Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7209652B2 - River management device, river management support system, river management support method, and river management support program - Google Patents
[go: Go Back, main page]

JP7209652B2 - River management device, river management support system, river management support method, and river management support program - Google Patents

River management device, river management support system, river management support method, and river management support program Download PDF

Info

Publication number
JP7209652B2
JP7209652B2 JP2020017646A JP2020017646A JP7209652B2 JP 7209652 B2 JP7209652 B2 JP 7209652B2 JP 2020017646 A JP2020017646 A JP 2020017646A JP 2020017646 A JP2020017646 A JP 2020017646A JP 7209652 B2 JP7209652 B2 JP 7209652B2
Authority
JP
Japan
Prior art keywords
water level
river
image
reference water
acquisition device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020017646A
Other languages
Japanese (ja)
Other versions
JP2021124370A (en
Inventor
敦之 中川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2020017646A priority Critical patent/JP7209652B2/en
Publication of JP2021124370A publication Critical patent/JP2021124370A/en
Application granted granted Critical
Publication of JP7209652B2 publication Critical patent/JP7209652B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A90/00Technologies having an indirect contribution to adaptation to climate change
    • Y02A90/30Assessment of water resources

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Description

本開示は、監視対象となる河川の画像を表示し、河川の管理を支援するための河川管理装置、河川管理支援システム、河川管理支援方法及び河川管理支援プログラムに関する。 The present disclosure relates to a river management device, a river management support system, a river management support method, and a river management support program for displaying an image of a river to be monitored and supporting river management.

河川は、洪水や高潮などによる災害の発生を防止し、公共の安全を保持するよう省庁及び地方自治体等の河川管理者によって管理されている。河川管理者による河川管理を支援する一つの手段として、監視対象河川における複数地点の水位を水位計により計測して情報を監視センターに集約し、監視センターの表示装置に計測結果をリアルタイム表示する河川管理支援システムが知られている(例えば、特許文献1参照)。 Rivers are managed by river administrators such as ministries, agencies and local governments to prevent disasters such as floods and storm surges and to maintain public safety. As a means of supporting river management by river administrators, rivers measure water levels at multiple points on rivers to be monitored using water level gauges, aggregate the information in a monitoring center, and display the measurement results in real time on a display device in the monitoring center. A management support system is known (see Patent Literature 1, for example).

この河川管理支援システムでは、計測した河川の水位と危険水位情報とを比較して危険な水位であるか否か判定し、危険な水位であると判定された場合には表示装置に警報が表示される。 In this river management support system, the measured water level of the river is compared with the dangerous water level information to determine whether the water level is dangerous or not. be done.

特開2003-156331号公報JP-A-2003-156331

従来の河川管理支援システムでは、管理の基準となる水位と現在の水位とを比較して現在の水位の危険性を自動判断することはできるが、例えば、現在の河川の水位から上昇して基準水位まで達した際に、増水の程度や川幅の状態等、実際の河川周辺がどのような状況となるのかを予測し、事前に把握することは困難であった。 In conventional river management support systems, it is possible to automatically judge the danger of the current water level by comparing the current water level with the water level that serves as a reference for management. It was difficult to predict and grasp in advance what the actual situation around the river would be like, such as the degree of water rise and the condition of the river width, when the water level reached it.

本開示は、上記のような課題を解決するためになされたものであり、基準水位に達した際の河川の状況を容易に把握できる河川管理装置、河川管理支援システム、河川管理支援方法及び河川管理支援プログラムを提供することを目的とする。 The present disclosure has been made to solve the above-described problems, and includes a river management device, a river management support system, a river management support method, and a river that can easily grasp the situation of a river when the standard water level is reached. Intended to provide administrative support programs.

本開示に係る河川管理装置は、撮影範囲を変更可能な画像取得装置により取得された河川画像に、基準水位を示す基準水位線を重ね合わせた基準水位合成画像を生成する処理部と、処理部により生成された基準水位合成画像を出力する出力部とを備え、画像取得装置の撮影範囲の変更に伴って基準水位線の位置が変更されるものである。 A river management device according to the present disclosure includes a processing unit that generates a reference water level composite image by superimposing a reference water level line indicating a reference water level on a river image acquired by an image acquisition device capable of changing the imaging range, and a processing unit. and an output unit for outputting the reference water level composite image generated by , and the position of the reference water level line is changed in accordance with the change of the photographing range of the image acquisition device .

本開示に係る河川管理支援システムは、河川画像を取得する、撮影範囲を変更可能な画像取得装置と、画像取得装置により取得された河川画像に、基準水位を示す基準水位線を重ね合わせた基準水位合成画像を生成する処理部及び処理部により生成された基準水位合成画像を出力する出力部を有する河川管理装置と、河川管理装置から出力された基準水位合成画像を表示する表示装置とを備え、画像取得装置の撮影範囲の変更に伴って基準水位線の位置が変更されるものである。 A river management support system according to the present disclosure includes an image acquisition device that acquires a river image and is capable of changing the imaging range; A river management device having a processing unit that generates a water level composite image and an output unit that outputs the reference water level composite image generated by the processing unit, and a display device that displays the reference water level composite image output from the river management device. , the position of the reference water line is changed as the imaging range of the image acquisition device is changed .

本開示に係る河川管理支援方法は、撮影範囲を変更可能な画像取得装置により河川画像を取得する工程と、取得した河川画像に、基準水位を示す基準水位線を重ね合わせた基準水位合成画像を生成する工程と、生成した基準水位合成画像を表示する工程と、画像取得装置の撮影範囲の変更に伴って基準水位線の位置が変更される工程と、を備えるものである。 A river management support method according to the present disclosure includes steps of acquiring a river image with an image acquisition device capable of changing the imaging range, and creating a standard water level composite image in which a standard water level line indicating the standard water level is superimposed on the acquired river image. It comprises a step of generating, a step of displaying the generated reference water level composite image, and a step of changing the position of the reference water level line as the imaging range of the image acquisition device is changed .

本開示に係る河川管理支援プログラムは、コンピュータに、撮影範囲を変更可能な画像取得装置により取得された河川画像に、基準水位を示す基準水位線を重ね合わせた基準水位合成画像を生成する工程と、生成した基準水位合成画像を出力する工程と、画像取得装置の撮影範囲の変更に伴って基準水位線の位置が変更される工程と、を実行させるものである。 A river management support program according to the present disclosure includes a step of generating a reference water level composite image in which a reference water level line indicating the reference water level is superimposed on a river image acquired by an image acquisition device capable of changing the imaging range , in a computer. a step of outputting the generated reference water level composite image; and a step of changing the position of the reference water level line in accordance with the change of the photographing range of the image acquisition device .

本開示によれば、監視対象である河川の現状を示す河川画像に基準水位線が重ねて表示されるため、今後河川の水位が基準水位に達した際の河川の状況を容易に把握することが可能となる。 According to the present disclosure, since the reference water level line is superimposed on the river image showing the current state of the river to be monitored, it is possible to easily grasp the river situation when the water level of the river reaches the reference water level in the future. becomes possible.

実施の形態1における河川管理支援システムの概略図である。1 is a schematic diagram of a river management support system according to Embodiment 1; FIG. 実施の形態1における親局システムの概略図である。1 is a schematic diagram of a master station system according to Embodiment 1; FIG. 実施の形態1における河川管理装置が保持する基準水位テーブルのデータ構造を示す図である。4 is a diagram showing the data structure of a reference water level table held by the river management device according to Embodiment 1; FIG. 実施の形態1における河川管理装置が保持する基準水位画像を示す図である。4 is a diagram showing a reference water level image held by the river management device according to Embodiment 1; FIG. 実施の形態1における子局管理装置が行う情報取得処理のフローチャートである。7 is a flowchart of information acquisition processing performed by the slave station management device according to Embodiment 1; 実施の形態1における河川管理装置が行う基準水位合成画像の生成処理のフローチャートである。4 is a flow chart of processing for generating a reference water level composite image performed by the river management device according to Embodiment 1. FIG. 実施の形態1における表示装置が表示するメイン画面の概略図である。4 is a schematic diagram of a main screen displayed by the display device according to Embodiment 1. FIG. 実施の形態1における表示装置が表示する詳細画面の概略図である。4 is a schematic diagram of a detailed screen displayed by the display device according to Embodiment 1. FIG. 実施の形態2における河川管理支援システムの概略図である。FIG. 10 is a schematic diagram of a river management support system according to Embodiment 2; 実施の形態2における画像取得装置の構造及び撮影範囲を示す図である。FIG. 10 is a diagram showing the structure and imaging range of an image acquisition device according to Embodiment 2; 実施の形態2における子局管理装置が行う情報取得処理のフローチャートである。10 is a flowchart of information acquisition processing performed by the slave station management device according to Embodiment 2. FIG. 実施の形態2における河川管理装置が行う基準水位合成画像の生成処理のフローチャートである。10 is a flow chart of a reference water level composite image generation process performed by the river management device according to Embodiment 2. FIG. 実施の形態2における撮影範囲変更前と撮影範囲変更後における基準水位合成画像の変化を示す図である。FIG. 10 is a diagram showing changes in the reference water level composite image before and after changing the imaging range in Embodiment 2; 実施の形態3における河川管理装置が行う基準水位合成画像の生成処理のフローチャートである。13 is a flow chart of a reference water level composite image generation process performed by the river management device according to Embodiment 3. FIG. 実施の形態3における表示装置が表示する基準水位合成画像を示す図である。FIG. 11 is a diagram showing a reference water level composite image displayed by a display device according to Embodiment 3;

実施の形態1.
<河川管理支援システム100の構成>
実施の形態1における河川管理支援システム100の構成について、図1を用いて説明する。図1に、河川管理支援システム100の概略図を示す。河川管理支援システム100は、河川周辺にある河川観測所に設けられた子局システム1と、河川管理者が各河川の情報を集約的に管理する河川管理事務所に設けられた親局システム2とを備えている。
Embodiment 1.
<Configuration of river management support system 100>
A configuration of the river management support system 100 according to Embodiment 1 will be described with reference to FIG. FIG. 1 shows a schematic diagram of a river management support system 100. As shown in FIG. A river management support system 100 includes a sub-station system 1 installed at a river observatory located near a river, and a master station system 2 installed at a river administration office where information on each river is collectively managed by a river administrator. and

子局システム1は、広域にわたる河川において、橋、堤防、ダム、水門、排水機場、遊水地等の複数の観測地に設定されている河川観測所毎に設けられている。子局システム1は、それぞれ、水位計10と、画像取得装置11と、子局管理装置12とを備えている。子局システム1は、同一の河川沿いに設置された複数の河川観測所にそれぞれ設けられていてもよいし、河川管理者が管轄する異なる河川に設置された複数の観測所にそれぞれ設けられていてもよい。 The sub-station system 1 is provided for each river observation station set at a plurality of observation sites such as bridges, embankments, dams, water gates, drainage pump stations, and retarding basins in wide-area rivers. Each slave station system 1 includes a water gauge 10 , an image acquisition device 11 , and a slave station management device 12 . The slave station system 1 may be installed in each of a plurality of river observation stations installed along the same river, or may be installed in each of multiple observation stations installed in different rivers under the jurisdiction of a river administrator. may

水位計10は、各観測地における監視対象河川の水位を測定する機器であり、測定データを子局管理装置12に自動送信することができる。水位計10としては、例えば、フロート式水位計、気泡式水位計、リードスイッチ式水位計、水圧式水位計、超音波式水位計等を用いることができる。 The water level gauge 10 is a device for measuring the water level of the river to be monitored at each observation site, and can automatically transmit measurement data to the slave station management device 12 . As the water level gauge 10, for example, a float type water level gauge, a bubble type water level gauge, a reed switch type water level gauge, a water pressure type water level gauge, an ultrasonic water level gauge, or the like can be used.

画像取得装置11は、観測地における監視対象河川の画像を取得する機器であり、取得した画像を子局管理装置12に自動送信することができる。画像取得装置11としては、例えば、固定式のCCTV(Closed-circuit Television)カメラを用いることができる。画像取得装置11が取得する画像は、静止画及び動画のどちらであってもよい。静止画であれば、例えば、JPEG、PNG、GIF等の形式が挙げられ、動画であれば、例えば、AVI、MOV、MPEG-2、MPEG-4、Mothion-JPEG等の形式が挙げられる。 The image acquisition device 11 is a device that acquires an image of a river to be monitored at an observation site, and can automatically transmit the acquired image to the slave station management device 12 . As the image acquisition device 11, for example, a fixed CCTV (Closed-Circuit Television) camera can be used. The image acquired by the image acquisition device 11 may be either a still image or a moving image. Examples of still images include formats such as JPEG, PNG, and GIF, and examples of moving images include formats such as AVI, MOV, MPEG-2, MPEG-4, and Motion-JPEG.

子局管理装置12は、水位計10及び画像取得装置11と有線又は無線方式により通信可能に接続されている。子局管理装置12は、河川観測所において、水位計10及び画像取得装置11により取得した河川の水位情報及び画像データを管理している。 The child station management device 12 is communicably connected to the water level gauge 10 and the image acquisition device 11 by a wired or wireless method. The slave station management device 12 manages river water level information and image data acquired by the water level gauge 10 and the image acquisition device 11 at the river observatory.

親局システム2は、河川管理装置20、表示装置26及び入力装置27を備えており、河川の治水、利水、環境整備計画の立案、工事、維持管理等を行う河川管理者の施設に設けられている。ここで、河川管理者とは、例えば、一級河川及び二級河川においては国土交通省大臣又は都道府県知事、準用河川及び普通河川においては市町村長が挙げられる。 The master station system 2 includes a river management device 20, a display device 26, and an input device 27, and is installed in a facility of a river manager who performs river flood control, water utilization, environmental improvement planning, construction, maintenance, and the like. ing. Here, the river administrator is, for example, the Minister of Land, Infrastructure, Transport and Tourism or a prefectural governor for first-class and second-class rivers, and the mayor of a municipality for mutatis mutandis applied rivers and ordinary rivers.

親局システム2の河川管理装置20は、例えば、専用のIPネットワーク、光ファイバー、無線LAN、VPN回線等のネットワーク3を介して子局システム1の子局管理装置12と通信可能に接続されている。これにより、親局システム2は各子局システム1がそれぞれの河川観測所において取得した河川の水位情報及び画像データを取得することができ、監視に必要な情報を一括管理することができる。また、河川管理装置20は表示装置26と接続されており、表示装置26は、河川観測所から取得した各河川観測所の水位情報及び画像データ表示する。河川管理事務所の河川監視担当者は、表示装置26を確認することで、各河川の状況を集約して監視することができる。 The river management device 20 of the master station system 2 is communicably connected to the slave station management device 12 of the slave station system 1 via a network 3 such as a dedicated IP network, optical fiber, wireless LAN, or VPN line. . As a result, the master station system 2 can acquire the river water level information and image data acquired by each slave station system 1 at each river observation station, and can collectively manage the information necessary for monitoring. The river management device 20 is also connected to a display device 26. The display device 26 displays water level information and image data obtained from each river observation station. By checking the display device 26, the person in charge of river monitoring at the river management office can collectively monitor the conditions of each river.

親局システム2の河川管理装置20は、例えば、WAN等のネットワーク4を介して上位機関のシステムと通信可能に接続されている。上位機関とは、例えば、市町村においては都道府県や国土交通省が挙げられ、都道府県においては国土交通省が挙げられる。国及び地方自治体等の各機関において集約した河川情報を共有することにより、豪雨等の災害発生時の避難対応等を適切に行うことができる。 The river management device 20 of the parent station system 2 is communicably connected to a system of a host institution via a network 4 such as a WAN. Higher organizations include, for example, prefectures and the Ministry of Land, Infrastructure, Transport and Tourism in the case of municipalities, and the Ministry of Land, Infrastructure, Transport and Tourism in the case of prefectures. By sharing aggregated river information among organizations such as the national government and local governments, appropriate evacuation measures can be taken when disasters such as heavy rain occur.

さらに、親局システム2の河川管理装置20は、例えば、インターネット等のネットワーク5を介して一般住民が所有するパーソナルコンピュータ、携帯電話、タブレット機器等と通信可能に接続されている。これにより、監視対象河川の近隣住民は、親局システム2の河川管理装置20が保有する河川の水位情報や画像データをリアルタイムに確認することができ、住民自身により避難判断を適切に行うことができる。 Furthermore, the river management device 20 of the master station system 2 is communicably connected to personal computers, mobile phones, tablet devices, etc. owned by general residents via a network 5 such as the Internet. As a result, residents in the neighborhood of the monitored river can check the water level information and image data of the river held by the river management device 20 of the master station system 2 in real time, and the residents themselves can make appropriate evacuation decisions. can.

親局システム2の構成について、図2を用いてさらに詳細に説明する。図2に、親局システム2の概略図を示す。親局システム2は、河川管理装置20と、表示装置26と、入力装置27とを備えている。 The configuration of the master station system 2 will be explained in more detail using FIG. FIG. 2 shows a schematic diagram of the master station system 2. As shown in FIG. The master station system 2 includes a river management device 20 , a display device 26 and an input device 27 .

河川管理装置20は、河川管理事務所において河川管理者の監視業務を支援するコンピュータであり、通信部21と、処理部22と、記憶部23と、入力部24と、出力部25とを備えている。 The river management device 20 is a computer that supports the monitoring work of the river administrator in the river management office, and includes a communication unit 21, a processing unit 22, a storage unit 23, an input unit 24, and an output unit 25. ing.

通信部21は、ネットワーク3を介して河川観測所の子局管理装置12と通信を行うためのインターフェースであり、例えば、LAN端子である。通信部21は、有線ネットワーク端子であるLAN端子に限られず、例えば、ワイヤレスLAN方式により無線で通信を行ってもよい。また、通信部21は、ネットワーク4、ネットワーク5を介して上位機関のシステム及び一般住民が所有する機器と通信可能に構成されている。 The communication unit 21 is an interface for communicating with the slave station management device 12 of the river observatory via the network 3, and is, for example, a LAN terminal. The communication unit 21 is not limited to a LAN terminal, which is a wired network terminal, and may perform wireless communication by, for example, a wireless LAN system. Further, the communication unit 21 is configured to be able to communicate with the system of the host institution and devices owned by general residents via the network 4 and the network 5 .

処理部22は、CPU等のプロセッサであり、通信部21、記憶部23、入力部24及び出力部25と接続されている。処理部22は、記憶部23にインストールされた河川管理支援プログラムを実行し、通信部21、記憶部23、入力部24及び出力部25の動作制御、及び演算処理等を実行する。 The processing unit 22 is a processor such as a CPU, and is connected to the communication unit 21 , storage unit 23 , input unit 24 and output unit 25 . The processing unit 22 executes a river management support program installed in the storage unit 23, and performs operation control of the communication unit 21, the storage unit 23, the input unit 24 and the output unit 25, arithmetic processing, and the like.

記憶部23は、処理部22が実行する河川管理支援プログラム及び各種データを格納する記憶媒体であり、例えば、ハードディスクドライブ(HDD)、ソリッドステートドライブ(SSD)、USBフラッシュメモリ、SDカード等が挙げられる。 The storage unit 23 is a storage medium that stores the river management support program and various data executed by the processing unit 22. Examples thereof include a hard disk drive (HDD), a solid state drive (SSD), a USB flash memory, and an SD card. be done.

図3に、河川管理装置20が保持する基準水位テーブル6のデータ構造を示す。図3に示す通り、河川管理装置20は、監視対象の各河川の基準水位の情報として、河川観測所毎に、水防団待機水位、氾濫注意水位、避難判断水位及び氾濫危険水位の値を関連付けて記憶部23に記憶している。 FIG. 3 shows the data structure of the reference water level table 6 held by the river management device 20. As shown in FIG. As shown in FIG. 3, the river management device 20 associates the values of the flood prevention team standby water level, flood warning water level, evacuation determination water level, and flood danger water level with each river observatory as information on the reference water level of each river to be monitored. are stored in the storage unit 23.

基準水位とは、例えば、河川の増水や氾濫などに対する水防活動の判断や住民の避難行動の参考となるよう国土交通省等が発表する指定河川洪水予報の発表基準となる水位のことである。水防団待機水位とは、水防団が水防活動の準備を始める目安となる水位であり、氾濫注意水位とは、法崩れ、洗掘、漏水等の災害が発生する危険性があり水防団が出動して河川の警戒にあたる水位である。また、避難判断水位とは、市区町村長による避難勧告等の発令判断の目安であって住民の避難判断の参考になる水位であり、氾濫危険水位とは、溢水、氾濫等により重大な災害が起こるおそれがある水位である。 The reference water level is, for example, the water level that serves as the standard for the announcement of flood forecasts for designated rivers issued by the Ministry of Land, Infrastructure, Transport and Tourism, etc., so as to serve as a reference for judgments regarding flood control activities against flooding and flooding of rivers, etc., and evacuation behavior for residents. The standby water level of the flood control team is the water level that serves as a guideline for the flood control team to start preparations for flood control activities, and the flood warning water level is the danger of disasters such as law collapse, scouring, and water leakage, and the flood control team will be dispatched. It is the water level that serves as a warning for rivers. In addition, the water level for judgment of evacuation is a guideline for the mayor of a municipality to issue an evacuation advisory, etc., and is a water level that serves as a reference for the judgment of residents to evacuate. is the water level at which there is a risk of

図2に戻り、河川管理装置20の記憶部23は、監視対象河川周辺の3次元地形データを記憶している。3次元地形データは、Mobile Mapping System(MMS)等の3次元移動計測装置で計測したデータを用いても良いし、国土地理院等の公的機関や地図データベースを作成する企業が提供するものを用いてもよい。 Returning to FIG. 2, the storage unit 23 of the river management device 20 stores three-dimensional landform data around the river to be monitored. The 3D terrain data may be data measured by a 3D movement measuring device such as the Mobile Mapping System (MMS), or provided by public institutions such as the Geospatial Information Authority of Japan or companies that create map databases. may be used.

さらに、河川管理装置20の記憶部23は、子局システム1の画像取得装置11が撮影した河川画像に重ね合わせる基準水位画像7を記憶している。図4に、河川管理装置20が保持する基準水位画像7を示す。図4に示す通り、記憶部23は、基準水位画像7として水防団待機水位画像71、氾濫注意水位画像72、避難判断水位画像73及び氾濫危険水位画像74を河川観測所毎に記憶している。 Furthermore, the storage unit 23 of the river management device 20 stores a reference water level image 7 to be superimposed on the river image captured by the image acquisition device 11 of the slave station system 1 . FIG. 4 shows a reference water level image 7 held by the river management device 20. As shown in FIG. As shown in FIG. 4, the storage unit 23 stores, as the reference water level image 7, a water level image 71 waiting for a flood prevention team, a water level image 72 warning about flooding, an image 73 of water level for evacuation judgment, and an image 74 of flood danger water level for each river observation station. .

本実施の形態では、画像取得装置11として固定式のCCTVカメラを用いているため、画像取得装置11が監視する撮影範囲は固定されている。このため、画像取得装置11が取得する河川画像に対して重ね合わせる基準水位も固定されることとなり、予め基準水位画像を作成しておくことができる。具体的には、基準水位画像7は、河川観測所に設置された画像取得装置11の位置、姿勢、角度、画角等の情報から画像取得装置11が取得する河川画像の撮影範囲を特定し、特定した撮影範囲に対応する基準水位線を記憶部23が保持する3次元地形データに基づいて描画することにより予め作成する。 In this embodiment, since a fixed CCTV camera is used as the image acquisition device 11, the imaging range monitored by the image acquisition device 11 is fixed. Therefore, the reference water level to be superimposed on the river image acquired by the image acquisition device 11 is also fixed, and the reference water level image can be created in advance. Specifically, the reference water level image 7 specifies the shooting range of the river image acquired by the image acquisition device 11 from information such as the position, posture, angle, angle of view, etc. of the image acquisition device 11 installed at the river observatory. , the reference water level line corresponding to the specified photographing range is created in advance by drawing based on the three-dimensional landform data held by the storage unit 23 .

ここで、記憶部23が保持する3次元地形データは、地形データのみならず、橋梁、コンクリート護岸、石積護岸、建物等の建造物や、樹木等の植物の3次元データを含んでいることが好ましい。基準水位画像7を描画する際に建造物や植物の構造や高さを考慮して水位線を描画し、構造物や植物に隠れて見えない水位線を削除することにより、実際に近い基準水位画像7を生成できるとともに、基準水位となった際の河川周辺の状況をより正確に把握することが可能となる。 Here, the three-dimensional topographical data held by the storage unit 23 may include not only topographical data but also three-dimensional data of structures such as bridges, concrete revetments, masonry revetments, buildings, etc., and plants such as trees. preferable. When drawing the reference water level image 7, the water level lines are drawn in consideration of the structures and heights of the buildings and plants, and the invisible water level lines hidden by the structures and plants are deleted, so that the reference water level is close to the actual one. The image 7 can be generated, and the situation around the river when the water level reaches the reference level can be more accurately grasped.

次に、入力部24は、河川管理装置20外から操作者の指示やデータを入力するための入力インターフェースであり、例えば、USB端子である。入力部24は、USBケーブルにより入力装置27と接続され、処理部22は入力装置27から操作者の指示を受け付ける。ここで、入力装置27は、操作者から入力を受け付けるものであればよく、例えば、キーボード、マウス、タッチパネル、リモートカメラコントローラ等が挙げられる。 Next, the input unit 24 is an input interface for inputting operator's instructions and data from outside the river management apparatus 20, and is, for example, a USB terminal. The input unit 24 is connected to the input device 27 via a USB cable, and the processing unit 22 receives instructions from the operator from the input device 27 . Here, the input device 27 may be any device as long as it receives input from the operator, and examples thereof include a keyboard, mouse, touch panel, remote camera controller, and the like.

出力部25は、処理部22が取得したデータや演算した演算結果等を河川管理装置20外に出力するための出力インターフェースであり、例えば、HDMI端子(HDMIは登録商標)、DVI端子、D-Sub端子等が挙げられる。出力部25は、各種ケーブルにより表示装置26と接続され、処理部22は、出力部25を介して各種情報を表示装置26に表示する。 The output unit 25 is an output interface for outputting the data acquired by the processing unit 22, the calculation result, etc. to the outside of the river management device 20. For example, the output unit 25 is an HDMI terminal (HDMI is a registered trademark), a DVI terminal, a D- Sub terminal etc. are mentioned. The output unit 25 is connected to the display device 26 by various cables, and the processing unit 22 displays various information on the display device 26 via the output unit 25 .

表示装置26は、河川管理装置20が送信した情報を受信して表示するための機器であり、例えば、液晶ディスプレイ、プラズマディスプレイ、有機ELディスプレイ、スマートフォン、携帯タブレット機器等が挙げられる。また、河川管理事務所においては複数の河川監視担当者により河川の監視が行われるため、表示装置26を複数枚のディスプレイを組み合わせた大型マルチスクリーンシステムとし、視認性を向上させてもよい。 The display device 26 is a device for receiving and displaying information transmitted by the river management device 20, and examples thereof include liquid crystal displays, plasma displays, organic EL displays, smart phones, mobile tablet devices, and the like. In addition, since river monitoring is performed by a plurality of river monitoring personnel in the river management office, the display device 26 may be a large multi-screen system combining a plurality of displays to improve visibility.

<子局システム1における情報取得処理>
河川観測所に設置された子局システム1における、河川の水位情報及び画像データの取得処理について、図5を用いて説明する。
<Information Acquisition Processing in Slave Station System 1>
The acquisition process of river water level information and image data in the slave station system 1 installed at the river observatory will be described with reference to FIG.

図5に、子局システム1の子局管理装置12が行う情報取得処理のフローチャートを示す。子局管理装置12は、ステップS101において、画像取得装置11が撮影した河川画像を取得する。続いて、子局管理装置12は、ステップS102において、水位計10が計測した河川の水位情報を取得する。子局管理装置12は、ステップS103において、画像取得装置11が撮影した河川画像及び水位計10が計測した河川の水位情報を、ネットワーク3を介して親局システム2の河川管理装置20へ送信する。本実施の形態では、子局管理装置12は、取得した河川画像及び水位情報を同時に親局システム2の河川管理装置20へ送信しているがこれに限らず、河川画像及び水位情報を別個に送信してもよい。 FIG. 5 shows a flowchart of information acquisition processing performed by the child station management device 12 of the child station system 1 . The child station management device 12 acquires the river image captured by the image acquisition device 11 in step S101. Subsequently, the child station management device 12 acquires the water level information of the river measured by the water level gauge 10 in step S102. In step S103, the slave station management device 12 transmits the river image captured by the image acquisition device 11 and the water level information of the river measured by the water level gauge 10 to the river management device 20 of the master station system 2 via the network 3. . In this embodiment, the slave station management device 12 simultaneously transmits the acquired river image and water level information to the river management device 20 of the master station system 2. You may send.

<親局システム2における基準水位合成画像の生成処理>
続いて、親局システム2における、基準水位合成画像の生成処理について、図6を用いて説明する。
<Generation processing of reference water level composite image in master station system 2>
Next, a process of generating a reference water level composite image in the master station system 2 will be described with reference to FIG.

図6に、親局システム2の河川管理装置20が行う基準水位合成画像の生成処理のフローチャートを示す。河川管理装置20は、ステップS201において、子局管理装置12から送信された河川画像及び水位情報を受信する。続いて、河川管理装置20は、ステップS202において、受信した水位情報と、親局システム2の記憶部23に記憶される基準水位テーブル6の基準水位とに基づいて、河川画像に合成すべき描画対象基準水位の決定を行う。 FIG. 6 shows a flow chart of the reference water level composite image generation processing performed by the river management device 20 of the master station system 2 . The river management device 20 receives the river image and water level information transmitted from the slave station management device 12 in step S201. Subsequently, in step S202, the river management device 20, based on the received water level information and the reference water level of the reference water level table 6 stored in the storage unit 23 of the master station system 2, draws images to be combined with the river image. Determine the target standard water level.

具体的には、描画対象基準水位は、河川画像に対応する河川の基準水位テーブル6に関連付けられた水防団待機水位、氾濫注意水位、避難判断水位及び氾濫危険水位のうち、水位計10が計測した現在の水位よりも高い基準水位を描画対象とする。つまり、河川管理装置20は、河川の現在の水位より高い基準水位を示す基準水位線を河川画像に重ね合わせ、河川の現在の水位より低い基準水位を示す基準水位線は河川画像に重ね合わせない。 Specifically, the drawing target standard water level is the water level measured by the water level gauge 10 among the flood prevention team standby water level, flood warning water level, evacuation determination water level, and flood danger water level associated with the standard water level table 6 of the river corresponding to the river image. The drawing target is the reference water level higher than the current water level. That is, the river management device 20 superimposes the reference water level line indicating the reference water level higher than the current water level of the river on the river image, and does not superimpose the reference water level line indicating the reference water level lower than the current water level of the river on the river image. .

例えば、図3の基準水位テーブル6を参照し、A川の○○橋における現在の水位が1.90mの場合、2.00mの避難判断水位及び2.80mの氾濫危険水位が河川画像に合成される描画対象基準水位となり、1.30mの水防団待機水位及び1.80mの氾濫注意水位は描画対象とはならない。これにより、現在の水面以下であって監視に不要な基準水位が河川画像に合成されなくなり、増水した際の河川周辺がどのような状況となるのかより把握しやすくなる。 For example, referring to the reference water level table 6 in FIG. 3, if the current water level at the XX bridge of the A river is 1.90 m, the evacuation judgment water level of 2.00 m and the flood danger water level of 2.80 m are combined with the river image. 1.30m standby water level and 1.80m overflow warning water level are not drawn. As a result, the reference water level, which is lower than the current water level and is unnecessary for monitoring, is no longer combined with the river image, making it easier to grasp the situation around the river when the water level rises.

なお、本実施の形態では、水位計10が計測した現在の水位に基づいて描画対象基準水位を決定しているがこれに限らず、ステップS202の描画対象基準水位の決定処理を省略し、水位によらず全ての基準水位を描画対象として河川画像に合成してもよい。この場合、現在の河川の水位によって描画対象を判定する処理が不要となり、表示装置26への迅速な画像表示が可能となる。 In the present embodiment, the drawing target standard water level is determined based on the current water level measured by the water level gauge 10, but this is not limiting. All the reference water levels may be drawn and combined with the river image. In this case, there is no need to determine the object to be drawn based on the current water level of the river, and rapid image display on the display device 26 is possible.

次に、河川管理装置20は、ステップS203において、子局管理装置12から受信した河川画像に、描画対象として決定した基準水位線を河川画像に重ね合わせ、基準水位合成画像を生成する。例えば、避難判断水位及び氾濫危険水位が描画対象基準水位である場合、河川管理装置20は、図4に示す避難判断水位画像73及び氾濫危険水位画像74を記憶部23から読み出し、子局管理装置12から受信した河川画像に重ね合わせることで基準水位合成画像を生成する。 Next, in step S203, the river management device 20 superimposes the reference water level line determined to be drawn on the river image received from the child station management device 12 to generate a reference water level composite image. For example, when the evacuation judgment water level and the flood danger water level are the reference water levels to be drawn, the river management device 20 reads the evacuation judgment water level image 73 and the flood danger water level image 74 shown in FIG. 12 to generate a reference water level composite image.

続いて、河川管理装置20は、ステップS204において、生成した基準水位合成画像を表示装置26に出力し、基準水位合成画像が表示装置26に表示される。生成した基準水位合成画像の出力先は表示装置26に限られず、図1に示す上位機関のシステム及び一般住民が所有する機器の表示装置26に出力してもよい。 Subsequently, in step S204, the river management device 20 outputs the generated reference water level composite image to the display device 26, and the reference water level composite image is displayed on the display device 26. FIG. The output destination of the generated reference water level composite image is not limited to the display device 26, and may be output to the display device 26 of the system of the host institution shown in FIG. 1 and the equipment owned by general residents.

<親局システム2における表示画面>
親局システム2の表示装置26に表示される表示画面について、図7及び図8を用いて説明する。
<Display screen in master station system 2>
Display screens displayed on the display device 26 of the master station system 2 will be described with reference to FIGS. 7 and 8. FIG.

図7に、親局システム2の表示装置26が表示するメイン画面8の概略図を示す。メイン画面8は、河川管理支援システム100が管理する各河川観測所を示す河川観測所表示領域81と、子局管理装置12の画像取得装置11が取得した河川画像を表示する河川画像表示領域82と、子局管理装置12の水位計10が取得した水位のグラフを表示する水位グラフ表示領域83とを備えている。 FIG. 7 shows a schematic diagram of the main screen 8 displayed by the display device 26 of the master station system 2. As shown in FIG. The main screen 8 includes a river observatory display area 81 that indicates each river observatory managed by the river management support system 100, and a river image display area 82 that displays river images acquired by the image acquisition device 11 of the child station management device 12. and a water level graph display area 83 for displaying a graph of the water level acquired by the water level gauge 10 of the slave station management device 12 .

河川観測所表示領域81には、河川管理支援システム100が管理する各河川観測所名が簡略地図上に表示されている。また、各河川観測所名の下には、各河川観測所の子局管理装置12から受信した現在の水位情報がそれぞれ表示されている。河川管理事務所の河川監視担当者は、この水位情報を確認することにより、管轄する河川の全体概況をおおよそ掴むことができる。 In the river observation station display area 81, the name of each river observation station managed by the river management support system 100 is displayed on a simplified map. Further, under each river observatory name, the current water level information received from the slave station management device 12 of each river observatory is displayed. By checking this water level information, the person in charge of river monitoring at the river management office can roughly grasp the general condition of the river under their jurisdiction.

河川画像表示領域82には、河川観測所表示領域81において選択された河川観測所の河川画像が表示されている。図7では、○○橋が選択されており、○○橋の観測所に設置された画像取得装置11が撮影する河川のリアルタイム画像が表示されている。河川管理事務所の河川監視担当者は、このリアルタイム画像を確認することにより、遠方の河川の現在の状況を見ることができる。 The river image of the river observatory selected in the river observatory display area 81 is displayed in the river image display area 82 . In FIG. 7, the XX bridge is selected, and a real-time image of the river captured by the image acquisition device 11 installed at the observation station of the XX bridge is displayed. By checking this real-time image, the person in charge of river monitoring at the river management office can see the current situation of the distant river.

水位グラフ表示領域83は、河川観測所表示領域81において選択された河川観測所の水位情報が表示されている。図7では、○○橋が選択されており、○○橋の観測所に設置された水位計10により計測された河川の水位がグラフにより表示されている。また、この水位グラフには現在の水位に加えて水防団待機水位、氾濫注意水位、避難判断水位及び氾濫危険水位の値も示されている。河川管理事務所の河川監視担当者は、この水位グラフを確認することにより、これからどの程度増水すると基準水位に達するのか概ね把握することができる。 The water level graph display area 83 displays the water level information of the river observation station selected in the river observation station display area 81 . In FIG. 7, the ○○ bridge is selected, and the water level of the river measured by the water level gauge 10 installed at the observation station of the ○○ bridge is displayed in a graph. In addition to the current water level, this water level graph also shows the values of the water level for the flood defense team, the water level for warning of flooding, the water level for judging evacuation, and the water level for flooding danger. By checking this water level graph, the person in charge of river monitoring at the river management office can roughly grasp how much water will rise from now on until it reaches the standard water level.

図8に、親局システム2の表示装置26が表示する詳細画面9の概略図を示す。メイン画面8から詳細画面9へは、入力装置27の操作によりメイン画面8の河川画像表示領域82を押すことによって遷移する。詳細画面9は、基準水位合成画像を表示する基準水位合成画像表示領域91と、基準水位線の表示有無を切り替える基準水位線表示切替ボタン92と、メイン画面8へ遷移するための戻るボタン93とを備えている。 FIG. 8 shows a schematic diagram of the detailed screen 9 displayed by the display device 26 of the master station system 2. As shown in FIG. A transition from the main screen 8 to the detailed screen 9 is made by pressing the river image display area 82 on the main screen 8 by operating the input device 27 . The detailed screen 9 includes a reference water level composite image display area 91 for displaying the reference water level composite image, a reference water level line display switching button 92 for switching whether or not to display the reference water level line, and a return button 93 for transitioning to the main screen 8. It has

基準水位合成画像表示領域91には、子局管理装置12から受信した河川画像に基準水位画像7を重ね合わせた基準水位合成画像が表示されている。基準水位合成画像には、河川のリアルタイム画像に重畳して各基準水位が示されており、河川管理事務所の河川監視担当者は、この基準水位を確認することで、万一基準水位まで水位が上昇した際に、河川の水が河川画像上のどのエリアまでくるのか視認することができる。このため、例えば経験の浅い河川監視担当者であっても基準水位に達した際の河川の状況を容易に把握することが可能となる。 A reference water level composite image display area 91 displays a reference water level composite image in which the reference water level image 7 is superimposed on the river image received from the slave station management device 12 . The reference water level composite image superimposes each reference water level on the real-time image of the river. It is possible to visually recognize to which area on the river image the water of the river reaches when . Therefore, even an inexperienced person in charge of river monitoring can easily grasp the condition of the river when the water level reaches the standard water level.

ここで、基準水位合成画像表示領域91において、各基準水位はそれぞれ異なる色で表示することが好ましい。各基準水位線の色は特に限定されないが、例えば、水防団待機水位を緑色、氾濫注意水位を黄色、避難判断水位を橙色、氾濫危険水位を赤色で示すことで、河川監視担当者はその危険度を感覚的に掴むことができる。また、本実施の形態では、基準水位合成画像を詳細画面9の基準水位合成画像表示領域91に表示しているが、これに限らず、メイン画面8の河川画像表示領域82に、河川画像に基準水位線を示した基準水位合成画像を表示してもよい。 Here, in the reference water level composite image display area 91, each reference water level is preferably displayed in a different color. The color of each standard water level line is not particularly limited. You can grasp the degree intuitively. Further, in the present embodiment, the reference water level composite image is displayed in the reference water level composite image display area 91 of the detailed screen 9, but the present invention is not limited to this. A reference water level composite image showing the reference water level line may be displayed.

基準水位線表示切替ボタン92は、基準水位合成画像表示領域91に表示される河川画像における、基準水位線の表示有無を切り替えるための入力を受け付けるボタンである。河川管理事務所の河川監視担当者は、入力装置27の操作により基準水位線表示切替ボタン92を押すことで基準水位合成画像表示領域91の河川画像から基準水位線を消したり表示させたりを任意に切り替えることができる。これにより、基準水位線により隠れた部分の確認も容易に行うことができ、ユーザビリティをさらに向上させることが可能となる。 The reference water level line display switching button 92 is a button for accepting an input for switching whether or not to display the reference water level line in the river image displayed in the reference water level combined image display area 91 . The person in charge of river monitoring at the river management office presses the standard water level line display switching button 92 by operating the input device 27 to arbitrarily erase or display the standard water level line from the river image in the standard water level composite image display area 91 . can be switched to As a result, it is possible to easily confirm the portion hidden by the reference water level line, and it is possible to further improve the usability.

本実施の形態の構成によると、河川観測所等に設置された画像取得装置11から取得した河川画像に基準水位を示す基準水位線を重ね合わせた基準水位合成画像を河川管理事務所等に設置された表示装置26に表示することができる。これにより、河川管理事務所の河川監視担当者は、表示装置26を確認することで、増水等により基準水位に達した際に河川がどのような状況となるかを容易に把握することが可能となる。 According to the configuration of this embodiment, a reference water level composite image obtained by superimposing a reference water level line indicating the reference water level on a river image obtained from an image acquisition device 11 installed at a river observatory or the like is installed at a river management office or the like. can be displayed on the displayed display device 26. As a result, by checking the display device 26, the person in charge of river monitoring at the river management office can easily grasp the state of the river when it reaches the standard water level due to an increase in water level, etc. becomes.

実施の形態2.
<河川管理支援システム100の構成>
実施の形態2における河川管理支援システム100の構成について、図9を用いて説明する。図9に、河川管理支援システム100の概略図を示す。図9中、図1と同一符号の構成は、実施の形態1の構成と同一又は相当する構成を示している。ここで、実施の形態1の子局システム1における画像取得装置11が固定式のCCTVカメラであったのに対して、実施の形態2の子局システム1では、画像取得装置11として可動式のカメラを用いている。画像取得装置11の構成、子局管理装置12が行う情報取得処理、及び河川管理装置20が行う基準水位合成画像の生成処理以外については、実施の形態1と同様である。
Embodiment 2.
<Configuration of river management support system 100>
The configuration of the river management support system 100 according to Embodiment 2 will be described using FIG. FIG. 9 shows a schematic diagram of the river management support system 100. As shown in FIG. In FIG. 9, the configurations with the same reference numerals as those in FIG. 1 indicate configurations that are the same as or correspond to those of the first embodiment. Here, while the image acquisition device 11 in the slave station system 1 of Embodiment 1 is a fixed CCTV camera, in the slave station system 1 of Embodiment 2, the image acquisition device 11 is a movable type I am using a camera. The configuration of the image acquisition device 11, the information acquisition processing performed by the slave station management device 12, and the reference water level composite image generation processing performed by the river management device 20 are the same as those in the first embodiment.

可動式のカメラとしては、例えば、レンズの向き及びズーム倍率等を遠隔操作により変更できるPTZ(Pan-Tilt-Zoom)カメラ、自動車の屋根に設置された車上カメラ、ドローンの下部に設置された空撮用カメラ等が挙げられる。車上カメラや空撮用カメラにより移動しながら河川画像を取得する場合は、子局システム1の子局管理装置12を介さず、画像取得装置11が取得した河川画像を親局システム2の河川管理装置20へ直接送信し、河川管理装置20により情報取得処理を行ってもよい。 Examples of movable cameras include a PTZ (Pan-Tilt-Zoom) camera that can change the direction of the lens and zoom ratio by remote control, an on-vehicle camera installed on the roof of a car, and a camera installed at the bottom of a drone. A camera for aerial photography and the like can be mentioned. When a river image is acquired while moving by an on-vehicle camera or an aerial camera, the river image acquired by the image acquisition device 11 is transferred to the river of the master station system 2 without going through the slave station management device 12 of the slave station system 1 . The information may be directly transmitted to the management device 20 and the information acquisition processing may be performed by the river management device 20 .

実施の形態2の画像取得装置11の構造及び動作について、PTZカメラを例とし、図10を用いて説明する。図10に、画像取得装置11の構造及び撮影範囲を示す図である。画像取得装置11は、遠隔操作により、レンズを横方向に首振りさせて画角を水平方向に移動させる制御(Pan)、レンズを縦方向に首振りさせて画角を垂直方法に移動させる制御(Tilt)、画角を拡大及び縮小する制御(Zoom)が可能に構成されている。これにより、画像取得装置11は撮影方向を任意に変えることができ、撮影範囲を変更することが可能となる。
<子局システム1における情報取得処理>
河川観測所に設置された子局システム1における、河川の水位情報及び画像データの取得処理について、図11を用いて説明する。
The structure and operation of the image acquisition device 11 according to the second embodiment will be described with reference to FIG. 10, taking a PTZ camera as an example. FIG. 10 is a diagram showing the structure and imaging range of the image acquisition device 11. As shown in FIG. The image acquisition device 11 performs control (Pan) to move the angle of view in the horizontal direction by swinging the lens in the horizontal direction, and control to move the angle of view in the vertical direction by swinging the lens in the vertical direction. (Tilt) and control (Zoom) for enlarging and reducing the angle of view are possible. As a result, the image acquisition device 11 can arbitrarily change the photographing direction and change the photographing range.
<Information Acquisition Processing in Slave Station System 1>
The acquisition process of river water level information and image data in the slave station system 1 installed at the river observatory will be described with reference to FIG. 11 .

図11に、子局システム1の子局管理装置12が行う情報取得処理のフローチャートを示す。子局管理装置12は、ステップS301において、画像取得装置11が撮影した河川画像を取得する。また、子局管理装置12は、ステップS302において、画像取得装置11の状態を示す情報を画像取得装置11から取得する。 FIG. 11 shows a flowchart of information acquisition processing performed by the slave station management device 12 of the slave station system 1 . The slave station management device 12 acquires the river image captured by the image acquisition device 11 in step S301. Further, slave station management device 12 acquires information indicating the state of image acquisition device 11 from image acquisition device 11 in step S302.

画像取得装置11の状態を示す情報としては、例えば、画像取得装置11の位置(緯度・経度)、姿勢(ピッチ角・ロール角・ヨー角)、角度(パン角・チルト角)、画角等の情報が挙げられる。画像取得装置11の状態を示す情報は、これらの情報のうち少なくとも1つであればよく、例えば固定の位置及び姿勢に設置されたPTZカメラであれば、画像取得装置11の位置及び姿勢を予め計測し固定値とできるため、画像取得装置11の位置情報及び姿勢情報の送信は不要となる。 The information indicating the state of the image acquisition device 11 includes, for example, the position (latitude/longitude), posture (pitch angle/roll angle/yaw angle), angle (pan angle/tilt angle), angle of view, etc. of the image acquisition device 11. information. The information indicating the state of the image acquisition device 11 may be at least one of these pieces of information. Since it can be measured and used as a fixed value, it is not necessary to transmit the position information and orientation information of the image acquisition device 11 .

続いて、子局管理装置12は、ステップS303において、水位計10が計測した河川の水位情報を取得する。子局管理装置12は、ステップS304において、画像取得装置11が撮影した河川画像、画像取得装置11の状態を示す情報及び水位計10が計測した河川の水位情報を、ネットワーク3を介して親局システム2の河川管理装置20へ送信する。本実施の形態では、子局管理装置12は、取得した河川画像、画像取得装置11の状態を示す情報及び水位情報を同時に親局システム2の河川管理装置20へ送信しているが、これに限らず、河川画像、画像取得装置11の状態を示す情報及び水位情報をそれぞれ別個に送信してもよい。 Subsequently, the child station management device 12 acquires the water level information of the river measured by the water level gauge 10 in step S303. In step S304, the slave station management device 12 transmits the river image captured by the image acquisition device 11, the information indicating the state of the image acquisition device 11, and the river water level information measured by the water level gauge 10 to the master station via the network 3. It is transmitted to the river management device 20 of the system 2 . In this embodiment, the slave station management device 12 simultaneously transmits the acquired river image, information indicating the state of the image acquisition device 11, and water level information to the river management device 20 of the master station system 2. Alternatively, the river image, the information indicating the state of the image acquisition device 11, and the water level information may be transmitted separately.

<親局システム2における基準水位合成画像の生成処理>
続いて、親局システム2における、基準水位合成画像の生成処理について、図12を用いて説明する。
<Generation processing of reference water level composite image in master station system 2>
Next, the reference water level composite image generation processing in the master station system 2 will be described with reference to FIG. 12 .

図12に、親局システム2の河川管理装置20が行う基準水位合成画像の生成処理のフローチャートを示す。河川管理装置20は、ステップS401において、子局管理装置12から送信された河川画像、画像取得装置11の状態を示す情報及び水位情報を受信する。続いて、河川管理装置20は、ステップS402において、受信した水位情報と、親局システム2の記憶部23に記憶される基準水位テーブル6の基準水位とに基づいて、河川画像に合成すべき描画対象基準水位の決定を行う。描画対象基準水位の決定処理は、実施の形態1と同様である。 FIG. 12 shows a flow chart of the reference water level composite image generation processing performed by the river management device 20 of the master station system 2 . The river management device 20 receives the river image, the information indicating the state of the image acquisition device 11, and the water level information transmitted from the child station management device 12 in step S401. Subsequently, in step S402, the river management device 20, based on the received water level information and the reference water level of the reference water level table 6 stored in the storage unit 23 of the master station system 2, draws images to be combined with the river image. Determine the target standard water level. The drawing target reference water level determination process is the same as in the first embodiment.

次に、河川管理装置20は、ステップS403において、基準水位画像の生成を行う。河川管理装置20は、受信した画像取得装置11の状態を示す情報に含まれる画像取得装置11の位置、姿勢及び角度情報に基づいて、画像取得装置11の位置を起点とする撮影方向を算出する。撮影方向の算出方法としては、例えば、下記の式(1)に示す回転行列を用いて、ヨー角ψ、ピッチ角θ、ロール角φ、パン角α、チルト角βを順に回転させることにより行う。 Next, the river management device 20 generates a reference water level image in step S403. The river management device 20 calculates the shooting direction starting from the position of the image acquisition device 11 based on the position, posture, and angle information of the image acquisition device 11 included in the received information indicating the state of the image acquisition device 11. . As a method of calculating the shooting direction, for example, the rotation matrix shown in the following equation (1) is used to sequentially rotate the yaw angle ψ, pitch angle θ, roll angle φ, pan angle α, and tilt angle β. .

Figure 0007209652000001
Figure 0007209652000001

また、河川管理装置20は、記憶部23が記憶する河川周辺の3次元地形データにおいて、基準水位テーブル6が保持している水防団待機水位、氾濫注意水位、避難判断水位、氾濫危険水位等の基準水位となった場合の水面位置を算出する。河川管理装置20は、画像取得装置11の位置を起点とする撮影方向と、画像取得装置11から取得した画角の情報から3次元地形データにおける画像取得装置11の撮影範囲を特定し、特定した撮影範囲において、算出した基準水位の水面位置を描画することにより、画像取得装置11が現在撮影している河川画像における基準水面位置に対応した基準水位線が描かれた基準水位画像7を生成する。 In addition, the river management device 20 stores, in the three-dimensional terrain data around the river stored in the storage unit 23, the water level held by the standard water level table 6, such as the standby water level for the flood fighting team, the flood warning water level, the evacuation determination water level, and the flood danger water level. Calculate the water surface position when the reference water level is reached. The river management device 20 identifies the imaging range of the image acquisition device 11 in the three-dimensional landform data from the imaging direction starting from the position of the image acquisition device 11 and the angle of view information acquired from the image acquisition device 11. By drawing the water surface position of the calculated reference water level in the imaging range, a reference water level image 7 is generated in which a reference water level line corresponding to the reference water surface position in the river image currently being photographed by the image acquisition device 11 is drawn. .

河川管理装置20は、ステップS404において、子局管理装置12から受信した河川画像に、基準水位画像7描画対象として決定した基準水位線を河川画像に重ね合わせ、基準水位合成画像を生成する。また、河川管理装置20は、ステップS405において、生成した基準水位合成画像を表示装置26に出力し、基準水位合成画像が表示装置26に表示される。基準水位合成画像の出力処理は、実施の形態1と同様である。 In step S404, the river management device 20 superimposes the reference water level line determined to be drawn in the reference water level image 7 on the river image received from the slave station management device 12 to generate a reference water level composite image. In step S405, the river management device 20 outputs the generated reference water level composite image to the display device 26, and the reference water level composite image is displayed on the display device 26. FIG. Output processing of the reference water level composite image is the same as in the first embodiment.

<親局システム2における表示画面>
親局システム2の表示装置26に表示される表示画面について説明する。河川管理装置20が生成した基準水位合成画像は、実施の形態1と同様、図8に示す基準水位合成画像表示領域91に表示される。
<Display screen in master station system 2>
A display screen displayed on the display device 26 of the master station system 2 will be described. The reference water level composite image generated by the river management device 20 is displayed in the reference water level composite image display area 91 shown in FIG. 8, as in the first embodiment.

図13は、画像取得装置11の撮影範囲変更前と撮影範囲変更後における基準水位合成画像の変化を示す図である。この例では、撮影範囲変更前から撮影範囲変更後にかけて、画像取得装置11のレンズの向きを画面左に移すとともに、ズーム倍率を拡大している。図13に示す基準水位合成画像に示す通り、基準水位合成画像に表示される基準水位線は、画像取得装置11の撮影範囲の変更にともなって適切な位置に変更されている。 FIG. 13 is a diagram showing changes in the reference water level composite image before and after changing the photographing range of the image acquisition device 11 . In this example, the direction of the lens of the image acquisition device 11 is moved to the left side of the screen and the zoom magnification is increased from before the change of the photographing range to after the change of the photographing range. As shown in the reference water level composite image shown in FIG. 13, the reference water level line displayed in the reference water level composite image has been changed to an appropriate position as the imaging range of the image acquisition device 11 is changed.

本実施の形態の構成によると、河川観測所等に設置された画像取得装置11から取得した河川画像に基準水位を示す基準水位線を重ね合わせた基準水位合成画像を河川管理事務所等に設置された表示装置26に表示することができるとともに、画像取得装置11の撮影範囲の変更に伴って基準水位線の位置もリアルタイムに変更される。これにより、河川管理事務所の河川監視担当者は、画像取得装置11の撮影範囲を変更した場合であっても、増水等により基準水位に達した際に河川がどのような状況となるかを容易に把握することが可能となる。 According to the configuration of this embodiment, a reference water level composite image obtained by superimposing a reference water level line indicating the reference water level on a river image obtained from an image acquisition device 11 installed at a river observatory or the like is installed at a river management office or the like. The position of the reference water level line is also changed in real time as the imaging range of the image acquisition device 11 is changed. As a result, the person in charge of river monitoring at the river management office can know what kind of situation the river will be in when the standard water level is reached due to an increase in water level, etc., even if the imaging range of the image acquisition device 11 is changed. It becomes possible to grasp easily.

実施の形態3.
<親局システム2における基準水位合成画像の生成処理>
実施の形態3における基準水位合成画像の生成処理について、図14を用いて説明する。図14に、親局システム2の河川管理装置20が行う基準水位合成画像の生成処理のフローチャートを示す。ここで、実施の形態3の親局システム2では、水位計10から取得した水位情報及び画像取得装置11から取得した河川画像に基づいて、河川障害が発生するか否か予測可能に構成されている。親局システム2の河川管理装置20が行う基準水位合成画像の生成処理及び表示装置26に表示される表示画面以外については、実施の形態1又は実施の形態2と同様である。
Embodiment 3.
<Generation processing of reference water level composite image in master station system 2>
A reference water level composite image generation process according to the third embodiment will be described with reference to FIG. 14 . FIG. 14 shows a flow chart of the reference water level composite image generation processing performed by the river management device 20 of the master station system 2 . Here, in the master station system 2 of Embodiment 3, it is possible to predict whether or not a river disturbance will occur based on the water level information acquired from the water level gauge 10 and the river image acquired from the image acquisition device 11. there is Except for the generation processing of the reference water level composite image performed by the river management device 20 of the master station system 2 and the display screen displayed on the display device 26, the configuration is the same as that of the first or second embodiment.

河川管理装置20は、ステップS501において、子局管理装置12から送信された河川画像及び水位情報を受信する。続いて、河川管理装置20は、ステップS502において、受信した水位情報と、親局システム2の記憶部23に記憶される基準水位テーブル6の基準水位とに基づいて、河川画像に合成すべき描画対象基準水位の決定を行う。描画対象基準水位の決定処理は、実施の形態1と同様である。 The river management device 20 receives the river image and water level information transmitted from the slave station management device 12 in step S501. Subsequently, in step S502, the river management device 20, based on the received water level information and the reference water level of the reference water level table 6 stored in the storage unit 23 of the master station system 2, draws images to be combined with the river image. Determine the target standard water level. The drawing target reference water level determination process is the same as in the first embodiment.

次に、河川管理装置20は、ステップ503において、子局管理装置12から受信した水位情報及び河川画像に基づいて、河川障害の危険性について判定する。ここで、河川障害とは、例えば、漏水、洗堀、法崩れ、破堤等が挙げられる。漏水とは、河川の水位上昇による水圧で堤防や地盤の中に水みちが生じ河川の水が漏れることであり、洗堀とは、激しい河川の流れや波浪等により堤防の土が削りとられることである。また、法崩れとは、雨の浸透や河川の流れにより堤防の斜面が崩れることであり、破堤とは、堤防が崩壊し、河川の水が堤防から流れ出すことである。 Next, at step 503 , the river management device 20 determines the risk of river disturbance based on the water level information and the river image received from the child station management device 12 . Here, the river disturbance includes, for example, water leakage, scouring, law collapse, bank breakage, and the like. Leakage is the leakage of water from the river due to water pressure caused by rising water levels in the levee and the ground, and scouring is the removal of soil from the levee due to strong river flow and waves. That is. In addition, law collapse means that the slope of the embankment collapses due to the infiltration of rain or the flow of the river, and levee breach means that the embankment collapses and the river water flows out from the embankment.

ここで、河川管理装置20の記憶部は、河川障害の情報がラベル付けされた水位情報及び河川画像を含む教師データにより予め学習させた河川障害判定アルゴリズムを保持している。河川障害判定アルゴリズムは、例えば、機械学習アルゴリズムが挙げられ、ニューラルネットワーク構造の深層学習(ディープラーニング)アルゴリズムが好ましい。 Here, the storage unit of the river management device 20 holds a river disturbance determination algorithm learned in advance from teacher data including water level information and river images labeled with river disturbance information. The river disturbance determination algorithm is, for example, a machine learning algorithm, preferably a deep learning algorithm with a neural network structure.

河川管理装置20は、子局管理装置12から受信した水位情報及び河川画像を河川障害判定アルゴリズムに入力し、河川障害の危険性に関する判定結果を得る。河川障害の危険性に関する判定は、漏水、洗堀、法崩れ、破堤のそれぞれに対し行われる。河川障害判定アルゴリズムにより、例えば、法崩れの危険ありと判定した場合には、入力された河川画像に対し法崩れの危険があることを示すフラグ付けを行う。 The river management device 20 inputs the water level information and the river image received from the slave station management device 12 to the river disturbance determination algorithm, and obtains the determination result regarding the risk of river disturbance. Judgments regarding the risk of river disturbances are made for each of leakage, scouring, law collapse, and levee breach. For example, when it is determined that there is a danger of law collapse by the river obstruction determination algorithm, a flag indicating that there is a danger of law collapse is added to the input river image.

次に、河川管理装置20は、ステップS504において、子局管理装置12から受信した河川画像に、描画対象として決定した基準水位線を河川画像に重ね合わせ、基準水位合成画像を生成する。ここで、河川障害判定アルゴリズムにより河川障害の危険があることを示すフラグが付された河川画像には、基準水位線に加えて警告表示94を合成する。警告表示94は、例えば法崩れの危険がある場合には、「法崩れの危険あり」というメッセージである。警告表示94はメッセージに限らず、例えば、イラスト及びアイコン等で表示してもよい。これにより、画像取得装置11から取得した河川画像に、基準水位線および警告表示94が合成された基準水位合成画像が生成される。 Next, in step S504, the river management device 20 superimposes the reference water level line determined as the drawing target on the river image received from the child station management device 12 to generate a reference water level composite image. Here, in addition to the reference water level line, a warning display 94 is combined with a river image to which a flag indicating that there is a risk of river disturbance is added by the river disturbance determination algorithm. The warning display 94 is, for example, a message "Risk of law collapse" when there is danger of law collapse. The warning display 94 is not limited to a message, and may be displayed as an illustration, an icon, or the like. As a result, a reference water level composite image is generated by combining the river image obtained from the image obtaining device 11 with the reference water level line and the warning display 94 .

続いて、河川管理装置20は、ステップS505において、生成した基準水位合成画像を表示装置26に出力し、基準水位合成画像が表示装置26に表示される。 Subsequently, in step S505, the river management device 20 outputs the generated reference water level composite image to the display device 26, and the reference water level composite image is displayed on the display device 26. FIG.

<親局システム2における表示画面>
親局システム2の表示装置26に表示される表示画面について、図15を用いて説明する。図15に、表示装置26の基準水位合成画像を示す。河川管理装置20が生成した基準水位合成画像は、実施の形態1と同様、図8に示す基準水位合成画像表示領域91に表示される。
<Display screen in master station system 2>
A display screen displayed on the display device 26 of the master station system 2 will be described with reference to FIG. FIG. 15 shows a reference water level composite image on the display device 26. As shown in FIG. The reference water level composite image generated by the river management device 20 is displayed in the reference water level composite image display area 91 shown in FIG. 8, as in the first embodiment.

基準水位合成画像は、河川障害の危険があることを示す警告表示94を含んでいる。河川管理事務所の河川監視担当者は、この警告表示94を確認することで、現在の河川においてどのような河川障害の危険があるのかを容易に理解することができる。 The reference water level composite image includes a warning display 94 indicating that there is a risk of river disturbance. By checking the warning display 94, the person in charge of river monitoring at the river management office can easily understand what kind of river disturbances are likely to occur in the current river.

本実施の形態の構成によると、河川観測所等に設置された画像取得装置11から取得した河川画像に基準水位を示す基準水位線を重ね合わせた基準水位合成画像を河川管理事務所等に設置された表示装置26に表示することができるとともに、基準水位合成画像に河川障害の危険性を示す警告表示94を付与することができる。これにより、例えば、経験の浅い河川監視担当者であっても、基準水位に達した際の河川の状況や河川障害の危険性を容易に把握することが可能となる。 According to the configuration of this embodiment, a reference water level composite image obtained by superimposing a reference water level line indicating the reference water level on a river image obtained from an image acquisition device 11 installed at a river observatory or the like is installed at a river management office or the like. A warning display 94 indicating the risk of river damage can be added to the reference water level composite image. As a result, for example, even an inexperienced person in charge of river monitoring can easily comprehend the state of the river and the risk of river damage when the standard water level is reached.

なお、各実施の形態に示した河川管理支援システム100として、河川観測所に設けられた子局システム1、河川管理事務所に設けられた親局システム2、上位機関のシステム及び一般住民が所有するパーソナルコンピュータ等を含む構成を用いて説明したが、これに限らない。例えば、上位機関のシステム及び一般住民のパーソナルコンピュータ等の一部又は全部を省略して河川管理支援システム100を構築してもよい。さらに、子局システム1及び親局システム2においても、開示する全ての構成を備えている必要はなく、一部又は全部を省略してもよい。 As the river management support system 100 shown in each embodiment, a slave station system 1 provided at a river observation station, a master station system 2 provided at a river management office, a system of a higher organization, and a system owned by general residents Although the configuration including a personal computer, etc., has been described, the configuration is not limited to this. For example, the river management support system 100 may be constructed by omitting part or all of the system of the host organization and the personal computers of general residents. Furthermore, the slave station system 1 and the master station system 2 do not need to have all the disclosed configurations, and some or all of them may be omitted.

また、各実施の形態に示した河川管理支援システム100は河川管理事務所内に設けられているが、これに限らない。例えば、河川管理支援サービスを提供する企業が管理する施設やクラウドプロバイダーが管理する施設に河川管理装置20を設け、各河川観測所からの情報を収集及び処理し、ネットワーク4を介して処理結果を河川管理事務所に送信し、表示装置26に必要な情報を表示させる構成としてもよい。 Moreover, although the river management support system 100 shown in each embodiment is provided in the river management office, it is not limited to this. For example, the river management device 20 is installed in a facility managed by a company that provides a river management support service or a facility managed by a cloud provider, collects and processes information from each river observation station, and outputs the processing results via the network 4. The information may be transmitted to the river management office and necessary information may be displayed on the display device 26 .

各実施の形態に示した河川管理支援システム100はあくまで一例であり、各実施の形態を、適宜、組み合わせたり、変形や省略したりすることも、実施の形態に示された技術的思想の範囲に含まれる。 The river management support system 100 shown in each embodiment is merely an example, and each embodiment can be appropriately combined, modified, or omitted within the scope of the technical idea shown in the embodiment. include.

11 画像取得装置、 20 河川管理装置、 22 処理部、 23 記憶部、 25 出力部、 26 表示装置、 100 河川管理支援システム。 11 image acquisition device, 20 river management device, 22 processing unit, 23 storage unit, 25 output unit, 26 display device, 100 river management support system.

Claims (10)

撮影範囲を変更可能な画像取得装置により取得された河川画像に、基準水位を示す基準水位線を重ね合わせた基準水位合成画像を生成する処理部と、
前記処理部により生成された前記基準水位合成画像を出力する出力部と、
を備え、
前記画像取得装置の撮影範囲の変更に伴って前記基準水位線の位置が変更される、河川管理装置。
a processing unit that generates a reference water level composite image by superimposing a reference water level line indicating a reference water level on a river image acquired by an image acquisition device capable of changing an imaging range ;
an output unit that outputs the reference water level composite image generated by the processing unit;
with
The river management device, wherein the position of the reference water level line is changed in accordance with the change of the photographing range of the image acquisition device.
前記基準水位は、氾濫危険水位、避難判断水位、氾濫注意水位、及び水防団待機水位から選択された少なくとも1つである、請求項1に記載の河川管理装置。 2. The river management device according to claim 1, wherein said reference water level is at least one selected from a flood danger water level, an evacuation judgment water level, a flood warning water level, and a water level for a flood fighting team. 画像取得装置により取得された河川画像に、基準水位を示す基準水位線を重ね合わせた基準水位合成画像を生成する処理部と、
前記処理部により生成された前記基準水位合成画像を出力する出力部と、
を備え、
前記処理部は、前記河川画像に、河川の現在の水位より高い基準水位を示す前記基準水位線を重ね合わせ、前記河川の現在の水位より低い基準水位を示す前記基準水位線は重ね合わせずに、前記基準水位合成画像を生成する、河川管理装置。
a processing unit that generates a reference water level composite image by superimposing a reference water level line indicating a reference water level on a river image acquired by the image acquisition device;
an output unit that outputs the reference water level composite image generated by the processing unit;
with
The processing unit superimposes the reference water level line indicating a reference water level higher than the current water level of the river on the river image, and does not superimpose the reference water level line indicating a reference water level lower than the current water level of the river on the river image. , a river management device that generates the reference water level composite image.
河川の3次元地形データを記憶する記憶部をさらに備え、
前記処理部は、前記記憶部に記憶された前記3次元地形データに基づいて前記河川画像に対応する前記基準水位線を描画する、請求項1から3の何れか一項に記載の河川管理装置。
further comprising a storage unit for storing three-dimensional terrain data of the river,
The river management apparatus according to any one of claims 1 to 3, wherein said processing unit draws said reference water level line corresponding to said river image based on said three-dimensional landform data stored in said storage unit. .
前記処理部は、
前記画像取得装置から前記画像取得装置の状態を示す情報を取得し、
取得した前記画像取得装置の状態を示す情報及び前記3次元地形データに基づいて、前記河川画像に対応する前記基準水位線を描画する、
請求項4に記載の河川管理装置。
The processing unit is
acquiring information indicating the state of the image acquisition device from the image acquisition device;
drawing the reference water level line corresponding to the river image based on the acquired information indicating the state of the image acquisition device and the three-dimensional terrain data;
The river management device according to claim 4.
前記画像取得装置の状態を示す情報は、前記画像取得装置の位置、姿勢、角度及び画角から選択された少なくとも1つを示す情報である、請求項5に記載の河川管理装置。 6. The river management device according to claim 5, wherein the information indicating the state of said image acquisition device is information indicating at least one selected from the position, orientation, angle and angle of view of said image acquisition device. 前記処理部は、前記河川画像を機械学習アルゴリズムにより解析して予測される河川の障害を示す情報を生成し、
前記出力部は、前記処理部により生成された前記河川の障害の情報を出力する、
請求項1から6の何れか一項に記載の河川管理装置。
The processing unit analyzes the river image with a machine learning algorithm to generate information indicating predicted river obstacles,
The output unit outputs the information on the disturbance of the river generated by the processing unit.
The river management device according to any one of claims 1 to 6.
河川画像を取得する、撮影範囲を変更可能な画像取得装置と、
前記画像取得装置により取得された前記河川画像に、基準水位を示す基準水位線を重ね合わせた基準水位合成画像を生成する処理部及び前記処理部により生成された前記基準水位合成画像を出力する出力部を有する河川管理装置と、
前記河川管理装置から出力された前記基準水位合成画像を表示する表示装置と、
を備え、
前記画像取得装置の撮影範囲の変更に伴って前記基準水位線の位置が変更される、河川管理支援システム。
an image acquisition device that acquires a river image and is capable of changing the imaging range ;
A processing unit for generating a reference water level composite image in which a reference water level line indicating a reference water level is superimposed on the river image obtained by the image obtaining device, and an output for outputting the reference water level composite image generated by the processing unit. a river management device having a section;
a display device for displaying the reference water level composite image output from the river management device;
with
A river management support system , wherein the position of the reference water level line is changed in accordance with the change of the photographing range of the image acquisition device .
撮影範囲を変更可能な画像取得装置により河川画像を取得する工程と、
取得した前記河川画像に、基準水位を示す基準水位線を重ね合わせた基準水位合成画像を生成する工程と、
生成した前記基準水位合成画像を表示する工程と、
前記画像取得装置の撮影範囲の変更に伴って前記基準水位線の位置が変更される工程と、
を備える、河川管理支援方法。
a step of acquiring a river image with an image acquisition device capable of changing the imaging range ;
generating a reference water level composite image by superimposing a reference water level line indicating a reference water level on the obtained river image;
a step of displaying the generated reference water level composite image;
a step of changing the position of the reference water line as the imaging range of the image acquisition device is changed;
A river management support method comprising:
コンピュータに、
撮影範囲を変更可能な画像取得装置により取得された河川画像に、基準水位を示す基準水位線を重ね合わせた基準水位合成画像を生成する工程と、
生成した前記基準水位合成画像を出力する工程と、
前記画像取得装置の撮影範囲の変更に伴って前記基準水位線の位置が変更される工程と、
を実行させる、河川管理支援プログラム。
to the computer,
generating a standard water level composite image by superimposing a standard water level line indicating a standard water level on a river image acquired by an image acquisition device capable of changing an imaging range ;
a step of outputting the generated reference water level composite image;
a step of changing the position of the reference water line as the imaging range of the image acquisition device is changed;
A river management support program that runs
JP2020017646A 2020-02-05 2020-02-05 River management device, river management support system, river management support method, and river management support program Active JP7209652B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020017646A JP7209652B2 (en) 2020-02-05 2020-02-05 River management device, river management support system, river management support method, and river management support program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020017646A JP7209652B2 (en) 2020-02-05 2020-02-05 River management device, river management support system, river management support method, and river management support program

Publications (2)

Publication Number Publication Date
JP2021124370A JP2021124370A (en) 2021-08-30
JP7209652B2 true JP7209652B2 (en) 2023-01-20

Family

ID=77460121

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020017646A Active JP7209652B2 (en) 2020-02-05 2020-02-05 River management device, river management support system, river management support method, and river management support program

Country Status (1)

Country Link
JP (1) JP7209652B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7430863B2 (en) * 2021-11-30 2024-02-14 株式会社エクサウィザーズ Information processing method, device and program
CN117107714B (en) * 2023-08-25 2024-06-18 杭州定川信息技术有限公司 Filtering method and device for abnormal water level of river channel and electronic equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009217725A (en) 2008-03-12 2009-09-24 Nippon Telegr & Teleph Corp <Ntt> Monitoring device and monitoring method
JP2011186681A (en) 2010-03-05 2011-09-22 Toshiba Corp Disaster prevention information providing system and disaster prevention information delivery server
JP2012186606A (en) 2011-03-04 2012-09-27 Mitsubishi Electric Corp Image display device

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07129776A (en) * 1993-11-05 1995-05-19 Babcock Hitachi Kk Abnormality monitoring method and device
JPH11328567A (en) * 1998-05-15 1999-11-30 Japan Radio Co Ltd Remote monitoring system
JP2004062445A (en) * 2002-07-26 2004-02-26 Doboku Support System Kk Fishing result management device, fishing result management system and fishing result management program
JP2008057994A (en) * 2006-08-29 2008-03-13 Basic Engineering:Kk Water level observation system by image processing
JP6642307B2 (en) * 2016-06-30 2020-02-05 アイシン精機株式会社 Perimeter monitoring device
JP6818639B2 (en) * 2017-06-22 2021-01-20 株式会社東芝 Information provision system and information provision method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009217725A (en) 2008-03-12 2009-09-24 Nippon Telegr & Teleph Corp <Ntt> Monitoring device and monitoring method
JP2011186681A (en) 2010-03-05 2011-09-22 Toshiba Corp Disaster prevention information providing system and disaster prevention information delivery server
JP2012186606A (en) 2011-03-04 2012-09-27 Mitsubishi Electric Corp Image display device

Also Published As

Publication number Publication date
JP2021124370A (en) 2021-08-30

Similar Documents

Publication Publication Date Title
Wang et al. Monitoring and early warning system of Cirenmaco glacial lake in the central Himalayas
CN110532952B (en) Flood risk early warning and evacuation system based on GIS positioning technology
JP2008057994A (en) Water level observation system by image processing
US20200097618A1 (en) Design engineering tools for visualizing existing utility lines within a land area and validating placement of new utility lines
JP2013196655A (en) Fire detection system and fire detection method
JP2002269656A (en) River information provision system
JP6441464B2 (en) Disaster prevention system
Zhao et al. Application of unmanned aerial vehicle tilt photography technology in geological hazard investigation in China
CN109269555A (en) System and method is monitored based on unmanned plane and the Safety of Tailings Dam of dimensional Modeling Technology
JP7209652B2 (en) River management device, river management support system, river management support method, and river management support program
KR20160099931A (en) Disaster preventing and managing method for the disaster harzard and interest area
JP2016108827A (en) Irrigation channel monitoring server and irrigation channel monitoring system
KR102533185B1 (en) General river safety management device using CCTV camera images
CN206388307U (en) A kind of novel intelligent Hydrology feelings observe early warning system
JP7505597B2 (en) Information processing device, information processing method, and program
KR20150045771A (en) Smart disaster managing system for combined disaster management
KR20240040179A (en) A WATER LEVEL MEASUREMENT SYSTEM USING CCTV-based ARTIFICIAL INTELLIGENCE
KR101551413B1 (en) A web-based EOC monitoring method of slopes
JP6707012B2 (en) Information providing system, control method of information providing system, and program
JP6609625B2 (en) Situation judgment system, decision support system, and situation judgment method
WO2021124436A1 (en) Prediction method
KR20150120579A (en) Integrated control system and method for disaster prevention using fluid simulation of three-dimensional numerical analysis
WO2021084699A1 (en) Work assistance device, work assistance system, and work assistance method
JP2018146559A (en) Smart virtual display system
KR102632719B1 (en) Remote drone station system for disaster management of flood damage

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20211119

RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7421

Effective date: 20220427

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220824

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220830

RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7421

Effective date: 20221003

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221027

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20221213

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230110

R150 Certificate of patent or registration of utility model

Ref document number: 7209652

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250