわち、指標Iの最新の値V2が代入されるものである。 Here, the coefficient a in the function f (x) is substituted with the value V2 included in the index information in the economic indicator prediction process. That is, the latest value V2 of the index I is substituted.

また、関数f(x)における変数xは、経済指標予測処理において、以下のような変動率Rを示す値が代入されるものである。すなわち、上記のとおり、稼働情報は、複数個の値V1を含むものである。複数個の値V1には、値V2に対応する時期に対するnか月前の時期に対応する値V1が含まれている。そこで、かかるnか月前の時期における値V1の変動率Rを示す値が変数xに代入される。これにより、予測値PV1が算出される。 Further, the variable x in the function f (x) is assigned a value indicating the volatility R as shown below in the economic indicator prediction process. That is, as described above, the operation information includes a plurality of values V1. The plurality of values V1 include the value V1 corresponding to the time n months before the time corresponding to the value V2. Therefore, a value indicating the volatility R of the value V1 in the period n months ago is assigned to the variable x. As a result, the predicted value PV1 is calculated.

モデルMが生成された後、経済指標予測装置100にて、稼働情報取得処理、データ前処理及び指標情報取得処理が実行される。次いで、経済指標予測装置100にて、経済指標予測処理が実行される。このとき、モデルMは、稼働情報及び指標情報の入力を受け付ける。これにより、指標Iの最新の値V2が関数f(x)の係数aに代入されるとともに、変動率Rを示す値が関数f(x)の変数xに代入される。モデルMは、関数f(x)に基づく予測値PV1を出力する。 After the model M is generated, the economic indicator prediction device 100 executes operation information acquisition processing, data preprocessing, and index information acquisition processing. Next, the economic indicator prediction process is executed by the economic indicator prediction device 100. At this time, the model M accepts the input of the operation information and the index information. As a result, the latest value V2 of the index I is assigned to the coefficient a of the function f (x), and the value indicating the fluctuation rate R is assigned to the variable x of the function f (x). The model M outputs the predicted value PV1 based on the function f (x).

なお、対象経済指標が複数個の指標Iを含むものであり、かつ、予測用モデルが複数個のモデルMを含むものである場合、複数個のモデルMの各々について、これらの処理と同様の処理が実行される。これにより、予測用モデル生成装置200にて、複数個の指標Iに対応する複数個のモデルMが生成される。また、経済指標予測装置100にて、複数個の指標Iの各々の予測値PV1が算出される。 When the target economic indicator includes a plurality of indicators I and the prediction model includes a plurality of models M, the same processing as these processing is performed for each of the plurality of models M. Will be executed. As a result, the prediction model generation device 200 generates a plurality of models M corresponding to the plurality of indexes I. Further, the economic indicator prediction device 100 calculates the predicted value PV1 of each of the plurality of indicators I.

次に、図10を参照して、経済指標予測装置100の変形例について説明する。また、図11を参照して、予測用モデル生成装置200の変形例について説明する。 Next, a modification of the economic indicator prediction device 100 will be described with reference to FIG. 10. Further, with reference to FIG. 11, a modification of the prediction model generation device 200 will be described.

稼働情報取得部11により取得される稼働情報は、季節変動を有しない時系列データD1、又は季節変動が除去された時系列データD1により構成されているものであっても良い。この場合、図10に示す如く、経済指標予測装置100は、データ前処理部12を有しないものであっても良い。すなわち、稼働情報取得部11、指標情報取得部13及び経済指標予測部14により経済指標予測装置100の要部が構成されているものであっても良い。 The operation information acquired by the operation information acquisition unit 11 may be composed of time-series data D1 having no seasonal variation or time-series data D1 from which seasonal variation has been removed. In this case, as shown in FIG. 10, the economic indicator prediction device 100 may not have the data preprocessing unit 12. That is, the main part of the economic indicator prediction device 100 may be configured by the operation information acquisition unit 11, the index information acquisition unit 13, and the economic indicator prediction unit 14.

また、履歴情報取得部21により取得される第1履歴情報は、異常値及び季節変動を有しない第1時系列データd1、又は異常値及び季節変動が除去された第1時系列データd1により構成されているものであっても良い。この場合、図11に示す如く、予測用モデル生成装置200は、データ前処理部22を有しないものであっても良い。すなわち、履歴情報取得部21及び予測用モデル生成部23により予測用モデル生成装置200の要部が構成されているものであっても良い。 Further, the first history information acquired by the history information acquisition unit 21 is composed of the first time-series data d1 having no abnormal value and seasonal variation, or the first time-series data d1 from which the abnormal value and seasonal variation are removed. It may be the one that has been done. In this case, as shown in FIG. 11, the prediction model generation device 200 may not have the data preprocessing unit 22. That is, the main part of the prediction model generation device 200 may be configured by the history information acquisition unit 21 and the prediction model generation unit 23.

次に、図12及び図13を参照して、経済指標予測装置100の他の変形例について説明する。 Next, another modification of the economic indicator prediction device 100 will be described with reference to FIGS. 12 and 13.

関数f(x)における係数aは、定数であっても良い。または、関数f(x)における係数aは、稼働情報に含まれる複数個の値V1に応じて定まる値であっても良い。この場合、個々のモデルMにおいて、指標情報の入力は不要である。また、経済指標予測装置100において、指標情報取得部13は不要である。すなわち、予測用モデルは、稼働情報の入力を受け付けて対象経済指標の予測値PV1を出力するものであっても良い。 The coefficient a in the function f (x) may be a constant. Alternatively, the coefficient a in the function f (x) may be a value determined according to a plurality of values V1 included in the operation information. In this case, it is not necessary to input the index information in each model M. Further, in the economic indicator prediction device 100, the index information acquisition unit 13 is unnecessary. That is, the prediction model may be one that accepts the input of operation information and outputs the predicted value PV1 of the target economic index.

この場合、図12又は図13に示す如く、経済指標予測装置100は、指標情報取得部13を有しないものであっても良い。すなわち、図12に示す如く、稼働情報取得部11、データ前処理部12及び経済指標予測部14により経済指標予測装置100の要部が構成されているものであっても良い。または、図13に示す如く、稼働情報取得部11及び経済指標予測部14により経済指標予測装置100の要部が構成されているものであっても良い。 In this case, as shown in FIG. 12 or 13, the economic indicator prediction device 100 may not have the index information acquisition unit 13. That is, as shown in FIG. 12, the main part of the economic indicator prediction device 100 may be configured by the operation information acquisition unit 11, the data preprocessing unit 12, and the economic indicator prediction unit 14. Alternatively, as shown in FIG. 13, the main part of the economic indicator prediction device 100 may be configured by the operation information acquisition unit 11 and the economic indicator prediction unit 14.

次に、そのほかの変形例について説明する。 Next, other modification examples will be described.

データ前処理部12により実行される前処理は、データ前処理部22により実行される異常値除去処理と同様の異常値除去処理を含むものであっても良い。すなわち、データ前処理部12により実行される前処理は、時系列データD1に含まれる異常値を除去する処理を含むものであっても良い。 The pre-processing executed by the data pre-processing unit 12 may include an abnormal value removing process similar to the abnormal value removing process executed by the data pre-processing unit 22. That is, the preprocessing executed by the data preprocessing unit 12 may include a process for removing an abnormal value included in the time series data D1.

稼働情報は、2個以上の時系列データD1を含むものであっても良い。例えば、稼働情報は、対象昇降機の稼働回数を示す時系列データD1、対象昇降機の走行距離を示す時系列データD1、対象昇降機の走行時間を示す時系列データD1、対象昇降機の積載重量を示す時系列データD1又は対象昇降機の搭乗者数を示す時系列データD1のうちのいずれか2個以上の時系列データD1を含むものであっても良い。経済指標予測部14は、経済指標予測処理を実行するとき、かかる2個以上の時系列データD1を組み合わせて用いるものであっても良い。または、このとき、経済指標予測部14は、かかる2個以上の時系列データD1を選択的に用いるものであっても良い。 The operation information may include two or more time series data D1s. For example, the operation information includes time-series data D1 indicating the number of times the target elevator has been operated, time-series data D1 indicating the mileage of the target elevator, time-series data D1 indicating the traveling time of the target elevator, and time indicating the load weight of the target elevator. It may include any two or more time-series data D1 of the series data D1 or the time-series data D1 indicating the number of passengers of the target elevator. The economic indicator prediction unit 14 may use two or more time-series data D1 in combination when executing the economic indicator prediction process. Alternatively, at this time, the economic indicator prediction unit 14 may selectively use the two or more time-series data D1s.

第1履歴情報は、2個以上の第1時系列データd1を含むものであっても良い。例えば、第1履歴情報は、対象昇降機の稼働回数の履歴を示す第1時系列データd1、対象昇降機の走行距離の履歴を示す第1時系列データd1、対象昇降機の走行時間の履歴を示す第1時系列データd1、対象昇降機の積載重量の履歴を示す第1時系列データd1又は対象昇降機の搭乗者数の履歴を示す第1時系列データd1のうちのいずれか2個以上の第1時系列データd1を含むものであっても良い。予測用モデル生成部23は、予測用モデル生成処理を実行するとき、かかる2個以上の第1時系列データd1を組み合わせて用いるものであっても良い。または、このとき、予測用モデル生成部23は、かかる2個以上の第1時系列データd1を選択的に用いるものであっても良い。 The first history information may include two or more first time series data d1. For example, the first history information includes first time-series data d1 showing the history of the number of times the target elevator has been operated, first time-series data d1 showing the history of the travel distance of the target elevator, and first history of the travel time of the target elevator. 1 time series data d1, 1st time series data d1 showing the history of the load weight of the target elevator, or 1st time series data d1 showing the history of the number of passengers of the target elevator, any two or more of the first time It may include the series data d1. The prediction model generation unit 23 may use the two or more first time-series data d1 in combination when executing the prediction model generation process. Alternatively, at this time, the prediction model generation unit 23 may selectively use the two or more first time series data d1.

予測用モデルは、図7〜図9を参照して説明した具体例に限定されるものではない。予測用モデルは、稼働情報又は稼働情報及び指標情報の入力を受け付けて対象経済指標の予測値PV1を出力するものであれば良い。 The prediction model is not limited to the specific examples described with reference to FIGS. 7 to 9. The forecasting model may be any model that accepts the input of operation information or operation information and index information and outputs the predicted value PV1 of the target economic index.

予測用モデル生成処理は、図7〜図9を参照して説明した具体例に限定されるものではない。予測用モデル生成処理には、統計又は機械学習に係る公知の種々の技術を用いることができる。これらの技術についての詳細な説明は省略する。 The prediction model generation process is not limited to the specific examples described with reference to FIGS. 7 to 9. Various known techniques related to statistics or machine learning can be used for the prediction model generation process. Detailed description of these techniques will be omitted.

以上のように、実施の形態1に係る経済指標予測装置100は、対象昇降機の稼働状態を示す稼働情報を取得する稼働情報取得部11と、稼働情報の入力を受け付けて対象経済指標の予測値PV1を出力する予測用モデルを用いて、対象経済指標の予測をする経済指標予測部14と、を備える。稼働情報を用いることにより、位置情報を用いる場合に比して、予測値PV1の信頼度の向上を図ることができる。 As described above, the economic indicator prediction device 100 according to the first embodiment has the operation information acquisition unit 11 that acquires the operation information indicating the operation state of the target elevator, and the operation information acquisition unit 11 that receives the input of the operation information and predicts the target economic indicator. It includes an economic indicator prediction unit 14 that predicts a target economic indicator using a prediction model that outputs PV1. By using the operation information, it is possible to improve the reliability of the predicted value PV1 as compared with the case of using the position information.

また、実施の形態1に係る予測用モデル生成装置200は、対象昇降機の稼働状態の履歴を示す第1履歴情報を取得するとともに、対象経済指標の履歴を示す第2履歴情報を取得する履歴情報取得部21と、第1履歴情報及び第2履歴情報を用いて予測用モデルを生成する予測用モデル生成部23と、を備え、予測用モデルは、稼働状態を示す稼働情報の入力を受け付けて対象経済指標の予測値PV1を出力するものである。第1履歴情報及び第2履歴情報を用いることにより、経済指標予測装置100における予測用モデルを生成することができる。 Further, the prediction model generation device 200 according to the first embodiment acquires the first history information indicating the history of the operating state of the target elevator and the second history information indicating the history of the target economic indicator. The prediction model includes an acquisition unit 21 and a prediction model generation unit 23 that generates a prediction model using the first history information and the second history information, and the prediction model accepts input of operation information indicating an operation state. It outputs the predicted value PV1 of the target economic indicator. By using the first history information and the second history information, it is possible to generate a prediction model in the economic indicator prediction device 100.

また、実施の形態1に係る予測用モデル生成方法は、履歴情報取得部21が、対象昇降機の稼働状態の履歴を示す第1履歴情報を取得するとともに、対象経済指標の履歴を示す第2履歴情報を取得するステップST11と、予測用モデル生成部23が、第1履歴情報及び第2履歴情報を用いて予測用モデルを生成するステップST12と、を備え、予測用モデルは、稼働状態を示す稼働情報の入力を受け付けて対象経済指標の予測値PV1を出力するものである。第1履歴情報及び第2履歴情報を用いることにより、経済指標予測装置100における予測用モデルを生成することができる。 Further, in the prediction model generation method according to the first embodiment, the history information acquisition unit 21 acquires the first history information indicating the history of the operating state of the target elevator and the second history showing the history of the target economic indicator. The prediction model includes a step ST11 for acquiring information and a step ST12 for the prediction model generation unit 23 to generate a prediction model using the first history information and the second history information, and the prediction model indicates an operating state. It accepts the input of operation information and outputs the predicted value PV1 of the target economic indicator. By using the first history information and the second history information, it is possible to generate a prediction model in the economic indicator prediction device 100.

実施の形態2.
図14は、実施の形態2に係る経済指標予測装置の要部を示すブロック図である。図14を参照して、実施の形態2に係る経済指標予測装置について説明する。なお、図14において、図1に示すブロックと同様のブロックには同一符号を付して説明を省略する。
Embodiment 2.
FIG. 14 is a block diagram showing a main part of the economic indicator prediction device according to the second embodiment. The economic indicator prediction device according to the second embodiment will be described with reference to FIG. In FIG. 14, the same blocks as those shown in FIG. 1 are designated by the same reference numerals and the description thereof will be omitted.

実施の形態2において、対象昇降機は、複数個の昇降機Eのうちの選択された1個以上の昇降機Eを含むものである。複数個の昇降機Eは、複数個の施設Fに設置されている。 In the second embodiment, the target elevator includes one or more selected elevators E among the plurality of elevators E. The plurality of elevators E are installed in the plurality of facilities F.

以下、複数個の施設Fの各々を含む地域を示す情報を「地域情報」という。また、複数個の施設Fの各々の種別を示す情報を「種別情報」という。また、複数個の昇降機Eの各々の用途を示す情報を「用途情報」という。また、地域情報、種別情報又は用途情報のうちの少なくとも一つを含む情報を「付加情報」という。 Hereinafter, the information indicating the area including each of the plurality of facilities F is referred to as "regional information". Further, the information indicating each type of the plurality of facilities F is referred to as "type information". Further, information indicating the use of each of the plurality of elevators E is referred to as "use information". In addition, information including at least one of regional information, type information, and usage information is referred to as "additional information".

地域情報は、例えば、複数個の施設Fの各々を含む都道府県又は市区町村を示す情報である。種別情報は、例えば、複数個の施設Fの各々がオフィスビル、商業施設又は工場のうちのいずれであるのかを示す情報である。用途情報は、例えば、複数個の昇降機Eの各々が荷物用又は人荷用のうちのいずれであるのかを示す情報である。 The area information is, for example, information indicating a prefecture or a city, ward, town, or village including each of a plurality of facilities F. The type information is, for example, information indicating whether each of the plurality of facilities F is an office building, a commercial facility, or a factory. The usage information is, for example, information indicating whether each of the plurality of elevators E is for luggage or for humans.

図14に示す如く、経済指標予測装置100aは、稼働情報取得部11、データ前処理部12、指標情報取得部13及び経済指標予測部14を有している。これに加えて、経済指標予測装置100aは、付加情報取得部15及び昇降機選択部16を有している。 As shown in FIG. 14, the economic indicator prediction device 100a has an operation information acquisition unit 11, a data preprocessing unit 12, an index information acquisition unit 13, and an economic indicator prediction unit 14. In addition to this, the economic indicator prediction device 100a has an additional information acquisition unit 15 and an elevator selection unit 16.

付加情報取得部15は、付加情報を取得するものである。付加情報は、例えば、サーバ装置(不図示)から取得される。付加情報取得部15、当該取得された付加情報を昇降機選択部16に出力するものである。 The additional information acquisition unit 15 acquires additional information. The additional information is acquired from, for example, a server device (not shown). The additional information acquisition unit 15 outputs the acquired additional information to the elevator selection unit 16.

昇降機選択部16は、付加情報取得部15により出力された付加情報を取得するものである。昇降機選択部16は、当該取得された付加情報を用いて、複数個の昇降機Eのうちの対象経済指標に対応する1個以上の昇降機Eを選択するものである。これにより、当該選択された1個以上の昇降機Eが対象昇降機となるものである。昇降機選択部16は、当該選択の結果を示す情報(以下「選択結果情報」という。)を稼働情報取得部11及び経済指標予測部14に出力するものである。 The elevator selection unit 16 acquires additional information output by the additional information acquisition unit 15. The elevator selection unit 16 selects one or more elevators E corresponding to the target economic indicators among the plurality of elevators E by using the acquired additional information. As a result, the selected one or more elevators E become the target elevators. The elevator selection unit 16 outputs information indicating the result of the selection (hereinafter referred to as “selection result information”) to the operation information acquisition unit 11 and the economic indicator prediction unit 14.

対象経済指標が1個の指標Iを含むものである場合、1個の指標Iに対応する1個以上の昇降機Eが選択される。他方、対象経済指標が複数個の指標Iを含むものである場合、複数個の指標Iの各々に対応する1個以上の昇降機Eが選択される。すなわち、個々の指標Iに対応する1個以上の昇降機Eが選択される。 When the target economic indicator includes one indicator I, one or more elevators E corresponding to one indicator I are selected. On the other hand, when the target economic indicator includes a plurality of indicators I, one or more elevators E corresponding to each of the plurality of indicators I are selected. That is, one or more elevators E corresponding to the individual indicators I are selected.

稼働情報取得部11は、選択結果情報が示す1個以上の昇降機Eに係る稼働情報を取得する。経済指標予測部14は、選択結果情報に基づき、当該取得された稼働情報のうちの対応する稼働情報を個々の指標Iの予測値PV1の算出に用いる。 The operation information acquisition unit 11 acquires operation information related to one or more elevators E indicated by the selection result information. Based on the selection result information, the economic indicator prediction unit 14 uses the corresponding operation information among the acquired operation information to calculate the predicted value PV1 of each index I.

すなわち、対象経済指標が1個の指標Iを含むものである場合、稼働情報取得部11は、1個の指標Iに対応する1個以上の昇降機Eに係る稼働情報を取得する。経済指標予測部14は、1個の指標Iの予測値PV1を算出するとき、当該取得された稼働情報を用いる。 That is, when the target economic indicator includes one index I, the operation information acquisition unit 11 acquires operation information related to one or more elevators E corresponding to one index I. The economic indicator prediction unit 14 uses the acquired operation information when calculating the predicted value PV1 of one index I.

他方、対象経済指標が複数個の指標Iを含むものである場合、稼働情報取得部11は、複数個の指標Iの各々に対応する1個以上の昇降機Eに係る稼働情報を取得する。経済指標予測部14は、複数個の指標Iの各々の予測値PV1を算出するとき、当該取得された稼働情報のうちの対応する稼働情報を用いる。 On the other hand, when the target economic indicator includes a plurality of indicators I, the operation information acquisition unit 11 acquires operation information related to one or more elevators E corresponding to each of the plurality of indicators I. When calculating the predicted value PV1 of each of the plurality of indicators I, the economic indicator prediction unit 14 uses the corresponding operation information among the acquired operation information.

以下、付加情報取得部15により実行される処理を総称して「付加情報取得処理」ということがある。また、昇降機選択部16により実行される処理を総称して「昇降機選択処理」ということがある。 Hereinafter, the processes executed by the additional information acquisition unit 15 may be collectively referred to as “additional information acquisition processing”. Further, the processes executed by the elevator selection unit 16 may be collectively referred to as "elevator selection process".

ここで、種別情報を用いた昇降機選択処理の具体例について説明する。 Here, a specific example of the elevator selection process using the type information will be described.

いま、オフィスビルに設置された1個の昇降機E、商業施設に設置された1個の昇降機E、及び工場に設置された1個の昇降機Eが複数個の昇降機Eに含まれているものとする。また、先行指数を用いた1個の指標I、一致指数を用いた1個の指標I、及び遅行指数を用いた1個の指標Iが対象経済指標に含まれているものとする。 Now, one elevator E installed in an office building, one elevator E installed in a commercial facility, and one elevator E installed in a factory are included in a plurality of elevators E. do. Further, it is assumed that one index I using the leading index, one index I using the coincidence index, and one index I using the lagging index are included in the target economic index.

例えば、オフィスビルに設置された昇降機Eの稼働状態は、景気の動向に対して先行指数的に振る舞うと考えられる。このため、かかる稼働状態の時間変動は、任意の一致指数の時間変動に対して先行する蓋然性が高く、かつ、任意の遅行指数の時間変動に対して先行する蓋然性が高いと考えられる。また、かかる稼働情報の時間変動は、一部の先行指数の時間変動に対しても先行し得ると考えられる。これは、工場に設置された昇降機Eについても同様である。 For example, the operating state of the elevator E installed in an office building is considered to behave as a leading exponential with respect to economic trends. Therefore, it is considered that the time fluctuation of the operating state has a high probability of leading to the time fluctuation of any coincidence index and also has a high probability of leading to the time fluctuation of any lagging index. In addition, it is considered that the time variation of the operation information can precede the time variation of some leading indices. This also applies to the elevator E installed in the factory.

他方、商業施設に設置された昇降機Eの稼働状態は、景気の動向に対して遅行指数的に振る舞うと考えられる。このため、かかる稼働状態の時間変動は、任意の一致指数の時間変動に対して先行する蓋然性が低く、かつ、任意の先行指数の時間変動に対して先行する蓋然性が低いと考えられる。また、かかる稼働情報の時間変動は、一部の遅行指数の時間変動に対してのみ先行し得ると考えられる。 On the other hand, the operating state of the elevator E installed in the commercial facility is considered to behave in a lagging exponential manner with respect to economic trends. Therefore, it is considered that the time variation of the operating state is unlikely to precede the time variation of any leading index and is unlikely to precede the time variation of any leading index. Further, it is considered that the time variation of the operation information can precede the time variation of some lagging indexes.

そこで、昇降機選択部16は、先行指数を用いた指標Iについては、オフィスビルに設置された昇降機E又は工場に設置された昇降機Eのうちの少なくとも一方を選択する。また、昇降機選択部16は、一致指数を用いた指標Iについては、オフィスビルに設置された昇降機E又は工場に設置された昇降機Eのうちの少なくとも一方を選択する。また、昇降機選択部16は、遅行指数を用いた指標Iについては、オフィスビルに設置された昇降機E、商業施設に設置された昇降機E又は工場に設置された昇降機Eのうちの少なくとも一つを選択する。 Therefore, the elevator selection unit 16 selects at least one of the elevator E installed in the office building and the elevator E installed in the factory for the index I using the leading index. Further, the elevator selection unit 16 selects at least one of the elevator E installed in the office building and the elevator E installed in the factory for the index I using the coincidence index. Further, the elevator selection unit 16 uses at least one of the elevator E installed in the office building, the elevator E installed in the commercial facility, or the elevator E installed in the factory for the index I using the lagging index. select.

次に、地域情報を用いた昇降機選択処理の具体例について説明する。 Next, a specific example of the elevator selection process using regional information will be described.

いま、特定の地域(以下「第1の地域」という。)における1個の施設Fに1個の昇降機Eが設置されており、かつ、他の地域(以下「第2の地域」という。)における1個の施設Fに1個の昇降機Eが設置されているものとする。また、第1の地域に係る指数を用いた1個の指標I、及び第2の地域に係る指数を用いた1個の指標Iが対象経済指標に含まれているものとする。 Now, one elevator E is installed in one facility F in one specific area (hereinafter referred to as "first area"), and another area (hereinafter referred to as "second area"). It is assumed that one elevator E is installed in one facility F in the above. Further, it is assumed that one index I using the index related to the first region and one index I using the index related to the second region are included in the target economic index.

この場合、昇降機選択部16は、第1の地域に係る指数を用いた指標Iについては、第1の地域における施設Fに設置された昇降機Eを選択する。また、昇降機選択部16は、第2の地域に係る指数を用いた指標Iについては、第2の地域における施設Fに設置された昇降機Eを選択する。 In this case, the elevator selection unit 16 selects the elevator E installed in the facility F in the first area for the index I using the index related to the first area. Further, the elevator selection unit 16 selects the elevator E installed in the facility F in the second area for the index I using the index related to the second area.

図15は、実施の形態2に係る予測用モデル生成装置の要部を示すブロック図である。図15を参照して、実施の形態2に係る予測用モデル生成装置について説明する。なお、図15において、図2に示すブロックと同様のブロックには同一符号を付して説明を省略する。 FIG. 15 is a block diagram showing a main part of the prediction model generation device according to the second embodiment. The prediction model generation device according to the second embodiment will be described with reference to FIG. In FIG. 15, the same blocks as those shown in FIG. 2 are designated by the same reference numerals and the description thereof will be omitted.

図15に示す如く、予測用モデル生成装置200aは、履歴情報取得部21、データ前処理部22及び予測用モデル生成部23を有している。これに加えて、予測用モデル生成装置200aは、付加情報取得部24及び昇降機選択部25を有している。 As shown in FIG. 15, the prediction model generation device 200a has a history information acquisition unit 21, a data preprocessing unit 22, and a prediction model generation unit 23. In addition to this, the prediction model generation device 200a has an additional information acquisition unit 24 and an elevator selection unit 25.

付加情報取得部24は、付加情報取得部15により実行される付加情報取得処理と同様の付加情報取得処理を実行するものである。昇降機選択部25は、昇降機選択部16により実行される昇降機選択処理と同様の昇降機選択処理を実行するものである。ただし、昇降機選択部25による選択結果情報は、履歴情報取得部21及び予測用モデル生成部23に出力される。 The additional information acquisition unit 24 executes an additional information acquisition process similar to the additional information acquisition process executed by the additional information acquisition unit 15. The elevator selection unit 25 executes an elevator selection process similar to the elevator selection process executed by the elevator selection unit 16. However, the selection result information by the elevator selection unit 25 is output to the history information acquisition unit 21 and the prediction model generation unit 23.

履歴情報取得部21は、選択結果情報が示す1個以上の昇降機Eに係る第1履歴情報を取得する。予測用モデル生成部23は、選択結果情報に基づき、当該取得された第1履歴情報のうちの対応する第1履歴情報を個々のモデルMの生成に用いる。 The history information acquisition unit 21 acquires the first history information related to one or more elevators E indicated by the selection result information. The prediction model generation unit 23 uses the corresponding first history information of the acquired first history information to generate the individual model M based on the selection result information.

すなわち、対象経済指標が1個の指標Iを含むものである場合、履歴情報取得部21は、1個の指標Iに対応する1個以上の昇降機Eに係る第1履歴情報を取得する。予測用モデル生成部23は、1個の指標Iに対応する1個のモデルMを生成するとき、当該取得された稼働情報を用いる。 That is, when the target economic indicator includes one index I, the history information acquisition unit 21 acquires the first history information related to one or more elevators E corresponding to one index I. The prediction model generation unit 23 uses the acquired operation information when generating one model M corresponding to one index I.

他方、対象経済指標が複数個の指標Iを含むものである場合、履歴情報取得部21は、複数個の指標Iの各々に対応する1個以上の昇降機Eに係る第1履歴情報を取得する。予測用モデル生成部23は、複数個の指標Iに対応する複数個のモデルMの各々を生成するとき、当該取得された第1履歴情報のうちの対応する第1履歴情報を用いる。 On the other hand, when the target economic indicator includes a plurality of indicators I, the history information acquisition unit 21 acquires the first history information related to one or more elevators E corresponding to each of the plurality of indicators I. When the prediction model generation unit 23 generates each of the plurality of models M corresponding to the plurality of indexes I, the prediction model generation unit 23 uses the corresponding first history information among the acquired first history information.

経済指標予測装置100aの要部のハードウェア構成は、実施の形態1にて図3を参照して説明したものと同様である。このため、図示及び説明を省略する。すなわち、稼働情報取得部11、データ前処理部12、指標情報取得部13、経済指標予測部14、付加情報取得部15及び昇降機選択部16の各々の機能は、プロセッサ31及びメモリ32により実現されるものであっても良く、又は専用の処理回路33により実現されるものであっても良い。 The hardware configuration of the main part of the economic indicator prediction device 100a is the same as that described with reference to FIG. 3 in the first embodiment. Therefore, illustration and description will be omitted. That is, each function of the operation information acquisition unit 11, the data preprocessing unit 12, the index information acquisition unit 13, the economic indicator prediction unit 14, the additional information acquisition unit 15, and the elevator selection unit 16 is realized by the processor 31 and the memory 32. It may be one, or it may be realized by a dedicated processing circuit 33.

予測用モデル生成装置200aの要部のハードウェア構成は、実施の形態1にて図4を参照して説明したものと同様である。このため、図示及び説明を省略する。すなわち、履歴情報取得部21、データ前処理部22、予測用モデル生成部23、付加情報取得部24及び昇降機選択部25の各々の機能は、プロセッサ41及びメモリ42により実現されるものであっても良く、又は専用の処理回路43により実現されるものであっても良い。 The hardware configuration of the main part of the prediction model generation device 200a is the same as that described with reference to FIG. 4 in the first embodiment. Therefore, illustration and description will be omitted. That is, each function of the history information acquisition unit 21, the data preprocessing unit 22, the prediction model generation unit 23, the additional information acquisition unit 24, and the elevator selection unit 25 is realized by the processor 41 and the memory 42. It may be realized by a dedicated processing circuit 43.

次に、図16のフローチャートを参照して、経済指標予測装置100aの動作について説明する。なお、図16において、図5に示すステップと同様のステップには同一符号を付して説明を省略する。 Next, the operation of the economic indicator prediction device 100a will be described with reference to the flowchart of FIG. In FIG. 16, the same steps as those shown in FIG. 5 are designated by the same reference numerals and the description thereof will be omitted.

まず、付加情報取得部15が付加情報取得処理を実行する(ステップST5)。次いで、昇降機選択部16が昇降機選択処理を実行する(ステップST6)。次いで、ステップST1〜ST4の処理が実行される。 First, the additional information acquisition unit 15 executes the additional information acquisition process (step ST5). Next, the elevator selection unit 16 executes the elevator selection process (step ST6). Next, the processes of steps ST1 to ST4 are executed.

次に、図17のフローチャートを参照して、予測用モデル生成装置200aの動作について説明する。なお、図17において、図6に示すステップと同様のステップには同一符号を付して説明を省略する。 Next, the operation of the prediction model generation device 200a will be described with reference to the flowchart of FIG. In FIG. 17, the same steps as those shown in FIG. 6 are designated by the same reference numerals and the description thereof will be omitted.

まず、付加情報取得部24が付加情報取得処理を実行する(ステップST14)。次いで、昇降機選択部25が昇降機選択処理を実行する(ステップST15)。次いで、ステップST11〜ST13の処理が実行される。 First, the additional information acquisition unit 24 executes the additional information acquisition process (step ST14). Next, the elevator selection unit 25 executes the elevator selection process (step ST15). Next, the processes of steps ST11 to ST13 are executed.

なお、経済指標予測装置100aは、実施の形態1にて説明したものと同様の種々の変形例を採用することができる。また、予測用モデル生成装置200aは、実施の形態1にて説明したものと同様の種々の変形例を採用することができる。 As the economic indicator prediction device 100a, various modifications similar to those described in the first embodiment can be adopted. Further, as the prediction model generation device 200a, various modifications similar to those described in the first embodiment can be adopted.

例えば、図18に示す如く、経済指標予測装置100aは、データ前処理部12を有しないものであっても良い。すなわち、稼働情報取得部11、指標情報取得部13、経済指標予測部14、付加情報取得部15及び昇降機選択部16により経済指標予測装置100aの要部が構成されているものであっても良い。 For example, as shown in FIG. 18, the economic indicator prediction device 100a may not have the data preprocessing unit 12. That is, the main part of the economic indicator prediction device 100a may be configured by the operation information acquisition unit 11, the index information acquisition unit 13, the economic indicator prediction unit 14, the additional information acquisition unit 15, and the elevator selection unit 16. ..

また、図19に示す如く、予測用モデル生成装置200aは、データ前処理部22を有しないものであっても良い。すなわち、履歴情報取得部21、予測用モデル生成部23、付加情報取得部24及び昇降機選択部25により予測用モデル生成装置200aの要部が構成されているものであっても良い。 Further, as shown in FIG. 19, the prediction model generation device 200a may not have the data preprocessing unit 22. That is, the main part of the prediction model generation device 200a may be configured by the history information acquisition unit 21, the prediction model generation unit 23, the additional information acquisition unit 24, and the elevator selection unit 25.

また、図20又は図21に示す如く、経済指標予測装置100aは、指標情報取得部13を有しないものであっても良い。すなわち、図20に示す如く、稼働情報取得部11、データ前処理部12、経済指標予測部14、付加情報取得部15及び昇降機選択部16により経済指標予測装置100aの要部が構成されているものであっても良い。または、図21に示す如く、稼働情報取得部11、経済指標予測部14、付加情報取得部15及び昇降機選択部16により経済指標予測装置100aの要部が構成されているものであっても良い。 Further, as shown in FIG. 20 or 21, the economic indicator prediction device 100a may not have the index information acquisition unit 13. That is, as shown in FIG. 20, the main part of the economic indicator prediction device 100a is composed of the operation information acquisition unit 11, the data preprocessing unit 12, the economic indicator prediction unit 14, the additional information acquisition unit 15, and the elevator selection unit 16. It may be a thing. Alternatively, as shown in FIG. 21, the main part of the economic indicator prediction device 100a may be configured by the operation information acquisition unit 11, the economic indicator prediction unit 14, the additional information acquisition unit 15, and the elevator selection unit 16. ..

次に、そのほかの変形例について説明する。 Next, other modification examples will be described.

付加情報は、上記の具体例に限定されるものではない。また、昇降機選択処理は、上記の具体例に限定されるものではない。昇降機選択処理は、個々の指標Iに対応する1個以上の昇降機Eを選択するものであれば良い。すなわち、昇降機選択処理は、個々の指標Iの時間変動に対して、その稼働状態の時間変動が高い相関を有すると想定される1個以上の昇降機Eを選択するものであれば良い。付加情報は、かかる選択を実現可能な情報であれば、如何なる情報を含むものであっても良い。 The additional information is not limited to the above specific example. Further, the elevator selection process is not limited to the above specific example. The elevator selection process may be performed as long as one or more elevators E corresponding to the individual indexes I are selected. That is, the elevator selection process may select one or more elevators E that are expected to have a high correlation with the time variation of the individual index I in the operating state. The additional information may include any information as long as such selection is feasible.

例えば、付加情報は、複数個の施設Fのうちの1個以上の施設Fが複数個の企業により使用されるものであるとき、1個以上の施設Fの各々を使用する企業が属する業種を示す情報(以下「業種情報」という。)を含むものであっても良い。この場合、特定の業種に係る指数を用いた指標Iについて、当該特定の業種に属する企業により使用される施設Fに設置された昇降機Eが対象昇降機に選択されるものであっても良い。 For example, the additional information includes an industry to which a company that uses each of the one or more facilities F belongs when one or more of the facilities F are used by a plurality of companies. It may include information indicating (hereinafter referred to as "industry information"). In this case, with respect to the index I using the index related to the specific industry, the elevator E installed in the facility F used by the company belonging to the specific industry may be selected as the target elevator.

以上のように、実施の形態2に係る経済指標予測装置100aは、付加情報を取得する付加情報取得部15と、付加情報を用いて複数個の昇降機Eのうちの対象経済指標に対応する1個以上の昇降機Eを対象昇降機に選択する昇降機選択部16と、を備え、付加情報は、複数個の昇降機Eが複数個の施設Fに設置されているとき、複数個の施設Fの各々を含む地域を示す情報、複数個の施設Fの各々の種別を示す情報又は複数個の昇降機Eの各々の用途を示す情報のうちの少なくとも一つを含む。これにより、個々の指標Iの予測値PV1を算出するにあたり、予測値PV1の算出に適した昇降機Eに係る稼働情報を予測値PV1の算出に用いることができる。 As described above, the economic index prediction device 100a according to the second embodiment corresponds to the additional information acquisition unit 15 for acquiring additional information and the target economic index among the plurality of elevators E by using the additional information1. Elevator selection unit 16 for selecting one or more elevators E as the target elevator is provided, and additional information is provided for each of the plurality of facilities F when the plurality of elevators E are installed in the plurality of facilities F. It contains at least one of information indicating an area including, information indicating each type of the plurality of facilities F, or information indicating the use of each of the plurality of elevators E. Thereby, in calculating the predicted value PV1 of each index I, the operation information related to the elevator E suitable for the calculation of the predicted value PV1 can be used for the calculation of the predicted value PV1.

また、実施の形態2に係る予測用モデル生成装置200aは、付加情報を取得する付加情報取得部24と、付加情報を用いて複数個の昇降機Eのうちの対象経済指標に対応する1個以上の昇降機Eを対象昇降機に選択する昇降機選択部25と、を備え、付加情報は、複数個の昇降機Eが複数個の施設Fに設置されているとき、複数個の施設Fの各々を含む地域を示す情報、複数個の施設Fの各々の種別を示す情報又は複数個の昇降機Eの各々の用途を示す情報のうちの少なくとも一つを含む。これにより、個々の指標Iに対応するモデルMを生成するにあたり、モデルMの生成に適した昇降機Eに係る第1履歴情報をモデルMの生成に用いることができる。 Further, the prediction model generation device 200a according to the second embodiment has an additional information acquisition unit 24 for acquiring additional information, and one or more of the plurality of elevators E corresponding to the target economic index using the additional information. Elevator selection unit 25 for selecting the elevator E of the above as the target elevator, and additional information includes the area including each of the plurality of facilities F when the plurality of elevators E are installed in the plurality of facilities F. Includes at least one of information indicating the above, information indicating each type of the plurality of facilities F, or information indicating the use of each of the plurality of elevators E. Thereby, in generating the model M corresponding to each index I, the first history information related to the elevator E suitable for generating the model M can be used for the generation of the model M.

実施の形態3.
図22は、実施の形態3に係る生産計画装置の要部を示すブロック図である。図22を参照して、実施の形態3に係る生産計画装置について説明する。
Embodiment 3.
FIG. 22 is a block diagram showing a main part of the production planning apparatus according to the third embodiment. The production planning apparatus according to the third embodiment will be described with reference to FIG. 22.

図22に示す如く、生産計画装置300は、経済指標予測装置100、受注情報取得部51及び生産計画部52を有している。 As shown in FIG. 22, the production planning device 300 includes an economic indicator prediction device 100, an order information acquisition unit 51, and a production planning unit 52.

経済指標予測装置100は、実施の形態1にて説明したものと同様である。このため、経済指標予測装置100についての詳細な説明は省略する。経済指標予測装置100は、経済指標予測部14により算出された予測値PV1を生産計画部52に出力する。 The economic indicator prediction device 100 is the same as that described in the first embodiment. Therefore, a detailed description of the economic indicator prediction device 100 will be omitted. The economic indicator prediction device 100 outputs the predicted value PV1 calculated by the economic indicator prediction unit 14 to the production planning unit 52.

以下、1個の製品P、複数個の製品P、又は複数個の製品Pのうちの選択された1個以上の製品Pを総称して「対象製品」という。個々の製品Pは、任意のシステム、任意の装置又は任意の部品である。 Hereinafter, one product P, a plurality of products P, or one or more selected products P among the plurality of products P are collectively referred to as "target products". The individual product P is any system, any device or any component.

受注情報取得部51は、対象製品の受注数を示す情報(以下「受注情報」という。)を取得するものである。受注情報は、例えば、対象製品の生産者(すなわち生産計画装置300の使用者又は生産計画装置300を用いた役務の利用者)により入力されたものである。受注情報取得部51は、当該取得された受注情報を生産計画部52に出力するものである。 The order information acquisition unit 51 acquires information indicating the number of orders for the target product (hereinafter referred to as "order information"). The order information is, for example, input by the producer of the target product (that is, the user of the production planning device 300 or the user of the service using the production planning device 300). The order information acquisition unit 51 outputs the acquired order information to the production planning unit 52.

生産計画部52は、経済指標予測装置100により出力された予測値PV1を取得するとともに、受注情報取得部51により出力された受注情報を取得するものである。生産計画部52は、当該取得された予測値PV1及び当該取得された受注情報を用いて、対象製品の生産数の計画値PV2を算出するものである。生産計画部52は、当該算出された計画値PV2を出力するものである。 The production planning unit 52 acquires the predicted value PV1 output by the economic indicator prediction device 100, and also acquires the order information output by the order information acquisition unit 51. The production planning unit 52 calculates the planned value PV2 of the production number of the target product by using the acquired predicted value PV1 and the acquired order information. The production planning unit 52 outputs the calculated planned value PV2.

すなわち、通常、生産者が受注数に応じて対象製品を生産するとき、受注後納期前の期間内に突発的に注文が追加されることにより、受注数が増加することがある。または、受注後納期前の期間内に注文が部分的に取り消されることにより、受注数が減少することがある。対象製品の在庫数を制御する観点から、対象製品の生産を開始するよりも先に、かかる受注数の増減を考慮した生産数の計画値PV2を得ることが求められている。 That is, usually, when a producer produces a target product according to the number of orders, the number of orders may increase due to sudden addition of orders within the period after the order is placed and before the delivery date. Alternatively, the number of orders may decrease due to the partial cancellation of the order within the period after the order is placed and before the delivery date. From the viewpoint of controlling the number of inventories of the target product, it is required to obtain the planned value PV2 of the production number in consideration of the increase / decrease in the number of orders before starting the production of the target product.

ここで、かかる受注数の増減は、受注後納期前の時期における景気の動向に対する相関を有すると考えられる。例えば、景気後退期から景気拡張期に移行する時期においては、注文の追加が発生しやすいと考えられる。他方、景気拡張期から景気後退期に移行する時期においては、注文の取消しが発生しやすいと考えられる。 Here, it is considered that the increase / decrease in the number of orders has a correlation with the economic trend in the period after the order is received and before the delivery date. For example, during the transition from recession to diastole, additional orders are likely to occur. On the other hand, in the period of transition from the economic expansion period to the recession period, it is considered that the cancellation of orders is likely to occur.

そこで、生産計画部52は、経済指標予測装置100により算出された予測値PV1を計画値PV2の算出に用いる。予測値PV1を用いることにより、かかる受注数の増減を考慮した生産数の計画値PV2を算出することができる。 Therefore, the production planning unit 52 uses the predicted value PV1 calculated by the economic indicator prediction device 100 to calculate the planned value PV2. By using the predicted value PV1, it is possible to calculate the planned value PV2 of the production number in consideration of the increase / decrease in the number of orders.

計画値PV2の算出には、例えば、専用のモデル(以下「計画用モデル」という。)が用いられる。すなわち、計画用モデルは、予測値PV1及び受注情報の入力を受け付けて計画値PV2を出力するものである。計画用モデルの生成には、統計又は機械学習に係る公知の種々の技術を用いることができる。これらの技術についての詳細な説明は省略する。 For the calculation of the planned value PV2, for example, a dedicated model (hereinafter referred to as “planning model”) is used. That is, the planning model accepts the input of the predicted value PV1 and the order information and outputs the planned value PV2. Various known techniques related to statistics or machine learning can be used to generate a planning model. Detailed description of these techniques will be omitted.

または、例えば、計画値PV2の算出には、所定の数式が用いられる。すなわち、当該数式は、1個以上の変数を含むものである。個々の変数には、予測値PV1、予測値PV1に基づき算出された値、受注数を示す値、受注数を示す値に基づき算出された値、又は予測値PV1及び受注数を示す値に基づき算出された値が入力される。これにより、計画値PV2が算出される。 Alternatively, for example, a predetermined mathematical formula is used for calculating the planned value PV2. That is, the formula includes one or more variables. The individual variables include the predicted value PV1, the value calculated based on the predicted value PV1, the value indicating the number of orders, the value calculated based on the value indicating the number of orders, or the predicted value PV1 and the value indicating the number of orders. The calculated value is entered. As a result, the planned value PV2 is calculated.

そのほか、計画値PV2の算出には、公知の種々の技術を用いることができる。これらの技術についての詳細な説明は省略する。 In addition, various known techniques can be used to calculate the planned value PV2. Detailed description of these techniques will be omitted.

以下、経済指標予測装置100により実行される処理を総称して「経済指標予測処理等」ということがある。経済指標予測処理等に含まれる個々の処理は、実施の形態1にて説明したものと同様である。このため、これらの処理についての詳細な説明は省略する。また、受注情報取得部により実行される処理を総称して「受注情報取得処理」ということがある。また、生産計画部52により実行される処理を総称して「生産計画処理」ということがある。 Hereinafter, the processes executed by the economic indicator prediction device 100 may be collectively referred to as “economic indicator prediction processing, etc.”. The individual processes included in the economic indicator prediction process and the like are the same as those described in the first embodiment. Therefore, detailed description of these processes will be omitted. In addition, the processing executed by the order information acquisition unit may be collectively referred to as "order information acquisition processing". In addition, the processing executed by the production planning unit 52 may be collectively referred to as "production planning processing".

次に、図23を参照して、生産計画装置300の要部のハードウェア構成について説明する。 Next, with reference to FIG. 23, the hardware configuration of the main part of the production planning apparatus 300 will be described.

図23Aに示す如く、生産計画装置300は、プロセッサ61及びメモリ62を有している。メモリ62には、経済指標予測装置100、受注情報取得部51及び生産計画部52の機能を実現するためのプログラムが記憶されている。かかるプログラムをプロセッサ61が読み出して実行することにより、経済指標予測装置100、受注情報取得部51及び生産計画部52の機能が実現される。 As shown in FIG. 23A, the production planning apparatus 300 has a processor 61 and a memory 62. The memory 62 stores a program for realizing the functions of the economic indicator prediction device 100, the order information acquisition unit 51, and the production planning unit 52. When the processor 61 reads out and executes such a program, the functions of the economic indicator prediction device 100, the order information acquisition unit 51, and the production planning unit 52 are realized.

または、図23Bに示す如く、生産計画装置300は、処理回路63を有している。この場合、経済指標予測装置100、受注情報取得部51及び生産計画部52の機能は、専用の処理回路63により実現される。 Alternatively, as shown in FIG. 23B, the production planning apparatus 300 has a processing circuit 63. In this case, the functions of the economic indicator prediction device 100, the order information acquisition unit 51, and the production planning unit 52 are realized by the dedicated processing circuit 63.

または、生産計画装置300は、プロセッサ61、メモリ62及び処理回路63を有している(不図示)。この場合、経済指標予測装置100、受注情報取得部51及び生産計画部52の機能のうちの一部の機能がプロセッサ61及びメモリ62により実現されるとともに、残余の機能が処理回路63により実現される。 Alternatively, the production planning apparatus 300 has a processor 61, a memory 62, and a processing circuit 63 (not shown). In this case, some of the functions of the economic indicator prediction device 100, the order information acquisition unit 51, and the production planning unit 52 are realized by the processor 61 and the memory 62, and the remaining functions are realized by the processing circuit 63. To.

プロセッサ61は、1個又は複数個のプロセッサにより構成されている。個々のプロセッサは、例えば、CPU、GPU、マイクロプロセッサ、マイクロコントローラ又はDSPを用いたものである。 The processor 61 is composed of one or a plurality of processors. The individual processors use, for example, CPUs, GPUs, microprocessors, microcontrollers or DSPs.

メモリ62は、1個又は複数個の不揮発性メモリにより構成されている。または、メモリ62は、1個又は複数個の不揮発性メモリ及び1個又は複数個の揮発性メモリにより構成されている。すなわち、メモリ62は、1個又は複数個のメモリにより構成されている。個々のメモリは、例えば、半導体メモリ、磁気ディスク、光ディスク、光磁気ディスク又は磁気テープを用いたものである。より具体的には、個々の揮発性メモリは、例えば、RAMを用いたものである。また、個々の不揮発性メモリは、例えば、ROM、フラッシュメモリ、EPROM、EEPROM、ソリッドステートドライブ、ハードディスクドライブ、フレキシブルディスク、コンパクトディスク、DVD、ブルーレイディスク又はミニディスクを用いたものである。 The memory 62 is composed of one or a plurality of non-volatile memories. Alternatively, the memory 62 is composed of one or more non-volatile memories and one or more volatile memories. That is, the memory 62 is composed of one or a plurality of memories. The individual memory uses, for example, a semiconductor memory, a magnetic disk, an optical disk, a magneto-optical disk, or a magnetic tape. More specifically, the individual volatile memories use, for example, RAM. Further, as the individual non-volatile memory, for example, ROM, flash memory, EPROM, EEPROM, solid state drive, hard disk drive, flexible disk, compact disk, DVD, Blu-ray disk or mini disk are used.

処理回路63は、1個又は複数個のデジタル回路により構成されている。または、処理回路63は、1個又は複数個のデジタル回路及び1個又は複数個のアナログ回路により構成されている。すなわち、処理回路63は、1個又は複数個の処理回路により構成されている。個々の処理回路は、例えば、ASIC、PLD、FPGA、SoC又はシステムLSIを用いたものである。 The processing circuit 63 is composed of one or a plurality of digital circuits. Alternatively, the processing circuit 63 is composed of one or a plurality of digital circuits and one or a plurality of analog circuits. That is, the processing circuit 63 is composed of one or a plurality of processing circuits. The individual processing circuits use, for example, an ASIC, PLD, FPGA, SoC or system LSI.

次に、図24のフローチャートを参照して、生産計画装置300の動作について説明する。 Next, the operation of the production planning apparatus 300 will be described with reference to the flowchart of FIG. 24.

まず、経済指標予測装置100が経済指標予測処理等を実行する(ステップST21)。次いで、受注情報取得部51が受注情報取得処理を実行する(ステップST22)。次いで、生産計画部52が生産計画処理を実行する(ステップST23)。 First, the economic indicator prediction device 100 executes economic indicator prediction processing and the like (step ST21). Next, the order information acquisition unit 51 executes the order information acquisition process (step ST22). Next, the production planning unit 52 executes the production planning process (step ST23).

なお、経済指標予測処理等及び受注情報取得処理の実行順は、図24に示す例に限定されるものではない。経済指標予測処理等は、生産計画処理が実行されるよりも先に実行されるものであれば良い。受注情報取得処理は、生産計画処理が実行されるよりも先に実行されるものであれば良い。 The execution order of the economic indicator prediction process and the order information acquisition process is not limited to the example shown in FIG. 24. The economic indicator prediction process or the like may be executed before the production planning process is executed. The order information acquisition process may be executed before the production planning process is executed.

次に、図25を参照して、生産計画装置300の変形例について説明する。 Next, a modified example of the production planning apparatus 300 will be described with reference to FIG. 25.

図25に示す如く、生産計画装置300は、経済指標予測装置100に代えて経済指標予測装置100aを有するものであっても良い。経済指標予測装置100aは、実施の形態2にて説明したものと同様である。このため、経済指標予測装置100aについての詳細な説明は省略する。 As shown in FIG. 25, the production planning device 300 may have the economic indicator prediction device 100a instead of the economic indicator prediction device 100. The economic indicator prediction device 100a is the same as that described in the second embodiment. Therefore, a detailed description of the economic indicator prediction device 100a will be omitted.

なお、図22に示す生産計画装置300における経済指標予測装置100は、実施の形態1にて説明したものと同様の種々の変形例を採用することができる。また、図25に示す生産計画装置300における経済指標予測装置100aは、実施の形態2にて説明したものと同様の種々の変形例を採用することができる。 As the economic indicator prediction device 100 in the production planning device 300 shown in FIG. 22, various modifications similar to those described in the first embodiment can be adopted. Further, as the economic indicator prediction device 100a in the production planning device 300 shown in FIG. 25, various modifications similar to those described in the second embodiment can be adopted.

以上のように、実施の形態3に係る生産計画装置300は、経済指標予測装置100又は経済指標予測装置100aと、対象製品の受注数を示す受注情報を取得する受注情報取得部51と、予測値PV1及び受注情報を用いて対象製品の生産数の計画値PV2を算出する生産計画部52と、を備える。予測値PV1を用いることにより、注文の追加による受注数の増加及び注文の取消しによる受注数の減少などを考慮した生産数の計画値PV2を算出することができる。 As described above, the production planning device 300 according to the third embodiment includes the economic index prediction device 100 or the economic index prediction device 100a, and the order information acquisition unit 51 that acquires order information indicating the number of orders for the target product. It includes a production planning unit 52 that calculates a planned value PV2 of the number of production of the target product using the value PV1 and the order information. By using the predicted value PV1, it is possible to calculate the planned value PV2 of the production number in consideration of the increase in the number of orders due to the addition of orders and the decrease in the number of orders due to the cancellation of orders.

なお、本願発明はその発明の範囲内において、各実施の形態の自由な組み合わせ、あるいは各実施の形態の任意の構成要素の変形、もしくは各実施の形態において任意の構成要素の省略が可能である。 It should be noted that, within the scope of the present invention, any combination of embodiments can be freely combined, any component of each embodiment can be modified, or any component can be omitted in each embodiment. ..

また、各実施の形態において、稼働情報取得部は、対象昇降機の稼働状態を示す稼働情報を取得するのに代えて又は加えて、他の機器等の稼働状態を示す稼働情報を取得するものであっても良い。例えば、稼働情報取得部は、工場等に設置された生産設備(以下「対象生産設備」という。)の稼働状態を示す稼働情報を取得するものであっても良い。予測用モデルは、当該取得された稼働情報の入力を受け付けて、対象経済指標の予測値を出力するものであっても良い。この場合における稼働情報は、例えば、対象生産設備の稼働率を示す情報、対象生産設備による生産量を示す情報、又は対象生産設備による生産に使用された部品の量を示す情報のうちの少なくとも一つを含むものであっても良い。 Further, in each embodiment, the operation information acquisition unit acquires operation information indicating the operation state of other equipment or the like in place of or in addition to acquiring the operation information indicating the operation state of the target elevator. There may be. For example, the operation information acquisition unit may acquire operation information indicating the operation state of the production equipment (hereinafter referred to as “target production equipment”) installed in a factory or the like. The forecasting model may be one that accepts the input of the acquired operation information and outputs the forecasted value of the target economic indicator. The operation information in this case is, for example, at least one of information indicating the operating rate of the target production equipment, information indicating the production amount by the target production equipment, or information indicating the amount of parts used for production by the target production equipment. It may include one.

また、各実施の形態において、履歴情報取得部は、稼働情報取得部により取得される稼働情報に対応する第1履歴情報を取得するものであれば良い。すなわち、履歴情報取得部は、対象昇降機の稼働状態の履歴を示す第1履歴情報を取得するのに代えて又は加えて、他の機器等の稼働状態の履歴を示す第1履歴情報を取得するものであっても良い。例えば、履歴情報取得部は、対象生産設備の稼働状態の履歴を示す第1履歴情報を取得するものであっても良い。予測用モデル生成部は、当該取得された第1履歴情報を予測用モデルの生成に用いるものであっても良い。 Further, in each embodiment, the history information acquisition unit may acquire the first history information corresponding to the operation information acquired by the operation information acquisition unit. That is, the history information acquisition unit acquires, in addition to, instead of acquiring the first history information indicating the history of the operating state of the target elevator, the first history information indicating the history of the operating state of other devices and the like. It may be a thing. For example, the history information acquisition unit may acquire the first history information indicating the history of the operating state of the target production equipment. The prediction model generation unit may use the acquired first history information to generate a prediction model.

本発明の経済指標予測装置、生産計画装置、予測用モデル生成装置及び予測用モデル生成方法は、例えば、対象製品の生産数の計画に用いることができる。 The economic indicator prediction device, the production planning device, the prediction model generation device, and the prediction model generation method of the present invention can be used, for example, for planning the production number of the target product.

11 稼働情報取得部、12 データ前処理部、13 指標情報取得部、14 経済指標予測部、15 付加情報取得部、16 昇降機選択部、21 履歴情報取得部、22 データ前処理部、23 予測用モデル生成部、24 付加情報取得部、25 昇降機選択部、31 プロセッサ、32 メモリ、33 処理回路、41 プロセッサ、42 メモリ、43 処理回路、51 受注情報取得部、52 生産計画部、61 プロセッサ、62 メモリ、63 処理回路、100,100a 経済指標予測装置、200,200a 予測用モデル生成装置、300 生産計画装置。 11 Operation information acquisition unit, 12 Data preprocessing unit, 13 Indicator information acquisition unit, 14 Economic index prediction unit, 15 Additional information acquisition unit, 16 Elevator selection unit, 21 History information acquisition unit, 22 Data preprocessing unit, 23 For prediction Model generation unit, 24 additional information acquisition unit, 25 elevator selection unit, 31 processor, 32 memory, 33 processing circuit, 41 processor, 42 memory, 43 processing circuit, 51 order information acquisition unit, 52 production planning unit, 61 processor, 62 Memory, 63 processing circuit, 100, 100a economic index prediction device, 200, 200a prediction model generation device, 300 production planning device.

Claims (18)

対象昇降機の稼働状態を示す稼働情報を取得する稼働情報取得部と、
前記稼働情報の入力を受け付けて対象経済指標の予測値を出力する予測用モデルを用いて、前記対象経済指標の予測をする経済指標予測部と、
を備える経済指標予測装置。
An operation information acquisition unit that acquires operation information indicating the operation status of the target elevator,
An economic indicator prediction unit that predicts the target economic indicator using a forecasting model that accepts the input of the operation information and outputs the predicted value of the target economic indicator.
An economic indicator forecaster equipped with.
前記稼働情報は、前記対象昇降機の稼働回数を示す情報、前記対象昇降機の走行距離を示す情報、前記対象昇降機の走行時間を示す情報、前記対象昇降機の積載重量を示す情報又は前記対象昇降機の搭乗者数を示す情報のうちの少なくとも一つを含むことを特徴とする請求項1記載の経済指標予測装置。 The operation information includes information indicating the number of times the target elevator has been operated, information indicating the mileage of the target elevator, information indicating the traveling time of the target elevator, information indicating the load weight of the target elevator, or boarding of the target elevator. The economic indicator predictor according to claim 1, wherein the device includes at least one of information indicating the number of persons. 付加情報を取得する付加情報取得部と、
前記付加情報を用いて複数個の昇降機のうちの前記対象経済指標に対応する1個以上の昇降機を前記対象昇降機に選択する昇降機選択部と、を備え、
前記付加情報は、前記複数個の昇降機が複数個の施設に設置されているとき、前記複数個の施設の各々を含む地域を示す情報、前記複数個の施設の各々の種別を示す情報又は前記複数個の昇降機の各々の用途を示す情報のうちの少なくとも一つを含む
ことを特徴とする請求項1記載の経済指標予測装置。
The additional information acquisition unit that acquires additional information,
It is provided with an elevator selection unit that selects one or more elevators corresponding to the target economic index among the plurality of elevators as the target elevator by using the additional information.
The additional information is information indicating an area including each of the plurality of facilities, information indicating the type of each of the plurality of facilities, or the above-mentioned information indicating the type of each of the plurality of facilities when the plurality of elevators are installed in the plurality of facilities. The economic indicator predictor according to claim 1, further comprising at least one of information indicating the use of each of the plurality of elevators.
前記稼働情報に対する前処理を実行するデータ前処理部を備え、
前記稼働情報は、時系列データにより構成されており、
前記前処理は、前記時系列データにおける季節変動を除去する処理を含む
ことを特徴とする請求項1記載の経済指標予測装置。
A data pre-processing unit that executes pre-processing for the operation information is provided.
The operation information is composed of time series data, and is composed of time series data.
The economic indicator prediction device according to claim 1, wherein the preprocessing includes a process for removing seasonal fluctuations in the time series data.
前記稼働情報に対する前処理を実行するデータ前処理部を備え、
前記稼働情報は、時系列データにより構成されており、
前記前処理は、前記時系列データに含まれる異常値を除去する処理を含む
ことを特徴とする請求項1記載の経済指標予測装置。
A data pre-processing unit that executes pre-processing for the operation information is provided.
The operation information is composed of time series data, and is composed of time series data.
The economic indicator prediction device according to claim 1, wherein the preprocessing includes a process of removing an abnormal value included in the time series data.
前記予測用モデルは、前記稼働状態の履歴と前記対象経済指標の履歴との時間的ずれ量に基づくものであることを特徴とする請求項1記載の経済指標予測装置。 The economic indicator prediction device according to claim 1, wherein the forecasting model is based on a time lag between the history of the operating state and the history of the target economic indicator. 前記予測用モデルは、前記稼働状態の履歴を示す第1時系列データと前記対象経済指標の履歴を示す第2時系列データとの時系列的な相関関係に基づくものであることを特徴とする請求項6記載の経済指標予測装置。 The forecasting model is characterized in that it is based on a time-series correlation between the first time-series data showing the history of the operating state and the second time-series data showing the history of the target economic indicator. The economic indicator prediction device according to claim 6. 前記対象経済指標を示す指標情報を取得する指標情報取得部を備え、
前記予測用モデルは、前記稼働情報及び前記指標情報の入力を受け付けて前記予測値を出力するものである
ことを特徴とする請求項1記載の経済指標予測装置。
It is equipped with an index information acquisition unit that acquires index information indicating the target economic indicator.
The economic indicator prediction device according to claim 1, wherein the prediction model accepts inputs of the operation information and the index information and outputs the predicted value.
請求項1記載の経済指標予測装置と、
対象製品の受注数を示す受注情報を取得する受注情報取得部と、
前記予測値及び前記受注情報を用いて前記対象製品の生産数の計画値を算出する生産計画部と、
を備える生産計画装置。
The economic indicator prediction device according to claim 1 and
The order information acquisition department that acquires order information indicating the number of orders for the target product,
A production planning unit that calculates a planned value of the number of production of the target product using the predicted value and the order information.
Production planning equipment.
対象昇降機の稼働状態の履歴を示す第1履歴情報を取得するとともに、対象経済指標の履歴を示す第2履歴情報を取得する履歴情報取得部と、
前記第1履歴情報及び前記第2履歴情報を用いて予測用モデルを生成する予測用モデル生成部と、を備え、
前記予測用モデルは、前記稼働状態を示す稼働情報の入力を受け付けて前記対象経済指標の予測値を出力するものである
ことを特徴とする予測用モデル生成装置。
A history information acquisition unit that acquires the first history information indicating the history of the operating state of the target elevator and the second history information indicating the history of the target economic indicator.
A prediction model generation unit that generates a prediction model using the first history information and the second history information is provided.
The forecasting model is a forecasting model generator, characterized in that it receives an input of operating information indicating the operating state and outputs a predicted value of the target economic indicator.
前記第1履歴情報は、前記対象昇降機の稼働回数の履歴を示す情報、前記対象昇降機の走行距離の履歴を示す情報、前記対象昇降機の走行時間の履歴を示す情報、前記対象昇降機の積載重量の履歴を示す情報又は前記対象昇降機の搭乗者数の履歴を示す情報のうちの少なくとも一つを含むことを特徴とする請求項10記載の予測用モデル生成装置。 The first history information includes information indicating the history of the number of times the target elevator has been operated, information indicating the history of the travel distance of the target elevator, information indicating the history of the travel time of the target elevator, and the load weight of the target elevator. The predictive model generation device according to claim 10, further comprising at least one of information indicating a history or information indicating a history of the number of passengers of the target elevator. 付加情報を取得する付加情報取得部と、
前記付加情報を用いて複数個の昇降機のうちの前記対象経済指標に対応する1個以上の昇降機を前記対象昇降機に選択する昇降機選択部と、を備え、
前記付加情報は、前記複数個の昇降機が複数個の施設に設置されているとき、前記複数個の施設の各々を含む地域を示す情報、前記複数個の施設の各々の種別を示す情報又は前記複数個の昇降機の各々の用途を示す情報のうちの少なくとも一つを含む
ことを特徴とする請求項10記載の予測用モデル生成装置。
The additional information acquisition unit that acquires additional information,
It is provided with an elevator selection unit that selects one or more elevators corresponding to the target economic index among the plurality of elevators as the target elevator by using the additional information.
When the plurality of elevators are installed in a plurality of facilities, the additional information includes information indicating an area including each of the plurality of facilities, information indicating the type of each of the plurality of facilities, or the above-mentioned information. The predictive model generator according to claim 10, further comprising at least one of information indicating the use of each of the plurality of elevators.
前記第1履歴情報に対する前処理を実行するデータ前処理部を備え、
前記第1履歴情報は、第1時系列データにより構成されており、
前記前処理は、前記第1時系列データにおける季節変動を除去する処理を含む
ことを特徴とする請求項10記載の予測用モデル生成装置。
A data pre-processing unit that executes pre-processing for the first history information is provided.
The first history information is composed of the first time series data.
The prediction model generation device according to claim 10, wherein the pre-processing includes a processing for removing seasonal fluctuations in the first time-series data.
前記第1履歴情報に対する前処理を実行するデータ前処理部を備え、
前記第1履歴情報は、第1時系列データにより構成されており、
前記前処理は、前記第1時系列データに含まれる異常値を除去する処理を含む
ことを特徴とする請求項10記載の予測用モデル生成装置。
A data pre-processing unit that executes pre-processing for the first history information is provided.
The first history information is composed of the first time series data.
The predictive model generation device according to claim 10, wherein the preprocessing includes a process of removing an abnormal value included in the first time series data.
前記予測用モデル生成部は、前記稼働状態の履歴と前記対象経済指標の履歴との時間的ずれ量に基づき前記予測用モデルを生成することを特徴とする請求項10記載の予測用モデル生成装置。 The prediction model generation device according to claim 10, wherein the prediction model generation unit generates the prediction model based on the amount of time lag between the history of the operating state and the history of the target economic indicator. .. 前記第1履歴情報は、第1時系列データにより構成されており、
前記第2履歴情報は、第2時系列データにより構成されており、
前記予測用モデル生成部は、前記第1時系列データと前記第2時系列データとの時系列的な相関関係に基づき前記予測用モデルを生成する
ことを特徴とする請求項15記載の予測用モデル生成装置。
The first history information is composed of the first time series data.
The second history information is composed of second time series data.
The prediction model according to claim 15, wherein the prediction model generation unit generates the prediction model based on the time-series correlation between the first time-series data and the second time-series data. Model generator.
前記予測用モデルは、前記稼働情報及び前記対象経済指標を示す指標情報の入力を受け付けて前記予測値を出力するものであることを特徴とする請求項10記載の予測用モデル生成装置。 The prediction model generation device according to claim 10, wherein the prediction model accepts input of operation information and index information indicating the target economic indicator and outputs the prediction value. 履歴情報取得部が、対象昇降機の稼働状態の履歴を示す第1履歴情報を取得するとともに、対象経済指標の履歴を示す第2履歴情報を取得するステップと、
予測用モデル生成部が、前記第1履歴情報及び前記第2履歴情報を用いて予測用モデルを生成するステップと、を備え、
前記予測用モデルは、前記稼働状態を示す稼働情報の入力を受け付けて前記対象経済指標の予測値を出力するものである
ことを特徴とする予測用モデル生成方法。
A step in which the history information acquisition unit acquires the first history information indicating the history of the operating state of the target elevator and the second history information indicating the history of the target economic indicator.
The prediction model generation unit includes a step of generating a prediction model using the first history information and the second history information.
The prediction model is a method for generating a prediction model, characterized in that it receives an input of operation information indicating the operation state and outputs a predicted value of the target economic index.
JP2021530126A 2019-09-27 2019-09-27 Economic indicator forecasting device, production planning device, forecasting model generator and forecasting model generation method Expired - Fee Related JP6987311B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2019/038147 WO2021059480A1 (en) 2019-09-27 2019-09-27 Economic indicator prediction device, production planning device, prediction model generation device, and prediction model generation method

Publications (2)

Publication Number Publication Date
JPWO2021059480A1 JPWO2021059480A1 (en) 2021-10-21
JP6987311B2 true JP6987311B2 (en) 2021-12-22

Family

ID=75165671

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021530126A Expired - Fee Related JP6987311B2 (en) 2019-09-27 2019-09-27 Economic indicator forecasting device, production planning device, forecasting model generator and forecasting model generation method

Country Status (4)

Country Link
JP (1) JP6987311B2 (en)
KR (1) KR102498392B1 (en)
CN (1) CN114450702A (en)
WO (1) WO2021059480A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113094654B (en) * 2021-04-06 2025-02-21 中国工商银行股份有限公司 A product data processing method, device and equipment
WO2024236615A1 (en) * 2023-05-12 2024-11-21 三菱電機株式会社 Production planning system, learning device, and inference device

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4228862B2 (en) * 2003-09-30 2009-02-25 株式会社日立製作所 Facility operation planning system and facility operation system
JP4717770B2 (en) * 2006-09-27 2011-07-06 住友重機械工業株式会社 Demand prediction method, demand prediction device, demand prediction program, and recording medium recording the program
JP6359354B2 (en) * 2014-06-19 2018-07-18 株式会社日立ビルシステム Elevator maintenance support system and elevator maintenance support method
JP6290806B2 (en) * 2015-03-13 2018-03-07 株式会社Quick Evaluation system, evaluation method, and evaluation program
KR20180043928A (en) * 2016-10-21 2018-05-02 현대엘리베이터주식회사 Method for predicting elevator calls using hybrid artificial intelligence learning techniques
JP6875231B2 (en) 2017-09-06 2021-05-19 株式会社Nttドコモ Information processing device

Also Published As

Publication number Publication date
WO2021059480A1 (en) 2021-04-01
CN114450702A (en) 2022-05-06
KR102498392B1 (en) 2023-02-10
JPWO2021059480A1 (en) 2021-10-21
KR20220038821A (en) 2022-03-29

Similar Documents

Publication Publication Date Title
JP6850757B2 (en) Demand forecasting system and method
JP6565185B2 (en) Optimization system, optimization method and optimization program
Roldán et al. Robustness of inventory replenishment and customer selection policies for the dynamic and stochastic inventory-routing problem
JP7219808B2 (en) PLANNING DEVICE, OPERATION PLAN GENERATION METHOD, HYDROGEN PRODUCTION METHOD, AND PROGRAM
JP6987311B2 (en) Economic indicator forecasting device, production planning device, forecasting model generator and forecasting model generation method
JP7099805B2 (en) Predictors, prediction systems, prediction methods and programs
JP2023124238A (en) Demand forecasting system, learning system, demand forecasting method, learning method, and program
JP6705716B2 (en) Power demand forecasting method and power demand forecasting program
US11301806B2 (en) Recommended order quantity determining device, recommended order quantity determination method, and recommended order quantity determination program
JP6735875B1 (en) Reservation number prediction device
JP4565490B2 (en) Emergency service simulation system and method
JP6416719B2 (en) Operation support system
JP7090298B2 (en) Evacuation judgment support method and evacuation judgment support device
JP6690882B2 (en) Cash Management Information Providing Device, Cash Management Information Providing Method, and Cash Management Information Providing Program
Lin et al. Combined forecasting of patient arrivals and doctor rostering simulation modelling for hospital emergency department
JP4222955B2 (en) Electricity demand forecast method
Khadem et al. Decentralized multi-commodity and multi-period mathematical model for disaster relief goods location and distribution using HACO-VNS hybrid algorithm
JP7491191B2 (en) Demand forecasting program, demand forecasting device, and demand forecasting method
JP6729330B2 (en) Manufacturing term prediction device, manufacturing term prediction method, and computer program
You et al. A predictive maintenance scheduling framework utilizing residual life prediction information
JP7437542B1 (en) Information processing device, method for controlling the information processing device, and control program for the information processing device
JP2018205877A (en) Offer number prediction device and offer number prediction method and offer number prediction program
Tzanakakis Risk Assessment Techniques
Andonotopo et al. Protecting Maternal Health in an Era of Aid Contraction: A Systematic Review of Resilient National Financing, Commodity Security, Governance, Workforce, and Social Protection Linkages
JP2025132475A (en) Demand forecasting method, demand forecasting device, and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210527

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20210527

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20211102

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211130

R150 Certificate of patent or registration of utility model

Ref document number: 6987311

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees