Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7075263B2 - Floor construction method - Google Patents
[go: Go Back, main page]

JP7075263B2 - Floor construction method - Google Patents

Floor construction method Download PDF

Info

Publication number
JP7075263B2
JP7075263B2 JP2018069520A JP2018069520A JP7075263B2 JP 7075263 B2 JP7075263 B2 JP 7075263B2 JP 2018069520 A JP2018069520 A JP 2018069520A JP 2018069520 A JP2018069520 A JP 2018069520A JP 7075263 B2 JP7075263 B2 JP 7075263B2
Authority
JP
Japan
Prior art keywords
fixing material
floor
large pull
screw
bundle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018069520A
Other languages
Japanese (ja)
Other versions
JP2019178585A (en
Inventor
峰雄 馬場
武彦 島田
秋水 田中
宏 黒田
晴司 藤山
翔平 浅野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP2018069520A priority Critical patent/JP7075263B2/en
Publication of JP2019178585A publication Critical patent/JP2019178585A/en
Application granted granted Critical
Publication of JP7075263B2 publication Critical patent/JP7075263B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Floor Finish (AREA)

Description

本発明は、建物の床を施工する床施工方法に係り、特に、床を構成するパネル材が固定材によって固定され、固定材が支柱によって支持されている構造の床を施工する床施工方法に関する。 The present invention relates to a floor construction method for constructing the floor of a building, and more particularly to a floor construction method for constructing a floor having a structure in which the panel material constituting the floor is fixed by a fixing material and the fixing material is supported by a support. ..

建物の床構造として、床を構成するパネル材が大引等の固定材によって固定され、固定材が束等の支柱によって支持されている床構造は、既に知られている(例えば、特許文献1参照)。
特許文献1に記載の床構造では、支柱としての束が、大引支持部と支柱本体とベース部とを備えている。ベース部は、土間床等に接地される。大引支持部は、角筒状の大引を嵌め込んで大引を固定する部分である。支柱本体は、大引支持部の下方位置で大引支持部を支持する。また、支柱本体は、その中途位置にターンバックルを備えており、ターンバックルを回すことで支柱本体の高さを変更することが可能である。これにより、大引支持部の上下位置を調整することが可能である。
As a floor structure of a building, a floor structure in which a panel material constituting the floor is fixed by a fixing material such as a large pull and the fixing material is supported by a support such as a bundle is already known (for example, Patent Document 1). reference).
In the floor structure described in Patent Document 1, a bundle as a support column includes a large pull support portion, a support column main body, and a base portion. The base portion is grounded to the soil floor or the like. The large pull support portion is a portion in which a square tubular large pull is fitted to fix the large pull. The strut body supports the large pull support portion at a position below the large pull support portion. In addition, the strut body is provided with a turnbuckle in the middle position, and the height of the strut body can be changed by turning the turnbuckle. This makes it possible to adjust the vertical position of the large pull support portion.

特開2002-121883号公報Japanese Patent Application Laid-Open No. 2002-121883

上記の従来技術では、大引の上下位置を調整する際には、束の支柱本体の中途部分に設けられた被操作部(例えば、ターンバックル)を操作して大引の上下位置を調整する。この際、支柱本体の被操作部を操作するには、支柱本体の側方から被操作部を把持したり操作用工具を被操作部に近付けたりする。このため、従来の床構造では被操作部が操作し難くなっており、特に、大引上に床パネルを載せた後に大引の上下位置を調整する場合には被操作部の操作が著しく困難となる。 In the above-mentioned conventional technique, when adjusting the vertical position of the large pull, the vertical position of the large pull is adjusted by operating the operated portion (for example, a turnbuckle) provided in the middle part of the column main body of the bundle. .. At this time, in order to operate the operated portion of the strut body, the operated portion is gripped from the side of the strut body or the operating tool is brought close to the operated portion. For this reason, it is difficult to operate the operated part in the conventional floor structure, and it is extremely difficult to operate the operated part especially when adjusting the vertical position of the large pull after placing the floor panel on the large pull. Will be.

本発明は、上記の課題に鑑みてなされたものであり、その目的は、床のパネル材を配置した後にもパネル材を支持する固定材の上下位置を容易に調整することが可能な床施工方法を提供することである。 The present invention has been made in view of the above problems, and an object thereof is floor construction in which the vertical position of a fixing material supporting the panel material can be easily adjusted even after the floor panel material is arranged. Is to provide a method.

上記課題は、本発明に係る床施工方法によれば、建物の床を構成するパネル材を支持する固定材と、前記固定材を支持する支柱とを一体化した床下ユニットを前記床のベース部に配置する工程と、前記床下ユニットを配置した後に、前記パネル材から前記支柱の上部が露出するように、前記固定材の上に前記パネル材を配置する工程と、前記固定材の上下位置を調整するために、前記固定材に組み付けられた前記支柱の上部に設けられた被操作部を操作して、前記支柱の高さを変更する工程と、を含み、前記固定材の上下位置を調整するための前記被操作部の操作は、前記パネル材において前記固定材の上に載った部分のうち、前記被操作部の上方位置に設けられた開口部を通じて行われることにより解決される。
上記の床施工方法によれば、パネル材を支持する固定材と支柱とを一体化した床下ユニットの上にパネル材を置いてから、支柱の高さを調整することができる。この際、パネル材の上から支柱の高さ調整が可能であるため、固定材及びパネル材の上下位置の調整を簡単に行うことができる。すなわち、上記の床施工方法によれば、床施工の労力を軽減できる。
According to the floor construction method according to the present invention, the above problem is to form an underfloor unit in which a fixing material that supports a panel material constituting the floor of a building and a support column that supports the fixing material are integrated into a base portion of the floor. The step of arranging the panel material on the fixing material and the vertical position of the fixing material so that the upper part of the support is exposed from the panel material after arranging the underfloor unit. The vertical position of the fixing material is adjusted, including a step of changing the height of the support column by operating an operated portion provided on the upper portion of the support column assembled to the fixing material for adjustment. The operation of the operated portion is solved by performing the operation of the operated portion through an opening provided at an upper position of the operated portion in the portion of the panel material placed on the fixing material.
According to the above-mentioned floor construction method, the height of the support column can be adjusted after the panel material is placed on the underfloor unit in which the fixing material supporting the panel material and the support column are integrated. At this time, since the height of the column can be adjusted from above the panel material, the vertical position of the fixing material and the panel material can be easily adjusted. That is, according to the above-mentioned floor construction method, the labor of floor construction can be reduced.

上記課題は、本発明に係る床施工方法によれば、建物の床を構成するパネル材を支持する固定材と、前記固定材を支持する支柱とを一体化した床下ユニットを前記床のベース部に配置する工程と、前記床下ユニットを配置した後に、前記パネル材から前記支柱の上部が露出するように、前記固定材の上に前記パネル材を配置する工程と、前記固定材の上下位置を調整するために、前記固定材に組み付けられた前記支柱の上部に設けられた被操作部を操作して、前記固定材に対する前記支柱の組み付け位置を上下方向において変更する工程と、を含み、前記固定材の上下位置を調整するための前記被操作部の操作は、前記パネル材において前記固定材の上に載った部分のうち、前記被操作部の上方位置に設けられた開口部を通じて行われ、前記支柱は、前記固定材が嵌合可能な受け部と、前記受け部の底壁を貫通して該底壁よりも上方に突出した前記被操作部と、を備え、前記床下ユニットは、前記支柱の前記受け部に、前記被操作部が前記固定材の底を貫通するように前記固定材を嵌合させて構成されることにより解決される。According to the floor construction method according to the present invention, the above problem is to form an underfloor unit in which a fixing material for supporting a panel material constituting the floor of a building and a support column for supporting the fixing material are integrated as a base portion of the floor. The step of arranging the panel material on the fixing material and the vertical position of the fixing material so that the upper part of the support is exposed from the panel material after arranging the underfloor unit. Including the step of operating the operated portion provided on the upper part of the support column attached to the fixing material to change the assembly position of the support column with respect to the fixing material in the vertical direction. The operation of the operated portion for adjusting the vertical position of the fixing material is performed through an opening provided at an upper position of the operated portion in the portion of the panel material placed on the fixing material. The support column comprises a receiving portion into which the fixing material can be fitted, and the operated portion that penetrates the bottom wall of the receiving portion and projects upward from the bottom wall. The problem is solved by fitting the fixing material into the receiving portion of the support column so that the operated portion penetrates the bottom of the fixing material.
上記の床施工方法によれば、パネル材を支持する固定材と支柱とを一体化した床下ユニットの上にパネル材を置いてから、支柱の高さを調整することができる。この際、パネル材の上から支柱の高さ調整が可能であるため、固定材及びパネル材の上下位置の調整を簡単に行うことができる。すなわち、上記の床施工方法によれば、床施工の労力を軽減できる。According to the above-mentioned floor construction method, the height of the support column can be adjusted after the panel material is placed on the underfloor unit in which the fixing material supporting the panel material and the support column are integrated. At this time, since the height of the column can be adjusted from above the panel material, the vertical position of the fixing material and the panel material can be easily adjusted. That is, according to the above-mentioned floor construction method, the labor of floor construction can be reduced.
また、支柱の受け部に固定材を嵌合させることで、支柱を固定材に簡単に組み付けることが可能となる。これにより、床施工の作業性を向上できる。Further, by fitting the fixing material to the receiving portion of the support, the support can be easily assembled to the fixing material. This makes it possible to improve the workability of floor construction.

上記の床施工方法において、前記固定材の上下位置を調整するための前記被操作部の操作は、前記パネル材において前記固定材の上に載った部分のうち、前記被操作部の上方位置に形成された穴又は切り欠きを通じて行われるとよい。In the above-mentioned floor construction method, the operation of the operated portion for adjusting the vertical position of the fixing material is performed at the position above the operated portion of the portion placed on the fixing material in the panel material. It may be done through a hole or notch formed.
こうすることで、パネル材において固定材の上に載った部分のうち、被操作部の上方位置には、開口部として形成された穴又は切り欠きが設けられており、固定材の上下位置を調整する際には、この穴又は切り欠きを通じて被操作部の操作が可能である。これにより、被操作部を操作して固定材の上下位置を調整することが一層簡単になる。By doing so, a hole or a notch formed as an opening is provided in the upper position of the operated portion in the portion of the panel material placed on the fixing material, and the vertical position of the fixing material can be determined. When making adjustments, the operated portion can be operated through this hole or notch. This makes it even easier to operate the operated portion to adjust the vertical position of the fixing material.

上記の床施工方法において、前記支柱のうち、前記被操作部を上端部に有する支柱本体を、前記固定材に形成された挿入孔に挿入して前記支柱が前記固定材に組み付けられ、前記固定材の上下位置を調整するための前記被操作部の操作は、前記パネル材において前記固定材の上に載った部分のうち、前記挿入孔の上方位置に形成された前記開口部を通じて行われるとよい。
こうすることで、固定材に形成された挿入孔に支柱の支柱本体を挿入することで、支柱を固定材に適切に組み付けることが可能となる。
In the above-mentioned floor construction method, among the columns, the column body having the operated portion at the upper end is inserted into an insertion hole formed in the fixing material, and the columns are assembled to the fixing material to be fixed. The operation of the operated portion for adjusting the vertical position of the material is performed through the opening formed above the insertion hole in the portion of the panel material placed on the fixing material. good.
By doing so, by inserting the column main body of the column into the insertion hole formed in the fixing material, the column can be appropriately assembled to the fixing material.

上記の床施工方法において、前記建物の基礎の立ち上がり部には、互いに離間して配置された一対の保持具が設置されており、前記床下ユニットは、前記一対の前記保持具に、前記床下ユニットの前記固定材のそれぞれの端部を保持させるようにして配置されるとよい。
こうすることで、固定材を配置する際に、固定材の位置決めを簡単に行うことができる。すなわち、上記の床施工方法によれば床下ユニットを配置することが容易となる。
In the above floor construction method, a pair of holders arranged apart from each other are installed at the rising portion of the foundation of the building, and the underfloor unit is attached to the pair of holders with the underfloor unit. It is preferable that the fixing material is arranged so as to hold each end of the fixing material.
By doing so, when arranging the fixing material, the fixing material can be easily positioned. That is, according to the above floor construction method, it becomes easy to arrange the underfloor unit.

本発明によれば、床のパネル材を配置した後にもパネル材を支持する固定材の上下位置を容易に調整することができる。 According to the present invention, the vertical position of the fixing material that supports the panel material can be easily adjusted even after the floor panel material is arranged.

本発明の建物における床構造の一例を示す模式図である。It is a schematic diagram which shows an example of the floor structure in the building of this invention. 床下ユニットの組み立て手順を示す図である。It is a figure which shows the assembly procedure of the underfloor unit. 大引に束を組み付ける手順を説明する図である。It is a figure explaining the procedure of assembling a bundle in a large pull. 床下ユニットの配置例を示す図である。It is a figure which shows the arrangement example of the underfloor unit. 床下ユニットの配置状態を示す側面図である。It is a side view which shows the arrangement state of the underfloor unit. 大引が保持具により保持されている状態を示す図である。It is a figure which shows the state which a large pull is held by a holder. 床下ユニットに床パネルを配置した状態を示す図である。It is a figure which shows the state which the floor panel is arranged in the underfloor unit. 束の組み付け位置の調整を説明する図である。It is a figure explaining the adjustment of the assembly position of a bundle. 変形例に係る束の組み付け位置の調整前の状態を示す図である。It is a figure which shows the state before adjustment of the assembly position of the bundle which concerns on a modification. 変形例に係る束の組み付け位置の調整後の状態を示す図である。It is a figure which shows the state after adjustment of the assembly position of the bundle which concerns on a modification. 変形例に係る床パネルを示す図である。It is a figure which shows the floor panel which concerns on the modification.

以下、図1乃至図11を参照しながら、本発明に係る建物の床の施工方法(床施工方法)について説明する。なお、以下に説明する実施例は、本発明の理解を容易にするためのものであり、本発明を限定するものではない。すなわち、本発明は、その趣旨を逸脱することなく、変更、改良され得る。また、当然ながら、本発明にはその等価物が含まれ得る。 Hereinafter, a method of constructing a floor of a building (floor construction method) according to the present invention will be described with reference to FIGS. 1 to 11. It should be noted that the examples described below are for facilitating the understanding of the present invention and do not limit the present invention. That is, the present invention can be modified or improved without departing from the spirit of the present invention. Also, of course, the present invention may include an equivalent thereof.

なお、以下では、互いに直交する3つの方向をX方向、Y方向及びZ方向と呼ぶこととする。ここで、X方向及びY方向は、水平方向である。より具体的に説明すると、X方向は、後述する大引12の長手方向(所定方向に相当)に該当し、Y方向は、大引12の長手方向と交差(直交)する方向に該当する。また、Z方向は、鉛直方向(上下方向)である。 In the following, the three directions orthogonal to each other will be referred to as the X direction, the Y direction, and the Z direction. Here, the X direction and the Y direction are horizontal directions. More specifically, the X direction corresponds to the longitudinal direction (corresponding to a predetermined direction) of the large pull 12 described later, and the Y direction corresponds to the direction intersecting (orthogonal) with the longitudinal direction of the large pull 12. Further, the Z direction is a vertical direction (vertical direction).

<<建物の構成>>
本実施形態に係る床施工方法により床を構築する建物(以下、建物1)は、例えば複数階建ての住宅や建屋であり、1階部分の床構造として、図1に図示した床構造を採用している。図1は、建物1における床構造の一例を示す模式図であり、X方向から床10及び床下ユニット20を見た図である。なお、図1に図示の床構造は、複数階建ての建物にのみ適用されるものではなく、平屋等、一階建ての建物にも適用可能である。
<< Building composition >>
The building (hereinafter referred to as building 1) for which the floor is constructed by the floor construction method according to the present embodiment is, for example, a multi-story house or building, and the floor structure shown in FIG. 1 is adopted as the floor structure of the first floor. is doing. FIG. 1 is a schematic view showing an example of a floor structure in a building 1, and is a view of the floor 10 and the underfloor unit 20 from the X direction. The floor structure shown in FIG. 1 is not only applied to a multi-story building, but is also applicable to a one-story building such as a one-story building.

床10は、パネル材としての床パネル11を床設置スペースに敷きつめて不図示の化粧材を床パネル11の上に固定することで構成されている。床パネル11は、平面視で略長方形状の合板からなる。床下ユニット20は、図1に示すように床10と土間FLとの間に配置され、床10を下方から支えるものである。床下ユニット20は、図2及び図3に示すように固定材としての大引12と、支柱としての束13と、を組み付けて一体化したものである。 The floor 10 is configured by laying a floor panel 11 as a panel material in a floor installation space and fixing a decorative material (not shown) on the floor panel 11. The floor panel 11 is made of plywood having a substantially rectangular shape in a plan view. As shown in FIG. 1, the underfloor unit 20 is arranged between the floor 10 and the soil floor FL, and supports the floor 10 from below. As shown in FIGS. 2 and 3, the underfloor unit 20 is formed by assembling and integrating a large pull 12 as a fixing material and a bundle 13 as a support.

大引12は、角筒状の鋼材からなり、その上端面には床パネル11が設置される。
また、大引12には所定の間隔で操作孔12aが形成されている。この操作孔12aは、上下に貫通した貫通孔であり、それぞれの操作孔12aの位置に束13が取り付けられる。
The large pull 12 is made of a square cylindrical steel material, and a floor panel 11 is installed on the upper end surface thereof.
Further, the operation holes 12a are formed in the large pull 12 at predetermined intervals. The operation hole 12a is a through hole penetrating up and down, and the bundle 13 is attached to the position of each operation hole 12a.

束13は、図1に示すように、大引12の下方位置で大引12を支持する部材である。束13は、X方向に沿って略一定の間隔で大引12に組み付けられる。なお、本実施形態において図示した束13の数は、例示であって、大引12の長さや、束13の配置間隔に応じて適宜変更され得る。 As shown in FIG. 1, the bundle 13 is a member that supports the large pull 12 at a position below the large pull 12. The bundle 13 is assembled to the large pull 12 at substantially constant intervals along the X direction. The number of bundles 13 shown in the present embodiment is an example and can be appropriately changed according to the length of the large pull 12 and the arrangement interval of the bundles 13.

また、図1乃至図3に示すように、束13は、大引12が嵌合可能な受け部14と、鉛直方向に延出した支柱本体15と、支柱本体15の土台をなすベース部16とを有する。
ベース部16は、土間FLに接地される部分であり、例えば、ゴム製のブロック体等によって構成されている。
支柱本体15は、ベース部16に対して立設された部分であり、棒状のネジ部15aと、ネジ部15aが挿入される筒状部15bと、を有する。
ネジ部15aの外周面には雄ネジが形成されており、筒状部15bの内周面に形成された雌ネジと係合(螺合)している。
Further, as shown in FIGS. 1 to 3, the bundle 13 has a receiving portion 14 into which the large pull 12 can be fitted, a support column body 15 extending in the vertical direction, and a base portion 16 forming a base of the column body 15. And have.
The base portion 16 is a portion grounded to the soil floor FL, and is composed of, for example, a rubber block body or the like.
The column main body 15 is a portion erected with respect to the base portion 16, and has a rod-shaped screw portion 15a and a tubular portion 15b into which the screw portion 15a is inserted.
A male screw is formed on the outer peripheral surface of the threaded portion 15a, and is engaged (screwed) with a female screw formed on the inner peripheral surface of the tubular portion 15b.

そして、ネジ部15aが順回転すると、ネジ部15aが筒状部15bに対して上昇し、支柱本体15の高さが増加する。反対に、ネジ部15aが逆回転すると、ネジ部15aが筒状部15bに対して下降し、支柱本体15の高さが減少する。このように支柱本体15を含む束13の高さは、ネジ部15aを回転させることで調整することが可能である。 Then, when the screw portion 15a rotates forward, the screw portion 15a rises with respect to the tubular portion 15b, and the height of the column main body 15 increases. On the contrary, when the screw portion 15a rotates in the reverse direction, the screw portion 15a descends with respect to the tubular portion 15b, and the height of the column main body 15 decreases. In this way, the height of the bundle 13 including the support column body 15 can be adjusted by rotating the screw portion 15a.

ネジ部15aを回転させる際には、ネジ部15aの上端部に設けられたネジ頂部17を、工具(例えばドライバーやプラグレンチ)によって操作する(回転させる)。つまり、ネジ頂部17は、束13の上部に設けられた被操作部に相当し、束13の高さを変更する際に操作される部分である。 When rotating the screw portion 15a, the screw top portion 17 provided at the upper end portion of the screw portion 15a is operated (rotated) by a tool (for example, a screwdriver or a plug wrench). That is, the screw top portion 17 corresponds to the operated portion provided on the upper portion of the bundle 13, and is a portion operated when the height of the bundle 13 is changed.

受け部14は、束13の上方部分、より具体的には筒状部15bの上方位置に設けられた上向きC字状の鋼材からなる。この受け部14は、図3に示すように、底壁14aと、底壁の両側端から立設された一対の側壁14bとを有する。図3は、大引12を束13に組み付ける直前の状態を示す図である。なお、図3は、法線方向がX方向であって後述の操作孔12aを通過する断面を示した図となっている。 The receiving portion 14 is made of an upward C-shaped steel material provided at an upper portion of the bundle 13, more specifically, at an upper position of the cylindrical portion 15b. As shown in FIG. 3, the receiving portion 14 has a bottom wall 14a and a pair of side walls 14b erected from both side ends of the bottom wall. FIG. 3 is a diagram showing a state immediately before assembling the large pull 12 to the bundle 13. Note that FIG. 3 is a diagram showing a cross section in which the normal direction is the X direction and passes through the operation hole 12a described later.

底壁14aには貫通孔14cが設けられており、図3に示すように貫通孔14cにネジ部15aの上端部が挿通されている。換言すると、ネジ頂部17は、受け部14の底壁14aを貫通して当該底壁14aよりも上方に突出していることになる。なお、底壁14aの下面には、図3に示すように、ナット(以下、下方ナット18)が溶接されている。下方ナット18は、その孔と底壁14aの貫通孔14cとが連通するように底壁14aに固定されている。ネジ部15aの上端部は、下方ナット18と螺合して底壁14aを貫くように配設されている。 The bottom wall 14a is provided with a through hole 14c, and as shown in FIG. 3, the upper end portion of the screw portion 15a is inserted into the through hole 14c. In other words, the screw top 17 penetrates the bottom wall 14a of the receiving portion 14 and projects upward from the bottom wall 14a. As shown in FIG. 3, a nut (hereinafter referred to as a lower nut 18) is welded to the lower surface of the bottom wall 14a. The lower nut 18 is fixed to the bottom wall 14a so that the hole and the through hole 14c of the bottom wall 14a communicate with each other. The upper end portion of the screw portion 15a is arranged so as to be screwed with the lower nut 18 and penetrate the bottom wall 14a.

一対の側壁14bは、互いに離れた状態で配置されており、それぞれ上方に向かって延出している。各側壁14bは、若干の弾性を有し、側壁14bの上端部同士の間隔(換言すると、受け部14の上端開口)が広がるように撓むことが可能である。また、各側壁14bの延出方向中途位置には、内側(対をなす側壁14bが位置する側)に突出した係合突起14dが形成されている。 The pair of side walls 14b are arranged apart from each other and extend upward from each other. Each side wall 14b has some elasticity and can be bent so that the distance between the upper end portions of the side wall 14b (in other words, the upper end opening of the receiving portion 14) is widened. Further, an engaging projection 14d projecting inward (the side on which the paired side wall 14b is located) is formed at a position halfway in the extending direction of each side wall 14b.

そして、受け部14は、図2及び図3に示すように、底壁14aと一対の側壁14bとによって囲まれたスペース内に大引12を入れ込むことで大引12と嵌合する。より具体的に説明すると、大引12は、図3に示すように受け部14の上方から受け部14内部のスペースに入り込む。また、受け部14における一対の側壁14bの間隔(横幅)は、大引12の両側部の間隔(横幅)と略一致する。このため、大引12を受け部14内に入れ込む際、受け部14の上端開口が広がるように側壁14bが撓む。これにより、大引12がスムーズに受け部14内に入り込むようになる。 Then, as shown in FIGS. 2 and 3, the receiving portion 14 fits into the large pull 12 by inserting the large pull 12 into the space surrounded by the bottom wall 14a and the pair of side walls 14b. More specifically, as shown in FIG. 3, the large pull 12 enters the space inside the receiving portion 14 from above the receiving portion 14. Further, the distance (horizontal width) between the pair of side walls 14b in the receiving portion 14 substantially coincides with the distance (horizontal width) between both side portions of the large pulling portion 12. Therefore, when the large pull 12 is inserted into the receiving portion 14, the side wall 14b bends so that the upper end opening of the receiving portion 14 widens. As a result, the large pull 12 smoothly enters the receiving portion 14.

以上のように受け部14内に大引12が入り込むことで束13が大引12に組み付けられる。また、大引12の両側部の各々には、内側(対をなす側部が位置する側)に窪んだ係合凹部12bが形成されている。束13が大引12に組み付けられた状態では、図8に示すように、大引12の両側部の各々と隣り合う位置に受け部14の側壁14bが位置し、係合突起14dが係合凹部12bと対向して係合凹部12b内に入り込む(係合する)ようになる。このように係合突起14dが係合凹部12bと係合することで、大引12と受け部14との嵌合状態(換言すると、大引12に対する束13の組み付け状態)を安定させることが可能となる。 As described above, the bundle 13 is assembled to the large pull 12 by inserting the large pull 12 into the receiving portion 14. Further, each of the both side portions of the large pull 12 is formed with an engaging recess 12b recessed inward (the side on which the paired side portions are located). In the state where the bundle 13 is assembled to the large pull 12, as shown in FIG. 8, the side wall 14b of the receiving portion 14 is located adjacent to each of the both side portions of the large pull 12, and the engaging projection 14d is engaged. It enters (engages) into the engaging recess 12b facing the recess 12b. By engaging the engaging protrusion 14d with the engaging recess 12b in this way, it is possible to stabilize the fitting state of the large pull 12 and the receiving portion 14 (in other words, the assembled state of the bundle 13 with respect to the large pull 12). It will be possible.

また、束13が大引12に組み付けられた状態では、図8に示すように、ネジ頂部17を含むネジ部15aの上端部が大引12の底を貫通し、大引12の底よりも上方に突出している。具体的に説明すると、大引12のうち、束13が組み付けられる部分の底には、図3に示すように、大引12を貫通した孔(以下、ネジ挿入孔12c)が形成されている。また、束13では、ネジ部15aの上端部が受け部14の底壁14aを貫くように配設されている。 Further, in the state where the bundle 13 is assembled to the large pull 12, as shown in FIG. 8, the upper end portion of the screw portion 15a including the screw top portion 17 penetrates the bottom of the large pull 12 and is larger than the bottom of the large pull 12. It protrudes upward. Specifically, as shown in FIG. 3, a hole (hereinafter referred to as a screw insertion hole 12c) penetrating the large pull 12 is formed at the bottom of the portion of the large pull 12 to which the bundle 13 is assembled. .. Further, in the bundle 13, the upper end portion of the screw portion 15a is arranged so as to penetrate the bottom wall 14a of the receiving portion 14.

そして、束13を大引12に組み付けるために大引12を受け部14に嵌合させるとき、上記のネジ挿入孔12c内にネジ部15aの上端部を挿通させる。この結果、束13は、ネジ頂部17を含むネジ部15aの上端部が大引12の底を貫通するように大引12に組み付けられる。 Then, when the bundle 13 is fitted to the receiving portion 14 in order to assemble the bundle 13 to the large pull 12, the upper end portion of the screw portion 15a is inserted into the screw insertion hole 12c. As a result, the bundle 13 is assembled to the large pull 12 so that the upper end portion of the screw portion 15a including the screw top 17 penetrates the bottom of the large pull 12.

なお、大引12の底を貫通したネジ部15aの上端部には、図1及び図8に示すように座金付きナット(以下、上方ナット19)が取り付けられる。上方ナット19がネジ部15aの上端部に取り付けられることで、大引12に組み付けられた束13が大引12に対して固定される。 A nut with a washer (hereinafter referred to as an upper nut 19) is attached to the upper end of the screw portion 15a penetrating the bottom of the large pull 12 as shown in FIGS. 1 and 8. By attaching the upper nut 19 to the upper end portion of the screw portion 15a, the bundle 13 assembled to the large pull 12 is fixed to the large pull 12.

また、図3に示すように、大引12の上壁のうち、ネジ挿入孔12cと対向する部分、換言すると、束13が大引12に組み付けられた状態においてネジ部15aの上端部の直上位置に在る部分には円穴状の操作孔12aが設けられている。この操作孔12aは、その径がネジ頂部17の外径よりも大きくなるように形成されている。より詳しく説明すると、操作孔12aの径は、上方ナット19の最外径(座金部分の外径)よりも若干大きくなっている。 Further, as shown in FIG. 3, a portion of the upper wall of the large pull 12 facing the screw insertion hole 12c, in other words, directly above the upper end portion of the screw portion 15a in a state where the bundle 13 is assembled to the large pull 12. A circular hole-shaped operation hole 12a is provided in the portion at the position. The operation hole 12a is formed so that its diameter is larger than the outer diameter of the screw top 17. More specifically, the diameter of the operation hole 12a is slightly larger than the outermost diameter of the upper nut 19 (the outer diameter of the washer portion).

そして、ネジ頂部17を操作する際には、操作孔12aを通じて操作する形になる。つまり、大引12に組み付けられた束13の高さを変更する際には、ネジ挿入孔12cを通って大引12の底を貫通したネジ頂部17を操作する。この際、操作孔12aを通じてネジ頂部17までアクセスしてネジ頂部17を操作する形になる。 Then, when the screw top 17 is operated, it is operated through the operation hole 12a. That is, when changing the height of the bundle 13 assembled to the large pull 12, the screw top 17 that penetrates the bottom of the large pull 12 through the screw insertion hole 12c is operated. At this time, the screw top 17 is accessed through the operation hole 12a to operate the screw top 17.

以上の要領でネジ頂部17を操作すると、束13の高さが変更される。そして、束13の高さが変わると、これに伴って大引12の上下位置が変化する。つまり、ネジ頂部17の操作により、大引12に対する束13の組み付け位置が上下方向において変更する。ここで、組み付け位置とは、束13の高さ方向(すなわち、Z方向)において、束13のうち、大引12に組み付けられている部位の位置を意味する。 When the screw top 17 is operated in the above manner, the height of the bundle 13 is changed. Then, when the height of the bundle 13 changes, the vertical position of the large pull 12 changes accordingly. That is, by operating the screw top portion 17, the assembly position of the bundle 13 with respect to the large pull 12 is changed in the vertical direction. Here, the assembling position means the position of the portion of the bundle 13 that is assembled to the large pull 12 in the height direction (that is, the Z direction) of the bundle 13.

より詳しく説明すると、ネジ頂部17の操作によって束13の高さが変化する一方で、ネジ頂部17に対する受け部14及び大引12の位置(相対位置)は、受け部14の下面に溶接された下方ナット18によって保持される。したがって、束13の高さが変わると、大引12に対する束13の組み付け位置(具体的には、受け部14の位置)が上下移動し、これに伴う形で大引12の上下位置が調整される。 More specifically, while the height of the bundle 13 is changed by the operation of the screw top portion 17, the positions (relative positions) of the receiving portion 14 and the large pulling portion 12 with respect to the screw top portion 17 are welded to the lower surface of the receiving portion 14. It is held by the lower nut 18. Therefore, when the height of the bundle 13 changes, the assembling position of the bundle 13 with respect to the large pull 12 (specifically, the position of the receiving portion 14) moves up and down, and the vertical position of the large pull 12 is adjusted accordingly. Will be done.

<<床の施工方法>>
次に、本実施形態に係る床10の施工方法について説明する。なお、以下では、図1に図示した構造の床10を施工する場合を例に挙げて説明する。
<< Floor construction method >>
Next, the construction method of the floor 10 according to this embodiment will be described. In the following, a case where the floor 10 having the structure shown in FIG. 1 is constructed will be described as an example.

[床下ユニット20の組み付け工程]
本実施形態に係る床10を施工する上では、先ず、大引12に束13を組み付けて床下ユニット20を構成する。なお、大引12と束13との組付けは、工場で行い、その後完成した床下ユニット20を建物1の建設現場に運んでもよいし、大引12と束13との組付けを建物1の建設現場で行ってもよい。
[Assembly process of underfloor unit 20]
In constructing the floor 10 according to the present embodiment, first, the bundle 13 is assembled to the large pull 12 to form the underfloor unit 20. The assembly of the large pull 12 and the bundle 13 may be performed at the factory, and then the completed underfloor unit 20 may be carried to the construction site of the building 1, or the assembly of the large pull 12 and the bundle 13 may be carried out in the building 1. It may be done at the construction site.

[床下ユニット20の配置工程]
そして、それぞれの床下ユニット20を土間FLに配置する。具体的には、図5及び図6に示されるように、各々の床下ユニット20を建物1の基礎Bの立ち上がり部Rに設けられた保持具40に、大引12の端部12dを載置することで、立ち上がり部Rに対して大引12を架設した状態で床下ユニット20を配置する。
なお、図5および図6に示されるように、基礎Bの立ち上がり部Rに対して、X方向において離間した位置に一対の保持具40が設けられる。
[Arrangement process of underfloor unit 20]
Then, each underfloor unit 20 is arranged in the soil floor FL. Specifically, as shown in FIGS. 5 and 6, the end portion 12d of the large pull 12 is placed on the holder 40 provided on the rising portion R of the foundation B of the building 1 for each underfloor unit 20. By doing so, the underfloor unit 20 is arranged in a state where the large pull 12 is erected with respect to the rising portion R.
As shown in FIGS. 5 and 6, a pair of holders 40 are provided at positions separated from the rising portion R of the foundation B in the X direction.

保持具40は、板部材41と高さ調整部42とを備える。具体的には、板部材41は、Y方向に離間して設けられ、立ち上がり部Rの上面と側面に沿ったL字状の第1プレート41A及び第2プレート41Bと、第1プレート41Aと第2プレート41Bとを連結し、大引12の端部12dを支持する載置面部41Cと、を有する。
高さ調整部42は、第1プレート41Aに設けられ、第1プレート41Aと立ち上がり部Rの上面との距離を調整する第1高さ調整部42Aと、第2プレート41Bに設けられ、第2プレート41Bと立ち上がり部Rの上面との距離を調整する第2高さ調整部42Bとを有する。
なお、第1高さ調整部42A及び第2高さ調整部42Bは、ボルトを有し、ボルトを回転させることにより、第1プレート41A及び第2プレート41Bのそれぞれの上下位置を調整可能である。そして、第1プレート41Aと第2プレート41Bに伴って載置面部41Cの位置も変化し、これにより載置面部41Cにより支持される大引12の高さが調整可能となっている。
なお、本実施形態においては、保持具40は、束13のベース部16が土間FLに接地する高さに予め調整されていることとする。
The holder 40 includes a plate member 41 and a height adjusting portion 42. Specifically, the plate members 41 are provided apart in the Y direction, and are L-shaped first plates 41A and second plates 41B along the upper surface and side surfaces of the rising portion R, and the first plate 41A and the first plate. It has a mounting surface portion 41C that connects the two plates 41B and supports the end portion 12d of the large pull 12.
The height adjusting portion 42 is provided on the first plate 41A, is provided on the first height adjusting portion 42A for adjusting the distance between the first plate 41A and the upper surface of the rising portion R, and is provided on the second plate 41B. It has a second height adjusting portion 42B for adjusting the distance between the plate 41B and the upper surface of the rising portion R.
The first height adjusting portion 42A and the second height adjusting portion 42B have bolts, and the vertical positions of the first plate 41A and the second plate 41B can be adjusted by rotating the bolts. .. The position of the mounting surface portion 41C also changes with the first plate 41A and the second plate 41B, whereby the height of the large pull 12 supported by the mounting surface portion 41C can be adjusted.
In the present embodiment, the holder 40 is preliminarily adjusted to a height at which the base portion 16 of the bundle 13 touches the soil floor FL.

上述したように、複数の床下ユニット20を土間FLに対して配置する。この際、それぞれの床下ユニット20の大引12を保持具40に架設するように配置することで、それぞれの床下ユニット20をX方向に沿って平行に配置することができる。
このように、保持具40に大引12を架設して床下ユニット20を配置することにより、床下ユニット20の土間FLにおける位置決めを容易に行うことができる。
As described above, a plurality of underfloor units 20 are arranged with respect to the soil floor FL. At this time, by arranging the large pull 12 of each underfloor unit 20 so as to be erected on the holder 40, each underfloor unit 20 can be arranged in parallel along the X direction.
In this way, by erection of the large pull 12 on the holder 40 and arranging the underfloor unit 20, the underfloor unit 20 can be easily positioned in the soil floor FL.

[床パネル11の配置工程]
次に、図7に示されるように、床下ユニット20の上に、複数の床パネル11を配置する。
具体的に説明すると、図7に示されるように、複数の床パネル11(図7では4つの床パネル11)をX方向に並べるようにして、大引12の上に配置する。
詳細に説明すると、各床パネル11は、平面視で略直方形状をなしており、その長辺が隣り合う床パネル11の長辺と重なるように配置する。
また、大引12のうちの一つ(以下、中央の大引12)には、Y方向における各床パネル11の中央部が載っている。残りの大引12(以下、端側の大引12)には、Y方向における床パネル11の端部が載っている。
[Floor panel 11 placement process]
Next, as shown in FIG. 7, a plurality of floor panels 11 are arranged on the underfloor unit 20.
Specifically, as shown in FIG. 7, a plurality of floor panels 11 (four floor panels 11 in FIG. 7) are arranged on the large pull 12 so as to be arranged in the X direction.
To be described in detail, each floor panel 11 has a substantially rectangular shape in a plan view, and the long sides thereof are arranged so as to overlap the long sides of the adjacent floor panels 11.
Further, one of the large pulls 12 (hereinafter referred to as the central large pull 12) has a central portion of each floor panel 11 in the Y direction. The end portion of the floor panel 11 in the Y direction is mounted on the remaining large pull 12 (hereinafter referred to as the large pull 12 on the end side).

なお、3つの大引12に固定されている床パネル11の配置では、図7に示すように、X方向における各大引12の一端部が、パネル群中、X方向において最も一端側に位置する床パネル11よりも幾分はみ出している。ただし、これに限定されるものではなく、床パネル11と大引12のX方向の端が揃っていてもよい。 In the arrangement of the floor panels 11 fixed to the three large pulls 12, as shown in FIG. 7, one end of each large pull 12 in the X direction is located on the one end side in the X direction in the panel group. It protrudes slightly from the floor panel 11 to be used. However, the present invention is not limited to this, and the edges of the floor panel 11 and the large pull 12 in the X direction may be aligned.

[大引12に対する束13の組み付け位置の変更工程]
次に、大引12に対する束13の組付け位置を変更する工程について説明する。
図7に示されるように、床パネル11において大引12の上に載った部分のうち、操作孔12aの上方位置には開口部が設けられている。
[Step of changing the assembly position of the bundle 13 with respect to the large pull 12]
Next, a step of changing the assembly position of the bundle 13 with respect to the large pull 12 will be described.
As shown in FIG. 7, an opening is provided in the upper position of the operation hole 12a in the portion of the floor panel 11 placed on the large pull 12.

より詳しく説明すると、床パネル11において中央の大引12の上に載っている部分(すなわち、Y方向における床パネル11の中央部)には、図7に示すように開口部としての切り欠き11aが形成されている。この切り欠き11aは、Y方向における床パネル11の中央部の側縁(X方向における一端側の縁)を略三角形状に切り欠くことで形成されている。また、切り欠き11aは、図7及び図8に示すように、中央の大引12に形成された操作孔12aの直上位置に設けられている。さらに、切り欠き11aは、操作孔12aの開口サイズよりも幾分大きく、切り欠き11aの縁が操作孔12aの縁よりも外側に位置するように形成されている。 More specifically, the portion of the floor panel 11 resting on the central pull 12 (that is, the central portion of the floor panel 11 in the Y direction) has a notch 11a as an opening as shown in FIG. Is formed. The notch 11a is formed by cutting out a side edge (one end side edge in the X direction) of the central portion of the floor panel 11 in the Y direction in a substantially triangular shape. Further, as shown in FIGS. 7 and 8, the notch 11a is provided at a position directly above the operation hole 12a formed in the central large pull 12. Further, the notch 11a is formed so as to be slightly larger than the opening size of the operation hole 12a and the edge of the notch 11a is located outside the edge of the operation hole 12a.

また、床パネル11において端側の大引12の上に載っている部分(すなわち、X方向における床パネル11の端部)には、図7に示すように開口部としての切り欠き11bが形成されている。切り欠き11bは、図7に示すように、X方向において互いに隣り合う2つの床パネル11の各々の角部を略三角形状に面取りすることで形成されている。また、切り欠き11bは、端側の大引12に形成された操作孔12aの直上位置に設けられている。また、切り欠き11bは、操作孔12aの開口サイズよりも若干大きく、切り欠き11bの外縁が操作孔12aの縁よりも外側に位置するように設けられている。なお、切り欠き11bと操作孔12aとの位置関係については、切り欠き11aと操作孔12aとの位置関係(すなわち、図8に示す位置関係)と略同様である。 Further, as shown in FIG. 7, a notch 11b as an opening is formed in the portion of the floor panel 11 resting on the large pull 12 on the end side (that is, the end portion of the floor panel 11 in the X direction). Has been done. As shown in FIG. 7, the notch 11b is formed by chamfering the corners of two floor panels 11 adjacent to each other in the X direction in a substantially triangular shape. Further, the notch 11b is provided at a position directly above the operation hole 12a formed in the large pull 12 on the end side. Further, the notch 11b is provided so as to be slightly larger than the opening size of the operation hole 12a and the outer edge of the notch 11b is located outside the edge of the operation hole 12a. The positional relationship between the notch 11b and the operation hole 12a is substantially the same as the positional relationship between the notch 11a and the operation hole 12a (that is, the positional relationship shown in FIG. 8).

以上のように、床パネル11において大引12の上に載っている部分のうち、大引12に組み付けられた束13が有するネジ部15aの直上位置にある箇所には、開口部としての切り欠き11a、11bが設けられている。つまり、大引12の底を貫通しているネジ部15aの頂部(すなわちネジ頂部17)は、操作孔12a及び切り欠き11a、11bを通じて床パネル11の上方空間に対して露出している。このため、ネジ頂部17は、切り欠き11a、11b及び操作孔12aを通じて操作可能となる。このような構成であれば、床パネル11の上方から切り欠き11a、11b及び操作孔12aを通じてネジ頂部17にアクセスしてネジ頂部17を操作することが可能となる。 As described above, among the parts of the floor panel 11 resting on the large pull 12, the portion directly above the screw portion 15a of the bundle 13 assembled to the large pull 12 is cut as an opening. Notches 11a and 11b are provided. That is, the top of the screw portion 15a (that is, the screw top 17) penetrating the bottom of the large pull 12 is exposed to the space above the floor panel 11 through the operation holes 12a and the notches 11a and 11b. Therefore, the screw top 17 can be operated through the notches 11a and 11b and the operation hole 12a. With such a configuration, it is possible to access the screw top 17 from above the floor panel 11 through the notches 11a and 11b and the operation hole 12a to operate the screw top 17.

すなわち、床下ユニット20の上に床パネル11を配置した後に、大引12の上下位置(すなわち、床レベル)を調整する。具体的には、各束13が支柱本体15に備えたネジ部15aのネジ頂部17を操作して束13の高さを変更する。この際、床パネル11において大引12の上に載った部分のうち、ネジ頂部17の上方位置に形成された切り欠き11a、11bを通じてネジ頂部17を操作する。 That is, after arranging the floor panel 11 on the underfloor unit 20, the vertical position (that is, the floor level) of the large pull 12 is adjusted. Specifically, each bundle 13 operates the screw top 17 of the screw portion 15a provided on the column main body 15 to change the height of the bundle 13. At this time, the screw top 17 is operated through the notches 11a and 11b formed above the screw top 17 in the portion of the floor panel 11 placed on the large pull 12.

より詳しく説明すると、束13が大引12に組み付けられた状態において、ネジ頂部17の直上位置には、大引12の上壁に形成された操作孔12a、及び、床パネル11に形成された切り欠き11a、11bが設けられている。つまり、ネジ頂部17は、床パネル11の上方空間に対して露出している。これにより、床パネル11の上方から操作孔12a及び切り欠き11a、11bを通じてネジ頂部17を操作し得るようになる。より詳しく説明すると、作業者(すなわち、床の施工者)は、操作孔12a及び切り欠き11a、11bを通じて工具を差し込み、当該工具によってネジ頂部17を操作してネジ部15aを回転させる。 More specifically, in a state where the bundle 13 is assembled to the large pull 12, the operation hole 12a formed in the upper wall of the large pull 12 and the floor panel 11 are formed at a position directly above the screw top portion 17. Notches 11a and 11b are provided. That is, the screw top 17 is exposed to the space above the floor panel 11. As a result, the screw top 17 can be operated from above the floor panel 11 through the operation holes 12a and the notches 11a and 11b. More specifically, the operator (that is, the floor builder) inserts a tool through the operation holes 12a and the notches 11a and 11b, and operates the screw top 17 with the tool to rotate the screw portion 15a.

そして、ネジ部15aの回転によって束13の高さが変更し、これに伴って大引12の上下位置(床レベル)が調整される。最終的に大引12の上下位置が所望の位置に達した時点で、作業者は、操作孔12a及び切り欠き11a、11bを通じて上方ナット19をネジ頂部17に螺合させる。これにより、大引12が所望の高さに配置された状態で束13が大引12に対して固定されるようになる。 Then, the height of the bundle 13 is changed by the rotation of the screw portion 15a, and the vertical position (floor level) of the large pull 12 is adjusted accordingly. When the vertical position of the large pull 12 finally reaches the desired position, the operator screwes the upper nut 19 into the screw top 17 through the operation hole 12a and the notches 11a and 11b. As a result, the bundle 13 is fixed to the large pull 12 in a state where the large pull 12 is arranged at a desired height.

その後、化粧材の設置等を含む後段の工程が実施される。そして、床10の施工に関する一連の工程が実施されることで床10及び床下ユニット20が完成し、これを以て床10の施工作業が終了する。 After that, the subsequent steps including the installation of decorative materials are carried out. Then, the floor 10 and the underfloor unit 20 are completed by carrying out a series of steps related to the construction of the floor 10, and the construction work of the floor 10 is completed by this.

<<変形例に係る建物及び床の施工方法>>
次に、変形例に係る建物及び床の施工方法について説明する。変形例では、固定材に相当する大引の構造、支柱に相当する束の構造、及び束を大引に組み付ける方法が上記の実施形態とは異なる。また、上記以外の点において、変形例は、上記の実施形態と共通するため、以下では、上記の実施形態からの相違点を主に説明する。
<< Construction method of building and floor according to the modified example >>
Next, the construction method of the building and the floor according to the modified example will be described. In the modified example, the structure of the large pull corresponding to the fixing material, the structure of the bundle corresponding to the support column, and the method of assembling the bundle in the large pull are different from the above-described embodiment. In addition, since the modification is common to the above embodiment in points other than the above, the differences from the above embodiment will be mainly described below.

変形例に係る大引(以下、大引30)は、角柱状の部材であり、例えば木材や鋼管からなる。大引30の上面にはX方向に沿って複数の床パネル11が固定されている。また、大引30には、X方向において略一定間隔で円穴状の挿入孔30aが形成されている。 The large pull (hereinafter, large pull 30) according to the modified example is a prismatic member, and is made of, for example, wood or a steel pipe. A plurality of floor panels 11 are fixed to the upper surface of the large pull 30 along the X direction. Further, the large pull 30 is formed with circular hole-shaped insertion holes 30a at substantially regular intervals in the X direction.

また、各床パネル11において大引30の上に載っている部分のうち、挿入孔30aの直上位置に在る箇所には、図9に示すように切り欠き11a、11b(図9では、図示の都合上、切り欠き11aのみ記載)が形成されている。この切り欠き11a、11bは、本実施形態における切り欠き11a、11bに相当する開口部であり、本実施形態における形成位置と略同じ位置に形成されている。なお、切り欠き11a、11bの代わりに円穴が開口部として形成されてもよい。切り欠き11a、11bは、その外縁が挿入孔30aの縁よりも外側に位置するように形成されている。図9は、変形例において大引30に束32を組み付ける手順を示す図である。なお、図9は、図8に示す断面に相当する。 Further, as shown in FIG. 9, notches 11a and 11b (not shown in FIG. 9) are located in the portions of the floor panels 11 directly above the insertion hole 30a among the portions placed on the large pull 30. For the convenience of the above, only the notch 11a is described). The notches 11a and 11b are openings corresponding to the notches 11a and 11b in the present embodiment, and are formed at substantially the same positions as the formation positions in the present embodiment. A circular hole may be formed as an opening instead of the notches 11a and 11b. The notches 11a and 11b are formed so that their outer edges are located outside the edges of the insertion holes 30a. FIG. 9 is a diagram showing a procedure for assembling the bundle 32 to the large pull 30 in the modified example. Note that FIG. 9 corresponds to the cross section shown in FIG.

さらに、大引30の下面には、図9に示すように、筒状の部品(以下、ネジ保持部材31)が取り付けられている。ネジ保持部材31は、その内部空間が挿入孔30aと連通した状態で大引30の下面に固定されている。ネジ保持部材31の内径は、挿入孔30aの径よりも僅かに小さくなっており、また、ネジ保持部材31の内周面にはネジ山が形成されている。 Further, as shown in FIG. 9, a cylindrical part (hereinafter referred to as a screw holding member 31) is attached to the lower surface of the large pull 30. The screw holding member 31 is fixed to the lower surface of the large pull 30 with its internal space communicating with the insertion hole 30a. The inner diameter of the screw holding member 31 is slightly smaller than the diameter of the insertion hole 30a, and a screw thread is formed on the inner peripheral surface of the screw holding member 31.

変形例に係る束(以下、束32)は、複数の部品に分割されており、これらの部品を組み立てることで構成される。具体的に説明すると、束32は、支柱本体33とベース部36とを有する。支柱本体33及びベース部36は、図9に示すように分離可能であり、束32が大引30に組み付けられる時点で連結する。 The bundle according to the modified example (hereinafter referred to as bundle 32) is divided into a plurality of parts, and is configured by assembling these parts. Specifically, the bundle 32 has a support column body 33 and a base portion 36. The strut body 33 and the base portion 36 are separable as shown in FIG. 9, and are connected when the bundle 32 is assembled to the large pull 30.

支柱本体33は、外周面の一部にネジ山が形成されたシャフトの部品であり、図9に示すように互いに形が異なる3つの部分(以下、小径ネジ部33a、中径部33b及び大径ネジ部33cという)を有する。小径ネジ部33aは、支柱本体33において最も小径であり、支柱本体33の下端部に位置する。中径部33bは、小径ネジ部33aよりも大径で、かつ、大径ネジ部33cよりも小径であり、支柱本体33の中央部に位置する。大径ネジ部33cは、支柱本体33において最も大径であり、支柱本体33の上端部に位置する。そして、小径ネジ部33a及び大径ネジ部33cの外周面にはネジ山が形成されている一方で、中径部33bの外周面は平坦面(ネジ山が形成されていない面)となっている。 The strut body 33 is a shaft component having a thread formed on a part of the outer peripheral surface, and as shown in FIG. 9, three portions having different shapes (hereinafter, small diameter screw portion 33a, medium diameter portion 33b, and large diameter portion 33b). It has a diameter screw portion 33c). The small diameter screw portion 33a has the smallest diameter in the column main body 33 and is located at the lower end portion of the column main body 33. The medium-diameter portion 33b has a larger diameter than the small-diameter screw portion 33a and a smaller diameter than the large-diameter screw portion 33c, and is located in the central portion of the column main body 33. The large-diameter screw portion 33c has the largest diameter in the column main body 33 and is located at the upper end portion of the column main body 33. The outer peripheral surfaces of the small-diameter screw portion 33a and the large-diameter screw portion 33c are formed with threads, while the outer peripheral surfaces of the medium-diameter portion 33b are flat surfaces (surfaces on which the threads are not formed). There is.

また、大径ネジ部33cの外周面に形成されたネジ山は、ネジ保持部材31の内周面に形成されたネジ山と係合(螺合)することが可能である。そして、支柱本体33は、大径ネジ部33cがネジ保持部材31内に挿入された状態で順方向に回転すると下方に向かって移動する。また、支柱本体33が下方に移動すると、やがて支柱本体33がネジ保持部材31の下端開口から突出するようになる。ネジ保持部材31の下端開口からの支柱本体33の突出量は、支柱本体33の移動の向き及び移動量によって調整可能である。 Further, the screw thread formed on the outer peripheral surface of the large-diameter screw portion 33c can be engaged (screwed) with the screw thread formed on the inner peripheral surface of the screw holding member 31. Then, the column main body 33 moves downward when the large-diameter screw portion 33c is rotated in the forward direction with the large-diameter screw portion 33c inserted in the screw holding member 31. Further, when the support column body 33 moves downward, the support column body 33 eventually protrudes from the lower end opening of the screw holding member 31. The amount of protrusion of the column main body 33 from the lower end opening of the screw holding member 31 can be adjusted by the moving direction and the moving amount of the column main body 33.

また、図9に示すように、支柱本体33の上端部には、被操作部としての軸頂部35が設けられている。大径ネジ部33cがネジ保持部材31内に挿入された状態で軸頂部35が操作されると、支柱本体33が回転して上下方向に移動する。 Further, as shown in FIG. 9, a shaft top portion 35 as an operated portion is provided at the upper end portion of the support column main body 33. When the shaft top portion 35 is operated with the large-diameter screw portion 33c inserted into the screw holding member 31, the column main body 33 rotates and moves in the vertical direction.

ベース部36は、図9に示すように、略円錐台状の接地部36aと、接地部36aの上端から上方に向かって立設された立設部36bと、を有する。接地部36aは、束32の下端部をなし、土間FLの上に接地される。立設部36bは、略円筒形状をなし、その外周面にはネジ山が形成されている。立設部36bの外径は、ネジ保持部材31の内径と略同径である。 As shown in FIG. 9, the base portion 36 has a substantially truncated cone-shaped ground contact portion 36a and an upright portion 36b erected upward from the upper end of the ground contact portion 36a. The grounding portion 36a forms the lower end portion of the bundle 32 and is grounded on the soil floor FL. The upright portion 36b has a substantially cylindrical shape, and a screw thread is formed on the outer peripheral surface thereof. The outer diameter of the upright portion 36b is substantially the same as the inner diameter of the screw holding member 31.

また、大引30に対して束32を組み付け始める段階では、図9に示すように、立設部36bがネジ保持部材31の内部空間の下方領域に入り込んでいる。この状態において、立設部36bの外周面に形成されたネジ山と、ネジ保持部材31の内周面に形成されたネジ山とが螺合している。なお、ベース部36は、ネジ保持部材31に対して順方向に回転すると、立設部36bがネジ保持部材31内に入り込む向き(すなわち、上方)に移動する。反対に、ベース部36は、ネジ保持部材31に対して逆方向に回転すると、立設部36bがネジ保持部材31から外れる向き(すなわち、下方)に移動する。 Further, at the stage of starting to assemble the bundle 32 with respect to the large pull 30, as shown in FIG. 9, the upright portion 36b has entered the lower region of the internal space of the screw holding member 31. In this state, the screw thread formed on the outer peripheral surface of the upright portion 36b and the screw thread formed on the inner peripheral surface of the screw holding member 31 are screwed together. When the base portion 36 rotates in the forward direction with respect to the screw holding member 31, the upright portion 36b moves in the direction in which the upright portion 36b enters the screw holding member 31 (that is, upward). On the contrary, when the base portion 36 rotates in the opposite direction to the screw holding member 31, the upright portion 36b moves in a direction (that is, downward) away from the screw holding member 31.

また、ベース部36の略中央部分には、ベース部36を貫通する貫通孔が設けられている。この貫通孔には、大引30に対して束32を組み付ける際、図10に示すように小径ネジ部33aが挿入される。なお、貫通孔の内周面にはネジ山が形成されており、このネジ山が小径ネジ部33aのネジ山と係合(螺合)する。図10は、変形例において束32の組み付け位置が調整された状態を示す図であり、図9と同じ断面を示している。 Further, a through hole penetrating the base portion 36 is provided in a substantially central portion of the base portion 36. A small diameter screw portion 33a is inserted into this through hole as shown in FIG. 10 when assembling the bundle 32 to the large pull 30. A thread is formed on the inner peripheral surface of the through hole, and this thread engages (screws) with the thread of the small diameter screw portion 33a. FIG. 10 is a diagram showing a state in which the assembly position of the bundle 32 is adjusted in the modified example, and shows the same cross section as in FIG.

そして、支柱本体33は、小径ネジ部33aがベース部36の貫通孔に差し掛かった状態で支柱本体33が順方向に回転すると、小径ネジ部33aが上記の貫通孔内に進入し、この結果、支柱本体33とベース部36とが連結するようになる。 Then, when the strut body 33 rotates in the forward direction with the small diameter screw portion 33a approaching the through hole of the base portion 36, the small diameter screw portion 33a enters the through hole, and as a result, the result. The support column body 33 and the base portion 36 are connected to each other.

次に、上述した大引30に対して束32を組み付け、大引30の上下位置を調整する手順について説明する。大引30に束32を組み付け始める段階では、図9に示すように、立設部36bがネジ保持部材31の内部空間の下部に入り込んでおり、立設部36bのネジ山とネジ保持部材31のネジ山とが螺合している。かかる状態において、大引30に形成された各挿入孔30aに、支柱本体33を床パネル11の上方から挿入する。ここで、大引30の上に載っている床パネル11のうち、挿入孔30aの上方位置に在る部分には、挿入孔30aよりも大きな切り欠き11a、11bが形成されている。これにより、支柱本体33が挿入孔30a内にスムーズに挿入されるようになる。 Next, a procedure for assembling the bundle 32 to the above-mentioned large pull 30 and adjusting the vertical position of the large pull 30 will be described. At the stage of starting to assemble the bundle 32 to the large pull 30, as shown in FIG. 9, the upright portion 36b has entered the lower part of the internal space of the screw holding member 31, and the screw thread of the upright portion 36b and the screw holding member 31 have entered. It is screwed with the screw thread of. In such a state, the support column main body 33 is inserted from above the floor panel 11 into each insertion hole 30a formed in the large pull 30. Here, in the floor panel 11 placed on the large pull 30, notches 11a and 11b larger than the insertion hole 30a are formed in the portion located above the insertion hole 30a. As a result, the column main body 33 is smoothly inserted into the insertion hole 30a.

支柱本体33が挿入孔30aに挿入されると、小径ネジ部33aがネジ保持部材31内に進入し、やがてネジ保持部材31に係合したベース部36の接地部36aに到達する。その後、作業者(すなわち、床の施工者)が軸頂部35を操作して支柱本体33を順方向に回転させると、小径ネジ部33aがベース部36に形成された貫通穴内に入り込み、当該貫通孔の内周面に形成されたネジ山と、小径ネジ部33aの外周面に形成されたネジ山とが螺合するようになる。また、小径ネジ部33aのネジ山と上記の貫通孔のネジ山とが螺合した状態で支柱本体33が順方向に回転すると、ベース部36が一体的に回転するようになる。つまり、ベース部36がネジ保持部材31に対して順方向に回転し、結果として、ベース部36の立設部36bがネジ保持部材31内に更に入り込むようになる。 When the support column body 33 is inserted into the insertion hole 30a, the small-diameter screw portion 33a enters the screw holding member 31 and eventually reaches the ground contact portion 36a of the base portion 36 engaged with the screw holding member 31. After that, when the worker (that is, the floor builder) operates the shaft top portion 35 to rotate the column main body 33 in the forward direction, the small diameter screw portion 33a enters the through hole formed in the base portion 36 and the penetration thereof. The thread formed on the inner peripheral surface of the hole and the thread formed on the outer peripheral surface of the small-diameter threaded portion 33a are screwed together. Further, when the column main body 33 rotates in the forward direction in a state where the thread of the small diameter screw portion 33a and the thread of the above-mentioned through hole are screwed together, the base portion 36 rotates integrally. That is, the base portion 36 rotates in the forward direction with respect to the screw holding member 31, and as a result, the upright portion 36b of the base portion 36 further enters the screw holding member 31.

作業者が更に軸頂部35を操作して支柱本体33を順方向に回転させ続けると、やがて小径ネジ部33aと中径部33bとの段差が立設部36bの上端面に当接する位置まで、小径ネジ部33aがベース部36の貫通孔に入り込む。その状態において作業者が軸頂部35を操作して支柱本体33を順方向に回転させる(分かり易くは、増し締めする)と、支柱本体33とベース部36とが連結し、束32として一体化するようになる。 When the operator further operates the shaft top portion 35 to continue rotating the column main body 33 in the forward direction, the step between the small diameter screw portion 33a and the medium diameter portion 33b eventually comes into contact with the upper end surface of the upright portion 36b. The small diameter screw portion 33a enters the through hole of the base portion 36. In that state, when the operator operates the shaft top portion 35 to rotate the support column body 33 in the forward direction (for easy understanding, retighten), the support column body 33 and the base portion 36 are connected and integrated as a bundle 32. Will come to do.

作業者は、それまで行っていた操作の向きとは逆の向きに軸頂部35を操作することで、束32として一体化した支柱本体33及びベース部36を、ネジ保持部材31に対して逆方向に回転させる。これにより、ネジ保持部材31内に嵌まり込んでいるベース部36の立設部36bが下方に移動し、やがてネジ保持部材31の外に出てネジ保持部材31から外れる。この際、支柱本体33は、ベース部36に固定された状態でベース部36と一体的に移動し、具体的には、小径ネジ部33a及び中径部33bがネジ保持部材31の貫通孔内を通過する。そして、支柱本体33は、大径ネジ部33cのネジ山とネジ保持部材31の貫通孔内に形成されたネジ山とが螺合する位置まで移動する。以上までの手順により、大引30に対して束32が組み付けられる。 By operating the shaft top portion 35 in the direction opposite to the direction of the operation performed up to that point, the operator reverses the support column main body 33 and the base portion 36 integrated as the bundle 32 with respect to the screw holding member 31. Rotate in the direction. As a result, the upright portion 36b of the base portion 36 fitted in the screw holding member 31 moves downward, and eventually goes out of the screw holding member 31 and comes off from the screw holding member 31. At this time, the column main body 33 moves integrally with the base portion 36 in a state of being fixed to the base portion 36, and specifically, the small diameter screw portion 33a and the medium diameter portion 33b are inside the through hole of the screw holding member 31. Pass through. Then, the column main body 33 moves to a position where the screw thread of the large-diameter screw portion 33c and the screw thread formed in the through hole of the screw holding member 31 are screwed together. By the above procedure, the bundle 32 is assembled to the large pull 30.

その後、作業者は、図10に図示の治具Tを取り付けた工具(具体的には、不図示のインパクトドライバー)を用いて軸頂部35を引き続き操作する。治具Tは、有底筒型形状をなしており、治具Tの内部空間の底には嵌合突起Taが突出形成されている。この嵌合突起Taは、棒状レンチをなしており、治具T内に軸頂部35が挿入された際に、軸頂部35の上端面に形成された嵌合孔34に嵌合される。なお、嵌合突起Taの断面形状及び嵌合孔34の開口形状は、両者が対応するものである限り任意に設定することができ、例えば、円形、方形状あるいは六角形であってもよい。 After that, the operator continues to operate the shaft top portion 35 by using a tool (specifically, an impact driver (not shown) to which the jig T shown in FIG. 10 is attached). The jig T has a bottomed tubular shape, and a fitting protrusion Ta is formed so as to protrude from the bottom of the internal space of the jig T. The fitting protrusion Ta is a rod-shaped wrench, and when the shaft top portion 35 is inserted into the jig T, it is fitted into the fitting hole 34 formed on the upper end surface of the shaft top portion 35. The cross-sectional shape of the fitting protrusion Ta and the opening shape of the fitting hole 34 can be arbitrarily set as long as they correspond to each other, and may be, for example, circular, square, or hexagonal.

作業者は、図10に示すように、治具T内に支柱本体33の上端部を入れ、軸頂部35の嵌合孔34に治具Tの嵌合突起Taを嵌合させる。かかる状態でインパクトドライバーを操作すると、支柱本体33がネジ保持部材31に対して順方向に回転し、ベース部36とともに下方に向かって移動する。これにより、ベース部36は、接地部36aが土間FLに接地する位置まで下降するようになる。 As shown in FIG. 10, the operator inserts the upper end portion of the support column body 33 into the jig T, and fits the fitting protrusion Ta of the jig T into the fitting hole 34 of the shaft top portion 35. When the impact driver is operated in such a state, the column main body 33 rotates forward with respect to the screw holding member 31 and moves downward together with the base portion 36. As a result, the base portion 36 descends to a position where the ground contact portion 36a touches the soil floor FL.

作業者がインパクトドライバーにて軸頂部35を引き続き操作すると、支柱本体33及び大引30に対して下降し続け、ネジ保持部材31からの支柱本体33の突出量が徐々に増加する。これにより、大引30に対する束32の組み付け位置が変化し、これに伴って、大引30の上下位置が調整される(具体的には、大引30が徐々に土間FLから離れる)。 When the operator continues to operate the shaft top portion 35 with the impact driver, it continues to descend with respect to the support column body 33 and the large pull 30, and the amount of protrusion of the column body 33 from the screw holding member 31 gradually increases. As a result, the assembling position of the bundle 32 with respect to the large pull 30 changes, and the vertical position of the large pull 30 is adjusted accordingly (specifically, the large pull 30 gradually separates from the soil floor FL).

作業者は、図10に示すように治具Tの先端が大引30における挿入孔30aの縁に係止される位置まで軸頂部35を操作し続ける。これにより、大引30の上下位置は、最終的に、図10に図示の位置(すなわち、治具Tの先端が大引30における挿入孔30aの縁に係止された時点での位置であり、以下、「最終調整位置」という)となる。 As shown in FIG. 10, the operator continues to operate the shaft top portion 35 until the tip of the jig T is locked to the edge of the insertion hole 30a in the large pull 30. As a result, the vertical position of the large pull 30 is finally the position shown in FIG. 10 (that is, the position when the tip of the jig T is locked to the edge of the insertion hole 30a in the large pull 30). , Hereinafter referred to as "final adjustment position").

なお、変形例では、大引30の上下位置を調整するために軸頂部35を操作する際に、床パネル11において大引30の上に載った部分のうち、挿入孔30aの上方位置に形成された切り欠き11a、11bを通じて軸頂部35を操作する。これにより、床パネル11の上方から切り欠き11a、11bを通じて軸頂部35にアクセスして軸頂部35を操作することが可能となる。このような構成により、変形例では、大引30上に床パネル11が固定された状態であっても、大引30の上下位置を簡単に調整することが可能となる。 In the modified example, when the shaft top portion 35 is operated to adjust the vertical position of the large pull 30, it is formed in the upper position of the insertion hole 30a among the portions placed on the large pull 30 on the floor panel 11. The shaft top 35 is operated through the cutouts 11a and 11b. This makes it possible to access the shaft top portion 35 from above the floor panel 11 through the notches 11a and 11b and operate the shaft top portion 35. With such a configuration, in the modified example, even when the floor panel 11 is fixed on the large pull 30, the vertical position of the large pull 30 can be easily adjusted.

また、変形例では、軸頂部35を操作する際に、図10に図示の治具Tを用いて操作する。そして、治具Tの先端が大引30における挿入孔30aの縁に係止されるようになるまで、軸頂部35を操作し続ける。これにより、ネジ保持部材31からの支柱本体33の突出量(換言すると、大引30に対する束32の組み付け位置)が予め設定された量となり、大引30の上下位置が一律の位置、具体的には最終調整位置に調整される。この結果、複数の束32を大引30に組み付ける際、各束32の組み付け位置を容易に揃えることが可能となる。 Further, in the modified example, when the shaft top portion 35 is operated, the jig T shown in FIG. 10 is used for the operation. Then, the shaft top portion 35 is continuously operated until the tip of the jig T is locked to the edge of the insertion hole 30a in the large pull 30. As a result, the amount of protrusion of the column main body 33 from the screw holding member 31 (in other words, the assembly position of the bundle 32 with respect to the large pull 30) becomes a preset amount, and the vertical position of the large pull 30 is a uniform position, specifically. Is adjusted to the final adjustment position. As a result, when assembling a plurality of bundles 32 to the large pull 30, it becomes possible to easily align the assembling positions of the bundles 32.

<その他の実施形態>
本発明は、上記の実施形態に限定されるものではない。
例えば、床パネル11の開口部としては、切り欠き11a、11bに限定されるものではない。具体的には、図7において切り欠き11a、11bが形成されている箇所に、切り欠き11a、11bの代わりに、図11に示すように円穴11c(穴の一例)が形成されていてもよい。円穴11cは、大引12に形成された操作孔12aの直上位置に一つずつ設けられており、操作孔12aの径よりも若干大径となっている。このような円穴11cが設けられていることで、大引12の底を貫通しているネジ部15aの頂部(ネジ頂部17)は、床パネル11の上方空間に対して露出するようになる。この結果、図2Bに図示の構成においても、床パネル11の上方から円穴11c及び操作孔12aを通じてネジ頂部17にアクセスしてネジ頂部17を操作することが可能となる。
<Other embodiments>
The present invention is not limited to the above embodiment.
For example, the opening of the floor panel 11 is not limited to the notches 11a and 11b. Specifically, even if a circular hole 11c (an example of a hole) is formed as shown in FIG. 11 instead of the notch 11a and 11b at the position where the notch 11a and 11b are formed in FIG. good. The circular holes 11c are provided one by one at a position directly above the operation hole 12a formed in the large pull 12, and have a diameter slightly larger than the diameter of the operation hole 12a. By providing such a circular hole 11c, the top portion (screw top portion 17) of the screw portion 15a penetrating the bottom of the large pull 12 is exposed to the space above the floor panel 11. .. As a result, even in the configuration shown in FIG. 2B, the screw top 17 can be accessed from above the floor panel 11 through the circular hole 11c and the operation hole 12a to operate the screw top 17.

また、上記の実施形態においては、束13の上部に設けられたネジ頂部17を操作することにより束13の受け部14の上下位置を調整することとしたが、これに限られない。例えば、ネジ部15aに取り付けられる下方ナット18と上方ナット19とを連結して構成したナット体を回すことにより、受け部14の上下位置を調整する機構としてもよい。 Further, in the above embodiment, the vertical position of the receiving portion 14 of the bundle 13 is adjusted by operating the screw top portion 17 provided on the upper portion of the bundle 13, but the present invention is not limited to this. For example, it may be a mechanism for adjusting the vertical position of the receiving portion 14 by turning a nut body formed by connecting the lower nut 18 and the upper nut 19 attached to the screw portion 15a.

また、上記の実施形態においては、大引12に形成された操作孔12aを通じて、束13のネジ頂部17を操作することとしたが、これに限られない。例えば、受け部14が複数の大引12を保持することとし、受け部14により保持される複数の大引12の隙間から、束13のネジ頂部17を操作するようにしてもよい。
こうした場合には、大引12に操作孔12aを形成する穴開け加工が不要となる。
Further, in the above embodiment, the screw top 17 of the bundle 13 is operated through the operation hole 12a formed in the large pull 12, but the present invention is not limited to this. For example, the receiving portion 14 may hold a plurality of large pulls 12, and the screw top portion 17 of the bundle 13 may be operated from the gap between the plurality of large pulls 12 held by the receiving portion 14.
In such a case, it is not necessary to make a hole in the large pull 12 to form the operation hole 12a.

また、ベース部16に対しては、下面に接着剤を塗布して土間FLと接合してもよいし、ベース部16から土間FLに向けて釘等の固着具を打ち込んで固定してもよい。 Further, the base portion 16 may be bonded to the soil floor FL by applying an adhesive to the lower surface thereof, or may be fixed by driving a fixing tool such as a nail from the base portion 16 toward the soil floor FL. ..

また、上記の実施形態において、束13の高さを調整した後に、立ち上がり部Rから保持具40を取り外すようにしてもよい。
また、保持具40を立ち上がり部Rから取り外さずに固定するようにしてもよい。この場合には、例えば立ち上がり部Rから上方に延出するアンカーボルトを設け、アンカーボルトに保持具40を締結するようにしてよい。
また、保持具40から立ち上がり部Rに向けて釘等の固着具を打ち込んで、保持具40を立ち上がり部Rに固定してもよい。
また、保持具40と立ち上がり部Rとを接着剤により固定してもよい。
また、上記の実施形態では、立ち上がり部Rに保持具40を設けて、保持具40により大引12を保持するようにしたが、保持具40を設けずに立ち上がり部Rに大引12を直接置くようにしてもよい。
Further, in the above embodiment, the holder 40 may be removed from the rising portion R after adjusting the height of the bundle 13.
Further, the holder 40 may be fixed without being removed from the rising portion R. In this case, for example, an anchor bolt extending upward from the rising portion R may be provided, and the holder 40 may be fastened to the anchor bolt.
Further, the fastener 40 may be fixed to the rising portion R by driving a fixing tool such as a nail from the holding tool 40 toward the rising portion R.
Further, the holder 40 and the rising portion R may be fixed by an adhesive.
Further, in the above embodiment, the holder 40 is provided on the rising portion R to hold the large pull 12 by the holder 40, but the large pull 12 is directly held on the rising portion R without providing the holder 40. You may put it.

<まとめ>
以上説明した本実施形態に係る床施工方法の主な特徴は以下の通りである。
<Summary>
The main features of the floor construction method according to the present embodiment described above are as follows.

[1]本実施形態に係る床施工方法は、建物1の床10を構成する床パネル11(パネル材)を支持する大引12(固定材)と、大引12を支持する束13(支柱)とを一体化した床下ユニット20を床10の土間FL(ベース部)に配置する工程と、床下ユニット20を配置した後に、床パネル11から束13の上部が露出するように、大引12の上に床パネル11を配置する工程と、大引12の上下位置を調整するために、大引12に組み付けられた束13の上部に設けられたネジ頂部17(被操作部)を操作して、大引12に対する束13の組み付け位置を上下方向において変更する工程と、を含む。大引12の上下位置を調整するためのネジ頂部17の操作は、床パネル11において大引12の上に載った部分のうち、ネジ頂部17の上方位置に設けられた開口部を通じて行われる。
上記の床施工方法によれば、床パネル11を支持する大引12と束13とを一体化した床下ユニット20の上に床パネル11を置いてから、束13の高さを調整することができる。この際、床パネル11の上から束13の高さ調整が可能であるため、大引12及び床パネル11の上下位置の調整を簡単に行うことができる。すなわち、上記の床施工方法によれば、床施工の労力を軽減できる。
[1] The floor construction method according to the present embodiment is a large pull 12 (fixing material) that supports the floor panel 11 (panel material) constituting the floor 10 of the building 1, and a bundle 13 (post) that supports the large pull 12. 12) so that the upper part of the bundle 13 is exposed from the floor panel 11 after the step of arranging the underfloor unit 20 integrated with) in the soil floor FL (base portion) of the floor 10 and after arranging the underfloor unit 20. In order to adjust the step of arranging the floor panel 11 on the floor panel 11 and the vertical position of the large pull 12, the screw top 17 (operated part) provided on the upper part of the bundle 13 assembled to the large pull 12 is operated. The step of changing the assembly position of the bundle 13 with respect to the large pull 12 in the vertical direction is included. The operation of the screw top 17 for adjusting the vertical position of the large pull 12 is performed through the opening provided at the upper position of the screw top 17 in the portion placed on the large pull 12 on the floor panel 11.
According to the above-mentioned floor construction method, the height of the bundle 13 can be adjusted after the floor panel 11 is placed on the underfloor unit 20 in which the large pull 12 supporting the floor panel 11 and the bundle 13 are integrated. can. At this time, since the height of the bundle 13 can be adjusted from above the floor panel 11, the vertical positions of the large pull 12 and the floor panel 11 can be easily adjusted. That is, according to the above-mentioned floor construction method, the labor of floor construction can be reduced.

[2]上記の床施工方法において、大引12の上下位置を調整するためのネジ頂部17の操作は、床パネル11において大引12の上に載った部分のうち、ネジ頂部17の上方位置に形成された穴又は切り欠きを通じて行われる。
こうすることで、床パネル11において大引12の上に載った部分のうち、ネジ頂部17の上方位置には、開口部として形成された穴(円穴11c)又は切り欠き(切り欠き11a、切り欠き11b)が設けられており、大引12の上下位置を調整する際には、この穴又は切り欠きを通じてネジ頂部17の操作が可能である。これにより、ネジ頂部17を操作して大引12の上下位置を調整することが一層簡単になる。
[2] In the above floor construction method, the operation of the screw top 17 for adjusting the vertical position of the large pull 12 is the position above the screw top 17 among the parts placed on the large pull 12 on the floor panel 11. It is done through a hole or notch formed in.
By doing so, a hole (circular hole 11c) or a notch (notch 11a,) formed as an opening is located above the screw top 17 in the portion of the floor panel 11 placed on the large pull 12. A notch 11b) is provided, and when adjusting the vertical position of the large pull 12, the screw top 17 can be operated through this hole or the notch. This makes it even easier to operate the screw top 17 to adjust the vertical position of the large pull 12.

[3]上記の床施工方法において、束13は、大引12が嵌合可能な受け部14と、受け部14の底壁14aを貫通して底壁14aよりも上方に突出したネジ頂部17とを備え、床下ユニット20は、束13の受け部14に、ネジ頂部17が大引12の底を貫通するように大引12を嵌合させて構成される。
こうすることで、束13の受け部14に大引12を嵌合させることで、束13を大引12に簡単に組み付けることが可能となる。これにより、床施工の作業性を向上できる。
[3] In the above floor construction method, the bundle 13 has a receiving portion 14 to which the large pull 12 can be fitted and a screw top portion 17 that penetrates the bottom wall 14a of the receiving portion 14 and protrudes above the bottom wall 14a. The underfloor unit 20 is configured by fitting the large pull 12 to the receiving portion 14 of the bundle 13 so that the screw top 17 penetrates the bottom of the large pull 12.
By doing so, the bundle 13 can be easily assembled to the large pull 12 by fitting the large pull 12 to the receiving portion 14 of the bundle 13. This makes it possible to improve the workability of floor construction.

[4]上記の床施工方法において、束13のうち、ネジ頂部17を上端部に有する支柱本体15を、大引12に形成された挿入孔に挿入して束13が大引12に組み付けられ、大引12の上下位置を調整するためのネジ頂部17の操作は、床パネル11において大引12の上に載った部分のうち、挿入孔の上方位置に形成された開口部を通じて行われる。
こうすることで、大引12に形成された挿入孔に束13の支柱本体15を挿入することで、束13を大引12に適切に組み付けることが可能となる。
[4] In the above floor construction method, of the bundle 13, the support column main body 15 having the screw top 17 at the upper end is inserted into the insertion hole formed in the large pull 12, and the bundle 13 is assembled to the large pull 12. The operation of the screw top 17 for adjusting the vertical position of the large pull 12 is performed through the opening formed in the upper position of the insertion hole in the portion placed on the large pull 12 on the floor panel 11.
By doing so, the bundle 13 can be appropriately assembled to the large pull 12 by inserting the support column main body 15 of the bundle 13 into the insertion hole formed in the large pull 12.

[5]上記の床施工方法において、建物1の基礎Bの立ち上がり部Rには、互いに離間して配置された一対の保持具40が設置されており、床下ユニット20は、一対の保持具40に、床下ユニット20の大引12のそれぞれの端部12dを保持させるようにして配置される。
こうすることで、大引12を配置する際に、大引12の位置決めを簡単に行うことができる。すなわち、上記の床施工方法によれば床下ユニット20を配置することが容易となる。
[5] In the above floor construction method, a pair of holders 40 arranged apart from each other are installed on the rising portion R of the foundation B of the building 1, and the underfloor unit 20 is a pair of holders 40. Is arranged so as to hold each end portion 12d of the large pull 12 of the underfloor unit 20.
By doing so, when arranging the large pull 12, the large pull 12 can be easily positioned. That is, according to the above floor construction method, it becomes easy to arrange the underfloor unit 20.

1 建物
10 床
11 床パネル(パネル材)
11a 切り欠き(開口部)
11b 切り欠き(開口部)
11c 円穴(開口部、穴)
12 大引(固定材)
12a 操作孔
12b 係合凹部
12c ネジ挿入孔
12d 端部
13 束(支柱)
14 受け部
14a 底壁
14b 側壁
14c 貫通孔
14d 係合突起
15 支柱本体
15a ネジ部
15b 筒状部
16 ベース部
17 ネジ頂部(被操作部)
18 下方ナット
19 上方ナット
20 床下ユニット
30 大引(固定材)
30a 挿入孔
31 ネジ保持部材
32 束(支柱)
33 支柱本体
33a 小径ネジ部
33b 中径部
33c 大径ネジ部
34 嵌合孔
35 軸頂部(被操作部)
36 ベース部
36a 接地部
36b 立設部
40 保持具
41 板部材
41A 第1プレート
41B 第2プレート
41C 載置面部
42 高さ調整部
42A 第1高さ調整部
42B 第2高さ調整部
B 基礎
FL 土間
R 立ち上がり部
T 治具
Ta 嵌合突起
1 Building 10 Floor 11 Floor panel (panel material)
11a Notch (opening)
11b Notch (opening)
11c circular hole (opening, hole)
12 Obiki (fixing material)
12a Operation hole 12b Engagement recess 12c Screw insertion hole 12d End 13 Bundle (strut)
14 Receiving part 14a Bottom wall 14b Side wall 14c Through hole 14d Engagement protrusion 15 Strut body 15a Threaded part 15b Cylindrical part 16 Base part 17 Screw top part (operated part)
18 Lower nut 19 Upper nut 20 Underfloor unit 30 Large pull (fixing material)
30a Insertion hole 31 Screw holding member 32 Bundle (strut)
33 Strut body 33a Small diameter screw part 33b Medium diameter part 33c Large diameter screw part 34 Fitting hole 35 Shaft top (operated part)
36 Base part 36a Grounding part 36b Standing part 40 Holder 41 Plate member 41A 1st plate 41B 2nd plate 41C Mounting surface part 42 Height adjusting part 42A 1st height adjusting part 42B 2nd height adjusting part B Basic FL Doma R Rising part T Jig Ta Fitting protrusion

Claims (5)

建物の床を構成するパネル材を支持する固定材と、前記固定材を支持する支柱とを一体化した床下ユニットを前記床のベース部に配置する工程と、
前記床下ユニットを配置した後に、前記パネル材から前記支柱の上部が露出するように、前記固定材の上に前記パネル材を配置する工程と、
前記固定材の上下位置を調整するために、前記固定材に組み付けられた前記支柱の上部に設けられた被操作部を操作して、前記支柱の高さを変更する工程と、を含み、
前記固定材の上下位置を調整するための前記被操作部の操作は、前記パネル材において前記固定材の上に載った部分のうち、前記被操作部の上方位置に設けられた開口部を通じて行われることを特徴とする床施工方法。
A process of arranging an underfloor unit that integrates a fixing material that supports a panel material constituting the floor of a building and a support column that supports the fixing material at the base portion of the floor.
After arranging the underfloor unit, a step of arranging the panel material on the fixing material so that the upper part of the column is exposed from the panel material, and a step of arranging the panel material.
Including a step of changing the height of the support column by operating a controlled portion provided on the upper portion of the support column assembled to the fixing material in order to adjust the vertical position of the fixing material.
The operation of the operated portion for adjusting the vertical position of the fixing material is performed through an opening provided at an upper position of the operated portion in the portion of the panel material placed on the fixing material. A floor construction method characterized by being struck.
建物の床を構成するパネル材を支持する固定材と、前記固定材を支持する支柱とを一体化した床下ユニットを前記床のベース部に配置する工程と、
前記床下ユニットを配置した後に、前記パネル材から前記支柱の上部が露出するように、前記固定材の上に前記パネル材を配置する工程と、
前記固定材の上下位置を調整するために、前記固定材に組み付けられた前記支柱の上部に設けられた被操作部を操作して、前記固定材に対する前記支柱の組み付け位置を上下方向において変更する工程と、を含み、
前記固定材の上下位置を調整するための前記被操作部の操作は、前記パネル材において前記固定材の上に載った部分のうち、前記被操作部の上方位置に設けられた開口部を通じて行われ
前記支柱は、前記固定材が嵌合可能な受け部と、前記受け部の底壁を貫通して該底壁よりも上方に突出した前記被操作部と、を備え、
前記床下ユニットは、前記支柱の前記受け部に、前記被操作部が前記固定材の底を貫通するように前記固定材を嵌合させて構成されることを特徴とする床施工方法。
A process of arranging an underfloor unit that integrates a fixing material that supports a panel material constituting the floor of a building and a support column that supports the fixing material at the base portion of the floor.
After arranging the underfloor unit, a step of arranging the panel material on the fixing material so that the upper part of the column is exposed from the panel material, and a step of arranging the panel material.
In order to adjust the vertical position of the fixing material, the operated portion provided on the upper part of the support column attached to the fixing material is operated to change the assembly position of the support column with respect to the fixing material in the vertical direction. Including the process,
The operation of the operated portion for adjusting the vertical position of the fixing material is performed through an opening provided at an upper position of the operated portion in the portion of the panel material placed on the fixing material. We ,
The support column includes a receiving portion into which the fixing material can be fitted, and the operated portion that penetrates the bottom wall of the receiving portion and projects upward from the bottom wall.
The floor construction method is characterized in that the underfloor unit is configured by fitting the fixing material to the receiving portion of the support column so that the operated portion penetrates the bottom of the fixing material.
前記固定材の上下位置を調整するための前記被操作部の操作は、前記パネル材において前記固定材の上に載った部分のうち、前記被操作部の上方位置に形成された穴又は切り欠きを通じて行われることを特徴とする請求項1又は請求項2に記載の床施工方法。 The operation of the operated portion for adjusting the vertical position of the fixing material is a hole or a notch formed in the upper position of the operated portion in the portion of the panel material placed on the fixing material. The floor construction method according to claim 1 or 2 , wherein the floor construction method is performed through. 前記支柱のうち、前記被操作部を上端部に有する支柱本体を、前記固定材に形成された挿入孔に挿入して前記支柱が前記固定材に組み付けられ、
前記固定材の上下位置を調整するための前記被操作部の操作は、前記パネル材において前記固定材の上に載った部分のうち、前記挿入孔の上方位置に形成された前記開口部を通じて行われることを特徴とする請求項1乃至3のいずれか一項に記載の床施工方法。
Among the columns, the column body having the operated portion at the upper end is inserted into an insertion hole formed in the fixing material, and the column is assembled to the fixing material.
The operation of the operated portion for adjusting the vertical position of the fixing material is performed through the opening formed above the insertion hole in the portion of the panel material placed on the fixing material. The floor construction method according to any one of claims 1 to 3, wherein the floor construction method is characterized.
前記建物の基礎の立ち上がり部には、互いに離間して配置された一対の保持具が設置されており、
前記床下ユニットは、前記一対の前記保持具に、前記床下ユニットの前記固定材のそれぞれの端部を保持させるようにして配置されることを特徴とする請求項1乃至4のいずれか一項に記載の床施工方法。
A pair of holders arranged apart from each other are installed at the rising portion of the foundation of the building.
The item according to any one of claims 1 to 4, wherein the underfloor unit is arranged so that the pair of the holders hold the respective ends of the fixing members of the underfloor unit. The described floor construction method.
JP2018069520A 2018-03-30 2018-03-30 Floor construction method Active JP7075263B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018069520A JP7075263B2 (en) 2018-03-30 2018-03-30 Floor construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018069520A JP7075263B2 (en) 2018-03-30 2018-03-30 Floor construction method

Publications (2)

Publication Number Publication Date
JP2019178585A JP2019178585A (en) 2019-10-17
JP7075263B2 true JP7075263B2 (en) 2022-05-25

Family

ID=68278135

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018069520A Active JP7075263B2 (en) 2018-03-30 2018-03-30 Floor construction method

Country Status (1)

Country Link
JP (1) JP7075263B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7274744B2 (en) * 2019-10-30 2023-05-17 株式会社ルイ▲高▼ Attachment device for competition goals

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2070100A (en) * 1980-02-22 1981-09-03 Thornhill B Adjustable Flooring
JPS61237754A (en) * 1985-04-13 1986-10-23 ナショナル住宅産業株式会社 Sleeper construction method

Also Published As

Publication number Publication date
JP2019178585A (en) 2019-10-17

Similar Documents

Publication Publication Date Title
KR20170038407A (en) Prefabricated wooden houses of the pillar and wall panel assembly devices
JP7075263B2 (en) Floor construction method
JP6971681B2 (en) How to install the horizontal material
JP6964427B2 (en) Floor construction method
JP6998140B2 (en) Structure
JP2015168983A (en) Floor structure and construction method of floor structure
KR102382182B1 (en) Leveling post for access floor and access floor installation structure including the same
JP4669955B2 (en) Anchor frame
CN110656782B (en) Foundation bolt fixing device and foundation bolt fixing construction method
JP5129297B2 (en) Building installation tools
JP5940322B2 (en) Pillar fixture
JP2001254445A (en) Upper and lower joint structure of unit building
JP2020002657A (en) Construction method of building foundation
JP2019178587A (en) Floor construction method
CN214498096U (en) Positioning device for connecting reinforcing steel bars of prefabricated column
JP2019178586A (en) Floor construction method and floor structure
JP2017008504A (en) Bonding structure between foundation pile and unit and unit construction method using it
JP2009263886A (en) Partition structure
JP2020002570A (en) Construction method for building and floor
JP5771467B2 (en) Building unit positioning structure, building unit positioning method, and unit guide installation method
KR200419888Y1 (en) Fence fixture and fence with same
JP2005127064A (en) Column base hardware
JPH11182101A (en) Fence mounting structure and fence mounting device
JP2011220046A (en) Connection fitting
JP7075685B1 (en) Hollow member connector

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210301

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220121

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220201

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220323

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220426

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220513

R150 Certificate of patent or registration of utility model

Ref document number: 7075263

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250