Brace for temporary structures Download PDF

Info

Publication number
JP7286408B2
JP7286408B2 JP2019092017A JP2019092017A JP7286408B2 JP 7286408 B2 JP7286408 B2 JP 7286408B2 JP 2019092017 A JP2019092017 A JP 2019092017A JP 2019092017 A JP2019092017 A JP 2019092017A JP 7286408 B2 JP7286408 B2 JP 7286408B2
Authority
JP
Japan
Prior art keywords
brace
shaft portion
hole
temporary structure
insertion shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019092017A
Other languages
Japanese (ja)
Other versions
JP2020186579A (en
Inventor
一雅 ▲高▼宮
克之 星野
凌吾 磯部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toru Noguchi
Original Assignee
Toru Noguchi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toru Noguchi filed Critical Toru Noguchi
Priority to JP2019092017A priority Critical patent/JP7286408B2/en
Publication of JP2020186579A publication Critical patent/JP2020186579A/en
Application granted granted Critical
Publication of JP7286408B2 publication Critical patent/JP7286408B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

本発明は、仮設構築物の強度を確保するための仮設構築物用ブレースに係り、例えば、土木作業現場や建築作業現場、解体作業現場等で構築される支保工や作業足場等の仮設構築物に用いられるものである。 The present invention relates to a brace for a temporary structure for ensuring the strength of a temporary structure, and is used for temporary structures such as shoring and work scaffolding constructed at civil engineering work sites, construction work sites, demolition work sites, etc. It is a thing.

土木作業現場や建築作業現場、解体作業現場等の作業現場では、仮設構築物である支保工や作業足場が構築され、この仮設構築物には、仮設構築物の横方向等の強度を確保するためにブレースが用いられる。下記の特許文献1では、仮設構築物を構成するために平行に配設された2本の細長状部材となっている2本の支柱と、これらの支柱と直角をなして水平に配設されて、互いに平行となっている2本の細長状部材である2本の水平部材とによって囲まれる空間に、ブレースがこれらの支柱と水平部材とに対して斜めの角度をもって配置され、このブレースの長さ方向の一方の端部が2本の水平部材のうちの一方の水平部材に連結されているとともに、ブレースの長さ方向の他方の端部が2本の支柱のうちの他方の支柱に連結されている。 At work sites such as civil engineering work sites, construction work sites, and demolition work sites, shoring and work scaffolding, which are temporary structures, are constructed. is used. In Patent Document 1 below, two columns, which are two elongated members arranged in parallel to constitute a temporary structure, and two columns arranged horizontally at right angles to the columns, are disclosed. , and two horizontal members, which are two elongated members running parallel to each other, a brace is arranged at an oblique angle to the struts and the horizontal member, and the length of the brace is One longitudinal end of the brace is connected to one of the two horizontal members and the other longitudinal end of the brace is connected to the other of the two columns. It is

このようにブレースの長さ方向の両方の端部を、仮設構築物を構成している2本の細長状部材に連結するために、従来では一般的に、下記の特許文献2に示されているように、それぞれの細長状部材にグラビティピンを設け、通常時は重量で下向きとなっているそれぞれのグラビティピンを作業者が水平の向きにした後に、これらのグラビティピンをブレースの長さ方向の両方の端部に設けられている孔に挿入し、グラビティピンが重量で下向きとなることにより、ブレースの長さ方向の両方の端部を2本の細長状部材にグラビティピンを介して連結している。 In order to connect both longitudinal ends of the brace to two elongated members forming a temporary structure in this way, conventionally, it is generally shown in US Pat. Each elongated member is provided with a gravity pin such that after an operator orients each gravity pin, which is normally downwardly oriented by weight, in a horizontal orientation, the gravity pins are moved along the length of the brace. Both longitudinal ends of the brace are connected to the two elongated members via the gravity pins by inserting them into holes provided in both ends and gravity pins pointing downward under the weight. ing.

特開2015-218479号公報JP 2015-218479 A

特開2010-229697号公報JP 2010-229697 A

ブレースは、仮設構築物に多数用いられるものであり、また、仮設構築物の高所にブレースが配置されることがあるため、ブレースの長さ方向の端部を、仮設構築物を構成する支柱や水平部材等の細長状部材に連結するための作業を短時間で容易に行えるようにする工夫が求められる。 Many braces are used in temporary structures, and sometimes braces are placed at high places in temporary structures. It is required to devise a way to easily perform the work for connecting to such elongated members in a short time.

本発明の目的は、長さ方向の端部を、仮設構築物を構成する細長状部材に連結するための作業を短時間で容易に行えるようになる仮設構築物用ブレースを提供するところにある。 SUMMARY OF THE INVENTION It is an object of the present invention to provide a brace for a temporary structure that facilitates the work of connecting the ends in the length direction to the elongated members constituting the temporary structure in a short time.

本発明に係る仮設構築物用ブレースは、仮設構築物を構成するために平行に配設された2本の細長状部材と、これらの細長状部材と直角をなして配設された少なくとも1本の細長状部材とによって囲まれる空間に、前記細長状部材のそれぞれに対して斜めの角度をもって配置されるブレースであって、長さ方向の一方の端部が前記細長状部材のうちの1本の細長状部材に連結され、長さ方向の他方の端部が残りの前記細長状部材のうちの1本の細長状部材に連結される仮設構築物用ブレースにおいて、前記一方の端部と前記他方の端部のうち、少なくともどちらかの端部に、前記細長状部材に設けられている孔に挿抜自在に挿入される連結ピンと、この連結ピンを、この連結ピンが前記孔に挿入される前進方向へ弾性付勢するための弾性部材とを備えて構成された連結具が設けられていることを特徴とするものである。 A temporary structure brace according to the present invention comprises two elongated members arranged in parallel to form a temporary structure, and at least one elongated member arranged perpendicular to the elongated members. a brace disposed at an oblique angle to each of said elongated members in the space enclosed by said elongated members, one longitudinal end of which extends through one of said elongated members; a temporary construction brace connected to an elongated member and having the other longitudinal end connected to one of said remaining elongated members, wherein said one end and said other end At least one of the ends of the portion has a connecting pin that is removably inserted into a hole provided in the elongated member, and the connecting pin is inserted into the hole in the advancing direction. It is characterized in that a connector is provided which is configured with an elastic member for elastic biasing.

このように本発明に係る仮設構築物用ブレースでは、このブレースの一方の端部と他方の端部のうち、少なくともどちらかの端部に、仮設構築物を構成している細長状部材に設けられている孔に挿抜自在に挿入される連結ピンと、この連結ピンを、この連結ピンが前記孔に挿入される前進方向へ弾性付勢するための弾性部材とを備えて構成された連結具が設けられているため、連結ピンを弾性部材の弾性付勢力に抗して後退させた後に、連結ピンを弾性部材の弾性付勢力で前進させて孔に挿入する作業を行うだけで、ブレースの長さ方向の端部を細長状部材に連結することができ、このため、この連結作業を短時間で容易に行えるようになる。 As described above, in the brace for a temporary structure according to the present invention, at least one of the one end and the other end of the brace is provided on the elongated member constituting the temporary structure. and a connecting member comprising a connecting pin removably inserted into the hole, and an elastic member for elastically biasing the connecting pin in the forward direction in which the connecting pin is inserted into the hole. Therefore, after the connecting pin is retreated against the elastic biasing force of the elastic member, the connecting pin is advanced by the elastic biasing force of the elastic member and inserted into the hole. The ends of the can be connected to the elongated members, which makes this connection work quick and easy.

また、前記孔に挿入された後の連結ピンは、弾性部材の弾性付勢力によって前記孔に挿入されている状態を維持することになるため、ブレースの長さ方向の端部を、仮設構築物を構成している細長状部材に確実に連結させておくことができる。 In addition, since the connecting pin after being inserted into the hole maintains the state of being inserted into the hole due to the elastic biasing force of the elastic member, the ends of the brace in the length direction can be attached to the temporary structure. It can be securely connected to the constituent elongated members.

なお、本発明に係る仮設構築物用ブレースが配置される前記空間は、仮設構築物を構成するために平行となって配設された2本の支柱又は2本の水平部材等による2本の細長状部材と、これらの細長状部材とそれぞれが直角をなして配設され、互いに平行となって配設された2本の水平部材又は2本の支柱等による2本の細長状部材とによって囲まれる空間でもよく、あるいは、仮設構築物を構成するために平行となって配設された2本の支柱又は2本の水平部材等による2本の細長状部材と、これらの細長状部材と直角をなして配設された1本の水平部材又は1本の支柱等による1本の細長状部材とによって囲まれる空間でもよい。 In addition, the space in which the temporary structure brace according to the present invention is arranged is formed by two slender columns such as two pillars or two horizontal members arranged in parallel to constitute the temporary structure. surrounded by a member and two elongated members, such as two horizontal members or two struts, each arranged perpendicular to each of these elongated members and arranged parallel to each other It may be a space, or two elongated members such as two columns or two horizontal members arranged in parallel to constitute a temporary structure, and these elongated members are perpendicular to each other. It may be a space surrounded by one horizontal member or one elongated member such as one strut.

そして、本発明に係る仮設構築物用ブレースの長さ方向の一方の端部と他方の端部が連結される細長状部材は、上述の細長状部材のうち、平行となって配設された2本の細長状部材でもよく、あるいは、平行となって配設された2本の細長状部材のうちの1本の細長状部材と、この細長状部材と直角をなして配設された1本の細長状部材とでもよい。 The elongated member to which one end and the other end in the length direction of the brace for temporary structure according to the present invention are connected is the two elongated members arranged in parallel among the above-described elongated members. Alternatively, two elongated members arranged in parallel, one elongated member and one elongated member arranged at right angles to the elongated member. of elongated members.

以上の本発明に係る仮設構築物用ブレースにおいて、前記連結ピンを、弾性部材の弾性付勢力で前進することにより前記孔に挿入される挿入軸部と、この挿入軸部を前記孔から脱出させるために、弾性部材の弾性付勢力に抗して挿入軸部を後退させるために操作される操作軸部とを有するものとすることが好ましい。 In the brace for a temporary structure according to the present invention described above, the insertion shaft portion is inserted into the hole by advancing the connection pin by the elastic biasing force of the elastic member, and the insertion shaft portion is made to escape from the hole. Further, it is preferable to have an operating shaft portion operated to retract the insertion shaft portion against the elastic biasing force of the elastic member.

これによると、連結ピンには、前記孔に挿入される挿入軸部を弾性部材の弾性付勢力に抗して後退させるために操作される操作軸部が設けられるため、この連結ピンを弾性部材の弾性付勢力に抗して後退させるための作業を、挿入軸部を操作するのではなく、操作軸部の操作によって一層容易に行うことができるようになる。 According to this, the connecting pin is provided with an operating shaft portion that is operated to retract the insertion shaft portion inserted into the hole against the elastic biasing force of the elastic member. The work for retracting the device against the elastic biasing force can be more easily performed by operating the operation shaft instead of operating the insertion shaft.

また、本発明に係る仮設構築物用ブレースにおいて、このブレースの一方の端部と他方の端部のうち、少なくともどちらかの端部に設けられる前記連結具は、上述の連結ピンと弾性部材とを備えて構成されたものであれば任意の構造のものとすることができる。その一例の構造は、連結具を、ブレース本体の端部に結合される連結具本体を備えて構成されたものとし、この連結具本体に、連結ピンをブレース本体の長さ方向と直角をなす方向にスライド自在に配置するとともに、この連結ピンを前記スライド方向に直線的に延びるものとすることであり、また、他の例の構造は、連結具を、ブレース本体の端部に結合される連結具本体を備えて構成されたものとし、この連結具本体に連結ピンをブレース本体の長さ方向と直角をなす方向にスライド自在に配置するとともに、この連結ピンを、前記挿入軸部と前記操作軸部が前記スライド方向に平行に延びていて、これらの挿入軸部と操作軸部が接続部で接続されたものとすることである。 Further, in the brace for a temporary structure according to the present invention, the connector provided at least at one of the one end and the other end of the brace includes the above-described connecting pin and elastic member. It can be of any structure as long as it is configured as follows. One example structure is that the connector is configured with a connector body that is coupled to the end of the brace body, and the connector body includes a connector pin that is perpendicular to the length of the brace body. and the connecting pin extends linearly in the sliding direction. A connecting device body is provided, and a connecting pin is disposed in the connecting device body so as to be slidable in a direction perpendicular to the length direction of the brace body. The operation shaft extends parallel to the sliding direction, and the insertion shaft and the operation shaft are connected by a connecting portion.

後者のように連結具を、ブレース本体の端部に結合される連結具本体を備えて構成されたものとし、この連結具本体に連結ピンをブレース本体の長さ方向と直角をなす方向にスライド自在に配置するとともに、連結ピンを、前記挿入軸部と前記操作軸部が前記スライド方向に平行に延びていて、これらの挿入軸部と操作軸部が接続部で接続されたものとすると、連結ピンがブレース本体の長さ方向と直角をなす方向に長い寸法のものにならず、このため、連結ピンを含んで構成された連結具全体を小型化できることになる。 As in the latter case, the coupler is configured with a coupler body coupled to the end of the brace body, and the coupling pin is slid into this coupler body in a direction perpendicular to the length direction of the brace body. Assuming that the connecting pin is freely arranged and that the insertion shaft portion and the operation shaft portion of the connecting pin extend parallel to the slide direction and the insertion shaft portion and the operation shaft portion are connected by a connecting portion, Since the connecting pin does not have a long dimension in a direction perpendicular to the length direction of the brace body, it is possible to reduce the overall size of the connecting device including the connecting pin.

また、このように連結具を構成する場合には、前記弾性部材を、前記操作軸部の外周に嵌合されたコイルばねとし、このコイルばねの長さ方向の一方の端部を連結具本体に当接させ、コイルばねの他方の端部を操作軸部に設けられたばね受け部材に当接させることにより、連結ピンに、コイルばねの弾性付勢力により、挿入軸部を前記孔に挿入させるための前進力を付与することができる。 Further, when the connector is configured in this manner, the elastic member is a coil spring fitted to the outer periphery of the operating shaft portion, and one end in the length direction of the coil spring is connected to the connector main body. and the other end of the coil spring is brought into contact with a spring receiving member provided on the operation shaft, so that the connecting pin is caused to insert the insertion shaft into the hole by the elastic biasing force of the coil spring. It can give forward force for

また、このように前記弾性部材を、前記操作軸部の外周に嵌合されたコイルばねとし、このコイルばねの長さ方向の一方の端部を連結具本体に当接させ、コイルばねの他方の端部を操作軸部に設けられたばね受け部材に当接させることにより、連結ピンに、コイルばねの弾性付勢力により、挿入軸部を前記孔に挿入させるための前進力を付与するようにする構成する場合には、前記連結具本体に、コイルばねの長さ方向の一部が挿入される凹部を設けることが好ましい。 Further, the elastic member is a coil spring fitted around the outer periphery of the operating shaft portion, and one end in the length direction of the coil spring is brought into contact with the connector main body, and the other end of the coil spring contacting a spring receiving member provided on the operating shaft, the elastic biasing force of the coil spring imparts a forward force to the connecting pin for inserting the insertion shaft into the hole. In this case, it is preferable to provide the connector main body with a recess into which a part of the coil spring in the length direction is inserted.

これによると、コイルばねを凹部の深さ分だけ自然長の長さ寸法が大きいものとすることができるため、前記細長状部材に設けられている前記孔に連結ピンの挿入軸部が挿入されることで細長状部材に連結されていたブレースの長さ方向の端部をこの細長状部材から取り外すとき等において、コイルばねの弾性付勢力に抗して前記挿入軸部を後退させるための移動量を大きくでき、これにより、細長状部材に連結されていたブレースの長さ方向の端部をこの細長状部材から取り外すための作業や、細長状部材にブレースの長さ方向の端部を連結する作業を一層確実に実施することができるようになる。 According to this, since the natural length of the coil spring can be increased by the depth of the recess, the insertion shaft of the connecting pin can be inserted into the hole provided in the elongated member. movement for retracting the insertion shaft portion against the elastic biasing force of the coil spring when the longitudinal end portion of the brace connected to the elongated member is removed from the elongated member. The amount of time required to remove the lengthwise ends of the braces that were connected to the elongated member from the elongated members and to connect the lengthwise ends of the braces to the elongated members can be increased. work can be carried out more reliably.

また、本発明に係る仮設構築物用ブレースにおいて、前記連結具本体に対して連結ピンの前記挿入軸部をブレース本体の長さ方向と直角をなす方向にスライド自在とし、このスライドにより挿入軸部を、仮設構築物を構成する前記細長状部材に設けられた前記孔に対して挿抜自在としてもよいが、前記連結具本体に、連結ピンの前記スライド方向の間隔をあけてそれぞれが前記ブレース本体の長さ方向に延びている2個の延出部を平行に設けるとともに、これらの延出部に、連結ピンの挿入軸部がスライド自在に挿入される貫通孔部を設け、連結ピンの挿入軸部が挿入される前記孔を、仮設構築物を構成する前記細長状部材に設けられた板状の突片部に形成し、この突片部が前記2個の延出部の間に挿入されることにより、連結ピンの挿入軸部が前記孔に挿入されるようにすることが好ましい。 In the brace for a temporary structure according to the present invention, the insertion shaft portion of the connecting pin is slidable with respect to the connector body in a direction perpendicular to the length direction of the brace body. Alternatively, they may be freely inserted into and removed from the holes provided in the elongated members that constitute the temporary structure. Two extending portions extending in the longitudinal direction are provided in parallel, and a through hole portion is provided in each of these extending portions into which the insertion shaft portion of the connecting pin is slidably inserted. the hole into which the is inserted is formed in a plate-like projecting piece provided on the elongated member constituting the temporary structure, and this projecting piece is inserted between the two extensions It is preferable that the insertion shaft portion of the connecting pin is inserted into the hole.

このように前記連結具本体に、連結ピンの前記スライド方向の間隔をあけてそれぞれが前記ブレース本体の長さ方向に延びている2個の延出部を平行に設けるとともに、これらの延出部に、連結ピンの挿入軸部がスライド自在に挿入される貫通孔部を設け、連結ピンの挿入軸部が挿入される前記孔を、仮設構築物を構成する前記細長状部材に設けられた板状の突片部に形成し、この突片部が前記2個の延出部の間に挿入されることにより、連結ピンの挿入軸部が前記孔に挿入されるようにすると、連結ピンの挿入軸部を、2個の延出部に設けられた貫通孔部に案内させて安定的にスライド自在とすることができる。また、突片部に形成された前記孔に連結ピンの挿入軸部が挿入された後に、ブレースに、このブレースの長さ方向の引っ張り力や圧縮力の軸力が作用したときには、2個の延出部に設けられた貫通孔部によって挿入軸部の軸方向の二箇所を支持した状態にすることができるため、前記連結具におけるこの軸力の支持を有効に行えるようになる。 In this manner, two extending portions extending in the longitudinal direction of the brace body are provided in parallel with each other at intervals in the sliding direction of the connecting pin, and these extending portions A plate-like member provided in the elongated member constituting the temporary structure is provided with a through hole into which the insertion shaft of the connecting pin is slidably inserted. and inserting this projecting portion between the two extending portions so that the insertion shaft portion of the connecting pin is inserted into the hole. The shaft can be stably slidable by being guided through the through holes provided in the two extensions. Further, when an axial force such as tensile force or compressive force in the longitudinal direction of the brace is applied to the brace after the insertion shaft portion of the connecting pin is inserted into the hole formed in the protruding portion, two Since the insertion shaft can be supported at two points in the axial direction by the through-hole provided in the extension, the axial force can be effectively supported by the connector.

また、以上の本発明に係る仮設構築物用ブレースにおいて、このブレースの長さ方向の前記一方の端部と前記他方の端部のうちのどちらかだけに、前記連結ピンと前記弾性部材とを備えて構成された前記連結具を設けてよいが、ブレースの長さ方向の前記一方の端部と前記他方の端部の両方に、前記連結ピンと前記弾性部材とを備えて構成された前記連結具を設けてもよい。 Further, in the above brace for temporary structure according to the present invention, the connecting pin and the elastic member are provided only at one of the one end and the other end in the length direction of the brace. The connecting device may be provided with the connecting device configured with the connecting pin and the elastic member at both the one longitudinal end and the other longitudinal end of the brace. may be provided.

後者のようにブレースの長さ方向の前記一方の端部と前記他方の端部の両方に、前記連結ピンと前記弾性部材とを備えて構成された前記連結具を設ける場合には、これらの連結具におけるそれぞれの前記連結ピンの前記孔への挿入前進方向を同じ方向とすることが好ましい。 In the latter case, in the case of providing the connecting tool configured with the connecting pin and the elastic member at both the one end and the other end in the length direction of the brace, It is preferable that the connecting pins of the tool are inserted into the holes in the same advancing direction.

これによると、ブレースの長さ方向の前記一方の端部と前記他方の端部の両方を仮設構築物を構成する前述した2本の細長状部材に連結するための作業を、作業者がこれらの細長状部材に対して同じ側から実施することができるようになり、この点でも作業を容易に行えるようになる。 According to this, an operator performs the work for connecting both the one end and the other end in the length direction of the brace to the two elongated members that constitute the temporary structure. The work can be performed from the same side of the elongated member, which also facilitates the work.

以上説明した本発明に係る仮設構築物用ブレースは、任意の用途のための仮設構築物に用いることができ、この仮設構築物は、土木作業現場等で構築される支保工でもよく、建築作業や解体作業現場で構築される作業足場でもよい。 The brace for a temporary structure according to the present invention described above can be used for a temporary structure for any purpose. A working scaffold constructed on site may also be used.

本発明によると、ブレースの長さ方向の端部を、仮設構築物を構成する細長状部材に連結するための作業を短時間で容易に行えるようになるという効果を得られる。 ADVANTAGE OF THE INVENTION According to this invention, the effect that the work for connecting the end part of the length direction of a brace to the elongated member which comprises a temporary structure can be performed easily in a short time is acquired.

図1は、本発明の一実施形態に係るブレースが用いられて構築された仮設構築物となっている支保工の一部を示す正面図である。FIG. 1 is a front view showing part of a shoring which is a temporary structure constructed using a brace according to one embodiment of the present invention. 図2は、ブレースを示し、(A)は平面図、(B)は正面図である。FIG. 2 shows the brace, where (A) is a plan view and (B) is a front view. 図3は、ブレースの長さ方向の端部が細長状部材である水平部材の突片部に連結されていることを示す図1の一部拡大図である。FIG. 3 is an enlarged partial view of FIG. 1 showing that the longitudinal ends of the brace are connected to the prongs of the horizontal member, which is an elongated member; 図4は、図3の斜視図である。4 is a perspective view of FIG. 3. FIG. 図5は、ブレースの長さ方向の端部に結合されている連結具を示し、(A)は平面図、(B)は底面図である。FIG. 5 shows the couplers coupled to the longitudinal ends of the brace, with (A) a plan view and (B) a bottom view. 図6も連結具を示し、(A)は右側面図、(B)は左側面図である。FIG. 6 also shows the connector, (A) is a right side view, and (B) is a left side view. 図7は、連結具の斜視図である。FIG. 7 is a perspective view of a connector. 図8は、連結具の分解斜視図である。FIG. 8 is an exploded perspective view of the coupler. 図9は、図6(B)のS9-S9線断面図である。FIG. 9 is a sectional view taken along line S9-S9 of FIG. 6(B). 図10は、図5(A)のS10-S10線断面図である。FIG. 10 is a sectional view taken along line S10-S10 of FIG. 5(A). 図11は、連結ピンの操作軸部をコイルばねの弾性付勢力に抗して押し操作したときを示す図9と同様の図である。FIG. 11 is a view similar to FIG. 9 showing the operation shaft portion of the connecting pin being pushed against the elastic biasing force of the coil spring. 図12は、連結ピンの挿入軸部が水平部材の突片部に設けられた孔に挿入されて、ブレースの長さ方向の端部が水平部材に連結されているときを示す図9と同様の図である。FIG. 12 is similar to FIG. 9 showing that the insertion shaft of the connecting pin is inserted into the hole provided in the projecting piece of the horizontal member, and the longitudinal end of the brace is connected to the horizontal member; is a diagram.

以下に本発明を実施するための形態を図面に基づいて説明する。図1には、本発明の一実施形態に係るブレース10が用いられて構築された仮設構築物の一部が示されており、この仮設構築物は支保工1である。図1で示されている支保工1の一部は、それぞれがジャッキベース2で下端が支持されて鉛直に立設され、互いに平行となっている2本の支柱3と、左右方向に隣接しているこれらの支柱3の間に、これらの支柱3と直角をなして水平に配設され、互いに平行となっている3本の水平部材4とを含んで構成されている。それぞれの水平部材4は、水平部材4の本体4Aと、この本体4Aの長さ方向の両端部に配置されたくさび部材4Bとを有して構成され、また、支柱3の外周には、これらの支柱3側の継手部材となっているフランジ部材5が支柱3の長さ方向に複数個結合され、フランジ部材5に上下に貫通して形成されている孔部又は凹部等による貫通部にくさび部材4Bが上から打ち込まれることにより、水平部材4の長さ方向の両端部が、左右に隣接している2本の支柱3に結合されている。 A mode for carrying out the present invention will be described below with reference to the drawings. FIG. 1 shows part of a temporary structure constructed using braces 10 according to an embodiment of the invention, the temporary structure being a shoring 1 . A part of the shoring 1 shown in FIG. It comprises three horizontal members 4 which are horizontally disposed between these struts 3 perpendicular to the struts 3 and parallel to each other. Each horizontal member 4 comprises a main body 4A of the horizontal member 4 and wedge members 4B arranged at both longitudinal ends of the main body 4A. A plurality of flange members 5, which are joint members on the side of the column 3, are coupled in the length direction of the column 3, and are wedged in the through portions such as holes or recesses formed vertically through the flange members 5. By driving the member 4B from above, both longitudinal ends of the horizontal member 4 are connected to the two columns 3 adjacent to each other on the left and right.

本実施形態に係るブレース10は、左右2本の支柱3と、上下2本の水平部材4とによって囲まれる四角形の空間Aに配置され、この空間Aにおけるブレース10の配置は、支柱3及び水平部材4に対して斜めの角度をもって行われている。また、本実施形態に係るブレース10は、このブレース10の長さ方向の両端部が上下2本の水平部材4に連結されることにより、四角形の空間Aに配置されている。 The brace 10 according to this embodiment is arranged in a rectangular space A surrounded by two left and right struts 3 and two upper and lower horizontal members 4. It is done at an oblique angle with respect to the member 4 . In addition, the brace 10 according to the present embodiment is arranged in a quadrangular space A by connecting both ends of the brace 10 in the length direction to two horizontal members 4 vertically.

なお、四角形の空間Aの外輪郭を形成している左右2本の支柱3と、上下2本の水平部材4は、支保工1の一部を形成している本実施形態の細長状部材となっている。また、本実施形態に係るそれぞれの水平部材4は、これらの水平部材4の長さ方向の両端部に近い箇所において、本体4Aに上下に突設された板状の突片部4Cを備えたものとなっており、ブレース10の長さ方向の両端部を上下2本の水平部材4に連結することは、図3及び図4に示されているように、これらの突片部4Cにブレース10の長さ方向の両端部を連結することによって行われている。本実施形態の突片部4Cは、水平部材4のうち、丸パイプ材又は断面円形の棒材によって形成されている本体4Aに、板状の突片部材を、この突片部材の厚さ方向を本体4Aの長さ方向と直角をなす方向にして、本体4Aと直角をなす方向の直径の中心部に溶接で結合することによって形成されたものとなっている。 The two left and right struts 3 and the two upper and lower horizontal members 4 that form the outer contour of the quadrangular space A are the elongated members of this embodiment that form a part of the shoring 1. It's becoming Further, each of the horizontal members 4 according to the present embodiment includes plate-like protruding pieces 4C protruding vertically from the main body 4A at locations near both ends in the length direction of the horizontal members 4. As shown in FIGS. 3 and 4, connecting both ends of the brace 10 in the length direction to the two upper and lower horizontal members 4 is performed by attaching braces to the projecting pieces 4C. This is done by connecting the longitudinal ends of 10 . The projecting piece 4C of the present embodiment has a main body 4A formed of a round pipe material or a bar having a circular cross section in the horizontal member 4. in a direction perpendicular to the length direction of the main body 4A and welded to the center of the diameter in the direction perpendicular to the main body 4A.

図2には、本実施形態に係るブレース10が示されており、図2(A)は平面図であり、図2(B)は正面図である。ブレース10は、丸パイプ材によって形成されたブレース本体11と、このブレース本体11の長さ方向の両端部に結合された連結具12とにより構成されており、これらの連結具12は同一のものであり、左右方向の向きが互いに逆向きとなってブレース本体11に結合されている。 FIG. 2 shows the brace 10 according to this embodiment, FIG. 2(A) being a plan view and FIG. 2(B) being a front view. The brace 10 is composed of a brace body 11 made of a round pipe material and couplings 12 connected to both longitudinal ends of the brace body 11. These couplings 12 are the same. , and are connected to the brace body 11 with their left and right directions opposite to each other.

図5~図8には、ブレース本体11の長さ方向の両端部に結合されている2個の連結具12のうち、右側の連結具12が示されている。図5(A)は連結具12の平面図、図5(B)は連結具12の底面図、図6(A)は連結具12の右側面図、図6(B)は連結具12の側面図、図7は連結具12の斜視図、図8は連結具12の分解斜視図である。連結具12は、鋳造等で形成された連結具本体13と、連結ピン14と、弾性部材であるコイルばね15とが主要の部材となって構成されたものであり、連結具本体13には、ブレース本体11の長さ方向の端部の端面からこのブレース本体11の内部に挿入される挿入部13Aを備えたフランジ部13Bが設けられている。図2に示されているように、挿入部13Aがブレース本体11の内部に挿入された後に、フランジ部13Bがブレース本体11の端面に溶接で結合されることにより、ブレース10の端部が、連結具本体13と連結ピン14とコイルばね15とが主要の部材となっている連結具12によって構成されることになる。 5 to 8 show the right connector 12 of the two connectors 12 that are connected to both ends of the brace body 11 in the longitudinal direction. 5A is a plan view of the connector 12, FIG. 5B is a bottom view of the connector 12, FIG. 6A is a right side view of the connector 12, and FIG. 7 is a perspective view of the connector 12, and FIG. 8 is an exploded perspective view of the connector 12. FIG. The connector 12 is composed mainly of a connector main body 13 formed by casting or the like, a connecting pin 14, and a coil spring 15 which is an elastic member. A flange portion 13B having an insertion portion 13A to be inserted into the brace body 11 from the end face of the brace body 11 in the longitudinal direction is provided. As shown in FIG. 2, after the insertion portion 13A is inserted into the brace body 11, the flange portion 13B is welded to the end face of the brace body 11, so that the end portion of the brace 10 is The connecting device 12 is composed of the connecting device body 13, the connecting pin 14, and the coil spring 15 as main members.

なお、連結具本体13には、図7に示されているように、半円状又は略半円状の凹部16が挿入部13Aとフランジ部13Bとに渡って形成されており、図6から分かるように、挿入部13Aとフランジ部13Bの円周方向における互いに反対側の二箇所に設けられている凹部16は、連結具本体13のフランジ部13Bがブレース本体11の端面の溶接で結合された後に、ブレース本体11の内部に侵入した雨水や、ブレース本体11の内部で結露した水をブレース10の外部に排出できるようにするための排水部である。 As shown in FIG. 7, the connector main body 13 is formed with a semicircular or substantially semicircular recessed portion 16 across the insertion portion 13A and the flange portion 13B. As can be seen, the recessed portions 16 provided at two locations on opposite sides in the circumferential direction of the insertion portion 13A and the flange portion 13B are connected to the flange portion 13B of the connector main body 13 by welding the end face of the brace main body 11. It is a drainage part for draining rainwater that has entered the interior of the brace body 11 and water that has condensed inside the brace body 11 to the outside of the brace 10 after the dew.

図5、図7及び図8に示されているように、連結具本体13には、挿入部13A側と反対側において、フランジ部13Bに基端部が接続されている二股部13Cが設けられ、この二股部C13は、それぞれがフランジ部13Bからブレース本体11の長さ方向に延びていて、ブレース本体11の長さ方向と直角をなす方向に互いに対向している2個の延出部17,18によって形成されている。また、これらの延出部17,18は、図7及び図8に示されているように、連結具本体13における延出部17,18の間のフランジ部13B側の基部に設けられている結合部19によって互いに結合されている。 As shown in FIGS. 5, 7 and 8, the coupler main body 13 is provided with a bifurcated portion 13C having a base end connected to the flange portion 13B on the side opposite to the insertion portion 13A side. The bifurcated portion C13 extends from the flange portion 13B in the length direction of the brace body 11, and has two extending portions 17 facing each other in a direction perpendicular to the length direction of the brace body 11. , 18. 7 and 8, these extending portions 17 and 18 are provided at the base portion on the side of the flange portion 13B between the extending portions 17 and 18 in the connector main body 13. They are joined together by a joint 19 .

この結合部19の上下の両面は、図7及び図8から分かるように、フランジ部13B側から延出部17,18の延出方向に延びるにしたがって互いに近づく方向に傾斜しているテーパー状の傾斜面となっている。 As can be seen from FIGS. 7 and 8, the upper and lower surfaces of the connecting portion 19 are tapered so as to approach each other as they extend from the flange portion 13B side in the direction in which the extending portions 17 and 18 extend. It has an inclined surface.

図7及び図8に示されているように、二股部13Cには、フランジ部13Bから離れた箇所において、ブレース本体11の長さ方向と直角をなす方向に貫通した貫通孔部20が設けられ、この貫通孔部20は、それぞれの延出部17,18に形成されているため、二股部13Cには、2個の延出部17,18の間で分断された2個の貫通孔部20が設けられている。また、二股部13Cには、フランジ部13Bに近い箇所において、ブレース本体11の長さ方向と直角をなす方向に貫通した貫通孔部21が設けられ、この貫通孔部21は、上述の結合部19が設けられている箇所に形成されているため、2個の延出部17,18と結合部19とに連続して形成された1個の孔部として貫通孔部21が、連結具本体13に設けられている(図6(B)のS9-S9線断面図である図9と、図5(A)のS10-S10線断面図である図10を参照)。 As shown in FIGS. 7 and 8, the bifurcated portion 13C is provided with a through-hole portion 20 penetrating in a direction perpendicular to the longitudinal direction of the brace body 11 at a location away from the flange portion 13B. Since the through-holes 20 are formed in the respective extensions 17 and 18, the forked portion 13C has two through-holes divided between the two extensions 17 and 18. 20 are provided. Further, the bifurcated portion 13C is provided with a through hole portion 21 penetrating in a direction perpendicular to the length direction of the brace body 11 at a location near the flange portion 13B. 19 is provided, the through-hole portion 21 as one hole formed continuously with the two extending portions 17 and 18 and the coupling portion 19 is formed in the connector main body. 13 (see FIG. 9, which is a cross-sectional view along line S9-S9 in FIG. 6B, and FIG. 10, which is a cross-sectional view along line S10-S10 in FIG. 5A).

図8及び図9に示されているように、本実施形態の連結ピン14は、短寸法となっている挿入軸部14Aと、長寸法となっている操作軸部14Bと、これらの挿入軸部14Aと操作軸部14Bとを接続している接続部14Cとからなる平面視でJ字形状又は略J字形状のものである。挿入軸部14Aが貫通孔部20に挿抜自在に挿入され、操作軸部14Bが貫通孔部21に挿抜自在に挿入されることにより、連結ピン14は連結具本体13にセットされ、これにより、挿入軸部14Aと操作軸部14Bは、連結具本体13に対してブレース本体11の長さ方向と直角をなす方向にスライド自在となり、また、ブレース本体11の長さ方向に離れている挿入軸部14Aと操作軸部14Bは、互いに平行となってブレース本体11の長さ方向と直角をなすスライド方向に延びるものとなる。 As shown in FIGS. 8 and 9, the connecting pin 14 of this embodiment includes an insertion shaft portion 14A with a short dimension, an operation shaft portion 14B with a long dimension, and these insertion shafts. It has a J-shape or a substantially J-shape in plan view, which is composed of the connection portion 14C connecting the portion 14A and the operation shaft portion 14B. The insertion shaft portion 14A is removably inserted into the through-hole portion 20, and the operation shaft portion 14B is removably inserted into the through-hole portion 21, whereby the connecting pin 14 is set in the connecting device main body 13. The insertion shaft portion 14A and the operation shaft portion 14B are slidable relative to the connector body 13 in a direction perpendicular to the length direction of the brace body 11. The portion 14A and the operating shaft portion 14B are parallel to each other and extend in the sliding direction perpendicular to the length direction of the brace body 11. As shown in FIG.

図7及び図8から分かるように、挿入軸部14Aの貫通孔部20への挿入及び操作軸部14Bの貫通孔部21への挿入は、二股部13Cを形成している2個の延出部17,18のうち、連結ピン14の接続部14C側となっている延出部17側から行われ、この挿入により、挿入軸部14Aは、図9に示されているように、2個の延出部17,18のうち、接続部14C側とは反対側の延出部18の貫通孔部20まで達し、また、挿入軸部14Aよりも長い寸法を有している操作軸部14Bの先端部は、貫通孔部21を貫通して延出部18の外部に突出する。このように延出部18の外部に突出した操作軸部14Bの外周部分には、前述した弾性部材となっているコイルばね15が嵌合され、このコイルばね15の長さ方向の一方の端部は二股部13Cの基部に当接し、また、コイルばね15の長さ方向の他方の端部は、操作軸部14Bの先端部の外周に嵌合されて配置された板状のばね受け部材22に当接し、このばね受け部材22は、操作軸部14Bの先端部に形成された孔に圧入固定された固定ピン23により、操作軸部14Bの先端部からの抜け出しが阻止されている。 As can be seen from FIGS. 7 and 8, the insertion of the insertion shaft portion 14A into the through-hole portion 20 and the insertion of the operation shaft portion 14B into the through-hole portion 21 are performed by two extensions forming the bifurcated portion 13C. Of the portions 17 and 18, the insertion is performed from the extending portion 17 side which is the connecting portion 14C side of the connecting pin 14. By this insertion, the insertion shaft portion 14A is divided into two pieces as shown in FIG. The operating shaft portion 14B reaches the through hole portion 20 of the extending portion 18 on the side opposite to the connecting portion 14C and has a longer dimension than the insertion shaft portion 14A. passes through the through-hole portion 21 and protrudes outside the extension portion 18 . The coil spring 15, which is an elastic member as described above, is fitted to the outer peripheral portion of the operating shaft portion 14B projecting outside the extension portion 18 in this way, and one end of the coil spring 15 in the length direction is fitted. The other end of the coil spring 15 in the length direction is a plate-shaped spring receiving member that is fitted to the outer circumference of the tip of the operating shaft portion 14B. 22, and is prevented from coming off from the tip of the operating shaft 14B by a fixing pin 23 press-fitted into a hole formed in the tip of the operating shaft 14B.

そして、このようにして二股部13Cの基部とばね受け部材22との間に配置されたコイルばね15は、圧縮されているため、連結ピン14には、挿入軸部14Aの先端部が延出部18の貫通孔部20に前進挿入されている状態を維持しようとする弾性力がコイルばね15の弾性付勢力によって常時付与されている。また、図11に示されているように、作業者が操作軸部14Bの先端部にコイルばね15の弾性付勢力に抗して押し操作力を作用すると、連結ピン14は、挿入軸部14Aの先端部が延出部18の貫通孔部20から脱出する後退方向へスライド移動する。 Since the coil spring 15 arranged between the base of the bifurcated portion 13C and the spring bearing member 22 is compressed in this way, the tip of the insertion shaft portion 14A extends to the connecting pin 14. An elastic biasing force of the coil spring 15 is constantly applied to maintain the state of being inserted forwardly into the through-hole portion 20 of the portion 18 . Further, as shown in FIG. 11, when the operator applies a pushing operation force to the distal end portion of the operation shaft portion 14B against the elastic biasing force of the coil spring 15, the connecting pin 14 is moved to the insertion shaft portion 14A. slides in a retreating direction in which the distal end portion of the extending portion 18 escapes from the through hole portion 20 of the extending portion 18 .

図9及び図11に示されているように、二股部13Cの基部には、延出部18側からの深さをもって形成された凹部24が設けられ、この凹部24は、二股部13Cの基部に設けられている前述の貫通孔部21よりも直径が大きく、かつこの貫通孔部21と同軸的に形成されているため、凹部24は、貫通孔部21の一部を兼ねたものとなっている。凹部24の底部24Aには、コイルばね15の長さ方向の上述した一方の端部が当接しており、このため、本実施形態では、コイルばね15を凹部24の深さ分だけ自然長の長さ寸法が大きいものとすることができる。これにより、作業者が、連結ピン14の操作軸部14Bの先端部にコイルばね15の弾性付勢力に抗して押し操作力を作用したときには、コイルばね15を充分に大きく圧縮変形させることができるため、連結ピン14を、挿入軸部14Aの先端部が延出部18の貫通孔部20から脱出して延出部17の貫通孔部20まで充分に達するまで、後退方向へ大きなスライド移動量でスライドさせることができる。 As shown in FIGS. 9 and 11, the base of the bifurcated portion 13C is provided with a recess 24 formed with a depth from the side of the extension 18, and the recess 24 is located at the base of the bifurcated portion 13C. Since the diameter is larger than that of the through-hole portion 21 provided in the above-described through-hole portion 21 and is formed coaxially with this through-hole portion 21, the recessed portion 24 also serves as a part of the through-hole portion 21. ing. The bottom portion 24A of the recess 24 is in contact with one end of the coil spring 15 in the length direction. The length dimension can be large. As a result, when an operator applies a pushing force against the elastic biasing force of the coil spring 15 to the distal end portion of the operating shaft portion 14B of the connecting pin 14, the coil spring 15 can be compressed and deformed sufficiently. Therefore, the connecting pin 14 is slidably moved in the backward direction until the tip of the insertion shaft portion 14A escapes from the through hole portion 20 of the extension portion 18 and reaches the through hole portion 20 of the extension portion 17 sufficiently. Can be slid in amount.

本実施形態に係るブレース10の長さ方向の両端部を、図1で説明したように、上下2本の水平部材4に連結するためには、ブレース10の長さ方向の両端部に設けられているそれぞれの連結具12について、図11に示されているように、作業者が連結ピン14の操作軸部14Bの先端部をコイルばね15の弾性付勢力に抗して押し操作し、これにより、連結ピン14の挿入軸部14Aの先端部を延出部18の貫通孔部20から脱出する後退方向にスライドさせ、この後に、水平部材4の一部としてこの水平部材4の本体4Aに設けられている前述の突片部4Cを、二股部13Cを形成している2個の延出部17,18の間に挿入する。次いで、連結ピン14の操作軸部14Bの先端部に作用させていた押し操作力を解除すると、連結ピン14の挿入軸部14Aはコイルばね15の弾性付勢力によって前進スライドするため、この挿入軸部14Aは、図12に示されているように、突片部4Cに設けられている孔25に挿入され、これにより、ブレース10の長さ方向の両端部のそれぞれは、連結具12に設けられている連結ピン14を介して上下2本の水平部材4に連結されることになる。 In order to connect both ends of the brace 10 in the length direction according to the present embodiment to the two upper and lower horizontal members 4 as described in FIG. As shown in FIG. 11, an operator pushes the distal end of the operating shaft portion 14B of the connecting pin 14 against the elastic biasing force of the coil spring 15 for each of the connecting devices 12 which are connected to each other. As a result, the distal end portion of the insertion shaft portion 14A of the connecting pin 14 is slid in the retreating direction of escaping from the through hole portion 20 of the extension portion 18, and thereafter, is attached to the main body 4A of the horizontal member 4 as a part of the horizontal member 4. The projecting piece portion 4C provided above is inserted between the two extending portions 17 and 18 forming the bifurcated portion 13C. Next, when the pushing operation force acting on the distal end portion of the operating shaft portion 14B of the connecting pin 14 is released, the insertion shaft portion 14A of the connecting pin 14 slides forward due to the elastic biasing force of the coil spring 15. As shown in FIG. 12, the portion 14A is inserted into a hole 25 provided in the protruding portion 4C so that each of the longitudinal ends of the brace 10 is provided in the connector 12. It will be connected to the upper and lower two horizontal members 4 via the connecting pins 14 provided.

この後の挿入軸部14Aには、コイルばね15の弾性付勢力によって前進スライド力が常時作用しているため、ブレース10の長さ方向の両端部が上下2本の水平部材4に連結された状態を維持させることができる。 Since the forward sliding force is always applied to the insertion shaft portion 14A after this due to the elastic biasing force of the coil spring 15, both ends in the length direction of the brace 10 are connected to the two upper and lower horizontal members 4. state can be maintained.

なお、突片部4Cを、二股部13Cを形成している2個の延出部17,18の間に挿入する際には、前述したように、2個の延出部17,18のフランジ部13側の基部を結合している結合部19の上下の両面は、フランジ部13B側から延出部17,18の延出方向に延びるにしたがって互いに近づく方向に傾斜しているテーパー状の傾斜面となっているため、突片部4Cが結合部19に当接しても、これらの傾斜面の案内作用により、突片部4Cを延出部17,18の間に一層確実かつ容易に挿入することができる。 When inserting the protruding piece 4C between the two extensions 17 and 18 forming the bifurcated portion 13C, the flanges of the two extensions 17 and 18 are inserted as described above. The upper and lower surfaces of the connecting portion 19 that connects the base portion of the portion 13 side are tapered and inclined toward each other as they extend in the extending direction of the extending portions 17 and 18 from the flange portion 13B side. Even if the projecting piece 4C comes into contact with the connecting portion 19, the projecting piece 4C can be more reliably and easily inserted between the extending portions 17 and 18 due to the guiding action of these inclined surfaces. can do.

また、ブレース10の長さ方向の両端部を上下2本の水平部材4との連結から解除するためには、それぞれの連結具12について、作業者が連結ピン14の操作軸部14Bの先端部をコイルばね15の弾性付勢力に抗して押し操作すると、挿入軸部14Aは後退して突片部4Cの孔25から脱出するため、二股部13Cを形成している2個の延出部17,18の間から突片部4Cを抜き取る作業を行える。 In addition, in order to release both ends of the brace 10 in the length direction from the connection with the two upper and lower horizontal members 4, the operator must move the tip portion of the operation shaft portion 14B of the connection pin 14 for each connection tool 12. is pushed against the elastic biasing force of the coil spring 15, the insertion shaft portion 14A retreats and escapes from the hole 25 of the projecting piece portion 4C. The operation of extracting the projecting piece portion 4C from between 17 and 18 can be performed.

以上説明したように本実施形態に係るブレース10の長さ方向の端部には、仮設構築物である支保工を構成するための細長状部材となっている水平部材4に設けられた孔25に挿抜自在に挿入される連結ピン14と、この連結ピン14を、この連結ピン14が孔25に挿入される前進方向へ弾性付勢するための弾性部材となっているコイルばね15とを備えて構成された連結具12が設けられているため、連結ピン14を孔25に挿入することでブレース10の長さ方向の端部を水平部材4に連結するための作業を、連結ピン14をコイルばね15の弾性付勢力に抗して後退させた後に、連結ピン14をコイルばね15の弾性付勢力で前進させて孔25に挿入するだけで行うことができ、このため、この連結作業を短時間で容易に行えるようになる。 As described above, at the longitudinal ends of the brace 10 according to the present embodiment, the holes 25 provided in the horizontal members 4, which are elongated members for constructing the shoring, which is a temporary structure, are provided. A connecting pin 14 inserted removably and a coil spring 15 serving as an elastic member for elastically biasing the connecting pin 14 in the forward direction in which the connecting pin 14 is inserted into the hole 25 are provided. A configured link 12 is provided so that the operation for linking the longitudinal ends of the brace 10 to the horizontal member 4 is accomplished by inserting the link pin 14 into the hole 25 so that the link pin 14 can be coiled. After retracting against the elastic biasing force of the spring 15, the connecting pin 14 can be advanced by the elastic biasing force of the coil spring 15 and inserted into the hole 25. Therefore, this connecting work can be shortened. It will become easier in time.

また、本実施形態に係る連結ピン14は、コイルばね15の弾性付勢力で前進することにより孔25に挿入される挿入軸部14Aと、この挿入軸部14Aを孔25から脱出させるために、コイルばね15の弾性付勢力に抗して挿入軸部14Aを後退させるために操作される操作軸部14Bとを有するものとなっているため、連結ピン14をコイルばね15の弾性付勢力に抗して後退させるための作業を、挿入軸部14Aを操作するのではなく、操作軸部14Bを操作することによって容易に行うことができる。 In addition, the connecting pin 14 according to the present embodiment includes an insertion shaft portion 14A that is inserted into the hole 25 by being advanced by the elastic biasing force of the coil spring 15, and in order to escape the insertion shaft portion 14A from the hole 25, The operating shaft portion 14B is operated to retract the insertion shaft portion 14A against the elastic biasing force of the coil spring 15. The operation for retracting by pressing can be easily performed by operating the operating shaft portion 14B instead of operating the insertion shaft portion 14A.

なお、コイルばね15の弾性付勢力に抗して挿入軸部14Aを後退させるための操作は、連結ピン14のうち、接続部14Cを引っ張り操作することにより行ってもよい。 The operation for retracting the insertion shaft portion 14A against the elastic biasing force of the coil spring 15 may be performed by pulling the connecting portion 14C of the connecting pin 14. FIG.

また、本実施形態に係る連結具12は、ブレース本体11の端部に結合される連結具本体13を備えて構成され、この連結具本体13に連結ピン14がブレース本体11の長さ方向と直角をなす方向にスライド自在に配置されているとともに、連結ピン14は、挿入軸部14Aと操作軸部14Bとがスライド方向に平行に延びていて、これらの挿入軸部14Aと操作軸部14Bとが接続部14Cで接続されたものとなっているため、連結ピンを上述のスライド方向に延びた直線状のものとした場合よりも、連結ピン14についてのブレース本体11の長さ方向と直角をなす方向における寸法を短くすることができ、これにより、連結ピン14を含んで構成される連結具12全体を小型化できる。 In addition, the connector 12 according to the present embodiment includes a connector body 13 that is coupled to the end portion of the brace body 11, and the connector pin 14 is attached to the connector body 13 in the longitudinal direction of the brace body 11. The connecting pin 14 has an insertion shaft portion 14A and an operation shaft portion 14B extending parallel to the sliding direction. are connected by the connecting portion 14C, the connecting pin 14 is perpendicular to the length direction of the brace body 11, compared to the case where the connecting pin is linear extending in the above-described sliding direction. can be shortened in the direction forming the , and thus the entire coupling 12 including the coupling pin 14 can be miniaturized.

また、本実施形態では、連結ピン14の操作軸部14Bの外周に嵌合されたコイルばね15の長さ方向の一方の端部は、連結具本体13に設けられた二股部13Cの基部に当接し、コイルばねの他方の端部は、操作軸部14Bに設けられたばね受け部材22に当接し、これにより、連結ピン14に、コイルばね15の弾性付勢力により、挿入軸部14Aを前記孔25に挿入させるための前進力を付与する構成としているとともに、連結具本体13には、コイルばね15の長さ方向の一部が挿入される凹部24を設けているため、コイルばね15をこの凹部24の深さ分だけ自然長の長さ寸法が大きくなったものとすることができる。このため、前記突片部4Cの孔25に連結ピン14の挿入軸部14Aが挿入されることで水平部材4に連結されていたブレース10の長さ方向の端部をこの水平部材4から取り外すとき等において、コイルばね15の弾性付勢力に抗して挿入軸部14Aを後退させるための移動量を、連結具本体13の二股部13Cを形成している2個の延出部17,18のうち、延出部18の貫通孔部20から挿入軸部14Aを脱出させて、この挿入軸部14Aの先端部が延出部17の貫通孔部20まで達する大きい移動量とすることができ、これにより、水平部材4に連結されていたブレース10の長さ方向の端部を水平部材4から取り外すための作業や、水平部材4にブレース10の長さ方向の端部を連結する作業を一層確実に実施することができる。 In addition, in this embodiment, one longitudinal end of the coil spring 15 fitted to the outer periphery of the operating shaft portion 14B of the connecting pin 14 is connected to the base of the forked portion 13C provided in the connector main body 13. The other end of the coil spring abuts on the spring bearing member 22 provided on the operating shaft portion 14B, whereby the insertion shaft portion 14A is pushed into the connecting pin 14 by the elastic biasing force of the coil spring 15 as described above. A forward force is applied to insert the coil spring 15 into the hole 25, and the connector main body 13 is provided with a recess 24 into which a part of the coil spring 15 in the length direction is inserted. The length dimension of the natural length can be increased by the depth of the recess 24 . Therefore, the longitudinal end of the brace 10 connected to the horizontal member 4 is removed from the horizontal member 4 by inserting the insertion shaft portion 14A of the connecting pin 14 into the hole 25 of the projecting piece 4C. In some cases, the amount of movement for retreating the insertion shaft portion 14A against the elastic biasing force of the coil spring 15 is determined by the two extending portions 17 and 18 forming the forked portion 13C of the connector main body 13. Of these, the insertion shaft portion 14A can be moved out of the through-hole portion 20 of the extension portion 18, and the distal end portion of the insertion shaft portion 14A can reach the through-hole portion 20 of the extension portion 17 by a large amount of movement. This eliminates the work of removing the ends of the braces 10 connected to the horizontal members 4 in the length direction from the horizontal members 4 and the work of connecting the ends of the braces 10 in the length direction to the horizontal members 4 . It can be implemented more reliably.

さらに、本実施形態では、連結具本体13には、連結ピン14の上述のスライド方向の間隔をあけてそれぞれがブレース本体11の長さ方向に延びている2個の延出部17,18が平行に設けられ、これらの延出部17,18に、連結ピン14の挿入軸部14Aがスライド自在に挿入される貫通孔部20が設けられ、挿入軸部14Aが挿入される前記孔25は、水平部材4に設けられた板状の突片部4Cに形成され、この突片部4Cが2個の延出部17,18の間に挿入されることにより、挿入軸部14Aが前記孔25に挿入されるため、挿入軸部14Aを、2個の延出部17,18に設けられた貫通孔部20に案内させて安定的にスライド自在とすることができる。 Further, in this embodiment, the coupler main body 13 has two extending portions 17 and 18 each extending in the longitudinal direction of the brace main body 11 with a space therebetween in the sliding direction of the connecting pin 14 . A through hole portion 20 into which the insertion shaft portion 14A of the connecting pin 14 is slidably inserted is provided in these extension portions 17 and 18, and the hole 25 into which the insertion shaft portion 14A is inserted is , is formed on a plate-like protruding piece 4C provided on the horizontal member 4, and by inserting this protruding piece 4C between the two extending portions 17 and 18, the insertion shaft portion 14A is inserted into the hole. 25, the insertion shaft portion 14A can be guided through the through-hole portions 20 provided in the two extension portions 17 and 18 and can be slid stably.

また、突片部4Cに形成された孔25に連結ピン14の挿入軸部14Aが挿入されることでブレース10の長さ方向の端部が水平部材4に連結された後は、支保工に作用する横荷重等によってブレース10に、このブレース10の長さ方向への引っ張り力や圧縮力の軸力が作用したときには、2個の延出部17、18に設けられた貫通孔部20によって挿入軸部14Aの軸方向の二箇所が支持された状態になるため、ブレース10の長さ方向の端部に設けられた連結具12によるこの軸力の支持を有効に行える。 Further, after the longitudinal end of the brace 10 is connected to the horizontal member 4 by inserting the insertion shaft portion 14A of the connecting pin 14 into the hole 25 formed in the protruding portion 4C, the shoring is performed. When an axial force such as a tensile force or a compressive force in the length direction of the brace 10 acts on the brace 10 due to an acting lateral load or the like, the through holes 20 provided in the two extensions 17 and 18 Since the insertion shaft portion 14A is supported at two points in the axial direction, this axial force can be effectively supported by the couplings 12 provided at the ends of the brace 10 in the longitudinal direction.

さらに、ブレース10の長さ方向の両端部に設けられているそれぞれの連結具12は、連結具本体13と、連結ピン14と、コイルばね15とが主要の部材となって構成されたものとなっているとともに、図2から分かるように、これらの連結具12において、水平部材4の突片部4Cの孔25に挿入軸部14Aを挿入させるための連結ピン14の前進スライド方向は同じ方向となっているため、ブレース10の長さ方向の両端部を上下2本の水平部材4に連結するための作業を行う作業者は、これらの水平部材4に対して同じ側からこの作業を実施することができ、このため、この点でも作業を容易に行えるようになる。 Furthermore, each of the connecting devices 12 provided at both ends in the length direction of the brace 10 is composed mainly of a connecting device main body 13, a connecting pin 14, and a coil spring 15. 2, in these connecting tools 12, the forward sliding direction of the connecting pin 14 for inserting the insertion shaft portion 14A into the hole 25 of the projection portion 4C of the horizontal member 4 is the same direction. Therefore, the operator who performs the work for connecting both ends of the brace 10 in the length direction to the two horizontal members 4 above and below performs this work from the same side with respect to these horizontal members 4. This makes the work easier in this respect as well.

本発明は、土木作業現場や建築作業現場、解体作業現場等で構築される支保工や作業足場等の仮設構築物において利用することができる。 INDUSTRIAL APPLICABILITY The present invention can be used in temporary constructions such as shoring and working scaffolds constructed at civil engineering work sites, construction work sites, demolition work sites, and the like.

1 仮設構築物である支保工
3 細長状部材である支柱
4 細長状部材である水平部材
4C 突片部
10 ブレース
11 ブレース本体
12 連結具
13 連結具本体
13C 二股部
14 連結ピン
14A 挿入軸部
14B 操作軸部
14C 接続部
15 弾性部材であるコイルばね
17,18 延出部
20,21 貫通孔部
22 ばね受け部材
24 凹部
25 孔
A 空間
1 Shoring which is a temporary structure 3 Post which is an elongated member 4 Horizontal member which is an elongated member 4C Protruding piece 10 Brace 11 Brace main body 12 Connector 13 Connector main body 13C Bifurcated portion 14 Connecting pin 14A Insertion shaft 14B Operation Axial portion 14C Connection portion 15 Coil spring which is an elastic member 17, 18 Extension portions 20, 21 Through hole portion 22 Spring receiving member 24 Recess 25 Hole A Space

Claims (9)

仮設構築物を構成するために平行に配設された2本の細長状部材と、これらの細長状部材と直角をなして配設された少なくとも1本の細長状部材とによって囲まれる空間に、前記細長状部材のそれぞれに対して斜めの角度をもって配置されるブレースであって、長さ方向の一方の端部が前記細長状部材のうちの1本の細長状部材に連結され、長さ方向の他方の端部が残りの前記細長状部材のうちの1本の細長状部材に連結される仮設構築物用ブレースにおいて、
前記一方の端部と前記他方の端部のうち、少なくともどちらかの端部に、前記細長状部材に設けられている孔に挿抜自在に挿入される連結ピンと、この連結ピンを、この連結ピンが前記孔に挿入される前進方向へ弾性付勢するための弾性部材とを備えて構成された連結具が設けられており、
前記連結ピンは、前記弾性部材の弾性付勢力で前進することにより前記孔に挿入される挿入軸部と、この挿入軸部を前記孔から脱出させるために、前記弾性部材の弾性付勢力に抗して前記挿入軸部を後退させるために操作される操作軸部とを有するものとなっており、
前記連結具は、ブレース本体の端部に結合された連結具本体を備えて構成されており、この連結具本体に前記連結ピンが前記ブレース本体の長さ方向と直角をなす方向にスライド自在に配置されているとともに、この連結ピンは、前記挿入軸部と前記操作軸部が前記スライド方向に平行に延びていて、これらの挿入軸部と操作軸部が接続部で接続されたものとなっており、
前記接続部は、前記挿入軸部と前記操作軸部とにおける前記スライド方向の同じ側の端部同士を接続したものとなっており、
前記連結具本体には、前記ブレース本体の長さ方向の端部の端面からこのブレース本体の内部に挿入された挿入部を備えていて、前記ブレース本体の前記端面に結合されているフランジ部が設けられ、前記挿入部と前記フランジ部には、前記ブレース本体の内部の水を排出するための凹部が形成されていることを特徴とする仮設構築物用ブレース。
In the space surrounded by two elongated members arranged in parallel and at least one elongated member arranged at right angles to these elongated members to constitute a temporary structure, A brace disposed at an oblique angle to each of the elongated members, one longitudinal end of which is connected to one of the elongated members and a longitudinal A temporary construction brace, the other end of which is connected to one of said remaining elongated members,
a connecting pin that is removably inserted into a hole provided in the elongated member at least one of the one end and the other end; is inserted into the hole and an elastic member for elastically urging it in the forward direction is provided,
The connecting pin has an insertion shaft portion that is inserted into the hole by being advanced by the elastic biasing force of the elastic member, and an insertion shaft portion that resists the elastic biasing force of the elastic member in order to escape the insertion shaft portion from the hole. and an operating shaft portion operated to retract the insertion shaft portion,
The connector includes a connector body coupled to an end of a brace body, and the connector pin is slidable in the connector body in a direction perpendicular to the length direction of the brace body. The connecting pin has the insertion shaft portion and the operation shaft portion extending parallel to the slide direction, and the insertion shaft portion and the operation shaft portion are connected by a connecting portion. and
The connection portion connects end portions of the insertion shaft portion and the operation shaft portion on the same side in the sliding direction,
The coupler main body has an insertion portion inserted into the brace main body from the end face of the end portion in the length direction of the brace main body, and a flange portion coupled to the end face of the brace main body. A brace for a temporary structure, wherein a concave portion for discharging water inside the brace body is formed in the insertion portion and the flange portion.
仮設構築物を構成するために平行に配設された2本の細長状部材と、これらの細長状部材と直角をなして配設された少なくとも1本の細長状部材とによって囲まれる空間に、前記細長状部材のそれぞれに対して斜めの角度をもって配置されるブレースであって、長さ方向の一方の端部が前記細長状部材のうちの1本の細長状部材に連結され、長さ方向の他方の端部が残りの前記細長状部材のうちの1本の細長状部材に連結される仮設構築物用ブレースにおいて、
前記一方の端部と前記他方の端部のうち、少なくともどちらかの端部に、前記細長状部材に設けられている孔に挿抜自在に挿入される連結ピンと、この連結ピンを、この連結ピンが前記孔に挿入される前進方向へ弾性付勢するための弾性部材とを備えて構成された連結具が設けられており、
前記連結ピンは、前記弾性部材の弾性付勢力で前進することにより前記孔に挿入される挿入軸部と、この挿入軸部を前記孔から脱出させるために、前記弾性部材の弾性付勢力に抗して前記挿入軸部を後退させるために操作される操作軸部とを有するものとなっており、
前記連結具は、ブレース本体の端部に結合された連結具本体を備えて構成されており、この連結具本体に前記連結ピンが前記ブレース本体の長さ方向と直角をなす方向にスライド自在に配置されているとともに、この連結ピンは、前記挿入軸部と前記操作軸部が前記スライド方向に平行に延びていて、これらの挿入軸部と操作軸部が接続部で接続されたものとなっており、
前記接続部は、前記挿入軸部と前記操作軸部とにおける前記スライド方向の同じ側の端部同士を接続したものとなっており、
前記連結具本体には、前記連結ピンの前記スライド方向の間隔をあけてそれぞれが前記ブレース本体の長さ方向に延びている2個の延出部が平行に設けられているとともに、これらの延出部に、前記連結ピンの前記挿入軸部がスライド自在に挿入された貫通孔部が設けられ、前記挿入軸部が挿入される前記孔は、前記細長状部材に設けられた板状の突片部に形成され、この突片部が前記2個の延出部の間に挿入されて、前記挿入軸部が前記孔に挿入されることを特徴とする仮設構築物用ブレース。
In the space surrounded by two elongated members arranged in parallel and at least one elongated member arranged at right angles to these elongated members to constitute a temporary structure, A brace disposed at an oblique angle to each of the elongated members, one longitudinal end of which is connected to one of the elongated members and a longitudinal A temporary construction brace, the other end of which is connected to one of said remaining elongated members,
a connecting pin that is removably inserted into a hole provided in the elongated member at least one of the one end and the other end; is inserted into the hole and an elastic member for elastically urging it in the forward direction is provided,
The connecting pin has an insertion shaft portion that is inserted into the hole by being advanced by the elastic biasing force of the elastic member, and an insertion shaft portion that resists the elastic biasing force of the elastic member in order to escape the insertion shaft portion from the hole. and an operating shaft portion operated to retract the insertion shaft portion,
The connector includes a connector body coupled to an end of a brace body, and the connector pin is slidable in the connector body in a direction perpendicular to the length direction of the brace body. The connecting pin has the insertion shaft portion and the operation shaft portion extending parallel to the slide direction, and the insertion shaft portion and the operation shaft portion are connected by a connecting portion. and
The connection portion connects end portions of the insertion shaft portion and the operation shaft portion on the same side in the sliding direction,
The connector main body is provided with two extending portions in parallel with each other extending in the longitudinal direction of the brace main body with an interval in the sliding direction of the connecting pin. The protruding portion is provided with a through hole into which the insertion shaft of the connecting pin is slidably inserted. A brace for a temporary structure, characterized in that it is formed in a piece portion, the projecting piece portion is inserted between the two extension portions, and the insertion shaft portion is inserted into the hole.
請求項1又は2に記載の仮設構築物用ブレースにおいて、前記挿入軸部が短寸法であって、前記操作軸部が長寸法となっていることにより、前記連結ピンは、J字形状又は略J字形状のものとなっていることを特徴とする仮設構築物用ブレース。 3. The brace for a temporary structure according to claim 1 , wherein the insertion shaft has a short dimension and the operation shaft has a long dimension, so that the connecting pin has a J shape or a substantially J shape. A brace for a temporary structure, characterized in that it is shaped like a letter. 請求項1~3のいずれかに記載の仮設構築物用ブレースにおいて、前記弾性部材は、前記操作軸部の外周に嵌合されたコイルばねとなっており、このコイルばねの長さ方向の一方の端部は、前記連結具本体に当接し、前記コイルばねの他方の端部は、前記操作軸部に設けられたばね受け部材に当接していることを特徴とする仮設構築物用ブレース。 The brace for a temporary structure according to any one of claims 1 to 3, wherein the elastic member is a coil spring fitted around the outer periphery of the operating shaft portion, and one of the coil springs in the length direction A brace for a temporary structure, wherein one end of the coil spring is in contact with the connector main body, and the other end of the coil spring is in contact with a spring receiving member provided on the operating shaft. 請求項4に記載の仮設構築物用ブレースにおいて、前記連結具本体には、前記コイルばねの長さ方向の一部が挿入された凹部が設けられていることを特徴とする仮設構築物用ブレース。 5. The brace for a temporary structure according to claim 4, wherein the connector body is provided with a recess into which a part of the coil spring in the longitudinal direction is inserted. 請求項5に記載の仮設構築物用ブレースにおいて、前記連結具本体には、前記操作軸部が挿入された貫通孔部が形成され、前記コイルばねの長さ方向の一部が挿入された前記凹部は、この貫通孔部よりも直径が大きく、かつこの貫通孔部と同軸的に形成されたものとなっていることを特徴とする仮設構築物用ブレース。 6. The brace for a temporary structure according to claim 5, wherein the connector main body is formed with a through-hole portion into which the operation shaft portion is inserted, and the concave portion into which a part of the coil spring in the length direction is inserted. is a brace for a temporary structure, characterized in that it has a larger diameter than the through-hole and is formed coaxially with the through-hole. 請求項2に記載の仮設構築物用ブレースにおいて、前記連結具本体には、前記2個の延出部を、これらの延出部の延出方向とは反対側の基部において結合する結合部が設けられ、この結合部における互いに反対側の面となっている2つの面は、前記2個の延出部の間において、これらの延出部の延出方向に延びるにしたがって互いに近づく方向に傾斜しているテーパー状の傾斜面となっていることを特徴とする仮設構築物用ブレース。 3. The brace for a temporary structure according to claim 2 , wherein the coupler main body is provided with a connecting portion that connects the two extending portions at the base portion on the side opposite to the extending direction of the extending portions. The two surfaces of the connecting portion, which are surfaces on opposite sides of each other, are inclined toward each other as they extend in the extending direction of the extending portions between the two extending portions. A brace for a temporary structure, characterized in that it has a tapered inclined surface that 請求項1~7のいずれかに記載の仮設構築物用ブレースにおいて、前記一方の端部と前記他方の端部の両方に、前記連結ピンと前記弾性部材とを備えて構成された前記連結具が設けられ、これらの連結具におけるそれぞれの前記連結ピンの前記孔への挿入前進方向が同じ方向になっていることを特徴とする仮設構築物用ブレース。 The brace for a temporary structure according to any one of claims 1 to 7 , wherein the connecting tool configured with the connecting pin and the elastic member is provided at both the one end and the other end. a brace for a temporary structure, wherein each of said connecting pins in said connecting tools is inserted forward in the same direction into said hole. 請求項1~8のいずれかに記載の仮設構築物用ブレースにおいて、前記一方の端部と前記他方の端部の両方に前記連結具が設けられているとともに、これらの前記連結具におけるそれぞれの前記連結ピンは、前記細長状部材となっている上下2本の水平部材に設けられている突片部の前記孔に挿入されるものとなっていることを特徴とする仮設構築物用ブレース。 The brace for a temporary structure according to any one of claims 1 to 8 , wherein the couplers are provided at both the one end and the other end, and A brace for a temporary structure, wherein the connecting pin is inserted into the hole of the protruding piece provided in the two upper and lower horizontal members that are the elongated members.
JP2019092017A 2019-05-15 2019-05-15 Brace for temporary structures Active JP7286408B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019092017A JP7286408B2 (en) 2019-05-15 2019-05-15 Brace for temporary structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019092017A JP7286408B2 (en) 2019-05-15 2019-05-15 Brace for temporary structures

Publications (2)

Publication Number Publication Date
JP2020186579A JP2020186579A (en) 2020-11-19
JP7286408B2 true JP7286408B2 (en) 2023-06-05

Family

ID=73220760

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019092017A Active JP7286408B2 (en) 2019-05-15 2019-05-15 Brace for temporary structures

Country Status (1)

Country Link
JP (1) JP7286408B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7721122B2 (en) * 2021-09-15 2025-08-12 アサヒ産業株式会社 Temporary Structure
JP2023183508A (en) * 2022-06-16 2023-12-28 株式会社タカミヤ Connection device for beam frames for temporary structures

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006112577A (en) 2004-10-18 2006-04-27 Ishii Seisakusho:Kk Connecting structure
JP2010229700A (en) 2009-03-27 2010-10-14 Alinco Inc Wife side leading handrail
JP2011246930A (en) 2010-05-26 2011-12-08 Taisen Industry Co Ltd Connector
JP2014080799A (en) 2012-10-17 2014-05-08 Alinco Inc Scaffolding handrail
JP2015218479A (en) 2014-05-16 2015-12-07 ホリー株式会社 Brace for temporary structure
JP2019015125A (en) 2017-07-10 2019-01-31 有限会社大谷総業 Wife side leading handrail

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0510641U (en) * 1991-07-24 1993-02-12 株式会社竹中工務店 Clamp with pin

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006112577A (en) 2004-10-18 2006-04-27 Ishii Seisakusho:Kk Connecting structure
JP2010229700A (en) 2009-03-27 2010-10-14 Alinco Inc Wife side leading handrail
JP2011246930A (en) 2010-05-26 2011-12-08 Taisen Industry Co Ltd Connector
JP2014080799A (en) 2012-10-17 2014-05-08 Alinco Inc Scaffolding handrail
JP2015218479A (en) 2014-05-16 2015-12-07 ホリー株式会社 Brace for temporary structure
JP2019015125A (en) 2017-07-10 2019-01-31 有限会社大谷総業 Wife side leading handrail

Also Published As

Publication number Publication date
JP2020186579A (en) 2020-11-19

Similar Documents

Publication Publication Date Title
JP7286408B2 (en) Brace for temporary structures
JP2014517176A (en) One-touch quick coupler for rebar connection
WO2013153943A1 (en) Temporary scaffold joint
KR100916546B1 (en) Underground temporary facilities and their construction methods
JP4040802B2 (en) Coupling device
KR100675985B1 (en) Bracing Horizontal Vertical Reinforced Bracing
JP2005120633A (en) Block and block connection device
JP2013057233A (en) Column-beam joint bracket
JP6246596B2 (en) Construction method of column beam frame
JP6263440B2 (en) Brace for temporary structure
JP4029105B2 (en) Connector, PC member manufacturing apparatus and manufacturing method
KR102191192B1 (en) Mini jack device of reinforcing rod connecting coupler
JP5307461B2 (en) Temporary scaffolding bracing
KR101303062B1 (en) Apparatus for connecting of plastic pipe
CN213982509U (en) Pipeline robot well entering tool
JP2005030156A (en) Connection metal fitting for metal concrete mold in vertical and lateral direction
KR20140008873A (en) Steel bars connecting device
JP6613427B1 (en) Lock release jig for lock pin for column connection
KR200479797Y1 (en) Stanchion for system scaffold
JP7258664B2 (en) Work scaffold and flange installation member
KR101441233B1 (en) Steel reinforcement coupler
JP4058430B2 (en) Structural material connection wedge
JP2019060103A (en) Pipe connecting tool
JP4473841B2 (en) Temporary scaffolding connection structure
JP4124548B2 (en) Scaffolding plate fastening device

Legal Events

Date Code Title Description
RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20190607

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220111

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20221028

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20221108

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221205

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230214

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230331

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230516

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230524

R150 Certificate of patent or registration of utility model

Ref document number: 7286408

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150