JP7345402B2 JP2020007805A JP2020007805A JP7345402B2 JP 7345402 B2 JP7345402 B2 JP 7345402B2 JP 2020007805 A JP2020007805 A JP 2020007805A JP 2020007805 A JP2020007805 A JP 2020007805A JP 7345402 B2 JP7345402 B2 JP 7345402B2
Authority
JP
Japan
Prior art keywords
flow path
circulating water
circulation
cooling
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020007805A
Other languages
Japanese (ja)
Other versions
JP2021113665A (en
Inventor
義一 佐藤
あい子 ▲高▼橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shinko Pantec Co Ltd
Original Assignee
Kobelco Eco Solutions Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobelco Eco Solutions Co Ltd filed Critical Kobelco Eco Solutions Co Ltd
Priority to JP2020007805A priority Critical patent/JP7345402B2/en
Publication of JP2021113665A publication Critical patent/JP2021113665A/en
Application granted granted Critical
Publication of JP7345402B2 publication Critical patent/JP7345402B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
  • Other Air-Conditioning Systems (AREA)

Description

本発明は、冷却塔を利用する冷却システムに関する。 The present invention relates to a cooling system that utilizes a cooling tower.

冷却塔を利用する冷却システムは、一般的に、流入してきた水と外気とを熱交換させることにより一部蒸発させて当該水を冷却する冷却塔と、冷却された水と発熱した冷却対象とを熱交換させて冷却対象を冷却する熱交換部と、冷却塔と熱交換部との間で水を循環させる循環流路(循環水の流路)とを備える。当該冷却システムは、圧縮機器、ポンプ、発電機等の比較的大型の機器からコンピュータ等に使用される比較的小型の電子機器まで、多岐にわたる様々な機器の冷却に適用される。 A cooling system that uses a cooling tower generally consists of a cooling tower that cools the incoming water by partially evaporating the water by exchanging heat with the outside air, and a cooling tower that cools the water by partially evaporating it by exchanging heat between the incoming water and the outside air. It includes a heat exchange section that cools the object to be cooled by exchanging heat with the cooling tower, and a circulation flow path (circulation water flow path) that circulates water between the cooling tower and the heat exchange section. The cooling system is applied to cooling a wide variety of devices, from relatively large devices such as compressors, pumps, and generators to relatively small electronic devices used in computers and the like.

このような冷却システムでは、1系統の冷却塔の設計および性能に対応して、冷却対象を冷却するための循環水の温度が一意的に定まる。従って、循環水の温度が異なる複数の冷却対象を冷却する場合、複数の冷却塔を利用する複数系統の冷却塔設備が用いられる。例えば、特許文献1には、2つの冷却塔を備え、異なる温度まで冷却対象が冷却される冷却システムが記載されている。 In such a cooling system, the temperature of circulating water for cooling an object to be cooled is uniquely determined depending on the design and performance of one system of cooling towers. Therefore, when cooling a plurality of objects to be cooled with different temperatures of circulating water, a multi-system cooling tower facility using a plurality of cooling towers is used. For example, Patent Document 1 describes a cooling system that includes two cooling towers and cools objects to be cooled to different temperatures.

一方、このような冷却システムでは、冷却塔において水が蒸発することにより循環水が濃縮する。すなわち、循環水中の水分のみが蒸発して、水以外の成分の含有濃度が上がる。濃縮が進行すると、循環水の循環流路の配管および熱交換部の伝熱管等にスケール(シリカ、カルシウム等)が析出するおそれがある。従って、冷却塔を利用する冷却システムでは、通常、循環水が濃縮し過ぎないように適宜循環水の排出(ブローダウン)を行うと共に、濃縮されていない新しい補給水を供給する。また、冷却塔設備にスケール防止薬剤の注入設備を設けて、循環流路に当該薬剤を注入して循環させることによって、循環水の循環流路の配管および熱交換部の伝熱管等におけるスケールの析出を抑制する方法も知られている(例えば特許文献2参照)。 On the other hand, in such a cooling system, circulating water is concentrated by evaporation of water in the cooling tower. That is, only the water in the circulating water evaporates, and the concentration of components other than water increases. As the concentration progresses, scale (silica, calcium, etc.) may be deposited on the piping of the circulation flow path of the circulating water, the heat exchanger tubes of the heat exchange section, and the like. Therefore, in a cooling system using a cooling tower, the circulating water is normally discharged (blowdown) as appropriate to prevent the circulating water from becoming too concentrated, and fresh, unconcentrated make-up water is supplied. In addition, by installing equipment for injecting scale-preventing chemicals into the cooling tower equipment and injecting the chemicals into the circulation channels and circulating them, it is possible to eliminate scale in the piping of the circulating water circulation channels and heat exchanger tubes in the heat exchange section. A method of suppressing precipitation is also known (see, for example, Patent Document 2).

特開2010-25408号公報Japanese Patent Application Publication No. 2010-25408 特開2008-249300号公報Japanese Patent Application Publication No. 2008-249300

冷却対象を冷却するための循環水の温度において、通常、冷却対象の大きさ、その使用目的、機能等の様々な要素に応じて、具体的には冷却対象の種類に応じて、望ましい循環水の温度は異なることが多い。そのため、これらの冷却対象を同時に冷却する場合には、前述した理由から、当該望ましい循環水の温度の数に対応する数の冷却塔が利用される複数系統の冷却塔設備を用いる必要がある。 The temperature of the circulating water used to cool the object to be cooled is usually determined depending on various factors such as the size of the object to be cooled, its purpose of use, and its function, and more specifically, depending on the type of object to be cooled. temperatures often vary. Therefore, when cooling these objects to be cooled at the same time, it is necessary to use a multi-system cooling tower facility in which a number of cooling towers corresponding to the desired temperature of the circulating water is used for the reasons described above.

本発明者らは、冷却対象を冷却するための循環水の温度が異なり、複数系統の冷却塔設備を用いる必要がある冷却システムを利用する場合において、循環水の循環流路等におけるスケールの析出を、どのようにすれば効率的に抑制することができるかとの課題に着目した。 The present inventors have discovered that when using a cooling system that requires the use of multiple systems of cooling tower equipment in which the temperature of the circulating water for cooling the object to be cooled differs, scale precipitation occurs in the circulating water circulation path, etc. We focused on the issue of how to effectively suppress this.

そこで、本発明は、冷却対象を冷却するための循環水の温度が異なる別の系統の冷却塔設備に効率良くスケール防止薬剤を供給することができる冷却システムを提供することを目的とする。 SUMMARY OF THE INVENTION Therefore, an object of the present invention is to provide a cooling system that can efficiently supply a scale preventive agent to cooling tower equipment of different systems having different temperatures of circulating water for cooling objects to be cooled.

本発明の一局面に係る冷却システムは、第1の冷却対象を第1の温度に冷却するための第1系統冷却塔設備と、第2の冷却対象を前記第1の温度とは異なる第2の温度に冷却するための第2系統冷却塔設備と、を備え、前記第1系統冷却塔設備は、循環水が循環する第1の循環流路と、前記第1の循環流路に配置され、前記循環水を第1の熱交換部へ流入させる第1の循環ポンプと、前記第1の循環ポンプによって流入された前記循環水と前記第1の冷却対象とを熱交換させ、前記第1の冷却対象を冷却する前記第1の熱交換部と、前記第1の熱交換部での熱交換によって温度が上昇した前記循環水を冷却する第1の冷却塔と、前記第1の循環流路へ水を補給する第1の補給水供給部と、前記循環水の一部を排出する第1の排出流路と、前記第1の循環流路へスケール防止薬剤を注入する薬剤注入部と、を備え、前記第2系統冷却塔設備は、循環水が循環する第2の循環流路と、前記第2の循環流路に配置され、前記循環水を第2の熱交換部へ流入させる第2の循環ポンプと、前記第2の循環ポンプによって流入された前記循環水と前記第2の冷却対象とを熱交換させ、前記第2の冷却対象を冷却する前記第2の熱交換部と、前記第2の熱交換部での熱交換によって温度が上昇した前記循環水を冷却する第2の冷却塔と、前記第2の循環流路へ水を補給する第2の補給水供給部と、前記循環水の一部を排出する第2の排出流路と、前記第2の循環流路へスケール防止薬剤の供給を受けるための循環水バイパス流路と、を備え、前記循環水バイパス流路は、前記スケール防止薬剤を含有する前記第1の排出流路および/または前記第1の循環流路における前記循環水の一部を前記第2の循環流路へ供給可能とするように、前記第1の排出流路および/または前記第1の循環流路と前記第2の循環流路とを接続している。 A cooling system according to one aspect of the present invention includes a first system cooling tower facility for cooling a first object to be cooled to a first temperature, and a cooling tower facility for cooling a second object to be cooled to a second temperature different from the first temperature. a second system cooling tower facility for cooling to a temperature of , a first circulation pump that causes the circulating water to flow into a first heat exchange section; and a first cooling target that causes heat exchange between the circulating water that has flowed in by the first circulation pump and the first cooling object; the first heat exchange section that cools the object to be cooled; a first cooling tower that cools the circulating water whose temperature has increased due to heat exchange in the first heat exchange section; and the first circulating flow. a first make-up water supply section that replenishes water to the channel; a first discharge channel that discharges a portion of the circulating water; and a chemical injection section that injects a scale-preventing chemical into the first circulating channel. , the second system cooling tower equipment includes a second circulation flow path through which circulating water circulates, and is disposed in the second circulation flow path and causes the circulating water to flow into a second heat exchange section. a second circulation pump, and the second heat exchange unit that exchanges heat between the circulating water introduced by the second circulation pump and the second object to be cooled to cool the second object to be cooled; , a second cooling tower that cools the circulating water whose temperature has increased due to heat exchange in the second heat exchange section; and a second make-up water supply section that supplies water to the second circulation flow path. , a second discharge flow path for discharging a portion of the circulating water, and a circulating water bypass flow path for receiving the supply of a scale prevention agent to the second circulation flow path, the circulating water bypass flow The channel is configured to allow a portion of the circulating water in the first discharge channel and/or the first circulation channel containing the anti-scaling agent to be supplied to the second circulation channel; The first discharge flow path and/or the first circulation flow path and the second circulation flow path are connected.

この冷却システムによると、第2系統冷却塔設備が薬剤注入部を備えていなくても、スケール防止薬剤を含有する第1の排出流路および/または第1の循環流路における循環水の一部が循環水バイパス流路を介して第2の循環流路に供給される。言い換えれば、循環水バイパス流路を備えることにより、第1系統冷却塔設備と第2系統冷却塔設備との両方に効率良くスケール防止薬剤を供給することができる。 According to this cooling system, even if the second system cooling tower equipment is not equipped with a chemical injection part, a portion of the circulating water in the first discharge flow path and/or the first circulation flow path containing the scale prevention agent is supplied to the second circulating flow path via the circulating water bypass flow path. In other words, by providing the circulating water bypass channel, the scale prevention agent can be efficiently supplied to both the first system cooling tower equipment and the second system cooling tower equipment.

さらに、前記第1の循環流路における流量は、前記第2の循環流路における流量よりも多いことが好ましい。 Furthermore, it is preferable that the flow rate in the first circulation flow path is higher than the flow rate in the second circulation flow path.

この構成によると、循環流路の流量がより多い第1系統冷却塔設備における第1の循環流路から循環流路の流量がより少ない第2系統冷却塔設備の第2の循環流路に循環水の一部が供給されるため、両循環流路における循環水の量および温度に大きな影響を与えることなく、第2の循環流路にスケール防止薬剤を適切な量で供給することができる。 According to this configuration, circulation flows from the first circulation flow path in the first system cooling tower equipment where the flow rate of the circulation flow path is higher to the second circulation flow path of the second system cooling tower equipment where the flow rate of the circulation flow path is lower. Since a portion of the water is supplied, an appropriate amount of the anti-scaling agent can be supplied to the second circulation channel without significantly affecting the amount and temperature of the circulating water in both circulation channels.

さらに、前記循環水バイパス流路は、前記第1の排出流路から分岐して前記第2の循環流路に接続していてよい。 Furthermore, the circulating water bypass flow path may be branched from the first discharge flow path and connected to the second circulation flow path.

この構成によると、第1系統冷却塔設備の第1の排出流路から排出(ブローダウン)される循環水を、第2系統冷却塔設備の第2の循環流路へと供給されるスケール防止薬剤として再利用することができる。 According to this configuration, the circulating water discharged (blown down) from the first discharge passage of the first system cooling tower equipment is supplied to the second circulation passage of the second system cooling tower equipment to prevent scaling. It can be reused as a medicine.

さらに、上記構成において、前記第1の排出流路は、前記第1の循環流路における前記第1の循環ポンプの吐出口側と前記第1の熱交換部の入口側との間の部位に設けられていると好ましい。 Furthermore, in the above configuration, the first discharge flow path is located in a portion of the first circulation flow path between the discharge port side of the first circulation pump and the inlet side of the first heat exchange section. It is preferable if it is provided.

この構成によると、第1系統冷却塔設備の第1の循環ポンプの吐出性能を利用して循環水の一部を第2系統冷却塔設備の第2の循環流路へと供給することができるため、効率的にスケール防止薬剤を含有する循環水を供給することができる。 According to this configuration, a part of the circulating water can be supplied to the second circulation channel of the second system cooling tower equipment by using the discharge performance of the first circulation pump of the first system cooling tower equipment. Therefore, circulating water containing anti-scaling agents can be efficiently supplied.

さらに、前記循環水バイパス流路は、単位時間当たりに供給される前記スケール防止薬剤の量が予め設定された範囲内に収まるように前記循環水バイパス流路を介して前記第2の循環流路に供給される前記第1の循環流路からの前記循環水の量を調整する流量調整部を備えてよい。 Furthermore, the circulating water bypass flow path connects the second circulation flow path via the circulating water bypass flow path so that the amount of the scale prevention agent supplied per unit time falls within a preset range. The apparatus may further include a flow rate adjustment section that adjusts the amount of the circulating water supplied from the first circulation flow path.

この構成によると、第2系統冷却塔設備の循環水中のスケール防止薬剤を、より正確で適切な量において供給することができる。 According to this configuration, the scale prevention agent in the circulating water of the second system cooling tower equipment can be supplied in a more accurate and appropriate amount.

以上のように、本発明によると、冷却対象を冷却するための循環水の温度が異なる別の系統の冷却塔設備に効率良くスケール防止薬剤を供給することができる冷却システムを提供することが可能となる。 As described above, according to the present invention, it is possible to provide a cooling system that can efficiently supply a scale prevention agent to cooling tower equipment of different systems in which the temperature of circulating water for cooling objects to be cooled is different. becomes.

本発明の実施形態1に係る冷却システムの構成を模式的に示す図である。1 is a diagram schematically showing the configuration of a cooling system according to Embodiment 1 of the present invention. 図1に示す第1系統冷却塔設備の第1の熱交換部の構成を模式的に示す図である。2 is a diagram schematically showing the configuration of a first heat exchange section of the first system cooling tower equipment shown in FIG. 1. FIG. 本発明の実施形態2に係る冷却システムの構成を模式的に示す図である。FIG. 2 is a diagram schematically showing the configuration of a cooling system according to Embodiment 2 of the present invention.

以下、図面に基づいて、本発明の実施形態に係る廃棄物処理設備を詳細に説明する。 DESCRIPTION OF THE PREFERRED EMBODIMENTS A waste treatment facility according to an embodiment of the present invention will be described in detail below based on the drawings.

(実施形態1)
本発明の実施形態1に係る冷却システム1の構成を、図1を参照して説明する。
(Embodiment 1)
The configuration of a cooling system 1 according to Embodiment 1 of the present invention will be described with reference to FIG. 1.

なお、図1は、本実施形態1に係る冷却システム1における主要な構成要素のみを示しているが、冷却システム1は、同図に現れていない他の構成要素もさらに備え得るものである。以下、冷却システム1の各構成要素についてそれぞれ詳細に説明する。 Note that although FIG. 1 shows only the main components of the cooling system 1 according to the first embodiment, the cooling system 1 may further include other components that are not shown in the figure. Each component of the cooling system 1 will be described in detail below.

本実施形態1に係る冷却システム1は、冷媒として水を用い、2系統の冷却塔設備を用いて熱交換部内の冷却対象を冷却するシステムである。 The cooling system 1 according to the first embodiment is a system that uses water as a refrigerant and uses two systems of cooling tower equipment to cool an object to be cooled in a heat exchange section.

図1に示すように、冷却システム1は、第1系統冷却塔設備10と第2系統冷却塔設備20と、を備える。 As shown in FIG. 1, the cooling system 1 includes a first system cooling tower facility 10 and a second system cooling tower facility 20.

第1系統冷却塔設備10は、後述する第1の冷却対象を予め設定された第1の温度に冷却する設備である。第2系統冷却塔設備20は、後述する第2の冷却対象を予め設定された第1の温度とは異なる第2の温度に冷却する設備である。 The first system cooling tower equipment 10 is equipment that cools a first object to be cooled, which will be described later, to a preset first temperature. The second system cooling tower equipment 20 is equipment that cools a second object to be cooled, which will be described later, to a second temperature different from a preset first temperature.

第1系統冷却塔設備10は、第1の循環流路11と、第1の循環ポンプ12と、第1の熱交換部13と、第1の冷却塔14と、第1の補給水供給ポンプ311および第1の補給水供給流路312(第1の補給水供給部)と、第1の排出流路15と、薬剤注入ポンプ設備16(薬剤注入部)と、を備える。 The first system cooling tower equipment 10 includes a first circulation channel 11, a first circulation pump 12, a first heat exchange section 13, a first cooling tower 14, and a first make-up water supply pump. 311 and a first make-up water supply channel 312 (first make-up water supply section), a first discharge channel 15, and drug injection pump equipment 16 (medicine injection section).

まず、第1系統冷却塔設備10におけるこれらの詳細な機能について説明する。 First, these detailed functions in the first system cooling tower equipment 10 will be explained.

第1の循環流路11は、冷却対象を冷却するための冷媒である循環水(冷却水ともいう)が循環する経路であり、例えば配管等である。本実施形態1では、第1の循環流路11において、第1の循環ポンプ12、第1の熱交換部13および第1の冷却塔14が、循環水の流れに沿ってこの順で間に配置されている。なお、第1の循環流路11を流れる循環水の流量は、後述する第1の冷却対象132を冷却するために必要とされる流量となっている。 The first circulation channel 11 is a path through which circulating water (also referred to as cooling water), which is a refrigerant for cooling an object to be cooled, circulates, and is, for example, a pipe. In the first embodiment, in the first circulation flow path 11, the first circulation pump 12, the first heat exchange section 13, and the first cooling tower 14 are arranged in between in this order along the flow of circulating water. It is located. Note that the flow rate of the circulating water flowing through the first circulation channel 11 is a flow rate required for cooling a first cooling target 132, which will be described later.

第1の循環ポンプ12は、第1の循環流路11を流れる循環水を後述する第1の熱交換部13へ流入させるポンプである。第1の循環ポンプ12の吐出性能は、第1の循環流路11における流量に見合ったものを選択すればよい。 The first circulation pump 12 is a pump that causes circulating water flowing through the first circulation channel 11 to flow into a first heat exchange section 13, which will be described later. The discharge performance of the first circulation pump 12 may be selected to match the flow rate in the first circulation flow path 11.

後に詳細に説明するが、第1の循環ポンプ12から吐出された循環水は、その一部が第1の排出流路15を介して第1系統冷却塔設備10外(単に系外ともいう)へ排出され、また、別の一部が循環水バイパス流路26を介して第2系統冷却塔設備20の第2の循環流路21へと供給される。 As will be described in detail later, a portion of the circulating water discharged from the first circulation pump 12 passes through the first discharge channel 15 to the outside of the first system cooling tower equipment 10 (also simply referred to as outside the system). Another part is supplied to the second circulation passage 21 of the second system cooling tower equipment 20 via the circulation water bypass passage 26 .

第1の熱交換部13は、第1の循環ポンプ12によって流入された循環水と第1の冷却対象とを熱交換させ、第1の冷却対象を冷却する。 The first heat exchange unit 13 exchanges heat between the circulating water introduced by the first circulation pump 12 and the first object to be cooled, thereby cooling the first object to be cooled.

図2は、図1に示す第1系統冷却塔設備10の第1の熱交換部13の構成を模式的に示す図である。図2に示すように、第1の熱交換部13は、互いに並列に配置された複数の第1の熱交換器131と、当該複数の第1の熱交換器131に各々接触して配置されている第1の冷却対象132と、当該複数の第1の熱交換器131内を通過する循環水分岐流路133と、を備える。第1の循環ポンプ12によって、第1の循環流路11において第1の熱交換部13内に流入してきた循環水は、第1の熱交換器131内の複数の循環水分岐流路133に分岐する。 FIG. 2 is a diagram schematically showing the configuration of the first heat exchange section 13 of the first system cooling tower equipment 10 shown in FIG. As shown in FIG. 2, the first heat exchange section 13 includes a plurality of first heat exchangers 131 arranged in parallel with each other, and is arranged in contact with each of the plurality of first heat exchangers 131. A first cooling target 132 is provided, and a circulating water branch flow path 133 that passes through the plurality of first heat exchangers 131 is provided. The circulating water that has flowed into the first heat exchange section 13 in the first circulation channel 11 by the first circulation pump 12 is transferred to a plurality of circulating water branch channels 133 in the first heat exchanger 131. Branch out.

循環水(冷却水)が分岐して通過することによって、各々接触して配置されている第1の冷却対象132の熱が吸収され、各第1の冷却対象132は予め設定した第1の温度に冷却される。予め設定した第1の温度とは、第1の冷却対象132が実用上使用される際にその機能等に影響を与えない、または適切であると判定される予め設定された温度である。基本的に、当該第1の温度に合わせて第1の循環流路11を流れる循環水の温度が決定される。その後、第1の熱交換部13を流出する際には、複数の循環水分岐流路133は合流する。第1の熱交換部13から流出される循環水は、第1の冷却対象132の熱を吸収しているため、循環水の温度は上昇している。 By branching and passing the circulating water (cooling water), the heat of the first cooling objects 132 placed in contact with each other is absorbed, and each first cooling object 132 has a preset first temperature. is cooled to The preset first temperature is a preset temperature that does not affect the functions or the like of the first cooling target 132 when it is actually used, or is determined to be appropriate. Basically, the temperature of the circulating water flowing through the first circulating flow path 11 is determined in accordance with the first temperature. Thereafter, when flowing out of the first heat exchange section 13, the plurality of circulating water branch channels 133 join together. Since the circulating water flowing out from the first heat exchange section 13 has absorbed the heat of the first cooling target 132, the temperature of the circulating water has increased.

第1の冷却対象132は、機器を冷却する際に要求される循環水の温度が比較的高い機器である。このような機器としては、例えば、空気圧縮機、油圧装置等が挙げられる。第1の冷却対象132は、例えば、第1の冷却塔14の流出口側での循環水の温度が32~35℃程度の温度であるような機器である。 The first cooling target 132 is a device in which the temperature of circulating water required to cool the device is relatively high. Examples of such devices include air compressors, hydraulic devices, and the like. The first cooling target 132 is, for example, a device in which the temperature of the circulating water on the outlet side of the first cooling tower 14 is about 32 to 35°C.

第1の冷却塔14では、第1の熱交換部13での熱交換によって温度が上昇した循環水を冷却し、再び温度を下げた状態で循環水を第1の循環流路11の配管等の経路に戻す。具体的には、第1の冷却塔14は、塔内部の上下間にわたって設けられた充填材141と、塔の頂部に設けられたファン142と、塔の上部に設けられた散水器143と、塔の底部に設けられた下部水槽144と、を備える。 In the first cooling tower 14, the circulating water whose temperature has increased due to heat exchange in the first heat exchange section 13 is cooled, and the circulating water is cooled down again and is transferred to the piping of the first circulation channel 11, etc. Return to the route. Specifically, the first cooling tower 14 includes a filling material 141 provided between the top and bottom inside the tower, a fan 142 provided at the top of the tower, a water sprinkler 143 provided at the top of the tower, A lower water tank 144 provided at the bottom of the tower is provided.

第1の熱交換部13から流入してきた循環水は、まず、散水器143まで配管等の経路を介して流れ込む。そして、ファン142の稼働により取り込まれた外気が充填材141の上方から下方へ流れていく循環水と接触することで、水の一部が蒸発する際に熱が奪われることにより循環水が冷却される。なお、循環水を構成する成分のうち、蒸発する成分は水だけであり、スケール成分および後述するスケール防止薬剤は蒸発しない成分であるため循環水におけるスケール防止薬剤の含有量は変わらない。この際の循環水の蒸発量は、第1の冷却塔14が行う交換熱量、すなわち第1の循環流路11における水温を何℃まで降下させるのかによって異なる。例えば、当該蒸発量は、第1の循環流路11の水の流量に対して0.1~5%程度、特に0.5~1%程度である。その後、冷却された循環水は、下部水槽144に回収される。 The circulating water that has flowed in from the first heat exchange section 13 first flows to the water sprinkler 143 via a path such as piping. When the outside air taken in by the operation of the fan 142 comes into contact with the circulating water flowing from above to below the filler 141, heat is removed when a part of the water evaporates, thereby cooling the circulating water. be done. Note that among the components constituting the circulating water, the only component that evaporates is water, and the scale components and the scale-preventing agent described below are components that do not evaporate, so the content of the scale-preventing agent in the circulating water does not change. The amount of evaporation of the circulating water at this time varies depending on the amount of heat exchanged by the first cooling tower 14, that is, to what degree the temperature of the water in the first circulation channel 11 is lowered. For example, the amount of evaporation is about 0.1 to 5%, particularly about 0.5 to 1%, of the flow rate of water in the first circulation channel 11. Thereafter, the cooled circulating water is collected into the lower water tank 144.

下部水槽144には、補給水も供給される。補給水は、概算で、第1の冷却塔14において循環水中の水分が蒸発した量(例えば単位としてm/h)と、後述する第1の排出流路15から系外に排出される循環水の量(例えば単位としてm/h)と、後述する循環水バイパス流路26を介して第2の循環流路21へと供給される循環水の一部の量(例えば単位としてm/h)とを加算した水の量が、第1の循環流路11に補充される。補給水は、第1の補給水供給ポンプ311により、補給水用水槽30から第1の補給水供給流路312を介して供給される。補給水の温度は、循環水と同じまたは低い温度が好ましいが、通常、循環水の蒸発量および系外に排出される排出量は循環流路における流量と比べて少量であるため当該同じまたは低い温度でなくても構わない。このように、最終的には下部水槽144に冷却後の循環水と補給水とが貯まることになる。その後、当初の第1の循環流路11における流量で、第1の冷却塔14の流出口側から循環水が流れ出る。 Makeup water is also supplied to the lower water tank 144. The make-up water is approximately the amount of water in the circulating water evaporated in the first cooling tower 14 (for example, in m 3 /h) and the amount of circulating water discharged outside the system from the first discharge channel 15, which will be described later. The amount of water (for example, m 3 /h as a unit) and the amount of part of the circulating water supplied to the second circulation flow path 21 via the circulating water bypass flow path 26 (described later) (for example, m 3 / h) /h) is added to the first circulation flow path 11. The make-up water is supplied by the first make-up water supply pump 311 from the make-up water tank 30 via the first make-up water supply channel 312 . The temperature of the make-up water is preferably the same or lower than that of the circulating water, but since the amount of evaporation of the circulating water and the amount of discharged to the outside of the system are usually small compared to the flow rate in the circulation flow path, the temperature is the same or lower than that of the circulating water. It doesn't have to be temperature. In this way, the cooled circulating water and make-up water will eventually be stored in the lower water tank 144. Thereafter, the circulating water flows out from the outlet side of the first cooling tower 14 at the original flow rate in the first circulation channel 11 .

薬剤注入ポンプ設備16は、第1の循環流路11へスケール防止薬剤を注入する設備である。薬剤注入ポンプ設備16は、具体的には、第1の循環流路11における第1の冷却塔14の流出口側と第1の循環ポンプ12の吸込口側との間に薬剤を注入するように配置されている。薬剤注入ポンプ設備16をこのような位置に配置することによって、第1の循環流路11へ補給水が供給された後、かつ後述の第1の排出流路15から循環水の一部が排出される前において薬剤を注入することができる。すなわち、第1の循環流路11において多くの流量が安定して流れている箇所に薬剤を注入することができるため、薬剤を均質に混合させながら注入することができる。さらには、薬剤を注入した直後において循環水の一部が第1の排出流路15から排出されてしまうことを避けることができるため、注入された薬剤が排出されて無駄になる量を減らすことができる。 The drug injection pump equipment 16 is equipment for injecting a scale prevention chemical into the first circulation channel 11 . Specifically, the drug injection pump equipment 16 is configured to inject a drug between the outlet side of the first cooling tower 14 and the suction port side of the first circulation pump 12 in the first circulation channel 11. It is located in By arranging the drug injection pump equipment 16 in such a position, after makeup water is supplied to the first circulation channel 11, a portion of the circulating water is discharged from the first discharge channel 15, which will be described later. The drug can be injected before the injection. That is, since the drug can be injected into a location where a large amount of flow is stably flowing in the first circulation channel 11, the drug can be injected while being homogeneously mixed. Furthermore, it is possible to avoid part of the circulating water from being discharged from the first discharge channel 15 immediately after the medicine is injected, thereby reducing the amount of the injected medicine that is discharged and wasted. I can do it.

スケール防止薬剤の注入量は、第1の循環流路11において必要とされるスケール防止薬剤の量において注入される。例えば、概算で、冷却システム1の起動時には、初期注入量として、第1の循環流路11の循環水に基づく量(例えば単位としてg/m)が注入される。冷却システム1の運転が安定した後には、例えば、概算で、第1の循環流路11における補充された補給水量当たりのスケール防止薬剤の予め設定した注入量(例えば単位としてg/m)、または、第1の循環流路11における単位時間当たりのスケール防止薬剤の予め設定した注入量(例えば単位としてg/h)が注入される。具体的には、例えば、後述する第1の排出流路15から単位時間当たりに系外に排出される循環水の一部に含まれるスケール防止薬剤の量(例えば単位としてg/h)と、さらには必要に応じて第1の冷却塔14のファン142によって飛散するスケール防止薬剤の量(例えば単位としてg/h)も加算した量と同じ量のスケール防止薬剤の量を再度注入すればよい。 The amount of anti-scaling agent to be injected is the amount of anti-scaling agent required in the first circulation channel 11 . For example, roughly speaking, when the cooling system 1 is started up, an amount based on the circulating water in the first circulating flow path 11 (for example, in g/m 3 ) is injected as the initial injection amount. After the operation of the cooling system 1 has stabilized, for example, approximately a preset injection amount of anti-scaling agent per amount of makeup water replenished in the first circulation channel 11 (for example in g/m 3 ), Alternatively, a preset injection amount (for example, in g/h) of the scale preventing agent per unit time in the first circulation channel 11 is injected. Specifically, for example, the amount of the scale prevention agent contained in a portion of the circulating water discharged out of the system per unit time from the first discharge channel 15 (described later) (for example, in g/h), Furthermore, if necessary, the amount of the scale preventive agent that is the same as the amount of the scale preventive agent scattered by the fan 142 of the first cooling tower 14 (for example, in g/h) may be injected again. .

また、第1の循環流路11を流れる循環水に含有されるスケール防止薬剤の濃度(例えば単位としてg/m)を検出する濃度センサをさらに設けて、当該濃度センサの測定結果に応じて必要な量のスケール防止薬剤(例えば単位としてg/h)を注入してもよい。さらに、このようなスケール防止薬剤の濃度を検出する濃度センサは、第1の循環流路11の任意の箇所に設けられていてもよい。あるいは、前述の濃度センサの代替として、第1の循環流路11における任意の適当な箇所を流れる循環水を断続的に採取して、スケール防止薬剤の濃度(例えば単位としてg/m)を測定してもよい。なお、スケール防止薬剤の具体的な注入量は、スケール防止薬剤の種類によって異なる。 Further, a concentration sensor for detecting the concentration (for example, g/m 3 as a unit) of the scale prevention agent contained in the circulating water flowing through the first circulation flow path 11 is further provided, and the concentration sensor is configured to detect the concentration of the scale preventive agent contained in the circulating water flowing through the first circulation channel 11. The required amount of antiscaling agent (for example in g/h) may be injected. Furthermore, a concentration sensor for detecting the concentration of such a scale prevention agent may be provided at any location in the first circulation channel 11. Alternatively, as an alternative to the concentration sensor described above, the circulating water flowing through any suitable point in the first circulating flow path 11 is intermittently sampled to determine the concentration of the scale preventive agent (for example, in g/m 3 ). May be measured. Note that the specific injection amount of the scale prevention agent varies depending on the type of scale prevention agent.

第1の排出流路15は、循環水の一部を系外の排出液水槽処理設備40へと排出(ブローダウン)するための経路である。具体的には、第1の排出流路15は、第1の循環流路11における第1の循環ポンプ12の吐出口側と第1の熱交換部13の入口側との間の箇所に接続して設けられている。前述した通り、ブローダウンは循環水の濃縮によるスケールの析出を抑制するために行われる。例えば、ブローダウンされる量は、第1の循環流路11における流量に対して、0.2%~1%程度、特に0.2~0.5%程度である。 The first discharge flow path 15 is a path for discharging (blowdown) a part of the circulating water to the effluent water tank treatment equipment 40 outside the system. Specifically, the first discharge flow path 15 is connected to a location between the discharge port side of the first circulation pump 12 and the inlet side of the first heat exchange section 13 in the first circulation flow path 11. It is provided. As mentioned above, blowdown is performed to suppress scale precipitation due to concentration of circulating water. For example, the blowdown amount is about 0.2% to 1%, particularly about 0.2 to 0.5%, relative to the flow rate in the first circulation channel 11.

ここで、第1の冷却塔14における、{(循環水の蒸発量)+(第1の排出流路15から排出される循環水の量)}/(第1の排出流路15から排出される循環水の量)、すなわち循環水の濃縮倍率は、3~8倍程度、好ましくは5倍程度とする。このような倍率で冷却システム1を運転することによって、スケール析出の抑制と、スケール防止薬剤のブローダウンでの排出によるコスト面での負荷とのバランスを好適に保つことができる。 Here, in the first cooling tower 14, {(amount of evaporation of circulating water)+(amount of circulating water discharged from the first discharge channel 15)}/(amount of circulating water discharged from the first discharge channel 15) The amount of circulating water), that is, the concentration ratio of the circulating water is about 3 to 8 times, preferably about 5 times. By operating the cooling system 1 at such a magnification, it is possible to maintain a favorable balance between suppression of scale precipitation and cost burden due to discharge of the scale prevention agent during blowdown.

次いで、第2系統冷却塔設備20について説明する。 Next, the second system cooling tower equipment 20 will be explained.

第2系統冷却塔設備20は、第2の循環流路21と、第2の循環ポンプ22と、第2の熱交換部23と、第2の冷却塔24と、第2の補給水供給ポンプ321および第2の補給水供給流路322(第2の補給水供給部)と、第2の排出流路25と、循環水バイパス流路26と、を備える。 The second system cooling tower equipment 20 includes a second circulation flow path 21, a second circulation pump 22, a second heat exchange section 23, a second cooling tower 24, and a second make-up water supply pump. 321 and a second makeup water supply channel 322 (second makeup water supply section), a second discharge channel 25, and a circulating water bypass channel 26.

第2系統冷却塔設備20の第2の冷却塔24および第2の排出流路25は、それぞれ、第1系統冷却塔設備10の第1の冷却塔14および第1の排出流路15と共通した機能および構成を有するため、説明を省略する。 The second cooling tower 24 and the second discharge passage 25 of the second system cooling tower equipment 20 are common with the first cooling tower 14 and the first discharge passage 15 of the first system cooling tower equipment 10, respectively. Since it has the same function and configuration, the explanation will be omitted.

以下、第2系統冷却塔設備20の他の構成について、第1系統冷却塔設備10における構成と異なる点について主に説明する。 Hereinafter, regarding other configurations of the second system cooling tower equipment 20, the points that differ from the configuration in the first system cooling tower equipment 10 will be mainly explained.

第2の循環流路21は、基本的には、第1の循環流路11と共通した機能および構成を有する。第1の循環流路11と異なる点としては、第2の循環流路21における流量は、第1の循環流路11における流量よりも少なくなっている。 The second circulation flow path 21 basically has the same function and configuration as the first circulation flow path 11. The difference from the first circulation flow path 11 is that the flow rate in the second circulation flow path 21 is lower than the flow rate in the first circulation flow path 11.

第2の循環ポンプ22は、基本的には、第1の循環ポンプ12と共通した機能および構成を有する。第1の循環ポンプ12と異なる点としては、第2の循環ポンプ22の吐出容量が第1の循環ポンプ12の吐出容量よりも小さいことである。これは、前述した通り、第2の循環流路21における流量が第1の循環流路11における流量よりも少ないためである。 The second circulation pump 22 basically has the same function and configuration as the first circulation pump 12. The difference from the first circulation pump 12 is that the discharge capacity of the second circulation pump 22 is smaller than that of the first circulation pump 12. This is because, as described above, the flow rate in the second circulation flow path 21 is smaller than the flow rate in the first circulation flow path 11.

第2の熱交換部23は、基本的には、第1の熱交換部13と共通した機能および構成を有する。第1の熱交換部13と異なる点としては、第2の冷却対象は、機器を冷却する際に要求される循環水の温度が比較的低い機器である。このような機器としては、例えば、抽気用真空ポンプ等が挙げられる。第2の冷却対象は、例えば、第2の冷却塔24の流出口側での循環水の温度が19~30℃程度の温度であるような機器である。さらに、第2の熱交換部23内における第2の冷却対象の数が、第1の熱交換部13内における第1の冷却対象132の数よりも顕著に少なく数個(例えば2、3個)程度であることから(図示せず)、循環水の流量も少ないという点においても異なる。 The second heat exchange section 23 basically has the same function and configuration as the first heat exchange section 13. The difference from the first heat exchange section 13 is that the second cooling target is a device in which the temperature of the circulating water required to cool the device is relatively low. Examples of such equipment include vacuum pumps for extraction. The second object to be cooled is, for example, a device in which the temperature of the circulating water on the outlet side of the second cooling tower 24 is about 19 to 30°C. Furthermore, the number of second objects to be cooled within the second heat exchange section 23 is significantly smaller than the number of first objects to be cooled 132 within the first heat exchange section 13 (for example, two or three objects). ) (not shown), the flow rate of circulating water is also small.

このように、本実施形態1では、第2の冷却対象は、第1の冷却対象132と比較してより低い循環水の温度を要求する。すなわち、第1系統冷却塔設備10と比較すると第2系統冷却塔設備20では、より低い温度まで循環水を冷却する必要がある。同じ温度の外気を用いて冷却する場合において、循環水をより低い温度まで冷却するには、第2系統冷却塔設備20のファン242の回転数を上げること等でより多くの外気を第2の冷却塔24内に送り込む必要がある。換言すれば、循環水をより低い温度まで冷却する必要のある第2の冷却対象の冷却の際には、より多くの電力を第2の冷却塔24で消費する。このようなより多くの電力消費を必須として当該機器の性能を発揮させる第2の冷却対象となり得る機器は、第1の冷却対象132と比べて限定されるため、その数も第1の冷却対象132と比べて少なくなることが多い。 Thus, in the first embodiment, the second cooling target requires a lower temperature of the circulating water compared to the first cooling target 132. That is, compared to the first system cooling tower equipment 10, the second system cooling tower equipment 20 needs to cool the circulating water to a lower temperature. In the case of cooling using outside air of the same temperature, in order to cool the circulating water to a lower temperature, more outside air can be transferred to the second system by increasing the rotation speed of the fan 242 of the second system cooling tower equipment 20. It is necessary to send it into the cooling tower 24. In other words, more power is consumed in the second cooling tower 24 when cooling the second object to be cooled, which requires cooling the circulating water to a lower temperature. The number of devices that can be used as the second cooling target that requires more power consumption to exhibit the performance of the device is limited compared to the first cooling target 132, so the number of devices is also the same as the first cooling target. It is often less than 132.

第2の補給水供給ポンプ321および第2の補給水供給流路322は、基本的には、第1の補給水供給ポンプ311および第1の補給水供給流路312と共通した機能および構成を有する。第1の補給水供給ポンプ311および第1の補給水供給流路312と異なる点としては、補給水は、概算で、第2の冷却塔24において循環水中の水分が蒸発した量(例えば単位としてm/h)と第2の排出流路25から系外に排出される循環水の量(例えば単位としてm/h)とを加算した値から、後述する循環水バイパス流路26を介して第2の循環流路21へと供給された循環水の量(例えば単位としてm/h)を減算した値の水の量が、第2の循環流路21に補充される。 The second make-up water supply pump 321 and the second make-up water supply passage 322 basically have the same function and configuration as the first make-up water supply pump 311 and the first make-up water supply passage 312. have The difference from the first make-up water supply pump 311 and the first make-up water supply flow path 312 is that the make-up water is approximately the amount of water in the circulating water evaporated in the second cooling tower 24 (for example, as a unit) m 3 /h) and the amount of circulating water discharged outside the system from the second discharge flow path 25 (for example, m 3 /h in unit), the amount of circulating water is The second circulation flow path 21 is replenished with an amount of water equal to the value obtained by subtracting the amount of circulating water supplied to the second circulation flow path 21 (for example, in m 3 /h).

第2系統冷却塔設備20は、薬剤注入ポンプ設備16を備えないが、その代替として、循環水バイパス流路26を備える。 The second system cooling tower equipment 20 does not include the drug injection pump equipment 16, but instead includes a circulating water bypass channel 26.

循環水バイパス流路26は、第1の循環流路11から第2の循環流路21へスケール防止薬剤の供給を受けるための流路である。具体的には、循環水バイパス流路26は、第1の循環流路11における第1の循環ポンプ12の吐出口側と第1の熱交換部13の入口側との間の部位に設けられている第1の排出流路15から分岐して、第2の冷却塔24の下部水槽244に接続しており、第2の循環流路21はスケール防止薬剤を含有する第1の循環流路11における循環水の一部の供給を受ける。 The circulating water bypass flow path 26 is a flow path for receiving the supply of the scale prevention agent from the first circulation flow path 11 to the second circulation flow path 21 . Specifically, the circulating water bypass flow path 26 is provided in a portion of the first circulation flow path 11 between the discharge port side of the first circulation pump 12 and the inlet side of the first heat exchange section 13. The second circulation flow path 21 is branched from the first discharge flow path 15 which is connected to the lower water tank 244 of the second cooling tower 24, and the second circulation flow path 21 is connected to the first circulation flow path containing the anti-scaling agent. Part of the circulating water in 11 is supplied.

すなわち、第1の循環流路11より排出(ブローダウン)される循環水が第2の循環流路21へ供給されるスケール防止薬剤として再利用される。そのため、第1の循環流路11と第2の循環流路21のそれぞれにスケール防止薬剤の注入を行う場合と比較して、スケール防止薬剤の消費量を抑えることができる。 That is, the circulating water discharged (blown down) from the first circulating flow path 11 is reused as an anti-scaling agent to be supplied to the second circulating flow path 21. Therefore, the consumption amount of the scale preventive agent can be suppressed compared to the case where the scale preventive agent is injected into each of the first circulation flow path 11 and the second circulation flow path 21.

また、第1の排出流路15から分岐して、循環水バイパス流路26を介して第2の循環流路21へ供給される循環水は、補給水と比較して、シリカやカルシウム等のスケール生成の原因となる成分を多く含んでいる。このため、第2の排出流路25からのブローダウンは、循環水の蒸発により濃縮されたスケール生成の原因となる成分に加え、第1の循環流路11から循環水バイパス流路26を介して供給される濃縮された循環水に含まれるスケール生成の原因となる成分をも排出可能とする流量に設定する必要がある。換言すれば、第2の排出流路25からの排出量(ブローダウンの量)を適切に設定し、スケール生成の原因となる成分を排出することで第2系統冷却塔設備20において過剰な濃縮が起こらないようにすることが可能である。 Furthermore, the circulating water that is branched from the first discharge channel 15 and supplied to the second circulating channel 21 via the circulating water bypass channel 26 contains more silica, calcium, etc. than makeup water. Contains many components that cause scale formation. Therefore, the blowdown from the second discharge flow path 25 is caused by the components that are concentrated due to the evaporation of the circulating water and cause scale formation, as well as the components that are caused by the blowdown from the first circulation flow path 11 via the circulating water bypass flow path 26. It is necessary to set the flow rate at a level that allows the components that cause scale formation contained in the concentrated circulating water supplied by the pump to be discharged. In other words, by appropriately setting the discharge amount (blowdown amount) from the second discharge flow path 25 and discharging components that cause scale formation, excessive concentration in the second system cooling tower equipment 20 can be prevented. It is possible to prevent this from happening.

さらに、循環水バイパス流路26には、バイパス流路流量調整弁27(流量調整部)が設けられている。バイパス流路流量調整弁27は、循環水バイパス流路26を流れる循環水の流量を調整する。具体的には、バイパス流路流量調整弁27の開度を調整することによって、単位時間当たりに供給されるスケール防止薬剤の量(例えば単位としてg/h)が予め設定された範囲内に収まるように循環水バイパス流路26を介して第2の循環流路21に供給される第1の循環流路11からの循環水の量(例えば単位としてm/h)を調整する。単位時間当たりに供給されるスケール防止薬剤の量(例えば単位としてg/h)の予め設定された範囲とは、第2の循環流路21における流量(例えば単位としてm)に応じて決定され、第2の循環流路21においてスケールの析出が抑制されると判定される当該薬剤の予め設定された範囲における量である。あるいは、第1の循環流路11における流量当たりのスケール防止薬剤の質量(例えば単位としてg/m)と、第2の循環流路21における流量当たりのスケール防止薬剤の質量(例えば単位としてg/m)とが同様となるように、循環水バイパス流路26を介して単位時間当たりに供給される循環水の量(例えば単位としてm/h)が調整されてもよい。さらには、必要に応じて、第2の冷却塔24のファン242によって飛散するスケール防止薬剤の量をさらに加算したスケール防止薬剤の量(例えば単位としてg/h)において、供給されるスケール防止薬剤の量を調整してもよい。 Further, the circulating water bypass flow path 26 is provided with a bypass flow flow rate adjustment valve 27 (flow rate adjustment section). The bypass channel flow rate adjustment valve 27 adjusts the flow rate of circulating water flowing through the circulating water bypass channel 26 . Specifically, by adjusting the opening degree of the bypass channel flow rate adjustment valve 27, the amount of the scale prevention agent supplied per unit time (for example, in g/h) is kept within a preset range. The amount of circulating water (for example, in m 3 /h as a unit) from the first circulation passage 11 that is supplied to the second circulation passage 21 via the circulation water bypass passage 26 is adjusted in this manner. The preset range of the amount of the scale preventive agent supplied per unit time (for example, g/h as a unit) is determined according to the flow rate (for example, as a unit of m 3 ) in the second circulation flow path 21. , is the amount of the drug within a preset range that is determined to suppress scale precipitation in the second circulation channel 21. Alternatively, the mass of the scale preventive agent per flow rate in the first circulation flow path 11 (for example, in g/m 3 ) and the mass of the scale preventive agent per flow rate in the second circulation flow path 21 (for example, in g/m 3 ) The amount of circulating water (for example, m 3 /h) supplied per unit time via the circulating water bypass flow path 26 may be adjusted so that the amount of water (m 3 /m 3 ) is the same. Furthermore, if necessary, the scale preventive agent supplied in the amount of the scale preventive agent (for example, in g/h) that is further added to the amount of the scale preventive agent scattered by the fan 242 of the second cooling tower 24. You may adjust the amount.

バイパス流路流量調整弁27の開度は、冷却システム1の全体構成に合わせて、起動時から所定の開度のままに変動させずに合わせておいてもよい。あるいは、バイパス流路流量調整弁27の開度制御部をさらに設けて、運転開始から時間経過に伴い、第2の循環流路21に供給されるスケール防止薬剤を含有する循環水の量またはスケール防止薬剤の量(例えば単位としてm/hまたはg/h)が予め設定された範囲となるように、当該開度を自動制御または手動制御してもよい。この場合、循環水バイパス流路26を介して第2の循環流路21に供給される循環水の流量(例えば単位としてm/h)を検出する流量センサおよび第2の循環流路21に供給される循環水に含有されるスケール防止薬剤の濃度(例えば単位としてg/m)を検出する濃度センサのうちの1つ以上をさらに設けてもよい。または、スケール防止薬剤の濃度(例えば単位としてg/m)を検出する濃度センサは、第2の循環流路21の任意の箇所に設けられていてもよい。あるいは、前述の濃度センサの代替として、第2の循環流路21に供給される循環水(または第2の循環流路21における任意の適当な箇所の循環水)を断続的に採取して、スケール防止薬剤の濃度を測定してもよい。 The opening degree of the bypass channel flow rate adjustment valve 27 may be set without changing at a predetermined opening degree from the time of startup, depending on the overall configuration of the cooling system 1. Alternatively, an opening control section for the bypass channel flow rate adjustment valve 27 may be further provided to control the amount or scale of the circulating water containing the scale prevention agent supplied to the second circulating channel 21 as time passes from the start of operation. The degree of opening may be automatically or manually controlled so that the amount of the preventive agent (for example, in units of m 3 /h or g/h) falls within a preset range. In this case, a flow rate sensor that detects the flow rate (for example, in m 3 /h) of the circulating water supplied to the second circulating channel 21 via the circulating water bypass channel 26 and the second circulating channel 21 One or more concentration sensors may further be provided for detecting the concentration (eg, in g/m 3 ) of the antiscaling agent contained in the supplied circulating water. Alternatively, a concentration sensor that detects the concentration of the scale prevention agent (for example, in g/m 3 as a unit) may be provided at any location in the second circulation flow path 21. Alternatively, as an alternative to the concentration sensor described above, the circulating water supplied to the second circulation flow path 21 (or the circulating water at any appropriate location in the second circulation flow path 21) is intermittently sampled, The concentration of antiscaling agent may also be measured.

このように、冷却システム1によると、第2系統冷却塔設備20が薬剤注入ポンプ設備16を備えていなくても、スケール防止薬剤を含有する第1の循環流路11における循環水の一部が循環水バイパス流路26を介して第2の循環流路21に供給される。そのため、冷却対象を冷却するための循環水の温度が異なる別の系統の冷却塔設備(第2系統冷却塔設備20)に、効率良くスケール防止薬剤を供給することができる。さらに、第2系統冷却塔設備20に別途薬剤注入ポンプ設備を設けなくてもよいため、薬剤注入ポンプ設備の設置コストおよびランニングコストを抑えることができる。さらには、当該設備を設置しなくて済むため、配置スペースの削減といった利点も有する。 In this way, according to the cooling system 1, even if the second system cooling tower equipment 20 is not equipped with the chemical injection pump equipment 16, a portion of the circulating water in the first circulation channel 11 containing the scale-preventing chemical can be The circulating water is supplied to the second circulating flow path 21 via the circulating water bypass flow path 26 . Therefore, the anti-scaling agent can be efficiently supplied to the cooling tower equipment of another system (the second system cooling tower equipment 20) in which the temperature of the circulating water for cooling the object to be cooled is different. Furthermore, since there is no need to separately provide a drug injection pump facility in the second system cooling tower facility 20, the installation cost and running cost of the drug injection pump facility can be reduced. Furthermore, since there is no need to install the equipment, there is an advantage that the installation space can be reduced.

特に、本実施形態1の冷却システム1では、第2の冷却対象の冷却に必要とされる交換熱量の総和が、第1の冷却対象132の冷却に必要とされる交換熱量の総和よりも顕著に少なくなっている。一般的に、冷却システムにおいて、冷却対象の冷却に必要とされる交換熱量が増えるにつれ、冷却システム内における循環流路の循環水の流量を増やす必要がある。本実施形態1の冷却システム1では、第2の循環流路21における流量は、第1の循環流路11における流量よりも少なくなっているため、循環流路の流量が少ない(換言すれば、冷却対象の冷却に必要とされる交換熱量の総和が小さい)第2系統冷却塔設備20に別途薬剤注入ポンプ設備を設けなくてよい。従って、本実施形態1のような第2の冷却対象の冷却に必要とされる交換熱量の総和が第1の冷却対象132の冷却に必要とされる交換熱量の総和よりも低い場合では、本発明を広くかつ効果的に適用させることができる。 In particular, in the cooling system 1 of the first embodiment, the total amount of heat exchanged required for cooling the second object to be cooled is more significant than the total amount of heat exchanged required for cooling the first object 132 to be cooled. has decreased. Generally, in a cooling system, as the amount of exchanged heat required to cool the object to be cooled increases, it is necessary to increase the flow rate of circulating water in the circulation flow path within the cooling system. In the cooling system 1 of the first embodiment, the flow rate in the second circulation flow path 21 is lower than the flow rate in the first circulation flow path 11, so the flow rate in the circulation flow path is small (in other words, There is no need to separately provide a chemical injection pump facility in the second system cooling tower facility 20 (where the total amount of exchanged heat required for cooling the object to be cooled is small). Therefore, in the case where the total amount of exchanged heat required for cooling the second cooling object is lower than the total amount of exchanged heat required for cooling the first cooling object 132, as in the first embodiment, the main The invention can be widely and effectively applied.

また、1つの薬剤注入ポンプ設備から第1の循環流路および第2の循環流路の両方へスケール防止薬剤を注入する場合、薬剤注入ポンプ設備自体の性能を大きく向上させる必要がある。このような形態と比べると、本実施形態1の冷却システム1では第1の循環流路11のみにスケール防止薬剤を注入すればよく、薬剤注入ポンプ設備の性能の向上は不要であるため、簡易な方法で効率良くスケール防止薬剤を供給することができる。 Furthermore, when injecting a scale-preventing chemical into both the first circulation channel and the second circulation channel from one drug injection pump facility, it is necessary to greatly improve the performance of the drug injection pump facility itself. Compared to such a configuration, in the cooling system 1 of the first embodiment, it is only necessary to inject the anti-scaling agent into the first circulation channel 11, and there is no need to improve the performance of the agent injection pump equipment. The anti-scaling agent can be efficiently supplied using a method that allows for efficient supply of anti-scaling agents.

さらに、前述したように、本実施形態1の冷却システム1では、第2の循環流路21における流量は、第1の循環流路11における流量よりも少なくなっている。すなわち、流量がより多い第1の循環流路11から流量がより少ない第2の循環流路21に循環水の一部が供給される。従って、両循環流路における循環水の量および温度に大きな影響を与えることなく、第2の循環流路21にスケール防止薬剤を適切な量で供給することができる。また、流量がより多い第1系統冷却塔設備10における第1の循環流路11の方にスケール防止薬剤が直接注入されるため、スケール析出の可能性がより高い系統の冷却塔設備の方にスケール防止薬剤が直接注入されることになるため、本発明の効果をより効率的に発揮することができる。 Furthermore, as described above, in the cooling system 1 of the first embodiment, the flow rate in the second circulation flow path 21 is smaller than the flow rate in the first circulation flow path 11. That is, a portion of the circulating water is supplied from the first circulation channel 11, which has a higher flow rate, to the second circulation channel 21, which has a lower flow rate. Therefore, an appropriate amount of the anti-scaling agent can be supplied to the second circulation channel 21 without significantly affecting the amount and temperature of the circulating water in both circulation channels. In addition, since the scale preventive agent is directly injected into the first circulation channel 11 of the first system cooling tower equipment 10 where the flow rate is higher, the scale prevention agent is directly injected into the first system cooling tower equipment 10 where the possibility of scale precipitation is higher. Since the anti-scaling agent is directly injected, the effects of the present invention can be exhibited more efficiently.

例えば、第1の循環流路11における流量/第2の循環流路21における流量=100/1~5/1、好ましくは10/1程度となっている。具体的な流量としては、第1の循環流路11における流量は、例えば、50~800m/h程度であり、第2の循環流路21における流量は、例えば、4~100m/h程度である。 For example, the flow rate in the first circulation flow path 11/the flow rate in the second circulation flow path 21 = 100/1 to 5/1, preferably about 10/1. Specifically, the flow rate in the first circulation flow path 11 is, for example, about 50 to 800 m 3 /h, and the flow rate in the second circulation flow path 21 is, for example, about 4 to 100 m 3 /h. It is.

ここで、本実施形態1において、例えば、第1の循環流路11における流量をF1(m/h)、第1の冷却塔14での水分蒸発量をE1(m/h)、第1の循環流路11への補給水供給量をS1(m/h)、第1の排出流路15からの排出量をB1(m/h)、第2の循環流路21における流量をF2(m/h)、第2の冷却塔24での水分蒸発量をE2(m/h)、第2の循環流路21への補給水供給量をS2(m/h)、第2の排出流路25からの排出量をB2(m/h)および循環水バイパス流路26を介した循環水供給量をBS(m/h)とする。その際、第1の循環流路11についてはF1=F1-E1+S1-B1-BSの式、第2の循環流路21についてはF2=F2-E2+S2-B2+BSの式が概算にて成立するように各量を調整することによって、実質的に第1の循環流路11における流量および第2の循環流路21における流量を変えずに安定させながら継続して冷却システム1を運転することができる。 Here, in the first embodiment, for example, the flow rate in the first circulation channel 11 is F1 (m 3 /h), the amount of water evaporation in the first cooling tower 14 is E1 (m 3 /h), and the The amount of makeup water supplied to the first circulation channel 11 is S1 (m 3 /h), the amount of discharge from the first discharge channel 15 is B1 (m 3 /h), and the flow rate in the second circulation channel 21 is S1 (m 3 /h). is F2 (m 3 /h), the amount of water evaporation in the second cooling tower 24 is E2 (m 3 /h), and the amount of makeup water supplied to the second circulation flow path 21 is S2 (m 3 /h). , the amount of discharge from the second discharge channel 25 is B2 (m 3 /h), and the amount of circulating water supplied via the circulating water bypass channel 26 is BS (m 3 /h). At that time, the equation F1=F1-E1+S1-B1-BS should be approximately satisfied for the first circulation channel 11, and the equation F2=F2-E2+S2-B2+BS should be established for the second circulation channel 21. By adjusting each amount, the cooling system 1 can be continuously operated while the flow rate in the first circulation flow path 11 and the flow rate in the second circulation flow path 21 are substantially unchanged and stabilized.

また、前述したように、本実施形態1の冷却システム1では、循環水バイパス流路26は、第1の循環流路11における第1の循環ポンプ12の吐出口側と第1の熱交換部13の入口側との間の部位に設けられている第1の排出流路15から分岐して、第2の冷却塔24の下部水槽244に接続している。従って、第1の循環ポンプ12の吐出性能を利用して、第1の排出流路15から排出(ブローダウン)される循環水を、第2の循環流路21へと供給されるスケール防止薬剤として再利用することができるため、効率的にスケール防止薬剤を含有する循環水を供給することができる。さらには、第1の冷却塔14において循環水が濃縮する前において、当該循環水の一部が第2の循環流路21へと供給されるため、より正確で適切な濃度においてスケール防止薬剤を供給することができる。加えて、第2の冷却塔24の下部水槽244へと接続されており、その後、第2の冷却塔24において供給された循環水が直ぐに濃縮されないため、当該濃度がすぐに変化することもない。 Further, as described above, in the cooling system 1 of the first embodiment, the circulating water bypass flow path 26 is connected to the discharge port side of the first circulation pump 12 in the first circulation flow path 11 and the first heat exchange section. It branches from the first discharge flow path 15 provided between the inlet side of the cooling tower 13 and connects to the lower water tank 244 of the second cooling tower 24 . Therefore, by utilizing the discharge performance of the first circulation pump 12, the circulating water discharged (blown down) from the first discharge passage 15 is transferred to the scale prevention agent supplied to the second circulation passage 21. Therefore, circulating water containing anti-scaling agents can be efficiently supplied. Furthermore, before the circulating water is concentrated in the first cooling tower 14, a portion of the circulating water is supplied to the second circulating flow path 21, so that the anti-scaling agent can be applied at a more accurate and appropriate concentration. can be supplied. In addition, since the circulating water that is connected to the lower water tank 244 of the second cooling tower 24 and then supplied to the second cooling tower 24 is not immediately concentrated, the concentration does not change immediately. .

さらに、前述したように、本実施形態1の冷却システム1では、循環水バイパス流路26にバイパス流路流量調整弁27が設けられており、単位時間当たりに供給されるスケール防止薬剤の量が予め設定された範囲内に収まるように第2の循環流路21に供給される当該循環水の量が調整される。そのため、第2系統冷却塔設備20の循環水中のスケール防止薬剤を、より正確で適切な量において供給することができる。 Furthermore, as described above, in the cooling system 1 of the first embodiment, the bypass flow rate adjustment valve 27 is provided in the circulating water bypass flow path 26, and the amount of scale prevention agent supplied per unit time is adjusted. The amount of the circulating water supplied to the second circulating flow path 21 is adjusted so that it falls within a preset range. Therefore, the scale prevention agent in the circulating water of the second system cooling tower equipment 20 can be supplied in a more accurate and appropriate amount.

(実施形態2)
次に、本発明の実施形態2に係る冷却システム1Aについて、図3を参照して説明する。本実施形態2に係る冷却システム1Aは、基本的に前述の実施形態1に係る冷却システム1と同様の構成を有し、かつ同様の作用効果を奏するものである。ただし、冷却システム1Aは、循環水バイパス流路26の第2の循環流路21における接続箇所が異なるという点のみにおいて前述の実施形態1と異なる。
(Embodiment 2)
Next, a cooling system 1A according to a second embodiment of the present invention will be described with reference to FIG. 3. The cooling system 1A according to the second embodiment basically has the same configuration as the cooling system 1 according to the first embodiment described above, and has the same effects. However, the cooling system 1A differs from the above-described first embodiment only in that the connection point of the circulating water bypass channel 26 in the second circulating channel 21 is different.

図3に示すように、循環水バイパス流路26は、第1の循環流路11における第1の循環ポンプ12の吐出口側と第1の熱交換部13の入口側との間の部位に設けられている第1の排出流路15から分岐して、第2の循環流路21における第2の排出流路25が設けられている箇所と第2の熱交換部23の入口側との間の部位に接続されている。当該循環水バイパス流路26を介して、第2の循環流路21は、スケール防止薬剤を含有する第1の循環流路11における循環水の一部の供給を受ける。 As shown in FIG. 3, the circulating water bypass passage 26 is located in the first circulation passage 11 between the discharge port side of the first circulation pump 12 and the inlet side of the first heat exchange section 13. Branching from the provided first discharge flow path 15, there is a connection between a portion of the second circulation flow path 21 where the second discharge flow path 25 is provided and the inlet side of the second heat exchange section 23. connected to the parts in between. Via the circulating water bypass channel 26, the second circulating channel 21 is supplied with a portion of the circulating water in the first circulating channel 11 containing the anti-scaling agent.

このような部位で第1の循環流路11と第2の循環流路21とを接続している構成であっても、第1の排出流路15から排出(ブローダウン)される循環水の一部を、第1の循環ポンプ12の吐出性能を利用して第2の循環流路21へと供給することができ、第1の冷却塔14において循環水が濃縮する前において、当該循環水の一部が第2の循環流路21へと供給されるため、より正確で適切な量においてスケール防止薬剤を供給することができる。加えて、第2の熱交換部23内の循環水分岐流路に流入する直前においてスケール防止薬剤を含有する循環水の一部が供給されるため、当該循環水分岐流路が細い等の理由でスケールが析出し易い事情等がある場合、より効率的にスケールの析出を防止することができる。 Even in a configuration in which the first circulation flow path 11 and the second circulation flow path 21 are connected at such a portion, the circulating water discharged (blown down) from the first discharge flow path 15 A portion of the circulating water can be supplied to the second circulating flow path 21 using the discharge performance of the first circulating pump 12, and before the circulating water is concentrated in the first cooling tower 14, the circulating water is Since a part of the amount is supplied to the second circulation channel 21, it is possible to supply the anti-scaling agent in a more accurate and appropriate amount. In addition, because part of the circulating water containing the scale prevention agent is supplied immediately before flowing into the circulating water branch channel in the second heat exchange section 23, the circulating water branch channel is narrow, etc. If there are circumstances where scale tends to precipitate, scale precipitation can be more efficiently prevented.

(他の実施形態)
前述の実施形態1および2では、循環水バイパス流路26は、第1の排出流路15から分岐して、第2の循環流路21(具体的には、第2の冷却塔24の下部水槽244または第2の排出流路25が設けられている箇所と第2の熱交換部23の入口側との間の部位)に接続される形態について述べたが、このような接続形態に限定されない。具体的には、循環水バイパス流路は、第1の循環流路における循環水の一部を第2の循環流路へ供給可能とするように、第1の排出流路および/または第1の循環流路と第2の循環流路とを接続していれば、本発明と同様の効果を奏することができる。例えば、循環水バイパス流路は、第1の循環流路における第1の循環ポンプの吐出口側と第1の排出流路の設置箇所と間の第1の排出流路に分岐する直前の部位と第2の循環流路とを接続していても構わない。
(Other embodiments)
In the first and second embodiments described above, the circulating water bypass flow path 26 branches from the first discharge flow path 15 to the second circulation flow path 21 (specifically, the lower part of the second cooling tower 24 Although the connection form is described above, the connection form is limited to such a connection form. Not done. Specifically, the circulating water bypass channel is connected to the first discharge channel and/or the first circulation channel so that a part of the circulating water in the first circulation channel can be supplied to the second circulation channel. If the circulation flow path and the second circulation flow path are connected, the same effects as the present invention can be achieved. For example, the circulating water bypass flow path is a part of the first circulation flow path immediately before branching into the first discharge flow path between the discharge port side of the first circulation pump and the installation location of the first discharge flow path. and the second circulation flow path may be connected.

なお、前述の実施形態1および2では、2つの系統の冷却塔設備を備える冷却システム1、1Aの形態について述べたが、3つ以上の系統の冷却塔設備に本発明の冷却システムを適用しても構わない。例えば、他の実施形態では、第1系統冷却塔設備の第1の循環流路から、第2系統冷却塔設備の第2の循環流路および第3系統冷却塔設備の第3の循環流路へ、それぞれの冷却塔設備が備える循環水バイパス流路を介してスケール防止薬剤を含有する循環水の一部が供給されてもよい。あるいは、第1系統冷却塔設備の第1の循環流路から第2系統冷却塔設備の第2の循環流路へ、さらに第2系統冷却塔設備の第2の循環流路から第3系統冷却塔設備の第3の循環流路へ、それぞれの冷却塔設備が備える循環水バイパス流路を介してスケール防止薬剤を含有する循環水の一部が供給されるような形態であってもよい。換言すれば、3つ以上の系統の冷却塔設備について本発明の冷却システムを適用する際、1つの系統の冷却塔設備の循環流路と2つ以上の系統の冷却塔設備の循環流路とが循環水バイパス流路を介して並列に接続されていてもよいし、3つ以上の系統の冷却塔設備の循環流路同士が循環水バイパス流路を介して直列に接続されていてもよい。さらには、複数の系統の冷却塔設備の循環流路同士においてこのような並列の接続と直列の接続とが組み合わさり、それぞれの循環水バイパス流路を介してスケール防止薬剤を含有する循環水の一部が各々供給されてもよい。 In addition, in the above-mentioned Embodiments 1 and 2, the cooling systems 1 and 1A having two systems of cooling tower equipment were described, but the cooling system of the present invention is applied to cooling tower equipment of three or more systems. I don't mind. For example, in another embodiment, from the first circulation flow path of the first system cooling tower equipment to the second circulation flow path of the second system cooling tower equipment and the third circulation flow path of the third system cooling tower equipment A portion of the circulating water containing the anti-scaling agent may be supplied to the cooling tower equipment via a circulating water bypass flow path provided in each cooling tower facility. Alternatively, from the first circulation flow path of the first system cooling tower equipment to the second circulation flow path of the second system cooling tower equipment, and further from the second circulation flow path of the second system cooling tower equipment to the third system cooling A part of the circulating water containing an anti-scaling agent may be supplied to the third circulation channel of the tower facility via a circulating water bypass channel provided in each cooling tower facility. In other words, when applying the cooling system of the present invention to cooling tower equipment of three or more systems, the circulation flow path of the cooling tower equipment of one system and the circulation flow path of the cooling tower equipment of two or more systems may be connected in parallel via a circulating water bypass channel, or the circulating channels of cooling tower equipment of three or more systems may be connected in series via a circulating water bypass channel. . Furthermore, such parallel connections and series connections are combined between the circulation channels of cooling tower equipment in multiple systems, and the circulating water containing the anti-scaling agent is distributed through the respective circulating water bypass channels. A portion may each be provided.

さらに、前述の実施形態1および2の冷却システム1、1Aでは、簡略化した解放式かつカウンターフロー方式の冷却塔を備える冷却塔設備に適用させる形態について述べたが、本発明の冷却システムは他の任意の方式の冷却塔を備える冷却塔設備に適用させることができる。例えば、クロスフロー方式の冷却塔を備える冷却塔設備に適用させてもよいし、密閉式の冷却塔を備える冷却塔設備に適用させてもよい。 Further, although the cooling systems 1 and 1A of the first and second embodiments described above are applied to cooling tower equipment having a simplified open type and counterflow type cooling tower, the cooling system of the present invention is applicable to other cooling tower equipment. It can be applied to cooling tower equipment equipped with any type of cooling tower. For example, the present invention may be applied to cooling tower equipment that includes a cross-flow type cooling tower, or may be applied to cooling tower equipment that includes a closed type cooling tower.

また、前述の実施形態1および2では、流量が多い第1の循環流路11から流量が少ない第2の循環流路21へ循環水バイパス流路26を介してスケール防止薬剤を含有する循環水の一部が供給される形態について述べたが、流量が少ない方の循環流路から流量が多い方の循環流路へ当該循環水の一部が供給されても本発明の効果を奏することができる。あるいは、他の実施形態では、当該2つの循環流路における流量が同量である。 Furthermore, in the first and second embodiments described above, the circulating water containing the anti-scaling agent is passed from the first circulating channel 11 with a high flow rate to the second circulating channel 21 with a low flow rate via the circulating water bypass channel 26. Although the embodiment has been described in which a portion of the circulating water is supplied, the effects of the present invention can also be achieved even if a portion of the circulating water is supplied from the circulation channel with a lower flow rate to the circulation channel with a higher flow rate. can. Alternatively, in other embodiments, the flow rates in the two circulation channels are the same.

さらに、前述の実施形態1および2では、第1の冷却対象132を例えば空気圧縮機、油圧装置等の冷却する際に要求される循環水の温度が比較的高い機器とし、第2の冷却対象を例えば抽気用真空ポンプ等の冷却する際に要求される循環水の温度が比較的低い機器とする形態について述べたが、第1の冷却対象の機器および第2の冷却対象の機器ならびにこれらの機器を冷却する際に要求される循環水の温度は特に限定されない。具体的には、第1系統冷却塔設備の循環水の温度と第2系統冷却塔設備の循環水の温度が異なればよく、第1系統冷却塔設備の循環水の温度が、第2系統冷却塔設備の循環水の温度に比べて低い温度になっていてもよい。また、第1の冷却対象の数に対する第2の冷却対象の数についても限定されない。 Furthermore, in the first and second embodiments described above, the first cooling target 132 is a device such as an air compressor or a hydraulic device that requires relatively high temperature of circulating water when cooling, and the second cooling target 132 is For example, we have described a form in which the temperature of the circulating water required for cooling is relatively low, such as a vacuum pump for bleed air. The temperature of the circulating water required to cool the equipment is not particularly limited. Specifically, the temperature of the circulating water in the first system cooling tower equipment and the temperature of the circulating water in the second system cooling tower equipment need only be different, and the temperature of the circulating water in the first system cooling tower equipment is different from the temperature of the circulating water in the second system cooling tower equipment. The temperature may be lower than the temperature of circulating water in the tower equipment. Furthermore, the number of second objects to be cooled relative to the number of first objects to be cooled is not limited either.

また、前述の実施形態1および2では、熱交換部における冷却方式が直接冷却方式である形態について述べたが、第1の冷却対象および第2の冷却対象に適切な冷却方式を採用すればどのような方式でもよい。例えば、間接冷却方式を採用しても構わない。 In addition, in the first and second embodiments described above, the cooling method in the heat exchange section is a direct cooling method, but if an appropriate cooling method is adopted for the first cooling object and the second cooling object, A method like this may also be used. For example, an indirect cooling method may be used.

さらに、本発明の冷却システムにおいて、補給水は、第1の循環流路および第2の循環の任意の箇所へ補給されてよい。例えば、他の実施形態では、第1の冷却塔および第2の冷却塔の循環水の流出口と薬剤注入ポンプ設備が注入される箇所との間に配管等の経路を介して補給水が供給される。 Furthermore, in the cooling system of the present invention, makeup water may be replenished to any location in the first circulation flow path and the second circulation. For example, in another embodiment, make-up water is supplied between the circulating water outlet of the first cooling tower and the second cooling tower and the location where the drug injection pump equipment is injected via a path such as piping. be done.

また、前述の実施形態1および2では、1個の補給水用水槽30から補給水が各循環流路に補給される形態について述べたが、他の実施形態では、別々の補給水用水槽から同じ温度または各々の冷却対象を冷却するための循環水の温度に合わせた異なる温度の補給水が供給される。あるいは、前述の実施形態1および2における補給水用水槽30が、他の設備にも使用されている貯水槽プラントであってもよい。 In addition, in the first and second embodiments described above, a configuration is described in which makeup water is supplied to each circulation channel from one makeup water tank 30, but in other embodiments, makeup water is supplied from separate makeup water tanks 30. Makeup water is supplied at the same temperature or at a different temperature that matches the temperature of the circulating water for cooling each object to be cooled. Alternatively, the make-up water tank 30 in the first and second embodiments described above may be a water tank plant that is also used for other equipment.

さらに、本発明の冷却システムにおいて、各系統の冷却塔設備における排出流路はどこに設けられていてもよい。例えば、他の実施形態では、各系統の冷却塔設備における冷却塔の下部水槽に排出流路が設けられており、循環水の一部(下部水槽に回収された冷却された循環水の一部)を系外の排出液水槽処理設備へとブローダウンするように構成されている。 Furthermore, in the cooling system of the present invention, the discharge passage in the cooling tower equipment of each system may be provided anywhere. For example, in another embodiment, a discharge flow path is provided in the lower water tank of the cooling tower in the cooling tower equipment of each system, and a portion of the circulating water (a portion of the cooled circulating water collected in the lower water tank) is provided. ) is configured to blow down to the effluent water tank treatment equipment outside the system.

また、本発明の冷却システムでは、各系統の冷却塔設備における排出流路において、流量調整が可能な構成とされていてもよい。例えば、他の実施形態では、当該排出流路に流量調整弁が設けられている。排出される循環水の流量を調整可能とすることによって、例えば、冷却システムの起動時における排出量の調整および/または運転開始からの時間経過に伴う排出量の調整を行い、本発明の冷却システムの起動および運転をより安定化することができる。 Further, in the cooling system of the present invention, the discharge flow path in the cooling tower equipment of each system may be configured to allow flow rate adjustment. For example, in other embodiments, a flow rate regulating valve is provided in the discharge flow path. By making it possible to adjust the flow rate of the circulating water to be discharged, for example, the amount of discharged water at the time of startup of the cooling system and/or the amount of discharged over time from the start of operation can be adjusted, and the cooling system of the present invention can be adjusted. The startup and operation of the system can be made more stable.

さらに、本発明の冷却システムでは、薬剤注入ポンプ設備の配置箇所は、第1の循環流路へスケール防止薬剤を注入して、スケール防止薬剤を循環水へ混合させることができる箇所であればどこでも構わない。具体的には、第1の循環流路における循環水の流量の多い箇所であればどこへ注入しても構わない。例えば、他の実施形態では、補給水と同様に、第1の冷却塔の下部水槽にスケール防止薬剤が注入される構成としてもよい。 Furthermore, in the cooling system of the present invention, the chemical injection pump equipment can be placed at any location where the anti-scaling agent can be injected into the first circulation flow path and mixed into the circulating water. I do not care. Specifically, the circulating water may be injected into any location in the first circulation channel as long as it has a large flow rate. For example, in another embodiment, an anti-scaling agent may be injected into the lower water tank of the first cooling tower in the same way as make-up water.

また、本発明の冷却システムにおいて、各循環流路に配置される各循環ポンプの下部に地下水槽が設けられており、各循環ポンプは当該地下水槽から循環水を吸込み、吸込んだ循環水を各熱交換部へ流入させてもよい。このような構成の場合、例えば、補給水は、当該各地下水槽に補給されてもよい。また、第1系統冷却塔設備については、スケール防止薬剤も当該地下水槽に注入されてもよい。 In addition, in the cooling system of the present invention, an underground water tank is provided below each circulation pump disposed in each circulation flow path, and each circulation pump sucks circulating water from the underground water tank and transfers the drawn circulating water to each It may also be allowed to flow into the heat exchange section. In the case of such a configuration, for example, makeup water may be supplied to each underground water tank. In addition, for the first system cooling tower equipment, an anti-scaling agent may also be injected into the underground water tank.

さらに、前述の実施形態1および2では、循環水バイパス流路26にバイパス流路流量調整弁27が設けられている形態について述べたが、他の実施形態では、バイパス流路流量調整弁は設けられていなくてもよい。例えば、第1の循環ポンプとして適切な吐出量および圧力等の性能を有する循環ポンプを選択すること等によって、循環水バイパス流路を流れる流量を調整することができる。 Furthermore, in the first and second embodiments described above, the bypass flow rate adjustment valve 27 is provided in the circulating water bypass flow path 26, but in other embodiments, the bypass flow rate adjustment valve is not provided. It doesn't have to be. For example, the flow rate flowing through the circulating water bypass channel can be adjusted by selecting, as the first circulation pump, a circulation pump with appropriate performance such as discharge amount and pressure.

また、本発明の冷却システムでは、循環水バイパス流路は、第1の循環流路における循環水の一部を第2の循環流路へ供給可能であれば、第1の循環流路と第2の循環流路の接続箇所は限定されない。例えば、他の実施形態では、循環水バイパス流路は、第1の循環流路における第1の冷却塔の流出口側と第1の循環ポンプの吸込口側との間から第2の循環流路の任意の箇所に接続されてもよい。このような構成の本発明の冷却システムにおいて、第1の循環ポンプの吐出性能を利用せずに当該循環水の一部を適切に供給するために、例えば、循環水バイパス流路において第1の循環流路の接続箇所を第2の循環流路の接続箇所よりも高い位置に設ければよい。 In addition, in the cooling system of the present invention, the circulating water bypass channel can be connected to the first circulating channel and the circulating water bypass channel if a part of the circulating water in the first circulating channel can be supplied to the second circulating channel. The connection location of the second circulation flow path is not limited. For example, in another embodiment, the circulating water bypass flow path allows the second circulating water to flow from between the outlet side of the first cooling tower and the suction side of the first circulation pump in the first circulation flow path. It may be connected at any point on the road. In the cooling system of the present invention having such a configuration, in order to appropriately supply a part of the circulating water without using the discharge performance of the first circulating pump, for example, the first circulating water bypass flow path is The connection point of the circulation flow path may be provided at a higher position than the connection point of the second circulation flow path.

さらに、第1の冷却塔において循環水が濃縮した後かつ補給水が供給される前、第1の循環流路の循環水の一部が循環水バイパス流路を介して第2の循環流路へ供給される接続箇所の構成であったとしても、第1の循環流路における流量に対する第1の冷却塔での循環水の水分の蒸発量が少ないため、必ずしも適切でない濃度でスケール防止薬剤が供給されることにはならない。 Further, after the circulating water is concentrated in the first cooling tower and before makeup water is supplied, a portion of the circulating water in the first circulating flow path is transferred to the second circulating flow channel via the circulating water bypass flow path. Even if the configuration of the connection point is such that the amount of moisture evaporated from the circulating water in the first cooling tower is small relative to the flow rate in the first circulation flow path, the scale preventive agent may be applied at an inappropriate concentration. It will not be supplied.

また、本発明の冷却システムでは、前述の実施形態1および2において述べた補給水の供給量、スケール防止薬剤の注入量、ならびに第1の循環流路11および第2の循環流路21における流量に関する式は、必ずしも適用されなくてもよい。例えば、他の実施形態では、冷却システムが本開示にて述べた構成以外のもの、1例として別の箇所へ流出する、または別の箇所から流入する配管等の経路を備える場合もあるため、当該供給量等が適用されない場合もある。 In addition, in the cooling system of the present invention, the supply amount of make-up water, the injection amount of the scale prevention agent, and the flow rate in the first circulation flow path 11 and the second circulation flow path 21 described in the above-mentioned Embodiments 1 and 2 are adjusted. The formulas for . . . do not necessarily have to be applied. For example, in other embodiments, the cooling system may include configurations other than those described in this disclosure, such as, for example, piping that flows out to or enters another location; In some cases, the supply amount, etc. may not apply.

今回開示された実施形態は、全ての点で例示であって、制限的なものではないと解されるべきである。本発明の範囲は、上述した説明ではなくて特許請求の範囲により示され、特許請求の範囲と均等の意味および範囲内での全ての変更が含まれることが意図される。 The embodiments disclosed herein are illustrative in all respects and should be understood not to be restrictive. The scope of the present invention is indicated by the claims rather than the above description, and it is intended that all changes within the meaning and range equivalent to the claims are included.

1、1A 冷却システム
10 第1系統冷却塔設備
20 第2系統冷却塔設備
11 第1の循環流路
21 第2の循環流路
12 第1の循環ポンプ
22 第2の循環ポンプ
13 第1の熱交換部
131 第1の熱交換器
132 第1の冷却対象
133 循環水分岐流路
23 第2の熱交換部
14 第1の冷却塔
24 第2の冷却塔
141、241 充填材
142、242 ファン
143、243 散水器
144、244 下部水槽
30 補給水用水槽
40 排出液水槽処理設備
15 第1の排出流路
25 第2の排出流路
16 薬剤注入ポンプ設備
26 循環水バイパス流路
27 バイパス流路流量調整弁
1, 1A Cooling system 10 First system cooling tower equipment 20 Second system cooling tower equipment 11 First circulation channel 21 Second circulation channel 12 First circulation pump 22 Second circulation pump 13 First heat Exchange part 131 First heat exchanger 132 First cooling object 133 Circulating water branch flow path 23 Second heat exchange part 14 First cooling tower 24 Second cooling tower 141, 241 Filler 142, 242 Fan 143 , 243 Water sprinkler 144, 244 Lower water tank 30 Make-up water tank 40 Effluent tank treatment equipment 15 First discharge channel 25 Second discharge channel 16 Chemical injection pump equipment 26 Circulating water bypass channel 27 Bypass channel flow rate Regulating valve

Claims (5)

第1の冷却対象を第1の温度に冷却するための第1系統冷却塔設備と、第2の冷却対象を前記第1の温度とは異なる第2の温度に冷却するための第2系統冷却塔設備と、を備え、
前記第1系統冷却塔設備は、循環水が循環する第1の循環流路と、前記第1の循環流路に配置され、前記循環水を第1の熱交換部へ流入させる第1の循環ポンプと、前記第1の循環ポンプによって流入された前記循環水と前記第1の冷却対象とを熱交換させ、前記第1の冷却対象を冷却する前記第1の熱交換部と、前記第1の熱交換部での熱交換によって温度が上昇した前記循環水を冷却する第1の冷却塔と、前記第1の循環流路へ水を補給する第1の補給水供給部と、前記循環水の一部を排出する第1の排出流路と、前記第1の循環流路へスケール防止薬剤を注入する薬剤注入部と、を備え、
前記第2系統冷却塔設備は、循環水が循環する第2の循環流路と、前記第2の循環流路に配置され、前記循環水を第2の熱交換部へ流入させる第2の循環ポンプと、前記第2の循環ポンプによって流入された前記循環水と前記第2の冷却対象とを熱交換させ、前記第2の冷却対象を冷却する前記第2の熱交換部と、前記第2の熱交換部での熱交換によって温度が上昇した前記循環水を冷却する第2の冷却塔と、前記第2の循環流路へ水を補給する第2の補給水供給部と、前記循環水の一部を排出する第2の排出流路と、前記第2の循環流路へスケール防止薬剤の供給を受けるための循環水バイパス流路と、を備え、
前記循環水バイパス流路は、前記スケール防止薬剤を含有する前記第1の排出流路および/または前記第1の循環流路における前記循環水の一部を前記第2の循環流路へ供給可能とするように、前記第1の排出流路および/または前記第1の循環流路と前記第2の循環流路とを接続しており、
前記第1の循環流路における流量は、前記第2の循環流路における流量よりも多い、冷却システム。
a first system cooling tower equipment for cooling a first cooling object to a first temperature; and a second system cooling tower equipment for cooling a second cooling object to a second temperature different from the first temperature. Equipped with tower equipment,
The first system cooling tower equipment includes a first circulation passage through which circulating water circulates, and a first circulation passage arranged in the first circulation passage through which the circulating water flows into a first heat exchange section. a pump, the first heat exchange unit configured to exchange heat between the circulating water introduced by the first circulating pump and the first cooling target to cool the first cooling target; a first cooling tower that cools the circulating water whose temperature has increased due to heat exchange in the heat exchange section; a first make-up water supply section that supplies water to the first circulation flow path; and a first makeup water supply section that supplies water to the first circulation flow path; a first discharge channel for discharging a part of the scale, and a drug injection part for injecting a scale prevention drug into the first circulation channel,
The second system cooling tower equipment includes a second circulation passage through which circulating water circulates, and a second circulation passage which is arranged in the second circulation passage and causes the circulation water to flow into a second heat exchange section. a pump, the second heat exchange unit configured to exchange heat between the circulating water introduced by the second circulation pump and the second object to be cooled, and cool the second object to be cooled; a second cooling tower that cools the circulating water whose temperature has increased due to heat exchange in the heat exchange section; a second make-up water supply section that supplies water to the second circulation flow path; and a second makeup water supply section that supplies water to the second circulation flow path; a second discharge flow path for discharging a portion of the water, and a circulating water bypass flow path for receiving the supply of the scale prevention agent to the second circulation flow path;
The circulating water bypass flow path is capable of supplying a portion of the circulating water in the first discharge flow path and/or the first circulation flow path containing the scale prevention agent to the second circulation flow path. the first discharge flow path and/or the first circulation flow path and the second circulation flow path are connected,
A cooling system in which a flow rate in the first circulation flow path is greater than a flow rate in the second circulation flow path .
前記循環水バイパス流路は、前記第1の排出流路から分岐して前記第2の循環流路に接続している、請求項1に記載の冷却システム。 The cooling system according to claim 1 , wherein the circulating water bypass flow path is branched from the first discharge flow path and connected to the second circulation flow path. 前記第1の排出流路は、前記第1の循環流路における前記第1の循環ポンプの吐出口側と前記第1の熱交換部の入口側との間の部位に設けられている、請求項に記載の冷却システム。 The first discharge flow path is provided in a portion of the first circulation flow path between a discharge port side of the first circulation pump and an inlet side of the first heat exchange section. The cooling system according to item 2 . 前記循環水バイパス流路は、単位時間当たりに供給される前記スケール防止薬剤の量が予め設定された範囲内に収まるように前記循環水バイパス流路を介して前記第2の循環流路に供給される前記第1の循環流路からの前記循環水の量を調整する流量調整部を備える、請求項1~のいずれか1項に記載の冷却システム。 The circulating water bypass channel supplies the anti-scaling agent to the second circulating channel via the circulating water bypass channel so that the amount of the anti-scaling agent supplied per unit time falls within a preset range. The cooling system according to any one of claims 1 to 3 , further comprising a flow rate adjustment unit that adjusts the amount of the circulating water from the first circulation flow path. 前記第2の冷却対象の冷却に必要とされる交換熱量の総和が前記第1の冷却対象の冷却に必要とされる交換熱量の総和よりも低い、請求項1~4のいずれか1項に記載の冷却システム。 5. The method according to claim 1, wherein the total amount of heat exchanged required for cooling the second object to be cooled is lower than the total amount of heat exchanged required for cooling the first object to be cooled. Cooling system as described.

JP2020007805A 2020-01-21 2020-01-21 cooling system Active JP7345402B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020007805A JP7345402B2 (en) 2020-01-21 2020-01-21 cooling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020007805A JP7345402B2 (en) 2020-01-21 2020-01-21 cooling system

Publications (2)

Publication Number Publication Date
JP2021113665A JP2021113665A (en) 2021-08-05
JP7345402B2 true JP7345402B2 (en) 2023-09-15

Family

ID=77076839

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020007805A Active JP7345402B2 (en) 2020-01-21 2020-01-21 cooling system

Country Status (1)

Country Link
JP (1) JP7345402B2 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009162418A (en) 2007-12-30 2009-07-23 Hakuto Co Ltd Open circulation type combined cooling facility and operation method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS551805A (en) * 1978-05-22 1980-01-09 Kurita Water Ind Ltd Water quality controller

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009162418A (en) 2007-12-30 2009-07-23 Hakuto Co Ltd Open circulation type combined cooling facility and operation method thereof

Also Published As

Publication number Publication date
JP2021113665A (en) 2021-08-05

Similar Documents

Publication Publication Date Title
US10767561B2 (en) Method and apparatus for cooling the ambient air at the inlet of gas combustion turbine generators
AU2012214955B2 (en) Method and apparatus of producing and utilizing thermal energy in a combined heat and power plant
CN107850335A (en) Liquid cooling is carried out using liquid-gas type film energy exchanger
CN118999190A (en) Automatic control of heat exchanger operation
CN112204335A (en) Hybrid operating mode for cooling to heat loads
US20160370047A1 (en) Chilling machine
JP7345402B2 (en) cooling system
KR20160104654A (en) A fluid handling device and a method of heating or cooling a fluid flow
KR102879502B1 (en) Mixed operating mode to provide cooling to heat loads
AU692023B2 (en) Vapour compression system
JP5359745B2 (en) Water treatment system
CN104654259B (en) Evaporator device and method of operation
US6334331B1 (en) Uninterrupted sub-loop water cooling system equipped with buffer tank
DK2532416T3 (en) FGD with water extraction option
CN109237644B (en) Heat pump unit and control method thereof
CN119486025A (en) Cold source integrated device, heat dissipation system, controller and related methods
JP2001263894A (en) Cryogenic liquid storage equipment
JP2002228293A (en) Refrigerant management device and method of storing and discharging refrigerant
JP2008149282A (en) Neutralization device with air-conditioning function and method for wastewater neutralization and air conditioning
JP6288841B2 (en) Water-cooled stoker device for waste incinerator and operation method thereof
KR102847817B1 (en) Liquid cooling system for data center
JP7853509B1 (en) Ejector-type cooling device and cooling system
JP2006207883A (en) Absorption heat pump
JP2019219087A (en) Condensing facility and steam turbine plant comprising the same
JP6212698B2 (en) Water heater

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220727

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230405

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230411

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230508

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230822

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230905

R150 Certificate of patent or registration of utility model

Ref document number: 7345402

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150