Turbulence evaluation device, turbulence evaluation method and program Download PDFInfo
- Publication number
- JP7066374B2 JP7066374B2 JP2017215905A JP2017215905A JP7066374B2 JP 7066374 B2 JP7066374 B2 JP 7066374B2 JP 2017215905 A JP2017215905 A JP 2017215905A JP 2017215905 A JP2017215905 A JP 2017215905A JP 7066374 B2 JP7066374 B2 JP 7066374B2
- Authority
- JP
- Japan
- Prior art keywords
- turbulence
- wind
- evaluation
- evaluation index
- wind speed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Wind Motors (AREA)
Description
本願発明は、乱流評価装置、乱流評価方法及びプログラムに関し、特に、候補地点における自然エネルギーの乱流を評価するための乱流評価装置等に関するものである。 The present invention relates to a turbulence evaluation device, a turbulence evaluation method and a program, and more particularly to a turbulence evaluation device for evaluating a turbulent flow of natural energy at a candidate site.
近年、風車事故が多発している。事故調査の結果、「金属疲労」が事故の主原因と報告されている。 In recent years, wind turbine accidents have occurred frequently. As a result of the accident investigation, "metal fatigue" is reported to be the main cause of the accident.
発明者らは、風力発電について研究・開発し、実用化を行ってきた(例えば特許文献1参照)。風車は、一般に、IEC規格に基づき設計される(例えば非特許文献1参照)。また、風車の乱流(現地風条件)を評価する値として、乱流強度が知られている。乱流強度は、一般的に、風車の標準偏差の平均風速に対する比として定義されている(非特許文献2の195頁参照)。
The inventors have researched and developed wind power generation and put it into practical use (see, for example, Patent Document 1). The wind turbine is generally designed based on the IEC standard (see, for example, Non-Patent Document 1). Further, the turbulent flow intensity is known as a value for evaluating the turbulent flow (local wind condition) of the wind turbine. Turbulence intensity is generally defined as the ratio of the standard deviation of the wind turbine to the average wind speed (see
現時点では、乱流が金属疲労の原因になるとの報告はない。そのため、現在の風車は、IEC規格等に従っていれば、いずれの場所に設置しても問題がないとされている。 At this time, there are no reports that turbulence causes metal fatigue. Therefore, it is said that there is no problem in installing the current wind turbine in any place as long as it complies with the IEC standard and the like.
しかしながら、発明者らは、風車の事故や故障に対して乱流が影響している可能性に着目した。風車がIEC規格等を満足していても、設置候補地点における乱流の状況によっては、その設置候補地点に風車を設置してはいけない可能性がある。 However, the inventors noted that turbulence may have an effect on wind turbine accidents and failures. Even if the wind turbine satisfies the IEC standard, etc., it may not be possible to install the wind turbine at the candidate installation site depending on the turbulent flow conditions at the candidate installation site.
ここで、乱流強度を基準にして、候補地点に風車を設置してもよいか否かを判定することも考えられる。しかしながら、乱流強度は、例えば風車のハブ高さのように、一定の高さにおける風の標準偏差と平均風速を用いて評価するものである。そのため、候補地点における風条件を十分に評価することができない可能性があった。 Here, it is also conceivable to determine whether or not a wind turbine may be installed at the candidate site based on the turbulent flow intensity. However, the turbulent flow intensity is evaluated using the standard deviation and average wind speed of the wind at a certain height, for example, the hub height of a wind turbine. Therefore, it may not be possible to sufficiently evaluate the wind conditions at the candidate sites.
そこで、本願発明は、候補地点に風車等を設置してよいか否かを、乱流強度等とは異なる新たな評価基準によって判定することに適した乱流評価装置等を提供することを目的とする。 Therefore, an object of the present invention is to provide a turbulence evaluation device or the like suitable for determining whether or not a wind turbine or the like may be installed at a candidate point by a new evaluation standard different from the turbulence intensity or the like. And.
本願発明の第1の観点は、候補地点における自然エネルギーの乱流を評価するための乱流評価装置であって、前記候補地点を含む候補空間における前記自然エネルギーの境界入力条件を記憶する境界入力条件記憶手段と、前記境界入力条件の下で、前記候補空間における前記自然エネルギーの変化を演算するシミュレーション手段と、前記シミュレーション手段が演算した前記候補空間における前記自然エネルギーの変化と、前記境界入力条件記憶手段が記憶する前記境界入力条件とを用いて、前記候補地点における乱流評価指標を演算する乱流評価指標演算手段と、乱流評価指標が評価基準値を超える場合に、前記候補地点の前記自然エネルギーの乱流が大きいと判定する判定手段を備えるものである。 The first aspect of the present invention is a turbulence evaluation device for evaluating the turbulence of natural energy at a candidate point, and is a boundary input for storing the boundary input condition of the natural energy in the candidate space including the candidate point. The condition storage means, the simulation means for calculating the change of the natural energy in the candidate space under the boundary input condition, the change of the natural energy in the candidate space calculated by the simulation means, and the boundary input condition. The turbulence evaluation index calculation means for calculating the turbulence evaluation index at the candidate point using the boundary input condition stored in the storage means, and the turbulence evaluation index when the turbulence evaluation index exceeds the evaluation reference value, the candidate point It is provided with a determination means for determining that the turbulence of the natural energy is large.
本願発明の第2の観点は、第1の観点の乱流評価装置であって、前記自然エネルギーの変化は、前記自然エネルギーが変化する速さであり、前記境界入力条件は、前記候補空間の境界の一部又は全部における前記自然エネルギーの変化の最大の速さを含み、前記候補空間に含まれる評価点における前記自然エネルギーの変化の速さの標準偏差を演算する標準偏差演算手段を備え、前記乱数評価指標演算手段は、前記乱流評価指標を、前記評価点における前記標準偏差の、前記最大の速さに対する比として演算するものである。 The second aspect of the present invention is the turbulence evaluation device of the first aspect, the change of the natural energy is the speed at which the natural energy changes, and the boundary input condition is the candidate space. A standard deviation calculation means for calculating the standard deviation of the change speed of the natural energy at the evaluation points included in the candidate space, including the maximum speed of the change of the natural energy in a part or all of the boundary, is provided. The random number evaluation index calculation means calculates the turbulence evaluation index as a ratio of the standard deviation at the evaluation point to the maximum speed.
本願発明の第3の観点は、第1又は第2の観点の乱流評価装置であって、実測して得られた、又は、前記シミュレーション手段により得られた、前記評価点における前記自然エネルギーにおいて、単位時間当たりの変化の平均が判定基準値を超えた方向がある場合に、前記境界入力条件は、前記評価点において前記判定基準値に対応する前記自然エネルギーの変化を生じ得るものであり、前記シミュレーション手段は、前記境界入力条件の下で、前記候補空間における前記自然エネルギーの変化を演算し、前記乱流評価指標演算手段は、前記判定基準値を超えた方向における前記自然エネルギーの変化に対して乱流評価指標を演算するものである。 The third aspect of the present invention is the turbulence evaluation device of the first or second aspect, in the natural energy at the evaluation point obtained by actual measurement or obtained by the simulation means. When there is a direction in which the average of the changes per unit time exceeds the determination reference value, the boundary input condition can cause the change of the natural energy corresponding to the determination reference value at the evaluation point. The simulation means calculates the change of the natural energy in the candidate space under the boundary input condition, and the turbulence evaluation index calculation means changes the natural energy in a direction exceeding the determination reference value. On the other hand, the turbulence evaluation index is calculated.
本願発明の第4の観点は、候補地点における自然エネルギーの乱流を評価するための乱流評価装置であって、前記候補地点を含む候補空間における前記自然エネルギーの境界入力条件を記憶する境界入力条件記憶手段と、前記境界入力条件の下で、前記候補空間における前記自然エネルギーの変化を演算するシミュレーション手段と、前記シミュレーション手段が演算した前記候補空間における前記自然エネルギーの変化と、前記境界入力条件記憶手段が記憶する前記境界入力条件とを用いて、前記候補地点における乱流評価指標を演算する乱流評価指標演算手段と、前記候補地点において前記自然エネルギーを利用して発電する発電装置の設計疲労線を記憶する設計DEL記憶手段と、複数の疲労荷重式を用いて前記発電装置の蓄積疲労を計算する蓄積疲労演算手段と、前記蓄積疲労が前記設計疲労線を越える時点を得る寿命評価手段を備え、前記乱流評価指標演算手段は、複数の方位のそれぞれからの前記自然エネルギーに対して、前記候補地点における前記乱流評価指標を演算し、前記疲労荷重式は、少なくとも、前記乱流評価指標が前記評価基準値を超える方位からの前記自然エネルギーによる蓄積疲労を計算するための第1疲労荷重式と、前記乱流評価指標が前記評価基準値を超えない方位からの前記自然エネルギーによる蓄積疲労を計算するための第2疲労荷重式を含み、前記第1疲労荷重式と前記第2疲労荷重式とは異なり、前記蓄積疲労演算手段は、複数の方位のそれぞれに対して、前記乱流評価指標の値に応じて前記複数の疲労荷重式の一つを選択して前記蓄積疲労を演算する。 The fourth aspect of the present invention is a turbulence evaluation device for evaluating the turbulence of natural energy at a candidate point, and is a boundary input for storing the boundary input condition of the natural energy in the candidate space including the candidate point. The condition storage means, the simulation means for calculating the change of the natural energy in the candidate space under the boundary input condition, the change of the natural energy in the candidate space calculated by the simulation means, and the boundary input condition. Design of a turbulence evaluation index calculation means for calculating a turbulence evaluation index at the candidate point using the boundary input condition stored in the storage means, and a power generation device for generating power using the natural energy at the candidate point. A design DEL storage means for storing a fatigue line, a cumulative fatigue calculation means for calculating the accumulated fatigue of the power generation device using a plurality of fatigue load equations, and a life evaluation means for obtaining a time point when the accumulated fatigue exceeds the designed fatigue line. The turbulence evaluation index calculation means calculates the turbulence evaluation index at the candidate point for the natural energy from each of a plurality of directions, and the fatigue load formula is at least the turbulence. The first fatigue load equation for calculating the accumulated fatigue due to the natural energy from the direction in which the evaluation index exceeds the evaluation reference value, and the natural energy from the direction in which the turbulence evaluation index does not exceed the evaluation reference value. The accumulated fatigue calculation means includes the second fatigue load formula for calculating the accumulated energy, and unlike the first fatigue load formula and the second fatigue load formula, the accumulated fatigue calculation means has the disturbance for each of a plurality of directions. The accumulated energy is calculated by selecting one of the plurality of fatigue load equations according to the value of the flow evaluation index.
本願発明の第5の観点は、第4の観点の乱流評価装置であって、前記疲労荷重式は、前記発電装置における前記自然エネルギーの変化の速さ及び前記自然エネルギーの変化の速さの標準偏差に対して直線近似することにより得られたものである。 The fifth aspect of the present invention is the turbulence evaluation device of the fourth aspect, and the fatigue load type is the rate of change of the natural energy and the speed of change of the natural energy in the power generation device. It was obtained by linear approximation to the standard deviation.
本願発明の第6の観点は、候補地点における自然エネルギーの乱流を評価するための乱流評価装置における乱流評価方法であって、前記乱流評価装置は、前記候補地点を含む候補空間における前記自然エネルギーの境界入力条件を記憶する境界入力条件記憶手段を備え、前記乱流評価装置が備えるシミュレーション手段が、前記境界入力条件の下で、前記候補空間における前記自然エネルギーの変化を演算するシミュレーションステップと、前記乱流評価装置が備える乱流評価指標演算手段が、前記シミュレーション手段が演算した前記候補空間における前記自然エネルギーの変化と、前記境界入力条件記憶手段が記憶する前記境界入力条件とを用いて、前記候補地点における乱流評価指標を演算する乱流評価指標演算ステップと、前記乱流評価装置が備える判定手段が、乱流評価指標が評価基準値を超える場合に、前記候補地点の前記自然エネルギーの乱流が大きいと判定する判定ステップを含むものである。 A sixth aspect of the present invention is a turbulence evaluation method in a turbulence evaluation device for evaluating turbulence of natural energy at a candidate point, wherein the turbulence evaluation device is in a candidate space including the candidate point. A simulation means in which the boundary input condition storage means for storing the boundary input condition of the natural energy is provided and the simulation means provided in the turbulence evaluation device calculates the change of the natural energy in the candidate space under the boundary input condition. The step and the change of the natural energy in the candidate space calculated by the turbulence evaluation index calculation means calculated by the turbulence evaluation device and the boundary input condition stored by the boundary input condition storage means. When the turbulence evaluation index calculation step for calculating the turbulence evaluation index at the candidate point and the determination means provided in the turbulence evaluation device exceed the evaluation reference value, the candidate point It includes a determination step for determining that the turbulence of the natural energy is large.
本願発明の第7の観点は、コンピュータにおいて、第6の観点の乱流評価方法を実現するためのプログラムである。なお、本願発明を、第7の観点のプログラムを記録するコンピュータ読み取り可能な記録媒体として捉えてもよい。 The seventh aspect of the present invention is a program for realizing the turbulence evaluation method of the sixth aspect in a computer. The invention of the present application may be regarded as a computer-readable recording medium for recording the program of the seventh aspect.
本願発明の各観点によれば、シミュレーションにより得られた自然エネルギーのデータを利用して、乱流評価指標という新たな基準を用いて、候補地点における自然エネルギーの乱流を評価できる。ここで、乱流評価指標は、従来の乱流強度とは異なる。乱流強度は、ハブ高さ等における固定点における風速の標準偏差と平均速度によって得られる値である。他方、乱流評価指標は、境界入力条件換算値であり、シミュレーションにおいて用いられる境界入力条件と、ハブ高さ等における標準偏差等を用いて得られる。そして、後に示すように、発明者らは、この乱流評価指標を使用して、候補地点における乱流が自然エネルギーを利用した発電装置の故障の要因となりうる程度か否かを原因となるか否かの判断できることを実験により明らかにした。 According to each aspect of the present invention, the turbulence of natural energy at the candidate site can be evaluated by using the data of natural energy obtained by the simulation and using a new standard called the turbulence evaluation index. Here, the turbulence evaluation index is different from the conventional turbulence intensity. The turbulent flow intensity is a value obtained by the standard deviation and the average velocity of the wind speed at a fixed point such as the height of the hub. On the other hand, the turbulence evaluation index is a boundary input condition conversion value, and is obtained by using the boundary input condition used in the simulation and the standard deviation in the hub height or the like. Then, as will be shown later, the inventors use this turbulence evaluation index to determine whether or not the turbulence at the candidate site can cause the failure of the power generation device using natural energy. It was clarified by an experiment that it can be judged whether or not.
さらに、本願発明の第2の観点によれば、例えば、評価点が風車のハブ高さであり、境界入力条件において風車の頂上の標高における最大風速Uin(境界風速)である場合には、「乱流評価指標=σu(ハブ高さ風速標準偏差)/Uin(境界風速)」という計算式により得ることができる。 Further, according to the second aspect of the present invention, for example, when the evaluation point is the hub height of the wind turbine and the maximum wind speed U in (boundary wind speed) at the altitude of the top of the wind turbine under the boundary input condition. It can be obtained by the formula "turbulence evaluation index = σ u (hub height wind speed standard deviation) / U in (boundary wind speed)".
さらに、本願発明の第3の観点によれば、例えば風速が大きい時間帯などのように、変化が大きい時間帯において乱流評価指標を演算して乱流を評価する。このように、危険性のある方向及びその時間帯を特定して、乱流評価指標により評価することができる。 Further, according to the third aspect of the present invention, the turbulence evaluation index is calculated and the turbulence is evaluated in the time zone in which the change is large, such as the time zone in which the wind speed is large. In this way, the dangerous direction and the time zone thereof can be specified and evaluated by the turbulence evaluation index.
さらに、本願発明の第4の観点によれば、乱流評価指標に対応した疲労荷重式を用いることにより、発電装置の寿命予測をすることができる。特に、第5の観点によれば、例えば風力発電であれば、第2の観点にあるように乱流指標が風速と風速標準偏差と風速の比から得られること、さらには、発明者らが見出した風速と風速標準偏差が蓄積疲労と直線近似できることを利用して、評価基準値を超えるものと超えないものとに対し、風速と風速標準偏差により直線近似することにより得られた疲労荷重式を利用することにより、精度の高い寿命予測が可能となる。 Further, according to the fourth aspect of the present invention, the life of the power generation device can be predicted by using the fatigue load formula corresponding to the turbulence evaluation index. In particular, according to the fifth viewpoint, for example, in the case of wind power generation, the turbulence index can be obtained from the ratio of the wind speed to the wind speed standard deviation and the wind speed as in the second viewpoint, and further, the inventors Using the fact that the found wind speed and wind speed standard deviation can be linearly approximated to accumulated fatigue, the fatigue load formula obtained by linearly approximating the wind speed and wind speed standard deviation for those that exceed and do not exceed the evaluation standard value. By using, it is possible to predict the life with high accuracy.
以下、図面を参照して本願発明の実施例について説明する。なお、本願発明は、以下の実施例に限定されるものではない。 Hereinafter, examples of the present invention will be described with reference to the drawings. The invention of the present application is not limited to the following examples.
図1は、本願発明の実施の形態の一例に係る乱流評価装置の構成の一例を示すブロック図である。図2は、図1の乱流評価装置1の動作の一例を示すフロー図である。図1及び図2を参照して、乱流評価装置1の構成及び動作の一例を説明する。
FIG. 1 is a block diagram showing an example of the configuration of a turbulence evaluation device according to an example of the embodiment of the present invention. FIG. 2 is a flow chart showing an example of the operation of the
ここで、乱流評価装置1は、自然エネルギーとして風を使って発電する風力発電装置(風車)を候補地点に設置してよいか否かを判定するものであるとする。また、候補空間は、風車を設置する空間であるとする。候補空間の最も高い場所は、風車の最も高い箇所(通常、ブレード先端高さである。)の標高となる。評価点は、風車のハブ高さであるとする。
Here, it is assumed that the
従来知られている乱流強度は、「乱流強度=σu(ハブ高さ風速標準偏差)/U(ハブ高さ平均風速)」と表現されるように、風車によって定まる一定の高さにおける風のデータのみを使用する。これは、風車で実測できるため、広く利用されている。しかしながら、乱流強度は、いわば、ハブ高さにおける風という一部のサンプルによって候補地点の評価をしようとしている。そのため、風力発電の事業者は、乱流強度によっては、風車を、全体として評価することはできない。 The conventionally known turbulent intensity is expressed as "turbulent intensity = σ u (hub height standard deviation of wind speed) / U (hub height average wind speed)" at a constant height determined by the wind turbine. Use only wind data. This is widely used because it can be measured with a wind turbine. However, the turbulence intensity is trying to evaluate the candidate site by a part of the sample, so to speak, the wind at the hub height. Therefore, the wind power generation company cannot evaluate the wind turbine as a whole depending on the turbulence intensity.
他方、発明者らは、自ら研究・開発した高精度なシミュレーション装置によって、任意の条件の下で、風のデータを得ることができる。そして、新たに導入する乱流評価指標は、「乱流評価指標=σu(ハブ高さ風速標準偏差)/Uin(境界風速)」であり、シミュレーションにおいて用いる境界入力条件を参照して、境界風速換算値として得られるものである。そのため、乱流評価装置1は、境界入力条件の下でのシミュレーションにより得られた風のデータを利用して、境界入力条件を加味した乱流評価指標により、候補地点における乱流の評価をすることができる。よって、風力発電の事業者は、シミュレーションを利用して、候補地点に風車を設置した状態を想定して、候補地点に風車を設置してよいか否かを判断することができる。
On the other hand, the inventors can obtain wind data under arbitrary conditions by using a high-precision simulation device that they have researched and developed. The newly introduced turbulence evaluation index is "turbulence evaluation index = σ u (hub height wind speed standard deviation) / U in (boundary wind speed)", and refer to the boundary input conditions used in the simulation. It is obtained as a boundary wind speed conversion value. Therefore, the
このように、本願により新たに導入する乱流評価指標は、候補地点に風車を設置する空間を評価することができる。さらに、各風向によっても高精度に評価できるため、風力発電の事業者にとって、例えば、故障の危険性がある風向を事前に知り、その風向のときには発電を止めて故障を回避し、他の風向のときは発電することなどの適切な発電制御を行うことにより、故障による停止を回避して、効率よく電気を得ることができる。このように、候補地点の評価は、故障を予防する対応策が可能か否かによっても評価が変わる。本願発明によれば、方向に応じた制御などの使用態様も考慮することができる。 As described above, the turbulence evaluation index newly introduced by the present application can evaluate the space where the wind turbine is installed at the candidate point. Furthermore, since each wind direction can be evaluated with high accuracy, for wind power generation companies, for example, the wind direction at risk of failure can be known in advance, and when that wind direction is reached, power generation is stopped to avoid failure, and other wind directions. In this case, by performing appropriate power generation control such as power generation, it is possible to avoid stoppage due to a failure and efficiently obtain electricity. In this way, the evaluation of candidate points changes depending on whether or not countermeasures to prevent failures are possible. According to the present invention, usage modes such as control according to the direction can also be considered.
図1を参照して、乱流評価装置1は、地形データ記憶部3(本願請求項の「地形データ記憶手段」の一例)と、境界入力条件記憶部5(本願請求項の「境界入力条件記憶手段」の一例)と、基準値記憶部7と、乱流評価指標記憶部9と、シミュレーション部11(本願請求項の「シミュレーション手段」の一例)と、制御部12と、標準偏差演算部13(本願請求項の「標準偏差演算手段」の一例)と、乱流評価指標演算部15(本願請求項の「乱流評価指標演算手段」の一例)と、判定部17(本願請求項の「判定手段」の一例)と、表示部19(本願請求項の「表示手段」の一例)を備える。
With reference to FIG. 1, the
地形データ記憶部3は、候補地点を含む地域の地形を特定するための地形データを記憶する。境界入力条件記憶部5は、境界入力条件を記憶する。本実施例では、境界入力条件には、境界風速が含まれるとする。ここで、境界風速は、風車のブレード先端高さの標高での最大風速であるとする。以下では、境界風速は10m/sとする。基準値記憶部7は、判断処理の基準値を記憶する。本実施例では、判定基準値と評価基準値を記憶する。乱流評価指標記憶部9は、乱流評価指標演算部15が演算した乱流評価指標を記憶する。
The terrain
図2を参照して、図1の乱流評価装置1の各構成の動作の一例を説明する。
An example of the operation of each configuration of the
まず、シミュレーション部11は、境界入力条件記憶部5が記憶する境界入力条件の下で、地形データ記憶部3が記憶する地形データを参照して、評価期間での評価点(ハブ高さ)における風のデータを得る(ステップST1)。
First, the
次に、制御部12は、例えば45°で分割して、東(東を中心に45°の範囲から吹く風。以下同様。)、南東、南、南西、西、北西、北、北東の8つに分割するように、風向を複数に分割し、その一つを選択する(ステップST2)。なお、上下を加えて3次元的に分割してもよい。
Next, the
制御部12は、シミュレーション部11が得た風のデータにおける風向を利用して、ステップST2で設定された風向の風の風速の経時的データを得る(ステップST3)。ステップST3で得た風速の経時的データは、一つ又は複数の期間のものとする。連続する期間に属する風のデータを、「風速群」という。期間を分ける基準は、例えば、他の風向から設定された風向になり他の風向に変わるまでを一つの風速群としたり、同じ風向であっても風速が所定値未満から所定値以上となって所定値未満になるまでを一つの風速群としたり、それらを組み合わせて風速群としたりしてよい。
The
制御部12は、一つの風速群を選択する(ステップST4)。そして、選択した風速群での単位時間の平均風速が、判定基準値を超えるか否かを判断する(ステップST5)。本実施例では、単位時間は10分間であり、判定基準値は9.0m/sである。単位時間の平均風速が判定基準値を超えるならば、ステップST6に進む。単位時間の平均風速が判定基準値を超えないならば、ステップST10に進む。
The
ステップST6において、標準偏差演算部13は、ハブ高さにおける風速の標準偏差を演算する。そして、乱流評価指標演算部15は、標準偏差演算部13が演算した風速の標準偏差と、境界入力条件記憶部5が記憶する境界速度を用いて、候補地点における乱流評価指標を演算する(ステップST7)。
In step ST6, the standard
判定部17は、乱流評価指標が評価基準値を超えるか否かを判定する(ステップST9)。ここで、評価基準値は、0.2である。判定部17は、乱流評価指標が評価基準値を超えないならば、ステップST10に進む。判定部17は、乱流評価指標が評価基準値を超えるならば、候補地点における風の乱流が大きいと判定し、表示部19に対して、風向と、乱流評価指標が評価基準値を超えることを表示させ(ステップST9)、ステップST10に進む。
The
制御部12は、全ての風速群に対して処理を行ったか否かを判断する(ステップST10)。処理を行っていない風速群があるならば、ステップST4に戻り、処理を行っていない一つの風速群を選択する。全ての風速群に対して処理を行ったならば、全ての風向に対して処理を行ったか否かを判断する(ステップST11)。全ての風向に対して処理を行っていないならば、ステップST2に戻り、処理を行っていない一つの風向を選択する。全ての風向に対して処理を行ったならば、図2の処理を終了する。
The
図3~図6を参照して、発明者らが行った実験を説明する。 The experiments conducted by the inventors will be described with reference to FIGS. 3 to 6.
図3は、本願で新たに導入する乱流評価指標を説明するための図である。 FIG. 3 is a diagram for explaining a turbulence evaluation index newly introduced in the present application.
図3(a)は、風車の鉛直方向の理想的な層流の風速分布を示す。地表から滑らかに増加し、羽根(ブレード)の部分では均等に分布することにより、各羽根には均等に力が働き、回転スピードはほぼ同一となる。そのため、3枚の羽根の根元にかかるストレスもほぼ同じとなる。風車性能が規定される風条件は、図3(a)のような状態である。 FIG. 3A shows the wind speed distribution of the ideal laminar flow in the vertical direction of the wind turbine. By smoothly increasing from the ground surface and evenly distributed in the blades, the force acts evenly on each blade, and the rotation speed becomes almost the same. Therefore, the stress applied to the roots of the three blades is almost the same. The wind conditions for which the wind turbine performance is defined are as shown in FIG. 3 (a).
しかしながら、例えば風上に山があるような地点では、図3(b)にあるように、地形の変化により、地表近くの風速や風の周期が乱される。図3(c)にあるように、風の乱れは、図3(a)の理想的な風速分布から離れることとなる。図3(c)では、受風面の下部の風速が、乱流化の影響で減速されると、3枚の羽根の回転スピードや、根元にかかるストレスが異なることになる。特に、乱流化の影響で風の周期も小さくなるために、羽根の根元には、サイクリックにストレスが発生し、そのストレスが蓄積し、最終的には危機損傷につながる可能性がある。そして、これによって金属疲労等が進行し、故障や事故が発生する可能性が高まる。図3(d)は、後のシミュレーションで得られたデータによる乱流化の状況を示すものである。縦軸は地表からの高さを示し、横軸は速度分布を示す。矢印は、ハブ高さにおいて、理想的な風速分布から減速した幅を示す。 However, for example, at a point where there is a mountain on the windward side, as shown in FIG. 3 (b), the wind speed and the wind cycle near the ground surface are disturbed due to the change in topography. As shown in FIG. 3 (c), the wind turbulence deviates from the ideal wind speed distribution in FIG. 3 (a). In FIG. 3C, when the wind speed at the lower part of the wind receiving surface is decelerated due to the influence of turbulence, the rotation speeds of the three blades and the stress applied to the roots are different. In particular, since the wind cycle becomes smaller due to the influence of turbulence, cyclic stress is generated at the base of the blade, and the stress accumulates, which may eventually lead to crisis damage. As a result, metal fatigue and the like progress, and the possibility of failure or accident increases. FIG. 3D shows the state of turbulence based on the data obtained in the later simulation. The vertical axis shows the height from the ground surface, and the horizontal axis shows the velocity distribution. Arrows indicate the width of the hub height decelerated from the ideal wind speed distribution.
ここで、複雑地形特有の風条件で金属疲労が生じても、風車の構造強度で十分に耐えることができるのであれば、その地形に風車を設置することができる。そこで、実験では、実際に測定した風車機器に入力される風速のデータや、風車ブレード歪みのデータを測定し、複雑地形特有の風条件と風車の構造強度への影響を特定したうえで、複雑地形での風条件の再現結果(リアムコンパクト社による風況解析結果)に基づく、数値風況面から、風車事故を提言する最適配置基準の定量化を行う。この最適配置基準を利用することにより、最適配置計画を支援することができる。 Here, even if metal fatigue occurs under the wind conditions peculiar to complicated terrain, the wind turbine can be installed on the terrain as long as the structural strength of the wind turbine can sufficiently withstand it. Therefore, in the experiment, the wind speed data input to the actually measured wind turbine equipment and the wind turbine blade strain data are measured, and the wind conditions peculiar to complicated terrain and the influence on the structural strength of the wind turbine are identified and then complicated. Based on the reproduction results of wind conditions on the terrain (wind condition analysis results by Liam Compact), we will quantify the optimum placement criteria for recommending wind turbine accidents from the numerical wind condition side. By using this optimum placement standard, it is possible to support the optimum placement plan.
実験では、まず、実際の風車において、風況と風車挙動の同期計測データを比較し、歪みデータ変動量(振幅)の大きい風向を特定した。ここで、風況は、ナセル風速計・風向計を使用して風速・風向変動を解析した。風車挙動は、3枚のブレード根元ルート部に歪みケージを設置し、歪み変動を解析した。 In the experiment, first, in an actual wind turbine, the synchronized measurement data of the wind condition and the wind turbine behavior were compared, and the wind direction in which the strain data fluctuation amount (amplitude) was large was identified. Here, the wind conditions were analyzed for wind speed and wind direction fluctuations using a nacelle anemometer and wind direction meter. For the wind turbine behavior, strain cages were installed at the root roots of the three blades, and strain fluctuations were analyzed.
そして、特定した風向を対象に、ブレード曲げ疲労荷重評価を実施して、複雑地形での風車疲労への影響を把握した。歪みデータより20年間のブレード曲げ疲労荷重を算定し、ブレード曲げ疲労ダメージを評価した(ブレード曲げ疲労ダメージ=歪みデータより算定した疲労荷重(20年)/設計許容疲労荷重(20年))。ブレード曲げ疲労ダメージが1を超えた場合、耐用年数20年経過前に疲労破壊に至ることとなる。 Then, the blade bending fatigue load was evaluated for the specified wind direction, and the effect on wind turbine fatigue in complicated terrain was grasped. The blade bending fatigue load for 20 years was calculated from the strain data, and the blade bending fatigue damage was evaluated (blade bending fatigue damage = fatigue load calculated from strain data (20 years) / design allowable fatigue load (20 years)). If the blade bending fatigue damage exceeds 1, fatigue fracture will occur before the end of the useful life of 20 years.
図4(a)は、実際の風車での歪みセンサを設置した状況を示す。この風車は、ブレード先端高さ100mであり、ブレードの直径が80m、ハブ高さは60mである。ブレード3本の根元(ルート部:ハブ接合面から約1.3m)は、既設設備に後付けで取り付け可能な場所であり、歪みセンサを設置した。ブレード根元の強度評価(ブレードの曲げ荷重評価)は、ブレードを通して風力エネルギーが入力されるため、重要である。 FIG. 4A shows a situation in which a strain sensor is installed in an actual wind turbine. This wind turbine has a blade tip height of 100 m, a blade diameter of 80 m, and a hub height of 60 m. The roots of the three blades (root part: about 1.3 m from the hub joint surface) are places that can be retrofitted to existing equipment, and strain sensors are installed. The strength evaluation of the blade root (blade bending load evaluation) is important because the wind energy is input through the blade.
図4(b)~(d)は、歪み計測データを示す。(b)東風では、11/13の8:00~10:00に、大きな歪みが計測されている。(c)北風では、11/9の17:00~22:00に、大きな歪みが計測されている。(d)南風では、11/14の2:00~5:00に、大きな歪みが計測されている。 4 (b) to 4 (d) show strain measurement data. (B) In the easterly wind, a large distortion was measured from 8:00 to 10:00 on November 13. (C) In the north wind, a large distortion was measured from 17:00 to 22:00 on November 9. (D) In the southerly wind, a large distortion was measured from 2:00 to 5:00 on November 14.
風向別に風速及び歪み計測データを分析すると、東風、北風及び南風で、最大9/s程度まで風速が上昇した際に、歪み変動(変動)が最大になっている。東風、北風及び南風は、大きな歪みが出た時間帯で、ほぼ同程度の風速まで上昇したが、歪み変動は、東風が最も大きかった。疲労ダメージは、東風が2.03、北風は0.95、南風が0.93であった。東風は1を超えるため、耐用年数20年経過前に疲労破壊に至ることが予想される。 Analyzing the wind speed and strain measurement data for each wind direction, the strain fluctuation (fluctuation) becomes maximum when the wind speed rises to a maximum of about 9 / s in the east wind, the north wind, and the south wind. The east wind, north wind, and south wind rose to almost the same wind speed during the time when the large distortion occurred, but the distortion fluctuation was the largest in the east wind. The fatigue damage was 2.03 for the east wind, 0.95 for the north wind, and 0.93 for the south wind. Since the east wind exceeds 1, it is expected that fatigue rupture will occur before the useful life of 20 years has passed.
図5を参照して、東風のときの風況及び歪み計測データの分析と、風車疲労荷重評価を具体的に説明する。図5(a)を参照して、歪み変動が大きな11/13の8:00~13:00を具体的に分析する。ここで、サンプリング周期は、50Hz(0.02s)である。この時間帯の風速及び風向の時系列データを分析すると、連続的に東方向の風が発生し、乱流化の影響により風の周期も短くなっている。図5(b)を参照して、風速9.7m/s(10分間平均)のとき、疲労ダメージの最大が2.03になっている。風速の標準偏差は、約2.4m/sである。東風が連続して発生した8:00~10:00にかけて疲労ダメージが2程度となっている。その後、南東に移行し1未満となっている。そのため、例えば東風のときには発電を停止し、南東の風に移行したときに発電を再開するなどように、風向に応じた制御を行うことにより、故障を回避しつつ、継続した発電を実現することができる。 With reference to FIG. 5, the analysis of wind conditions and strain measurement data in the case of an east wind and the evaluation of wind turbine fatigue load will be specifically described. With reference to FIG. 5A, a concrete analysis is made from 8:00 to 13:00 on November 13, when the strain fluctuation is large. Here, the sampling period is 50 Hz (0.02 s). Analyzing the time-series data of wind speed and wind direction in this time zone, eastern winds are continuously generated, and the wind cycle is shortened due to the influence of turbulence. With reference to FIG. 5 (b), the maximum fatigue damage is 2.03 when the wind speed is 9.7 m / s (10-minute average). The standard deviation of the wind speed is about 2.4 m / s. Fatigue damage is about 2 from 8:00 to 10:00 when the east wind occurs continuously. After that, it moved to the southeast and became less than 1. Therefore, for example, by controlling according to the wind direction, such as stopping power generation when the wind is easterly and restarting power generation when the wind shifts to the southeast, continuous power generation can be realized while avoiding failures. Can be done.
続いて、図6を参照して、風況シミュレーションにより得られたデータについて説明する。ここで、地形による乱流の影響を評価するために、東風のときの風上の山があるとき(標高修正なし)と、山がないとき(標高修正あり)を比較した。 Subsequently, the data obtained by the wind condition simulation will be described with reference to FIG. Here, in order to evaluate the effect of turbulence due to the terrain, we compared the time when there was an upwind mountain in the easterly wind (without elevation correction) and the time when there was no mountain (with elevation correction).
図6(a)は、東風について、標高修正のある場合と無い場合を比較したものである。標高修正が無い場合は、標高修正がある場合に比較して、風速の変化が大きかった。標高修正がある場合の風速の変化は、風上に山がない北風や南風での風速の変化と同様であった。 FIG. 6A compares the easterly wind with and without elevation correction. When there was no altitude correction, the change in wind speed was larger than when there was altitude correction. The change in wind speed with elevation correction was similar to the change in wind speed in north and south winds with no mountains upwind.
実測風況データと風況シミュレーション結果を比較すると、東風(風向90deg付近)の場合、風向変動周期は、両者が同一の周期的変動(周期6~7s程度)が見られ、風速変動が大きかった。また、風速の標準偏差は、両者ともに約2.4m/s(シミュレーションではU成分)であり、ほぼ一致する傾向が見られた。そのため、実機では、シミュレーション結果で得られたように、乱流が発生したと考えられる。
Comparing the measured wind condition data and the wind condition simulation result, in the case of the east wind (around 90 deg of the wind direction), the same periodic fluctuation (
図3(d)で示したように、境界入力条件として与えた風速に対して、実機では、ブレード面で減速(乱流化)している。シミュレーション結果では、地形の影響を受けて、受風面下部に向けて平均風速が小さくなっており乱流が発生していると考えられる。 As shown in FIG. 3D, the wind speed given as the boundary input condition is decelerated (turbulent) on the blade surface in the actual machine. According to the simulation results, it is considered that the average wind speed decreases toward the lower part of the wind receiving surface and turbulence is generated due to the influence of the topography.
乱流評価について、実測の場合、東風風速9.7m/s、標準偏差2.4で、乱流強度25%となった。東風において疲労ダメージ2.03で、5.88年で設計疲労荷重の計画値に到達する結果となった。 Regarding the turbulence evaluation, in the case of actual measurement, the easterly wind speed was 9.7 m / s, the standard deviation was 2.4, and the turbulence intensity was 25%. With a fatigue damage of 2.03 in the easterly wind, the planned value of the design fatigue load was reached in 5.88.
シミュレーション結果では、東風において、本願が新たに提案する乱流評価指標(境界風速(10m/s)換算値)は、0.236(=ハブ高さ標準偏差2.36m/s/境界風速10m/s)となった。なお、乱流強度は、64%(ハブ高さ標準偏差2.36m/s/平均風速3.71m/s)であった。他方、北風及び南風では、それぞれ、乱流評価指標は0.099及び0.111、乱流強度は0.11及び0.09である。これより、乱流評価指標が0.2を超えないという配置基準(すなわち、乱流評価指標の上限を0.2とする基準)は妥当であり、今回の実験で、乱流評価指標0.236で、疲労ダメージ2.03となり、定量的に評価することができた。 According to the simulation results, the turbulence evaluation index (boundary wind speed (10 m / s) conversion value) newly proposed by the present application for easterly wind is 0.236 (= hub height standard deviation 2.36 m / s / boundary wind speed 10 m / s). became. The turbulent flow intensity was 64% (hub height standard deviation 2.36 m / s / average wind speed 3.71 m / s). On the other hand, in the north wind and the south wind, the turbulence evaluation indexes are 0.099 and 0.111, and the turbulence intensity is 0.11 and 0.09, respectively. From this, the placement criterion that the turbulence evaluation index does not exceed 0.2 (that is, the criterion that the upper limit of the turbulence evaluation index is 0.2) is appropriate, and in this experiment, the turbulence evaluation index 0.236 was used. , Fatigue damage was 2.03, which could be evaluated quantitatively.
以上をまとめると、風車事故を低減できる配置は、以下のように考えることができる。まず、例えば風況観測データをもとに風速が9m/sを超えた場合において、その風向に乱流を引き起こす障害(地形・地物)の有無を確認する。次に、障害が引き起こす風向をシミュレーションし、乱流評価指標が0.2以内であることを確認する。すなわち、今回の実験で、乱流評価指標が0.2を超えたとき、疲労ダメージが1以上となった。 Summarizing the above, the layout that can reduce wind turbine accidents can be considered as follows. First, for example, when the wind speed exceeds 9 m / s based on the wind condition observation data, it is confirmed whether or not there is an obstacle (topography / feature) that causes turbulence in the wind direction. Next, simulate the wind direction caused by the obstacle and confirm that the turbulence evaluation index is within 0.2. That is, in this experiment, when the turbulence evaluation index exceeded 0.2, the fatigue damage was 1 or more.
図7は、本願発明の実施の形態の他の一例に係る乱流評価装置の構成の一例を示すブロック図である。図8は、図7の乱流評価装置21の動作の一例を示すフロー図である。図7及び図8を参照して、乱流評価装置21の構成及び動作の一例を説明する。
FIG. 7 is a block diagram showing an example of the configuration of the turbulence evaluation device according to another example of the embodiment of the present invention. FIG. 8 is a flow chart showing an example of the operation of the
乱流評価装置21は、自然エネルギーとして風を使って発電する風力発電装置(風車)を候補地点に設置してよいか否かを判定するものであるとする。
It is assumed that the
図7を参照して、乱流評価装置21は、地形データ記憶部3(本願請求項の「地形データ記憶手段」の一例)と、境界入力条件記憶部5(本願請求項の「境界入力条件記憶手段」の一例)と、基準値記憶部7と、乱流評価指標記憶部9と、シミュレーション部11(本願請求項の「シミュレーション手段」の一例)と、制御部12と、標準偏差演算部13(本願請求項の「標準偏差演算手段」の一例)と、乱流評価指標演算部15(本願請求項の「乱流評価指標演算手段」の一例)を備える。これらの各部は、図1の乱流評価装置1における同じ符号を付したものと同様に動作し、乱流評価指標演算部15は、各方向の乱流評価指標を演算する。
With reference to FIG. 7, the
乱流評価装置21は、さらに、実測値記憶部23と、設計DEL記憶部25(本願請求項の「設計DEL記憶手段」の一例)と、疲労荷重式演算部27と、蓄積疲労演算部29(本願請求項の「蓄積疲労演算手段」の一例)と、寿命評価部31(本願請求項の「寿命評価手段」の一例)を備える。
The
図8を参照して、シミュレーション部11は、境界入力条件記憶部5が記憶する境界入力条件の下で、地形データ記憶部3が記憶する地形データを参照して、評価期間での評価点(ハブ高さ)における風のデータを得る(ステップSTJ1)。
With reference to FIG. 8, the
次に、乱流評価指標演算部15は、16方位に分割された各方位に対して、標準偏差演算部13が演算した風速の標準偏差と、境界入力条件記憶部5が記憶する境界速度を用いて、候補地点における乱流評価指標を演算する(ステップSTJ2)。
Next, the turbulence evaluation
ステップSTJ1及びSTJ2は、具体的には、図1においてステップST8及びST9を省略したものと同様にして演算することができる。 Specifically, steps STJ1 and STJ2 can be calculated in the same manner as in FIG. 1 in which steps ST8 and ST9 are omitted.
疲労荷重式演算部27は、各方位の一部又は全部に対して、直線近似を行い、疲労荷重式を演算する(ステップSTJ3)。
The fatigue load
蓄積疲労演算部29は、各方位の乱流評価指標の値に応じて、疲労荷重式を選択し(ステップSTJ4)、実測値記憶部23が記憶する一定期間の実測データを用いて蓄積疲労を演算する(ステップSTJ5)。なお、実測データがない場合には、シミュレーション等により得られた値により代用してもよい。
The accumulated
疲労荷重式演算部27が、全部の方位に対して疲労荷重式を演算するならば、蓄積疲労演算部29は、各方位に対応する疲労荷重式を選択して蓄積疲労を演算すればよい。
If the fatigue load
疲労荷重式演算部27が一部の方位に対して疲労荷重式を演算する場合には、乱流評価指標が評価基準値を超える方位の少なくとも一つに対して疲労荷重式を演算し、蓄積疲労演算部29は、乱流評価指標が評価基準値を超える方位に対しては、乱流評価指標が評価基準値を超える方位から得られた疲労荷重式の一つを選択する。疲労荷重式演算部27は、乱流評価指標が評価基準値を超えない方位の少なくとも一つに対して疲労荷重式を演算し、蓄積疲労演算部29は、乱流評価指標が評価基準値を超えない方位に対しては、乱流評価指標が評価基準値を超えない方位から得られた疲労荷重式の一つを選択する。
When the fatigue load
図9~図11では、疲労荷重式演算部27は、乱流評価指標が評価基準値0.2を超えるもの、評価基準値0.2を超えず0.1を超えるもの、0.1を超えないものから、それぞれ一つの方位を選択し、疲労荷重式を演算し、蓄積疲労演算部29は、乱流評価指標が評価基準値0.2を超える方位、評価基準値0.2を超えず0.1を超える方位、0.1を超えない方位に対して、それぞれ、対応する疲労荷重式を選択して蓄積疲労を計算している。
In FIGS. 9 to 11, the fatigue load
寿命評価部31は、蓄積疲労演算部29が演算した蓄積疲労が、時の経過に応じて増加して、設計DEL記憶部25が記憶する風車の設計疲労線を超える時期を求めて、風車の寿命を評価する(ステップSTJ6)。
The
図9~図11を参照して、具体的な例について説明する。 A specific example will be described with reference to FIGS. 9 to 11.
図9は、東方位(乱流評価指標0.236)と北方位(乱流評価指標0.099)を対象とした分析結果を示す。東方位及び北方位を対象に、風速、風速標準偏差、乱流強度及び疲労(DEL)の実測データを用いて相互にデータの関係性を分析した結果、以下の2点が判明した。すなわち、疲労(DEL)と風速の関係は、直線近似が可能である。疲労(DEL)と風速標準偏差(σ)の関係は、直線近似が可能である。 FIG. 9 shows the analysis results for the east direction (turbulence evaluation index 0.236) and the north direction (turbulence evaluation index 0.099). As a result of analyzing the mutual data relationship using the measured data of wind speed, wind speed standard deviation, turbulence intensity and fatigue (DEL) for the east and north directions, the following two points were found. That is, the relationship between fatigue (DEL) and wind speed can be linearly approximated. The relationship between fatigue (DEL) and wind speed standard deviation (σ) can be linearly approximated.
図9(a)及び(b)は、それぞれ、東方位及び北方位の10分の風速(m/s)と風速標準偏差(m/s)の関係を示すグラフである。横軸は風速(m/s)であり、縦軸は風速標準偏差(m/s)である。直線近似は、東方位が傾きa=0.23であり、北方位が傾きa=0.14である。東方位の場合、北方位に比べて風速標準偏差の傾きが大きく、北方位と比較して風速が大きくなるほど風速標準偏差が大きくなる。 9 (a) and 9 (b) are graphs showing the relationship between the wind speed (m / s) and the wind speed standard deviation (m / s) for 10 minutes in the east and north directions, respectively. The horizontal axis is the wind speed (m / s), and the vertical axis is the wind speed standard deviation (m / s). In the straight line approximation, the east direction has a slope a = 0.23 and the north direction has a slope a = 0.14. In the case of the east direction, the slope of the wind speed standard deviation is larger than that of the north direction, and the larger the wind speed is, the larger the wind speed standard deviation is.
図9(c)は、風速と疲労との関係を示す。横軸は風速(m/s)であり、縦軸は疲労(DEL)である。直線近似は、東方位が傾きa=0.15であり、北方位が傾きa=0.08である。図9(d)は、風速標準偏差と疲労との関係を示す。横軸は風速標準偏差(m/s)であり、縦軸は疲労(DEL)である。直線近似は、東方位が傾きa=0.41であり、北方位が傾きa=0.46である。よって、風速標準偏差(σ)が大きいほど、風速と疲労(DEL)の傾きも大きくなることが判明した。 FIG. 9C shows the relationship between wind speed and fatigue. The horizontal axis is wind speed (m / s), and the vertical axis is fatigue (DEL). In the straight line approximation, the east direction has a slope a = 0.15, and the north direction has a slope a = 0.08. FIG. 9D shows the relationship between the wind speed standard deviation and fatigue. The horizontal axis is the wind speed standard deviation (m / s), and the vertical axis is fatigue (DEL). In the straight line approximation, the east direction has a slope a = 0.41 and the north direction has a slope a = 0.46. Therefore, it was found that the larger the wind speed standard deviation (σ), the larger the slope of the wind speed and fatigue (DEL).
図10は、過去の風速・風向の実測データ(1年分)を用いて20年間のストレス(蓄積疲労)を積算し、耐用年数である20年の設計疲労線と比較してブレードの寿命評価を行ったものである。 In Fig. 10, the stress (accumulated fatigue) for 20 years is integrated using the measured data of the past wind speed and direction (for one year), and the life of the blade is evaluated by comparing with the design fatigue line of 20 years, which is the useful life. Was done.
図10(a)は、12方位のそれぞれの方向角を示す。図10(b)は、各方位の実測疲労(DEL)線を示すグラフである。横軸は風速(m/s)であり、縦軸は疲労(DEL)である。図10(c)は、実測データにおいて、各方位の風向で、風速に応じた時間を積算することにより得られた、実測DELと設計DELを示す。1年間の実測DEL及び設計DELの蓄積疲労は、それぞれ、13,976及び20,425である。20年間の蓄積疲労は、それぞれ、279,524及び408,496である。ストレス(蓄積疲労)割合を、実測DEL/設計DELとする。寿命(年)は、20(年、耐用年数)/ストレス割合であり、20/0.68=29(小数点以下の第一位を四捨五入)となる。 FIG. 10A shows each of the 12 azimuths. FIG. 10B is a graph showing measured fatigue (DEL) lines in each direction. The horizontal axis is wind speed (m / s), and the vertical axis is fatigue (DEL). FIG. 10C shows the actual measurement DEL and the design DEL obtained by integrating the time corresponding to the wind speed in the wind direction in each direction in the actual measurement data. The accumulated fatigue of the measured DEL and the design DEL for one year is 13,976 and 20,425, respectively. The 20-year accumulated fatigue is 279,524 and 408,496, respectively. The stress (accumulated fatigue) ratio is defined as the measured DEL / design DEL. The life (year) is 20 (year, useful life) / stress ratio, and 20 / 0.68 = 29 (rounded to the first decimal place).
図11は、乱流評価指標を用いて蓄積疲労を計算した場合を示す。実測データが12方位であるのに対し、シミュレーションが16方位で行われる。 FIG. 11 shows a case where the accumulated fatigue is calculated using the turbulence evaluation index. The simulation is performed in 16 directions while the measured data is in 12 directions.
この例では、乱流評価指標が0.2を超える方位として12方位における方位4(東)を、0.2を超えず0.1を超える方位として12方位における方位12を、0.1を超えない方位として12方位における方位1(北)を選択し、直線近似により疲労荷重式を計算している。方位4、12、1に対応する疲労荷重式は、それぞれ、実測データより得て、傾きが0.1527、0.0945、0.0782であり、切片が-0.4089、-0.2304、-0.1458である。図11(a)は、これらの疲労荷重式と、設計DEL線を示す。横軸は風速(m/s)であり、縦軸は疲労(DEL)である。
In this example, the direction 4 (east) in 12 directions is defined as the direction in which the turbulence evaluation index exceeds 0.2, and the
図11(b)は、各方位の乱流評価指標を示す。0.2を超える16方位における方位5は、12方位における方位4に対して得られた疲労荷重式を用いる。0.2を超えず0.1を超える16方位における方位2、4、6、7、8、9,10、12、13、14、15、16は、12方位における方位12に対して得られた疲労荷重式を用いる。0.1を超えない16方位における方位1、3、11は、12方位における方位1に対して得られた疲労荷重式を用いる。図11(c)は、実測データにおいて、各方位の風向で、風速に応じた時間を積算することにより得られた、実測DELと設計DELを示す。1年間の実測DEL及び設計DELの蓄積疲労は、それぞれ、13,184及び20,425である。20年間の蓄積疲労は、それぞれ、263,684及び408,496である。ストレス(蓄積疲労)割合を、実測DEL/設計DELとする。寿命(年)は、20(年、耐用年数)/ストレス割合であり、20/0.65=31(小数点以下の第一位を四捨五入)となる。
FIG. 11B shows a turbulence evaluation index in each direction. For the
図10及び図11を比較して、乱流評価指標を用いて寿命予測した結果、寿命は31年であった。12方位の実測疲労(DEL)線を用いて寿命予測した結果(寿命29年)とおおむね一致した。
As a result of comparing FIGS. 10 and 11 and predicting the lifetime using the turbulence evaluation index, the lifetime was 31 years. It was almost the same as the result of life prediction (
以上より、風速と風速標準偏差が、風車ストレス(蓄積疲労)に密接に関連していることが裏付けられた。さらに、風況シミュレーション、風況データ及び運転データの分析を行うことにより、風車ストレス(蓄積疲労)が大きい風向を特定することができる。さらに、実測風速と風況シミュレーション結果で得られた乱流評価指標に対応した疲労荷重式により、ブレード寿命予測が可能となる。 From the above, it was confirmed that the wind speed and the standard deviation of the wind speed are closely related to the wind turbine stress (accumulated fatigue). Furthermore, by performing wind condition simulation, wind condition data, and analysis of operation data, it is possible to identify a wind direction in which wind turbine stress (accumulated fatigue) is large. Furthermore, the blade life can be predicted by the fatigue load formula corresponding to the turbulence evaluation index obtained from the measured wind speed and the wind condition simulation result.
この実施例を踏まえ、風力発電装置に対する乱流の影響を分析する手法の一例を説明する。風力発電装置では、通常、風況データを取得している。そのため、過去の風速、風向、風速標準偏差を得ることができる。また、過去の運転データとして、ANN、発電出力、加速度などを得ることができる。これらを利用して、風況・運転データを分析することができる。本実施例によれば、これに加えて、風況シミュレーションを実施し、複数の方位ごとに乱流評価指標を得ることができるとともに、過去の風況データを利用して、乱流評価指標に基づき疲労荷重式を選択して、風車の寿命を予測することができる。そして、風況・運転データ分析及び風車の寿命により乱流の影響を判定し、現状の保守を継続すべきか、新たな保守・運転を提案するかを判断することができる。 Based on this example, an example of a method for analyzing the influence of turbulence on a wind turbine generator will be described. Wind power generators usually acquire wind condition data. Therefore, the past wind speed, wind direction, and wind speed standard deviation can be obtained. In addition, ANN, power generation output, acceleration, etc. can be obtained as past operation data. By using these, wind conditions and operation data can be analyzed. According to this embodiment, in addition to this, a wind condition simulation can be performed to obtain a turbulence evaluation index for each of a plurality of directions, and past wind condition data can be used as a turbulence evaluation index. Based on this, the fatigue load type can be selected to predict the life of the wind turbine. Then, the influence of turbulence can be determined by the wind condition / operation data analysis and the life of the wind turbine, and it can be determined whether the current maintenance should be continued or a new maintenance / operation is proposed.
1,21 乱流評価装置、3 地形データ記憶部、5 境界入力条件記憶部、7 基準値記憶部、9 乱流評価指標記憶部、11 シミュレーション部、12 制御部、13 標準偏差演算部、15 乱数評価指標演算部、17 判定部、19 表示部、23 実測値記憶部、25 設計DEL記憶部、27 疲労荷重式演算部、29 蓄積疲労演算部、31 寿命評価部 1,21 Turbulence evaluation device, 3 Topography data storage unit, 5 Boundary input condition storage unit, 7 Reference value storage unit, 9 Turbulence evaluation index storage unit, 11 Simulation unit, 12 Control unit, 13 Standard deviation calculation unit, 15 Random number evaluation index calculation unit, 17 judgment unit, 19 display unit, 23 actual measurement value storage unit, 25 design DEL storage unit, 27 fatigue load type calculation unit, 29 accumulated fatigue calculation unit, 31 life evaluation unit
Claims (6)
前記候補地点を含む候補空間における前記風力エネルギーの風況シミュレーションにおいて用いられる前記候補空間の境界の一部又は全部における最大の風速である境界入力条件を記憶する境界入力条件記憶手段と、
前記境界入力条件の下で、前記候補空間における前記風力エネルギーの時系列に変化する風速を演算するシミュレーション手段と、
前記シミュレーション手段が演算した前記候補空間における前記風力エネルギーの時系列に変化する風速と、前記境界入力条件記憶手段が記憶する前記境界入力条件とを用いて、前記候補地点における乱流評価指標を演算する乱流評価指標演算手段と、
乱流評価指標が評価基準値を超える場合に、前記候補地点の前記風力エネルギーの乱流が大きいと判定する判定手段を備え、
前記候補空間に含まれる評価点における前記時系列に変化する風速の標準偏差を演算する標準偏差演算手段を備え、
前記乱流評価指標演算手段は、前記乱流評価指標を、前記評価点における前記標準偏差の、前記最大の風速に対する比で表される境界風速換算値として演算する、乱流評価装置。 It is a turbulence evaluation device for evaluating the turbulence of wind energy that causes accumulated fatigue of the wind power generation device at a candidate site where it is considered to install a wind power generation device that generates power using wind energy.
Boundary input condition storage means for storing the boundary input condition which is the maximum wind speed in a part or all of the boundary of the candidate space used in the wind condition simulation of the wind energy in the candidate space including the candidate point.
Under the boundary input condition, a simulation means for calculating the wind speed changing in time series of the wind energy in the candidate space, and
A turbulence evaluation index at the candidate point is calculated using the wind speed that changes in time series of the wind energy in the candidate space calculated by the simulation means and the boundary input condition stored by the boundary input condition storage means. Turbulence evaluation index calculation means and
A determination means for determining that the turbulence of the wind energy at the candidate point is large when the turbulence evaluation index exceeds the evaluation reference value is provided .
A standard deviation calculation means for calculating the standard deviation of the wind speed changing in the time series at the evaluation points included in the candidate space is provided.
The turbulence evaluation index calculation means is a turbulence evaluation device that calculates the turbulence evaluation index as a boundary wind speed conversion value represented by the ratio of the standard deviation at the evaluation point to the maximum wind speed .
前記シミュレーション手段は、前記境界入力条件の下で、前記候補空間における前記風力エネルギーの時系列に変化する風速を演算し、
前記乱流評価指標演算手段は、前記判定基準値を超えた方向における前記風力エネルギーの時系列に変化する風速に対して乱流評価指標を演算する、請求項1記載の乱流評価装置。 In the wind energy at the evaluation point obtained by actual measurement or obtained by the simulation means, when there is a direction in which the average wind speed per unit time exceeds the judgment reference value, the direction thereof. Against
The simulation means calculates a wind speed that changes in a time series of the wind energy in the candidate space under the boundary input condition.
The turbulence evaluation device according to claim 1 , wherein the turbulence evaluation index calculation means calculates a turbulence evaluation index for a wind speed changing in a time series of the wind energy in a direction exceeding the determination reference value.
前記候補地点を含む候補空間における前記風力エネルギーの風況シミュレーションにおいて用いられる前記候補空間の境界の一部又は全部における最大の風速である境界入力条件を記憶する境界入力条件記憶手段と、
前記境界入力条件の下で、前記候補空間における前記風力エネルギーの時系列に変化する風速を演算するシミュレーション手段と、
前記シミュレーション手段が演算した前記候補空間における前記風力エネルギーの時系列に変化する風速を用いて、前記候補地点における乱流評価指標を演算する乱流評価指標演算手段と、
前記候補地点における前記風力発電装置の設計疲労線を記憶する設計DEL記憶手段と、
複数の疲労荷重式を用いて前記風力発電装置の蓄積疲労を計算する蓄積疲労演算手段と、
前記蓄積疲労が前記設計疲労線を越える時点を演算する寿命評価手段を備え、
前記候補空間に含まれる評価点における前記時系列に変化する風速の標準偏差を演算する標準偏差演算手段を備え、
前記乱流評価指標演算手段は、前記乱流評価指標を、前記評価点における前記標準偏差の、前記最大の速さに対する比で表される境界風速換算値として演算し、
前記乱流評価指標演算手段は、複数の方位のそれぞれからの前記風力エネルギーに対して、前記候補地点における前記乱流評価指標を演算し、
前記疲労荷重式は、少なくとも、
前記乱流評価指標が評価基準値を超える方位からの前記風力エネルギーによる蓄積疲労を計算するための第1疲労荷重式と、
前記乱流評価指標が前記評価基準値を超えない方位からの前記風力エネルギーによる蓄積疲労を計算するための第2疲労荷重式を含み、
前記第1疲労荷重式と前記第2疲労荷重式とは異なり、
前記蓄積疲労演算手段は、複数の方位のそれぞれに対して、前記乱流評価指標の値に応じて前記複数の疲労荷重式のうちの一つを選択して前記蓄積疲労を演算する、乱流評価装置。
It is a turbulence evaluation device for evaluating the turbulence of wind energy that causes accumulated fatigue of the wind power generation device at a candidate site where it is considered to install a wind power generation device that generates power using wind energy.
Boundary input condition storage means for storing the boundary input condition which is the maximum wind speed in a part or all of the boundary of the candidate space used in the wind condition simulation of the wind energy in the candidate space including the candidate point.
Under the boundary input condition, a simulation means for calculating the wind speed changing in time series of the wind energy in the candidate space, and
A turbulence evaluation index calculation means for calculating a turbulence evaluation index at the candidate point using a wind speed that changes in time series of the wind energy in the candidate space calculated by the simulation means.
A design DEL storage means for storing the design fatigue line of the wind power generator at the candidate point,
Accumulated fatigue calculation means for calculating the accumulated fatigue of the wind power generation device using a plurality of fatigue load equations, and
A life evaluation means for calculating the time point at which the accumulated fatigue crosses the design fatigue line is provided.
A standard deviation calculation means for calculating the standard deviation of the wind speed changing in the time series at the evaluation points included in the candidate space is provided.
The turbulence evaluation index calculation means calculates the turbulence evaluation index as a boundary wind speed conversion value represented by the ratio of the standard deviation at the evaluation point to the maximum speed.
The turbulence evaluation index calculation means calculates the turbulence evaluation index at the candidate point for the wind energy from each of the plurality of directions.
The fatigue load type is at least
The first fatigue load formula for calculating the accumulated fatigue due to the wind energy from the direction in which the turbulence evaluation index exceeds the evaluation reference value, and
The second fatigue load equation for calculating the accumulated fatigue due to the wind energy from the direction in which the turbulence evaluation index does not exceed the evaluation reference value is included.
Unlike the first fatigue load type and the second fatigue load type,
The accumulated fatigue calculation means calculates the accumulated fatigue by selecting one of the plurality of fatigue load equations according to the value of the turbulence evaluation index for each of the plurality of directions. Evaluation device.
前記乱流評価装置は、前記候補地点を含む候補空間における前記風力エネルギーの風況シミュレーションにおいて用いられる前記候補空間の境界の一部又は全部における最大の風速である境界入力条件を記憶する境界入力条件記憶手段を備え、
前記乱流評価装置が備えるシミュレーション手段が、前記境界入力条件の下で、前記候補空間における前記風力エネルギーの時系列に変化する風速を演算するシミュレーションステップと、
前記乱流評価装置が備える乱流評価指標演算手段が、前記シミュレーション手段が演算した前記候補空間における前記風力エネルギーの時系列に変化する風速と、前記境界入力条件記憶手段が記憶する前記境界入力条件とを用いて、前記候補地点における乱流評価指標を演算する乱流評価指標演算ステップと、
前記乱流評価装置が備える判定手段が、乱流評価指標が評価基準値を超える場合に、前記候補地点の前記風力エネルギーの乱流が大きいと判定する判定ステップを含み、
前記候補空間に含まれる評価点における前記時系列に変化する風速の標準偏差を演算する標準偏差演算手段を備え、
乱流評価指標演算ステップにおいて、前記乱流評価指標演算手段は、前記乱流評価指標を、前記評価点における前記標準偏差の、前記最大の速さに対する比で表される境界風速換算値として演算する、乱流評価方法。 Turbulence evaluation in a turbulence evaluation device for evaluating the turbulence of wind energy that causes accumulated fatigue of the wind power generation device at a candidate site where consideration is being given to installing a wind power generation device that generates power using wind energy. It ’s a method,
The turbulence evaluation device stores a boundary input condition that is the maximum wind speed in a part or all of the boundary of the candidate space used in the wind condition simulation of the wind energy in the candidate space including the candidate point. Equipped with storage means
The simulation means provided in the turbulence evaluation device includes a simulation step of calculating a wind speed changing in a time series of the wind energy in the candidate space under the boundary input condition.
The turbulence evaluation index calculation means included in the turbulence evaluation device has the wind velocity changing in time series of the wind energy in the candidate space calculated by the simulation means, and the boundary input condition stored in the boundary input condition storage means. The turbulence evaluation index calculation step for calculating the turbulence evaluation index at the candidate point, and
The determination means provided in the turbulence evaluation device includes a determination step of determining that the turbulence of the wind energy at the candidate point is large when the turbulence evaluation index exceeds the evaluation reference value.
A standard deviation calculation means for calculating the standard deviation of the wind speed changing in the time series at the evaluation points included in the candidate space is provided.
In the turbulence evaluation index calculation step, the turbulence evaluation index calculation means calculates the turbulence evaluation index as a boundary wind velocity conversion value represented by the ratio of the standard deviation at the evaluation point to the maximum speed. Turbulence evaluation method .
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016230686 | 2016-11-28 | ||
| JP2016230686 | 2016-11-28 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2018091328A JP2018091328A (en) | 2018-06-14 |
| JP7066374B2 true JP7066374B2 (en) | 2022-05-13 |
Family
ID=62565817
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2017215905A Active JP7066374B2 (en) | 2016-11-28 | 2017-11-08 | Turbulence evaluation device, turbulence evaluation method and program |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7066374B2 (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113803220B (en) * | 2020-06-17 | 2023-05-09 | 新疆金风科技股份有限公司 | Method, device, system and controller for detecting fatigue damage of wind power generating set |
| JP7467012B2 (en) * | 2020-11-19 | 2024-04-15 | 西日本技術開発株式会社 | Evaluation device, evaluation method, and program for implementing the evaluation method |
| JP7684107B2 (en) * | 2021-06-22 | 2025-05-27 | 株式会社日立製作所 | Remaining life assessment method and device for wind power generation equipment |
| CN116181584B (en) * | 2022-11-28 | 2025-06-17 | 华能陇东能源有限责任公司 | A method and system for identifying extreme turbulence characteristics of wind condition distribution at a wind turbine station |
| CN116882144A (en) * | 2023-06-28 | 2023-10-13 | 三峡国际能源投资集团有限公司 | Wind turbine generator set operation life prediction model construction method and operation life prediction method |
| JP7376746B1 (en) | 2023-08-29 | 2023-11-08 | 株式会社日立パワーソリューションズ | Wind condition observation equipment placement support device and wind condition observation equipment placement support method |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3197903U (en) | 2015-03-27 | 2015-06-04 | 株式会社リアムコンパクト | Installation aptitude calculation device |
| US20150167637A1 (en) | 2013-12-12 | 2015-06-18 | General Electric Company | System and method for operating a wind turbine |
| JP2015117682A (en) | 2013-12-20 | 2015-06-25 | 三菱重工業株式会社 | Wind power generator monitoring system and monitoring method |
| US20160160842A1 (en) | 2013-07-22 | 2016-06-09 | Nabla Wind Power, S.L. | Method for determining the life of components of a wind turbine or similar according to its location |
| CN105787239A (en) | 2014-12-23 | 2016-07-20 | 南车株洲电力机车研究所有限公司 | Method and system for processing turbulence intensity of wind power farm |
| JP2016186253A (en) | 2015-03-27 | 2016-10-27 | 株式会社リアムコンパクト | Installation appropriateness calculation device, installation appropriateness calculation method and program |
-
2017
- 2017-11-08 JP JP2017215905A patent/JP7066374B2/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20160160842A1 (en) | 2013-07-22 | 2016-06-09 | Nabla Wind Power, S.L. | Method for determining the life of components of a wind turbine or similar according to its location |
| US20150167637A1 (en) | 2013-12-12 | 2015-06-18 | General Electric Company | System and method for operating a wind turbine |
| JP2015117682A (en) | 2013-12-20 | 2015-06-25 | 三菱重工業株式会社 | Wind power generator monitoring system and monitoring method |
| CN105787239A (en) | 2014-12-23 | 2016-07-20 | 南车株洲电力机车研究所有限公司 | Method and system for processing turbulence intensity of wind power farm |
| JP3197903U (en) | 2015-03-27 | 2015-06-04 | 株式会社リアムコンパクト | Installation aptitude calculation device |
| JP2016186253A (en) | 2015-03-27 | 2016-10-27 | 株式会社リアムコンパクト | Installation appropriateness calculation device, installation appropriateness calculation method and program |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2018091328A (en) | 2018-06-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP7066374B2 (en) | Turbulence evaluation device, turbulence evaluation method and program | |
| Yang et al. | Wind turbine condition monitoring: technical and commercial challenges | |
| JP6906354B2 (en) | Wind turbine generator fatigue damage calculation device, wind power generation system, and wind turbine generator fatigue damage calculation method | |
| CN110390146B (en) | Method for calculating fatigue damage of welding seam of tower cylinder of wind turbine generator based on sector load and product | |
| Zhang et al. | Fatigue damage assessment of wind turbine composite blades using corrected blade element momentum theory | |
| Haid et al. | Simulation-length requirements in the loads analysis of offshore floating wind turbines | |
| CN104063564B (en) | Method for selecting mounting points of transmission iron tower stress sensors based on finite element analysis | |
| Biswal et al. | Fatigue damage analysis of offshore wind turbine monopile weldments | |
| JP7263096B2 (en) | Maintenance method for wind power generation system and wind power generation device | |
| CN117217735A (en) | A risk assessment method and device for pole tower failure caused by ice covering that takes into account accidents | |
| Zhang et al. | Dynamic strain distribution monitoring and fatigue damage analysis on a 100 kW wind turbine blade based on field aerodynamic measurements | |
| WO2013002316A1 (en) | Windmill repair timing determination support device and repair timing determination support method | |
| Liu et al. | Research on online monitoring method for time-varying tension in transmission lines based on operational modal response | |
| JP7467012B2 (en) | Evaluation device, evaluation method, and program for implementing the evaluation method | |
| Xie et al. | Vibration monitoring, load simulation, and vibration reduction design for existing wind turbines | |
| JP3230525U (en) | Evaluation device | |
| Pollino et al. | In-situ measurements of fatigue demands on a wind turbine support structure | |
| CN108563824B (en) | A method and system for determining the most unfavorable working condition of a transmission tower in an unconventional wind farm | |
| Xiong et al. | Fatigue damage of wind turbine gearbox under extreme wind conditions | |
| Ferrari et al. | Statistical analysis of component failures: A 16 year survey on more than 550 wind turbines | |
| Yang et al. | An analytical model of aerodynamic load on wind turbines in parked states | |
| Fava et al. | Estimating fatigue in the main bearings of wind turbines using experimental data | |
| Ward et al. | Analysis of the effect of a series of back twist blade configurations for an active pitch-to-stall floating offshore wind turbine | |
| Moynihan et al. | Fatigue life analysis of main shaft bearings in wind turbines using strain measurements collected on blades | |
| JP2016186253A (en) | Installation appropriateness calculation device, installation appropriateness calculation method and program |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20171110 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20201104 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20210721 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20210727 |
|
| A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20210927 |
|
| A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20211118 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20211122 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20211122 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20211124 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20220125 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20220301 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20220426 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20220427 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7066374 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |