JP7121108B2 - Open shield construction method combined with jacking method - Google Patents
[go: Go Back, main page]

JP7121108B2 - Open shield construction method combined with jacking method - Google Patents

Open shield construction method combined with jacking method Download PDF

Info

Publication number
JP7121108B2
JP7121108B2 JP2020209912A JP2020209912A JP7121108B2 JP 7121108 B2 JP7121108 B2 JP 7121108B2 JP 2020209912 A JP2020209912 A JP 2020209912A JP 2020209912 A JP2020209912 A JP 2020209912A JP 7121108 B2 JP7121108 B2 JP 7121108B2
Authority
JP
Japan
Prior art keywords
concrete box
jack
shield machine
open shield
pushing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020209912A
Other languages
Japanese (ja)
Other versions
JP2022096763A (en
Inventor
誠 植村
賢治郎 植村
正一 日浦
元晶 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2020209912A priority Critical patent/JP7121108B2/en
Publication of JP2022096763A publication Critical patent/JP2022096763A/en
Application granted granted Critical
Publication of JP7121108B2 publication Critical patent/JP7121108B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

本発明は、市街地に上下水道、地下道等の地下構造物を施工する推進工法併用のオープンシールド工法に関するものである。 TECHNICAL FIELD The present invention relates to an open shield construction method used in combination with a jacking method for constructing underground structures such as water supply and sewage systems and underground passages in urban areas.

オープンシールド工法は、開削工法(オープンカット工法)とシールド工法の長所を生かした合理性に富む工法で、上部開放型シールド機(オープンシールド機)を使用して推進させ土砂崩壊を防ぎながら、その内部で函体布設を行う工法である。 The open shield construction method is a highly rational construction method that takes advantage of the advantages of the open cut construction method and the shield construction method. This is a construction method in which the box is laid inside.

下記特許文献にもあるが、オープンシールド工法の概略は左右の側壁板と、これら側壁板に連結する底板とからなる前面、後面および上面を開口した前記側壁板と底板の先端を刃口として形成したオープンシールド機本体に、中央または後端近くにシールドジャッキを後方に向け上下に並べて配設したオープンシールド機を使用するものである。
特開2009-108570号公報
As described in the following patent documents, the outline of the open shield construction method is to form a cutting edge at the front, rear, and top surfaces of the side wall plate and the bottom plate, which are composed of left and right side wall plates and a bottom plate connected to these side wall plates. An open shield machine is used in which shield jacks are arranged vertically in the center or near the rear end of the open shield machine body facing rearward.
JP 2009-108570 A

発進坑内にこのオープンシールド機を設置して、オープンシールド機のシールドジャッキを伸長して発進坑内の反力壁に反力をとってオープンシールド機を前進させ、地下構造物を形成する第1番目のコンクリート函体を上方から吊り降ろし、オープンシールド機のテール部内で縮めたシールドジャッキの後方にセットする。シールドジャッキと反力壁との間にはストラットを配設して適宜間隔調整をする。 This open shield machine is installed in the starting pit, the shield jack of the open shield machine is extended, the reaction force is applied to the reaction wall in the starting pit, and the open shield machine is advanced to form the underground structure. Lower the concrete box from above and set it behind the contracted shield jack in the tail part of the open shield machine. A strut is placed between the shield jack and the reaction wall to adjust the spacing as appropriate.

また、発進坑は土留壁で構成し、オープンシールド機を発進させるにはこの土留壁を一部鏡切りするが、必要に応じて薬液注入などで発進坑の前方部分に地盤改良を施しておくこともある。 In addition, the starting hole is composed of a retaining wall, and in order to start the open shield machine, a part of this retaining wall is cut off, but if necessary, the ground in front of the starting hole is improved by injecting chemicals etc. Sometimes.

ショベル等の掘削機でオープンシールド機1の前面または上面から土砂を掘削しかつ排土する。この排土工程と同時またはその後にシールドジャッキを伸長してオープンシールド機1を前進させる。この前進工程の場合、コンクリート函体4の前にはボックス鋼材または型鋼を用いた枠体よりなるプレスバーを配設し、オープンシールド機は後方にセットされたコンクリート函体から反力をとる。 An excavator such as a shovel is used to excavate and discharge earth and sand from the front or top surface of the open shield machine 1 . Simultaneously with or after this discharging process, the shield jack is extended to move the open shield machine 1 forward. In the case of this forward process, a press bar consisting of a frame made of box steel or shaped steel is arranged in front of the concrete box 4, and the open shield machine takes reaction force from the concrete box set behind.

そして第1番目のコンクリート函体の前に第2番目のコンクリート函体をオープンシールド機のテール部内で吊り降ろす。以下、同様の排土工程、前進工程、コンクリート函体のセット工程を適宜繰返して、順次コンクリート函体をオープンシールド機1の前進に伴い縦列に地中に残置し、さらにこのコンクリート函体4の上面に埋戻土を入れる。 Then, the second concrete box is lowered in the tail part of the open shield machine in front of the first concrete box. Thereafter, the same earth-discharging process, forwarding process, and concrete box setting process are repeated as appropriate, and the concrete boxes are sequentially left in the ground in series as the open shield machine 1 advances. Put backfill soil on top.

このようにして、オープンシールド機が到達坑まで達したならばこれを撤去して工事を完了する。 In this way, when the open shield machine reaches the arrival pit, it is removed and the construction is completed.

ところで、下記特許文献にもあるが、前記のようなオープンシールド工法にコンクリート函体をジャッキで推進させる推進工法を併用する場合もある。
特許第2759445号公報
By the way, as described in the following patent documents, there are cases where a jacking method for propelling a concrete box with a jack is used together with the open shield method as described above.
Japanese Patent No. 2759445

下記にかかる推進工法併用オープンシールド工法を説明する。図27~図31は概略の施工フローを示すもので、オープンシールド機1は図21、図22に示すように、左右の側壁板1aとこれら側壁板1aに連結する底板1bとからなる前面、後面及び上面を開口したシールド機である。 The open shield construction method combined with the jacking method will be described below. 27 to 31 show a schematic construction flow. The open shield machine 1, as shown in FIGS. It is a shield machine with an open rear surface and an upper surface.

該オープンシールド機1は布設するコンクリート函体4の幅とシールド機の幅が同一で、前記側壁板1aと底板1bの先端を刃口として形成し、また側壁板1aの中央又は後端近くにシールドジャッキ3を後方に向け上下に並べて配設する。前記刃口のうち、側壁部分はスライド式土留16として分割して可動できるように形成し、底板部分は可動分割底盤18として底盤ジャッキ19を配設する。スライド式土留16は掘削時に側部の地山崩壊を防止するためのもので、オープンシールド機1の先端から1.0m迄伸縮する。 In the open shield machine 1, the width of the concrete box 4 to be laid and the width of the shield machine are the same. The shield jacks 3 are arranged vertically facing rearward. Of the cutting edge, the side wall portion is divided and formed as a slide type earth retaining 16 so as to be movable, and the bottom plate portion is formed as a movable split bottom plate 18 and a bottom plate jack 19 is provided. The slide-type earth retaining 16 is for preventing the collapse of the ground at the side during excavation, and extends and contracts from the tip of the open shield machine 1 up to 1.0 m.

図中14は刃口の奥に設ける隔壁で、排水ゲートとする場合もある。図中15は、シールドジャッキ3と先頭コンクリート函体4との間に置き、推力を前記先頭コンクリート函体4に伝達させるプレスバー15で、鋼材の枠体で形成する。 Reference numeral 14 in the figure denotes a partition provided at the back of the cutting edge, which may be used as a drainage gate. Reference numeral 15 in the figure denotes a press bar 15 which is placed between the shield jack 3 and the leading concrete box 4 to transmit thrust to the leading concrete box 4, and which is formed of a steel frame.

図23、図24に示すように函体の布設及びシールド機の据付・組立のため発進基地に発進立坑8を築造し、図27に示すようにシールド機が工事終点付近に近づくまでに、シールド機の解体・撤去のため設けられる到達立坑13を築造する。立坑築造のための土留工法としては、鋼矢板工法、親杭横矢板工法、ライナープレート工法等がある。 As shown in Figures 23 and 24, a starting shaft 8 was constructed at the starting base for the installation and assembly of the box and the shield machine. An arrival shaft 13 is constructed for the dismantling and removal of the machine. Earth retaining methods for constructing vertical shafts include the steel sheet pile method, the main pile horizontal sheet pile method, the liner plate method, and the like.

発進立坑8では元押ジャッキ23の反力を支持するための支圧壁22を鋼材を井桁状に組む方法や、無筋コンクリートや鉄筋コンクリートとする方法で最奥部に構築し、その前面に鋼材を組んで元押ジャッキ23を設置する。 In the starting vertical shaft 8, the bearing wall 22 for supporting the reaction force of the main pushing jack 23 is constructed at the innermost part by a method of assembling steel materials in a grid pattern, or by a method of using plain concrete or reinforced concrete, and a steel material are assembled and the original pushing jack 23 is installed.

シールド機の組立は発進立坑8内で、まず、H鋼をレール状に並べその上の全面に鉄板を設置して受台25を形成し、シールド機及び函体の直進性を保つためにシールド機の両側にH鋼によるガイド鋼26を設置する。 In the starting shaft 8, the shield machine is assembled by first arranging H steel in a rail shape and installing an iron plate on the entire surface to form a cradle 25, and in order to maintain the straightness of the shield machine and the box, A guide steel 26 made of H steel is installed on both sides of the machine.

オープンシールド機1を組立完了後、発進立坑8上の揚重機31(図27参照)でコンクリート函体4を立坑内へ吊り下し、元押ジャッキ23とシールド機との間にコンクリート函体4を設置し、元押ジャッキ23でオープンシールド機1と設置したコンクート函体4を推進させる。 After completing the assembly of the open shield machine 1, the concrete box 4 is suspended into the vertical shaft by the lifting machine 31 (see FIG. 27) on the starting shaft 8, and the concrete box 4 is placed between the main pushing jack 23 and the shield machine. is installed, and the open shield machine 1 and the installed concrete box body 4 are propelled by the original pushing jack 23.

図21、図22に示すように、オープンシールド機1の後方には、プレスバー15、先頭コンクリート函体4、その後ろにコンクリート函体4の配置順序となり、プレスバー15は先頭コンクリート函体4にPC鋼棒で緊結され、固定状態となる。 As shown in FIGS. 21 and 22, behind the open shield machine 1 are the press bar 15, the front concrete box 4, and the concrete box 4 behind them. It is tied with a PC steel bar and becomes fixed.

また、プレスバー15はPC鋼線29と牽引ジャッキ30でオープンシールド機1と連結し、オープンシールド機1がプレスバー15を反力として前進するには牽引ジャッキ30でPC鋼線29を緩め、オープンシールド機1がプレスバー15付きのコンクリート函体4の全体の推進によりコンクリート函体4とともに前進する場合は牽引ジャッキ30でPC鋼線29を緊張させ、オープンシールド機1とプレスバー15とは一体のものとする。 The press bar 15 is connected to the open shield machine 1 by a PC steel wire 29 and a traction jack 30. In order for the open shield machine 1 to move forward with the reaction force of the press bar 15, the PC steel wire 29 is loosened by the traction jack 30. When the open shield machine 1 advances together with the concrete box 4 by propelling the entire concrete box 4 with the press bar 15, the PC steel wire 29 is tensioned by the traction jack 30, and the open shield machine 1 and the press bar 15 are separated. be united.

なお、元押ジャッキ23の伸長幅が足りない場合は、ストラット24を配設する。(図23参照) A strut 24 is provided when the extension width of the original pushing jack 23 is insufficient. (See Figure 23)

掘進は、図19、図20に示すように、切羽内の地山をバックホウ等の掘削機6によって掘削し、側部の地山が崩壊しないようにスライド式土留16により側部の土留を行いながら掘削を行い、オープンシールド機1を推進させる。 For excavation, as shown in FIGS. 19 and 20, the ground in the face is excavated by an excavator 6 such as a backhoe, and side earth retaining is carried out by a slide type earth retaining 16 to prevent the side of the natural ground from collapsing. While excavating, the open shield machine 1 is propelled.

図21中20は函体と埋戻し材の縁を切り、函体のみを推進させるために設置するフリクションカットプレートで、薄鉄板等からなり、コンクリート函体4が発進立坑8から外に出た所から設置していく。 In FIG. 21, 20 is a friction cut plate installed to cut the edges of the box and backfill material and to propel only the box. Install from place.

オープンシールド機1の推進は、シールド機内部に装着したシールドジャッキ3によりプレスバー15を介して先頭コンクリート4aに推進反力が伝達され、その後方に敷設された函体4に伝達され推進させる。プレスバー15はPC鋼線29によりオープンシールド機1に緊結される。 Propulsion of the open shield machine 1 is carried out by a shield jack 3 mounted inside the shield machine, which transmits a propulsive reaction force to the top concrete 4a via a press bar 15, which is then transmitted to the box 4 laid behind it to propel it forward. The press bar 15 is tied to the open shield machine 1 by PC steel wires 29 .

その次に、支圧壁を反力に元押ジャッキ23を使用して、布設した全てのコンクリート函体4を推進させる函体推進に移行する。オープンシールド機1の推進に伴い、オープンシールド機1の後方の函体上部は砂等で埋戻し土5を施す。 Next, the main pushing jack 23 is used with the bearing wall as a reaction force to move to box propulsion in which all the laid concrete boxes 4 are propelled. As the open shield machine 1 is advanced, backfill soil 5 is applied to the upper part of the box behind the open shield machine 1 with sand or the like.

このようにして、オープンシールド機1の前面又は上面開口より前方の土砂を掘削・排土する工程と、シールドジャッキ3を伸長してプレスバー15を介して後方に接続された先頭コンクリート函体4、その後続のコンクリート函体4を反力にしてシールド機を前進させる工程と、コンクリート函体4を発進立坑8に設置した元押ジャッキ23で押し出し、該元押ジャッキ23と押し出したコンクリート函体4との間に新たなコンクリート函体4を配設して押し出しを繰り返す工程を繰り返して、オープンシールド機1を到達立坑13まで到達させる。 In this way, the step of excavating and discharging earth and sand in front of the front or top opening of the open shield machine 1, and the front concrete box 4 connected to the rear via the press bar 15 by extending the shield jack 3 , the step of advancing the shield machine by using the subsequent concrete box 4 as a reaction force, pushing out the concrete box 4 with the pushing jack 23 installed in the starting shaft 8, and pushing out the pushing jack 23 and the pushed concrete box A new concrete box body 4 is arranged between 4 and the process of repeating extrusion is repeated, and the open shield machine 1 is made to reach the arrival shaft 13.例文帳に追加

また、元押ジャッキ23での元押設備だけではオープンシールド機1及びコンクリート函体4を押す為の推力が不足する場合や支圧壁反力が足りない場合に、図19、図20に示すように中押し設備21を設ける。 19 and 20 when the thrust for pushing the open shield machine 1 and the concrete box 4 is insufficient or the reaction force of the bearing wall is insufficient only with the main pushing equipment with the main pushing jack 23. A middle pressing facility 21 is provided as follows.

図16、図17に示すように中押し設備21は鋼製筒体であるカラー21aを本体とし、内部に中押しジャッキ27を配設したもので、予め、推進させるコンクリート函体4の数が何函体目で元押しジャッキ23の推力が不足するか定めて置き、所定の推進函体数を推進させた後、この中押し設備21を設置し、元押しジャッキ23を伸長して中押し設備21を配置したままでコンクリート函体4の全体を推進させる。 As shown in FIGS. 16 and 17, the center pushing equipment 21 has a collar 21a, which is a cylindrical steel body, as its main body, and has a center pushing jack 27 disposed therein. After determining whether the thrust of the primary pushing jack 23 is insufficient and propelling a predetermined number of propulsion boxes, the intermediate pushing equipment 21 is installed, the primary pushing jack 23 is extended, and the intermediate pushing equipment 21 is arranged. The entire concrete box body 4 is propelled while it is held.

この中押し設備21の場合もコンクリート函体4と中押しジャッキ27との間にはプレスバー28を配設する。 A press bar 28 is arranged between the concrete box 4 and the intermediate pushing jack 27 also in the case of this intermediate pushing equipment 21 .

なお、この中押し設備21を用いる場合、コンクリート函体4同士の接続箇所に鋼製カラー32を配置することもある。 In addition, when using this intermediate pushing equipment 21, the steel collar 32 may be arranged in the connection part of concrete box 4 comrades.

このように順次コンクリート函体4を推進させていき、元押しジャッキ23による推進力が不足していると想定される箇所の函体を布設・推進した段階で、オープンシールド機1が推進後、シールドジャッキ3を戻し、空いたスペース分に中押しジャッキ27を伸長して中押し設備より前方のすべてのコンクリート函体4を前方へ推進する。 In this way, the concrete boxes 4 are propelled one by one, and at the stage of laying and propelling the boxes in places where the propulsive force of the original pushing jack 23 is assumed to be insufficient, after the open shield machine 1 is propelled, The shield jack 3 is returned, the intermediate pushing jack 27 is extended by the vacant space, and all the concrete boxes 4 ahead of the intermediate pushing equipment are pushed forward.

推進後、中押しジャッキ27を戻し、発進立坑8内の元押しジャッキ23を伸長し、中押し設備21より後方のすべてのコンクリート函体4を推進させる。 After propulsion, the intermediate pushing jack 27 is returned, the original pushing jack 23 in the starting shaft 8 is extended, and all the concrete boxes 4 behind the intermediate pushing equipment 21 are pushed forward.

コンクリート函体4の推進に当たって、コンクリート函体4と地山の摩擦を減ずるために、滑剤35を注入する。(図21参照) When the concrete box 4 is propelled, a lubricant 35 is injected to reduce the friction between the concrete box 4 and the natural ground. (See Figure 21)

函体4の推進・布設が完了し、オープンシールド機1が到達立坑13に到達後、到達立坑内でシールド機1を解体・撤去する。(図30参照) After the promotion and installation of the box 4 are completed and the open shield machine 1 reaches the arrival shaft 13, the shield machine 1 is dismantled and removed in the arrival shaft. (See Figure 30)

最終的にコンクリート函体4をすべて布設完了した段階で、セメントミルク等の裏込注入材をコンクリート函体4と地山との僅かな空隙に滑剤35と置き換えるように裏込注入を行う。図31に示すように、コンクリート函体4のグラウトホール34を介してコンクリート函体4の内部より注入ノズル36で注入充填する。フリクションカットプレート20がある場合は頂版にも裏込注入する。 Finally, when the concrete box 4 is completely laid, a back-filling injection material such as cement milk is injected so as to replace the lubricant 35 in the slight gap between the concrete box 4 and the natural ground. As shown in FIG. 31, injection filling is performed from the inside of the concrete box 4 through the grout holes 34 of the concrete box 4 using the injection nozzle 36 . If there is a friction cut plate 20, backfill the top plate as well.

このような推進工法併用のオープンシールド工法において、前記のようにオープンシール機1とプレスバー15はオープンシール機1ではプレスバー15が必要に応じて固定および解除可能なように牽引ジャッキ30とPC鋼線29で連結される。 In such an open shield construction method in combination with the jacking method, the open seal machine 1 and the press bar 15 are connected to the towing jack 30 and the PC so that the press bar 15 can be fixed and released as necessary in the open seal machine 1 as described above. They are connected by steel wires 29 .

また、プレスバー15はPC鋼棒で先頭のコンクリート函体4に緊結固定される。 Also, the press bar 15 is tightly fixed to the leading concrete box 4 with a PC steel bar.

オープンシールド機1の推進は、まず、プレスバー15に装着されている牽引ジャッキ30の牽引を緩め、PC鋼線29の緊結状態を緩め、シールドジャッキ3のジャッキシリンダーを後方へ伸長することにより、本体プレスバー15を介して後方の先頭のコンクリート函体4に伝達され、オープンシールド機1が推進する。 For propulsion of the open shield machine 1, first, the traction of the traction jack 30 attached to the press bar 15 is loosened, the tightness of the PC steel wire 29 is loosened, and the jack cylinder of the shield jack 3 is extended backward. It is transmitted to the front concrete box 4 at the rear through the main body press bar 15, and the open shield machine 1 is propelled.

オープンシールド機1が所定の長さを推進後、シールドジャッキ3を縮め、発進立坑8内の元押しジャッキ23を伸長して、布設済のコンクリート函体4と先頭のコンクリート函体、プレスバー15すべてを前方へ推進させ、オープンシールド機1後端へプレスバー15を押し込み、緩めてあったPC鋼線29を牽引ジャッキ30でプレスバー15をオープンシールド機1後端の所定の位置に密着させる。以上の動作を繰り返す。 After the open shield machine 1 propels the predetermined length, the shield jack 3 is shortened, the main push jack 23 in the starting shaft 8 is extended, and the concrete box 4 that has been laid, the concrete box at the top, and the press bar 15 All are pushed forward, the press bar 15 is pushed into the rear end of the open shield machine 1, and the loosened PC steel wire 29 is brought into close contact with the predetermined position of the rear end of the open shield machine 1 by the pulling jack 30. . Repeat the above operations.

中押し設備21の動作は以下のとおりである。前述のとおり、コンクリート函体4を発進立坑8内に揚重機31で投入し所定の位置に据え付け後、元押しジャッキ23を伸長して函体を順次前方へ推進していくわけであるが、元押しジャッキ23の布設したコンクリート函体4を前方へ推進させる推力が足りなくなった時点で、図19、図20に示す中押し設備21から前方の布設コンクリート函体4を図16、図17に示す該中押し設備に配設した中押しジャッキ27で推進させる。 The operation of the intermediate pushing equipment 21 is as follows. As described above, after the concrete box 4 is thrown into the starting shaft 8 by the lifting machine 31 and installed at a predetermined position, the main pushing jack 23 is extended to propel the box sequentially forward. 16 and 17 show the laid concrete box 4 in front of the intermediate pushing equipment 21 shown in FIGS. It is propelled by an intermediate pushing jack 27 arranged in the intermediate pushing equipment.

推進後、該中押しジャッキ27のシリンダーを縮め、図19に示す中押し設備21から後方の布設函体を元押しジャッキ23で前方に推進させ、図16、図17のコンクリート函体4を該中押しジャッキ27のシリンダーを縮めてできたスペースへ押し込む。 After propulsion, the cylinder of the intermediate pushing jack 27 is contracted, the rearward laying box is pushed forward from the intermediate pushing equipment 21 shown in FIG. Push the 27 cylinder into the space created by shrinking it.

以上のオープンシールド機の推進と中押し設備の動作により、コンクリート函体4を順次は発進立坑8に投入据え付後推進していく操作を繰り返す。 By the above-described propulsion of the open shield machine and the operation of the intermediate pushing equipment, the concrete box 4 is successively thrown into the starting pit 8, installed and then propelled, and this operation is repeated.

前記オープンシールド機1が推進の場合や中押し設備でのコンクリート函体4の押出しの場合はコンクリート函体4は鋼製の筒状部材であるプレスバーの嵌合用スカート部や中押し設備のカラー本体に外周が囲われ、前記の操作を繰り返しながらオープンシールド機の推進と中押し設備の動作を行っていくとき、嵌合部同士の接触が生じるため、該コンクリート函体4の嵌合部の欠けやクラックなどの損傷が生じ、コンクリート函体4の耐久性が低下する恐れがあった。 When the open shield machine 1 is used for propulsion or when the concrete box 4 is extruded by the intermediate pressing equipment, the concrete box 4 is attached to the fitting skirt portion of the press bar, which is a tubular steel member, or to the collar body of the intermediate pressing equipment. When the outer circumference is surrounded and the operation of the open shield machine and the operation of the intermediate pressing equipment are performed while repeating the above operation, the fitting parts come into contact with each other, so chipping and cracking of the fitting part of the concrete box 4 may occur. Such damage may occur, and the durability of the concrete box 4 may be lowered.

プレスバー15はPC鋼棒で先頭のコンクリート函体4に緊結固定されるとはいえ、間にゴム等の緩衝材が介在されるとコンクリート函体4との嵌合にずれが生じ、前記欠けやクラックなどの損傷が生じる。 Although the press bar 15 is tightly fixed to the front concrete box 4 with a PC steel bar, if a cushioning material such as rubber is interposed between the press bar 15 and the concrete box 4, the fit may be displaced, and the chipping may occur. and damage such as cracks.

また、コンクリート函体4は矩形であり、これに嵌合する鋼製の筒状部材であるプレスバーの嵌合用スカート部や中押し設備のカラー本体も矩形であるため、コンクリート函体4は隅角部の出隅が欠け易いものである。 In addition, the concrete box 4 is rectangular, and the fitting skirt portion of the press bar, which is a steel cylindrical member that is fitted to the concrete box 4, and the collar body of the intermediate pressing equipment are also rectangular. The protruding corner of the part is easily chipped.

本発明の目的はこのような従来の不都合を解消し、先頭のコンクリート函体の嵌合部の耐久性の低下や、中押し設備に嵌合するコンクリート函体の嵌合部の耐久性低下を防止できる推進工法併用のオープンシールド工法およびそれに使用するコンクリート函体を提供することにある。 It is an object of the present invention to eliminate such conventional inconveniences and prevent deterioration in the durability of the fitting portion of the leading concrete box and the deterioration of the durability of the fitting portion of the concrete box that is fitted to the intermediate pushing equipment. To provide an open shield construction method combined with a jacking method and a concrete box used for the method.

前記目的を達成するため本発明は推進工法併用のオープンシールド工法としては、上部開放型シールド機であるオープンシールド機を使用し、オープンシールド機の前面又は上面開口より前方の土砂を掘削・排土する工程と、シールドジャッキを伸長してコンクリート函体を反力にしてオープンシールド機を前進させる工程と、前進させたオープンシールド機に対してその前進分を埋めるべくコンクリート函体を発進立坑の元押ジャッキもしくは布設するコンクリート函体とコンクリート函体の間に設けた中押し設備の中押しジャッキで押し出し、その後該元押ジャッキもしくは中押しジャッキと押し出したコンクリート函体との間に新たなコンクリート函体を配設して押し出しを繰り返すコンクリート函体の推進工程を組み合わせるオープンシールド工法において、コンクリート函体先頭部にはシールドジャッキとの間にコンクリート函体への嵌合用スカート部を有するプレスバーを配設け、コンクリート函体は前端の嵌合部の隅角部の出隅に鋼製部材を取り付け、これをプレスバーの嵌合用スカート部に嵌入させ、オープンシールド機のシールドジャッキはプレスバーおよびコンクリート函体を推進反力として伸長させること、もしくは、中押し設備は一端をコンクリート函体嵌合部とした鋼製筒体であるカラーを本体とし、コンクリート函体は前端の嵌合部の隅角部の出隅に鋼製部材を取り付け、これをプレスバーを内部に置く中押し設備のカラーに嵌入させ、中押し設備の中押しジャッキは後方のコンクリート函体を推進反力として伸長させ、プレスバーおよび前方のコンクリート函体を押し出すことを要旨とするものである。 In order to achieve the above object, the present invention uses an open shield machine, which is an open top shield machine, as an open shield construction method combined with a jacking method, and excavates and discharges earth and sand in front of the front or top opening of the open shield machine. , the process of extending the shield jack and using the concrete box as a reaction force to advance the open shield machine, and the concrete box to fill the advance of the advanced open shield machine Push out with a pushing jack or a middle pushing jack of a middle pushing facility provided between the concrete box to be laid and the concrete box, and then arrange a new concrete box between the original pushing jack or middle pushing jack and the pushed concrete box. In the open shield construction method that combines a concrete box promotion process in which the concrete box is repeatedly pushed out, a press bar having a skirt part for fitting to the concrete box is arranged between the shield jack and the concrete box head, and the concrete box is pushed out. A steel member is attached to the protruding corner of the fitting part at the front end of the box, and this is fitted into the fitting skirt part of the press bar, and the shield jack of the open shield machine propels the press bar and concrete box. It can be extended as a reaction force, or the middle pushing equipment has a collar that is a steel cylinder with one end as the fitting part of the concrete box, and the concrete box is at the outer corner of the fitting part at the front end. A steel member is attached, and this is fitted into the collar of the intermediate pressing equipment in which the press bar is placed. The gist of this is to push out.

請求項1記載の本発明によれば、コンクリート函体の前端の嵌合部の隅角部の出隅に鋼製部材を取り付けたので、プレスバーの嵌合部は鋼製であっても前後の移動の繰り返しによる接触が生じても接触部は同材質の部材の接触であるため、コンクリートの欠けやクラックが生じるおそれはない。 According to the present invention of claim 1, since the steel members are attached to the protruding corners of the corners of the fitting portion at the front end of the concrete box, even if the fitting portion of the press bar is made of steel, the Even if contact occurs due to repeated movements, the contact portion is made of the same material, so there is no risk of chipping or cracking of the concrete.

請求項2の記載の本発明によれば、中押し設備に嵌合するコンクリート函体嵌合部の隅角部の出隅部に鋼製型部材を取り付けたため、鋼製である中押し設備のカラーに嵌合するコンクリート函体は、コンクリート函体の嵌合部も前後の移動を繰り返す動作により、中押し設備とコンクリート函体4の嵌合部に接触が繰り返し生じても鋼製同士の部材の接触であるため、コンクリートの欠けやクラックが生じる恐れはない。 According to the second aspect of the present invention, since the steel mold member is attached to the outer corner of the corner of the fitting portion of the concrete box that is fitted to the intermediate pressing equipment, the collar of the intermediate pressing equipment made of steel is attached. As for the concrete box to be fitted, even if the fitting part of the concrete box 4 is repeatedly moved back and forth, even if the fitting part of the intermediate pressing equipment and the concrete box 4 come into contact repeatedly, the steel members will not contact each other. Therefore, there is no risk of chipping or cracking of the concrete.

以上述べたように本発明の推進工法併用のオープンシールド工法は、先頭のコンクリート函体の嵌合部の耐久性の低下や、中押し設備に嵌合するコンクリート函体の嵌合部の耐久性低下を防止できるものである。 As described above, the open shield construction method in combination with the jacking method of the present invention reduces the durability of the fitting portion of the leading concrete box and the durability of the fitting portion of the concrete box that is fitted to the intermediate pushing equipment. can be prevented.

本発明の推進工法併用のオープンシールド工法およびそれに使用するコンクリート函体の1実施形態を示す縦断側面図である。BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a longitudinal side view showing an embodiment of an open shield construction method combined with a jacking method and a concrete box body used therein according to the present invention; 本発明の推進工法併用のオープンシールド工法およびそれに使用するコンクリート函体の1実施形態を示す横断平面図である。BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a cross-sectional plan view showing an embodiment of an open shield construction method combined with a jacking method and a concrete box body used therein according to the present invention; 本発明の推進工法併用のオープンシールド工法およびそれに使用するコンクリート函体の1実施形態を示す要部の縦断正面図である。BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a vertical cross-sectional front view of an essential part showing an embodiment of an open shield construction method combined with a jacking method and a concrete box body used therein according to the present invention. 本発明の推進工法併用のオープンシールド工法およびそれに使用するコンクリート函体の1実施形態を示す要部の縦断側面図である。BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a vertical cross-sectional side view of a main part showing an embodiment of an open shield construction method combined with a jacking method of the present invention and a concrete box body used therein. 図4の拡大縦断側面図である。FIG. 5 is an enlarged vertical cross-sectional side view of FIG. 4; 本発明の推進工法併用のオープンシールド工法およびそれに使用するコンクリート函体の1実施形態を示す要部の拡大縦断正面図である。BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an enlarged vertical cross-sectional front view of an essential part showing an embodiment of an open shield construction method combined with a jacking method and a concrete box body used therein according to the present invention; 本発明の推進工法併用のオープンシールド工法およびそれに使用するコンクリート函体の第2実施形態を示す横断平面図である。FIG. 2 is a cross-sectional plan view showing a second embodiment of the open shield construction method combined with the jacking method of the present invention and a concrete box body used therein. 本発明の推進工法併用のオープンシールド工法およびそれに使用するコンクリート函体の第2実施形態を示す縦断側面図である。It is a longitudinal side view which shows 2nd Embodiment of the open shield construction method of this invention combined with the jacking method and the concrete box body used for it. 本発明の推進工法併用のオープンシールド工法およびそれに使用するコンクリート函体の第2実施形態を示す縦断正面図である。It is a longitudinal front view showing a second embodiment of the open shield construction method combined with the jacking method of the present invention and the concrete box body used therefor. 本発明の推進工法併用のオープンシールド工法およびそれに使用するコンクリート函体の第2実施形態を示す要部の縦断側面図である。It is a longitudinal side view of the principal part which shows 2nd Embodiment of the open shield construction method of this invention combined with the jacking method and the concrete box body used for it. 図10の拡大縦断側面図である。11 is an enlarged vertical cross-sectional side view of FIG. 10; FIG. 本発明の推進工法併用のオープンシールド工法およびそれに使用するコンクリート函体の第2実施形態を示す要部の拡大縦断正面図である。It is an enlarged longitudinal front view of the main part showing the second embodiment of the open shield construction method combined with the jacking method of the present invention and the concrete box used therefor. 従来例を示す縦断側面図である。It is a longitudinal side view showing a conventional example. 従来例を示す横縦平面図である。It is a horizontal vertical plan view showing a conventional example. 従来例を示す縦断正面図である。It is a longitudinal front view showing a conventional example. 他の従来例を示す縦断側面図である。and FIG. 11 is a longitudinal side view showing another conventional example. 他の従来例を示す横断平面図である。and FIG. 11 is a cross-sectional plan view showing another conventional example. 他の従来例を示す縦断正面図である。FIG. 11 is a longitudinal front view showing another conventional example; 推進工法併用のオープンシールド工法の概要を示す縦断側面図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a longitudinal side view which shows the outline|summary of the open shield construction method of a jacking method combination. 推進工法併用のオープンシールド工法の概要を示す横断平面図である。It is a cross-sectional plan view showing the outline of the open shield construction method combined with the jacking method. オープンシールド工法で使用するオープンシールド機の縦断側面図である。It is a longitudinal side view of the open shield machine used by the open shield construction method. オープンシールド工法で使用するオープンシールド機の横縦平面図である。It is a horizontal vertical plan view of the open shield machine used by the open shield construction method. 推進工法併用のオープンシールド工法の発進立坑の縦断側面図である。It is a longitudinal side view of the starting shaft of the open shield construction method combined with the jacking method. 推進工法併用のオープンシールド工法の発進立坑の横断平面図である。It is a cross-sectional plan view of the starting shaft of the open shield construction method combined with the jacking method. 推進工法併用のオープンシールド工法の発進立坑の縦断正面図である。It is a longitudinal front view of the starting shaft of the open shield construction method combined with the jacking method. 推進工法併用のオープンシールド工法の発進立坑の要部の縦断正面図である。It is a longitudinal front view of the main part of the starting shaft of the open shield construction method combined with the jacking method. 推進工法併用のオープンシールド工法の第1工程を示す側面図である。It is a side view which shows the 1st process of the open shield construction method of a jacking method combination. 推進工法併用のオープンシールド工法の第2工程を示す側面図である。It is a side view which shows the 2nd process of the open shield construction method of a jacking method combination. 推進工法併用のオープンシールド工法の第3工程を示す側面図である。It is a side view which shows the 3rd process of the open shield construction method of a jacking method combination. 推進工法併用のオープンシールド工法の第4工程を示す側面図である。It is a side view which shows the 4th process of the open shield construction method of a jacking method combination. 滑剤注入状況を示す縦断正面図である。It is a vertical front view which shows a lubricating agent injection|pouring condition.

以下図面について本発明の実施の形態を詳細に説明する。図1は本発明の推進工法併用のオープンシールド工法の1実施形態を示す縦断側面図、図2は同上横断平面図で、図中1はオープンシールド機、4はコンクリート函体を示すがオープンシールド工法としては推進工法併用のオープンシールド工法の場合である。 Embodiments of the present invention will be described in detail below with reference to the drawings. FIG. 1 is a vertical cross-sectional side view showing one embodiment of the open shield construction method combined with the jacking method of the present invention, and FIG. 2 is a cross-sectional plan view of the same. As a construction method, it is the case of the open shield construction method combined with the jacking method.

上部開放型シールド機であるオープンシールド機1を使用し、オープンシールド機1の前面又は上面開口より前方の土砂を掘削・排土する工程と、シールドジャッキ3を伸長してコンクリート函体4を反力にしてオープンシールド機1を前進させる工程と、前進させたオープンシールド機1に対してその前進分を埋めるべくコンクリート函体4を発進立坑の元押ジャッキもしくは布設するコンクリート函体とコンクリート函体の間に設けた中押し設備の中押しジャッキで押し出し、その後該元押ジャッキもしくは中押しジャッキと押し出したコンクリート函体との間に新たなコンクリート函体4を配設して押し出しを繰り返すコンクリート函体の推進工程を組み合わせるオープンシールド工法である。 Using an open shield machine 1, which is a top open shield machine, a process of excavating and discharging earth and sand in front of the front or top opening of the open shield machine 1, and extending the shield jack 3 to turn back the concrete box 4. A step of advancing the open shield machine 1 by force, and a concrete box and a concrete box for laying a concrete box 4 as a main pushing jack of the starting pit or laying it to fill the advanced portion with respect to the advanced open shield machine 1. Pushing out with a middle pushing jack of a middle pushing equipment provided between, after that, a new concrete box 4 is arranged between the main pushing jack or the middle pushing jack and the extruded concrete box, and pushing out is repeated. This is an open shield construction method that combines processes.

図中、3はシールドジャッキ、16はスライド式土留め、17はスライド式土留め16を動かすスライドジャッキであるが、オープンシールド機1の詳細については前記図21、図22で説明した通りである。 In the figure, 3 is a shield jack, 16 is a slide type earth retainer, and 17 is a slide jack for moving the slide type earth retainer 16. The details of the open shield machine 1 are as described with reference to FIGS. 21 and 22. .

コンクリート函体4とオープンシールド機1のシールドジャッキ3との間には鋼製の筒状部材であるプレスバー15をセットするが、プレスバー15はPC鋼棒(図示せず)で先頭のコンクリート函体4に緊結固定される。 Between the concrete box 4 and the shield jack 3 of the open shield machine 1, a press bar 15, which is a cylindrical member made of steel, is set. It is tightened and fixed to the box 4 .

また、プレスバー15とオープンシールド機1はプレスバー15に牽引ジャッキ30を取付け、牽引ジャッキ30と一端をオープンシールド機1に固定するPC鋼線(図示せず)で必要に応じて固定および解除可能なように連結した。 In addition, the press bar 15 and the open shield machine 1 are fixed and released by a PC steel wire (not shown) for fixing the towing jack 30 to the press bar 15 and one end thereof to the open shield machine 1 as necessary. connected as possible.

プレスバー15はコンクリート函体4への嵌合用スカート部38を設けた。この嵌合用スカート部38は鋼製の筒枠である。 The press bar 15 is provided with a skirt portion 38 for fitting to the concrete box 4 . This fitting skirt portion 38 is a tubular frame made of steel.

一方、コンクリート函体4の嵌合部の隅角部の出隅部4か所にアンカー40aを有するアングル材である鋼製部材40を取付けた。アングル材の鋼製部材40はコンクリート函体4の嵌合部の出隅部の外面が同一面上になるように設置する。 On the other hand, steel members 40 which are angle members having anchors 40a were attached to four protruding corners of the corners of the fitting portion of the concrete box 4 . The steel member 40 of the angle material is installed so that the outer surface of the external corner of the fitting portion of the concrete box 4 is on the same plane.

アンカー40aは先頭コンクリート函体4のコンクリート内面に向かって定着させ、他端を鋼製部材40の内面に溶接で固定している。図中アンカー40aは2本示しているが、先頭コンクリート函体4が大きく、コンクリート函体4の嵌合部の長さが長くなる場合は鋼製部材40の長さを長くする必要があるため、3本以上の複数本設置してもよい。 The anchor 40a is fixed toward the inner surface of concrete of the leading concrete box 4, and the other end is fixed to the inner surface of the steel member 40 by welding. Although two anchors 40a are shown in the figure, it is necessary to increase the length of the steel member 40 when the head concrete box 4 is large and the fitting portion of the concrete box 4 is long. , three or more may be installed.

図示は省略するが、図3に示す鋼製部材40の断面の内面に収まるように、かつ、先頭コンクリート函体4の嵌合部と同一面になるように別途プレートを設置し溶接・固着して補強鋼材の剛性を高め、さらに該先頭コンクリート函体4の嵌合部が繰り返し移動し、プレスバー15の嵌合用スカート部38に該補強鋼材の先端の接触により剥がれないようすることもできる。 Although illustration is omitted, a separate plate is installed, welded and fixed so that it fits inside the cross section of the steel member 40 shown in FIG. It is also possible to increase the rigidity of the reinforcing steel material by increasing the rigidity of the reinforcing steel material and prevent the fitting part of the front concrete box 4 from repeatedly moving and the tip of the reinforcing steel material from coming into contact with the fitting skirt part 38 of the press bar 15 and peeling off.

コンクリート函体4の前端面にはゴムによる緩衝材39を貼付け、プレスバー15を嵌合用スカート部38を介して先頭コンクリート函体4の嵌合部に嵌めるのにこの緩衝材39を介在させる。 A cushioning material 39 made of rubber is attached to the front end face of the concrete box 4, and this cushioning material 39 is interposed when the press bar 15 is fitted to the fitting portion of the leading concrete box 4 via the skirt part 38 for fitting.

コンクリート函体4とプレスバー15はPC鋼棒(図示せず)で緊結固定されており、コンクリート函体4が発進立坑の元押ジャッキで推進する場合は両者一体に推進する。 The concrete box 4 and the press bar 15 are tightly fixed with a PC steel bar (not shown), and when the concrete box 4 is propelled by the main pushing jack of the starting pit, both are propelled together.

オープンシールド機1の推進は、シールドジャッキ3を伸長してコンクリート函体4とプレスバー15を反力にオープンシールド機1のみを掘進させる場合と、オープンシールド機1がプレスバー15付きのコンクリート函体4の全体の推進によりコンクリート函体4とともに前進する場合の両方を選択できる。 The open shield machine 1 is propelled by extending the shield jack 3 and excavating only the open shield machine 1 with the reaction force of the concrete box 4 and the press bar 15, and when the open shield machine 1 is a concrete box with the press bar 15. Both cases of moving forward together with the concrete box 4 by propulsion of the whole body 4 can be selected.

後者の場合は牽引ジャッキ30でPC鋼線を緊張させ、オープンシールド機1とプレスバー15とは一体のものとする。 In the latter case, the PC steel wire is tensioned by a pulling jack 30, and the open shield machine 1 and the press bar 15 are integrated.

このようにして先頭コンクリート函体4の嵌合部がプレスバー15の嵌合用スカート部38内で移動・接触しても鋼製部材40で防護されているのでコンクリートの欠けやクラックが生じることが無い。 In this way, even if the fitting portion of the front concrete box 4 moves and contacts within the fitting skirt portion 38 of the press bar 15, it is protected by the steel member 40, so chipping or cracking of the concrete can occur. None.

次に本発明の第2実施形態について説明する。図7、図8は中押し設備21を使用する場合で、中押し設備21は鋼製筒体であるカラー21aを本体とし、内部に中押しジャッキ27を配設した。 Next, a second embodiment of the invention will be described. FIGS. 7 and 8 show the case of using the intermediate pushing equipment 21. The intermediate pushing equipment 21 has a collar 21a, which is a cylindrical steel body, as its main body, and has an intermediate pushing jack 27 inside.

カラー21aの端部がコンクリート函体4への嵌合部43となる。 An end portion of the collar 21 a serves as a fitting portion 43 to the concrete box 4 .

図中28は中押し設備21を設置する場合にコンクリート函体4の端面に配設するプレスバーである。 Reference numeral 28 in the figure denotes a press bar arranged on the end surface of the concrete box 4 when installing the intermediate pressing equipment 21 .

また、前記プレスバー28を設置するに際し、コンクリート函体4の前端面にはゴムによる緩衝材39を貼付け、その上にプレスバー28を押圧する。 When the press bar 28 is installed, a buffer material 39 made of rubber is attached to the front end face of the concrete box 4, and the press bar 28 is pressed thereon.

この場合もコンクリート函体4は中押し設備21に接続・嵌合する場合の隅角部の出隅部4か所にアンカー40aを有するアングル材である鋼製部材40を取付けた。 In this case as well, the concrete box 4 is attached with steel members 40 which are angle members having anchors 40a at four protruding corners of the corners when connecting/fitting to the intermediate pushing equipment 21 .

鋼製部材40はカラー21aの嵌合部43までの長さで設置しており、該コンクリート函体4は最終的には中押し設備21内の中押しジャッキ27及び中押しプレスバー28を撤去して該コンクリート函体を該中押し設備21にカラー21aの先端まで差し込むため、鋼製部材40を鋼製カラー側まで所定の間隔で断続的に設置してもよい。 The steel member 40 is installed with a length up to the fitting portion 43 of the collar 21a. In order to insert the concrete box into the intermediate pushing equipment 21 up to the tip of the collar 21a, the steel members 40 may be intermittently installed at predetermined intervals up to the steel collar side.

このようにして、コンクリート函体4は中押し設備21の中押しジャッキ27で推進されるが、コンクリート函体4の嵌合部が中押し設備21内で移動・接触しても鋼製部材40で防護されているので、コンクリートの欠けやクラックが生じることが無い。 In this way, the concrete box 4 is propelled by the intermediate pushing jack 27 of the intermediate pushing equipment 21, but even if the fitting portion of the concrete box 4 moves or comes into contact with the intermediate pushing equipment 21, it is protected by the steel member 40. Therefore, chipping and cracking of concrete do not occur.

1…オープンシールド機
1a…側壁板 1b…底板
3…シールドジャッキ 4…コンクリート函体
5…埋戻し土 6…掘削機
8…発進立坑 13…到達立坑
14…隔壁 15…プレスバー
16…スライド式土留め 17…スライドジャッキ
18…稼働分割底盤 19…底版ジャッキ
20…フリクションカットプレート 21…中押し設備
21a…カラー 22…支圧壁
23…元押しジャッキ 24…ストラット
25…受け台 26…ガイド鋼
27…中押しジャッキ 28…プレスバー
29…PC鋼線 30…牽引ジャッキ
31…揚重機 32…鋼製カラー
34…グラウトホール 35…滑剤
36…注入ノズル 38…嵌合用スカート部
39…緩衝材(ゴム) 40…鋼製部材
40a…アンカー 43…嵌合部
DESCRIPTION OF SYMBOLS 1... Open shield machine 1a... Side wall plate 1b... Bottom plate 3... Shield jack 4... Concrete box 5... Backfilling soil 6... Excavator 8... Starting pit 13... Arrival pit 14... Partition wall 15... Press bar 16... Sliding soil Fastening 17 Slide jack 18 Operation split bottom plate 19 Bottom plate jack 20 Friction cut plate 21 Intermediate pushing equipment 21a Collar 22 Bearing wall 23 Primary pushing jack 24 Strut 25 Catch 26 Guide steel 27 Intermediate pushing Jack 28 Press bar 29 PC steel wire 30 Traction jack 31 Lifting machine 32 Steel collar 34 Grout hole 35 Lubricant 36 Injection nozzle 38 Fitting skirt 39 Cushioning material (rubber) 40 Steel Made member 40a... Anchor 43... Fitting part

Claims (2)

上部開放型シールド機であるオープンシールド機を使用し、オープンシールド機の前面又は上面開口より前方の土砂を掘削・排土する工程と、シールドジャッキを伸長してコンクリート函体を反力にしてオープンシールド機を前進させる工程と、前進させたオープンシールド機に対してその前進分を埋めるべくコンクリート函体を発進立坑の元押ジャッキもしくは布設するコンクリート函体とコンクリート函体の間に設けた中押し設備の中押しジャッキで押し出し、その後該元押ジャッキもしくは中押しジャッキと押し出したコンクリート函体との間に新たなコンクリート函体を配設して押し出しを繰り返すコンクリート函体の推進工程を組み合わせるオープンシールド工法において、コンクリート函体先頭部にはシールドジャッキとの間にコンクリート函体への嵌合用スカート部を有するプレスバーを配設け、コンクリート函体は前端の嵌合部の隅角部の出隅に鋼製部材を取り付け、これをプレスバーの嵌合用スカート部に嵌入させ、オープンシールド機のシールドジャッキはプレスバーおよびコンクリート函体を推進反力として伸長させることを特徴とする推進工法併用のオープンシールド工法。 Using an open shield machine, which is a top open type shield machine, the process of excavating and removing earth and sand in front of the front or top opening of the open shield machine, and extending the shield jack to open the concrete box by reaction force. The process of advancing the shield machine, and the intermediate pushing equipment provided between the concrete box to be laid and the concrete box to fill the advance of the forwarded open shield machine. In the open shield construction method, a step of pushing out with an intermediate pushing jack, then placing a new concrete box between the main pushing jack or the pushing jack and the extruded concrete box, and pushing out the concrete box repeatedly, is combined. A press bar with a skirt portion for fitting to the concrete box is arranged between the shield jack and the front end of the concrete box, and the concrete box is a steel member at the outer corner of the fitting part at the front end. and inserting it into the fitting skirt of the press bar, and the shield jack of the open shield machine extends the press bar and concrete box as a propulsive reaction force. 上部開放型シールド機であるオープンシールド機を使用し、オープンシールド機の前面又は上面開口より前方の土砂を掘削・排土する工程と、シールドジャッキを伸長してコンクリート函体を反力にしてオープンシールド機を前進させる工程と、前進させたオープンシールド機に対してその前進分を埋めるべくコンクリート函体を発進立坑の元押ジャッキもしくは布設するコンクリート函体とコンクリート函体の間に設けた中押し設備の中押しジャッキで押し出し、その後該元押ジャッキもしくは中押しジャッキと押し出したコンクリート函体との間に新たなコンクリート函体を配設して押し出しを繰り返すコンクリート函体の推進工程を組み合わせるオープンシールド工法において、中押し設備は一端をコンクリート函体嵌合部とした鋼製筒体であるカラーを本体とし、コンクリート函体は前端の嵌合部の隅角部の出隅に鋼製部材を取り付け、これをプレスバーを内部に置く中押し設備のカラーに嵌入させ、中押し設備の中押しジャッキは後方のコンクリート函体を推進反力として伸長させ、プレスバーおよび前方のコンクリート函体を押し出すことを特徴とする推進工法併用のオープンシールド工法。

Using an open shield machine, which is a top open type shield machine, the process of excavating and removing earth and sand in front of the front or top opening of the open shield machine, and extending the shield jack to open the concrete box by reaction force. The process of advancing the shield machine, and the intermediate pushing equipment provided between the concrete box to be laid and the concrete box to fill the advance of the forwarded open shield machine. In the open shield construction method, a step of pushing out with an intermediate pushing jack, then placing a new concrete box between the main pushing jack or the pushing jack and the extruded concrete box, and pushing out the concrete box repeatedly, is combined. The main body of the intermediate pressing equipment is a collar, which is a steel cylinder with one end fitted to the concrete box. The concrete box has a steel member attached to the outer corner of the front end fitting part, and is pressed. The jacking method is characterized in that the bar is fitted into the collar of the intermediate pushing equipment placed inside, and the intermediate pushing jack of the intermediate pushing equipment extends the rear concrete box as a propulsion reaction force, pushing out the press bar and the front concrete box. open shield construction method.

JP2020209912A 2020-12-18 2020-12-18 Open shield construction method combined with jacking method Active JP7121108B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020209912A JP7121108B2 (en) 2020-12-18 2020-12-18 Open shield construction method combined with jacking method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020209912A JP7121108B2 (en) 2020-12-18 2020-12-18 Open shield construction method combined with jacking method

Publications (2)

Publication Number Publication Date
JP2022096763A JP2022096763A (en) 2022-06-30
JP7121108B2 true JP7121108B2 (en) 2022-08-17

Family

ID=82165374

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020209912A Active JP7121108B2 (en) 2020-12-18 2020-12-18 Open shield construction method combined with jacking method

Country Status (1)

Country Link
JP (1) JP7121108B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116104505B (en) * 2022-12-28 2025-08-15 中煤科工集团上海有限公司 Combined shield launching process

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008133660A (en) 2006-11-28 2008-06-12 Takenaka Komuten Co Ltd Building
JP2009108570A (en) 2007-10-30 2009-05-21 Makoto Uemura Concrete box body for use in open shield tunneling method
JP2016113873A (en) 2014-12-18 2016-06-23 植村 誠 Concrete box body for open shield method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762436B2 (en) * 1991-11-06 1995-07-05 厚一 植村 Open shield method
JP2666012B2 (en) * 1991-12-09 1997-10-22 厚一 植村 Open shield method and concrete box used for it
JP2666014B2 (en) * 1991-12-16 1997-10-22 厚一 植村 Open shield method and concrete box used for it
JP2767168B2 (en) * 1992-01-13 1998-06-18 厚一 植村 Open shield method and concrete box used for it

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008133660A (en) 2006-11-28 2008-06-12 Takenaka Komuten Co Ltd Building
JP2009108570A (en) 2007-10-30 2009-05-21 Makoto Uemura Concrete box body for use in open shield tunneling method
JP2016113873A (en) 2014-12-18 2016-06-23 植村 誠 Concrete box body for open shield method

Also Published As

Publication number Publication date
JP2022096763A (en) 2022-06-30

Similar Documents

Publication Publication Date Title
JP5584542B2 (en) Ground deformation prevention method and underground structure construction method using the same
JP7121108B2 (en) Open shield construction method combined with jacking method
JP7177233B2 (en) Start Reaction Force Structure and Method for Concrete Box or Open Shield Machine
JP7185667B2 (en) Press bar for open shield method
JP2001349173A (en) Shield starting tunneling method
JP6307136B2 (en) Open shield method
JP3135188B2 (en) Construction method of underground cavity
CN218969976U (en) Pushing structure suitable for pushing method construction continuous wall
JPH0762436B2 (en) Open shield method
JP6764438B2 (en) Open shield method with propulsion method
JP3784373B2 (en) Construction method of propulsion pipe and large section tunnel
JP6034447B1 (en) Open shield method
JP5639213B2 (en) Open shield method
JPH07331997A (en) Constructing method of rock cavern
JP4148047B2 (en) Open shield machine
JP7597777B2 (en) Method of entering the vertical shaft of an open shield machine in the open shield construction method
JP4185401B2 (en) Construction method of large section tunnel using divided box
JP4402640B2 (en) Open shield method
JP4705467B2 (en) Construction method of underground structure
JP6675201B2 (en) Construction method of underground outer shell structure
JP7595329B1 (en) Construction method of guide tunnel and steel protective shelter structure
JP4279441B2 (en) Open shield machine and open shield method using this open shield machine
JP7082225B1 (en) Construction method of underground structure
CN115522941B (en) Method for constructing tunnel by shield method
KR102608601B1 (en) Sheet non excavation method for drilling a tunnel having a file reinforcing structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210210

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220322

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220427

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220524

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220712

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220802

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220804

R150 Certificate of patent or registration of utility model

Ref document number: 7121108

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250