JP7231531B2 - Steel shoring erection method - Google Patents
[go: Go Back, main page]

JP7231531B2 - Steel shoring erection method - Google Patents

Steel shoring erection method Download PDF

Info

Publication number
JP7231531B2
JP7231531B2 JP2019214272A JP2019214272A JP7231531B2 JP 7231531 B2 JP7231531 B2 JP 7231531B2 JP 2019214272 A JP2019214272 A JP 2019214272A JP 2019214272 A JP2019214272 A JP 2019214272A JP 7231531 B2 JP7231531 B2 JP 7231531B2
Authority
JP
Japan
Prior art keywords
shoring
steel
irradiator
laser
steel shoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019214272A
Other languages
Japanese (ja)
Other versions
JP2021085205A (en
Inventor
真吾 宮本
快尚 古賀
卓也 谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2019214272A priority Critical patent/JP7231531B2/en
Publication of JP2021085205A publication Critical patent/JP2021085205A/en
Application granted granted Critical
Publication of JP7231531B2 publication Critical patent/JP7231531B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明は、トンネル施工における鋼製支保工建込方法に関する。 The present invention relates to a steel shoring erection method in tunnel construction.

山岳工法によるトンネルの施工では、機械掘削工法や発破掘削工法によって地山を掘削し、地山の掘削によって露出した地山面を支保工により閉合する。地山面の閉合に使用する支保工は、地山面に沿って建て込まれた鋼製支保工と、地山面に吹き付けられた吹付けコンクリートと、必要に応じて施工されたロックボルト等を備えている。
鋼製支保工を建て込む際には、坑口側から切羽に向けて照射されたレーザー光と鋼製支保工との離隔距離を、定規等を用いて目視により確認しながら横断方向の位置調整を行うとともに、建込間隔と同じ長さの継ぎ材(例えばタイロッド)を用いて既設の鋼製支保工と連結することで縦断方向の位置決めを行うのが一般的であった。前記従来の鋼製支保工の建込方法では、鋼製支保工を把持したエレクターを操作するオペレータの他に、レーザー光と鋼製支保工との離れを測定する作業員等、複数の作業員が必要であった。また、定規を用いた測量とエレクターの操作とを交互に繰り返す必要があるため、作業に手間がかかっていた。
In tunnel construction using the mountain construction method, the natural ground is excavated by a mechanical excavation method or a blasting excavation method, and the ground surface exposed by the excavation of the natural ground is closed with support. The shoring used to close the ground surface consists of steel shoring erected along the ground surface, shotcrete sprayed onto the ground surface, and rock bolts etc. installed as necessary. It has
When erecting a steel shoring, visually check the separation distance between the laser beam irradiated from the tunnel face toward the face and the steel shoring using a ruler, etc., and adjust the position in the transverse direction. In addition, it was common to perform longitudinal positioning by connecting to the existing steel shoring using joints (for example, tie rods) of the same length as the erection interval. In the conventional steel shoring installation method, in addition to the operator who operates the erector holding the steel shoring, a plurality of workers such as a worker who measures the distance between the laser beam and the steel shoring. was necessary. In addition, since it is necessary to alternately repeat the surveying using the ruler and the operation of the erector, the work is time-consuming.

そのため、鋼製支保工の建て込み時の省力化を図ることを可能とした支保工建込方法が開発されている。例えば、特許文献1の支保工建込方法では、鋼製支保工の少なくとも3箇所にターゲットを取り付け、ターゲットを自動追尾するトータルステーションを所定地点に設置しておき、エレクタコントローラに鋼製支保工の設置予定位置とターゲットの設置高さとを予め入力する。そして、3箇所のターゲットのそれぞれについて、トータルステーションで自動追尾してトンネル中心からの距離を測量し、測量した距離と予め入力した鋼製支保工の設置予定位置とに基づき、鋼製支保工の設置誤差が所定値以下になるようにエレクタコントローラによりエレクターを制御する。
特許文献1の支保工建込方法では、鋼製支保工の位置を測量して設計値との離隔距離を計算してから鋼製支保工を移動し、さらに移動後の鋼製支保工の位置の測量を行い設計位置との比較を行う作業を繰り返すことにより所定の位置に鋼製支保工を配置する。
Therefore, a shoring erection method has been developed that makes it possible to save labor when erecting steel shoring. For example, in the shoring erection method of Patent Document 1, targets are attached to at least three locations of a steel shoring, a total station that automatically tracks the target is installed at a predetermined point, and the steel shoring is installed in the erector controller. Enter the planned position and the installation height of the target in advance. Then, for each of the three targets, the total station automatically tracks and measures the distance from the center of the tunnel, and based on the measured distance and the planned installation position of the steel shoring entered in advance, the steel shoring is installed. The erector is controlled by an erector controller so that the error is less than or equal to a predetermined value.
In the shoring erection method of Patent Document 1, the position of the steel shoring is measured, the separation distance from the design value is calculated, the steel shoring is moved, and the position of the steel shoring after movement is calculated. By repeating the work of measuring and comparing with the design position, the steel shoring is placed at the specified position.

特開2007-138427号公報JP 2007-138427 A

本発明は、位置決めに時間をかけずに鋼製支保工を所定の位置に建て込むことを可能とした鋼製支保工建込方法を提案することを課題とする。 SUMMARY OF THE INVENTION An object of the present invention is to propose a method for erecting a steel shoring, which enables erecting a steel shoring at a predetermined position without taking time for positioning.

前記課題を解決するための本発明の鋼製支保工建込方法は、エレクタマシンをトンネル内の所定の位置に据え付けるマシン据付工程と、前記エレクタマシンのブームに取り付けられた周方向レーザー照射器の向きを調整する照射器調整工程と、前記周方向レーザー照射器を所定の位置に配置する照射器配置工程と、前記エレクタマシンを操作して鋼製支保工を建て込む支保工建込工程とを備えている。前記照射器調整工程では、切羽の坑口側に設けられた基準点に向けて周方向レーザーを照射できる位置に前記周方向レーザー照射器を配置する作業と、前記周方向レーザー照射器から前記基準点に向けて周方向レーザーを照射して前記周方向レーザー照射器の向きを調整する作業とを行う。また、前記照射器配置工程では、周方向レーザーを鋼製支保工建込箇所に照射できる位置に前記周方向レーザー照射器を配置する。さらに、前記支保工建込工程では、前記周方向レーザー照射器により前記鋼製支保工建込箇所に周方向レーザーを照射する作業と、前記鋼製支保工建込箇所に前記鋼製支保工を建て込んだ場合に当該鋼製支保工の脚部となる位置に向けてレーザー光を照射する作業と、前記周方向レーザーにより縦断方向の位置を確認するとともに前記レーザー光により横断方向の位置を確認しながら前記鋼製支保工を建て込む作業とを行う。 The steel shoring erection method of the present invention for solving the above problems comprises a machine installation step of installing an erector machine at a predetermined position in a tunnel, and a circumferential laser irradiator attached to the boom of the erector machine. An irradiator adjustment process for adjusting the orientation, an irradiator placement process for arranging the circumferential laser irradiator at a predetermined position, and a shoring erection process for erecting the steel shoring by operating the erector machine. I have it. In the irradiator adjustment step, the operation of arranging the circumferential laser irradiator at a position where the circumferential laser can be irradiated toward the reference point provided on the tunnel side of the face; and adjusting the orientation of the circumferential laser irradiator by irradiating a circumferential laser toward the substrate. In addition, in the irradiator placement step, the circumferential laser irradiator is arranged at a position where the circumferential laser irradiator can irradiate the steel shoring erection location. Furthermore, in the shoring erection step, the circumferential laser irradiator irradiates the steel shoring erection site with a circumferential laser, and the steel shoring is installed at the steel shoring erection site. Work to irradiate a laser beam toward the position that will be the leg of the steel shoring when erected, and confirm the position in the longitudinal direction with the circumferential laser and the position in the transverse direction with the laser beam. while erecting the steel shoring.

かかる鋼製支保工建込方法によれば、周方向レーザーと脚部に照射されたレーザー光(脚部レーザー)を目印に鋼製支保工の位置決めを行うため、建込作業を行いやすい。作業性に優れている。そのため、測量、演算、鋼製支保工の移動を繰り返す従来の建込方法に比べて、作業時間を短縮することができる。また、特殊な機能を有するエレクタマシンを使用する必要がないので経済的である。
なお、前記周方向レーザーがラインレーザーであり、前記支保工建込工程において、前記ラインレーザーによりトンネル断面を照射するようにすれば、鉛直面のガイドとして周方向レーザーが機能するため、ピッチングの調整が容易となる。
また、前記鋼製支保工の脚部に取り付けられた反射材により反射した前記レーザー光(脚部レーザー)を確認しながら前記鋼製支保工の位置調整を行えば、エレクタマシンのオペレータが、離れた位置からレーザー光の光反射を確認しながら、エレクターの操作をすることができる。
According to this steel shoring erection method, the steel shoring is positioned using the circumferential laser and the laser light irradiated to the leg (leg laser) as a mark, so the erection work is easy. Excellent workability. Therefore, the work time can be shortened compared to the conventional erection method in which surveying, calculation, and movement of steel shoring are repeated. Moreover, it is economical because there is no need to use an erector machine with special functions.
In addition, the circumferential laser is a line laser, and in the shoring erection process, if the tunnel cross section is irradiated with the line laser, the circumferential laser functions as a guide for the vertical surface, so pitching can be adjusted. becomes easier.
In addition, if the position of the steel shoring is adjusted while checking the laser beam (leg laser) reflected by the reflector attached to the leg of the steel shoring, the operator of the erector machine can move away from the steel shoring. You can operate the erector while checking the light reflection of the laser light from the position.

本発明の鋼製支保工建込方法によれば、周方向レーザーと脚部レーザーとを目印として鋼製支保工を移動させることで、鋼製支保工の位置決めが完了するため、鋼製支保工を所定の位置に容易に建て込むことができる。そのため、工期短縮化を図ることができ、ひいては、工事費の低減化を図ることができる。 According to the steel shoring erection method of the present invention, the positioning of the steel shoring is completed by moving the steel shoring using the circumferential laser and the leg laser as marks. can be easily erected in place. Therefore, the construction period can be shortened, and the construction cost can be reduced.

本実施形態の鋼製支保工建込方法の概要を示す図であって、(a)は縦断図、(b)は横断図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a figure which shows the outline|summary of the steel shoring erection method of this embodiment, Comprising: (a) is a longitudinal cross-sectional view, (b) is a cross-sectional view. 周方向レーザー照射器の取付状況を示す図であって、(a)は側面図、(b)は正面図である。It is a figure which shows the attachment condition of a circumferential laser irradiation device, (a) is a side view, (b) is a front view. 鋼製支保工建込方法のフローチャートである。4 is a flow chart of a steel shoring erection method; 反射材の設置状況を示す正面図である。It is a front view which shows the installation condition of a reflector. 鋼製支保工建込方法の照射器調整工程を示す縦断図である。It is a longitudinal section showing an irradiator adjustment process of the steel shoring erection method. 鋼製支保工建込方法の照射器配置工程を示す縦断図である。It is a longitudinal section showing an irradiator arrangement step of the steel shoring erection method. 鋼製支保工建込方法の支保工建込工程を示す縦断図である。It is a longitudinal section showing a shoring erection process of the steel shoring erection method. 支保部材同士の接合状況を示す部分拡大図であって、(a)は接合前、(b)は接合途中、(c)は接合後をそれぞれ示している。It is a partial enlarged view showing the joining state of support members, (a) shows before joining, (b) shows during joining, and (c) shows after joining.

本実施形態では、図1(a)および(b)に示すように、切羽Kの近傍において鋼製支保工2を建て込む方法について説明する。鋼製支保工2は、トンネル施工時の地山の掘削によって露出した地山面を閉合するために設置する支保工の一部である。支保工には、鋼製支保工2の他に、地山面に吹き付ける吹付けコンクリート21や、必要に応じて地山に埋め込まれるロックボルトなどがある。
鋼製支保工2は、一対の支保部材22,22を組み合わせることによりアーチ状に形成されている。支保部材22は、H形鋼を加工することにより形成されている。支保部材22の上端には支保部材22同士を接合するための継手板(頂板)23が固定されており、支保部材22の下端には底板24が固定されている。なお、一基の鋼製支保工2を組み立てるための支保部材22の数は二つに限定されるものではない。また、鋼製支保工2の形状は、トンネルの断面形状に応じて適宜決定すればよい。
In this embodiment, as shown in FIGS. 1(a) and 1(b), a method of erecting a steel shoring 2 in the vicinity of the face K will be described. The steel shoring 2 is part of the shoring installed to close the ground surface exposed by excavating the ground during tunnel construction. In addition to the steel shoring 2, the shoring includes shotcrete 21 that is sprayed onto the natural ground surface, and rock bolts that are embedded into the natural ground as needed.
The steel support 2 is formed in an arch shape by combining a pair of support members 22,22. The support member 22 is formed by processing H-section steel. A joint plate (top plate) 23 for joining the supporting members 22 together is fixed to the upper ends of the supporting members 22 , and a bottom plate 24 is fixed to the lower ends of the supporting members 22 . The number of support members 22 for assembling one steel support 2 is not limited to two. Moreover, the shape of the steel shoring 2 may be appropriately determined according to the cross-sectional shape of the tunnel.

鋼製支保工2を建て込む際には、エレクタマシン1を使用する。図1を参照して、本実施形態のエレクタマシン1について説明する。エレクタマシン1は、鋼製支保工2を移動させる重機であって、本体部11と、走行部12と、2本のエレクターブーム13,13と、二つのバスケット14,14とを備えている。本体部11には、操縦席15が設けられている。本体部11は、走行部12に支持されている。操縦席15には、エレクターブーム13等の操作を行うためのレバー等や、走行部12を操作するためのハンドル等が設けられている。走行部12は、トンネル坑内を走行する走行手段である。本実施形態では、走行部12として、複数の駆動輪に無端状のベルトが巻き付けられた、いわゆるクローラ式の走行部12を使用する。走行部12の形式は限定されるものではなく、例えば、ホイール式であってもよい。エレクターブーム13の先端部には、把持手段16が設けられている。エレクターブーム13は、伸縮可能であるとともに、上下左右に旋回可能である。把持手段16は、鋼製支保工2を把持可能である。 An erector machine 1 is used when erecting a steel shoring 2. - 特許庁An erector machine 1 of the present embodiment will be described with reference to FIG. The erector machine 1 is a heavy machine for moving the steel shoring 2, and includes a main body 11, a traveling section 12, two erector booms 13, 13, and two baskets 14, 14. A cockpit 15 is provided in the main body 11 . The body portion 11 is supported by the running portion 12 . The operator's seat 15 is provided with a lever or the like for operating the erector boom 13 or the like and a handle or the like for operating the travel section 12 . The running unit 12 is a running means that runs inside the tunnel. In this embodiment, a so-called crawler-type traveling section 12 in which an endless belt is wound around a plurality of drive wheels is used as the traveling section 12 . The type of the traveling portion 12 is not limited, and may be, for example, a wheel type. A gripping means 16 is provided at the tip of the erector boom 13 . The erector boom 13 is extendable and can be turned vertically and horizontally. The gripping means 16 are capable of gripping the steel shoring 2 .

バスケット14は、高所作業を行う作業員のための足場として機能する。バスケット14は、バスケットブーム17の先端に取り付けられている。バスケットブーム17は、伸縮可能であるとともに、上下左右に旋回可能である。また、バスケットブーム17は、エレクタマシン1の本体部11上において、前後に移動可能である。本体部11には、操縦席15の左右に、前後方向に沿ったバスケットブーム17用のレール(図示せず)が設けられている。バスケットブーム17は、本体部11に設けられたレールを走行することで、前後方向へ移動する。このように、バスケット14はバスケットブーム17を介して前後上下左右に移動する。バスケットブーム17の操作は、バスケット14上の作業員または操縦席15のオペレータが行う。 The basket 14 functions as a scaffold for workers working at height. Basket 14 is attached to the tip of basket boom 17 . The basket boom 17 is extendable and can be turned vertically and horizontally. Also, the basket boom 17 can move forward and backward on the body portion 11 of the erector machine 1 . The body portion 11 is provided with rails (not shown) for the basket boom 17 along the front-rear direction on the left and right sides of the operator's seat 15 . The basket boom 17 moves in the front-rear direction by traveling on rails provided on the main body 11 . In this manner, the basket 14 moves forward, backward, upward, downward, leftward, and rightward via the basket boom 17 . The operation of the basket boom 17 is performed by a worker on the basket 14 or an operator at the cockpit 15 .

本実施形態では、二つのバスケット14、14のうちの一方のバスケット14の下側に周方向レーザー照射器3が吊持されている。図2(a)および(b)を参照して、周方向レーザー照射器3について説明する。周方向レーザー照射器3は、鋼製支保工2の建込位置に向けてレーザー光(ラインレーザー)を照射する。本実施形態では、周方向レーザー照射器3として、いわゆるレーザー墨出し器を使用する。周方向レーザー照射器3のレーザーの照射部31には円錐状のミラーが取り付けられている。周方向レーザー照射器3から照射されたレーザー光は、ミラーを介してトンネル壁面に向けて照射され、トンネル周方向に延在する目印線を形成する。周方向レーザー照射器3には、レーザー光の照射時のブレを抑制するために、ヨーイングの調整機構と、揺れ低減機構が搭載されている。周方向レーザー照射器3は、架台4を介してバスケット14に吊持されている。架台4は、鋼材(例えば、L形鋼)を組み合わせることにより形成されている。架台4は、周方向レーザー照射器3を取り付けるためのフレーム41と、一端がバスケット14に固定され、他端がフレーム41に固定された吊具42とを備えている。フレーム41は、上面がバスケット14の床板と平行になるように吊持されている。すなわち、フレーム41は、バスケット14とともに、水平性が維持されている。本実施形態では、周方向レーザー照射器3は、フレーム41に上載されたケース32の内部に収納されている。ケース32は、周方向レーザー照射器3を保護する箱形部材である。ケース32には、周方向レーザー照射器3の照射部31の位置に対応して、窓(図示せず)が形成されており、この窓を通じて、周方向レーザー照射器3から照射されたレーザー光(周方向レーザーL)がトンネル壁面に至る。 In this embodiment, the circumferential laser irradiator 3 is suspended under one basket 14 of the two baskets 14 , 14 . The circumferential laser irradiator 3 will be described with reference to FIGS. 2(a) and 2(b). The circumferential laser irradiator 3 irradiates a laser beam (line laser) toward the setting position of the steel shoring 2 . In this embodiment, a so-called laser marking device is used as the circumferential laser irradiator 3 . A conical mirror is attached to the laser irradiation portion 31 of the circumferential laser irradiation device 3 . A laser beam emitted from the circumferential laser irradiator 3 is directed toward the tunnel wall surface via a mirror to form a mark line extending in the tunnel circumferential direction. The circumferential laser irradiator 3 is equipped with a yawing adjustment mechanism and a shake reduction mechanism in order to suppress blurring during laser beam irradiation. The circumferential laser irradiator 3 is suspended from the basket 14 via the mount 4 . The frame 4 is formed by combining steel materials (for example, L-shaped steel). The pedestal 4 includes a frame 41 for mounting the circumferential laser irradiator 3 and a hanger 42 having one end fixed to the basket 14 and the other end fixed to the frame 41 . The frame 41 is suspended so that its upper surface is parallel to the floor plate of the basket 14. - 特許庁That is, the horizontality of the frame 41 is maintained together with the basket 14 . In this embodiment, the circumferential laser irradiator 3 is housed inside a case 32 mounted on the frame 41 . The case 32 is a box-shaped member that protects the circumferential laser irradiator 3 . A window (not shown) is formed in the case 32 corresponding to the position of the irradiation section 31 of the circumferential laser irradiator 3, and the laser beam irradiated from the circumferential laser irradiator 3 passes through this window. (Circumferential laser L 1 ) reaches the tunnel wall surface.

図3~図8を参照して本実施形態の鋼製支保工建込方法について説明する。本実施形態の鋼製支保工建込方法は、図3に示すように、準備工程S1と、マシン据付工程S2と、照射器調整工程S3と、照射器配置工程S4と、支保工建込工程S5とを備えている。
準備工程S1では、既設鋼製支保工20(例えば、新たに建て込む鋼製支保工2の二基手前の既設鋼製支保工20)に基準点を設置する。基準点は、視認しやすいように形成されているのが望ましく、例えば、鋼板、ボルト、釘等を既設鋼製支保工20の側面に凸設すればよい。なお、基準点の位置および形成方法は限定されるものではなく、例えば、切羽から所定長離れた位置の吹付けコンクリート21に打ち込まれた釘(基準釘)であってもよい。また、準備工程S1では、図4に示すように、新設する鋼製支保工2の脚部に治具51を取り付けて置く。治具51には、反射テープ(反射材)5を貼付する。治具51の構成は限定されるものではないが、本実施形態の治具51は、鋼材(例えばL形鋼)からなり、マグネット52を介して鋼製支保工2に固定される。なお、反射テープ5は、マグネット52に直接貼付してもよい。また、治具51の固定方法はマグネット52によるものに限定されるものではなく、例えば、クランプ等で鋼製支保工2に固定してもよい。また、反射材は反射テープ5に限定されるものではなく、例えば、治具51に塗布された塗料であってもよい。
The steel shoring erection method of the present embodiment will be described with reference to FIGS. 3 to 8. FIG. As shown in FIG. 3, the steel shoring erection method of the present embodiment includes a preparation step S1, a machine installation step S2, an irradiator adjustment step S3, an irradiator placement step S4, and a shoring erection step. S5.
In the preparation step S1, a reference point is set on the existing steel shoring 20 (for example, the existing steel shoring 20 two units before the steel shoring 2 to be erected newly). The reference point is desirably formed so as to be easily visible. The position and formation method of the reference point are not limited, and for example, it may be a nail (reference nail) driven into the shotcrete 21 at a position a predetermined distance away from the face. Moreover, in the preparation step S1, as shown in FIG. A reflective tape (reflective material) 5 is attached to the jig 51 . Although the configuration of the jig 51 is not limited, the jig 51 of the present embodiment is made of steel (for example, L-shaped steel) and fixed to the steel shoring 2 via magnets 52 . Note that the reflective tape 5 may be attached directly to the magnet 52 . Moreover, the fixing method of the jig 51 is not limited to the use of the magnet 52. For example, the jig 51 may be fixed to the steel shoring 2 with a clamp or the like. Further, the reflective material is not limited to the reflective tape 5, and may be paint applied to the jig 51, for example.

マシン据付工程S2は、エレクタマシン1をトンネル内の所定の位置に据え付ける工程である。エレクタマシン1は、エレクターブーム13により鋼製支保工2を切羽Kに沿って建て込むことが可能となる位置に据え付ける。エレクタマシン1は、把持手段16によって鋼製支保工2を把持した状態で据え付ける。エレクタマシン1を所定の位置に配置したら、アウトリガー(図示せず)等を利用して、エレクタマシン1の水平性を確保するのが望ましい。 The machine installation step S2 is a step of installing the erecta machine 1 at a predetermined position in the tunnel. The erector machine 1 is installed at a position where the steel shoring 2 can be erected along the face K by the erector boom 13 . The erector machine 1 is installed with the steel shoring 2 gripped by gripping means 16 . After placing the erector machine 1 at a predetermined position, it is desirable to secure the horizontality of the erector machine 1 by using an outrigger (not shown) or the like.

照射器調整工程S3は、エレクタマシン1のバスケット14(バスケットブーム17の先端)に取り付けられた周方向レーザー照射器3の向きを調整する工程である。
照射器調整工程S3では、まず、図5に示すように、基準釘が設置された既設鋼製支保工20に対して周方向レーザーLを照射できる位置に周方向レーザー照射器3を配置する(仮配置作業S31)。このとき、周方向レーザー照射器3は、既設鋼製支保工20の縦断位置と一致する位置において、トンネル幅方向中央に位置するように配置する。また、バスケットブーム17の基部は、エレクタマシン1の本体部11の後部に位置させておく。なお、図5では、鋼製支保工2を把持したエレクターブーム13の図示を省略している。
The irradiator adjustment step S3 is a step of adjusting the orientation of the circumferential laser irradiator 3 attached to the basket 14 (tip of the basket boom 17) of the erectamachine 1. FIG.
In the irradiator adjustment step S3, first, as shown in FIG. 5, the circumferential laser irradiator 3 is arranged at a position where the existing steel support 20 on which the reference nail is installed can be irradiated with the circumferential laser L1 . (Temporary arrangement work S31). At this time, the circumferential laser irradiator 3 is arranged so as to be positioned at the center in the width direction of the tunnel at a position coinciding with the longitudinal position of the existing steel shoring 20 . Also, the base of the basket boom 17 is positioned at the rear of the main body 11 of the erector machine 1 . 5, illustration of the erector boom 13 holding the steel shoring 2 is omitted.

次に、周方向レーザー照射器3の向きを調整する作業を行う(向き調整作業S32)。向き調整作業S32では、周方向レーザー照射器3から既設鋼製支保工20に対して周方向レーザーLを照射し、照射された周方向レーザーLが既設鋼製支保工20と一致するように、周方向レーザー照射器3の向きを調整する。本実施形態では、既設鋼製支保工20に固定した設けられた基準点に対して周方向レーザーLを照射することで、ねじれに対するキャリブレーションを行う。なお、周方向レーザー照射器3が上載されたフレーム41は、水平性が確保されているため、フレーム41に上載された周方向レーザー照射器3の仰角は一定である。 Next, an operation for adjusting the orientation of the circumferential laser irradiator 3 is performed (orientation adjustment operation S32). In the orientation adjustment work S32, the circumferential laser beam L1 is irradiated from the circumferential laser irradiator 3 to the existing steel shoring structure 20, and the irradiated circumferential laser beam L1 is aligned with the existing steel shoring structure 20. Then, the direction of the circumferential laser irradiator 3 is adjusted. In the present embodiment, torsion is calibrated by irradiating a reference point fixed to the existing steel shoring 20 with the circumferential laser L1 . Since the horizontality of the frame 41 on which the circumferential laser irradiator 3 is mounted is ensured, the elevation angle of the circumferential laser irradiator 3 mounted on the frame 41 is constant.

照射器配置工程S4は、図6に示すように、周方向レーザー照射器3を所定の位置に配置する工程である。
照射器配置工程S4では、バスケットブーム17を鋼製支保工建込箇所にレーザー光を照射できる位置に周方向レーザー照射器3を配置する。本実施形態では、エレクタマシン1の本体部11上でバスケットブーム17を前方に所定長(本実施形態では二基分)スライドさせることにより周方向レーザー照射器3を所定の位置まで水平移動させる。このとき、バスケットブーム17の角度および長さは、照射器調整工程S3において設定された角度および長さに固定されている。なお、図6では、鋼製支保工2を把持したエレクターブーム13の図示を省略している。
The irradiator placement step S4 is, as shown in FIG. 6, a step of arranging the circumferential laser irradiator 3 at a predetermined position.
In the irradiator arranging step S4, the circumferential laser irradiator 3 is arranged at a position where the basket boom 17 can irradiate the steel shoring construction location with laser light. In this embodiment, the basket boom 17 is slid forward on the main body 11 of the erector machine 1 by a predetermined length (two units in this embodiment) to horizontally move the circumferential laser irradiator 3 to a predetermined position. At this time, the angle and length of the basket boom 17 are fixed to the angle and length set in the irradiator adjustment step S3. 6, illustration of the erector boom 13 holding the steel shoring 2 is omitted.

支保工建込工程S5は、図7に示すように、エレクタマシン1のエレクター(エレクターブーム13および把持手段16)を操作して鋼製支保工2を建て込む工程である。
鋼製支保工2は、周方向レーザー照射器3によって照射された周方向レーザーLおよび鋼製支保工2の脚部に向けて照射された脚部レーザーLを基準にして、縦断位置、横断位置、高さ、倒れ等を確認しながら建て込む。そして、把持手段16により把持された左右一対の支保部材22,22を組み合わせることによりアーチ状の鋼製支保工2を組み立てる(図1(b)参照)。一対の支保部材22,22は、それぞれエレクターブーム13により支持しながら、頂部を突き合せた状態でボルト接合する。支保部材22同士を接合する際には、図8(a)に示すように、一方の支保部材22の継手板23に取り付けられた外れ止ボルト25の軸部を、図8(b)に示すように他方の支保部材22の継手板23に挿通すればよい。本実施形態の外れ止ボルト25は、外れ止め用のロック機構26を備えており、外れ止ボルト25を他方の継手板23に差し込むと、図8(c)に示すように、ロック機構26が他方の継手板23に係止されて、支保部材22同士が連結される。なお、支保部材22同士の接合に使用する留具は外れ止ボルト25に限定されるものではなく、例えばボルトとナットを使用するなど、適宜選定して使用すればよい。
The shoring erection step S5 is a step of erecting the steel shoring 2 by operating the erector (the erector boom 13 and the gripping means 16) of the erector machine 1, as shown in FIG.
The steel shoring 2 has a longitudinal position, based on the circumferential laser L 1 irradiated by the circumferential laser irradiator 3 and the leg laser L 2 irradiated toward the leg of the steel shoring 2. Erect while checking the crossing position, height, collapse, etc. Then, the arch-shaped steel shoring 2 is assembled by combining the pair of left and right support members 22, 22 gripped by the gripping means 16 (see FIG. 1(b)). The pair of support members 22 , 22 are bolted together with their tops facing each other while being supported by the erector boom 13 . When joining the support members 22 together, as shown in FIG. 8(a), the shaft portion of the retaining bolt 25 attached to the joint plate 23 of one of the support members 22 is shown in FIG. 8(b). As shown in FIG. The retaining bolt 25 of the present embodiment has a locking mechanism 26 for retaining. When the retaining bolt 25 is inserted into the other joint plate 23, the locking mechanism 26 is activated as shown in FIG. 8(c). The supporting members 22 are connected to each other by being locked by the other joint plate 23 . The fasteners used for joining the support members 22 together are not limited to the detachment prevention bolts 25. For example, a bolt and a nut may be appropriately selected and used.

支保工建込工程S5をより詳細に説明する。支保工建込工程S5では、まず、周方向レーザー照射器3により鋼製支保工2の建込箇所に向けて周方向レーザーLを照射する(周方向レーザー照射作業S51)。また、鋼製支保工2の脚部(反射テープ5の設置箇所)の設置予定位置に向けてレーザー光(脚部レーザーL)を照射する(脚部レーザー照射作業S52)。脚部レーザーLは、エレクタマシン1の後方に据え付けられたトランシット6から照射する。本実施形態のトランシット6は、エレクタマシン1よりも後方にある既設鋼製支保工20に固定されたブラケット61に据え付けられている。なお、トランシット6は、必ず既設鋼製支保工20に固定しておく必要はなく、三脚等を利用して、任意の位置に据え付けてもよい。 The shoring erection step S5 will be described in more detail. In the shoring erection step S5, first, the circumferential laser irradiator 3 irradiates the circumferential laser L1 toward the erected location of the steel shoring 2 (circumferential laser irradiation work S51). In addition, a laser beam (leg laser L 2 ) is irradiated toward the planned installation position of the leg of the steel shoring 2 (place where the reflective tape 5 is installed) (leg laser irradiation work S52). The leg laser L 2 is emitted from the transit 6 installed behind the erecta machine 1 . The transit 6 of this embodiment is installed on a bracket 61 fixed to the existing steel shoring 20 behind the erector machine 1 . The transit 6 does not necessarily have to be fixed to the existing steel shoring 20, and may be installed at an arbitrary position using a tripod or the like.

次に、周方向レーザーLにより縦断方向の位置を確認するとともに脚部レーザーLにより横断方向の位置および高さ位置を確認しながら鋼製支保工2を建て込む(建込作業S53)。オペレータは、鋼製支保工2の脚部に取り付けられた反射テープ5により反射した脚部レーザーLを確認しながら鋼製支保工2の位置および向きの調整を行う。鋼製支保工2の位置決めが完了したら、必要に応じて鋼製支保工2の脚部を固定する。
鋼製支保工2を所定に位置に建て込んだら、エレクタマシン1(エレクターブーム13および把持手段16)により鋼製支保工2を支持した状態で、トンネル壁面に吹付けコンクリート21の施工を行う。なお、壁面には、必要に応じて金網を設置してもよい。
Next, while confirming the position in the longitudinal direction by the circumferential laser L1 and confirming the position in the transverse direction and the height position by the leg laser L2 , the steel shoring 2 is erected (installation work S53). The operator adjusts the position and orientation of the steel shoring 2 while checking the leg laser L2 reflected by the reflective tape 5 attached to the leg of the steel shoring 2 . After the positioning of the steel shoring 2 is completed, the legs of the steel shoring 2 are fixed as necessary.
After erecting the steel shoring 2 at a predetermined position, the erector machine 1 (the erector boom 13 and the gripping means 16) supports the steel shoring 2, and shotcrete 21 is applied to the tunnel wall surface. In addition, a wire mesh may be installed on the wall surface as necessary.

以上、本実施形態の鋼製支保工建込方法によれば、周方向レーザーLと脚部レーザーLを目印に鋼製支保工2の位置決めを行うため、作業性に優れている。そのため、測量、演算、鋼製支保工2の移動を繰り返す従来の建込方法に比べて、作業時間を短縮することができる。また、特殊な機能を有するエレクタマシン1を使用する必要がなく、経済的である。
周方向レーザーLは、トンネル断面を示すように照射されたラインレーザーであるため、鋼製支保工2の鉛直面のガイドとして機能する。そのため、鋼製支保工2のピッチングの調整が容易である。また、鋼製支保工2の建込位置において周方向レーザーLが照射されているため、縦断方向の位置把握が容易である。
また、エレクタマシン1のオペレータは、離れた位置から脚部レーザーLの光反射(反射材で反射した脚部レーザーL)を確認しながら、エレクタマシン1の操作をすることができる。反射テープ5は、マグネット52によって固定されているため、着脱が容易である。
As described above, according to the steel shoring erecting method of the present embodiment, the steel shoring 2 is positioned using the circumferential laser L1 and the leg laser L2 as marks, so workability is excellent. Therefore, the work time can be shortened compared to the conventional erection method in which surveying, calculation, and movement of the steel shoring 2 are repeated. Moreover, it is economical because there is no need to use the erecta machine 1 having special functions.
Since the circumferential laser L1 is a line laser irradiated to indicate the tunnel cross section, it functions as a guide for the vertical surface of the steel support 2 . Therefore, it is easy to adjust the pitching of the steel shoring 2 . In addition, since the circumferential direction laser L1 is irradiated at the erected position of the steel shoring 2, it is easy to grasp the position in the longitudinal direction.
Further, the operator of the erector machine 1 can operate the erector machine 1 while confirming the light reflection of the leg laser L2 (the leg laser L2 reflected by the reflector) from a distant position. Since the reflective tape 5 is fixed by the magnet 52, it can be easily attached and detached.

また、オペレータは、周方向レーザーLおよび脚部レーザーLを基準にして鋼製支保工2の位置を確認しながらエレクタマシン1の操作を行うため、作業性に優れているとともに、費用の低減化を図ることができる。すなわち、定規を利用して測量を行う従来の施工方法では、定規を据え付ける作業員を配置する必要があるが、本実施形態の鋼製支保工建込方法によれば、オペレータが一人で作業を行うことができる。そのため、人員を削減し、切羽に近づかないことから安全を確保することができる。また、周方向レーザーLや脚部レーザーLの位置を確認しながら鋼製支保工2を移動させれば良いため、測量、誤差の算出、鋼製支保工2の移動を繰り返すことにより位置決めを行う従来の施工方法に比べて作業性に優れている。また、測量結果に基づいて鋼製支保工2の移動を繰り返す場合には、鋼製支保工2の位置決めが収束し難いが、本実施形態の鋼製支保工建込方法によれば、周方向レーザーLおよび脚部レーザーLを基準にして鋼製支保工2の位置を調整するため、位置決めが容易である。 In addition, since the operator operates the erector machine 1 while confirming the position of the steel shoring 2 based on the circumferential laser L1 and the leg laser L2, the workability is excellent and the cost is low. reduction can be achieved. That is, in the conventional construction method in which surveying is performed using a ruler, it is necessary to allocate a worker to install the ruler. It can be carried out. Therefore, it is possible to reduce the number of personnel and ensure safety by not approaching the face. In addition, since it is sufficient to move the steel shoring 2 while confirming the positions of the circumferential laser L1 and the leg laser L2 , positioning can be performed by repeating surveying, error calculation, and movement of the steel shoring 2. It has excellent workability compared to the conventional construction method that performs Further, when the steel shoring 2 is repeatedly moved based on the survey results, the positioning of the steel shoring 2 is difficult to converge. Positioning is easy because the position of the steel shoring 2 is adjusted based on the laser L1 and the leg laser L2.

以上、本発明の実施形態について説明したが、本発明は、前述の実施形態に限られず、前記の各構成要素については本発明の趣旨を逸脱しない範囲で適宜変更が可能である。
前記実施形態では、周方向レーザー照射器3をバスケット14の下に吊り下げる場合について説明したが、周方向レーザー照射器3の設置個所は限定されるものではない。例えば、バスケットブーム17のバスケット14以外の部分に取り付けてもよいし、エレクターブーム13等のバスケットブーム17以外のブームに取り付けてもよい。
鋼製支保工2の脚部に照射された脚部レーザーLをオペレータ等が直接視認可能な場合には、鋼製支保工2の脚部に反射板を設置する必要はない。
また、エレクタマシン1の構成は限定されるものではない。例えば、エレクターブーム13やバスケット14の数は二つに限定されるものではない。また、バスケットブーム17は、必ずしも本体部11上を移動可能である必要はない。バスケットブーム17が本体部11上で前後方向に移動しない場合には、バスケットブーム17の伸縮により周方向レーザー照射器3の位置決めを行う。
Although the embodiments of the present invention have been described above, the present invention is not limited to the above-described embodiments, and each of the constituent elements described above can be modified as appropriate without departing from the scope of the present invention.
In the above embodiment, the case where the circumferential laser irradiator 3 is suspended under the basket 14 has been described, but the installation location of the circumferential laser irradiator 3 is not limited. For example, it may be attached to a portion of the basket boom 17 other than the basket 14 , or may be attached to a boom other than the basket boom 17 such as the erector boom 13 .
If the operator or the like can directly see the leg laser L2 irradiated to the leg of the steel shoring 2, there is no need to install a reflector on the leg of the steel shoring 2.
Also, the configuration of the erector machine 1 is not limited. For example, the number of erector booms 13 and baskets 14 is not limited to two. Also, the basket boom 17 does not necessarily have to be movable on the body portion 11 . When the basket boom 17 does not move in the longitudinal direction on the main body 11 , the expansion and contraction of the basket boom 17 positions the circumferential laser irradiator 3 .

1 エレクタマシン
11 本体部
12 走行部
13 エレクターブーム
14 バスケット
15 操縦席
16 把持手段
17 バスケットブーム
2 鋼製支保工
3 周方向レーザー照射器
4 架台
5 反射テープ(反射材)
S1 準備工程
S2 マシン据付工程
S3 照射器調整工程
S31 仮配置作業
S32 向き調整作業
S4 照射器配置工程
S5 支保工建込工程
S51 周方向レーザー照射作業
S52 脚部レーザー照射作業
S53 建込作業
1 erector machine 11 main body 12 traveling part 13 erector boom 14 basket 15 cockpit 16 grasping means 17 basket boom 2 steel shoring 3 circumferential laser irradiator 4 mount 5 reflective tape (reflective material)
S1 Preparation process S2 Machine installation process S3 Irradiator adjustment process S31 Temporary placement work S32 Orientation adjustment work S4 Irradiator placement process S5 Shoring installation process S51 Circumferential laser irradiation work S52 Leg laser irradiation work S53 Installation work

Claims (3)

エレクタマシンをトンネル内の所定の位置に据え付けるマシン据付工程と、
前記エレクタマシンのブームに取り付けられた周方向レーザー照射器の向きを調整する照射器調整工程と、
前記周方向レーザー照射器を所定の位置に配置する照射器配置工程と、
前記エレクタマシンを操作して鋼製支保工を建て込む支保工建込工程と、を備える鋼製支保工建込方法であって、
前記照射器調整工程では、切羽の坑口側に設けられた基準点に向けて周方向レーザーを照射できる位置に前記周方向レーザー照射器を配置する作業と、前記周方向レーザー照射器から前記基準点に向けて周方向レーザーを照射して、前記周方向レーザー照射器の向きを調整する作業と、を行い、
前記照射器配置工程では、周方向レーザーを鋼製支保工建込箇所に照射できる位置に前記周方向レーザー照射器を配置し、
前記支保工建込工程では、前記周方向レーザー照射器により前記鋼製支保工建込箇所に周方向レーザーを照射する作業と、前記鋼製支保工建込箇所に前記鋼製支保工を建て込んだ場合に当該鋼製支保工の脚部となる位置に向けてレーザー光を照射する作業と、前記周方向レーザーにより縦断方向の位置を確認するとともに前記レーザー光により横断方向の位置を確認しながら前記鋼製支保工を建て込む作業と、を行うことを特徴とする鋼製支保工建込方法。
A machine installation process for installing the erecta machine at a predetermined position in the tunnel;
an irradiator adjustment step of adjusting the orientation of a circumferential laser irradiator attached to the boom of the erector machine;
an irradiator placement step of arranging the circumferential laser irradiator at a predetermined position;
A steel shoring erecting method comprising a shoring erecting step of operating the erector machine to erect a steel shoring,
In the irradiator adjustment step, the operation of arranging the circumferential laser irradiator at a position where the circumferential laser can be irradiated toward the reference point provided on the tunnel side of the face; irradiating a circumferential laser toward and adjusting the orientation of the circumferential laser irradiator,
In the irradiator arranging step, the circumferential laser irradiator is arranged at a position where the circumferential laser irradiator can be irradiated to the steel shoring installation location,
In the shoring erection step, the circumferential laser irradiator irradiates the steel shoring erection site with a circumferential laser, and the steel shoring erection work is performed at the steel shoring erection site. In that case, the operation of irradiating a laser beam toward the position that will be the leg of the steel shoring, and while confirming the position in the longitudinal direction with the circumferential laser and the position in the transverse direction with the laser beam A method of erecting a steel shoring, comprising the steps of erecting the steel shoring.
前記周方向レーザーは、ラインレーザーであることを特徴とする、請求項1に記載の鋼製支保工建込方法。 The steel shoring erecting method according to claim 1, characterized in that said circumferential laser is a line laser. 前記鋼製支保工の脚部に取り付けられた反射材により反射した前記レーザー光を確認しながら前記鋼製支保工の位置調整を行うことを特徴とする、請求項1または請求項2に記載の鋼製支保工建込方法。 3. The position adjustment of the steel shoring according to claim 1 or 2, wherein the position of the steel shoring is adjusted while checking the laser beam reflected by a reflector attached to the leg of the steel shoring. Steel shoring erection method.
JP2019214272A 2019-11-27 2019-11-27 Steel shoring erection method Active JP7231531B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019214272A JP7231531B2 (en) 2019-11-27 2019-11-27 Steel shoring erection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019214272A JP7231531B2 (en) 2019-11-27 2019-11-27 Steel shoring erection method

Publications (2)

Publication Number Publication Date
JP2021085205A JP2021085205A (en) 2021-06-03
JP7231531B2 true JP7231531B2 (en) 2023-03-01

Family

ID=76088746

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019214272A Active JP7231531B2 (en) 2019-11-27 2019-11-27 Steel shoring erection method

Country Status (1)

Country Link
JP (1) JP7231531B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114046164B (en) * 2021-11-10 2024-04-26 中国铁建重工集团股份有限公司 Multifunctional assembling equipment for assembled steel structure in tunnel
CN114046161B (en) * 2021-12-09 2023-05-16 中铁十六局集团有限公司 A safety maintenance shock attenuation protection system for tunnel
CN116696413A (en) * 2023-05-18 2023-09-05 四川蓝海智能装备制造有限公司 Arch frame installation method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007138427A (en) 2005-11-15 2007-06-07 Maeda Corp Support construction method and support construction system
JP2012197559A (en) 2011-03-18 2012-10-18 Kajima Corp Tunnel support guiding and building method
JP2019114761A (en) 2017-12-20 2019-07-11 力成科技股▲分▼有限公司 Package structure and method for manufacturing the same

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0424394A (en) * 1990-05-21 1992-01-28 Toa Harbor Works Co Ltd Laser beam radiating method to facing surface of tunnel and device therefore
JPH06307199A (en) * 1993-04-27 1994-11-01 Fujita Corp Method and device for measuring constructing position of shoring in tunnel
JP3808948B2 (en) * 1996-08-20 2006-08-16 大成建設株式会社 Tunnel support construction equipment
JPH10325723A (en) * 1997-05-26 1998-12-08 Laser Techno Kk Laser apparatus for setting out

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007138427A (en) 2005-11-15 2007-06-07 Maeda Corp Support construction method and support construction system
JP2012197559A (en) 2011-03-18 2012-10-18 Kajima Corp Tunnel support guiding and building method
JP2019114761A (en) 2017-12-20 2019-07-11 力成科技股▲分▼有限公司 Package structure and method for manufacturing the same

Also Published As

Publication number Publication date
JP2021085205A (en) 2021-06-03

Similar Documents

Publication Publication Date Title
JP7231531B2 (en) Steel shoring erection method
CN113874314B (en) Construction and/or material handling machine and method for guiding and moving a working head
JP5977265B2 (en) Suspended scaffolding system
KR20210054303A (en) Concrete lining formwork for tunnels with sloped construction
CN106064774A (en) Facility and method for alignment track in the elevator shaft
JP6715000B2 (en) Temporary scaffolding for transportation facilities
JP2005083014A (en) Pre-cast tunnel method and member conveyor used therefor
JP2010255404A (en) Drilling module and portable drilling rig unit
US12152489B2 (en) Modular tunnel formwork device
JP6942680B2 (en) Construction method of temporary bridge
JP6379128B2 (en) Tunnel work table and tunnel work set
JP7364185B2 (en) Shoring erection method and shoring erection system
JP2006028881A (en) Self-propelled PC slab erection machine and PC slab erection method
JP2908577B2 (en) Tunnel lining plate installation method
JP7328659B2 (en) Shoring erection device and shoring erection method using the same
JP4330141B2 (en) Precast concrete floor laying equipment
JP6843001B2 (en) Reinforcing bar cage built-in system
CN120800287A (en) Offset real-time measurement device based on arched girder collaborative pushing and application method thereof
JP5201947B2 (en) How to build support structures
CN117569851A (en) Mine automatic scaffolding robot and coal mine tunnel automatic scaffolding technology
JP6559374B1 (en) Low head excavator and its assembly method
JPH10196097A (en) Moving support device and construction method for temporary structure using it
JP2007321429A (en) Underground structure construction method
JP2005126957A (en) Excavating method and excavating device for pile work
RU2459915C2 (en) Method and device to lift steel frame

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220426

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230202

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230207

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230216

R150 Certificate of patent or registration of utility model

Ref document number: 7231531

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150