Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7299059B2 - Temporary scaffolding and method of constructing temporary scaffolding - Google Patents
[go: Go Back, main page]

JP7299059B2 - Temporary scaffolding and method of constructing temporary scaffolding - Google Patents

Temporary scaffolding and method of constructing temporary scaffolding Download PDF

Info

Publication number
JP7299059B2
JP7299059B2 JP2019085814A JP2019085814A JP7299059B2 JP 7299059 B2 JP7299059 B2 JP 7299059B2 JP 2019085814 A JP2019085814 A JP 2019085814A JP 2019085814 A JP2019085814 A JP 2019085814A JP 7299059 B2 JP7299059 B2 JP 7299059B2
Authority
JP
Japan
Prior art keywords
scaffolding
pile
temporary
fixed
members
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019085814A
Other languages
Japanese (ja)
Other versions
JP2020180521A (en
Inventor
幸一 西浦
裕之 杉浦
悠帆 林
隆浩 山本
貴彦 網野
洋志 濱田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Starlite Co Ltd
Toa Corp
Original Assignee
Starlite Co Ltd
Toa Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Starlite Co Ltd, Toa Corp filed Critical Starlite Co Ltd
Priority to JP2019085814A priority Critical patent/JP7299059B2/en
Publication of JP2020180521A publication Critical patent/JP2020180521A/en
Application granted granted Critical
Publication of JP7299059B2 publication Critical patent/JP7299059B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Revetment (AREA)

Description

本発明は、仮設足場および仮設足場の構築方法に関し、さらに詳しくは、防食層を有する水域に立設された杭に対して、防食層の損傷を回避して所望の高さ位置に仮設足場を構築できる仮設足場および仮設足場の構築方法に関するものである。 TECHNICAL FIELD The present invention relates to a temporary scaffolding and a method for constructing a temporary scaffold, and more particularly, to a pile erected in a water area having an anticorrosion layer, the temporary scaffolding is installed at a desired height position while avoiding damage to the anticorrosion layer. It relates to a temporary scaffolding that can be built and a method of building a temporary scaffolding.

桟橋などの水上構造物は、水域に立設された複数の杭の上端部にコンクリート製の上部構造体を支持させた構造になっている。上部構造体の下面や、上部構造体と杭との接合部分などの補修作業を行う場合には、上部構造体の下面と水面との間に仮設足場を構築する必要がある。そこで、従来、杭に設置する種々の仮設足場が提案されている(例えば、特許文献1参照)。 A water structure such as a pier has a structure in which a concrete superstructure is supported on the upper ends of a plurality of piles erected in a water area. A temporary scaffold must be constructed between the lower surface of the upper structure and the water surface when repairing the lower surface of the upper structure or the joints between the upper structure and piles. Therefore, conventionally, various temporary scaffolds installed on piles have been proposed (see, for example, Patent Document 1).

特許文献1に記載の発明では、杭の外周に杭側固定体を巻き付けて固定する。次いで、浮体により水面を移動する足場ユニットに設けられている固定部材本体を杭側固定体の外側に巻き付けて、固定部材本体の両端部を連結し、杭側固定体の楔部と固定部材本体の係合溝とを互いに嵌合させて、足場板の基端側を杭の外周に固定する。次いで、可動リングを杭の外側に上下動可能に嵌合させ、その後、展開手段により可動リングを上昇させるとともに折り畳まれていた足場板を水平になる位置まで展開させる。そして、可動リングを杭に固定すると仮設足場の設置が完了する。 In the invention described in Patent Document 1, the pile-side fixing body is wound around the outer periphery of the pile and fixed. Next, the fixing member main body provided in the scaffolding unit that moves on the water surface by the floating body is wrapped around the outside of the pile side fixing body, the both ends of the fixing member main body are connected, and the wedge part of the pile side fixing body and the fixing member main body are connected. and the engagement grooves are fitted to each other to fix the base end side of the scaffold board to the outer periphery of the pile. Next, the movable ring is fitted to the outside of the pile so that it can move up and down, and then the movable ring is raised by the unfolding means and the folded scaffolding board is unfolded to a horizontal position. Then, when the movable ring is fixed to the stake, the installation of the temporary scaffolding is completed.

一般的に、水域に立設されている杭には、水面付近から上部構造体の下面の高さ位置にまで海水による杭の腐食を防止するための防食層が設けられている。防食層は合成樹脂等で形成されているため比較的損傷しやすいが、特許文献1に記載の発明では、防食層の損傷を回避する対策は考慮されていない。それ故、防食層に仮設足場を設置した場合に、防食層を損傷させてしまう恐れがある。そのため、仮設足場を設置できる位置は、防食層を避けた水面付近の位置に限定され、仮設足場を所望の高さ位置に設置できない場合がある。 In general, piles erected in a water area are provided with anti-corrosion layers from the vicinity of the water surface to the height position of the lower surface of an upper structure to prevent corrosion of the piles due to seawater. Since the anticorrosion layer is made of a synthetic resin or the like, it is relatively easily damaged. Therefore, when a temporary scaffold is installed on the anticorrosion layer, the anticorrosion layer may be damaged. Therefore, the position where the temporary scaffolding can be installed is limited to a position near the water surface avoiding the anticorrosion layer, and the temporary scaffolding may not be installed at a desired height position.

また、特許文献1に記載の発明では、足場ユニットの重量が重いため、足場ユニットを浮体によって水面に浮かせて移動させているが、この方法では、仮設足場を水面から離れた杭の高い位置に構築することは困難である。それ故、例えば、水面から上部構造体の下面までの高さが高い場合には、作業員が上部構造体の下面に届く高さに仮設足場を構築できない場合がある。また、特許文献1に記載の杭側固定体と固定部材本体とを連結する作業は、波やうねりの影響を大きく受けるため、作業性が悪い。 In addition, in the invention described in Patent Document 1, since the scaffolding unit is heavy, the scaffolding unit is moved by floating it on the surface of the water using a floating body. It is difficult to build. Therefore, for example, when the height from the water surface to the lower surface of the upper structure is high, workers may not be able to build a temporary scaffolding at a height that reaches the lower surface of the upper structure. Further, the work of connecting the pile-side fixing body and the fixing member main body described in Patent Document 1 is greatly affected by waves and swells, so workability is poor.

特開2017-57615号公報JP 2017-57615 A

本発明の目的は、防食層を有する水域に立設された杭に対して、防食層の損傷を回避して所望の高さ位置に仮設足場を構築できる仮設足場および仮設足場の構築方法を提供することにある。 It is an object of the present invention to provide a temporary scaffolding and a method for constructing a temporary scaffold that can construct a temporary scaffold at a desired height position while avoiding damage to the anticorrosion layer for piles set up in a water area having an anticorrosion layer. to do.

上記目的を達成するため本発明の仮設足場は、水域に立設された杭に固定される仮設足場において、複数の分割体を連結して構成された前記杭の外周に巻装される環状の固定部材と、この固定部材の内周側に設けられた複数の上側押圧部材と、前記固定部材に一端部が固定されて前記杭を中心にして放射状に延在する複数の支持部材と、それぞれの前記支持部材に上端部が連結されて下方に延在する支持脚と、それぞれの前記支持脚の下端部に設けられた下側押圧部材と、複数の前記支持部材に支持される足場板とを備え、それぞれの前記上側押圧部材とそれぞれの前記下側押圧部材のうち、少なくともそれぞれの前記上側押圧部材が、前記杭の外周面に押し当てられる内周面に非金属製の軟質の緩衝材を有し、前記固定部材および複数の前記上側押圧部材が一体化された巻装ユニットと、前記支持部材および前記支持脚および前記下側押圧部材が一体化された複数の張出し足場ユニットと、前記足場板とに分離可能であり、前記巻装ユニットの前記固定部材が前記杭の外周に巻装されて固定され、それぞれの前記上側押圧部材が前記杭の外周面に押し当てられた状態となり、前記杭に固定された前記固定部材に対して、それぞれの前記張出し足場ユニットの前記支持部材が別々に固定されて、それぞれの前記張出し足場ユニットの前記下側押圧部材が別々に前記杭の外周面に押し当てられた状態になることで、それぞれの前記張出し足場ユニットが別々に前記杭に対して固定され、前記杭に対して固定された複数の前記張出し足場ユニットの前記支持部材に前記足場板が支持させることで、前記杭に対して前記仮設足場が構築される構成であることを特徴とする。 In order to achieve the above object, the temporary scaffolding of the present invention is a temporary scaffold fixed to a pile erected in a water area. a fixing member, a plurality of upper pressing members provided on the inner peripheral side of the fixing member, and a plurality of support members having one ends fixed to the fixing member and extending radially about the pile, respectively. a supporting leg extending downward with an upper end connected to the supporting member; a lower pressing member provided at the lower end of each of the supporting legs; and a scaffolding board supported by the plurality of supporting members At least each of the upper pressing members and the lower pressing members has a non-metallic soft cushioning material on the inner peripheral surface that is pressed against the outer peripheral surface of the pile. a winding unit in which the fixing member and the plurality of upper pressing members are integrated; a plurality of overhanging scaffolding units in which the supporting member, the supporting leg and the lower pressing member are integrated; It is separable from the scaffold board, the fixing member of the winding unit is wound around the outer periphery of the pile and fixed, and each of the upper pressing members is pressed against the outer peripheral surface of the pile, The support members of each of the overhanging scaffolding units are separately fixed to the fixing members fixed to the piles, and the lower pressing members of each of the overhanging scaffolding units are separately attached to the outer peripheral surfaces of the piles. Each of the overhanging scaffolding units is separately fixed to the piles by being pressed against the piles, and the scaffolding plate is attached to the support members of the plurality of overhanging scaffolding units fixed to the piles. The temporary scaffolding is constructed with respect to the piles by supporting the piles .

本発明の仮設足場の構築方法は、外周面の所定の上下範囲に防食層を有して、水域に立設された杭に、仮設足場を構築する仮設足場の構築方法において、複数の分割体を連結して構成された環状の固定部材と、この固定部材の内周側に設けられた複数の上側押圧部材と、前記固定部材に一端部が固定されて前記杭を中心にして放射状に延在する複数の支持部材と、それぞれの前記支持部材に上端部が連結されて下方に延在する支持脚と、それぞれの前記支持脚の下端部に設けられた下側押圧部材と、前記支持部材に支持される足場板とを有し、それぞれの前記上側押圧部材とそれぞれの前記下側押圧部材のうち、少なくともそれぞれの前記上側押圧部材が、前記杭の外周面に押し当てられる内周面に非金属製の軟質の緩衝材を有し、前記固定部材および複数の前記上側押圧部材が一体化された巻装ユニットと、前記支持部材および前記支持脚および前記下側押圧部材が一体化された複数の張出し足場ユニットと、前記足場板とに分離可能な前記仮設足場を使用し、前記巻装ユニットの前記固定部材を前記杭の外周に環状に巻装して固定し、それぞれの前記上側押圧部材を前記杭の外周面に押し当てた状態とし、前記杭に固定された前記固定部材に対して、それぞれの前記張出し足場ユニットの前記支持部材を別々に固定して、それぞれの前記張出し足場ユニットの前記下側押圧部材を別々に前記杭の外周面に押し当てた状態にすることで、それぞれの前記張出し足場ユニットを別々に前記杭に対して固定し、前記防食層にはそれぞれの前記緩衝材を押し当てた状態にし、前記杭に対して固定された複数の前記張出し足場ユニットの前記支持部材に前記足場板を支持させることで、前記杭に対して前記仮設足場を構築することを特徴とする。 The temporary scaffolding construction method of the present invention is a temporary scaffolding construction method in which a temporary scaffolding is constructed on a pile erected in a water area having an anticorrosion layer in a predetermined upper and lower range of the outer peripheral surface, in which a plurality of divided bodies , a plurality of upper pressing members provided on the inner peripheral side of the fixing member, and one end fixed to the fixing member and extending radially around the pile a plurality of supporting members present; supporting legs each having an upper end connected to each of the supporting members and extending downward; a lower pressing member provided at a lower end of each of the supporting legs; and a scaffolding plate supported by the pile, and at least each of the upper pressing members among the upper pressing members and the lower pressing members is on the inner peripheral surface pressed against the outer peripheral surface of the pile A winding unit having a non-metallic soft cushioning material, in which the fixing member and the plurality of upper pressing members are integrated, and the supporting member, the supporting legs, and the lower pressing member are integrated. The separable temporary scaffold is used for a plurality of overhanging scaffolding units and the scaffolding plate , and the fixing member of the winding unit is annularly wound around the outer periphery of the pile and fixed, and the upper pressing A member is pressed against the outer peripheral surface of the pile, and the support members of each of the overhanging scaffolding units are separately fixed to the fixing members fixed to the piles, so that each of the overhanging scaffolding units Each of the overhanging scaffolding units is separately fixed to the pile by pressing the lower pressing member separately against the outer peripheral surface of the pile, and the anticorrosion layer has the buffer The temporary scaffolding is constructed on the piles by pressing the material against the piles and supporting the scaffolding boards on the support members of the plurality of overhanging scaffolding units fixed to the piles. and

本発明によれば、仮設足場の固定部材を杭の外周に環状に巻装して、それぞれの上側押圧部材およびそれぞれの下側押圧部材を杭の外周面に押し当て、防食層には非金属製の軟質の緩衝材を押し当てた状態にする。これにより、杭の防食層が設けられている位置においても、防食層の損傷を回避しつつ、仮設足場を安定して固定できる。 According to the present invention, the fixing member of the temporary scaffolding is annularly wound around the outer periphery of the pile, the upper pressing member and the lower pressing member are pressed against the outer peripheral surface of the pile, and the anticorrosion layer is made of non-metallic material. A soft cushioning material made of As a result, the temporary scaffolding can be stably fixed while avoiding damage to the anticorrosion layer even at the position where the anticorrosion layer of the pile is provided.

本発明の仮設足場の実施形態において、仮設足場を杭に構築した状態を上面視で例示する説明図である。FIG. 2 is an explanatory diagram illustrating a state in which the temporary scaffolding is built on piles in an embodiment of the temporary scaffolding of the present invention, viewed from above. 図1のA-A断面矢視図である。FIG. 2 is a cross-sectional view taken along the line AA of FIG. 1; 図1の仮設足場の巻装ユニットのみを杭に巻装した状態を上面視で例示する説明図である。1. It is explanatory drawing which illustrates the state which wound only the winding unit of the temporary scaffolding of FIG. 1 on the pile by top view. 図3のB-B断面矢視図である。4 is a cross-sectional view taken along line BB of FIG. 3; FIG. 図3の巻装ユニットに張出し足場ユニットを取付けた状態を上面視で例示する説明図である。FIG. 4 is an explanatory diagram illustrating a state in which an overhanging scaffolding unit is attached to the winding unit of FIG. 3 as viewed from above; 図1の仮設足場を上下方向に複数設置した状態を断面視で例示する説明図である。It is explanatory drawing which illustrates the state which installed multiple temporary scaffolds of FIG. 1 in the up-down direction by sectional view. 図1の仮設足場どうしの間に連結足場板を架け渡した状態を上面視で例示する説明図である。1. It is explanatory drawing which illustrates the state which bridged the connection scaffold board between the temporary scaffolds of FIG. 1 by top view. 巻装ユニットを変更した図1の仮設足場を図1の杭とは杭径が異なる別の杭に構築した状態を上面視で例示する説明図である。1. It is explanatory drawing which illustrates the state which built the temporary scaffolding of FIG. 1 which changed the winding unit on another pile with a pile diameter different from the pile of FIG. 1 by top view. 本発明の仮設足場の別の実施形態を上面視で例示する説明図である。It is explanatory drawing which illustrates another embodiment of the temporary scaffolding of this invention by top view. 図9のE-E断面矢視図である。FIG. 10 is a cross-sectional view taken along line EE of FIG. 9;

以下、本発明の仮設足場および仮設足場の構築方法を図に示した実施形態に基づいて説明する。 Hereinafter, the temporary scaffolding and the construction method of the temporary scaffolding of the present invention will be described based on the embodiments shown in the drawings.

図1および図2に例示するように、本発明の仮設足場1は、水域に立設されている鋼管杭などの杭20に固定して設置する。一般的に、水域に立設されている杭20は、水面付近の所定の上下範囲に、海水による杭20の腐食を防止する防食層21が設けられている。防食層21としては例えば、杭20にポリエチレンやポリウレタンなどの合成樹脂を塗装したものや、杭20に巻き付けたペトロラタム系防食テープを繊維強化プラスチック(FRP)製のカバーで被覆したものなどがある。本発明の仮設足場1は、防食層21を有する杭20に固定するのに特に適した仕様になっている。 As illustrated in FIGS. 1 and 2, the temporary scaffolding 1 of the present invention is installed by fixing to piles 20 such as steel pipe piles erected in a water area. In general, a pile 20 erected in a water area is provided with an anti-corrosion layer 21 in a predetermined vertical range near the water surface to prevent the pile 20 from being corroded by seawater. As the anticorrosion layer 21, for example, the pile 20 is coated with a synthetic resin such as polyethylene or polyurethane, or the petrolatum anticorrosion tape wound around the pile 20 is covered with a fiber reinforced plastic (FRP) cover. The temporary scaffolding 1 of the present invention is specially adapted for fixing to piles 20 having an anticorrosion layer 21 .

仮設足場1は、杭20の外周に巻装される環状の固定部材3と、固定部材3の内周側に設けられた複数の上側押圧部材4と、固定部材3に一端部が固定される複数の支持部材8と、それぞれの支持部材8に上端部が連結されて下方に延在する支持脚9と、それぞれの支持脚9の下端部に設けられた下側押圧部材10と、複数の支持部材8に支持される足場板13とを備えている。 The temporary scaffolding 1 includes an annular fixing member 3 wound around the outer periphery of the pile 20, a plurality of upper pressing members 4 provided on the inner peripheral side of the fixing member 3, and one end fixed to the fixing member 3. a plurality of support members 8; support legs 9 extending downward with upper ends connected to the support members 8; lower pressing members 10 provided at the lower ends of the support legs 9; and a scaffold board 13 supported by the support member 8 .

この実施形態の仮設足場1は、固定部材3および複数の上側押圧部材4が一体化された巻装ユニット2と、支持部材8および支持脚9および下側押圧部材10が一体化された複数の張出し足場ユニット7と、複数の足場板13とに分離可能な構成になっている。 The temporary scaffolding 1 of this embodiment includes a winding unit 2 in which a fixing member 3 and a plurality of upper pressing members 4 are integrated, and a plurality of supporting members 8, supporting legs 9 and lower pressing members 10 in which a plurality of supporting members 8 and 9 are integrated. The overhanging scaffolding unit 7 and a plurality of scaffolding boards 13 are separable.

本発明の仮設足場1では、それぞれの上側押圧部材4とそれぞれの下側押圧部材10のうち、少なくともそれぞれの上側押圧部材4が、杭20の外周面に押し当てられる内周面に非金属製の軟質の緩衝材5を有している。緩衝材5には例えば、ゴムや軟質樹脂などの中実体や発泡体を用いる。緩衝材5は、一般的なゴムと同等以下の硬度にするとよい。緩衝材5の杭20に対する押圧面には、防食層21に対してより摩擦抵抗を大きくする加工や処理をするとよい。 In the temporary scaffolding 1 of the present invention, among the upper pressing members 4 and the lower pressing members 10, at least each of the upper pressing members 4 has a non-metallic material on the inner peripheral surface that is pressed against the outer peripheral surface of the pile 20. of soft cushioning material 5. For the cushioning material 5, for example, a solid material such as rubber or soft resin, or a foam material is used. The cushioning material 5 should have a hardness equal to or lower than that of general rubber. The surface of the cushioning material 5 that presses against the pile 20 may be processed or treated to increase the frictional resistance of the anticorrosion layer 21 .

固定部材3は、複数の分割体3aを連結して構成されている。この実施形態の固定部材3は、6つの分割体3aで構成されていて、隣り合う分割体3aの端部どうしがヒンジ部3bで連結されている。固定部材3の両端部(両端に配置された分割体3aの端部)には、それぞれ連結部3cが設けられていて、連結部3cどうしを連結具3dで着脱可能に連結できる構造になっている。この実施形態では、一続きの固定部材3としているが、例えば、固定部材3が複数のパーツに分離可能な構成にすることもできる。 The fixing member 3 is configured by connecting a plurality of divided bodies 3a. The fixing member 3 of this embodiment is composed of six divided bodies 3a, and the ends of the adjacent divided bodies 3a are connected by hinges 3b. Connecting portions 3c are provided at both ends of the fixing member 3 (ends of the divided bodies 3a arranged at both ends), and the connecting portions 3c can be detachably connected with connecting tools 3d. there is In this embodiment, the fixing member 3 is a continuous piece, but for example, the fixing member 3 can be configured to be separable into a plurality of parts.

図1に例示するように、この実施形態の仮設足場1は、連結部3cどうしを連結して固定部材3を杭20に巻装した状態で、杭20の軸心Cを中心にして水平方向に60度ずつ固定角度を変えて放射状に延在する6つの上側押圧部材4を有している。それぞれの上側押圧部材4の外周側は固定部材3の内周側に接合されていて、杭20の外周面に押し当てられるそれぞれの上側押圧部材4の内周面に緩衝材5が設けられている。 As illustrated in FIG. 1 , the temporary scaffolding 1 of this embodiment is configured such that the connecting portions 3c are connected to each other and the fixing member 3 is wound around the pile 20, and the piles 20 are arranged in a horizontal direction around the axis C of the pile 20. It has six upper pressing members 4 radially extending with fixed angles changed every 60 degrees. The outer peripheral side of each upper pressing member 4 is joined to the inner peripheral side of the fixing member 3, and a cushioning material 5 is provided on the inner peripheral surface of each upper pressing member 4 that is pressed against the outer peripheral surface of the pile 20. there is

支持部材8は、板状の部材で構成されている。図1に例示するように、杭20に巻装した固定部材3に支持部材8を固定した状態にすると、複数の支持部材8が、杭20を中心にして放射状に略水平方向に延在した状態になる。この実施形態では、杭20の軸心Cを中心にして固定部材3の外周側に水平方向に60度ずつ固定角度を変えて6つの支持部材8が固定可能な構造になっている。 The support member 8 is configured by a plate-like member. As illustrated in FIG. 1, when the supporting members 8 are fixed to the fixing members 3 wound around the piles 20, the plurality of supporting members 8 radially extend substantially horizontally around the piles 20. become a state. In this embodiment, six supporting members 8 can be fixed to the outer peripheral side of the fixing member 3 around the axis C of the pile 20 by changing the fixing angle by 60 degrees in the horizontal direction.

この実施形態では、固定部材3に支持部材8を上側係合具6によって固定する構成になっている。それぞれの分割体3aとそれぞれの支持部材8には2ヶ所ずつ上側係合具6を挿入する挿入孔が形成されている。図2に例示するように、上側係合具6は、固定部材3と支持部材8とを連結した状態で、上側係合具6の下部が支持部材8の下方にまで突出した状態となり、その突出した上側係合具6の下部に連結部材12の上端部を連結できる構造になっている。それぞれの支持部材8には、さらに、支持部材8に対して足場板13を固定する固定具13aを挿入可能な挿入孔8aが複数形成されている。この実施形態では挿入孔8aとして、支持部材8の長手方向に延在する長孔が形成されている。 In this embodiment, the supporting member 8 is fixed to the fixing member 3 by the upper engaging member 6 . Each split body 3a and each support member 8 are formed with two insertion holes into which the upper engaging members 6 are inserted. As illustrated in FIG. 2, the upper engaging member 6 is in a state in which the lower portion of the upper engaging member 6 protrudes below the supporting member 8 when the fixing member 3 and the supporting member 8 are connected. The structure is such that the upper end portion of the connecting member 12 can be connected to the lower portion of the projecting upper engaging member 6 . Each support member 8 is further formed with a plurality of insertion holes 8a into which fasteners 13a for fixing the scaffolding board 13 to the support member 8 can be inserted. In this embodiment, an elongated hole extending in the longitudinal direction of the support member 8 is formed as the insertion hole 8a.

それぞれの支持脚9は、支持部材8の幅方向に離間して配置された一対の棒状材で構成されていて、それぞれの棒状材の上端部が支持部材8の他端部の側面に連結具9aによって上下方向に回転可能に連結されている。図2に例示するように、連結具9aによる締付を弱めると支持部材8と支持脚9とがなす角度Dを変更でき、連結具9aによる締付を強めると支持部材8に対して支持脚9を固定できる構造になっている。それぞれの支持脚9は、支持部材8の他端部から杭20に向かって斜め下方向に延在した状態で支持部材8に対して固定される。 Each support leg 9 is composed of a pair of rod-shaped members spaced apart in the width direction of the support member 8 , and the upper end of each rod-shaped member connects to the side surface of the other end of the support member 8 . 9a to be vertically rotatable. As exemplified in FIG. 2, when the tightening by the connector 9a is weakened, the angle D between the support member 8 and the support leg 9 can be changed. It has a structure that can fix 9. Each support leg 9 is fixed to the support member 8 while extending obliquely downward from the other end of the support member 8 toward the pile 20 .

それぞれの下側押圧部材10は、支持脚9の下端部に連結具10aによって上下方向に回転可能に連結されている。連結具10aによる締付を弱めると支持脚9に対する下側押圧部材10の固定角度を変更でき、連結具10aによる締付を強めると支持脚9に対して下側押圧部材10を固定できる構造になっている。この実施形態では、杭20の外周面に押し当てられるそれぞれの下側押圧部材10の内周面に緩衝材5が設けられている。 Each lower pressing member 10 is connected to the lower end of the support leg 9 by a connector 10a so as to be vertically rotatable. A structure in which the fixing angle of the lower pressing member 10 to the support leg 9 can be changed by weakening the tightening by the connector 10a, and the lower pressing member 10 can be fixed to the support leg 9 by increasing the tightening by the connector 10a. It's becoming In this embodiment, cushioning material 5 is provided on the inner peripheral surface of each lower pressing member 10 that is pressed against the outer peripheral surface of pile 20 .

この実施形態では、それぞれの下側押圧部材10の上部に下側係合具11が設けられていて、それぞれの下側係合具11は、連結部材12の下端部を連結できる構造になっている。連結部材12は例えばワイヤロープや樹脂製のロープなどで構成される。それぞれの連結部材12は、それぞれの支持部材8と支持脚9とのなす角度Dが所定の一定角度になるように、予め長さが調整されている。上側係合具6と下側係合具11は、杭20に仮設足場1を固定した状態で、それぞれの上側係合具6の真下にそれぞれ下側係合具11が位置するように配置されている。この実施形態では、下側係合具11を下側押圧部材10の上部に固定しているが、例えば、下側係合具11を連結具10aや支持脚9の下端部に固定した構成にすることもできる。 In this embodiment, a lower engaging member 11 is provided on the upper portion of each lower pressing member 10 , and each lower engaging member 11 has a structure capable of connecting the lower ends of the connecting members 12 . there is The connecting member 12 is composed of, for example, a wire rope, a resin rope, or the like. The length of each connecting member 12 is adjusted in advance so that the angle D formed by each supporting member 8 and supporting leg 9 is a predetermined constant angle. The upper engaging tool 6 and the lower engaging tool 11 are arranged so that the lower engaging tool 11 is positioned directly below the upper engaging tool 6 with the temporary scaffolding 1 fixed to the pile 20. ing. In this embodiment, the lower engaging member 11 is fixed to the upper portion of the lower pressing member 10. However, for example, the lower engaging member 11 may be fixed to the connecting member 10a or the lower end of the support leg 9. You can also

この実施形態では、張出し足場ユニット7に、下側係合具11と連結部材12とが予め一体化されている。この実施形態の仮設足場1は、張出し足場ユニット7を6組有している。 In this embodiment, the lower engagement member 11 and the connecting member 12 are integrated with the overhang scaffolding unit 7 in advance. The temporary scaffolding 1 of this embodiment has six overhanging scaffolding units 7 .

この実施形態では、周方向に隣り合う支持部材8どうしの間にそれぞれ上面視台形状の足場板13を架け渡して、足場板13の両端部をそれぞれ別々の支持部材8に固定具13aで固定する構造になっている。この実施形態の仮設足場1は、足場板13を6枚有している。 In this embodiment, scaffolding boards 13 each having a trapezoidal shape when viewed from the top are laid between support members 8 adjacent in the circumferential direction, and both ends of the scaffolding boards 13 are fixed to separate support members 8 with fasteners 13a. It is structured to The temporary scaffolding 1 of this embodiment has six scaffolding boards 13 .

上述した固定部材3、上側押圧部材4、支持部材8、支持脚9、下側押圧部材10、および足場板13は、それぞれ軽量で耐久性に優れたアルミニウム合金などの軽量金属や、繊維強化プラスチックなどで形成するとよい。巻装ユニット2、張出し足場ユニット7、および足場板13はそれぞれ、1人或いは2人の作業者が人力で持ち上げることが可能な重量、具体的には例えば15kg以下にすることが可能である。巻装ユニット2、張出し足場ユニット7、および足場板13はそれぞれ水に浮く密度で形成することが可能であり、巻装ユニット2、張出し足場ユニット7、および足場板13が落水した場合にも容易に回収できる。例えば、巻装ユニット2、張出し足場ユニット7、および足場板13の密度を高くする場合には、巻装ユニット2、張出し足場ユニット7、および足場板13に水に浮かぶフロート材を付設することもできる。 The fixing member 3, the upper pressing member 4, the supporting member 8, the supporting leg 9, the lower pressing member 10, and the scaffold board 13 described above are made of lightweight metal such as aluminum alloy which is lightweight and excellent in durability, or fiber reinforced plastic. and so on. Each of the winding unit 2, the overhanging scaffolding unit 7, and the scaffolding board 13 can have a weight that can be manually lifted by one or two workers, specifically, for example, 15 kg or less. The winding unit 2, the overhanging scaffolding unit 7, and the scaffolding board 13 can each be formed with a density that floats on water, and even if the winding unit 2, the overhanging scaffolding unit 7, and the scaffolding board 13 fall into the water, they can easily be formed. can be recovered to For example, when the density of the winding unit 2, the overhanging scaffolding unit 7, and the scaffolding board 13 is increased, the winding unit 2, the overhanging scaffolding unit 7, and the scaffolding board 13 may be provided with float materials that float on water. can.

次に、仮設足場1を使用して水域に立設された杭20に仮設足場を構築する方法を説明する。この実施形態では、杭20の上端部に構築されている上部構造体22の下面と水面との間に仮設足場1を設置する。 Next, a method of constructing a temporary scaffold on piles 20 erected in a water area using the temporary scaffold 1 will be described. In this embodiment, the temporary scaffolding 1 is installed between the lower surface of the upper structure 22 built on the upper end of the pile 20 and the water surface.

小型船や筏などを使用して、仮設足場1を構成する巻装ユニット2と、複数の張出し足場ユニット7と、複数の足場板13とを杭20の近傍まで移送する。次いで、図3および図4に例示するように、巻装ユニット2を所望の高さ位置で杭20の外周に巻装して固定する。 A small ship, a raft, or the like is used to transfer a winding unit 2 constituting a temporary scaffolding 1, a plurality of overhanging scaffolding units 7, and a plurality of scaffolding boards 13 to the vicinity of a pile 20.例文帳に追加Next, as illustrated in FIGS. 3 and 4, the winding unit 2 is wound around the pile 20 at a desired height and fixed.

具体的には、固定部材3を所望の高さ位置で杭20に外嵌めし、固定部材3の連結部3cどうしを連結具3dで連結することで、杭20の外周に固定部材3を巻装する。杭20の外周に固定部材3を巻装すると、それぞれの上側押圧部材4に設けられている緩衝材5が、杭20の外周面に密着した状態になる。この実施形態では、それぞれの上側押圧部材4に設けられている緩衝材5をそれぞれ杭20の防食層21に当接させている。複数の上側押圧部材4がそれぞれ杭20の軸心Cに向かって杭20の外周面を押圧することで、複数の上側押圧部材4によって杭20が挟持され、杭20に対して巻装ユニット2が安定して固定された状態になる。 Specifically, the fixing member 3 is fitted around the pile 20 at a desired height position, and the connecting parts 3c of the fixing member 3 are connected with the connecting tool 3d, so that the fixing member 3 is wound around the outer periphery of the pile 20. wear. When the fixing member 3 is wound around the pile 20 , the cushioning material 5 provided on each upper pressing member 4 comes into close contact with the outer peripheral surface of the pile 20 . In this embodiment, the cushioning material 5 provided on each upper pressing member 4 is brought into contact with the anti-corrosion layer 21 of each pile 20 . By pressing the outer peripheral surface of the pile 20 toward the axis C of the pile 20 by the plurality of upper pressing members 4, the pile 20 is sandwiched by the plurality of upper pressing members 4, and the winding unit 2 is attached to the pile 20. becomes stable and fixed.

次いで、図5に例示するように、杭20に固定された巻装ユニット2に、それぞれの張出し足場ユニット7を固定する。具体的には、支持部材8を持ち上げた状態で、支持部材8の一端部を固定部材3に上側係合具6を用いて固定する。このとき、支持部材8と支持脚9とを連結する連結具9aによる締付は緩めた状態にし、支持脚9と下側押圧部材10は小型船や筏の上に置いた状態にするとよい。次いで、図1および図2に例示するように、下側押圧部材10を持ち上げて、下側係合具11に下端部が連結された状態の連結部材12の上端部を上方に位置する上側係合具6の下部に連結し、下側押圧部材10の内周面を杭20の外周面に押し当てた状態にする。そして、支持部材8と支持脚9とを連結する連結具9aによる締付を強めて、支持部材8に対して支持脚9を固定する。この実施形態では、それぞれの下側押圧部材10の内周面に設けられている緩衝材5をそれぞれ杭20の防食層21に当接させている。 Each overhanging scaffolding unit 7 is then fixed to the winding unit 2 fixed to the pile 20, as illustrated in FIG. Specifically, one end of the support member 8 is fixed to the fixing member 3 by using the upper engaging member 6 while the support member 8 is lifted. At this time, it is preferable that the tightening by the connecting member 9a that connects the support member 8 and the support leg 9 is loosened, and the support leg 9 and the lower pressing member 10 are placed on a small boat or raft. Next, as illustrated in FIGS. 1 and 2, the lower pressing member 10 is lifted, and the upper end of the connecting member 12 whose lower end is connected to the lower engaging member 11 is moved to the upper engaging member positioned above. The inner peripheral surface of the lower pressing member 10 is pressed against the outer peripheral surface of the pile 20 by connecting to the lower part of the fitting 6 . Then, the support leg 9 is fixed to the support member 8 by increasing the tightening by the connector 9 a that connects the support member 8 and the support leg 9 . In this embodiment, the cushioning material 5 provided on the inner peripheral surface of each lower pressing member 10 is brought into contact with the anti-corrosion layer 21 of each pile 20 .

巻装ユニット2にすべての張出し足場ユニット7を固定し終えると、固定部材3に支持部材8の一端部が固定されるとともに、複数の下側押圧部材10がそれぞれ杭20の軸心Cに向かって杭20の外周面を押圧することで、複数の下側押圧部材10によって杭20が挟持され、杭20に対して張出し足場ユニット7が安定して固定された状態になる。 When all the overhanging scaffolding units 7 are fixed to the winding unit 2, one end of the support member 8 is fixed to the fixing member 3, and the plurality of lower pressing members 10 move toward the axis C of the pile 20. By pressing the outer peripheral surface of the pile 20, the pile 20 is sandwiched by the plurality of lower pressing members 10, and the overhanging scaffolding unit 7 is stably fixed to the pile 20.例文帳に追加

次いで、図1および図2に例示するように、杭20の周方向に隣り合う支持部材8どうしの間に足場板13を架け渡して、足場板13の両端部をそれぞれ別々の支持部材8に固定具13aで固定する。すべての足場板13を固定し終えると、上面視で固定部材3の外周側に環状に連続して足場板13が配置された状態になる。以上により、仮設足場1の設置作業が完了する。このように、杭20に仮設足場1を固定することで、水上における杭20の周囲に作業員が搭乗可能な仮設足場が構築される。この仮設足場1では、緩衝材5のみが防食層21に接触した状態になる。 Next, as exemplified in FIGS. 1 and 2, the scaffolding board 13 is bridged between the support members 8 adjacent in the circumferential direction of the pile 20, and both ends of the scaffolding board 13 are attached to the separate support members 8, respectively. It is fixed by the fixture 13a. When all the scaffolding boards 13 have been fixed, the scaffolding boards 13 are arranged continuously in a ring on the outer peripheral side of the fixing member 3 in top view. By the above, the installation work of the temporary scaffolding 1 is completed. By fixing the temporary scaffolding 1 to the piles 20 in this manner, a temporary scaffolding on which workers can ride around the piles 20 on the water is constructed. In this temporary scaffolding 1 , only the cushioning material 5 is in contact with the anticorrosion layer 21 .

図6に例示するように、例えば、杭20に構築し終えた仮設足場1を使用して、その仮設足場1よりも高い位置に別の仮設足場1を構築することもできる。小型船や筏から巻装ユニット2、張出し足場ユニット7、および足場板13を杭20に固定し終えている仮設足場1の上に持ち上げて載置し、その仮設足場1の上で同様に別の仮設足場1の設置作業を行うことができる。図6では、上下方向に2層の仮設足場1を構築する場合を例示しているが、3層以上の仮設足場1を構築することも可能である。例えば、上下に設置した仮設足場1どうしの間に梯子などを架けることもできる。 As illustrated in FIG. 6, for example, a temporary scaffolding 1 that has been constructed on piles 20 can be used to construct another temporary scaffolding 1 at a position higher than the temporary scaffolding 1 . The winding unit 2, the overhanging scaffolding unit 7, and the scaffolding board 13 are lifted from a small boat or raft onto the temporary scaffolding 1 that has been fixed to the piles 20, and placed on the temporary scaffolding 1. installation work of the temporary scaffolding 1 can be performed. FIG. 6 exemplifies a case where two layers of temporary scaffolding 1 are constructed in the vertical direction, but it is also possible to construct a temporary scaffolding 1 of three or more layers. For example, a ladder or the like can be hung between the temporary scaffolds 1 installed vertically.

図7に例示するように、複数の杭20にそれぞれ仮設足場1を固定し、隣り合う仮設足場1どうしの間に連結足場板17を架け渡すことで、杭20どうしの間に仮設足場を構築することもできる。連結足場板17は、板状材や網状材で構成される。連結足場板17は、軽量で耐久性に優れたアルミニウム合金などの軽量金属や、繊維強化プラスチックなどで形成するとよい。 As exemplified in FIG. 7, a temporary scaffolding is constructed between piles 20 by fixing temporary scaffolds 1 to a plurality of piles 20, respectively, and connecting scaffolding boards 17 between adjacent temporary scaffolds 1. You can also The connecting scaffold board 17 is composed of a plate-like material or a net-like material. The connecting scaffolding board 17 is preferably made of lightweight metal such as aluminum alloy, which is lightweight and excellent in durability, or fiber-reinforced plastic.

仮設足場1は設置作業と逆の手順で撤去することができる。具体的には、連結足場板17を取外す。次いで、それぞれの足場板13を支持部材8から取外す。次いで、上側係合具6と連結部材12との連結を解除し、上側係合具6による固定部材3に対する支持部材8の固定を解除して、それぞれの張出し足場ユニット7を巻装ユニット2から取外す。次いで、連結具3dによる固定部材3の連結部3cの連結を解除して、杭20から巻装ユニット2を取外す。以上により仮設足場1の撤去が完了する。 The temporary scaffolding 1 can be removed by reversing the installation work. Specifically, the connecting scaffold board 17 is removed. Each scaffolding board 13 is then removed from the support member 8 . Next, the connection between the upper engaging tool 6 and the connecting member 12 is released, the fixation of the support member 8 to the fixing member 3 by the upper engaging tool 6 is released, and each overhanging scaffolding unit 7 is removed from the winding unit 2. Remove. Next, the connection of the connecting portion 3c of the fixing member 3 by the connecting tool 3d is released, and the winding unit 2 is removed from the pile 20. As shown in FIG. Removal of the temporary scaffolding 1 is thus completed.

このように、本発明によれば、仮設足場1の固定部材3を杭20の外周に環状に巻装して、それぞれの上側押圧部材4およびそれぞれの下側押圧部材10を杭20の外周面に押し当て、防食層21には非金属製の軟質の緩衝材5を押し当てた状態にする。これにより、杭20の防食層21が設けられている位置においても、防食層21の損傷を回避しつつ、仮設足場1を安定して固定できる。 Thus, according to the present invention, the fixing member 3 of the temporary scaffolding 1 is annularly wound around the outer periphery of the pile 20 , and each upper pressing member 4 and each lower pressing member 10 is attached to the outer peripheral surface of the pile 20 . , and a nonmetallic soft cushioning material 5 is pressed against the anticorrosion layer 21 . As a result, the temporary scaffolding 1 can be stably fixed while avoiding damage to the anticorrosion layer 21 even at the positions of the piles 20 where the anticorrosion layer 21 is provided.

さらに、緩衝材5を設けることで、杭20の外周面に歪みや凹凸がある場合にも、緩衝材5が杭20の外周面の形状に合わせて変形して杭20の外周面に緩衝材5が密着した状態になる。それ故、それぞれの上側押圧部材4とそれぞれの下側押圧部材10による押圧力が局部に集中することなく、杭20に対して均一に押圧力を加えることができる。これにより、杭20に対して仮設足場1を安定して固定しつつ、防食層21が損傷するリスクを低減できる。 Furthermore, by providing the cushioning material 5, even if the outer peripheral surface of the pile 20 is distorted or uneven, the cushioning material 5 is deformed according to the shape of the outer peripheral surface of the pile 20, 5 will be in close contact. Therefore, the pressing forces of the respective upper pressing members 4 and the respective lower pressing members 10 can be uniformly applied to the piles 20 without local concentration. As a result, the risk of damage to the anticorrosion layer 21 can be reduced while stably fixing the temporary scaffolding 1 to the piles 20 .

このように、従来では、防食層21の損傷を回避するために、仮設足場を杭20の防食層21を避けた水中部に潜水士によって固定するなどの対策がとられていたが、本発明では従来と発想を変えて、仮設足場1を防食層21に固定するのに適した仕様にすることで、防食層21の損傷を回避しつつ、仮設足場1を防食層21に固定することを可能にしている。これにより、本発明では、仮設足場1を固定可能な高さ位置が限定されないため、杭20の所望の高さ位置に仮設足場1を構築することが可能となる。 Thus, conventionally, in order to avoid damage to the anti-corrosion layer 21, measures such as fixing the temporary scaffolding to the underwater part of the pile 20 avoiding the anti-corrosion layer 21 have been taken. Then, by changing the idea from the conventional one and making the specifications suitable for fixing the temporary scaffold 1 to the anticorrosive layer 21, it is possible to fix the temporary scaffold 1 to the anticorrosive layer 21 while avoiding damage to the anticorrosive layer 21. making it possible. Accordingly, in the present invention, since the height position to which the temporary scaffolding 1 can be fixed is not limited, the temporary scaffolding 1 can be constructed at a desired height position of the piles 20 .

この実施形態のように、仮設足場1が、固定部材3および複数の上側押圧部材4が一体化された巻装ユニット2と、支持部材8および支持脚9および下側押圧部材10が一体化された複数の張出し足場ユニット7と、足場板13とに分離可能な構成にすると、巻装ユニット2、張出し足場ユニット7、および足場板13をそれぞれ1人或いは2人の少人数の作業者で持ち上げることが可能な重量(例えば、15kg以下)にすることができる。それ故、巻装ユニット2を杭20に巻装して固定し、次いで、巻装ユニット2に複数の張出し足場ユニット7を固定し、次いで、複数の張出し足場ユニット7に足場板13を固定することで、仮設足場1を少人数で容易に構築することができる。 As in this embodiment, the temporary scaffolding 1 is composed of a winding unit 2 in which a fixing member 3 and a plurality of upper pressing members 4 are integrated, and a support member 8, supporting legs 9, and a lower pressing member 10 which are integrated. In addition, when a plurality of overhanging scaffolding units 7 and scaffolding boards 13 are configured to be separable, each of the winding unit 2, overhanging scaffolding units 7, and scaffolding boards 13 can be lifted by a small number of workers, one or two. possible weight (for example, 15 kg or less). Therefore, the winding unit 2 is wound around the stake 20 and fixed, then a plurality of overhanging scaffolding units 7 are fixed to the winding unit 2, and then the scaffolding boards 13 are fixed to the plurality of overhanging scaffolding units 7. Thus, the temporary scaffolding 1 can be easily constructed by a small number of people.

また、例えば、仮設足場1の構成部材をより細かく分離した状態で水域において構成部材どうしを組み立ててもよいが、この実施形態のように、予め巻装ユニット2と張出し足場ユニット7を形成しておくと、水域において少ない工数でより容易に仮設足場1を構築できる。撤去作業も少ない工数で容易に行えるので、非常に利便性が高くなる。 Further, for example, the constituent members of the temporary scaffolding 1 may be assembled in a water area after being separated more finely, but as in this embodiment, the winding unit 2 and the overhanging scaffolding unit 7 are formed in advance. By placing them, the temporary scaffolding 1 can be more easily constructed in a water area with a small number of man-hours. Since the removal work can be easily performed with a small number of man-hours, the convenience is greatly enhanced.

さらに、巻装ユニット2、張出し足場ユニット7、および足場板13に分けてそれぞれ作業者が人力で持ち上げられる15kg以下の重量にすると、図6に例示するように、杭20に構築し終えた仮設足場1を使用して、その仮設足場1よりも高い位置に別の仮設足場1を構築することが可能となる。それ故、例えば、水面から上部構造体22の下面までの高さが高い場合にも、仮設足場1を上下方向に複数設置することで、作業員が上部構造体22の下面に届く高さに仮設足場1を構築することが可能となる。 Furthermore, if the winding unit 2, the overhanging scaffolding unit 7, and the scaffolding board 13 are divided into a weight of 15 kg or less, which can be manually lifted by a worker, the temporary structure that has been constructed on the pile 20 can be used as shown in FIG. Using the scaffolding 1, it becomes possible to construct another temporary scaffolding 1 at a position higher than the temporary scaffolding 1.例文帳に追加Therefore, for example, even if the height from the water surface to the lower surface of the upper structure 22 is high, by installing a plurality of temporary scaffolds 1 in the vertical direction, the worker can reach the lower surface of the upper structure 22 at a height. A temporary scaffold 1 can be constructed.

この実施形態のように、上側係合具6、下側係合具11、および連結部材12を設けると、杭20に固定された巻装ユニット2に対して張出し足場ユニット7を固定する際に、上側係合具6と下側係合具11とを連結部材12で連結した状態にすることで、下側押圧部材10や支持脚9の荷重を固定部材3に支持させた状態にできる。これにより、巻装ユニット2に対する張出し足場ユニット7の固定作業を少人数の作業員でより行ない易くなる。また、仮設足場1を構築し終えた状態では、上側係合具6、下側係合具11、および連結部材12により、支持脚9の下端部にかかる荷重が固定部材3に支持された状態になる。それ故、支持脚9の上端部と支持部材8との連結部分にかかる負荷を低減でき、固定部材3および支持部材8に対して支持脚9および下側押圧部材10をより安定して固定できる。なお、上側係合具6、下側係合具11、および連結部材12は任意で設けることができる。 As in this embodiment, when the upper engagement tool 6, the lower engagement tool 11, and the connecting member 12 are provided, when the overhanging scaffolding unit 7 is fixed to the winding unit 2 fixed to the pile 20, By connecting the upper engaging member 6 and the lower engaging member 11 with the connecting member 12, the load of the lower pressing member 10 and the supporting leg 9 can be supported by the fixing member 3. This makes it easier for a small number of workers to fix the overhanging scaffolding unit 7 to the winding unit 2 . Further, in a state where the construction of the temporary scaffolding 1 is completed, the load applied to the lower ends of the support legs 9 is supported by the fixed members 3 by the upper engaging tools 6 , the lower engaging tools 11 and the connecting members 12 . become. Therefore, the load applied to the connecting portion between the upper end portion of the support leg 9 and the support member 8 can be reduced, and the support leg 9 and the lower pressing member 10 can be more stably fixed to the fixing member 3 and the support member 8. . In addition, the upper engagement tool 6, the lower engagement tool 11, and the connection member 12 can be provided arbitrarily.

この実施形態のように、支持部材8に挿入孔8aとして長孔を形成した構成にすると、支持部材8に対する足場板13の固定位置を支持部材8の長手方向に変更することが可能となる。これにより、図8に例示するように、杭径が異なる杭20に対しても、巻装ユニット2を杭径に応じた別の巻装ユニット2に交換するだけで、同じ張出し足場ユニット7および足場板13を使用して、様々な杭径の杭20に仮設足場1を構築することが可能となる。それ故、支持部材8に挿入孔8aとして丸孔を形成する場合よりも、仮設足場1の利便性をより高くできる。 As in this embodiment, when the support member 8 is formed with an elongated hole as the insertion hole 8a, the fixing position of the scaffold board 13 to the support member 8 can be changed in the longitudinal direction of the support member 8. As a result, as shown in FIG. 8, even for piles 20 with different pile diameters, the same overhanging scaffolding unit 7 and The scaffolding board 13 can be used to construct the temporary scaffolding 1 on piles 20 of various pile diameters. Therefore, the temporary scaffolding 1 can be made more convenient than when the support member 8 is formed with a round hole as the insertion hole 8a.

図9および図10に本発明の仮設足場1の別の実施形態を例示する。 Figures 9 and 10 illustrate another embodiment of the temporary scaffolding 1 of the present invention.

この実施形態の仮設足場1は、それぞれの上側押圧部材4の内周面の位置を杭20の軸心Cに対して近接および離反させる方向に進退移動させる移動機構14を有している。それぞれの下側押圧部材10にも同様に移動機構14が設けられている。さらに、それぞれの支持脚9が脚長を可変にする構造になっている。その他の構成は先に例示した実施形態の仮設足場1と同じである。 The temporary scaffolding 1 of this embodiment has a moving mechanism 14 that moves the position of the inner peripheral surface of each upper pressing member 4 toward and away from the axis C of the pile 20 . Each lower pressing member 10 is similarly provided with a moving mechanism 14 . Furthermore, each support leg 9 has a structure in which the leg length is variable. Other configurations are the same as those of the temporary scaffolding 1 of the previously illustrated embodiment.

図9および図10に例示するように、それぞれの上側押圧部材4に設けられている移動機構14は、固定部材3に設けられたボルト孔15と、そのボルト孔15に螺合して固定部材3と上側押圧部材4とを連結する調整ボルト16とで構成されている。調整ボルト16の先端部に上側押圧部材4の外周側端部が接合されていて、調整ボルト16の長手方向の中途部分が固定部材3のボルト孔15に嵌め込まれている。調整ボルト16を回転させることで、上側押圧部材4の内周面の位置を杭20の軸心Cに対して近接および離反させる方向に進退移動させることができる。 As illustrated in FIGS. 9 and 10, the moving mechanism 14 provided in each upper pressing member 4 includes a bolt hole 15 provided in the fixing member 3 and a fixing member screwed into the bolt hole 15 to move the fixing member. 3 and an adjusting bolt 16 that connects the upper pressing member 4 . The outer peripheral end of the upper pressing member 4 is joined to the tip of the adjusting bolt 16 , and the longitudinal middle portion of the adjusting bolt 16 is fitted into the bolt hole 15 of the fixing member 3 . By rotating the adjusting bolt 16 , the position of the inner peripheral surface of the upper pressing member 4 can be moved forwards and backwards in the directions of approaching and separating from the axis C of the pile 20 .

図10に例示するように、この実施形態のそれぞれの下側押圧部材10は、支持脚9の下端部に連結された第一部材10bと、杭20の外周面に押し当てられる第二部材10cで構成されている。それぞれの下側押圧部材10に設けられている移動機構14は、第一部材10bに設けられたボルト孔15と、そのボルト孔15に螺合して第一部材10bと第二部材10cとを連結する調整ボルト16で構成されている。調整ボルト16の先端部に第二部材10cの外周側端部が接合されていて、調整ボルト16の長手方向の中途部分が第一部材10bのボルト孔15に嵌め込まれている。調整ボルト16を回転させることで、下側押圧部材10(第二部材10c)の内周面の位置を杭20の軸心Cに対して近接および離反させる方向に進退移動させることができる。 As illustrated in FIG. 10 , each of the lower pressing members 10 in this embodiment includes a first member 10b connected to the lower end of the support leg 9 and a second member 10c pressed against the outer peripheral surface of the pile 20. consists of The moving mechanism 14 provided in each lower pressing member 10 includes a bolt hole 15 provided in the first member 10b, and screwed into the bolt hole 15 to connect the first member 10b and the second member 10c. It is composed of adjusting bolts 16 that are connected. The outer peripheral end of the second member 10c is joined to the tip of the adjustment bolt 16, and the lengthwise middle portion of the adjustment bolt 16 is fitted into the bolt hole 15 of the first member 10b. By rotating the adjusting bolt 16, the position of the inner peripheral surface of the lower pressing member 10 (second member 10c) can be moved forwards and backwards in the directions of approaching and separating from the axis C of the pile 20.

それぞれの支持脚9は、2つの筒状の分割部材が長手方向に相対移動可能に接続されたテレスコピック構造になっている。支持部材8に連結されている分割部材に対して、下側押圧部材10が連結されている分割部材を相対移動させて分割部材どうしの固定位置を変更することで、支持脚9の脚長を変更できる。 Each support leg 9 has a telescopic structure in which two cylindrical split members are connected so as to be relatively movable in the longitudinal direction. The leg length of the support leg 9 is changed by moving the divided member connected to the lower pressing member 10 relative to the divided member connected to the support member 8 to change the fixed position between the divided members. can.

この実施形態の仮設足場1を使用した仮設足場の構築方法は先に示した実施形態と概ね同じである。図10に例示するように、この実施形態では、仮設足場1のそれぞれの下側押圧部材10の内周面を、杭20に設けられている防食層21よりも下方の杭20の外周面に押し当てている。防食層21には上側押圧部材4に設けられている緩衝材5のみを接触させた状態にしている。 A method of constructing a temporary scaffold using the temporary scaffold 1 of this embodiment is generally the same as that of the previous embodiment. As illustrated in FIG. 10, in this embodiment, the inner peripheral surface of each lower pressing member 10 of the temporary scaffolding 1 is placed on the outer peripheral surface of the pile 20 below the anticorrosion layer 21 provided on the pile 20. I am pressing. Only the cushioning material 5 provided on the upper pressing member 4 is brought into contact with the anticorrosion layer 21 .

このように、下側押圧部材10の内周面を防食層21よりも下方の杭20の外周面に押し当てると、下側押圧部材10を防食層21に押し当てる場合よりも、下側押圧部材10を杭20の外周面により強く押し当てることが可能となる。それ故、仮設足場1を杭20に安定して固定するにはより有利になる。この実施形態では、下側押圧部材10が緩衝材5を有する場合を例示しているが、下側押圧部材10を防食層21ではない位置に押し当てる場合には、下側押圧部材10の内周面に緩衝材5を有さない構成にすることもできる。 In this way, when the inner peripheral surface of the lower pressing member 10 is pressed against the outer peripheral surface of the pile 20 below the anticorrosive layer 21 , the lower pressing member 10 is pressed against the anticorrosive layer 21 more than when the lower pressing member 10 is pressed against the anticorrosive layer 21 . It becomes possible to press the member 10 against the outer peripheral surface of the stake 20 more strongly. Therefore, it is more advantageous to stably fix the temporary scaffolding 1 to the stakes 20 . In this embodiment, the case where the lower pressing member 10 has the cushioning material 5 is exemplified. A configuration without the cushioning material 5 on the peripheral surface is also possible.

この実施形態のように仮設足場1が移動機構14を有していると、杭20の外径に合わせて、移動機構14によりそれぞれの上側押圧部材4とそれぞれの下側押圧部材10の内周面の位置を進退移動させて調整することで、同じ巻装ユニット2を使用して、仮設足場1を様々な外径の杭20に固定することが可能になる。 If the temporary scaffolding 1 has the moving mechanism 14 as in this embodiment, the moving mechanism 14 moves the inner circumferences of the upper pressing members 4 and the lower pressing members 10 according to the outer diameter of the piles 20 . By adjusting the position of the surface by moving back and forth, it becomes possible to use the same winding unit 2 to fix the temporary scaffolding 1 to piles 20 having various outer diameters.

また、移動機構14を設けると、固定部材3を杭20の外周に巻装した状態で、移動機構14によりそれぞれの上側押圧部材4とそれぞれの下側押圧部材10の内周面の位置を進退移動させて調整することで、杭20に対するそれぞれの上側押圧部材4とそれぞれの下側押圧部材10の押し当て具合(密着度合いや押圧力など)を調整できる。それ故、例えば、図10に例示するように上側押圧部材4を押し当てる防食層21と下側押圧部材10を押し当てる杭20の外周面との間に段差がある場合や、杭20の外周面に凹凸がある場合などにも、杭20に対して仮設足場1をより安定して固定できる。移動機構14の構造はこの実施形態に限定されず、異なる構造にすることもできる。 Further, when the moving mechanism 14 is provided, the positions of the inner peripheral surfaces of the respective upper pressing members 4 and the respective lower pressing members 10 are advanced and retracted by the moving mechanism 14 in a state in which the fixed member 3 is wound around the outer periphery of the pile 20 . By moving and adjusting, it is possible to adjust the pressing conditions (degree of close contact, pressing force, etc.) of the respective upper pressing members 4 and the respective lower pressing members 10 with respect to the stakes 20 . Therefore, for example, as illustrated in FIG. The temporary scaffolding 1 can be more stably fixed to the piles 20 even when the surface has unevenness. The structure of the moving mechanism 14 is not limited to this embodiment, and may have a different structure.

仮設足場1を、それぞれの支持脚9の上端部が支持部材8に上下方向に回転可能に連結されている構造にすると、支持部材8と支持脚9とがなす角度Dを変更することで、下側押圧部材10の上下方向および水平方向の固定位置を変更することが可能となる。また、それぞれの支持脚9が脚長を可変にする構造にすると、支持脚9の脚長を変更することで、下側押圧部材10の上下方向および水平方向の固定位置を変更することが可能となる。それぞれの下側押圧部材10が支持脚9の下端部に上下方向に回転可能に連結されている構造にすると、支持部材8と支持脚9とがなす角度Dを変更した場合にも、下側押圧部材10の固定角度を下側押圧部材10の内周面を杭20の外周面に押し当てる適切な角度に調整することが可能となる。 If the temporary scaffolding 1 has a structure in which the upper end of each support leg 9 is connected to the support member 8 so as to be rotatable in the vertical direction, by changing the angle D formed by the support member 8 and the support leg 9, It is possible to change the vertical and horizontal fixing positions of the lower pressing member 10 . In addition, if each support leg 9 has a variable leg length structure, changing the leg length of the support leg 9 makes it possible to change the fixed position of the lower pressing member 10 in the vertical direction and the horizontal direction. . If each lower pressing member 10 is connected to the lower end of the supporting leg 9 so as to be rotatable in the vertical direction, even if the angle D formed between the supporting member 8 and the supporting leg 9 is changed, the lower pressing member 10 can be It is possible to adjust the fixing angle of the pressing member 10 to an appropriate angle for pressing the inner peripheral surface of the lower pressing member 10 against the outer peripheral surface of the pile 20 .

この実施形態の仮設足場1では、支持部材8と支持脚9とがなす角度Dや、支持脚9の脚長、支持脚9に対する下側押圧部材10の固定角度を変更することで、それぞれの下側押圧部材10を押し当てる位置を杭20の所望の高さ位置に設定できる。それ故、それぞれの下側押圧部材10を押し当てる位置を、杭20の防食層21ではない位置や防食層21の劣化が進んでいない位置に設定することで、防食層21の損傷を回避するにはより有利になる。 In the temporary scaffolding 1 of this embodiment, by changing the angle D between the support member 8 and the support leg 9, the leg length of the support leg 9, and the fixed angle of the lower pressing member 10 with respect to the support leg 9, The position where the side pressing member 10 is pressed can be set at a desired height position of the pile 20 . Therefore, by setting the pressing position of each lower pressing member 10 to a position where the anticorrosion layer 21 is not on the pile 20 or a position where the deterioration of the anticorrosion layer 21 is not progressing, damage to the anticorrosion layer 21 is avoided. be more favorable to

なお、本発明では、例えば、固定部材3、上側押圧部材4、支持部材8、支持脚9、下側押圧部材10、および一部の足場板13を予め一体化した大組ユニットにした状態で、固定部材3を杭20に巻装することで、杭20に仮設足場1を一括設置する構成にすることもできる。この場合には、大組ユニットの重量は重くなるが、仮設足場1の設置作業や撤去作業に要する作業工数を少なくするには有利になる。 In the present invention, for example, the fixed member 3, the upper pressing member 4, the supporting member 8, the supporting leg 9, the lower pressing member 10, and a part of the scaffolding board 13 are integrated in advance into a large assembly unit. By winding the fixing member 3 around the pile 20, the temporary scaffolding 1 can be collectively installed on the pile 20. - 特許庁In this case, although the weight of the large assembly unit is increased, it is advantageous in reducing the man-hours required for the installation and removal of the temporary scaffolding 1 .

上述した実施形態では、横断面視で外周形状が円形状の杭20に固定する場合の仮設足場1を例示したが、仮設足場1は、上側押圧部材4や下側押圧部材10の内周面の位置を杭20の外周形状に合わせて適宜設定することで、例えば、横断面視で外周形状が多角形状の杭20に固定する仕様にすることもできる。 In the above-described embodiment, the temporary scaffolding 1 is fixed to the piles 20 whose outer peripheral shape is circular in cross-sectional view. By appropriately setting the position of , according to the outer peripheral shape of the pile 20, for example, it is possible to fix to the pile 20 having a polygonal outer peripheral shape in a cross-sectional view.

固定部材3、上側押圧部材4、上側係合具6、支持部材8、支持脚9、下側押圧部材10、下側係合具11、連結部材12、および足場板13のそれぞれの形状や構造、数、配置などはこの実施形態に限定されず、異なる構成にすることもできる。例えば、固定部材3は、5つ以下の分割体3aで構成することもできるし、7つ以上の分割体3aで構成することもできる。 Each shape and structure of the fixing member 3, the upper pressing member 4, the upper engaging member 6, the supporting member 8, the supporting leg 9, the lower pressing member 10, the lower engaging member 11, the connecting member 12, and the scaffold board 13 , number, arrangement, etc., are not limited to this embodiment and may be configured differently. For example, the fixing member 3 can be composed of five or less divided bodies 3a, or can be composed of seven or more divided bodies 3a.

また、固定部材3の連結部3cどうしの連結構造や、固定部材3と支持部材8との連結構造、支持部材8と支持脚9との連結構造、支持脚9と下側押圧部材10との連結構造なども上述した実施形態に限定されず、異なる構成にすることもできる。例えば、支持脚9の上端部が支持部材8に接合されている構造にすることもできる。 Also, the connecting structure between the connecting portions 3c of the fixing member 3, the connecting structure between the fixing member 3 and the supporting member 8, the connecting structure between the supporting member 8 and the supporting leg 9, and the connecting structure between the supporting leg 9 and the lower pressing member 10. The connection structure and the like are also not limited to the above-described embodiments, and can be configured differently. For example, a structure in which the upper ends of the support legs 9 are joined to the support member 8 may be employed.

1 仮設足場
2 巻装ユニット
3 固定部材
3a 分割体
3b ヒンジ部
3c 連結部
3d 連結具
4 上側押圧部材
5 緩衝材
6 上側係合具
7 張出し足場ユニット
8 支持部材
8a 挿入孔
9 支持脚
9a 連結具
10 下側押圧部材
10a 連結具
10b 第一部材
10c 第二部材
11 下側係合具
12 連結部材
13 足場板
13a 固定具
14 移動機構
15 ボルト孔
16 調整ボルト
17 連結足場板
20 杭
21 防食層
22 上部構造体
C 杭の軸心
WL 水面位置
1 Temporary scaffolding 2 Winding unit 3 Fixing member 3a Divided body 3b Hinge part 3c Connecting part 3d Connecting tool 4 Upper pressing member 5 Cushioning material 6 Upper engaging tool 7 Overhanging scaffolding unit 8 Supporting member 8a Insertion hole 9 Supporting leg 9a Connecting tool 10 lower pressing member 10a connector 10b first member 10c second member 11 lower engaging tool 12 connecting member 13 scaffold board 13a fixture 14 moving mechanism 15 bolt hole 16 adjustment bolt 17 connecting scaffold board 20 pile 21 anticorrosion layer 22 Upper structure C Pile axis WL Water surface position

Claims (13)

水域に立設された杭に固定される仮設足場において、
複数の分割体を連結して構成された前記杭の外周に巻装される環状の固定部材と、この固定部材の内周側に設けられた複数の上側押圧部材と、前記固定部材に一端部が固定されて前記杭を中心にして放射状に延在する複数の支持部材と、それぞれの前記支持部材に上端部が連結されて下方に延在する支持脚と、それぞれの前記支持脚の下端部に設けられた下側押圧部材と、複数の前記支持部材に支持される足場板とを備え、それぞれの前記上側押圧部材とそれぞれの前記下側押圧部材のうち、少なくともそれぞれの前記上側押圧部材が、前記杭の外周面に押し当てられる内周面に非金属製の軟質の緩衝材を有し、
前記固定部材および複数の前記上側押圧部材が一体化された巻装ユニットと、前記支持部材および前記支持脚および前記下側押圧部材が一体化された複数の張出し足場ユニットと、前記足場板とに分離可能であり、
前記巻装ユニットの前記固定部材が前記杭の外周に巻装されて固定され、それぞれの前記上側押圧部材が前記杭の外周面に押し当てられた状態となり、前記杭に固定された前記固定部材に対して、それぞれの前記張出し足場ユニットの前記支持部材が別々に固定されて、それぞれの前記張出し足場ユニットの前記下側押圧部材が別々に前記杭の外周面に押し当てられた状態になることで、それぞれの前記張出し足場ユニットが別々に前記杭に対して固定され、前記杭に対して固定された複数の前記張出し足場ユニットの前記支持部材に前記足場板が支持させることで、前記杭に対して前記仮設足場が構築される構成であることを特徴とする仮設足場。
Temporary scaffolding fixed to piles erected in water bodies,
An annular fixing member wound around the outer periphery of the pile constructed by connecting a plurality of divided bodies, a plurality of upper pressing members provided on the inner peripheral side of the fixing member, and one end portion of the fixing member. are fixed and extend radially around the pile; support legs each having an upper end connected to each of the support members and extending downward; and a lower end of each of the support legs. and a scaffolding board supported by a plurality of the support members, wherein at least each of the upper pressing members among the upper pressing members and the lower pressing members is , having a non-metallic soft cushioning material on the inner peripheral surface that is pressed against the outer peripheral surface of the pile,
A winding unit in which the fixing member and the plurality of upper pressing members are integrated, a plurality of overhanging scaffolding units in which the supporting member, the supporting leg and the lower pressing member are integrated, and the scaffolding board is separable,
The fixing member of the winding unit is wound around and fixed to the outer periphery of the pile, and each of the upper pressing members is pressed against the outer peripheral surface of the pile, and the fixing member fixed to the pile. , the support members of the respective overhanging scaffolding units are separately fixed, and the lower pressing members of the respective overhanging scaffolding units are separately pressed against the outer peripheral surface of the pile. wherein each of the overhanging scaffolding units is separately fixed to the piles, and the scaffolding plates are supported by the support members of the plurality of overhanging scaffolding units fixed to the piles, so that the piles A temporary scaffolding characterized in that the temporary scaffolding is constructed in contrast to the above-mentioned temporary scaffolding.
前記巻装ユニットは、前記杭の外周に巻装されて固定された状態で、複数の前記上側押圧部材が前記杭の周方向に互いに間隔をあけて配置された状態になる構成である請求項1に記載の仮設足場。 The winding unit is wound around the outer periphery of the pile and fixed, and the plurality of upper pressing members are arranged in a state of being spaced apart from each other in the circumferential direction of the pile. 1. Temporary scaffolding according to 1. 前記杭に対して押し当てられた状態になる前記上側押圧部材の高さ位置と、前記杭に対して押し当てられた状態になる前記下側押圧部材の高さ位置との上下方向の離間距離を変更できる構成である請求項1または2に記載の仮設足場。 Vertical separation distance between the height position of the upper pressing member pressed against the pile and the height position of the lower pressing member pressed against the pile 3. The temporary scaffolding according to claim 1 or 2, which is configured to be able to change . それぞれの前記下側押圧部材が前記緩衝材を有している請求項1~3のいずれかに記載の仮設足場。 The temporary scaffolding according to any one of claims 1 to 3, wherein each of said lower pressing members has said cushioning material. 前記巻装ユニット、前記張出し足場ユニット、および前記足場板がそれぞれ15kg以下である請求項1~4のいずれかに記載の仮設足場。 The temporary scaffolding according to any one of claims 1 to 4, wherein each of said winding unit, said overhanging scaffolding unit and said scaffolding board weighs 15 kg or less. 前記上側押圧部材の前記内周面の位置を前記杭の軸心に対して近接および離反させる方向に進退移動させる移動機構を有している請求項1~5のいずれかに記載の仮設足場。 The temporary scaffolding according to any one of claims 1 to 5, further comprising a moving mechanism for advancing and retreating the position of the inner peripheral surface of the upper pressing member toward and away from the axial center of the pile. 外周面の所定の上下範囲に防食層を有して、水域に立設された杭に、仮設足場を構築する仮設足場の構築方法において、
複数の分割体を連結して構成された環状の固定部材と、この固定部材の内周側に設けられた複数の上側押圧部材と、前記固定部材に一端部が固定されて前記杭を中心にして放射状に延在する複数の支持部材と、それぞれの前記支持部材に上端部が連結されて下方に延在する支持脚と、それぞれの前記支持脚の下端部に設けられた下側押圧部材と、前記支持部材に支持される足場板とを有し、それぞれの前記上側押圧部材とそれぞれの前記下側押圧部材のうち、少なくともそれぞれの前記上側押圧部材が、前記杭の外周面に押し当てられる内周面に非金属製の軟質の緩衝材を有し、前記固定部材および複数の前記上側押圧部材が一体化された巻装ユニットと、前記支持部材および前記支持脚および前記下側押圧部材が一体化された複数の張出し足場ユニットと、前記足場板とに分離可能な前記仮設足場を使用し、
前記巻装ユニットの前記固定部材を前記杭の外周に環状に巻装して固定し、それぞれの前記上側押圧部材を前記杭の外周面に押し当てた状態とし、前記杭に固定された前記固定部材に対して、それぞれの前記張出し足場ユニットの前記支持部材を別々に固定して、それぞれの前記張出し足場ユニットの前記下側押圧部材を別々に前記杭の外周面に押し当てた状態にすることで、それぞれの前記張出し足場ユニットを別々に前記杭に対して固定し、前記防食層にはそれぞれの前記緩衝材を押し当てた状態にし、前記杭に対して固定された複数の前記張出し足場ユニットの前記支持部材に前記足場板を支持させることで、前記杭に対して前記仮設足場を構築することを特徴とする仮設足場の構築方法。
A temporary scaffolding construction method for constructing a temporary scaffolding on a pile erected in a water area having an anticorrosion layer in a predetermined upper and lower range of the outer peripheral surface,
An annular fixed member configured by connecting a plurality of divided bodies, a plurality of upper pressing members provided on the inner peripheral side of the fixed member, and one end fixed to the fixed member centered on the pile. a plurality of support members radially extending through the support member, support legs extending downward with upper ends connected to the support members, and lower pressing members provided at the lower ends of the support legs. and scaffolding plates supported by the support members, wherein at least each of the upper pressing members and the lower pressing members is pressed against the outer peripheral surface of the pile. A winding unit having a non-metallic soft cushioning material on an inner peripheral surface, in which the fixing member and the plurality of upper pressing members are integrated, and the supporting member, the supporting legs, and the lower pressing member. Using the temporary scaffolding that can be separated into a plurality of integrated scaffolding units and the scaffolding board,
The fixing member of the winding unit is annularly wound around the outer circumference of the pile and fixed, and each of the upper pressing members is pressed against the outer peripheral surface of the pile, and the fixing fixed to the pile The supporting members of the respective overhanging scaffolding units are separately fixed to the members, and the lower pressing members of the respective overhanging scaffolding units are separately pressed against the outer peripheral surface of the pile. and each of the overhanging scaffolding units is separately fixed to the piles, each of the shock-absorbing materials is pressed against the anticorrosion layer, and a plurality of the overhanging scaffolding units are fixed to the piles. A method of constructing a temporary scaffolding, wherein the temporary scaffolding is constructed with respect to the piles by supporting the scaffolding plates on the support members of (1).
前記巻装ユニットを前記杭の外周に巻装して固定する際に、複数の前記上側押圧部材が前記杭の周方向に互いに間隔をあけて配置された状態にする請求項7に記載の仮設足場の構築方法。 8. The temporary construction according to claim 7, wherein when the winding unit is wound around and fixed to the outer periphery of the pile, the plurality of upper pressing members are spaced apart from each other in the circumferential direction of the pile. How to build scaffolding. 前記杭に対して押し当てた状態にする前記上側押圧部材の高さ位置と、前記杭に対して押し当てた状態にする前記下側押圧部材の高さ位置との上下方向の離間距離を変更できる構成の前記仮設足場を使用し、
前記杭に対して押し当てた状態にする前記上側押圧部材の高さ位置と、前記杭に対して押し当てた状態にする前記下側押圧部材の高さ位置との上下方向の離間距離を変更することで、前記杭に対して前記下側押圧部材を押し当てる高さ位置を調整する請求項7または8に記載の仮設足場の構築方法。
Changing the vertical separation distance between the height position of the upper pressing member pressed against the pile and the height position of the lower pressing member pressed against the pile Using the temporary scaffolding configured to allow
Changing the vertical separation distance between the height position of the upper pressing member pressed against the pile and the height position of the lower pressing member pressed against the pile The method of constructing a temporary scaffolding according to claim 7 or 8, wherein the height position at which the lower pressing member is pressed against the pile is adjusted by doing so.
それぞれの前記下側押圧部材の内周面に設けられている前記緩衝材を、前記防食層に押し当てた状態にする請求項7~9のいずれかに記載の仮設足場の構築方法。 The method of constructing a temporary scaffolding according to any one of claims 7 to 9, wherein the cushioning material provided on the inner peripheral surface of each of the lower pressing members is pressed against the anticorrosion layer. それぞれの前記下側押圧部材の内周面を、前記防食層よりも下方の前記杭の外周面に押し当てた状態にする請求項7~9のいずれかに記載の仮設足場の構築方法。 The method of constructing a temporary scaffolding according to any one of claims 7 to 9, wherein the inner peripheral surface of each of the lower pressing members is pressed against the outer peripheral surface of the pile below the anticorrosion layer. 前記杭に構築し終えた前記仮設足場を使用して、その前記仮設足場よりも高い位置に別の前記仮設足場を構築する請求項7~11のいずれかに記載の仮設足場の構築方法。 The method of constructing a temporary scaffold according to any one of claims 7 to 11, wherein the temporary scaffold that has been constructed on the pile is used to construct another temporary scaffold at a position higher than the temporary scaffold. 複数の前記杭にそれぞれ前記仮設足場を固定し、隣り合う前記仮設足場どうしの間に連結足場板を架け渡す請求項7~12のいずれかに記載の仮設足場の構築方法。 The method of constructing a temporary scaffolding according to any one of claims 7 to 12, wherein the temporary scaffolding is fixed to each of the plurality of piles, and a connecting scaffolding board is bridged between the adjacent temporary scaffoldings.
JP2019085814A 2019-04-26 2019-04-26 Temporary scaffolding and method of constructing temporary scaffolding Active JP7299059B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019085814A JP7299059B2 (en) 2019-04-26 2019-04-26 Temporary scaffolding and method of constructing temporary scaffolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019085814A JP7299059B2 (en) 2019-04-26 2019-04-26 Temporary scaffolding and method of constructing temporary scaffolding

Publications (2)

Publication Number Publication Date
JP2020180521A JP2020180521A (en) 2020-11-05
JP7299059B2 true JP7299059B2 (en) 2023-06-27

Family

ID=73023711

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019085814A Active JP7299059B2 (en) 2019-04-26 2019-04-26 Temporary scaffolding and method of constructing temporary scaffolding

Country Status (1)

Country Link
JP (1) JP7299059B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7503512B2 (en) * 2021-02-22 2024-06-20 大成建設株式会社 Construction method for floating structures

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004251094A (en) 2002-12-27 2004-09-09 Tatsuo Ono Lifting device, lifting tower and conveyance device
JP2008106569A (en) 2006-10-27 2008-05-08 Kajima Corp Rope type repair scaffold and floating type repair scaffold
JP2009041194A (en) 2007-08-06 2009-02-26 Ohmoto Gumi Co Ltd Temporary scaffold for pile
JP2011206754A (en) 2010-03-31 2011-10-20 Nittetsu Corrosion Prevention Co Ltd Corrosion control method
JP2017057615A (en) 2015-09-16 2017-03-23 五洋建設株式会社 Temporary scaffolding of pile-type aquatic structure and its installation method
JP2017115552A (en) 2015-12-25 2017-06-29 清水建設株式会社 Brace band and installation method for working platform

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0849407A (en) * 1994-08-05 1996-02-20 Daiwa House Ind Co Ltd Temporary working stage for square column
JP3839921B2 (en) * 1997-08-05 2006-11-01 ジャパン スチールス インターナショナル株式会社 Scaffolding plate support frame, method for attaching and removing the same, and method for constructing a reinforced concrete wall body using the same

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004251094A (en) 2002-12-27 2004-09-09 Tatsuo Ono Lifting device, lifting tower and conveyance device
JP2008106569A (en) 2006-10-27 2008-05-08 Kajima Corp Rope type repair scaffold and floating type repair scaffold
JP2009041194A (en) 2007-08-06 2009-02-26 Ohmoto Gumi Co Ltd Temporary scaffold for pile
JP2011206754A (en) 2010-03-31 2011-10-20 Nittetsu Corrosion Prevention Co Ltd Corrosion control method
JP2017057615A (en) 2015-09-16 2017-03-23 五洋建設株式会社 Temporary scaffolding of pile-type aquatic structure and its installation method
JP2017115552A (en) 2015-12-25 2017-06-29 清水建設株式会社 Brace band and installation method for working platform

Also Published As

Publication number Publication date
JP2020180521A (en) 2020-11-05

Similar Documents

Publication Publication Date Title
RU2230967C2 (en) Pipe laying vessel and method of laying pipe lines (versions)
KR102630560B1 (en) Wind energy power plant and method of construction
US6561736B1 (en) Frictional coupler and stiffener for strengthening a section of piling
US8839734B2 (en) Articulated multiple buoy marine platform apparatus and method of installation
CN112770995A (en) Device and method for erecting a tubular element having a longitudinal direction at an outer end
CA1202791A (en) Articulated pipe discharge ramp and a method for laying a pipeline
CN106114754B (en) The method that oil tanker repacks FPSO into
US20140205383A1 (en) Jack-up drilling unit with tension legs
BRPI0613160A2 (en) pipe laying vessel and method of operation thereof
JP7299059B2 (en) Temporary scaffolding and method of constructing temporary scaffolding
KR102045025B1 (en) Roundness Maintaining Device of Large Cylindrical Structure and Manufacturing Method Thereof
US6854407B2 (en) Method for constructing a very large turret mooring arrangement
CN105539740A (en) Wharf boarding ladder of FLNG barge
JP5546598B2 (en) Floating body unit, floating body structure assembled by floating body unit, and assembling method of floating body structure
US20220161903A1 (en) Floatable structure and method of making same
TWI342852B (en) A method of constructing a semi-submersible rig using dry dock mating
US20150003918A1 (en) Pier Installation Support Assembly
JP6152768B2 (en) Submarine pipeline laying method
CN210000502U (en) Mooring device for floating dock
EP4331966B1 (en) Mooring buoy
JP5087154B2 (en) Construction method and scaffold structure of water structure
US20140216324A1 (en) Floating Platform
JP5075392B2 (en) Rope type repair scaffold
NO841252L (en) PROCEDURE FOR BUILDING, TRANSPORTING AND APPLICATION OF A PROFESSIONAL CONSTRUCTION THAT SHOULD STAND ON THE SEA
KR20000074945A (en) On-ground Deck Mating Method of Rig Structure by Jack System

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220228

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20221125

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20221227

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230222

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230404

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230407

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230530

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230615

R150 Certificate of patent or registration of utility model

Ref document number: 7299059

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150