Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7030318B2 - How to use hanging brackets and hanging brackets - Google Patents
[go: Go Back, main page]

JP7030318B2 - How to use hanging brackets and hanging brackets - Google Patents

How to use hanging brackets and hanging brackets Download PDF

Info

Publication number
JP7030318B2
JP7030318B2 JP2017166942A JP2017166942A JP7030318B2 JP 7030318 B2 JP7030318 B2 JP 7030318B2 JP 2017166942 A JP2017166942 A JP 2017166942A JP 2017166942 A JP2017166942 A JP 2017166942A JP 7030318 B2 JP7030318 B2 JP 7030318B2
Authority
JP
Japan
Prior art keywords
metal fitting
hanging
hanging metal
posture
holding means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017166942A
Other languages
Japanese (ja)
Other versions
JP2019043709A (en
Inventor
敏男 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanwa Kizai Co Ltd
Original Assignee
Sanwa Kizai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanwa Kizai Co Ltd filed Critical Sanwa Kizai Co Ltd
Priority to JP2017166942A priority Critical patent/JP7030318B2/en
Publication of JP2019043709A publication Critical patent/JP2019043709A/en
Application granted granted Critical
Publication of JP7030318B2 publication Critical patent/JP7030318B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Description

本発明は、掘削機のスクリューロッド、撹拌機の撹拌ロッド、その他種々の作業を行う作業ロッドとするために、この作業ロッドを分割した分割ロッドの継ぎ足し、分割等の作業に使用される吊り金具および吊り金具の使用方法に係るものである。 In the present invention, in order to use a screw rod of an excavator, a stirring rod of a stirrer, and other work rods for performing various operations, a hanging metal fitting used for work such as adding or dividing a split rod obtained by dividing the work rod. And how to use the hanging bracket.

従来、吊り装置に吊り金具を吊り下げ、この吊り金具を作業ロッドを長さ方向に分割した分割作業ロッドに接続し、吊り金具と分割作業ロッドを吊り下げて運搬して、分割作業ロッドの接続作業あるいは分割作業を行う方法は、公知である(特許文献1) Conventionally, a hanging metal fitting is suspended from a hanging device, the hanging metal fitting is connected to a split work rod in which the work rod is divided in the length direction, and the hanging metal fitting and the split work rod are suspended and transported to connect the split work rod. A method for performing work or division work is known (Patent Document 1).

特開2001-173352JP 2001-173352

前記公知例の吊り金具は、吊り装置に垂直の起立姿勢で吊り下げられているため、直立姿勢の分割作業ロッドへの装着は容易であるが、地面に寝かせた横向き姿勢の分割作業ロッドに接続するのが容易でないという課題がある。
すなわち、公知例の吊り金具の形状では、分割作業ロッドの接続端部の差し込み方向がクレーンで吊られた吊り金具に対し直交しており、人力作業では重作業であり、かつ、吊り金具自体が不安定な姿勢になり、分割作業ロッドに接続するのが容易でなかった。
本願は、吊り金具の構成を工夫し、分割作業ロッドへの装着作業を容易にし、ひいては、分割作業ロッドを作業ロッドとする接続あるいは分割作業の全般を容易にするものである。
Since the hanging metal fitting of the above-mentioned known example is suspended in an upright posture perpendicular to the hanging device, it is easy to attach it to the split work rod in the upright posture, but it is connected to the split work rod in the sideways posture laid on the ground. There is a problem that it is not easy to do.
That is, in the shape of the hanging metal fitting of the known example, the insertion direction of the connection end of the split work rod is orthogonal to the hanging metal fitting suspended by the crane, which is a heavy work in manual work, and the hanging metal fitting itself is The posture became unstable and it was not easy to connect to the split work rod.
In the present application, the structure of the hanging metal fitting is devised to facilitate the mounting work on the split work rod, and by extension, the connection or the general split work using the split work rod as the work rod is facilitated.

請求項1の発明は、所定長さを有して形成し、その上下両端に継ぎ足すための上側接続部10と下側接続部11とをそれぞれ設けた分割作業ロッド1を、長さ方向に継ぎ足して土木作業に使用される機器の作業ロッドRとし、この作業ロッドRとするために分割作業ロッド1の継ぎ足し分割作業に使用する吊り金具15を、分割作業ロッド1の上側接続部10と下側接続部11の何れかに接続する筒状の金具側接続部19と吊り金具15を吊り下げる吊り装置Tに吊り下げられる係合部材21を取付ける吊用取付部18とを設けて構成し、該吊り金具15は、接続する前の分割作業ロッド1の上側接続部10と下側接続部11の軸心方向と吊り金具15の金具側接続部19の軸心方向とが一致する姿勢に合うように、吊り装置Tに吊り下げられる吊り金具15の姿勢を変更保持する姿勢変更保持手段30を設けた吊り金具としたものである。
請求項2の発明は、前記姿勢変更保持手段30は、上部に設けた吊り装置T側に係合する上側連結部31、下部に設けた吊り金具15側の金具側係合部32に係合する下側連結部33をそれぞれ設けて構成した吊り金具としたものである。
請求項3の発明は、前記姿勢変更保持手段30は、継ぎ目の無い「O」型形状に形成した吊り金具としたものである。
請求項4の発明は、前記姿勢変更保持手段30は、一対の「U」の字形状の半割部材38を軸形状の連結軸部材39により連結して「O」の形状に形成した吊り金具としたものである。
請求項5の発明は、前記金具側係合部32は突起36により前記姿勢変更保持手段30が係合する係合溝37を形成して構成した吊り金具としたものである。
請求項6の発明は、前記姿勢変更保持手段30は、吊り金具15側に取付ける連結部材30Aと、前記吊り装置T側に取付けた第二連結部材30Bとにより構成した吊り金具としたものである。
請求項7の発明は、前記姿勢変更保持手段30の下側連結部33が係合する吊り金具15側の金具側係合部32は前記吊り金具15を横向き姿勢とした状態の重心Gの略上方に配置した吊り金具としたものである。
請求項8の発明は、吊り装置Tにより昇降する接続金具35に吊り金具15の吊用取付部18の挿通孔20に挿通した係合部材21を係合させて、吊り金具15を起立状態に吊り下げ、次に、一旦、吊り下げた吊り金具15を吊り装置Tにより下降させて吊り金具15の筒状の金具側接続部19の軸心方向が水平方向となる横向き姿勢とし、この状態で、吊り金具15の金具側係合部32に取付けた姿勢変更保持手段30の上側連結部31を前記接続金具35に係合させ、吊り金具15の横向き姿勢を保持し、この状態で、吊り装置Tにより吊り金具15の金具側接続部19を横向き姿勢の分割作業ロッド1の下側接続部11に接近移動させて接続し、次に、姿勢変更保持手段30による吊り金具15の姿勢保持状態を解除し、吊り金具15と分割作業ロッド1を、吊り装置Tにより上昇させて運搬し、運搬した分割作業ロッド1の下側接続部11を別途用意した分割作業ロッド1の上側接続部10に接続し、次に、分割作業ロッド1の上側接続部10から吊り金具15を取り外し、取り外した吊り金具15を、前記のように姿勢変更保持手段30により横向き姿勢に変更保持して次の接続作業用の別の横向きの分割作業ロッド1に接続し、これを反復して、複数の分割作業ロッド1を接続して土木作業に使用する所望長さの作業ロッドRとする吊り金具の使用方法としたものである。
The invention of claim 1 is to form a split work rod 1 having a predetermined length and provided with an upper connecting portion 10 and a lower connecting portion 11 for adding to the upper and lower ends thereof, respectively, in the length direction. The work rod R of the equipment used for civil engineering work is added, and the hanging metal fitting 15 used for the addition and division work of the division work rod 1 to be added to this work rod R is attached to the upper connection portion 10 and the lower side of the division work rod 1. A tubular metal fitting side connection portion 19 connected to any of the side connection portions 11 and a suspension mounting portion 18 for mounting an engaging member 21 suspended by a suspension device T for suspending the suspension metal fitting 15 are provided. The hanging metal fitting 15 has a posture in which the axial direction of the upper connecting portion 10 and the lower connecting portion 11 of the split work rod 1 and the axial center direction of the metal fitting side connecting portion 19 of the hanging metal fitting 15 coincide with each other . It is a hanging metal fitting provided with a posture changing holding means 30 for changing and holding the posture of the hanging metal fitting 15 suspended from the hanging device T so as to fit .
According to the second aspect of the present invention, the posture change holding means 30 is engaged with an upper connecting portion 31 that engages with the suspension device T side provided at the upper portion and a metal fitting side engaging portion 32 provided at the lower portion on the hanging metal fitting 15 side. It is a hanging metal fitting configured by providing each of the matching lower connecting portions 33.
According to the third aspect of the present invention, the posture change holding means 30 is a hanging metal fitting formed in a seamless "O" shape.
According to the fourth aspect of the present invention, the posture change holding means 30 is a hanging metal fitting formed by connecting a pair of "U" -shaped half-split members 38 with a shaft-shaped connecting shaft member 39 to form an "O" shape. It is the one that was made.
According to the fifth aspect of the present invention, the metal fitting side engaging portion 32 is a hanging metal fitting formed by forming an engaging groove 37 with which the posture change holding means 30 is engaged by a protrusion 36.
According to the sixth aspect of the present invention, the posture change holding means 30 is a hanging metal fitting composed of a connecting member 30A attached to the hanging metal fitting 15 side and a second connecting member 30B attached to the hanging device T side. ..
In the invention of claim 7, the metal fitting side engaging portion 32 on the hanging metal fitting 15 side with which the lower connecting portion 33 of the posture change holding means 30 is engaged is an abbreviation of the center of gravity G in a state where the hanging metal fitting 15 is in a sideways posture. It is a hanging bracket placed above .
The invention of claim 8 is to engage the engaging member 21 inserted into the insertion hole 20 of the hanging mounting portion 18 of the hanging metal fitting 15 with the connecting metal fitting 35 that is raised and lowered by the hanging device T, so that the hanging metal fitting 15 is in an upright state. Suspended, then the suspended metal fitting 15 was once lowered by the suspending device T to take a horizontal posture in which the axial direction of the tubular metal fitting side connecting portion 19 of the hanging metal fitting 15 is horizontal. , The upper connecting portion 31 of the posture change holding means 30 attached to the metal fitting side engaging portion 32 of the hanging metal fitting 15 is engaged with the connecting metal fitting 35 to hold the lateral posture of the hanging metal fitting 15, and is suspended in this state. The metal fitting side connection portion 19 of the hanging metal fitting 15 is moved closer to and connected to the lower connecting portion 11 of the split work rod 1 in the sideways posture by the device T, and then the posture holding state of the hanging metal fitting 15 by the posture change holding means 30. The hanging metal fitting 15 and the split work rod 1 are lifted and transported by the suspension device T, and the lower connection portion 11 of the transported split work rod 1 is connected to the upper connection portion 10 of the split work rod 1 separately prepared. Next, the hanging metal fitting 15 is removed from the upper connecting portion 10 of the split work rod 1, and the removed hanging metal fitting 15 is changed and held in the sideways posture by the posture change holding means 30 as described above, and the next connection work is performed. How to use a hanging bracket to connect to another sideways split work rod 1 for use and repeat this to connect a plurality of split work rods 1 to form a work rod R of a desired length used for civil engineering work. It was done.

請求項1の発明では、吊り金具15を接合させようとする分割作業ロッド1の軸心方向に一致するように、姿勢変更保持手段30により姿勢を保持して吊り下げて、吊り装置Tにより吊り金具15の重量を支持したまま移動させ、この支持状態で吊り金具15と分割作業ロッド1との位置合わせと接続あるいは分割作業を行えるので、作業を容易にできる。
請求項2の発明では、前記姿勢変更保持手段30は、上部に設けた吊り装置T側に係合する上側連結部31、下部に設けた吊り金具15側の金具側係合部32に係合する下側連結部33をそれぞれ設けているので、姿勢変更保持手段30により簡単に吊り金具15を横向き姿勢に保持することができ、しかも、姿勢変更保持手段30の構成を簡素にできる。
請求項3の発明では、姿勢変更保持手段30を継ぎ目の無い「O」型形状に形成しているので、姿勢変更保持手段30の構成を簡素にできる。
請求項4の発明では、姿勢変更保持手段30を、一対の「U」の字形状の半割部材38を軸形状の連結軸部材39により連結して「O」の形状に形成しているので、吊り金具15の金具側係合部32の形状を問わず、金具側係合部32に係合させることができ、汎用性を向上させることができる。
請求項5の発明では、金具側係合部32は突起36により前記姿勢変更保持手段30が係合する係合溝37を形成しているので、姿勢変更保持手段30の係合および離脱作業を容易にできる。
請求項6の発明では、姿勢変更保持手段30を、吊り金具15側に取付ける連結部材30Aと、吊り装置T側に取付けた第二連結部材30Bとにより構成しているので、接続金具35に吊り金具15の係合部材21を係合させて吊り下げた状態から、横向き姿勢に姿勢変更が容易にでき、分割作業ロッド1に装着後に分割作業ロッド1を上昇させる上昇作業への移行も容易にできる。
請求項7の発明では、前記姿勢変更保持手段30の下側連結部33が係合する吊り金具15側の金具側係合部32は前記吊り金具15を横向き姿勢とした状態の重心Gの略上方に配置しているので、姿勢変更保持手段30により簡単に吊り金具15を横向き姿勢に保持することができ、しかも、姿勢変更保持手段30の構成を簡素にできる。
請求項8の発明では、吊り金具15を接合させようとする分割作業ロッド1の軸心方向に一致するように、姿勢変更保持手段30により姿勢を保持して吊り下げて、Tにより吊り金具15の重量を支持したまま移動させ、この支持状態で吊り金具15と分割作業ロッド1との位置合わせと接続あるいは分割作業を行えるので、作業を容易にできる。
In the first aspect of the present invention, the posture is held by the posture change holding means 30 and suspended by the suspension device T so as to coincide with the axial direction of the split work rod 1 to which the suspension fitting 15 is to be joined. Since the weight of the metal fitting 15 can be moved while being supported, and the hanging metal fitting 15 and the split work rod 1 can be aligned and connected or divided in this supported state, the work can be facilitated.
In the invention of claim 2, the posture change holding means 30 is engaged with an upper connecting portion 31 that engages with the suspension device T side provided at the upper part and a metal fitting side engaging portion 32 provided at the lower part on the hanging metal fitting 15 side. Since the lower connecting portions 33 to be matched are provided respectively, the hanging metal fitting 15 can be easily held in the sideways posture by the posture change holding means 30, and the configuration of the posture change holding means 30 can be simplified.
In the invention of claim 3, since the posture change holding means 30 is formed in a seamless "O" shape, the configuration of the posture change holding means 30 can be simplified.
In the invention of claim 4, since the posture change holding means 30 is formed by connecting a pair of "U" -shaped half-split members 38 with a shaft-shaped connecting shaft member 39 to form an "O" shape. Regardless of the shape of the metal fitting side engaging portion 32 of the hanging metal fitting 15, it can be engaged with the metal fitting side engaging portion 32, and the versatility can be improved.
In the invention of claim 5, since the metal fitting side engaging portion 32 forms an engaging groove 37 with which the posture change holding means 30 is engaged by the protrusion 36, the posture change holding means 30 can be engaged and disengaged. You can do it easily.
In the invention of claim 6, since the posture change holding means 30 is composed of the connecting member 30A attached to the hanging metal fitting 15 side and the second connecting member 30B attached to the hanging device T side, the posture change holding means 30 is suspended from the connecting metal fitting 35. The posture can be easily changed from the state in which the engaging member 21 of the metal fitting 15 is engaged and suspended to the sideways posture, and the transition to the ascending work in which the split work rod 1 is raised after being attached to the split work rod 1 is also easy. can.
In the invention of claim 7, the metal fitting side engaging portion 32 on the hanging metal fitting 15 side with which the lower connecting portion 33 of the posture change holding means 30 engages is an abbreviation for the center of gravity G in a state where the hanging metal fitting 15 is in a sideways posture. Since it is arranged above, the hanging metal fitting 15 can be easily held in the sideways posture by the posture change holding means 30, and the configuration of the posture change holding means 30 can be simplified.
In the invention of claim 8, the posture is held and hung by the posture change holding means 30 so as to coincide with the axial direction of the split work rod 1 to which the hanging metal fitting 15 is to be joined, and the hanging metal fitting 15 is hung by T. The work can be facilitated because the hanging metal fitting 15 and the split work rod 1 can be aligned, connected, or split while being moved while supporting the weight of the rod 1.

掘削作業機の側面図。Side view of the excavator. 同吊り装置に吊り金具により分割作業ロッドを吊り下げた状態の側面図。A side view of the split work rod suspended from the suspension device by a hanging bracket. 吊り金具により分割作業ロッドを吊り下げ状態側面図。Side view of the split work rod suspended by the hanging bracket. 係合部材を省略した吊り金具の断面図。Sectional drawing of the hanging metal fitting which omitted the engaging member. 吊り金具の係合部材の正面図および側面図。Front view and side view of the engaging member of the hanging bracket. 係合部材を省略した吊り金具の側面図。The side view of the hanging metal fitting which omitted the engaging member. 同正面図。Same front view. 同断面図。The same sectional view. 吊り金具の横断面図。Cross-sectional view of the hanging bracket. 横向き姿勢の分割作業ロッドへの吊り金具の装着例の側面図。A side view of an example of mounting a hanging bracket on a split work rod in a sideways posture. (A)姿勢変更保持手段により吊り金具を横向き姿勢にした側面図。 (B)連結部材の正面図および側面図。 (C)連結部材の他の実施形態の正面図および側面図。 (D)連結部材の他の実施形態の正面図および側面図。(A) A side view in which the hanging metal fitting is placed in a sideways posture by the posture change holding means. (B) Front view and side view of the connecting member. (C) Front view and side view of another embodiment of the connecting member. (D) Front view and side view of another embodiment of the connecting member. 姿勢変更保持手段により吊り金具を横向き姿勢に姿勢変更した側面図。The side view which changed the posture of the hanging metal fitting to the sideways posture by the posture change holding means. 図11(B)の姿勢変更保持手段により吊り金具を横向き姿勢にした際の金具側係合部の他の実施形態の側面図。FIG. 11 (B) is a side view of another embodiment of the metal fitting side engaging portion when the hanging metal fitting is placed in a sideways posture by the posture change holding means. 図11(B)の姿勢変更保持手段により吊り金具を横向き姿勢にした際の金具側係合部の他の実施形態の側面図および正面図。11 (B) is a side view and a front view of another embodiment of the metal fitting side engaging portion when the hanging metal fitting is placed in a sideways posture by the posture change holding means. 図11(C)の姿勢変更保持手段により吊り金具を横向き姿勢にした際の他の実施形態の側面図。FIG. 11 is a side view of another embodiment when the hanging metal fitting is placed in a sideways posture by the posture change holding means of FIG. 11C. 金具側係合部の他の実施形態の側面図。A side view of another embodiment of the metal fitting side engaging portion. 金具側係合部の他の実施形態の側面図および正面図。Side view and front view of another embodiment of the metal fitting side engaging portion. 図11(C)の姿勢変更保持手段により吊り金具を横向き姿勢にする前の側面図。FIG. 11 (C) is a side view before the hanging metal fitting is placed in the sideways posture by the posture change holding means. 図11(D)の姿勢変更保持手段により吊り金具を横向き姿勢にした側面図および正面図。11 (D) is a side view and a front view in which the hanging metal fitting is placed in a sideways posture by the posture change holding means. 種々の連結部材を組み合わせて姿勢変更保持手段とした実施形態の側面図および正面図。A side view and a front view of an embodiment in which various connecting members are combined to form a posture change holding means. 吊り金具の他の実施形態の側面図および正面図。Side view and front view of other embodiments of the hanging bracket. 吊り金具の金具側接続部の他の実施形態の側面図および正面図。Side view and front view of another embodiment of the metal fitting side connection portion of the hanging metal fitting. 吊り金具の金具側接続部の他の実施形態の側面図および正面図。Side view and front view of another embodiment of the metal fitting side connection portion of the hanging metal fitting. 吊り金具の他の実施形態の側面図。Side view of another embodiment of the hanging bracket.

本発明の一実施形態を図面により説明すると、1は土木作業(掘削作業や土壌改良作業)等に使用される機器の作業ロッドRを構成する分割作業ロッドであり、所謂掘削装置のスクリューロッドや撹拌機の撹拌ロッドの総称として本例で使用している。
図1は分割作業ロッド1を使用する掘削装置2の一例を示し、3はベースマシン、4はベースマシン3に設けたリーダー、5はリーダー4に昇降自在に取付けた回転駆動部であり、回転駆動部5の回転軸体6に前記分割作業ロッド1の上部を取付けている。
なお、本発明の本実施形態の説明するにあたり、理解を容易にするために、上下左右等の方向を用いて説明しているが、このことによって本発明の構成が限定的に解釈されることはない。
Explaining one embodiment of the present invention by drawing, 1 is a split work rod constituting a work rod R of an apparatus used for civil engineering work (excavation work, soil improvement work), etc., and is a so-called screw rod of an excavation device. It is used in this example as a general term for agitating rods of a stirrer.
FIG. 1 shows an example of an excavator 2 using a split work rod 1. Reference numeral 3 is a base machine, 4 is a leader provided in the base machine 3, and 5 is a rotary drive unit mounted on the leader 4 so as to be vertically movable. The upper portion of the split work rod 1 is attached to the rotary shaft body 6 of the drive unit 5.
In the description of the present embodiment of the present invention, in order to facilitate understanding, the directions such as up, down, left, and right are used, but the configuration of the present invention is limitedly interpreted by this. There is no.

前記作業ロッドRは、所定長さを有して形成した分割作業ロッド1を複数継ぎ足して構成し、各分割作業ロッド1の上下両端には継ぎ足すための上側接続部10と下側接続部11とをそれぞれ設け、複数の分割作業ロッド1を長さ方向に継ぎ足して前記作業ロッドRとして使用する。
この作業ロッドRとするための分割作業ロッド1の継ぎ足し、切り離し等のために使用する吊り金具15が本発明の要旨となるものであり、吊り金具15は各分割作業ロッド1を各種の吊り装置Tで吊すときに使用する吊用取付部18と分割作業ロッド1の上側接続部10に接続される金具側接続部19を設けて構成する。
ここで、吊り装置Tの構成は本願の要件では無く、その構成は任意であり、吊り金具15を吊り下げて昇降させられればよく、本実施形態では、一例として、クレーン(図示省略)のワイヤー16の吊用フック17としているが、例えば、図示は省略するが、油圧式ショベルのショベル下面に吊用フックを設け、この油圧式ショベルを吊り装置Tとしてもよい。
The work rod R is configured by adding a plurality of split work rods 1 formed having a predetermined length, and an upper connection portion 10 and a lower connection portion 11 for adding to the upper and lower ends of each split work rod 1. And are provided respectively, and a plurality of split work rods 1 are added in the length direction and used as the work rod R.
The hanging metal fitting 15 used for adding, separating, etc. of the split work rod 1 for making the work rod R is the gist of the present invention, and the hanging metal fitting 15 is a various hanging devices for each split work rod 1. It is configured by providing a hanging mounting portion 18 used when suspending with T and a metal fitting side connecting portion 19 connected to the upper connecting portion 10 of the split work rod 1.
Here, the configuration of the suspension device T is not a requirement of the present application, the configuration is arbitrary, and the suspension metal fitting 15 may be suspended and raised and lowered. In this embodiment, as an example, a wire of a crane (not shown). Although the suspension hook 17 of 16 is used, for example, although not shown, a suspension hook may be provided on the lower surface of the excavator of the hydraulic excavator, and the hydraulic excavator may be used as the suspension device T.

吊り金具15の吊用取付部18は所定の板厚を有する板部材により形成し、吊用取付部18には左右方向に貫通する挿通孔20を設ける。挿通孔20にはワイヤー16に設けた吊り装置T(吊用フック17)に係合する係合部材21を取付ける。
係合部材21の構成は任意であるが、一例を示すと、逆さ「U」の字形状の一対の係合部22の下部を軸部材23により連結して構成し(図5)、一対の係合部22を吊用取付部18の挿通孔20の左右両側に位置させ、この状態の係合部22を挿通孔20に挿通した軸部材23により連結して、係合部材21を吊り金具15に取付ける。
そのため、係合部材21は、軸部材23を吊り装置T(吊用フック17)に係合させて吊り金具15を吊り上げる。
吊り金具15の金具側接続部19には分割作業ロッド1の上側接続部10を接続する嵌合穴25を設け、金具側接続部19内には上側接続部10の係合溝26に係合させる係合ピン27を挿入するピン挿入孔28を設ける(図4)。
The hanging mounting portion 18 of the hanging metal fitting 15 is formed of a plate member having a predetermined plate thickness, and the hanging mounting portion 18 is provided with an insertion hole 20 penetrating in the left-right direction. An engaging member 21 that engages with the suspension device T (suspension hook 17) provided on the wire 16 is attached to the insertion hole 20.
The configuration of the engaging member 21 is arbitrary, but as an example, the lower portions of the pair of engaging portions 22 having an inverted “U” shape are connected by the shaft member 23 (FIG. 5), and the pair is configured. The engaging portion 22 is positioned on both the left and right sides of the insertion hole 20 of the hanging mounting portion 18, and the engaging portion 22 in this state is connected by the shaft member 23 inserted into the insertion hole 20, and the engaging member 21 is connected to the hanging bracket. Attach to 15.
Therefore, the engaging member 21 engages the shaft member 23 with the hanging device T (hanging hook 17) to lift the hanging metal fitting 15.
The metal fitting side connection portion 19 of the hanging metal fitting 15 is provided with a fitting hole 25 for connecting the upper connection portion 10 of the split work rod 1, and the metal fitting side connection portion 19 is engaged with the engagement groove 26 of the upper connection portion 10. A pin insertion hole 28 for inserting the engaging pin 27 to be inserted is provided (FIG. 4).

しかして、分割作業ロッド1を吊り装置T(吊用フック17)により吊り上げるには、分割作業ロッド1の上側接続部10に吊り金具15の金具側接続部19を接続し、吊り金具15の係合部材21を吊り装置T(吊用フック17)に引っ掛けて吊り上げることになるが、吊り金具15は所定の重量を有して構成されており、人力作業で吊り金具15を持ち上げて分割作業ロッド1に接続するのは容易ではないので、吊り装置T(吊用フック17)により吊り金具15を吊り下げた状態で分割作業ロッド1に接続する。
この場合、吊り金具15を接続する前の分割作業ロッド1の姿勢に合わせて、起立状態の吊り金具15の吊り下げ姿勢を姿勢変更保持手段30により横倒れの横向き姿勢に変更させて保持し、この状態で、吊り金具15の金具側接続部19の軸心方向(接続方向)を分割作業ロッド1の上側接続部10に対峙させて接続する。
Then, in order to lift the split work rod 1 by the suspension device T (hanging hook 17), the metal fitting side connection portion 19 of the hanging metal fitting 15 is connected to the upper connection portion 10 of the split work rod 1 and the hanging metal fitting 15 is engaged. The joining member 21 is hooked on the hanging device T (hanging hook 17) to be lifted, but the hanging metal fitting 15 is configured to have a predetermined weight, and the hanging metal fitting 15 is manually lifted to be a split work rod. Since it is not easy to connect to 1, the hanging metal fitting 15 is suspended from the hanging device T (hanging hook 17) and connected to the split work rod 1.
In this case, according to the posture of the split work rod 1 before connecting the hanging metal fitting 15, the hanging posture of the hanging metal fitting 15 in the upright state is changed to the sideways posture of lying down by the posture change holding means 30 and held. In this state, the axial center direction (connection direction) of the metal fitting side connection portion 19 of the hanging metal fitting 15 is opposed to the upper connection portion 10 of the split work rod 1 and connected.

この場合の姿勢変更保持手段30は、吊り装置T(吊用フック17)側と吊り金具15側を連結する構成であればよく、構成は任意であり、一例を示すと、姿勢変更保持手段30は吊り装置T側に装着(係合)する上側連結部31と、吊り金具15側に装着(係合)する下側連結部33を有した連結部材30Aにて構成している。
そのため、姿勢変更保持手段30の連結部材30Aの上側連結部31を吊り装置T(吊用フック17)に係合させ、姿勢変更保持手段30の連結部材30Aの下側連結部33を吊り金具15に設けた金具側係合部32に係合させると、吊り金具15は横向き姿勢で吊り装置T(吊用フック17)に吊り下げられ、横倒れの姿勢の分割作業ロッド1に吊り金具15の金具側接続部19を容易に接続できる。
In this case, the posture change holding means 30 may be configured to connect the hanging device T (hanging hook 17) side and the hanging metal fitting 15 side, and the configuration is arbitrary. To give an example, the posture change holding means 30 Is composed of a connecting member 30A having an upper connecting portion 31 mounted (engaged) on the hanging device T side and a lower connecting portion 33 mounted (engaged) on the hanging metal fitting 15 side.
Therefore, the upper connecting portion 31 of the connecting member 30A of the posture change holding means 30 is engaged with the suspension device T (suspension hook 17), and the lower connecting portion 33 of the connecting member 30A of the posture change holding means 30 is attached to the hanging metal fitting 15. When engaged with the metal fitting side engaging portion 32 provided in the above, the hanging metal fitting 15 is suspended from the hanging device T (hanging hook 17) in a sideways posture, and the hanging metal fitting 15 is attached to the split work rod 1 in a sideways posture. The metal fitting side connection portion 19 can be easily connected.

姿勢変更保持手段30の連結部材30Aは吊り装置T(吊用フック17)側に吊り下げられる構成であればよく、その構成は任意であり、図11Bの連結部材30Aは所謂マスターリンクと称される継ぎ目の無い「O」型形状に構成し、連結部材30Aの上部の円弧部が上側連結部31となり、連結部材30Aの下部の円弧部が下側連結部33に構成される。
図11Cの姿勢変更保持手段30の連結部材30Aは一対の「U」の字形状の半割部材38を軸形状の連結軸部材39により連結して「O」の形状に形成している。
図11Dの姿勢変更保持手段30の連結部材30Aは、逆さ「U」の字形状の一対の係合脚40の下部を軸部材41により連結して構成し、一対の係合脚40を吊り装置T(吊用フック17)に吊り下げる構成としている。
The connecting member 30A of the posture change holding means 30 may be configured to be suspended on the suspension device T (suspension hook 17) side, and the configuration is arbitrary, and the connecting member 30A in FIG. 11B is referred to as a so-called master link. It is configured in a seamless "O" shape, the upper arc portion of the connecting member 30A is the upper connecting portion 31, and the lower arc portion of the connecting member 30A is the lower connecting portion 33.
The connecting member 30A of the posture change holding means 30 of FIG. 11C is formed by connecting a pair of "U" -shaped half-split members 38 with a shaft-shaped connecting shaft member 39 to form an "O" shape.
The connecting member 30A of the posture change holding means 30 of FIG. 11D is configured by connecting the lower portions of the pair of engaging legs 40 having an inverted “U” shape with the shaft member 41, and the pair of engaging legs 40 are connected by the suspension device T ( It is configured to be hung on a hanging hook 17).

このように、姿勢変更保持手段30の連結部材30Aの上側連結部31を吊り装置T(吊用フック17)側に吊り下げ、連結部材30Aの下側連結部33を吊り金具15の金具側係合部32に係合させ、この状態で、吊り装置T(吊用フック17)により上昇させると、吊り金具15は吊り装置T(吊用フック17)に横向きに吊り下げられる(図11、図12等)。
このとき、金具側係合部32は横向き姿勢の吊り金具15の重心Gの略上方位置に設ける。
すなわち、吊り金具15は姿勢変更保持手段30のみにより吊り金具15を吊り装置T(吊用フック17)に横向きに吊り下げるために、金具側係合部32は横向き吊り金具15の重心Gの略上方位置に設けており、後述する図12のように、吊り装置T(吊用フック17)に吊り下げた接続金具35(第二連結部材30B)に連結部材30Aを吊り下げた場合でも、連結部材30Aの下側連結部33は吊り金具15の重心Gの略上方位置にある金具側係合部32に係合して、吊り装置T(吊用フック17)に横向きに吊り下げられることになる。
In this way, the upper connecting portion 31 of the connecting member 30A of the posture change holding means 30 is hung on the suspension device T (hanging hook 17) side, and the lower connecting portion 33 of the connecting member 30A is engaged on the metal fitting side of the hanging metal fitting 15. When engaged with the joint portion 32 and raised by the hanging device T (hanging hook 17) in this state, the hanging metal fitting 15 is suspended sideways to the hanging device T (hanging hook 17) (FIGS. 11 and 11). 12 mag).
At this time, the metal fitting side engaging portion 32 is provided at a position substantially above the center of gravity G of the hanging metal fitting 15 in the lateral posture.
That is, since the hanging metal fitting 15 suspends the hanging metal fitting 15 sideways to the hanging device T (hanging hook 17) only by the posture change holding means 30, the metal fitting side engaging portion 32 is an abbreviation of the center of gravity G of the horizontal hanging metal fitting 15. Even when the connecting member 30A is suspended from the connecting metal fitting 35 (second connecting member 30B) suspended from the suspending device T (suspension hook 17) as shown in FIG. 12, which is provided at an upper position, the connecting member 30A is connected. The lower connecting portion 33 of the member 30A engages with the fitting side engaging portion 32 located substantially above the center of gravity G of the hanging fitting 15, and is suspended sideways to the hanging device T (hanging hook 17). Become.

しかして、姿勢変更保持手段30の連結部材30Aの下側連結部33を装着(係合)させる吊り金具15側となる金具側係合部32の構成も任意であり、図4、図11の実施形態では金具側係合部32は突起36により係合溝37を形成して構成しており、図11の金具側係合部32は起立姿勢状態の吊り金具15を基準に下向きに係合溝37を形成しているが、図13の金具側係合部32は起立姿勢状態の吊り金具15を基準に上向きに係合溝37を形成しており、図14の金具側係合部32は起立姿勢状態の吊り金具15を基準に左右方向の左右いずれかの方向に係合溝37を開口させて形成している。 The configuration of the metal fitting side engaging portion 32 on the hanging metal fitting 15 side for mounting (engaging) the lower connecting portion 33 of the connecting member 30A of the posture change holding means 30 is also arbitrary, and FIGS. 4 and 11 show. In the embodiment, the metal fitting side engaging portion 32 is configured by forming an engaging groove 37 by the protrusion 36, and the metal fitting side engaging portion 32 in FIG. 11 is engaged downward with reference to the hanging metal fitting 15 in the standing posture. Although the groove 37 is formed, the metal fitting side engaging portion 32 in FIG. 13 forms an engaging groove 37 upward with reference to the hanging metal fitting 15 in the upright posture, and the metal fitting side engaging portion 32 in FIG. 14 is formed. Is formed by opening the engaging groove 37 in either the left or right direction in the left or right direction with respect to the hanging metal fitting 15 in the standing posture.

また、姿勢変更保持手段30の連結部材30Aを吊り装置T(吊用フック17)側に吊り下げる構成あるいは吊り下げ作業および姿勢変更の作業順序も任意であり、図15の実施形態では一対の「U」の字形状の半割部材38を軸形状の連結軸部材39により連結して形成した連結部材30Aと、吊り装置T(吊用フック17)に予め吊り下げた接続金具35(第二連結部材30B)とにより姿勢変更保持手段30を構成している。
そのため、吊り装置T(吊用フック17)に予め接続金具35(第二連結部材30B)を吊り下げておき、接続金具35(第二連結部材30B)に吊り下げた連結部材30Aを吊り金具15の金具側係合部32に係合させて、吊り金具15を横向きの吊り姿勢に保持している。
この場合、吊り金具15は、連結部材30Aと接続金具35(第二連結部材30B)とにより横向きに吊り下げられるので、連結部材30Aと接続金具35(第二連結部材30B)とが姿勢変更保持手段30となる。
Further, the configuration in which the connecting member 30A of the posture change holding means 30 is suspended on the suspension device T (suspension hook 17) side, or the suspension work and the posture change work order are also arbitrary. A connecting member 30A formed by connecting a U-shaped half-split member 38 with a shaft-shaped connecting shaft member 39, and a connecting metal fitting 35 (second connecting) suspended in advance from a hanging device T (hanging hook 17). The posture change holding means 30 is configured by the member 30B).
Therefore, the connecting fitting 35 (second connecting member 30B) is suspended from the hanging device T (hanging hook 17) in advance, and the connecting member 30A suspended from the connecting fitting 35 (second connecting member 30B) is attached to the hanging bracket 15. The hanging metal fitting 15 is held in a lateral hanging posture by engaging with the metal fitting side engaging portion 32 of the above.
In this case, the hanging metal fitting 15 is suspended sideways by the connecting member 30A and the connecting metal fitting 35 (second connecting member 30B), so that the connecting member 30A and the connecting metal fitting 35 (second connecting member 30B) hold the posture change. Means 30.

図16、図17では、開口方向の向きを変えた金具側係合部32の係合溝37に半割部材38により形成した連結部材30Aにより吊り金具15を吊り下げた状態を示している。
また、図18のように、予め吊り装置T(吊用フック17)に接続金具35(第二連結部材30B)を吊設しておき、この接続金具35に係合部材21を予め挿通させて吊り金具15が起立姿勢となるように吊り装置T(吊用フック17)に吊り下げておき、この状態のままの吊り金具15は垂直状態の分割作業ロッド1に接続するが、横向きの分割作業ロッド1に接続するときには、例えば、一旦、ワイヤー16を緩めて、吊り装置T(吊用フック17)を下降させて、吊り金具15を横向きにし、この状態で、吊り装置T(吊用フック17)の接続金具35に挿通させておいた半割部材38の連結部材30Aを吊り金具15の金具側係合部32に係合させて、吊り金具15を横向きに吊り下げる(図13)。
16 and 17 show a state in which the hanging metal fitting 15 is suspended by the connecting member 30A formed by the half-split member 38 in the engaging groove 37 of the metal fitting side engaging portion 32 whose opening direction is changed.
Further, as shown in FIG. 18, the connecting metal fitting 35 (second connecting member 30B) is suspended in advance from the hanging device T (hanging hook 17), and the engaging member 21 is inserted through the connecting metal fitting 35 in advance. The hanging metal fitting 15 is suspended from the hanging device T (hanging hook 17) so as to be in an upright posture, and the hanging metal fitting 15 in this state is connected to the vertical division work rod 1, but the horizontal division work is performed. When connecting to the rod 1, for example, once the wire 16 is loosened, the hanging device T (hanging hook 17) is lowered, the hanging metal fitting 15 is turned sideways, and in this state, the hanging device T (hanging hook 17) is turned sideways. ), The connecting member 30A of the half-split member 38 inserted through the connecting metal fitting 35 is engaged with the metal fitting side engaging portion 32 of the hanging metal fitting 15, and the hanging metal fitting 15 is suspended sideways (FIG. 13).

このように、姿勢変更保持手段30を、連結部材30Aと接続金具35(第二連結部材30B)との複数の部材で構成し、接続金具35(第二連結部材30B)に連結部材30Aを挿通させておくと、横向き姿勢で分割作業ロッド1に取付けた吊り金具15を吊り上げるとき、連結部材30Aを金具側係合部32から離脱させるだけで、分割作業ロッド1の吊り下げ姿勢に移行させることができ、作業全般を容易にする。
図19は、図11Dに示した連結部材30Aにより吊り金具15を横向きにした状態を示し、一対の係合脚40を吊り装置T(吊用フック17)に直接吊り下げており、連結部材30Aの軸部材41は吊り金具15側に設けた透孔43により形成した金具側係合部32に挿通させた構成としている。
そのため、予め、連結部材30Aの軸部材41を姿勢変更保持手段30は吊り金具15の金具側係合部32である透孔43に挿通し、この軸部材41に係合脚40の下部を取付けて、連結部材30Aを吊り金具15に装着し、この連結部材30Aの係合脚40を起立させて吊り装置T(吊用フック17)に吊り下げて、横向き姿勢にする。
In this way, the posture change holding means 30 is composed of a plurality of members of the connecting member 30A and the connecting fitting 35 (second connecting member 30B), and the connecting member 30A is inserted into the connecting fitting 35 (second connecting member 30B). When the hanging metal fitting 15 attached to the split work rod 1 is lifted in the horizontal posture, the connecting member 30A is simply disengaged from the metal fitting side engaging portion 32 to shift to the hanging posture of the split work rod 1. And make the whole work easier.
FIG. 19 shows a state in which the hanging metal fitting 15 is turned sideways by the connecting member 30A shown in FIG. 11D, and the pair of engaging legs 40 are directly suspended from the hanging device T (hanging hook 17) of the connecting member 30A. The shaft member 41 is configured to be inserted into a metal fitting side engaging portion 32 formed by a through hole 43 provided on the hanging metal fitting 15 side.
Therefore, in advance, the posture change holding means 30 inserts the shaft member 41 of the connecting member 30A into the through hole 43 which is the metal fitting side engaging portion 32 of the hanging metal fitting 15, and attaches the lower portion of the engaging leg 40 to the shaft member 41. The connecting member 30A is attached to the hanging metal fitting 15, and the engaging leg 40 of the connecting member 30A is erected and suspended from the suspension device T (suspension hook 17) so as to be in a sideways posture.

図20は姿勢変更保持手段30の別の実施形態を示し、吊り装置T(吊用フック17)に吊り下げる接続金具35(第二連結部材30B)に、リング部材44(連結部材30A)により中間フック45(第三連結部材30C)を予め吊設しておき、吊り金具15側の金具側係合部32を軸部材により逆さ「U」の字形状に形成した係合孔46に、中間フック45(第三連結部材30C)を係合させて吊り金具15を横向きに吊り下げる構成としている。
なお、吊り金具15の姿勢は横倒れ姿勢以外に、金具側係合部32の吊り金具15に対する相対的位置を変更する等の構成により、斜めの姿勢に姿勢変更保持手段30により姿勢保持してもよく、任意の手段で設置保管されている分割作業ロッド1の保管姿勢に合わせられればよい。
FIG. 20 shows another embodiment of the posture change holding means 30, which is intermediate between the connection fitting 35 (second connecting member 30B) suspended from the suspending device T (suspension hook 17) by the ring member 44 (connecting member 30A). An intermediate hook is provided in an engaging hole 46 in which a hook 45 (third connecting member 30C) is suspended in advance and the metal fitting side engaging portion 32 on the hanging metal fitting 15 side is formed in an inverted “U” shape by a shaft member. The hanging metal fitting 15 is suspended sideways by engaging 45 (third connecting member 30C).
In addition to the sideways posture, the posture of the hanging metal fitting 15 is maintained in an oblique posture by the posture changing holding means 30 by changing the relative position of the metal fitting side engaging portion 32 with respect to the hanging metal fitting 15. It may be adjusted to the storage posture of the split work rod 1 installed and stored by any means.

本発明は、分割作業ロッド1を吊り下げる吊り金具15の姿勢を変更可能に構成することが要旨であり、分割作業ロッド1の上側接続部10と下側接続部11および吊り金具15の金具側接続部19の構成は要件ではなく、図4の金具側接続部19は所謂雌雄の継ぎ手の雌の継ぎ手形状に形成しているが、分割作業ロッド1の上側接続部10を雌の継ぎ手形状に、吊り金具15の金具側接続部19を雄の継ぎ手形状にそれぞれ反対の形状に形成してもよく、図21のように、雄の継ぎ手形状にした場合、断面六角形状にしたり、あるいは、図23のようにキー溝48を設けて断面十字としてもよく、さらに、図示は省略するが、雌雄のない同一形状の継ぎ手形状に形成してもよい。49は係合ピン27が係合する係合溝である。
また、図10のように、分割作業ロッド1の上側接続部10の係合溝26が上下(図10において左右)に位相を変えて設けている場合、図24のように、吊り金具15の金具側接続部19に左右一対のピン挿入孔28を係合溝26に合わせて上下に並設しておくと、ピン挿入孔28と分割作業ロッド1の係合溝26との位置合わせを容易にできて好適である。
The gist of the present invention is to configure the hanging metal fitting 15 for suspending the split work rod 1 so that the posture of the hanging metal fitting 15 can be changed. The configuration of the connection portion 19 is not a requirement, and the metal fitting side connection portion 19 in FIG. 4 is formed in the shape of a female joint of a so-called male and female joint, but the upper connection portion 10 of the split work rod 1 is formed in the shape of a female joint. , The metal fitting side connection portion 19 of the hanging metal fitting 15 may be formed in a shape opposite to the male joint shape, and when the male joint shape is formed as shown in FIG. A key groove 48 may be provided as in the case of 23 to form a cross-section cross, and although not shown, the joint may be formed into a joint shape having the same shape without males and females. Reference numeral 49 is an engaging groove in which the engaging pin 27 is engaged.
Further, as shown in FIG. 10, when the engaging groove 26 of the upper connecting portion 10 of the split work rod 1 is provided in different phases in the vertical direction (left and right in FIG. 10), the hanging metal fitting 15 is provided as shown in FIG. By arranging a pair of left and right pin insertion holes 28 vertically in the metal fitting side connection portion 19 in line with the engagement groove 26, it is easy to align the pin insertion hole 28 with the engagement groove 26 of the split work rod 1. It is suitable because it can be made.

(実施形態の作用)
本発明は上記構成であり、例えば、ベースマシン3に設けたリーダー4に昇降自在に取付けた回転駆動部5の回転軸体6に作業ロッドRの上部を接続するにあたり、複数の分割作業ロッド1を吊り金具15を使用して運搬移動させて、各分割作業ロッド1を長さ方向に継ぎ足して所定長さの作業ロッドRとして使用する。
この分割作業ロッド1の継ぎ足し、切り離し等のために使用する吊り金具15は、吊り装置Tに吊すときに使用する吊用取付部18と分割作業ロッド1の上側接続部10に装着される金具側接続部19を設けて構成し、垂直状態の分割作業ロッド1は吊り装置Tに吊り金具15の係合部材21を係合させて吊り下げている。
この場合、吊り金具15の吊用取付部18の板厚より広く、かつ、吊り金具15の金具側接続部19の外径より狭い幅に形成した一対の係合部22を吊用取付部18の挿通孔20の左右両側に位置させ、この状態の係合部22を挿通孔20に挿通した軸部材23により連結して、係合部材21を吊り金具15に取付ける。
(Action of Embodiment)
The present invention has the above configuration, for example, when connecting the upper part of the work rod R to the rotary shaft body 6 of the rotary drive unit 5 attached to the leader 4 provided in the base machine 3 so as to be vertically movable, the plurality of split work rods 1 Is transported and moved using the hanging metal fitting 15, and each split work rod 1 is added in the length direction to be used as a work rod R having a predetermined length.
The hanging metal fitting 15 used for adding, separating, and the like of the dividing work rod 1 is on the metal fitting side to be attached to the hanging mounting portion 18 used when suspending from the hanging device T and the upper connecting portion 10 of the dividing work rod 1. A connecting portion 19 is provided, and the split work rod 1 in the vertical state is suspended by engaging the engaging member 21 of the hanging metal fitting 15 with the suspending device T.
In this case, the hanging mounting portion 18 is formed with a pair of engaging portions 22 formed to be wider than the plate thickness of the hanging mounting portion 18 of the hanging bracket 15 and narrower than the outer diameter of the metal fitting side connecting portion 19 of the hanging bracket 15. The engaging portion 22 in this state is connected by the shaft member 23 inserted into the insertion hole 20, and the engaging member 21 is attached to the hanging metal fitting 15.

そのため、係合部材21の係合部22は常に吊り装置Tに対して同じ方向で対峙するので、吊り金具15の吊り装置Tへの係合を容易にしている。
分割作業ロッド1の上側接続部10に吊り金具15の金具側接続部19を接続する作業は、吊り金具15は所定の重量を有して構成されており、人力作業で吊り金具15を持ち上げて分割作業ロッド1に接続するのは容易ではないので、吊り装置Tにより吊り金具15を吊り下げた状態で分割作業ロッド1に接続するが、本発明では、分割作業ロッド1が起立姿勢以外の姿勢では、吊り金具15を接続する前の分割作業ロッド1の姿勢に合わせて、吊り金具15の吊り下げ姿勢を姿勢変更保持手段30により変更させて保持し、この状態で、吊り金具15の金具側接続部19の軸心方向(接続方向)を分割作業ロッド1の上側接続部10に対峙させて接続する。
Therefore, the engaging portion 22 of the engaging member 21 always faces the suspending device T in the same direction, so that the hanging metal fitting 15 can be easily engaged with the suspending device T.
In the work of connecting the metal fitting side connection portion 19 of the hanging metal fitting 15 to the upper connecting portion 10 of the split work rod 1, the hanging metal fitting 15 is configured to have a predetermined weight, and the hanging metal fitting 15 is manually lifted. Since it is not easy to connect to the split work rod 1, it is connected to the split work rod 1 in a state where the hanging metal fitting 15 is suspended by the suspension device T. However, in the present invention, the split work rod 1 is in a posture other than the standing posture. Then, the hanging posture of the hanging metal fitting 15 is changed and held by the posture change holding means 30 according to the posture of the split work rod 1 before connecting the hanging metal fitting 15, and in this state, the metal fitting side of the hanging metal fitting 15 is held. The axial center direction (connection direction) of the connection portion 19 is opposed to the upper connection portion 10 of the split work rod 1 and connected.

すなわち、吊り金具15は、金具側接続部19の軸心方向が接合させようとする分割作業ロッド1の軸心方向に一致するように、吊り装置Tに姿勢変更保持手段30により姿勢を変更させて吊り下げ、吊り装置Tで吊り金具15の重量を支持したまま移動させ、この支持状態で吊り金具15と分割作業ロッド1との位置合わせと接続を手作業により行う。
そのため、吊り金具15の接続作業をする間、吊り金具15の重量を人力で支持する必要がなく、頗る作業を容易にする。
したがって、吊り金具15は、姿勢変更保持手段30により横向きの分割作業ロッド1に合わせて、吊り金具15の金具側接続部19の軸心方向を横向きの横倒れ姿勢にして、分割作業ロッド1への接続作業を行う。
That is, the hanging metal fitting 15 is made to change its posture by the posture changing holding means 30 so that the axial center direction of the metal fitting side connecting portion 19 coincides with the axial center direction of the split work rod 1 to be joined. The hanging metal fitting 15 is moved while being supported by the hanging device T, and the position and connection between the hanging metal fitting 15 and the split work rod 1 are manually performed in this supported state.
Therefore, it is not necessary to manually support the weight of the hanging metal fitting 15 while the hanging metal fitting 15 is being connected, which facilitates the work of nodding.
Therefore, the hanging metal fitting 15 is set to the horizontal split work rod 1 by the posture change holding means 30 so that the axial direction of the metal fitting side connection portion 19 of the hanging metal fitting 15 is set to the horizontal sideways tilting posture. Perform connection work.

姿勢変更保持手段30は、上部に吊り装置T側に係合する上側連結部31を設け、下部に吊り金具15側の金具側係合部32に係合する下側連結部33を有して構成しているので、姿勢変更保持手段30の上側連結部31を吊り装置Tに係合させ、姿勢変更保持手段30の下側連結部33を吊り金具15の金具側係合部32に係合させると、吊り金具15は横向き姿勢で吊り装置Tに吊り下げられ、横倒れの姿勢の分割作業ロッド1に吊り金具15の金具側接続部19を容易に接続できる。 The posture change holding means 30 is provided with an upper connecting portion 31 engaged with the suspension device T side at the upper portion, and has a lower connecting portion 33 engaging with the metal fitting side engaging portion 32 on the hanging metal fitting 15 side at the lower portion. Since it is configured, the upper connecting portion 31 of the posture change holding means 30 is engaged with the suspension device T, and the lower connecting portion 33 of the posture change holding means 30 is engaged with the metal fitting side engaging portion 32 of the hanging metal fitting 15. Then, the hanging metal fitting 15 is suspended from the hanging device T in a sideways posture, and the metal fitting side connecting portion 19 of the hanging metal fitting 15 can be easily connected to the split work rod 1 in the sideways posture.

この場合、姿勢変更保持手段30は、吊り装置T側と吊り金具15側を連結する構成であればよく、構成は任意であり、一例を示すと、姿勢変更保持手段30は吊り装置T側に装着(係合)する上側連結部31と、吊り金具15側に装着(係合)する下側連結部33を有した連結部材30Aにて構成していればよく、図11Bの連結部材30Aでは、所謂マスターリンクと称される継ぎ目の無い「O」型形状の接続金具により構成しているので、上部の円弧部が上側連結部31となり、下部の円弧部が下側連結部33に構成されことになり、連結部材30Aの上側連結部31を吊り装置T側に吊り下げ、連結部材30Aの下側連結部33を吊り金具15の金具側係合部32に係合させ、この状態で、吊り装置Tを上昇させると、吊り金具15は吊り装置Tに横向きに吊り下げられる。 In this case, the posture change holding means 30 may be configured to connect the hanging device T side and the hanging metal fitting 15 side, and the configuration is arbitrary. For example, the posture change holding means 30 is located on the hanging device T side. It suffices to be composed of a connecting member 30A having an upper connecting portion 31 to be mounted (engaged) and a lower connecting portion 33 to be mounted (engaged) on the hanging metal fitting 15 side. Since it is composed of a seamless "O" -shaped connection fitting called a so-called master link, the upper arc portion is formed as the upper connecting portion 31 and the lower arc portion is formed as the lower connecting portion 33. Therefore, the upper connecting portion 31 of the connecting member 30A is suspended to the suspension device T side, and the lower connecting portion 33 of the connecting member 30A is engaged with the metal fitting side engaging portion 32 of the hanging metal fitting 15, and in this state, When the suspending device T is raised, the hanging metal fitting 15 is suspended sideways to the suspending device T.

このとき、金具側係合部32は横向き吊り金具15の重心Gの略上方位置に設けているので、吊り金具15を簡単に横向き姿勢に保持できる。
すなわち、姿勢変更保持手段30の連結部材30Aが取り付けられる金具側係合部32は横向き吊り金具15の重心Gの略上方位置に設けているので、姿勢変更保持手段30の連結部材30Aのみにより吊り金具15を吊り装置Tに横向きに吊り下げることができ、簡素な構成で横向き姿勢の分割作業ロッド1に吊り金具15の姿勢を合わせられる。
また、金具側係合部32は、一例として、突起36により係合溝37を形成して構成しているので、仮に、例えば、図18のように、吊り装置Tに係合部材21により吊り金具15を吊り下げていても、吊り装置Tを下降させて、吊り金具15を横向きにし、この状態で、吊り金具15の金具側係合部32に姿勢変更保持手段30の連結部材30Aの下側連結部33を係合させれば、吊り金具15を横向き姿勢に保持できる。
At this time, since the metal fitting side engaging portion 32 is provided at a position substantially above the center of gravity G of the horizontal hanging metal fitting 15, the hanging metal fitting 15 can be easily held in the horizontal posture.
That is, since the metal fitting side engaging portion 32 to which the connecting member 30A of the posture change holding means 30 is attached is provided at a position substantially above the center of gravity G of the lateral hanging metal fitting 15, it is suspended only by the connecting member 30A of the posture change holding means 30. The metal fitting 15 can be hung sideways from the suspension device T, and the posture of the hanging metal fitting 15 can be adjusted to the split work rod 1 in the horizontal posture with a simple configuration.
Further, since the metal fitting side engaging portion 32 is configured by forming an engaging groove 37 by the protrusion 36 as an example, it is tentatively suspended by the engaging member 21 on the suspending device T, for example, as shown in FIG. Even if the metal fitting 15 is suspended, the suspension device T is lowered to turn the hanging metal fitting 15 sideways, and in this state, the posture change holding means 30 is under the connecting member 30A on the metal fitting side engaging portion 32 of the hanging metal fitting 15. By engaging the side connecting portion 33, the hanging metal fitting 15 can be held in the sideways posture.

金具側係合部32は係合溝37を有していれば形状は任意であるが、図11(A)の起立姿勢状態の吊り金具15を基準に下向きに係合溝37を形成した金具側係合部32では、図11(A)において右側から姿勢変更保持手段30の下側連結部33を係合溝37に係合させると、吊り金具15の横向き姿勢を保持できる。
同様に、図13の起立姿勢状態の吊り金具15を基準に上向きに係合溝37を形成した金具側係合部32では、図13において左側から姿勢変更保持手段30の下側連結部33を係合溝37に係合させると、吊り金具15の横向き姿勢を保持できる。
同様に、図14の起立姿勢状態の吊り金具15を基準に左右方向の左右いずれかの方向に係合溝37を開口させて形成した金具側係合部32では、図14において奥側あるいは手前側から係合溝37に姿勢変更保持手段30の下側連結部33を係合させると、吊り金具15の横向き姿勢を保持できる。
The shape of the metal fitting side engaging portion 32 is arbitrary as long as it has the engaging groove 37, but the metal fitting having the engaging groove 37 formed downward with reference to the hanging metal fitting 15 in the upright posture in FIG. 11 (A). In the side engaging portion 32, when the lower connecting portion 33 of the posture change holding means 30 is engaged with the engaging groove 37 from the right side in FIG. 11A, the lateral posture of the hanging metal fitting 15 can be held.
Similarly, in the metal fitting side engaging portion 32 in which the engaging groove 37 is formed upward with reference to the hanging metal fitting 15 in the upright posture in FIG. 13, the lower connecting portion 33 of the posture change holding means 30 is provided from the left side in FIG. When engaged with the engaging groove 37, the sideways posture of the hanging metal fitting 15 can be maintained.
Similarly, in the metal fitting side engaging portion 32 formed by opening the engaging groove 37 in either the left or right direction in the left-right direction with respect to the hanging metal fitting 15 in the upright posture of FIG. 14, the metal fitting side engaging portion 32 is formed in the back side or the front side in FIG. By engaging the lower connecting portion 33 of the posture change holding means 30 with the engaging groove 37 from the side, the lateral posture of the hanging metal fitting 15 can be held.

また、図15の姿勢変更保持手段30では、吊り装置Tに予め吊り下げた接続金具35(第二連結部材30B)に、一対の「U」の字形状の半割部材38を軸形状の連結軸部材39により連結して「O」の形状に形成した第一連結部材30Aを連結し、この第一連結部材30Aの下側半割部材38の下側連結部33を金具側係合部32に係合させて、吊り金具15を横向きの吊り姿勢に保持する。
また、図18のように、予め吊り装置Tに接続金具35(第二連結部材30B)を吊設しておき、この接続金具35(第二連結部材30B)に係合部材21を予め挿通させて吊り金具15が起立姿勢で吊り装置Tに吊り下げた状態とし、一旦、吊り下げた吊り金具15を吊り装置Tにより下降させて地面に置く等の任意の方法により横向きにし、この状態で、横向きにした吊り金具15の金具側係合部32に吊り装置Tの接続金具35(第二連結部材30B)に予め挿通させておいた半割部材38の連結部材30Aを係合させると、吊り金具15は横向きに吊り下げられて、図12の状態になる。
Further, in the posture change holding means 30 of FIG. 15, a pair of "U" -shaped half-split members 38 are axially connected to a connection fitting 35 (second connecting member 30B) suspended in advance from the suspension device T. The first connecting member 30A formed in the shape of "O" by being connected by the shaft member 39 is connected, and the lower connecting portion 33 of the lower half split member 38 of the first connecting member 30A is connected to the metal fitting side engaging portion 32. To hold the hanging metal fitting 15 in a lateral hanging posture.
Further, as shown in FIG. 18, the connecting metal fitting 35 (second connecting member 30B) is suspended from the suspending device T in advance, and the engaging member 21 is inserted into the connecting metal fitting 35 (second connecting member 30B) in advance. The hanging metal fitting 15 is suspended from the hanging device T in an upright position, and once the hanging metal fitting 15 is lowered by the hanging device T and placed on the ground, the hanging metal fitting 15 is turned sideways by any method. When the connecting member 30A of the half-split member 38 previously inserted into the connecting metal fitting 35 (second connecting member 30B) of the hanging device T is engaged with the metal fitting side engaging portion 32 of the hanging metal fitting 15 turned sideways, the suspension is suspended. The metal fitting 15 is suspended sideways to be in the state shown in FIG.

図19の実施形態では、姿勢変更保持手段30を、逆さ「U」の字形状の一対の係合脚40の下部を軸部材41により連結して連結部材30Aを構成し、連結部材30Aの一対の係合脚40を吊り装置Tに直接吊り下げ、連結部材30Aの軸部材41は吊り金具15側に設けた透孔43により形成した金具側係合部32に挿通させた構成としているので、予め、連結部材30Aは吊り金具15の金具側係合部32の透孔43に軸部材41を挿通し、この軸部材41に係合脚40の下部を取付け、この係合脚40を起立させて吊り装置Tに係合させて吊り下げる。
なお、吊り装置Tに吊り下げた状態の連結部材30Aの係合脚40に、金具側係合部32の透孔43に挿通した軸部材41を挿通してもよく、作業順序は任意である。
In the embodiment of FIG. 19, the posture change holding means 30 is connected to the lower portions of a pair of upside-down "U" -shaped engaging legs 40 by a shaft member 41 to form a connecting member 30A, and a pair of connecting members 30A. Since the engaging leg 40 is directly suspended from the suspension device T and the shaft member 41 of the connecting member 30A is inserted into the metal fitting side engaging portion 32 formed by the through hole 43 provided on the hanging metal fitting 15 side, it is configured in advance. In the connecting member 30A, the shaft member 41 is inserted into the through hole 43 of the metal fitting side engaging portion 32 of the hanging metal fitting 15, the lower portion of the engaging leg 40 is attached to the shaft member 41, and the engaging leg 40 is erected to elevate the hanging device T. Engage in and hang.
The shaft member 41 inserted through the through hole 43 of the metal fitting side engaging portion 32 may be inserted into the engaging leg 40 of the connecting member 30A suspended from the suspending device T, and the work order is arbitrary.

図20の別の実施形態では、吊り装置Tの接続金具35(第二連結部材30B)にリング部材44(連結部材30A)により中間フック45(第三連結部材30C)を予め吊設しているので、吊り金具15側の金具側係合部32を軸部材により逆さ「U」の字形状に形成した係合孔46に、中間フック45を係合させて吊り金具15を横向きに吊り下げ、吊り金具15の横向き姿勢を保持する。
なお、本発明では、姿勢変更保持手段30のみによって吊り金具15の横向き姿勢を保持するが、係合部材21と姿勢変更保持手段30とにより吊り金具15の横向き姿勢を保持してもよい。
In another embodiment of FIG. 20, the intermediate hook 45 (third connecting member 30C) is suspended in advance by the ring member 44 (connecting member 30A) on the connecting fitting 35 (second connecting member 30B) of the suspending device T. Therefore, the hanging metal fitting 15 is hung sideways by engaging the intermediate hook 45 with the engaging hole 46 in which the metal fitting side engaging portion 32 on the hanging metal fitting 15 side is formed in an inverted “U” shape by the shaft member. The sideways posture of the hanging metal fitting 15 is maintained.
In the present invention, the sideways posture of the hanging metal fitting 15 is held only by the posture change holding means 30, but the sideways posture of the hanging metal fitting 15 may be held by the engaging member 21 and the posture change holding means 30.

また、上述した作業手順は、任意であり、姿勢変更保持手段30を別途用意しておき、吊り金具15を横向き姿勢にしておいて、吊り金具15の金具側係合部32に姿勢変更保持手段30の連結部材30Aの下側連結部33を係合させ、次に、吊り装置T側の接続金具35(第二連結部材30B)に第一連結部材30Aの上側連結部31を係合させてもよい。
また、一部の図面では理解を容易にするために、吊り金具15の係合部材21の図示は省略しているが、これにより、本発明の構成は限定されない。
Further, the above-mentioned work procedure is optional, and the posture change holding means 30 is separately prepared, the hanging metal fitting 15 is set to the sideways posture, and the posture changing holding means is attached to the metal fitting side engaging portion 32 of the hanging metal fitting 15. The lower connecting portion 33 of the connecting member 30A of 30 is engaged, and then the upper connecting portion 31 of the first connecting member 30A is engaged with the connecting fitting 35 (second connecting member 30B) on the suspension device T side. May be good.
Further, in some drawings, the engaging member 21 of the hanging metal fitting 15 is not shown for ease of understanding, but this does not limit the configuration of the present invention.

また、姿勢変更保持手段30を、連結部材30Aと接続金具35(第二連結部材30B)等により種々の形状の連結部材を用意し、複数の連結部材を適宜選択して組み合わせて構成してもよく、吊り装置Tに吊り金具15の吊り下げ姿勢を変更できれば、構成は任意である。
しかして、姿勢変更保持手段30により横向きに吊り下げた吊り金具15の金具側接続部19を分割作業ロッド1の上側接続部10に接続すると、姿勢変更保持手段30の下側連結部33を金具側係合部32から外し、次に、姿勢変更保持手段30による姿勢保持状態を解除し、吊り金具15と分割作業ロッド1を、吊り装置Tにより上昇させて運搬し、運搬した分割作業ロッド1の下側接続部11を別途用意した分割作業ロッド1の上側接続部10に接続し、次に、分割作業ロッド1の上側接続部10から吊り金具15を取り外し、取り外した吊り金具15を、前記のように姿勢変更保持手段30により横向き姿勢に変更保持して次の接続作業用の別の横向きの分割作業ロッド1に接続し、これを反復して、複数の分割作業ロッド1を接続して土木作業に使用する所望長さの作業ロッドRとする。
Further, the posture change holding means 30 may be configured by preparing connecting members having various shapes by means of a connecting member 30A, a connecting metal fitting 35 (second connecting member 30B), or the like, and appropriately selecting and combining a plurality of connecting members. Well, if the hanging posture of the hanging metal fitting 15 can be changed to the hanging device T, the configuration is arbitrary.
Then, when the metal fitting side connecting portion 19 of the hanging metal fitting 15 suspended sideways by the posture change holding means 30 is connected to the upper connecting portion 10 of the split work rod 1, the lower connecting portion 33 of the posture changing holding means 30 is connected to the metal fitting. The split work rod 1 is disengaged from the side engaging portion 32, then the posture holding state by the posture change holding means 30 is released, and the hanging metal fitting 15 and the split work rod 1 are lifted and carried by the hanging device T. The lower connecting portion 11 is connected to the upper connecting portion 10 of the separately prepared split work rod 1, then the hanging bracket 15 is removed from the upper connecting portion 10 of the split work rod 1, and the removed hanging bracket 15 is attached to the above. By changing and holding the posture to the sideways posture by the posture change holding means 30, the rod 1 is connected to another sideways split work rod 1 for the next connection work, and this is repeated to connect the plurality of split work rods 1. A work rod R having a desired length used for civil engineering work.

1…分割作業ロッド、2…掘削装置、3…ベースマシン、4…リーダー、5…回転駆動部、6…回転軸体、10…上側接続部、11…下側接続部、15…吊り金具、16…ワイヤー、17…吊用フック、18…吊用取付部、19…金具側接続部、20…挿通孔、21…係合部材、22…係合部、23…軸部材、25…嵌合穴、26…係合溝、27…係合ピン、28…ピン挿入孔、30…姿勢変更保持手段、30A…連結部材(第一連結部材)、30B…第二連結部材、30C…第三連結部材、31…上側連結部、32…金具側係合部、33…下側連結部、35…接続金具、36…突起、37…係合溝、38…半割部材、39…連結軸部材、40…係合脚、41…軸部材、43…透孔、44…リング部材、45…中間フック、48…キー溝、49…係合溝、T…吊り装置、R…作業ロッド。 1 ... split work rod, 2 ... excavator, 3 ... base machine, 4 ... leader, 5 ... rotary drive unit, 6 ... rotary shaft body, 10 ... upper connection part, 11 ... lower connection part, 15 ... hanging bracket, 16 ... Wire, 17 ... Suspension hook, 18 ... Suspension mounting part, 19 ... Metal fitting side connection part, 20 ... Insertion hole, 21 ... Engagement member, 22 ... Engagement part, 23 ... Shaft member, 25 ... Fitting Hole, 26 ... engaging groove, 27 ... engaging pin, 28 ... pin insertion hole, 30 ... posture change holding means, 30A ... connecting member (first connecting member), 30B ... second connecting member, 30C ... third connecting Member, 31 ... upper connecting part, 32 ... metal fitting side engaging part, 33 ... lower connecting part, 35 ... connecting metal fitting, 36 ... protrusion, 37 ... engaging groove, 38 ... half split member, 39 ... connecting shaft member, 40 ... engaging legs, 41 ... shaft members, 43 ... through holes, 44 ... ring members, 45 ... intermediate hooks, 48 ... key grooves, 49 ... engaging grooves, T ... hanging devices, R ... working rods.

Claims (8)

所定長さを有して形成し、その上下両端に継ぎ足すための上側接続部10と下側接続部11とをそれぞれ設けた分割作業ロッド1を、長さ方向に継ぎ足して土木作業に使用される機器の作業ロッドRとし、この作業ロッドRとするために分割作業ロッド1の継ぎ足し分割作業に使用する吊り金具15を、分割作業ロッド1の上側接続部10と下側接続部11の何れかに接続する筒状の金具側接続部19と吊り金具15を吊り下げる吊り装置Tに吊り下げられる係合部材21を取付ける吊用取付部18とを設けて構成し、該吊り金具15は、接続する前の分割作業ロッド1の上側接続部10と下側接続部11の軸心方向と吊り金具15の金具側接続部19の軸心方向とが一致する姿勢に合うように、吊り装置Tに吊り下げられる吊り金具15の姿勢を変更保持する姿勢変更保持手段30を設けた吊り金具。 A split work rod 1 formed with a predetermined length and provided with an upper connecting portion 10 and a lower connecting portion 11 for adding to both upper and lower ends thereof is added in the length direction and used for civil engineering work. The work rod R of the equipment to be used is the work rod R, and the hanging metal fitting 15 used for the additional division work of the division work rod 1 to be the work rod R is either the upper connection portion 10 or the lower connection portion 11 of the division work rod 1. A tubular metal fitting side connection portion 19 to be connected to the metal fitting side and a suspension mounting portion 18 for mounting an engaging member 21 suspended by the suspension device T for suspending the suspension metal fitting 15 are provided, and the suspension metal fitting 15 is configured. Splitting work before connection The suspending device so that the axial direction of the upper connecting portion 10 and the lower connecting portion 11 of the rod 1 and the axial direction of the metal fitting side connecting portion 19 of the hanging metal fitting 15 match. A hanging metal fitting provided with a posture changing holding means 30 for changing and holding the posture of the hanging metal fitting 15 suspended from T. 請求項1において、前記姿勢変更保持手段30は、上部に設けた吊り装置T側に係合する上側連結部31、下部に設けた吊り金具15側の金具側係合部32に係合する下側連結部33をそれぞれ設けて構成した吊り金具。 In claim 1, the posture change holding means 30 engages with the upper connecting portion 31 that engages with the suspension device T side provided at the upper part and the metal fitting side engaging portion 32 on the hanging metal fitting 15 side provided at the lower part. A hanging metal fitting configured by providing each of the lower connecting portion 33. 請求項2において、前記姿勢変更保持手段30は、継ぎ目の無い「O」型形状に形成した吊り金具。 In claim 2, the posture change holding means 30 is a hanging metal fitting formed in a seamless "O" shape. 請求項2において、前記姿勢変更保持手段30は、一対の「U」の字形状の半割部材38を軸形状の連結軸部材39により連結して「O」の形状に形成した吊り金具。 In claim 2, the posture change holding means 30 is a hanging metal fitting formed by connecting a pair of "U" -shaped half-split members 38 with a shaft-shaped connecting shaft member 39 to form an "O" shape. 請求項1~請求項4の何れかにおいて、前記金具側係合部32は突起36により前記姿勢変更保持手段30が係合する係合溝37を形成して構成した吊り金具。 In any one of claims 1 to 4, the metal fitting side engaging portion 32 is a hanging metal fitting formed by forming an engaging groove 37 with which the posture change holding means 30 is engaged by a protrusion 36. 請求項1~請求項5の何れかにおいて、前記姿勢変更保持手段30は、吊り金具15側に取付ける連結部材30Aと、前記吊り装置T側に取付けた第二連結部材30Bとにより構成した吊り金具。 In any one of claims 1 to 5, the posture change holding means 30 is a hanging metal fitting composed of a connecting member 30A attached to the hanging metal fitting 15 side and a second connecting member 30B attached to the hanging device T side. .. 請求項1~請求項6の何れかにおいて、前記姿勢変更保持手段30の下側連結部33が係合する吊り金具15側の金具側係合部32は前記吊り金具15を横向き姿勢とした状態の重心Gの略上方に配置した吊り金具。 In any one of claims 1 to 6, the metal fitting side engaging portion 32 on the hanging metal fitting 15 side with which the lower connecting portion 33 of the posture change holding means 30 engages is in a state in which the hanging metal fitting 15 is in a sideways posture. A hanging bracket placed approximately above the center of gravity G of. 吊り装置Tにより昇降する接続金具35に吊り金具15の吊用取付部18の挿通孔20に挿通した係合部材21を係合させて、吊り金具15を起立状態に吊り下げ、次に、一旦、吊り下げた吊り金具15を吊り装置Tにより下降させて吊り金具15の筒状の金具側接続部19の軸心方向が水平方向となる横向き姿勢とし、この状態で、吊り金具15の金具側係合部32に取付けた姿勢変更保持手段30の上側連結部31を前記接続金具35に係合させ、吊り金具15の横向き姿勢を保持し、この状態で、吊り装置Tにより吊り金具15の金具側接続部19を横向き姿勢の分割作業ロッド1の下側接続部11に接近移動させて接続し、次に、姿勢変更保持手段30による吊り金具15の姿勢保持状態を解除し、吊り金具15と分割作業ロッド1を、吊り装置Tにより上昇させて運搬し、運搬した分割作業ロッド1の下側接続部11を別途用意した分割作業ロッド1の上側接続部10に接続し、次に、分割作業ロッド1の上側接続部10から吊り金具15を取り外し、取り外した吊り金具15を、前記のように姿勢変更保持手段30により横向き姿勢に変更保持して次の接続作業用の別の横向きの分割作業ロッド1に接続し、これを反復して、複数の分割作業ロッド1を接続して土木作業に使用する所望長さの作業ロッドRとする吊り金具の使用方法。 The engaging member 21 inserted into the insertion hole 20 of the hanging mounting portion 18 of the hanging metal fitting 15 is engaged with the connecting metal fitting 35 which is raised and lowered by the hanging device T, and the hanging metal fitting 15 is suspended in an upright state. The suspended hanging metal fitting 15 is lowered by the hanging device T to take a horizontal posture in which the axial direction of the tubular metal fitting side connecting portion 19 of the hanging metal fitting 15 is horizontal, and in this state, the metal fitting side of the hanging metal fitting 15 is set. The upper connecting portion 31 of the posture change holding means 30 attached to the engaging portion 32 is engaged with the connecting metal fitting 35 to hold the lateral posture of the hanging metal fitting 15, and in this state, the hanging metal fitting 15 is held by the hanging device T. The metal fitting side connection portion 19 is moved closer to and connected to the lower connection portion 11 of the split work rod 1 in the sideways posture, and then the posture holding state of the hanging metal fitting 15 by the posture change holding means 30 is released, and the hanging metal fitting 15 is released. The split work rod 1 is lifted and transported by the suspension device T, and the lower connection portion 11 of the transported split work rod 1 is connected to the upper connection portion 10 of the separately prepared split work rod 1, and then the split work rod 1 is divided. The hanging metal fitting 15 is removed from the upper connecting portion 10 of the work rod 1, and the removed hanging metal fitting 15 is changed and held in the sideways posture by the posture change holding means 30 as described above, and another horizontal division for the next connection work is performed. A method of using a hanging metal fitting that connects to a work rod 1 and repeats this to connect a plurality of split work rods 1 to form a work rod R having a desired length used for civil engineering work.
JP2017166942A 2017-08-31 2017-08-31 How to use hanging brackets and hanging brackets Active JP7030318B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017166942A JP7030318B2 (en) 2017-08-31 2017-08-31 How to use hanging brackets and hanging brackets

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017166942A JP7030318B2 (en) 2017-08-31 2017-08-31 How to use hanging brackets and hanging brackets

Publications (2)

Publication Number Publication Date
JP2019043709A JP2019043709A (en) 2019-03-22
JP7030318B2 true JP7030318B2 (en) 2022-03-07

Family

ID=65816112

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017166942A Active JP7030318B2 (en) 2017-08-31 2017-08-31 How to use hanging brackets and hanging brackets

Country Status (1)

Country Link
JP (1) JP7030318B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000502648A (en) 1995-12-22 2000-03-07 フレノーリック フォルヴァルトニングス アーベー Lifting hook
JP2000104478A (en) 1998-09-28 2000-04-11 Sanwa Kizai Co Ltd Hanging device of excavation rod in excavator
JP2000145348A (en) 1998-11-09 2000-05-26 Sanwa Kizai Co Ltd Suspension fittings for excavation rod
JP2009091788A (en) 2007-10-05 2009-04-30 Motoegumi:Kk Coupling joint of excavation rod in excavator

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4320915A (en) * 1980-03-24 1982-03-23 Varco International, Inc. Internal elevator
JPH10258984A (en) * 1997-03-14 1998-09-29 Masaaki Mizuta Slinging implement

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000502648A (en) 1995-12-22 2000-03-07 フレノーリック フォルヴァルトニングス アーベー Lifting hook
JP2000104478A (en) 1998-09-28 2000-04-11 Sanwa Kizai Co Ltd Hanging device of excavation rod in excavator
JP2000145348A (en) 1998-11-09 2000-05-26 Sanwa Kizai Co Ltd Suspension fittings for excavation rod
JP2009091788A (en) 2007-10-05 2009-04-30 Motoegumi:Kk Coupling joint of excavation rod in excavator

Also Published As

Publication number Publication date
JP2019043709A (en) 2019-03-22

Similar Documents

Publication Publication Date Title
JP7463766B2 (en) Lifting device and reinforcing cage installation method
JP7030318B2 (en) How to use hanging brackets and hanging brackets
JP2010163823A (en) Frame for front attachment, and method for connecting front attachment using the same
JP6616261B2 (en) Hanging device and hanging method
JP2016217001A (en) Elevated structure construction method
JP2008248493A (en) Pile holder to be attached to ready-made piles
JP6387778B2 (en) Suspension jig used when building the core material of the underground continuous wall, the method of building the core material of the underground continuous wall, and the system for building the core material of the underground continuous wall
JP2014129706A (en) Burying method and pedestal for pipe for heat exchange
JP3192308U (en) Guide device for supporting pile driving
JP2006070437A (en) Digging earth retaining method and apparatus
JP4509844B2 (en) Vertical wall assembly apparatus and vertical wall construction method
KR102136557B1 (en) Jig for electroless plating
JP2017048649A (en) Suspended scaffolding, erection method for suspended scaffolding, and hanger
JP6649623B2 (en) Hose holding device for construction machinery
JP5747337B2 (en) Supporting anchor for supporting column and method for laying supporting anchor for supporting column
JP6628964B2 (en) Precast foundation position adjustment jig
CN116730164A (en) Working method of combined hanging beam
JP3108762U (en) Jig for jig
JP2007031133A (en) Hanging tool
JP7112231B2 (en) drilling rig stand
CN222757812U (en) Hoisting device between anti-slide piles
JP6364357B2 (en) Suspended piping method for buried pipes
CN214531877U (en) Building template for shear wall concrete construction
KR102780452B1 (en) Mainframe rotation mechanism and rotation method for excavation apparatus
JP2001234535A (en) Surface casing pulling apparatus

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200610

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210531

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210706

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210825

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220201

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220215

R150 Certificate of patent or registration of utility model

Ref document number: 7030318

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250