Falling object scattering prevention device Download PDF

Info

Publication number
JP7121381B2
JP7121381B2 JP2018041932A JP2018041932A JP7121381B2 JP 7121381 B2 JP7121381 B2 JP 7121381B2 JP 2018041932 A JP2018041932 A JP 2018041932A JP 2018041932 A JP2018041932 A JP 2018041932A JP 7121381 B2 JP7121381 B2 JP 7121381B2
Authority
JP
Japan
Prior art keywords
building
elevating
floor
scaffolding
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018041932A
Other languages
Japanese (ja)
Other versions
JP2019157399A (en
Inventor
昭二 歳清
Original Assignee
建装工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 建装工業株式会社 filed Critical 建装工業株式会社
Priority to JP2018041932A priority Critical patent/JP7121381B2/en
Publication of JP2019157399A publication Critical patent/JP2019157399A/en
Application granted granted Critical
Publication of JP7121381B2 publication Critical patent/JP7121381B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Description

本発明は、建物の建築時に使用される足場において建築資材等を引き上げたり、下ろしたりする際に、その建築資材等の落下による飛散を防止する落下物飛散防止装置に関するものである。 BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a falling object scattering prevention device that prevents building materials from being scattered when they are lifted or lowered from a scaffold used for construction of a building.

建物の建築現場あるいは、建築物の改修工事の現場において、仮設の足場を組み立てる場合がある。これらの足場を組み立てる際に必要となるその足場の部材や、建築や改修工事に必要な部材を上方階に引き上げる必要がある。この場合、それら必要な部材が落下するおそれがあり、その場合に、歩行者に危害を加える恐れがある。これを防止するために、あらかじめ規制により、足場の高さを基準として、地上における足場の基礎部分から水平方向に向かって、その高さの半分の距離について、歩行者等の第三者の立ち入りを禁止するという規制を設ける場合がある。 Temporary scaffolding is sometimes erected at a building construction site or a building repair work site. It is necessary to pull up the scaffolding members required for assembling these scaffoldings and the members required for construction and renovation work to the upper floors. In this case, there is a risk that these necessary members will fall, which may injure pedestrians. In order to prevent this, the height of the scaffolding is used as a standard, and third parties such as pedestrians are prohibited from entering in the horizontal direction from the base of the scaffolding on the ground for half the height. There may be regulations prohibiting

このように上記規制では、高層建物の場合には、その高さに比例して、その高層建築における基礎部分から水平方向において一定の範囲の立ち入りを規制する必要があるものの、特に都市部においては、その規制には限界がある。 As described above, in the case of a high-rise building, in the case of a high-rise building, it is necessary to restrict entry to a certain extent in the horizontal direction from the foundation part of the high-rise building. , the regulation has its limits.

これを解決するものとして、特開2015-052255号公報に記載されている鉄筋コンクリート造の外壁の表面を外装材で仕上げた建築物に対して施工される建築物用防護ネット柵であって、該建築物の外壁の全体または一部に取り付けられ出幅調整孔とワイヤー通し管を備えている複数の留め具と、この留め具を連結する連結部材と、該それぞれの留め具のワイヤー通し管に通されているワイヤーと、各ワイヤーの張りを調整するワイヤーの上下部に備えられたターンバックルと、該ターンバックルに掛けられたワイヤーを備えており、該複数本のワイヤーにはネットが結束線によって取り付けられ、建築物の外壁の全体または一部がネットで覆われていることを特徴とする、防護ネットを備えている建築物用防護ネット柵が開示されている。 As a solution to this, a protective net fence for buildings that is constructed on a building in which the surface of the outer wall of the reinforced concrete structure is finished with an exterior material is described in JP-A-2015-052255. A plurality of fasteners attached to the whole or a part of the outer wall of a building and provided with width adjustment holes and wire passage tubes, connecting members connecting the fasteners, and wire passage tubes of the respective fasteners. Wires passed through, turnbuckles provided on the upper and lower parts of the wires for adjusting the tension of each wire, and wires hung on the turnbuckles, and a net is attached to the plurality of wires. Disclosed is a protective net fence for buildings with a protective net, which is attached by and is characterized in that the outer wall of the building is wholly or partly covered with the net.

しかしながら、比較的大型の資材を上方階へ持ち上げる際には、このネットを外し、下方階に配置された足場から、上方階に配置された足場へ、ロープを使用して引き上げるということが行われている。このようにネットを外さなくては資材を上方階へ引き上げることができず、そのネットを外した箇所からその資材が落下した場合、落下物が周囲に飛散する場合がある。 However, when lifting a relatively large material to the upper floor, the net is removed and a rope is used to pull it up from the scaffolding on the lower floor to the scaffolding on the upper floor. ing. Materials cannot be lifted up to the upper floor without removing the net in this way, and if the materials fall from the place where the net is removed, the falling objects may scatter around.

特開2015-052255号公報JP 2015-052255 A

本発明は前記の点に鑑みなされたもので、その課題は、足場のネットを取り外す必要がなく、仮に資材が落下してもその落下物が周囲に飛散する恐れを可及的に防止する装置を提供することである。 The present invention has been made in view of the above points, and its object is to provide a device that does not require the removal of the scaffolding net and prevents the falling materials from scattering around as much as possible even if materials fall. is to provide

前記の課題を解決するため、第1観点の落下物飛散防止装置は、少なくとも複数階を有する建築物に取り付けて作業者の足場となる足場と、上方または下方からの荷物の上げ下ろしを行うための通路となる昇降部と、を有し、昇降部は、前記足場の前方に取り付けられているというものである。
また、第2観点の落下物飛散防止装置は、第1観点において、足場は、その足場の支柱となる後方支柱と前方支柱を有し、後方支柱は、建築物に固定され、前方支柱は昇降部と固定されているというものである。
また、第3観点の落下物飛散防止装置は、第2観点において、昇降部は、支柱となる昇降前方支柱を有し、昇降前方支柱の下部と、前方支柱と、を接続する支え部材と、をさらに有するというものである。
また、第4観点の落下物飛散防止装置は、第1観点から第3観点において、昇降部を覆うネットを具備したというものである。
In order to solve the above-mentioned problems, the falling object scattering prevention device of the first aspect is provided with a scaffold that is attached to a building having at least a plurality of floors and serves as a scaffolding for workers, and a scaffold for raising and lowering luggage from above or below. and an elevating section that serves as a passage, and the elevating section is attached to the front of the scaffold.
In the second aspect of the device for preventing scattering of falling objects, in the first aspect, the scaffold has a rear support and a front support that serve as supports for the scaffold, the rear support is fixed to the building, and the front support is liftable. It is fixed with the part.
Further, in the falling object scattering prevention device of the third aspect, in the second aspect, the elevating section has an elevating front strut serving as a strut, and a supporting member that connects the lower part of the elevating front strut and the front strut, It further has
A fourth aspect of the device for preventing scattering of falling objects is that, in the first to third aspects, a net covering the elevating section is provided.

本発明は以上のように構成され、かつ、作用するものであるから、足場のネットを取り外す必要がなく、仮に資材が落下してもその落下物が周囲に飛散する恐れを可及的に防止する装置を提供することができる。 Since the present invention is constructed and operates as described above, it is not necessary to remove the net of the scaffolding, and even if materials fall, the falling materials can be prevented from scattering around as much as possible. It is possible to provide a device for

落下物飛散防止装置の斜視図である。It is a perspective view of a falling object scattering prevention device. 落下物飛散防止装置の概略斜視図である。1 is a schematic perspective view of a device for preventing scattering of falling objects; FIG. 足場と昇降部との斜視図である。It is a perspective view of a scaffolding and a raising/lowering part. 図1のIV-IV線端面図である。FIG. 2 is an end view taken along line IV-IV of FIG. 1; 足場と昇降部との正面図である。It is a front view of a scaffolding and a raising/lowering part. 足場と昇降部との平面図である。It is a top view of a scaffolding and a raising/lowering part.

以下、実施例を説明する。本実施例の落下物飛散防止装置10は、建築物100の複数階にそれぞれ取り付けて足場となる足場20と、複数階の足場20に取り付けられその複数階における上方である上方階及び下方である下方階へ荷物を引き上げおよび引き下ろしするための通路となる昇降部30と、を有するものである。すなわち作業者は足場20から、ロープを使用して、その昇降部30を通路として使用して建築資材などの荷物を、引き上げたり下ろしたりすることができる。 Examples are described below. The falling object scattering prevention device 10 of the present embodiment includes scaffolds 20 attached to a plurality of floors of a building 100 to serve as scaffolds, and upper and lower floors attached to the scaffolds 20 of the plurality of floors. and an elevating section 30 that serves as a passageway for lifting and lowering luggage to and from lower floors. In other words, the worker can use the rope to raise or lower a load such as building materials from the scaffolding 20 using the elevating section 30 as a passageway.

建築物100は、マンション等の集合住宅やビルなどの複数階を有する建物が好ましい。本実施例において、複数階を有する建築物100を建築する際や、その建築物100をリフォームする際に、作業するための足場20が取り付けられている。なお足場20の外周部分に図示しない防護ネットを配置することができる。なお図2においては、理解容易のために、足場20についてはその外形を概念的に記載し、昇降部30を記載している。 The building 100 is preferably a multi-story building such as an apartment complex or a building. In this embodiment, a scaffolding 20 is attached for work when constructing a building 100 having multiple floors or when remodeling the building 100 . A protection net (not shown) can be arranged around the outer periphery of the scaffolding 20 . In FIG. 2, for ease of understanding, the outline of the scaffolding 20 is conceptually shown, and the lifting section 30 is shown.

足場20は、建物100側に配置した複数の後方支柱21と、建物100とは反対側に配置した前方支柱22とを有し、それら後方支柱21と、前方支柱22との最下部22aは、その後方支柱21と前方支柱22とを保持するためのベースとなる複数のジャッキベース23にそれぞれ接続されている。またそのジャッキベース23は、敷き板23aに載置されている。 The scaffolding 20 has a plurality of rear struts 21 arranged on the building 100 side and a front strut 22 arranged on the opposite side of the building 100, and the lowest part 22a of the rear strut 21 and the front strut 22 is It is connected to a plurality of jack bases 23 that serve as bases for holding the rear support column 21 and the front support column 22, respectively. The jack base 23 is placed on a floor plate 23a.

複数の後方支柱21と、複数の前方支柱22の数量は、建築物100の規模によって異なるものであって、その複数の後方支柱21と、複数の前方支柱22及びジャッキベース23は、所定の間隔に配置されている。この間隔は1800ミリメートルから2000ミリメートルが好ましい。 The number of the plurality of rear struts 21 and the plurality of front struts 22 varies depending on the scale of the building 100, and the plurality of rear struts 21, the plurality of front struts 22 and the jack base 23 are spaced at predetermined intervals. are placed in This spacing is preferably between 1800 mm and 2000 mm.

また、足場20は、後方支柱21および前方支柱22における建築物100の各階に相当の床面と天井面との間の任意の位置に、それら後方支柱21と前方支柱22をそれぞれ連結するために水平に配置する複数の横桟24を有している。また、その複数の後方支柱21と、前方支柱22と複数の横桟24と、はそれぞれ接続されている。もっとも、後述する筋交い27と共に、ピン25で接続することもできる。 In addition, the scaffolding 20 is provided at an arbitrary position between the floor surface and the ceiling surface corresponding to each story of the building 100 in the rear support column 21 and the front support column 22 to connect the rear support column 21 and the front support column 22, respectively. It has a plurality of crossbars 24 arranged horizontally. Further, the plurality of rear struts 21, the front strut 22 and the plurality of horizontal beams 24 are connected to each other. However, it is also possible to connect with a pin 25 together with a brace 27 which will be described later.

さらに、その複数の横桟24のうち2本の横桟24を渡すように、建築物100と平行に板状の足場板26を配置する。また、さらに他のそれぞれ2本の横桟24を渡すように、建築物100と平行に板状の足場板26をそれぞれ配置する。これによって、建築物100の各階に対応する足場20を構成することができる。なお、強度確保のためX字状の筋交い27を、その2本の後方支柱21のそれぞれの上下部分に斜めに渡すように配置することができる。また、前方支柱22においても同様である。なお、そのX字状の筋交い27の下部に、作業者の転落防止のために水平に棒状の第2横桟を使用することも好ましい。また、さらに他の前方支柱22のそれぞれの上下部分に斜めに渡すように配置することで、筋交い27は、建築物100の各階に対応する部分に設けることもできる。なお、後述するように昇降部30を取り付ける部分については、筋交い27を取り付けないことが好ましい。 Further, a plate-shaped scaffolding board 26 is arranged in parallel with the building 100 so as to bridge two horizontal beams 24 out of the plurality of horizontal beams 24 . In addition, plate-shaped scaffolding boards 26 are arranged in parallel with the building 100 so as to bridge the other two horizontal beams 24 . Thereby, the scaffolding 20 corresponding to each floor of the building 100 can be constructed. In order to secure the strength, an X-shaped brace 27 can be arranged so as to extend diagonally over the upper and lower portions of each of the two rear struts 21 . The same applies to the front strut 22 as well. In addition, it is also preferable to use a horizontal rod-shaped second cross bar below the X-shaped brace 27 to prevent the operator from falling. Further, by arranging diagonally across the upper and lower portions of the other front struts 22 , the braces 27 can be provided in the portions corresponding to the respective floors of the building 100 . In addition, as will be described later, it is preferable not to attach the brace 27 to the portion to which the elevating section 30 is attached.

また、建築物100と上記足場20を接続してその足場をその建築物100と固定するための複数の壁つなぎ28を有する。壁つなぎ28は、建築物100側に配置した後方支柱21においてたとえば、建築物100の各階に対応する部分に設けることも可能であり、また、建築物100において、1階おきに対応する部分に設けることも可能である。 It also has a plurality of wall ties 28 for connecting the building 100 and the scaffolding 20 and fixing the scaffolding to the building 100 . The wall joints 28 can be provided, for example, in portions corresponding to each floor of the building 100 in the rear support 21 arranged on the side of the building 100, or in portions corresponding to every other floor in the building 100. It is also possible to provide

建築資材を下方の階から上方の階へ引き上げたり、上方の階から下方の階に下ろすための通路となる昇降部30は、上記足場20を介して、その足場20の前方Fすなわち建築物100の位置の方向(後方R)とは反対の方向に配置されるものであり、建築物100と足場20との間の図示しない作業者の移動に支障がないように配置している。 An elevating section 30, which serves as a passageway for lifting building materials from a lower floor to an upper floor or from an upper floor to a lower floor, passes through the scaffolding 20 in front of the scaffolding 20, i.e., the building 100. It is arranged in a direction opposite to the direction of the position of (rear R), and is arranged so as not to interfere with the movement of a worker (not shown) between the building 100 and the scaffolding 20 .

すなわち、図示しない作業者が、建築物100に対してリフォームなどの作業をする際に、建築物100と足場20との間(後方R)ではなく、足場20の前方Fに、昇降部30を配置することによって、作業者におけるリフォームなどの作業をする際に、その上方の階へ引き上げたり、上方の階から下方の階に下ろす際に、作業者が誤って、その建築資材が落下した場合に、下方の階において足場20上で作業している他の作業者との衝突を避けることができる(図4参照)。 That is, when a worker (not shown) performs work such as renovation on the building 100, the elevating unit 30 is placed in front F of the scaffolding 20 instead of between the building 100 and the scaffolding 20 (rear R). By arranging it, when the construction material is pulled up to the upper floor or lowered from the upper floor to the lower floor when the worker is doing work such as renovation, the building material may fall. In addition, collisions with other workers working on scaffolding 20 on the floor below can be avoided (see FIG. 4).

なお、ここで前方Fとは、建築物100に背を向けて正面が前方Fである。従って、後方Rから前方Fに向けて、端面視、建築物100、足場20、昇降部30の順に配置されていることが好ましい。このように昇降部30を、足場20の外側(建築物100とは反対側、前方F)に設けることが好ましい。 Here, the front F is the front F when the back is turned to the building 100 . Therefore, it is preferable that the building 100, the scaffolding 20, and the lifting section 30 are arranged in this order from the rear R to the front F in the end view. It is preferable to provide the lifting section 30 on the outside of the scaffolding 20 (on the side opposite to the building 100, on the front side F).

昇降部30は、複数の前方支柱22に取り付けて、後述する複数の自在クランプ36aで固定される複数の昇降後方支柱31と、前方支柱22とは反対側に配置した昇降前方支柱32とを有する。昇降後方支柱31と、昇降前方支柱32は、共に、支柱として昇降部30を構成する。また、昇降部30は、昇降後方支柱31および昇降前方支柱32における建築物100の各階に相当の床面と天井面との間の任意の位置にそれぞれ、昇降後方支柱31および昇降前方支柱32をそれぞれ連結するために水平に配置する複数の昇降横桟34を有している。また、その昇降後方支柱31と昇降前方支柱32と複数の昇降横桟34とは、それぞれ接続されている。もっとも、後述する筋交い38と共に、ピン37で接続することもできる。 The elevation unit 30 has a plurality of rear elevation struts 31 attached to the front struts 22 and fixed by a plurality of universal clamps 36a, which will be described later, and a front elevation strut 32 arranged on the opposite side of the front struts 22. . The lifting rear column 31 and the lifting front column 32 together constitute the lifting section 30 as a column. In addition, the elevating unit 30 has the elevating rear support column 31 and the elevating front support column 32 at arbitrary positions between the floor surface and the ceiling surface corresponding to each floor of the building 100, respectively. It has a plurality of elevating crossbars 34 arranged horizontally for connecting to each other. Further, the elevation rear strut 31, the elevation front strut 32, and the plurality of elevation horizontal beams 34 are connected to each other. However, they can also be connected by pins 37 together with braces 38, which will be described later.

また、昇降部30は、地上から設置するのではなく、たとえば建築物100の2階あるいは3階相当から、上方に向かって配置することが好ましい。また昇降前方支柱32の最下部にその昇降前方支柱32を支持する支え部材36を配置し自在クランプ36aを用いることで、支え部材36の一端はその下層階に対応する前方支柱22と接続し、他端は、昇降前方支柱32と接続することで、昇降部30を支持することができる。なお、足場の設置基準として、いわゆるアサガオを設置する高さを路面から物件の下端までの高さを、歩車道の区別がない道路の場合はその高さを5m以上とし、 歩道が存在する場合はその高さを 4m以上としたことから、それに準ずるために建築物100の2階あるいは3階相当から、上方に向かって配置することが好ましい。 Moreover, it is preferable that the elevating unit 30 is not installed from the ground, but is arranged upward from, for example, the second or third floor of the building 100 . In addition, by placing a support member 36 for supporting the elevation front column 32 at the lowest part of the elevation front column 32 and using a universal clamp 36a, one end of the support member 36 is connected to the front column 22 corresponding to the lower floor, The other end can support the lifting section 30 by being connected to the lifting front column 32 . As a standard for installing scaffolding, the height from the road surface to the bottom of the property at which the so-called morning glory will be installed shall be 5 m or more in the case of a road without distinction between sidewalks and roads, and when there is a sidewalk. Since the height of is set to 4 m or more, it is preferable to arrange upward from the 2nd or 3rd floor of the building 100 in order to comply with it.

昇降部30は、少なくとも足場20の一部に取り付けることができる。すなわち、複数の前方支柱22のうち、2本の前方支柱22に取り付けてそれぞれ固定される2本の昇降後方支柱31と、その2本の昇降後方支柱31とは反対側(前方F)に配置した2本の昇降前方支柱32とを有する。また、昇降後方支柱31および昇降前方支柱32をそれぞれ連結するために、後方Rから前方F、かつ水平に配置する2本の昇降横桟34を有している。また、2本の昇降前方支柱32を連結するための前方横桟35を有する。これは、昇降横桟34と同じ高さに配置することが好ましい。 The lifting unit 30 can be attached to at least part of the scaffolding 20 . That is, among the plurality of front struts 22, the two lifting rear struts 31 attached to and fixed to the two front struts 22 and the two lifting rear struts 31 are arranged on the opposite side (front F). It has two elevating front struts 32 that are connected to each other. In order to connect the rear elevation strut 31 and the front elevation strut 32 respectively, there are two elevation horizontal beams 34 arranged horizontally from the rear R to the front F. It also has a front horizontal beam 35 for connecting the two lifting front struts 32 . It is preferably located at the same height as the lift rungs 34 .

また、複数の昇降後方支柱31と前方支柱22とを接続するために、その接続する角度を変えられる自在クランプ36aを使用することができる。 Also, in order to connect the plurality of rear pillars 31 and the front pillars 22, it is possible to use a universal clamp 36a whose connection angle can be changed.

また、強度確保のためX字状の筋交い38をその、昇降前方支柱32に設けることもできる。なお、そのX字状の筋交い38の下部に、水平に棒状の第2横桟を使用することも好ましい。さらに、昇降部30全体を覆うネット40をさらに配置することができる。これにより、昇降部30内において、仮に建築資材等の荷物が落下したとしても周囲にその荷物が飛び出し飛散することを防止することができる。特に足場20に防護ネットを配置した場合に、荷物の上げ下ろしをするためにそのネットを取り外す必要がないので、足場20で作業をしている作業者の安全を図ることができる。なお、上述の横桟24を延長して、昇降横桟34と一体のものとしても好ましい。 Also, an X-shaped brace 38 can be provided on the front up/down support pillar 32 to ensure strength. In addition, it is also preferable to use a horizontally rod-shaped second cross bar below the X-shaped brace 38 . Furthermore, a net 40 that covers the entire lifting section 30 can be further arranged. As a result, even if a load such as a building material falls in the lifting section 30, it is possible to prevent the load from jumping out and scattering around. In particular, when a protective net is arranged on the scaffolding 20, it is not necessary to remove the net for loading and unloading a load, so that the safety of workers working on the scaffolding 20 can be ensured. Incidentally, it is also preferable to extend the horizontal beam 24 described above and integrate it with the elevation horizontal beam 34 .

上記構成の昇降部30は、上方階に相当する高さから、下方階に相当する高さに至るまでに、昇降後方支柱31と昇降前方支柱32と、2本の昇降横桟34と、前方横桟35とにおいて、平面視、口の字状の開口部39を有している。また、すなわちこの開口部39は、上方階に相当する高さから、下方階に相当する高さに至るまで貫通するように構成されており、その開口部39内のスペースを、建築資材などの荷物の引き上げおよび荷下ろしをするための通路として使用することができる。このように作業者は、任意の各階に相当するそれぞれの足場20に位置する場合に、その昇降部30は、その階に対応する開口部39を有するので、図示しないロープ、ワイヤ、紐等と、滑車を使用し、当該作業に最適な階における足場20から、荷物を引き上げたり下ろしたりすることができる。 The elevating section 30 having the above configuration includes an elevating rear strut 31, an elevating front strut 32, two elevating horizontal beams 34, and a front The horizontal beam 35 has an opening 39 shaped like a square when viewed from above. In other words, the opening 39 is configured to penetrate from the height corresponding to the upper floor to the height corresponding to the lower floor, and the space in the opening 39 is used for building materials and the like. Can be used as an aisle for loading and unloading cargo. In this way, when a worker is positioned on each scaffolding 20 corresponding to each arbitrary floor, the lifting section 30 has an opening 39 corresponding to that floor, so that ropes, wires, strings, etc. (not shown) can be used. , pulleys can be used to lift and lower loads from scaffolding 20 at the floor most suitable for the task in question.

なお、上記のとおり、昇降部30は全体をネット40で覆うことにより、仮にその荷物が落下した場合の飛散をさらに防止することができる。なお本実施例における昇降部30は、足場20における1箇所に配置しているが、たとえば、建築物100の周囲に、昇降部30を複数配置することもできる。 In addition, as described above, by covering the whole lifting section 30 with the net 40, it is possible to further prevent the scattering of the luggage when it falls. In this embodiment, the elevating unit 30 is arranged at one location on the scaffolding 20, but a plurality of elevating units 30 may be arranged around the building 100, for example.

10 落下物飛散防止装置
20 足場
21 後方支柱
22 前方支柱
23 ジャッキベース
24 横桟
25 ピン
30 昇降部
31 昇降後方支柱
32 昇降前方支柱
34 昇降横桟
35 前方横桟
36 支え部材
36a クランプ
37 ピン
40 ネット
100 建築物
10 Falling object scattering prevention device 20 Scaffolding 21 Rear strut 22 Front strut 23 Jack base 24 Horizontal beam 25 Pin 30 Elevating part 31 Elevating rear strut 32 Elevating front strut 34 Elevating horizontal beam 35 Front horizontal beam 36 Supporting member 36a Clamp 37 Pin 40 Net 100 buildings

Claims (3)

少なくとも複数階を有する建築物に取り付けて作業者の足場となるとともに前方支柱とを具備する足場と、
前記足場より、ロープ、ワイヤ、紐等を用いて荷物を下方の階から上方の階へ引き上げたり、上方の階から下方の階に下ろすための通路となる昇降部と、を有し、
前記昇降部は、前記足場の前方に取り付けられ、かつ、アサガオを設置する高さに準ずるために前記建築物の2階または3階相当の高さから上方に向かって設置し、
前記昇降部は、昇降前方支柱と、その昇降前方支柱を支持する支え部材と、をさらに有し、前記支え部材は、前記アサガオを設置する高さに準ずるために前記建築物の2階または3階相当の高さに対応する前記前方支柱と接続することで前記昇降部を支持し、
前記昇降部は、開口部と、を有し、
前記開口部は、上方の階に相当する高さから、前記建築物の2階または3階相当の高さに至るまで貫通するように構成されており、前記開口部内のスペースを、前記ロープ、ワイヤ、紐等を用いて前記荷物の引き上げおよび荷下ろしをするための通路として使用することで、作業者が当該荷物を前記通路となる前記昇降部内に落下した場合にその下方の階の足場上の他の作業者にその荷物が衝突することを避けるための落下物飛散防止装置。
a scaffold attached to a building having at least multiple floors to serve as a scaffold for a worker and comprising a front support;
an elevating section that serves as a passage for lifting a load from a lower floor to an upper floor or lowering it from an upper floor to a lower floor using ropes, wires, strings, etc., from the scaffold;
The elevating unit is installed in front of the scaffold and installed upward from a height corresponding to the second or third floor of the building in order to conform to the height at which the morning glory is installed,
The elevating section further has a front elevating support column and a support member for supporting the front elevating support column. Support the elevating unit by connecting to the front strut corresponding to the height of the floor,
The elevating unit has an opening,
The opening is configured to penetrate from a height corresponding to the upper floor to a height corresponding to the second or third floor of the building, and the space in the opening is defined by the rope, By using wires, strings, etc., as a passageway for lifting and unloading the cargo, when a worker drops the cargo into the elevating section that serves as the passageway, the cargo can be removed from the scaffolding on the floor below. equipment to prevent the cargo from colliding with other workers.
前記足場は、その足場の支柱となる後方支柱と、を有し、
前記後方支柱は、前記建築物に固定されている請求項1記載の落下物飛散防止装置。
The scaffold has a rear support that serves as a support for the scaffold,
2. A device for preventing scattering of falling objects according to claim 1, wherein said rear strut is fixed to said building.
前記昇降部を覆うネットを具備した請求項1または2記載の落下物飛散防止装置。 3. A device for preventing scattering of falling objects according to claim 1 or 2 , further comprising a net covering said elevating section.
JP2018041932A 2018-03-08 2018-03-08 Falling object scattering prevention device Active JP7121381B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018041932A JP7121381B2 (en) 2018-03-08 2018-03-08 Falling object scattering prevention device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018041932A JP7121381B2 (en) 2018-03-08 2018-03-08 Falling object scattering prevention device

Publications (2)

Publication Number Publication Date
JP2019157399A JP2019157399A (en) 2019-09-19
JP7121381B2 true JP7121381B2 (en) 2022-08-18

Family

ID=67992430

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018041932A Active JP7121381B2 (en) 2018-03-08 2018-03-08 Falling object scattering prevention device

Country Status (1)

Country Link
JP (1) JP7121381B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004300838A (en) 2003-03-31 2004-10-28 Daiwa House Ind Co Ltd Temporary scaffold
JP2012224996A (en) 2011-04-15 2012-11-15 Asahi Kasei Homes Co Lifting device for temporary scaffold
JP3195041U (en) 2014-10-10 2014-12-25 有限会社齋藤組 Folding bracket for frame scaffold, frame scaffold structure using the jump bracket, veranda bracket for frame scaffold, frame scaffold structure using the veranda bracket
JP2015218576A (en) 2014-05-20 2015-12-07 光洋機械産業株式会社 Scaffold widening bracket and its mounting method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6466363A (en) * 1987-09-04 1989-03-13 Sumikin Kozai Kogyo Kk Framework scaffold

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004300838A (en) 2003-03-31 2004-10-28 Daiwa House Ind Co Ltd Temporary scaffold
JP2012224996A (en) 2011-04-15 2012-11-15 Asahi Kasei Homes Co Lifting device for temporary scaffold
JP2015218576A (en) 2014-05-20 2015-12-07 光洋機械産業株式会社 Scaffold widening bracket and its mounting method
JP3195041U (en) 2014-10-10 2014-12-25 有限会社齋藤組 Folding bracket for frame scaffold, frame scaffold structure using the jump bracket, veranda bracket for frame scaffold, frame scaffold structure using the veranda bracket

Also Published As

Publication number Publication date
JP2019157399A (en) 2019-09-19

Similar Documents

Publication Publication Date Title
US20210180341A1 (en) Scaffolding
JP2023085392A (en) safety rail system
US8714306B2 (en) Perimetric protection system for buildings undergoing construction
CA2877179C (en) The improved frame for climbing screen
KR101246665B1 (en) Supporting bracket and supporting device with safety net using thereof
US9556624B1 (en) Scaffold system
RU2400609C2 (en) Complex system of accident prevention support in construction
US8511039B2 (en) Safety barrier for multi-storey buildings
GB2529470A (en) Climbing screen support
JP7121381B2 (en) Falling object scattering prevention device
EP1206611B1 (en) Scaffolding
CN100419191C (en) scaffold
KR200480362Y1 (en) Folding safety net assembly of gang form
Adhikari et al. Designing and detailing of scaffoldings
CA2734994C (en) Perimetric protection system for buildings undergoing construction
JP2019027145A (en) Installation method for falling object protective device
JP7245472B2 (en) Anti-scattering system and demolition method for existing buildings
US20240060319A1 (en) Temporary perimeter containment assembly
KR20230054932A (en) Dropping prevention net mounted with climbing system and method for mounting the same
JP6844122B2 (en) How to build a scaffold
DK177113B1 (en) Scaffolding system with extended width on upper work platform
KR200230611Y1 (en) Lightweight safety footstool
RU127730U1 (en) UNIVERSAL PROTECTIVE PROTECTION OF THE DOOR OPENING OF THE UZO-1 LIFT SHAFT
JP7122080B2 (en) temporary scaffolding
GB2563231A (en) Methods and apparatus for building construction

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210303

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20210303

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20211215

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20211221

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220218

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220405

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220603

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220705

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220729

R150 Certificate of patent or registration of utility model

Ref document number: 7121381

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250