JP6989326B2 - Tunnel construction method - Google Patents
[go: Go Back, main page]

JP6989326B2 - Tunnel construction method - Google Patents

Tunnel construction method Download PDF

Info

Publication number
JP6989326B2
JP6989326B2 JP2017180139A JP2017180139A JP6989326B2 JP 6989326 B2 JP6989326 B2 JP 6989326B2 JP 2017180139 A JP2017180139 A JP 2017180139A JP 2017180139 A JP2017180139 A JP 2017180139A JP 6989326 B2 JP6989326 B2 JP 6989326B2
Authority
JP
Japan
Prior art keywords
tunnel
reinforcing pipe
excavation
reinforcing
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017180139A
Other languages
Japanese (ja)
Other versions
JP2019056213A (en
Inventor
兼一 田村
明 山田
Original Assignee
株式会社ケー・エフ・シー
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社ケー・エフ・シー filed Critical 株式会社ケー・エフ・シー
Priority to JP2017180139A priority Critical patent/JP6989326B2/en
Publication of JP2019056213A publication Critical patent/JP2019056213A/en
Application granted granted Critical
Publication of JP6989326B2 publication Critical patent/JP6989326B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

本発明は、トンネル施工方法に関する。 The present invention relates to a tunnel construction method.

特許文献1には、先受け区間の断面において、上下に二重以上の鋼管を配置する長尺鋼管先受け工法が提案されている。この長尺鋼管先受け工法では、打設される各鋼管は、軸方向の長さが異なる複数の管を有しており、複数の鋼管の間で、各管の接合箇所が、軸方向に異なるようにすることで、鋼管剛性の弱点部を分散している。 Patent Document 1 proposes a long steel pipe tip receiving method in which two or more steel pipes are arranged one above the other in the cross section of the first receiving section. In this long steel pipe tip receiving method, each steel pipe to be cast has a plurality of pipes having different axial lengths, and the joint portion of each pipe is axially formed between the plurality of steel pipes. By making them different, the weak points of the steel pipe rigidity are dispersed.

特開2014−062385号公報Japanese Unexamined Patent Publication No. 2014-062385

図1及び図2を用いて、特許文献1に例示される従来のトンネル施工方法の問題点について説明する。図1及び図2は、従来例に係るトンネル施工方法を模式的に例示する縦断面図及び横断面図である。従来のトンネル施工方法では、所定の間隔で地山を掘削することで、トンネル80を掘り進めていく。 The problems of the conventional tunnel construction method exemplified in Patent Document 1 will be described with reference to FIGS. 1 and 2. 1 and 2 are a vertical sectional view and a horizontal sectional view schematically illustrating a tunnel construction method according to a conventional example. In the conventional tunnel construction method, the tunnel 80 is dug by excavating the ground at predetermined intervals.

地山を掘削した領域では、トンネル80の天井面から両側面にわたって、トンネル80の周方向に(鋼製)支保工90を設置すると共に、天井面、両側面、及び掘削面82を含む掘削抗壁に吹付コンクリート91を施工する。また、更に、その後、トンネル80の支保材として、吹付コンクリート91表面からほぼ直交方向に、即ちトンネル周囲の地山に放射方向にロックボルト92を打設する。 In the area where the ground has been excavated, a (steel) support 90 is installed in the circumferential direction of the tunnel 80 from the ceiling surface to both sides of the tunnel 80, and the excavation resistance including the ceiling surface, both side surfaces, and the excavation surface 82. Install sprayed concrete 91 on the wall. Further, after that, the lock bolt 92 is placed as a support material for the tunnel 80 in a direction substantially orthogonal to the surface of the sprayed concrete 91, that is, in a radial direction on the ground around the tunnel.

一方、トンネル80の切羽81の崩落を防ぐため、トンネル80の支保とは別の補助工法(詳細には、先受け工)として、トンネル掘進の所定長ごとに、周方向に所定の間隔を空けて、掘削面82直近の支保工90をガイドとして切羽前方地山に向けて所定の仰角で、複数の第1補強管95を掘削面(鏡面)82から打設し、補強管95内外に注入材を注入して地山を一体化する。このとき、各第1補強管95の後端の一部は、掘削面82から掘進方向前方に位置する掘削予定の領域83に打設されるが、第1補強管95の殆どの部分は、掘削予定の領域83の上側の周囲領域84に打設され、領域83の上方を覆うように配置される。 On the other hand, in order to prevent the face 81 of the tunnel 80 from collapsing, as an auxiliary construction method (specifically, a pre-received construction) different from the support of the tunnel 80, a predetermined interval is provided in the circumferential direction for each predetermined length of tunnel excavation. Then, using the support 90 closest to the excavation surface 82 as a guide, a plurality of first reinforcing pipes 95 are driven from the excavation surface (mirror surface) 82 at a predetermined elevation angle toward the ground in front of the face, and injected into and out of the reinforcing pipe 95. Inject wood to integrate the ground. At this time, a part of the rear end of each first reinforcing pipe 95 is driven into the area 83 to be excavated located in front of the excavation surface 82 in the excavation direction, but most of the part of the first reinforcing pipe 95 is. It is placed in the peripheral area 84 above the area 83 to be excavated and is arranged so as to cover the upper part of the area 83.

各第1補強管95及びその周辺地山に注入された注入材は、トンネル80を更に掘り進める際に、トンネル80上の周囲領域84の地山を一体化して掘進時の崩落を抑制する。また、周囲領域84の地山を一体化しても掘削面82に向けて切羽前方地山が押し出してくる山では、更なる補助工法(詳細には、鏡補強工)として、掘進方向前方に向けて水平方向に複数の第2補強管96を掘削面82から打設すると共に必要に応じその周囲に注入材を注入することで、切羽前方地山を補強し安定性を高めていた。そのため、従来のトンネル施工方法では、所定の掘進長ごとに、第1補強管95及び第2補強管96の2種類の補強管を別行程で打設することになり、支保とは異なる仮設資材である補助工法の施工効率が悪く、またコストが高くなってしまうという問題点があった。 When the tunnel 80 is further dug, the injection material injected into each of the first reinforcing pipes 95 and the surrounding ground is integrated with the ground of the peripheral region 84 on the tunnel 80 to suppress the collapse during excavation. In addition, even if the ground of the surrounding area 84 is integrated, in the mountain where the ground in front of the face is pushed out toward the excavation surface 82, as a further auxiliary construction method (specifically, mirror reinforcement work), the ground is directed toward the front in the excavation direction. By driving a plurality of second reinforcing pipes 96 in the horizontal direction from the excavation surface 82 and injecting an injection material around them as needed, the ground in front of the face was reinforced and the stability was improved. Therefore, in the conventional tunnel construction method, two types of reinforcing pipes, the first reinforcing pipe 95 and the second reinforcing pipe 96, are placed in a separate process for each predetermined excavation length, which is a temporary material different from the support. There is a problem that the construction efficiency of the auxiliary construction method is poor and the cost is high.

なお、補助工法を施工した後、トンネル80を更に掘り進める際には、各第1補強管95の後端の一部及び各第2補強管96と共に地山を掘削する。この過程において、各第1補強管95の残りの部分が、既設の補強管95Aとして先受け工の役割を果たすように周囲領域84を一体化している。また、切羽81の後方では、吹付コンクリート91の表面に防水シート(不図示)を敷設した後、移動式型枠をセットして、二次覆工コンクリート93を施工する。これらの工程が目的の範囲で完了することで、トンネル80は完成する。 When the tunnel 80 is further dug after the auxiliary construction method is constructed, the ground is excavated together with a part of the rear end of each first reinforcing pipe 95 and each second reinforcing pipe 96. In this process, the remaining portion of each first reinforcing pipe 95 integrates the peripheral region 84 so as to serve as a pre-receiver as the existing reinforcing pipe 95A. Further, behind the face 81, a waterproof sheet (not shown) is laid on the surface of the sprayed concrete 91, a mobile formwork is set, and the secondary lining concrete 93 is constructed. When these steps are completed within the desired range, the tunnel 80 is completed.

本発明は、一側面では、このような点を考慮してなされたものであり、その目的は、低コストで切羽前方地山の補強を効率的に行うことのできるトンネル施工方法を提供することである。 The present invention has been made in consideration of such a point on one aspect, and an object of the present invention is to provide a tunnel construction method capable of efficiently reinforcing the ground in front of the face at low cost. Is.

本発明は、上述した課題を解決するために、以下の構成を採用する。 The present invention adopts the following configuration in order to solve the above-mentioned problems.

すなわち、本発明の一側面に係るトンネル施工方法は、地山を掘削することで、トンネルを掘り進めるステップと、前記地山を掘削した領域において、前記トンネルの天井面から両側面にわたって、前記トンネルの周方向に支保工を設置するステップと、前記トンネルの切羽の掘削面において、前記周方向に所定の間隔を空けて複数の補強管を打設するステップであって、前記掘削面から前記トンネルの掘進方向前方に位置する掘削予定の第1領域に打設される第1部分、及び前記第1領域の放射方向外側に隣接する第2領域に打設される第2部分を当該複数の補強管それぞれが有するように、前記支保工から放射方向内側に離間した位置に、前記掘進方向に対して所定の仰角で当該複数の補強管それぞれを打設するステップと、を備える。 That is, the tunnel construction method according to one aspect of the present invention is a step of digging a tunnel by excavating a ground and the tunnel from the ceiling surface to both sides of the tunnel in the excavated area of the ground. A step of installing a support in the circumferential direction of the tunnel and a step of placing a plurality of reinforcing pipes at a predetermined interval in the circumferential direction on the excavated surface of the face of the tunnel, from the excavated surface to the tunnel. The plurality of reinforcements are placed in the first part to be driven in the first area to be excavated located in front of the excavation direction of the above, and the second part to be placed in the second area adjacent to the outside of the first area in the radial direction. As each of the pipes has, a step of placing each of the plurality of reinforcing pipes at a predetermined elevation angle with respect to the excavation direction is provided at a position separated inward in the radial direction from the support.

当該トンネル施工方法では、トンネルの切羽の掘削面において、周方向に所定の間隔を空けて複数の補強管を打設する。このとき、掘削予定の第1領域に打設される第1部分及び第1領域の放射方向外側に隣接する第2領域に打設される第2部分を各補強管が有するように、支保工から放射方向内側に離間した位置に、掘進方向に対して所定の仰角で各補強管を打設する。 In the tunnel construction method, a plurality of reinforcing pipes are placed on the excavated surface of the tunnel face at predetermined intervals in the circumferential direction. At this time, support work is carried out so that each reinforcing pipe has a first portion to be driven into the first region to be excavated and a second portion to be driven into the second region adjacent to the outside in the radial direction of the first region. Each reinforcing pipe is placed at a position separated from the inside in the radial direction at a predetermined elevation angle with respect to the excavation direction.

これにより、各補強管の第2部分を、切羽における第2領域からの崩落を抑制する先受け工として機能させつつ、各補強管の第1部分を、切羽前方地山の安定性を高める鏡補強工として機能させることができる。すなわち、先受け工及び鏡補強工の2つの役割を各補強管に持たせることができる。したがって、本発明によれば、低コストで切羽前方地山の補強を効率的に行うことができる。 As a result, the second part of each reinforcing pipe functions as a pre-receiver that suppresses the collapse of the face from the second region, while the first part of each reinforcing pipe is a mirror that enhances the stability of the ground in front of the face. It can function as a reinforcement work. That is, each reinforcing pipe can have two roles of a pre-receiver and a mirror reinforcing pipe. Therefore, according to the present invention, it is possible to efficiently reinforce the ground in front of the face at low cost.

また、上記一側面に係るトンネル施工方法において、前記複数の補強管それぞれは、前記第1部分により前記掘削面を補強するため、前記支保工から放射方向内側に900mm〜1300mm離間した位置に打設されてよい。当該構成によれば、各補強管の第1部分により、切羽前方地山の安定性を十分に高めることができる。 Further, in the tunnel construction method according to the one side surface, each of the plurality of reinforcing pipes is placed at a position 900 mm to 1300 mm inward in the radial direction from the support in order to reinforce the excavated surface by the first portion. May be done. According to this configuration, the stability of the ground in front of the face can be sufficiently enhanced by the first portion of each reinforcing pipe.

また、上記一側面に係るトンネル施工方法において、前記第1部分と前記第2部分との比率が1:0.8〜1:1.2になるように、前記複数の補強管は打設されてよい。当該構成によれば、第1部分及び第2部分それぞれに先受け工及び鏡補強工それぞれの役割を十分に発揮させることができる。したがって、当該構成によれば、切羽を適切に補強することができる。 Further, in the tunnel construction method according to the one side surface, the plurality of reinforcing pipes are placed so that the ratio of the first portion to the second portion is 1: 0.8 to 1: 1.2. It's okay. According to this configuration, the roles of the pre-receiver and the mirror reinforcement work can be fully exerted in each of the first part and the second part. Therefore, according to the configuration, the face can be appropriately reinforced.

また、上記一側面に係るトンネル施工方法において、前記複数の補強管それぞれは、前記掘進方向に対して8度〜12度の仰角で打設されてよい。当該構成によれば、第1部分及び第2部分それぞれに先受け工及び鏡補強工それぞれの役割を十分に発揮させることができる。したがって、当該構成によれば、切羽前方地山をより適切に補強することができる。 Further, in the tunnel construction method according to the one side surface, each of the plurality of reinforcing pipes may be driven at an elevation angle of 8 to 12 degrees with respect to the excavation direction. According to this configuration, the roles of the pre-receiver and the mirror reinforcement work can be fully exerted in each of the first part and the second part. Therefore, according to the configuration, the ground in front of the face can be reinforced more appropriately.

また、上記一側面に係るトンネル施工方法において、前記複数の補強管それぞれの少なくとも前記第1部分には、前記掘削の際に切除可能なように1又は複数のスリットが設けられてよい。当該構成によれば、地山の更なる掘削をする際に、各補強管において掘削断面内に露出することとなる第1部分を容易に切断することができる。これにより、トンネルの施工性を高めることができる。 Further, in the tunnel construction method according to the one side surface, at least the first portion of each of the plurality of reinforcing pipes may be provided with one or a plurality of slits so as to be cut off during the excavation. According to this configuration, when further excavating the ground, it is possible to easily cut the first portion of each reinforcing pipe that will be exposed in the excavated cross section. This makes it possible to improve the workability of the tunnel.

また、上記一側面に係るトンネル施工方法において、前記複数の補強管それぞれの少なくとも前記第1部分は、前記掘削の際にせん断可能な樹脂材料で構成されてよい。当該構成によれば、地山の更なる掘削をする際に、各補強管の第1部分を容易に切断することができる。これにより、トンネルの施工性を高めることができる。なお、せん断可能な樹脂材料の一例として、例えば、繊維補強プラスチック、樹脂管等を挙げることができる。 Further, in the tunnel construction method according to the one side surface, at least the first portion of each of the plurality of reinforcing pipes may be made of a resin material that can be sheared during excavation. According to this configuration, the first portion of each reinforcing pipe can be easily cut when further excavating the ground. This makes it possible to improve the workability of the tunnel. As an example of the resin material that can be sheared, for example, fiber reinforced plastic, resin pipe, and the like can be mentioned.

本発明によれば、低コストで切羽前方地山の補強を効率的に行うことのできるトンネル施工方法を提供することができる。 According to the present invention, it is possible to provide a tunnel construction method capable of efficiently reinforcing the ground in front of the face at low cost.

図1は、従来例に係るトンネル施工方法を例示する縦断面図である。FIG. 1 is a vertical sectional view illustrating a tunnel construction method according to a conventional example. 図2は、従来例に係るトンネル施工方法を例示する横断面図である。FIG. 2 is a cross-sectional view illustrating the tunnel construction method according to the conventional example. 図3は、実施の形態に係るトンネル施工方法を例示する縦断面図である。FIG. 3 is a vertical cross-sectional view illustrating the tunnel construction method according to the embodiment. 図4は、実施の形態に係るトンネル施工方法を例示する横断面図である。FIG. 4 is a cross-sectional view illustrating the tunnel construction method according to the embodiment. 図5は、実施の形態に係るトンネル施工方法を例示する斜視図である。FIG. 5 is a perspective view illustrating the tunnel construction method according to the embodiment. 図6は、実施の形態に係る各補強管の打設場面を例示する。FIG. 6 illustrates a scene in which each reinforcing pipe is placed according to the embodiment. 図7は、実施の形態に係る各補強管の打設場面を例示する。FIG. 7 illustrates a scene in which each reinforcing pipe is placed according to the embodiment. 図8は、実施の形態に係る補強管を例示する。FIG. 8 illustrates the reinforcing pipe according to the embodiment. 図9は、実施の形態に係る補強管を例示する部分断面図である。FIG. 9 is a partial cross-sectional view illustrating the reinforcing pipe according to the embodiment. 図10は、実施例に係るトンネル施工方法を例示する。FIG. 10 illustrates a tunnel construction method according to an embodiment. 図11は、比較例に係るトンネル施工方法を例示する。FIG. 11 illustrates a tunnel construction method according to a comparative example. 図12は、シミュレーションの概念を示す。FIG. 12 shows the concept of simulation. 図13Aは、実施例のA−A断面における変位量分布のシミュレーション結果を示す。FIG. 13A shows the simulation result of the displacement amount distribution in the AA cross section of the example. 図13Bは、実施例のA−A断面におけるせん断ひずみ量分布のシミュレーション結果を示す。FIG. 13B shows the simulation result of the shear strain amount distribution in the AA cross section of the example. 図13Cは、実施例のA−A断面における塑性領域分布のシミュレーション結果を示す。FIG. 13C shows the simulation result of the plastic region distribution in the AA cross section of the example. 図14Aは、実施例のB−B断面における変位量分布のシミュレーション結果を示す。FIG. 14A shows the simulation result of the displacement amount distribution in the BB cross section of the example. 図14Bは、実施例のB−B断面におけるせん断ひずみ量分布のシミュレーション結果を示す。FIG. 14B shows the simulation result of the shear strain amount distribution in the BB cross section of the example. 図14Cは、実施例のB−B断面における塑性領域分布のシミュレーション結果を示す。FIG. 14C shows the simulation result of the plastic region distribution in the BB cross section of the example. 図15Aは、比較例のC−C断面における変位量分布のシミュレーション結果を示す。FIG. 15A shows the simulation result of the displacement amount distribution in the CC cross section of the comparative example. 図15Bは、比較例のC−C断面におけるせん断ひずみ量分布のシミュレーション結果を示す。FIG. 15B shows the simulation result of the shear strain amount distribution in the CC cross section of the comparative example. 図15Cは、比較例のC−C断面における塑性領域分布のシミュレーション結果を示す。FIG. 15C shows the simulation result of the plastic region distribution in the CC cross section of the comparative example. 図16Aは、比較例のD−D断面における変位量分布のシミュレーション結果を示す。FIG. 16A shows the simulation result of the displacement amount distribution in the DD cross section of the comparative example. 図16Bは、比較例のD−D断面におけるせん断ひずみ量分布のシミュレーション結果を示す。FIG. 16B shows the simulation result of the shear strain amount distribution in the DD cross section of the comparative example. 図16Cは、比較例のD−D断面における塑性領域分布のシミュレーション結果を示す。FIG. 16C shows the simulation result of the plastic region distribution in the DD cross section of the comparative example.

以下、本発明の一側面に係る実施の形態(以下、「本実施形態」とも表記する)を、図面に基づいて説明する。ただし、以下で説明する本実施形態は、あらゆる点において本発明の例示に過ぎない。本発明の範囲を逸脱することなく種々の改良や変形が行われてもよい。つまり、本発明の実施にあたって、実施形態に応じた具体的構成が適宜採用されてもよい。 Hereinafter, an embodiment according to one aspect of the present invention (hereinafter, also referred to as “the present embodiment”) will be described with reference to the drawings. However, the embodiments described below are merely examples of the present invention in all respects. Various improvements and modifications may be made without departing from the scope of the present invention. That is, in carrying out the present invention, a specific configuration according to the embodiment may be appropriately adopted.

§1 施工方法
まず、図3〜図5を用いて、本実施形態に係るトンネル10の施工方法について説明する。図3〜図5は、本実施形態に係るトンネル10の施工方法を模式的に例示する縦断面図、横断面図、及び斜視図である。
§1 Construction method First, the construction method of the tunnel 10 according to the present embodiment will be described with reference to FIGS. 3 to 5. 3 to 5 are a vertical sectional view, a horizontal sectional view, and a perspective view schematically illustrating a construction method of the tunnel 10 according to the present embodiment.

(第1ステップ)
本実施形態では、まず、所定の掘進長ずつ地山を掘削することで、トンネル10を掘り進める工程(以下、掘削工程とも記載する)を実施する。地山を掘削する掘進長は、実施の形態に応じて適宜決定されてよい。また、この地山の掘削工程は、公知の方法により実施可能である。このとき、地山の掘削には、公知の掘削機が用いられてよい。
(1st step)
In the present embodiment, first, a step of digging a tunnel 10 (hereinafter, also referred to as an excavation step) is carried out by excavating a ground by a predetermined excavation length. The excavation length for excavating the ground may be appropriately determined according to the embodiment. Further, the excavation process of this ground can be carried out by a known method. At this time, a known excavator may be used for excavating the ground.

(第2ステップ)
続いて、各図に示されるとおり、地山を掘削した領域において、トンネル10の天井面101から両側面102にわたって、トンネル10の周方向に(鋼製)支保工20を設置する工程(以下、支保工設置工程とも記載する)を実施する。この支保工20は、掘進方向に所定の間隔で設置される。支保工20を設置する間隔は、実施の形態に応じて適宜決定されてよい。また、支保工20には、公知の支保工材が用いられてよい。例えば、支保工20は、複数のH形鋼をアーチ状に連結することで構成される。
(Second step)
Subsequently, as shown in each figure, a step of installing (steel) support 20 in the circumferential direction of the tunnel 10 from the ceiling surface 101 of the tunnel 10 to both side surfaces 102 in the area where the ground is excavated (hereinafter, It is also described as the support installation process). The support works 20 are installed at predetermined intervals in the excavation direction. The interval at which the support work 20 is installed may be appropriately determined according to the embodiment. Further, a known support material may be used for the support 20. For example, the support work 20 is configured by connecting a plurality of H-shaped steels in an arch shape.

なお、図4に例示されるとおり、トンネル10の横断面は、例えば、略円弧状に形成される。トンネル10の周方向とは、このトンネル10の円弧に沿う方向である。ただし、周方向は、円弧に正確に沿っていなくてもよい。トンネル10の横断面の形状は、正確に円弧状に形成されていなくてもよいし、楕円形状、円形状等の円弧状以外の形状に形成されてもよい。周方向は、トンネル10の内周に大まかに沿う方向であってよい。 As illustrated in FIG. 4, the cross section of the tunnel 10 is formed in a substantially arc shape, for example. The circumferential direction of the tunnel 10 is a direction along the arc of the tunnel 10. However, the circumferential direction does not have to be exactly along the arc. The shape of the cross section of the tunnel 10 may not be formed exactly in an arc shape, or may be formed in a shape other than an arc shape such as an elliptical shape or a circular shape. The circumferential direction may be a direction roughly along the inner circumference of the tunnel 10.

また、支保工20を設置した後、公知のコンクリート吹付機等を利用して、天井面101、両側面102、及び掘削面12を含む掘削抗壁に吹付コンクリート21を施工する。吹付コンクリート21の厚みは、実施の形態に応じて適宜決定されてよい。支保工20が存在する場所では、吹付コンクリート21は、当該支保工20を埋めるように打設される。このとき、支保工20は、吹付コンクリート21から少なくとも部分的に露出してもよいし、吹付コンクリート21に完全に埋設されてもよい。 Further, after the support work 20 is installed, the sprayed concrete 21 is constructed on the excavated anti-wall including the ceiling surface 101, both side surfaces 102, and the excavated surface 12 by using a known concrete spraying machine or the like. The thickness of the sprayed concrete 21 may be appropriately determined according to the embodiment. In the place where the support 20 is present, the sprayed concrete 21 is cast so as to fill the support 20. At this time, the support work 20 may be at least partially exposed from the sprayed concrete 21 or may be completely buried in the sprayed concrete 21.

更に、吹付コンクリート21を打設した後、トンネル10を更に補強するため、トンネル10の放射方向に複数のロックボルト22を周方向に間隔を空けて打設する。各ロックボルト22の打設は、公知の方法により実施可能である。また、各ロックボルト22には、公知のロックボルトが用いられてよい。これにより、支保工設置工程が完了する。 Further, after the sprayed concrete 21 is placed, a plurality of lock bolts 22 are placed at intervals in the circumferential direction in the radial direction of the tunnel 10 in order to further reinforce the tunnel 10. The placement of each lock bolt 22 can be carried out by a known method. Further, a known lock bolt may be used for each lock bolt 22. This completes the support installation process.

放射方向とは、トンネル10の内周面(天井面101、各側面102)とトンネル軸心とを結ぶ線の延びる方向である。トンネル10の軸心の位置は、当該トンネル10の上半アーチ部分の円弧形状の中心となり得る位置である。図4には、放射方向の一例が示されている。ただし、トンネル10の軸心は、厳密に規定されなくてもよい。放射方向は、トンネル10の中央付近と内周面とを大まかに結ぶ線の延びる方向であってよい。 The radial direction is the direction in which the line connecting the inner peripheral surface (ceiling surface 101, each side surface 102) of the tunnel 10 and the tunnel axis extends. The position of the axis of the tunnel 10 is a position that can be the center of the arc shape of the upper half arch portion of the tunnel 10. FIG. 4 shows an example of the radial direction. However, the axis of the tunnel 10 does not have to be strictly defined. The radial direction may be the direction in which the line roughly connecting the vicinity of the center of the tunnel 10 and the inner peripheral surface extends.

(第3ステップ)
次に、トンネル10の切羽11の掘削面12において、周方向に所定の間隔を空けて複数の補強管30を打設する工程(以下、補助工設置工程とも記載する)を実施する。このとき、図3に示されるとおり、本実施形態では、各補強管30を、支保工20から放射方向内側に離間した位置に、掘進方向に対して所定の仰角で打設する。これにより、各補強管30は、掘削面12からトンネル10の掘進方向前方に位置する掘削予定の第1領域13に打設される第1部分31、及び第1領域13の放射方向外側に隣接する第2領域に打設される第2部分32を各補強管30が有するように打設される。
(Third step)
Next, on the excavated surface 12 of the face 11 of the tunnel 10, a step of placing a plurality of reinforcing pipes 30 at predetermined intervals in the circumferential direction (hereinafter, also referred to as an auxiliary work installation step) is carried out. At this time, as shown in FIG. 3, in the present embodiment, each reinforcing pipe 30 is placed at a position separated from the support work 20 inward in the radial direction at a predetermined elevation angle with respect to the excavation direction. As a result, each reinforcing pipe 30 is adjacent to the first portion 31 to be driven into the first region 13 to be excavated located in front of the excavation surface 12 in the excavation direction of the tunnel 10 and to the outside of the first region 13 in the radial direction. The reinforcing pipe 30 is driven so as to have a second portion 32 to be driven in the second region.

なお、説明の便宜のため、隣接する補強管30同士の周方向の間隔を「ピッチ(P)」と称し、支保工20から放射方向内側に各補強管30を離間させる距離を「離間距離(H)」と称し、掘進方向に対する各補強管30の向き(角度)を「仰角(E)」と称する。ここで、掘進方向は、トンネル10を掘り進めていく方向のことであり、トンネル10の有する軸の延びる方向(軸方向)に一致する。 For convenience of explanation, the distance between adjacent reinforcing pipes 30 in the circumferential direction is referred to as "pitch (P)", and the distance for separating each reinforcing pipe 30 from the support work 20 inward in the radial direction is referred to as "separation distance (separation distance)". It is referred to as "H)", and the direction (angle) of each reinforcing pipe 30 with respect to the excavation direction is referred to as "elevation angle (E)". Here, the digging direction is the direction in which the tunnel 10 is dug, and coincides with the extending direction (axial direction) of the axis of the tunnel 10.

各補強管30は、軸線方向(すなわち、長手方向)に延びる略円筒状に形成される。各補強管30の構成及び各補強管30を打設する方法の詳細は後述する。各補強管30の軸線方向の長さは、実施の形態に応じて適宜決定されてよい。各補強管30の軸線方向の長さは、例えば、15500mm〜18500mm(15.5m〜18.5m)とすることができる。 Each reinforcing pipe 30 is formed in a substantially cylindrical shape extending in the axial direction (that is, in the longitudinal direction). Details of the configuration of each reinforcing pipe 30 and the method of placing each reinforcing pipe 30 will be described later. The length of each reinforcing pipe 30 in the axial direction may be appropriately determined according to the embodiment. The length of each reinforcing pipe 30 in the axial direction can be, for example, 15500 mm to 18500 mm (15.5 m to 18.5 m).

また、支保工20と各補強管30との間の放射方向の離間距離H、第1部分31と第2部分32との比率、及び掘進方向に対する各補強管30の仰角Eはそれぞれ、実施の形態に応じて適宜決定されてよい。 Further, the separation distance H in the radial direction between the support work 20 and each reinforcing pipe 30, the ratio between the first portion 31 and the second portion 32, and the elevation angle E of each reinforcing pipe 30 with respect to the excavation direction are each implemented. It may be appropriately determined according to the form.

例えば、支保工20と各補強管30との間の放射方向の離間距離Hは、第1部分31により掘削面12を補強するため、900mm〜1300mmとすることができる。第1部分31と第2部分32との比率は、1:0.8〜1:1.2とすることができる。各補強管30の仰角Eは、8度〜12度とすることができる。 For example, the distance H in the radial direction between the support 20 and each reinforcing pipe 30 can be 900 mm to 1300 mm because the excavated surface 12 is reinforced by the first portion 31. The ratio of the first portion 31 to the second portion 32 can be 1: 0.8 to 1: 1.2. The elevation angle E of each reinforcing pipe 30 can be 8 to 12 degrees.

これらの条件を全て満たすように各補強管30を打設するのが好ましい。ただし、各補強管30は、必ずしもこれら全ての条件を満たしていなくてもよい。なお、掘削面12に打設される複数の補強管30のうちの半数以上が上記各条件を満たすように打設されている場合に、各補強管30の打設は、上記各条件に則して行われているものとする。 It is preferable to place each reinforcing pipe 30 so as to satisfy all of these conditions. However, each reinforcing pipe 30 does not necessarily have to satisfy all of these conditions. When more than half of the plurality of reinforcing pipes 30 to be driven on the excavation surface 12 are driven so as to satisfy each of the above conditions, the placement of each reinforcing pipe 30 shall be in accordance with the above conditions. It is assumed that it is done.

更に、補強管30のピッチP、及び打設範囲は、実施の形態に応じて適宜決定されてよい。補強管30の打設範囲は、トンネル10の中心における各補強管30の分布範囲の角度Sで規定することができる。例えば、補強管30のピッチPは、300mm〜600mmとすることができる。また、補強管30の打設範囲(角度S)は、90度〜180度とすることができる。 Further, the pitch P of the reinforcing pipe 30 and the casting range may be appropriately determined according to the embodiment. The casting range of the reinforcing pipe 30 can be defined by the angle S of the distribution range of each reinforcing pipe 30 at the center of the tunnel 10. For example, the pitch P of the reinforcing pipe 30 can be 300 mm to 600 mm. Further, the casting range (angle S) of the reinforcing pipe 30 can be 90 degrees to 180 degrees.

なお、切羽11は、掘削の現場である。切羽11及び掘削面12の位置は、上記掘削工程により所定の距離(間隔)分の掘削を実施する度に掘進方向前方に移動する。上記支保工設置工程及び当該補助工設置工程は、当該掘削工程により所定の距離分の掘削が完了する度に実施される。このとき、各掘削工程で掘削する距離は、実施の形態に応じて適宜決定されてよい。また、掘削する距離は、各掘削工程で必ずしも一致していなくてもよい。 The face 11 is an excavation site. The positions of the face 11 and the excavation surface 12 move forward in the excavation direction each time excavation is performed for a predetermined distance (interval) by the excavation process. The support work installation process and the auxiliary work installation process are carried out every time the excavation for a predetermined distance is completed by the excavation process. At this time, the distance to be excavated in each excavation step may be appropriately determined according to the embodiment. Further, the excavation distance does not necessarily have to be the same in each excavation process.

補助工設置工程が完了後、掘削工程から工程を繰り返すことで、トンネル10を更に掘り進める。このとき、掘削工程では、各補強管30の第1部分31と共に地山を掘削する。この過程において、各補強管30の第2部分32は、既設の補強管30Aとして第2領域14に残存し、切羽11における第2領域14からの崩落を抑制する先受け工の役割を果たす。なお、図3及び4に示されるとおり、掘削工程を実施する間隔、すなわち、各補強管30を打設する間隔は、トンネル10の横断面において同一の放射方向に複数の補強管30(30A)がオーバーラップするように決定されるのが好ましい。 After the auxiliary work installation process is completed, the tunnel 10 is further dug by repeating the process from the excavation process. At this time, in the excavation process, the ground is excavated together with the first portion 31 of each reinforcing pipe 30. In this process, the second portion 32 of each reinforcing pipe 30 remains in the second region 14 as the existing reinforcing pipe 30A, and serves as a pre-receiver for suppressing the collapse of the face 11 from the second region 14. As shown in FIGS. 3 and 4, the interval at which the excavation process is carried out, that is, the interval at which each reinforcing pipe 30 is placed, is such that a plurality of reinforcing pipes 30 (30A) in the same radial direction in the cross section of the tunnel 10. Is preferably determined to overlap.

(第4ステップ)
トンネル10の掘削が十分に進んだ段階で、切羽11の後ろの方で、吹付コンクリート21の表面に防水シート(不図示)を敷設する。そして、移動式型枠をセットして、二次覆工コンクリート23を施工する。これらの工程が目的の範囲で完了することで、トンネル10は完成する。完成したトンネル10は、(鋼製)支保工20、吹付コンクリート21、ロックボルト22、及び二次覆工コンクリート23によって支保されている状態となる。
(4th step)
When the excavation of the tunnel 10 has progressed sufficiently, a waterproof sheet (not shown) is laid on the surface of the sprayed concrete 21 behind the face 11. Then, the mobile formwork is set and the secondary lining concrete 23 is constructed. When these steps are completed within the desired range, the tunnel 10 is completed. The completed tunnel 10 is in a state of being supported by a (steel) support 20, sprayed concrete 21, lock bolt 22, and secondary lining concrete 23.

[打設方法]
次に、図6及び図7を用いて、各補強管30の打設方法について説明する。図6は、本実施形態に係る各補強管30の打設場面を模式的に例示する。図7は、図6の部分拡大図である。本実施形態に係る各補強管30は、ドリルジャンボ60を用いた二重管削孔打設方式により打設可能である。
[Placement method]
Next, a method of placing each reinforcing pipe 30 will be described with reference to FIGS. 6 and 7. FIG. 6 schematically illustrates a driving scene of each reinforcing pipe 30 according to the present embodiment. FIG. 7 is a partially enlarged view of FIG. Each reinforcing pipe 30 according to the present embodiment can be driven by a double pipe drilling method using a drill jumbo 60.

具体的に、ドリルジャンボ60は、ドリフタ61、ガイドセル62、削孔ロッド63、及び削孔ビット64を備えている。削孔ロッド63の後端は、ドリフタ61に連結される。このドリフタ61は、削孔ロッド63に回転力及び打撃力を供給するように構成されている。また、ガイドセル62には、打設する対象の補強管30が配置されており、この補強管30内に削孔ロッド63が挿入される。削孔ロッド63の長さは補強管30よりも長くなっており、補強管30の先端からは削孔ロッド63の先端部が露出する。この露出した削孔ロッド63の先端部には、削孔ビット64が装着されている。 Specifically, the drill jumbo 60 includes a drifter 61, a guide cell 62, a drilling rod 63, and a drilling bit 64. The rear end of the drilling rod 63 is connected to the drifter 61. The drifter 61 is configured to supply a rotational force and a striking force to the drilling rod 63. Further, a reinforcing pipe 30 to be driven is arranged in the guide cell 62, and the drilling rod 63 is inserted into the reinforcing pipe 30. The length of the drilling rod 63 is longer than that of the reinforcing pipe 30, and the tip portion of the drilling rod 63 is exposed from the tip of the reinforcing pipe 30. A drilling bit 64 is attached to the tip of the exposed drilling rod 63.

このドリルジャンボ60を用いて、各補強管30を次のように打設することができる。すなわち、補強管30を削孔ロッド63に装着した状態でドリフタ61を駆動して、削孔ロッド63に回転力及び打撃力を供給することで、削孔ロッド63の先端部に装着された削孔ビット64により掘削面12に削孔を形成する。続いて、補強管30を打設するのに十分な深さを有する削孔を形成した後、形成した削孔内に補強管30を残したまま、当該補強管30内部空間を介して削孔ロッド63及び削孔ビット64を削孔から引き抜く。そして、セメント系、レジン系、水ガラス系等の固結材を補強管30内に注入して、補強管30と削孔との間の隙間及び補強管30の内部空間に固結材を充填する。これにより、各補強管30を打設することができる。 Using this drill jumbo 60, each reinforcing pipe 30 can be driven as follows. That is, the drilling rod 61 is driven with the reinforcing pipe 30 mounted on the drilling rod 63 to supply rotational force and striking force to the drilling rod 63, whereby the drilling rod 63 is mounted on the tip of the drilling rod 63. A hole is formed in the excavation surface 12 by the hole bit 64. Subsequently, after forming a hole having a depth sufficient for driving the reinforcing pipe 30, the hole is drilled through the internal space of the reinforcing pipe 30 while the reinforcing pipe 30 remains in the formed hole. The rod 63 and the drilling bit 64 are pulled out from the drilling. Then, a cement-based, resin-based, water glass-based, or other solidifying material is injected into the reinforcing pipe 30, and the solidifying material is filled in the gap between the reinforcing pipe 30 and the drilled hole and the internal space of the reinforcing pipe 30. do. As a result, each reinforcing pipe 30 can be placed.

[補強管]
次に、図8及び図9を用いて、上記トンネル施工方法に利用可能な各補強管30の一例について説明する。図8は、本実施形態に係る補強管30を模式的に例示する。図9は、補強管30を模式的に例示する部分断面図である。
[Reinforcing pipe]
Next, an example of each reinforcing pipe 30 that can be used in the above tunnel construction method will be described with reference to FIGS. 8 and 9. FIG. 8 schematically illustrates the reinforcing pipe 30 according to the present embodiment. FIG. 9 is a partial cross-sectional view schematically illustrating the reinforcing pipe 30.

本実施形態に係る各補強管30は、1m〜3.5m程度の長さで周壁に所定ピッチで固結材吐出用の貫通孔52が穿設された複数の管体(40、41)を所定全長となるように直列に連結することで構成される。連結の方法は、ネジ継手、或いは溶接等による。各第1管体40は補強管30の後端側に配置され、各第2管体41は補強管30の前端側に配置される。基本的には、各第1管体40は、第1領域13に打設される第1部分31を構成し、各第2管体41は、第2領域14に打設される第2部分32を構成する。ただし、各補強管30の第1部分31及び第2部分32の構成は、このような例に限定されなくてもよい。例えば、本実施形態では、第2部分32は、後述する環状スリット54を備える第1管体40の一部を含んでよい。これにより、寸法誤差等によって、第2部分32の一部が第1領域13に打設されてしまった場合に、第1領域13に打設された第2部分32の一部を容易に切除可能にすることができる。 Each reinforcing pipe 30 according to the present embodiment has a plurality of pipe bodies (40, 41) having a length of about 1 m to 3.5 m and having through holes 52 for discharging a solidifying material at a predetermined pitch on the peripheral wall. It is configured by connecting in series so as to have a predetermined total length. The method of connection is a screw joint, welding, or the like. Each first pipe body 40 is arranged on the rear end side of the reinforcing pipe 30, and each second pipe body 41 is arranged on the front end side of the reinforcing pipe 30. Basically, each first pipe body 40 constitutes a first portion 31 to be driven into the first region 13, and each second pipe body 41 is a second portion to be driven into the second region 14. 32 is configured. However, the configuration of the first portion 31 and the second portion 32 of each reinforcing pipe 30 may not be limited to such an example. For example, in the present embodiment, the second portion 32 may include a part of the first tubular body 40 provided with the annular slit 54 described later. As a result, when a part of the second portion 32 is driven into the first region 13 due to a dimensional error or the like, a part of the second portion 32 driven into the first region 13 is easily cut off. Can be made possible.

図9に示されるとおり、第1管体40の外周面には、軸方向に所定の間隔で、螺旋状に延びる凹部51と、周方向に1周り分(360度)延びる環状スリット54と、が設けられている。凹部51内には、第1管体40の壁を径方向に貫通する貫通孔52が設けられており、この貫通孔52の位置に合わせて、隣接する環状スリット54の間で軸線方向に延びる縦断スリット53が設けられている。なお、第2管体41は、第1管体40から縦断スリット53及び環状スリット54を省略した構成を有している。すなわち、第2管体41の外周面には、凹部51及び貫通孔52のみが設けられている。 As shown in FIG. 9, on the outer peripheral surface of the first tubular body 40, recesses 51 extending spirally at predetermined intervals in the axial direction, and annular slits 54 extending one circumference (360 degrees) in the circumferential direction are provided. Is provided. A through hole 52 that penetrates the wall of the first tubular body 40 in the radial direction is provided in the recess 51, and extends in the axial direction between the adjacent annular slits 54 in accordance with the position of the through hole 52. A vertical slit 53 is provided. The second tubular body 41 has a configuration in which the longitudinal slit 53 and the annular slit 54 are omitted from the first tubular body 40. That is, only the recess 51 and the through hole 52 are provided on the outer peripheral surface of the second pipe body 41.

貫通孔52は、上記補助工設置工程を実施する際、補強管30内に注入した固結材を補強管30の外側、すなわち、補強管30外側の周囲の地山に吐出する役割を果たす。貫通孔52から吐出された固結材は、補強管30と削孔との隙間を埋めると共に補強管30の周囲の地山に広がる。これにより、補強管30は、良好に定着され、固結材が注入された地山と一体となって、切羽前方及び掘削断面上方の地山が安定化される。 The through hole 52 serves to discharge the consolidated material injected into the reinforcing pipe 30 to the outside of the reinforcing pipe 30, that is, to the ground around the outside of the reinforcing pipe 30 when the auxiliary work installation process is carried out. The solidifying material discharged from the through hole 52 fills the gap between the reinforcing pipe 30 and the drilled hole and spreads to the ground around the reinforcing pipe 30. As a result, the reinforcing pipe 30 is well fixed, and is integrated with the ground into which the binder is injected to stabilize the ground in front of the face and above the excavation cross section.

このとき、貫通孔52は、凹部51内に存在するため、削孔の内壁に塞がれることはなく、固結材を適切に吐出することができる。更に、補強管30が削孔の内壁に密着していても、貫通孔52から吐出された固結材は、凹部51に沿って削孔内全体に広がることができる。 At this time, since the through hole 52 exists in the recess 51, the through hole 52 is not blocked by the inner wall of the drilled hole, and the solidifying material can be appropriately discharged. Further, even if the reinforcing pipe 30 is in close contact with the inner wall of the drilled hole, the solidifying material discharged from the through hole 52 can spread throughout the drilled hole along the recess 51.

また、環状スリット54は、上記掘削工程の際に、掘削機等により第1管体40を切除可能にするために設けられる。すなわち、上記掘削工程では、掘削機等の刃を環状スリット54に入れて、第1管体40を切除しながら地山を掘削する。更に、切除した第1管体40を、縦断スリット53を利用して、軸線方向に水平な面で分解することができる。これにより、第1管体40内で固結した固結材と第1管体40とを分離することができる。 Further, the annular slit 54 is provided so that the first pipe body 40 can be excavated by an excavator or the like during the excavation process. That is, in the above excavation step, a blade of an excavator or the like is inserted into the annular slit 54, and the ground is excavated while excavating the first pipe body 40. Further, the excised first tubular body 40 can be disassembled on a horizontal surface in the axial direction by using the longitudinal slit 53. As a result, the solidifying material solidified in the first tube body 40 and the first tube body 40 can be separated.

この縦断スリット53及び環状スリット54は、補強管30のうちの少なくとも第1部分31を構成する第1管体40に設けられればよい。また、縦断スリット53及び環状スリット54それぞれの数は、実施の形態に応じて適宜決定されてよく、1つであってもよいし、複数であってもよい。 The longitudinal slit 53 and the annular slit 54 may be provided in the first pipe body 40 constituting at least the first portion 31 of the reinforcing pipe 30. Further, the number of each of the longitudinal slit 53 and the annular slit 54 may be appropriately determined according to the embodiment, and may be one or a plurality.

以上のような構成を有する各補強管30の材料は、実施の形態に応じて適宜決定されてよく、例えば、掘削の際にせん断可能な樹脂材料が用いられてよい。せん断可能な樹脂材料の一例として、例えば、繊維補強プラスチック、樹脂管等を挙げることができる。 The material of each reinforcing pipe 30 having the above-mentioned structure may be appropriately determined according to the embodiment, and for example, a resin material that can be sheared during excavation may be used. Examples of shearable resin materials include fiber reinforced plastics, resin pipes, and the like.

§2 特徴
以上のとおり、本実施形態に係るトンネル施工方法では、支保工20から放射方向内側に離間した位置で、掘進方向に対して所定の仰角で各補強管30を打設する。これにより、各補強管30の第1部分31が第1領域13に打設され、第2部分32が第2領域14に打設される。
§2 Features As described above, in the tunnel construction method according to the present embodiment, each reinforcing pipe 30 is placed at a position separated from the support work 20 inward in the radial direction and at a predetermined elevation angle with respect to the excavation direction. As a result, the first portion 31 of each reinforcing pipe 30 is driven into the first region 13, and the second portion 32 is driven into the second region 14.

第1領域13は、切羽11から前方の掘削予定の地山であり、第2領域14は、掘削予定範囲の上方に位置する地山である。そのため、各補強管30の第2部分32を、切羽11における第2領域14からの崩落を抑制する先受け工として機能させつつ、各補強管30の第1部分31を、切羽11の前方地山の安定性を高める鏡補強工として機能させることができる。 The first region 13 is a ground to be excavated in front of the face 11, and the second region 14 is a ground located above the planned excavation range. Therefore, while the second portion 32 of each reinforcing pipe 30 functions as a pre-receiver for suppressing the collapse of the face 11 from the second region 14, the first portion 31 of each reinforcing pipe 30 is used as the front ground of the face 11. It can function as a mirror reinforcement that enhances the stability of the mountain.

したがって、本実施形態によれば、先受け工及び鏡補強工の2つの役割を各補強管30に持たせることができるため、先受け工及び鏡補強工を別々に施工しなくてもよくなり、低コストで切羽11の補強を効率的に行うことができる。加えて、後述する実施例のシミュレーション結果で示されるとおり、本実施形態によれば、切羽11の押出方向に向かって、トンネル10の軸方向の抗力を各補強管30により発現させることができ、切羽11の補強効果を高めることができる。 Therefore, according to the present embodiment, since each reinforcing pipe 30 can have two roles of the pre-received work and the mirror reinforcing work, it is not necessary to construct the pre-received work and the mirror reinforcing work separately. The face 11 can be efficiently reinforced at low cost. In addition, as shown in the simulation results of the examples described later, according to the present embodiment, the axial drag of the tunnel 10 can be expressed by each reinforcing pipe 30 toward the extrusion direction of the face 11. The reinforcing effect of the face 11 can be enhanced.

また、本実施形態では、各補強管30の長さを15500mm〜18500mmとし、離間距離Hを900mm〜1300mmとし、仰角Eを8度〜12度とし、第1部分31と第2部分32との比率を1:0.8〜1:1.2とすることができる。これによって、第1部分31及び第2部分32それぞれに先受け工及び鏡補強工それぞれの役割を十分に発揮させることができ、切羽11前方地山の安定性をより合理的に高めることができる。 Further, in the present embodiment, the length of each reinforcing pipe 30 is 15500 mm to 18500 mm, the separation distance H is 900 mm to 1300 mm, the elevation angle E is 8 to 12 degrees, and the first portion 31 and the second portion 32 are used. The ratio can be 1: 0.8 to 1: 1.2. As a result, the roles of the pre-receiver and the mirror reinforcement work can be fully exerted in each of the first part 31 and the second part 32, and the stability of the ground in front of the face 11 can be more rationally improved. ..

また、本実施形態では、各補強管30の少なくとも第1部分31に縦断スリット53及び環状スリット54を設け、各補強管30の材料に、せん断可能な樹脂材料を用いることができる。これによって、補助工設置工程で各補強管30を打設した後、地山を更に掘削する際に、当該各補強管30の第1部分31を容易に切断することができる。したがって、本実施形態によれば、トンネル10の施工性を高めることができる。 Further, in the present embodiment, a longitudinal slit 53 and an annular slit 54 are provided in at least the first portion 31 of each reinforcing pipe 30, and a shearable resin material can be used as the material of each reinforcing pipe 30. As a result, after each reinforcing pipe 30 is placed in the auxiliary work installation process, the first portion 31 of each reinforcing pipe 30 can be easily cut when further excavating the ground. Therefore, according to the present embodiment, the workability of the tunnel 10 can be improved.

§3 変形例
以上、本発明の実施の形態を詳細に説明してきたが、前述までの説明はあらゆる点において本発明の例示に過ぎない。本発明の範囲を逸脱することなく種々の改良や変形を行うことができることは言うまでもない。例えば、以下のような変更が可能である。なお、以下では、上記実施形態と同様の構成要素に関しては同様の符号を用い、上記実施形態と同様の点については、適宜説明を省略した。以下の変形例は適宜組み合わせ可能である。
§3 Modifications Although the embodiments of the present invention have been described in detail above, the above description is merely an example of the present invention in all respects. Needless to say, various improvements and modifications can be made without departing from the scope of the present invention. For example, the following changes can be made. In the following, the same reference numerals will be used for the same components as those in the above embodiment, and the same points as in the above embodiment will be omitted as appropriate. The following modifications can be combined as appropriate.

上記実施形態の補助工打設工程では、二重管削孔打設方式により各補強管30を打設している。しかしながら、各補強管30の打設方法は、このような例に限定されなくてもよく、実施の形態に応じて適宜決定されてよい。また、各補強管30の構成は、上記実施形態の例に限定されなくてもよい。各補強管30の構成に関して、実施の形態に応じて、適宜、構成要素の省略、置換及び追加が可能である。 In the auxiliary work driving process of the above embodiment, each reinforcing pipe 30 is driven by a double pipe drilling method. However, the method of placing each reinforcing pipe 30 does not have to be limited to such an example, and may be appropriately determined according to the embodiment. Further, the configuration of each reinforcing pipe 30 does not have to be limited to the example of the above embodiment. With respect to the configuration of each reinforcing pipe 30, components can be omitted, replaced or added as appropriate according to the embodiment.

また、上記実施形態では、支保工20から放射方向内側に離間した位置に打設される補強管30以外の補強管は存在していない。しかしながら、上記実施形態に係るトンネル施工方法は、このような例に限定されなくてもよい。例えば、補強管30の他に、従来と同様に打設される補強管が存在してもよい。すなわち、上記実施形態は、従来のフォアパイリング、更なる長尺鏡補強工等と併用されてよい。また、例えば、各補強管30の代わりに、スタビライザーを備え、湾曲した形状を有する鋼管が用いられてもよい。 Further, in the above embodiment, there is no reinforcing pipe other than the reinforcing pipe 30 placed at a position separated inward in the radial direction from the support work 20. However, the tunnel construction method according to the above embodiment does not have to be limited to such an example. For example, in addition to the reinforcing pipe 30, there may be a reinforcing pipe to be cast as in the conventional case. That is, the above embodiment may be used in combination with conventional fore-piling, further long mirror reinforcement work, and the like. Further, for example, instead of each reinforcing pipe 30, a steel pipe provided with a stabilizer and having a curved shape may be used.

§4 実施例
以下、本発明の実施例について説明する。ただし、本発明は、以下の実施例に限定される訳ではない。
§4 Examples Hereinafter, examples of the present invention will be described. However, the present invention is not limited to the following examples.

図10は、実施例に係るトンネル施工方法を示す。また、図11は、比較例に係るトンネル施工方法を示す。実施例では、上記実施形態と同様の方法で補強管を打設するものと設定した。一方、比較例では、上記図1及び図2で示した従来例と同様に第1補強管(補強管)を打設するものと設定し、第2補強管の打設を省略した。実施例及び比較例の各パラメータは以下のとおりである。なお、比較例のパラメータは、標準的なトンネルの施工条件に基づいて設定した。 FIG. 10 shows a tunnel construction method according to an embodiment. Further, FIG. 11 shows a tunnel construction method according to a comparative example. In the embodiment, the reinforcing pipe is set to be placed by the same method as that of the above embodiment. On the other hand, in the comparative example, the first reinforcing pipe (reinforcing pipe) was set to be driven in the same manner as in the conventional examples shown in FIGS. 1 and 2, and the driving of the second reinforcing pipe was omitted. The parameters of the examples and comparative examples are as follows. The parameters of the comparative example were set based on the standard tunnel construction conditions.

<実施例のパラメータ>
・補強管:鋼管(外径:76.3mm、肉厚:4.2mm)
・補強管の長さ(打設長):17500mm(17.5m)
・補強管の単位体積重量(γ):78kN/m3
・補強管の弾性係数(E):210000MPa
・補強管の断面積:0.95×10-32
・補強管の断面二次モーメント:0.62×10-64
・1シフト長:6000mm(6.0m)
・打設ピッチ(ピッチP):900mm(0.9m)
・1シフトあたりの打設本数:12.5本
・離間距離H:1000mm(1.0m)
・仰角E:10度
・打設範囲(角度S):120度
<Parameters of Examples>
-Reinforcing pipe: Steel pipe (outer diameter: 76.3 mm, wall thickness: 4.2 mm)
-Reinforcing pipe length (casting length): 17500 mm (17.5 m)
-Unit volume weight (γ) of reinforcing pipe: 78 kN / m 3
-Reinforcing tube elastic modulus (E): 210000 MPa
・ Cross-sectional area of reinforcing pipe: 0.95 × 10 -3 m 2
・ Second moment of inertia of area of reinforcing pipe: 0.62 × 10 -6 m 4
・ 1 shift length: 6000 mm (6.0 m)
・ Casting pitch (pitch P): 900 mm (0.9 m)
・ Number of castings per shift: 12.5 ・ Separation distance H: 1000 mm (1.0 m)
・ Elevation angle E: 10 degrees ・ Casting range (angle S): 120 degrees

<比較例のパラメータ>
・補強管:鋼管(外径:114.3mm、肉厚:6.0mm)
・補強管の長さ(打設長):12500mm(12.5m)
・補強管の単位体積重量(γ):78kN/m3
・補強管の弾性係数(E):210000MPa
・補強管の断面積:2.04×10-32
・補強管の断面二次モーメント:3.0×10-64
・1シフト長:9000mm(9.0m)
・打設ピッチ(ピッチP):450mm(0.45m)
・1シフトあたりの打設本数:25本
・打設位置:支保工を起点に各補強管を打設
・打設範囲:120度
<Parameters of comparative example>
-Reinforcing pipe: Steel pipe (outer diameter: 114.3 mm, wall thickness: 6.0 mm)
-Reinforcing pipe length (casting length): 12500 mm (12.5 m)
-Unit volume weight (γ) of reinforcing pipe: 78 kN / m 3
-Reinforcing tube elastic modulus (E): 210000 MPa
・ Cross-sectional area of reinforcing pipe: 2.04 × 10 -3 m 2
・ Second moment of inertia of area of reinforcing pipe: 3.0 × 10 -6 m 4
・ 1 shift length: 9000 mm (9.0 m)
・ Casting pitch (pitch P): 450 mm (0.45 m)
・ Number of placements per shift: 25 ・ Placement position: Placement of each reinforcing pipe starting from the support work ・ Placement range: 120 degrees

解析ソフト(FLAC3D:Fast Lagrangian Analysis of Continua in 3 Dimensions:ITASCA社製)を用いて、以上の実施例及び比較例の3次元数値解析モデルを作成し、実施例及び比較例の検証を行った。 Using analysis software (FLAC3D: Fast Lagrangian Analysis of Continua in 3 Dimensions: manufactured by ITASCA), three-dimensional numerical analysis models of the above examples and comparative examples were created, and the examples and comparative examples were verified.

図12は、利用した解析ソフトの計算プロセスの概念図を示す。当該解析ソフトは、連続的な3次元体が平行状態又は定常状態の塑性流れに近付くとき、数値的に力学的挙動を追跡する。物体の力学は、一般原理(ひずみの定義、運動法則)と理想物体を定義する構成方程式(構成式)とを用いることにより得られる。全体の数学的表現は、一連の微分方程式、関連する力学的変数(応力、力)、及び運動学的変数(ひずみ速度、速度、加速度、変位)である。解析ソフトは、個々の幾何学状及び性質、与えられた特定の境界条件、並びに初期条件に対してそれらを解く。 FIG. 12 shows a conceptual diagram of the calculation process of the analysis software used. The analysis software numerically tracks the mechanical behavior of a continuous three-dimensional body as it approaches a parallel or steady-state plastic flow. The mechanics of an object can be obtained by using the general principle (definition of strain, law of motion) and the constitutive equation (constitutive equation) that defines an ideal object. The whole mathematical representation is a series of differential equations, related mechanical variables (stress, force), and kinematic variables (strain velocity, velocity, acceleration, displacement). The analysis software solves them for individual geometries and properties, given specific boundary conditions, and initial conditions.

以上の実施例及び比較例において、境界条件は、地表面を自由面、他の面をローラー境界とした。また、地山の入力物性値のパラメータは、以下のとおりに設定した。なお、解析は、モール・クーロンの破壊基準に基づく弾完全塑性解析とした。更に、吹付コンクリート及び(鋼製)支保工のパラメータを以下のとおりに設定した。 In the above examples and comparative examples, the boundary condition is that the ground surface is a free surface and the other surface is a roller boundary. In addition, the parameters of the input physical property values of the ground were set as follows. The analysis was a complete elasto-plastic analysis based on the Mohr-Coulomb fracture criteria. Furthermore, the parameters of sprayed concrete and (steel) support were set as follows.

<地山のパラメータ>
・単位体積重量(γ):19kN/m3
・弾性係数(E):50MN/m2
・ポアソン比:0.35
・粘着力(C):10kN/m2
・内部摩擦角(φ):35度
<Parameters of the ground>
-Unit volume weight (γ): 19 kN / m 3
-Elastic modulus (E): 50MN / m 2
・ Poisson's ratio: 0.35
・ Adhesive strength (C): 10 kN / m 2
・ Internal friction angle (φ): 35 degrees

<吹付コンクリート+支保工のパラメータ>
・構造要素:曲面板(シェル型)
・弾性係数(E):9230MPa
・断面積:0.25m2
<Parameters for sprayed concrete + support work>
-Structural element: Curved plate (shell type)
-Elastic modulus (E): 9230 MPa
・ Cross-sectional area: 0.25m 2

そして、境界条件の影響を考慮して、最初の20mの区間は一括掘削されるものとして評価の対象から除外し、その後1mごとに掘削を繰り返して、1m遅れで支保が設置されるものとした。1mごとに掘削を繰り返す区間は、60mとした。以上の条件で、実施例及び比較例における変位量分布、せん断歪み量分布、及び塑性領域分布を解析した。 Then, considering the influence of the boundary conditions, the first 20m section was excluded from the evaluation as being excavated all at once, and then excavation was repeated every 1m, and the support was installed with a delay of 1m. .. The section where excavation is repeated every 1 m is set to 60 m. Under the above conditions, the displacement distribution, shear strain distribution, and plastic region distribution in the examples and comparative examples were analyzed.

図13A〜図13Cは、実施例のA−A断面における変位量分布、せん断ひずみ量分布、及び塑性領域分布のシミュレーション結果を示す。図14A〜図14Cは、実施例のB−B断面における変位量分布、せん断ひずみ量分布、及び塑性領域分布のシミュレーション結果を示す。図15A〜図15Cは、比較例のC−C断面における変位量分布、せん断ひずみ量分布、及び塑性領域分布のシミュレーション結果を示す。図16A〜図16Cは、比較例のD−D断面における変位量分布、せん断ひずみ量分布、及び塑性領域分布のシミュレーション結果を示す。変位量分布及びせん断ひずみ量分布では、色が濃い部分ほど値が大きいことを示す。また、塑性領域分布では、ハッチングの部分が塑性領域を示し、白色の部分が弾性領域を示す。なお、図10及び図11に示すとおり、A−A断面及びC−C断面は、各補強管を打設した掘削面の断面として設定した。また、B−B断面及びD−D断面は、各補強管を打設する直前の断面として設定した。 13A to 13C show the simulation results of the displacement amount distribution, the shear strain amount distribution, and the plastic region distribution in the AA cross section of the example. 14A to 14C show the simulation results of the displacement amount distribution, the shear strain amount distribution, and the plastic region distribution in the BB cross section of the example. 15A to 15C show the simulation results of the displacement amount distribution, the shear strain amount distribution, and the plastic region distribution in the CC cross section of the comparative example. 16A to 16C show simulation results of displacement amount distribution, shear strain amount distribution, and plastic region distribution in the DD cross section of the comparative example. In the displacement distribution and the shear strain distribution, the darker the color, the larger the value. Further, in the plastic region distribution, the hatched portion indicates the plastic region, and the white portion indicates the elastic region. As shown in FIGS. 10 and 11, the AA cross section and the CC cross section are set as the cross sections of the excavated surface in which each reinforcing pipe is placed. Further, the BB cross section and the DD cross section were set as the cross sections immediately before each reinforcing pipe was placed.

以上のシミュレーション結果に示されるとおり、実施例による切羽前方地山の変位、ひずみ、及び塑性領域の抑制効果は、比較例よりも高いことが分かった。これにより、本発明によれば、切羽の押出方向に向かって、トンネルの軸方向の抗力を各補強管により発現させることができ、切羽前方地山の補強効果を高められることが分かった。 As shown in the above simulation results, it was found that the effect of suppressing the displacement, strain, and plastic region of the ground in front of the face by the example was higher than that of the comparative example. As a result, according to the present invention, it has been found that the axial drag of the tunnel can be exerted by each reinforcing pipe toward the extrusion direction of the face, and the reinforcing effect of the ground in front of the face can be enhanced.

また、図15A〜図15C及び図16A〜図16Cから、比較例に係るトンネル施工方法では、各補強管を打設する直前のD−D断面における切羽前方地山の変位、ひずみ、及び塑性領域は、各補強管を打設したC−C断面よりも大きくなってしまうことが確認された。一方、図13A〜図13C及び図14A〜図14Cから、実施例に係るトンネル施工方法では、各補強管を打設したA−A断面と比べて、各補強管を打設する直前のB−B断面における切羽前方地山の変位、ひずみ、及び塑性領域はそれほど大きくならないことが確認された。特に、B−B断面の塑性領域は、A−A断面よりも小さくなることが確認された。これにより、本発明によれば、トンネルを掘り進める際に、トンネルの周辺地山の塑性化を低減することにより、掘削面の解放部分を小さくして、当該掘削面が崩落する可能性を低減することができる効果が期待できることが分かった。 Further, from FIGS. 15A to 15C and FIGS. 16A to 16C, in the tunnel construction method according to the comparative example, the displacement, strain, and plastic region of the ground in front of the face in the DD cross section immediately before placing each reinforcing pipe. Was confirmed to be larger than the CC cross section in which each reinforcing pipe was placed. On the other hand, from FIGS. 13A to 13C and FIGS. 14A to 14C, in the tunnel construction method according to the embodiment, B- immediately before each reinforcing pipe is placed, as compared with the AA cross section in which each reinforcing pipe is placed. It was confirmed that the displacement, strain, and plastic region of the ground in front of the face in the B section were not so large. In particular, it was confirmed that the plastic region of the BB cross section was smaller than that of the AA cross section. Thereby, according to the present invention, when digging a tunnel, the plasticization of the ground around the tunnel is reduced, so that the open portion of the excavated surface is made smaller and the possibility that the excavated surface collapses is reduced. It turned out that the effect that can be expected can be expected.

10…トンネル、11…切羽、12…掘削面(鏡面)、
13…第1領域、14…第2領域、
20…支保工、21…吹付コンクリート、
22…ロックボルト、23…二次覆工コンクリート、
30…補強管、30A…(既設の)補強管、
31…第1部分、32…第2部分、
40…第1管体、41…第2管体、
51…凹部、52…貫通孔、53…縦断スリット、
54…環状スリット、
60…ドリルジャンボ、
61…ドリフタ、62…ガイドセル、63…削孔ロッド、
64…削孔ビット
10 ... tunnel, 11 ... face, 12 ... excavation surface (mirror surface),
13 ... 1st area, 14 ... 2nd area,
20 ... Support, 21 ... Sprayed concrete,
22 ... Rock bolt, 23 ... Secondary lining concrete,
30 ... Reinforcing pipe, 30A ... (Existing) Reinforcing pipe,
31 ... 1st part, 32 ... 2nd part,
40 ... 1st tube, 41 ... 2nd tube,
51 ... recess, 52 ... through hole, 53 ... longitudinal slit,
54 ... Circular slit,
60 ... Drill jumbo,
61 ... Drifter, 62 ... Guide cell, 63 ... Drilling rod,
64 ... Drilling bit

Claims (4)

地山を掘削することで、トンネルを掘り進めるステップと、
前記地山を掘削した領域において、前記トンネルの天井面から両側面にわたって、前記トンネルの周方向に支保工を設置するステップと、
前記トンネルの切羽の掘削面において、前記周方向に所定の間隔を空けて複数の補強管を打設するステップであって、前記掘削面から前記トンネルの掘進方向前方に位置する掘削予定の第1領域に打設される第1部分、及び前記第1領域の放射方向外側に隣接する第2領域に打設される第2部分を当該複数の補強管それぞれが有するように、前記支保工から放射方向内側に離間した位置に、前記掘進方向に対して所定の仰角で当該複数の補強管それぞれを打設するステップと、
を備え、
前記複数の補強管それぞれの軸線方向の長さは、15500mm〜18500mmであり、
前記打設するステップでは、先端部に削孔ビットが装着された削孔ロッドを前記複数の補強管それぞれに挿入し、当該削孔ビットにより削孔しながら前記複数の補強管それぞれを打設し、
前記複数の補強管それぞれは、前記第1部分により前記掘削面を補強するため、前記支保工から放射方向内側に900mm〜1300mm離間した位置に、前記掘進方向に対して8度〜12度の仰角で、かつ前記第1部分と前記第2部分との比率が1:0.8〜1:1.2になるように、打設される、
トンネル施工方法。
By excavating the ground, the steps to dig a tunnel and
In the area where the ground is excavated, a step of installing a support in the circumferential direction of the tunnel from the ceiling surface to both sides of the tunnel, and
A step of placing a plurality of reinforcing pipes at a predetermined interval in the circumferential direction on the excavated surface of the face of the tunnel, and the first excavation schedule located in front of the excavated surface in the excavation direction of the tunnel. Radiation from the support so that each of the plurality of reinforcing pipes has a first portion to be driven into the region and a second portion to be driven into the second region adjacent to the outer side in the radial direction of the first region. A step of placing each of the plurality of reinforcing pipes at a predetermined elevation angle with respect to the excavation direction at positions separated inward in the direction, and
Bei to give a,
The length of each of the plurality of reinforcing pipes in the axial direction is 15500 mm to 18500 mm.
In the step of placing, a drilling rod having a drilling bit attached to the tip thereof is inserted into each of the plurality of reinforcing pipes, and each of the plurality of reinforcing pipes is driven while drilling with the drilling bit. ,
Each of the plurality of reinforcing pipes has an elevation angle of 8 to 12 degrees with respect to the excavation direction at a position 900 mm to 1300 mm inward in the radial direction from the support in order to reinforce the excavation surface by the first portion. And it is placed so that the ratio of the first part to the second part is 1: 0.8 to 1: 1.2.
Tunnel construction method.
前記複数の補強管それぞれの少なくとも前記第1部分には、前記掘削の際に切除可能なように1又は複数のスリットが設けられる、
請求項に記載のトンネル施工方法。
At least the first portion of each of the plurality of reinforcing pipes is provided with one or a plurality of slits so as to be excised during the excavation.
The tunnel construction method according to claim 1.
前記複数の補強管それぞれの少なくとも前記第1部分は、前記掘削の際にせん断可能な樹脂材料で構成される、
請求項1又は2に記載のトンネル施工方法。
At least the first portion of each of the plurality of reinforcing pipes is made of a resin material that can be sheared during excavation.
The tunnel construction method according to claim 1 or 2.
前記複数の補強管それぞれの外周面には、軸方向に所定の間隔で、螺旋状に延びる凹部が設けられ、 On the outer peripheral surface of each of the plurality of reinforcing pipes, recesses extending spirally at predetermined intervals in the axial direction are provided.
前記凹部には、前記第1部分の壁を径方向に貫通する貫通孔が設けられる、 The recess is provided with a through hole that radially penetrates the wall of the first portion.
請求項1から3のいずれか1項に記載のトンネル施工方法。The tunnel construction method according to any one of claims 1 to 3.
JP2017180139A 2017-09-20 2017-09-20 Tunnel construction method Active JP6989326B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017180139A JP6989326B2 (en) 2017-09-20 2017-09-20 Tunnel construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017180139A JP6989326B2 (en) 2017-09-20 2017-09-20 Tunnel construction method

Publications (2)

Publication Number Publication Date
JP2019056213A JP2019056213A (en) 2019-04-11
JP6989326B2 true JP6989326B2 (en) 2022-01-05

Family

ID=66107335

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017180139A Active JP6989326B2 (en) 2017-09-20 2017-09-20 Tunnel construction method

Country Status (1)

Country Link
JP (1) JP6989326B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20230122223A (en) * 2022-02-14 2023-08-22 오순옥 Method of constructing a tunnel using longitudinal reinforcement

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114294018B (en) * 2021-12-30 2024-01-26 中国矿业大学 A method for rapid grouting of advanced dense protective layer in loose slip area
CN114592875B (en) * 2022-01-26 2024-06-04 浙江大通建设科技有限公司 Multi-angle reinforcement construction method in subway tunnel
CN116044455B (en) * 2023-04-03 2023-06-23 湖南大学 A grouting system for directional reinforcement of tunnels
CN118499000B (en) * 2024-07-17 2024-10-15 中铁四局集团有限公司 A slurry and reinforcement method suitable for soft water-rich formations

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101233794B1 (en) * 2010-08-30 2013-02-18 이승수 Tunnel reinforcing method by multi-forepoling

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20230122223A (en) * 2022-02-14 2023-08-22 오순옥 Method of constructing a tunnel using longitudinal reinforcement
KR102732772B1 (en) * 2022-02-14 2024-11-21 오순옥 Method of constructing a tunnel using longitudinal reinforcement

Also Published As

Publication number Publication date
JP2019056213A (en) 2019-04-11

Similar Documents

Publication Publication Date Title
JP6989326B2 (en) Tunnel construction method
JP6987559B2 (en) Construction method of continuous underground wall and steel pipe pile
JP5582497B2 (en) Slope stabilization method and landslide steel pipe restraint pile
KR101685088B1 (en) Construction method for tunneling
KR101674656B1 (en) CIP retaining wall with steel tube
JP6943633B2 (en) Ring-shaped tip hardware and middle digging pile method using it
JP2788953B2 (en) Structure of tunnel structure
JP6460712B2 (en) Construction method of underground continuous wall
ITTO20110913A1 (en) PROCEDURE FOR THE CONSTRUCTION OF LARGE DIAMETER POLES AND EXCAVATION TOOL
JP2005146733A (en) Columnar underground wall method
JP4407716B2 (en) Construction method of earth retaining wall
JP4816327B2 (en) Widening part formation method of shield tunnel
KR102288469B1 (en) Underground structure construction method with double concrete tube and underground structure constructed using the same
JP5185084B2 (en) Ground improvement method
JP7316184B2 (en) Auxiliary method
JP6765566B1 (en) Construction method of the skeleton and the skeleton
KR200354672Y1 (en) Wall Structure by Steel-column Pile Recovery Process
JP4730607B2 (en) Construction method of shield tunnel
JP5416435B2 (en) Underground structure and construction method of underground structure
JP7026562B2 (en) Tunnel construction method
JP5161948B2 (en) Promotion method
JP4026771B2 (en) Ground reinforcement structure and ground reinforcement construction method
JPH01203590A (en) Advancement and arrival of shield excavator in vertical shaft
JP4322688B2 (en) Construction method of large section tunnel
JP2007162323A (en) Wall body forming method and wall body

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200508

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210315

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210413

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210609

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20210609

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20211130

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211202

R150 Certificate of patent or registration of utility model

Ref document number: 6989326

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250