Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7239652B2 - Outgoing management device - Google Patents
[go: Go Back, main page]

JP7239652B2 - Outgoing management device - Google Patents

Outgoing management device Download PDF

Info

Publication number
JP7239652B2
JP7239652B2 JP2021135623A JP2021135623A JP7239652B2 JP 7239652 B2 JP7239652 B2 JP 7239652B2 JP 2021135623 A JP2021135623 A JP 2021135623A JP 2021135623 A JP2021135623 A JP 2021135623A JP 7239652 B2 JP7239652 B2 JP 7239652B2
Authority
JP
Japan
Prior art keywords
work
time
delivery
plan
collection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021135623A
Other languages
Japanese (ja)
Other versions
JP2022020612A (en
Inventor
正裕 高橋
英一 大竹
智徳 角
高志 近藤
泰治 中山
章弘 鈴木
Original Assignee
キムラユニティー株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by キムラユニティー株式会社 filed Critical キムラユニティー株式会社
Priority to JP2021135623A priority Critical patent/JP7239652B2/en
Publication of JP2022020612A publication Critical patent/JP2022020612A/en
Application granted granted Critical
Publication of JP7239652B2 publication Critical patent/JP7239652B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、保管庫から所望の物品を収集して出荷する出庫作業の効率化を図れる出庫管理装置に関する。 TECHNICAL FIELD The present invention relates to a delivery management apparatus capable of improving the efficiency of delivery work for collecting and shipping desired articles from storage.

多種多様な物品(完成品、部品(補給部品を含む)等)が収容された保管庫から、所望の物品を適切に収集して出荷する出庫作業は、益々効率化が求められている。これらに関連する記載が、例えば、下記の特許文献にある。 2. Description of the Related Art There is a growing demand for more efficient delivery work for appropriately collecting and shipping desired items from a storage warehouse containing a wide variety of items (finished products, parts (including supply parts), etc.). Descriptions related to these can be found in, for example, the following patent documents.

実用新案登録第3187207号公報Utility Model Registration No. 3187207

上記文献は、棚を区画して形成され物品の品番に応じて、多数配置される間口(ロケーション)の状態を俯瞰的に把握できる間口管理装置を提案している。本提案によれば、適切な間口管理が可能となるため、出庫作業が間接的に効率化される。但し、その装置により出庫作業が直接的に効率化される訳ではない。 The above document proposes a frontage management device that can grasp the state of a large number of frontages (locations) that are formed by partitioning a shelf and arranged in accordance with the product numbers of articles from a bird's-eye view. According to this proposal, since appropriate frontage management becomes possible, the efficiency of delivery work is indirectly improved. However, the device does not directly improve the efficiency of the shipping work.

本発明はこのような事情に鑑みて為されたものであり、出庫作業の直接的な効率化を図れる出庫管理装置を提供することを目的とする。 SUMMARY OF THE INVENTION It is an object of the present invention to provide a delivery management apparatus capable of directly improving the efficiency of delivery work.

本発明者はこの課題を解決すべく鋭意研究した結果、保管庫から物品を収集する際に予想される動線と作業時間を的確に予測し、それらに基づいて作成した作業計画と実作業の進捗状況とを比較して表示することにより、出庫作業を的確に管理することを着想した。これを具現化することにより、以降に述べる本発明を完成するに至った。 As a result of diligent research to solve this problem, the inventors of the present invention accurately predicted the expected flow line and work time when collecting articles from storage, and created a work plan and actual work based on them. By comparing and displaying the progress, we came up with the idea of accurately managing the delivery work. By embodying this, the present invention described below has been completed.

《出庫管理装置》
(1)本発明は、出庫指示情報に基づいて保管庫から出庫する物品を収集する収集作業の移動経路である動線を作成する動線作成手段と、該動線に沿った該収集作業に要する作業時間を算出する作業時間算出手段と、該作業時間を考慮して該収集作業を経時的に示した作業計画を作成する作業計画作成手段と、実際になされる該収集作業である実作業の進捗状況を該作業計画と対比して表示する表示手段と、を備える出庫管理装置である。
《Delivery management device》
(1) The present invention provides flow line creation means for creating a flow line, which is a moving route for collection work for collecting articles to be delivered from a storage based on delivery instruction information, and collection work along the flow line. Work time calculation means for calculating required work time, work plan creation means for creating a work plan showing the collection work chronologically in consideration of the work time, and actual work that is the collection work that is actually performed display means for displaying the progress of the work in comparison with the work plan.

(2)本発明の出庫管理装置によれば、的確で効率的な出庫管理が可能となる。この理由は次の通りである。先ず、動線作成手段により、出庫する物品の収集作業に沿った効率的な移動経路(動線)が画定(作成)される。次に、作業時間算出手段により、その動線に沿った収集作業に要する作業時間が高精度に算出される。さらに作業計画作成手段は、その予測される作業時間を利用して、収集作業を経時的に示す作業計画(スケジュール)を作成する。そして表示手段は、実際の収集作業(実作業)の進捗状況(作業実績)を、作業計画と対比させつつ表示する。こうして本発明の出庫管理装置によれば、実作業の進み具合や遅れ具合等が、精度よく的確に把握される。 (2) According to the delivery management apparatus of the present invention, accurate and efficient delivery management becomes possible. The reason for this is as follows. First, the flow line creation means defines (creates) an efficient moving route (flow line) along the collection work of the articles to be delivered. Next, the work time calculating means calculates with high accuracy the work time required for the collection work along the flow line. Further, the work plan creating means creates a work plan (schedule) showing the collection work chronologically using the estimated work time. The display means displays the progress (actual work) of the actual collection work (actual work) while comparing it with the work plan. In this way, according to the delivery management system of the present invention, the progress or delay of the actual work can be grasped accurately and accurately.

こうして、管理者や作業者等は、既定の出庫(出荷)時間までに収集作業が完了するか否かの判断、遅れている収集作業に援助(救援、補助等)が必要か否かの判断等を的確に行えるようになる。その結果、収集作業の効率化が図られると共に、出庫作業を納期(出庫締切時刻)までに、より確実に完了させることが可能となる。 In this way, managers and workers can judge whether or not the collection work will be completed by the set delivery (shipment) time, and whether or not assistance (rescue, assistance, etc.) is necessary for the delayed collection work. etc. can be performed accurately. As a result, collection work can be made more efficient, and delivery work can be completed more reliably by the delivery date (deadline for delivery).

《その他》
(1)本発明の出庫管理装置は、具体的にいうと、各種コンピュータに上述した各手段を構成するプログラムを実行させることにより実現される。コンピュータには、ホストコンピュータのみならず、ホストコンピュータと通信可能な端末を含めてもよい。
"others"
(1) Specifically speaking, the delivery management apparatus of the present invention is realized by causing various computers to execute programs constituting the above-described means. The computer may include not only the host computer but also a terminal capable of communicating with the host computer.

(2)本発明は、上述した各手段をコンピュータに実行させるためのプログラムとしても把握できる。また、上述した手段をステップに読み替えれば、本発明は出庫管理方法等としても把握される。さらに、通信可能なホストコンピュータと端末により、各手段が実現される場合、本発明は出庫管理システムとしても把握される。 (2) The present invention can also be grasped as a program for causing a computer to execute each of the means described above. Further, if the means described above are replaced with steps, the present invention can also be grasped as a delivery management method or the like. Furthermore, when each means is realized by a communicable host computer and a terminal, the present invention can also be grasped as a delivery management system.

出庫管理に係るフローチャートである。It is a flow chart concerning delivery management. 倉庫内に作成された動線の一例を示す図である。It is a figure which shows an example of the flow line created in the warehouse. 作業時間の算出例を示す表である。7 is a table showing an example of calculation of working hours; 作業計画の作成例を示す図である。It is a figure which shows the example of preparation of a work plan. 作業計画と実作業の進捗状況(作業実績)を比較した表示例を示す図である。FIG. 10 is a diagram showing a display example in which the work plan and the progress of actual work (actual work results) are compared; 実作業の完了予測時刻が出庫締切時刻を超過するときの表示例を示す図である。FIG. 10 is a diagram showing a display example when the estimated completion time of actual work exceeds the delivery deadline. 援助作業が導入されたときの表示例を示す図である。FIG. 10 is a diagram showing a display example when assistance work is introduced;

本明細書で説明する内容は、出庫管理装置としてのみならず、出庫管理プログラム、出庫管理方法、出庫管理システム等にも該当し得る。上述した本発明の構成要素に、本明細書中から任意に選択した一つまたは二つ以上の構成要素を付加し得る。いずれの実施形態が最良であるか否かは、対象、要求性能等によって異なる。 The contents described in this specification can be applied not only to the delivery management device but also to the delivery management program, the delivery management method, the delivery management system, and the like. In addition to the components of the present invention described above, one or more components arbitrarily selected from this specification may be added. Which embodiment is the best depends on the target, required performance, and the like.

《動線作成手段》
動線作成手段は、出庫指示情報に基づいて、収集作業に係る保管庫内の移動経路(動線)を画定する。このとき、通常、その移動距離が最短となるルート(動線)が作成される。
《Flow line creation means》
The flow line creation means defines a moving route (flow line) in the storage for collection work based on the delivery instruction information. At this time, a route (flow line) with the shortest moving distance is usually created.

出庫指示情報は、出庫する場所(出荷先)、出庫(締切)時刻、出庫する物品の種類や数量等、種々の情報(データ)を含む。1周回(1サイクル)当りの収集作業で、複数の出庫指示情報に対応できると、出庫作業の効率化が図られる。そこで動線作成手段は、出庫指示情報が複数あるとき、少なくとも二以上の出庫指示情報(コア)を集約して動線を作成するとよい。 The delivery instruction information includes various information (data) such as delivery location (shipment destination), delivery (deadline) time, type and quantity of articles to be delivered. If a plurality of pieces of delivery instruction information can be handled in one round (one cycle) of collection work, the efficiency of the delivery work can be improved. Therefore, when there is a plurality of pieces of delivery instruction information, the flow line creation means preferably aggregates at least two or more pieces of delivery instruction information (core) to create a flow line.

《作業時間算出手段》
作業時間算出手段は、画定された動線に沿って収集作業を行うときの所要時間(作業時間)を算出する。作業時間は、収集する物品の種類(間口)、その数量、動線に沿った移動距離や移動速度、出庫指示情報の集約数、1回あたりの収集作業の開始時や終了時に行う段取に係る工数や時間等を考慮して算出される。作業時間の算出に必要な数式や定数は予め設定されるが、作業履歴等を考慮して、適宜、変更されてもよい。
<<Working time calculation means>>
The work time calculation means calculates the time required (work time) for performing the collection work along the defined flow line. The work time depends on the type (frontage) of the items to be collected, their quantity, the distance and speed of movement along the line of flow, the number of collections of delivery instruction information, and the setup at the start and end of each collection work. It is calculated in consideration of the man-hours and time involved. Numerical formulas and constants necessary for calculating the work time are set in advance, but may be changed as appropriate in consideration of the work history and the like.

少なくとも作業時間には、動線に沿った移動時間と動線上にある間口からの物品の取出時間とを含む。移動時間は、例えば、動線上の移動距離とその移動速度とに基づいて算出される。通常、動線距離を移動速度で除することにより移動時間が求まる。但し、移動速度は一定である必要はない。保管庫の形態や収集作業の内容(収集する物品のタイプ(例えば重量、サイズ等)や量)等に応じて、動線上の移動区間毎や作業内容毎に、異なる移動速度が設定されてもよい。各移動速度を適切に設定することにより、より正確な移動時間の算出、ひいては作業計画の作成が可能となる。 At least the work time includes the time to move along the line of flow and the time to take out the article from the frontage on the line of flow. The travel time is calculated, for example, based on the travel distance on the flow line and the travel speed. Normally, the moving time is obtained by dividing the moving line distance by the moving speed. However, the moving speed need not be constant. Even if different movement speeds are set for each movement section on the flow line and each work content, depending on the form of storage and the content of collection work (type (e.g. weight, size, etc.) and amount of items to be collected) good. By appropriately setting each moving speed, it becomes possible to calculate a more accurate moving time and, in turn, create a work plan.

取出時間は、物品を収容している間口(棚や棚を区切った区画)から、少なくとも一種以上の物品を、少なくとも一個以上取り出すために必要な時間である。1周回(1サイクル)の収集作業で複数の間口間を移動するとき、各間口における物品の取出に要する時間(単位取出時間)の合計が取出時間となる。取出時間も、収集する物品が収容されている間口数の他、各間口で取り出す物品の種類や数量等を考慮して算出される。各単位取出時間を適切に設定することにより、より正確な取出時間の算出、ひいては作業計画の作成が可能となる。 The takeout time is the time required to take out at least one or more items of at least one type from the frontage (a shelf or a section into which the shelves are divided) housing the items. When moving between a plurality of frontages in one round (one cycle) of collection work, the total time (unit removal time) required to take out the articles at each frontage is the removal time. The take-out time is also calculated in consideration of the number of frontages in which articles to be collected are accommodated, as well as the type and quantity of articles to be taken out at each frontage. By appropriately setting each unit take-out time, it becomes possible to calculate a more accurate take-out time and, in turn, create a work plan.

《作業計画作成手段》
作業計画作成手段は、収集作業に応じて算出された作業時間に基づいて、収集作業を経時的に示した作業計画(スケジュール)を作成する。作業計画は、例えば、次のようにして作成される。先ず、時間軸上に、出庫指示情報に基づいて、収集作業の開始時刻と、その完了予測時刻または出庫締切時刻とを設定する。
《Work plan creation means》
The work plan creating means creates a work plan (schedule) indicating the collection work over time based on the work time calculated according to the collection work. A work plan is created, for example, as follows. First, on the time axis, based on the delivery instruction information, the start time of the collection work and the expected completion time or the delivery deadline time are set.

また、作業時間算出手段で求めた全体の作業時間を、作業者一人当たりの1日分の作業時間(例えば、8Hr/日)で割ることにより、必要作業者数を算出する。その作業人数分の作業者を割り当てる。 Also, the required number of workers is calculated by dividing the total working time obtained by the working time calculation means by the working time per worker per day (eg, 8 hours/day). Allocate workers for the number of workers.

次に、開始時刻から順に、例えば、作業時間が長いサイクル順に収集作業を配列する。この際、各作業者の作業終了時間が均等になるよう自動で配列する。各収集作業(コア)の長さは、それぞれの(単位)作業時間とする。 Next, the collection operations are arranged in order from the start time, for example, in order of the cycle with the longest operation time. At this time, it is automatically arranged so that the work completion time of each worker is even. The length of each collection work (core) shall be the respective (unit) work time.

作業計画作成手段は、出庫指示情報に基づいて、作業計画を自動的に作成すると効率的である。作業計画作成手段は、さらに、その作業計画を変更できる計画変更手段を備えるとよい。これにより、出庫管理者等が、個別な事情(収集する作業者や物品等に係る事情、その他の外部事情等)を考慮して作業計画の最適化を図ることも可能となる。 It is efficient if the work plan creating means automatically creates a work plan based on the shipping instruction information. The work plan creation means may further include plan change means for changing the work plan. As a result, it becomes possible for the delivery manager or the like to optimize the work plan in consideration of individual circumstances (circumstances related to workers and articles to be collected, other external circumstances, etc.).

《表示手段》
表示手段は、実際になされる収集作業である実作業の進捗状況(「作業実績」ともいう。)を、作業計画と対比して表示する。これにより、作業計画に対する実作業の進捗状況を視覚的に効率よく把握できる。なお、表示手段には、単なる表示機器(ディスプレー)のみならず、その表示内容を処理するプログラムも含まれる。
<<Display means>>
The display means displays the progress of the actual work, which is the collection work that is actually performed (also referred to as "work record"), in comparison with the work plan. This makes it possible to visually and efficiently grasp the progress of the actual work with respect to the work plan. The display means includes not only a simple display device (display) but also a program for processing display contents.

表示手段は、少なくとも、実作業の完了予測時刻を表示するとよい。これにより、例えば、予定している出庫(出荷)時刻までに実作業が完了するか否かの判断が容易になる。また、その時刻に対する実作業の進み・遅れ具合等も視覚的に把握できる。 The display means preferably displays at least the predicted completion time of the actual work. As a result, for example, it becomes easier to determine whether or not the actual work will be completed by the scheduled delivery (shipment) time. In addition, it is possible to visually grasp the progress or delay of the actual work with respect to the time.

表示手段は、作業計画に対して実作業の進捗に所定の遅れがあるとき、警告を発する警告手段を備えるとよい。これにより出庫管理者等は、例えば、遅れている実作業の援助を的確に行える。警告は、作業実績と作業計画を表示している画面上だけに表示する他、別途設けたランプ(いわゆる「あんどん」)を点灯等させてもよい。 The display means preferably includes warning means for issuing a warning when there is a predetermined delay in the progress of the actual work with respect to the work plan. As a result, the delivery manager or the like can, for example, accurately assist the delayed actual work. The warning may be displayed only on the screen displaying the work results and work plan, or may be lighted by a separately provided lamp (so-called "andon").

また表示手段は、作業計画に対して進捗が遅れている実作業を援助する場合、その援助作業の進捗状況も併せて表示するとよい。これにより、収集作業全体が明らかとなり、援助作業の過不足等も適切に判断できる。 Further, when assisting actual work whose progress is behind the work plan, the display means should also display the progress of the assisting work. As a result, the overall collection work can be clarified, and it is possible to appropriately judge whether the assistance work is excessive or insufficient.

《その他》
物品の収集作業や援助作業は、人間(作業者・管理者等)が行う他、ロボットや自動搬送装置等が行ってもよい。
"others"
The work of collecting articles and the work of assistance may be performed by humans (workers, managers, etc.), or may be performed by robots, automatic transport devices, and the like.

本発明の出庫管理装置の一例として、倉庫(保管庫)に収納されている多種多様な自動車の補給部品(物品)の出庫管理を行うシステム取り上げて、本発明を具体的に説明する。 As an example of the delivery management system of the present invention, a system for carrying out delivery management of a wide variety of spare parts (goods) for automobiles stored in a warehouse (storage) will be taken up to specifically explain the present invention.

《構成》
出庫管理システムは、補給部品を収集する各作業者が保有する端末と、これら端末と通信可能なホストコンピュータと、ホストコンピュータにより演算処理された内容を表示するディスプレと、警告灯を備える。
"composition"
The delivery management system includes a terminal owned by each worker who collects supply parts, a host computer that can communicate with these terminals, a display that displays the content processed by the host computer, and a warning light.

端末は、タブレットとバーコードリーダを備える。タブレットには、作業者が収集すべき補給部品の種類と数、その収納場所、倉庫内の移動経路(動線)、作業に要する時間やその作業を完了すべき時刻等が表示される。バーコードリーダは、各種の指示書や収集した部品の品番等を読み込む。タブレットは、無線によりホストコンピュータと双方向通信が可能となっている。バーコードリーダとタブレットは、有線または無線により通信可能となっている。バーコードリーダにより読み取られたデータはタブレットに取り込まれる。 The terminal is equipped with a tablet and barcode reader. The tablet displays the type and number of supply parts to be collected by the worker, their storage location, movement route (flow line) in the warehouse, the time required for the work, the time to complete the work, and so on. The bar code reader reads various instructions, product numbers of collected parts, and the like. The tablet is capable of two-way communication with the host computer wirelessly. The barcode reader and tablet can communicate by wire or wirelessly. The data read by the barcode reader is taken into the tablet.

この他、ホームポジション(出庫の開始位置かつ、出庫後に戻ってくる場所)に、作業者毎に開始時刻と終了時刻を記録してもよい。例えば、バーコードスキャナで作業者IDと次に出庫行う出庫指示データの識別子(サイクルNo)を読ませて、作業者毎の作業時刻を登録してもよい。 In addition, the start time and end time may be recorded for each worker in the home position (the starting position of leaving the warehouse and the place to return after leaving the warehouse). For example, the worker ID and the identifier (cycle number) of the delivery instruction data to be delivered next may be read by a barcode scanner, and the work time for each worker may be registered.

ホストコンピュータは、通常のコンピュータと同様に、入力機器、プログラムや各種のデータを記憶する記憶機器、プログラムを作動させてデータを処理する演算機器等を備える。ホストコンピュータは、出庫指示データ(出庫指示情報)を読み込むため、倉庫の外部(補給部品の供給会社やディーラ等)とも通信可能となっている。 The host computer, like a normal computer, includes an input device, a storage device for storing programs and various types of data, an arithmetic device for operating programs and processing data, and the like. Since the host computer reads shipping instruction data (shipping instruction information), it can also communicate with the outside of the warehouse (supply parts suppliers, dealers, etc.).

ディスプレには、ホストコンピュータからの指令により、補給部品の収集や出庫に関する作業計画、作業実績、出庫締切時刻、実作業の進捗状況、警告等を表示する。警告灯(例えば赤色灯等)は、ディスプレに警告が表示されるとき(例えば、収集作業が出庫締切時刻に間に合わず、収集作業の救援が必要なとき)に点灯する。これにより、倉庫内にいる管理者や作業者は、収集作業に相当な遅延が生じていることを認識する。 The display displays work plans, work results, deadlines for shipping, progress of actual work, warnings, etc. regarding the collection and delivery of spare parts in response to commands from the host computer. A warning light (e.g., red light) lights up when a warning is displayed on the display (e.g., when collection work will not meet the delivery deadline and collection work assistance is required). This allows managers and workers in the warehouse to recognize that the collection work is considerably delayed.

《処理》
出庫管理システムによる処理(出庫管理処理)は、ホストコンピュータがインストールされているプログラムを実行することによりなされる。以下、図1に示すフローチャートに基づいて、その内容を具体的に説明する。
"process"
Processing by the delivery management system (delivery management processing) is performed by executing a program installed in the host computer. The contents will be specifically described below based on the flowchart shown in FIG.

(1)ホストコンピュータは、出庫指示データ(発注データ)を読み込む(ステップS1)。出庫指示データは、倉庫から出庫すべき補給部品の種類、その数量(個数)、出庫締切時刻(または補給部品の収集完了時刻)、出庫先(出荷先)等の一群からなる。このような一群からなる一つの出庫指示データを、適宜、「コア」という。通常、ホストコンピュータは、一つの出庫締切時刻に対して、多数の出庫指示データを一度に読み込む。 (1) The host computer reads delivery instruction data (order data) (step S1). The delivery instruction data consists of a group of items such as the type of supply parts to be delivered from the warehouse, their quantity (number), delivery deadline time (or supply part collection completion time), delivery destination (shipment destination), and the like. One such group of delivery instruction data is appropriately referred to as a "core". Normally, the host computer reads a large number of shipping instruction data at once for one shipping deadline.

(2)ホストコンピュータは、出庫締切時刻と関連付けて、読み込んだ多数の出庫指示データ(コア)を集約処理する(ステップS21)。集約された補給部品の全てが最も効率的に収集される倉庫内の移動経路(動線)が演算され、画定される(ステップS22)。この集約処理と動線画定が本発明でいう動線作成に相当する。 (2) The host computer aggregates a large number of read delivery instruction data (core) in association with the delivery deadline (step S21). A movement path (flow line) within the warehouse along which all of the aggregated supply parts are most efficiently collected is calculated and defined (step S22). This aggregation processing and flow line definition correspond to the flow line creation referred to in the present invention.

こうして作成された動線(折れ曲がった太実線)の一例を図2に示した。図2からわかるように、倉庫内には、縦方向および横方向にそれぞれ規則的に多数の棚が配列されており、さらに各棚も縦方向および横方向にそれぞれ多数の区画(間口)に区切られている。各間口毎に、品番により区別された一種または二種以上の補給部品がそれぞれ収納されている。動線は、棚間の通路に沿って作成される。図2中の動線に付した番号は、移動経路の順番を示している。なお、通常、出庫管理を行っているホームから出発して、そのホームに帰着する動線が作成される。そのホームで、収集前の段取がなされ、収集された補給部品は、そのホームを経由して出庫(出荷)される。 An example of flow lines (bent thick solid lines) created in this way is shown in FIG. As can be seen from FIG. 2, in the warehouse, a large number of shelves are regularly arranged in the vertical and horizontal directions, and each shelf is divided into a large number of compartments (frontages) in the vertical and horizontal directions. It is One type or two or more types of supply parts distinguished by product numbers are accommodated in each frontage. Flow lines are created along passages between shelves. The numbers attached to the flow lines in FIG. 2 indicate the order of the movement routes. It should be noted that a line of flow is usually created that departs from the platform where delivery management is being performed and returns to the platform. At the platform, pre-collection setup is performed, and the collected supply parts are delivered (shipped) via the platform.

(3)ホストコンピュータは、画定された動線に沿って、各補給部品の収集に要する時間(作業時間)を算出する(ステップS3)。例えば、図3に示すように、予め既定しておいた単位に基づいて、各パラメータの小計を算出する。それら小計に基づいて、合計の作業時間が算出される。 (3) The host computer calculates the time (work time) required to collect each supply part along the defined flow line (step S3). For example, as shown in FIG. 3, the subtotal of each parameter is calculated based on a predetermined unit. Based on these subtotals, a total working time is calculated.

なお、図3に示した段取数は、収集した補給部品を収納するボックスやそれを運ぶ台車の用意等に必要な時間を算出するために必要な工数である。集約数は、集約した出庫指示データの数である。集約数が増加すると、収集作業に必要な情報を端末へ取り込む時間も増加する。図3に例示した場合なら、ベース時間:10秒に、コア数に応じた時間:3秒×2=6秒が必要となる。数量は補給部品の取出時間の算出に必要であり、動線距離は作業者の移動時間の算出に必要である。 Note that the number of setups shown in FIG. 3 is the number of man-hours necessary for calculating the time required to prepare boxes for storing the collected supply parts and the carts for transporting the boxes. The aggregate number is the number of aggregated delivery instruction data. As the number of aggregates increases, the time required to load the information necessary for the collection work into the terminal also increases. In the example shown in FIG. 3, the base time is 10 seconds, and the time corresponding to the number of cores is 3 seconds×2=6 seconds. The quantity is necessary for calculating the pick-up time of supply parts, and the flow line distance is necessary for calculating the worker's travel time.

(4)ホストコンピュータは、算出された作業時間に基づいて、自動で作業計画を立案する(ステップS4)。その様子をディスプレに表示した一例を図4に示した。ここでは、2名の作業者に収集作業を割り振られ、各作業者の作業計画が上段側に示されている。なお、作業計画に付されている数字(No.1~8)は、集約処理(コア集約)した際の順番である。 (4) The host computer automatically draws up a work plan based on the calculated work time (step S4). FIG. 4 shows an example of this state displayed on the display. Here, collection work is assigned to two workers, and the work plan of each worker is shown on the upper side. It should be noted that the numbers (No. 1 to 8) attached to the work plan are the order of the aggregation processing (core aggregation).

各収集作業の各作業者への割り振りは、例えば、作業終了時刻が一番早い作業者に、作業時間の長い収集作業を順に割り振ることにより、全作業者間の作業終了時刻が近接するようになされる。具体的にいうと次の通りである。作業時間の長い順に(本例では、No.4→No.3→No.6→No.1→No.2→No.7→No.8→No.5)、各収集作業が各作業者(本例では作業者Aと作業者B)に割り振られる。作業時間が最長な収集作業(No.4)が或る作業者(本例では作業者A)に割り当てられた場合、作業時間が次に長い収集作業(No.3)は、作業終了見込み時刻が最も早い別な作業者(本例では作業者B)に割り振られる。 Allocating each collection work to each worker is, for example, by allocating the collection work with the longest work time to the worker with the earliest work finish time, so that the work finish times of all workers are close to each other. done. Specifically, it is as follows. Each collection work is performed by each worker in order of long work time (in this example, No. 4 → No. 3 → No. 6 → No. 1 → No. 2 → No. 7 → No. 8 → No. 5). (Worker A and Worker B in this example). When the collection work (No. 4) with the longest work time is assigned to a certain worker (worker A in this example), the collection work (No. 3) with the next longest work time is assigned to the expected end time of the work. is assigned to another worker who is the fastest (worker B in this example).

その次に作業時間が長い収集作業(No.6)は、作業者Aと作業者Bの作業終了見込み時刻を比較して、作業者Bの方が早いため、作業者Bに割り当てられる。 その次に作業時間が長い収集作業(No.1)も、作業者Aと作業者Bの作業終了見込み時刻を比較して、未だ作業者Bの方が早いため、作業者Bに割り当てられる。このように、各作業者の作業終了見込み時刻を比較しつつ、作業時間が長い収集作業から順に、各作業者への割り振りがなされる。なお、各収集作業を各作業者へ割り振る作業計画は、管理者等が手動で修正することも可能である。 The collection work (No. 6), which takes the next longest work time, is assigned to worker B because worker B is earlier than worker A when the estimated work completion times of worker A and worker B are compared. The collection work (No. 1), which takes the next longest work time, is also assigned to worker B because worker B is still earlier than worker A when comparing the estimated work completion times of worker A and worker B. FIG. In this way, while comparing the estimated work completion times of the workers, the collection work with the longest work time is assigned to each worker in order. The work plan for allocating each collection work to each worker can also be manually revised by the manager or the like.

(5)作業者が補給部品の収集作業(実作業)を開始すると、その進捗状況(作業実績)が、作業計画の下段側に示される(ステップS51)。なお、作業者は、補給部品を収集する毎に、補給部品や間口等に表示されたバーコードをバーコードリーダで読み込む。そのデータが作業者の端末からホストコンピュータへ通信される。こうしてホストコンピュータは、各作業者の収集作業の進捗状況を把握する。 (5) When the worker starts the supply parts collection work (actual work), the progress (actual work) is shown on the lower side of the work plan (step S51). Each time the worker collects the supply parts, the barcode displayed on the supply parts, frontage, or the like is read by a barcode reader. The data is communicated from the operator's terminal to the host computer. In this way, the host computer grasps the progress of each worker's collection work.

なお、ホームポジション(出庫開始、終了位置)でバーコードスキャンして、1サイクルの出庫開始、終了時間を記録して進捗を把握してもよい。 It is also possible to grasp the progress by scanning the barcode at the home position (start and end positions of delivery) and recording the delivery start and end times of one cycle.

作業実績と作業計画が対比してディスプレに表示される一例を図5Aに示した。この場合、時刻を示すタイムバーが最上部に表示されると共に、現時刻を示すライン(縦の太実線)も示されている。また、収集作業の各状態(作業計画に対する遅れ・進み、進行中、未着手)が色別で示されている。さらに、出庫締切時刻を示すライン(縦の太破線)と、現状から予測される収集作業の完了時刻を示すライン(折れた二重線)も示されている。このように、作業計画と作業実績が比較表示されることにより、収集作業の進捗状況が一目瞭然となる。また、現時刻、収集作業の完了予測時刻および出庫締切時刻が併せて示されるため、出庫締切時刻までに収集作業が完了しそうか否か等を的確に判断できる。 FIG. 5A shows an example in which the work results and the work plan are displayed in comparison. In this case, a time bar indicating the time is displayed at the top, and a line (vertical thick solid line) indicating the current time is also displayed. In addition, each state of the collection work (delayed/advanced with respect to the work plan, in progress, not yet started) is indicated by color. In addition, a line (bold vertical dashed line) indicating the delivery deadline and a line (broken double line) indicating the completion time of collection work expected from the current situation are also shown. In this way, the progress of the collection work can be made clear at a glance by comparing and displaying the work plan and the work results. In addition, since the current time, the estimated completion time of the collection work, and the delivery deadline time are also displayed, it is possible to accurately determine whether the collection work is likely to be completed by the delivery deadline time.

収集作業中、その完了予測時刻が出庫締切時刻を超過するか否かが監視されている(ステップS52)。完了予測時刻が出庫締切時刻を超過する場合、警告表示がなされる(ステップS53)。その様子をディスプレに表示した一例を図5Bに示した。この場合、作業者Bの収集作業の完了予測時刻が出庫締切時刻を超過している。つまり、作業者Bに割り振られている最後のコア(一つ)に係る収集作業が出庫締切時刻に間に合わないことが予測される。そこで、図5Bの右下部分に示すような警告表示がなされる。警告表示には、出庫締切時刻を超過するコア数と、そのコアに係る収集作業に要する時間とが表示される。この警告表示がディスプレ上にされると、併せて、倉庫内に設けた警告灯も点灯する。これにより倉庫内にいる各作業者等も、収集作業の現状把握が可能となる。 During the collection work, it is monitored whether or not the predicted completion time exceeds the delivery deadline (step S52). If the predicted completion time exceeds the delivery deadline time, a warning is displayed (step S53). FIG. 5B shows an example of the state displayed on the display. In this case, the estimated completion time of the collection work of worker B has exceeded the delivery deadline. That is, it is predicted that the collection work related to the last core (one) assigned to worker B will not meet the delivery deadline. Therefore, a warning is displayed as shown in the lower right portion of FIG. 5B. In the warning display, the number of cores exceeding the delivery deadline and the time required for the collection work related to the cores are displayed. When this warning display is displayed on the display, the warning light provided in the warehouse also lights up. This makes it possible for each worker in the warehouse to grasp the current state of the collection work.

警告表示がなされると、管理者は、完了予測時刻が出庫締切時刻を超過する収集作業に対して、援助作業を導入するか否かを判断する。この判断は、全体的な収集作業の進捗状況等を踏まえてなされる。 When the warning is displayed, the manager determines whether or not to introduce assistance work for the collection work whose expected completion time exceeds the delivery deadline. This judgment is made based on the overall progress of the collection work.

援助作業が導入されると、援助対象である収集作業の進捗状況に加えて、その援助作業自体の進捗状況(作業計画と作業実績)も併せてディスプレに表示される(ステップS54)。その一例を図5Cに示した。この場合、作業者Bに割り振られていた最後の収集作業(コア)が、援助者によりなされる。その結果、いずれの収集作業も、完了予測時刻が出庫締切時刻内となる。ちなみに、ステップS51~S54に係る処理(実行プログラム)が、本発明でいう表示手段に相当する。 When the assistance work is introduced, in addition to the progress of the collection work to be assisted, the progress of the assistance work itself (work plan and work results) is also displayed on the display (step S54). An example is shown in FIG. 5C. In this case, the last collection work (core) assigned to worker B is done by the helper. As a result, the estimated time of completion of any collection work is within the delivery deadline. Incidentally, the processing (execution program) related to steps S51 to S54 corresponds to the display means of the present invention.

なお、上記のような作業履歴の解析結果を、図3に示した各設定値の修正・調整、作業者の指導等へ反映(フィードバック)させてもよい。これを繰り返すことにより、より的確な作業計画の立案と、さらなる高効率な出庫作業の実現が可能となる。 Note that the analysis result of the work history as described above may be reflected (feedback) in the correction/adjustment of each set value shown in FIG. By repeating this process, it is possible to formulate a more accurate work plan and realize more efficient delivery work.

Claims (7)

出庫締切時刻を含む出庫指示情報に基づいて保管庫から出庫する物品を収集する収集作業を行なう作業者の移動経路である動線を作成する動線作成手段と、
該動線に沿った該収集作業に要する作業時間を算出する作業時間算出手段と、
該作業時間を考慮して該収集作業を経時的に示した作業計画を作成する作業計画作成手段と、
実際になされる該収集作業である実作業の進捗状況を該作業計画と対比して、該出庫締切時刻と共に表示する表示手段と、
を備える出庫管理装置。
flow line creation means for creating a flow line, which is a movement path of a worker who collects articles to be delivered from the storage, based on the delivery instruction information including the delivery deadline ;
a work time calculation means for calculating the work time required for the collection work along the flow line;
a work plan creation means for creating a work plan showing the collection work chronologically in consideration of the work time;
display means for displaying the progress status of the actual work, which is the collection work that is actually performed , in comparison with the work plan together with the delivery deadline ;
A delivery management device.
前記動線作成手段は、前記出庫指示情報が複数あるとき、少なくとも二以上の該出庫指示情報を集約して前記動線を作成する請求項1に記載の出庫管理装置。 2. The delivery management apparatus according to claim 1, wherein, when there is a plurality of delivery instruction information, said flow line creating means aggregates at least two pieces of said delivery instruction information to create said flow line. 前記作業時間は、前記動線に沿った移動時間と該動線上にある間口からの物品の取出時間とを少なくとも含む請求項1または2に記載の出庫管理装置。 3. The delivery management apparatus according to claim 1, wherein said work time includes at least a time for moving along said line of flow and a time for taking out an article from a frontage on said line of flow. 前記作業計画作成手段は、前記作業計画を変更する計画変更手段を備える請求項1~3のいずれかに記載の出庫管理装置。 4. The delivery management apparatus according to any one of claims 1 to 3, wherein said work plan creation means comprises plan change means for changing said work plan. 前記表示手段は、前記実作業の完了予測時刻を表示する請求項1~4のいずれかに記載の出庫管理装置。 5. The delivery management apparatus according to any one of claims 1 to 4, wherein said display means displays the predicted completion time of said actual work. 前記表示手段は、前記作業計画に対して前記実作業に所定の遅れがあるとき、警告を発する警告手段を備える請求項1~5のいずれかに記載の出庫管理装置。 6. The delivery management apparatus according to any one of claims 1 to 5, wherein said display means comprises warning means for issuing a warning when said actual work has a predetermined delay with respect to said work plan. 前記表示手段は、前記作業計画に対して遅れている前記実作業を援助する援助作業の進捗状況も併せて表示する請求項1~6のいずれかに記載の出庫管理装置。 7. The delivery management apparatus according to claim 1, wherein said display means also displays the progress of assistance work for assisting said actual work delayed with respect to said work plan.
JP2021135623A 2021-08-23 2021-08-23 Outgoing management device Active JP7239652B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021135623A JP7239652B2 (en) 2021-08-23 2021-08-23 Outgoing management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021135623A JP7239652B2 (en) 2021-08-23 2021-08-23 Outgoing management device

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2018004525U Continuation JP3219972U (en) 2018-11-21 2018-11-21 Delivery management device

Publications (2)

Publication Number Publication Date
JP2022020612A JP2022020612A (en) 2022-02-01
JP7239652B2 true JP7239652B2 (en) 2023-03-14

Family

ID=80216133

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021135623A Active JP7239652B2 (en) 2021-08-23 2021-08-23 Outgoing management device

Country Status (1)

Country Link
JP (1) JP7239652B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006076768A (en) 2004-09-13 2006-03-23 Toyota Industries Corp Work management system and work management method
JP2011154579A (en) 2010-01-28 2011-08-11 Hitachi Ltd Routing system
JP2018129001A (en) 2017-02-10 2018-08-16 株式会社リコー Information processing apparatus, information processing system, moving path determination method, and program

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11236108A (en) * 1998-02-20 1999-08-31 Teraoka Seiko Co Ltd Sorting system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006076768A (en) 2004-09-13 2006-03-23 Toyota Industries Corp Work management system and work management method
JP2011154579A (en) 2010-01-28 2011-08-11 Hitachi Ltd Routing system
JP2018129001A (en) 2017-02-10 2018-08-16 株式会社リコー Information processing apparatus, information processing system, moving path determination method, and program

Also Published As

Publication number Publication date
JP2022020612A (en) 2022-02-01

Similar Documents

Publication Publication Date Title
JP6408121B2 (en) Warehouse management system, warehouse and warehouse management method
JP7637757B2 (en) Logistics management device, logistics management method, and logistics management program
WO2015125287A1 (en) Warehouse layout generation device, and distribution warehouse
JP3219972U (en) Delivery management device
JP7486132B2 (en) WAREHOUSE OPERATION EXECUTION DEVICE, WAREHOUSE OPERATION EXECUTION METHOD, AND COMPUTER PROGRAM FOR WAREHOUSE OPERATION EXECUTION
JP2002140110A (en) Production management system and production management method
WO2004026741A1 (en) Parts inventory control device
Bae et al. Lean design and analysis of a milk-run delivery system: case study
JP4056139B2 (en) Article management method, article management apparatus, and picking work apparatus in a picking work place
WO2022270162A1 (en) Information processing system, warehouse management method, and warehouse control device
JP2019034806A (en) Picking system, picking cart and program
JP7239652B2 (en) Outgoing management device
JP2022091599A (en) Bottleneck visualization device and bottleneck visualization method
JP2004352384A (en) Product inventory management system
JP2002109003A (en) Rationalization support system in distribution center
WO2016020982A1 (en) Information processing system and information processing method
JP6537762B1 (en) Kitting management device
JP2004185119A (en) Delivery planning system and delivery planning method
CN119234238A (en) Product monitoring method in production system, electronic equipment and storage medium
Vujosevic et al. Lean kitting: A case study
JP2000142926A (en) Shipping management system
JP7538580B1 (en) Management device, management method, and program
JP7601934B2 (en) Logistics system, logistics system control method, logistics system control program, and storage medium
JP2004086358A (en) Logistics optimization equipment
Blomqvist A warehouse design framework for order processing and materials handling improvement: Case Etra Oy

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210823

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220621

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220628

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20220829

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221025

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230214

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230302

R150 Certificate of patent or registration of utility model

Ref document number: 7239652

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250