JP7357586B2 - Solar power generation prediction device - Google Patents
Solar power generation prediction device Download PDFInfo
- Publication number
- JP7357586B2 JP7357586B2 JP2020098161A JP2020098161A JP7357586B2 JP 7357586 B2 JP7357586 B2 JP 7357586B2 JP 2020098161 A JP2020098161 A JP 2020098161A JP 2020098161 A JP2020098161 A JP 2020098161A JP 7357586 B2 JP7357586 B2 JP 7357586B2
- Authority
- JP
- Japan
- Prior art keywords
- power generation
- amount
- generation amount
- solar
- solar power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A90/00—Technologies having an indirect contribution to adaptation to climate change
- Y02A90/10—Information and communication technologies [ICT] supporting adaptation to climate change, e.g. for weather forecasting or climate simulation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
Landscapes
- Control Of Electrical Variables (AREA)
- Photovoltaic Devices (AREA)
Description
本願は、太陽光発電量予測装置に関するものである。 The present application relates to a solar power generation amount prediction device.
降雪により、太陽光発電のパネル上に積雪した場合、発電量がゼロ近くに減少するため、通常の発電予測では過大な予測誤差が発生する。これを回避するため、天候などに関する予測情報を用いて積雪時の電力量を予測計算したり(特許文献1参照)、平均降雪日数の情報に基づいて、電力量を補正する技術が知られている(特許文献2参照)。 When snow accumulates on solar power generation panels, the amount of power generated decreases to nearly zero, resulting in excessive prediction errors in normal power generation forecasts. In order to avoid this, there are known techniques for predicting and calculating the amount of electricity during snowfall using forecast information regarding the weather, etc. (see Patent Document 1), and for correcting the amount of electricity based on information on the average number of days of snowfall. (See Patent Document 2).
大規模な降雪が発生し、太陽光発電パネル上に数日間以上に渡って積雪が発生する場合、降雪量の予報情報を用いるだけでは、積雪時における太陽光発電の発電量の予測の精度が悪いという問題があった。 When large-scale snowfall occurs and snow accumulates on solar panels for several days or more, it is difficult to accurately predict the amount of solar power generated during snowfall by simply using snowfall forecast information. There was a problem with it being bad.
本願は、上述の課題を解決するためになされたもので、大規模な降雪が発生し、太陽光発電パネル上に数日間以上に渡って積雪が発生する場合においても、精度良く発電予測計算ができる太陽光発電量予測装置を提供することを目的とする。 This application was made in order to solve the above-mentioned problem, and even when large-scale snowfall occurs and the snow accumulates on the solar power generation panels for several days or more, it is possible to accurately calculate power generation prediction. The purpose is to provide a solar power generation amount prediction device that can predict the amount of solar power generated.
本願に開示される太陽光発電量予測装置は、太陽光発電パネルの発電量実績計測値と降雪量予報値と日射量予報値を受信するデータ受信部、日射量予報値を太陽光発電パネルに応じた予測発電量に変換する日射量変換部、予測発電量と発電量実績計測値とを比較して算出した現在の積雪深さと、降雪量予報値から現在以降の積雪深さとを推定する積雪推定部、積雪推定部で推定した積雪深さに基づいて予測発電量を補正する発電量予測補正部を備えている。 The solar power generation amount prediction device disclosed in the present application includes a data receiving unit that receives the actual power generation amount measured value, snowfall amount forecast value, and solar radiation amount forecast value of the solar power generation panel, and a data receiving unit that receives the solar radiation amount forecast value from the solar power generation panel. A solar radiation conversion unit that converts the predicted power generation amount to the corresponding predicted power generation amount, and a snow cover that estimates the snow depth from now on based on the current snow depth calculated by comparing the predicted power generation amount and the actual power generation amount measurement value, and the snowfall forecast value. The power generation amount prediction correction section corrects the predicted power generation amount based on the snow depth estimated by the estimation section and the snow accumulation estimation section.
本願に開示される太陽光発電量予測装置によれば、太陽光発電パネル上に数日間以上に渡って積雪が発生する場合においても、精度良く発電量の予測ができるものである。 According to the solar power generation amount prediction device disclosed in the present application, even when snow falls on the solar power generation panels for several days or more, it is possible to accurately predict the amount of power generation.
以下、本願に係る太陽光発電量予測装置の好適な実施の形態について、図面を参照して説明する。なお、同一内容および相当部については同一符号を配し、その詳しい説明は省略する。以降の実施形態も同様に、同一符号を付した構成について重複した説明は省略する。 Hereinafter, preferred embodiments of the solar power generation amount prediction device according to the present application will be described with reference to the drawings. Note that the same content and corresponding parts are designated by the same reference numerals, and detailed explanation thereof will be omitted. Similarly, in the embodiments that follow, redundant explanations will be omitted for the components denoted by the same reference numerals.
実施の形態1.
図1は、実施の形態1の太陽光発電量予測装置100の概略構成図である。太陽光発電量予測装置100は、データ受信部101、日射量変換部102、発電量設備データベース103、積雪推定部104、発電量予測補正部105、予測結果蓄積部106、表示部107を備える。
FIG. 1 is a schematic configuration diagram of a solar power generation
データ受信部101は、太陽光発電パネル10の発電量の計測値、降雪量予報値、および日射量予報値を入力する。
The
太陽光発電パネル10の発電量の計測値は、太陽光発電システム1において、計測される。太陽光発電システム1は、図1に示すように、太陽光発電パネル10、計測器11、パワーコンディショナ12で概略構成され、計測器11において、電流値と電圧値とから発電量の実績値を計測する。発電量実績計測値はリアルタイムに太陽光発電量予測装置100に送信してもよく、時間ごと、日付ごとなどに区分して蓄積し、一定時間ごとに送信してもよい。
The measured value of the power generation amount of the solar
降雪量予報値および日射量予報値は、ネットワーク2などを介して気象会社から提供される予報値を入力する。 For the snowfall forecast value and solar radiation forecast value, forecast values provided by a weather company via the network 2 or the like are input.
データ受信部101に入力された、発電量実績計測値、降雪量予報値、および日射量予報値は、太陽光発電量予測装置100において、図2で示すフローチャートに従って、以下のように使用される。
(1)日射量予報値は、日射量変換部102において、予測発電量に変換する(ステップS1)。この際、日射量を発電出力に変換するための太陽光発電システム1の設備情報を蓄積した発電量設備データベース103を使用する。
(2)変換された予測発電量と現在の発電量実績計測値とを比較し、誤差を考慮しても予測発電量に達していない場合(ステップS2)、太陽光発電パネル10上に積雪があると推定され、発電量実績計測値と予測発電量の差分に応じて、積雪推定部104において、太陽光発電パネル10上の現在の積雪の深さを推定する(ステップS3)。
(3)発電量実績計測値が、誤差を考慮して予測発電量と同じがそれ以上である場合、積雪はないと判断する(ステップS4)。
(4)積雪推定部104で推定された積雪の深さと、降雪量予報値とから、現在以降の積雪の深さをさらに推定し、日射量変換部102により変換された予測発電量を推定された今後の積雪の深さに基づいて補正し、今後の発電量を予測する(ステップS5)。
(5)予測結果を予測結果蓄積部106に記憶する(ステップS6)。記憶した予測結果は、必要に応じ、表示部に表示させてもよい。また、この予測結果を使用して、融雪の開始時期を計算するなど、別の操作を行うトリガとしてもよい。
The actual power generation amount measurement value, snowfall amount forecast value, and solar radiation amount forecast value input into the
(1) The solar radiation forecast value is converted into a predicted power generation amount in the solar radiation conversion unit 102 (step S1). At this time, a power
(2) Compare the converted predicted power generation amount with the current actual power generation amount measurement value, and if the predicted power generation amount has not been reached even after considering the error (step S2), snow has fallen on the solar
(3) If the actual power generation amount measured value is equal to but greater than the predicted power generation amount taking into account the error, it is determined that there is no snowfall (step S4).
(4) Based on the snow depth estimated by the snow
(5) The prediction result is stored in the prediction result storage unit 106 (step S6). The stored prediction results may be displayed on the display unit, if necessary. Furthermore, this prediction result may be used as a trigger for performing another operation, such as calculating the start time of snow melting.
積雪推定部104が、降雪量予報値と発電量実績計測値とから、将来の太陽光発電パネル10上の積雪の深さを推定するアルゴリズムを図3で示すフローチャートに従って説明する。
(1)現在の発電量実績計測値がゼロでない場合(ステップS7)、ステップS3により、現在の太陽光発電パネル10上の積雪の深さを推定する(ステップS8)
(2)現在の発電量実績計測値がゼロである場合、1日前の発電量実績計測値がゼロでなければ(ステップS9)、ステップS3において、発電量実績計測値がゼロになるまでに推定された積雪の深さに加えて現在の太陽光発電パネル10上の積雪の深さを推定し(ステップS8)、ステップS5において今後の降雪量予報値から換算した積雪量から積雪の深さを加算する(ステップS10)。
(3)現在の発電量実績計測値がゼロで、さらに1日前の発電量実績計測値がゼロの場合、予め設定された残雪積雪量(残雪積雪量設定値)を加算し(ステップS11)、さらに、今後の降雪量予報値から換算した積雪量から積雪の深さを加算する(ステップS10)。
(4)本実施の形態の発電量実績計測値は、当日と1日前の2日間の発電量実績計測値を参照しているが、積雪が数日間続き、2日以上の発電量実績計測値がゼロの場合は、発電量実績計測値がゼロである日数に応じた複数の残雪積雪量設定値を設定して対応してもよい。
An algorithm by which the
(1) If the current measured power generation amount is not zero (step S7), the current depth of snow on the solar
(2) If the current actual power generation amount measurement value is zero, if the actual power generation amount measurement value one day ago is not zero (step S9), the estimated value will be estimated before the actual power generation amount measurement value becomes zero in step S3. In addition to the estimated snow depth, the current snow depth on the solar
(3) If the current power generation performance measurement value is zero and the power generation performance measurement value one day ago is zero, a preset amount of remaining snow (remaining snow amount setting value) is added (step S11), Furthermore, the depth of snowfall is added from the snowfall amount converted from the future snowfall forecast value (step S10).
(4) The power generation amount actual measured value in this embodiment refers to the power generation amount actual measurement value for two days, the current day and one day before, but the power generation amount actual measurement value for two or more days when the snow continues for several days. In the case where is zero, a plurality of remaining snow amount setting values may be set according to the number of days in which the actual power generation amount measurement value is zero.
太陽光発電量予測装置100のハードウエアの一例を図4に示す。プロセッサ50と記憶装置60から構成され、図示していないが、記憶装置60はランダムアクセスメモリ等の揮発性記憶装置と、フラッシュメモリ等の不揮発性の補助記憶装置とを具備する。また、フラッシュメモリの代わりにハードディスクの補助記憶装置を具備してもよい。プロセッサ50は、記憶装置60から入力されたプログラムを実行することにより、例えば、図2、または図3のフローチャートを実行する。この場合、補助記憶装置から揮発性記憶装置を介してプロセッサ50にプログラムが入力される。また、プロセッサ50は、演算結果等のデータを記憶装置60の揮発性記憶装置に出力してもよいし、揮発性記憶装置を介して補助記憶装置にデータを保存してもよい。例えば、予測結果蓄積部106を、記憶装置60の一部としてもよい。
An example of the hardware of the solar power generation
以上のように本実施の形態の太陽光発電量予測装置により、太陽光発電パネル上に数日間以上に渡って積雪が発生する場合においても、精度良く発電予測計算ができる。 As described above, the solar power generation amount prediction device of the present embodiment allows accurate power generation prediction calculations even when snow falls on the solar power generation panels for several days or more.
本願は、例示的な実施の形態が記載されているが、実施の形態に記載された様々な特徴、態様、及び機能は特定の実施の形態の適用に限られるのではなく、単独で、または様々な組み合わせで実施の形態に適用可能である。
従って、例示されていない無数の変形例が、本願明細書に開示される技術の範囲内において想定される。例えば、少なくとも1つの構成要素を変形する場合、追加する場合または省略する場合が含まれるものとする。
Although this application describes exemplary embodiments, the various features, aspects, and functions described in the embodiments are not limited to the application of particular embodiments, and may be used alone or It is applicable to the embodiments in various combinations.
Accordingly, countless variations not illustrated are envisioned within the scope of the technology disclosed herein. For example, this includes cases in which at least one component is modified, added, or omitted.
1:太陽光発電システム、2:ネットワーク、10:太陽光発電パネル、11:計測器、12:パワーコンディショナ、50:プロセッサ、60:記憶装置、100:太陽光発電量予測装置、101:データ受信部、102:日射量変換部、103:発電量設備データベース、104:積雪推定部、105:発電量予測補正部、106:予測結果蓄積部、107:表示部 1: Solar power generation system, 2: Network, 10: Solar power generation panel, 11: Measuring instrument, 12: Power conditioner, 50: Processor, 60: Storage device, 100: Solar power generation amount prediction device, 101: Data Receiving unit, 102: Solar radiation conversion unit, 103: Power generation equipment database, 104: Snow accumulation estimation unit, 105: Power generation prediction correction unit, 106: Prediction result accumulation unit, 107: Display unit
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2020098161A JP7357586B2 (en) | 2020-06-05 | 2020-06-05 | Solar power generation prediction device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2020098161A JP7357586B2 (en) | 2020-06-05 | 2020-06-05 | Solar power generation prediction device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2021189154A JP2021189154A (en) | 2021-12-13 |
| JP7357586B2 true JP7357586B2 (en) | 2023-10-06 |
Family
ID=78849470
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2020098161A Active JP7357586B2 (en) | 2020-06-05 | 2020-06-05 | Solar power generation prediction device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7357586B2 (en) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2018148741A (en) | 2017-03-08 | 2018-09-20 | 中国電力株式会社 | Photovoltaic power output prediction device considering snow cover |
| JP2018148743A (en) | 2017-03-08 | 2018-09-20 | 中国電力株式会社 | Photovoltaic power generation output prediction device considering residual snow |
| JP2019219978A (en) | 2018-06-21 | 2019-12-26 | 中国電力株式会社 | Power output prediction device, power output prediction system and power output prediction method |
| JP2020127337A (en) | 2019-02-06 | 2020-08-20 | 東京電力ホールディングス株式会社 | Power generation amount estimation device, power generation amount estimation method and power generation amount estimation program |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6785971B2 (en) * | 2017-07-27 | 2020-11-18 | 三菱電機株式会社 | Photovoltaic power generation forecasting device, photovoltaic power generation forecasting system, forecasting method and program |
| JP6852621B2 (en) * | 2017-08-21 | 2021-03-31 | 中国電力株式会社 | Power generation output prediction device |
-
2020
- 2020-06-05 JP JP2020098161A patent/JP7357586B2/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2018148741A (en) | 2017-03-08 | 2018-09-20 | 中国電力株式会社 | Photovoltaic power output prediction device considering snow cover |
| JP2018148743A (en) | 2017-03-08 | 2018-09-20 | 中国電力株式会社 | Photovoltaic power generation output prediction device considering residual snow |
| JP2019219978A (en) | 2018-06-21 | 2019-12-26 | 中国電力株式会社 | Power output prediction device, power output prediction system and power output prediction method |
| JP2020127337A (en) | 2019-02-06 | 2020-08-20 | 東京電力ホールディングス株式会社 | Power generation amount estimation device, power generation amount estimation method and power generation amount estimation program |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2021189154A (en) | 2021-12-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5658881B2 (en) | Method for predicting the amount of electricity produced by photovoltaic power generation equipment | |
| TWI592811B (en) | Demand forecast device, program and recording medium | |
| JP4920696B2 (en) | System and method for determining estimated battery parameter vector and product thereof | |
| JP6012868B2 (en) | Thermal load prediction device, distribution system, thermal load prediction method and program | |
| EP3923101A1 (en) | Method and computing system for performing a prognostic health analysis for an asset | |
| JP6880841B2 (en) | Photovoltaic power generation output prediction device considering snow cover | |
| JP2007018322A (en) | Energy saving amount estimation apparatus, method, and program | |
| WO2021186512A1 (en) | Information processing device, information processing method, computer program and information processing system | |
| WO2011092882A1 (en) | System for predicting output from solar electric generating facility ,weather predicting system, and method for predicting output from solar electric generating facility | |
| JP7257117B2 (en) | Photovoltaic power generation system distribution estimation device, photovoltaic power generation system distribution estimation method, and photovoltaic power generation output prediction device | |
| JP6702232B2 (en) | Maintenance plan creation device and method | |
| JP6203449B2 (en) | System stability estimation apparatus and system stability estimation method | |
| JP7357586B2 (en) | Solar power generation prediction device | |
| KR101405594B1 (en) | System and method for electric vehicle charging load forecasting | |
| KR20170069046A (en) | System for forcasting power demand based on weather infromation | |
| JP2005293169A (en) | Plant operating state calculation device, plant simulation calculation device, plant operation optimization system and method, program | |
| JP6971936B2 (en) | Maintenance support equipment, methods and programs for electric power equipment | |
| JP7508922B2 (en) | Prediction system and method for calculating predicted values | |
| US20190006850A1 (en) | Method for forecasting the power daily generable by a solar inverter | |
| JP7497163B2 (en) | Anomaly detection device and anomaly detection method | |
| JP6222822B2 (en) | Deterioration function calculation device, deterioration rate estimation system, deterioration function calculation method, and program | |
| US20250343413A1 (en) | Generated-power prediction method, generated-power prediction device, and solar power generation system | |
| JP7689664B2 (en) | Apparatus and method for estimating available power transmission capacity | |
| CN110737646A (en) | Data labeling method, device, equipment and readable storage medium | |
| JP7206964B2 (en) | Forecasting system, forecasting method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20230113 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20230817 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20230829 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20230926 |
|
| R151 | Written notification of patent or utility model registration |
Ref document number: 7357586 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |