Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6997699B2 - Housing design methods, design equipment and programs - Google Patents
[go: Go Back, main page]

JP6997699B2 - Housing design methods, design equipment and programs - Google Patents

Housing design methods, design equipment and programs Download PDF

Info

Publication number
JP6997699B2
JP6997699B2 JP2018234538A JP2018234538A JP6997699B2 JP 6997699 B2 JP6997699 B2 JP 6997699B2 JP 2018234538 A JP2018234538 A JP 2018234538A JP 2018234538 A JP2018234538 A JP 2018234538A JP 6997699 B2 JP6997699 B2 JP 6997699B2
Authority
JP
Japan
Prior art keywords
information
design information
house
design
energy consumption
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018234538A
Other languages
Japanese (ja)
Other versions
JP2020095597A (en
Inventor
寛 佐藤
啓二 溝渕
義浩 伊藤
栄作 来山
希光 岡
曜 鈴木
Original Assignee
パナソニックホームズ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニックホームズ株式会社 filed Critical パナソニックホームズ株式会社
Priority to JP2018234538A priority Critical patent/JP6997699B2/en
Publication of JP2020095597A publication Critical patent/JP2020095597A/en
Application granted granted Critical
Publication of JP6997699B2 publication Critical patent/JP6997699B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Residential Or Office Buildings (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、屋根面に太陽光発電装置が設けられる住宅を設計するための方法等に関する。 The present invention relates to a method for designing a house in which a photovoltaic power generation device is provided on a roof surface and the like.

近年、電力需給の逼迫や、エネルギー価格の不安定化などに伴い、太陽光などの再生可能エネルギーを導入した省エネルギー住宅への関心が高まっている。このような住宅のうち、国土交通省が定めた省エネルギー基準を満たす住宅の一例としては、ZEH(ネット・ゼロ・エネルギー・ハウス)や、ZEHよりも省エネルギー率が高いLCCM住宅(ライフサイクルカーボンマイナス住宅)などが挙げられる。 In recent years, with the tight supply and demand of electricity and the destabilization of energy prices, there is increasing interest in energy-saving housing that introduces renewable energy such as solar power. Among such houses, ZEH (Net Zero Energy House) and LCCM house (life cycle carbon minus house), which has a higher energy saving rate than ZEH, are examples of houses that meet the energy saving standards set by the Ministry of Land, Infrastructure, Transport and Tourism. ) And so on.

上記のような省エネルギー住宅を設計するには、住宅のエネルギー消費性能を知ることが必要となる。エネルギー消費性能の計算には、例えば、下記非特許文献1のプログラムが用いられる。 In order to design an energy-saving house as described above, it is necessary to know the energy consumption performance of the house. For the calculation of energy consumption performance, for example, the program of Non-Patent Document 1 below is used.

国立研究開発法人建築研究所、「エネルギー消費性能計算プログラム(住宅版)」、[online]、[平成30年11月14日検索]、インターネット<URL:http://house.app.lowenergy.jp/>National Research and Development Corporation Building Research Institute, "Energy consumption performance calculation program (residential version)", [online], [Search on November 14, 2018], Internet <URL: http://house.app.lowenergy.jp /> > >

上記プログラムには、エネルギー消費性能の計算に必要な、住宅の様々な仕様に基づく複数の情報が入力される。これらの情報の中には、例えば、住宅の具体的な間取りや設備仕様等のプランニングが確定した後でなければ決定できない情報が含まれている。したがって、従来では、住宅の設計初期段階(例えば、プランニング前)において、その住宅のエネルギー消費性能やそれに対応する太陽光発電装置の仕様を計算することができなかった。 In the above program, multiple pieces of information based on various specifications of the house, which are necessary for calculating the energy consumption performance, are input. This information includes, for example, information that can be determined only after the planning such as the specific floor plan of the house and the equipment specifications is confirmed. Therefore, in the past, it was not possible to calculate the energy consumption performance of a house and the specifications of the corresponding photovoltaic power generation device at the initial stage of designing the house (for example, before planning).

このため、住宅の設計がある程度進んだ設計後期段階(例えば、プランニング後)に住宅のエネルギー消費性能を計算した場合、それに対応する太陽光発電装置の仕様やコストが、施主が想定していたものとはかけ離れたものになることがある。このような場合、住宅の再設計が必要になるなど、住宅設計の効率低下を招く場合や、過剰に太陽光発電装置を搭載させてしまう場合があるという問題があった。 For this reason, when the energy consumption performance of a house is calculated in the late stage of design (for example, after planning) when the design of the house has advanced to some extent, the specifications and costs of the corresponding photovoltaic power generation device are assumed by the owner. It can be far from that. In such a case, there is a problem that the efficiency of the house design may be lowered such that the house needs to be redesigned, or the solar power generation device may be excessively mounted.

本発明は、以上のような実状に鑑み案出されたもので、施主の省エネルギー要望を満たす住宅を効率良く設計することができる方法等を提供することを主たる目的としている。 The present invention has been devised in view of the above circumstances, and an object of the present invention is to provide a method and the like capable of efficiently designing a house that satisfies the energy saving request of the owner.

本発明は、屋根面に太陽光発電装置を有する住宅の設計方法であって、施主が希望する前記住宅の省エネルギー化度合いに関する情報である省エネルギー要望情報を取得する工程と、前記住宅のエネルギー消費性能を計算するために必要な複数の住宅設計情報のうちの一部である第1設計情報を取得する工程と、前記複数の住宅設計情報の残りの情報である第2設計情報を、前記第1設計情報を用いて推定する工程と、前記施主との間で前記第2設計情報が決定される前段階で、前記第1設計情報及び前記推定された前記第2設計情報に基づいて、前記エネルギー消費性能を計算する工程と、前記第2設計情報が決定される前段階で、計算された前記エネルギー消費性能に基づいて、前記省エネルギー要望情報を満たす前記太陽光発電装置の仕様に関する第1次情報を計算する工程とを含むことを特徴とする。 The present invention is a method for designing a house having a photovoltaic power generation device on the roof surface, the process of acquiring energy saving request information which is information on the degree of energy saving of the house desired by the owner, and the energy consumption performance of the house. The process of acquiring the first design information which is a part of the plurality of housing design information necessary for calculating the above, and the second design information which is the remaining information of the plurality of housing design information are the first. The energy is based on the first design information and the estimated second design information before the second design information is determined between the step of estimating using the design information and the owner. Primary information on the specifications of the photovoltaic power generation device that satisfies the energy saving request information based on the calculated energy consumption performance in the process of calculating the consumption performance and the stage before the second design information is determined. It is characterized by including a step of calculating.

本発明に係る前記住宅の設計方法において、前記第2設計情報を決定する工程と、前記第1設計情報及び前記決定された前記第2設計情報に基づいて、前記エネルギー消費性能を再計算する工程と、前記再計算された前記エネルギー消費性能に基づいて、前記省エネルギー要望情報を満たす前記太陽光発電装置の前記仕様に関する第2次情報を計算する工程とを含でもよい。 In the housing design method according to the present invention, a step of determining the second design information and a step of recalculating the energy consumption performance based on the first design information and the determined second design information. And, based on the recalculated energy consumption performance, a step of calculating secondary information regarding the specifications of the photovoltaic power generation device that satisfies the energy saving request information may be included.

本発明に係る前記住宅の設計方法において、前記省エネルギー要望情報は、第1省エネルギー基準と、前記第1省エネルギー基準よりも厳しい省エネルギー基準である第2省エネルギー基準とを含んでもよい。 In the method for designing a house according to the present invention, the energy saving request information may include a first energy saving standard and a second energy saving standard which is a stricter energy saving standard than the first energy saving standard.

本発明に係る前記住宅の設計方法において、前記第1設計情報は、前記住宅の建設予定地を特定する情報と、前記住宅の床面積と、前記住宅のオール電化の有無に関する情報とを含んでもよい。 In the method of designing a house according to the present invention, the first design information includes information for specifying a planned construction site of the house, floor area of the house, and information regarding the presence or absence of all-electricity of the house. good.

本発明に係る前記住宅の設計方法において、前記第2設計情報は、前記住宅の間取りを決定した後に決まる前記住宅の情報であってもよい。 In the method of designing a house according to the present invention, the second design information may be information on the house determined after the floor plan of the house is determined.

本発明に係る前記住宅の設計方法において、前記第2設計情報を推定する工程は、前記第2設計情報を、前記第1設計情報と、予め定められた関係式とを用いて推定する工程を含んでもよい。 In the housing design method according to the present invention, the step of estimating the second design information is a step of estimating the second design information using the first design information and a predetermined relational expression. It may be included.

本発明に係る前記住宅の設計方法において、前記第2設計情報は、前記住宅のリビングルームの床面積、リビングルーム以外の居室の床面積及び非居室の床面積を含んでもよい。 In the method for designing a house according to the present invention, the second design information may include the floor area of the living room of the house, the floor area of a living room other than the living room, and the floor area of a non-living room.

本発明に係る前記住宅の設計方法において、前記第2設計情報は、前記住宅の外皮平均熱貫流率、冷房期の平均日射熱取得率及び暖房期の平均日射熱取得率を含んでもよい。 In the method for designing a house according to the present invention, the second design information may include the average thermal transmission rate of the outer skin of the house, the average thermal heat acquisition rate in the cooling period, and the average solar heat acquisition rate in the heating period.

本発明に係る前記住宅の設計方法において、前記太陽光発電装置の前記仕様は、前記省エネルギー要望情報を満たす必要出力数であってもよい。 In the housing design method according to the present invention, the specifications of the photovoltaic power generation device may be a required number of outputs that satisfy the energy saving request information.

本発明は、屋根面に太陽光発電装置を有する住宅の設計装置であって、施主が希望する前記住宅の省エネルギー化度合いに関する情報である省エネルギー要望情報が入力される省エネルギー要望取得部と、前記住宅のエネルギー消費性能を計算するために必要な複数の住宅設計情報のうちの一部である第1設計情報を取得する第1設計情報取得部と、前記複数の住宅設計情報の残りの情報である第2設計情報を、前記第1設計情報を用いて推定する第2設計情報推定部と、前記施主との間で前記第2設計情報が決定される前段階で、前記第1設計情報及び前記推定された前記第2設計情報に基づいて、前記エネルギー消費性能を計算する消費性能計算部と、前記第2設計情報が決定される前段階で、計算された前記エネルギー消費性能に基づいて、前記省エネルギー要望情報を満たす前記太陽光発電装置の仕様に関する第1次情報を計算する第1次情報計算部とを含むことを特徴とする。 The present invention is an energy saving request acquisition unit for inputting energy saving request information which is information on the degree of energy saving of the house desired by the owner, which is a housing design device having a solar power generation device on the roof surface, and the house. The first design information acquisition unit that acquires the first design information that is a part of the plurality of housing design information necessary for calculating the energy consumption performance of the above, and the remaining information of the plurality of housing design information. The first design information and the above are before the second design information is determined between the second design information estimation unit that estimates the second design information using the first design information and the owner. The energy consumption performance calculation unit that calculates the energy consumption performance based on the estimated second design information, and the energy consumption performance calculated before the second design information is determined. It is characterized by including a primary information calculation unit that calculates primary information regarding the specifications of the solar power generation device that satisfies the energy saving request information.

本発明は、屋根面に太陽光発電装置を有する住宅を設計するための方法をコンピュータに実行させるためのプログラムであって、前記コンピュータに、施主が希望する前記住宅の省エネルギー化度合いに関する情報である省エネルギー要望情報を取得させる工程と、前記住宅のエネルギー消費性能を計算するのに必要な複数の住宅設計情報のうちの一部である第1設計情報を取得させる工程と、前記複数の住宅設計情報の残りの情報である第2設計情報を、前記第1設計情報を用いて推定させる工程と、前記施主との間で前記第2設計情報が決定される前段階で、前記第1設計情報及び前記推定された前記第2設計情報に基づいて、前記エネルギー消費性能を計算させる工程と、前記第2設計情報が決定される前段階で、計算された前記エネルギー消費性能に基づいて、前記省エネルギー要望情報を満たす前記太陽光発電装置の仕様に関する第1次情報を計算させる工程とを実行させることを特徴とする。 The present invention is a program for causing a computer to execute a method for designing a house having a solar power generation device on a roof surface, and is information on the degree of energy saving of the house desired by the owner. The process of acquiring energy saving request information, the process of acquiring the first design information which is a part of the plurality of housing design information necessary for calculating the energy consumption performance of the house, and the plurality of housing design information. The first design information and the step before the second design information is determined between the step of estimating the second design information which is the remaining information of the above using the first design information and the owner. The energy saving request based on the calculated energy consumption performance in the step of calculating the energy consumption performance based on the estimated second design information and in the stage before the second design information is determined. It is characterized by executing a step of calculating primary information regarding the specifications of the solar power generation device that satisfies the information.

本発明の住宅の設計方法は、施主が希望する前記住宅の省エネルギー化度合いに関する情報である省エネルギー要望情報を取得する工程と、前記住宅のエネルギー消費性能を計算するために必要な複数の住宅設計情報のうちの一部である第1設計情報を取得する工程と、前記複数の住宅設計情報の残りの情報である第2設計情報を、前記第1設計情報を用いて推定する工程とを含んでいる。さらに、本発明の住宅の設計方法は、前記施主との間で前記第2設計情報が決定される前段階で、前記第1設計情報及び前記推定された前記第2設計情報に基づいて、前記エネルギー消費性能を計算する工程と、計算された前記エネルギー消費性能に基づいて、前記省エネルギー要望情報を満たす前記太陽光発電装置の仕様に関する第1次情報を計算する工程とを含んでいる。 The housing design method of the present invention includes a process of acquiring energy saving request information which is information on the degree of energy saving of the house desired by the owner, and a plurality of housing design information necessary for calculating the energy consumption performance of the house. A step of acquiring the first design information which is a part of the above, and a step of estimating the second design information which is the remaining information of the plurality of housing design information by using the first design information are included. There is. Further, the method for designing a house of the present invention is based on the first design information and the estimated second design information before the second design information is determined with the owner. It includes a step of calculating the energy consumption performance and a step of calculating the primary information regarding the specifications of the photovoltaic power generation device satisfying the energy saving request information based on the calculated energy consumption performance.

前記設計方法は、前記住宅の設計初期段階(例えば、プランニング前)において、前記住宅の前記エネルギー消費性能や、それに対応する前記太陽光発電装置の仕様(前記第1次情報)を計算することができる。これにより、前記設計方法は、前記住宅の設計がある程度進んだ設計後期段階(例えば、プランニング後)において、前記住宅のエネルギー消費性能を計算した場合に、それに対応する太陽光発電装置の仕様やコストが、施主の想定範囲を超えるのを抑制することができる。したがって、本発明の設計方法は、住宅の再設計が必要となる状況を防ぐことができるため、施主の省エネルギー要望を満たす住宅を効率良く設計することができる。 In the design method, at the initial stage of designing the house (for example, before planning), the energy consumption performance of the house and the corresponding specifications of the photovoltaic power generation device (the primary information) can be calculated. can. As a result, the design method is based on the specifications and costs of the photovoltaic power generation device corresponding to the calculation of the energy consumption performance of the house in the late stage of design (for example, after planning) in which the design of the house has advanced to some extent. However, it is possible to prevent the owner from exceeding the expected range. Therefore, since the design method of the present invention can prevent the situation where the house needs to be redesigned, it is possible to efficiently design the house that satisfies the energy saving request of the owner.

住宅の設計方法が実施されるコンピュータ(設計装置)の一例を示すブロック図である。It is a block diagram which shows an example of the computer (design apparatus) in which the design method of a house is carried out. 住宅の設計方法の処理手順の一例を示すフローチャートである。It is a flowchart which shows an example of the processing procedure of the house design method. 省エネルギー要望情報の選択肢が表示された画面の一例を示す図である。It is a figure which shows an example of the screen which displayed the option of the energy saving request information. 第1取得工程の処理手順の一例を示すフローチャートである。It is a flowchart which shows an example of the processing procedure of the 1st acquisition process. 第1設計情報の「住宅の建設予定地を特定する情報」を入力するための画面の一例を示す図である。It is a figure which shows an example of the screen for inputting "information for specifying the planned construction site of a house" of 1st design information. 第1設計情報の「住宅の床面積」を入力するための画面の一例を示す図である。It is a figure which shows an example of the screen for inputting the "floor area of a house" of the 1st design information. 第1設計情報の「住宅のオール電化の有無」を入力するための画面の一例を示す図である。It is a figure which shows an example of the screen for inputting the "presence or absence of all electrification of a house" of the 1st design information. 第2推定工程の処理手順の一例を示すフローチャートである。It is a flowchart which shows an example of the processing procedure of the 2nd estimation process. 太陽光発電装置の仕様に関する第1次情報が出力された画面の一例を示す図である。It is a figure which shows an example of the screen which output the primary information about the specification of a photovoltaic power generation apparatus. 本発明の他の実施形態の住宅の設計方法の処理手順の一例を示すフローチャートである。It is a flowchart which shows an example of the processing procedure of the house design method of another embodiment of this invention. 地域の区分:3、オール電化、及び、ZEHの住宅について、住宅の床面積と、第1次情報との関係を示すグラフである。Area classification: 3, All-electric, and ZEH houses, it is a graph showing the relationship between the floor area of the house and the primary information. 第2設計情報が決定される前段階の第1次情報と、第2設計情報が決定された後の第2次情報との関係を示すグラフである。It is a graph which shows the relationship between the primary information of the stage before the 2nd design information is decided, and the secondary information after the 2nd design information is decided.

以下、本発明の実施の一形態が図面に基づき説明される。
本実施形態の住宅の設計方法(以下、単に「設計方法」ということがある。)では、屋根面に太陽光発電装置を有する住宅が設計される。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
In the housing design method of the present embodiment (hereinafter, may be simply referred to as "design method"), a house having a solar power generation device on the roof surface is designed.

図1は、本実施形態の設計方法が実施されるコンピュータ(設計装置)の一例を示すブロック図である。本実施形態のコンピュータ1は、入力デバイスとしての入力部2、出力デバイスとしての出力部3、及び、後述のエネルギー消費性能等を計算する演算処理装置4を有しており、住宅を設計するための設計装置5として構成されている。コンピュータ1には、例えば、パーソナルコンピュータや、タブレット型携帯情報等を採用することができる。 FIG. 1 is a block diagram showing an example of a computer (design device) in which the design method of the present embodiment is implemented. The computer 1 of the present embodiment has an input unit 2 as an input device, an output unit 3 as an output device, and an arithmetic processing unit 4 for calculating energy consumption performance and the like, which will be described later, for designing a house. It is configured as the design device 5 of. For the computer 1, for example, a personal computer, a tablet-type mobile information, or the like can be adopted.

入力部2は、例えば、キーボード、マウス、又は、タッチパネル等が用いられる。出力部3は、例えば、ディスプレイ装置又はプリンタ等が用いられる。演算処理装置4は、各種の演算を行う演算部(CPU)6、データやプログラム等が記憶される記憶部7、及び、作業用メモリ8が含まれている。 For the input unit 2, for example, a keyboard, a mouse, a touch panel, or the like is used. For the output unit 3, for example, a display device, a printer, or the like is used. The arithmetic processing device 4 includes an arithmetic unit (CPU) 6 that performs various arithmetic operations, a storage unit 7 that stores data, programs, and the like, and a working memory 8.

記憶部7は、例えば、磁気ディスク、光ディスク又はSSD等からなる不揮発性の情報記憶装置である。記憶部7には、データ部9及びプログラム部10が設けられている。 The storage unit 7 is a non-volatile information storage device including, for example, a magnetic disk, an optical disk, an SSD, or the like. The storage unit 7 is provided with a data unit 9 and a program unit 10.

データ部9は、住宅の設計に必要な情報を記憶するためのものである。本実施形態のデータ部9は、省エネルギー要望記憶部11、第1設計情報記憶部12、第2設計情報記憶部13、エネルギー消費性能記憶部14、第1次情報記憶部15、第2次情報記憶部16、及び、設計データ記憶部17を含んでいる。 The data unit 9 is for storing information necessary for designing a house. The data unit 9 of the present embodiment includes an energy saving request storage unit 11, a first design information storage unit 12, a second design information storage unit 13, an energy consumption performance storage unit 14, a primary information storage unit 15, and a secondary information unit. A storage unit 16 and a design data storage unit 17 are included.

プログラム部10は、コンピュータ1(演算部6)に、本実施形態の設計方法を実行させるためのプログラムである。本実施形態のプログラム部10には、省エネルギー要望取得部21、省エネルギー要望判断部22、第1設計情報取得部23、第2設計情報決定部24、第2設計情報推定部25、消費性能計算部26、第1次情報計算部27、第2次情報計算部28、住宅設計部29、及び、許容範囲判断部30を含んでいる。 The program unit 10 is a program for causing the computer 1 (calculation unit 6) to execute the design method of the present embodiment. The program unit 10 of the present embodiment includes an energy saving request acquisition unit 21, an energy saving request judgment unit 22, a first design information acquisition unit 23, a second design information determination unit 24, a second design information estimation unit 25, and a consumption performance calculation unit. 26, a primary information calculation unit 27, a secondary information calculation unit 28, a housing design unit 29, and an allowable range determination unit 30 are included.

本実施形態では、例えば、国土交通省が定めた省エネルギー基準を満たす住宅が設計される。複数の省エネルギー基準のうち、平成30年省エネルギー基準(ZEH基準)を満たす住宅(省エネルギー住宅)の一例としては、ZEH(ネット・ゼロ・エネルギー・ハウス)、ZEHよりも省エネルギー率が低いNearly ZEH(ニアリー・ネット・ゼロ・エネルギー・ハウス)、及び、ZEHよりも省エネルギー率が高いLCCM住宅(ライフサイクルカーボンマイナス住宅)などが挙げられる。本実施形態の設計方法は、ZEH、Nearly ZEH、及び、LCCM住宅の全ての設計に用いることができるが、いずれか一つの設計にのみ用いられるものでもよい。 In this embodiment, for example, a house that meets the energy saving standard set by the Ministry of Land, Infrastructure, Transport and Tourism is designed. Among multiple energy-saving standards, ZEH (Net Zero Energy House) and Nearly ZEH (Nearly), which have a lower energy-saving rate than ZEH, are examples of houses (energy-saving houses) that meet the 2018 energy-saving standards (ZEH standards).・ Net Zero Energy House) and LCCM House (Life Cycle Carbon Minus House), which has a higher energy saving rate than ZEH. The design method of this embodiment can be used for all designs of ZEH, Nearly ZEH, and LCCM houses, but may be used only for any one of the designs.

ZEHは、太陽光などの再生可能エネルギーを導入することで、一次エネルギー消費量の収支をゼロにする(即ち、一次エネルギー消費量を100%削減する)ことを目指した住宅である。一方、Nearly ZEHは、一次エネルギー消費量を75%~100%(本例では、75%)の削減を目指した住宅である。 ZEH is a house that aims to reduce the balance of primary energy consumption to zero (that is, to reduce primary energy consumption by 100%) by introducing renewable energy such as sunlight. On the other hand, Nearly ZEH is a house that aims to reduce primary energy consumption by 75% to 100% (75% in this example).

LCCM住宅は、太陽光などの再生可能エネルギーを導入することで、住宅の建設時、運用時、及び、廃棄時を含むライフサイクル全体を通じて、CO2排出量をマイナスにする住宅である。即ち、LCCM住宅では、運用時の一次消費エネルギーに、住宅の建設時、解体時及び再利用時に用いられる材料の一次消費エネルギーを加算した一次消費エネルギーの収支をマイナス(即ち、運用時、建設時、解体時及び再利用時の一次エネルギー消費量を100%以上削減する)にすることを目指している。 LCCM homes are homes that reduce CO 2 emissions throughout their life cycle, including during construction, operation, and disposal, by introducing renewable energy such as sunlight. That is, in an LCCM house, the balance of primary energy consumption, which is the sum of the primary energy consumption during operation and the primary energy consumption of materials used during construction, demolition, and reuse of the house, is negative (that is, during operation and construction). , Reduce primary energy consumption during dismantling and reuse by 100% or more).

上記のような省エネルギー住宅を設計するには、住宅のエネルギー消費性能(一次エネルギー消費量)を知ることが必要となる。エネルギー消費性能の計算には、例えば、上記非特許文献1のプログラムが用いられる。 In order to design an energy-saving house as described above, it is necessary to know the energy consumption performance (primary energy consumption) of the house. For the calculation of energy consumption performance, for example, the program of Non-Patent Document 1 is used.

上記プログラムには、エネルギー消費性能の計算に必要な、住宅の様々な仕様に基づく複数の情報(以下、単に「住宅設計情報」ということがある。)が入力される。住宅設計情報の詳細については、上記非特許文献1、及び、先行技術文献(国立研究開発法人建築研究所、「平成28年省エネルギー基準に準拠したエネルギー消費性能の評価に関する技術情報(住宅)」、[online]、[平成30年11月14日検索]、インターネット<URL:https://www.kenken.go.jp/becc/house.html>)等に記載のとおりである。 In the above program, a plurality of information (hereinafter, may be simply referred to as "house design information") based on various specifications of the house, which are necessary for calculating the energy consumption performance, are input. For details of housing design information, see Non-Patent Document 1 above and Prior Art Document (National Research and Development Corporation Building Research Institute, "Technical Information on Evaluation of Energy Consumption Performance Compliant with 2016 Energy Conservation Standards (Housing)", [Online], [Search on November 14, 2018], Internet <URL: https://www.kenken.go.jp/becc/house.html>), etc.

複数の住宅設計情報には、複数の住宅設計情報のうちの一部である第1設計情報と、複数の住宅設計情報の残りの情報である第2設計情報とが含まれる。 The plurality of housing design information includes a first design information which is a part of the plurality of housing design information and a second design information which is the remaining information of the plurality of housing design information.

本実施形態の第1設計情報は、住宅の具体的な間取りや設備仕様等のプランニングが確定する前において、施主の希望によって決定可能な情報である。第1設計情報については、プランニングが確定する前に決定可能な情報であれば、適宜選択することができる。本実施形態の第1設計情報は、「住宅の建設予定地を特定する情報」、「住宅の床面積」、及び、「住宅のオール電化の有無に関する情報」を含んでいる。 The first design information of the present embodiment is information that can be determined at the request of the owner before the planning of the specific layout of the house and the equipment specifications is finalized. The first design information can be appropriately selected as long as it is information that can be determined before the planning is finalized. The first design information of the present embodiment includes "information for specifying the planned construction site of the house", "floor area of the house", and "information regarding the presence or absence of all-electricity of the house".

第1設計情報の「住宅の建設予定地を特定する情報」は、上記非特許文献1のプログラムにおいて、「地域の区分」及び「年間日射地域区分の指定」に相当する。「地域の区分」は、主に外気条件を評価軸として、全国の市町村を8つの地域(1~8の地域区分)に分けた区分である。「年間日射量地域区分」は、水平面全天日射量の年間積算値を指標として、日本全国を日射の少ない地域から多い地域までを5地域に分類した地域区分である。これらの情報は、施主が希望する住宅の建設予定地に基づいて決定される。 The first design information "information for specifying the planned construction site of a house" corresponds to "regional classification" and "designation of annual solar radiation area classification" in the program of Non-Patent Document 1 above. The "regional division" is a division in which cities, towns and villages nationwide are divided into eight regions (regional divisions 1 to 8) mainly based on the outside air condition. The "annual solar radiation area classification" is a regional classification that classifies the whole of Japan into five areas from the area with low solar radiation to the area with high solar radiation, using the annual integrated value of the total solar radiation on the horizontal plane as an index. This information is determined based on the planned construction site of the house desired by the owner.

第1設計情報の「住宅の床面積」は、上記非特許文献1のプログラムにおいて、「合計床面積(m2)」に相当する。「合計床面積」は、例えば、「主たる居室の床面積(m2)」、「その他の居室の床面積(m2)」、及び、「非居室の床面積(m2)」の合計値である。「主たる居室」とは、住宅に設けられた居室のうち、就寝を除いた日常生活で在室時間が長い居室のことであり、リビングルームに相当する。「その他の居室」は、住宅に設けられた居室のうち、主たる居室(リビングルーム)以外の居室である。「非居室」は、居室以外の空間をいい、例えば、トイレ、洗面所、及び、浴室等に相当する。上記の床面積のうち、「合計床面積(m2)」については、施主が希望する住宅の規模に基づいて決定される。 The "floor area of a house" in the first design information corresponds to the "total floor area (m 2 )" in the program of Non-Patent Document 1 above. The "total floor area" is, for example, the total value of "the floor area of the main living room (m 2 )", "the floor area of other living rooms (m 2 )", and "the floor area of the non-living room (m 2 )". Is. The "main living room" is a living room provided in a house that has a long living time in daily life excluding sleeping, and corresponds to a living room. "Other living rooms" are living rooms other than the main living room (living room) among the living rooms provided in the house. "Non-living room" refers to a space other than the living room, and corresponds to, for example, a toilet, a washroom, a bathroom, and the like. Of the above floor areas, the "total floor area (m 2 )" is determined based on the size of the house desired by the owner.

第1設計情報の「住宅のオール電化の有無」は、上記非特許文献1のプログラムにおいて、「給湯設備」及び「給湯熱源機」等に相当する。「給湯設備」は、給湯設備の有無を判断するための項目である。本実施形態の「給湯設備」には、オール電化である場合、及び、オール電化でない場合の双方において、「給湯設備がある(浴室等がある)」が選択される。一方、「給湯熱源機」は、給湯器の種類を特定する項目である。本実施形態において、オール電化である場合には、給湯熱源機として「電気ヒートポンプ給湯機」が選択される。一方、オール電化でない場合には、給湯熱源機として「ガス潜熱回収型給湯器」が選択される。これらの情報は、施主が希望する給湯方式等に基づいて決定される。 The "presence or absence of all-electric homes" in the first design information corresponds to "hot water supply equipment", "hot water supply heat source machine", etc. in the program of Non-Patent Document 1 above. "Hot water supply equipment" is an item for determining the presence or absence of hot water supply equipment. For the "hot water supply facility" of the present embodiment, "there is a hot water supply facility (there is a bathroom, etc.)" is selected in both the case of all-electricity and the case of not all-electricity. On the other hand, the "hot water heat source machine" is an item that specifies the type of water heater. In the present embodiment, in the case of all-electricity, the "electric heat pump water heater" is selected as the hot water supply heat source machine. On the other hand, if it is not all-electric, a "gas latent heat recovery type water heater" is selected as the hot water supply heat source machine. This information is determined based on the hot water supply method or the like desired by the owner.

第2設計情報は、第1設計情報とは異なり、住宅の間取りを決定した後(プランニングが確定した後)に決まる情報である。本実施形態の第2設計情報は、リビングルームの床面積、リビングルーム以外の居室の床面積、及び、非居室の床面積を含んでいる。なお、リビングルーム、リビングルーム以外の居室、及び、非居室については、上述のとおりである。 Unlike the first design information, the second design information is information that is determined after the floor plan of the house is determined (after the planning is confirmed). The second design information of the present embodiment includes the floor area of the living room, the floor area of the living room other than the living room, and the floor area of the non-living room. The living room, living rooms other than the living room, and non-living rooms are as described above.

第2設計情報の「リビングルームの床面積」は、上記非特許文献1のプログラムにおいて、「主たる居室の床面積」に相当する。第2設計情報の「リビングルーム以外の居室の床面積」は、「その他の居室の床面積」に相当する。第2設計情報の「非居室面積」は、「主たる居室の床面積」と、「その他の居室の床面積」との合計値を、「合計床面積」から減じた値に相当する。 The "floor area of the living room" in the second design information corresponds to the "floor area of the main living room" in the program of Non-Patent Document 1. The "floor area of the living room other than the living room" in the second design information corresponds to the "floor area of the other living room". The "non-living room area" in the second design information corresponds to the value obtained by subtracting the total value of the "floor area of the main living room" and the "floor area of other living rooms" from the "total floor area".

さらに、本実施形態の第2設計情報は、外皮の面積、住宅の外皮平均熱貫流率、冷房期の平均日射熱取得率、及び、暖房期の平均日射熱取得率が含まれる。 Further, the second design information of the present embodiment includes the area of the outer skin, the average thermal transmission rate of the outer skin of the house, the average thermal heat acquisition rate in the cooling period, and the average solar heat acquisition rate in the heating period.

第2設計情報の「外皮の面積」は、上記非特許文献1のプログラムにおいて、「外皮面積の合計」に相当する。外皮面積の合計は、外気等に接する天井(小屋裏又は天井裏が外気と通じていない場合にあっては、屋根)、壁、床、及び、開口部、並びに、当該単位住戸以外の建築物の部分に接する部分の面積を合計した値である。 The "area of the outer skin" of the second design information corresponds to the "total area of the outer skin" in the program of the above-mentioned non-patent document 1. The total area of the outer skin is the ceiling in contact with the outside air (the roof if the attic or the ceiling does not communicate with the outside air), walls, floors, openings, and buildings other than the unit dwelling unit. It is the total value of the area of the part in contact with the part of.

第2設計情報の「住宅の外皮平均熱貫流率」は、上記非特許文献1のプログラムにおいて、「外皮平均熱貫流率(UA)」に相当する。外皮平均熱貫流率は、単位住戸の内外の温度差1℃当たりの総熱損失量(換気による熱損失量を除く)を、外皮の面積(外皮面積の合計)で除した値である。 The "average thermal transmission rate of the outer skin of a house" in the second design information corresponds to the "average thermal transmission rate of the outer skin ( UA )" in the program of Non-Patent Document 1. The thermal average heat transmission rate of the outer skin is a value obtained by dividing the total heat loss amount (excluding the heat loss amount due to ventilation) per 1 ° C. temperature difference between the inside and outside of the unit dwelling unit by the area of the outer skin (total of the outer skin area).

第2設計情報の「冷房期の平均日射熱取得率」は、上記非特許文献1のプログラムにおいて、「冷房期平均日射熱取得率(ηAC)」に相当する。冷房期平均日射熱取得率は、冷房期において、屋根、外壁、及び、窓等の外皮の各部位から入射する日射量を、外皮の面積(外皮面積の合計)で除した値である。 The "average solar heat gain rate during the cooling period" in the second design information corresponds to the "average solar heat gain rate during the cooling period (η AC )" in the program of Non-Patent Document 1. The average solar heat gain rate during the cooling period is a value obtained by dividing the amount of solar radiation incident from each part of the outer skin such as the roof, the outer wall, and the window by the area of the outer skin (total of the outer skin area) in the cooling period.

第2設計情報の「暖房期の平均日射熱取得率」は、上記非特許文献1のプログラムにおいて、「暖房期平均日射熱取得率(ηAH)」に相当する。暖房期平均日射熱取得率は、暖房期において、屋根、外壁、及び、窓等の外皮の各部位から入射する日射量を、外皮の面積の合計で除した値である。 The "average solar heat gain rate during the heating period" in the second design information corresponds to the "average solar heat gain rate during the heating period (η AH )" in the program of Non-Patent Document 1. The average solar heat acquisition rate during the heating period is a value obtained by dividing the amount of solar radiation incident from each part of the outer skin such as the roof, the outer wall, and the window by the total area of the outer skin during the heating period.

また、本実施形態の第2設計情報は、上記非特許文献1のプログラムに基づいて、「主たる居室の通風の利用」、「その他の居室の通風の利用」、「蓄熱の利用」、「床下空間を経由して外気を導入する換気方式の利用」、「暖房方式の選択」、「主たる居室及びその他の居室の暖房設備機器等の選択」、「冷房方式の選択」、及び、「主たる居室及びその他の居室の冷房設備機器等の選択」を含んでいる。さらに、本実施形態の第2設計情報は、上記非特許文献1のプログラムに基づいて、「換気設備の方式の選択」、「ダクト式換気設備を設置する場合の評価方法」、「換気回数」、「熱交換型換気設備の設置」、「配管方式」、「水栓」、「浴槽」、「主たる居室等の昭明」、「太陽光発電設備」、「液体集熱式太陽熱利用設備」、「空気集熱式太陽熱利用設備」、及び、「コージェネレーション設備」等を含んでいる。これらの第2設計情報に入力される値の詳細については、上記非特許文献1、及び、先行技術文献に記載のとおりである。 Further, the second design information of the present embodiment is based on the program of Non-Patent Document 1 described above, "use of ventilation in the main room", "use of ventilation in other rooms", "use of heat storage", and "underfloor". "Use of ventilation method to introduce outside air via space", "Selection of heating method", "Selection of heating equipment for main room and other rooms", "Selection of cooling method", and "Main room" And selection of other air-conditioning equipment in the living room. " Further, the second design information of the present embodiment is based on the program of Non-Patent Document 1 above, "selection of ventilation equipment method", "evaluation method when installing duct type ventilation equipment", "ventilation frequency". , "Installation of heat exchange type ventilation equipment", "Piping method", "Water faucet", "Bathtub", "Akiaki of main living room", "Solar power generation equipment", "Liquid heat collection type solar heat utilization equipment", Includes "air-collecting solar heat utilization equipment" and "cogeneration equipment". Details of the values input to these second design information are as described in Non-Patent Document 1 and Prior Art Documents.

上記非特許文献1のプログラムにおいて、第1設計情報と、第2設計情報とが入力されることで、住宅のエネルギー消費性能(一次エネルギー消費量)が計算される。 In the program of Non-Patent Document 1, the energy consumption performance (primary energy consumption) of the house is calculated by inputting the first design information and the second design information.

上述したように、第2設計情報は、プランニングが確定した後に決まる情報である。したがって、従来では、住宅の設計初期段階(例えば、プランニング前)において、その住宅のエネルギー消費性能や、それに対応する太陽光発電装置の仕様を計算することができなかった。 As described above, the second design information is information determined after the planning is finalized. Therefore, in the past, it was not possible to calculate the energy consumption performance of a house and the specifications of the corresponding photovoltaic power generation device at the initial stage of designing the house (for example, before planning).

このため、住宅の設計がある程度進んだ設計後期段階(例えば、プランニング後)に住宅のエネルギー消費性能を計算した場合、それに対応する太陽光発電装置の仕様やコストが、施主が想定していたものとはかけ離れたものになることがある。このような場合、住宅の再設計が必要になるなど、住宅設計の効率低下を招くという問題がある。 For this reason, when the energy consumption performance of a house is calculated in the late stage of design (for example, after planning) when the design of the house has advanced to some extent, the specifications and costs of the corresponding photovoltaic power generation device are assumed by the owner. It can be far from that. In such a case, there is a problem that the efficiency of the house design is lowered, such as the need to redesign the house.

本実施形態の設計方法では、第2設計情報を、第1設計情報を用いて推定することで、第2設計情報が決定される前段階(プランニング前)で、エネルギー消費性能と、太陽光発電装置の仕様に関する第1次情報を計算している。図2は、住宅の設計方法の処理手順の一例を示すフローチャートである。 In the design method of the present embodiment, the second design information is estimated using the first design information, so that the energy consumption performance and the photovoltaic power generation can be performed at the stage before the second design information is determined (before planning). The primary information about the device specifications is being calculated. FIG. 2 is a flowchart showing an example of a processing procedure of a house design method.

本実施形態の設計方法では、先ず、省エネルギー要望情報が取得される(工程S1)。省エネルギー要望情報は、施主が希望する住宅の省エネルギー化度合いに関する情報である。本実施形態の省エネルギー要望情報は、第1省エネルギー基準と、前記第1省エネルギー基準よりも厳しい省エネルギー基準である第2省エネルギー基準とを含んでいる。 In the design method of this embodiment, first, energy saving request information is acquired (process S1). The energy saving request information is information on the degree of energy saving of the house desired by the owner. The energy saving request information of this embodiment includes the first energy saving standard and the second energy saving standard which is a stricter energy saving standard than the first energy saving standard.

第1省エネルギー基準、及び、第2省エネルギー基準としては、適宜選択することができる。本実施形態の第2省エネルギー基準には、現行の省エネルギー基準のうち、住宅に推奨されるエネルギー基準(本例では、平成30年省エネルギー基準(ZEH基準))が選択される。一方、第1省エネルギー基準には、第2省エネルギー基準よりも低い省エネルギー基準であれば、適宜選択することができる。本実施形態の第1省エネルギー基準には、平成4年省エネルギー基準が選択される。 The first energy saving standard and the second energy saving standard can be appropriately selected. As the second energy saving standard of this embodiment, the energy standard recommended for housing (in this example, the 2018 energy saving standard (ZEH standard)) is selected from the current energy saving standards. On the other hand, as the first energy saving standard, any energy saving standard lower than the second energy saving standard can be appropriately selected. The 1992 energy saving standard is selected as the first energy saving standard of this embodiment.

工程S1では、先ず、図1に示されるように、プログラム部10の省エネルギー要望取得部21が、作業用メモリ8に読み込まれる。そして、省エネルギー要望取得部21が、演算部6によって実行される。図3は、省エネルギー要望情報の選択肢が表示された画面の一例を示す図である。 In step S1, first, as shown in FIG. 1, the energy saving request acquisition unit 21 of the program unit 10 is read into the working memory 8. Then, the energy saving request acquisition unit 21 is executed by the calculation unit 6. FIG. 3 is a diagram showing an example of a screen on which options for energy saving request information are displayed.

工程S1では、設計装置5の出力部3(ディスプレイ装置)に、省エネルギー要望情報の選択肢が表示される。本実施形態の出力部3には、平成4年省エネルギー基準(即ち、第1省エネルギー基準)のオプションボタン31と、平成30年省エネルギー基準(ZEH基準)(即ち、第2省エネルギー基準)のオプションボタン32とが表示されている。次に、工程S1では、施主等によって、施主が希望する省エネルギー基準(第1省エネルギー基準及び第2省エネルギー基準のいずれか)のオプションボタンが選択され、「次へ」ボタン37が押下される。これにより、工程S1では、選択された省エネルギー基準が、省エネルギー要望情報として特定され、省エネルギー要望記憶部11に記憶される。 In step S1, the output unit 3 (display device) of the design device 5 displays options for energy saving request information. The output unit 3 of the present embodiment has an option button 31 of the 1992 energy saving standard (that is, the first energy saving standard) and an option button 32 of the 2018 energy saving standard (ZEH standard) (that is, the second energy saving standard). Is displayed. Next, in step S1, the owner or the like selects an option button for the energy saving standard (either the first energy saving standard or the second energy saving standard) desired by the owner, and the "Next" button 37 is pressed. As a result, in step S1, the selected energy saving standard is specified as energy saving request information and stored in the energy saving request storage unit 11.

次に、本実施形態の設計方法では、省エネルギー要望情報が、第2省エネルギー基準であるか否かが判断される(工程S2)。工程S2では、先ず、図1に示されるように、省エネルギー要望記憶部11に記憶されている省エネルギー要望情報、及び、プログラム部10の省エネルギー要望判断部22が、作業用メモリ8に入力される。そして、省エネルギー要望判断部22が、演算部6によって実行される。 Next, in the design method of the present embodiment, it is determined whether or not the energy saving request information is the second energy saving standard (process S2). In step S2, first, as shown in FIG. 1, the energy saving request information stored in the energy saving request storage unit 11 and the energy saving request determination unit 22 of the program unit 10 are input to the work memory 8. Then, the energy saving request determination unit 22 is executed by the calculation unit 6.

工程S2において、省エネルギー要望情報が、第2省エネルギー基準であると判断された場合(工程S2において、「Y」)、次の第1取得工程S3が実行される。一方、省エネルギー要望情報が、第2省エネルギー基準ではない(即ち、第1省エネルギー基準である)と判断された場合(工程S2において、「N」)、第1省エネルギー基準を推奨しない旨のメッセージ(図示省略)を出力部3に出力し(工程S4)、工程S1及び工程S2が再度実施される。これにより、本実施形態の設計方法では、第2省エネルギー基準が選択されなかった場合に、例えば、第2省エネルギー基準を満たすことの重要性やメリット等を施主に説明する機会を得ることができるため、その重要性等を施主に理解してもらった上で、省エネルギー率の高い(第2省エネルギー基準を準拠した)住宅を設計することが可能となる。 When the energy saving request information is determined to be the second energy saving standard in the step S2 (“Y” in the step S2), the next first acquisition step S3 is executed. On the other hand, when it is determined that the energy saving request information is not the second energy saving standard (that is, it is the first energy saving standard) (“N” in step S2), a message to the effect that the first energy saving standard is not recommended (illustrated). (Omitted) is output to the output unit 3 (step S4), and steps S1 and S2 are performed again. As a result, in the design method of the present embodiment, when the second energy saving standard is not selected, for example, it is possible to obtain an opportunity to explain to the owner the importance and merits of satisfying the second energy saving standard. It will be possible to design a house with a high energy saving rate (compliant with the second energy saving standard) after having the owner understand its importance.

次に、本実施形態の設計方法では、第1設計情報が取得される(第1取得工程S3)。本実施形態の第1取得工程S3では、上述した第1設計情報の「住宅の建設予定地を特定する情報」、「住宅の床面積」及び「住宅のオール電化の有無に関する情報」が取得される。 Next, in the design method of the present embodiment, the first design information is acquired (first acquisition step S3). In the first acquisition step S3 of the present embodiment, the above-mentioned first design information "information for specifying the planned construction site of the house", "floor area of the house" and "information regarding the presence or absence of all-electricity of the house" are acquired. To.

第1取得工程S3では、先ず、図1に示されるように、プログラム部10の第1設計情報取得部23が、作業用メモリ8に読み込まれる。そして、第1設計情報取得部23が、演算部6によって実行される。図4は、第1取得工程S3の処理手順の一例を示すフローチャートである。 In the first acquisition step S3, first, as shown in FIG. 1, the first design information acquisition unit 23 of the program unit 10 is read into the working memory 8. Then, the first design information acquisition unit 23 is executed by the calculation unit 6. FIG. 4 is a flowchart showing an example of the processing procedure of the first acquisition step S3.

本実施形態の第1取得工程S3では、先ず、第1設計情報の「住宅の建設予定地を特定する情報」が取得される(工程S31)。図5は、住宅の建設予定地を特定する情報を入力するための画面の一例を示す図である。 In the first acquisition process S3 of the present embodiment, first, the first design information "information for specifying the planned construction site of the house" is acquired (process S31). FIG. 5 is a diagram showing an example of a screen for inputting information for specifying a planned construction site of a house.

工程S31では、先ず、設計装置5の出力部3(ディスプレイ装置)に、住宅の建設予定地の郵便番号を入力するためのテキストボックス33が表示される。次に、工程S31では、施主等によって、テキストボックス33に郵便番号が入力され、「次へ」ボタン38が押下される。これにより、工程S31では、入力された郵便番号に基づいて、上記非特許文献1のプログラムでの「地域の区分」、及び、「年間日射地域区分の指定」が特定される。これらの特定には、例えば、郵便番号と、「地域の区分」及び「年間日射地域区分の指定」とを対応させたデータベースが用いられるのが望ましい。これにより、本実施形態では、住宅の建設予定地の郵便番号から、「地域の区分」及び「年間日射地域区分の指定」を容易に特定することができる。 In step S31, first, a text box 33 for inputting the postal code of the planned construction site of the house is displayed on the output unit 3 (display device) of the design device 5. Next, in step S31, the zip code is input to the text box 33 by the owner or the like, and the "Next" button 38 is pressed. As a result, in step S31, the "regional classification" and the "designation of the annual solar radiation region classification" in the program of the non-patent document 1 are specified based on the input zip code. For these identifications, for example, it is desirable to use a database in which a zip code is associated with "regional classification" and "designation of annual solar radiation area classification". Thereby, in the present embodiment, the "regional division" and the "designation of the annual solar radiation area classification" can be easily specified from the postal code of the planned construction site of the house.

特定された「地域の区分」、及び、「年間日射地域区分の指定」は、第1設計情報の「住宅の建設予定地を特定する情報」として、第1設計情報記憶部12に記憶される。なお、図5において「戻る」ボタン41が押下された場合には、図3に示した画面を表示して、省エネルギー要望情報を取得する工程S1が実施されるのが望ましい。 The specified "regional classification" and "designation of annual solar radiation area classification" are stored in the first design information storage unit 12 as "information for specifying the planned construction site of the house" of the first design information. .. When the "return" button 41 is pressed in FIG. 5, it is desirable that the step S1 for displaying the screen shown in FIG. 3 and acquiring the energy saving request information is performed.

次に、本実施形態の第1取得工程S3では、第1設計情報の「住宅の床面積」が取得される(工程S32)。図6は、「住宅の床面積」を入力するための画面の一例を示す図である。工程S32では、先ず、設計装置5の出力部3(ディスプレイ装置)に、住宅の床面積を入力するためのテキストボックス34が表示される。次に、工程S32では、施主等によって、テキストボックス34に住宅の床面積が入力され、「次へ」ボタン39が押下される。これにより、工程S32では、入力された住宅の床面積が、上記非特許文献1のプログラムでの「合計床面積」として特定される。特定された合計床面積は、第1設計情報の「住宅の床面積」として、第1設計情報記憶部12に記憶される。なお、図6において、「戻る」ボタン42が押下された場合、図5に示した画面を表示して、第1設計情報の「住宅の建設予定地を特定する情報」を取得する工程S31が実施されるのが望ましい。 Next, in the first acquisition step S3 of the present embodiment, the "floor area of the house" of the first design information is acquired (process S32). FIG. 6 is a diagram showing an example of a screen for inputting a “floor area of a house”. In step S32, first, a text box 34 for inputting the floor area of the house is displayed on the output unit 3 (display device) of the design device 5. Next, in step S32, the floor area of the house is input to the text box 34 by the owner or the like, and the "Next" button 39 is pressed. As a result, in step S32, the input floor area of the house is specified as the "total floor area" in the program of Non-Patent Document 1. The specified total floor area is stored in the first design information storage unit 12 as the "floor area of the house" of the first design information. In addition, in FIG. 6, when the "back" button 42 is pressed, the step S31 for displaying the screen shown in FIG. 5 and acquiring "information for specifying the planned construction site of the house" of the first design information is performed. It is desirable to be implemented.

次に、本実施形態の第1取得工程S3では、第1設計情報の「住宅のオール電化の有無」が取得される(工程S33)。図7は、「住宅のオール電化の有無」を入力するための画面の一例を示す図である。工程S33では、先ず、設計装置5の出力部3(ディスプレイ装置)に、住宅のオール電化の有無(本例では、オール電化を希望するか否か)に関する選択肢が表示される。本実施形態の出力部3には、はい(即ち、オール電化を希望する)のオプションボタン35と、いいえ(即ち、オール電化を希望しない)のオプションボタン36とが表示される。 Next, in the first acquisition process S3 of the present embodiment, the "presence or absence of all-electricity of the house" of the first design information is acquired (process S33). FIG. 7 is a diagram showing an example of a screen for inputting “whether or not the house is all-electric”. In step S33, first, the output unit 3 (display device) of the design device 5 displays options regarding whether or not the house is all-electric (in this example, whether or not all-electricity is desired). The output unit 3 of the present embodiment displays a yes (that is, wants all-electricity) option button 35 and a no (that is, does not want all-electricity) option button 36.

次に、工程S33では、施主等によって、オプションボタン35及び36のいずれかが選択され、「次へ」ボタン40が押下される。これにより、工程S33では、選択されたオプションボタン35及び36のいずれかに基づいて、上記非特許文献1のプログラムでの「給湯設備」及び「給湯熱源機」が特定される。 Next, in step S33, one of the option buttons 35 and 36 is selected by the owner or the like, and the "Next" button 40 is pressed. Thereby, in step S33, the "hot water supply equipment" and the "hot water supply heat source machine" in the program of the non-patent document 1 are specified based on any of the selected option buttons 35 and 36.

図7において、「はい(即ち、オール電化を希望する)」のオプションボタン35が選択された場合には、「給湯設備」として「給湯設備がある(浴室等がある)」が選択され、かつ、「給湯熱源機」として「電気ヒートポンプ給湯機」が選択される。一方、図7において、「いいえ(即ち、オール電化を希望しない)」のオプションボタン36が選択された場合には、「給湯設備」として「給湯設備がある(浴室等がある)」が選択され、かつ、「給湯熱源機」として「ガス潜熱回収型給湯器」が選択される。選択された「給湯設備」及び「給湯熱源機」は、第1設計情報の「住宅のオール電化の有無」として、第1設計情報記憶部12に記憶される。なお、図7において、「戻る」ボタン43が押下された場合、図6に示した画面を表示して、第1設計情報の「住宅の床面積」を取得する工程S32が実施されるのが望ましい。 In FIG. 7, when the option button 35 of "Yes (that is, all-electricity is desired)" is selected, "There is a hot water supply facility (there is a bathroom, etc.)" is selected as the "Hot water supply facility", and , "Electric heat pump water heater" is selected as the "hot water heat source machine". On the other hand, in FIG. 7, when the option button 36 of "No (that is, not wanting to be all-electric)" is selected, "There is a hot water supply facility (there is a bathroom, etc.)" is selected as the "Hot water supply facility". In addition, a "gas latent heat recovery type water heater" is selected as the "hot water supply heat source machine". The selected "hot water supply equipment" and "hot water supply heat source machine" are stored in the first design information storage unit 12 as "presence or absence of all-electricity of the house" of the first design information. In addition, in FIG. 7, when the "back" button 43 is pressed, the step S32 of displaying the screen shown in FIG. 6 and acquiring the "floor area of the house" of the first design information is carried out. desirable.

次に、本実施形態の設計方法では、第1設計情報を用いて、第2設計情報が推定される(第2推定工程S5)。第2推定工程S5は、施主との間で第2設計情報が決定される前段階において、第2設計情報が推定される。 Next, in the design method of the present embodiment, the second design information is estimated using the first design information (second estimation step S5). In the second estimation step S5, the second design information is estimated before the second design information is determined with the client.

第2推定工程S5では、先ず、図1に示されるように、第1設計情報記憶部12に記憶されている第1設計情報、及び、プログラム部10の第2設計情報推定部25が、作業用メモリ8に読み込まれる。そして、第2設計情報推定部25が、演算部6によって実行される。図8は、第2推定工程S5の処理手順の一例を示すフローチャートである。 In the second estimation step S5, first, as shown in FIG. 1, the first design information stored in the first design information storage unit 12 and the second design information estimation unit 25 of the program unit 10 work. It is read into the memory 8. Then, the second design information estimation unit 25 is executed by the calculation unit 6. FIG. 8 is a flowchart showing an example of the processing procedure of the second estimation step S5.

本実施形態の第2推定工程S5では、先ず、第1設計情報と、予め定められた関係式とを用いて、第2設計情報が推定される(工程S51)。工程S51では、上述の第2設計情報のうち、リビングルームの床面積、リビングルーム以外の居室の床面積、非居室の床面積、及び、外皮の面積が推定される。 In the second estimation step S5 of the present embodiment, first, the second design information is estimated using the first design information and the predetermined relational expression (step S51). In step S51, among the above-mentioned second design information, the floor area of the living room, the floor area of the living room other than the living room, the floor area of the non-living room, and the area of the outer skin are estimated.

工程S51では、第1設計情報の住宅の床面積(合計床面積)Fと、下記の関係式(1)~(4)とを用いて、第2設計情報のリビングルームの床面積F1、リビングルーム以外の居室の床面積F2、非居室の床面積F3、及び、外皮の面積F4が推定される。
F1=0.34×F…(1)
F2=0.35×F…(2)
F3=0.31×F…(3)
F4=2.7×F…(4)
In step S51, the floor area F1 of the living room of the second design information and the living room are used by using the floor area (total floor area) F of the house of the first design information and the following relational expressions (1) to (4). The floor area F2 of the living room other than the room, the floor area F3 of the non-living room, and the area F4 of the outer skin are estimated.
F1 = 0.34 × F ... (1)
F2 = 0.35 × F ... (2)
F3 = 0.31 × F ... (3)
F4 = 2.7 × F ... (4)

上記の関係式(1)~(4)は、住宅の床面積(合計床面積)Fに、予め定められた係数を乗じたものである。関係式(1)~(3)の係数(0.34、0.35及び0.31)は、住宅の床面積(合計床面積)Fに対する各床面積F1~F3の割合である。これらの係数は、例えば、これまで建設されてきた住宅の実績に基づいて設定される。 The above relational expressions (1) to (4) are obtained by multiplying the floor area (total floor area) F of the house by a predetermined coefficient. The coefficients (0.34, 0.35 and 0.31) of the relational expressions (1) to (3) are the ratio of each floor area F1 to F3 to the floor area (total floor area) F of the house. These coefficients are set, for example, based on the performance of the houses that have been built so far.

関係式(4)の係数(2.7)は、住宅の床面積(合計床面積)Fに対する外皮の面積の割合である。このような係数は、例えば、これまで建設されてきた住宅の実績に基づいて設定される。このように、本実施形態の設計方法では、住宅の設計初期段階(例えば、プランニング前)において、住宅の間取りを決定した後(プランニングが確定した後)に決まる第2設計情報を推定することができる。なお、上記関係式(1)~(4)は一例であり、例えば、これまで建設されてきた住宅の実績に基づいて、適宜変更することができる。 The coefficient (2.7) of the relational expression (4) is the ratio of the area of the outer skin to the floor area (total floor area) F of the house. Such coefficients are set, for example, based on the performance of the houses that have been built so far. As described above, in the design method of the present embodiment, it is possible to estimate the second design information determined after the floor plan of the house is determined (after the planning is confirmed) in the initial stage of designing the house (for example, before planning). can. The above relational expressions (1) to (4) are examples, and can be appropriately changed, for example, based on the actual results of the houses constructed so far.

次に、本実施形態の第2推定工程S5では、第1設計情報から、第2設計情報が推定される(工程S52)。工程S52では、先ず、第2設計情報の「住宅の外皮平均熱貫流率」、「冷房期の平均日射熱取得率」、及び、「暖房期の平均日射熱取得率」が推定される。これらの第2設計情報は、建設予定地が同一地域の住宅においては略同一であるが、異なる地域の住宅においては大きく異なる傾向がある。とりわけ、ある程度仕様が決められている工業化住宅の場合には、同一地域の住宅において略同一となる傾向がある。したがって、本実施形態の工程S52では、第1設計情報の「住宅の建設予定地を特定する情報(即ち、「地域の区分」及び「年間日射地域区分の指定」)」に基づいて、上記の第2設計情報が推定される。 Next, in the second estimation step S5 of the present embodiment, the second design information is estimated from the first design information (step S52). In step S52, first, the second design information "average thermal transmission rate of the outer skin of the house", "average thermal heat acquisition rate in the cooling period", and "average solar heat acquisition rate in the heating period" are estimated. These second design information are substantially the same for houses in the same planned construction site, but tend to be significantly different in houses in different areas. In particular, in the case of industrialized houses whose specifications have been determined to some extent, they tend to be almost the same in houses in the same area. Therefore, in the process S52 of the present embodiment, the above-mentioned is based on the first design information "information for specifying the planned construction site of the house (that is," area classification "and" designation of annual solar radiation area classification ")". The second design information is estimated.

本実施形態の工程S52では、例えば、第1設計情報の「住宅の建設予定地を特定する情報(本例では、地域の区分、及び、年間日射地域区分の指定)」と、第2設計情報の「住宅の外皮平均熱貫流率」、「冷房期の平均日射熱取得率」及び「暖房期の平均日射熱取得率」とを対応させたデータベースが用いられるのが望ましい。なお、第2設計情報の「住宅の外皮平均熱貫流率」、「冷房期の平均日射熱取得率」及び「暖房期の平均日射熱取得率」の数値は、これまで建設されてきた住宅の実績に基づいて設定される。これにより、工程S52では、第1設計情報の「住宅の建設予定地を特定する情報」に基づいて、第2設計情報の「住宅の外皮平均熱貫流率」、「冷房期の平均日射熱取得率」、及び、「暖房期の平均日射熱取得率」を容易に推定することができる。 In the process S52 of the present embodiment, for example, the first design information "information for specifying the planned construction site of the house (in this example, the designation of the area classification and the annual solar radiation area classification)" and the second design information. It is desirable to use a database that corresponds to the "average thermal transmission rate of the outer skin of a house", "average thermal heat acquisition rate during the cooling period", and "average thermal heat acquisition rate during the heating period". In addition, the numerical values of "Average thermal transmission rate of the outer skin of the house", "Average thermal heat acquisition rate during the cooling period" and "Average thermal heat acquisition rate during the heating period" in the second design information are for the houses that have been constructed so far. It is set based on actual results. As a result, in step S52, based on the first design information "information for specifying the planned construction site of the house", the second design information "average thermal transmission rate of the outer skin of the house" and "average solar heat acquisition during the cooling period" are acquired. The "rate" and the "average thermal heat gain rate during the heating period" can be easily estimated.

次に、工程S52では、第2設計情報の「主たる居室の通風の利用」、「その他の居室の通風の利用」、「蓄熱の利用」、「床下空間を経由して外気を導入する換気方式の利用」、「暖房方式の選択」、「主たる居室及びその他の居室の暖房設備機器等の選択」、「冷房方式の選択」、及び、「主たる居室及びその他の居室の冷房設備機器等の選択」が推定される。 Next, in step S52, the second design information "use of ventilation in the main room", "use of ventilation in other rooms", "use of heat storage", "ventilation method to introduce outside air via the underfloor space". "Use of", "Selection of heating method", "Selection of heating equipment for the main room and other rooms", "Selection of cooling method", and "Selection of cooling equipment for the main room and other rooms" Is estimated.

さらに、工程S52では、第2設計情報の「換気設備の方式の選択」、「ダクト式換気設備を設置する場合の評価方法」、「換気回数」、「熱交換型換気設備の設置」、「配管方式」、「水栓」、「浴槽」、「主たる居室等の昭明」、「太陽光発電設備」、「液体集熱式太陽熱利用設備」、「空気集熱式太陽熱利用設備」、及び、「コージェネレーション設備」が推定される。 Further, in step S52, the second design information "selection of ventilation equipment method", "evaluation method when installing duct type ventilation equipment", "ventilation frequency", "installation of heat exchange type ventilation equipment", " "Piping method", "water faucet", "tub", "Akiaki of main living room", "solar power generation equipment", "liquid heat collecting type solar heat utilization equipment", "air heat collecting type solar heat utilization equipment", and "Cogeneration equipment" is estimated.

これらの第2設計情報も、建設予定地が同一地域の住宅においては略同一であるが、異なる地域の住宅においては大きく異なる傾向がある。したがって、本実施形態の工程S52では、第1設計情報の「住宅の建設予定地を特定する情報(即ち、「地域の区分」及び「年間日射地域区分の指定」)」に基づいて、上記の第2設計情報が推定される。 These second design information are also substantially the same for houses in the same planned construction site, but tend to be significantly different for houses in different areas. Therefore, in the process S52 of the present embodiment, the above-mentioned is based on the first design information "information for specifying the planned construction site of the house (that is," area classification "and" designation of annual solar radiation area classification ")". The second design information is estimated.

本実施形態では、例えば、第1設計情報の「住宅の建設予定地を特定する情報(本例では、地域の区分、及び、年間日射地域区分の指定)」と、上記の第2設計情報とを対応させたデータベースが用いられるのが望ましい。これにより、工程S52では、第1設計情報の「住宅の建設予定地を特定する情報」に基づいて、上記の第2設計情報を容易に推定することができる。 In this embodiment, for example, the first design information "information for specifying the planned construction site of the house (in this example, the designation of the area classification and the annual solar radiation area classification)" and the above-mentioned second design information It is desirable to use a database that corresponds to. Thereby, in the process S52, the above-mentioned second design information can be easily estimated based on the "information for specifying the planned construction site of the house" of the first design information.

このように、第2推定工程S5では、施主との間で第2設計情報が決定される前段階(即ち、住宅の設計初期段階(例えば、プランニング前))において、第1設計情報を用いることで、第2設計情報を推定することができる。推定された第2設計情報は、第2設計情報記憶部13に記憶される。 As described above, in the second estimation step S5, the first design information is used in the stage before the second design information is determined with the owner (that is, in the initial stage of designing the house (for example, before planning)). Then, the second design information can be estimated. The estimated second design information is stored in the second design information storage unit 13.

次に、本実施形態の設計方法では、第1設計情報、及び、推定された第2設計情報に基づいて、エネルギー消費性能が計算される(工程S6)。本実施形態の工程S6では、施主との間で第2設計情報が決定される前段階において、エネルギー消費性能が計算される。 Next, in the design method of the present embodiment, the energy consumption performance is calculated based on the first design information and the estimated second design information (step S6). In step S6 of the present embodiment, the energy consumption performance is calculated before the second design information is determined with the owner.

工程S6では、先ず、図1に示されるように、第1設計情報記憶部12に記憶されている第1設計情報、第2設計情報記憶部13に記憶されている第2設計情報、及び、プログラム部10の消費性能計算部26が、作業用メモリ8に読み込まれる。そして、消費性能計算部26が、演算部6によって実行される。 In step S6, first, as shown in FIG. 1, the first design information stored in the first design information storage unit 12, the second design information stored in the second design information storage unit 13, and the second design information are stored in the second design information storage unit 13. The consumption performance calculation unit 26 of the program unit 10 is read into the work memory 8. Then, the consumption performance calculation unit 26 is executed by the calculation unit 6.

工程S6では、第1設計情報、及び、推定された第2設計情報が、例えば、上記非特許文献1のプログラムや、国立研究開発法人建築研究所によって提供されているエネルギー消費性能計算プログラム(住宅版)APIに入力される。これにより、工程S6では、施主との間で第2設計情報が決定される前段階において、エネルギー消費性能(一次エネルギー消費量(GJ/年))を計算することができる。計算されたエネルギー消費性能は、エネルギー消費性能記憶部14に記憶される。 In step S6, the first design information and the estimated second design information are, for example, the above-mentioned program of Non-Patent Document 1 and the energy consumption performance calculation program (house) provided by the National Research and Development Corporation Building Research Institute. Version) Entered in the API. As a result, in step S6, the energy consumption performance (primary energy consumption (GJ / year)) can be calculated before the second design information is determined with the client. The calculated energy consumption performance is stored in the energy consumption performance storage unit 14.

次に、本実施形態の設計方法では、計算されたエネルギー消費性能に基づいて、太陽光発電装置の仕様に関する第1次情報が計算される(工程S7)。本実施形態の工程S7では、施主との間で第2設計情報が決定される前段階において、第1次情報が計算される。 Next, in the design method of the present embodiment, the primary information regarding the specifications of the photovoltaic power generation device is calculated based on the calculated energy consumption performance (step S7). In step S7 of the present embodiment, the primary information is calculated before the second design information is determined with the client.

工程S7では、先ず、図1に示されるように、エネルギー消費性能記憶部14に記憶されているエネルギー消費性能、及び、プログラム部10の第1次情報計算部27が、作業用メモリ8に読み込まれる。そして、第1次情報計算部27が、演算部6によって実行される。 In step S7, first, as shown in FIG. 1, the energy consumption performance stored in the energy consumption performance storage unit 14 and the primary information calculation unit 27 of the program unit 10 are read into the work memory 8. Is done. Then, the primary information calculation unit 27 is executed by the calculation unit 6.

第1次情報は、省エネルギー要望情報を満たす太陽光発電装置の仕様に関するものである。本実施形態の仕様としては、省エネルギー要望情報を満たす必要出力数である。上述したように、省エネルギー要望情報には、第2省エネルギー基準(平成30年省エネルギー基準(ZEH基準))が選択されている。このため、本実施形態の工程S7では、第2省エネルギー基準を満たすZEH、Nearly ZEH、及び、LCCM住宅に必要な太陽光発電装置の出力数がそれぞれ計算される。なお、これらの出力数のうち、いずれか一つの出力数のみが計算されるものでもよい。 The primary information relates to the specifications of the photovoltaic power generation device that satisfies the energy saving request information. The specifications of this embodiment are the required number of outputs that satisfy the energy saving request information. As described above, the second energy saving standard (2018 energy saving standard (ZEH standard)) is selected as the energy saving request information. Therefore, in step S7 of the present embodiment, the number of outputs of the ZEH, the Nearly ZEH, and the photovoltaic power generation device required for the LCCM house, which satisfy the second energy saving standard, are calculated. It should be noted that only one of these output numbers may be calculated.

本実施形態の工程S7では、先ず、ZEHに必要な太陽光発電装置の出力数(W)が計算される。上述したように、ZEHは、一次エネルギー消費量の収支をゼロにする(即ち、一次エネルギー消費量を100%削減する)ことを目指した住宅である。このため、工程S7では、工程S6で計算されたエネルギー消費性能(一次エネルギー消費量(GJ/年))をW(ワット)に変換することで、ZEHに必要な太陽光発電装置の出力数が計算される。 In step S7 of the present embodiment, first, the number of outputs (W) of the photovoltaic power generation device required for ZEH is calculated. As mentioned above, ZEH is a house that aims to reduce the balance of primary energy consumption to zero (that is, to reduce primary energy consumption by 100%). Therefore, in step S7, the energy consumption performance (primary energy consumption (GJ / year)) calculated in step S6 is converted into W (watt), so that the number of outputs of the photovoltaic power generation device required for ZEH can be increased. It is calculated.

次に、本実施形態の工程S7では、Nearly ZEHに必要な太陽光発電装置の出力数(W)が計算される。上述したように、Nearly ZEHは、一次エネルギー消費量を75%~100%(本例では、75%)の削減を目指した住宅である。本実施形態の工程S7では、先ず、工程S6で計算されたエネルギー消費性能(一次エネルギー消費量(GJ/年))値をW(ワット)に変換する。この変換した値は、一次エネルギー消費量を100%削減するために必要な太陽光発電装置の出力数である。そして、この変換した値に、例えば0.75を乗じることで、一次エネルギー消費量の75%削減を目指したNearly ZEHに必要な太陽光発電装置の出力数(W)を計算することができる。 Next, in step S7 of the present embodiment, the number of outputs (W) of the photovoltaic power generation device required for the Nearly ZEH is calculated. As mentioned above, Nearly ZEH is a house that aims to reduce primary energy consumption by 75% to 100% (75% in this example). In step S7 of the present embodiment, first, the energy consumption performance (primary energy consumption (GJ / year)) value calculated in step S6 is converted into W (watt). This converted value is the number of outputs of the photovoltaic power generation device required to reduce the primary energy consumption by 100%. Then, by multiplying this converted value by, for example, 0.75, the number of outputs (W) of the photovoltaic power generation device required for Nearly ZEH aiming at a 75% reduction in primary energy consumption can be calculated.

次に、本実施形態の工程S7では、LCCM住宅に必要な太陽光発電装置の出力数(W)が計算される。上述したように、LCCM住宅は、運用時の一次消費エネルギーに、住宅の建設時、解体時及び再利用時に用いられる材料の一次消費エネルギーを加算した一次消費エネルギーの収支を、マイナス(即ち、一次エネルギー消費量を100%以上削減する)にすることを目指したものである。本実施形態の工程S7では、先ず、工程S6で計算されたエネルギー消費性能(一次エネルギー消費量(GJ/年))をW(ワット)に変換する。この変換した値は、一次エネルギー消費量を100%削減するために必要な1年間の太陽光発電装置の出力数である。そして、この変換した値に、建設時、解体時及び再利用時に用いられる材料の一次消費エネルギーを100%削減するために必要な太陽光発電装置の出力数(例えば、5kW)が加算されることで、LCCM住宅に必要な太陽光発電装置の出力数(W)を計算することができる。なお、加算される出力数については、これまで建設されてきた住宅の実績に基づいて設定されるのが望ましい。 Next, in step S7 of the present embodiment, the number of outputs (W) of the photovoltaic power generation device required for the LCCM house is calculated. As mentioned above, the LCCM house has a negative (that is, primary) balance of primary energy consumption, which is the sum of the primary energy consumption during operation and the primary energy consumption of materials used during construction, dismantling, and reuse of the house. The aim is to reduce energy consumption by 100% or more). In step S7 of the present embodiment, first, the energy consumption performance (primary energy consumption (GJ / year)) calculated in step S6 is converted into W (watt). This converted value is the number of outputs of the photovoltaic power generation device for one year required to reduce the primary energy consumption by 100%. Then, the number of outputs (for example, 5 kW) of the photovoltaic power generation device required to reduce the primary energy consumption of the materials used at the time of construction, dismantling, and reuse by 100% is added to this converted value. Then, the number of outputs (W) of the photovoltaic power generation device required for the LCCM house can be calculated. It is desirable that the number of outputs to be added is set based on the actual results of the houses that have been constructed so far.

次に、工程S7では、太陽光発電装置の仕様に関する第1次情報が、設計装置5の出力部3(ディスプレイ装置)に表示される。図9は、太陽光発電装置の仕様に関する第1次情報が出力された画面の一例を示す図である。本実施形態では、ZEH、Nearly ZEH、及び、LCCM住宅に必要な太陽光発電装置の出力数がそれぞれ表示されている。これらの第1次情報(出力数)により、施主は、住宅の設計初期段階(例えば、プランニング前)に、ZEH、Nearly ZEH、及び、LCCM住宅に必要な太陽光発電装置の仕様やコスト等を容易に把握することができる。第1次情報は、図1に示した第1次情報記憶部15に記憶される。 Next, in step S7, the primary information regarding the specifications of the photovoltaic power generation device is displayed on the output unit 3 (display device) of the design device 5. FIG. 9 is a diagram showing an example of a screen on which primary information regarding the specifications of the photovoltaic power generation device is output. In this embodiment, the number of outputs of the ZEH, the Nearly ZEH, and the photovoltaic power generation device required for the LCCM house are displayed, respectively. Based on these primary information (number of outputs), the owner can determine the specifications and costs of ZEH, Nearly ZEH, and photovoltaic power generation equipment required for LCCM housing at the initial stage of housing design (for example, before planning). It can be easily grasped. The primary information is stored in the primary information storage unit 15 shown in FIG.

このように、本実施形態の設計方法では、住宅の設計初期段階(例えば、プランニング前)において、住宅のエネルギー消費性能や、それに対応する前記太陽光発電装置の仕様(第1次情報)を計算することができる。これにより、本実施形態の設計方法は、太陽光発電装置の仕様やコストを事前に把握することができるため、住宅の設計がある程度進んだ設計後期段階(例えば、プランニング後)にエネルギー消費性能を計算した場合に、それに対応する太陽光発電装置の仕様やコストが、施主の想定を超えるのを抑制することができる。したがって、本実施形態の設計方法は、住宅の再設計が必要となる状況を防ぐことができるため、施主の省エネルギー要望を満たす住宅を効率良く設計することができる。 As described above, in the design method of the present embodiment, the energy consumption performance of the house and the corresponding specifications (primary information) of the photovoltaic power generation device are calculated at the initial stage of the design of the house (for example, before planning). can do. As a result, the design method of the present embodiment can grasp the specifications and costs of the photovoltaic power generation device in advance, so that the energy consumption performance can be determined at the late stage of design (for example, after planning) when the design of the house has advanced to some extent. When calculated, it is possible to prevent the specifications and costs of the corresponding photovoltaic power generation device from exceeding the owner's assumption. Therefore, since the design method of the present embodiment can prevent the situation where the house needs to be redesigned, it is possible to efficiently design the house that satisfies the energy saving request of the owner.

図9において、「次へ」ボタン44が押下されることにより、次の工程S8が実施される。一方、「戻る」ボタン45が押下された場合、図7に示した画面を表示して、第1設計情報の「住宅のオール電化の有無」を取得する工程S33が実施されるのが望ましい。 In FIG. 9, when the "Next" button 44 is pressed, the next step S8 is performed. On the other hand, when the "back" button 45 is pressed, it is desirable to display the screen shown in FIG. 7 and carry out the step S33 to acquire the first design information "whether or not the house is all-electric".

次に、本実施形態の設計方法では、第2設計情報が決定される(工程S8)。本実施形態の工程S8では、先ず、第1次情報記憶部15に記憶されている第1次情報、及び、プログラム部10の第2設計情報決定部24が、作業用メモリ8に読み込まれる。そして、第2設計情報決定部24が、演算部6によって実行される。 Next, in the design method of the present embodiment, the second design information is determined (step S8). In step S8 of the present embodiment, first, the primary information stored in the primary information storage unit 15 and the second design information determination unit 24 of the program unit 10 are read into the work memory 8. Then, the second design information determination unit 24 is executed by the calculation unit 6.

工程S8では、先ず、太陽光発電装置の仕様に関する第1次情報に基づいて、施主へのヒアリング等により、施主が希望する具体的な間取りや設備仕様等の情報が取得される。そして、工程S8では、取得された情報に基づいて、第2設計情報が決定される。第2設計情報の詳細については、上述のとおりである。 In step S8, first, based on the primary information regarding the specifications of the photovoltaic power generation device, information such as specific floor plans and equipment specifications desired by the owner is acquired by hearing with the owner or the like. Then, in step S8, the second design information is determined based on the acquired information. The details of the second design information are as described above.

工程S8では、太陽光発電装置の仕様に関する第1次情報に基づいて、太陽光発電装置を載せるのに必要な屋根面の面積が計算されるのが望ましい。そして、計算された屋根面の面積に基づいて間取りが決定されることにより、省エネルギー要望情報を満たす太陽光発電装置を屋根面に確実に載せることができるため、省エネルギー要望情報を満たす住宅の第2設計情報を確実に決定することができる。決定された第2設計情報は、第2設計情報記憶部13に記憶される。 In step S8, it is desirable to calculate the area of the roof surface required for mounting the photovoltaic power generation device based on the primary information regarding the specifications of the photovoltaic power generation device. Then, by determining the floor plan based on the calculated roof surface area, it is possible to reliably mount the photovoltaic power generation device that satisfies the energy saving request information on the roof surface, so that the second house that satisfies the energy saving request information can be reliably mounted. Design information can be determined reliably. The determined second design information is stored in the second design information storage unit 13.

本実施形態の工程S8は、例えば、工程S7の処理が終了してから数日後に実施されてもよいし、数日間に亘って工程S8が実施されてもよい。 The step S8 of the present embodiment may be carried out, for example, several days after the processing of the step S7 is completed, or the step S8 may be carried out over several days.

次に、本実施形態の設計方法では、第1設計情報、及び、決定された第2設計情報に基づいて、省エネルギー要望情報を満たす住宅が設計される(工程S9)。工程S9では、先ず、第1設計情報記憶部12に記憶されている第1設計情報、第2設計情報記憶部13に記憶されている第2設計情報、及び、プログラム部10の住宅設計部29が、作業用メモリ8に読み込まれる。そして、住宅設計部29が、演算部6によって実行される。住宅設計部29としては、例えば、コンピュータ支援設計(CAD)等が挙げられる。 Next, in the design method of the present embodiment, a house satisfying the energy saving request information is designed based on the first design information and the determined second design information (process S9). In step S9, first, the first design information stored in the first design information storage unit 12, the second design information stored in the second design information storage unit 13, and the housing design unit 29 of the program unit 10 Is read into the working memory 8. Then, the housing design unit 29 is executed by the calculation unit 6. Examples of the housing design department 29 include computer-aided design (CAD) and the like.

工程S9では、第1設計情報及び第2設計情報に基づいて、オペレータが住宅を設計する。これにより、本実施形態の設計方法は、施主の省エネルギー要望を満たす住宅を効率良く設計することができる。住宅の設計データは、設計データ記憶部17に記憶される。そして、この住宅の設計データに基づいて、住宅が建設される。 In step S9, the operator designs the house based on the first design information and the second design information. Thereby, the design method of the present embodiment can efficiently design a house that satisfies the energy saving request of the owner. The design data of the house is stored in the design data storage unit 17. Then, a house is constructed based on the design data of this house.

本実施形態の工程S9は、例えば、工程S8の処理が終了してから数日後に実施されてもよいし、数日間に亘って工程S9が実施されてもよい。 The step S9 of the present embodiment may be carried out, for example, several days after the processing of the step S8 is completed, or the step S9 may be carried out over several days.

図10は、本発明の他の実施形態の住宅の設計方法の処理手順の一例を示すフローチャートである。なお、この実施形態において、これまでの実施形態と同一の構成については、同一の符号を付し、説明を省略することがある。 FIG. 10 is a flowchart showing an example of a processing procedure of a housing design method according to another embodiment of the present invention. In this embodiment, the same configurations as those in the previous embodiments may be designated by the same reference numerals and description thereof may be omitted.

この実施形態の設計方法では、第2設計情報を決定する工程S8が実施された後、第1設計情報、及び、決定された第2設計情報に基づいて、エネルギー消費性能が再計算される(工程S10)。工程S10では、先ず、図1に示されるように、第1設計情報記憶部12に記憶されている第1設計情報、第2設計情報記憶部13に記憶されている第2設計情報、及び、プログラム部10の消費性能計算部26が、作業用メモリ8に読み込まれる。そして、消費性能計算部26が、演算部6によって実行される。 In the design method of this embodiment, after the step S8 for determining the second design information is performed, the energy consumption performance is recalculated based on the first design information and the determined second design information (). Step S10). In step S10, first, as shown in FIG. 1, the first design information stored in the first design information storage unit 12, the second design information stored in the second design information storage unit 13, and the second design information are stored in the second design information storage unit 13. The consumption performance calculation unit 26 of the program unit 10 is read into the work memory 8. Then, the consumption performance calculation unit 26 is executed by the calculation unit 6.

工程S10では、第1設計情報、及び、決定された第2設計情報が、例えば、上記非特許文献1のプログラムや、エネルギー消費性能計算プログラム(住宅版)APIに入力される。これにより、工程S10では、住宅の設計がある程度進んだ設計後期段階(例えば、プランニング後)において、エネルギー消費性能(一次エネルギー消費量(GJ/年))を再計算することができる。再計算されたエネルギー消費性能は、エネルギー消費性能記憶部14に記憶される。 In step S10, the first design information and the determined second design information are input to, for example, the program of Non-Patent Document 1 or the energy consumption performance calculation program (household version) API. As a result, in step S10, the energy consumption performance (primary energy consumption (GJ / year)) can be recalculated at the late stage of design (for example, after planning) in which the design of the house has advanced to some extent. The recalculated energy consumption performance is stored in the energy consumption performance storage unit 14.

次に、この実施形態の設計方法では、再計算されたエネルギー消費性能に基づいて、省エネルギー要望情報を満たす太陽光発電装置の仕様に関する第2次情報が計算される(工程S11)。この実施形態の工程S11では、住宅の設計がある程度進んだ設計後期段階(例えば、プランニング後)において、第2次情報を計算することができる。 Next, in the design method of this embodiment, the secondary information regarding the specifications of the photovoltaic power generation device satisfying the energy saving request information is calculated based on the recalculated energy consumption performance (step S11). In step S11 of this embodiment, secondary information can be calculated at a late stage of design (for example, after planning) in which the design of the house has advanced to some extent.

工程S11では、先ず、図1に示されるように、エネルギー消費性能記憶部14に記憶されている再計算されたエネルギー消費性能、及び、プログラム部10の第2次情報計算部28が、作業用メモリ8に読み込まれる。そして、第2次情報計算部28が、演算部6によって実行される。 In step S11, first, as shown in FIG. 1, the recalculated energy consumption performance stored in the energy consumption performance storage unit 14 and the secondary information calculation unit 28 of the program unit 10 are used for work. It is read into the memory 8. Then, the second information calculation unit 28 is executed by the calculation unit 6.

第2次情報は、第1次情報と同様に、省エネルギー要望情報を満たす太陽光発電装置の仕様に関するものである。この実施形態の工程S11では、ZEH、Nearly ZEH、及び、LCCM住宅に必要な太陽光発電装置の出力数が計算される。第2次情報の計算方法については、第1次情報の計算方法と同様である。そして、工程S11では、第2次情報が、設計装置5の出力部3(ディスプレイ装置)に表示される。このように、工程S11では、第2設計情報が決定した後に、太陽光発電装置の仕様やコストを再確認することができる。第2次情報は、図1に示した第2次情報記憶部16に記憶される。 The secondary information, like the primary information, relates to the specifications of the photovoltaic power generation device that satisfies the energy saving request information. In step S11 of this embodiment, the number of outputs of the ZEH, the Nearly ZEH, and the photovoltaic power generation device required for the LCCM house is calculated. The calculation method of the secondary information is the same as the calculation method of the primary information. Then, in step S11, the secondary information is displayed on the output unit 3 (display device) of the design device 5. As described above, in step S11, after the second design information is determined, the specifications and costs of the photovoltaic power generation device can be reconfirmed. The secondary information is stored in the secondary information storage unit 16 shown in FIG.

次に、この実施形態の方法では、第2次情報が許容範囲内か否かが判断される(工程S12)。この実施形態の工程S12では、第2次情報から第1次情報を減じた値が、許容範囲内か否かが判断される。工程S12では、先ず、図1に示されるように、第1次情報記憶部15に記憶されている第1次情報、第2次情報記憶部16に記憶されている第2次情報、及び、プログラム部10の許容範囲判断部30が、作業用メモリ8に読み込まれる。そして、許容範囲判断部30が、演算部6によって実行される。 Next, in the method of this embodiment, it is determined whether or not the secondary information is within the allowable range (step S12). In step S12 of this embodiment, it is determined whether or not the value obtained by subtracting the primary information from the secondary information is within the allowable range. In step S12, first, as shown in FIG. 1, the primary information stored in the primary information storage unit 15, the secondary information stored in the secondary information storage unit 16, and the secondary information are stored in the secondary information storage unit 16. The permissible range determination unit 30 of the program unit 10 is read into the work memory 8. Then, the permissible range determination unit 30 is executed by the calculation unit 6.

工程S12では、先ず、第2次情報から第1次情報を減じた値が求められる。この値が大きいほど、住宅の設計がある程度進んだ設計後期段階(例えば、プランニング後)に計算された第2次情報が、住宅の設計初期段階(例えば、プランニング前)に計算された第1次情報から大きく乖離していることを示している。このような値の許容範囲については、適宜設定することができる。この実施形態の許容範囲は、±1kWに設定される。 In step S12, first, a value obtained by subtracting the primary information from the secondary information is obtained. The larger this value, the more the secondary information calculated in the late design stage (for example, after planning) when the design of the house has progressed to some extent, and the primary information calculated in the early stage of design of the house (for example, before planning). It shows that there is a large deviation from the information. The permissible range of such values can be set as appropriate. The permissible range of this embodiment is set to ± 1 kW.

工程S12において、第2次情報から第1次情報を減じた値が、許容範囲内であると判断された場合(工程S12において、「Y」)、前実施形態と同様に、住宅を設計する工程S9が実施され、この住宅の設計データに基づいて、住宅が建設される。一方、第2次情報から第1次情報を減じた値が、許容範囲外であると判断された場合(工程S12において、「N」)、工程S8、工程S10、工程S11及び工程S12が再度実施され、住宅が再設計される。これにより、この実施形態の設計方法では、太陽光発電装置の仕様やコストが、施主の想定範囲を超えた住宅が設計されるのを防ぐことができる。 When it is determined in step S12 that the value obtained by subtracting the primary information from the secondary information is within the permissible range (“Y” in step S12), the house is designed in the same manner as in the previous embodiment. Process S9 is carried out, and a house is constructed based on the design data of this house. On the other hand, when it is determined that the value obtained by subtracting the primary information from the secondary information is out of the allowable range (“N” in the process S12), the process S8, the process S10, the process S11 and the process S12 are performed again. It will be implemented and the housing will be redesigned. Thereby, in the design method of this embodiment, it is possible to prevent the design of the house in which the specifications and costs of the photovoltaic power generation device exceed the range assumed by the owner.

これまでの実施形態では、第1設計情報及び推定された第2設計情報に基づいて、エネルギー消費性能、及び、太陽光発電装置の仕様に関する第1次情報が計算されたが、このような態様に限定されない。たとえば、第1設計情報のみに基づいて、エネルギー消費性能、及び、第1次情報が計算されてもよい。 In the previous embodiments, the primary information regarding the energy consumption performance and the specifications of the photovoltaic power generation device has been calculated based on the first design information and the estimated second design information. Not limited to. For example, the energy consumption performance and the primary information may be calculated based only on the first design information.

この実施形態の設計方法では、第1設計情報の「住宅の床面積」を変数とする関係式を用いて、太陽光発電装置の仕様に関する第1次情報が計算される。この実施形態では、第1設計情報の「住宅の建設予定地を特定する情報」、及び、「住宅のオール電化の有無に関する情報」の全ての組み合わせにおいて、関係式がそれぞれ特定される。 In the design method of this embodiment, the primary information regarding the specifications of the photovoltaic power generation device is calculated by using the relational expression with the "floor area of the house" of the first design information as a variable. In this embodiment, the relational expression is specified in all combinations of the first design information "information for specifying the planned construction site of the house" and "information regarding the presence or absence of all-electricity of the house".

この実施形態において、上記組み合わせに用いられる第1設計情報の「住宅の建設予定地を特定する情報」は、上記非特許文献1のプログラムの「地域の区分」の1~8(8種類)である。一方、第1設計情報の「住宅のオール電化の有無に関する情報」は、オール電化、及び、ガス給湯(2種類)である。これにより、第1設計情報の「住宅の建設予定地を特定する情報」、及び、「住宅のオール電化の有無に関する情報」の全ての組み合わせは16種類あるため、16個の関係式が特定される。さらに、この実施形態では、ZEH、Nearly ZEH、及び、LCCM住宅(全3種)ごとに、16個の関係式がそれぞれ特定される。したがって、この実施形態では、48個の関係式が特定される。 In this embodiment, the first design information "information for specifying the planned construction site of the house" used in the above combination is 1 to 8 (8 types) of the "regional division" of the program of the above non-patent document 1. be. On the other hand, the first design information "information on the presence or absence of all-electric homes" is all-electric and gas hot water supply (two types). As a result, since there are 16 types of all combinations of the first design information "information for specifying the planned construction site of the house" and "information regarding the presence or absence of all-electric housing", 16 relational expressions are specified. To. Further, in this embodiment, 16 relational expressions are specified for each of ZEH, Nearly ZEH, and LCCM housing (all three types). Therefore, in this embodiment, 48 relational expressions are specified.

上記のような関係式を特定するには、先ず、各組み合わせ(組み合わせの一例として、地域の区分:3、オール電化、及び、ZEH)において、第2設計情報が推定される。第2設計情報の推定方法については、上述のとおりである。次に、複数種類の住宅の床面積(例えば、100m2、120m2、140m2、160m2及び180m2)毎に、第1設計情報、及び、推定された第2設計情報が、例えば、上記非特許文献1のプログラムや、エネルギー消費性能計算プログラム(住宅版)APIに入力される。これにより、各組み合わせにおいて、複数種類の住宅の床面積ごとに、エネルギー消費性能(一次エネルギー消費量(GJ/年))が計算される。 In order to specify the above relational expression, first, the second design information is estimated in each combination (as an example of the combination, regional division: 3, all-electric, and ZEH). The second design information estimation method is as described above. Next, for each floor area of a plurality of types of houses (for example, 100 m 2 , 120 m 2 , 140 m 2 , 160 m 2 and 180 m 2 ), the first design information and the estimated second design information are, for example, the above. It is input to the program of Non-Patent Document 1 and the energy consumption performance calculation program (household version) API. As a result, the energy consumption performance (primary energy consumption (GJ / year)) is calculated for each floor area of a plurality of types of houses in each combination.

次に、計算されたエネルギー消費性能に基づいて、複数種類の住宅の床面積ごとに、太陽光発電装置の仕様に関する第1次情報(太陽光発電装置の出力数(W))が計算される。図11は、地域の区分:3、オール電化、及び、ZEHの住宅について、住宅の床面積と、第1次情報との関係を示すグラフである。 Next, based on the calculated energy consumption performance, the primary information (number of outputs (W) of the photovoltaic power generation device) regarding the specifications of the photovoltaic power generation device is calculated for each floor area of a plurality of types of houses. .. FIG. 11 is a graph showing the relationship between the floor area of the house and the primary information for the area classification: 3, all-electric, and ZEH houses.

図11に示されるように、住宅の床面積、及び、第1次情報(太陽光発電装置の出力数(W))の回帰直線が求められる。この回帰直線が、住宅の床面積を変数とする第1次情報の関係式(本例では、一次関数)として特定される。 As shown in FIG. 11, the floor area of the house and the regression line of the primary information (the number of outputs (W) of the photovoltaic power generation device) are obtained. This regression line is specified as a relational expression (in this example, a linear function) of the first-order information with the floor area of the house as a variable.

この実施形態の設計方法では、これらの関係式のうち、取得された第1設計情報(「住宅の建設予定地を特定する情報」、及び、「住宅のオール電化の有無に関する情報」)、及び、省エネルギー住宅(ZEH、Nearly ZEH、及び、LCCM住宅)の条件に適合する一つの関係式を特定し、その特定された関係式に第1設計情報の「住宅の床面積」が代入される。これにより、この実施形態の設計方法では、第2設計情報が決定される前段階で、太陽光発電装置の仕様に関する第1次情報を計算することができる。 In the design method of this embodiment, among these relational expressions, the acquired first design information (“information for specifying the planned construction site of the house” and “information regarding the presence or absence of all-electricity of the house”) and , One relational expression that meets the conditions of energy-saving housing (ZEH, Nearly ZEH, and LCCM housing) is specified, and the "floor area of the house" of the first design information is substituted into the specified relational expression. Thereby, in the design method of this embodiment, the primary information regarding the specifications of the photovoltaic power generation device can be calculated before the second design information is determined.

このように、この実施形態の設計方法では、上記の関係式が予め特定されていることにより、上記非特許文献1のプログラムや、エネルギー消費性能計算プログラム(住宅版)APIを用いなくても、第1設計情報のみに基づいて、太陽光発電装置の仕様に関する第1次情報を容易に求めることができる。したがって、この実施形態の設計方法では、第2設計情報を決定する必要がないため、上記非特許文献1のプログラムや、エネルギー消費性能計算プログラム(住宅版)APIにアクセスできない環境において、施主の省エネルギー要望を満たす住宅を効率良く設計することができる。 As described above, in the design method of this embodiment, since the above relational expression is specified in advance, the program of Non-Patent Document 1 and the energy consumption performance calculation program (household version) API are not used. The primary information regarding the specifications of the photovoltaic power generation device can be easily obtained based only on the first design information. Therefore, in the design method of this embodiment, it is not necessary to determine the second design information. Therefore, in an environment where the program of Non-Patent Document 1 and the energy consumption performance calculation program (residential version) API cannot be accessed, the owner saves energy. It is possible to efficiently design a house that meets the demand.

以上、本発明の特に好ましい実施形態について詳述したが、本発明は図示の実施形態に限定されることなく、種々の態様に変形して実施しうる。 Although the particularly preferred embodiment of the present invention has been described in detail above, the present invention is not limited to the illustrated embodiment and can be modified into various embodiments.

屋根面に太陽光発電装置を有する住宅が設計された(実施例)。実施例では、図2、図4及び図8に示した処理手順に基づいて、屋根面に太陽光発電装置を有する住宅が設計された。そして、実施例では、施主との間で第2設計情報が決定される前段階で、第1設計情報及び推定された第2設計情報に基づいて、エネルギー消費性能を計算する工程と、計算されたエネルギー消費性能に基づいて、省エネルギー要望情報を満たす太陽光発電装置の仕様に関する第1次情報(ZEH)を計算する工程とが実施された。 A house with a photovoltaic device on the roof was designed (Example). In the embodiment, a house having a photovoltaic power generation device on the roof surface was designed based on the processing procedures shown in FIGS. 2, 4 and 8. Then, in the embodiment, the step of calculating the energy consumption performance based on the first design information and the estimated second design information before the second design information is determined with the owner is calculated. Based on the energy consumption performance, the process of calculating the primary information (ZEH) regarding the specifications of the photovoltaic power generation device that satisfies the energy saving request information was carried out.

さらに、実施例では、第1次情報が計算された住宅について、施主との間で第2設計情報を決定した後に、第1設計情報及び決定した第2設計情報に基づいて、エネルギー消費性能を再計算する工程と、再計算されたエネルギー消費性能に基づいて、省エネルギー要望情報を満たす太陽光発電装置の仕様に関する第2次情報(ZEH)を計算する工程とが実施された。そして、第1次情報と第2次情報との相関が求められた。共通仕様は、次のとおりである。
設計された住宅:51棟
省エネルギー要望情報:第2省エネルギー基準(平成30年省エネルギー基準(ZEH基準))
第1設計情報:
住宅の建設予定地を特定する情報:
地域区分の範囲:4~7
年間日射地域区分の範囲:A2~A4
住宅の床面積:
合計床面積の範囲:100~180m2
住宅のオール電化の有無に関する情報:
オール電化のみ選択:
給湯設備:給湯設備がある(浴室等がある)
熱源機の分類:給湯専用型
給湯熱源機:電気ヒートポンプ給湯機
効率(エネルギー消費効率):3.6%
ふろ機能の種類:ふろ給湯機(追焚あり)
第2設計情報(床面積及び外皮の面積以外については、地域区分4~7で共通した値に設定される):
リビングルームの床面積F1:上記式(1)に基づいて推定
リビングルーム以外の居室の床面積F2:上記式(2)に基づいて推定
非居室の床面積F3:上記式(3)に基づいて推定
外皮の面積F4:上記式(4)に基づいて推定
住宅の外皮平均熱貫流率(UA):0.6W/m2・K
冷房期の平均日射熱取得率(冷房期平均日射熱取得率(ηAC)):1.5
暖房期の平均日射熱取得率(暖房期平均日射熱取得率(ηAH)):1.5
主たる居室の通風の利用:利用しない
その他の居室の通風の利用:利用しない
蓄熱の利用:利用しない
床下空間を経由して外気を導入する換気方式の利用:通年利用する
暖房方式の選択:居室のみ暖房する
主たる居室及びその他の居室の暖房設備機器等の選択:ルームコンディショナー
評価方法の選択:区分(い)
冷房方式の選択:居室のみ冷房する
主たる居室及びその他の居室の冷房設備機器等の選択:ルームコンディショナー
評価方法の選択:区分(い)
換気設備の方式の選択:ダクト式第一種換気設備
ダクト式換気設備を設置する場合の評価方法(比消費電力):0.4W/(m3/h)
換気回数:0.5回/h
熱交換型換気設備の設置:設置しない
配管方式:ヘッダー方式(13Aより大きい)
水栓:2バルブ水栓
浴槽の保温措置:高断熱浴槽を使用する
主たる居室の昭明:
設置の有無:設置する
照明器具の種類:全てLED
多灯分散照明方式の採用:採用しない
調光が可能な制御:採用しない
その他の居室の昭明:
設置の有無:設置する
照明器具の種類:全てLED
調光が可能な制御:採用しない
非居室の昭明:
設置の有無:設置する
照明器具の種類:全てLED
調光が可能な制御:採用しない
液体集熱式太陽熱利用設備:設置しない
空気集熱式太陽熱利用設備:設置しない
コージェネレーション設備:設置しない
Further, in the embodiment, for the house for which the primary information is calculated, after the second design information is determined with the owner, the energy consumption performance is determined based on the first design information and the determined second design information. A recalculation step and a step of calculating the secondary information (ZEH) regarding the specifications of the photovoltaic power generation device satisfying the energy saving request information based on the recalculated energy consumption performance were carried out. Then, the correlation between the primary information and the secondary information was obtained. The common specifications are as follows.
Designed house: 51 buildings Energy saving request information: 2nd energy saving standard (2018 energy saving standard (ZEH standard))
First design information:
Information to identify the planned construction site of a house:
Area classification range: 4-7
Range of annual solar radiation area classification: A2-A4
Residential floor area:
Range of total floor area: 100-180m 2
Information on the presence or absence of all-electric homes:
Select all-electric only:
Hot water supply equipment: There is a hot water supply facility (there is a bathroom, etc.)
Classification of heat source machine: Hot water supply only type
Hot water supply heat source machine: Electric heat pump water heater
Efficiency (energy consumption efficiency): 3.6%
Types of bath functions: Bath water heater (with reheating)
Second design information (other than the floor area and the outer skin area, the values are set to the common values in the area categories 4 to 7):
Living room floor area F1: Estimated based on the above formula (1) Floor area F2 of living rooms other than the living room: Estimated based on the above formula (2) Non-living room floor area F3: Estimated based on the above formula (3) Estimated outer skin area F4: Estimated based on the above formula (4) Residential outer skin average heat transmission coefficient ( UA ): 0.6 W / m 2 · K
Average solar heat acquisition rate during the cooling period (Average solar heat acquisition rate during the cooling period (η AC )): 1.5
Average solar heat acquisition rate during the heating period (Average solar heat acquisition rate during the heating period (η AH )): 1.5
Use of ventilation in the main room: Not used Use of ventilation in other rooms: Not used Use of heat storage: Not used Use of ventilation method that introduces outside air via the underfloor space: Use throughout the year Heating method selection: Only in the room Selection of heating equipment, etc. for the main room to be heated and other rooms: Room conditioner Selection of evaluation method: Category (i)
Selection of cooling method: Cooling only the living room Selection of cooling equipment for the main living room and other living rooms: Room conditioner Selection of evaluation method: Category (i)
Selection of ventilation equipment method: Duct type first-class ventilation equipment Evaluation method when installing duct type ventilation equipment (specific power consumption): 0.4 W / (m 3 / h)
Ventilation frequency: 0.5 times / h
Installation of heat exchange type ventilation equipment: Not installed Piping method: Header method (larger than 13A)
Faucet: 2-valve faucet Heat insulation measures for bathtub: Use highly insulated bathtub Akiaki Main room:
With or without installation: Install
Lighting equipment type: All LEDs
Adoption of multi-lamp distributed lighting method: Not adopted
Dimmable control: Not adopted Akiaki of other living rooms:
With or without installation: Install
Lighting equipment type: All LEDs
Dimmable control: Not adopted Akiaki non-living room:
With or without installation: Install
Lighting equipment type: All LEDs
Dimmable control: Not adopted Liquid heat collecting type solar heat utilization equipment: Not installed Air heat collecting type solar heat utilization equipment: Not installed Cogeneration equipment: Not installed

図12は、第2設計情報が決定される前段階の第1次情報と、第2設計情報が決定された後の第2次情報との関係を示すグラフである。図12に示されるように、第1次情報と第2次情報とは、正の相関があった。したがって、実施例の設計方法は、住宅の設計初期段階(例えば、プランニング前)において、住宅の前記エネルギー消費性能、及び、それに対応する前記太陽光発電装置の仕様(第1次情報)を高い精度で計算することができた。これにより、実施例の設計方法は、住宅の設計がある程度進んだ設計後期段階(例えば、プランニング後)において、太陽光発電装置の仕様やコストが、施主の想定範囲を超えるのを抑制することができた。したがって、実施例の設計方法は、住宅の再設計が必要となる状況を防ぐことができ、施主の省エネルギー要望を満たす住宅を効率良く設計できることを確認できた。 FIG. 12 is a graph showing the relationship between the primary information in the stage before the second design information is determined and the secondary information after the second design information is determined. As shown in FIG. 12, there was a positive correlation between the primary information and the secondary information. Therefore, the design method of the embodiment has high accuracy in the energy consumption performance of the house and the specifications (primary information) of the photovoltaic power generation device corresponding to the energy consumption performance of the house in the initial stage of designing the house (for example, before planning). I was able to calculate with. As a result, the design method of the embodiment can prevent the specifications and costs of the photovoltaic power generation device from exceeding the range expected by the owner in the late stage of design (for example, after planning) when the design of the house has advanced to some extent. did it. Therefore, it was confirmed that the design method of the embodiment can prevent the situation where the house needs to be redesigned and can efficiently design the house that meets the energy saving request of the owner.

S1 省エネルギー要望情報を取得する工程
S3 第1設計情報を取得する工程
S5 第2設計情報を推定する工程
S6 エネルギー消費性能を計算する工程
S7 第1次情報を計算する工程
S1 Step to acquire energy saving request information S3 Step to acquire first design information S5 Step to estimate second design information S6 Step to calculate energy consumption performance S7 Step to calculate primary information

Claims (10)

屋根面に太陽光発電装置を有する住宅の設計方法であって、
施主が希望する前記住宅の省エネルギー化度合いに関する情報である省エネルギー要望情報を、コンピュータに記憶する工程と、
前記住宅のエネルギー消費性能を計算するために必要な複数の住宅設計情報のうちの一部である第1設計情報を、前記コンピュータに記憶する工程と、
前記コンピュータが、前記複数の住宅設計情報の残りの情報である第2設計情報を、前記第1設計情報を用いて推定する工程と、
前記コンピュータが、前記施主との間で前記第2設計情報が決定される前段階で、前記第1設計情報及び前記推定された前記第2設計情報に基づいて、前記エネルギー消費性能を計算する工程と、
前記コンピュータが、前記第2設計情報が決定される前段階で、計算された前記エネルギー消費性能に基づいて、前記省エネルギー要望情報を満たす前記太陽光発電装置の仕様に関する第1次情報を計算する工程と、
前記施主との間で決定された前記第2設計情報を、前記コンピュータに入力する工程と、
前記コンピュータが、前記第1設計情報及び前記決定された前記第2設計情報に基づいて、前記エネルギー消費性能を再計算する工程と、
前記コンピュータが、前記再計算された前記エネルギー消費性能に基づいて、前記省エネルギー要望情報を満たす前記太陽光発電装置の前記仕様に関する第2次情報を計算する工程とを含む、
住宅の設計方法。
It is a method of designing a house that has a solar power generation device on the roof surface.
A process of storing energy-saving request information, which is information on the degree of energy-saving of the house desired by the owner, in a computer, and
A process of storing the first design information, which is a part of a plurality of housing design information necessary for calculating the energy consumption performance of the house, in the computer .
A step in which the computer estimates the second design information, which is the remaining information of the plurality of housing design information, using the first design information.
A step in which the computer calculates the energy consumption performance based on the first design information and the estimated second design information before the second design information is determined with the owner. When,
A step in which the computer calculates primary information regarding the specifications of the photovoltaic power generation device that satisfies the energy saving request information based on the calculated energy consumption performance before the second design information is determined. When,
The process of inputting the second design information determined with the owner into the computer, and
A step in which the computer recalculates the energy consumption performance based on the first design information and the determined second design information.
The computer comprises a step of calculating secondary information regarding the specifications of the photovoltaic power generation device that satisfies the energy saving request information based on the recalculated energy consumption performance .
How to design a house.
前記省エネルギー要望情報は、第1省エネルギー基準と、前記第1省エネルギー基準よりも厳しい省エネルギー基準である第2省エネルギー基準とを含む、請求項1記載の住宅の設計方法。 The method for designing a house according to claim 1 , wherein the energy saving request information includes a first energy saving standard and a second energy saving standard which is a stricter energy saving standard than the first energy saving standard . 前記第1設計情報は、前記住宅の建設予定地を特定する情報と、前記住宅の床面積と、前記住宅のオール電化の有無に関する情報とを含む、請求項1又は2に記載の住宅の設計方法。 The housing design according to claim 1 or 2, wherein the first design information includes information for specifying a planned construction site of the house, floor area of the house, and information regarding the presence or absence of all-electricity of the house. Method. 前記第2設計情報は、前記住宅の間取りを決定した後に決まる前記住宅の情報である、請求項1ないし3のいずれかに記載の住宅の設計方法。 The method for designing a house according to any one of claims 1 to 3 , wherein the second design information is information on the house determined after the floor plan of the house is determined . 前記第2設計情報を推定する工程は、前記第2設計情報を、前記第1設計情報と、予め定められた関係式とを用いて推定する工程を含む、請求項4記載の住宅の設計方法。 The method for designing a house according to claim 4, wherein the step of estimating the second design information includes a step of estimating the second design information using the first design information and a predetermined relational expression. .. 前記第2設計情報は、前記住宅のリビングルームの床面積、リビングルーム以外の居室の床面積及び非居室の床面積を含む、請求項1ないし5のいずれかに記載の住宅の設計方法。 The method for designing a house according to any one of claims 1 to 5, wherein the second design information includes a floor area of a living room of the house, a floor area of a living room other than the living room, and a floor area of a non-living room . 前記第2設計情報は、前記住宅の外皮平均熱貫流率、冷房期の平均日射熱取得率及び暖房期の平均日射熱取得率を含む、請求項1ないし6のいずれかに記載の住宅の設計方法。 The housing design according to any one of claims 1 to 6, wherein the second design information includes the average thermal transmission rate of the outer skin of the house, the average thermal heat acquisition rate in the cooling period, and the average solar heat acquisition rate in the heating period. Method. 前記太陽光発電装置の前記仕様は、前記省エネルギー要望情報を満たす必要出力数である、請求項1ないし7のいずれかに記載の住宅の設計方法。 The method for designing a house according to any one of claims 1 to 7 , wherein the specification of the photovoltaic power generation device is a required number of outputs that satisfy the energy saving request information . 屋根面に太陽光発電装置を有する住宅の設計装置であって、It is a design device for a house that has a solar power generation device on the roof surface.
施主が希望する前記住宅の省エネルギー化度合いに関する情報である省エネルギー要望情報が入力される省エネルギー要望取得部と、The Energy Conservation Request Acquisition Department, in which energy conservation request information, which is information on the degree of energy conservation of the house desired by the owner, is input,
前記住宅のエネルギー消費性能を計算するために必要な複数の住宅設計情報のうちの一部である第1設計情報を取得する第1設計情報取得部と、The first design information acquisition unit that acquires the first design information that is a part of the plurality of housing design information necessary for calculating the energy consumption performance of the house, and
前記複数の住宅設計情報の残りの情報である第2設計情報を、前記第1設計情報を用いて推定する第2設計情報推定部と、A second design information estimation unit that estimates the second design information, which is the remaining information of the plurality of housing design information, using the first design information.
前記施主との間で前記第2設計情報が決定される前段階で、前記第1設計情報及び前記推定された前記第2設計情報に基づいて、前記エネルギー消費性能を計算する消費性能計算部と、A consumption performance calculation unit that calculates the energy consumption performance based on the first design information and the estimated second design information before the second design information is determined with the owner. ,
前記第2設計情報が決定される前段階で、計算された前記エネルギー消費性能に基づいて、前記省エネルギー要望情報を満たす前記太陽光発電装置の仕様に関する第1次情報を計算する第1次情報計算部と、Prior to the determination of the second design information, the first information calculation for calculating the primary information regarding the specifications of the photovoltaic power generation device satisfying the energy saving request information based on the calculated energy consumption performance. Department and
前記施主との間で決定された前記第2設計情報が記憶される第2設計情報記憶部と、A second design information storage unit that stores the second design information determined with the owner, and
前記第1設計情報及び前記決定された前記第2設計情報に基づいて、前記エネルギー消費性能を再計算する前記消費性能計算部と、The consumption performance calculation unit that recalculates the energy consumption performance based on the first design information and the determined second design information.
前記再計算された前記エネルギー消費性能に基づいて、前記省エネルギー要望情報を満たす前記太陽光発電装置の前記仕様に関する第2次情報を計算する第2次情報計算部とを含む、A secondary information calculation unit that calculates secondary information regarding the specifications of the photovoltaic power generation device that satisfies the energy saving request information based on the recalculated energy consumption performance.
住宅の設計装置。Housing design equipment.
屋根面に太陽光発電装置を有する住宅を設計するための方法をコンピュータに実行させるためのプログラムであって、
前記コンピュータに、
施主が希望する前記住宅の省エネルギー化度合いに関する情報である省エネルギー要望情報を取得させる工程と、
前記住宅のエネルギー消費性能を計算するのに必要な複数の住宅設計情報のうちの一部である第1設計情報を取得させる工程と、
前記複数の住宅設計情報の残りの情報である第2設計情報を、前記第1設計情報を用いて推定させる工程と、
前記施主との間で前記第2設計情報が決定される前段階で、前記第1設計情報及び前記推定された前記第2設計情報に基づいて、前記エネルギー消費性能を計算させる工程と、
前記第2設計情報が決定される前段階で、計算された前記エネルギー消費性能に基づいて、前記省エネルギー要望情報を満たす前記太陽光発電装置の仕様に関する第1次情報を計算させる工程と、
前記施主との間で決定された前記第2設計情報を取得させる工程と、
前記第1設計情報及び前記決定された前記第2設計情報に基づいて、前記エネルギー消費性能を再計算させる工程と、
前記再計算された前記エネルギー消費性能に基づいて、前記省エネルギー要望情報を満たす前記太陽光発電装置の前記仕様に関する第2次情報を計算させる工程とを実行させる、
プログラム
A program that allows a computer to execute a method for designing a house with a solar power generation device on the roof surface.
To the computer
The process of acquiring energy saving request information, which is information on the degree of energy saving of the house desired by the owner, and
The process of acquiring the first design information, which is a part of the plurality of housing design information necessary for calculating the energy consumption performance of the house, and
A process of estimating the second design information, which is the remaining information of the plurality of housing design information, using the first design information, and
A step of calculating the energy consumption performance based on the first design information and the estimated second design information before the second design information is determined with the owner.
Prior to the determination of the second design information, a step of calculating the primary information regarding the specifications of the photovoltaic power generation device satisfying the energy saving request information based on the calculated energy consumption performance.
The process of acquiring the second design information determined with the owner, and
A step of recalculating the energy consumption performance based on the first design information and the determined second design information.
Based on the recalculated energy consumption performance, a step of calculating a secondary information regarding the specification of the photovoltaic power generation device satisfying the energy saving request information is executed.
Program .
JP2018234538A 2018-12-14 2018-12-14 Housing design methods, design equipment and programs Active JP6997699B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018234538A JP6997699B2 (en) 2018-12-14 2018-12-14 Housing design methods, design equipment and programs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018234538A JP6997699B2 (en) 2018-12-14 2018-12-14 Housing design methods, design equipment and programs

Publications (2)

Publication Number Publication Date
JP2020095597A JP2020095597A (en) 2020-06-18
JP6997699B2 true JP6997699B2 (en) 2022-02-04

Family

ID=71084096

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018234538A Active JP6997699B2 (en) 2018-12-14 2018-12-14 Housing design methods, design equipment and programs

Country Status (1)

Country Link
JP (1) JP6997699B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023148653A (en) * 2022-03-30 2023-10-13 パナソニックホームズ株式会社 Housing design methods, manufacturing methods, design systems and computer programs

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023147393A (en) * 2022-03-30 2023-10-13 大和ハウス工業株式会社 Energy saving performance simple prediction system
JP2025171399A (en) * 2024-05-09 2025-11-20 三井住友建設株式会社 Simple calculation method for BEI, building design method including said method, and simple BEI calculation system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002304519A (en) 2001-04-03 2002-10-18 Sekisui House Ltd Residential energy utilization system proposal creation system and method
JP2004126946A (en) 2002-10-02 2004-04-22 Sharp Corp Layout design apparatus and layout design method for solar cell module
JP2018173932A (en) 2017-03-31 2018-11-08 積水化学工業株式会社 Solar power generation device installation support system, solar power generation device installation support method, and solar power generation device installation support program

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002304519A (en) 2001-04-03 2002-10-18 Sekisui House Ltd Residential energy utilization system proposal creation system and method
JP2004126946A (en) 2002-10-02 2004-04-22 Sharp Corp Layout design apparatus and layout design method for solar cell module
JP2018173932A (en) 2017-03-31 2018-11-08 積水化学工業株式会社 Solar power generation device installation support system, solar power generation device installation support method, and solar power generation device installation support program

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023148653A (en) * 2022-03-30 2023-10-13 パナソニックホームズ株式会社 Housing design methods, manufacturing methods, design systems and computer programs

Also Published As

Publication number Publication date
JP2020095597A (en) 2020-06-18

Similar Documents

Publication Publication Date Title
Yu et al. A long-term, integrated impact assessment of alternative building energy code scenarios in China
Kapsalaki et al. A methodology for economic efficient design of Net Zero Energy Buildings
Aste et al. nZEB: bridging the gap between design forecast and actual performance data
Milić et al. On the performance of LCC optimization software OPERA-MILP by comparison with building energy simulation software IDA ICE
KR101762543B1 (en) System and method to estimate energy consumption by end use in buildings
JP5070307B2 (en) Basic unit calculation system, program for executing the system, and recording medium recording the program
Bucking et al. A methodology for identifying the influence of design variations on building energy performance
CN114169577B (en) A method for predicting energy consumption of surface water source heat pump system considering randomness of load and system performance
JP6997699B2 (en) Housing design methods, design equipment and programs
KR20160027481A (en) Building energy efficiency and service evaluation system, and processing method thereof
JP6804019B1 (en) Energy saving calculation input information acquisition device, energy saving calculation input information acquisition method and computer program
Ma et al. A macro-scale optimisation of zero-energy design schemes for residential buildings based on building archetypes
Hallik et al. Comparative assessment of simple and detailed energy performance models for urban energy modelling based on digital twin and statistical typology database for the renovation of existing building stock
Jin et al. Measurement and normalization methods to provide detailed information on energy consumption by usage in apartment buildings
Dadras et al. Enhancing building energy optimization efficiency: a performance analysis of simplification approaches
Kim et al. Evaluation of multi-functional variable refrigerant flow system with thermal energy storage and photovoltaic-based distributed system for net-zero energy home design
A. Letskovska et al. Inspection Of Buildings For Energy Efficiency
Bayata et al. Developing a model and software for energy efficiency optimization in the building design process: a case study in Turkey
Bucking et al. Methodology for energy and economic modeling of net zero energy communities
Bao et al. Study on energy-saving design of renewable energy applied to high-rise residential buildings
JP7041647B2 (en) How to design a custom home
Tsang Energy-saving retrofits for residential buildings in the hot summer and cold winter zone in China
Jurjević et al. Final method for selection of the optimal solution for deep energy renovation of a building
Rabani et al. Hybrid Ventilation Systems for Reduced Lifetime Emissions in Cold Climates
Song et al. Development of a data model for energy consumption analysis and prediction of large-scale commercial buildings

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20200117

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200924

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20211005

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20211203

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20211214

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211217

R150 Certificate of patent or registration of utility model

Ref document number: 6997699

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150