Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7209290B2 - Revetment structure and bank protection construction method - Google Patents
[go: Go Back, main page]

JP7209290B2 - Revetment structure and bank protection construction method - Google Patents

Revetment structure and bank protection construction method Download PDF

Info

Publication number
JP7209290B2
JP7209290B2 JP2019039901A JP2019039901A JP7209290B2 JP 7209290 B2 JP7209290 B2 JP 7209290B2 JP 2019039901 A JP2019039901 A JP 2019039901A JP 2019039901 A JP2019039901 A JP 2019039901A JP 7209290 B2 JP7209290 B2 JP 7209290B2
Authority
JP
Japan
Prior art keywords
layer
side wall
impermeable
bank protection
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019039901A
Other languages
Japanese (ja)
Other versions
JP2020143484A (en
Inventor
一禎 木原
多克 和木
和宏 西
Original Assignee
エム・エムブリッジ株式会社
ワールドエンジニアリング株式会社
三井住友建設鉄構エンジニアリング株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by エム・エムブリッジ株式会社, ワールドエンジニアリング株式会社, 三井住友建設鉄構エンジニアリング株式会社 filed Critical エム・エムブリッジ株式会社
Priority to JP2019039901A priority Critical patent/JP7209290B2/en
Publication of JP2020143484A publication Critical patent/JP2020143484A/en
Application granted granted Critical
Publication of JP7209290B2 publication Critical patent/JP7209290B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/30Landfill technologies aiming to mitigate methane emissions

Landscapes

  • Revetment (AREA)
  • Processing Of Solid Wastes (AREA)

Description

本発明は、護岸構造及び護岸構築方法に関する。 The present invention relates to a bank protection structure and a bank protection construction method.

近年、産業廃棄物や一般廃棄物の排出量が急増している。これに対して、廃棄物を一旦焼却処理して残留物や不燃物等の最終処分量を減少させる方法がとられている。一方、最終処分量(埋立量)は今後益々増大することが予想され、これに見合うだけの処分場を陸地に求めるのが困難な状況となっている。そこで、今後は沿岸海域に海面処分場を建設する気運が大きくなっている。 In recent years, the amount of industrial waste and general waste discharged has increased rapidly. On the other hand, a method is adopted in which the waste is temporarily incinerated to reduce the amount of final disposal such as residues and incombustibles. On the other hand, it is expected that the final disposal amount (landfill amount) will increase more and more in the future, and it is difficult to find a disposal site on land to meet this increase. Therefore, there is a growing trend to construct sea surface disposal sites in coastal waters in the future.

このような海面処分場は、所定の海域に管理型護岸を築造し、護岸で囲まれた領域又は沿岸と護岸とで囲まれた領域に埋め立てる構成である。このような管理型護岸は、例えば遮水基盤の上面に溝部が設けられ、溝部の底部に護岸構造物が配置され、溝部の側壁と護岸構造物との間に遮水層が配置される構成である(例えば、特許文献1及び特許文献2等参照)。 Such a sea surface disposal site has a configuration in which a controlled seawall is constructed in a predetermined sea area and landfilled in an area surrounded by the seawall or in an area surrounded by the coast and the seawall. Such a controlled revetment has, for example, a structure in which a groove is provided on the upper surface of the impermeable foundation, a revetment structure is arranged at the bottom of the groove, and an impermeable layer is arranged between the side wall of the groove and the revetment structure. (See, for example, Patent Literature 1 and Patent Literature 2, etc.).

特許第5099709号公報Japanese Patent No. 5099709 特許第4293435号公報Japanese Patent No. 4293435

特許文献1及び特許文献2の構成においては、護岸構造物の安定性に関する要求性能を満たす範囲内での水平移動を許容した構成となっている。したがって、遮水層を構成する材料としては、アスファルト混合物等、護岸構造物の水平移動に追随して変形する変形追随性遮水材に限定される。 In the configurations of Patent Documents 1 and 2, horizontal movement is allowed within a range that satisfies the required performance regarding the stability of the bank protection structure. Therefore, the material constituting the impermeable layer is limited to a deformation-following impervious material such as asphalt mixture that deforms following the horizontal movement of the revetment structure.

本発明は、上記に鑑みてなされたものであり、護岸構造物の水平移動を規制することにより遮水層の材料選択の幅を拡大させつつ、安定した遮水性を確保することが可能な護岸構造及び護岸構築方法を提供することを目的とする。 The present invention has been made in view of the above, and a revetment that can ensure stable imperviousness while expanding the range of material selection for the impermeable layer by restricting the horizontal movement of the embankment structure. It aims at providing a structure and a bank protection construction method.

本発明の態様に係る護岸構造は、水平面に沿った底部と水平面に垂直な側壁とを有する溝部が上面に形成される海底の遮水基盤と、前記溝部の底部に当該溝部の側壁との間に間隔を空けた状態で配置される護岸構造物と、前記護岸構造物と前記溝部の側壁との間隔を埋めるように配置される遮水層と、前記護岸構造物と前記溝部の側壁との間隔を埋めるように配置され、前記護岸構造物からの水平力を前記側壁に対してせん断力として伝達可能な荷重伝達材を有し、前記水平力を前記側壁に伝達する場合に垂直方向に座屈しないように前記垂直方向の厚さが設定された荷重伝達層とを備える。 A seawall structure according to an aspect of the present invention is provided between a water-impervious foundation on the seabed in which a groove having a bottom along a horizontal plane and a side wall perpendicular to the horizontal is formed on the upper surface, and a side wall of the groove at the bottom of the groove. an impermeable layer arranged to fill the gap between the revetment structure and the side wall of the trench; and the revetment structure and the side wall of the trench. It has a load transmission member disposed so as to fill the gap and capable of transmitting a horizontal force from the revetment structure to the side wall as a shear force, and is vertically seated when the horizontal force is transmitted to the side wall. and a load transfer layer with the vertical thickness set so as not to yield.

この構成では、荷重伝達層が座屈することなく、護岸構造物からの水平力を側壁に対してせん断力として伝達するため、護岸構造物の水平移動を規制することができる。このように護岸構造物の水平移動を規制することにより、遮水層の材料が変形追随性遮水材に限定されないため、遮水層の材料選択の幅を拡大させることができる。また、選択した材料を用いた遮水層により、安定した遮水性を確保することが可能となる。 In this configuration, the horizontal force from the revetment structure is transmitted to the side wall as a shear force without buckling of the load transmission layer, so the horizontal movement of the revetment structure can be restricted. By restricting the horizontal movement of the revetment structure in this way, the material of the impermeable layer is not limited to the deformation-following impermeable material, so the range of material choices for the impermeable layer can be expanded. In addition, the impermeable layer using the selected material can ensure stable impermeability.

また、前記荷重伝達層は、前記垂直方向に複数層に配置されてもよい。 Also, the load transfer layer may be arranged in a plurality of layers in the vertical direction.

従って、護岸構造物からの水平力が垂直方向に分散されるため、側壁の一部分にせん断力が集中することを抑制できる。 Therefore, since the horizontal force from the revetment structure is dispersed in the vertical direction, it is possible to suppress the concentration of the shear force on a portion of the side wall.

また、前記遮水層及び前記荷重伝達層は、同一の層として形成されてもよい。 Further, the impermeable layer and the load transfer layer may be formed as the same layer.

従って、遮水層及び荷重伝達層を容易に形成することができる。 Therefore, the impermeable layer and the load transfer layer can be easily formed.

また、前記遮水層は、変形非追随性遮水材を用いて形成されてもよい。 Further, the impermeable layer may be formed using a non-deformation-following impermeable material.

従って、遮水層が例えばコンクリート系遮水材又は土質系遮水材等のような変形非追随性遮水材を用いることにより、低コストで短工期にて施工を行うことが可能となる。 Therefore, by using a non-deforming impermeable material such as a concrete impermeable material or a soil impermeable material for the impermeable layer, construction can be performed at low cost and in a short construction period.

また、前記側壁は、アンカーにより前記遮水基盤に固定されてもよい。 Also, the side wall may be fixed to the impermeable base by an anchor.

従って、荷重伝達材からのせん断力を側壁において確実に受けることができる。 Therefore, the side wall can reliably receive the shearing force from the load transmission member.

また、前記溝部は、前記底部に形成される凹凸を覆う被覆層を有してもよい。 Further, the groove may have a coating layer covering irregularities formed on the bottom.

従って、遮水基盤における許容支持力(許容端趾圧)が高められるため、護岸構造物を細くすることができる。したがって、護岸構造物のコンパクト化を図ることができる。また、護岸構造物と被覆層との間の摩擦力を高めることができるため、護岸構造物が水平方向に移動することを抑制できる。 Therefore, since the permissible bearing capacity (permissible toe pressure) in the impermeable foundation is increased, the bank protection structure can be made thinner. Therefore, the revetment structure can be made compact. Moreover, since the frictional force between the revetment structure and the covering layer can be increased, it is possible to suppress the horizontal movement of the revetment structure.

また、前記被覆層は、水中コンクリートからなる層、捨石を用いた基礎捨石マウンド、並びに、前記基礎捨石マウンドに用いられる前記捨石間の空隙を水中コンクリート系材料、アスファルト混合物系材料又は土質系材料により充填させたハイブリッド基礎マウンド、のいずれかであってもよい。 In addition, the coating layer is a layer made of underwater concrete, a basic rubble mound using rubble, and the voids between the rubble used in the rubble mound are filled with underwater concrete material, asphalt mixture material or soil material. A filled hybrid foundation mound.

従って、被覆層として、水中コンクリート、基礎捨石マウンド、ハイブリッド基礎マウンドのいずれかを採用することで、護岸構造物のコンパクト化を図り、護岸構造物が水平方向に移動することを抑制できる。 Therefore, by adopting any one of submerged concrete, rubble mound, and hybrid foundation mound as the covering layer, it is possible to make the revetment structure more compact and to suppress the horizontal movement of the revetment structure.

本発明の態様に係る護岸構築方法は、海底の遮水基盤の上面に水平面に沿った底部と水平面に垂直な側壁とを有する溝部を形成する工程と、前記溝部の底部に当該溝部の側壁との間に間隔を空けた状態で護岸構造物を配置する工程と、前記護岸構造物と前記溝部の側壁との間隔を埋めるように遮水層を配置する工程と、前記護岸構造物からの水平力を前記側壁に伝達可能な荷重伝達材を有し、前記水平力を前記側壁に伝達する場合に垂直方向に座屈しないように前記垂直方向の厚さが設定された荷重伝達層を、前記護岸構造物と前記溝部の側壁との間隔を埋めるように配置する工程とを含む。 A bank protection construction method according to an aspect of the present invention includes the steps of forming a groove having a bottom along a horizontal plane and side walls perpendicular to the horizontal plane on the upper surface of an impermeable foundation on the seabed; A step of arranging a revetment structure with a gap between them, a step of arranging an impermeable layer so as to fill the gap between the revetment structure and the side wall of the trench, and a horizontal line from the revetment structure a load transmission layer having a load transmission member capable of transmitting a force to the side wall and having a thickness in the vertical direction so as not to buckle vertically when the horizontal force is transmitted to the side wall; arranging so as to fill the gap between the bank protection structure and the side wall of the trench.

この構成では、荷重伝達層が座屈することなく、護岸構造物からの水平力を側壁に対してせん断力として伝達するため、護岸構造物の水平移動を規制することができる。このように護岸構造物の水平移動を規制することにより、遮水層の材料が護岸構造物の水平移動に追随可能な材料に限定されないため、遮水層の材料選択の幅を拡大させることができる。また、選択した材料を用いた遮水層により、安定した遮水性を確保することが可能となる。 In this configuration, the horizontal force from the revetment structure is transmitted to the side wall as a shear force without buckling of the load transmission layer, so the horizontal movement of the revetment structure can be restricted. By restricting the horizontal movement of the revetment structure in this way, the material for the impermeable layer is not limited to the material that can follow the horizontal movement of the revetment structure, so it is possible to expand the selection of materials for the impermeable layer. can. In addition, the impermeable layer using the selected material can ensure stable impermeability.

本発明によれば、護岸構造物の水平移動を抑制し、安定した遮水性を確保することが可能な護岸構造及び護岸構築方法を提供することができる。 ADVANTAGE OF THE INVENTION According to this invention, the horizontal movement of a bank protection structure can be suppressed and the bank protection structure and bank protection construction method which can ensure stable imperviousness can be provided.

図1は、本実施形態に係る護岸構造の一例を示す図である。FIG. 1 is a diagram showing an example of a bank protection structure according to this embodiment. 図2は、本実施形態に係る護岸構築方法の一例を示すフローチャートである。FIG. 2 is a flow chart showing an example of a bank protection construction method according to the present embodiment. 図3は、護岸構造の他の例を示す図である。FIG. 3 is a diagram showing another example of the bank protection structure. 図4は、護岸構造の他の例を示す図である。FIG. 4 is a diagram showing another example of the bank protection structure. 図5は、護岸構造の他の例を示す図である。FIG. 5 is a diagram showing another example of the bank protection structure. 図6は、護岸構造の他の例を示す図である。FIG. 6 is a diagram showing another example of the bank protection structure. 図7は、護岸構造の他の例を示す図である。FIG. 7 is a diagram showing another example of the bank protection structure. 図8は、護岸構造の他の例を示す図である。FIG. 8 is a diagram showing another example of the bank protection structure. 図9は、護岸構造の他の例を示す図である。FIG. 9 is a diagram showing another example of the bank protection structure. 図10は、護岸構造の他の例を示す図である。FIG. 10 is a diagram showing another example of the bank protection structure. 図11は、護岸構造の他の例を示す図である。FIG. 11 is a diagram showing another example of the bank protection structure. 図12は、護岸構造の他の例を示す図である。FIG. 12 is a diagram showing another example of the bank protection structure.

以下、本発明に係る護岸構造及び護岸構築方法の実施形態を図面に基づいて説明する。なお、この実施形態によりこの発明が限定されるものではない。また、下記実施形態における構成要素には、当業者が置換可能かつ容易なもの、あるいは実質的に同一のものが含まれる。また、以下の各構成は、適宜組み合わせることが可能である。 Hereinafter, embodiments of a bank protection structure and a bank protection construction method according to the present invention will be described based on the drawings. In addition, this invention is not limited by this embodiment. In addition, components in the following embodiments include components that can be easily replaced by those skilled in the art, or components that are substantially the same. Moreover, each of the following configurations can be combined as appropriate.

図1は、本実施形態に係る護岸構造の一例を示す図である。図1に示す護岸構造100は、例えば管理型護岸、安定型埋立護岸等の護岸構造及び防波堤構造に適用可能である。護岸構造100は、遮水基盤10と、護岸構造物20と、遮水層30と、荷重伝達層40とを備えている。本実施形態では、護岸構造100は、例えば廃棄物の海面処分場を構成する管理型護岸である場合を例に挙げて説明する。したがって、護岸構造100は、所定の埋立区域を囲うように、当該埋立区域の外周部に沿って延びた状態で設けられる。以下、護岸構造を示す各図においては、左側が海面処分場の外側(海域側)を示し、の右側が海面処分場の内側(埋立区域側)を示している。 FIG. 1 is a diagram showing an example of a bank protection structure according to this embodiment. The revetment structure 100 shown in FIG. 1 is applicable to revetment structures and breakwater structures such as controlled revetments and stable reclaimed revetments. The bank protection structure 100 includes a water impermeable foundation 10 , a bank protection structure 20 , a water impermeable layer 30 , and a load transfer layer 40 . In this embodiment, the seawall structure 100 will be described by taking as an example a case where the seawall structure 100 is, for example, a managed seawall that constitutes a sea surface disposal site for waste. Therefore, the revetment structure 100 is provided so as to surround a predetermined landfill area, extending along the outer periphery of the landfill area. Hereinafter, in each figure showing the seawall structure, the left side shows the outside of the sea surface disposal site (sea area side), and the right side shows the inside of the sea surface disposal site (landfill area side).

遮水基盤10は、例えば海底の軟弱地盤GをCDM(Cement Deep Mixing)工法等によって不透水性基板改良がなされた遮水基盤である。なお、遮水基盤10は、改良地盤に限定されず、例えば海底の岩盤部等であってもよい。この場合、岩盤部は、保有水等の浸出を防止するために必要な遮水の効力を有する遮水基盤である。遮水基盤10の上部には、溝部11が形成される。溝部11は、護岸構造100が延びる長手方向に沿って形成される。溝部11は、底部12及び側壁13を有する。底部12は、水平面に沿って形成される。底部12には、当該底部12の凹凸を覆う被覆層14が形成される。被覆層14により、底部12の平面度が高められた状態となる。被覆層14としては、例えば水中コンクリート等を用いることができるが、他の材料が用いられてもよい。側壁13は、護岸構造100の長手方向の直交する幅方向の両端に形成される。側壁13は、水平面に垂直又はほぼ垂直に形成される。 The impermeable base 10 is, for example, a impermeable base in which the soft ground G of the seabed is improved by a CDM (Cement Deep Mixing) method or the like. The impervious base 10 is not limited to the improved ground, and may be, for example, a bedrock portion of the seabed. In this case, the bedrock part is the impermeable base having the impermeable effect necessary to prevent seepage of retained water and the like. A groove 11 is formed in the upper portion of the impermeable base 10 . The groove portion 11 is formed along the longitudinal direction in which the bank protection structure 100 extends. The groove 11 has a bottom 12 and sidewalls 13 . The bottom 12 is formed along a horizontal plane. A coating layer 14 is formed on the bottom portion 12 to cover the unevenness of the bottom portion 12 . The flatness of the bottom portion 12 is improved by the coating layer 14 . As the coating layer 14, underwater concrete or the like can be used, but other materials may be used. The side walls 13 are formed at both ends of the revetment structure 100 in the width direction perpendicular to the longitudinal direction. The sidewalls 13 are formed perpendicular or nearly perpendicular to the horizontal plane.

護岸構造物20は、溝部11の底部12上、つまり本実施形態では被覆層14の上面に配置される。護岸構造物20としては、例えばケーソン、セル、L字ブロック等が挙げられる。護岸構造物20は、護岸構造100の長手方向に複数並んだ状態で配置される。護岸構造100の長手方向に隣り合う護岸構造物20同士の間は、例えば不図示の目地構造等によって接続される。各護岸構造物20は、幅方向の両端の側壁13との間に間隔を空けて配置される。 The revetment structure 20 is arranged on the bottom 12 of the trench 11, that is, on the upper surface of the covering layer 14 in this embodiment. Examples of the bank protection structure 20 include caissons, cells, and L-shaped blocks. A plurality of bank protection structures 20 are arranged in a row in the longitudinal direction of the bank protection structure 100 . The revetment structures 20 adjacent to each other in the longitudinal direction of the revetment structure 100 are connected by, for example, a joint structure (not shown). Each revetment structure 20 is arranged with a gap between the side walls 13 at both ends in the width direction.

遮水層30は、護岸構造物20と側壁13との間隔を埋めるように配置される。遮水層30は、例えばアスファルト混合物等の変形追随性遮水材が用いられるが、これに限定されず、コンクリート系材料又は土質系材料等のような変形非追随性遮水材が用いられてもよい。本実施形態において、遮水層30は、後述する荷重伝達層40の上層に配置されるが、これに限定されない。 The impermeable layer 30 is arranged so as to fill the gap between the bank protection structure 20 and the side wall 13 . The impermeable layer 30 uses, for example, a deformation-following impermeable material such as an asphalt mixture, but is not limited thereto, and a non-deformation-following impermeable material such as a concrete-based material or a soil-based material is used. good too. In the present embodiment, the impermeable layer 30 is arranged above the load transmission layer 40, which will be described later, but is not limited to this.

荷重伝達層40は、護岸構造物20と側壁13との間隔を埋めるように配置される。荷重伝達層40は、護岸構造物20からの水平力を側壁13に伝達可能な荷重伝達材を有する。本実施形態における水平力は、護岸構造物20からの力のうち護岸構造100の幅方向の成分を有する力である。つまり、水平力は、護岸構造物20から海域側に向けた力、及び護岸構造物20から埋立区域側に向けた力を含む。荷重伝達材としては、例えば水中コンクリートが用いられるが、これに限定されず、他の材料が用いられてもよい。本実施形態において、荷重伝達層40は、例えば被覆層14上に直接設けられる構成であるが、これに限定されず、被覆層14との間に他の層を挟んで配置されてもよい。 The load transfer layer 40 is arranged so as to fill the gap between the bank protection structure 20 and the side wall 13 . The load transmission layer 40 has a load transmission member capable of transmitting horizontal force from the revetment structure 20 to the side walls 13 . The horizontal force in this embodiment is a force having a component in the width direction of the bank protection structure 100 among the forces from the bank protection structure 20 . That is, the horizontal force includes a force directed from the seawall structure 20 toward the sea area and a force directed from the seawall structure 20 toward the landfill area. As the load transfer material, underwater concrete is used, for example, but it is not limited to this, and other materials may be used. In the present embodiment, the load transmission layer 40 is directly provided on the coating layer 14, for example, but is not limited to this, and may be arranged with another layer sandwiched between the coating layer 14 and the load transmission layer 40.

荷重伝達層40は、護岸構造物20からの水平力を側壁13に伝達する。この場合、荷重伝達層40は、護岸構造物20からの水平力を側壁13に対するせん断力として当該側壁13に伝達する。側壁13は、この荷重伝達層40からのせん断力を支持する。つまり、側壁13は、護岸構造物20からの水平力を、荷重伝達層40からのせん断力として受け、当該せん断力を支持することにより、護岸構造物20からの水平力を支持する。 The load transfer layer 40 transfers horizontal forces from the revetment structure 20 to the side walls 13 . In this case, the load transmission layer 40 transmits the horizontal force from the bank protection structure 20 to the side wall 13 as a shear force on the side wall 13 . The sidewalls 13 support shear forces from this load transfer layer 40 . That is, the side wall 13 receives the horizontal force from the bank protection structure 20 as a shear force from the load transmission layer 40 and supports the horizontal force from the bank protection structure 20 by supporting the shear force.

荷重伝達層40は、護岸構造物20からの水平力を側壁13に伝達する場合において垂直方向に座屈しないように垂直方向の厚さtが設定されている。荷重伝達層40の厚さtは、例えばオイラーの公式又はテトマイヤーの公式等を用いて算出される所定の閾値よりも大きくなるように設定することができる。荷重伝達層40が水平力の伝達時に垂直方向に座屈しないように厚さtが設定されるため、遮水層30の変形が抑制される。なお、厚さtは、護岸構造物20の海側の荷重伝達層40と埋立区域側の荷重伝達層40との間で同一であってもよいし、異なっていてもよい。 The load transmission layer 40 has a vertical thickness t so as not to buckle in the vertical direction when transmitting the horizontal force from the revetment structure 20 to the side wall 13 . The thickness t of the load transfer layer 40 can be set to be larger than a predetermined threshold calculated using, for example, Euler's formula or Tetmeyer's formula. Since the thickness t is set so that the load transmission layer 40 does not buckle in the vertical direction when horizontal force is transmitted, the deformation of the impermeable layer 30 is suppressed. Note that the thickness t may be the same or different between the load transfer layer 40 on the sea side of the seawall structure 20 and the load transfer layer 40 on the landfill area side.

次に、上記のように構成された護岸構造100を構築する護岸構築方法を説明する。図2は、本実施形態に係る護岸構築方法の一例を示すフローチャートである。図2に示すように、護岸構築方法は、溝部形成工程(ステップS10)と、護岸構造物配置工程(ステップS20)と、遮水層配置工程(ステップS30)と、荷重伝達層配置工程(ステップS40)とを含む。 Next, a bank protection construction method for building the bank protection structure 100 configured as described above will be described. FIG. 2 is a flow chart showing an example of a bank protection construction method according to the present embodiment. As shown in FIG. 2, the bank protection construction method includes a groove formation step (step S10), a bank protection structure placement step (step S20), an impermeable layer placement step (step S30), and a load transmission layer placement step (step S40).

溝部形成工程S10は、遮水基盤10の上面に、水平面に沿った底部12と水平面に垂直な側壁13とを有する溝部11を形成する。本実施形態において、溝部形成工程S10では、遮水基盤10に溝部11を形成した後、溝部11の底部12の凹凸を覆うように被覆層14を形成する。 In the groove forming step S10, the groove 11 having the bottom 12 along the horizontal plane and the side walls 13 perpendicular to the horizontal plane is formed on the upper surface of the waterproof substrate 10 . In this embodiment, in the groove forming step S10, after the groove 11 is formed in the impervious substrate 10, the coating layer 14 is formed so as to cover the unevenness of the bottom 12 of the groove 11. FIG.

護岸構造物配置工程S20は、溝部11の底部12に、当該溝部11の側壁13との間に間隔を空けた状態で護岸構造物20を配置する。護岸構造物配置工程S20では、護岸構造100の幅方向の両側の側壁13との間に間隔を空けるように、被覆層14の上面に護岸構造物20を配置する。 In the bank protection structure arranging step S<b>20 , the bank protection structure 20 is arranged on the bottom 12 of the groove 11 with a gap between it and the sidewall 13 of the groove 11 . In the bank protection structure arranging step S<b>20 , the bank protection structure 20 is arranged on the upper surface of the coating layer 14 so as to be spaced from the side walls 13 on both sides in the width direction of the bank protection structure 100 .

遮水層配置工程S30は、護岸構造物20と溝部11の側壁13との間隔を埋めるように遮水層30を配置する。本実施形態において、遮水層30は、荷重伝達層40の上層に配置されるため、後述する荷重伝達層配置工程S40を行った後、当該遮水層配置工程S30を行う。このように、遮水層30と荷重伝達層40との位置関係に応じて、遮水層配置工程S30と荷重伝達層配置工程S40との順序を前後させたり、交互に行ったり、少なくとも一方を繰り返し行ったりすることができる。 In the impermeable layer arranging step S<b>30 , the impermeable layer 30 is arranged so as to fill the gap between the bank protection structure 20 and the side wall 13 of the groove portion 11 . In the present embodiment, since the impermeable layer 30 is disposed above the load transmission layer 40, the impermeable layer disposing step S30 is performed after performing the load transmitting layer disposing step S40, which will be described later. In this manner, depending on the positional relationship between the impermeable layer 30 and the load transfer layer 40, the order of the impermeable layer placement step S30 and the load transfer layer placement step S40 may be reversed or alternated, or at least one of them may be changed. You can do it repeatedly.

荷重伝達層配置工程S40は、護岸構造物20からの水平力を側壁13に伝達可能な荷重伝達材を有し、水平力を側壁13に伝達する場合に垂直方向に座屈しないように垂直方向の厚さtが設定された荷重伝達層40を、護岸構造物20と溝部11の側壁13との間隔を埋めるように配置する。 The load transmission layer placement step S40 includes a load transmission member capable of transmitting a horizontal force from the revetment structure 20 to the side wall 13, and is vertically bent so as not to vertically buckle when transmitting the horizontal force to the side wall 13. A load transmission layer 40 having a thickness t of 1 is arranged so as to fill the gap between the revetment structure 20 and the side wall 13 of the trench 11 .

以上のように、本実施形態に係る護岸構造100は、水平面に沿った底部12と水平面に垂直な側壁13とを有する溝部11が上面に形成される海底の遮水基盤10と、溝部11の底部12に当該溝部11の側壁13との間に間隔を空けた状態で配置される護岸構造物20と、護岸構造物20と溝部11の側壁13との間隔を埋めるように配置される遮水層30と、護岸構造物20と溝部11の側壁13との間隔を埋めるように配置され、護岸構造物20からの水平力を側壁13に対してせん断力として伝達可能な荷重伝達材を有し、水平力を側壁13に伝達する場合に垂直方向に座屈しないように垂直方向の厚さtが設定された荷重伝達層40とを備える。 As described above, the seawall structure 100 according to the present embodiment includes a seabed impervious base 10 having a bottom 12 along the horizontal plane and a groove 11 having a side wall 13 perpendicular to the horizontal plane formed on the upper surface, and the groove 11 A revetment structure 20 arranged on the bottom 12 with a gap between it and the side wall 13 of the groove 11, and a water impermeable structure arranged so as to fill the gap between the revetment structure 20 and the side wall 13 of the groove 11. It has a layer 30 and a load transmission member arranged to fill the gap between the revetment structure 20 and the side wall 13 of the groove 11 and capable of transmitting the horizontal force from the revetment structure 20 to the side wall 13 as a shear force. , a load transfer layer 40 having a vertical thickness t such that it does not buckle vertically when transferring horizontal forces to the sidewalls 13 .

また、本実施形態に係る護岸構築方法は、海底の遮水基盤10の上面に水平面に沿った底部12と水平面に垂直な側壁13とを有する溝部11を形成する工程と、溝部11の底部12に当該溝部11の側壁13との間に間隔を空けた状態で護岸構造物20を配置する工程と、護岸構造物20と溝部11の側壁13との間隔を埋めるように遮水層30を配置する工程と、護岸構造物20からの水平力を側壁13に伝達可能な荷重伝達材を有し、水平力を側壁13に伝達する場合に垂直方向に座屈しないように垂直方向の厚さtが設定された荷重伝達層40を、護岸構造物20と溝部11の側壁13との間隔を埋めるように配置する工程とを含む。 In addition, the bank protection construction method according to the present embodiment includes a step of forming a groove 11 having a bottom 12 along a horizontal plane and a side wall 13 perpendicular to the horizontal on the upper surface of the impermeable foundation 10 on the seabed; a step of arranging a bank protection structure 20 with a gap between it and the side wall 13 of the groove 11; and having a load transfer member capable of transferring horizontal forces from the revetment structure 20 to the sidewalls 13, and having a vertical thickness t so as not to vertically buckle when transferring horizontal forces to the sidewalls 13. is set so as to fill the gap between the bank protection structure 20 and the side wall 13 of the trench 11 .

この構成では、荷重伝達層40が座屈することなく、護岸構造物20からの水平力を側壁13に対してせん断力として伝達するため、護岸構造物20の水平移動を規制することができる。このように護岸構造物20の水平移動を規制することにより、遮水層30の材料が変形追随性遮水材に限定されないため、遮水層30の材料選択の幅を拡大させることができる。また、選択した材料を用いた遮水層30により、安定した遮水性を確保することが可能となる。 In this configuration, the horizontal force from the revetment structure 20 is transmitted to the side wall 13 as a shear force without the load transmission layer 40 buckling, so the horizontal movement of the revetment structure 20 can be restricted. By restricting the horizontal movement of the revetment structure 20 in this way, the material of the impermeable layer 30 is not limited to the deformation-following impermeable material, so the range of material choices for the impermeable layer 30 can be expanded. Moreover, the impermeable layer 30 using the selected material can ensure stable impermeability.

本実施形態に係る護岸構造100において、溝部11は、底部12に形成される凹凸を覆う被覆層14を有する。従って、遮水基盤10における許容支持力(許容端趾圧)が高められるため、護岸構造物20を細くすることができる。したがって、護岸構造物20のコンパクト化を図ることができる。また、護岸構造物20と、底部12の被覆層14との間の摩擦力を高めることができるため、護岸構造物20が水平方向に移動することを抑制できる。 In the bank protection structure 100 according to the present embodiment, the groove portion 11 has a coating layer 14 that covers irregularities formed on the bottom portion 12 . Therefore, since the permissible bearing force (permissible toe pressure) in the impervious base 10 is increased, the revetment structure 20 can be made thinner. Therefore, the revetment structure 20 can be made compact. Moreover, since the frictional force between the revetment structure 20 and the coating layer 14 of the bottom part 12 can be increased, it is possible to suppress the revetment structure 20 from moving in the horizontal direction.

本発明の技術範囲は上記実施形態に限定されるものではなく、本発明の趣旨を逸脱しない範囲で適宜変更を加えることができる。例えば、上記実施形態では、遮水層30及び荷重伝達層40が1層ずつ設けられた構成を例に挙げて説明したが、これに限定されない。 The technical scope of the present invention is not limited to the above embodiments, and modifications can be made as appropriate without departing from the scope of the present invention. For example, in the above-described embodiment, a configuration in which one impermeable layer 30 and one load transmission layer 40 are provided has been described as an example, but the present invention is not limited to this.

図3は、護岸構造の他の例を示す図である。図3に示す護岸構造100Aは、遮水層30が複数層(例えば、2層)設けられ、垂直方向に荷重伝達層40を挟んだ状態で配置される点で、上記実施形態に係る護岸構造100とは異なっている。このように、遮水層30を複数設けることで、より安定した遮水性が確保される。 FIG. 3 is a diagram showing another example of the bank protection structure. A bank protection structure 100A shown in FIG. different from 100. By providing a plurality of impermeable layers 30 in this manner, more stable impermeability is ensured.

図4は、護岸構造の他の例を示す図である。図4に示す護岸構造100Bは、荷重伝達層40が複数層(例えば、2層)設けられ、垂直方向に遮水層30を挟んだ状態で配置される点で、上記実施形態に係る護岸構造100とは異なっている。この場合、水平力を側壁13に伝達する場合に垂直方向に座屈しないように、各荷重伝達層40の垂直方向の厚さが設定される。この場合、2層の荷重伝達層40の合計の厚さが、例えばオイラーの公式又はテトマイヤーの公式等を用いて算出される所定の閾値よりも大きくなるように設定すればよい。このように、複数の荷重伝達層40を垂直方向に複数配置することにより、護岸構造物20からの水平力が垂直方向に分散される。このため、側壁13の一部分にせん断力が集中することを抑制できる。 FIG. 4 is a diagram showing another example of the bank protection structure. The revetment structure 100B shown in FIG. 4 is provided with a plurality of load transmission layers 40 (for example, two layers), and is arranged with the impermeable layer 30 sandwiched in the vertical direction. different from 100. In this case, the vertical thickness of each load transfer layer 40 is set so that it does not buckle vertically when transferring horizontal forces to the sidewalls 13 . In this case, the total thickness of the two load transfer layers 40 may be set to be greater than a predetermined threshold calculated using, for example, Euler's formula or Tetmeyer's formula. By arranging a plurality of load transfer layers 40 in the vertical direction in this manner, the horizontal force from the bank protection structure 20 is dispersed in the vertical direction. Therefore, it is possible to suppress the concentration of the shearing force on a portion of the side wall 13 .

図5は、護岸構造の他の例を示す図である。図5に示す護岸構造100Cは、遮水層30及び荷重伝達層40がそれぞれ複数層(例えば、2層)設けられ、垂直方向に交互に配置される点で、上記実施形態に係る護岸構造100とは異なっている。この場合においても、2層の荷重伝達層40の合計の厚さが、例えばオイラーの公式又はテトマイヤーの公式等を用いて算出される所定の閾値よりも大きくなるように設定すればよい。このように、複数の遮水層30及び荷重伝達層40を垂直方向に交互に配置することで、より安定した遮水性が確保され、側壁13の一部分にせん断力が集中することを抑制できる。 FIG. 5 is a diagram showing another example of the bank protection structure. The bank protection structure 100C shown in FIG. 5 is provided with a plurality of layers (for example, two layers) of the impermeable layer 30 and the load transmission layer 40, which are arranged alternately in the vertical direction. is different from Also in this case, the total thickness of the two load transfer layers 40 may be set to be larger than a predetermined threshold calculated using, for example, Euler's formula or Tetmeyer's formula. By alternately arranging a plurality of impermeable layers 30 and load transfer layers 40 in the vertical direction in this manner, more stable imperviousness is ensured, and concentration of shear force on a portion of the side wall 13 can be suppressed.

上記実施形態では、護岸構造物20に対して海域側と埋立区域側とで、遮水層30及び荷重伝達層40が対称に配置された構成を例に挙げて説明したが、これに限定されない。図6は、護岸構造の他の例を示す図である。図6に示す護岸構造100Dは、護岸構造物20に対して海域側と埋立区域側とで、遮水層30及び荷重伝達層40の数及び配置が非対称となっている。つまり、海域側では、遮水層30が1層配置され、荷重伝達層40が2層配置され、垂直方向について2層の荷重伝達層40の間に遮水層30が配置された構成である。一方、埋立区域側では、荷重伝達層40が1層配置され、遮水層30が2層配置され、垂直方向について2層の遮水層30の間に荷重伝達層40が配置された構成である。この場合、海域側では、2層の荷重伝達層40の合計の厚さが、例えばオイラーの公式又はテトマイヤーの公式等を用いて算出される所定の閾値よりも大きくなるように設定すればよい。また、埋立区域側では、1層の荷重伝達層40の厚さが、例えばオイラーの公式又はテトマイヤーの公式等を用いて算出される所定の閾値よりも大きくなるように設定すればよい。このように、護岸構造物20に対して海域側と埋立区域側とで、遮水層30及び荷重伝達層40の数及び配置が非対称であっても、安定した遮水性が確保され、側壁13の一部分にせん断力が集中することを抑制できる。 In the above-described embodiment, a configuration in which the impermeable layer 30 and the load transfer layer 40 are arranged symmetrically on the sea area side and the landfill area side with respect to the revetment structure 20 has been described as an example, but it is not limited to this. . FIG. 6 is a diagram showing another example of the bank protection structure. In the seawall structure 100D shown in FIG. 6, the sea area side and the landfill area side of the seawall structure 20 are asymmetrical in number and arrangement of the impermeable layers 30 and the load transfer layers 40 . That is, on the sea area side, one impermeable layer 30 is arranged, two load transfer layers 40 are arranged, and the impermeable layer 30 is arranged between the two load transfer layers 40 in the vertical direction. . On the other hand, on the landfill area side, one load transfer layer 40 is arranged, two impermeable layers 30 are arranged, and the load transfer layer 40 is arranged between the two impermeable layers 30 in the vertical direction. be. In this case, on the sea area side, the total thickness of the two load transfer layers 40 may be set to be greater than a predetermined threshold calculated using, for example, Euler's formula or Tetmeyer's formula. Also, on the landfill area side, the thickness of one layer of the load transfer layer 40 may be set to be larger than a predetermined threshold calculated using, for example, Euler's formula or Tetmeyer's formula. Thus, even if the number and arrangement of the impermeable layers 30 and the load transfer layers 40 are asymmetrical on the sea area side and the landfill area side with respect to the revetment structure 20, stable imperviousness is ensured, and the side wall 13 It is possible to suppress the concentration of shear force on a part of

上記実施形態では、遮水層30と荷重伝達層40とが別個の層として設けられる構成を例に挙げて説明したが、これに限定されない。図7は、護岸構造の他の例を示す図である。図7に示す護岸構造100Eは、遮水層30及び荷重伝達層40が、同一の遮水・荷重伝達層50として形成されている。遮水・荷重伝達層50は、遮水層30を構成する遮水材31と、荷重伝達層40を構成する荷重伝達材41とを有する。遮水材31としては、例えばプレパックドコンクリート等のコンクリート系の遮水材が用いられる。また、荷重伝達材41としては、例えば複数の石材等が用いられる。遮水・荷重伝達層50は、荷重伝達材41を構成する石材同士の隙間を埋めるように遮水材31が配置される。 In the above embodiment, the configuration in which the impermeable layer 30 and the load transmission layer 40 are provided as separate layers was described as an example, but the present invention is not limited to this. FIG. 7 is a diagram showing another example of the bank protection structure. In the bank protection structure 100E shown in FIG. The impermeable/load-transmitting layer 50 has a impermeable material 31 that constitutes the impermeable layer 30 and a load-transmitting material 41 that constitutes the load-transmitting layer 40 . As the impermeable material 31, for example, a concrete impermeable material such as prepacked concrete is used. As the load transmission member 41, for example, a plurality of stones or the like are used. In the impermeable/load-transmitting layer 50 , the impermeable material 31 is arranged so as to fill the gaps between the stone materials forming the load-transmitting material 41 .

また、図8は、護岸構造の他の例を示す図である。図8に示す護岸構造100Fは、遮水層30及び荷重伝達層40が、同一の遮水・荷重伝達層60として形成されている。遮水・荷重伝達層60は、遮水層30を構成する遮水材と、荷重伝達層40を構成する荷重伝達材とが共通の土質系材料を用いて形成される。 Moreover, FIG. 8 is a figure which shows the other example of a bank protection structure. In the bank protection structure 100F shown in FIG. In the impermeable/load-transmitting layer 60, the impermeable material forming the impermeable layer 30 and the load-transmitting material forming the load-transmitting layer 40 are formed using a common soil material.

このように、遮水層30と荷重伝達層40とが1つの遮水・荷重伝達層50、60として形成されるため、幅広い材料から遮水材及び荷重伝達材を選択し、遮水層30及び荷重伝達層40を容易に形成できる。 In this way, since the impermeable layer 30 and the load transfer layer 40 are formed as one impermeable/load transfer layer 50, 60, the impermeable material and the load transfer material are selected from a wide range of materials, and the impermeable layer 30 And the load transmission layer 40 can be easily formed.

上記実施形態では、遮水基盤10の上面に溝部11を掘ることで、底部12及び側壁13を形成する場合を例に挙げて説明したが、これに限定されない。図9は、護岸構造の他の例を示す図である。図9に示す護岸構造100Gは、岩盤で構成される遮水基盤10G上に被覆層14Gが形成され、被覆層14Gの上面に側壁部材15が配置され、側壁部材15がアンカー16によって被覆層14Gに固定されることで溝部11Gが形成された構成である。この構成において、側壁部材15のうち護岸構造物20側に向けられた部分が側壁13Gを構成する。そして、護岸構造物20と側壁13Gとの間には、遮水層30及び荷重伝達層40が配置される。また、図9に示す例において、荷重伝達層40は、アンカー16によって被覆層14Gに固定される。この構成では、側壁部材15及び荷重伝達層40がアンカー16により被覆層14Gに固定される構成であるため、荷重伝達層40からのせん断力を側壁13Gにおいて確実に受けることができる。なお、アンカー16は、側壁部材15及び荷重伝達層40のいずれか一方に配置された構成であってもよい。 In the above embodiment, the case where the bottom 12 and the side walls 13 are formed by digging the groove 11 in the upper surface of the impervious base 10 has been described as an example, but the present invention is not limited to this. FIG. 9 is a diagram showing another example of the bank protection structure. A bank protection structure 100G shown in FIG. It is the structure in which the groove part 11G was formed by fixing to. In this configuration, the portion of the side wall member 15 facing the bank protection structure 20 constitutes the side wall 13G. A water shield layer 30 and a load transfer layer 40 are arranged between the bank protection structure 20 and the side wall 13G. Also, in the example shown in FIG. 9, the load transfer layer 40 is fixed to the cover layer 14G by the anchors 16. As shown in FIG. In this configuration, the side wall member 15 and the load transmission layer 40 are fixed to the cover layer 14G by the anchors 16, so that the shear force from the load transmission layer 40 can be reliably received by the side wall 13G. In addition, the anchor 16 may be arranged on either one of the side wall member 15 and the load transmission layer 40 .

上記実施形態では、遮水基盤10の溝部11の底部12上に水中コンクリートからなる被覆層14が配置される場合を例に挙げて説明したが、これに限定されない。図10は、護岸構造の他の例を示す図である。図10に示す護岸構造100Hは、底部12上に基礎捨石マウンドからなる被覆層17が配置され、被覆層17上に護岸構造物20、遮水層30及び荷重伝達層40が配置された構成である。このように、基礎捨石マウンドからなる被覆層17を用いた構成であっても、遮水層30及び荷重伝達層40を配置することができる。なお、基礎捨石マウンドからなる被覆層17の上面に遮水シートを配置することで、被覆層17を介する水漏れを抑制してもよい。なお、被覆層は、上記の水中コンクリート及び基礎捨石マウンドからなる構成の他に、例えばハイブリッド基礎マウンドからなる構成であってもよい。ハイブリッド基礎マウンドは、基礎捨石マウンドに用いられる捨石間の空隙を水中コンクリート系材料、アスファルト混合物系材料又は土質系材料により充填させた構成である。 In the above embodiment, the case where the covering layer 14 made of underwater concrete is arranged on the bottom 12 of the groove 11 of the impermeable base 10 has been described as an example, but the present invention is not limited to this. FIG. 10 is a diagram showing another example of the bank protection structure. The revetment structure 100H shown in FIG. 10 has a structure in which a coating layer 17 made of a foundation riprap mound is arranged on the bottom part 12, and a revetment structure 20, an impervious layer 30, and a load transmission layer 40 are arranged on the covering layer 17. be. In this manner, even in the configuration using the coating layer 17 made of the foundation rubble mound, the impermeable layer 30 and the load transfer layer 40 can be arranged. In addition, water leakage through the covering layer 17 may be suppressed by placing a waterproof sheet on the upper surface of the covering layer 17 made of the foundation rubble mound. The coating layer may be composed of, for example, a hybrid foundation mound, in addition to the construction of the underwater concrete and the foundation rubble mound. The hybrid foundation mound is constructed by filling the gaps between the rubble stones used in the foundation rubble mound with an underwater concrete-based material, an asphalt mixture-based material, or a soil-based material.

上記実施形態では、護岸構造物20の海域側及び埋立区域側の両側に荷重伝達層40を配置する構成を例に挙げて説明したが、これに限定されない。図11は、護岸構造の他の例を示す図である。図11に示す護岸構造100Iは、護岸構造物20の海域側及び埋立区域側のいずれか一方のみ(例えば、海域側)に荷重伝達層40及び遮水層30が配置される構成である。この場合、護岸構造物20の埋立区域側では、遮水層70のみが配置され、荷重伝達層40は配置されない。このように、護岸構造物20を基準とした海域側及び埋立区域側のいずれか一方のみに荷重伝達層40が配置される場合、荷重伝達層40が配置される側に向けた護岸構造物20の水平力については、荷重伝達層40を介して側壁13に伝達することができる。 In the above-described embodiment, the configuration in which the load transmission layers 40 are arranged on both sides of the revetment structure 20 on the sea area side and the landfill area side has been described as an example, but the present invention is not limited to this. FIG. 11 is a diagram showing another example of the bank protection structure. The revetment structure 100I shown in FIG. 11 has a configuration in which the load transfer layer 40 and the impermeable layer 30 are arranged only on either the sea area side or the landfill area side of the seawall structure 20 (for example, the sea area side). In this case, on the landfill area side of the revetment structure 20, only the impermeable layer 70 is arranged and the load transfer layer 40 is not arranged. In this way, when the load transfer layer 40 is arranged only on either the sea area side or the landfill area side with respect to the bank protection structure 20, the bank protection structure 20 is directed toward the side where the load transfer layer 40 is arranged. horizontal force can be transmitted to the sidewall 13 via the load transmission layer 40 .

上記実施形態では、護岸構造物20の海域側及び埋立区域側の両側に配置される遮水基盤10の高さが等しい又はほぼ等しい構成を例に挙げて説明したが、これに限定されない。図12は、護岸構造の他の例を示す図である。図12に示す護岸構造100Jは、護岸構造物20の海域側及び埋立区域側の一方(例えば、海域側)における遮水基盤10の高さが、他方(例えば、埋立区域側)よりも高くなっている構成である。このように、護岸構造物20の海域側及び埋立区域側の一方における遮水基盤10の高さが、他方よりも高くなっている構成であっても、安定した遮水性が確保される。 In the above-described embodiment, a configuration in which the impermeable foundations 10 arranged on both the sea area side and the reclamation area side of the revetment structure 20 have the same or substantially the same height has been described as an example, but the present invention is not limited to this. FIG. 12 is a diagram showing another example of the bank protection structure. In the seawall structure 100J shown in FIG. 12, the height of the impermeable foundation 10 on one of the sea area side and the landfill area side of the seawall structure 20 (for example, the sea area side) is higher than the other (for example, the landfill area side). configuration. In this way, even if the height of the impermeable base 10 on one of the sea area side and the landfill area side of the revetment structure 20 is higher than the other, stable imperviousness is ensured.

10,10G 遮水基盤
11,11G 溝部
12 底部
13,13G 側壁
14,14G 被覆層
15 側壁部材
16 アンカー
17 基礎捨石マウンド
20 護岸構造物
30,70 遮水層
31 遮水材
40 荷重伝達層
41 荷重伝達材
50,60 遮水・荷重伝達層
100,100A,100B,100C,100D,100E,100F,100G,100H,100I,100J 護岸構造
G 軟弱地盤
S10 溝部形成工程
S20 護岸構造物配置工程
S30 遮水層配置工程
S40 荷重伝達層配置工程
10, 10G Impermeable foundation 11, 11G Groove 12 Bottom 13, 13G Side wall 14, 14G Coating layer 15 Side wall member 16 Anchor 17 Foundation rubble mound 20 Revetment structure 30, 70 Impermeable layer 31 Impermeable material 40 Load transmission layer 41 Load Transmission material 50, 60 Impermeable/load transmitting layer 100, 100A, 100B, 100C, 100D, 100E, 100F, 100G, 100H, 100I, 100J Revetment structure G Soft ground S10 Groove formation step S20 Revetment structure arrangement step S30 Water impermeability Layer Arranging Step S40 Load Transfer Layer Arranging Step

Claims (8)

水平面に沿った底部と水平面に垂直な側壁とを有する溝部が上面に形成される海底の遮水基盤と、
前記溝部の底部に当該溝部の側壁との間に間隔を空けた状態で配置される護岸構造物と、
前記護岸構造物と前記溝部の側壁との間隔を埋めるように配置される遮水層と、
前記護岸構造物と前記溝部の側壁との間隔を埋めるように配置され、前記護岸構造物からの水平力を前記側壁に対してせん断力として伝達可能な荷重伝達材を有し、前記水平力を前記側壁に伝達する場合に垂直方向に座屈しないように前記垂直方向の厚さが設定された荷重伝達層と
を備える護岸構造。
a seafloor impermeable base having a groove formed in the upper surface thereof, the groove having a bottom along the horizontal plane and sidewalls perpendicular to the horizontal plane;
a revetment structure arranged at the bottom of the groove with a gap between it and the side wall of the groove;
an impermeable layer arranged to fill the gap between the revetment structure and the side wall of the trench;
A load transmission member is disposed so as to fill the gap between the bank protection structure and the side wall of the groove, and is capable of transmitting a horizontal force from the bank protection structure to the side wall as a shear force, wherein the horizontal force is transferred to the side wall. a revetment structure having a thickness in the vertical direction so as not to buckle vertically when the load is transferred to the side walls.
前記荷重伝達層は、前記垂直方向に複数層に配置される
請求項1に記載の護岸構造。
The bank protection structure according to claim 1, wherein the load transfer layer is arranged in a plurality of layers in the vertical direction.
前記遮水層及び前記荷重伝達層は、同一の層として形成される
請求項1又は請求項2に記載の護岸構造。
The bank protection structure according to claim 1 or 2, wherein the impermeable layer and the load transfer layer are formed as the same layer.
前記遮水層は、変形非追随性遮水材を用いて形成される
請求項1から請求項3のいずれか一項に記載の護岸構造。
The bank protection structure according to any one of claims 1 to 3, wherein the impermeable layer is formed using a non-deforming impermeable impermeable material.
前記側壁は、アンカーにより前記遮水基盤に固定される
請求項1から請求項4のいずれか一項に記載の護岸構造。
The bank protection structure according to any one of claims 1 to 4, wherein the side wall is fixed to the impermeable base with an anchor.
前記溝部は、前記底部に形成される凹凸を覆う被覆層を有する
請求項1から請求項5のいずれか一項に記載の護岸構造。
The bank protection structure according to any one of claims 1 to 5, wherein the groove has a coating layer covering irregularities formed on the bottom.
前記被覆層は、水中コンクリートからなる層、捨石を用いた基礎捨石マウンド、並びに、前記基礎捨石マウンドに用いられる前記捨石間の空隙を水中コンクリート系材料、アスファルト混合物系材料又は土質系材料により充填させたハイブリッド基礎マウンド、のいずれかである
請求項6に記載の護岸構造。
The covering layer is a layer made of underwater concrete, a basic rubble mound using rubble, and a gap between the rubble used in the rubble mound is filled with underwater concrete-based material, asphalt mixture-based material, or soil-based material. The revetment structure according to claim 6, which is a hybrid foundation mound.
海底の遮水基盤の上面に水平面に沿った底部と水平面に垂直な側壁とを有する溝部を形成する工程と、
前記溝部の底部に当該溝部の側壁との間に間隔を空けた状態で護岸構造物を配置する工程と、
前記護岸構造物と前記溝部の側壁との間隔を埋めるように遮水層を配置する工程と、
前記護岸構造物からの水平力を前記側壁に対してせん断力として伝達可能な荷重伝達材を有し、前記水平力を前記側壁に伝達する場合に垂直方向に座屈しないように前記垂直方向の厚さが設定された荷重伝達層を、前記護岸構造物と前記溝部の側壁との間隔を埋めるように配置する工程と
を含む護岸構築方法。
forming a groove having a bottom along a horizontal plane and sidewalls perpendicular to the horizontal plane in the upper surface of the impervious base of the seabed;
arranging a revetment structure on the bottom of the groove with a gap between it and the side wall of the groove;
arranging an impermeable layer so as to fill the gap between the revetment structure and the side wall of the trench;
It has a load transmission member capable of transmitting a horizontal force from the revetment structure to the side wall as a shear force, and when transmitting the horizontal force to the side wall, the vertical force is not vertically buckled. arranging a load transmission layer with a set thickness so as to fill the gap between the revetment structure and the side wall of the trench.
JP2019039901A 2019-03-05 2019-03-05 Revetment structure and bank protection construction method Active JP7209290B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019039901A JP7209290B2 (en) 2019-03-05 2019-03-05 Revetment structure and bank protection construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019039901A JP7209290B2 (en) 2019-03-05 2019-03-05 Revetment structure and bank protection construction method

Publications (2)

Publication Number Publication Date
JP2020143484A JP2020143484A (en) 2020-09-10
JP7209290B2 true JP7209290B2 (en) 2023-01-20

Family

ID=72355514

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019039901A Active JP7209290B2 (en) 2019-03-05 2019-03-05 Revetment structure and bank protection construction method

Country Status (1)

Country Link
JP (1) JP7209290B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4293435B2 (en) 2002-08-28 2009-07-08 ワールドエンジニアリング株式会社 Construction method of managed revetment
JP5099709B2 (en) 2002-08-28 2012-12-19 ワールドエンジニアリング株式会社 Construction method of managed revetment
JP2013249689A (en) 2012-06-04 2013-12-12 World Engineering Kk Sealing structure of cell body
JP2015040440A (en) 2013-08-22 2015-03-02 Jfeエンジニアリング株式会社 Dam body
JP2018188882A (en) 2017-05-09 2018-11-29 ワールドエンジニアリング株式会社 Control type revetment and installation method of the same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4293435B2 (en) 2002-08-28 2009-07-08 ワールドエンジニアリング株式会社 Construction method of managed revetment
JP5099709B2 (en) 2002-08-28 2012-12-19 ワールドエンジニアリング株式会社 Construction method of managed revetment
JP2013249689A (en) 2012-06-04 2013-12-12 World Engineering Kk Sealing structure of cell body
JP2015040440A (en) 2013-08-22 2015-03-02 Jfeエンジニアリング株式会社 Dam body
JP2018188882A (en) 2017-05-09 2018-11-29 ワールドエンジニアリング株式会社 Control type revetment and installation method of the same

Also Published As

Publication number Publication date
JP2020143484A (en) 2020-09-10

Similar Documents

Publication Publication Date Title
JP6357323B2 (en) Liquefaction countermeasure structure and its construction method
KR101975297B1 (en) Multi-wall construction method using multi-wall construction supporting files and supporting files used for construction of harbors, rivers, dams and concrete that can prevent the inflow of soil and water
JP4293435B2 (en) Construction method of managed revetment
JP5728206B2 (en) Construction method of partition revetment
JP7209290B2 (en) Revetment structure and bank protection construction method
JP5099709B2 (en) Construction method of managed revetment
JP4315620B2 (en) Impermeable treatment method for managed waste landfill revetment
CN101748735A (en) Foundation ditch excavation method for reducing pile deflection in soft soil area
JP7285392B2 (en) L-shaped caisson structure
JP4410572B2 (en) Construction method of revetment for landfill
JP5791257B2 (en) Closure method for water-impervious revetment opening
JP3999628B2 (en) Construction method of caisson dyke
JP2003113608A (en) Impermeable wall structure and impermeable seawall structure using the impermeable wall
JP6128725B2 (en) breakwater
JP2002201623A (en) Double sheet pile type revetment and construction method
JP2004162325A (en) Impervious construction method for controlling revetment
JP6018804B2 (en) Cell body water-blocking structure
JP4606454B2 (en) Construction method of managed revetment
JP4895924B2 (en) Construction method of partition revetment
KR102762119B1 (en) A method for installing a marine breakwater wall using a cylindrical device of the TSP method
JP4139871B2 (en) Steel plate cell revetment
JP2014009447A (en) Construction method for impermeable seawall
CN1050645C (en) A soft settling structure and method for setting the same
JP5046283B2 (en) Partition revetment
JP4194679B2 (en) Ground improvement method to prevent liquefaction

Legal Events

Date Code Title Description
RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7426

Effective date: 20190409

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20190409

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220209

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20221130

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20221206

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20221226

R150 Certificate of patent or registration of utility model

Ref document number: 7209290

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250