Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7339197B2 - Shield excavator main pushing device and initial excavation method for shield excavator - Google Patents
[go: Go Back, main page]

JP7339197B2 - Shield excavator main pushing device and initial excavation method for shield excavator - Google Patents

Shield excavator main pushing device and initial excavation method for shield excavator Download PDF

Info

Publication number
JP7339197B2
JP7339197B2 JP2020054780A JP2020054780A JP7339197B2 JP 7339197 B2 JP7339197 B2 JP 7339197B2 JP 2020054780 A JP2020054780 A JP 2020054780A JP 2020054780 A JP2020054780 A JP 2020054780A JP 7339197 B2 JP7339197 B2 JP 7339197B2
Authority
JP
Japan
Prior art keywords
excavator
jack
pushing
segment
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020054780A
Other languages
Japanese (ja)
Other versions
JP2021155939A (en
Inventor
智昭 池島
俊彦 伊東
実 阿部
崚汰 北本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumura Corp
Original Assignee
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumura Corp filed Critical Okumura Corp
Priority to JP2020054780A priority Critical patent/JP7339197B2/en
Publication of JP2021155939A publication Critical patent/JP2021155939A/en
Application granted granted Critical
Publication of JP7339197B2 publication Critical patent/JP7339197B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

本発明は、シールド掘削機元押し装置及びシールド掘削機の初期掘進方法に関する。 The present invention relates to a shield excavator base pushing device and an initial excavation method for a shield excavator.

パイプライン用などのトンネルを施工する際には、シールド掘削機を用いて、掘削機本体の前端部で地盤を掘削し、掘削機本体の後部においてセグメントを組み立てることをセグメントの1リング毎に繰り返している。 When constructing tunnels for pipelines, etc., a shield excavator is used to excavate the ground at the front end of the excavator body, and the segments are assembled at the rear of the excavator body, which is repeated for each segment ring. ing.

掘削機本体を発進坑から発進させる際には、掘削機本体を元押しジャッキによって推進するが、その間に設置されている多数のリング数の仮組セグメントやストラットを介して反力をとっており、仮組セグメントを1リング毎に設置しながら推進させている(例えば、特許文献1参照)。 When starting the excavator body from the starting hole, the excavator body is propelled by the main pushing jack, but the reaction force is taken through the temporary assembled segments and struts of the number of rings installed in between. , the provisional assembly segment is installed for each ring and propelled (see, for example, Patent Document 1).

特開平10-8877号公報JP-A-10-8877

しかしながら、仮組セグメントは、トンネルの一部となるセグメントが本組みされた後に解体される。また、仮組セグメントやストラットは円筒状であるので、作業員の通行、セグメントなどの資材の搬入、切削土砂の排出などの際に妨げとなっていた。なお、仮組セグメントの上部だけを先に解体することも可能であるが、下部は残存するので、作業などを行う際に邪魔になる。特に、このような不都合は、パイプラインなどの長尺体が挿入可能となるように発進坑が前後方向に長い場合に顕著であった。 However, the pre-assembled segments are dismantled after the segments that become part of the tunnel have been fully assembled. In addition, since the temporary assembly segments and struts are cylindrical, they hinder the passage of workers, the delivery of materials such as segments, and the discharge of cutting earth and sand. Although it is possible to dismantle only the upper portion of the temporary assembly segment first, the lower portion remains, which is an obstacle when performing work. In particular, such an inconvenience is significant when the starting hole is long in the longitudinal direction so that a long object such as a pipeline can be inserted.

本発明は、以上の点に鑑み、作業の短縮化及び簡易化を図ることが可能なシールド掘削機元押し装置及びシールド掘削機の初期掘進方法を提供することを目的とする。 SUMMARY OF THE INVENTION In view of the above points, it is an object of the present invention to provide a shield excavator pushing device and an initial excavation method for a shield excavator that can shorten and simplify the work.

本発明のシールド掘削機元押し装置は、後端部に推進ジャッキを有する掘削機本体の初期掘進時に使用する元押し装置であって、水平方向に離間して配置され、前記掘削機本体を前方に押す少なくとも2本の元押しジャッキを備え、前記掘削機本体を発進坑内に配置するとき、縮小状態の前記元押しジャッキの先端部と前記発進坑の口部側の壁面との前後方向の間に、前記掘削機本体が位置するとともに、前記元押しジャッキの先端部と前記掘削機本体の後端部の前記推進ジャッキとの前後方向の間に、トンネルの一部を構成するセグメントが本組みされた後に解体するべき仮組セグメントが最大2リング設置されていることを特徴とする。 A shield excavator main pushing device according to the present invention is a main pushing device that is used at the time of initial excavation of an excavator body having a propulsion jack at its rear end, and is horizontally spaced and arranged so as to move the excavator body forward. When the excavator main body is placed in the starting hole, the front-to-rear direction between the tips of the contracted starting jacks and the wall surface on the mouth side of the starting hole is provided. The excavator main body is positioned between them, and a segment constituting a part of the tunnel is located between the front end portion of the main pushing jack and the propulsion jack at the rear end portion of the excavator main body in the longitudinal direction. A maximum of two rings of temporarily assembled segments to be dismantled after being assembled are installed .

本発明のシールド掘削機元押し装置によれば、掘削機本体を発進坑内に配置するとき、元押しジャッキの先端部と掘削機本体の後端部の推進ジャッキとの前後方向の間に、仮組セグメントが最大2リングしか設置されていない。これにより、セグメントを本組みした後に解体される仮設セグメントのリング数を従来と比較して抑制できるので、作業の短縮化を図ることが可能となる。さらに、元押しジャッキは水平方向に離間して配置されており、その間の空間において作業可能であるので、本組みしたセグメントの後方近傍における作業の簡易化を図ることが可能となる。なお、元押しジャッキの先端部と掘削機本体の後端部の推進ジャッキとの前後方向の間に、仮組セグメントは1リングのみ設置されていることが好ましい。 According to the shield excavator main pushing device of the present invention, when the excavator main body is arranged in the starting hole, a temporary Only a maximum of 2 rings are installed in the set segment. As a result, the number of rings of temporary segments to be dismantled after the segments are fully assembled can be reduced compared to the conventional art, so that the work can be shortened. Furthermore, since the main pushing jacks are horizontally spaced apart and the work can be performed in the space between them, it is possible to simplify the work in the vicinity of the rear of the assembled segment. In addition, it is preferable that only one ring of the temporarily assembled segment is installed between the front end of the main pushing jack and the propulsion jack at the rear end of the excavator main body in the front-rear direction.

本発明のシールド掘削機元押し装置において、前記元押しジャッキは、多段ジャッキであることが好ましい。 In the shield excavator main pushing device of the present invention, it is preferable that the main pushing jack is a multistage jack.

この場合、元押しジャッキが3段式以上の多段式であるので通常の2段式のジャッキである場合と比較して、ジャッキの長さが同じである場合のストロークを長くすることが可能となる。これにより、元押しジャッキの先端部と掘削機本体の後端部の推進ジャッキとの前後方向の間に仮組セグメントが最大2リングしか存在しなくとも、掘削機本体を発進坑の口部から前方に十分に推進させることが可能となる。 In this case, since the main thrust jack is a multi-stage type with three or more stages, it is possible to make the stroke longer when the length of the jack is the same compared to the case of a normal two-stage jack. Become. As a result, the excavator body can be moved from the opening of the starting hole even if there are only a maximum of two temporary assembly segments between the front end of the main pushing jack and the propulsion jack at the rear end of the excavator body. It is possible to sufficiently propel forward.

また、本発明のシールド掘削機元押し装置において、前記元押しジャッキの基端部と前記発進坑の口部とは反体側の壁面との前後方向の間に押角又はストラットの少なくとも何れかが存在することが好ましい。 Further, in the shield excavator main pushing device of the present invention, at least one of a pushing angle or a strut exists between the base end of the main pushing jack and the wall surface on the side opposite to the mouth of the starting hole in the longitudinal direction. preferably.

この場合、押角又はストラットが存在することによって、元押しジャッキの先端部と掘削機本体の後端部の推進ジャッキとの前後方向の間に仮組セグメントが最大2リングしか存在しなくとも、掘削機本体を発進坑の口部から前方に十分に推進させることが可能となる。 In this case, due to the presence of the push angle or the strut, even if there are only two rings at maximum between the front end of the main pushing jack and the propulsion jack at the rear end of the excavator main body in the longitudinal direction, the excavation is possible. It is possible to sufficiently propel the machine body forward from the mouth of the launch pit.

本発明のシールド掘削機の初期掘進方法は、水平方向に離間して配置される少なくとも2本の元押しジャッキを発進坑内に配置する工程と、縮小状態とした前記元押しジャッキの先端部と前記発進坑の口部側の壁面との前後方向の間の前記発進坑内に、後端部に推進ジャッキを有する掘削機本体を配置する工程と、前記掘削機本体を前記元押しジャッキのピストンを伸長させることにより前方に押し出し、前記発進坑の口部より前方の地盤を掘削する工程と、前記掘削機本体の後部であって、前記元押しジャッキの先端部と前記掘削機本体の後端部の前記推進ジャッキとの前後方向の間に、最大2リングの仮組セグメントを設置する工程と、前記掘削機本体を前記推進ジャッキを用いて前方に推進させて、前記掘削機本体の後部であって、前記発進坑の口部の壁面より前方の部分に、前記仮組セグメントに連続させて本設セグメントを組み付ける工程とを備え、前記仮組セグメントとは、トンネルの一部を構成するセグメントが本組みされた後に解体するべきセグメントであることを特徴とする。 The initial excavation method for a shield excavator of the present invention comprises the steps of arranging at least two main pushing jacks which are horizontally spaced apart in a starting hole; arranging an excavator body having a propulsion jack at its rear end in the starting hole between the wall surface on the mouth side of the starting hole in the longitudinal direction; and extending the piston of the jack for pushing the excavator body. a step of pushing forward to excavate the ground in front of the opening of the starting hole, and a rear end portion of the excavator main body, which is the tip portion of the main pushing jack and the rear end portion of the excavator main body. a step of installing a temporary assembly segment of maximum two rings between the propulsion jack and the forward and backward direction of the excavator body; and assembling a permanently installed segment continuously to the temporary assembly segment to a portion forward of the wall surface of the opening of the starting hole , wherein the temporary assembly segment is a segment that constitutes a part of the tunnel. It is characterized by being a segment to be dismantled after being fully assembled .

本発明のシールド掘削機の初期掘進方法によれば、元押しジャッキの先端部と掘削機本体の後端部の推進ジャッキとの前後方向の間に、仮組セグメントが最大2リングしか設置されない。これにより、セグメントを本組みした後に解体される仮組セグメントのリング数を従来と比較して抑制できるので、作業の短縮化を図ることが可能となる。さらに、元押しジャッキは水平方向に離間して配置されており、その間の空間において作業可能であるので、本組みしたセグメントの後方近傍における作業の簡易化を図ることが可能となる。 According to the initial excavation method for a shield excavator of the present invention, no more than two rings of temporary assembly segments are installed between the front end of the main pushing jack and the propulsion jack at the rear end of the excavator body in the longitudinal direction. As a result, the number of rings of temporary assembled segments to be dismantled after the segments are actually assembled can be reduced compared to the conventional art, so that the work can be shortened. Furthermore, since the main pushing jacks are horizontally spaced apart and the work can be performed in the space between them, it is possible to simplify the work in the vicinity of the rear of the assembled segment.

本発明の実施形態に係るシールド掘削機元押し装置を含むシールド掘削機を用いた発進方法を示す模式正面図。1 is a schematic front view showing a starting method using a shield excavator including a shield excavator root pushing device according to an embodiment of the present invention; FIG. シールド掘削機を用いた初期掘進方法を示す模式上面図。FIG. 4 is a schematic top view showing an initial excavation method using a shield excavator. シールド掘削機本体を発進坑内に位置させた状態を示す模式正面図。FIG. 4 is a schematic front view showing a state in which the shield excavator main body is positioned in the starting hole; 本発明の実施形態に係るシールド掘削機を用いた初期掘進方法を示すフローチャート。4 is a flow chart showing an initial excavation method using a shield excavator according to an embodiment of the present invention;

本発明の実施形態に係るシールド掘削機元押し装置20を含む(以下、単に元押し装置20という)シールド掘削機100について図1及び図2を参照して説明する。シールド掘削機100は、パイプライン用などのシールドトンネルを施工する際に使用される。 A shield excavator 100 including a shield excavator pushing device 20 according to an embodiment of the present invention (hereinafter simply referred to as the pushing device 20) will be described with reference to FIGS. 1 and 2. FIG. The shield excavator 100 is used when constructing shield tunnels for pipelines and the like.

シールド掘削機100の発進坑Aは、地盤Bを垂直方向に掘削した立坑として形成されている。パイプライン用のシールドトンネルを施工する場合、トンネル完成後に発進坑Aから長尺のパイプラインを挿入する必要があるため、発進坑Aは前後方向(シールド掘削機100の推進方向)に長く形成されている。発進坑Aを掘削する地盤Bには、必要に応じて地盤改良を行っておくことが好ましい。発進坑Aの口部の周囲には坑口コンクリートCが設けられており、この坑口コンクリートCにはパッキン(不図示)が設けられている。 A starting pit A of the shield excavator 100 is formed as a vertical pit by excavating the ground B in the vertical direction. When constructing a shield tunnel for a pipeline, it is necessary to insert a long pipeline from the starting hole A after the completion of the tunnel. ing. It is preferable that the ground B in which the starting hole A is excavated is subjected to ground improvement as necessary. A wellhead concrete C is provided around the opening of the starting well A, and the wellhead concrete C is provided with a packing (not shown).

発進坑A内には、シールド掘削機100を支持する受け台Dが設けられている。掘削機100は、掘削機本体10、及び掘削機本体10を発進させるとともに初期掘進時に使用する元押し装置20を備えている。 A cradle D for supporting the shield excavator 100 is provided in the starting hole A. As shown in FIG. The excavator 100 includes an excavator main body 10 and a base pushing device 20 that starts the excavator main body 10 and is used during initial excavation.

掘削機本体10は、シールド掘削を行う際に使用される掘削機の本体であり、従来から周知のものである。掘削機本体10は、シールド筒11、掘削用のカッタヘッド12、推進用の推進ジャッキ13、シールド筒11の内部にてセグメント31,32を組み付けるためのエレクタ(不図示)、掘削した土砂を後方に搬出する排土機構(不図示)などを備えている。推進ジャッキ13は掘削機本体10の後端部に配置されている。 The excavator main body 10 is a main body of an excavator used when performing shield excavation, and is conventionally known. The excavator main body 10 includes a shield tube 11, a cutter head 12 for excavation, a propulsion jack 13 for propulsion, an erector (not shown) for assembling segments 31 and 32 inside the shield tube 11, and an excavated earth and sand rearward. Equipped with a soil discharge mechanism (not shown) for carrying out to the ground. A propulsion jack 13 is arranged at the rear end of the excavator body 10 .

元押し装置20は、複数本、ここでは4本の元押しジャッキ21、反圧壁(支圧壁)22、押角23及びストラット24などから構成されており、これらは受け台Dにより支持されている。 The main pushing device 20 is composed of a plurality of, here four, main pushing jacks 21, counterpressure walls (bearing pressure walls) 22, push angles 23, struts 24, etc., which are supported by a cradle D. there is

元押しジャッキ21は、水平方向に離間して設けられており、ここでは、2本の元押しジャッキ21aが水平方向に離間して受け台Dに支持され、他の2本の元押しジャッキ21bが元押しジャッキ21aのそれぞれの上方に位置するように、受け台Dに設けられた支持台Eによって支持されている。なお、図2において、受け台Dに及び支持台Eは省略されている。 The main pushing jacks 21 are provided horizontally spaced apart. Here, two main pushing jacks 21a are horizontally separated and supported on the cradle D, and the other two main pushing jacks 21b are supported. are supported by a support base E provided on a receiving base D so that are positioned above each of the original pushing jacks 21a. In FIG. 2, the cradle D and the support E are omitted.

元押しジャッキ21は、ここでは、互いに連接された複数の異径ロッド部を順次大径側に収納する構造の油圧式多段ジャッキである。多段ジャッキは、収縮時には、各ロッド部が大径側の隣接ロッド部に収納され、最大径のロッド部がシリンダ部中に収納されるので、完全収縮時にはジャッキの全長はシリンダ部の長さにほぼ等しくなる。一方、伸長時には、各ロッド部が順次大径側の隣接ロッド部から突出する。これにより、ジャッキの長さが同じである場合、通常の2段式のジャッキと比較して、大きなストロークを得ることができる。なお、元押しジャッキ21は、図面では3段式であるが、これに限定されず4段式以上の多段ジャッキであってもよく、さらには、2段式の通常のジャッキであってもよい。 The original pushing jack 21 is a hydraulic multi-stage jack having a structure in which a plurality of mutually connected different-diameter rod portions are successively accommodated on the large-diameter side. When the multistage jack is retracted, each rod is housed in the adjacent rod on the large diameter side, and the rod with the largest diameter is housed in the cylinder. become approximately equal. On the other hand, when extended, each rod portion sequentially protrudes from the adjacent rod portion on the larger diameter side. As a result, when the length of the jack is the same, a larger stroke can be obtained compared to a normal two-stage jack. Although the original pushing jack 21 is a three-stage type in the drawing, it is not limited to this, and may be a multi-stage jack of four or more stages, or may be a normal two-stage jack. .

反力壁22は、発進坑Aにおける口部とは反対の側、すなわち、発進坑Aの口部の対面側に設けられており、例えば鋼材などから構成されている。 The reaction wall 22 is provided on the opposite side of the opening of the starting hole A, that is, on the opposite side of the opening of the starting hole A, and is made of steel, for example.

押角23は、ボックス鋼材又は型鋼を用いた枠体よりなり、全体として直方体形状である。押角23は、水平方向に離間した元押しジャッキ21に対応して、元押しジャッキ21の後方にて反力壁22と当接するように位置している。そして、押角23は、ここでは、前後方向に2個連続して位置するように設けられているが、1個でも3個以上でもよく、その個数は限定されない。 The pressing angle 23 is made of a frame made of box steel or shaped steel, and has a rectangular parallelepiped shape as a whole. The push angle 23 is positioned so as to contact the reaction force wall 22 behind the main pushing jack 21 corresponding to the main pushing jack 21 spaced apart in the horizontal direction. Although two pressing angles 23 are provided so as to be continuously positioned in the front-rear direction here, one pressing angle or three or more pressing angles may be provided, and the number thereof is not limited.

ストラット24は、板状鋼材などを用いた円筒形状であり、その前後側面には、円形状又は円盤形状の接続板が固定されている。そして、ストラット24は、接続板同士がボルトなどで連結されることにより、前後方向に連続して、ここでは、3個連続して、元押しジャッキ21の基端部と押角23との間に、それぞれ当接して位置している。なお、ストラット24の個数も限定されない。 The strut 24 has a cylindrical shape using a plate-shaped steel material or the like, and circular or disk-shaped connection plates are fixed to the front and rear side surfaces thereof. The struts 24 are connected to each other by bolts or the like, so that the struts 24 are arranged continuously in the front-rear direction, here, three consecutive struts, between the base end portion of the original pushing jack 21 and the push angle 23 . , are located abutting each other. The number of struts 24 is also not limited.

そして、元押しジャッキ21は、それぞれのシリンダの基端側が反力壁22の側に位置し、ロッドの先端側が発進坑Aの口部側に位置している。これにより、元押しジャッキ21は、シリンダの基端部において反力壁22から押角23及びストラット24を介して反力を取って、ロッドの進出、退入により、伸縮可能となっている。 The base end side of each cylinder of the main pushing jack 21 is positioned on the reaction wall 22 side, and the tip side of the rod is positioned on the opening side of the starting hole A. As shown in FIG. As a result, the main pushing jack 21 receives a reaction force from the reaction wall 22 at the base end of the cylinder via the push angle 23 and the strut 24, and can be extended and contracted by advancing and retracting the rod.

なお、押角23及びストラット24は、元押しジャッキ21と反力壁22との間に位置して、元押しジャッキ21のロッドの伸長により掘削機本体10を発進させるために機能する推力受材であり、上述した構成や形状が異なっていてもよい。 The push angle 23 and the strut 24 are thrust receiving members positioned between the main pushing jack 21 and the reaction wall 22 and functioning to start the excavator main body 10 by extension of the rod of the main pushing jack 21. Yes, and the configuration and shape described above may be different.

元押しジャッキ21は、ロッドの伸長により、押輪25を介してセグメント31,32を前方に推進させる。押輪25は、例えば鋼製の短円筒形状であり、受け台Cに支持されている。 The original push jack 21 propels the segments 31 and 32 forward via the push ring 25 by extension of the rod. The push ring 25 is, for example, made of steel and has a short cylindrical shape, and is supported by the cradle C. As shown in FIG.

それぞれのセグメント31,32は、例えば、6個などの複数個の鋼製の部材が組み付けられてなる全体として短円筒状(リング状)の部材であり、掘削機本体10の後部の前記エレクタを用いて作業員によって組み立てられる。 Each of the segments 31 and 32 is a short cylindrical (ring-shaped) member as a whole formed by assembling a plurality of steel members, such as six, for example, and serves as the erector at the rear of the excavator body 10. Assembled by workers using

仮組セグメント31は、発進坑A内に位置する仮組みのセグメントであり、本設セグメント32が構築された後に除去され、ここでは1リングのみである。一方、本設セグメント32は、トンネルの壁体の一部となるものであり、仮組セグメント31の前方に多数リング連続して組み付けられる。そして、掘削機本体10の発進時において、元押しジャッキ21の先端部の推進ジャッキ13と掘削機本体10の後端との前後方向の間に、仮組セグメント31が1リングしか設置されていない。 Temporary segment 31 is a temporary segment located in launch shaft A and is removed after permanent segment 32 has been constructed, here with only one ring. On the other hand, the permanent segment 32 is part of the wall of the tunnel, and is continuously assembled in front of the temporary assembly segment 31 in a large number of rings. When the excavator main body 10 starts moving, only one ring of the temporary assembly segment 31 is installed between the propulsion jack 13 at the tip of the main pushing jack 21 and the rear end of the excavator main body 10 in the longitudinal direction. .

さらに、図3を参照して、全ての元押しジャッキ21のピストンを完全に収縮したときに、発進坑Aの口部側の側面とストラット24との前後方向の隙間の空間に、掘削機本体10が配置することができるように、押角23及びストラット24の前後方向の合計長さが定められている。押角23及びストラット24は、元押しジャッキ21と反力壁22との間隔を調整する機能も有する。 Furthermore, referring to FIG. 3, when the pistons of all the original pushing jacks 21 are completely retracted, the excavator main body is filled in the space between the strut 24 and the side surface of the mouth of the starting hole A in the longitudinal direction. The total length of the push angle 23 and the strut 24 in the front-rear direction is determined so that the strut 10 can be arranged. The push angle 23 and the strut 24 also have the function of adjusting the distance between the original pushing jack 21 and the reaction force wall 22 .

以下、本発明の実施形態に係るシールド掘削機100の初期掘進方法について図4も参照して説明する。 Hereinafter, the initial excavation method of the shield excavator 100 according to the embodiment of the present invention will be described with reference to FIG. 4 as well.

まず、元押しジャッキ21、反圧壁22、押角23及びストラット24から構成される元押し装置20を発進坑A内に配置する元押し装置配置工程(S1)を行う。 First, the step of arranging the main pushing device 20 composed of the pushing jack 21, the anti-pressure wall 22, the push angle 23 and the strut 24 in the starting hole A (S1) is performed.

次に、縮小状態とした元押しジャッキ21の先端部と発進坑Aの口部側の壁面との前後方向の間の発進坑A内に、掘削機本体10を配置する掘削機本体配置工程(S2)を行う。 Next, an excavator main body arranging step ( S2) is performed.

次に、掘削機本体10を元押しジャッキ21のピストンを伸長させることに前方に押し出し、発進坑Aの口部より前方の地盤を掘削する地盤掘削工程(S3)を行う。 Next, a ground excavation step (S3) is performed in which the excavator main body 10 is pushed forward by extending the piston of the main push jack 21 to excavate the ground ahead of the opening of the starting hole A.

次に、掘削機本体10の後部において、元押しジャッキ21の先端部と掘削機本体10の後端部の推進ジャッキ13との前後方向の間に、仮組セグメント31を1リングのみ設置するセグメント仮組み工程(S4)を行う。 Next, in the rear part of the excavator body 10, a segment in which only one ring of the temporary assembly segment 31 is installed between the front end portion of the main pushing jack 21 and the propulsion jack 13 at the rear end portion of the excavator body 10 in the front-rear direction. A temporary assembly step (S4) is performed.

次に、掘削機本体10を前方に推進させて、掘削機本体10の後部において、発進坑Aの口部の壁面より前方の部分に、仮組セグメント31に連続させて本設セグメント32を設置するセグメント本組み工程(S5)を行う。セグメント本組み工程(S5)を連続して行うことにより、本設セグメント32が前後方向に連続してなるトンネルを構築することができる。 Next, the excavator main body 10 is propelled forward, and a permanent segment 32 is installed in the rear part of the excavator main body 10 in front of the wall surface of the opening of the starting hole A, connected to the temporary assembly segment 31. Then, the main segment assembly step (S5) is performed. By continuously performing the segment main assembling step (S5), it is possible to construct a tunnel in which the permanent segments 32 are continuous in the front-rear direction.

セグメント本組み工程(S5)において、掘削機本体10の前方への推進は、推進ジャッキ13の伸長によって行う。ここで、推進ジャッキ13の反力は、本設セグメント32が存在しない場合、あるいは本設セグメント32のリング数が所定数に達していない場合には、仮組セグメント31などを介して反力壁22にとり、本設セグメント32が所定リング数以上存在する場合には、本設セグメント32にとればよい。 In the segment main assembly step (S5), the excavator main body 10 is propelled forward by extending the propulsion jack 13 . Here, if the permanent segment 32 does not exist, or if the number of rings of the permanent segment 32 does not reach a predetermined number, the reaction force of the propulsion jack 13 is applied to the reaction wall via the temporary assembly segment 31 or the like. 22, if there are more permanent segments 32 than a predetermined number of rings, the permanent segments 32 may be taken.

そして、本設セグメント32が所定リング数以上設置され、本設セグメント32から推進ジャッキ13の反力がとれるようになった後、元押し装置20及び仮組セグメント31を解体して発進坑Aから外部に運び出す解体工程(S6)を行う。 After a predetermined number of rings or more of the permanent segments 32 are installed and the reaction force of the propulsion jacks 13 can be taken from the permanent segments 32, the main pushing device 20 and the temporary assembly segment 31 are dismantled and removed from the starting shaft A. A dismantling step (S6) is carried out to carry out to the outside.

以上説明したように、本実施形態によれば、元押しジャッキ21の先端部と掘削機本体10の後端部の推進ジャッキ13との前後方向の間に、仮組セグメント31が1リングしか設置されない。これにより、本設セグメント32を設置した後に解体される仮組セグメント31のリング数を従来と比較して抑制できるので、作業の短縮化を図ることが可能となる。 As described above, according to the present embodiment, only one ring of temporary assembly segment 31 is installed between the front end portion of the main pushing jack 21 and the propulsion jack 13 at the rear end portion of the excavator main body 10 in the longitudinal direction. not. As a result, the number of rings of the temporary assembly segment 31 to be dismantled after the permanent segment 32 is installed can be reduced compared to the conventional case, so that the work can be shortened.

さらに、元押しジャッキ21は水平方向に離間して配置されており、その間の空間において作業可能であるので、本設セグメント32の後方近傍における作業の簡易化を図ることが可能となる。 Further, since the main pushing jacks 21 are horizontally spaced apart and work can be performed in the space between them, work in the vicinity of the rear portion of the permanent segment 32 can be simplified.

なお、本発明は、上述した実施形態に限定されるものではなく、適宜変更することができる。例えば、元押しジャッキ21の先端部と掘削機本体10の後端との前後方向の間に仮組セグメント31が1リングのみ存在する場合について説明したが、2リング存在してもよい。 It should be noted that the present invention is not limited to the above-described embodiments, and can be modified as appropriate. For example, although the case where only one ring of the temporary assembly segment 31 exists between the front end of the pushing jack 21 and the rear end of the excavator main body 10 in the front-rear direction, two rings may exist.

10…掘削機本体、 11…シールド筒、 12…カッタヘッド、 13…推進ジャッキ、 20…元押し装置(シールド掘削機元押し装置)、 21,21a,21b…元押しジャッキ、 22…反圧壁、 23…押角、 24…ストラット、 25…押輪、 31…仮組セグメント、 32…本設セグメント、 100…シールド掘削機、 A…発進坑、 B…地盤、 C…坑口コンクリート、 D…受け台、 E…支持台。
DESCRIPTION OF SYMBOLS 10... Excavator main body 11... Shield tube 12... Cutter head 13... Propulsion jack 20... Base push device (shield excavator base push device) 21, 21a, 21b... Base push jack, 22... Counter pressure wall 23... Push angle 24... Strut 25... Push wheel 31... Temporary assembly segment 32... Permanent segment 100... Shield excavator A... Starting well B... Ground C... Wellhead concrete D... Cradle E... Support base.

Claims (4)

後端部に推進ジャッキを有する掘削機本体の初期掘進時に使用する元押し装置であって、
水平方向に離間して配置され、前記掘削機本体を前方に押す少なくとも2本の元押しジャッキを備え、
前記掘削機本体を発進坑内に配置するとき、縮小状態の前記元押しジャッキの先端部と前記発進坑の口部側の壁面との前後方向の間に、前記掘削機本体が位置するとともに、
前記元押しジャッキの先端部と前記掘削機本体の後端部の前記推進ジャッキとの前後方向の間に、トンネルの一部を構成するセグメントが本組みされた後に解体するべき仮組セグメントが最大2リング設置されていることを特徴とするシールド掘削機元押し装置。
A main pushing device used during initial excavation of an excavator body having a propulsion jack at the rear end,
at least two push jacks horizontally spaced apart to push the excavator body forward;
When the excavator main body is arranged in the starting hole, the excavator main body is positioned between the front end portion of the contracted main pushing jack and the wall surface on the mouth side of the starting hole in the front-rear direction, and
A maximum temporary assembly segment to be dismantled after the segment constituting a part of the tunnel is fully assembled between the front end of the main pushing jack and the propulsion jack at the rear end of the excavator body in the front-rear direction. A shield excavator main pushing device characterized by being installed with two rings.
前記元押しジャッキは、多段ジャッキであることを特徴とする請求項1に記載のシールド掘削機元押し装置。 The shield excavator main pushing device according to claim 1, wherein the main pushing jack is a multistage jack. 前記元押しジャッキの基端部と前記発進坑の口部とは反体側の壁面との前後方向の間に押角又はストラットの少なくとも何れかが存在することを特徴とする請求項1又は2に記載のシールド掘削機元押し装置。 3. The method according to claim 1, wherein at least one of a pushing angle and a strut is present between the base end of the pushing jack and the wall surface on the opposite side of the starting hole in the front-rear direction. shield excavator main pusher. 水平方向に離間して配置される少なくとも2本の元押しジャッキを発進坑内に配置する工程と、
縮小状態とした前記元押しジャッキの先端部と前記発進坑の口部側の壁面との前後方向の間の前記発進坑内に、後端部に推進ジャッキを有する掘削機本体を配置する工程と、
前記掘削機本体を前記元押しジャッキのピストンを伸長させることにより前方に押し出し、前記発進坑の口部より前方の地盤を掘削する工程と、
前記掘削機本体の後部であって、前記元押しジャッキの先端部と前記掘削機本体の後端部の前記推進ジャッキとの前後方向の間に、最大2リングの仮組セグメントを設置する工程と、
前記掘削機本体を前記推進ジャッキを用いて前方に推進させて、前記掘削機本体の後部であって、前記発進坑の口部の壁面より前方の部分に、前記仮組セグメントに連続させて本設セグメントを組み付ける工程とを備え
前記仮組セグメントとは、トンネルの一部を構成するセグメントが本組みされた後に解体するべきセグメントであることを特徴とするシールド掘削機の初期掘進方法。
locating at least two horizontally spaced drive jacks in the launch shaft;
disposing an excavator main body having a propulsion jack at its rear end in the starting hole between the front end portion of the main pushing jack in a contracted state and the wall surface on the mouth side of the starting hole in the front-rear direction;
a step of pushing the excavator body forward by extending the piston of the original pushing jack to excavate the ground ahead of the opening of the starting hole;
A step of installing temporary assembled segments of maximum two rings in the rear part of the excavator main body between the front end of the main pushing jack and the propulsion jack at the rear end of the excavator main body in the longitudinal direction. and,
The excavator main body is propelled forward using the propulsion jack, and the rear part of the excavator main body, which is in front of the wall surface of the opening of the starting hole, is connected to the temporary assembly segment. a step of assembling the design segment ;
The initial excavation method for a shield excavator, wherein the temporary assembly segment is a segment to be dismantled after the segment constituting a part of the tunnel is actually assembled.
JP2020054780A 2020-03-25 2020-03-25 Shield excavator main pushing device and initial excavation method for shield excavator Active JP7339197B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020054780A JP7339197B2 (en) 2020-03-25 2020-03-25 Shield excavator main pushing device and initial excavation method for shield excavator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020054780A JP7339197B2 (en) 2020-03-25 2020-03-25 Shield excavator main pushing device and initial excavation method for shield excavator

Publications (2)

Publication Number Publication Date
JP2021155939A JP2021155939A (en) 2021-10-07
JP7339197B2 true JP7339197B2 (en) 2023-09-05

Family

ID=77919074

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020054780A Active JP7339197B2 (en) 2020-03-25 2020-03-25 Shield excavator main pushing device and initial excavation method for shield excavator

Country Status (1)

Country Link
JP (1) JP7339197B2 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009079399A (en) 2007-09-26 2009-04-16 Nishimatsu Constr Co Ltd Starting method of shield machine

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS563297A (en) * 1979-06-20 1981-01-14 Nagano Yuki Kk Device for holding root of propelling pipe
JPS6059298A (en) * 1983-09-08 1985-04-05 大成建設株式会社 Shield machine push-out construction method in departure shaft pit
JP2751044B2 (en) * 1996-05-20 1998-05-18 大豊建設株式会社 Shield starting method and device
JP3412066B2 (en) * 1996-06-20 2003-06-03 不動建設株式会社 Initial excavation method of shield machine

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009079399A (en) 2007-09-26 2009-04-16 Nishimatsu Constr Co Ltd Starting method of shield machine

Also Published As

Publication number Publication date
JP2021155939A (en) 2021-10-07

Similar Documents

Publication Publication Date Title
JP5475521B2 (en) Tunnel excavator
CN103025999B (en) Tunnel excavation apparatus and tunnel excavation method
JP4371603B2 (en) Semi shield excavator
JP6600478B2 (en) Tunnel excavator
JP7339197B2 (en) Shield excavator main pushing device and initial excavation method for shield excavator
JPH03180690A (en) Tunnel excavator
CN111271070A (en) Grid pipe jacking machine and construction method
JPH09144479A (en) Tunnel excavator
JP3821919B2 (en) Mobile back anchor device and shield start method using the same
JP3875230B2 (en) Shield excavator for branch tunnel construction
JP5763740B2 (en) How to start the excavator
JP3784241B2 (en) Shield machine and its temporary propulsion method
JP7245714B2 (en) Tunnel excavator and tunnel excavation method
JP4752017B2 (en) Removal shield and tunnel removal method using the same
JP4752015B2 (en) Tunnel construction method and removal shield used in this method
JP4347683B2 (en) Tunnel excavator
JP3897515B2 (en) Starting method of mud shield excavator
JP2015117480A (en) Method for starting excavator
JP4287246B2 (en) Shield excavator for branch tunnel excavation
JP4221477B2 (en) How to install a shield machine at the start of propulsion
JP4752016B2 (en) Removal shield
JP2794639B2 (en) Tunnel excavation method and shield machine used for excavation
JP3210621B2 (en) Support method for tunnel excavation wall
JP2016223110A (en) Start preparation method and start method for shield machine
JP4390548B2 (en) Excavation method for excavation tunnel

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220826

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230531

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230606

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230726

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20230727

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230808

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230824

R150 Certificate of patent or registration of utility model

Ref document number: 7339197

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150