Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7259376B2 - REMOTE MONITORING CONTROL SYSTEM AND REMOTE MONITORING CONTROL METHOD - Google Patents
[go: Go Back, main page]

JP7259376B2 - REMOTE MONITORING CONTROL SYSTEM AND REMOTE MONITORING CONTROL METHOD - Google Patents

REMOTE MONITORING CONTROL SYSTEM AND REMOTE MONITORING CONTROL METHOD Download PDF

Info

Publication number
JP7259376B2
JP7259376B2 JP2019021459A JP2019021459A JP7259376B2 JP 7259376 B2 JP7259376 B2 JP 7259376B2 JP 2019021459 A JP2019021459 A JP 2019021459A JP 2019021459 A JP2019021459 A JP 2019021459A JP 7259376 B2 JP7259376 B2 JP 7259376B2
Authority
JP
Japan
Prior art keywords
equipment
power
management facility
remote monitoring
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019021459A
Other languages
Japanese (ja)
Other versions
JP2020129894A (en
Inventor
靖 小室
直樹 高橋
英治 福田
利明 佐々木
邦明 今岡
正敏 角
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2019021459A priority Critical patent/JP7259376B2/en
Publication of JP2020129894A publication Critical patent/JP2020129894A/en
Application granted granted Critical
Publication of JP7259376B2 publication Critical patent/JP7259376B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Description

この発明は、変電所などに設置されている遠隔監視制御装置において、電気所の各電力機器の定期点検時において表示試験を行うのに好適な遠隔監視制御システムに関する。 BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a remote monitoring control system installed in a substation or the like, which is suitable for performing a display test during periodic inspection of each electric power device in the electrical station.

近年、発電所、変電所、開閉所などの電気所内の電力機器(たとえば、遮断器、断路器およびリレー装置)などを遠方から運転制御するために、遠隔監視制御システムが一般化されつつある。 2. Description of the Related Art In recent years, remote monitoring and control systems have become popular in order to remotely control the operation of power equipment (for example, circuit breakers, disconnectors, and relay devices) in electrical stations such as power plants, substations, and switching stations.

図6は、基幹給電制御所10と電気所20の電力機器70、71、75とデータのやり取りや電力機器70、71、75の監視制御を行う制御信号の伝達する遠隔制御システム1の一例を示した構成図である。 FIG. 6 shows an example of a remote control system 1 that transmits control signals for exchanging data between the main power supply control center 10 and power devices 70, 71, and 75 of the power station 20 and for monitoring and controlling the power devices 70, 71, and 75. It is a block diagram shown.

基幹給電制御所10には制御装置が設置されるとともに、各電気所20には前記基幹給電制御所10とネットワークを介して接続された遠隔監視制御装置(以下、「ITC」という。)30が設置され、1つの基幹給電制御所10で複数の電気所20、20、…を遠隔操作にて監視制御できるようになっている。 A control device is installed in the main power supply control center 10, and each electrical station 20 has a remote monitoring and control device (hereinafter referred to as "ITC") 30 connected to the main power supply control center 10 via a network. are installed, and a plurality of electric stations 20, 20, . . .

また、電気所20内には、ITC30の他、電気所20内の各電力機器70、71、75の状態を監視するための集中管理制御装置(以下、「OPC」という。)31が設置され、前記ITC30とネットワークSLANを介して接続されている。このITC30とOPC31とが接続される階層を一般にステーションレベルと称される。 In addition to the ITC 30, the power station 20 also has a centralized control device (hereinafter referred to as "OPC") 31 for monitoring the states of the power devices 70, 71, and 75 in the power station 20. , and the ITC 30 via a network SLAN. A hierarchy in which the ITC 30 and the OPC 31 are connected is generally called a station level.

前記ステーションレベルの下位階層としてベイレベルと称される階層があり、このベイレベルには、電圧階級別に例えば500kV機器70、71とのデータ処理・中継を行うデータ処理・中継装置(以下、「500kVDCU」という。)40や220kV以下機器75とのデータ処理・中継を行うデータ処理・中継装置(以下、「220kVDCU」という。)45が設置されている。 There is a hierarchy called a bay level as a hierarchy below the station level, and in this bay level, for example, data processing / relay equipment (hereinafter referred to as "500 kV VDC U ) 40 and a data processing/relay unit (hereinafter referred to as “220 kV DCU”) 45 for processing/relaying data with equipment 75 of 220 kV or less is installed.

これら500kVDCU40と220kVDCU45とは、同階層であるベイレベルとしてネットワークBLANを介して接続され、また、各500kVDCU40、220kVDCU45は、上位階層である前記ステーションレベルとの接続のため、ネットワークSLANにも接続されている。 These 500kVDCU 40 and 220kVDCU 45 are connected via a network BLAN as a bay level, which is the same hierarchy, and each of the 500kVDCU 40 and 220kVDCU 45 is also connected to a network SLAN for connection with the station level, which is a higher hierarchy. there is

前記ベイレベルの下位階層としてプロセスレベルと称される階層があり、このプロセスレベルには、各電力機器70、71、75に接続された入出力分散制御装置(以下、BCUという。)50、51、55が設置され、各BCU50、51、55は、上位階層であるベイレベルのネットワークBLANに接続されている。 Below the bay level, there is a hierarchy called a process level. In this process level, I/O distributed control units (hereinafter referred to as BCUs) 50, 51 connected to the power devices 70, 71, 75 are connected. , 55 are installed, and each of the BCUs 50, 51, 55 is connected to a higher-level bay-level network BLAN.

そして、各レベルにおいてネットワークに接続されたDCU40、45-BCU50、51、55は管理設備60として機能し、これら管理設備60は第1の管理設備60Aと第2の管理設備60Bとを有し、前記ITC30及び前記OPC31は2つの管理設備60A、60Bに選択的に接続され、また、各電力機器70、71、75も前記2つの管理設備60A、60Bに選択的に接続されるようになっていて、各電力機器70、71、75は前記ITC30及び前記OPC31に対して2系統の伝送路(2つの管理設備60A、60B)で接続されている。 The DCUs 40, 45-BCUs 50, 51, 55 connected to the network at each level function as management facilities 60, and these management facilities 60 have a first management facility 60A and a second management facility 60B, The ITC 30 and the OPC 31 are selectively connected to the two control facilities 60A, 60B, and each power equipment 70, 71, 75 is also selectively connected to the two control facilities 60A, 60B. Each power device 70, 71, 75 is connected to the ITC 30 and the OPC 31 via two systems of transmission lines (two management facilities 60A, 60B).

このように2系統の伝送路を有するのは、一方の伝送路は常用系として、他方の伝送路は待機系として機能する。すなわち、通常は常用系の伝送路でITC及びOPCと各電力機器70、71、75とデータのやり取りを行い、万が一、常用系の伝送路に事故が起きたときに直ちに待機系の伝送路に切り替わり、非常用として用いることができるようになっている。なお、図中、符号の後ろに「A]と記しているのは「常用系」を示し、「B]と記しているのは「待機系」を示す。 The reason why two transmission lines are provided is that one transmission line functions as a regular system and the other as a standby system. That is, normally, data is exchanged between the ITC and OPC and each of the power devices 70, 71, and 75 on the normal transmission line, and if an accident occurs on the normal transmission line, the standby transmission line is immediately switched. It can be switched and used as an emergency. In the figure, "A" after the reference numeral indicates "regular system", and "B" indicates "standby system".

特開2009-95197号公報JP 2009-95197 A

ところで、上記のような遠隔監視制御システムにおいて、数ヶ月或いは数年に1度、電力所における各電力機器の定期点検が行われ、定期点検時において表示試験(OPCのモニタに当該電力機器の点検データを表示する)を行う必要があり、そのためには、遠隔監視制御システムから試験・点検に該当する電力機器を切り離して、すなわち、前記BCUと各電力機器と接続する接続ケーブルを切り離さなければならなかった。 By the way, in the remote monitoring and control system as described above, once every several months or several years, a periodic inspection of each power device in a power station is performed. data display), and for this purpose, the power equipment to be tested and inspected must be disconnected from the remote monitoring and control system, that is, the connection cables connecting the BCU and each power equipment must be disconnected. I didn't.

そして、遠隔監視制御システムから切り離した電力機器にメンテナンス用パーソナルコンピュータを接続して、電力機器の点検を行っていた。 Then, a personal computer for maintenance is connected to the power equipment disconnected from the remote monitoring and control system, and the power equipment is inspected.

ところで、試験・点検に該当する電力機器を遠隔監視制御システムから切り離さずに試験・点検を行うと、当該電力機器における試験・点検用の信号が基幹給電制御所に伝達されてしまい、遠隔監視制御システム全体として異常・故障が発生したと誤認してしまうため、上記切り離し作業が必須であった。 By the way, if the test/inspection is performed without disconnecting the power equipment to be tested/inspected from the remote monitoring and control system, the signal for the test/inspection of the power equipment will be transmitted to the main power supply control center, and remote monitoring and control will not be possible. The disconnection work was necessary because the system as a whole would mistakenly assume that an abnormality or failure had occurred.

そのため、接続ケーブルの切り離し作業に手間が掛かり、また、時間も必要であるとともに、物理的に切り離し作業を行うため、人為的ミスも発生しやすいという問題があった。さらに、試験・点検終了後、切り離した接続ケーブルを接続しなければならず、その分の手間と時間も必要で、更に人為的ミスのリスクもあった。 As a result, the work of disconnecting the connection cable is troublesome and time consuming, and the physical disconnection work is prone to human error. Furthermore, after the test/inspection is completed, the disconnected connection cable must be connected, which requires labor and time, and also poses the risk of human error.

そこで本発明は、上記課題を解決するために、待機系伝送路を他の常用系伝送路から切り離し電力機器の点検用データを伝送する伝送路として利用することで点検作業の手間と時間の軽減を図る遠隔監視制御システム及び遠隔監視制御方法を提供することを目的とする。 Therefore, in order to solve the above problems, the present invention cuts off the standby system transmission line from other normal system transmission lines and uses it as a transmission line for transmitting data for inspection of power equipment, thereby reducing the labor and time required for inspection work. It is an object of the present invention to provide a remote monitoring control system and a remote monitoring control method.

上記課題を解決するために、請求項1の発明は、基幹給電制御所と接続されたITCと、電気所内の各電力機器の監視を行うOPCと、第1の管理設備と、第2の管理設備と、を備え、前記ITC及びOPCは、前記第1の管理設備と前記第2の管理設備とに選択的に接続され、また、前記電力機器は、前記第1の管理設備と第2の管理設備とに選択的に接続されており、前記電力機器の点検時に、点検対象となる電力機器を第2の管理設備に自動で接続するとともに、該第2の管理設備を前記現地監視制御装置のみに自動で接続した、ことを特徴とする。 In order to solve the above problems, the invention of claim 1 provides an ITC connected to a main power supply control center, an OPC for monitoring each power device in the power station, a first management facility, and a second management system. and equipment, wherein the ITC and OPC are selectively connected to the first management equipment and the second management equipment, and the power equipment is connected to the first management equipment and the second management equipment. It is selectively connected to the management facility, and when the power equipment is inspected, the power equipment to be inspected is automatically connected to the second management equipment, and the second management equipment is connected to the on-site monitoring control device. It is characterized in that it is automatically connected only to

この発明によれば、電力機器の点検時に、点検対象となる電力機器を第2の管理設備に自動で接続するとともに、該第2の管理設備を前記OPCのみに自動で接続する。 According to this invention, when inspecting the power equipment, the power equipment to be inspected is automatically connected to the second management equipment, and the second management equipment is automatically connected only to the OPC.

請求項2の発明は、基幹給電制御所と接続されたITCと、電気所内の各電力機器の監視を行うOPCと、第1の管理設備と、第2の管理設備と、を備え、前記ITC及びOPCは、前記第1の管理設備と前記第2の管理設備とに選択的に接続され、また、前記電力機器は、前記第1の管理設備と第2の管理設備とに選択的に接続されており、前記電力機器の点検時に、点検対象となる電力機器を第2の管理設備に接続するとともに、該第2の管理設備と前記現地監視制御装置のみに接続した、ことを特徴とする。 The invention of claim 2 comprises an ITC connected to a main power supply control center, an OPC for monitoring each power device in the power station, a first management facility, and a second management facility, wherein the ITC and OPC are selectively connected to the first management facility and the second management facility, and the power equipment is selectively connected to the first management facility and the second management facility. When inspecting the power equipment, the power equipment to be inspected is connected to a second management facility, and is connected only to the second management equipment and the on-site monitoring and control device. .

請求項1及び請求項2の発明によれば、電力機器の点検時に、点検対象となる電力機器を第2の管理設備に接続するとともに、該第2の管理設備と前記OPCのみに接続したので、点検の対象となる電力機器については、待機系としての第2の管理設備を介してOPCにデータを上げて表示させることができ、点検の対象となっていない他の電力機器については、常用系としての第1の管理設備を介して、ITCを通じて基幹給電制御所に遠隔監視制御されつつ、OPCにもデータを上げて表示させることができ、結局、各管理設備内のスイッチの切換のみ、接続ケーブルの切り離し及び接続などの作業を不要とし、その分の作業時間の短縮、さらには人為的ミスのリスクも回避することができる。 According to the inventions of claims 1 and 2, when inspecting the power equipment, the power equipment to be inspected is connected to the second management facility, and is connected only to the second management facility and the OPC. , For power equipment subject to inspection, data can be uploaded and displayed on the OPC via the second management facility as a standby system, and for other power equipment not subject to inspection, regular use Through the first management facility as a system, while being remotely monitored and controlled by the main power supply control center through the ITC, data can also be uploaded and displayed on the OPC. Work such as disconnection and connection of the connection cable becomes unnecessary, the work time can be shortened accordingly, and the risk of human error can be avoided.

図2~図5とともに、この発明の実施の形態を示すもので、本図は全体の概略を示す構成図である。This figure shows an embodiment of the present invention together with FIGS. 500kV機器からのデータ収集するときのデータの流れを説明するための構成図である。FIG. 4 is a configuration diagram for explaining the flow of data when collecting data from 500 kV equipment; 500kV機器及び220kV以下機器に基幹給電制御所からの指令の流れを説明するための構成図である。FIG. 3 is a configuration diagram for explaining the flow of commands from a main power supply control center to 500 kV equipment and 220 kV or less equipment; 220kV以下機器の点検を行うための手順を示すフローチャート図である。It is a flowchart figure which shows the procedure for inspecting 220 kV or less apparatus. 220kV以下機器について点検を行う場合のデータの流れを説明するための構成図である。FIG. 4 is a configuration diagram for explaining the flow of data when inspecting equipment of 220 kV or less; 従来において220kV以下機器の点検を行う場合のデータの流れを説明するための構成図である。FIG. 3 is a configuration diagram for explaining the flow of data when inspecting equipment of 220 kV or less in the related art;

以下、この発明を図示の実施の形態に基づいて説明する。 BEST MODE FOR CARRYING OUT THE INVENTION The present invention will be described below based on the illustrated embodiments.

(実施の形態)
図1乃至図5は、この実施の形態に係る遠隔制御監視システム1を示すもので、図1は全体の概略を示す構成図であり、図2は500kV機器からのデータ収集するときのデータの流れを説明するための構成図で、図3は500kV機器及び220kV以下機器に基幹給電制御所からの指令の流れを説明するための構成図である。
(Embodiment)
1 to 5 show a remote control and monitoring system 1 according to this embodiment. FIG. 1 is a block diagram showing the outline of the whole, and FIG. FIG. 3 is a configuration diagram for explaining the flow, and FIG. 3 is a configuration diagram for explaining the flow of commands from the main power supply control center to 500 kV equipment and 220 kV or less equipment.

なお、この実施の形態に係る遠隔制御監視システム1の構成は、背景技術を説明した図6の遠隔制御監視システム1と同じものであるため、同一符号を付すことにより詳細な説明は省略する。 The configuration of the remote control monitoring system 1 according to this embodiment is the same as that of the remote control monitoring system 1 of FIG. 6 in which the background art has been explained, and thus the same reference numerals are used to omit detailed description.

特に、図1と図6との相違は、各設備、例えば、「DCU」「BCU」の標記を図1にあっては電圧階級「500kV」「220kV・110kV」を付記しているのに対して図6にあってはその電圧階級は省略した点である。また、図2~図4、図6の図面は、データ(情報)の流れを説明するものであるため、その設備が(常用系)か(待機系)かを明記した点で図1とは相違する。 In particular, the difference between FIG. 1 and FIG. 6 is that each facility, for example, "DCU" and "BCU" are marked with voltage classes "500 kV" and "220 kV/110 kV" in FIG. However, in FIG. 6, the voltage class is omitted. 2 to 4 and 6 are intended to explain the flow of data (information). differ.

なお、各設備、ITC、OPC、DCU、BCUには、他の設備、他の電力機器、各ネットワークなどとの接続、切断を為すためのハードスイッチ又はソフトスイッチが設けられ、各設備の状態が切り替えられるようになっている。 Each facility, ITC, OPC, DCU, and BCU is provided with a hard switch or soft switch for connection and disconnection with other facilities, other power equipment, each network, etc., and the status of each facility is It can be switched.

まず、各電力機器、例えば500kV機器70のデータ(入/切状態、計測情報など)収集についてその流れを説明する(図2参照)。尚、ここで使用される伝送路は常用系となっている第1の管理設備60Aが使用される。 First, the flow of collecting data (on/off state, measurement information, etc.) of each electric power device, for example, the 500 kV device 70 will be described (see FIG. 2). The transmission line used here is the first management facility 60A, which is a regular system.

また、500kV機器70のデータの流れを、太線で表し、データの流れる方向を矢印で記す。以下において説明する、データ及び情報の流れについての表現も同様に記す。 Also, the data flow of the 500 kV equipment 70 is indicated by a thick line, and the direction of data flow is indicated by an arrow. Expressions for data and information flow, which will be described below, are also noted.

500kV機器70の上記データは、前記プロセスレベルにおけるBCU50A(常用系)を介してベイレベルのBLAN-Aに上げられ、さらに、500kVDCU40A(常用系)を介してステーションレベルのSLAN-Aに上げられた後、ITC-Aを通じて、ネットワーク回線により基幹給電制御所10に上げられる。 The above data of the 500 kV equipment 70 is raised to the bay level BLAN-A via the BCU 50A (common system) at the process level, and further to the station level SLAN-A via the 500 kV DCU 40A (common system). After that, it is sent to the main power supply control center 10 through the network line through the ITC-A.

これにより、基幹給電制御所10では、500kV機器70のデータに基づき監視制御を行うことができる。 As a result, the main power supply control center 10 can monitor and control based on the data of the 500 kV equipment 70 .

また、ステーションレベルのSLAN-Aに上げられた500kV機器70のデータはOPC-1にも上げられて、モニタに表示されるため、現地での管理部門でも500kV機器70の状態を確認することができる。 In addition, since the data of the 500 kV equipment 70 uploaded to the station level SLAN-A is also uploaded to the OPC-1 and displayed on the monitor, even the local management department can check the status of the 500 kV equipment 70. can.

なお、この実施の形態では500kV機器70のデータがBCU50Bには上がらないようになっているが、待機系となっているBCU50B(待機系)-ベイレベルのBLAN-B-500kVDCU40B(待機系)まで上げ、それより上位の階層にはいかないように選択的な接続することもできる。 In this embodiment, the data of the 500 kV equipment 70 is not sent to the BCU 50B, but the data from the standby BCU 50B (standby system) to the bay level BLAN-B to the 500 kV DCU 40B (standby system) It can also be selectively connected so as not to go to a higher hierarchy.

次に各電力機器、例えば500kV機器70と220kV以下機器75に対する基幹給電制御所10からの指令情報の流れを説明する(図3参照)。尚、ここで使用される伝送路は常用系となっている第1の管理設備60Aが使用される。 Next, the flow of command information from the main power supply control center 10 to each power device, for example, the 500 kV device 70 and the 220 kV or less device 75 will be described (see FIG. 3). The transmission line used here is the first management facility 60A, which is a regular system.

各電力機器70、71、75のデータを収集した後、他の情報も考慮した上で、各電力機器70、71に指令が発せられる。 After collecting the data of each power device 70, 71, 75, a command is issued to each power device 70, 71 after considering other information.

この指令情報は、基幹給電制御所10からネットワーク回線により電気所20のITC-Aを通じてステーションレベルのSLAN-1に流され、500kVDCU40A(常用系)を介してベイションレベルのBLAN-Aに送られた後、プロセスレベルにおけるBCU50A(常用系)を介して、500kV機器70に伝えられ、500kV機器70はその指令情報に従い制御管理される。 This command information is sent from the main power supply control center 10 to the station level SLAN-1 through the ITC-A of the power station 20 via the network line, and is sent to the baition level BLAN-A via the 500 kVDCU 40A (common system). After that, it is transmitted to the 500 kV equipment 70 via the BCU 50A (common system) at the process level, and the 500 kV equipment 70 is controlled and managed according to the command information.

また、ステーションレベルのSLAN-1に流された指令情報は、220kV以下DCU45A-BLAN-Aを通じてプロセスレベルにおけるBCU(常用系)を介して220kV以下機器75に伝えられ、220kV機器75はその指令情報に従い制御管理される。 Also, the command information sent to the station level SLAN-1 is transmitted to the 220 kV or less equipment 75 through the 220 kV or less DCU 45A-BLAN-A via the BCU (common system) at the process level, and the 220 kV equipment 75 receives the command information Controlled and managed according to

そして、電力機器、例えば、220kV以下機器75の点検を行う場合についてその手順について説明する(図4、図5参照)。 Next, a procedure for inspecting a power device, for example, a device 75 of 220 kV or less will be described (see FIGS. 4 and 5).

まず、点検対象となる220kV以下機器75のデータ(情報)を常用系の伝送路から切り離し、待機系の伝送路に乗せる必要がある。そのたの手順をステップ1~ステップ4に示し(図4参照)、また、図5に待機系の伝送路を成立させた場合の構成図を示す。 First, it is necessary to separate the data (information) of the 220 kV or less equipment 75 to be inspected from the normal transmission line and place it on the standby transmission line. Other procedures are shown in steps 1 to 4 (see FIG. 4), and FIG. 5 shows a configuration diagram when a standby transmission line is established.

(ステップ1)
OPC31のスイッチ43TS(ソフトスイッチ)を点検用試験データを受け入れるように切り替える(S1)(図4参照)。すなわち、ステーションレベルのネットワークSLAN-2に接続される。これにより、OPC31は「平常」状態から「試験」状態に切り替わる(図5参照)。
(Step 1)
The switch 43TS (soft switch) of the OPC 31 is switched to accept inspection test data (S1) (see FIG. 4). That is, it is connected to the station level network SLAN-2. As a result, the OPC 31 switches from the "normal" state to the "test" state (see FIG. 5).

(ステップ2)
DCU45B(待機系)のハードスイッチを、ステーションレベルのネットワークSLAN-2を介して前記OPC31に接続するとともにベイレベルのネットワークBLAN-2に接続できるように切り替える(ステップ2)(図4参照)。これにより、DCU45Bは「待機」状態から「試験」状態に切り替わる(図5参照)。
(Step 2)
The hardware switch of the DCU 45B (standby system) is connected to the OPC 31 via the station level network SLAN-2 and is switched to connect to the bay level network BLAN-2 (step 2) (see FIG. 4). As a result, the DCU 45B switches from the "standby" state to the "test" state (see FIG. 5).

(ステップ3)
点検対象の220kV以下機器75を担当するBCU55Bのハードスイッチ43-TLSを、ベイレベルのネットワークBLAN-2を介して前記DCU45Bに接続するとともに点検対象の220kV以下機器75に接続するように切り替える(ステップ3)(図4参照)。これにより、BCU55Bは「待機」状態から「試験」状態に切り替わる(図5参照)。
(Step 3)
The hardware switch 43-TLS of the BCU 55B in charge of the 220 kV or less equipment 75 to be inspected is switched to connect to the DCU 45B via the bay level network BLAN-2 and to the 220 kV or less equipment 75 to be inspected (step 3) (see Figure 4). As a result, the BCU 55B switches from the "standby" state to the "test" state (see FIG. 5).

(ステップ4)
OPC31のハードスイッチ43-28を「切」から「入」に切り替える(ステップ4)(図4参照)。これは、点検対象となる220kV以下機器75のデータ(情報)をOPC31に表示するとともに警報を鳴動する(図5参照)。
(Step 4)
The hardware switch 43-28 of the OPC 31 is switched from "off" to "on" (step 4) (see FIG. 4). This displays the data (information) of the 220 kV or less equipment 75 to be inspected on the OPC 31 and sounds an alarm (see FIG. 5).

以上のステップ1~4の手順を行うことにより、待機系の伝送路であったものが、「試験」という特別な系の伝送路に変更され、点検対象の220kV以下機器75からのデータ(情報)をOPC31に表示することが可能となる。 By performing the above steps 1 to 4, the transmission line of the standby system is changed to a transmission line of a special system called "test", and data (information ) can be displayed on the OPC 31.

そして、この「試験」という新たな系の伝送路は、他の常用系の伝送路とは、別個独立の系として成立するため、点検対象の220kV以下機器75からのデータ(情報)が他の常用系の伝送路、とりわけ、ITC30へは流れることはなく、よって基幹給電制御所10にも上がることはない。そのため、遠隔監視制御システム1としては、点検対象の220kV以下機器75のみを切り離した形で他の電力機器71、75については従来通りの遠隔監視制御を行いつつ、かつ、当該電気所20における点検対象となる電力機器のみを、その表示試験(点検)を行うことができる。しかも、点検対象となす電力機器75とBCU55との接続ケーブルの切り離し及び接続などの作業を不要とし、その分の作業時間の短縮、さらには人為的ミスのリスクも回避することができる。 Since the transmission line of this new system called "test" is established as a separate and independent system from the transmission line of the other normal system, the data (information) from the 220 kV or less equipment 75 to be inspected can be transferred to other systems. It does not flow to the normal transmission line, particularly the ITC 30 , and therefore does not go up to the main power supply control center 10 . Therefore, as the remote monitoring and control system 1, only the equipment 75 of 220 kV or less to be inspected is isolated, and the other electric power equipment 71 and 75 are remotely monitored and controlled as in the past, and the inspection at the electric station 20 is performed. Display tests (inspections) can be performed only on target electric power equipment. In addition, work such as disconnection and connection of the connection cable between the power equipment 75 to be inspected and the BCU 55 is not required, thereby shortening the work time and avoiding the risk of human error.

以上に説明したように、この実施の形態による遠隔監視制御システム1によれば、点検対象の電力機器75をその担当のBCU55との接続ケーブルを切り離すことなく、各設備における各種スイッチの切換のみで、当該電力機器を常用系の伝送路から切り離すことが出来る。 As described above, according to the remote monitoring and control system 1 according to this embodiment, the power equipment 75 to be inspected can be inspected only by switching various switches in each equipment without disconnecting the connection cable from the BCU 55 in charge of the equipment. , the power equipment can be separated from the normal transmission line.

1 遠隔制御監視システム
10 基幹給電制御所
20 電気所
30 ITC:遠隔監視制御装置
31 OPC:集中管理制御装置
40 DCU:データ処理・中継装置
45 DCU
50 BCU:入出力分散制御装置
51 BCU
55 BCU
60A 第1の管理設備
60B 第2の管理設備
70 電力機器
71 電力機器
75 電力機器


1 remote control monitoring system 10 main power supply control center 20 electric station 30 ITC: remote monitoring control device 31 OPC: centralized control device 40 DCU: data processing/relay device 45 DCU
50 BCU: input/output distributed control unit 51 BCU
55 BCUs
60A First control facility 60B Second control facility 70 Power equipment 71 Power equipment 75 Power equipment


Claims (2)

基幹給電制御所と接続された遠隔監視制御装置と、電気所内の各電力機器の監視を行う現地監視制御装置と、第1の管理設備と、第2の管理設備と、を備え、
前記遠隔監視制御装置及び現地監視制御装置は、前記第1の管理設備と前記第2の管理設備とに選択的に接続され、
また、前記電力機器は、前記第1の管理設備と第2の管理設備とに選択的に接続されており、
前記電力機器の点検時に、点検対象となる電力機器を第2の管理設備に自動で接続するとともに、第2の管理設備を前記現地監視制御装置のみに自動で接続した
ことを特徴とする遠隔監視制御システム。
Equipped with a remote monitoring control device connected to a main power supply control center, a local monitoring control device that monitors each power device in the power station, a first management facility, and a second management facility,
the remote monitoring and control device and the on-site monitoring and control device are selectively connected to the first management facility and the second management facility;
Also, the power equipment is selectively connected to the first management facility and the second management facility,
Remote monitoring characterized in that, when inspecting the power equipment, the power equipment to be inspected is automatically connected to a second management facility, and the second management equipment is automatically connected only to the on-site monitoring control device. control system.
基幹給電制御所と接続された遠隔監視制御装置と、電気所内の各電力機器の監視を行う現地監視制御装置と、第1の管理設備と、第2の管理設備と、を備え、
前記遠隔監視制御装置及び現地監視制御装置は、前記第1の管理設備と前記第2の管理設備とに選択的に接続され、
また、前記電力機器は、前記第1の管理設備と第2の管理設備とに選択的に接続されており、
前記電力機器の点検時に、点検対象となる電力機器を第2の管理設備に接続するとともに、第2の管理設備と前記現地監視制御装置のみに接続した
ことを特徴とする遠隔監視制御方法。


Equipped with a remote monitoring control device connected to a main power supply control center, a local monitoring control device that monitors each power device in the power station, a first management facility, and a second management facility,
the remote monitoring and control device and the on-site monitoring and control device are selectively connected to the first management facility and the second management facility;
Also, the power equipment is selectively connected to the first management facility and the second management facility,
A remote monitoring and control method, wherein, when inspecting the power equipment, the power equipment to be inspected is connected to a second management facility, and is connected only to the second management equipment and the on-site monitoring and control device.


JP2019021459A 2019-02-08 2019-02-08 REMOTE MONITORING CONTROL SYSTEM AND REMOTE MONITORING CONTROL METHOD Active JP7259376B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019021459A JP7259376B2 (en) 2019-02-08 2019-02-08 REMOTE MONITORING CONTROL SYSTEM AND REMOTE MONITORING CONTROL METHOD

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019021459A JP7259376B2 (en) 2019-02-08 2019-02-08 REMOTE MONITORING CONTROL SYSTEM AND REMOTE MONITORING CONTROL METHOD

Publications (2)

Publication Number Publication Date
JP2020129894A JP2020129894A (en) 2020-08-27
JP7259376B2 true JP7259376B2 (en) 2023-04-18

Family

ID=72174993

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019021459A Active JP7259376B2 (en) 2019-02-08 2019-02-08 REMOTE MONITORING CONTROL SYSTEM AND REMOTE MONITORING CONTROL METHOD

Country Status (1)

Country Link
JP (1) JP7259376B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013165358A (en) 2012-02-09 2013-08-22 Chugoku Electric Power Co Inc:The Remote monitoring controller
JP2014096863A (en) 2012-11-07 2014-05-22 Chugoku Electric Power Co Inc:The Remote supervisory control device and method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013165358A (en) 2012-02-09 2013-08-22 Chugoku Electric Power Co Inc:The Remote monitoring controller
JP2014096863A (en) 2012-11-07 2014-05-22 Chugoku Electric Power Co Inc:The Remote supervisory control device and method

Also Published As

Publication number Publication date
JP2020129894A (en) 2020-08-27

Similar Documents

Publication Publication Date Title
KR102145266B1 (en) System and method for monitoring power system
JPH02145036A (en) Monitoring system for transmission line
KR102476188B1 (en) Remote control panel for controller failure diagnosis and emergency control
KR102485079B1 (en) Diagnostic apparatus for protection and distribution board
JP7259376B2 (en) REMOTE MONITORING CONTROL SYSTEM AND REMOTE MONITORING CONTROL METHOD
JP2001157381A (en) Substation equipment control and monitoring equipment
CN114397528B (en) A method and device for testing the logic action of a remote standby automatic switching device
JP2661434B2 (en) Monitoring and control device for power system
JP6238720B2 (en) Supervisory control system
JP3392718B2 (en) Simulator
JP3684292B2 (en) Power system controller
JPH04213246A (en) Fault information transmission suppression system
JPH05328455A (en) Distributed control system
CN116488168B (en) Switcher, submarine cable power supply system and grounding switching method
JP5458992B2 (en) Replacement method of remote monitoring control device
KR20140122484A (en) System for monitoring, diagnosing, and protecting electric power distribution
EP1552998A2 (en) System for the diagnosis and operation of apparatuses for generating and distributing power supplies, in particular for railway's safety and signalling plants
JPH1094173A (en) Power system monitoring and control device and power system monitoring and control training device
JP2019088147A (en) Short circuit accident trial power transmission system and short circuit accident trial power transmission method
Pan Computer interlocking system maintenance and troubleshooting
JPH0528544B2 (en)
KR20260023704A (en) Digital twin-based equipment fault diagnosis and insulation degradation prediction system
JPH01198139A (en) System for monitoring and controlling loop type transmission equipment
CN117376217A (en) Communication fault monitoring system and method
JP2012055138A (en) Equipment integration system for substation

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20211216

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230307

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230320

R150 Certificate of patent or registration of utility model

Ref document number: 7259376

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150