JP7032243B2 - Power demand management equipment and methods - Google Patents
[go: Go Back, main page]

JP7032243B2 - Power demand management equipment and methods - Google Patents

Power demand management equipment and methods Download PDF

Info

Publication number
JP7032243B2
JP7032243B2 JP2018104358A JP2018104358A JP7032243B2 JP 7032243 B2 JP7032243 B2 JP 7032243B2 JP 2018104358 A JP2018104358 A JP 2018104358A JP 2018104358 A JP2018104358 A JP 2018104358A JP 7032243 B2 JP7032243 B2 JP 7032243B2
Authority
JP
Japan
Prior art keywords
power
equipment
suppression control
power suppression
target
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018104358A
Other languages
Japanese (ja)
Other versions
JP2019213251A (en
Inventor
瑞 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Azbil Corp
Original Assignee
Azbil Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Azbil Corp filed Critical Azbil Corp
Priority to JP2018104358A priority Critical patent/JP7032243B2/en
Publication of JP2019213251A publication Critical patent/JP2019213251A/en
Application granted granted Critical
Publication of JP7032243B2 publication Critical patent/JP7032243B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/123Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、需要家の電力需要を管理する技術に係り、特に電力抑制制御の対象となる需要家の設備を選択する電力需要管理装置および方法に関するものである。 The present invention relates to a technique for managing a consumer's electric power demand, and more particularly to a power demand management device and a method for selecting a consumer's equipment to be subject to power suppression control.

電力を消費する装置の稼働が集中する等の理由で、消費電力量が一時的に上昇し、電力の供給が逼迫した状況になると、電力の供給量が不足する状況になることを避けるために、電力供給側の主体から、消費電力量の調整を求めるデマンド制御の要求(消費電力量の調整要求)を行うことが提案されている(特許文献1参照)。以下、特許文献1に開示されているように、電力供給側からの要請に応じて需要家側が電力の使用を抑制するよう電力消費パターンを変化させることを、デマンドレスポンスとする。 In order to avoid a situation where the power supply is insufficient when the power consumption temporarily rises due to the concentration of power consumption equipment and the power supply becomes tight. , The main body of the power supply side has proposed to make a demand control request (power consumption adjustment request) for adjusting the power consumption (see Patent Document 1). Hereinafter, as disclosed in Patent Document 1, changing the power consumption pattern so that the consumer side suppresses the use of power in response to a request from the power supply side is defined as a demand response.

このようなデマンドレスポンスにおいては、ビル(需要家)の予め決められた設備を停止することで、その分の電力削減量(ネガワット)を、需要家が実施した節電成果としてカウントすることができる。しかしながら、需要家側の設備が電力抑制開始の段階で、既に停止していたり、故障していたりした場合、電力会社に申請していた量のネガワットを達成できないケースがあった。 In such a demand response, by stopping the predetermined equipment of the building (customer), the amount of power reduction (negawatt) corresponding to that amount can be counted as the result of power saving carried out by the customer. However, there were cases where the amount of negawatts requested by the electric power company could not be achieved if the equipment on the consumer side had already stopped or failed at the stage of starting power suppression.

図4(A)、図4(B)は従来のデマンドレスポンスの問題点を説明する図である。図4(A)の例では、ビル100の、電力会社へ申請した電力抑制時の電力削減量が例えば200kWであり、電力抑制時に運転を停止したり抑制したりする設備101-A~101-Eが5つある例を示している。図4(A)の102は設備101-A~101-Eを制御するビル管理システム(BEMS:Building and Energy Management System)、103は電力会社と需要家との間で電力需要調整を行うアグリゲーションセンター104と通信を行うゲートウェイである。 4 (A) and 4 (B) are diagrams for explaining the problems of the conventional demand response. In the example of FIG. 4A, the amount of power reduction of the building 100 at the time of power suppression applied to the electric power company is, for example, 200 kW, and the equipment 101-A to 101-that stops or suppresses the operation at the time of power suppression. An example with five E's is shown. 102 in FIG. 4A is a building and energy management system (BEMS) that controls equipment 101-A to 101-E, and 103 is an aggregation center that adjusts power demand between an electric power company and a consumer. It is a gateway that communicates with 104.

一方、図4(B)は、実際の電力抑制時に5つの設備101-A~101-Eのうち設備101-C,101-Eが既に停止していた例を示している。各設備101-A~101-Eの使用電力をそれぞれ40kWとすると、設備101-C,101-Eが既に停止していたことにより、設備101-A,101-B,101-Dを停止することによる電力削減量は120kWとなる。したがって、電力会社へ申請した電力削減量200kWを達成できないことになる。 On the other hand, FIG. 4B shows an example in which facilities 101-C and 101-E of the five facilities 101-A to 101-E were already stopped at the time of actual power suppression. Assuming that the power consumption of each of the facilities 101-A to 101-E is 40 kW, the facilities 101-A, 101-B, and 101-D are stopped because the facilities 101-C and 101-E have already stopped. As a result, the amount of power reduction is 120 kW. Therefore, the power reduction amount of 200 kW applied to the electric power company cannot be achieved.

国際公開WO2016/186081International release WO2016 / 186081

本発明は、上記課題を解決するためになされたもので、目標の電力削減量を満たすように電力抑制制御の対象の設備を選択することが可能な電力需要管理装置および方法を提供することを目的とする。 The present invention has been made to solve the above problems, and to provide a power demand management device and a method capable of selecting equipment subject to power suppression control so as to satisfy a target power reduction amount. The purpose.

本発明の電力需要管理装置は、電力抑制の要請の対象となる需要家の設備の運転状況のデータを需要家側の管理システムから受信するように構成された設備データ受信部と、前記需要家の設備のうち標準の電力抑制制御グループとして決定された設備の情報と、電力抑制予備グループとして決定された設備の情報とを予め記憶するように構成された設備グループ記憶部と、前記標準の電力抑制制御グループに電力抑制制御を適用したときの電力削減量の総和を、前記需要家の目標の電力削減量として予め記憶するように構成された需要家情報記憶部と、電力抑制制御を実行する際に、前記運転状況のデータに基づいて、前記目標の電力削減量を前記標準の電力抑制制御グループで達成可能かどうかを判定するように構成された削減量達成可否判定部と、前記需要家の設備のうち、電力抑制制御の対象となる設備を選択するように構成された制御対象決定部と、この制御対象決定部によって決定された設備において電力抑制制御が実施されるよう前記需要家に対して要請するように構成された電力抑制要請部とを備え、前記制御対象決定部は、前記目標の電力削減量を前記標準の電力抑制制御グループで達成可能と判定された場合は、前記標準の電力抑制制御グループの全ての設備を電力抑制制御の対象として選択し、前記目標の電力削減量を達成不可能と判定された場合は、前記標準の電力抑制制御グループの正常運転中の全ての設備と、前記電力抑制予備グループの正常運転中の1乃至複数の設備とを組み合わせて、電力抑制制御の実施による電力削減量が、前記目標の電力削減量に最も近くなるように電力抑制制御の対象を選択することを特徴とするものである。 The power demand management device of the present invention includes an equipment data receiving unit configured to receive data on the operating status of the equipment of a consumer who is the target of a request for power suppression from a management system on the consumer side, and the consumer. The equipment group storage unit configured to store in advance the information of the equipment determined as the standard power suppression control group and the information of the equipment determined as the power suppression reserve group among the equipment of the above, and the standard power. Executes power suppression control with a consumer information storage unit configured to store in advance the total amount of power reduction when power suppression control is applied to the suppression control group as the target power reduction amount of the consumer. At that time, the reduction amount achievement determination unit configured to determine whether or not the target power reduction amount can be achieved by the standard power suppression control group based on the operation status data, and the consumer. Among the facilities of the above, the control target determination unit configured to select the equipment subject to the power suppression control and the equipment determined by the control target determination unit are used by the consumer to perform the power suppression control. The control target determination unit is provided with a power suppression request unit configured to request the control, and when it is determined that the target power reduction amount can be achieved by the standard power suppression control group, the standard If all the equipment of the power suppression control group of the above is selected as the target of the power suppression control and it is determined that the target power reduction amount cannot be achieved, all the equipment of the standard power suppression control group during normal operation is performed. The power suppression control is performed so that the power reduction amount due to the implementation of the power suppression control is closest to the target power reduction amount by combining the equipment and one or more facilities during normal operation of the power suppression spare group. It is characterized by selecting an object.

また、本発明の電力需要管理装置の1構成例において、前記削減量達成可否判定部は、前記標準の電力抑制制御グループの全ての設備が正常運転中の場合、前記目標の電力削減量を前記標準の電力抑制制御グループで達成可能と判定し、前記標準の電力抑制制御グループの設備のうち少なくとも1つが停止あるいは故障中の場合、前記目標の電力削減量を前記標準の電力抑制制御グループで達成不可能と判定することを特徴とするものである。
また、本発明の電力需要管理装置の1構成例において、前記設備グループ記憶部は、前記標準の電力抑制制御グループの設備の情報および前記電力抑制予備グループの設備の情報として、電力抑制制御の実施による各設備の電力削減量の情報を少なくとも記憶し、前記制御対象決定部は、前記目標の電力削減量を前記標準の電力抑制制御グループで達成不可能と判定された場合に、前記設備グループ記憶部に記憶された情報に基づいて、前記電力抑制制御の対象を選択することを特徴とするものである。
また、本発明の電力需要管理装置の1構成例は、前記電力抑制制御の対象として選択された設備に適用する電力抑制制御の内容を設備毎に決定するように構成された電力抑制制御決定部をさらに備え、前記電力抑制要請部は、前記電力抑制制御決定部によって決定された電力抑制制御が前記制御対象決定部によって決定された設備において実施されるよう前記需要家に対して要請することを特徴とするものである。
また、本発明の電力需要管理装置の1構成例において、前記設備グループ記憶部は、前記標準の電力抑制制御グループの設備の情報および前記電力抑制予備グループの設備の情報として、各設備に適用される電力抑制制御の内容を指定する情報を少なくとも記憶し、前記電力抑制制御決定部は、前記設備グループ記憶部に記憶されている情報に従って、前記電力抑制制御の対象の設備に適用する電力抑制制御の内容を決定することを特徴とするものである。
Further, in one configuration example of the power demand management device of the present invention, the reduction amount achievement determination unit determines the target power reduction amount when all the equipment of the standard power suppression control group is in normal operation. If it is determined that the standard power suppression control group is achievable and at least one of the facilities of the standard power suppression control group is stopped or out of order, the target power reduction amount is achieved by the standard power suppression control group. It is characterized by determining that it is impossible.
Further, in one configuration example of the power demand management device of the present invention, the equipment group storage unit implements power suppression control as information on the equipment of the standard power suppression control group and information on the equipment of the power suppression spare group. At least the information on the power reduction amount of each equipment is stored, and the control target determination unit stores the equipment group when it is determined that the target power reduction amount cannot be achieved by the standard power suppression control group. It is characterized in that the target of the power suppression control is selected based on the information stored in the unit.
Further, one configuration example of the power demand management device of the present invention is a power suppression control determination unit configured to determine the content of the power suppression control applied to the equipment selected as the target of the power suppression control for each equipment. Further, the power suppression request unit requests the consumer to perform the power suppression control determined by the power suppression control determination unit in the equipment determined by the control target determination unit. It is a feature.
Further, in one configuration example of the power demand management device of the present invention, the equipment group storage unit is applied to each equipment as information on the equipment of the standard power suppression control group and information on the equipment of the power suppression reserve group. At least the information that specifies the content of the power suppression control is stored, and the power suppression control determination unit applies the power suppression control to the equipment subject to the power suppression control according to the information stored in the equipment group storage unit. It is characterized by determining the contents of.

また、本発明の電力需要管理方法は、電力抑制制御を実行する際に、電力抑制の要請の対象となる需要家の設備の運転状況のデータを取得する第1のステップと、前記需要家の設備のうち標準の電力抑制制御グループとして決定された設備の情報を記憶する設備グループ記憶部と、前記標準の電力抑制制御グループに電力抑制制御を適用したときの電力削減量の総和を、前記需要家の目標の電力削減量として記憶する需要家情報記憶部と、前記運転状況のデータとを参照し、前記目標の電力削減量を前記標準の電力抑制制御グループで達成可能かどうかを判定する第2のステップと、前記需要家の設備のうち、電力抑制制御の対象となる設備を選択する第3のステップと、この第3のステップで決定した設備において電力抑制制御が実施されるよう前記需要家に対して要請する第4のステップとを含み、前記第3のステップは、前記目標の電力削減量を前記標準の電力抑制制御グループで達成可能と判定された場合は、前記標準の電力抑制制御グループの全ての設備を電力抑制制御の対象として選択し、前記目標の電力削減量を達成不可能と判定された場合は、前記標準の電力抑制制御グループとして決定された設備の情報の他に、電力抑制予備グループとして決定された設備の情報を予め記憶する前記設備グループ記憶部を参照し、前記標準の電力抑制制御グループの正常運転中の全ての設備と、前記電力抑制予備グループの正常運転中の1乃至複数の設備とを組み合わせて、電力抑制制御の実施による電力削減量が、前記目標の電力削減量に最も近くなるように電力抑制制御の対象を選択するステップを含むことを特徴とするものである。 Further, the electric power demand management method of the present invention includes a first step of acquiring data on the operating status of the equipment of a consumer who is the target of the request for electric power suppression when executing the electric power suppression control, and the above-mentioned consumer's electric power demand management method. The demand is the sum of the power reduction amount when the power suppression control is applied to the standard power suppression control group and the equipment group storage unit that stores the information of the equipment determined as the standard power suppression control group among the equipment. With reference to the consumer information storage unit that stores the target power reduction amount of the house and the operation status data, it is determined whether or not the target power reduction amount can be achieved by the standard power suppression control group. The demand so that the power suppression control is carried out in the second step, the third step of selecting the equipment subject to the power suppression control from the equipment of the consumer, and the equipment determined in the third step. The third step includes the fourth step of requesting the house, and the third step is the standard power suppression if it is determined that the target power reduction amount can be achieved by the standard power suppression control group. If all the equipment in the control group is selected as the target of power suppression control and it is determined that the target power reduction amount cannot be achieved, in addition to the information on the equipment determined as the standard power suppression control group. Refer to the equipment group storage unit that stores information of the equipment determined as the power suppression reserve group in advance, and all the equipment in the normal operation of the standard power suppression control group and the normal operation of the power suppression reserve group. It is characterized by including a step of selecting a target of power suppression control so that the amount of power reduction due to the implementation of power suppression control in combination with one or more of the facilities in the above is closest to the target power reduction amount. It is something to do.

本発明によれば、標準の電力抑制制御グループとして設備グループ記憶部に登録されている設備が電力抑制制御の開始以前に既に停止あるいは故障していた場合であっても、可能な限り目標の電力削減量を満たすように電力抑制制御を行うことが可能となる。 According to the present invention, even if the equipment registered in the equipment group storage unit as a standard power suppression control group has already stopped or failed before the start of the power suppression control, the target power as much as possible. It is possible to perform power suppression control so as to satisfy the reduction amount.

図1は、本発明の実施例に係るデマンドレスポンスシステムの構成を示すブロック図である。FIG. 1 is a block diagram showing a configuration of a demand response system according to an embodiment of the present invention. 図2は、本発明の実施例に係るデマンドレスポンスシステムの動作を説明するフローチャートである。FIG. 2 is a flowchart illustrating the operation of the demand response system according to the embodiment of the present invention. 図3は、本発明の実施例に係るデマンドレスポンスシステムの電力需要管理装置を実現するコンピュータの構成例を示すブロック図である。FIG. 3 is a block diagram showing a configuration example of a computer that realizes the power demand management device of the demand response system according to the embodiment of the present invention. 図4は、従来のデマンドレスポンスの問題点を説明する図である。FIG. 4 is a diagram illustrating a problem of conventional demand response.

以下、本発明の実施例について図面を参照して説明する。図1は本発明の実施例に係るデマンドレスポンスシステムの構成を示すブロック図である。デマンドレスポンスシステムは、電力抑制の要請の対象となる需要家の施設であるビル1と、電力会社と需要家との間で電力需要調整を行うアグリゲータ事業者が運営するアグリゲーションセンター2とから構成される。 Hereinafter, examples of the present invention will be described with reference to the drawings. FIG. 1 is a block diagram showing a configuration of a demand response system according to an embodiment of the present invention. The demand response system consists of a building 1 which is a facility of a consumer who is the target of a request for power suppression, and an aggregation center 2 operated by an aggregator operator who adjusts the power demand between the power company and the customer. To.

ビル1には、例えば空調機や照明などの多数の設備10-A~10-Iと、設備10-A~10-Iを制御するビル管理システム(BEMS)11と、ネットワークを介してアグリゲーションセンター2と通信を行う通信機器であるゲートウェイ12とが設けられている。 The building 1 includes a large number of facilities 10-A to 10-I such as air conditioners and lighting, a building management system (BEMS) 11 that controls the facilities 10-A to 10-I, and an aggregation center via a network. A gateway 12 which is a communication device that communicates with 2 is provided.

アグリゲーションセンター2には、電力需要管理装置20が設けられている。電力需要管理装置20は、設備データ受信部21と、設備データ記憶部22と、設備グループ記憶部23と、需要家情報記憶部24と、要請入力部25と、削減量達成可否判定部26と、制御対象決定部27と、電力抑制制御決定部28と、電力抑制要請部29とを備えている。 The aggregation center 2 is provided with a power demand management device 20. The electric power demand management device 20 includes an equipment data receiving unit 21, an equipment data storage unit 22, an equipment group storage unit 23, a consumer information storage unit 24, a request input unit 25, and a reduction amount achievement determination unit 26. A control target determination unit 27, a power suppression control determination unit 28, and a power suppression request unit 29 are provided.

電力需要管理装置20の設備グループ記憶部23には、ビル1(需要家)の標準の電力抑制制御グループとして需要家から予め申請された設備10-A~10-Eの識別情報と、これらの各設備10-A~10-Eに適用される電力抑制制御の内容を指定する制御情報と、この電力抑制制御の実施による各設備10-A~10-Eの電力削減量ER-A~ER-Eの情報と、前記電力抑制制御グループの代わりの電力抑制予備グループとして需要家から予め申請された設備10-F~10-Iの識別情報と、これらの各設備10-F~10-Iに適用される電力抑制制御の内容を指定する制御情報と、この電力抑制制御の実施による各設備10-F~10-Iの電力削減量ER-F~ER-Iの情報とが予め記憶されている。 In the equipment group storage unit 23 of the power demand management device 20, the identification information of the equipments 10-A to 10-E previously applied by the customer as the standard power suppression control group of the building 1 (customer) and their identification information are provided. Control information that specifies the content of the power suppression control applied to each equipment 10-A to 10-E, and the amount of power reduction of each equipment 10-A to 10-E by implementing this power suppression control ER-A to ER. -E information, identification information of equipment 10-F to 10-I previously applied by the consumer as a power suppression preliminary group instead of the power suppression control group, and each of these equipment 10-F to 10-I. The control information that specifies the content of the power suppression control applied to is stored in advance, and the information of the power reduction amounts ER-F to ER-I of each equipment 10-F to 10-I due to the implementation of this power suppression control is stored in advance. ing.

電力需要管理装置20の需要家情報記憶部24には、ビル1(需要家)の目標の電力削減量ERspの情報が予め記憶されている。この目標の電力削減量ERspは、設備グループ記憶部23に記憶されている標準の電力抑制制御グループの各設備10-A~10-Eの電力削減量ERの総和と等しい。したがって、設備10-A~10-Eの電力削減量ER-A~ER-Eと設備10-F~10-Iの電力削減量ER-F~ER-Iの総和は、目標の電力削減量ERspを上回るように設定されていることになる。 In the consumer information storage unit 24 of the power demand management device 20, information on the target power reduction amount ERsp of the building 1 (customer) is stored in advance. The target power reduction amount ERsp is equal to the total power reduction amount ER of each equipment 10-A to 10-E of the standard power suppression control group stored in the equipment group storage unit 23. Therefore, the sum of the power reduction amounts ER-A to ER-E of the equipment 10-A to 10-E and the power reduction amount ER-F to ER-I of the equipment 10-F to 10-I is the target power reduction amount. It will be set to exceed ERsp.

なお、目標の電力削減量ERspと各設備10-A~10-Iの電力削減量ERと各設備10-A~10-Iに適用される電力抑制制御の内容とは、予め需要家からの申請に応じて決定され、設備グループ記憶部23と需要家情報記憶部24とに登録されている。 The target power reduction amount ERsp, the power reduction amount ER of each facility 10-A to 10-I, and the content of the power suppression control applied to each facility 10-A to 10-I are previously determined by the consumer. It is determined according to the application and registered in the equipment group storage unit 23 and the consumer information storage unit 24.

ビル1に設けられたゲートウェイ12は、ビル管理システム11から設備10-A~10-Iの運転状況のデータを定期的に取得し、取得したデータをネットワークを介してアグリゲーションセンター2の電力需要管理装置20に送信する。運転状況のデータとしては、例えば設備10-A~10-Iの発停を示すデータ、設備10-A~10-Iの正常/異常(故障)を示すデータ、設備10-A~10-Iの使用電力を示すデータなどがある。電力需要管理装置20の設備データ受信部21は、ゲートウェイ12から定期的に送信されるデータを受信して設備データ記憶部22に格納する。 The gateway 12 provided in the building 1 periodically acquires the operation status data of the facilities 10-A to 10-I from the building management system 11, and manages the acquired data for the power demand of the aggregation center 2 via the network. It is transmitted to the device 20. The operating status data includes, for example, data indicating the start and stop of equipment 10-A to 10-I, data indicating normality / abnormality (failure) of equipment 10-A to 10-I, and equipment 10-A to 10-I. There is data showing the power consumption of. The equipment data receiving unit 21 of the power demand management device 20 receives data periodically transmitted from the gateway 12 and stores it in the equipment data storage unit 22.

図2は本実施例のデマンドレスポンスシステムの動作を説明するフローチャートである。電力需要管理装置20の要請入力部25は、電力会社からの電力抑制の要請をネットワークを介して受け付ける。
電力需要管理装置20は、要請入力部25が電力会社からの電力抑制の要請を受信すると(図2ステップS1においてYES)、ビル1(需要家)に要請する電力抑制制御の内容を以下のようにして決定する。
FIG. 2 is a flowchart illustrating the operation of the demand response system of this embodiment. The request input unit 25 of the electric power demand management device 20 receives a request for electric power suppression from an electric power company via a network.
When the request input unit 25 receives the power suppression request from the electric power company (YES in step S1 of FIG. 2), the electric power demand management device 20 requests the building 1 (customer) for the electric power suppression control as follows. To decide.

最初に、電力需要管理装置20の削減量達成可否判定部26は、需要家情報記憶部24に記憶された目標の電力削減量ERspを、標準の電力抑制制御グループで達成可能かどうかを判定する。具体的には、削減量達成可否判定部26は、設備グループ記憶部23に標準の電力抑制制御グループとして記憶された各設備10-A~10-Eの最新の運転状況のデータを設備データ記憶部22から取得する(図2ステップS2)。そして、削減量達成可否判定部26は、各設備10-A~10-Eが正常運転中であれば、目標の電力削減量ERspを標準の電力抑制制御グループで達成可能と判定する(図2ステップS3)。 First, the power reduction amount achievement determination unit 26 of the power demand management device 20 determines whether the target power reduction amount ERsp stored in the consumer information storage unit 24 can be achieved by the standard power suppression control group. .. Specifically, the reduction amount achievement determination unit 26 stores the latest operation status data of each equipment 10-A to 10-E stored as a standard power suppression control group in the equipment group storage unit 23. Obtained from unit 22 (step S2 in FIG. 2). Then, the reduction amount achievement determination unit 26 determines that the target power reduction amount ERsp can be achieved by the standard power suppression control group if each of the facilities 10-A to 10-E is in normal operation (FIG. 2). Step S3).

電力需要管理装置20の制御対象決定部27は、目標の電力削減量ERspを標準の電力抑制制御グループで達成可能と判定された場合(ステップS3においてYES)、標準の電力抑制制御グループに属する設備10-A~10-Eを電力抑制制御の対象として選択する(図2ステップS4)。 When the control target determination unit 27 of the power demand management device 20 determines that the target power reduction amount ERsp can be achieved by the standard power suppression control group (YES in step S3), the equipment belongs to the standard power suppression control group. 10-A to 10-E are selected as targets for power suppression control (step S4 in FIG. 2).

電力需要管理装置20の電力抑制制御決定部28は、電力抑制制御の対象として選択された設備10-A~10-Eに適用する電力抑制制御の内容を、設備グループ記憶部23に記憶されている制御情報に基づいて決定する(図2ステップS5)。 The power suppression control determination unit 28 of the power demand management device 20 stores the contents of the power suppression control applied to the equipment 10-A to 10-E selected as the target of the power suppression control in the equipment group storage unit 23. It is determined based on the existing control information (step S5 in FIG. 2).

設備グループ記憶部23に記憶されている電力抑制制御の種類としては、例えば空調機や照明などの設備の発停(ON/OFF)制御がある。また、別の電力抑制制御の種類として、例えば空調機などのように運転中に制御量(例えば室内温度)を制御設定値(例えば室内温度設定値)に追従させる設定値追従制御が行われる設備において、制御設定値を使用電力が減少する指定方向に指定幅だけ変更する設定値制御がある。設備グループ記憶部23には、このような電力抑制制御の内容を指定する制御情報が予め設備毎に登録されている。
電力抑制制御決定部28は、設備グループ記憶部23に記憶されている制御情報に従って、各設備10-A~10-Eに適用する電力抑制制御の内容を決定すればよい。
As a type of power suppression control stored in the equipment group storage unit 23, for example, there is start / stop (ON / OFF) control of equipment such as an air conditioner and lighting. In addition, as another type of power suppression control, equipment such as an air conditioner that performs set value tracking control that makes a controlled amount (for example, indoor temperature) follow a control set value (for example, indoor temperature set value) during operation. In, there is a set value control that changes the control set value by a specified width in a specified direction in which the power consumption is reduced. In the equipment group storage unit 23, control information for designating the content of such power suppression control is registered in advance for each equipment.
The power suppression control determination unit 28 may determine the content of the power suppression control to be applied to each of the equipments 10-A to 10-E according to the control information stored in the equipment group storage unit 23.

電力需要管理装置20の電力抑制要請部29は、制御対象決定部27と電力抑制制御決定部28とによって電力抑制制御の対象の設備とこれに適用する電力抑制制御の内容とが決定されると、ビル1のゲートウェイ12に対して電力抑制を要請する制御信号をネットワークを介して送信する(図2ステップS6)。 In the power suppression request unit 29 of the power demand management device 20, the control target determination unit 27 and the power suppression control determination unit 28 determine the equipment subject to the power suppression control and the content of the power suppression control applied thereto. , A control signal requesting power suppression is transmitted to the gateway 12 of the building 1 via the network (FIG. 2, step S6).

ステップS1で受信した、電力会社からの電力抑制の要請には、例えば電力抑制開始時間、電力抑制継続時間、電力削減量ERtotal等の内容が含まれている。一方、電力抑制要請部29から送信する制御信号には、電力抑制開始時間、電力抑制継続時間、電力抑制制御の対象の設備を指定する設備指定情報、この設備毎の電力抑制制御の内容を指定する制御指定情報などが含まれている。 The request for power suppression from the electric power company received in step S1 includes, for example, the contents such as the power suppression start time, the power suppression duration, and the power reduction amount ERtotal. On the other hand, in the control signal transmitted from the power suppression request unit 29, the power suppression start time, the power suppression duration, the equipment designation information for designating the equipment subject to the power suppression control, and the content of the power suppression control for each equipment are specified. Control specification information to be used is included.

ビル1のゲートウェイ12を介して電力需要管理装置20からの制御信号を受信したビル管理システム11は、受信した制御信号に応じて電力抑制制御を行う。
例えばビル管理システム11は、設備指定情報で電力抑制制御の対象として指定された設備(標準の電力抑制制御グループの場合には設備10-A~10-E)のうち、制御指定情報で発停制御が指定されている設備については、電力抑制開始時間になった時点で運転を停止させ、電力抑制継続時間の経過後に運転を再開させる。
The building management system 11 that has received the control signal from the power demand management device 20 via the gateway 12 of the building 1 performs power suppression control according to the received control signal.
For example, the building management system 11 starts and stops with the control designation information among the equipment designated as the target of the power suppression control in the equipment designation information (equipment 10-A to 10-E in the case of the standard power suppression control group). For equipment for which control is specified, the operation is stopped when the power suppression start time is reached, and the operation is restarted after the power suppression duration elapses.

また、ビル管理システム11は、電力抑制制御の対象として指定された設備のうち、制御指定情報で設定値制御が指定されている設備については、電力抑制開始時間になった時点で制御設定値を制御指定情報で指定された方向に指定された幅だけ変更し、電力抑制継続時間の経過後に制御設定値を元の値に戻す。
こうして、電力会社あるいはアグリゲータ事業者と需要家との間で予め取り決められた目標の電力削減量ERspを達成できるように電力抑制制御が行われる。
Further, among the equipment designated as the target of the power suppression control, the building management system 11 sets the control setting value at the time when the power suppression start time is reached for the equipment for which the set value control is specified in the control designation information. The width specified in the direction specified in the control specification information is changed, and the control setting value is returned to the original value after the power suppression duration has elapsed.
In this way, the power suppression control is performed so that the target power reduction amount ERsp previously agreed between the electric power company or the aggregator operator and the consumer can be achieved.

一方、電力需要管理装置20の削減量達成可否判定部26は、設備グループ記憶部23に標準の電力抑制制御グループとして記憶された各設備10-A~10-Eの最新の運転状況のデータを設備データ記憶部22から取得した結果、各設備10-A~10-Eのうち少なくとも1つが停止あるいは故障中の場合、目標の電力削減量ERspを標準の電力抑制制御グループで達成不可能と判定する(図2ステップS3においてNO)。 On the other hand, the reduction amount achievement determination unit 26 of the power demand management device 20 stores the latest operation status data of each equipment 10-A to 10-E stored as a standard power suppression control group in the equipment group storage unit 23. As a result of acquisition from the equipment data storage unit 22, if at least one of the equipment 10-A to 10-E is stopped or out of order, it is determined that the target power reduction amount ERsp cannot be achieved by the standard power suppression control group. (NO in step S3 of FIG. 2).

電力需要管理装置20の制御対象決定部27は、目標の電力削減量ERspを標準の電力抑制制御グループで達成不可能と判定された場合、設備グループ記憶部23に電力抑制予備グループとして記憶された各設備10-F~10-Iの最新の運転状況のデータを設備データ記憶部22から取得する(図2ステップS7)。 When the control target determination unit 27 of the power demand management device 20 determines that the target power reduction amount ERsp cannot be achieved by the standard power suppression control group, the control target determination unit 27 is stored in the equipment group storage unit 23 as a power suppression preliminary group. The latest operating status data of each equipment 10-F to 10-I is acquired from the equipment data storage unit 22 (step S7 in FIG. 2).

そして、制御対象決定部27は、標準の電力抑制制御グループの設備10-A~10-Eのうち正常運転中の全ての設備と、電力抑制予備グループの設備10-F~10-Iのうち正常運転中の1乃至複数の設備とを組み合わせて、電力抑制制御の実施による電力削減量が、目標の電力削減量ERsp以上で、かつ電力削減量ERspに最も近くなるように電力抑制制御の対象を選択する(図2ステップS8)。 Then, the control target determination unit 27 is among all the equipments of the standard power suppression control group 10-A to 10-E during normal operation and the equipments 10-F to 10-I of the power suppression reserve group. The target of power suppression control so that the amount of power reduction by implementing power suppression control in combination with one or more facilities during normal operation is equal to or greater than the target power reduction amount ERsp and is closest to the power reduction amount ERsp. Is selected (FIG. 2, step S8).

例えば標準の電力抑制制御グループに属する設備10-Cと10-Eとが、電力抑制制御の開始以前に何らかの理由で既に停止していたとする。そして、設備グループ記憶部23には、電力抑制制御の実施による設備10-Cの電力削減量ER-Cが30kW、設備10-Eの電力削減量ER-Eが40kWと登録されていたとする。目標の電力削減量ERsp=200kWであったとすれば、70kW分の電力削減量が足りないことになる。 For example, it is assumed that the facilities 10-C and 10-E belonging to the standard power suppression control group have already been stopped for some reason before the start of the power suppression control. Then, it is assumed that the power reduction amount ER-C of the equipment 10-C due to the implementation of the power suppression control is registered as 30 kW and the power reduction amount ER-E of the equipment 10-E is registered as 40 kW in the equipment group storage unit 23. If the target power reduction amount ERsp = 200 kW, the power reduction amount for 70 kW is insufficient.

一方、電力抑制予備グループに属する設備10-Fと10-Gとが正常運転中で、設備グループ記憶部23には、電力抑制制御の実施による設備10-Fの電力削減量ER-Fが30kW、設備10-Gの電力削減量ER-Gが40kWと登録されていたとする。 On the other hand, the equipments 10-F and 10-G belonging to the power suppression reserve group are operating normally, and the power reduction amount ER-F of the equipment 10-F due to the implementation of the power suppression control is 30 kW in the equipment group storage unit 23. It is assumed that the power reduction amount ER-G of the equipment 10-G is registered as 40 kW.

したがって、標準の電力抑制制御グループに属する設備10-A,10-B,10-Dと電力抑制予備グループに属する設備10-F,10-Gとを組み合わせて、電力抑制制御の対象として選択すれば、目標の電力削減量ERsp=200kWを達成できることになる。こうして、制御対象決定部27は、電力抑制制御の対象を選択する。 Therefore, the equipment 10-A, 10-B, 10-D belonging to the standard power suppression control group and the equipment 10-F, 10-G belonging to the power suppression preliminary group should be combined and selected as the target of the power suppression control. For example, the target power reduction amount ERsp = 200 kW can be achieved. In this way, the control target determination unit 27 selects the target of the power suppression control.

なお、制御対象決定部27は、設備10-A~10-Eのうち正常運転中の全ての設備に、設備10-F~10-Iのうち正常運転中の1乃至複数の設備を組み合わせたとしても、電力抑制制御の実施による電力削減量が、目標の電力削減量ERsp以上とならない場合には、電力抑制制御の実施による電力削減量が、電力削減量ERspに最も近くなるように電力抑制制御の対象を選択すればよい。 The control target determination unit 27 combines all the equipments 10-A to 10-E that are in normal operation with one or more of the equipments 10-F to 10-I that are in normal operation. Even so, if the amount of power reduction due to the implementation of power suppression control does not exceed the target power reduction amount ERsp, the power reduction amount due to the implementation of power suppression control is power suppression so as to be closest to the power reduction amount ERsp. The control target may be selected.

次に、電力需要管理装置20の電力抑制制御決定部28は、ステップS5と同様に、電力抑制制御の対象として選択された設備10-A,10-B,10-D,10-F,10-Gに適用する電力抑制制御の内容を、設備グループ記憶部23に記憶されている制御情報に従って決定する(図2ステップS9)。 Next, the power suppression control determination unit 28 of the power demand management device 20 is the equipment 10-A, 10-B, 10-D, 10-F, 10 selected as the target of the power suppression control, as in step S5. -The content of the power suppression control applied to G is determined according to the control information stored in the equipment group storage unit 23 (step S9 in FIG. 2).

電力需要管理装置20の電力抑制要請部29の動作はステップS6で説明したとおりである。
こうして、本実施例では、標準の電力抑制制御グループとして登録されている設備が電力抑制制御の開始以前に既に停止あるいは故障していた場合であっても、可能な限り目標の電力削減量ERspを満たすように電力抑制制御を行うことが可能となる。
The operation of the power suppression request unit 29 of the power demand management device 20 is as described in step S6.
Thus, in this embodiment, even if the equipment registered as the standard power suppression control group has already stopped or failed before the start of the power suppression control, the target power reduction amount ERsp is set as much as possible. It is possible to perform power suppression control so as to satisfy.

なお、本実施例では、ビル1のゲートウェイ12に対して電力抑制を要請する制御信号を送信するようにしているが、これに限るものではなく、電力抑制要請部29は、自動で電力抑制制御を実施しない需要家の既知の管理者に対して、電力抑制を要請する要請通知メールを送信するようにしてもよい。この要請通知メールには、電力抑制開始時間、電力抑制継続時間、電力抑制制御の対象の設備を指定する設備指定情報、この設備毎の電力抑制制御の内容を指定する制御指定情報などが記載されている。管理者は、受信した要請通知メールの内容に従って電力抑制制御を手動で実施することになる。 In this embodiment, a control signal requesting power suppression is transmitted to the gateway 12 of the building 1, but the present invention is not limited to this, and the power suppression request unit 29 automatically controls the power suppression. It is also possible to send a request notification mail requesting power reduction to a known administrator of a consumer who does not implement the above. In this request notification mail, the power suppression start time, the power suppression duration, the equipment designation information for specifying the equipment subject to the power suppression control, the control designation information for specifying the content of the power suppression control for each equipment, etc. are described. ing. The administrator will manually implement the power suppression control according to the content of the received request notification email.

また、本実施例では、1棟のビル1(需要家)を対象として説明したが、これに限るものではなく、複数の需要家を対象としてもよいことは言うまでもない。例えば電力会社から要請された電力削減量ERtotalが、単一の需要家の目標の電力削減量ERspを上回る場合には、単一の需要家で電力削減量ERtotalを満たすことができない。この場合、電力需要管理装置20は、複数の需要家を選択して、合計の電力削減量がERtotal以上になるようにすればよい。設備データ記憶部22と設備グループ記憶部23と需要家情報記憶部24には、上記で説明した情報が需要家毎に記憶されていることになる。こうして、図2で説明した処理を、選択した需要家毎に実施することにより、電力会社から要請された電力削減量ERtotalを維持することが可能となる。 Further, in this embodiment, the description has been made for one building 1 (customer), but the present invention is not limited to this, and it goes without saying that a plurality of customers may be targeted. For example, if the power reduction amount ERtotal requested by the electric power company exceeds the target power reduction amount ERsp of a single consumer, the power reduction amount ERtotal cannot be satisfied by a single consumer. In this case, the power demand management device 20 may select a plurality of consumers so that the total power reduction amount is ERtotal or more. The information described above is stored for each customer in the equipment data storage unit 22, the equipment group storage unit 23, and the consumer information storage unit 24. In this way, by carrying out the process described with reference to FIG. 2 for each selected consumer, it is possible to maintain the power reduction amount ERtotal requested by the power company.

本実施例で説明した電力需要管理装置20は、CPU(Central Processing Unit)、記憶装置及びインタフェースを備えたコンピュータと、これらのハードウェア資源を制御するプログラムによって実現することができる。このコンピュータの構成例を図3に示す。コンピュータは、CPU200と、記憶装置201と、インターフェース装置(以下、I/Fと略する)202とを備えている。I/F202には、設備データ受信部21のハードウェア、要請入力部25のハードウェア、電力抑制要請部29のハードウェア等が接続される。このようなコンピュータにおいて、本発明の電力需要管理方法を実現させるためのプログラムは記憶装置201に格納される。CPU200は、記憶装置201に格納されたプログラムに従って本実施例で説明した処理を実行する。 The power demand management device 20 described in this embodiment can be realized by a computer including a CPU (Central Processing Unit), a storage device, and an interface, and a program for controlling these hardware resources. An example of the configuration of this computer is shown in FIG. The computer includes a CPU 200, a storage device 201, and an interface device (hereinafter, abbreviated as I / F) 202. The hardware of the equipment data receiving unit 21, the hardware of the request input unit 25, the hardware of the power suppression request unit 29, and the like are connected to the I / F 202. In such a computer, a program for realizing the power demand management method of the present invention is stored in the storage device 201. The CPU 200 executes the process described in this embodiment according to the program stored in the storage device 201.

本発明は、電力抑制制御を実行する際に電力抑制制御の対象となる需要家の設備を選択する技術に適用することができる。 INDUSTRIAL APPLICABILITY The present invention can be applied to a technique of selecting equipment of a consumer who is a target of power suppression control when executing power suppression control.

1…ビル、2…アグリゲーションセンター、10-A~10-I…設備、11…ビル管理システム、12…ゲートウェイ、20…電力需要管理装置、21…設備データ受信部、22…設備データ記憶部、23…設備グループ記憶部、24…需要家情報記憶部、25…要請入力部、26…削減量達成可否判定部、27…制御対象決定部、28…電力抑制制御決定部、29…電力抑制要請部。 1 ... Building, 2 ... Aggregation Center, 10-A-10-I ... Equipment, 11 ... Building Management System, 12 ... Gateway, 20 ... Power Demand Management Device, 21 ... Equipment Data Receiver, 22 ... Equipment Data Storage Unit, 23 ... Equipment group storage unit, 24 ... Consumer information storage unit, 25 ... Request input unit, 26 ... Reduction amount achievement determination unit, 27 ... Control target determination unit, 28 ... Power suppression control determination unit, 29 ... Power suppression request Department.

Claims (6)

電力抑制の要請の対象となる需要家の設備の運転状況のデータを需要家側の管理システムから受信するように構成された設備データ受信部と、
前記需要家の設備のうち標準の電力抑制制御グループとして決定された設備の情報と、電力抑制予備グループとして決定された設備の情報とを予め記憶するように構成された設備グループ記憶部と、
前記標準の電力抑制制御グループに電力抑制制御を適用したときの電力削減量の総和を、前記需要家の目標の電力削減量として予め記憶するように構成された需要家情報記憶部と、
電力抑制制御を実行する際に、前記運転状況のデータに基づいて、前記目標の電力削減量を前記標準の電力抑制制御グループで達成可能かどうかを判定するように構成された削減量達成可否判定部と、
前記需要家の設備のうち、電力抑制制御の対象となる設備を選択するように構成された制御対象決定部と、
この制御対象決定部によって決定された設備において電力抑制制御が実施されるよう前記需要家に対して要請するように構成された電力抑制要請部とを備え、
前記制御対象決定部は、前記目標の電力削減量を前記標準の電力抑制制御グループで達成可能と判定された場合は、前記標準の電力抑制制御グループの全ての設備を電力抑制制御の対象として選択し、前記目標の電力削減量を達成不可能と判定された場合は、前記標準の電力抑制制御グループの正常運転中の全ての設備と、前記電力抑制予備グループの正常運転中の1乃至複数の設備とを組み合わせて、電力抑制制御の実施による電力削減量が、前記目標の電力削減量に最も近くなるように電力抑制制御の対象を選択することを特徴とする電力需要管理装置。
An equipment data receiver configured to receive data on the operating status of the equipment of the consumer who is the target of the request for power suppression from the management system on the consumer side.
The equipment group storage unit configured to store in advance the information of the equipment determined as the standard power suppression control group and the information of the equipment determined as the power suppression reserve group among the equipment of the consumer.
A consumer information storage unit configured to store in advance the total power reduction amount when the power suppression control is applied to the standard power suppression control group as the target power reduction amount of the consumer.
When executing the power suppression control, it is configured to determine whether or not the target power reduction amount can be achieved by the standard power suppression control group based on the operation status data. Department and
Among the above-mentioned consumer equipment, a control target determination unit configured to select equipment subject to power suppression control, and a control target determination unit.
It is provided with a power suppression request unit configured to request the consumer to perform power suppression control in the equipment determined by the control target determination unit.
When the control target determination unit determines that the target power reduction amount can be achieved by the standard power suppression control group, the control target determination unit selects all the facilities of the standard power suppression control group as the target of the power suppression control. If it is determined that the target power reduction amount cannot be achieved, all the equipment in the normal operation of the standard power suppression control group and one or more of the equipment in the normal operation of the power suppression spare group. A power demand management device characterized in that the target of power suppression control is selected so that the amount of power reduction due to the implementation of power suppression control in combination with equipment is closest to the target power reduction amount.
請求項1記載の電力需要管理装置において、
前記削減量達成可否判定部は、前記標準の電力抑制制御グループの全ての設備が正常運転中の場合、前記目標の電力削減量を前記標準の電力抑制制御グループで達成可能と判定し、前記標準の電力抑制制御グループの設備のうち少なくとも1つが停止あるいは故障中の場合、前記目標の電力削減量を前記標準の電力抑制制御グループで達成不可能と判定することを特徴とする電力需要管理装置。
In the power demand management device according to claim 1,
When all the equipment of the standard power suppression control group is operating normally, the reduction amount achievement determination unit determines that the target power reduction amount can be achieved by the standard power suppression control group, and determines that the standard power reduction control group can achieve the target power reduction amount. When at least one of the facilities of the power suppression control group is stopped or out of order, the power demand management device is characterized in that the target power reduction amount is determined to be unattainable by the standard power suppression control group.
請求項1または2記載の電力需要管理装置において、
前記設備グループ記憶部は、前記標準の電力抑制制御グループの設備の情報および前記電力抑制予備グループの設備の情報として、電力抑制制御の実施による各設備の電力削減量の情報を少なくとも記憶し、
前記制御対象決定部は、前記目標の電力削減量を前記標準の電力抑制制御グループで達成不可能と判定された場合に、前記設備グループ記憶部に記憶された情報に基づいて、前記電力抑制制御の対象を選択することを特徴とする電力需要管理装置。
In the power demand management device according to claim 1 or 2.
The equipment group storage unit stores at least information on the amount of power reduction of each equipment due to the implementation of power suppression control as information on the equipment of the standard power suppression control group and information on the equipment of the power suppression reserve group.
When it is determined that the target power reduction amount cannot be achieved by the standard power suppression control group, the control target determination unit determines the power suppression control based on the information stored in the equipment group storage unit. A power demand management device characterized by selecting a target.
請求項1乃至3のいずれか1項に記載の電力需要管理装置において、
前記電力抑制制御の対象として選択された設備に適用する電力抑制制御の内容を設備毎に決定するように構成された電力抑制制御決定部をさらに備え、
前記電力抑制要請部は、前記電力抑制制御決定部によって決定された電力抑制制御が前記制御対象決定部によって決定された設備において実施されるよう前記需要家に対して要請することを特徴とする電力需要管理装置。
In the power demand management device according to any one of claims 1 to 3.
Further provided with a power suppression control determination unit configured to determine the content of the power suppression control applied to the equipment selected as the target of the power suppression control for each equipment.
The power suppression requesting unit requests the consumer to perform the power suppression control determined by the power suppression control determination unit in the equipment determined by the control target determination unit. Demand management device.
請求項4記載の電力需要管理装置において、
前記設備グループ記憶部は、前記標準の電力抑制制御グループの設備の情報および前記電力抑制予備グループの設備の情報として、各設備に適用される電力抑制制御の内容を指定する情報を少なくとも記憶し、
前記電力抑制制御決定部は、前記設備グループ記憶部に記憶されている情報に従って、前記電力抑制制御の対象の設備に適用する電力抑制制御の内容を決定することを特徴とする電力需要管理装置。
In the power demand management device according to claim 4,
The equipment group storage unit stores at least information that specifies the content of the power suppression control applied to each equipment as the information of the equipment of the standard power suppression control group and the information of the equipment of the power suppression spare group.
The power suppression control determination unit is a power demand management device that determines the content of power suppression control applied to the equipment subject to the power suppression control according to the information stored in the equipment group storage unit.
電力抑制制御を実行する際に、電力抑制の要請の対象となる需要家の設備の運転状況のデータを取得する第1のステップと、
前記需要家の設備のうち標準の電力抑制制御グループとして決定された設備の情報を記憶する設備グループ記憶部と、前記標準の電力抑制制御グループに電力抑制制御を適用したときの電力削減量の総和を、前記需要家の目標の電力削減量として記憶する需要家情報記憶部と、前記運転状況のデータとを参照し、前記目標の電力削減量を前記標準の電力抑制制御グループで達成可能かどうかを判定する第2のステップと、
前記需要家の設備のうち、電力抑制制御の対象となる設備を選択する第3のステップと、
この第3のステップで決定した設備において電力抑制制御が実施されるよう前記需要家に対して要請する第4のステップとを含み、
前記第3のステップは、前記目標の電力削減量を前記標準の電力抑制制御グループで達成可能と判定された場合は、前記標準の電力抑制制御グループの全ての設備を電力抑制制御の対象として選択し、前記目標の電力削減量を達成不可能と判定された場合は、前記標準の電力抑制制御グループとして決定された設備の情報の他に、電力抑制予備グループとして決定された設備の情報を予め記憶する前記設備グループ記憶部を参照し、前記標準の電力抑制制御グループの正常運転中の全ての設備と、前記電力抑制予備グループの正常運転中の1乃至複数の設備とを組み合わせて、電力抑制制御の実施による電力削減量が、前記目標の電力削減量に最も近くなるように電力抑制制御の対象を選択するステップを含むことを特徴とする電力需要管理方法。
When executing the power suppression control, the first step of acquiring the data of the operation status of the equipment of the consumer who is the target of the power suppression request, and
The sum of the equipment group storage unit that stores the information of the equipment determined as the standard power suppression control group among the equipment of the consumer and the amount of power reduction when the power suppression control is applied to the standard power suppression control group. Whether or not the target power reduction amount can be achieved by the standard power suppression control group by referring to the consumer information storage unit that stores the power reduction amount as the target power reduction amount of the customer and the data of the operation status. The second step to determine
Among the above-mentioned consumer equipment, the third step of selecting the equipment subject to power suppression control, and
Including the fourth step of requesting the consumer to carry out the power suppression control in the equipment determined in the third step.
In the third step, when it is determined that the target power reduction amount can be achieved by the standard power suppression control group, all the facilities of the standard power suppression control group are selected as the target of the power suppression control. If it is determined that the target power reduction amount cannot be achieved, the information on the equipment determined as the standard power suppression control group and the information on the equipment determined as the power suppression reserve group are previously provided. With reference to the equipment group storage unit to be stored, all the equipment in the normal operation of the standard power suppression control group and one or more equipments in the normal operation of the power suppression preliminary group are combined to suppress power. A power demand management method comprising a step of selecting a target of power suppression control so that the power reduction amount due to the implementation of control is closest to the target power reduction amount.
JP2018104358A 2018-05-31 2018-05-31 Power demand management equipment and methods Active JP7032243B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018104358A JP7032243B2 (en) 2018-05-31 2018-05-31 Power demand management equipment and methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018104358A JP7032243B2 (en) 2018-05-31 2018-05-31 Power demand management equipment and methods

Publications (2)

Publication Number Publication Date
JP2019213251A JP2019213251A (en) 2019-12-12
JP7032243B2 true JP7032243B2 (en) 2022-03-08

Family

ID=68847108

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018104358A Active JP7032243B2 (en) 2018-05-31 2018-05-31 Power demand management equipment and methods

Country Status (1)

Country Link
JP (1) JP7032243B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7481180B2 (en) * 2020-07-01 2024-05-10 アズビル株式会社 Demand response control system and method
JP7715556B2 (en) * 2021-07-13 2025-07-30 アズビル株式会社 Power saving management device and power saving management program
JP7821720B2 (en) * 2022-12-14 2026-02-27 株式会社日立製作所 Electricity supply and demand adjustment system, electricity supply and demand adjustment method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014517365A (en) 2011-03-17 2014-07-17 コンサート インコーポレイテッド Method and apparatus for actively managing power consumption from one or more electrical facilities
WO2016186081A1 (en) 2015-05-19 2016-11-24 ダイキン工業株式会社 Management device for plurality of air conditioning devices
JP2017070131A (en) 2015-10-01 2017-04-06 株式会社日立製作所 Power demand adjustment plan management device and power demand adjustment plan management method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014517365A (en) 2011-03-17 2014-07-17 コンサート インコーポレイテッド Method and apparatus for actively managing power consumption from one or more electrical facilities
WO2016186081A1 (en) 2015-05-19 2016-11-24 ダイキン工業株式会社 Management device for plurality of air conditioning devices
JP2017070131A (en) 2015-10-01 2017-04-06 株式会社日立製作所 Power demand adjustment plan management device and power demand adjustment plan management method

Also Published As

Publication number Publication date
JP2019213251A (en) 2019-12-12

Similar Documents

Publication Publication Date Title
US8805976B2 (en) Network system, network management server, and configuration scheduling method, using summed processing time
JP7032243B2 (en) Power demand management equipment and methods
US10642236B2 (en) Electric power demand adjustment program management apparatus and electric power demand adjustment program management method
JP6378057B2 (en) Connection control device, connection control method, connection control system, and computer program
US20100008377A1 (en) Queue management based on message age
CN107885594A (en) Distributed resource scheduling method, scheduling node and access node
KR20200062887A (en) Apparatus and method for assuring quality of control operations of a system based on reinforcement learning.
CN111177160B (en) Service updating method, device, server and medium
US9727104B2 (en) Various PSUs adaptive server and method
JP6293577B2 (en) Equipment management system, equipment management apparatus and equipment management method
JP2018201263A (en) Server device, power control system, and computer program
JP2011113290A (en) Job flow management apparatus, management method and management program
JP6483592B2 (en) Controller and control system
JP5216299B2 (en) Order system
JP6825968B2 (en) Power management method and power management device
KR20170025496A (en) Method of guaranteeing service level of peer and server of enabling the method
CN111404653B (en) Monitoring service system, method and device
JP7185577B2 (en) Storage battery control system
JP5826434B2 (en) Wide area management system, wide area management apparatus, building management apparatus, and wide area management method
US20190266020A1 (en) Server Scheduling Tool
CN110097345A (en) A kind of job Shop Management System system and method
JP7204560B2 (en) Storage battery control system
CN114169803A (en) Robot scheduling method, device, equipment and storage medium
CN111864810A (en) Dynamic control method and device, storage medium, and electronic device for power consumption
CN109725992A (en) Method for processing business and its device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210324

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220113

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220201

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220224

R150 Certificate of patent or registration of utility model

Ref document number: 7032243

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250