JP7170205B2 - How to build lights and buildings - Google Patents
How to build lights and buildings Download PDFInfo
- Publication number
- JP7170205B2 JP7170205B2 JP2020020053A JP2020020053A JP7170205B2 JP 7170205 B2 JP7170205 B2 JP 7170205B2 JP 2020020053 A JP2020020053 A JP 2020020053A JP 2020020053 A JP2020020053 A JP 2020020053A JP 7170205 B2 JP7170205 B2 JP 7170205B2
- Authority
- JP
- Japan
- Prior art keywords
- ceiling
- adapter
- lighting fixture
- connector
- lamp
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Fastening Of Light Sources Or Lamp Holders (AREA)
- Arrangement Of Elements, Cooling, Sealing, Or The Like Of Lighting Devices (AREA)
- Non-Portable Lighting Devices Or Systems Thereof (AREA)
Description
本開示は、灯具および建築物を建設する方法に関する。 The present disclosure relates to methods of constructing lighting fixtures and buildings.
例えば特許文献1には、反射板に形成された長穴に沿う方向にけい光ランプを移動させて固定位置を調整可能な照明器具が開示されている。 For example, Japanese Laid-Open Patent Publication No. 2002-100003 discloses a lighting fixture in which a fixed position can be adjusted by moving a fluorescent lamp in a direction along an elongated hole formed in a reflector.
本開示は、灯具本体を建材に取り付けた後に、灯具本体を建材の取付面に沿う方向に移動させて取付位置の調整が可能な灯具および建築物を建設する方法を提供することを目的とする。 An object of the present disclosure is to provide a lighting fixture and a method for constructing a building, in which the mounting position can be adjusted by moving the lighting fixture body in a direction along the mounting surface of the building material after mounting the lighting fixture body on the building material. .
本開示の一態様によれば、灯具は、光源配置面と、前記光源配置面の反対側の裏面とを有するシャーシと、前記シャーシの前記光源配置面に配置された複数の光源と、を有する灯具本体と、建材に形成された取付穴に嵌め込まれる嵌合アダプタと、前記嵌合アダプタに固定されたアダプタ固定部材と、前記シャーシの前記裏面に固定されたアダプタ押さえ部材と、を備えている。前記アダプタ固定部材は、前記シャーシの前記裏面と前記アダプタ押さえ部材との間に挟まれ、且つ前記シャーシの前記裏面に平行な方向に移動可能である。
また、本開示の一態様によれば、建築物を建設する方法は、複数の天井材を配して形成される天井の天井裏に配される複数の配線のうち、天井への設置に際して吊り材による固定を有さない照明灯具である軽量大型照明灯具と電気的に接続するための配線として、コネクタ付き配線を設ける工程と、前記天井材に設けられた開口を介して、形成された天井の上方にある天井裏空間に配された前記コネクタ付き配線と、電源アダプタとを、前記コネクタ付き配線のコネクタにより接続する工程と、形成された天井の下方にある居室空間において用意された前記軽量大型照明灯具と、前記電源アダプタと、を電気的に接続する工程と、前記コネクタ付き配線と電気的に接続された前記軽量大型照明灯具または前記コネクタ付き配線と電気的に接続された前記電源アダプタが有する留め具を前記天井材の開口に通して、前記軽量大型照明灯具を前記天井材に設置する工程と、前記天井材に設置された前記軽量大型照明灯具の前記天井材に対する位置を、前記軽量大型照明灯具として移動が可能な所定の範囲内で調整する工程と、を有する。
According to one aspect of the present disclosure, a lamp includes a chassis having a light source arrangement surface and a back surface opposite to the light source arrangement surface, and a plurality of light sources arranged on the light source arrangement surface of the chassis. A lamp body, a fitting adapter fitted into a mounting hole formed in a building material, an adapter fixing member fixed to the fitting adapter, and an adapter pressing member fixed to the rear surface of the chassis. . The adapter fixing member is sandwiched between the rear surface of the chassis and the adapter pressing member, and is movable in a direction parallel to the rear surface of the chassis.
In addition, according to one aspect of the present disclosure, a method for constructing a building includes, among a plurality of wirings arranged in a ceiling space of a ceiling formed by arranging a plurality of ceiling materials, a plurality of wirings which are suspended when installed in the ceiling. A step of providing a wiring with a connector as a wiring for electrically connecting with a light-weight large lighting fixture which is a lighting fixture not fixed by a material, and a ceiling formed through an opening provided in the ceiling material. a step of connecting the wiring with a connector arranged in the ceiling space above the ceiling and a power adapter with a connector of the wiring with a connector; a step of electrically connecting a large lighting fixture and the power adapter; and the lightweight large lighting fixture electrically connected to the wiring with a connector or the power adapter electrically connected to the wiring with a connector. A step of installing the large lightweight illumination lamp on the ceiling material by passing the fastener of the above through the opening of the ceiling material; and adjusting within a predetermined range in which the light fixture can be moved as a large-sized light fixture.
本開示によれば、灯具本体を建材に取り付けた後に、灯具本体を建材の取付面に沿う方向に移動させて取付位置の調整が可能な灯具および建築物を建設する方法を提供することができる。 According to the present disclosure, it is possible to provide a lighting fixture whose mounting position can be adjusted by moving the lighting fixture body in a direction along the mounting surface of the building material after mounting the lighting fixture body on the building material, and a method for constructing a building. .
以下、図面を参照し、実施形態について説明する。なお、各図面中、同じ要素には同じ符号を付している。 Hereinafter, embodiments will be described with reference to the drawings. In addition, the same code|symbol is attached|subjected to the same element in each drawing.
図1は、本発明の一実施形態の灯具100の側面図である。
図2は、灯具100の発光面の平面図である。
図3は、灯具100の裏面の平面図である。
図4は、灯具100の短手方向に沿った断面図である。
FIG. 1 is a side view of a
FIG. 2 is a plan view of the light emitting surface of the
FIG. 3 is a plan view of the back surface of the
FIG. 4 is a cross-sectional view of the
灯具100の外形は例えば矩形状に形成され、矩形状の発光面を有する。灯具100は、灯具本体10と、透光性カバー30と、嵌合アダプタ40とを有する。
The
図4に示すように、灯具本体10は、シャーシ11と、光源モジュール20とを有する。シャーシ11は、例えば金属板が好ましい。
As shown in FIG. 4 , the
図3に示すように、シャーシ11の裏面11bに、嵌合アダプタ40が設けられている。嵌合アダプタ40の上面に、例えばソケット構造の灯具側コネクタ43が固定されている。また、シャーシ11の裏面11bには、クッション材13が設けられている。
As shown in FIG. 3, a
図4に示すように、光源モジュール20は、シャーシ11の裏面11bの反対側の光源配置面11aに取り付けられている。光源モジュール20はシャーシ11に例えばねじ止めされている。シャーシ11は、光源モジュール20の補強板および放熱板として機能する。また、シャーシ11の裏面11bには、矩形状のシャーシ11の長手方向に延びる複数の凹凸が形成されている。これら凹凸は、シャーシ11の面強度を高める。
As shown in FIG. 4, the
光源モジュール20は、基板21と、複数の光源22とを有する。基板21の裏面は、シャーシ11の光源配置面11aに接している。複数の光源22が、基板21の光源実装面(シャーシ11に接する裏面の反対側の面)に周期配列されている。例えば、複数の光源22は等ピッチで格子配列されている。
The
光源22は、例えばLED(Light Emitting Diode)等の発光素子を含む。また、光源22は、その他に、蛍光体層と樹脂部材とを含むことができる。図3に示す灯具側コネクタ43は、基板21に形成された導体パターンを通じて、光源22と電気接続している。
The
透光性カバー30は、光源22が発する光に対する透光性を有する。透光性カバー30は、例えばアクリルなどの樹脂材に酸化チタン等を分散させた光拡散性を有する乳白色に形成されている。透光性カバー30は、光源22を覆うように、灯具本体10に支持されている。
The
図4に示すように、透光性カバー30は、主面部31と、側面部32と、上辺部33とを有する。主面部31は、空間90を隔てて光源22に対向している。主面部31、側面部32、および上辺部33は、例えば押出成形により一体形成される。側面部32は、主面部31の端部に連続し、空間90の側方を覆っている。側面部32は、灯具本体10の外縁部よりも外側に位置し、光源モジュール20よりも上方に延びている。
As shown in FIG. 4 , the
上辺部33は、側面部32の上端に連続し、側面部32からシャーシ11に向かって突出している。側面部32および上辺部33は、透光性カバー30の長手方向(図4において紙面を貫く方向)に沿って延びている。透光性カバー30の長手方向の両端は開放されている。
The
シャーシ11の裏面11bにおける短手方向(図4における左右方向)の両端部には、カバー挿入部11cが設けられている。カバー挿入部11cは、シャーシ11の裏面11bとの間に隙間を形成するようにシャーシ11の外側に突出している。そのカバー挿入部11cの下の隙間に、透光性カバー30の上辺部33が挿入される。カバー挿入部11c、およびその下の隙間は、シャーシ11の長手方向(図4において紙面を貫く方向)に沿って延びている。
シャーシ11と透光性カバー30とを相対的に長手方向にスライドさせて、透光性カバー30の上辺部33をシャーシ11のカバー挿入部11cの下の隙間に挿入する。透光性カバー30の上辺部33が、シャーシ11の裏面11bの短手方向の両端部の上に載置され、透光性カバー30が灯具本体10に対して支持される。
The
透光性カバー30の長手方向の開放された両端には、図1~図3に示すサイドキャップ36が装着される。
Side caps 36 shown in FIGS. 1 to 3 are attached to the open ends of the
図5は、図3における一部分(嵌合アダプタ40が設けられた部分)の拡大図である。図6は、図5におけるX-X断面図である。 FIG. 5 is an enlarged view of a portion (the portion provided with the fitting adapter 40) in FIG. 6 is a cross-sectional view taken along the line XX in FIG. 5. FIG.
図6に示すように、嵌合アダプタ40は、アダプタ固定部材80の上に固定されている。嵌合アダプタ40は、アダプタ固定部材80に例えばネジ止めされている。アダプタ固定部材80は、例えばアルミニウムの板である。
As shown in FIG. 6, the
シャーシ11の裏面11bには、アダプタ押さえ部材70が固定されている。アダプタ押さえ部材70は、例えば電気亜鉛めっき鋼板である。
An
アダプタ押さえ部材70は、下段部72と、上段部71とを有する。下段部72は、シャーシ11に対して例えばネジ止めされている。上段部71は、下段部72よりもシャーシ11の裏面11bから離れた位置にあり、上段部71とシャーシ11の裏面11bとの間にスペースが形成される。そのスペースに、アダプタ固定部材80が配置されている。
The
アダプタ固定部材80は外縁部80aを有する。その外縁部80aと、アダプタ押さえ部材70の下段部72との間には、隙間73が形成されている。図6における紙面を貫く方向には下段部72は設けられず、上段部71とシャーシ11の裏面11bとの間のスペースは、図6における紙面を貫く方向において開放されている。
The
図5に示すように、アダプタ押さえ部材70の上段部71には開口71aが形成されている。嵌合アダプタ40は、その開口71a内に位置する。アダプタ固定部材80の外縁部80aは、開口71aの縁よりも外側に位置する。図5に示す上面視において、アダプタ固定部材80は、嵌合アダプタ40の下およびアダプタ押さえ部材70の上段部71の下に隠れている。図5にアダプタ固定部材80の外形を破線で表す。
As shown in FIG. 5, an
開口71aは、直線部71dを介してつながった第1の縁71bと第2の縁71cとを有する。嵌合アダプタ40は筒状に形成され、この例では第1の縁71bは、嵌合アダプタ40の側面の環状形状に沿って形成されている。第2の縁71cは、第1の縁71bから直線部71dを介して図5における下方(下方向B)に突出している。
The
図5における上方向Aは、後述するように、嵌合アダプタ40を天井材から取り外す際に、灯具本体10をアダプタ押さえ部材70とともに、アダプタ固定部材80に対して相対的に移動させる方向(第1方向)であり、図5における下方向(第2方向)Bは、灯具本体10を上方向(第1方向)Aに移動させた後(図14に示す状態)において、嵌合アダプタ40を天井材から取り外す際に操作する取外し部材12を引っ張る方向である。
As will be described later, an upward direction A in FIG. 5 is a direction in which the
図6に示すように、アダプタ固定部材80は、アダプタ押さえ部材70の上段部71と、シャーシ11の裏面11bとの間に挟まれ、シャーシ11に対しては固定されていない。すなわち、アダプタ固定部材80に固定された嵌合アダプタ40と、灯具本体10とは、シャーシ11の裏面11bに平行な方向に相対的に移動可能となっている。ここでの移動は、直線移動に限らず、回転移動も含む。
As shown in FIG. 6 , the
アダプタ固定部材80の外縁部80aと、アダプタ押さえ部材70の下段部72との間の隙間73や、上段部71に形成された開口71aの縁と、嵌合アダプタ40の側面との間の隙間によって、嵌合アダプタ40に対する灯具本体10の相対移動が許容される。アダプタ固定部材80の外縁部80aとアダプタ押さえ部材70の下段部72との当接や、嵌合アダプタ40の側面と開口71aの縁との当接により、嵌合アダプタ40に対する灯具本体10の相対移動が規制される。
A
図7に示すように、アダプタ押さえ部材70の上段部71の下面には凸部75が形成され、アダプタ固定部材80の上面には、凸部75が嵌合可能な凹部81が形成されている。複数の凸部75が上段部71に形成され、複数の凸部75に対応した複数の凹部81がアダプタ押さえ部材80に形成されている。
As shown in FIG. 7 , a
嵌合アダプタ40と灯具本体10との相対位置の初期位置においては、凸部75が凹部81に嵌合している。すなわち、天井材に嵌合アダプタ40を介して灯具本体10が取り付けられ、灯具本体10の位置(天井面に沿う方向の位置)を調整する必要がない場合には、凸部75が凹部81に嵌合した状態が保持される。
At the initial position of the relative position between the
取り付け後において、灯具本体10の位置調整が必要な場合には、天井材に対して固定された嵌合アダプタ40およびアダプタ固定部材80に対して、灯具本体10を上記初期位置から取付面(天井面)に沿う方向にスライド移動(回転も含む)させることで、灯具本体10の取付位置を調整できる。このとき、凸部75と凹部81との嵌合が外れ、凸部75がアダプタ固定部材80の上面に接触する。すなわち、複数の凸部75がアダプタ固定部材80の上面に接触する点接触の状態で、灯具本体10は、天井材に対して固定されたアダプタ固定部材80に支持される。アダプタ押さえ部材70とアダプタ固定部材80とが点接触することで、面接触する場合に比べて、アダプタ押さえ部材70とアダプタ固定部材80との間の摩擦力が小さくなり、アダプタ押さえ部材70とアダプタ固定部材80との相対移動が容易になる。
If the position of the lamp
本実施形態によれば、嵌合アダプタ40を灯具本体10に固定させるのではなく、嵌合アダプタ40と灯具本体10とを相対移動可能な状態とすることによって、アダプタ固定部材80の外縁部80aと、アダプタ押さえ部材70の下段部72との間の隙間73や、上段部71に形成された開口71aの縁と、嵌合アダプタ40の側面との間の隙間によって形成される位置調整代の分、天井材に取り付け後において、灯具本体10の位置調整が可能になる。
According to this embodiment, instead of fixing the
これにより、複数の灯具本体10を並べて設置する際に、天井材に形成した複数の取付穴の位置のばらつきが発生しても、複数の灯具本体10、すなわち発光面をシームレスに均等配置することが可能になる。
As a result, when the plurality of lamp
また、壁際の取付穴の位置がずれると、壁際の設置スペースに灯具本体10が収まらなくなることが起こり得る。しかしながら、本実施形態によれば、壁際の取付穴の位置を、初期位置の灯具本体10が壁から離れるような位置にしておき、嵌合アダプタ40を介して天井材に灯具本体10を取り付けた後に、灯具本体10を壁側に移動させて寄せることで、壁際の設置スペースに灯具本体10を確実に収めることができる。
Further, if the positions of the mounting holes near the wall are misaligned, the lamp
シャーシ11の裏面11bに設けられた図3に示すクッション材13は、シャーシ11の裏面11bと天井面との間で圧縮され、灯具本体10は、クッション材13を介して天井面に密着している。クッション材13と天井面との摩擦力によって、灯具本体10の天井面に沿った方向の位置が保持される。その摩擦力に抗する力を灯具本体10に加えることで、灯具本体10を移動させて位置調整できる。
The
灯具本体10の嵌合アダプタ40に対する相対移動の許容範囲は、アダプタ固定部材80の外縁部80aとアダプタ押さえ部材70の下段部72との間の隙間73の大きさ、および上段部71に形成された開口71aの縁と嵌合アダプタ40の側面との間の隙間の大きさによって決まる。嵌合アダプタ40がアダプタ押さえ部材70に形成された開口71aの範囲内で移動した際に、アダプタ固定部材80がアダプタ押さえ部材70の下段部72に干渉しないクリアランスが、アダプタ固定部材80と下段部72との間に確保されていればよい。
The allowable range of relative movement of the
次に、嵌合アダプタ40の天井材への取り付け構造および方法について説明する。嵌合アダプタ40は、取付金具によって、天井材に取り付けられる。
Next, the structure and method for attaching the
図8は、灯具100における天井材300の裏側に位置する要素の斜視図である。
図9は、取付金具60の斜視図である。
図10は、取付金具60と嵌合アダプタ40との嵌合構造を表す斜視図である。
図11は、取付金具60と嵌合アダプタ40との嵌合構造を表す断面斜視図である。
FIG. 8 is a perspective view of the elements of the
FIG. 9 is a perspective view of the mounting
10 is a perspective view showing a fitting structure between the mounting
11 is a cross-sectional perspective view showing a fitting structure between the mounting
図9に示すように、取付金具60は環状に形成され、その内側に開口64を有する。取付金具60の側面には、板ばね構造の複数の取付ばね63が設けられている。取付金具60の下面には、環状のフランジ61が設けられている。フランジ61の外径は、天井材300に形成された円形の取付穴の直径よりも大きい。フランジ61の上面には、開口64の縁に沿って受け板62が設けられている。
As shown in FIG. 9, the mounting
取付金具60は、天井材300に形成された取付穴300a(図11に示す)に嵌め込まれる。取付金具60の側面と天井材300の取付穴300aの内壁との間に、取付ばね63が自然状態から変形した状態で配置される。この取付ばね63の復元力により、取付金具60は上方に付勢され、フランジ61の外縁部側の上面が天井材300の表側の面に押し当たることで(図11参照)、取付金具60が取付穴300aに嵌合した状態が保持される。
The mounting
取付金具60を天井材300の取付穴300aに嵌め込む前に、必要に応じて、天井材300の裏側に、図8に示す電源ユニット50が配置される。電源ユニット50は、取付穴300aから天井材300の裏側に通され、天井材300の裏側において取付穴300aに重ならない位置に配置される。
Before fitting the mounting
または、既に天井材300の裏側に設置済みの電源ユニット50をそのまま使う場合には、電源ユニット50を天井材300の裏側に設置する作業は不要となる。
Alternatively, if the
図8に示すように、電源ユニット50は、外部電源(商用電源)と接続可能な端子台52、53を有する。電源ユニット50からは電気ケーブル51が導出されている。端子台52、53の端子は、電源ユニット50の回路基板に電気接続され、その回路基板に電気ケーブル51が電気接続されている。電気ケーブル51の端部には、電源側コネクタ51aが設けられている。
As shown in FIG. 8, the
灯具本体10が天井材300に取り付けられる前の状態において、電気ケーブル51は、天井材300の取付穴300a、およびその取付穴300aに嵌め込まれた取付金具60の内側の開口64を通され、電源側コネクタ51aが天井材300の表側に位置する。
Before the lamp
灯具100の取付作業を行う作業者は、灯具100を天井材300に近づけ、灯具100を片手で保持しつつ、もう一方の手で、取付穴300aから垂下する電気ケーブル51の電源側コネクタ51aをつかんで、灯具本体10の裏面に設けられた嵌合アダプタ40の上面に固定された灯具側コネクタ43に電源側コネクタ51aを接続する。
An operator who installs the
電源側コネクタ51aを灯具側コネクタ43に接続した後、嵌合アダプタ40を、天井材300の取付穴300aに嵌め込まれた取付金具60の内側の開口64に嵌め込む。
After connecting the power-
図11に示すように、嵌合アダプタ40は、上ケース41と、下ケース42と、2つのスライド部材45と、2つのスライド部材45を連結するばね47とを有する。
As shown in FIG. 11 , the
それぞれのスライド部材45の先端には、傾斜面をもつ爪部44が設けられている。ばね47の伸縮に伴う2つのスライド部材45のスライド移動により、爪部44は上ケース41と下ケース42との間に形成された開口を通じてケース41、42の内側に引っ込んだり、ケース41、42の外側に突出することが可能となっている。
A
図11は、爪部44がケース41、42の外側に突出して、取付金具60の受け板62の上面に乗り上がった状態を示す。図11に示すように、上ケース41から下方に突出するストッパー41aがスライド部材45の上面に形成された凹部46内に位置し、ストッパー41aと凹部46の壁面との当接により、2つのスライド部材45の互いに離間する方向への移動が規制される。
FIG. 11 shows a state in which the
通常、爪部44はケース41、42の外側に突出している。嵌合アダプタ40を取付金具60の内側に嵌め込むときに、取付金具60のフランジ61の内周壁および受け板62の内周壁に、爪部44の傾斜面を当接させる。爪部44がフランジ61の内周壁および受け板62の内周壁から受ける力により、2つのスライド部材45はばね47を圧縮させて互いに近づくようにスライド移動する。爪部44はケース41、42の内側に引っ込み、取付金具60の内側への嵌合アダプタ40の嵌め込みを許容する。
Normally, the
そして、爪部44が受け板62よりも上方の位置まで移動すると、爪部44が受け板62の内周壁から受ける力が解除され、ばね47の復元力により2つのスライド部材45は互いに離間する方向に付勢される。爪部44はケース41、42の外側に突出し、爪部44の下面が受け板62の上面に乗り上げる(引っ掛かる)。これにより、嵌合アダプタ40、および嵌合アダプタ40と固定された灯具本体10の、取付金具60からの落下が防止される。
When the
嵌合アダプタ40が取付金具60に嵌合した状態において、図3に示すシャーシ11の裏面11bに設けられたクッション材13が、天井材300の表側の面に密着する。透光性カバー30の主面部31は、天井材300の表側の面に平行となり、天井材300の下方の空間に向けられる。
When the
または、実施形態の灯具100は、天井材300に対する取付方法と同様の方法で、壁材に対しても取り付けることができる。灯具100が壁材に取り付けられると、カバー30の主面部31は壁面に平行となり、壁材の側方空間に向けられる。
Alternatively, the
光源モジュール20における複数の光源22は、天井材300の取付穴300aの面積および取付金具60の開口64の面積よりも広い領域にわたって配置され、灯具本体10において嵌合アダプタ40に重なる領域にも光源22が配置されている。このため、透光性カバー30の主面部31において、取付穴300aおよび嵌合アダプタ40に重なる領域である中央部も光らせることができ、広い面積にわたって発光面が得られる。
The plurality of
図5に示すように、シャーシ11の裏面11bには、取外し部材12が配置されている。取外し部材12の一端部は、嵌合アダプタ40のスライド部材45に連結されている。
As shown in FIG. 5, a
図12および図13は、嵌合アダプタ40と取外し部材12との連結構造を表す斜視図である。
図12は、嵌合アダプタ40の上ケース41を取り外した状態を示す。
図13は、図12においてさらに下ケース42も取り外し、取外し部材12とスライド部材45との連結構造を裏側から見た斜視図である。
12 and 13 are perspective views showing the connecting structure between the
FIG. 12 shows a state in which the
FIG. 13 is a perspective view of the connection structure between the
取外し部材12とスライド部材45とは、2つのアーム部材48を介して連結されている。それぞれのアーム部材48は、下ケース42に設けられた軸部42aを支点に回動することができる。
The removing
それぞれのアーム部材48の一端部には貫通孔48aが形成され、その貫通孔48a内に、取外し部材12の一端部に設けられたピン12aが係合している。
A through
作業者が取外し部材12の他端部12bを例えば治具または直接指で引っ張ることで、取外し部材12の長手方向に沿って取外し部材12をスライドさせることができる。
A worker can slide the
取外し部材12の他端部が灯具100の側面より外側に突出する方向に取外し部材12を引っ張ると、取外し部材12のピン12aに係合している一対のアーム部材48が軸部42aを支点に回動する。このアーム部材48の回動により、図13に示すアーム部材48の他端部48bが、スライド部材45の下面に設けられた突出部49を押す。これにより、2つのスライド部材45は、ばね47を圧縮させて互いに近づく方向にスライド移動する。
When the
このスライド部材45のスライド移動により、爪部44が、図11に示す取付金具60の受け板62に乗り上げた状態が解除され、嵌合アダプタ40が取付金具60から外れ、灯具本体10を天井材300から取り外すことができる。
Due to this sliding movement of the
灯具本体10が天井材に取り付けられた状態、すなわち、嵌合アダプタ40が取付金具60を介して天井材に取り付けられた状態で、図5に示すように、取外し部材12の他端部12bは灯具に重なっている。図5に示す例では、取外し部材12の他端部12bは、透光性カバー30の上辺部33に重なっている。この状態で灯具は天井材に設置された状態が維持され、使用される。すなわち、取外し部材12は発光面側から見えない。
With the lamp
図5の状態の灯具本体10を、嵌合アダプタ40およびアダプタ固定部材80に対して第1方向Aに移動させることで、図14に示すように、取外し部材12の他端部12bが灯具の側面(透光性カバー30の側面)より外側に突出する。そして、その突出した他端部12bを治具または手でつかんで取外し部材12を第1方向Aの反対の第2方向Bに移動させることで、嵌合アダプタ40の爪部44が取付金具60から外れる。
By moving the
図5の状態において、嵌合アダプタ40の第2方向Bに向く側面と、アダプタ押さえ部材70に形成された開口71aの縁71cとの第2方向Bに沿った離間距離は、嵌合アダプタ40の第1方向Aに向く側面とアダプタ押さえ部材70に形成された開口71aの縁71bとの間の第1方向Aに沿った離間距離よりも大きい。図5の状態から灯具本体10を第2方向Bに移動させても、取外し部材12は灯具の裏側に隠れたままである。
5, the distance along the second direction B between the side surface of the
このような構成により、取り外す際に灯具本体10を移動させる方向を一方向Aに定めることができ、作業者への明確な操作指示となる。
With such a configuration, the direction in which the lamp
以上説明した実施形態によれば、灯具本体10の形状およびサイズに合わせた角穴を建材(天井材や壁材)にあけなくてもよく、建材への施工は、灯具本体10のサイズよりも小さく、嵌合アダプタ40のサイズに合わせた1つの取付穴をあけるだけでよい。そして、取付穴に嵌め込まれた取付金具60に対して、嵌合アダプタ40を嵌め込むことで灯具本体10を簡単に建材に取り付けることができる。
According to the embodiment described above, it is not necessary to make a square hole in the building material (ceiling material or wall material) that matches the shape and size of the lamp
灯具側コネクタ43は、ケーブルの一端に接続されてぶらぶらしているのではなく、嵌合アダプタ40の上面に固定されている。一方で、電源側コネクタ51aは電気ケーブル51によって電源ユニット50から導出されている。したがって、電源側コネクタ51aを天井材300の取付穴300aおよび取付金具60の開口64を通して天井材300の表側における作業者の手元に位置させ、作業者はその電源側コネクタ51aを片手でつかみ、もう一方の手を透光性カバー30の主面部31に添えて灯具100を支えつつ、灯具側コネクタ43に電源側コネクタ51aを接続させることができる。灯具側コネクタ43自体を手でつかまなくてもよい。そのため、灯具本体10の平面サイズが大型化しても、1人の作業者によって、電源ユニット50と灯具100との電気接続、および灯具100の天井材300への取り付けを容易に行うことができる。
The lamp-
灯具100を天井材300から取り外す際にも、一方の手を灯具100の主面部31に添えて灯具100を支えつつ、前述した取り外し部材12の他端部12bをもう片方の手で例えば治具を使って引っ張ることで嵌合アダプタ40の爪部44と取付金具60との係合が解除され、灯具100を天井材300から取り外すことができる。この後、片手で灯具100を支えた状態を維持しつつ、もう片方の手を取り外し部材12から電源側コネクタ51aに移動させて電源側コネクタ51aを引っ張って灯具側コネクタ43から引き抜くことができる。すなわち、灯具100の天井材300からの取り外し、および電源ユニット50と灯具100との電気接続の解除も1人の作業者によって容易に行うことができる。
Also when removing the
このような実施形態によれば、多品種の灯具本体10を、これらに共通の電源ユニット50に対してワンタッチで簡単に接続できるため、手間をかけずに他種の灯具本体10への変更が可能となる。この灯具本体10の変更に際して、共通の電源ユニット50は天井材300から外す必要がない。
According to such an embodiment, since various types of lamp
図15は、本発明の他の実施形態の灯具200の裏面の平面図である。
図16は、灯具200の端部の拡大断面図である。
FIG. 15 is a plan view of the back surface of a
FIG. 16 is an enlarged cross-sectional view of the end of the
この灯具200は、正方形状の発光面を有する。灯具本体10の外形形状も正方形状である。また、灯具本体10、嵌合アダプタ40、アダプタ固定部材80、アダプタ押さえ部材70、取外し部材12などの構成は、上記実施形態と同じであり、その機能および効果も同じである。
This
透光性カバー130は、光源22が発する光に対する透光性を有する。透光性カバー130は、例えばアクリルなどの樹脂材に酸化チタン等を分散させた光拡散性を有する乳白色に形成されている。透光性カバー130は、光源22を覆うように、灯具本体10に支持されている。
The
図16に示すように、透光性カバー130は、主面部131と、側面部132とを有する。主面部131は、空間90を隔てて光源22に対向している。側面部132は、主面部131の端部に連続し、空間90の側方を覆っている。側面部132は、光源モジュール20よりも上方に延びている。側面部132は、灯具200の4辺に沿って設けられている。側面部132の上端には上方に突出する突出部133が設けられている。側面部132の上部には、溝132aが形成されている。溝132aは、側面部132の内側面に開口している。
As shown in FIG. 16 ,
主面部131、側面部132、突出部133、および溝132aは、例えば射出成形により一体形成される。
The
灯具200の背面には、灯具200の4辺に沿って4つの背面カバー15が設けられている。背面カバー15は、光源22が発する光に対する透光性を有する。背面カバー15は、例えば樹脂部材である。
Four rear covers 15 are provided along the four sides of the
背面カバー15は、灯具本体10に例えばネジ止めされた下段部16と、下段部16よりも灯具本体10から上方に離れた位置にあり、且つ灯具本体10よりも外側に突出する上段部17とを有する。下段部16と上段部17との間に、貫通孔18が形成されている。上段部17の先端には孔17aが形成され、その孔17a内に透光性カバー130の突出部133が挿入されている。上段部17は、シャーシ11の外周に形成されたシャーシ11の側壁部11dよりも上方で、灯具本体10の外側に向けて突出している。
The
背面カバー15の上にはカバー保持部材14が配置され、カバー保持部材14は灯具本体10に対して例えばネジ止めされている。1つの背面カバー15につき、例えば2つのカバー保持部材14が配置されている。
A
カバー保持部材14は、背面カバー15に形成された貫通孔18、およびシャーシ11の裏面11bと側壁部11dとの間に形成された貫通孔を通って、透光性カバー130の側面部132に向けて突出している。1つのカバー保持部材14は、例えば2つの突出部14aを有する。突出部14aの先端は、透光性カバー130の側面部132に形成された溝132aに入り込んでいる。
The
透光性カバー130の側面部132における溝132aが形成された部分が、カバー保持部材14の先端に重なる(引っ掛かる)ことで、透光性カバー130が灯具本体10に支持されている。
The light-transmitting
灯具200を天井材に取り付ける際に作業者が透光性カバー130を押すといった取り扱い要因や、透光性カバー130の膨張といった環境要因により、側面部132が外側に開くように変形してしまうと、透光性カバー130が灯具本体10から外れてしまうおそれがある。図16に示す例によれば、透光性カバー130の側面部132の上端に設けた突出部133が、背面カバー15に形成された孔17a内に位置しているため、側面部132が外側に開くように変形しようとしても、突出部133が孔17aの内壁に当接して、側面部132の変形を阻止する。
Due to handling factors such as pushing the
灯具本体10の背面の外周に透光性の背面カバー15を設けることによって、透光性カバー130の内部で反射して背面カバー15を透過した光で、灯具の背面外周を照らすことができ、天井面を明るくすることができる。
By providing a translucent
また、透光性カバー130における側面部132の厚さを主面部131の厚さよりも厚くすることで、光源22を側面部132側に寄せて配置してもその光源22の粒状の視認を抑制することができる。光源22を側面部132側に寄せることで、側面部132側の暗部の発生を抑制し、主面部131における全体を均一発光させることができる。
In addition, by making the thickness of the
なお、図16に示す灯具200の断面構造は、前述した灯具100の断面構造にも適用することができる。
The cross-sectional structure of the
図17は、図5及び図14に示すアダプタ押さえ部材70の他の例の平面図である。図17において嵌合アダプタ40を2点鎖線で仮想的に表す。
17 is a plan view of another example of the
図17に示す例においても、嵌合アダプタ40と灯具本体10との相対位置が初期位置においては、図5及び図14に示す例と同様に、嵌合アダプタ40の第2方向Bに向く側面と、アダプタ押さえ部材70に形成された開口71aの縁71cとの第2方向Bに沿った離間距離は、嵌合アダプタ40の第1方向Aに向く側面とアダプタ押さえ部材70に形成された開口71aの縁71bとの間の第1方向Aに沿った離間距離よりも大きい。
In the example shown in FIG. 17 as well, when the relative positions of the
さらに図17に示す例では、嵌合アダプタ40の方向A及びBに直交する方向に向く側面と、アダプタ押さえ部材70に形成された開口71aの縁71dとの上記直交方向に沿った離間距離は、嵌合アダプタ40の第1方向Aに向く側面とアダプタ押さえ部材70に形成された開口71aの縁71bとの間の第1方向Aに沿った離間距離よりも大きい。
Furthermore, in the example shown in FIG. 17, the distance along the orthogonal direction between the side surface of the
上記直交方向は、矩形状の灯具本体10の長手方向に沿う方向である。したがって、灯具本体10の長手方向の位置調整幅に余裕をもたせることができ、複数の灯具本体10を長手方向に隣接させて取り付けた場合において、隣接する灯具本体10間の隙間の調整がしやすくなる。
The orthogonal direction is a direction along the longitudinal direction of the rectangular lamp
次に、実施形態として、灯具に用いる光源モジュール20の具体例について、図15の灯具200に用いられる光源モジュールを説明する。
Next, as an embodiment, a light source module used in the
図26は、他の実施形態の灯具の光源モジュール20について、発光面を模式的に示す平面図である。光源モジュール20は、基板21上に複数の光源22を有する。なお、光源モジュール20を備えた灯具としてみたとき、嵌合アダプタ40は、図26の点線で囲んだZのシャーシの裏面側に配置されている。
FIG. 26 is a plan view schematically showing a light emitting surface of a
図27は、図26の灯具の複数の光源22のうちの1つを模式的に示す断面図である。図27に示す基板21は、光源モジュール全体のうち、一部だけを示している。
27 is a cross-sectional view schematically showing one of the plurality of
光源22は、半導体積層体511と一対の電極512とを有する発光素子510と、半導体積層体511の側面を覆う透光性部材520と、一対の電極512を露出させるよう、透光性部材520の外面を覆い、発光素子510からの光を反射する光反射性部材530と、発光素子510の上面と、透光性部材520と、光反射性部材530とを覆い、側面を有する波長変換部材540と、光反射性部材530の側面および波長変換部材540の側面に接する側面被覆部材551と、上面にレンズ部550Aを有し、側面被覆部材551と波長変換部材540を被覆する被覆部材550と、を有している。なお、光源22は、導体配線570と導体配線570の上面の一部を覆う絶縁層580とを有する基板21の、導体配線570の露出部に、一対の電極512が電気的に接続されて実装されている。
The
半導体積層体511の一例としては、第1導電型半導体層(例えばn型半導体層)、発光層(活性層)および第2導電型半導体層(例えばp型半導体層)の3つの半導体層を含むことができる。半導体層には、例えば、III-V族化合物半導体、II-VI族化合物半導体等の半導体材料から形成することができる。具体的には、InXAlYGa1-X-YN(0≦X、0≦Y、X+Y≦1)等の窒化物系の半導体材料(例えばInN、AlN、GaN、InGaN、AlGaN、InGaAlN等)を用いることができる。発光素子510は、例えば、発光ピーク波長が430nm以上490nm未満の範囲にあることが好ましい。発光素子510の電極512としては、電気良導体を用いることができ、例えばCu等の金属が好適である。
An example of the
透光性部材520は、透光性樹脂、ガラス等の透光性材料から形成することができる。透光性樹脂としては、特に、シリコーン樹脂、シリコーン変性樹脂、エポキシ樹脂、フェノール樹脂などの熱硬化性の透光性樹脂であるのが好ましい。またフィラーが添加されていてもよい。
The
光反射性部材530は、光反射性樹脂から形成することができる。光反射性樹脂とは、発光素子510からの光に対する反射率が70%以上の樹脂材料を意味する。光反射性部材530に達した光が反射されて、被覆部材550のレンズ部550Aに向かうことにより、光源22の光取出し効率を高めることができる。樹脂材料としては、特に、シリコーン樹脂、シリコーン変性樹脂、エポキシ樹脂、フェノール樹脂などの熱硬化性の透光性樹脂であるのが好ましい。さらに光反射性物質を分散させたものが使用でき、光反射性物質としては、例えば、酸化チタン、酸化ケイ素、二酸化ジルコニウム、チタン酸カリウム、アルミナ、窒化アルミニウム、窒化ホウ素、ムライトなどが好適である。
The light
波長変換部材540は、その内部を透過する光によって励起される蛍光体を含有している。光源22が波長変換部材540を備えることにより、発光素子510の発光色とは異なる発光色を有する光源22を得ることができる。例えば、青色光を発する発光素子510と、青色光を吸収して黄色の蛍光を発する波長変換部材540とを組み合わせたり、青色光を発する発光素子510と、青色光を吸収して、緑色と赤色の蛍光を発する波長変換部材540とを組み合わせたりすることにより、白色光を発する光源22を得ることができる。
具体的な材料としては、例えば、蛍光体として、イットリウム・アルミニウム・ガーネット系蛍光体(Y3(Al,Ga)5O12:Ce)、ルテチウム・アルミニウム・ガーネット系蛍光体(Lu3(Al,Ga)5O12:Ce)、テルビウム・アルミニウム・ガーネット系蛍光体(Tb3(Al,Ga)5O12:Ce)系蛍光体、βサイアロン系蛍光体(Si6-zAlzOzN8-z:Eu(0<z<4.2))、αサイアロン系蛍光体(Mz(Si,Al)12(O,N)16(但し、0<z≦2であり、MはLi、Mg、Ca、Y、及びLaとCeを除くランタニド元素)、窒素含有アルミノ珪酸カルシウム(CASN又はSCASN)系蛍光体(例えば(Sr,Ca)AlSiN3:Eu)などの窒化物蛍光体、KSF系蛍光体(K2SiF6:Mn)又はMGF系蛍光体(3.5MgO・0.5MgF2・GeO2:Mn)等のフッ化物系蛍光体、シリケート系蛍光体(例えば(Ba,Sr)2SiO4:Eu)、クロロシリケート系蛍光体(例えばCa8Mg(SiO4)4Cl2:Eu)等の窒化物蛍光体、量子ドット蛍光体などを用いることができる。波長変換部材540は、複数種類の蛍光体を含んでいてもよい。また、波長変換部材540は、異なる種類の蛍光体の層を複数積層させた構成であってもよい。
Specific materials include, for example, yttrium-aluminum-garnet-based phosphor (Y3 ( Al, Ga) 5O12 :Ce), lutetium-aluminum-garnet-based phosphor ( Lu3 ( Al, Ga) 5 O 12 :Ce), terbium-aluminum-garnet-based phosphor (Tb 3 (Al, Ga) 5 O 12 :Ce)-based phosphor, β-sialon-based phosphor (Si 6-z Al z O z N 8-z : Eu (0<z<4.2)), α-sialon phosphor (Mz(Si, Al) 12 (O, N) 16 (where 0<z≦2, M is Li, lanthanide elements excluding Mg, Ca, Y, and La and Ce), nitride phosphors such as nitrogen-containing calcium aluminosilicate (CASN or SCASN) phosphors (e.g. (Sr, Ca) AlSiN 3 :Eu), KSF phosphors Fluoride-based phosphors such as phosphors (K 2 SiF 6 :Mn) or MGF-based phosphors (3.5MgO·0.5MgF 2 ·GeO 2 :Mn), silicate-based phosphors (for example, (Ba, Sr) 2 SiO 4 :Eu), nitride phosphors such as chlorosilicate-based phosphors (for example, Ca 8 Mg(SiO 4 ) 4 Cl 2 :Eu), quantum dot phosphors, etc. The
被覆部材550は、透光性を有する材料から形成することができる。また、上面にレンズ部550Aを有することが好ましい。被覆部材550の材料としては、エポキシ樹脂やシリコーン樹脂あるいはそれらを混合させた樹脂などの透光性樹脂や、ガラスなどを用いることができる。被覆部材550のレンズ部は、凸面レンズ、凹面レンズ、フレネル等公知のレンズ形状を備えることができる。さらに、被覆部材550は、被覆部材550の幅(W)に対する高さ(H)の比(H/W)が0.3以下となる形状であったり、発光素子510の直上に凹部550Bを有する形状であったり、直上に凹部550Bを有してかつもっとも高い最頂部に複数の突起550Cを有する形状であったり、被覆部材550の幅(W)に対する高さ(H)の比(H/W)が2.0以上となる形状であったり、種々の形状とすることができる。また、被覆部材550を形成する前に、光反射性部材530の側面もしくは光反射性部材530の側面と波長変換部材の側面540を覆う側面被覆部材551を形成することができる。側面被覆部材551は光反射性部材530と同様に、光反射性物質が分散された透光性樹脂を用いることができる。
The covering
さらに、波長変換部材540に含有する蛍光体として、具体的に、次の第1蛍光体、第2蛍光体、第3蛍光体を用いて、これらと、発光素子として、440nm以上470nm以下の範囲に発光ピーク波長を有する発光素子510を用いた光源22とすることができる。この光源22、さらには光源モジュール20は、図28に示すような発光スペクトルの特性を有する光源モジュール、ひいてはその光源モジュールを備えた灯具とすることができる。これは、人間の眼疲労を低減し視覚作業に優れた発光スペクトルの一例であると考えられる。
Further, as the phosphor contained in the
第1蛍光体として、480nm以上518nm以下の範囲に発光ピーク波長を有する蛍光体であって、下記式(1A)及び下記式(1B)で表される組成を有する蛍光体から選ばれる少なくとも1種の蛍光体を用いる。 As the first phosphor, at least one phosphor selected from phosphors having an emission peak wavelength in the range of 480 nm or more and 518 nm or less and having a composition represented by the following formula (1A) and the following formula (1B) of phosphor is used.
(Sr1-vM1
v)4Al14O25:Eu (1A)
式(1A)中、M1は、Mg、Ca、Ba及びZnからなる群から選ばれる少なくとも1種の元素であり、vは、0≦v≦0.5を満たす数である。
(Sr 1-v M 1 v ) 4 Al 14 O 25 :Eu (1A)
In formula (1A), M1 is at least one element selected from the group consisting of Mg, Ca, Ba and Zn, and v is a number satisfying 0≤v≤0.5.
M2
8MgSi4O16X1
2:Eu (1B)
式(1B)中、M2はCa、Sr、Ba及びZnからなる群から選択される少なくとも1種であり、X1はF、Cl、Br及びIからなる群から選択される少なくとも1種の元素である。
M28MgSi4O16X12 : Eu ( 1B )
In formula (1B), M2 is at least one selected from the group consisting of Ca, Sr, Ba and Zn, and X1 is at least one selected from the group consisting of F, Cl, Br and I. is an element.
第2蛍光体として、510nm以上590nm未満の範囲に発光ピーク波長を有し、CIE1931における色度座標のx値が0.27以上0.40以下である、下記式(2A)で表される組成を有する蛍光体を用いる。 As the second phosphor, a composition represented by the following formula (2A) having an emission peak wavelength in the range of 510 nm or more and less than 590 nm, and having an x value of chromaticity coordinates in CIE1931 of 0.27 or more and 0.40 or less is used.
(Ln1-aCea)3(Al1-bGab)5O12 (2A)
式(2A)中、Lnは、Y、Gd、Lu及びTbからなる群から選ばれる少なくとも1種の元素であり、a、bは、それぞれ、0.001≦a≦0.20、0≦b≦1.0を満たす数である。
(Ln 1-a Ce a ) 3 (Al 1-b Ga b ) 5 O 12 (2A)
In formula (2A), Ln is at least one element selected from the group consisting of Y, Gd, Lu and Tb, and a and b are 0.001 ≤ a ≤ 0.20 and 0 ≤ b, respectively. A number that satisfies ≦1.0.
第3蛍光体として、590nm以上670nm以下の範囲に発光ピーク波長を有する第三蛍光体であって、下記式(3A)、(3B)及び(3C)で表される組成を有する蛍光体を用いる。 As the third phosphor, a third phosphor having an emission peak wavelength in the range of 590 nm or more and 670 nm or less and having a composition represented by the following formulas (3A), (3B) and (3C) is used. .
(Ca1-pSrp)AlSiN3:Eu (3A)
式(3A)中、pは、0≦p≦1.0を満たす数である。
(Ca 1-p Sr p )AlSiN 3 :Eu (3A)
In formula (3A), p is a number that satisfies 0≦p≦1.0.
(Ca1-q-rSrqBar)2Si5N8:Eu (3B)
式(3B)中、q及びrは、それぞれ、0≦q≦1.0、0≦r≦1.0、q+r≦1.0を満たす数である。
( Ca1 -qrSrqBar ) 2Si5N8 :Eu ( 3B)
In formula (3B), q and r are numbers satisfying 0≦q≦1.0, 0≦r≦1.0, and q+r≦1.0, respectively.
M4kSi12-(m+n)Alm+nOnN16-n:Eu (3C)
式(3C)中、M4は、Li、Mg、Ca、Sr、Y及びランタニド元素(LaとCeを除く。)からなる群から選ばれる少なくとも1種の元素であり、k、m及びnは、それぞれ、0<k≦2.0、2.0≦m≦6.0、0≦n≦1.0、を満たす数である。
M 4k Si 12-(m+n) Al m+n O n N 16-n : Eu (3C)
In formula (3C), M4 is at least one element selected from the group consisting of Li, Mg, Ca, Sr, Y and lanthanide elements (excluding La and Ce), and k, m and n are , 0<k≦2.0, 2.0≦m≦6.0, and 0≦n≦1.0, respectively.
次に、実施形態として、オフィスビル、工場、または、商業施設などの建築物の建設に際して、上述した灯具100や灯具200などの照明灯具400が設置される工程を説明する。そこでまずは、このような建築物の建設における従来の工程を説明する。図18は、従来の建築物が建設されるまでの工程における照明設置の流れを説明するためのフロー図である。ここでは一般的なオフィスビルのように、複数階の構造を有し、通路と居室を有する建築物を対象とする。オフィスビルのような大規模な建築物の建設では、総合建設業者が建設工事の発注を請負い、種々の業者によって作業される建設工事全体の取りまとめを行う。
Next, as an embodiment, a process of installing
まず、設計士やデザイナーが建築物の設計を行う(ステップS1)。この工程において、通路や居室のレイアウトなどが決められ、建築物の全体的なデザインが設計図面に記される。また、採用する建築材料や、照明灯具などの電気設備資材についてもある程度決められ、その配置についても図面に記される。 First, an architect or designer designs a building (step S1). In this process, the layout of corridors and living rooms is determined, and the overall design of the building is drawn up on the blueprints. In addition, the building materials to be used and electrical equipment materials such as lighting fixtures are also determined to some extent, and their layout is also indicated on the drawing.
次に、決められた設計に基づいて、建築材料や建設機械が用意され、基礎工事が行われる(ステップS2)。この工程では、杭工事や土工事により建築物の荷重に耐え得る安定した地盤を確保する。ここでは主に、土木工事を行う業者の作業員が作業を行う。なお、土木工事業者の作業員に限らず、他の業者の作業員も作業を行っている。 Next, building materials and construction machines are prepared based on the determined design, and foundation work is carried out (step S2). In this process, piling and earthwork are used to secure a stable ground that can withstand the load of the building. Workers of civil engineering contractors mainly work here. In addition, not only the workers of civil engineering contractors but also the workers of other contractors are working.
次に、安定した地盤の上に建築物の躯体を形成する躯体工事が行われる(ステップS3)。躯体工事としては、基礎部分や地下階を有する場合には地下階など地下の工事から始まり、地上階へと進んでいく。コンクリートの打設、柱の建込み、鉄骨の組み立てなどを行い、建築物全体の骨組みが完成する。また、外壁、屋上、各階の床等にもコンクリートが打設される。 Next, frame work is performed to form the frame of the building on the stable ground (step S3). As frame construction, if there is a foundation part or a basement floor, it starts with underground construction such as the basement floor and progresses to the ground floor. Concrete is cast, columns are erected, steel frames are assembled, and the framework of the entire building is completed. Concrete is also placed on the outer walls, the roof, the floors of each floor, and the like.
また、躯体工事では、後の内装工事において吊りボルトを下げるために、インサートが埋め込まれる。例えば、吊りボルトを固定するための天井インサートを、上階の床スラブ(鉄筋コンクリートの床板など)の打設時にスラブの一部として固定する。ここでは主に、土木工事を行う業者の作業員や、とび・土工・コンクリート工事を行う業者の作業員などが作業を行う。次に、建築物の外装工事が行われる(ステップS4)。外壁のタイル張りや、窓サッシ、窓ガラス、カーテンウォールなどが取り付けられる。また、塗装なども行われる。 In addition, inserts are embedded in the framework construction to lower the hanging bolts in the interior construction later. For example, ceiling inserts for fixing hanging bolts are fixed as part of the upper floor slab (such as a reinforced concrete floorboard) when it is cast. Workers of civil engineering contractors and workers of scaffolding, earthwork, and concrete construction workers mainly work here. Next, exterior construction of the building is carried out (step S4). Exterior wall tiling, window sashes, window glass, curtain walls, etc. can be installed. Painting is also performed.
次に、内装工事が行われる(ステップS5)。内装工事では、天井、壁、床を作り上げる。天井を設置する天井工事では、ステップS3の躯体工事で設けられた天井インサートから吊りボルトを下げ、軽量鉄骨材を組み合わせた下地に、天井板や天井下地材などの天井面を構成する部材である天井材が取り付けられる。天井材の支持には、吊りボルトやハンガー等の吊り材及び斜め部材などが用いられ、これにより天井板の脱落といった危険防止措置が取られる。 Next, interior construction is performed (step S5). In interior construction, ceilings, walls and floors are constructed. In the ceiling work to install the ceiling, hanging bolts are lowered from the ceiling insert provided in the frame work in step S3, and the ceiling plate and ceiling base material are members that make up the ceiling surface on the base that combines lightweight steel frames. Ceiling material is installed. Suspension bolts, hangers, and other hanging materials, diagonal members, and the like are used to support the ceiling material, and measures are taken to prevent the ceiling board from falling off.
例えば日本国では、建築基準法や施行令などにより、このような天井脱落を防止するための規定が設けられている。その一つに、既定の条件を満たす天井材を設けるときには吊り材等により固定を行うなどの脱落防止措置を施しておくことが規定されている。照明灯具についても、その大きさや重量などによって、吊り材に固定されずに天井に設置できるものや、吊り材による固定を有するものがある。 For example, in Japan, the Building Standards Law and the Enforcement Ordinance stipulate regulations for preventing such falling-off of ceilings. As one of them, it is stipulated that when installing a ceiling material that satisfies predetermined conditions, measures to prevent it from falling off, such as fixing it with hanging materials, etc., are stipulated. Depending on the size and weight of the lighting fixtures, there are those that can be installed on the ceiling without being fixed to suspension materials, and those that are fixed by suspension materials.
なお、吊りボルトを固定するための天井インサートは、コンクリートの打設の際に設置する代わりに、打設後にコンクリートにアンカーを打ち吊りボルトを固定することも可能ではある。しかし、効率面や安全面を考慮すれば事前に設置される方が好ましく、吊り材が設けられることがわかっている場所については、設計の段階で天井インサートの配置が決められ、コンクリートの打設の際に埋め込まれるのが望ましい。 It should be noted that the ceiling insert for fixing the suspension bolt can be fixed by driving an anchor into the concrete after the concrete is placed instead of installing the ceiling insert when the concrete is placed. However, from the perspective of efficiency and safety, it is preferable to install them in advance. It is desirable to be embedded when
また、内装工事では、天井を張る前、つまり天井材による天井の形成が完了する前に、配管や空調のダクトの吊り込みをしておき、電線などを配管内に通す作業も行われる。そのため、天井裏には、電気配線やダクト、空調機器などを設置するために必要な空間が設けられる。またさらに、照明や空調が設置される場所に合わせて天井材に開口が設けられる。ここで、天井内のダクト設置や吊り材による天井材の固定といった作業は、内装工事を行う業者の作業員などが作業を行う。一方で、電気配線を設ける作業は、感電等の危険があるため、電気工事を行うことのできる専門的な作業員によって行われる。 In addition, in the interior work, before the ceiling is installed, that is, before the ceiling material is completely formed, the pipes and air-conditioning ducts are suspended, and the wires and the like are passed through the pipes. Therefore, a space necessary for installing electrical wiring, ducts, air conditioning equipment, etc. is provided in the ceiling space. Furthermore, openings are provided in the ceiling material according to the places where lighting and air conditioning are installed. Here, work such as installation of ducts in the ceiling and fixing of the ceiling material with hanging materials is performed by workers of interior construction contractors. On the other hand, the work of installing electrical wiring is performed by a professional worker who can perform electrical work because of the risk of electric shock.
天井を設置する天井工事の作業者と、天井裏に電気配線を通す配線工事の作業者と、は多くの場合は別人であることが想定される。なお、日本国では、電気工事士の資格を有さない者による配線工事などの電気工事は許可されていない。このように建築物の建設は、種々の専門的な業者から作業員が派遣され、それぞれが専門的な作業を行うことで安全面に配慮している。 In many cases, it is assumed that a ceiling construction worker who installs a ceiling and a wiring construction worker who runs electrical wiring through the ceiling are different people. In Japan, electrical work such as wiring work is not permitted by a person who is not qualified as an electrician. As described above, construction workers are dispatched from various specialized contractors, and each of them performs specialized work, so that safety is taken into consideration.
本明細書において、建築物の建設のために天井材を準備して天井工事を行う業者の作業員を天井設置作業者と呼ぶ。また、建築物の建設のために電気配線を準備して配線工事を行う業者の作業員を配線工事作業者と呼ぶ。なお、建築物の建設における各工程の工事は、通常複数の作業者によって行われる。従って、天井設置作業者とは一人の作業者に限らず、建築物の建設において天井工事を行う1以上の作業者を指す。配線工事作業者などについても同様である。 In this specification, a worker of a contractor who prepares a ceiling material for construction of a building and performs ceiling construction is referred to as a ceiling installation worker. In addition, a worker of a contractor who prepares electrical wiring for construction of a building and performs wiring work is called a wiring worker. It should be noted that the construction of each step in the construction of a building is usually carried out by a plurality of workers. Therefore, the ceiling installation worker is not limited to one worker, but refers to one or more workers who perform ceiling construction in the construction of a building. The same applies to wiring workers and the like.
次に、内装工事を終え、床や壁や天井が出来上がると、設置工事が行われる(ステップS6)。設置工事では、建築物を実際に利用する際に必要になる設備が設置される。例えば、電気、ガス、水道、排水、空調、トイレ、防災、放送などのための設備や、照明、エスカレーター、エレベーターなどの設備が配置される。これらの作業は、電気工事、電気通信工事、水道施設工事、消防施設工事、清掃施設工事などの事業者の作業員が行う。 Next, when the interior work is completed and the floor, walls, and ceiling are completed, installation work is carried out (step S6). In the installation work, equipment necessary for actual use of the building is installed. For example, facilities such as electricity, gas, water supply, drainage, air conditioning, toilets, disaster prevention, and broadcasting, as well as facilities such as lighting, escalators, and elevators are arranged. These works are carried out by workers of businesses such as electrical work, telecommunication work, water supply facility work, firefighting facility work, and cleaning facility work.
照明の設置工事においても、照明灯具を電気的に接続する必要があるため電気工事士の資格者による作業を要する。なお、照明が設置される場所は天井に限らないが、天井に設置される照明灯具は、通常であれば電気工事士の資格者によって天井裏に用意された配線に接続され、電気的に接続される。空調の設備工事において天井に空調機器を設置する場合も、電気工事士の資格者によって天井裏に用意された配線に接続される。 Also in the lighting installation work, it is necessary to perform the work by a qualified electrician because it is necessary to electrically connect the lighting fixtures. The place where the lighting is installed is not limited to the ceiling, but the lighting fixtures installed on the ceiling are usually connected to the wiring prepared in the ceiling space by a qualified electrician, and electrically connected. be done. When air-conditioning equipment is installed in the ceiling during air-conditioning installation work, it is connected to wiring prepared in the ceiling space by a qualified electrician.
通常では、オフィスビルのような建築物の居室において、天井に配置される大型の照明灯具や空調機器は吊り材によって固定される。従って、このような大型の照明灯具や空調機器の設置工事を行う作業員は、大型の照明灯具や空調機器を天井インサートから吊り下げられた吊り材に固定して天井に設置する作業も行うことになる。 Generally, in living rooms of buildings such as office buildings, large lighting fixtures and air conditioners arranged on the ceiling are fixed by hanging materials. Therefore, workers who install such large-sized lighting fixtures and air-conditioning equipment must also fix the large-sized lighting fixtures and air-conditioning equipment to hanging materials suspended from ceiling inserts and install them on the ceiling. become.
照明の設置工事に間に合わせるように、照明灯具の製造者は建設に必要な照明灯具を製造し、電気設備資材を管理する電材商社に納品する(ステップS7)。また電材商社は、照明灯具に限らず、スイッチ、コンセント、電線、ケーブル、配電盤、アンテナなどの資材や、分電盤、インターホン、火災報知器などの資材の在庫を管理しており、工事に必要な電気設備資材を必要な分だけ供給する(ステップS8)。本明細書において、照明灯具を製造し、あるいは照明灯具を納品する業者の従業員を照明灯具供給者と呼ぶ。 In order to make it in time for the lighting installation work, the manufacturer of the lighting equipment manufactures the lighting equipment necessary for the construction and delivers them to the electric materials trading company that manages the electrical equipment materials (step S7). In addition to lighting fixtures, electrical material trading companies manage inventories of materials such as switches, outlets, wires, cables, distribution boards, antennas, distribution boards, intercoms, fire alarms, etc., which are necessary for construction. necessary amount of electrical equipment materials (step S8). In this specification, an employee of a company that manufactures lighting fixtures or delivers lighting fixtures is called a lighting fixture supplier.
なお、設置工事の工程において、照明の設置工事と、空調の設置工事とは別々に行われる。なお、同時に行うことも、あるいは、同一人が両方の設置工事を行うことも可能だが、作業効率を考慮して分担して作業を進める方が一般的である。このようにして建築物は建設される。 In the installation work process, the lighting installation work and the air conditioning installation work are performed separately. It should be noted that although it is possible for the same person to carry out both installation works at the same time, it is common to divide the work in consideration of work efficiency. Buildings are constructed in this way.
なお、本明細書において、設置工事の作業者と言う場合は、照明や空調などの設置工事を行う一人以上の作業者を指すものとし、上述したような同一人が照明及び空調の設置工事を行う場合も含み得るものとする。一方で、照明の設置工事の作業者と言う場合は、照明の設置工事を行う一人以上の作業者を指し、かつ、空調の設置工事は行わない作業者を指すものとする。空調の設置工事の作業者と言う場合は、空調の設置工事を行う一人以上の作業者を指し、かつ、照明の設置工事は行わない作業者を指すものとする。 In this specification, the term "installation worker" refers to one or more workers who perform the installation work of lighting and air conditioning. It can also include the case of doing so. On the other hand, a lighting installation worker refers to one or more workers who perform the lighting installation work, and refers to workers who do not perform the air conditioning installation work. The term "air-conditioning installation worker" refers to one or more workers who perform the air-conditioning installation work, and refers to workers who do not perform the lighting installation work.
次に、実施形態として、建築物を建設する工程と、この建設において照明灯具400を設置する工程と、について説明する。ここでの照明灯具400には、既に説明された灯具100、または、灯具200を用いることができる。実施形態に係る建築物410は、複数階の構造を有し、通路と居室を有する。なお、一階建ての建築物であってもよい。図19及び図20は、建築物410の特定の階における居室の構造の一例を記した模式図である。
Next, as an embodiment, a process of constructing a building and a process of installing the
建築物410は、床420と、壁421と、天井422と、窓423と、により居室空間を形成する。なお、窓423が無く側面が壁421だけの居室であっても構わない。また、天井には、複数の照明灯具400と、複数の空調機器430とが設置されている。なお、空調機器430は一台でもよい。
Building 410 forms living room space with
ここで、天井に設置される照明灯具や空調機器などの天井設置器具には、吊り材によって直接固定される必要があるものと不要なものとがある。例えば、監視カメラや、ダウンライト、非常用照明、あるいは煙感知器センサーなど、小型の天井設置器具については、吊りボルト等の吊り材や斜め部材に直接接続されることによって固定されずに設置される。このような小型の天井設置器具は、天井材に掛かる荷重が小さいため吊り材を要さずに設置することが認められる。以下、このような天井設置器具は、吊り材による固定を要さない天井設置器具という。 Ceiling fixtures such as lighting fixtures and air conditioners to be installed on the ceiling include those that need to be directly fixed by hanging materials and those that do not. For example, small ceiling-mounted fixtures such as surveillance cameras, downlights, emergency lighting, or smoke detector sensors may be installed loosely by being directly connected to hangers, such as hanger bolts, or diagonal members. be. Such small ceiling fixtures are permitted to be installed without the need for hangers because the load on the ceiling material is small. Hereinafter, such a ceiling fixture will be referred to as a ceiling fixture that does not require fixing with hanging materials.
一方で、天井面設置型のベース照明や、天井埋込型のベース照明、あるいは空調機器430などは、吊り材に直接繋がれることによって固定されて設置される。このような天井設置器具は、天井材に掛かる荷重が大きいため、吊り材で固定されていないと、例えば地震が起こった場合に脱落する危険性が高くなる。よって、天井材に全ての荷重を掛けるような設置構造とはせずに、天井設置器具そのものを吊り材で支えるようにする。以下、このような天井設置器具は、吊り材による固定を要する天井設置器具という。
On the other hand, the ceiling-mounted base lighting, the ceiling-embedded base lighting, the
例えば、オフィスビルのような建築物の場合、通路などの狭い空間における照明にはダウンライトなどの小型の天井設置器具が設けられ、居室などの広い空間ではベース照明などの大型の照明灯具が設けられることが考えられる。居室の一部に小型の照明灯具が設けられることはあり得るが、居室全体に設置される照明灯具の設置数で見ると、大多数は大型の照明灯具である。 For example, in buildings such as office buildings, small ceiling fixtures such as downlights are installed for lighting in narrow spaces such as corridors, and large lighting fixtures such as base lighting are installed in large spaces such as living rooms. It is conceivable that Small lighting fixtures may be installed in a part of a living room, but in terms of the number of lighting fixtures installed in the entire living room, most of them are large lighting fixtures.
本実施形態に係る照明灯具400は、照明灯具の性能としてはベース照明に相当する性能を有しており、かつ、照明の設置工事においては吊り材による固定を要さない照明灯具とすることができる。つまり、照明灯具400は、ベース照明相当として取り扱えるほど大型でありながら、吊り材を要さないほど軽量である、軽量大型照明灯具である。
The
ここで、本明細書における軽量大型照明灯具とは、全光束が2500lm以上であるか、床に最も近い面である発光面の面積が45000mm2以上であるか、光源素子が100個以上配されているか、の少なくとも一を満たす照明灯具を指すものとする。またあるいは、これに加えて、重量が0.5kg以上から2.5kg未満であるという条件により、軽量大型照明灯具の特性をさらに特定してもよい。 Here, the lightweight large lighting fixture in this specification means a total luminous flux of 2500 lm or more, a light emitting surface closest to the floor having an area of 45000 mm2 or more, or having 100 or more light source elements. It refers to a lighting fixture that satisfies at least one of the following: Alternatively, in addition to this, the characteristics of the lightweight large-sized illumination lamp may be further specified according to the condition that the weight is 0.5 kg or more and less than 2.5 kg.
軽量大型照明灯具である照明灯具400としては、例えば、縦450mm、横450mm、天井設置面から発光面までの高さが20mmの、発光面が正方形の照明灯具とすることができる。また、発光面が、縦600mm、横600mmの正方形の照明灯具であってもよい。また、発光面が、縦150mm、横600mmの長方形の照明灯具であってもよく、縦75mm、横600mmの長方形の照明灯具であってもよい。
The
このように、600mmや、これを自然数で割った長さで縦横の長さが設計することで、天井材300との相性がよくなる。日本国の建築基準では、天井材などの建築材料は尺単位で扱われており、天井材の縦横の長さもおよそ300mm単位で設計されている。従って、天井材300の縦幅あるいは横幅に照明灯具400の縦幅や横幅を合わせることで、照明灯具400を並べて配置するような場合でも設置がしやすくなる。
By designing the vertical and horizontal lengths to 600 mm or a length obtained by dividing this by a natural number in this way, compatibility with the
吊り材による固定を要さない照明灯具400は、天井材300に照明灯具400の荷重を掛けることになる。そのため、1の天井材300に1の照明灯具400を設置することが望ましい。また、荷重のバランスを考慮すると、照明灯具400の重心が、天井材300の中央にくるようにするのがよい。建築材料の基準に合わせて、照明灯具400の縦または横の寸法を、天井材の縦横の寸法に対応させることで、これらの設置条件を満たす設計がしやすくなる。
The
特に、図20に示すように、照明灯具400を連結して設置するような場合、照明灯具400の縦または横の寸法が、天井材の縦横の寸法に合っていないと、隣同士の天井材300における照明灯具400の設置個所が異なってしまう。連結される数が増えるほど、このずれが連結方向に連鎖していくことになるため荷重のバランスが悪くなる。
In particular, as shown in FIG. 20, when the
次に、建築物410の建設において照明灯具400が設置されるまでの工程を説明する。なお、図18を利用して既に説明した建築物が建設されるまでの工程と異なる点を詳細に説明し、重複する点については説明を簡易的にするか、あるいは省略する。
Next, the steps up to the installation of the
照明灯具400は、吊り材470により固定される必要がないため、ステップS1において、設計士やデザイナーは、照明灯具400の設置位置に合わせて吊り材の配置位置を決定しておく必要はない。また、天井インサートが設けられ、吊り材470の配置位置が確定した後に、従来の吊り材による固定を要するベース照明の配置位置を変更する場合は、新たに吊りボルトを設置する必要がある一方で、照明灯具400の場合はその必要がない。従って、設計士やデザイナーは、工事がある程度進んだ後でも、照明灯具400の設置場所を柔軟に変更することができる。
Since the
ステップS2~ステップS4までの工程については、既にした説明と概ね同様である。次に、ステップS5の内装工事では、天井を設ける天井工事が行われる。また、天井を張る前に、あるいは、天井を張った後に、天井裏に配される配線が天井よりも高い位置に通される。図21は、天井工事が行われた状態の天井裏の一例を示している。 The steps from step S2 to step S4 are generally the same as those already explained. Next, in the interior construction of step S5, the ceiling construction for installing the ceiling is performed. In addition, before or after the ceiling is installed, the wiring arranged in the ceiling space is passed through a position higher than the ceiling. FIG. 21 shows an example of the ceiling after ceiling construction.
図21にあるように、天井裏は、コンクリートが打設された躯体424によって上面と側面が、天井材300が配された天井422によって下面が形成された空間を有している。また、天井422を形成する各天井材300は、躯体の天井インサートに繋がれた吊り材470によって固定され、支えられている。なお、図が煩雑になるため、図21では吊り材470の表示を一部省略している。天井裏の空間には、配管を通って設けられた配線440及び配線441がある。この配線は、設計図面に基づき、天井裏に設置される照明や空調などの電気接続機器の設置台数に応じて設けられる。電気接続機器への電源供給に十分な数の配線が用意された上で、天井422は設けられる。
As shown in FIG. 21, the ceiling space has a space whose upper surface and side surfaces are formed by a
ここで、天井裏に配線を通す作業は、電気工事士の資格を有する配線工事作業者によって行われる。また、この作業において、照明灯具400に接続される予定の配線440については、電気工事士の資格を有する配線工事作業者によってコネクタが設けられる。コネクタは、電気接続機器を電気的に接続するための電気接続機器と配線440との接続作業において感電を防止するための、感電防止接続器具の一例である。
Here, the work of passing the wiring through the ceiling space is performed by a wiring worker who is qualified as an electrician. Also, in this work, a wiring worker who is qualified as an electrician provides a connector for the
コネクタ等の感電防止接続器具を有していれば、照明灯具400に配線440を接続する作業は、電気工事士の資格を有する者でなくても行うことができる。図21の例では、照明灯具400に接続する予定の配線440についてはコネクタが設けられる一方で、空調機器430に接続される予定の配線441についてはコネクタ等の感電防止接続器具は設けられていない。従って、出願時点の日本国の法令に遵守すると、空調機器430に配線441を接続する作業は、電気工事士の資格を有する者によって行われる必要がある。なお、図が煩雑になるため、図21では配線440の表示を一部省略している。
If an electric shock prevention connecting device such as a connector is available, the work of connecting the
このように、天井裏に配される配線を設ける作業において、天井裏に配される複数の配線のうち、天井への設置に際して吊り材による固定を有さない照明灯具400と電気的に接続するための配線として、コネクタなどの感電防止接続器具を付した配線440を設ける作業が行われる。
In this way, in the work of installing the wiring to be arranged in the ceiling space, among the plurality of wirings arranged in the ceiling space, the
また、空調機器430は吊り材によって固定されるため、空調機器430を固定するための吊り材として、吊り材471が設けられている。図21の時点では、まだ空調機器430は取り付けられていないため、吊り材471は空調機器430を固定していない。
Moreover, since the
天井材300には、空調機器430や照明灯具400など、天井設置器具を設置するために開口が設けられている。図21に示される四角の開口は、空調機器430のための開口である。また、円形の開口は、照明灯具400のための取付穴300aである。図21の例では、6×3の計18枚の天井材300のうち、2枚の天井材300のそれぞれに空調機器430を設置するための開口が、12枚の天井材300のそれぞれに照明灯具400を設置するための開口が設けられている。
The
図21に示されるように、照明灯具400を設置するために設けられる取付穴300aは天井材300に比べて小さい。また、照明灯具400の発光面と比べても十分に小さい開口である。この点については、ダウンライトや非常用照明は対照的に、その照明灯具の大きさと同等の開口を有している。照明灯具400では、発光面の面積に対して取付穴300aを1/3以下とすることができる。またあるいは、1/5以下とすることができる。またあるいは、1/10以下とすることができる。
As shown in FIG. 21, the mounting
照明灯具400を設置するための取付穴300aは、例えば、直径10cm~15cmの円形で形成される。また、取付穴300aの形状は円形でなくてもよく、最大径が15cm以下の多角形であってもよい。また、電源アダプタ450等の大きさや形状に基づいて決定されればよい。なお、照明灯具400の取り付けのために、居室側から配線440を手に取ることが出来るように、取付穴300aは作業員の腕が通せるだけの大きさを確保するのが好ましい。
The mounting
なお、天井材300は予め開口が設けられたものである必要はない。開口の無い状態の天井材300を用意し、内装工事を行う現場で作業員が天井材300に穴を空けて開口を設ける方が一般的である。開口のない天井材300に対し、適宜開口を設ける作業を行えばよい。どのような天井設置器具を設置するかによって用意すべき開口の形状も異なり得る。よって、開口は、天井材300を吊り材470で固定して天井に取り付けるときに設ければよく、あるいは、天井を形成した後で設けてもよい。
Note that the
このようにして天井422が設けられた上で、ステップS6の設備工事において、照明の設置工事が行われる。図22は、コネクタ付き配線440、天井材300、電源アダプタ450、及び、照明灯具400の接続関係を表す図である。なお、照明の設置作業は、電気工事士の資格を有さない者であっても作業を行うことができる。
After the
なお、建築物410に天井422が設けられた時点で、図19で示した居室を形成する空間である居室空間と、図21で示した天井裏を形成する空間である天井裏空間と、は区別された空間として扱うことができる。ここで、天井材300の開口の有無については考慮しない。具体的には、建築物410において開口を有さない天井材300により天井422が形成された場合に、空間を形成する一部分として天井422を有する空間であって天井422の上方にある空間を天井裏空間、空間を形成する一部分として天井422を有する空間であって天井422の下方にある空間を居室空間として区別する。
Note that when the
まず、居室空間に存在する作業員によって居室空間内に照明灯具400と電源アダプタ450とが準備される。照明灯具400は、居室空間に存在する作業員が、照明灯具400の取付アダプタを電源アダプタ450に嵌め込むことで、電源アダプタ450に接続される。また、電源アダプタ450のDCハーネス480と接続することで、照明灯具400は電源アダプタ450からのDC電源の電力供給を受ける。例えば、100Vの直流電圧が供給される。DCハーネス480との接続についても、電気工事士の資格を有していない作業員が行うことができる。なお、嵌合アダプタ40は、取付アダプタの一形態に相当する。また、電源ユニット50は、電源アダプタ450の一形態に相当する。また、電気ケーブル51は、DCハーネス480の一形態に相当する。
First, a worker present in the living room space prepares the
なお、配線440を介してAC電源が供給されるため、電源アダプタ450はAC/DC変換機能を有している。また、電源アダプタ450は、コネクタ付き配線440とコネクタを介して電気的に接続するための接続部としてのAC端子台460を有する。居室空間に存在する作業員は、開口に腕を通し、開口から天井裏空間に設けられたコネクタ付き配線440を引っ張って、居室空間内に引き込む。そして、居室空間においてコネクタ付き配線440のコネクタとAC端子台460とを接続する。なお、端子台52または53は、AC端子台460の一形態に相当する。
Since AC power is supplied via the
なお、照明灯具400が発光の強度や色調を調節する調光機能を有する場合に備えて、電源アダプタ450は調光の制御を行う調光ドライバ装置と接続するための接続部としての調光端子台を有する。調光機能を有さない照明灯具400を使用する場合には、調光端子台は不要である。
In addition, in preparation for the case where the
このように、天井材300に設けられた開口を介して、形成された天井422の上方にある天井裏空間に配されたコネクタ付き配線440と、電源アダプタ450とを、コネクタ付き配線のコネクタによって接続する作業が行われる。
In this way, the wiring with
また、図23に示すように、居室空間に存在する作業員が、電源アダプタ450を天井材300に設置する。居室空間に存在する作業員は、コネクタ付き配線440と接続した電源アダプタ450を、接続するコネクタ付き配線440が通った開口を介して天井裏に配置する。コネクタ付き配線440も天井裏に戻り、開口からは電源アダプタ450のDCハーネス480が居室空間に飛び出す形となる。照明灯具400は、DCハーネス480と接続し、電源の供給を受ける。このように、形成された天井422の下方にある居室空間において用意された照明灯具400と、電源アダプタ450と、を電気的に接続する作業が行われる。
Also, as shown in FIG. 23 , a worker present in the room space installs the
また、照明灯具400は、留め具490を有し、留め具490を開口に通して天井材300の天井裏に掛けることで、天井422に取り付けられる。照明灯具400の留め具63はバネ性(弾性)を有しており、これを天井面側(居室空間側)から天井材300の開口に通して貫通させる。貫通した後は、留め具63が天井材300の天井裏面に掛かり、従って荷重が天井材300に掛かるようになる。天井422に照明灯具400が取り付けられると、1の照明灯具400及び1の電源アダプタ450の荷重は、1の天井材300に掛かることとなる。なお、爪部44は、留め具490の一形態に相当する。また、留め具63は、バネ性を有する構造に限らず、天井材300に荷重が掛かる構造であればよい。
Further, the
また、図24及び図25に示すように、照明灯具400の留め具490が天井材300の開口に取り付けられる代わりに、電源アダプタ451の留め具491が天井材300の開口に取り付けられるようにしてもよい。
24 and 25, instead of attaching the
なお、コネクタ付き配線440と電源アダプタ450を接続する作業と、電源アダプタ450と照明灯具400とを接続する作業と、はいずれが先であってもよい。また、電源アダプタ450を天井材300に取り付ける作業は、照明灯具400が電源アダプタ450に接続する前でも、接続した後であってもよい。
Either the work of connecting the wiring with
このように、コネクタ付き配線440と電気的に接続された照明灯具400が有する留め具490を天井材300の開口に通して、照明灯具400を天井材300に設置する作業が行われる。または、コネクタ付き配線440と電気的に接続された電源アダプタ451が有する留め具491を天井材300の開口に通して、照明灯具400を天井材300に設置する作業が行われる。
In this way, the
また、コネクタ付き配線440と、電源アダプタ450とを、コネクタ付き配線440のコネクタにより接続し、コネクタ付き配線440と電気的に接続された電源アダプタ451を天井裏空間に配置する作業が行われ、照明灯具400を天井材300に設置する作業が行われる。
Also, the wiring with
なお、灯具100に係る実施形態で説明したように、留め具としての取付ばね63を有する取付金具60を介して、照明灯具400を天井材300に取り付けるようにしてもよい。この場合、コネクタ付き配線440と電気的に接続された電源アダプタ450を天井裏空間に配置する作業を行った後に、取付金具160が留め具により天井材300に設置される。
Note that, as described in the embodiment related to the
また、天井裏空間に配置された電源アダプタ450のDCハーネス480を、取付金具60の開口64を通して居室空間に引き込み、居室空間においてDCハーネス480を照明灯具400に接続することで、電源アダプタ450と照明灯具400とが電気的に接続される。また、電源アダプタ450と電気的に接続することで、照明灯具400はコネクタ付き配線440と電気的に接続する。
In addition, the
また、電源アダプタ450と照明灯具400とが電気的に接続された状態で、照明灯具400を取付金具60に設置する。嵌合アダプタ40の爪部44は、照明灯具400を取付金具60に設置するための留め具に相当する。つまり、天井材300への設置には取付金具60の留め具が用いられ、取付金具60への設置には照明灯具400の留め具が用いられる。
In addition, the
このように、照明灯具400の留め具を取付金具60の開口64に通して、取付金具60を介した照明灯具400の天井材300への設置作業が行われる。取付金具60は照明灯具400の天井材300への設置を補助する取付補助部材の一形態と言える。取付補助部材は、例えば、取付金具60と同様の形状及び構造を有し、かつ、金属以外の材料で形成されたものであってもよい。
In this manner, the fixture of the
また、灯具100及び灯具200に係る実施形態で説明したように、照明灯具400が天井材300に設置された状態で移動可能となっていることで、天井材300に対する照明灯具400の位置が調整できる。
In addition, as described in the embodiments of the
図20のように照明灯具400を連結して配置する場合、各天井材300に連結する複数の照明灯具400がそれぞれ設置された状態では、天井材300の開口の位置ずれなどから、意図した設置位置から僅かにずれてしまうことが考えられる。特に、このような連結照明は、美感の面からも、精度良く一直線に並ぶ方が好ましい。
When the
そのため、連結する隣同士の照明灯具400(ここでは、隣り合う照明灯具400をそれぞれ第1照明灯具、第2照明灯具と呼ぶものとする)をそれぞれの天井材300に設置する作業を行った後に、第1照明灯具または第2照明灯具を移動させて、第1照明灯具と第2照明灯具との連結を調整する作業を行う。
Therefore, after performing the work of installing the
なお、天井422に設置する段階で、第1照明灯具と第2照明灯具は連結して設置されることが考えられる。一方で、この段階での連結は、意図した状態よりもずれが生じている可能性がある。そのため、この照明灯具400を連結して天井422に設置する作業としては、第1照明灯具と第2照明灯具とを連結させてそれぞれの天井材300に設置する第1連結作業と、第1連結作業の後に、天井材300に設置された第1照明灯具または第2照明灯具を移動させて、第1照明灯具と第2照明灯具との連結を調整する第2連結作業と、の二段階に分けて行われることとなる。
It is conceivable that the first illumination lamp and the second illumination lamp are connected and installed at the stage of installation on the
また、第1照明灯具の位置調整を先に行った後に、第2照明灯具を第1照明灯具に連結させるようにしてもよい。つまり、第2照明灯具と連結していない状態で、第1照明灯具を1の天井材300に設置する作業、及び、位置を調整する作業を行った後に、第2照明灯具を隣の天井材300に設置して第1照明灯具に連結する作業を行ってもよい。この場合、第2照明灯具は、位置を調整しながら第1照明灯具に連結してもよいし、連結作業を行ってから、位置の調整作業を行ってもよい。
Alternatively, the second lighting device may be connected to the first lighting device after adjusting the position of the first lighting device. In other words, after performing the work of installing the first lighting fixture on one
例えば、天井422において連結して設置される複数の照明灯具400のうちの少なくとも1つに、壁421の壁際に配置され壁421に接触して設置される照明灯具がある場合、壁際に設置される方の照明灯具400を第1照明灯具とし、その照明灯具400に連結する方の照明灯具400を第2照明灯具として、このような作業を行うとよい。
For example, if at least one of the plurality of
図20の例によると、壁際に設置される方の照明灯具400は、連結方向の端に位置する照明灯具400である。また、対向する側面のうちの一方の側面が他の照明灯具400と連結する連結面であり、他方の側面が他の照明灯具400と連結せずに壁際に設置される壁際設置面である。連結する照明灯具400が3つ以上ある場合、壁際に設置された照明灯具400の隣に設置される照明灯具400は、対向する側面のいずれも他の照明灯具400と連結する連結面となる。
According to the example of FIG. 20, the
設置工事の作業者は、壁際に設置される天井材300に開口を形成する。この開口は、壁421方向に位置の調整が可能な状態の第1照明灯具を設置した場合に、第1照明灯具の壁際設置面が壁421に接触せず、かつ、壁421の近傍に設けられる位置に設けられる。壁421の近傍とは、位置の調整によって壁421に接触させることができる範囲である。例えば、位置調整が可能な移動範囲が10mmであったとすると、誤差や公差に配慮して壁421から5mm程度離れた位置に壁際設置面がくるように開口の位置を設計するとよい。
An installation worker forms an opening in the
次に、設置工事の作業者は、壁際に設置される第1照明灯具を、天井材300の開口を通して、壁際から離れた位置で天井材300に設置する。このとき、壁421方向に位置の調整が可能な状態で第1照明灯具は設置される。
Next, the installation worker installs the first lighting fixture to be installed near the wall on the
次に、天井材300に設置された状態で、第1照明灯具を、壁421の壁際に近付く位置へと移動し、第1照明灯具の壁際設置面の所定の部位を壁421に接触させる。次に、第2照明灯具を、第1照明灯具に連結する。また、第2照明灯具を移動させて、第1照明灯具と第2照明灯具との連結を調整する。第1照明灯具は壁421に接触させるように位置調整がされているため、第2照明灯具との位置調整においては、第1照明灯具は移動させずに、第2照明灯具を移動させる方が好ましい。
Next, while being installed on the
なお、天井材300に設置された照明灯具400の位置調整が可能な移動範囲は、一方向について、10mm~15mmを上限とする程度でよい。または、少なくとも10mmは移動可能にする程度でよい。取付穴300aの位置ずれや、照明灯具400の部材公差などの影響分を移動範囲としてカバーできればよいためである。なお、この範囲でなくてもよい。
The movement range in which the position of the
いずれにしても、この移動範囲は、照明灯具400そのものの機構によって得られ、照明灯具400として移動が可能な所定の範囲である。つまり、取付穴300aの穴の大きさや、取付金具60の開口の大きさとなどと、照明灯具400の嵌合部分の大きさとの違いから移動が可能となるといった他の部材との関係によるものではなく、照明灯具400そのものの仕組みとして予め定められた移動の許容範囲である。
In any case, this movement range is a predetermined range obtained by the mechanism of the
一方向の移動範囲が、その方向における照明灯具400の幅を超えるような調整や、1の天井材300の幅を超えるような調整は、ここでいう公差やずれの影響をカバーする位置の調整とは異なる意味の調整である。なお、このような異なる意味の調整をさらに含んで、どちらの調整も可能とする照明灯具400であってもよい。
Adjustments such that the range of movement in one direction exceeds the width of the
なお、電源アダプタ451は、自ら通った開口の付近で、その開口を有する天井材300の天井裏に配置される。従って、1の照明灯具400を1の天井材300に取り付ける場合、その照明灯具400に接続する1の電源アダプタ451が、その1の天井材300に配置される。従って、第一実施形態と変わらず、1の電源アダプタ451及び1の照明灯具210が、1の天井材300に掛かる荷重となる。
In addition, the
なお、電源アダプタ451は、照明灯具400が取り付けられない天井材300に配置されるようにしてもよい。例えば、開口を有していない天井材300に配置されるように、電源アダプタ451を移動してもよい。こうすることで、1の天井材300に掛かる荷重を軽減することができる。例えば、図23で2枚の天井材300にそれぞれ配置されている計2つの電源アダプタ451を、開口を有していない1の天井材に配置してもよい。但し、天井材300までの距離が腕を伸ばしても届かないくらいに遠いと、電源アダプタ451を配置する作業は困難あるいは面倒になることも考えられる。
Note that the
このように、照明灯具400の設置工事は、吊り材470による固定を有さないため、天井裏にあるコネクタ付き配線440を居室空間に引っ張り出せるだけの開口が設けられていればよい。言い換えると、照明灯具400を天井422に設置する作業をするには、腕が通せるサイズの開口があればよい。一方で、吊り材470で固定する作業が必要な照明灯具になると、腕が通る程度の大きさの開口だけを利用して、居室空間側から照明灯具を取り付けることは困難な作業になる。
In this way, since the installation work of the
また、照明灯具400の設置工事前に、予めコネクタ付き配線440を天井裏に用意しておくことで、電気工事士の資格を有する者でなくても照明灯具400と天井裏の配線とを電気的に接続する作業を行うことができる。従って、天井材300に穴を空けて天井の一部として設置する作業員が、そのまま照明灯具400の設置作業を行うことも可能となる。
In addition, by preparing
このことはつまり、建築物410の建設において、照明灯具供給者が電材商社に照明灯具400を供給する代わりに天井設置作業者に供給し、天井設置作業者が照明灯具400の天井工事を行うことができるということである。
In other words, in the construction of the
以上、具体例を参照しつつ、本開示の実施形態について説明した。しかし、本開示は、これらの具体例に限定されるものではない。本開示の上述した実施形態を基にして、当業者が適宜設計変更して実施し得る全ての形態も、本開示の要旨を包含する限り、本開示の範囲に属する。その他、本開示の思想の範疇において、当業者であれば、各種の変更例及び修正例に想到し得るものであり、それら変更例及び修正例についても本開示の範囲に属するものと了解される。 The embodiments of the present disclosure have been described above with reference to specific examples. However, the present disclosure is not limited to these specific examples. Based on the above-described embodiments of the present disclosure, all modes that can be implemented by those skilled in the art by appropriately designing and modifying are also within the scope of the present disclosure as long as they include the gist of the present disclosure. In addition, within the scope of the idea of the present disclosure, those skilled in the art can conceive of various modifications and modifications, and it is understood that these modifications and modifications also fall within the scope of the present disclosure. .
10…灯具本体、11…シャーシ、12…取外し部材、14…カバー保持部材、15…背面カバー、20…光源モジュール、22…光源、30,130…透光性カバー、40…嵌合アダプタ、44…爪部、60…取付金具、70…アダプタ押さえ部材、75…凸部、80…アダプタ固定部材、100…灯具、400…照明灯具、510…発光素子、511…半導体積層体、512…電極、520…透光性部材、530…光反射性部材、540…波長変換部材、550…被覆部材、550A…レンズ部、550B…凹部、550C…突起、551…側面被覆部材、570…導体配線、580…絶縁層
DESCRIPTION OF
Claims (10)
建材に形成された取付穴に嵌め込まれる嵌合アダプタと、
前記嵌合アダプタに固定されたアダプタ固定部材と、
前記シャーシの前記裏面に固定されたアダプタ押さえ部材と、
を備え、
前記アダプタ固定部材は、前記シャーシの前記裏面と前記アダプタ押さえ部材との間に挟まれ、且つ前記シャーシの前記裏面に平行な方向に移動可能である灯具。 a lamp main body having a chassis having a light source arrangement surface and a back surface opposite to the light source arrangement surface; and a plurality of light sources arranged on the light source arrangement surface of the chassis;
a fitting adapter to be fitted into a mounting hole formed in the building material;
an adapter fixing member fixed to the fitting adapter;
an adapter pressing member fixed to the rear surface of the chassis;
with
The adapter fixing member is sandwiched between the rear surface of the chassis and the adapter pressing member, and is movable in a direction parallel to the rear surface of the chassis.
前記嵌合アダプタは、前記建材の前記取付穴に嵌め込まれた取付金具に引っ掛かる爪部を有し、
前記取外し部材は、前記爪部に連結する一端部と、前記嵌合アダプタが前記取付金具に取り付けられた状態で前記灯具に重なる他端部とを有し、
前記灯具本体を前記アダプタ固定部材に対して第1方向に移動させることで、前記取外し部材の前記他端部が前記灯具の側面より外側に突出する請求項1記載の灯具。 further comprising a removal member disposed on the rear surface of the chassis;
The fitting adapter has a claw portion that hooks onto a mounting bracket that is fitted into the mounting hole of the building material,
The removal member has one end connected to the claw portion and the other end overlapping the lamp when the fitting adapter is attached to the mounting bracket,
2. The lamp according to claim 1, wherein the other end of the removal member protrudes outward from the side surface of the lamp by moving the lamp main body in the first direction with respect to the adapter fixing member.
前記取外し部材の前記他端部が前記灯具に重なっている状態において、前記嵌合アダプタの前記第2方向に向く側面と前記開口の縁との離間距離は、前記嵌合アダプタの前記第1方向に向く側面と前記開口の縁との間の離間距離よりも大きい請求項3記載の灯具。 The adapter pressing member has an opening, the fitting adapter is arranged in the opening,
In a state where the other end portion of the removal member overlaps the lamp, the distance between the side surface of the fitting adapter facing the second direction and the edge of the opening is 4. The lamp according to claim 3, wherein the distance between the side facing toward and the edge of the opening is greater than the separation distance.
複数の天井材を配して形成される天井の天井裏に配される複数の配線のうち、天井への設置に際して吊り材による固定を有さない照明灯具である軽量大型照明灯具と電気的に接続するための配線として、コネクタ付き配線を設ける工程と、
前記天井材に設けられた開口を介して、形成された天井の上方にある天井裏空間に配された前記コネクタ付き配線と、電源アダプタとを、前記コネクタ付き配線のコネクタにより接続する工程と、
形成された天井の下方にある居室空間において用意された前記軽量大型照明灯具と、前記電源アダプタと、を電気的に接続する工程と、
前記コネクタ付き配線と電気的に接続された前記軽量大型照明灯具または前記コネクタ付き配線と電気的に接続された前記電源アダプタが有する留め具を前記天井材の開口に通して、前記軽量大型照明灯具を前記天井材に設置する工程と、
前記天井材に設置された前記軽量大型照明灯具の前記天井材に対する位置を、前記軽量大型照明灯具として移動が可能な所定の範囲内で調整する工程と、
を有する方法。 A method of constructing a building comprising:
Among the plurality of wirings arranged in the ceiling space of the ceiling formed by arranging a plurality of ceiling materials, it is electrically connected to a light weight large lighting fixture that is a lighting fixture that does not have a hanging material when installed on the ceiling. A step of providing wiring with a connector as wiring for connection;
a step of connecting, via an opening provided in the ceiling material, the wiring with connector disposed in the ceiling space above the formed ceiling and a power adapter with a connector of the wiring with connector;
a step of electrically connecting the light fixture provided in the living room space below the formed ceiling with the power adapter;
The large lightweight lighting fixture electrically connected to the wiring with a connector or the fastener of the power adapter electrically connected to the wiring with a connector is passed through the opening of the ceiling material, and the large lightweight lighting fixture is installed. a step of installing on the ceiling material;
a step of adjusting the position of the large lightweight illumination lamp installed on the ceiling material with respect to the ceiling material within a predetermined range in which the large lightweight illumination lamp can be moved;
How to have
取付補助部材が有する留め具を前記天井材の開口に通して、前記取付補助部材を前記天井材に設置する工程と、
をさらに有し、
前記軽量大型照明灯具と、前記電源アダプタと、を電気的に接続する工程において、前記取付補助部材の開口を通して、前記天井裏空間に配された前記電源アダプタの電気ケーブルを居室空間に引き込み、前記電気ケーブルを前記軽量大型照明灯具に接続して、前記コネクタ付き配線と前記軽量大型照明灯具とを電気的に接続し、
前記軽量大型照明灯具を前記天井材に設置する工程において、前記コネクタ付き配線と電気的に接続された前記軽量大型照明灯具が有する留め具を前記取付補助部材の開口に通して、前記軽量大型照明灯具を前記天井材に設置する請求項6に記載の方法。 a step of connecting the wiring with a connector and the power adapter with a connector of the wiring with a connector, and arranging the power adapter electrically connected to the wiring with a connector in the ceiling space;
a step of inserting a fastener of an auxiliary mounting member into an opening of the ceiling material to install the auxiliary mounting member on the ceiling material;
further having
In the step of electrically connecting the light fixture and the power adapter, the electric cable of the power adapter arranged in the ceiling space is drawn into the room space through the opening of the mounting support member, and the connecting an electric cable to the large lightweight lighting fixture to electrically connect the wiring with a connector and the large lightweight lighting fixture;
In the step of installing the large lightweight lighting fixture on the ceiling material, the fastener of the large lightweight lighting fixture electrically connected to the wiring with a connector is passed through the opening of the mounting support member to remove the large lighting fixture. 7. The method according to claim 6, wherein a lighting fixture is installed on the ceiling material.
Applications Claiming Priority (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2019053180 | 2019-03-20 | ||
| JP2019053180 | 2019-03-20 | ||
| JP2019144009 | 2019-08-05 | ||
| JP2019144009 | 2019-08-05 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2021015788A JP2021015788A (en) | 2021-02-12 |
| JP7170205B2 true JP7170205B2 (en) | 2022-11-14 |
Family
ID=74531972
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2020020053A Active JP7170205B2 (en) | 2019-03-20 | 2020-02-07 | How to build lights and buildings |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7170205B2 (en) |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009295544A (en) | 2008-06-09 | 2009-12-17 | Mitsubishi Electric Corp | Lighting-up device and embedded illuminating fixture having the same |
| JP2013134956A (en) | 2011-12-27 | 2013-07-08 | Toshiba Lighting & Technology Corp | Lighting fixture |
| JP2019016432A (en) | 2017-07-03 | 2019-01-31 | 有限会社コイズミトレーディング | Electrical plug for duct rail |
-
2020
- 2020-02-07 JP JP2020020053A patent/JP7170205B2/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009295544A (en) | 2008-06-09 | 2009-12-17 | Mitsubishi Electric Corp | Lighting-up device and embedded illuminating fixture having the same |
| JP2013134956A (en) | 2011-12-27 | 2013-07-08 | Toshiba Lighting & Technology Corp | Lighting fixture |
| JP2019016432A (en) | 2017-07-03 | 2019-01-31 | 有限会社コイズミトレーディング | Electrical plug for duct rail |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2021015788A (en) | 2021-02-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US10955124B2 (en) | LED link system with distributive powering scheme | |
| JP6635207B1 (en) | Buildings with lighting fixtures | |
| CN103097806A (en) | Lighting apparatus with a boost | |
| JP7799211B2 (en) | Buildings, construction methods, installation methods, equipment control systems, and air conditioning devices. | |
| JP7406140B2 (en) | Light equipment | |
| JP7170205B2 (en) | How to build lights and buildings | |
| KR20060058230A (en) | Connection structure for each module of wiring duct | |
| JP7261972B2 (en) | Mounting method of lighting fixture, mounting structure of lighting fixture, lighting fixture, and method of constructing building | |
| JP2021157965A (en) | Lighting fixture installation method, lighting set, and mounting plate | |
| JP7286911B2 (en) | Method of constructing a lighting system and building | |
| TWI795586B (en) | A method of constructing a building and a method of installing a large sized lightweight lighting fixture to a building | |
| JP7530002B2 (en) | Lighting device and method for constructing a building | |
| JP6923818B2 (en) | How to install lighting fixtures, lighting fixtures, and how to build a building | |
| JP7558482B2 (en) | How to install lighting fixtures, how to renovate buildings, and how to construct buildings | |
| JP2022000837A (en) | Lighting fixture and installation method for lighting fixture | |
| KR200404543Y1 (en) | AISLE LiGHTiNG TRIM |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20211118 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20220930 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20220930 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20221013 |
|
| R151 | Written notification of patent or utility model registration |
Ref document number: 7170205 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |