Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7043433B2 - Protection control system - Google Patents
[go: Go Back, main page]

JP7043433B2 - Protection control system - Google Patents

Protection control system Download PDF

Info

Publication number
JP7043433B2
JP7043433B2 JP2019001399A JP2019001399A JP7043433B2 JP 7043433 B2 JP7043433 B2 JP 7043433B2 JP 2019001399 A JP2019001399 A JP 2019001399A JP 2019001399 A JP2019001399 A JP 2019001399A JP 7043433 B2 JP7043433 B2 JP 7043433B2
Authority
JP
Japan
Prior art keywords
information
unit
power
monitoring
server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019001399A
Other languages
Japanese (ja)
Other versions
JP2020114050A (en
Inventor
将太 福島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Toshiba Energy Systems and Solutions Corp
Original Assignee
Toshiba Corp
Toshiba Energy Systems and Solutions Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Toshiba Energy Systems and Solutions Corp filed Critical Toshiba Corp
Priority to JP2019001399A priority Critical patent/JP7043433B2/en
Publication of JP2020114050A publication Critical patent/JP2020114050A/en
Application granted granted Critical
Publication of JP7043433B2 publication Critical patent/JP7043433B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Emergency Protection Circuit Devices (AREA)

Description

本発明の実施形態は、保護制御システムに関する。 Embodiments of the present invention relate to protection control systems.

電力系統において、変電所には、送電線や母線、変電設備等を保護する保護リレー装置、及び変電所全体の監視や制御を行う監視制御装置が設けられている。保護リレー装置が、運用を開始した後に、保護リレー装置のプログラムや監視制御装置のデータベースを変更する場合、各装置のメーカ側が更新プログラム等を作成し、電力系統を運用する運用側が動作を確認し、作業員が現地へ赴いてプログラム等を変更する作業を行うなど、人間系により変更を実施しており、手間がかかっていた。 In the power system, the substation is provided with a protection relay device for protecting transmission lines, buses, substation equipment, etc., and a monitoring and control device for monitoring and controlling the entire substation. When the protection relay device changes the program of the protection relay device or the database of the monitoring / control device after the operation starts, the manufacturer of each device creates an update program, etc., and the operation side that operates the power system confirms the operation. , Workers went to the site to change the program, etc., and the changes were carried out by humans, which was troublesome.

特開2006-238697号公報Japanese Unexamined Patent Publication No. 2006-238697

本発明が解決しようとする課題は、電力系統における電力設備のプログラムを変更する際に生じる手間を抑制することができる保護制御システムを提供することである。 An object to be solved by the present invention is to provide a protection control system capable of suppressing the trouble caused when changing the program of the electric power equipment in the electric power system.

実施形態の保護制御システムは、保護リレー装置と、監視制御装置と、配信サーバとを持つ。前記保護制御システムは、電力系統における電気所に設置された電力設備を保護及び制御する。前記保護制御システムでは、保護リレー装置と、監視制御装置と、配信サーバとが互いに通信可能に接続される。前記保護リレー装置は、電力情報取得部と、遮断制御部と、送信部と、を有する。前記電力情報取得部は、前記電力設備における電力に関する電力情報を取得する。前記遮断制御部は、前記電力情報取得部により取得された電力情報に基づいて、前記電力設備に電力を供給又は遮断する遮断器を制御する。前記送信部は、前記電力情報、及び前記保護リレー装置における動作を示す動作情報を前記監視制御装置、及び前記保護リレー装置と前記監視制御装置とに接続する監視サーバに接続する管理サーバに送信する。前記監視制御装置は、受信部と、故障判定部と、送信部と、を有する。前記受信部は、前記保護リレー装置から前記電力情報と前記動作情報を受信すると共に、前記保護リレー装置及び前記監視制御装置に接続する中央監視制御装置から前記電力系統における運用の状態を示す運用情報を受信する。前記故障判定部は、前記受信部から受信した前記電力情報、前記動作情報、及び前記運用情報に基づいて、前記電力設備が故障したか否かを判定する。前記送信部は、前記故障判定部による判定結果を示す故障情報を前記監視サーバに送信する。前記配信サーバは、生成部と、送信部とを有する。前記配信サーバは、前記中央監視制御装置、前記中央監視制御装置に接続する運用側ネットワーク、前記運用側ネットワークに接続するゲートウェイ、及び前記ゲートウェイに接続する製造側ネットワークを介して、通信可能に接続する。前記生成部は、前記電力系統における運用の状態が変更される場合において、前記故障情報、及び、前記保護リレー装置の設備に関する設備情報に基づいて、前記保護リレー装置の更新プログラムを生成する。前記送信部は、前記生成部により生成された更新プログラムを、前記管理サーバに送信する。 The protection control system of the embodiment includes a protection relay device, a monitoring control device, and a distribution server. The protection control system protects and controls the power equipment installed in the electric station in the power system. In the protection control system, the protection relay device, the monitoring control device, and the distribution server are connected to each other so as to be communicable with each other. The protection relay device includes a power information acquisition unit, a cutoff control unit, and a transmission unit. The electric power information acquisition unit acquires electric power information related to electric power in the electric power equipment. The cutoff control unit controls a circuit breaker that supplies or cuts power to the power equipment based on the power information acquired by the power information acquisition unit. The transmission unit transmits the power information and operation information indicating the operation of the protection relay device to the monitoring control device and a management server connected to the monitoring server connected to the protection relay device and the monitoring control device. .. The monitoring control device includes a receiving unit, a failure determination unit, and a transmitting unit. The receiving unit receives the power information and the operation information from the protection relay device, and also receives operation information indicating the operation status in the power system from the protection relay device and the central monitoring control device connected to the monitoring control device. To receive. The failure determination unit determines whether or not the power equipment has failed based on the power information, the operation information, and the operation information received from the reception unit. The transmission unit transmits failure information indicating a determination result by the failure determination unit to the monitoring server. The distribution server has a generation unit and a transmission unit. The distribution server is communicably connected via the central monitoring and control device, the operation side network connected to the central monitoring and control device, the gateway connected to the operation side network, and the manufacturing side network connected to the gateway. .. The generation unit generates an update program for the protection relay device based on the failure information and the equipment information regarding the equipment of the protection relay device when the operation state in the power system is changed. The transmission unit transmits the update program generated by the generation unit to the management server.

実施形態の保護制御システム1構成の例を示すブロック図。The block diagram which shows the example of the protection control system 1 configuration of embodiment. 実施形態のRY60の構成の例を示すブロック図。The block diagram which shows the example of the structure of RY60 of embodiment. 実施形態のBCU50の構成の例を示すブロック図。The block diagram which shows the example of the structure of the BCU 50 of an embodiment. 実施形態の監視サーバ40の構成の例を示すブロック図。The block diagram which shows the example of the configuration of the monitoring server 40 of an embodiment. 実施形態の配信サーバ90の構成の例を示すブロック図。The block diagram which shows the example of the configuration of the distribution server 90 of an embodiment. 実施形態の運用情報における表示の例を示す図。The figure which shows the example of the display in the operation information of an embodiment. 実施形態の保護制御システム1の動作の流れを示すシーケンス図。The sequence diagram which shows the operation flow of protection control system 1 of embodiment.

以下、実施形態の保護制御システムを、図面を参照して説明する。 Hereinafter, the protection control system of the embodiment will be described with reference to the drawings.

図1は、実施形態の保護制御システム1構成の例を示すブロック図である。保護制御システム1は、例えば、SCADA(Supervisory Control And Data Acquisition)10と、ITC(Intelligent Tele-Control unit)20と、SCU(Station Control Unit)30と、監視サーバ40と、複数のBCU(Bay Control Unit)50(BCU50-1、…50-N)(但し、Nは任意の自然数)と、複数のRY(Relay)60(RY60-1、…60-M)(但し、Mは任意の自然数)と、設備情報記憶サーバ70と、故障情報記憶サーバ80と、配信サーバ90とを備える。ここで、BCU50は、「監視制御装置」の一例である。RY60は、「保護リレー装置」の一例である。 FIG. 1 is a block diagram showing an example of the protection control system 1 configuration of the embodiment. The protection control system 1 includes, for example, SCADA (Supervisory Control And Data Acquisition) 10, ITC (Intelligent Tele-Control unit) 20, SCU (Station Control Unit) 30, monitoring server 40, and a plurality of BCUs (Bay Control). Unit) 50 (BCU50-1, ... 50-N) (where N is an arbitrary natural number) and multiple RY (Relay) 60 (RY60-1, ... 60-M) (where M is an arbitrary natural number). A facility information storage server 70, a failure information storage server 80, and a distribution server 90 are provided. Here, the BCU 50 is an example of a “monitoring control device”. RY60 is an example of a "protection relay device".

保護制御システム1を構成する装置、つまり、SCADA10、ITC20、SCU30、監視サーバ40、BCU50、RY60、設備情報記憶サーバ70、故障情報記憶サーバ80、及び配信サーバ90の各々は、例えば、CPUなどのプロセッサが組み込まれて動作する装置である。これらの装置が備える機能部は、CPUなどのプロセッサがプログラム(ソフトウェア)を実行することにより実現される。また、これらの機能部のうち一部または全部は、LSI(Large Scale Integration)やASIC(Application Specific Integrated Circuit)、FPGA(Field-Programmable Gate Array)などのハードウェアにより実現されてもよいし、ソフトウェアとハードウェアが協働することで実現されてもよい。 Each of the devices constituting the protection control system 1, that is, the SCADA 10, ITC20, SCU30, monitoring server 40, BCU50, RY60, equipment information storage server 70, failure information storage server 80, and distribution server 90 is, for example, a CPU or the like. It is a device that operates with a built-in processor. The functional unit included in these devices is realized by executing a program (software) by a processor such as a CPU. Further, some or all of these functional parts may be realized by hardware such as LSI (Large Scale Integration), ASIC (Application Specific Integrated Circuit), FPGA (Field-Programmable Gate Array), or software. And hardware may work together.

保護制御システム1は、電力系統を運用する電力会社などの運用側の装置群と、電力系統における電力設備を製造したメーカなどの製造側の装置群とで構成される。本実施形態では、運用側の装置群は、SCADA10と、ITC20と、SCU30と、監視サーバ40と、BCU50と、RY60である。また、製造側の装置群は、設備情報記憶サーバ70と、故障情報記憶サーバ80と、配信サーバ90である。 The protection control system 1 is composed of an operation-side device group such as an electric power company that operates an electric power system, and a manufacturing-side device group such as a manufacturer that manufactures electric power equipment in the electric power system. In the present embodiment, the device group on the operation side is SCADA 10, ITC 20, SCU 30, monitoring server 40, BCU 50, and RY60. The equipment group on the manufacturing side is an equipment information storage server 70, a failure information storage server 80, and a distribution server 90.

運用側の装置群は、運用側ネットワークNW1及びステーションバスBにより、通信可能に接続される。運用側ネットワークNW1は、運用側である電力会社等により用いられる通信ネットワークであり、例えば、イーサネット(登録商標)、電話回線、携帯電話回線、無線LAN(Local Area Network)、WAN(Wide Area Network)などを含む通信網である。運用側ネットワークNW1の全部又は一部に、インターネット等の公衆網が含まれていてよいが、通信の安全が保証されるような通信方式(例えば、インターネットの公開鍵方式)にて通信が行われることが好ましい。ステーションバスBは、例えば、イーサネット等のLANを用いた通信網である。 The devices on the operation side are communicably connected by the network NW1 on the operation side and the station bus B. The operation side network NW1 is a communication network used by an electric power company or the like on the operation side, and is, for example, Ethernet (registered trademark), a telephone line, a mobile phone line, a wireless LAN (Local Area Network), or a WAN (Wide Area Network). It is a communication network including. A public network such as the Internet may be included in all or part of the operation side network NW1, but communication is performed by a communication method (for example, the public key method of the Internet) that guarantees the security of communication. Is preferable. The station bus B is, for example, a communication network using a LAN such as Ethernet.

製造側の装置群は、製造側ネットワークNW2により、通信可能に接続される。製造側ネットワークNW2は、製造側であるメーカ等により用いられる通信ネットワークであり、例えば、イーサネット(登録商標)、電話回線、携帯電話回線、無線LAN(Local Area Network)、WAN(Wide Area Network)などを含む通信網である。運用側ネットワークNW1同様に、製造側ネットワークNW2の全部又は一部に、インターネット等の公衆網が含まれていてよいが、通信の安全が保証されるような通信方式(例えば、インターネットの公開鍵方式)にて通信が行われることが好ましい。 The equipment group on the manufacturing side is communicably connected by the manufacturing side network NW2. The manufacturing side network NW2 is a communication network used by a manufacturer or the like on the manufacturing side, and is, for example, an Ethernet (registered trademark), a telephone line, a mobile phone line, a wireless LAN (Local Area Network), a WAN (Wide Area Network), or the like. It is a communication network including. Similar to the operation side network NW1, all or part of the manufacturing side network NW2 may include a public network such as the Internet, but a communication method that guarantees the security of communication (for example, a public key method of the Internet). ) Is preferred.

本実施形態においては、運用側ネットワークNW1と製造側ネットワークNW2とが、ゲートウェイGWを介して通信可能に接続される。これにより、運用側と、製造側とが互いのネットワークを介して連携することが可能となる。 In the present embodiment, the operation side network NW1 and the manufacturing side network NW2 are communicably connected via the gateway GW. This makes it possible for the operation side and the manufacturing side to cooperate with each other via each other's network.

以下、運用側の装置群について説明する。 Hereinafter, the device group on the operation side will be described.

RY60は、電力系統に設けられた送電線において複数の箇所の各々に設けられた遮断器を制御する保護リレー装置である。RY60は、電力系統に短絡や地絡などの事故が発生した場合に、遮断器を遮断して事故が発生した電力設備や系統を切り離すことにより、事故を除去すると共に、事故の拡大を抑制して電力系統の健全な運用を確保する。 The RY60 is a protection relay device that controls circuit breakers provided at each of a plurality of locations in a transmission line provided in the power system. When an accident such as a short circuit or a ground fault occurs in the power system, the RY60 eliminates the accident and suppresses the spread of the accident by shutting off the circuit breaker and disconnecting the power equipment and system in which the accident occurred. To ensure the sound operation of the power system.

RY60は、RY60が保護の対象とする送電線の区間に供給される電力に関する電力情報を取得する。電力情報は、送電線の区間に供給される電力に関する情報であって、例えば、その区間に供給される電力の電圧値や電流値を示す情報である。 The RY60 acquires electric power information regarding the electric power supplied to the section of the transmission line to be protected by the RY60. The electric power information is information about electric power supplied to a section of a transmission line, and is, for example, information indicating a voltage value or a current value of electric power supplied to the section.

また、RY60は、遮断器の動作に関する動作情報を生成する。動作情報は、RY60により制御される遮断器の動作に関する情報であって、例えば、遮断器が接続状態にあるか遮断状態にあるかを示す情報である。RY60は、電力情報、及び動作情報を、BCU50、監視サーバ40、SCU30、ITC20、及びSCADA10に送信する。 Further, the RY60 generates operation information regarding the operation of the circuit breaker. The operation information is information on the operation of the circuit breaker controlled by the RY60, and is, for example, information indicating whether the circuit breaker is in the connected state or the circuit breaker state. The RY60 transmits power information and operation information to the BCU 50, the monitoring server 40, the SCU 30, the ITC 20, and the SCADA 10.

BCU50は、変電所において負荷に電力を供給する回線ごと設けられ、回線における電力設備の監視、及び制御を行う。BCU50は、自身が監視する回線に設けられたRY60から電力情報及び動作情報を取得し、取得した情報に基づいて、故障情報を生成する。故障情報は、回線における状態が変化したか否か、電力設備の状態が変化したか否かを示す情報であり、例えば、回線に設けられたRY60が故障したことを示す情報である。BCU50は、生成した故障情報を、監視サーバ40、SCU30、ITC20、及びSCADA10に送信する。 The BCU 50 is provided for each line that supplies power to the load at the substation, and monitors and controls the power equipment in the line. The BCU 50 acquires power information and operation information from the RY 60 provided in the line monitored by itself, and generates failure information based on the acquired information. The failure information is information indicating whether or not the state of the line has changed and whether or not the state of the electric power equipment has changed. For example, it is information indicating that the RY60 provided in the line has failed. The BCU 50 transmits the generated failure information to the monitoring server 40, SCU30, ITC20, and SCADA10.

BCU50は、例えば、回線における系統の状態や、電力設備の状態を示す運用情報をSCADA10などから受信する。また、BCU50は、SCADA10などの制御に従い、回線における系統の構成を変更するための遮断器や断路器などの開閉器の開閉を制御したり、系統に供給される系統電圧を調整したりする。 The BCU 50 receives, for example, operational information indicating the state of the system in the line and the state of the electric power equipment from the SCADA 10 or the like. Further, the BCU 50 controls the opening and closing of switches such as circuit breakers and disconnectors for changing the system configuration in the line according to the control of SCADA 10 and the like, and adjusts the system voltage supplied to the system.

監視サーバ40は、電力情報、動作情報、及び故障情報に基づいて、SCADA10などにより系統の構成が変更されるか否かを判定する。監視サーバ40は、系統の構成が変更されると判定した場合、系統が変更された後のRY60が行う処理を示す更新プログラムを配信サーバ90に要求する。 The monitoring server 40 determines whether or not the system configuration is changed by SCADA 10 or the like based on the power information, the operation information, and the failure information. When the monitoring server 40 determines that the system configuration is changed, the monitoring server 40 requests the distribution server 90 for an update program indicating the processing performed by the RY 60 after the system change.

ここで、RY60の更新プログラムは、系統の変更に伴う電力設備などの変更が反映された保護リレーのシーケンス処理である。RY60の更新プログラムには、例えば、系統の電圧や電流を測定する計器用変成器が変更された場合における、変更後のCT比や、VT比が示されている。 Here, the update program of the RY60 is a sequence process of the protection relay reflecting the change of the power equipment and the like due to the change of the system. The RY60 update program shows, for example, the changed CT ratio and VT ratio when the instrument transformer that measures the voltage and current of the system is changed.

また、監視サーバ40は、系統の構成が変更されると判定した場合、系統が変更された後のBCU50が行う処理を示す更新プログラムを配信サーバ90に要求する。 Further, when the monitoring server 40 determines that the system configuration is changed, the monitoring server 40 requests the distribution server 90 for an update program indicating the processing performed by the BCU 50 after the system change.

ここで、BCU50の更新プログラムは、例えば、系統の変更に伴う回線における系統の状態や、電力設備の状態の変更が反映された情報を表示する処理である。BCU50の更新プログラムには、例えば、系統の変更に伴って故障を判定する条件が変更された場合における、変更後の故障の判定シーケンスが示されている。 Here, the update program of the BCU 50 is, for example, a process of displaying information reflecting the change of the system state in the line due to the change of the system and the change of the state of the electric power equipment. The update program of the BCU 50 shows, for example, a failure determination sequence after the change when the condition for determining the failure is changed due to the change of the system.

監視サーバ40は、配信サーバ90から更新プログラムを受信し、受信した更新プログラムを保持する。監視サーバ40は、保持した更新プログラムをRY60又はBCU50におけるプログラムが記憶される記憶領域において、書き込み準備が完了している場合に、当該記憶領域に更新プログラムを書込む。 The monitoring server 40 receives the update program from the distribution server 90 and holds the received update program. The monitoring server 40 writes the updated program in the storage area where the program stored in the RY60 or BCU50 is stored, when the update preparation is completed.

また、監視サーバ40は、系統の構成が変更されると判定した場合、系統が変更された後の運用情報を配信サーバ90に要求する。ここで、系統が変更された後の運用情報は、例えば、回線の名称が変更された場合における、変更後の回線の名称が示された情報である。 Further, when the monitoring server 40 determines that the system configuration is changed, the monitoring server 40 requests the distribution server 90 for the operation information after the system change. Here, the operation information after the system is changed is, for example, information indicating the name of the changed line when the name of the line is changed.

監視サーバ40は、配信サーバ90から系統が変更された後の運用情報を受信し、受信した運用情報を保持する。監視サーバ40は、保持した運用情報を、BCU50において運用情報が記憶される記憶領域に書込むことにより、運用情報を更新する。 The monitoring server 40 receives the operation information after the system is changed from the distribution server 90, and holds the received operation information. The monitoring server 40 updates the operation information by writing the retained operation information in the storage area where the operation information is stored in the BCU 50.

ここで、監視サーバ40は、配信サーバ90から受信した更新プログラム又は運用情報(以下、更新プログラム等という)を表示するようにしてもよい。そして、監視サーバ40は、更新プログラム等を視認した管理者により、更新を承認する旨の操作入力がなされた場合に、更新プログラム等を書込むようにしてもよい。 Here, the monitoring server 40 may display the update program or operation information (hereinafter referred to as an update program or the like) received from the distribution server 90. Then, the monitoring server 40 may write the update program or the like when the administrator who visually recognizes the update program or the like inputs an operation to approve the update.

SCU30は、複数のBCU50の監視、及び制御を行う集中監視制御装置である。SCU30は、監視の対象とするBCU50の各々から、故障情報を回線の状態を示す情報として取得する。また、SCU30は監視の対象とするBCU50の回線に設けられたRY60の各々から、電力情報及び動作情報を回線の状態を示す情報として取得する。SCU30は、BCU50における回線の状態に基づいて、或いはSCADA10の制御により、回線の状態を変化させる場合、BCU50を制御して回線の状態を変化させる。 The SCU 30 is a centralized monitoring and control device that monitors and controls a plurality of BCUs 50. The SCU 30 acquires failure information from each of the BCUs 50 to be monitored as information indicating the state of the line. Further, the SCU 30 acquires power information and operation information as information indicating the state of the line from each of the RY60s provided on the line of the BCU 50 to be monitored. When the SCU 30 changes the line state based on the line state in the BCU 50 or by the control of the SCADA 10, the SCU 30 controls the BCU 50 to change the line state.

ITC20は、変電所から離れた遠方にあるBCU50(遠方制御所)とSCU30との通信を中継する、いわゆるテレコンである。 The ITC 20 is a so-called teleconverter that relays communication between a BCU 50 (remote control station) located far away from a substation and an SCU 30.

SCADA10は、電力系統の全体を監視、及び制御する。SCADA10は、電力系統の全体におけるRY60から電力情報及び動作情報、及びBCU50から故障情報を取得する。SCADA10は、取得した情報に基づいて、系統を変更するか否かを判定し、判定した結果に基づいてRY60、及びBCU50を制御し、系統の状態を変化させる。 SCADA 10 monitors and controls the entire power system. The SCADA 10 acquires power information and operation information from RY60 and failure information from BCU50 in the entire power system. The SCADA 10 determines whether or not to change the system based on the acquired information, and controls the RY60 and the BCU50 based on the determined result to change the state of the system.

以下、製造側の装置群について説明する。 Hereinafter, the device group on the manufacturing side will be described.

設備情報記憶サーバ70は、例えば、設備情報記憶部701を備える。設備情報記憶部701は、設備情報を記憶する。設備情報は、電力系統に設けられた電力設備に関する情報であって、例えば、RY60に用いられる部品や計器類の仕様や回路図などを示す情報である。 The equipment information storage server 70 includes, for example, the equipment information storage unit 701. The equipment information storage unit 701 stores equipment information. The equipment information is information about the electric power equipment provided in the electric power system, and is, for example, information indicating specifications, circuit diagrams, and the like of parts and instruments used in the RY60.

故障情報記憶サーバ80は、例えば、故障情報記憶部801を備える。故障情報記憶部801は、故障情報を記憶する。故障情報は、電力系統に設けられたBCU50により生成された情報である。故障情報記憶サーバ80は、SCADA10、運用側ネットワークNW1、ゲートウェイGW、製造側ネットワークNW2を介して、BCU50から故障情報を取得する。 The failure information storage server 80 includes, for example, a failure information storage unit 801. The failure information storage unit 801 stores failure information. The failure information is information generated by the BCU 50 provided in the power system. The failure information storage server 80 acquires failure information from the BCU 50 via the SCADA 10, the operation side network NW1, the gateway GW, and the manufacturing side network NW2.

配信サーバ90は、監視サーバ40からの要求に応じて、更新プログラムを生成する。配信サーバ90は、例えば、設備情報及び故障情報を用いてRY60の更新プログラムを生成する。配信サーバ90は、設備情報及び故障情報を用いてBCU50の更新プログラムを生成する。配信サーバ90は、故障情報を用いて運用情報を生成する。配信サーバ90は、生成した更新プログラム及び運用情報を、監視サーバ40に配信する。 The distribution server 90 generates an update program in response to a request from the monitoring server 40. The distribution server 90 generates an update program for RY60 using, for example, equipment information and failure information. The distribution server 90 generates an update program for the BCU 50 using the equipment information and the failure information. The distribution server 90 generates operation information using the failure information. The distribution server 90 distributes the generated update program and operation information to the monitoring server 40.

図2は、実施形態のRY60の構成の例を示すブロック図である。RY60は、例えば、通信部601と、電力情報取得部602と、遮断判定部603と、制御部604と、記憶部605とを備える。 FIG. 2 is a block diagram showing an example of the configuration of the RY60 of the embodiment. The RY 60 includes, for example, a communication unit 601, a power information acquisition unit 602, a cutoff determination unit 603, a control unit 604, and a storage unit 605.

通信部601は、ステーションバスBを介して、運用側の装置群と通信を行う。電力情報取得部602は、電力情報を取得する。遮断判定部603は、電力情報に基づいて遮断器を遮断するか否かを判定する。制御部604は、例えば、CPUなどを含むプロセッサであり、RY60を統括的に制御する。制御部604は、記憶部605に記憶されているプログラムを実行して各種の処理を行う。制御部604は、例えば、遮断判定部603の判定結果に基づいて動作情報を生成する。記憶部605は、RY60における各種の処理を実行するためのプログラム、及び、各種の処理に用いられる変数などのデータを記憶する。 The communication unit 601 communicates with the device group on the operation side via the station bus B. The electric power information acquisition unit 602 acquires electric power information. The cutoff determination unit 603 determines whether or not to cut off the circuit breaker based on the power information. The control unit 604 is a processor including, for example, a CPU, and controls the RY60 in an integrated manner. The control unit 604 executes a program stored in the storage unit 605 to perform various processes. The control unit 604 generates operation information based on, for example, the determination result of the cutoff determination unit 603. The storage unit 605 stores data such as a program for executing various processes in the RY 60 and variables used in the various processes.

図3は、実施形態のBCU50の構成の例を示すブロック図である。BCU50は、例えば、通信部501と、電力情報取得部502と、動作情報取得部503と、故障判定部504と、運用情報取得部505と、表示部506と、制御部507と、記憶部508を備える。 FIG. 3 is a block diagram showing an example of the configuration of the BCU 50 of the embodiment. The BCU 50 includes, for example, a communication unit 501, a power information acquisition unit 502, an operation information acquisition unit 503, a failure determination unit 504, an operation information acquisition unit 505, a display unit 506, a control unit 507, and a storage unit 508. To prepare for.

通信部501は、ステーションバスBを介して、運用側の装置群と通信を行う。電力情報取得部502は、通信部501を介してRY60の電力情報を取得する。動作情報取得部503は、通信部501を介してRY60の動作情報を取得する。故障判定部504は、電力情報、及び動作情報に基づいて、回線における電力設備が故障したか否かを判定する。運用情報取得部505は、通信部501を介して運用情報を取得する。表示部506は、運用情報を表示する。制御部507は、例えば、CPUなどを含むプロセッサであり、BCU50を統括的に制御する。制御部507は、記憶部508に記憶されているプログラムを実行して各種の処理を行う。制御部507は、例えば、故障判定部504の判定結果に基づいて故障情報を生成する。記憶部508は、BCU50における各種の処理を実行するためのプログラム、及び、各種の処理に用いられる変数などのデータを記憶する。 The communication unit 501 communicates with the device group on the operation side via the station bus B. The power information acquisition unit 502 acquires the power information of the RY60 via the communication unit 501. The operation information acquisition unit 503 acquires the operation information of the RY60 via the communication unit 501. The failure determination unit 504 determines whether or not the power equipment in the line has failed based on the power information and the operation information. The operation information acquisition unit 505 acquires operation information via the communication unit 501. The display unit 506 displays operational information. The control unit 507 is a processor including, for example, a CPU, and controls the BCU 50 in an integrated manner. The control unit 507 executes a program stored in the storage unit 508 to perform various processes. The control unit 507 generates failure information based on the determination result of the failure determination unit 504, for example. The storage unit 508 stores data such as a program for executing various processes in the BCU 50 and variables used in the various processes.

図4は、実施形態の監視サーバ40の構成の例を示すブロック図である。監視サーバ40は、例えば、通信部401と、電力情報取得部402と、動作情報取得部403と、故障情報取得部404と、系統変更判定部405と、配信情報取得部406と、表示部407と、入力部408と、制御部409と、記憶部410とを備える。 FIG. 4 is a block diagram showing an example of the configuration of the monitoring server 40 of the embodiment. The monitoring server 40 is, for example, a communication unit 401, a power information acquisition unit 402, an operation information acquisition unit 403, a failure information acquisition unit 404, a system change determination unit 405, a distribution information acquisition unit 406, and a display unit 407. The input unit 408, the control unit 409, and the storage unit 410 are provided.

通信部401は、ステーションバスBを介して、運用側の装置群と通信を行う。また、通信部401は、SCADA10、運用側ネットワークNW1、ゲートウェイGW、及び製造側ネットワークNW2を介して、配信サーバ90と通信を行う。電力情報取得部402は、通信部401を介して電力情報を取得する。動作情報取得部403は、通信部401を介して動作情報を取得する。故障情報取得部404は、通信部401を介して故障情報を取得する。系統変更判定部405は、電力情報、動作情報、及び故障情報に基づいて、SCADA10などにより系統の構成が変更されるか否かを判定する。配信情報取得部406は、通信部401を介して配信サーバ90から配信情報を取得する。配信情報は、配信サーバ90により生成された更新プログラム、及び系統が変更された後の運用情報である。表示部407は、配信情報を表示する。入力部408は、管理者等によるキーボードやマウス操作により入力された情報を取得する。制御部409は、監視サーバ40を統括的に制御する。制御部409は、例えば、更新プログラム、及び運用情報を所定の記憶領域に書込む。記憶部410は、受信した更新プログラム、及び運用情報を記憶する。 The communication unit 401 communicates with the device group on the operation side via the station bus B. Further, the communication unit 401 communicates with the distribution server 90 via the SCADA 10, the operation side network NW1, the gateway GW, and the manufacturing side network NW2. The power information acquisition unit 402 acquires power information via the communication unit 401. The operation information acquisition unit 403 acquires operation information via the communication unit 401. The failure information acquisition unit 404 acquires failure information via the communication unit 401. The system change determination unit 405 determines whether or not the system configuration is changed by SCADA 10 or the like based on the power information, the operation information, and the failure information. The distribution information acquisition unit 406 acquires distribution information from the distribution server 90 via the communication unit 401. The distribution information is the update program generated by the distribution server 90 and the operation information after the system is changed. The display unit 407 displays the distribution information. The input unit 408 acquires the information input by the keyboard or mouse operation by the administrator or the like. The control unit 409 comprehensively controls the monitoring server 40. The control unit 409 writes, for example, an update program and operation information in a predetermined storage area. The storage unit 410 stores the received update program and operation information.

図5は、実施形態の配信サーバ90の構成の例を示すブロック図である。配信サーバ90は、例えば、通信部901と、故障情報取得部902と、設備情報取得部903と、配信情報生成部904と、制御部905と、記憶部906とを備える。 FIG. 5 is a block diagram showing an example of the configuration of the distribution server 90 of the embodiment. The distribution server 90 includes, for example, a communication unit 901, a failure information acquisition unit 902, an equipment information acquisition unit 903, a distribution information generation unit 904, a control unit 905, and a storage unit 906.

通信部901は、製造側ネットワークNW2を介して製造側の装置群と通信を行う。また、通信部901は、製造側ネットワークNW2、ゲートウェイGW、運用側ネットワークNW1、およびSCADA10を介して、監視サーバ40と通信を行う。故障情報取得部902は、故障情報記憶サーバ80から故障情報を取得する。設備情報取得部903は、設備情報記憶サーバ70から設備情報を取得する。配信情報生成部904は、監視サーバ40からの要求に応じて、設備情報及び故障情報に基づいて、更新プログラム及び系統が変化した後の運用情報(配信情報)を生成する。制御部905は、配信サーバ90を統括的に制御する。記憶部906は、配信情報生成部904が配信情報を生成する際に用いるデータ、例えば、各種のシミュレーション結果や、RY60やBCU50における様々な条件下の制御シーケンスを記憶する。 The communication unit 901 communicates with the device group on the manufacturing side via the manufacturing side network NW2. Further, the communication unit 901 communicates with the monitoring server 40 via the manufacturing side network NW2, the gateway GW, the operating side network NW1, and the SCADA 10. The failure information acquisition unit 902 acquires failure information from the failure information storage server 80. The equipment information acquisition unit 903 acquires equipment information from the equipment information storage server 70. The distribution information generation unit 904 generates operation information (distribution information) after the update program and the system are changed based on the equipment information and the failure information in response to the request from the monitoring server 40. The control unit 905 comprehensively controls the distribution server 90. The storage unit 906 stores data used by the distribution information generation unit 904 to generate distribution information, for example, various simulation results and control sequences under various conditions in the RY60 and BCU50.

図6は、実施形態の運用情報における表示の例を示す図である。運用情報は、例えば、BCU項目、SCU画面、警報の各々の項目を有する。BCU項目は、制御対象、表示、切替、挙動の各項目を有する。制御対象はBCU50が制御する対象を示す。表示は、制御対象に対応する表示を示す。種別は制御対象の種類の別を示す。挙動は制御対象を制御する動作を示す。SCU画面は、メッセージの項目を有する。メッセージは、SCU30に表示される内容を示す。警報は、ベルとブザーの各項目を有する。警報では、ベル又はブザーによる警告の有無が示される。この図では、BCU50の制御対象としてCB(Circuit Breaker、遮断器)が示され、「CB」と表示され、当該遮断器が、接続状態とするか遮断状態とするかの「入/切」の「切替」の制御が行われる対象であることが示されている。また、制御対象「CB」は、SCU30に「CB××」(××には、例えば、遮断器が設けられた箇所の地名などが入る)と表示されており、ベルによる警報がなされていることが示されている。また、BCU50の制御対象としてLS(Line Switch、断路器)が示され、「LS」と表示され、当該断路器が、接続状態とするか遮断状態とするかの「入/切」の「切替」の制御が行われる対象であることが示されている。また、制御対象「LS」は、SCU30に「LS甲」と表示されており、ベル又はブザーによる警報がなされていないことが示されている。 FIG. 6 is a diagram showing an example of display in the operational information of the embodiment. The operation information includes, for example, BCU items, SCU screens, and alarm items. The BCU item has each item of control target, display, switching, and behavior. The control target indicates an target controlled by the BCU 50. The display indicates the display corresponding to the controlled object. The type indicates the type of control target. The behavior indicates the operation of controlling the controlled object. The SCU screen has message items. The message indicates the content displayed on the SCU 30. The alarm has a bell and a buzzer. The alarm indicates the presence or absence of a bell or buzzer warning. In this figure, a CB (Circuit Breaker, circuit breaker) is shown as a control target of the BCU 50, and "CB" is displayed. It is shown that the control of "switching" is performed. Further, the controlled object "CB" is displayed on the SCU 30 as "CBXX" (where XX is, for example, the place name of the place where the circuit breaker is provided), and an alarm is given by a bell. It is shown that. Further, LS (Line Switch, disconnector) is indicated as a control target of the BCU 50, and "LS" is displayed, and "switching" of "on / off" whether the disconnector is in the connected state or the disconnected state is displayed. It is shown that the control is performed. Further, the controlled object "LS" is displayed as "LS instep" on the SCU 30, indicating that the alarm by the bell or buzzer is not given.

BCU50は、図6に示すような運用情報を、SCADA10又は配信サーバ90から取得し、取得した運用情報を記憶部508に記憶する。また、BCU50は、表示部506に受信した運用情報を表示する。 The BCU 50 acquires the operation information as shown in FIG. 6 from the SCADA 10 or the distribution server 90, and stores the acquired operation information in the storage unit 508. Further, the BCU 50 displays the received operation information on the display unit 506.

なお、SCU30、及びITC20が、BCU50と同様に、運用情報を表示する構成を備えていてもよい。この場合、SCU30、及びITC20は、例えば、通信部と、記憶部と、表示部とを備え、運用情報を、SCADA10又は配信サーバ90から通信部を介して取得し、取得した運用情報を記憶部に記憶する。また、SCU30、及びITC20は、受信した運用情報を表示部に表示する。 The SCU 30 and the ITC 20 may be configured to display operational information in the same manner as the BCU 50. In this case, the SCU 30 and the ITC 20 include, for example, a communication unit, a storage unit, and a display unit, acquire operation information from the SCADA 10 or the distribution server 90 via the communication unit, and store the acquired operation information. Remember in. Further, the SCU 30 and the ITC 20 display the received operation information on the display unit.

図7は、実施形態の保護制御システム1の動作の流れを示すシーケンス図である。この図では、電力情報を取得してからRY60の更新プログラムが書き込まれるまでの動作の流れを示している。この他、BCU50の更新プログラムが書き込まれるまでの動作、及び運用情報が更新されるまで動作についても、同様な流れで処理が行われてよい。 FIG. 7 is a sequence diagram showing an operation flow of the protection control system 1 of the embodiment. This figure shows the flow of operation from the acquisition of power information to the writing of the RY60 update program. In addition, the operation until the update program of the BCU 50 is written and the operation until the operation information is updated may be processed in the same flow.

まず、RY60は、電力情報を取得し(ステップS101)、取得した電力情報を用いて動作情報を生成する(ステップS102)。このとき、RY60は、生成した動作情報に基づき遮断器を制御する。RY60は、電力情報及び動作情報をBCU50、及び監視サーバ40に送信する(ステップS103)。 First, the RY60 acquires power information (step S101) and generates operation information using the acquired power information (step S102). At this time, the RY 60 controls the circuit breaker based on the generated operation information. The RY60 transmits the power information and the operation information to the BCU 50 and the monitoring server 40 (step S103).

次に、BCU50は、RY60から電力情報、及び動作情報を受信し(ステップS104)、受信した情報を用いて故障情報を生成する(ステップS105)。BCU50は、故障情報を、監視サーバ40に送信する(ステップS106)。このとき、監視サーバ40は、故障情報を故障情報記憶サーバ80に送信する。或いは、監視サーバ40は、故障情報をSCADA10に送信し、SCADA10により故障情報が故障情報記憶サーバ80に送信されるようにしてもよい。故障情報記憶サーバ80は、受信した故障情報を故障情報記憶部801に記憶させる。 Next, the BCU 50 receives power information and operation information from the RY60 (step S104), and generates failure information using the received information (step S105). The BCU 50 transmits the failure information to the monitoring server 40 (step S106). At this time, the monitoring server 40 transmits the failure information to the failure information storage server 80. Alternatively, the monitoring server 40 may transmit the failure information to the SCADA 10 and cause the failure information to be transmitted to the failure information storage server 80 by the SCADA 10. The failure information storage server 80 stores the received failure information in the failure information storage unit 801.

監視サーバ40は、RY60から電力情報、及び動作情報を受信すると共に、BCU50から故障情報を受信する(ステップS107)。監視サーバ40は、電力情報、動作情報、及び故障情報を用いて、系統が変更されるか否かを判定する(ステップS108)。監視サーバ40は、系統が変更されると判定する場合に、RY60の更新プログラムを配信サーバ90に要求する(ステップS109)。 The monitoring server 40 receives power information and operation information from the RY60, and also receives failure information from the BCU 50 (step S107). The monitoring server 40 determines whether or not the system is changed by using the power information, the operation information, and the failure information (step S108). When the monitoring server 40 determines that the system is changed, the monitoring server 40 requests the distribution server 90 to update the RY60 (step S109).

配信サーバ90は、監視サーバ40からRY60の更新プログラムの要求を受信すると(ステップS110)、故障情報記憶サーバ80から故障情報を取得する(ステップS111)と共に、設備情報記憶サーバ70から設備情報を取得する(ステップS112)。配信サーバ90は、故障情報、及び設備情報を用いて、RY60の更新プログラムを生成する(ステップS113)。このとき、配信サーバ90は、記憶部906に記憶する各種のシミュレーション結果や、RY60やBCU50における様々な条件下の制御シーケンスを参照し、故障情報、及び設備情報に合致する制御シーケンスを、RY60の更新プログラムとするようにしてもよい。配信サーバ90は、生成したRY60の更新プログラムを監視サーバ40に配信する(ステップS114)。 When the distribution server 90 receives the request for the update program of the RY60 from the monitoring server 40 (step S110), the distribution server 90 acquires the failure information from the failure information storage server 80 (step S111) and also acquires the equipment information from the equipment information storage server 70. (Step S112). The distribution server 90 generates an update program for the RY60 using the failure information and the equipment information (step S113). At this time, the distribution server 90 refers to various simulation results stored in the storage unit 906 and control sequences under various conditions in the RY60 and BCU50, and obtains a control sequence that matches the failure information and the equipment information of the RY60. It may be an update program. The distribution server 90 distributes the generated update program of RY60 to the monitoring server 40 (step S114).

監視サーバ40は、配信サーバ90からRY60の更新プログラムを受信し(ステップS115)、受信した更新プログラムを記憶部410に記憶させる(ステップS116)。監視サーバ40は、RY60の更新プログラムを書き込み準備が整っているか否かを確認する。ここでの書き込み準備とは、例えば、更新の対象とするRY60が系統から切り離されて系統の事故を検出させない状態となることをいう。監視サーバ40は、例えば、運用情報を参照することにより、更新の対象とするRY60が系統から切り離されているか否かを確認する。 The monitoring server 40 receives the update program of the RY60 from the distribution server 90 (step S115), and stores the received update program in the storage unit 410 (step S116). The monitoring server 40 confirms whether or not the update program of RY60 is ready to be written. The writing preparation here means, for example, that the RY60 to be updated is separated from the system so that an accident in the system is not detected. The monitoring server 40 confirms whether or not the RY60 to be updated is disconnected from the system by referring to the operation information, for example.

監視サーバ40は、更新の対象とするRY60が、更新プログラムを書き込む準備が整っていると判定する場合、更新プログラムを書込む旨を、RY60に命令する(ステップS118)。RY60は、監視サーバ40からの命令に応じて、更新プログラムを受信し、受信した更新プログラムを記憶部605の所定の領域に記憶させる(書込む)ことにより、RY60のプログラムを更新する(ステップS119)。 When the monitoring server 40 determines that the RY60 to be updated is ready to write the update program, the monitoring server 40 instructs the RY60 to write the update program (step S118). The RY60 receives an update program in response to an instruction from the monitoring server 40, and stores (writes) the received update program in a predetermined area of the storage unit 605 to update the program of the RY60 (step S119). ).

以上説明したように、実施形態の保護制御システム1は、RY60と、BCU50と、配信サーバ90とを備える。RY60は、電力情報取得部602により電力情報を取得し、取得した電力情報を用いて遮断判定部603により遮断器を制御する。RY60は、遮断器の動作情報を通信部601によりBCU50及び監視サーバ40に送信する。BCU50は、通信部501を介して、RY60の電力情報及び動作情報を受信すると共に、SCADA10から運用情報を受信し、受信した情報を用いて故障判定部504により電力設備が故障したか否かを判定する。BCU50は、故障判定部504による判定結果を故障情報として、通信部501により監視サーバ40に送信する。配信サーバ90は、SCADA10、運用側ネットワークNW1、ゲートウェイGW、及び製造側ネットワークNW2を介して、監視サーバ40と通信可能に接続する。配信サーバ90は、電力系統における運用の状態が変更される場合において、配信情報生成部904により故障情報、及び設備情報に基づいて、RY60の更新プログラムを生成し、生成した更新プログラムを通信部901により監視サーバ40に配信する。 As described above, the protection control system 1 of the embodiment includes a RY60, a BCU 50, and a distribution server 90. The RY 60 acquires power information by the power information acquisition unit 602, and controls the circuit breaker by the cutoff determination unit 603 using the acquired power information. The RY60 transmits the operation information of the circuit breaker to the BCU 50 and the monitoring server 40 by the communication unit 601. The BCU 50 receives the power information and the operation information of the RY60 via the communication unit 501, receives the operation information from the SCADA 10, and uses the received information to determine whether or not the power equipment has failed by the failure determination unit 504. judge. The BCU 50 transmits the determination result by the failure determination unit 504 as failure information to the monitoring server 40 by the communication unit 501. The distribution server 90 is communicably connected to the monitoring server 40 via the SCADA 10, the operation side network NW1, the gateway GW, and the manufacturing side network NW2. The distribution server 90 generates an update program for RY60 based on failure information and equipment information by the distribution information generation unit 904 when the operation status in the power system is changed, and the generated update program is used as the communication unit 901. Distributes to the monitoring server 40.

これにより、実施形態の保護制御システム1は、運用側ネットワークNW1と製造側ネットワークNW2とが、ゲートウェイGWを介して接続しているために、運用側において電力系統における運用の状態が変更される場合に、製造側にて生成した更新プログラムを、自動的に運用側の監視サーバ40に保持することができ、運用側が更新プログラム動作を確認したり、RY60のプログラムを更新したりする処理をスムーズに行うことが可能となる。つまり、電力系統における電力設備のプログラムを変更する際に生じる手間を抑制することができる。 As a result, in the protection control system 1 of the embodiment, since the operation side network NW1 and the manufacturing side network NW2 are connected via the gateway GW, the operation state in the power system is changed on the operation side. In addition, the update program generated by the manufacturing side can be automatically stored in the monitoring server 40 on the operation side, and the operation side can smoothly check the update program operation and update the RY60 program smoothly. It will be possible to do. That is, it is possible to reduce the time and effort required when changing the program of the electric power equipment in the electric power system.

また、実施形態の保護制御システム1では、監視サーバ40を更に備える。監視サーバ40は、通信部401によりRY60から電力情報及び動作情報を受信すると共に、BCU50から故障情報を受信し、受信した情報を用いて系統変更判定部405により電力系統における運用の状態が変更されるか否かを判定する。監視サーバ40は、通信部401を介して、RY60の電力情報及び動作情報を受信すると共に、BCU50の故障情報を受信し、受信した情報を用いて系統変更判定部405により電力系統における運用が変更されるか否かを判定する。監視サーバ40は、系統変更判定部405の判定結果に基づいて、通信部901により運用の変更に応じたプログラムの更新を配信サーバ90に要求すると共に、配信サーバ90から要求に応じたプログラム(更新プログラム)を受信する。監視サーバ40は、制御部409により更新プログラムに対応する現行のプログラムが記憶される記憶領域(RY60の更新プログラムであればRY60の記憶部605)に書込んで更新する。 Further, the protection control system 1 of the embodiment further includes a monitoring server 40. The monitoring server 40 receives power information and operation information from the RY 60 by the communication unit 401, receives failure information from the BCU 50, and uses the received information to change the operation status in the power system by the system change determination unit 405. Judge whether or not. The monitoring server 40 receives the power information and the operation information of the RY60 via the communication unit 401, receives the failure information of the BCU 50, and uses the received information to change the operation in the power system by the system change determination unit 405. Determine if it is done. Based on the determination result of the system change determination unit 405, the monitoring server 40 requests the distribution server 90 to update the program according to the operation change by the communication unit 901, and the distribution server 90 requests the program (update). Program) is received. The monitoring server 40 writes and updates the current program corresponding to the update program in the storage area (in the case of the update program of RY60, the storage unit 605 of RY60) by the control unit 409.

これにより、実施形態の保護制御システム1では、監視サーバ40により電力系統における運用が変更されるか否かを判定することができ、運用の変更に応じたプログラムの更新を要求し、要求に応じた更新プログラムを取得することができ、RY60などの電力設備のプログラムを更新させることができるために、作業員が現地へ赴いて更新を行う必要がない。 As a result, in the protection control system 1 of the embodiment, it is possible to determine whether or not the operation in the power system is changed by the monitoring server 40, request the update of the program according to the change in the operation, and respond to the request. It is not necessary for the worker to go to the site to update the program because the update program can be obtained and the program of the electric power equipment such as RY60 can be updated.

また、実施形態の保護制御システム1では、監視サーバ40において、通信部401により受信されたプログラムにおける更新の内容を表示部407に表示し、表示部407に表示された内容について当該更新を許可する旨の操作信号が入力部408に入力された場合、当該プログラムを前記記憶領域に書込むようにしてもよい。これにより、実施形態の保護制御システム1では、表示部407に表示された内容を確認することができるために、運用側の管理者や製造側の責任者が現地へ赴いて更新に立ち会う必要がない。 Further, in the protection control system 1 of the embodiment, in the monitoring server 40, the content of the update in the program received by the communication unit 401 is displayed on the display unit 407, and the content displayed on the display unit 407 is permitted to be updated. When the operation signal to that effect is input to the input unit 408, the program may be written in the storage area. As a result, in the protection control system 1 of the embodiment, since the content displayed on the display unit 407 can be confirmed, it is necessary for the manager on the operation side or the person in charge on the manufacturing side to go to the site and witness the update. do not have.

また、実施形態の保護制御システム1では、配信サーバ90において、配信情報生成部904により設備情報に基づいて運用情報を更新し、更新した運用情報を監視サーバ40に送信するようにしてもよい。これにより、実施形態の保護制御システム1では、更新プログラムと同様に、電力系統における電力設備のデータベース(運用情報)を変更する際に生じる手間を抑制することができる。 Further, in the protection control system 1 of the embodiment, in the distribution server 90, the distribution information generation unit 904 may update the operation information based on the equipment information and transmit the updated operation information to the monitoring server 40. As a result, in the protection control system 1 of the embodiment, it is possible to suppress the trouble caused when changing the database (operation information) of the electric power equipment in the electric power system as in the update program.

以上説明した少なくとも一つの実施形態によれば、RY60と、BCU50と、配信サーバ90とを備える。これにより、実施形態の保護制御システム1は、運用側ネットワークNW1と製造側ネットワークNW2とが、ゲートウェイGWを介して接続しているために、運用側において電力系統における運用の状態が変更される場合に、製造側にて生成した更新プログラムを、自動的に運用側の監視サーバ40に保持することができ、運用側が更新プログラム動作を確認したり、RY60のプログラムを更新したりする処理をスムーズに行うことが可能となる。つまり、電力系統における電力設備のプログラムを変更する際に生じる手間を抑制することができる。 According to at least one embodiment described above, the RY 60, the BCU 50, and the distribution server 90 are provided. As a result, in the protection control system 1 of the embodiment, since the operation side network NW1 and the manufacturing side network NW2 are connected via the gateway GW, the operation state in the power system is changed on the operation side. In addition, the update program generated by the manufacturing side can be automatically stored in the monitoring server 40 on the operation side, and the operation side can smoothly check the update program operation and update the RY60 program smoothly. It will be possible to do. That is, it is possible to reduce the time and effort required when changing the program of the electric power equipment in the electric power system.

本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれると同様に、特許請求の範囲に記載された発明とその均等の範囲に含まれるものである。 Although some embodiments of the present invention have been described, these embodiments are presented as examples and are not intended to limit the scope of the invention. These embodiments can be implemented in various other embodiments, and various omissions, replacements, and changes can be made without departing from the gist of the invention. These embodiments and variations thereof are included in the scope of the invention described in the claims and the equivalent scope thereof, as are included in the scope and gist of the invention.

1…保護制御システム、40…監視サーバ、401…通信部、402…電力情報取得部、403…動作情報取得部、404…故障情報取得部、405…系統変更判定部、406…配信情報取得部、407…表示部、408…入力部、409…制御部、410…記憶部、50…BCU、501…通信部、502…電力情報取得部、503…動作情報取得部、504…故障判定部、505…運用情報取得部、506…表示部、507…制御部、508…記憶部、60…RY、601…通信部、602…電力情報取得部、603…遮断判定部、604…制御部、605…記憶部、90…配信サーバ、901…通信部、902…故障情報取得部、903…設備情報取得部、904…配信情報生成部、905…制御部、906…記憶部 1 ... protection control system, 40 ... monitoring server, 401 ... communication unit, 402 ... power information acquisition unit, 403 ... operation information acquisition unit, 404 ... failure information acquisition unit, 405 ... system change determination unit, 406 ... distribution information acquisition unit , 407 ... Display unit, 408 ... Input unit, 409 ... Control unit, 410 ... Storage unit, 50 ... BCU, 501 ... Communication unit, 502 ... Power information acquisition unit, 503 ... Operation information acquisition unit, 504 ... Failure determination unit, 505 ... Operation information acquisition unit, 506 ... Display unit, 507 ... Control unit, 508 ... Storage unit, 60 ... RY, 601 ... Communication unit, 602 ... Power information acquisition unit, 603 ... Blocking determination unit, 604 ... Control unit, 605 ... Storage unit, 90 ... Distribution server, 901 ... Communication unit, 902 ... Failure information acquisition unit, 903 ... Equipment information acquisition unit, 904 ... Distribution information generation unit, 905 ... Control unit, 906 ... Storage unit

Claims (4)

電力系統における電気所に設置された電力設備を保護及び制御する保護制御システムであって、互いに通信可能に接続された保護リレー装置と、監視制御装置と、配信サーバとを備える保護制御システムにおいて、
前記保護リレー装置は、
前記電力設備における電力に関する電力情報を取得する電力情報取得部と、
前記電力情報取得部により取得された電力情報に基づいて、前記電力設備に電力を供給又は遮断する遮断器を制御する遮断制御部と、
前記電力情報、及び前記保護リレー装置における動作を示す動作情報を前記監視制御装置、及び前記保護リレー装置と前記監視制御装置とに接続する監視サーバに送信する送信部と、を有し、
前記監視制御装置は、
前記保護リレー装置から前記電力情報と前記動作情報を受信すると共に、前記保護リレー装置及び前記監視制御装置に接続する中央監視制御装置から前記電力系統における運用の状態を示す運用情報を受信する受信部と、
前記受信部から受信した前記電力情報、前記動作情報、及び前記運用情報に基づいて、前記電力設備が故障したか否かを判定する故障判定部と、
前記故障判定部による判定結果を示す故障情報を前記監視サーバに送信する送信部と、を有し
前記配信サーバは、
前記中央監視制御装置、前記中央監視制御装置に接続する運用側ネットワーク、前記運用側ネットワークに接続するゲートウェイ、及び前記ゲートウェイに接続する製造側ネットワークを介して、通信可能に接続する配信サーバであって、
前記電力系統における運用の状態が変更される場合において、前記故障情報、及び、前記保護リレー装置の設備に関する設備情報に基づいて、前記保護リレー装置の更新プログラムを生成する生成部と、
前記生成部により生成された更新プログラムを、前記監視サーバに送信する送信部と、を有する、
保護制御システム。
A protection control system that protects and controls electric power equipment installed in an electric power station in an electric power system, and includes a protection relay device, a monitoring control device, and a distribution server that are communicably connected to each other.
The protection relay device is
The electric power information acquisition unit that acquires electric power information related to electric power in the electric power equipment, and
A circuit breaker that controls a circuit breaker that supplies or cuts power to the power equipment based on the power information acquired by the power information acquisition unit.
It has the power information and the operation information indicating the operation in the protection relay device, the monitoring control device, and a transmission unit that transmits the protection relay device and the monitoring server connected to the monitoring control device.
The monitoring control device is
A receiving unit that receives the power information and the operation information from the protection relay device, and also receives the operation information indicating the operation status in the power system from the protection relay device and the central monitoring control device connected to the monitoring control device. When,
A failure determination unit that determines whether or not the power equipment has failed based on the power information, the operation information, and the operation information received from the reception unit.
The distribution server has a transmission unit that transmits failure information indicating a determination result by the failure determination unit to the monitoring server.
A distribution server that is communicably connected via the central monitoring and control device, the operation side network connected to the central monitoring and control device, the gateway connected to the operation side network, and the manufacturing side network connected to the gateway. ,
A generation unit that generates an update program for the protection relay device based on the failure information and the equipment information regarding the equipment of the protection relay device when the operation status in the power system is changed.
It has a transmission unit that transmits the update program generated by the generation unit to the monitoring server.
Protection control system.
前記監視サーバ、を更に備え、
前記監視サーバは、
前記保護リレー装置から前記電力情報及び前記動作情報を受信するとともに、前記監視制御装置から前記故障情報を受信する受信部と、
前記受信部により受信された前記電力情報、前記動作情報、及び前記故障情報を用いて、前記電力系統における運用が変更されるか否かを判定する判定部と、
前記判定部による判定結果に基づいて、前記運用の変更に応じたプログラムの更新を前記配信サーバに要求すると共に、前記配信サーバから前記要求に応じたプログラムを受信する通信部と、
前記通信部により受信されたプログラムを、当該プログラムに対応する現行のプログラムが記憶される記憶領域に書込んで更新する制御部と、を有する、
請求項1に記載の保護制御システム。
Further equipped with the monitoring server,
The monitoring server is
A receiving unit that receives the power information and the operation information from the protection relay device and also receives the failure information from the monitoring control device.
A determination unit for determining whether or not the operation in the power system is changed by using the power information, the operation information, and the failure information received by the reception unit.
Based on the determination result by the determination unit, the communication unit that requests the distribution server to update the program according to the change in operation and receives the program according to the request from the distribution server.
It has a control unit for writing and updating a program received by the communication unit in a storage area in which a current program corresponding to the program is stored.
The protection control system according to claim 1.
前記監視サーバにおいて、
前記通信部により受信されたプログラムにおける更新の内容を表示する表示部と、
操作信号が入力される入力部と、を更に備え、
前記制御部は、前記表示部に表示された内容について当該更新を許可する旨の操作信号が前記入力部に入力された場合、当該プログラムを前記記憶領域に書込む、
請求項2に記載の保護制御システム。
In the monitoring server
A display unit that displays the contents of updates in the program received by the communication unit, and a display unit.
Further equipped with an input unit for inputting operation signals,
When an operation signal for permitting the update of the content displayed on the display unit is input to the input unit, the control unit writes the program in the storage area.
The protection control system according to claim 2.
前記配信サーバにおいて、
前記生成部は、前記電力系統における運用の状態が変更される場合において、前記設備情報に基づいて、前記運用情報を更新し、
前記送信部は、前記生成部により生成された前記運用情報を、前記監視サーバに送信する、
請求項1から請求項3の何れか一項に記載の保護制御システム。
In the distribution server
The generation unit updates the operation information based on the equipment information when the operation state in the power system is changed.
The transmission unit transmits the operation information generated by the generation unit to the monitoring server.
The protection control system according to any one of claims 1 to 3.
JP2019001399A 2019-01-08 2019-01-08 Protection control system Active JP7043433B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019001399A JP7043433B2 (en) 2019-01-08 2019-01-08 Protection control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019001399A JP7043433B2 (en) 2019-01-08 2019-01-08 Protection control system

Publications (2)

Publication Number Publication Date
JP2020114050A JP2020114050A (en) 2020-07-27
JP7043433B2 true JP7043433B2 (en) 2022-03-29

Family

ID=71667310

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019001399A Active JP7043433B2 (en) 2019-01-08 2019-01-08 Protection control system

Country Status (1)

Country Link
JP (1) JP7043433B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023136595A (en) * 2022-03-17 2023-09-29 株式会社東芝 Digital relay device and control method for digital relay device
JP7779784B2 (en) * 2022-03-29 2025-12-03 パナソニックホールディングス株式会社 Breaking systems and distribution boards

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001333549A (en) 2000-03-15 2001-11-30 Mitsubishi Electric Corp Power system protection control system and system construction method
JP2005006370A (en) 2003-06-10 2005-01-06 Meidensha Corp Data updating method of digital protective relay
US20130232478A1 (en) 2012-03-02 2013-09-05 Lsis Co., Ltd. Method for maintaining firmware of digital protective relay and digital protective relay performing the same
JP2017017832A (en) 2015-06-30 2017-01-19 株式会社東芝 Server device
JP2017028924A (en) 2015-07-27 2017-02-02 三菱電機株式会社 Protection control device and protection control system
JP2017034752A (en) 2015-07-29 2017-02-09 東京電力ホールディングス株式会社 Supervisory control system
JP2018073238A (en) 2016-11-01 2018-05-10 株式会社東芝 Protection control system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3573891B2 (en) * 1996-12-03 2004-10-06 ティーエム・ティーアンドディー株式会社 Power system protection control system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001333549A (en) 2000-03-15 2001-11-30 Mitsubishi Electric Corp Power system protection control system and system construction method
JP2005006370A (en) 2003-06-10 2005-01-06 Meidensha Corp Data updating method of digital protective relay
US20130232478A1 (en) 2012-03-02 2013-09-05 Lsis Co., Ltd. Method for maintaining firmware of digital protective relay and digital protective relay performing the same
JP2017017832A (en) 2015-06-30 2017-01-19 株式会社東芝 Server device
JP2017028924A (en) 2015-07-27 2017-02-02 三菱電機株式会社 Protection control device and protection control system
JP2017034752A (en) 2015-07-29 2017-02-09 東京電力ホールディングス株式会社 Supervisory control system
JP2018073238A (en) 2016-11-01 2018-05-10 株式会社東芝 Protection control system

Also Published As

Publication number Publication date
JP2020114050A (en) 2020-07-27

Similar Documents

Publication Publication Date Title
US6347027B1 (en) Method and apparatus for automated reconfiguration of an electric power distribution system with enhanced protection
JP2001202104A (en) Integration of field devices in equipment control system
JP7043433B2 (en) Protection control system
JP2003299263A (en) Monitoring and control system
EP2273642B1 (en) Method and apparatus for automated reconfiguration of an electric power distribution system with enhanced protection
KR102043441B1 (en) IoT-based Smart Distribution Panelboard Control Apparatus for Mobile Communication
KR20230082007A (en) An Apparatus for Monitering a Distribution Panel Board
JP2017085777A (en) Protective relay system, protective relay, and program for protective relay
JP6794019B2 (en) Abnormal communication system of distribution board
KR20170138172A (en) Electrical safety device using a learning function and method thereof
JP5399123B2 (en) Support system for protective relay device
Gomes et al. Distribution automation case study: Rapid fault detection, isolation, and power restoration for a reliable underground distribution system
CN113067408A (en) Remote control system
KR20210129831A (en) Power Quality Analysis and Electrical Safety Management method Using Smart Distribution Board Blackbox
JP6591316B2 (en) Supervisory control device
JP4274992B2 (en) Distribution automation system and power outage construction management method
Smallwood et al. Expansion of distribution automation with communicating faulted circuit indicators
JP4767238B2 (en) Supervisory control system
US9653918B2 (en) Autonomous thermal event control and monitoring system for a network vault
US20250208848A1 (en) Firmware validation for power delivery system using simulated power delivery system values
JP7363442B2 (en) Power line transport control system
Taksana et al. Analysis of the 115/22 kV transformer fault tripping using fault tree analysis based on Python platform
JP2004080884A (en) Electric power equipment work accident prevention device, electric power equipment remote operation system, and electric power equipment work accident prevention method
JP7102142B2 (en) How to switch between monitoring control system and monitoring control system
JPH04340315A (en) Protective relay system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210308

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220208

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220215

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220316

R150 Certificate of patent or registration of utility model

Ref document number: 7043433

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150