Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7274396B2 - Power control device and system - Google Patents
[go: Go Back, main page]

JP7274396B2 - Power control device and system - Google Patents

Power control device and system Download PDF

Info

Publication number
JP7274396B2
JP7274396B2 JP2019187995A JP2019187995A JP7274396B2 JP 7274396 B2 JP7274396 B2 JP 7274396B2 JP 2019187995 A JP2019187995 A JP 2019187995A JP 2019187995 A JP2019187995 A JP 2019187995A JP 7274396 B2 JP7274396 B2 JP 7274396B2
Authority
JP
Japan
Prior art keywords
power
control device
power sources
sources
controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019187995A
Other languages
Japanese (ja)
Other versions
JP2021065020A (en
Inventor
集 歌丸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kyocera Corp
Original Assignee
Kyocera Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kyocera Corp filed Critical Kyocera Corp
Priority to JP2019187995A priority Critical patent/JP7274396B2/en
Publication of JP2021065020A publication Critical patent/JP2021065020A/en
Application granted granted Critical
Publication of JP7274396B2 publication Critical patent/JP7274396B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/70Hybrid systems, e.g. uninterruptible or back-up power supplies integrating renewable energies

Landscapes

  • Stand-By Power Supply Arrangements (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本開示は、電源制御装置及びシステムに関するものである。 The present disclosure relates to power control devices and systems.

負荷に電力を供給可能な分散電源として太陽電池及び/又は蓄電池を備える電力制御システムがある。このような電力制御システムを導入する需要家は増えつつある。また、負荷に電力を供給可能な分散電源として燃料電池を備える電力制御システムの導入も進みつつある。近年、電力制御システムにおいて、太陽電池、燃料電池、及び蓄電池のような複数の電源を制御しようとする試みも提案されている(例えば特許文献1参照)。 There is a power control system that includes a solar cell and/or a storage battery as a distributed power source capable of supplying power to loads. The number of consumers who introduce such a power control system is increasing. Also, the introduction of power control systems equipped with fuel cells as distributed power sources capable of supplying power to loads is progressing. In recent years, attempts have been made to control a plurality of power sources such as solar cells, fuel cells, and storage batteries in a power control system (see Patent Document 1, for example).

国際公開第WO2013/015225号International Publication No. WO2013/015225

太陽電池、燃料電池、及び蓄電池のような複数の電源を制御するシステムが動作可能な場面を拡張することができれば、当該複数の電源の非常時の電力供給能力を高めることができる。 If a system that controls a plurality of power sources such as solar cells, fuel cells, and storage batteries can operate in a wider range of situations, the emergency power supply capacity of the plurality of power sources can be increased.

本開示の目的は、複数の電源の非常時の電力供給能力を高め得る電源制御装置及びシステムを提供することにある。 An object of the present disclosure is to provide a power supply control device and system capable of enhancing the power supply capability of a plurality of power supplies in an emergency.

一実施形態に係るシステムは、
燃料電池及び蓄電池を含み、負荷に電力を供給可能な複数の電源と、
前記複数の電源のそれぞれに有線接続されて当該複数の電源を制御する第1制御装置と、
前記複数の電源のそれぞれに有線又は無線で接続されて当該複数の電源を制御する第2制御装置と、
を含む。
前記第1制御装置が電力系統から電力の供給を受けることができる状態において、当該第1制御装置及び前記第2制御装置の少なくとも一方は前記複数の電源を制御可能である。
前記第1制御装置が電力系統から電力の供給を受けることができない状態において、当該第1制御装置は前記複数の電源の少なくともいずれかから供給される電力によって動作する。
A system according to one embodiment includes:
a plurality of power sources, including fuel cells and storage batteries, capable of supplying power to loads;
a first control device connected by wire to each of the plurality of power sources and controlling the plurality of power sources;
a second control device that is wired or wirelessly connected to each of the plurality of power sources and controls the plurality of power sources;
including.
At least one of the first control device and the second control device can control the plurality of power supplies in a state where the first control device can receive power from a power system.
In a state in which the first control device cannot receive power supply from the power system, the first control device operates with power supplied from at least one of the plurality of power sources.

また、一実施形態に係るシステムは、
太陽電池からの入力信号に基づいて制御される燃料電池及び蓄電池を含み、負荷に電力を供給可能な複数の電源と、
前記複数の電源のそれぞれに有線接続されて当該複数の電源を制御する第1制御装置と、
前記複数の電源のそれぞれに有線又は無線で接続されて当該複数の電源を制御する第2制御装置と、
を含む。
前記システムは、前記第1制御装置が電力系統から電力の供給を受けることができる状態において、当該第1制御装置及び前記第2制御装置の少なくとも一方は前記複数の電源を制御可能である。
前記システムは、前記第1制御装置が電力系統から電力の供給を受けることができない状態において、当該第1制御装置は前記複数の電源の少なくともいずれかから供給される電力によって動作する。
また、一実施形態に係るシステムは、
太陽電池からの入力信号に基づいて制御される燃料電池及び蓄電池を含み、負荷に電力を供給可能な複数の電源と、
前記太陽電池及び前記複数の電源の少なくともいずれかから供給される電力を変換するインバータと、
前記複数の電源のそれぞれに有線接続されて当該複数の電源を制御する第1制御装置と、
前記複数の電源のそれぞれに有線又は無線で接続されて当該複数の電源を制御する第2制御装置と、
を含む。
前記第1制御装置が電力系統から電力の供給を受けることができる状態において、当該第1制御装置及び前記第2制御装置の少なくとも一方は前記複数の電源を制御可能である。
前記第1制御装置が電力系統から電力の供給を受けることができない状態において、当該第1制御装置は前記複数の電源の少なくともいずれかから供給される電力によって動作する。
前記インバータは、前記第1制御装置及び前記第2制御装置の少なくとも一方によって制御可能である。
In addition, a system according to one embodiment includes:
a plurality of power sources capable of supplying power to loads, including fuel cells and storage batteries controlled based on input signals from solar cells;
a first control device connected by wire to each of the plurality of power sources and controlling the plurality of power sources;
a second control device that is wired or wirelessly connected to each of the plurality of power sources and controls the plurality of power sources;
including.
In the system, at least one of the first control device and the second control device can control the plurality of power supplies in a state in which the first control device can receive power supply from a power system.
In the system, the first control device operates with power supplied from at least one of the plurality of power supplies when the first control device cannot receive power supply from the power system.
In addition, a system according to one embodiment includes:
a plurality of power sources capable of supplying power to loads, including fuel cells and storage batteries controlled based on input signals from solar cells;
an inverter that converts power supplied from at least one of the solar cell and the plurality of power sources;
a first control device connected by wire to each of the plurality of power sources and controlling the plurality of power sources;
a second control device that is wired or wirelessly connected to each of the plurality of power sources and controls the plurality of power sources;
including.
At least one of the first control device and the second control device can control the plurality of power supplies in a state where the first control device can receive power from a power system.
In a state in which the first control device cannot receive power supply from the power system, the first control device operates with power supplied from at least one of the plurality of power sources.
The inverter is controllable by at least one of the first controller and the second controller.

一実施形態によれば、複数の電源の非常時の電力供給能力を高め得る電源制御装置及びシステムを提供することができる。 According to one embodiment, it is possible to provide a power supply control device and system capable of enhancing the power supply capability of a plurality of power supplies in an emergency.

一実施形態に係る制御装置を含むシステムの概略構成を示す機能ブロック図である。It is a functional block diagram showing a schematic structure of a system containing a control device concerning one embodiment. 一実施形態に係る第1制御装置の概略構成を示す機能ブロック図である。It is a functional block diagram showing a schematic structure of the 1st control device concerning one embodiment. 一実施形態に係る第2制御装置の概略構成を示す機能ブロック図である。It is a functional block diagram showing a schematic structure of the 2nd control device concerning one embodiment. 一実施形態に係る制御装置を含むシステムの動作を説明するフローチャートである。4 is a flow chart describing the operation of a system including a control device according to one embodiment;

以下、一実施形態に係る制御装置、及び制御装置を含むシステムについて、図面を参照して説明する。 Hereinafter, a control device and a system including the control device according to one embodiment will be described with reference to the drawings.

図1は、一実施形態に係る制御装置を含むシステムの概略構成を示す機能ブロック図である。図1において、各機能ブロックを結ぶ実線は、主として電力の流れる配線(以下、「電力線」とも記す)を表す。また、図1において、各機能ブロックを結ぶ破線は、主として制御信号又は通信される情報の流れる配線(以下、「制御線」とも記す)を表す。 FIG. 1 is a functional block diagram showing a schematic configuration of a system including a control device according to one embodiment. In FIG. 1 , solid lines connecting functional blocks mainly represent wiring through which electric power flows (hereinafter also referred to as “power lines”). Also, in FIG. 1, dashed lines connecting functional blocks mainly represent wiring through which control signals or information to be communicated (hereinafter also referred to as “control lines”).

図1に示すように、一実施形態に係るシステム1は、第1制御装置10と、太陽電池21と、燃料電池22と、蓄電池23と、インバータ30と、分電盤40と、負荷50と、センサ群60とを備えている。図1に示すように、一実施形態に係るシステム1は、電力系統(例えば商用電力系統)100に接続される。また、図1に示すように、一実施形態に係るシステム1は、第2制御装置200に接続される。このように、一実施形態に係るシステム1は、第1制御装置10と、複数の電源20と、第2制御装置200と、を含んで構成される。 As shown in FIG. 1, a system 1 according to one embodiment includes a first control device 10, a solar cell 21, a fuel cell 22, a storage battery 23, an inverter 30, a distribution board 40, and a load 50. , and a sensor group 60 . As shown in FIG. 1, a system 1 according to one embodiment is connected to a power grid (eg, commercial power grid) 100 . Also, as shown in FIG. 1, the system 1 according to one embodiment is connected to a second control device 200 . Thus, the system 1 according to one embodiment includes the first control device 10 , the plurality of power sources 20 and the second control device 200 .

以下、一実施形態に係るシステム1は、例えばビル内などの電力の制御及び/又は管理等を行ういわゆるBEMS(Building Energy Management System又はBuilding and Energy Management System(ビル・エネルギー管理システム))を構成するものとして説明する。BEMSとは、室内環境及び/又はエネルギー性能の最適化を図るためのビル管理システムとしてよい。例えばクラウドを採用してBEMSを構成する標準技術として、2011年に国際標準化されたオープンな通信規格のIEEE1888がある。 Hereinafter, the system 1 according to one embodiment constitutes a so-called BEMS (Building Energy Management System or Building and Energy Management System) that controls and/or manages electric power in a building, for example. described as a thing. BEMS may be a building management system for optimizing indoor climate and/or energy performance. For example, there is IEEE1888, an open communication standard that was internationally standardized in 2011, as a standard technology for configuring BEMS by adopting the cloud.

ただし、一実施形態に係るシステム1はBEMSを構成するものに限定されず、例えば、家庭内エネルギー管理システムであるHEMS(Home Energy Management System)を構成するシステムなどとしてもよい。HEMSは、家庭内の家電機器の電力消費量を表示したり、遠隔的に運転を制御したりすることができる。また、一実施形態に係るシステム1はHEMSを構成するものに限定されず、他のエネルギー管理システムなどを構成してもよい。 However, the system 1 according to one embodiment is not limited to configuring BEMS, and may be, for example, a system configuring HEMS (Home Energy Management System), which is a home energy management system. The HEMS can display the power consumption of home appliances and remotely control their operation. Moreover, the system 1 according to one embodiment is not limited to configuring the HEMS, and may configure another energy management system or the like.

第1制御装置10は、燃料電池22及び蓄電池23を制御する機能を有する。このため、図1に示すように、第1制御装置10は、燃料電池22及び蓄電池23のそれぞれに、制御線によって接続されてよい。また、第1制御装置10は、後述する他の電源24を制御する機能を有してもよい。この場合、第1制御装置10は、他の電源24と制御線によって接続されてよい。このように、一実施形態において、第1制御装置10は、複数の電源20のそれぞれに有線接続されて、複数の電源20を制御する。さらに、第1制御装置10は、インバータ30を制御してもよい。このため、図1に示すように、第1制御装置10は、インバータ30に、制御線によって接続されてよい。 The first control device 10 has a function of controlling the fuel cell 22 and the storage battery 23 . For this reason, as shown in FIG. 1, the first control device 10 may be connected to each of the fuel cell 22 and the storage battery 23 by control lines. The first control device 10 may also have a function of controlling another power source 24, which will be described later. In this case, the first control device 10 may be connected to another power source 24 by a control line. Thus, in one embodiment, the first controller 10 is wired to each of the plurality of power sources 20 to control the plurality of power sources 20 . Furthermore, the first control device 10 may control the inverter 30 . Therefore, as shown in FIG. 1, the first control device 10 may be connected to the inverter 30 by control lines.

一実施形態において、第1制御装置10は、太陽電池21からの入力、負荷50からの入力、及びセンサ群60からの入力の少なくともいずれかに基づいて、制御を実行してよい。このため、図1に示すように、第1制御装置10は、太陽電池21、負荷50、及びセンサ群60のそれぞれに、制御線によって接続されてよい。第1制御装置10の構成及び動作などについては、さらに後述する。 In one embodiment, the first control device 10 may perform control based on at least one of inputs from the solar cell 21 , inputs from the load 50 , and inputs from the sensor group 60 . Therefore, as shown in FIG. 1, the first control device 10 may be connected to each of the solar cell 21, the load 50, and the sensor group 60 by control lines. The configuration and operation of the first control device 10 will be further described later.

太陽電池21は、太陽光のエネルギーを直流の電力に変換するものである。太陽電池21は、例えば光電変換セルを有する発電部がマトリクス状に接続され、所定の直流電流(たとえば10A)を出力するように構成される。太陽電池21は、シリコン系多結晶太陽電池、シリコン系単結晶太陽電池、又はCIGS等薄膜系太陽電池等、光電変換可能なものであればその種類は制限されない。一実施形態において、太陽電池21は、電力を供給するために太陽光発電を行う機能を有するものであれば、任意の電源を採用してよい。 The solar cell 21 converts sunlight energy into DC power. The solar cell 21 is configured such that power generation units having, for example, photoelectric conversion cells are connected in a matrix and output a predetermined direct current (for example, 10 A). The type of the solar cell 21 is not limited as long as it is capable of photoelectric conversion, such as a silicon-based polycrystalline solar cell, a silicon-based monocrystalline solar cell, or a thin-film solar cell such as CIGS. In one embodiment, the solar cell 21 may employ any power source that has the ability to generate solar power to supply power.

太陽電池21は、発電した電力を、インバータ30に供給する。このため、図1に示すように、太陽電池21は、インバータ30に、電力線によって接続されてよい。 Solar cell 21 supplies the generated power to inverter 30 . Therefore, as shown in FIG. 1, the solar cell 21 may be connected to the inverter 30 by a power line.

図1に示すように、太陽電池21は、第1制御装置10及び第2制御装置200の少なくとも一方に、制御線によって接続されてよい。このような接続により、第1制御装置10及び第2制御装置200の少なくとも一方は、太陽電池21からの情報(例えば太陽電池21が発電する電力の大きさの情報など)を受信することができる。 As shown in FIG. 1, the solar cell 21 may be connected to at least one of the first control device 10 and the second control device 200 by control lines. Such a connection enables at least one of the first control device 10 and the second control device 200 to receive information from the solar cell 21 (for example, information on the amount of power generated by the solar cell 21). .

燃料電池22は、例えば、水素を用いて空気中の酸素との化学反応により直流の電力を発電するセルと、その他補機類とを備えてよい。燃料電池22は、例えば、固体酸化物型燃料電池(Solid Oxide Fuel Cell:SOFC)、固体高分子形燃料電池(Polymer Electrolyte Fuel Cell:PEFC)、リン酸形燃料電池(Phosphoric Acid Fuel Cell:PAFC)、又は溶融炭酸塩形燃料電池(Molten Carbonate Fuel Cell:MCFC)などのような燃料電池のセルスタックを含んで構成してもよい。 The fuel cell 22 may include, for example, a cell that uses hydrogen to chemically react with oxygen in the air to generate DC power, and other accessories. The fuel cell 22 is, for example, a solid oxide fuel cell (SOFC), a polymer electrolyte fuel cell (PEFC), or a phosphoric acid fuel cell (PAFC). or a cell stack of a fuel cell such as a molten carbonate fuel cell (MCFC).

燃料電池22は、対応する電流センサが順潮流(買電方向の電流)を検出する間発電を行うものとしてもよく、発電時には負荷50の消費電力に追従する負荷追従運転又は所定の定格電力値による定格運転を行ってもよい。負荷追従運転時の追従範囲は、例えば0.5~3.0kWであり、定格運転時の定格電力値は、例えば3.0kWなどとしてもよい。なお、燃料電池22は、連系運転時は負荷50の消費電力に追従する負荷追従運転(例えば0.5~3.0kW)を行い、自立運転時に、負荷追従運転又は定格電力値による定格運転を行うものとしてもよい。一実施形態において、燃料電池22は、電力を供給するためにガスなどを用いて発電を行う機能を有するものであれば、任意の電源を採用してよい。 The fuel cell 22 may generate power while the corresponding current sensor detects forward power flow (current in the power purchase direction). Rated operation may be performed by The follow-up range during load follow-up operation may be, for example, 0.5 to 3.0 kW, and the rated power value during rated operation may be, for example, 3.0 kW. The fuel cell 22 performs load-following operation (for example, 0.5 to 3.0 kW) that follows the power consumption of the load 50 during grid-connected operation, and performs load-following operation or rated operation according to the rated power value during isolated operation. may be performed. In one embodiment, the fuel cell 22 may employ any power source as long as it has a function of generating power using gas or the like to supply power.

燃料電池22は、発電した電力を、インバータ30に供給する。このため、図1に示すように、燃料電池22は、インバータ30に、電力線によって接続されてよい。上述のように、燃料電池22は、制御線によって第1制御装置10に接続されてよい。このような接続により、第1制御装置10は、燃料電池22を制御することができる。 The fuel cell 22 supplies the generated power to the inverter 30 . Therefore, as shown in FIG. 1, the fuel cell 22 may be connected to the inverter 30 by a power line. As mentioned above, the fuel cell 22 may be connected to the first controller 10 by control lines. This connection allows the first control device 10 to control the fuel cell 22 .

蓄電池23は、リチウムイオン電池又はニッケル水素電池等の蓄電池から構成されてよい。蓄電池23は、充電された電力を放電することにより、電力を供給可能である。また、蓄電池23は、電力系統100から供給される電力、太陽電池21から供給される電力、燃料電池22から供給される電力、及び他の電源24から供給される電力の少なくともいずれかを充電可能である。一実施形態において、蓄電池23は、電力を充電及び放電する機能を有するものであれば、任意の電源を採用してよい。 The storage battery 23 may be composed of a storage battery such as a lithium ion battery or a nickel metal hydride battery. The storage battery 23 can supply power by discharging the charged power. In addition, the storage battery 23 can be charged with at least one of power supplied from the power system 100, power supplied from the solar battery 21, power supplied from the fuel cell 22, and power supplied from another power supply 24. is. In one embodiment, the storage battery 23 may employ any power source as long as it has a function of charging and discharging power.

蓄電池23は、放電した電力を、インバータ30に供給する。また、蓄電池23は、インバータ30から供給された電力を充電する。このため、図1に示すように、蓄電池23は、インバータ30に、電力線によって接続されてよい。上述のように、蓄電池23は、制御線によって第1制御装置10に接続されてよい。このような接続により、第1制御装置10は、蓄電池23を制御することができる。 Storage battery 23 supplies the discharged power to inverter 30 . Moreover, the storage battery 23 is charged with power supplied from the inverter 30 . Therefore, as shown in FIG. 1, the storage battery 23 may be connected to the inverter 30 by a power line. As mentioned above, the storage battery 23 may be connected to the first controller 10 by control lines. Through such connection, the first control device 10 can control the storage battery 23 .

上述のように、一実施形態に係るシステム1は、他の電源24を含んでもよい。他の電源24は、例えば、所定のガスなどを燃料とするガスエンジンで発電するガス発電機などとしてもよい。また、他の電源24は、例えば、車載充電装置を搭載した電気自動車(EV:Electric Vehicle)などとしてもよい。すなわち、他の電源24は、発電又は放電などにより電力を供給することができる任意の電源としてよい。 As noted above, system 1 according to one embodiment may include other power sources 24 . The other power supply 24 may be, for example, a gas generator that generates electricity with a gas engine that uses a predetermined gas or the like as fuel. Further, the other power supply 24 may be, for example, an electric vehicle (EV) equipped with an in-vehicle charging device. That is, the other power source 24 may be any power source capable of supplying power, such as by generating or discharging power.

他の電源24は、インバータ30に電力を供給してよい。このため、図1に示すように、他の電源24は、インバータ30に、電力線によって接続されてよい。上述のように、他の電源24は、制御線によって第1制御装置10に接続されてよい。このような接続により、第1制御装置10は、他の電源24を制御することができる。 Another power source 24 may power the inverter 30 . Thus, as shown in FIG. 1, the other power source 24 may be connected to the inverter 30 by power lines. As mentioned above, the other power source 24 may be connected to the first controller 10 by control lines. Such connections allow the first controller 10 to control the other power sources 24 .

以下、太陽電池21と、燃料電池22と、蓄電池23、他の電源24とを、電源の機能を有するものとして特に区別しない場合、「電源20」とも記す。一実施形態において、複数の電源20は、太陽電池21、燃料電池22、及び蓄電池23を含んでよく、これらは、負荷50に電力を供給可能に構成されてよい。また、複数の電源20は、例えば、太陽電池21と、燃料電池22と、蓄電池23、及び他の電源24を含んでもよい。 Hereinafter, the solar cell 21, the fuel cell 22, the storage battery 23, and the other power source 24 will also be referred to as the "power source 20" unless otherwise distinguished as having power source functions. In one embodiment, multiple power sources 20 may include solar cells 21 , fuel cells 22 , and storage batteries 23 , which may be configured to power loads 50 . The plurality of power sources 20 may also include, for example, solar cells 21 , fuel cells 22 , storage batteries 23 , and other power sources 24 .

インバータ30は、電源20の少なくともいずれかから供給される直流の電力と、電力系統100から供給される交流の電力との変換を行う機能を有してよい。インバータ30は、システム1の連系運転及び自立運転の切り替え制御を行ってよい。また、電源20の少なくともいずれかから供給される電力は、インバータ30によって適宜変換された後、分電盤40に供給されてよい。このため、図1に示すように、インバータ30は、分電盤40に、電力線によって接続されてよい。 The inverter 30 may have a function of converting DC power supplied from at least one of the power supplies 20 and AC power supplied from the power system 100 . The inverter 30 may perform switching control between the grid-connected operation and the isolated operation of the system 1 . Moreover, the power supplied from at least one of the power sources 20 may be supplied to the distribution board 40 after being appropriately converted by the inverter 30 . Therefore, as shown in FIG. 1, the inverter 30 may be connected to the distribution board 40 by a power line.

一実施形態において、インバータ30は、例えばパワーコンディショナのような装置又は機器などとしてもよい。また、インバータ30は、双方向インバータとしてもよい。この場合、太陽電池21、燃料電池22、蓄電池23、及び他の電源24から供給される直流の電力を交流の電力に変換することができ、電力系統100から供給される交流の電力を直流の電力に変換することもできる。上述のように、インバータ30は、第1制御装置10に、制御線によって接続されてよい。このような接続により、第1制御装置10は、インバータ30を制御することができる。 In one embodiment, the inverter 30 may be a device or appliance such as a power conditioner. Also, the inverter 30 may be a bi-directional inverter. In this case, the DC power supplied from the solar cell 21, the fuel cell 22, the storage battery 23, and the other power source 24 can be converted into AC power, and the AC power supplied from the power system 100 can be converted to DC power. It can also be converted into electricity. As mentioned above, the inverter 30 may be connected to the first controller 10 by control lines. This connection allows the first control device 10 to control the inverter 30 .

インバータ30は、電源20の少なくともいずれかから出力される電力の電圧を昇圧及び/又は降圧するDC/DCコンバータを備えてもよい。さらに、DC/DCコンバータは、電源20が蓄電池23の場合、当該蓄電池23に充電される電力を昇圧及び/又は降圧するものとしてもよい。また、上述のようなDC/DCコンバータは、インバータ30には備えられずに、電源20のそれぞれに含まれるものとしてもよい。また、インバータ30は、複数の電源20のそれぞれに含まれるものとしてもよい。 Inverter 30 may include a DC/DC converter that steps up and/or steps down the voltage of power output from at least one of power sources 20 . Furthermore, when the power source 20 is a storage battery 23, the DC/DC converter may step up and/or step down the power charged in the storage battery 23. Further, the DC/DC converter as described above may be included in each of the power supplies 20 instead of being provided in the inverter 30 . Moreover, the inverter 30 may be included in each of the plurality of power sources 20 .

分電盤40は、連系運転時に電力系統100から供給される電力を、複数の支幹に分岐させて、負荷50に分配してよい。また、分電盤40は、電源20の少なくともいずれかから供給される電力を、複数支幹に分岐させて負荷50に分配してもよい。このため、図1に示すように、分電盤40は、電力系統100及び負荷50に、電力線によって接続されてよい。 The distribution board 40 may branch the power supplied from the power system 100 during grid-connected operation to a plurality of branch trunks and distribute the branched power to the loads 50 . Moreover, the distribution board 40 may branch the power supplied from at least one of the power supplies 20 to a plurality of branches and distribute the power to the loads 50 . Therefore, as shown in FIG. 1, the distribution board 40 may be connected to the power system 100 and the load 50 by power lines.

また、一実施形態において、分電盤40は、第1制御装置10に電力を供給してもよい。このため、図1に示すように、分電盤40は、第1制御装置10に、電力線によって接続されてよい。 Also, in one embodiment, the distribution board 40 may supply power to the first control device 10 . Therefore, as shown in FIG. 1, the distribution board 40 may be connected to the first control device 10 by a power line.

負荷50は、システム1から電力が供給される電気製品などの各種の機器とすることができる。負荷50は、電力を消費する電力負荷であり、例えばビルなどの商工業施設で使用される空調機器及び照明器具などの機械又は設備等としてよい。また、負荷50は、例えば家庭内で使用されるエアコン、電子レンジ、テレビ等の各種電気製品などとしてもよい。図1において、負荷50は1つの機能ブロックとして示してあるが、負荷50は1つの機器には限定されず、任意の個数の各種機器などとすることができる。 The load 50 can be various devices such as appliances powered by the system 1 . The load 50 is a power load that consumes power, and may be, for example, machines or equipment such as air conditioners and lighting fixtures used in commercial and industrial facilities such as buildings. Also, the load 50 may be, for example, an air conditioner, a microwave oven, a television, or other electrical appliances used in the home. Although the load 50 is shown as one functional block in FIG. 1, the load 50 is not limited to one device, and can be any number of various devices.

負荷50は、分電盤40を介してインバータ30に接続されることにより、電源20から供給される電力を受電してよい。また、負荷50は、分電盤40を介して電力系統100から供給される電力を受電してもよい。このため、図1に示すように、負荷50は、分電盤40に、電力線によって接続されてよい。 The load 50 may receive power supplied from the power supply 20 by being connected to the inverter 30 via the distribution board 40 . Also, the load 50 may receive power supplied from the power system 100 via the distribution board 40 . Therefore, as shown in FIG. 1, the load 50 may be connected to the distribution board 40 by a power line.

図1に示すように、負荷50は、第1制御装置10及び第2制御装置200の少なくとも一方に、制御線によって接続されてよい。このような接続により、第1制御装置10及び第2制御装置200の少なくとも一方は、負荷50からの情報(例えば負荷50の消費電力の大きさの情報など)を受信することができる。 As shown in FIG. 1, the load 50 may be connected to at least one of the first controller 10 and the second controller 200 by control lines. Such a connection allows at least one of the first control device 10 and the second control device 200 to receive information from the load 50 (for example, information on the power consumption of the load 50, etc.).

センサ群60は、種々のセンサをまとめて示している。センサ群60は、システム1が設置される施設内に備えられる各種のセンサとしてよい。例えば、センサ群60は、システム1が設置される施設内に備えられる、人感センサ、温度センサ、及び湿度センサなどの少なくともいずれかとしてよい。センサ群60を人感センサとする場合、当該センサ群60は、例えばシステム1が設置される施設内の各部屋又は通路などの所定の場所に人間又は動物などが存在するか否かを検出するセンサとしてよい。また、センサ群60を温度及び/又は湿度センサとする場合、当該センサ群60は、例えばシステム1が設置される施設内の各部屋又は通路などの所定の場所の温度及び/又は湿度を検出するセンサとしてよい。 A sensor group 60 collectively shows various sensors. The sensor group 60 may be various sensors provided in the facility where the system 1 is installed. For example, the sensor group 60 may be at least one of a human sensor, a temperature sensor, a humidity sensor, and the like provided in the facility where the system 1 is installed. When the sensor group 60 is a human detection sensor, the sensor group 60 detects whether or not a human being or an animal exists in a predetermined place such as each room or corridor in the facility where the system 1 is installed. It can be used as a sensor. Further, when the sensor group 60 is a temperature and / or humidity sensor, the sensor group 60 detects the temperature and / or humidity of a predetermined place such as each room or passage in the facility where the system 1 is installed. It can be used as a sensor.

センサ群60によって検出された結果(例えば検出信号)は、第1制御装置10及び第2制御装置200の少なくとも一方に出力されてよい。このため、図1に示すように、センサ群60は、第1制御装置10及び第2制御装置200の少なくとも一方に、制御線によって接続されてよい。ここで、センサ群60によって検出される結果の検出信号とは、例えばセンサ群60を人感センサとする場合、当該センサ群60によって検出された人間又は動物などが存在するか否かの情報としてよい。また、センサ群60によって検出される結果の検出信号とは、センサ群60を温度及び/又は湿度センサとする場合、当該センサ群60によって検出された温度及び/又は湿度の情報としてよい。 A result (eg, detection signal) detected by the sensor group 60 may be output to at least one of the first control device 10 and the second control device 200 . Therefore, as shown in FIG. 1, the sensor group 60 may be connected to at least one of the first control device 10 and the second control device 200 by control lines. Here, the detection signal of the result detected by the sensor group 60 is, for example, when the sensor group 60 is a human sensor, information indicating whether or not a human being or an animal detected by the sensor group 60 exists. good. Further, when the sensor group 60 is a temperature and/or humidity sensor, the detection signal of the result detected by the sensor group 60 may be information on the temperature and/or humidity detected by the sensor group 60 .

電力系統100は、一般的な商用電力系統(グリッド)としてよい。 Power system 100 may be a typical commercial power system (grid).

第2制御装置200は、第1制御装置10と同様に、燃料電池22及び蓄電池23を制御する機能を有する。このような機能を実現するために、第2制御装置200は、燃料電池22及び蓄電池23のそれぞれに、有線又は無線によって接続されてよい。また、第2制御装置200は、他の電源24を制御する機能を有してもよい。この場合、第2制御装置200は、他の電源24に、有線又は無線によって接続されてよい。特に、第2制御装置200は、システム1から離れた場所に設置される場合、電源20のそれぞれに、無線によって接続されてよい。このように、一実施形態において、第2制御装置200は、複数の電源20のそれぞれに有線又は無線で接続されて、複数の電源20を制御する。さらに、第2制御装置200は、インバータ30を制御してもよい。このため、図1に示すように、第2制御装置200は、インバータ30に、有線又は無線によって接続されてよい。 The second control device 200 has a function of controlling the fuel cell 22 and the storage battery 23 in the same manner as the first control device 10 . In order to implement such functions, the second control device 200 may be connected to each of the fuel cell 22 and the storage battery 23 by wire or wirelessly. Also, the second control device 200 may have a function of controlling another power supply 24 . In this case, the second control device 200 may be wired or wirelessly connected to the other power supply 24 . In particular, the second control device 200 may be wirelessly connected to each of the power sources 20 when installed remotely from the system 1 . Thus, in one embodiment, the second controller 200 is wired or wirelessly connected to each of the plurality of power sources 20 to control the plurality of power sources 20 . Furthermore, the second control device 200 may control the inverter 30 . Therefore, as shown in FIG. 1, the second control device 200 may be connected to the inverter 30 by wire or wirelessly.

一実施形態において、第2制御装置200は、第1制御装置10と同様に、太陽電池21からの入力、負荷50からの入力、及びセンサ群60からの入力の少なくともいずれかに基づいて、制御を実行してよい。このため、図1に示すように、第2制御装置200は、太陽電池21、負荷50、及びセンサ群60のそれぞれに、有線又は無線によって接続されてよい。特に、第2制御装置200は、システム1から離れた場所に設置される場合、太陽電池21、負荷50、及びセンサ群60のそれぞれに、無線によって接続されてよい。第2制御装置200の構成及び動作などについては、さらに後述する。 In one embodiment, the second control device 200 performs control based on at least one of the input from the solar cell 21, the input from the load 50, and the input from the sensor group 60, similar to the first control device 10. may be executed. Therefore, as shown in FIG. 1, the second control device 200 may be connected to each of the solar cell 21, the load 50, and the sensor group 60 by wire or wirelessly. In particular, when the second control device 200 is installed at a location remote from the system 1 , it may be wirelessly connected to each of the solar cell 21 , the load 50 and the sensor group 60 . The configuration and operation of the second control device 200 will be further described later.

一実施形態に係るシステム1は、例えば図1に示すように、あるビル内に備えられるものとしてよい。図1においては、一点鎖線の右側を、あるビルのビル内として示してある。また、図1においては、一点鎖線の左側を、あるビルのビル外として、典型的には当該ビルから離れた遠隔地として示してある。すなわち、一実施形態において、第2制御装置200は、システム1が設置されたビルなどから遠隔地に設置されてもよい。また、一実施形態において、第2制御装置200は、システム1が設置されたビルなどから近くに設置されてもよい。 A system 1 according to an embodiment may be provided in a building, for example as shown in FIG. In FIG. 1, the right side of the dashed line is shown as the inside of a certain building. Also, in FIG. 1, the left side of the dashed line is shown as outside a certain building, typically as a remote location away from the building. That is, in one embodiment, the second control device 200 may be installed remotely from the building where the system 1 is installed. Also, in one embodiment, the second control device 200 may be installed near the building where the system 1 is installed.

図1に示すように、第1制御装置10は、分電盤40に、電力線によって接続されている。このため、第1制御装置10は、システム1が備えられたビルに電力を供給する電力系統100から供給される電力、及び/又は、システム1に含まれる電源20の少なくとも1つから供給される電力を受電することができる。一方、第2制御装置200は、例えば遠隔地に存在するなどの理由により、分電盤40に、電力線によって接続されていないことを想定している。このため、第2制御装置200は、システム1が供えられたビルに電力を供給する電力系統100から供給される電力を受電することができないことを想定している。第2制御装置200は、例えば、第2制御装置200が備えられた場所に電力を供給する電力系統から供給される電力、及び/又は、第2制御装置200のそばに設置された電源などから供給される電力によって動作することを想定している。このように、第2制御装置200が電力の供給を受けられない状況において、第2制御装置200は、電源20を制御することができない。 As shown in FIG. 1, the first control device 10 is connected to the distribution board 40 via power lines. For this reason, the first control device 10 is supplied with power supplied by the power system 100 that supplies power to the building in which the system 1 is installed, and/or is supplied by at least one of the power supply 20 included in the system 1. Power can be received. On the other hand, it is assumed that the second control device 200 is not connected to the distribution board 40 by a power line, for example, because it is located in a remote location. Therefore, it is assumed that the second control device 200 cannot receive power supplied from the power system 100 that supplies power to the building in which the system 1 is installed. The second control device 200, for example, power supplied from a power system that supplies power to the place where the second control device 200 is provided, and / or from a power supply installed near the second control device 200 It is assumed to operate with supplied power. Thus, the second control device 200 cannot control the power source 20 in a situation where the second control device 200 cannot receive power supply.

また、何らかの原因によって、第2制御装置200とシステム1との間の通信に不具合が発生すると、第2制御装置200と電源20との間の通信にも影響が及ぶことが想定される。このような状況においても、第2制御装置200は、電源20を制御することができないと想定される。 Further, if a problem occurs in communication between the second control device 200 and the system 1 for some reason, it is assumed that the communication between the second control device 200 and the power supply 20 will also be affected. It is assumed that the second control device 200 cannot control the power source 20 even in such a situation.

すなわち、例えば、第2制御装置200が電力の供給を受けられないような状況、及び/又は、第2制御装置200がシステム1と通信できないような状況などにおいては、第2制御装置200は電源20を制御できないことが想定される。 That is, for example, in a situation where the second control device 200 cannot receive power supply and/or a situation where the second control device 200 cannot communicate with the system 1, the second control device 200 is powered. 20 cannot be controlled.

一方、第1制御装置10は、電力系統100から供給される電力を受電することができない場合であっても、システム1の電源20の少なくともいずれかが発電する電力によって動作することができる。すなわち、第1制御装置10は、例えば停電などの非常時においても、システム1の電源20の制御を行うことができるため、システム1の電源20の発電を停止せずに、電源20の制御を続けることができる。 On the other hand, even if the first control device 10 cannot receive power supplied from the power system 100 , it can operate using power generated by at least one of the power sources 20 of the system 1 . That is, since the first control device 10 can control the power supply 20 of the system 1 even in an emergency such as a power failure, the power supply 20 can be controlled without stopping power generation of the power supply 20 of the system 1. can continue.

次に、図1に示した第1制御装置10について、さらに説明する。図2は、一実施形態に係る第1制御装置10の概略構成を示す機能ブロック図である。 Next, the first control device 10 shown in FIG. 1 will be further described. FIG. 2 is a functional block diagram showing a schematic configuration of the first control device 10 according to one embodiment.

図2に示すように、一実施形態に係る第1制御装置10は、コントローラ12と、記憶部14と、通信部16とを備えてよい。 As shown in FIG. 2 , the first control device 10 according to one embodiment may include a controller 12 , a storage section 14 and a communication section 16 .

コントローラ12は、種々の機能を実行するための制御及び処理能力を提供するために、例えばCPU(Central Processing Unit)のような、少なくとも1つのプロセッサを含んでよい。コントローラ12は、まとめて1つのプロセッサで実現してもよいし、いくつかのプロセッサで実現してもよいし、それぞれ個別のプロセッサで実現してもよい。プロセッサは、単一の集積回路として実現されてよい。集積回路は、IC(Integrated Circuit)ともいう。プロセッサは、複数の通信可能に接続された集積回路及びディスクリート回路として実現されてよい。プロセッサは、他の種々の既知の技術に基づいて実現されてよい。一実施形態において、コントローラ12は、例えばCPU及び当該CPUで実行されるプログラムとして構成してよい。コントローラ12において実行されるプログラム、及び、コントローラ12において実行された処理の結果などは、記憶部14に記憶してよい。 Controller 12 may include at least one processor, such as a CPU (Central Processing Unit), to provide control and processing power for performing various functions. The controller 12 may be implemented collectively by one processor, may be implemented by several processors, or may be implemented by individual processors. A processor may be implemented as a single integrated circuit. An integrated circuit is also called an IC (Integrated Circuit). A processor may be implemented as a plurality of communicatively coupled integrated and discrete circuits. Processors may be implemented based on various other known technologies. In one embodiment, controller 12 may be configured, for example, as a CPU and a program executed by the CPU. Programs executed by the controller 12 and results of processes executed by the controller 12 may be stored in the storage unit 14 .

一実施形態において、コントローラ12は、図2に示すように、入力信号に基づいて処理を行うことができる。ここで、図2に示す入力信号とは、例えば、太陽電池21からの入力信号、負荷50からの入力信号、及び/又は、センサ群60からの入力信号などとしてよい。また、一実施形態において、コントローラ12は、図2に示すように、電源20の少なくともいずれかを制御する電源制御信号を出力することができる。ここで、図2に示す電源制御信号とは、電源20のうち、例えば、燃料電池22、蓄電池23、及び他の電源24の少なくともいずれかを制御する信号としてよい。このように、一実施形態において、第1制御装置10は、複数の電源20を制御するコントローラ12を備えてよい。一実施形態に係るコントローラ12の動作については、さらに後述する。 In one embodiment, controller 12 may perform processing based on input signals, as shown in FIG. Here, the input signal shown in FIG. 2 may be an input signal from the solar cell 21, an input signal from the load 50, and/or an input signal from the sensor group 60, for example. In one embodiment, the controller 12 may also output power control signals to control at least one of the power supplies 20, as shown in FIG. Here, the power supply control signal shown in FIG. 2 may be a signal for controlling at least one of the fuel cell 22, the storage battery 23, and the other power supply 24 among the power supplies 20, for example. Thus, in one embodiment, the first controller 10 may comprise a controller 12 that controls multiple power sources 20 . The operation of the controller 12 according to one embodiment is further described below.

記憶部14は、コントローラ12及び通信部16などから取得した各種情報を記憶する。一実施形態において、記憶部14は、ユーザなどが入力した情報も記憶してよい。また、記憶部14は、コントローラ12によって実行されるプログラム等を記憶する。その他、記憶部14は、例えばコントローラ12による演算結果などの各種データも記憶する。さらに、記憶部14は、コントローラ12が動作する際のワークメモリ等も含むものとしてもよい。記憶部14は、例えば半導体メモリ又は磁気ディスク等により構成することができるが、これらに限定されず、任意の記憶装置とすることができる。例えば、記憶部14は、本実施形態に係る第1制御装置10に挿入されたメモリカードのような記憶媒体としてもよい。また、記憶部14は、コントローラ12として用いられるCPUの内部メモリであってもよい。 The storage unit 14 stores various information acquired from the controller 12, the communication unit 16, and the like. In one embodiment, the storage unit 14 may also store information input by a user or the like. The storage unit 14 also stores programs and the like executed by the controller 12 . In addition, the storage unit 14 also stores various data such as calculation results by the controller 12, for example. Furthermore, the storage unit 14 may also include a work memory or the like used when the controller 12 operates. The storage unit 14 can be configured by, for example, a semiconductor memory, a magnetic disk, or the like, but is not limited to these, and can be an arbitrary storage device. For example, the storage unit 14 may be a storage medium such as a memory card inserted into the first control device 10 according to this embodiment. Also, the storage unit 14 may be an internal memory of the CPU used as the controller 12 .

通信部16は、無線通信をはじめとする各種の機能を実現することができる。通信部16は、例えばLTE(Long Term Evolution)等の種々の通信方式による通信を実現してよい。通信部16は、例えばITU-T(International Telecommunication Union Telecommunication Standardization Sector)において通信方式が標準化されたモデムを含んでよい。また、通信部16は、例えばWiFi又はBluetooth(登録商標)等の種々の方式による無線通信を実現してもよい。通信部16は、例えばアンテナを介して、例えば外部サーバなどの通信部と無線通信してもよい。通信部16が送受信する各種の情報は、例えば記憶部14に記憶してもよい。通信部16は、例えば電波を送受信するアンテナ及び適当なRF部などを含めて構成してよい。通信部16は、無線通信を行うための既知の技術により構成することができるため、より詳細なハードウェアの説明は省略する。 The communication unit 16 can implement various functions including wireless communication. The communication unit 16 may realize communication according to various communication schemes such as LTE (Long Term Evolution). The communication unit 16 may include a modem whose communication method is standardized by the ITU-T (International Telecommunication Union Telecommunication Standardization Sector), for example. Also, the communication unit 16 may realize wireless communication by various methods such as WiFi or Bluetooth (registered trademark). The communication unit 16 may wirelessly communicate with a communication unit such as an external server, for example, via an antenna. Various types of information transmitted and received by the communication unit 16 may be stored in the storage unit 14, for example. The communication unit 16 may include, for example, an antenna for transmitting and receiving radio waves and an appropriate RF unit. Since the communication unit 16 can be configured by a known technology for wireless communication, a more detailed description of hardware is omitted.

一実施形態において、他の電子機器の送信部から送信されて、第1制御装置10の通信部16が受信した情報は、記憶部14に記憶してもよいし、コントローラ12によって処理してもよい。また、一実施形態において、記憶部14に記憶した情報及び/又はコントローラ12によって処理した情報は、通信部16から他の電子機器の受信部に送信してもよい。 In one embodiment, information transmitted from a transmission unit of another electronic device and received by the communication unit 16 of the first control device 10 may be stored in the storage unit 14 or processed by the controller 12. good. Further, in one embodiment, the information stored in the storage unit 14 and/or the information processed by the controller 12 may be transmitted from the communication unit 16 to the receiving unit of another electronic device.

図1及び図2に示すように、第1制御装置10は、電力系統100又は電源20の少なくとも一方から電力の供給を受けることができる。このようにして供給された電力によって、第1制御装置10は、種々の制御の動作を行うことができる。典型的には、第1制御装置10のコントローラ12は、太陽電池21、負荷50、及び/又はセンサ群60などからの入力信号に基づいて、燃料電池22、蓄電池23、及び他の電源24の少なくともいずれかを制御してよい。 As shown in FIGS. 1 and 2 , the first control device 10 can receive power from at least one of the power system 100 and the power source 20 . The power supplied in this way allows the first control device 10 to perform various control operations. Typically, controller 12 of first controller 10 controls fuel cell 22, storage battery 23, and other power sources 24 based on input signals from solar cell 21, load 50, and/or sensors 60, and the like. At least one of them may be controlled.

このような制御のため、コントローラ12は、現在の負荷50の大きさを取得してよい。このような取得により、コントローラ12は、負荷50が消費する電力に応じて、電力系統100から売電する電力、及び/又は、電源20が発電する電力を制御することができる。 For such control, the controller 12 may obtain the current magnitude of the load 50 . With such acquisition, the controller 12 can control the power sold from the power grid 100 and/or the power generated by the power supply 20 according to the power consumed by the load 50 .

このように、一実施形態において、コントローラ12は、負荷50の消費電力に応じて、複数の電源20の少なくともいずれかを制御してもよい。 Thus, in one embodiment, the controller 12 may control at least one of the multiple power sources 20 according to the power consumption of the load 50 .

さらに、上述のような制御のため、コントローラ12は、負荷50の大きさの時間変化を収集して、記憶部14に蓄積してよい。このような蓄積により、コントローラ12は、負荷50が消費する電力の消費の時間変化のパターンを得ることができる。コントローラ12は、このようなパターンに基づいて、未来の負荷50の発生するパターンを予測することができる。 Furthermore, for the control as described above, the controller 12 may collect temporal changes in the magnitude of the load 50 and store them in the storage unit 14 . By such accumulation, the controller 12 can obtain the pattern of time change of power consumption consumed by the load 50 . Based on such a pattern, the controller 12 can predict the pattern that the load 50 will occur in the future.

このように、一実施形態において、コントローラ12は、負荷50の消費電力の過去の履歴に基づいて、複数の電源20の少なくともいずれかを制御してもよい。また、一実施形態において、コントローラ12は、負荷50の消費電力の予測に基づいて、複数の電源20の少なくともいずれかを制御してもよい。 Thus, in one embodiment, the controller 12 may control at least one of the power supplies 20 based on the past history of power consumption of the load 50 . Further, in one embodiment, the controller 12 may control at least one of the power supplies 20 based on the power consumption prediction of the load 50 .

また、コントローラ12は、システム1が設置されたビルなどにおける現在の人員の存在状況を取得してよい。このような取得により、コントローラ12は、人員の存在状況に応じて、電力系統100から売電する電力、及び/又は、電源20が発電する電力を制御することができる。さらに、コントローラ12は、システム1が設置されたビルなどにおける人員の存在状況の時間変化を収集して、記憶部14に蓄積してよい。このような蓄積により、コントローラ12は、システム1が設置されたビルなどにおける人員の存在状況の時間変化のパターンを得ることができる。コントローラ12は、このようなパターンに基づいて、システム1が設置されたビルなどにおける未来の人員の存在状況のパターンを予測することができる。 Also, the controller 12 may acquire the current presence status of personnel in a building or the like in which the system 1 is installed. With such acquisition, the controller 12 can control the power sold from the power system 100 and/or the power generated by the power supply 20 according to the presence of personnel. Furthermore, the controller 12 may collect temporal changes in the presence of personnel in a building or the like in which the system 1 is installed, and store them in the storage unit 14 . By such accumulation, the controller 12 can obtain a pattern of temporal changes in the presence of personnel in a building or the like in which the system 1 is installed. Based on such patterns, the controller 12 can predict future patterns of presence of personnel in a building or the like in which the system 1 is installed.

また、コントローラ12は、システム1が設置されたビルなどにおける現在の温度及び/又は湿度の状況を取得してよい。このような取得により、コントローラ12は、温度及び/又は湿度の状況に応じて、電力系統100から売電する電力、及び/又は、電源20が発電する電力を制御することができる。さらに、コントローラ12は、システム1が設置されたビルなどにおける温度及び/又は湿度の状況の時間変化を収集して、記憶部14に蓄積してよい。このような蓄積により、コントローラ12は、システム1が設置されたビルなどにおける温度及び/又は湿度の状況の時間変化のパターンを得ることができる。コントローラ12は、このようなパターンに基づいて、システム1が設置されたビルなどにおける未来の温度及び/又は湿度の状況のパターンを予測することができる。 Also, the controller 12 may acquire the current temperature and/or humidity conditions in a building or the like in which the system 1 is installed. Such acquisition allows the controller 12 to control the power sold from the power grid 100 and/or the power generated by the power supply 20 according to temperature and/or humidity conditions. Furthermore, the controller 12 may collect temporal changes in temperature and/or humidity conditions in a building or the like in which the system 1 is installed, and store them in the storage unit 14 . Such accumulation enables the controller 12 to obtain patterns of time-varying temperature and/or humidity conditions in a building or the like in which the system 1 is installed. Based on such patterns, the controller 12 can predict future patterns of temperature and/or humidity conditions in a building or the like in which the system 1 is installed.

さらに、コントローラ12は、予め設定されて記憶部14に記憶された消費電力の情報に基づいて、複数の電源20の少なくともいずれかが出力する電力の大きさなどを制御してもよい。この場合、コントローラ12は、電力系統100から買電する電力の情報、及び/又は、システム1において供給可能な電力の情報を加味した上で、複数の電源20の少なくともいずれかが出力する電力の大きさなどを制御してもよい。このような制御によれば、電力系統100から買電する電力が、例えば予め設定した電力を超えないように(例えば予め設定した所定値以下になるように)制御することができる。 Further, the controller 12 may control the magnitude of power output by at least one of the plurality of power sources 20 based on power consumption information preset and stored in the storage unit 14 . In this case, the controller 12 determines the power output from at least one of the plurality of power sources 20 after taking into account information on power purchased from the power grid 100 and/or information on power that can be supplied in the system 1. You can control the size and so on. According to such control, it is possible to control the power purchased from the power system 100 so as not to exceed, for example, a preset power (for example, so as to be equal to or less than a preset predetermined value).

このように、一実施形態において、コントローラ12は、電力系統100から買電する電力が所定量以下になるように、複数の電源20の少なくともいずれかを制御してもよい。 Thus, in one embodiment, the controller 12 may control at least one of the plurality of power sources 20 so that the power purchased from the power grid 100 is equal to or less than a predetermined amount.

次に、図1に示した第2制御装置200について、さらに説明する。 Next, the second control device 200 shown in FIG. 1 will be further described.

第2制御装置200は、例えば遠隔地のような、システム1が設置されたビルなどの外部から電源20の少なくともいずれかを制御することができる装置としてよい。一実施形態において、第2制御装置200は、例えば電源20の少なくともいずれかを例えば遠隔地から制御するBEMSに含まれる装置としてもよい。 The second control device 200 may be a device capable of controlling at least one of the power supplies 20 from outside the building in which the system 1 is installed, for example at a remote location. In one embodiment, the second control device 200 may be, for example, a device included in a BEMS that controls at least one of the power sources 20, for example, remotely.

図3は、一実施形態に係る第2制御装置200の概略構成を示す機能ブロック図である。図3に示すように、一実施形態に係る第2制御装置200は、コントローラ120と、記憶部140と、通信部160とを備えてよい。 FIG. 3 is a functional block diagram showing a schematic configuration of the second control device 200 according to one embodiment. As shown in FIG. 3 , the second control device 200 according to one embodiment may include a controller 120 , a storage section 140 and a communication section 160 .

コントローラ120は、図2に示した第1制御装置10のコントローラ12と同様に構成してもよいし、異なる構成としてもよい。コントローラ120は、図2に示した第1制御装置10のコントローラ12と同じような機能を備える任意の構成としてよい。 The controller 120 may have the same configuration as the controller 12 of the first control device 10 shown in FIG. 2, or may have a different configuration. Controller 120 may be any configuration that provides similar functionality to controller 12 of first control device 10 shown in FIG.

記憶部140は、図2に示した第1制御装置10の記憶部14と同様に構成してもよいし、異なる構成としてもよい。記憶部140は、図2に示した第1制御装置10の記憶部14と同じような機能を備える任意の構成としてよい。 The storage unit 140 may have the same configuration as the storage unit 14 of the first control device 10 shown in FIG. 2, or may have a different configuration. The storage unit 140 may have any configuration having the same functions as the storage unit 14 of the first control device 10 shown in FIG.

通信部160は、図2に示した第1制御装置10の通信部16と同様に構成してもよいし、異なる構成としてもよい。通信部160は、図2に示した第1制御装置10の通信部16と同じような機能を備える任意の構成としてよい。 The communication unit 160 may have the same configuration as the communication unit 16 of the first control device 10 shown in FIG. 2, or may have a different configuration. The communication unit 160 may have any configuration having the same functions as the communication unit 16 of the first control device 10 shown in FIG.

上述のように、複数の電源20のそれぞれは、複数の電源20を制御する第2制御装置200のような他の制御装置に有線又は無線で接続されてよい。このような接続により、第2制御装置200は、第1制御装置10と同様に、負荷50が消費する電力に応じて、電力系統100から売電する電力、及び/又は、電源20が発電する電力を制御することができる。 As described above, each of the plurality of power sources 20 may be wired or wirelessly connected to another controller, such as a second controller 200 that controls the plurality of power sources 20 . With such a connection, the second control device 200, like the first control device 10, sells power from the power system 100 and/or the power source 20 generates power according to the power consumed by the load 50. Power can be controlled.

一実施形態に係る第2制御装置200が第1制御装置10とは異なる点として、第2制御装置200は、上述のように、電力系統100又は電源20のようなシステム1側からの電力の供給を受けることができない点が挙げられる。したがって、第2制御装置200が第1制御装置10と同様に電源20の制御を行うためには、第2制御装置200は例えば電力系統100以外から電力の供給を受けられる状況にある必要がある。 The second control device 200 differs from the first control device 10 in that, as described above, the second control device 200 receives power from the system 1 side such as the power system 100 or the power supply 20. The point is that it is not possible to receive supplies. Therefore, in order for the second control device 200 to control the power supply 20 in the same manner as the first control device 10, the second control device 200 needs to be in a state where it can receive power supply from, for example, other than the power system 100. .

また、一実施形態に係る第2制御装置200が第1制御装置10とは異なる点として、第2制御装置200は、上述のように、システム1側との良好な通信が確保されていないと、電源20を制御することができない点が挙げられる。すなわち、第2制御装置200は、システム1が例えば停電などの原因により電力系統100から電力の供給を受けられない場合、システム1側との通信ができないため、電源20の制御を行うことができないことが想定される。 Further, the second control device 200 according to one embodiment differs from the first control device 10 in that the second control device 200 does not ensure good communication with the system 1 side as described above. , the power supply 20 cannot be controlled. That is, when the system 1 cannot receive power supply from the power system 100 due to a power failure or the like, the second control device 200 cannot control the power source 20 because it cannot communicate with the system 1 side. is assumed.

すなわち、上述のように、例えば、第2制御装置200が電力の供給を受けられない状況、及び/又は、第2制御装置200がシステム1と通信できない状況などにおいては、第2制御装置200が電源20を制御できないことも想定される。このような状況においては、システム1は、第2制御装置200による制御に基づいて電源20の出力を負荷50に供給することができない。 That is, as described above, for example, in a situation where the second control device 200 cannot receive power supply and/or a situation where the second control device 200 cannot communicate with the system 1, the second control device 200 It is also assumed that the power supply 20 cannot be controlled. Under such circumstances, the system 1 cannot supply the output of the power supply 20 to the load 50 under the control of the second control device 200 .

しかしながら、このような場合でも、一実施形態に係るシステム1において、第1制御装置10は、電源20の少なくともいずれかからの電力供給を受けながら、電源20の少なくともいずれかを制御することができる。当然ながら、第1制御装置10は、システム1が電力系統100から電力の供給を受けられる場合、すなわち第1制御装置10が電力系統100から電力の供給を受けられる場合、電源20の少なくともいずれかを制御することができる。この場合、第2制御装置200が電源20の少なくともいずれかを制御してもよい。 However, even in such a case, in the system 1 according to one embodiment, the first control device 10 can control at least one of the power sources 20 while receiving power supply from at least one of the power sources 20. . Naturally, the first control device 10 is configured to operate at least one of the power sources 20 when the system 1 can receive power from the power grid 100 , i.e. when the first control device 10 can receive power from the power grid 100 . can be controlled. In this case, the second control device 200 may control at least one of the power sources 20 .

このように、第1制御装置10が電力系統100から電力の供給を受けることができる状態において、第1制御装置10及び第2制御装置200の少なくとも一方は、複数の電源20を制御可能である。この場合、複数の電源20のそれぞれは、第1制御装置10が電力系統100から電力の供給を受けることができる状態において、第1制御装置10及び第2制御装置200の少なくとも一方によって制御可能としてよい。一方、第1制御装置10が電力系統100から電力の供給を受けることができない状態において、第1制御装置10は複数の電源20の少なくともいずれかから供給される電力によって動作する。このような状況において、システム1は、第1制御装置10による制御に基づいて、電源20の少なくともいずれかの出力を負荷50に供給することができる。 Thus, in a state where the first control device 10 can receive power from the power system 100, at least one of the first control device 10 and the second control device 200 can control the plurality of power supplies 20. . In this case, each of the plurality of power sources 20 is controllable by at least one of the first control device 10 and the second control device 200 in a state where the first control device 10 can receive power supply from the power system 100. good. On the other hand, in a state in which the first control device 10 cannot receive power supply from the power system 100 , the first control device 10 operates with power supplied from at least one of the plurality of power sources 20 . Under such circumstances, the system 1 can supply at least one output of the power supply 20 to the load 50 under the control of the first controller 10 .

次に、一実施形態に係るシステム1の動作について説明する。図4は、一実施形態に係る第1制御装置10を含むシステム1の動作を説明するフローチャートである。図4に示す動作は、システム1の稼働状態において、常時継続して(絶え間なく)行うものとしてよい。また、図4に示す動作は、システム1の稼働状態において、所定時間ごとに(例えば1分おきに)行うものとしてもよい。図4に示す動作の主体は、システム1における第1制御装置10としてもよいし、システム1における他の装置としてもよい。 Next, operation of the system 1 according to one embodiment will be described. FIG. 4 is a flow chart explaining the operation of the system 1 including the first control device 10 according to one embodiment. The operation shown in FIG. 4 may be performed continuously (incessantly) while the system 1 is in operation. Moreover, the operation shown in FIG. 4 may be performed at predetermined time intervals (for example, at intervals of one minute) while the system 1 is in operation. The subject of the operation shown in FIG. 4 may be the first control device 10 in the system 1 or may be another device in the system 1 .

図4に示す動作が開始すると、システム1における第1制御装置10が電力系統100から電力供給を受けることができるか否かを判定する(ステップS1)。ステップS1において、電力系統100が正常に電力の供給を行っている場合、システム1における第1制御装置10は、電力系統100から電力供給を受けることができる。一方、ステップS1において、例えば停電などの原因により電力系統100が正常に電力の供給を行っていない場合、システム1における第1制御装置10は、電力系統100から電力供給を受けることができないことが想定される。 When the operation shown in FIG. 4 starts, it is determined whether or not the first control device 10 in the system 1 can receive power supply from the power system 100 (step S1). In step S<b>1 , when the power system 100 is normally supplying power, the first control device 10 in the system 1 can receive power supply from the power system 100 . On the other hand, in step S1, when the power system 100 does not normally supply power due to a power failure or the like, the first control device 10 in the system 1 cannot receive power supply from the power system 100. is assumed.

ステップS1において電力系統100が電力供給を受けられる場合、第1制御装置10及び第2制御装置200の少なくとも一方は、複数の電源20を制御してよい(ステップS2)。 When the power system 100 can receive power supply in step S1, at least one of the first control device 10 and the second control device 200 may control the plurality of power sources 20 (step S2).

一方、ステップS1において電力系統100が電力供給を受けられない場合、第1制御装置10が、複数の電源20を制御してよい(ステップS3)。ステップS3において、第1制御装置10は複数の電源20の少なくともいずれかから供給される電力によって動作してよい。 On the other hand, when the power system 100 cannot receive power supply in step S1, the first control device 10 may control the plurality of power sources 20 (step S3). In step S<b>3 , the first control device 10 may operate with power supplied from at least one of the plurality of power sources 20 .

以上説明したように、一実施形態に係るシステム1は、例えば停電などの原因により電力系統100から電力供給を受けることができない場合でも、複数の電源20を制御することができる。このため、太陽電池、燃料電池、及び蓄電池のような複数の電源を制御するシステムが動作可能な場面を拡張することができる。したがって、一実施形態に係るシステム1によれば、複数の電源の非常時の電力供給能力を高めることができる。 As described above, the system 1 according to one embodiment can control the plurality of power sources 20 even when power cannot be supplied from the power system 100 due to a power failure or the like. Therefore, it is possible to expand the situations in which a system that controls a plurality of power sources such as solar cells, fuel cells, and storage batteries can operate. Therefore, according to the system 1 according to one embodiment, it is possible to increase the power supply capacity of the plurality of power supplies in an emergency.

本開示を諸図面及び実施例に基づき説明してきたが、当業者であれば本開示に基づき種々の変形又は修正を行うことが容易であることに注意されたい。したがって、これらの変形又は修正は本開示の範囲に含まれることに留意されたい。例えば、各機能部に含まれる機能などは論理的に矛盾しないように再配置可能である。複数の機能部等は、1つに組み合わせられたり、分割されたりしてよい。上述した本開示に係る各実施形態は、それぞれ説明した各実施形態に忠実に実施することに限定されるものではなく、適宜、各特徴を組み合わせたり、一部を省略したりして実施され得る。つまり、本開示の内容は、当業者であれば本開示に基づき種々の変形および修正を行うことができる。したがって、これらの変形および修正は本開示の範囲に含まれる。例えば、各実施形態において、各機能部、各手段、各ステップなどは論理的に矛盾しないように他の実施形態に追加し、若しくは、他の実施形態の各機能部、各手段、各ステップなどと置き換えることが可能である。また、各実施形態において、複数の各機能部、各手段、各ステップなどを1つに組み合わせたり、或いは分割したりすることが可能である。また、上述した本開示の各実施形態は、それぞれ説明した各実施形態に忠実に実施することに限定されるものではなく、適宜、各特徴を組み合わせたり、一部を省略したりして実施することもできる。 Although the present disclosure has been described with reference to figures and examples, it should be noted that various variations or modifications will be readily apparent to those skilled in the art based on the present disclosure. Therefore, it should be noted that these variations or modifications are included within the scope of this disclosure. For example, the functions included in each functional unit can be rearranged so as not to be logically inconsistent. A plurality of functional units and the like may be combined into one or divided. The above-described embodiments according to the present disclosure are not limited to faithful implementation of the respective described embodiments, and can be implemented by combining features or omitting some of them as appropriate. . That is, the contents of the present disclosure can be variously modified and modified based on the present disclosure by those skilled in the art. Accordingly, these variations and modifications are included within the scope of this disclosure. For example, in each embodiment, each functional unit, each means, each step, etc. are added to other embodiments so as not to be logically inconsistent, or each functional unit, each means, each step, etc. of other embodiments can be replaced with Also, in each embodiment, it is possible to combine a plurality of functional units, means, steps, etc. into one or divide them. In addition, the above-described embodiments of the present disclosure are not limited to faithful implementation of the respective described embodiments, and may be implemented by combining features or omitting some of them as appropriate. can also

例えば、上述の実施形態においては、システム1は燃料電池22が発電する電力のみを制御するものとして説明した。しかしながら、燃料電池22は例えば給湯などのような熱も出力する。このため、システム1は、燃料電池22が出力する熱についても、電源20が出力する電力と同様に制御してもよい。 For example, in the embodiments described above, the system 1 is described as controlling only the power generated by the fuel cell 22 . However, the fuel cell 22 also outputs heat, such as hot water supply. Therefore, the system 1 may control the heat output by the fuel cell 22 in the same manner as the power output by the power supply 20 .

上述した実施形態は、システム1としての実施のみに限定されるものではない。例えば、上述した実施形態は、システム1に含まれる第1制御装置10のような制御装置として実施してもよい。さらに、例えば、上述した実施形態は、第1制御装置10が実行するプログラムとして実施してもよい。 The embodiments described above are not limited to implementation as system 1 only. For example, the embodiments described above may be implemented as a controller such as the first controller 10 included in the system 1 . Furthermore, for example, the embodiment described above may be implemented as a program executed by the first control device 10 .

2015年9月の国連サミットにおいて採択された17の国際目標として、「持続可能な開発目標(Sustainable Development Goals:SDGs)」がある。一実施形態に係る第1制御装置10及び当該第1制御装置10を含むシステム1は、このSDGsの17の目標のうち、例えば「7.エネルギーをみんなに そしてクリーンに」、「9.産業と技術革新の基盤をつくろう」、及び「11.「住み続けられるまちづくりを」の目標などの達成に貢献し得る。 The 17 international goals adopted at the United Nations Summit in September 2015 are the "Sustainable Development Goals: SDGs". The first control device 10 according to one embodiment and the system 1 including the first control device 10 are among the 17 goals of the SDGs, for example, "7. Energy for everyone and clean", "9. Industry and Let's create a foundation for technological innovation" and "11. Developing a city where people can continue to live."

1 システム
10 第1制御装置
12 コントローラ
14 記憶部
16 通信部
21 太陽電池
22 燃料電池
23 蓄電池
24 他の電源
30 インバータ
40 分電盤
50 負荷
60 センサ群
100 電力系統
200 第2制御装置
120 コントローラ
140 記憶部
160 通信部

1 system 10 first control device 12 controller 14 storage unit 16 communication unit 21 solar cell 22 fuel cell 23 storage battery 24 other power source 30 inverter 40 distribution board 50 load 60 sensor group 100 power system 200 second control device 120 controller 140 storage Part 160 Communication part

Claims (7)

料電池及び蓄電池を含み、負荷に電力を供給可能な複数の電源と、
前記複数の電源のそれぞれに有線接続されて当該複数の電源を制御する第1制御装置と、
前記複数の電源のそれぞれに有線又は無線で接続されて当該複数の電源を制御する第2制御装置と、
を含むシステムであって、
前記第1制御装置が電力系統から電力の供給を受けることができる状態において、当該第1制御装置及び前記第2制御装置の少なくとも一方は前記複数の電源を制御可能であり、
前記第1制御装置が電力系統から電力の供給を受けることができない状態において、当該第1制御装置は前記複数の電源の少なくともいずれかから供給される電力によって動作する、システム。
a plurality of power sources, including fuel cells and storage batteries, capable of supplying power to loads;
a first control device connected by wire to each of the plurality of power sources and controlling the plurality of power sources;
a second control device that is wired or wirelessly connected to each of the plurality of power sources and controls the plurality of power sources;
A system comprising
at least one of the first control device and the second control device is capable of controlling the plurality of power sources in a state where the first control device can receive power from a power system;
The system according to claim 1, wherein the first control device operates with power supplied from at least one of the plurality of power sources in a state in which the first control device cannot receive power supply from a power system.
前記第1制御装置は、前記負荷の消費電力に応じて、前記複数の電源の少なくともいずれかを制御する、請求項1に記載のシステム2. The system according to claim 1, wherein said first control device controls at least one of said plurality of power supplies according to the power consumption of said load. 前記第1制御装置は、前記負荷の消費電力の過去の履歴に基づいて、前記複数の電源の少なくともいずれかを制御する、請求項1又は2に記載のシステム 3. The system according to claim 1, wherein said first control device controls at least one of said plurality of power supplies based on a past history of power consumption of said load. 前記第1制御装置は、前記負荷の消費電力の予測に基づいて、前記複数の電源の少なくともいずれかを制御する、請求項1から3のいずれかに記載のシステム 4. The system according to any one of claims 1 to 3, wherein said first control device controls at least one of said plurality of power supplies based on a prediction of power consumption of said load. 前記第1制御装置は、前記電力系統から買電する電力が所定量以下になるように、前記複数の電源の少なくともいずれかを制御する、請求項1から4のいずれかに記載のシステム 5. The system according to any one of claims 1 to 4, wherein said first control device controls at least one of said plurality of power sources so that power purchased from said power system is equal to or less than a predetermined amount. 太陽電池からの入力信号に基づいて制御される燃料電池及び蓄電池を含み、負荷に電力を供給可能な複数の電源と、
前記複数の電源のそれぞれに有線接続されて当該複数の電源を制御する第1制御装置と、
前記複数の電源のそれぞれに有線又は無線で接続されて当該複数の電源を制御する第2制御装置と、
を含むシステムであって、
前記第1制御装置が電力系統から電力の供給を受けることができる状態において、当該第1制御装置及び前記第2制御装置の少なくとも一方は前記複数の電源を制御可能であり、
前記第1制御装置が電力系統から電力の供給を受けることができない状態において、当該第1制御装置は前記複数の電源の少なくともいずれかから供給される電力によって動作する、システム。
a plurality of power sources capable of supplying power to loads, including fuel cells and storage batteries controlled based on input signals from solar cells;
a first control device connected by wire to each of the plurality of power sources and controlling the plurality of power sources;
a second control device that is wired or wirelessly connected to each of the plurality of power sources and controls the plurality of power sources;
A system comprising
at least one of the first control device and the second control device is capable of controlling the plurality of power sources in a state where the first control device can receive power from a power system;
The system according to claim 1, wherein the first control device operates with power supplied from at least one of the plurality of power sources in a state in which the first control device cannot receive power supply from a power system.
太陽電池からの入力信号に基づいて制御される燃料電池及び蓄電池を含み、負荷に電力を供給可能な複数の電源と、
前記太陽電池及び前記複数の電源の少なくともいずれかから供給される電力を変換するインバータと、
前記複数の電源のそれぞれに有線接続されて当該複数の電源を制御する第1制御装置と、
前記複数の電源のそれぞれに有線又は無線で接続されて当該複数の電源を制御する第2制御装置と、
を含むシステムであって、
前記第1制御装置が電力系統から電力の供給を受けることができる状態において、当該第1制御装置及び前記第2制御装置の少なくとも一方は前記複数の電源を制御可能であり、
前記第1制御装置が電力系統から電力の供給を受けることができない状態において、当該第1制御装置は前記複数の電源の少なくともいずれかから供給される電力によって動作し、
前記インバータは、前記第1制御装置及び前記第2制御装置の少なくとも一方によって制御可能である、システム。
a plurality of power sources capable of supplying power to loads, including fuel cells and storage batteries controlled based on input signals from solar cells;
an inverter that converts power supplied from at least one of the solar cell and the plurality of power sources;
a first control device connected by wire to each of the plurality of power sources and controlling the plurality of power sources;
a second control device that is wired or wirelessly connected to each of the plurality of power sources and controls the plurality of power sources;
A system comprising
at least one of the first control device and the second control device is capable of controlling the plurality of power sources in a state where the first control device can receive power from a power system;
In a state in which the first control device cannot receive power supply from the power system, the first control device operates with power supplied from at least one of the plurality of power sources ,
The system , wherein the inverter is controllable by at least one of the first controller and the second controller .
JP2019187995A 2019-10-11 2019-10-11 Power control device and system Active JP7274396B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019187995A JP7274396B2 (en) 2019-10-11 2019-10-11 Power control device and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019187995A JP7274396B2 (en) 2019-10-11 2019-10-11 Power control device and system

Publications (2)

Publication Number Publication Date
JP2021065020A JP2021065020A (en) 2021-04-22
JP7274396B2 true JP7274396B2 (en) 2023-05-16

Family

ID=75488213

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019187995A Active JP7274396B2 (en) 2019-10-11 2019-10-11 Power control device and system

Country Status (1)

Country Link
JP (1) JP7274396B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7825946B2 (en) * 2021-05-25 2026-03-09 東京瓦斯株式会社 Distributed Power Systems
JP7736154B1 (en) * 2024-12-04 2025-09-09 富士電機株式会社 Power System

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011083084A (en) 2009-10-05 2011-04-21 Panasonic Electric Works Co Ltd Power supply system and method of controlling the same
JP2011101529A (en) 2009-11-06 2011-05-19 Panasonic Electric Works Co Ltd Power distribution system
JP2016140206A (en) 2015-01-28 2016-08-04 京セラ株式会社 Power supply device, power supply system, and power supply method
JP2018174666A (en) 2017-03-31 2018-11-08 古河電気工業株式会社 Power storage system
JP2019146482A (en) 2019-04-11 2019-08-29 京セラ株式会社 Power management system, power management method, controller, and hot water storage unit

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011083084A (en) 2009-10-05 2011-04-21 Panasonic Electric Works Co Ltd Power supply system and method of controlling the same
JP2011101529A (en) 2009-11-06 2011-05-19 Panasonic Electric Works Co Ltd Power distribution system
JP2016140206A (en) 2015-01-28 2016-08-04 京セラ株式会社 Power supply device, power supply system, and power supply method
JP2018174666A (en) 2017-03-31 2018-11-08 古河電気工業株式会社 Power storage system
JP2019146482A (en) 2019-04-11 2019-08-29 京セラ株式会社 Power management system, power management method, controller, and hot water storage unit

Also Published As

Publication number Publication date
JP2021065020A (en) 2021-04-22

Similar Documents

Publication Publication Date Title
US9651971B2 (en) Control device, power control system, and power control method
JP5485857B2 (en) Power management system
US20120235492A1 (en) Power supply system
US11139681B2 (en) Smart switching panel for secondary power supply
JP6414658B2 (en) Power conversion system
JP2016123267A (en) Control device, storage battery, and control method
JP6395849B2 (en) Device and method for wiring a battery management system
EP3029794B1 (en) Power-supply-device identification apparatus, power-supply-device identification method, and power conversion apparatus
JP6689093B2 (en) Grid-connected power conditioner and distributed power supply network
US10566796B2 (en) Control method of power generation system, power generation system, and power generation apparatus
CN105075054A (en) Power conversion device, control system and control method
WO2016002346A1 (en) Power control system, and power control device
US10389131B2 (en) Power control apparatus, power control method, and power control system
JP7274396B2 (en) Power control device and system
JP3756020B2 (en) Power management equipment
JP2011078237A (en) Power supply system
EP3718815A1 (en) Electric power management system
JP6128999B2 (en) Power accommodation system and control procedure determination apparatus for the power accommodation system
JP2011083059A (en) Storage battery operation controller of power supply system
JP6378955B2 (en) Power supply system
JP6476240B2 (en) Power control apparatus, power control apparatus control method, and power control apparatus control program
JP2015136258A (en) Power controller, control method for power controller, and power control system
JP2025005929A (en) Control system and distribution board system
JP6580456B2 (en) Power control apparatus, power management system, and power management method
JP2016036213A (en) Power supply system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220311

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20221109

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20221122

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230123

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230411

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230501

R150 Certificate of patent or registration of utility model

Ref document number: 7274396

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150