JP7390926B2 - Protection systems for multi-terminal power transmission systems - Google Patents
[go: Go Back, main page]

JP7390926B2 - Protection systems for multi-terminal power transmission systems - Google Patents

Protection systems for multi-terminal power transmission systems Download PDF

Info

Publication number
JP7390926B2
JP7390926B2 JP2020028568A JP2020028568A JP7390926B2 JP 7390926 B2 JP7390926 B2 JP 7390926B2 JP 2020028568 A JP2020028568 A JP 2020028568A JP 2020028568 A JP2020028568 A JP 2020028568A JP 7390926 B2 JP7390926 B2 JP 7390926B2
Authority
JP
Japan
Prior art keywords
protection
power transmission
terminal
switches
relay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020028568A
Other languages
Japanese (ja)
Other versions
JP2021136707A (en
Inventor
晴泰 松本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2020028568A priority Critical patent/JP7390926B2/en
Publication of JP2021136707A publication Critical patent/JP2021136707A/en
Application granted granted Critical
Publication of JP7390926B2 publication Critical patent/JP7390926B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Description

この開示は、多端子送電系統を保護する保護システムに関する。 This disclosure relates to protection systems for protecting multi-terminal power transmission systems.

送電線の接続形態が変更されても、送電線保護が継続できることが望ましい。たとえば、特許文献1(特開2011-239521号公報)は、途中に線路ジャンパまたは線路開閉器が設置された送電線に使用される電流差動リレーを開示する。 It is desirable that power transmission line protection can continue even if the connection form of power transmission lines is changed. For example, Patent Document 1 (Japanese Unexamined Patent Publication No. 2011-239521) discloses a current differential relay used in a power transmission line in which a line jumper or a line breaker is installed in the middle.

具体的にこの文献の電流差動リレーは、状態判定部において線路ジャンパが「入」状態であると判定された場合には自端子側電流と相手端子側電流との差に基づいて送電線に発生した事故を検出する。一方、この電流差動リレーは、状態判定部において線路ジャンパが「切」状態であると判定された場合には自端子側電流のみに基づいて送電線に発生した事故を検出する。 Specifically, in the current differential relay of this document, when the state determination unit determines that the line jumper is in the "on" state, the current differential relay is connected to the power transmission line based on the difference between the current on the own terminal side and the current on the other terminal side. Detect accidents that have occurred. On the other hand, when the state determining section determines that the line jumper is in the "off" state, this current differential relay detects an accident occurring in the power transmission line based only on the current on its own terminal side.

特開2011-239521号公報JP2011-239521A

たとえば、一つの鉄塔に1号送電線および2号送電線が敷設された複数回線の多端子送電線網を保護する電流差動リレーは、1号送電線用の電流差動リレーと2号送電線用の電流差動リレーとが必要である。1号送電線用の電流差動リレーは、1号送電線の各端子の電流を用いて内部事故の有無を判定し、2号送電線用の電流差動リレーは、2号送電線の各端子の電流を用いて内部事故の有無を判定する。 For example, a current differential relay that protects a multi-line, multi-terminal power transmission network where No. 1 and No. 2 transmission lines are installed on one tower is a current differential relay for No. 1 transmission line and a No. 2 transmission line. A current differential relay for electric wires is required. The current differential relay for the No. 1 power transmission line uses the current at each terminal of the No. 1 power transmission line to determine the presence or absence of an internal fault, and the current differential relay for the No. The presence or absence of an internal accident is determined using the terminal current.

ところで、今後増加が予想される太陽光発電および風力発電などの分散電源を送電線網に接続したり、片方の回線をπ引き込み回線に変更したりする場合などにおいて、需要家への電力供給を極力停止しないようにする必要がある。このために、1号送電線と2号送電線との間を接続するための複数の開閉器を設けるのが都合がよい。他の送電線を用いた迂回ルートがとれない場合もあるからである。 By the way, when connecting distributed power sources such as solar power generation and wind power generation, which are expected to increase in the future, to the power transmission grid, or when changing one line to a π lead-in line, it is necessary to reduce the power supply to consumers. It is necessary to avoid stopping as much as possible. For this purpose, it is convenient to provide a plurality of switches for connecting the No. 1 power transmission line and the No. 2 power transmission line. This is because it may not be possible to take a detour route using other power transmission lines.

ところが、開閉器を用いて1号送電線と2号送電線とを接続したり、各送電線を途中で分離したりすると、電流差動リレーの保護区間が変更されてしまう。従来技術では、このような場合に対処する手段は明らかにされていない。 However, when the No. 1 power transmission line and the No. 2 power transmission line are connected using a switch, or when each power transmission line is separated in the middle, the protection section of the current differential relay ends up being changed. In the prior art, no means have been disclosed to deal with such a case.

本開示は、上記の問題を考慮してなされたものであり、その目的の1つは、複数の開閉器の開閉状態の変更によって保護区間が変更されるような多端子送電系統を、電流差動方式によって保護するための保護システムを提供することである。 The present disclosure has been made in consideration of the above-mentioned problems, and one of its purposes is to provide a multi-terminal power transmission system in which the protection interval is changed by changing the open/close state of a plurality of switches, by controlling the current difference. The purpose of the present invention is to provide a protection system for protection by a dynamic method.

一局面において、多端子送電系統の保護システムが提供される。多端子送電系統は、3箇所以上の変電所間を接続する複数の送電線と、複数の開閉器と、複数の遮断器とを含む。各送電線は、3箇所以上の変電所のうちいずれか1つの変電所と他の1つ以上の変電所との間を接続する。複数の開閉器は、1つ以上の送電線および送電線間に設けられる。複数の遮断器は、各送電線の端子に隣接して個別に設けられる。保護システムは、複数の送電線の各端子に対応して個別に設けられ、互いに通信路を介して接続された複数の保護リレーを備える。各保護リレーは、保護区間特定部と、保護リレー演算部とを含む。保護区間特定部は、複数の開閉器の開閉状態が変更されたときに、複数の開閉器の変更後の開閉状態の情報に基づいて対応する遮断器が設けられた送電線の自端子に電気的に接続される全ての他端子を特定することによって、電流差動方式を用いて保護すべき保護区間を特定する。保護リレー演算部は、自端子でサンプリングされた電流値と特定された各他端子でサンプリングされた電流値とに基づいて、電流差動方式によるリレー演算を行う。 In one aspect, a protection system for a multi-terminal power transmission system is provided. A multi-terminal power transmission system includes multiple power transmission lines that connect three or more substations, multiple switches, and multiple circuit breakers. Each power transmission line connects any one substation among the three or more substations and one or more other substations. The plurality of switches are provided at one or more power transmission lines and between the power transmission lines. A plurality of circuit breakers are individually provided adjacent to the terminals of each power transmission line. The protection system includes a plurality of protection relays that are individually provided corresponding to each terminal of a plurality of power transmission lines and connected to each other via a communication path. Each protection relay includes a protection section identification section and a protection relay calculation section. When the open/close states of multiple switches are changed, the protection zone identification unit detects electricity at the own terminal of the power transmission line equipped with the corresponding circuit breaker based on information on the changed open/close states of the multiple switches. By specifying all other terminals that are connected to each other, the protection interval to be protected is specified using the current differential method. The protective relay calculation unit performs relay calculation using a current differential method based on the current value sampled at its own terminal and the current value sampled at each specified other terminal.

上記一局面の保護システムによれば、複数の開閉器の開閉状態が変更されたときに、各保護リレーは、複数の開閉器の変更後の開閉状態の情報に基づいて変更後の保護区間を特定し、特定した保護区間に基づいて電流差動方式によるリレー演算を行うことにより、多端子送電系統を保護できる。 According to one aspect of the protection system described above, when the open/close states of multiple switches are changed, each protection relay determines the changed protection interval based on information about the changed open/close states of the multiple switches. By specifying and performing relay calculation using the current differential method based on the specified protection interval, a multi-terminal power transmission system can be protected.

多端子送電系統およびその保護システムの構成例を示す図である。1 is a diagram illustrating a configuration example of a multi-terminal power transmission system and its protection system. 図1の多端子送電系統の運用方法と保護区間について説明するための図である。FIG. 2 is a diagram for explaining the operating method and protection zone of the multi-terminal power transmission system in FIG. 1. FIG. イーサネット(登録商標)による通信路の構成例を示す図である。FIG. 2 is a diagram illustrating an example of a configuration of a communication path based on Ethernet (registered trademark). 図1の保護リレーのハードウェア構成の一例を示す図である。FIG. 2 is a diagram showing an example of the hardware configuration of the protection relay in FIG. 1. FIG. 図1の開閉器制御装置のハードウェア構成の一例を示す図である。FIG. 2 is a diagram showing an example of the hardware configuration of the switch control device shown in FIG. 1. FIG. 図1の上位計算機のハードウェア構成の一例を示す図である。2 is a diagram illustrating an example of the hardware configuration of a host computer in FIG. 1. FIG. 保護リレーの演算処理部の動作を示す機能ブロック図である。FIG. 3 is a functional block diagram showing the operation of the arithmetic processing section of the protection relay. 図1の多端子送電系統の保護システムの動作の一例を示すフローチャートである(3端子運用から2号線のπ引き込み運用に切り替わる際の手順を示す)。2 is a flowchart illustrating an example of the operation of the protection system for the multi-terminal power transmission system in FIG. 1 (showing a procedure when switching from 3-terminal operation to π pull-in operation of Line 2). 図1の多端子送電系統の保護システムの動作の一例を示すフローチャートである(2号線のπ引き込み運用から3端子運用に切り替わる際の手順を示す)。2 is a flowchart illustrating an example of the operation of the protection system for the multi-terminal power transmission system in FIG. 1 (showing the procedure when switching from π pull-in operation to 3-terminal operation of Line 2). 実施の形態2による上位計算機の演算処理部の動作を示す機能ブロック図である。FIG. 3 is a functional block diagram showing the operation of an arithmetic processing unit of a host computer according to a second embodiment. 実施の形態3の保護システムにおいて、イーサネットによる通信路の構成例を示す図である。FIG. 7 is a diagram showing an example of a configuration of a communication path using Ethernet in the protection system of Embodiment 3; 実施の形態4による多端子送電系統の保護システムの動作の一例を示すフローチャートである(3端子運用から2号線のπ引き込み運用に切り替わる際の手順を示す)。11 is a flowchart illustrating an example of the operation of the protection system for a multi-terminal power transmission system according to Embodiment 4 (showing the procedure when switching from 3-terminal operation to π pull-in operation of line 2). 実施の形態4による多端子送電系統の保護システムの動作の一例を示すフローチャートである(2号線のπ引き込み運用から3端子運用に切り替わる際の手順を示す)。12 is a flowchart illustrating an example of the operation of the protection system for a multi-terminal power transmission system according to Embodiment 4 (showing a procedure when switching from π pull-in operation of Line 2 to 3-terminal operation).

以下、各実施の形態について図面を参照して詳しく説明する。なお、同一または相当する部分には同一の参照符号を付して、その説明を繰り返さない場合がある。 Each embodiment will be described in detail below with reference to the drawings. Note that the same reference numerals are given to the same or corresponding parts, and the description thereof may not be repeated.

実施の形態1.
[多端子送電系統の保護システムの全体構成例]
図1は、多端子送電系統およびその保護システムの構成例を示す図である。
Embodiment 1.
[Example of overall configuration of multi-terminal power transmission system protection system]
FIG. 1 is a diagram showing a configuration example of a multi-terminal power transmission system and its protection system.

多端子送電系統30は、変電所31(A端)、変電所32(B端)、および変電所33(C端)の間を接続する1号送電線1Lと2号送電線2Lとを含む。1号送電線1Lは、変電所31の母線A-1BとノードN1とを接続する区間A-1Lと、変電所32の母線B-1BとノードN1とを接続する区間B-1Lと、変電所33の母線C-1BとノードN1とを接続する区間C-1Lとに区分される。2号送電線2Lは、変電所31の母線A-2BとノードN2とを接続する区間A-2Lと、変電所32の母線B-2BとノードN2とを接続する区間B-2Lと、変電所33の母線C-2BとノードN2とを接続する区間C-2Lとに区分される。 The multi-terminal power transmission system 30 includes a No. 1 power transmission line 1L and a No. 2 power transmission line 2L that connect between a substation 31 (A end), a substation 32 (B end), and a substation 33 (C end). . The No. 1 transmission line 1L has a section A-1L that connects the bus A-1B of the substation 31 and the node N1, a section B-1L that connects the bus B-1B of the substation 32 and the node N1, and a substation It is divided into a section C-1L that connects the bus line C-1B of station 33 and node N1. The No. 2 transmission line 2L has a section A-2L that connects the bus A-2B of the substation 31 and the node N2, a section B-2L that connects the bus B-2B of the substation 32 and the node N2, and a section B-2L that connects the bus A-2B of the substation 31 and the node N2. It is divided into a section C-2L that connects the bus line C-2B of station 33 and node N2.

多端子送電系統30は、さらに、1号送電線1Lの各端子に隣接して設けられた遮断器CB1,CB3,CB5と、2号送電線2Lの各端子に隣接して設けられた遮断器CB2,CB4,CB6とを含む。また、多端子送電系統30は、1号送電線1Lの各端子と対応する遮断器との間に個別に設けられた電流変成器CT1,CT3,CT5と、2号送電線2Lの各端子と対応する遮断器との間に個別に設けられた電流変成器CT2,CT4,CT6とを含む。以下の説明では、遮断器CB1~CB6および電流変成器CT1~CT6について、総称する場合または不特定のものを示す場合には遮断器CBおよび電流変成器CTとそれぞれ記載する。 The multi-terminal power transmission system 30 further includes circuit breakers CB1, CB3, and CB5 provided adjacent to each terminal of the No. 1 power transmission line 1L, and circuit breakers provided adjacent to each terminal of the No. 2 power transmission line 2L. It includes CB2, CB4, and CB6. In addition, the multi-terminal power transmission system 30 includes current transformers CT1, CT3, CT5 individually provided between each terminal of the No. 1 power transmission line 1L and the corresponding circuit breaker, and each terminal of the No. 2 power transmission line 2L. It includes current transformers CT2, CT4, and CT6 individually provided between the corresponding circuit breakers. In the following description, the circuit breakers CB1 to CB6 and the current transformers CT1 to CT6 will be referred to as a circuit breaker CB and a current transformer CT, respectively, when they are referred to generically or unspecified.

多端子送電系統30は、さらに、開閉器SW1~SW3を含む。開閉器SW1は、1号送電線1Lの区間C-1Lに設けられる。開閉器SW2は、2号送電線2Lの区間B-2Lに設けられる。開閉器SW3は、2号送電線2Lの区間A-2Lの開閉器SW2と遮断器CB2との間のノードN3と、1号送電線1Lの区間C-1Lの開閉器SW1と遮断器CB5との間のノードN4との間に接続される。以下の説明では、開閉器SW1~SW3について、総称する場合または不特定のものを示す場合には開閉器SWと記載する。 Multi-terminal power transmission system 30 further includes switches SW1 to SW3. Switch SW1 is provided in section C-1L of No. 1 power transmission line 1L. Switch SW2 is provided in section B-2L of No. 2 power transmission line 2L. Switch SW3 connects to node N3 between switch SW2 and circuit breaker CB2 in section A-2L of No. 2 transmission line 2L, and switch SW1 and circuit breaker CB5 in section C-1L of No. 1 power transmission line 1L. and a node N4 between the two. In the following description, the switches SW1 to SW3 will be referred to as switches SW when they are referred to generically or when an unspecified item is indicated.

なお、図1では、図解を容易にするために、1本の送電線で記載しているが、3相送電線の場合には実際には3本の送電線がある。また、遮断器CB、電流変成器CT、および開閉器SWの各々についても実際には相ごとに設けられているが、本開示では3相分をまとめて1つの断器CB、電流変成器CT、および開閉器SWとして記載している。 Although FIG. 1 shows one power transmission line for ease of illustration, there are actually three power transmission lines in the case of a three-phase power transmission line. Further, although the circuit breaker CB, current transformer CT, and switch SW are actually provided for each phase, in the present disclosure, three phases are combined into one circuit breaker CB, current transformer CT, and switch SW. , and switch SW.

上記の構成の多端子送電系統30を保護する保護システムは、変電所31に設けられた保護リレーRY1,RY2と、変電所32に設けられた保護リレーRY3,RY4と、変電所33に設けられた保護リレーRY5,RY6と、開閉器SW1~SW3の開閉を制御する開閉器制御装置SWCUと、制御所34に設けられた上位計算機35とを含む。保護リレーRY1~RY6について、総称する場合または不特定のものを示す場合には保護リレーRYと記載する。 The protection system that protects the multi-terminal power transmission system 30 configured as described above includes protection relays RY1 and RY2 provided in the substation 31, protection relays RY3 and RY4 provided in the substation 32, and protection relays RY3 and RY4 provided in the substation 33. protection relays RY5 and RY6, a switch control device SWCU that controls opening and closing of switches SW1 to SW3, and a host computer 35 provided in a control center 34. The protection relays RY1 to RY6 will be referred to as protection relays RY when used collectively or when referring to an unspecified item.

保護リレーRY1は、1号送電線1Lの変電所31側の端子(A端)に隣接して設けられた電流変成器CT1および遮断器CB1と接続される。保護リレーRY1は、遮断器CB1の開閉を制御する。同様に、保護リレーRY2は、2号送電線2Lの変電所31側の端子(A端)に隣接して設けられた電流変成器CT2および遮断器CB2と接続され、遮断器CB2の開閉を制御する。保護リレーRY3は、1号送電線1Lの変電所32側の端子(B端)に隣接して設けられた電流変成器CT3および遮断器CB3と接続され、遮断器CB3の開閉を制御する。保護リレーRY4は、2号送電線2Lの変電所32側の端子(B端)に隣接して設けられた電流変成器CT4および遮断器CB4と接続され、遮断器CB4の開閉を制御する。保護リレーRY5は、1号送電線1Lの変電所33側の端子(C端)に隣接して設けられた電流変成器CT5および遮断器CB5と接続され、遮断器CB5の開閉を制御する。保護リレーRY6は、2号送電線2Lの変電所33側の端子(C端)に隣接して設けられた電流変成器CT6および遮断器CB6と接続され、遮断器CB6の開閉を制御する。 The protective relay RY1 is connected to a current transformer CT1 and a circuit breaker CB1 that are provided adjacent to a terminal (A end) on the substation 31 side of the No. 1 power transmission line 1L. Protection relay RY1 controls opening and closing of circuit breaker CB1. Similarly, the protective relay RY2 is connected to the current transformer CT2 and the circuit breaker CB2, which are provided adjacent to the terminal (A terminal) on the substation 31 side of the No. 2 power transmission line 2L, and controls the opening and closing of the circuit breaker CB2. do. The protective relay RY3 is connected to a current transformer CT3 and a circuit breaker CB3 that are provided adjacent to a terminal (B end) on the substation 32 side of the No. 1 power transmission line 1L, and controls opening and closing of the circuit breaker CB3. The protective relay RY4 is connected to a current transformer CT4 and a circuit breaker CB4 that are provided adjacent to a terminal (B end) on the substation 32 side of the No. 2 power transmission line 2L, and controls opening and closing of the circuit breaker CB4. Protective relay RY5 is connected to current transformer CT5 and circuit breaker CB5, which are provided adjacent to the substation 33 side terminal (C end) of No. 1 power transmission line 1L, and controls opening and closing of circuit breaker CB5. The protective relay RY6 is connected to a current transformer CT6 and a circuit breaker CB6 that are provided adjacent to a terminal (C end) on the substation 33 side of the No. 2 power transmission line 2L, and controls opening and closing of the circuit breaker CB6.

保護リレーRY1~RY6、開閉器制御装置SWCU、および上位計算機35は、シリアル伝送を行う通信路(不図示)を介して相互に接続されている。これにより、各保護リレーRYは、開閉器SW1~SW3の開閉情報を開閉器制御装置SWCUから受信し、さらに上位計算機35からの指令を受信する。通信路の具体的な構成例については後述する。 The protection relays RY1 to RY6, the switch control device SWCU, and the host computer 35 are interconnected via a communication path (not shown) that performs serial transmission. As a result, each protection relay RY receives switching information for the switches SW1 to SW3 from the switch control device SWCU, and further receives instructions from the host computer 35. A specific example of the configuration of the communication path will be described later.

なお、上記の多端子送電系統30の構成は一例であって、これに限定されることは意図していない。より一般的には、多端子送電系統は、3箇所以上の変電所間を電気的に接続する複数の送電線を含む。各送電線は、3箇所以上の変電所のうちいずれか1つの変電所と他の1つ以上の変電所との間を接続する。多端子送電系統は、さらに、1つ以上の送電線および送電線間に設けられた複数の開閉器と、各送電線の端子に隣接して個別に設けられた複数の遮断器と、各送電線の端子と対応する遮断器との間に個別に設けられた複数電流変成器とを含む。複数の開閉器の開閉状態を変更することによって、上記の3箇所以上の変電所間の電気的な接続形態が変更される。複数の保護リレーは、複数の送電線の各端子に対応して個別に設けられる。 In addition, the structure of the said multiterminal power transmission system 30 is an example, Comprising: It is not intended to be limited to this. More generally, a multiterminal power transmission system includes a plurality of power transmission lines that electrically connect three or more substations. Each power transmission line connects any one substation among the three or more substations and one or more other substations. A multi-terminal power transmission system further includes one or more transmission lines, a plurality of switches provided between the transmission lines, a plurality of circuit breakers individually provided adjacent to the terminals of each transmission line, and a plurality of circuit breakers provided individually adjacent to the terminals of each transmission line. and multiple current transformers individually provided between the wire terminals and the corresponding circuit breakers. By changing the open/close states of the plurality of switches, the electrical connection form between the three or more substations described above is changed. The plurality of protection relays are individually provided corresponding to each terminal of the plurality of power transmission lines.

[送電線の運用方法]
図1の開閉器SW1~SW3の開閉状態を切り替えることによって、変電所31~33の間の電気的な接続形態を変更することができる。以下、3端子運用と2号送電線のπ引き込み運用とについて説明する。
[How to operate power transmission lines]
By switching the open/close states of the switches SW1 to SW3 in FIG. 1, the electrical connection form between the substations 31 to 33 can be changed. The three-terminal operation and the π pull-in operation of the No. 2 transmission line will be explained below.

図2は、図1の多端子送電系統の運用方法と保護区間について説明するための図である。変電所31~33間の電気的な接続形態を変更することによって、電流差動方式による保護区間も変更される。 FIG. 2 is a diagram for explaining the operating method and protection zone of the multi-terminal power transmission system in FIG. 1. By changing the electrical connection form between the substations 31 to 33, the protection zone based on the current differential method is also changed.

まず、図2(A)を参照して、開閉器SW1,SW2が投入され、開閉器SW3が切断されている場合、1号送電線1LはA端、B端、およびC端を接続する3端子送電線として構成され、2号送電線2LもA端、B端、およびC端を接続する3端子送電線として構成される。以下、この運用方法を3端子運用と称する。一方、開閉器SW1,SW2が切断され、開閉器SW3が投入されている場合、1号送電線1LはA端とB端とを接続する2端子送電線として構成され、2号送電線2LはA端とC端とを接続する2端子送電線およびB端とC端とを接続する2端子送電線として構成される。この運用方法を2号線のπ引き込み運用と称する。 First, referring to FIG. 2(A), when switches SW1 and SW2 are turned on and switch SW3 is disconnected, No. 1 power transmission line 1L connects end A, end B, and end C. It is configured as a terminal power transmission line, and the No. 2 power transmission line 2L is also configured as a three-terminal power transmission line that connects the A end, B end, and C end. Hereinafter, this operating method will be referred to as three-terminal operation. On the other hand, when switches SW1 and SW2 are disconnected and switch SW3 is closed, the No. 1 power transmission line 1L is configured as a two-terminal power transmission line connecting the A end and the B end, and the No. 2 power transmission line 2L is It is configured as a two-terminal power transmission line that connects the A end and the C end, and a two-terminal power transmission line that connects the B end and the C end. This operation method is referred to as Line 2 π pull-in operation.

次に、図2(B)を参照して、3端子運用の場合における電流差動方式の保護区間について説明する。この場合、2個の保護区間が存在する。 Next, with reference to FIG. 2(B), the protection interval of the current differential method in the case of three-terminal operation will be described. In this case, there are two protection intervals.

第1の保護区間は、図1の区間A-1L、区間B-1L、および区間C-1Lによって構成される。この場合、保護区間の端子に対応して設けられた保護リレーRY1,RY3,RY5によって、電流差動方式による保護リレー演算が実行される。電流変成器CT1,CT3,CT5による検出電流の瞬時値をそれぞれi1、i3、i5とすると、保護リレーRY1,RY3,RY5の各々は、これらの電流の和(すなわち、i1+i3+i5)が閾値を超えている場合に、保護区間の内部での事故であると判定する。 The first protection zone is constituted by zone A-1L, zone B-1L, and zone C-1L in FIG. In this case, protection relay calculation using the current differential method is executed by the protection relays RY1, RY3, and RY5 provided corresponding to the terminals of the protection section. If the instantaneous values of the currents detected by current transformers CT1, CT3, and CT5 are i1, i3, and i5, respectively, each of the protective relays RY1, RY3, and RY5 detects when the sum of these currents (i1+i3+i5) exceeds the threshold value. If the accident occurs within the protected area, it is determined that the accident occurred within the protected area.

第2の保護区間は、図1の区間A-2L、区間B-2L、および区間C-2Lによって構成される。この場合、保護区間の端子に対応して設けられた保護リレーRY2,RY4,RY6によって、電流差動方式による保護リレー演算が実行される。電流変成器CT2,CT4,CT6による検出電流の瞬時値をそれぞれi2、i4、i6とすると、保護リレーRY2,RY4,RY6の各々は、これらの電流の和(すなわち、i2+i4+i6)が閾値を超えている場合に、保護区間の内部での事故であると判定する。 The second protection zone is constituted by zone A-2L, zone B-2L, and zone C-2L in FIG. In this case, protection relay calculation using the current differential method is executed by the protection relays RY2, RY4, and RY6 provided corresponding to the terminals of the protection section. If the instantaneous values of the currents detected by current transformers CT2, CT4, and CT6 are i2, i4, and i6, respectively, then each of the protective relays RY2, RY4, and RY6 detects when the sum of these currents (i.e., i2+i4+i6) exceeds the threshold value. If the accident occurs within the protected area, it is determined that the accident occurred within the protected area.

次に、図2(C)を参照して、2号線のπ引き込み運用の場合における電流差動方式の保護区間について説明する。この場合、3個の保護区間が存在する。 Next, with reference to FIG. 2(C), a protection section of the current differential method in the case of the π pull-in operation of Line 2 will be described. In this case, there are three protection intervals.

第1の保護区間は、図1の区間A-1Lおよび区間B-1Lによって構成される。この場合、保護区間の端子に対応して設けられた保護リレーRY1,RY3によって、電流差動方式による保護リレー演算が実行される。電流変成器CT1,CT3による検出電流の瞬時値をそれぞれi1、i3とすると、保護リレーRY1,RY3の各々は、これらの電流の和(すなわち、i1+i3)が閾値を超えている場合に、保護区間の内部での事故であると判定する。 The first protection zone is constituted by zone A-1L and zone B-1L in FIG. In this case, protection relay calculation using the current differential method is executed by the protection relays RY1 and RY3 provided corresponding to the terminals of the protection section. Assuming that the instantaneous values of the currents detected by current transformers CT1 and CT3 are i1 and i3, respectively, each of protection relays RY1 and RY3 changes the protection interval when the sum of these currents (i1+i3) exceeds the threshold value. It was determined that the accident occurred inside the building.

第2の保護区間は、図1の区間A-2Lおよび区間C-1Lによって構成される。この場合、保護区間の端子に対応して設けられた保護リレーRY2,RY5によって、電流差動方式による保護リレー演算が実行される。電流変成器CT2,CT5による検出電流の瞬時値をそれぞれi2、i5とすると、保護リレーRY2,RY5の各々は、これらの電流の和(すなわち、i2+i5)が閾値を超えている場合に、保護区間の内部での事故であると判定する。 The second protection zone is constituted by zone A-2L and zone C-1L in FIG. In this case, protection relay calculation using the current differential method is executed by the protection relays RY2 and RY5 provided corresponding to the terminals of the protection section. Assuming that the instantaneous values of the currents detected by current transformers CT2 and CT5 are i2 and i5, respectively, each of protection relays RY2 and RY5 changes the protection interval when the sum of these currents (i2+i5) exceeds the threshold value. It was determined that the accident occurred inside the building.

第3の保護区間は、図1の区間B-2Lおよび区間C-2Lによって構成される。この場合、保護区間の端子に対応して設けられた保護リレーRY4,RY6によって、電流差動方式による保護リレー演算が実行される。電流変成器CT4,CT6による検出電流の瞬時値をそれぞれi4、i6とすると、保護リレーRY4,RY6の各々は、これらの電流の和(すなわち、i4+i6)が閾値を超えている場合に、保護区間の内部での事故であると判定する。 The third protection zone is constituted by zone B-2L and zone C-2L in FIG. In this case, protection relay calculation using the current differential method is executed by protection relays RY4 and RY6 provided corresponding to the terminals of the protection section. Assuming that the instantaneous values of the currents detected by current transformers CT4 and CT6 are i4 and i6, respectively, each of protection relays RY4 and RY6 changes the protection interval when the sum of these currents (i4+i6) exceeds the threshold value. It was determined that the accident occurred inside the building.

以上のように、電流差動方式による保護区間の構成と開閉器SW1~SW3の開閉状態とは対応付けられている。本実施の形態の各保護リレーRYは、通信路を介して開閉器制御装置SWCUから受信した開閉器SW1~SW3の開閉状態の情報に基づいて、自動的に保護区間を切り替えるように構成されている。 As described above, the configuration of the protection zone based on the current differential method and the open/close states of the switches SW1 to SW3 are associated with each other. Each protection relay RY of the present embodiment is configured to automatically switch the protection interval based on information on the open/close states of the switches SW1 to SW3 received from the switch control device SWCU via a communication path. There is.

[通信路の構成例]
図3は、イーサネットによる通信路の構成例を示す図である。図3に示すように、制御所34には、ネットワークスイッチ40,50が配置される。変電所31には、ネットワークスイッチ41,42,51,52が配置される。変電所33には、ネットワークスイッチ43,44,53,54が配置される。変電所32には、ネットワークスイッチ45,46,51,52が配置される。開閉器制御装置SWCUの近傍にネットワークスイッチ47,57が配置される。
[Example of communication channel configuration]
FIG. 3 is a diagram showing an example of a configuration of a communication path using Ethernet. As shown in FIG. 3, network switches 40 and 50 are arranged in the control center 34. In the substation 31, network switches 41, 42, 51, and 52 are arranged. Network switches 43, 44, 53, and 54 are arranged in the substation 33. Network switches 45, 46, 51, and 52 are arranged in the substation 32. Network switches 47 and 57 are arranged near the switch control device SWCU.

上位計算機35は、ネットワークスイッチ40,50の各々と接続される。保護リレーRY1は、ネットワークスイッチ41,51の各々と接続される。保護リレーRY2は、ネットワークスイッチ42,52の各々と接続される。保護リレーRY5は、ネットワークスイッチ43,53の各々と接続される。保護リレーRY6は、ネットワークスイッチ44,54の各々と接続される。保護リレーRY3は、ネットワークスイッチ45,55の各々と接続される。保護リレーRY4は、ネットワークスイッチ46,56の各々と接続される。開閉器制御装置SWCUは、ネットワークスイッチ47,57の各々と接続される。 The host computer 35 is connected to each of the network switches 40 and 50. Protection relay RY1 is connected to each of network switches 41 and 51. Protection relay RY2 is connected to each of network switches 42 and 52. Protection relay RY5 is connected to each of network switches 43 and 53. Protection relay RY6 is connected to each of network switches 44 and 54. Protection relay RY3 is connected to each of network switches 45 and 55. Protection relay RY4 is connected to each of network switches 46 and 56. The switch control device SWCU is connected to each of the network switches 47 and 57.

ネットワークスイッチ40~47が光ファイバ39を介して接続されることによって、上位計算機35、保護リレーRY1~RY6、および開閉器制御装置SWCUを接続する第1の通信路49が構成される。ネットワークスイッチ50~57が光ファイバ39を介して接続されることによって、上位計算機35、保護リレーRY1~RY6、および開閉器制御装置SWCUを接続する第2の通信路59が構成される。このように第1の通信路49と第2の通信路59を設けて冗長性を持たせることにより、保護システムの信頼性を高めることができる。 By connecting network switches 40 to 47 via optical fiber 39, a first communication path 49 is configured that connects host computer 35, protection relays RY1 to RY6, and switch control device SWCU. By connecting network switches 50 to 57 via optical fiber 39, a second communication path 59 is configured that connects host computer 35, protection relays RY1 to RY6, and switch control device SWCU. By providing the first communication path 49 and the second communication path 59 in this way to provide redundancy, the reliability of the protection system can be improved.

[保護リレーのハードウェア構成の一例]
図4は、図1の保護リレーのハードウェア構成の一例を示す図である。図1の保護リレーRY1~RY6は同一の構成を有しているので、以下では、保護リレーRY1について代表的に説明する。
[Example of hardware configuration of protection relay]
FIG. 4 is a diagram showing an example of the hardware configuration of the protection relay in FIG. 1. Since the protection relays RY1 to RY6 in FIG. 1 have the same configuration, the protection relay RY1 will be described below as a representative example.

図4を参照して、保護リレーRY1は、入力変換部100と、A/D変換部110と、演算処理部120と、入出力部(I/O部)130とを備える。 Referring to FIG. 4, protection relay RY1 includes an input conversion section 100, an A/D conversion section 110, an arithmetic processing section 120, and an input/output section (I/O section) 130.

入力変換部100は、図1の電流変成器CT1から出力された各相の電流信号が入力される入力部である。入力変換部100には、入力変換器101a,101b,…がチャンネルごとに設けられている。各チャンネルには、各相の電流信号が入力される(図4では、代表的に2チャンネルのみ示されている)。各入力変換器101a,101bは、たとえば、補助変成器によって構成され、電流変成器CT1からの電流信号をA/D変換部110および演算処理部120での信号処理に適した電圧レベルの信号に変換する。 The input conversion section 100 is an input section into which current signals of each phase output from the current transformer CT1 in FIG. 1 are input. The input converter 100 is provided with input converters 101a, 101b, . . . for each channel. Current signals of each phase are input to each channel (only two channels are typically shown in FIG. 4). Each input converter 101a, 101b is configured, for example, by an auxiliary transformer, and converts the current signal from the current transformer CT1 into a signal at a voltage level suitable for signal processing in the A/D converter 110 and the arithmetic processing unit 120. Convert.

A/D変換部110は、アナログフィルタ(AF:Analog Filter)111と、サンプルホールド回路(S/H:Sample and Hold Circuit)112と、マルチプレクサ(MPX:Multiplexer)113と、アナログデジタル(A/D)変換器114とを含む。アナログフィルタ111(111a,111b,…)およびサンプルホールド回路112(112a,112b,…)の各々は、複数の入力変換器101(101a,101b,…)にそれぞれ対応してチャンネルごとに設けられる。 The A/D conversion unit 110 includes an analog filter (AF) 111, a sample and hold circuit (S/H) 112, a multiplexer (MPX) 113, and an analog/digital (A/D) circuit. ) converter 114. Each of the analog filters 111 (111a, 111b, . . . ) and sample-and-hold circuits 112 (112a, 112b, . . . ) is provided for each channel corresponding to the plurality of input converters 101 (101a, 101b, .

各アナログフィルタ111は、A/D変換の際の折返し誤差を除去するために設けられたフィルタである。各サンプルホールド回路112は、対応のアナログフィルタ111を通過した信号を規定のサンプルレート(サンプリング周波数とも称する)でサンプリングして保持する。マルチプレクサ113は、各サンプルホールド回路112に保持された電圧信号を順次選択する。A/D変換器114は、マルチプレクサによって選択された信号をデジタル値に変換する。 Each analog filter 111 is a filter provided to remove aliasing errors during A/D conversion. Each sample and hold circuit 112 samples and holds the signal that has passed through the corresponding analog filter 111 at a specified sample rate (also referred to as sampling frequency). Multiplexer 113 sequentially selects the voltage signals held in each sample and hold circuit 112. A/D converter 114 converts the signal selected by the multiplexer into a digital value.

演算処理部120は、CPU(Central Processing Unit)121と、RAM(Random Access Memory)122と、ROM(Read Only Memory)123と、フラッシュメモリなど電気的に書換え可能な不揮発性メモリ124とを備える。これらの各要素はバス125を介して相互に接続されている。RAM122およびROM123は、CPU121の主記憶として用いられる。CPU121は、ROM123および不揮発性メモリ124に格納されたプログラムに従って、保護リレーRY1の全体の動作を制御する。 The arithmetic processing unit 120 includes a CPU (Central Processing Unit) 121, a RAM (Random Access Memory) 122, a ROM (Read Only Memory) 123, and an electrically rewritable nonvolatile memory 124 such as a flash memory. Each of these elements is interconnected via a bus 125. RAM122 and ROM123 are used as main memory of CPU121. CPU 121 controls the overall operation of protection relay RY1 according to programs stored in ROM 123 and nonvolatile memory 124.

入出力部130は、図3のネットワークスイッチ41と接続される通信回路(TX/RX)131と、図3のネットワークスイッチ51と接続される通信回路132とを備える。さらに、入出力部130は、デジタル入力(D/I:Digital Input)回路133と、デジタル出力(D/O:Digital Output)回路134とを備える。デジタル入力回路133は、外部機器から出力された信号を受信するためのインターフェイス回路であり、デジタル出力回路134は、外部機器に信号を出力するためのインターフェイス回路である。たとえば、デジタル出力回路134は、対応する遮断器CB1にトリップ信号を出力し、デジタル入力回路133は、対応する遮断器CB1の開閉状態の情報を取得する。 The input/output unit 130 includes a communication circuit (TX/RX) 131 connected to the network switch 41 in FIG. 3, and a communication circuit 132 connected to the network switch 51 in FIG. Furthermore, the input/output unit 130 includes a digital input (D/I) circuit 133 and a digital output (D/O) circuit 134. The digital input circuit 133 is an interface circuit for receiving a signal output from an external device, and the digital output circuit 134 is an interface circuit for outputting a signal to the external device. For example, the digital output circuit 134 outputs a trip signal to the corresponding circuit breaker CB1, and the digital input circuit 133 acquires information on the open/closed state of the corresponding circuit breaker CB1.

[開閉器制御装置のハードウェア構成の一例]
図5は、図1の開閉器制御装置のハードウェア構成の一例を示す図である。図5を参照して、開閉器制御装置SWCUは、演算処理部200と、入出力部(I/O部)210とを備える。
[Example of hardware configuration of switch control device]
FIG. 5 is a diagram showing an example of the hardware configuration of the switch control device shown in FIG. 1. Referring to FIG. 5, the switch control device SWCU includes an arithmetic processing section 200 and an input/output section (I/O section) 210.

演算処理部200は、CPU201と、RAM202と、ROM203と、フラッシュメモリなど電気的に書換え可能な不揮発性メモリ204とを備える。これらの各要素はバス205を介して相互に接続されている。RAM202およびROM203は、CPU201の主記憶として用いられる。CPU201は、ROM203および不揮発性メモリ204に格納されたプログラムに従って、開閉器制御装置SWCUの全体の動作を制御する。 The arithmetic processing unit 200 includes a CPU 201, a RAM 202, a ROM 203, and an electrically rewritable nonvolatile memory 204 such as a flash memory. Each of these elements is interconnected via a bus 205. RAM202 and ROM203 are used as main memory of CPU201. CPU 201 controls the overall operation of switch control device SWCU according to programs stored in ROM 203 and nonvolatile memory 204.

入出力部210は、図3のネットワークスイッチ47と接続される通信回路(TX/RX)211と、図3のネットワークスイッチ57と接続される通信回路212とを備える。さらに、入出力部210は、デジタル入力(D/I)回路213と、デジタル出力(D/O)回路214とを備える。デジタル入力回路213は、外部機器から出力された信号を受信するためのインターフェイス回路であり、デジタル出力回路214は、外部機器に信号を出力するためのインターフェイス回路である。具体的に、デジタル出力回路214は、上位計算機35から指令に基づいて、開閉器SW1~SW3に投入指令または開放指令を出力する。デジタル入力回路213は、開閉器SW1~SW3の開閉状態の情報を取得する。 The input/output unit 210 includes a communication circuit (TX/RX) 211 connected to the network switch 47 in FIG. 3, and a communication circuit 212 connected to the network switch 57 in FIG. Further, the input/output section 210 includes a digital input (D/I) circuit 213 and a digital output (D/O) circuit 214. The digital input circuit 213 is an interface circuit for receiving a signal output from an external device, and the digital output circuit 214 is an interface circuit for outputting a signal to the external device. Specifically, the digital output circuit 214 outputs a closing command or an opening command to the switches SW1 to SW3 based on a command from the host computer 35. The digital input circuit 213 acquires information on the open/close states of the switches SW1 to SW3.

[上位計算機のハードウェア構成の一例]
図6は、図1の上位計算機のハードウェア構成の一例を示す図である。図5を参照して、上位計算機35は、演算処理部300と、入出力部(I/O部)310とを備える。
[Example of hardware configuration of host computer]
FIG. 6 is a diagram showing an example of the hardware configuration of the host computer in FIG. 1. Referring to FIG. 5, host computer 35 includes an arithmetic processing section 300 and an input/output section (I/O section) 310.

演算処理部300は、CPU301と、RAM302と、ROM303と、フラッシュメモリなど電気的に書換え可能な不揮発性メモリ304とを備える。これらの各要素はバス305を介して相互に接続されている。RAM302およびROM303は、CPU301の主記憶として用いられる。CPU301は、ROM303および不揮発性メモリ304に格納されたプログラムに従って、上位計算機35の全体の動作を制御する。 The arithmetic processing unit 300 includes a CPU 301, a RAM 302, a ROM 303, and an electrically rewritable nonvolatile memory 304 such as a flash memory. Each of these elements is interconnected via a bus 305. RAM302 and ROM303 are used as main memory of CPU301. CPU 301 controls the overall operation of host computer 35 according to programs stored in ROM 303 and nonvolatile memory 304 .

入出力部310は、図3のネットワークスイッチ40と接続される通信回路(TX/RX)311と、図3のネットワークスイッチ50と接続される通信回路312とを備える。 The input/output unit 310 includes a communication circuit (TX/RX) 311 connected to the network switch 40 in FIG. 3, and a communication circuit 312 connected to the network switch 50 in FIG.

[保護リレーの動作]
次に、各保護リレーRYによる多端子送電系統30の保護動作について説明する。保護リレーRY1~RY6の各々は同様の保護動作を実行するので、以下では、保護リレーRY1の動作について説明する。
[Protection relay operation]
Next, the protection operation of the multi-terminal power transmission system 30 by each protection relay RY will be explained. Since each of protection relays RY1 to RY6 performs similar protection operations, the operation of protection relay RY1 will be described below.

図7は、保護リレーRY1の演算処理部の動作を示す機能ブロック図である。図7では、保護リレーRY1に接続される電流変成器CT1、遮断器CB1、およびネットワークスイッチ41,51と、保護リレーRY1を構成するサンプルホールド回路112、A/D変換器114、通信回路131,132、およびデジタル入出力回路133,134とも併せて示されている。 FIG. 7 is a functional block diagram showing the operation of the arithmetic processing section of the protection relay RY1. In FIG. 7, current transformer CT1, circuit breaker CB1, and network switches 41, 51 connected to protective relay RY1, sample and hold circuit 112, A/D converter 114, communication circuit 131, and 132 and digital input/output circuits 133 and 134 are also shown.

図7を参照して、機能的に見ると演算処理部120は、保護区間特定部62と、サンプリング同期制御部61と、保護リレー演算部63と、ロジック演算部64とを含む。これらの各機能は、CPU121がプログラムを実行することによって実現される。 Referring to FIG. 7, from a functional perspective, the arithmetic processing unit 120 includes a protection interval identification unit 62, a sampling synchronization control unit 61, a protection relay calculation unit 63, and a logic calculation unit 64. Each of these functions is realized by the CPU 121 executing a program.

保護区間特定部62は、通信路49または59を介して開閉器SW1~SW3の開閉状態の情報を開閉器制御装置SWCUから受信する。保護区間特定部62は、開閉器SW1~SW3の開閉状態が変更されたときに、対応する遮断器CB1が設けられた送電線の自端子に電気的に接続される全ての他端子を特定することによって、電流差動方式を用いて保護すべき自端子を含む保護区間を特定する。たとえば、開閉器SW1~SW3の開閉状態のパターンと各パターンに対応する保護区間との対応関係を表す情報がメモリ(ROM123、不揮発性メモリ124)に予め格納されている。保護区間特定部62は、この対応関係を表す情報に基づいて、受信した開閉器SW1~SW3の開閉状態に対応する保護区間を特定する。 The protection zone specifying unit 62 receives information on the open/closed states of the switches SW1 to SW3 from the switch control device SWCU via the communication path 49 or 59. The protection zone identifying unit 62 identifies all other terminals that are electrically connected to the own terminal of the power transmission line provided with the corresponding circuit breaker CB1 when the open/close states of the switches SW1 to SW3 are changed. By this, the protection section including the own terminal to be protected is specified using the current differential method. For example, information representing the correspondence between the open/close state patterns of the switches SW1 to SW3 and the protection intervals corresponding to each pattern is stored in advance in the memory (ROM 123, nonvolatile memory 124). The protection section specifying unit 62 specifies the protection section corresponding to the received open/close states of the switches SW1 to SW3 based on the information representing this correspondence.

サンプリング同期制御部61は、保護区間特定部62によって特定された他端子に対応付けられている保護リレーRYのサンプリング同期制御部61と、通信路49または59を介して通信を行うことにより、自端子における電流のサンプリングタイミングと、特定された各他端子における電流のサンプリングタイミングとを同期させる。 The sampling synchronization control unit 61 communicates with the sampling synchronization control unit 61 of the protection relay RY associated with the other terminal specified by the protection interval identification unit 62 via the communication path 49 or 59. The sampling timing of the current at the terminal and the sampling timing of the current at each of the specified other terminals are synchronized.

サンプリング同期の方法として種々の方法を採用することができる。本実施の形態では、イーサネットを利用したIEEE1588規格のPTP(Precision Time Protocol)が利用される。他の方法として、GPS(Global Positioning System)信号を利用することによって各保護リレーRYに設けられた時計を同期させてもよい。もしくは、専用線を介して自端子の保護リレーRYと他端子の保護リレーRYとから相互にタイミングフラグを送信し、自端子と他端子との両方でのタイミングフラグの送信時刻と受信時刻の時間差に基づいて、サンプリングタイミングの同期を行うことができる。 Various methods can be adopted as the sampling synchronization method. In this embodiment, PTP (Precision Time Protocol) of the IEEE1588 standard using Ethernet is used. As another method, the clocks provided in each protection relay RY may be synchronized by using GPS (Global Positioning System) signals. Alternatively, the protection relay RY of the own terminal and the protection relay RY of the other terminal transmit the timing flag to each other via a dedicated line, and the time difference between the transmission time and reception time of the timing flag at both the own terminal and the other terminal is determined. Based on this, sampling timing can be synchronized.

なお、全ての送電線の全ての端子における電流のサンプリングタイミングの同期が可能な場合には、サンプリング同期制御部61は、最初に全端子におけるサンプリングタイミングの同期を確立してもよい。この場合には、開閉器SWの開閉状態の変更によって保護区間が変更されても、サンプリングタイミングの同期を確立し直す必要はない。たとえば、各保護リレーRYが光ファイバまたは複数の通信装置経由で接続されることにより、全保護リレー間で同一のサンプリング同期を実現できる。また、GPS信号を利用して保護リレーRYごとに内蔵の時計を同期化することより全端子におけるサンプリング同期を行ってもよい。詳しくは、実施の形態4で説明する。 Note that if it is possible to synchronize the sampling timings of currents at all terminals of all power transmission lines, the sampling synchronization control unit 61 may first establish synchronization of sampling timings at all terminals. In this case, even if the protection interval is changed due to a change in the open/closed state of the switch SW, there is no need to re-establish the synchronization of the sampling timing. For example, by connecting each protection relay RY via an optical fiber or a plurality of communication devices, it is possible to achieve the same sampling synchronization among all protection relays. Alternatively, sampling synchronization at all terminals may be performed by synchronizing the built-in clock of each protection relay RY using a GPS signal. Details will be explained in Embodiment 4.

保護リレー演算部63は、各他端子での電流サンプリング値を、通信路49または59を介して各他端子の保護リレーRYから受信する。保護リレー演算部63は、自端子での電流のサンプリング値と、同時刻の各他端子での電流のサンプリング値とに基づいて、電流差動方式によるリレー演算を実行する。 The protection relay calculation unit 63 receives the current sampling value at each other terminal from the protection relay RY at each other terminal via the communication path 49 or 59. The protective relay calculation unit 63 executes relay calculation using a current differential method based on the current sampling value at its own terminal and the current sampling value at each other terminal at the same time.

ロジック演算部64は、保護リレー演算部63でのリレー演算結果に基づいて、対応する遮断器CB1にトリップ信号を出力したり、対応する遮断器CB1の再閉路を行うための信号を出力したりする。また、ロジック演算部64は、上位計算機35からの指令に従って、対応する遮断器CB1に対して開放操作および投入操作を行うための制御信号を出力する。さらに、ロジック演算部64は、開閉器SW1~SW3の開閉状態を変更する際に、各開閉器SWおよび関係する遮断器CBの開放および投入の順序が、予め定められた手順に従っているか判断する。 The logic calculation unit 64 outputs a trip signal to the corresponding circuit breaker CB1, or outputs a signal for re-closing the corresponding circuit breaker CB1, based on the relay calculation result in the protection relay calculation unit 63. do. Further, the logic calculation unit 64 outputs a control signal for performing an opening operation and a closing operation on the corresponding circuit breaker CB1 according to a command from the host computer 35. Further, when changing the open/close states of the switches SW1 to SW3, the logic calculation unit 64 determines whether the order of opening and closing of each switch SW and related circuit breaker CB follows a predetermined procedure.

[保護システムの動作]
次に、上位計算機35、開閉器制御装置SWCU、および各保護リレーRYを含む保護システム全体の動作について説明する。
[Protection system operation]
Next, the operation of the entire protection system including the host computer 35, switch control device SWCU, and each protection relay RY will be explained.

図8および図9は、図1の多端子送電系統の保護システムの動作の一例を示すフローチャートである。以下に示すように、図8のフローチャートは、3端子運用から2号線のπ引き込み運用に切り替わる際の手順を示し、図9のフローチャートは、2号線のπ引き込み運用から3端子運用に切り替わる際の手順を示す。運用方式に応じて保護区間が自動的に切り替わることにより、いずれの運用においても保護リレーRYによる多端子送電系統30の保護が実現されている。 8 and 9 are flowcharts illustrating an example of the operation of the multi-terminal power transmission system protection system of FIG. 1. As shown below, the flowchart in Figure 8 shows the procedure when switching from 3-terminal operation to π-pulling operation on Line 2, and the flowchart in Figure 9 shows the procedure when switching from π-pulling operation on Line 2 to 3-terminal operation. Show the steps. By automatically switching the protection interval according to the operation method, protection of the multi-terminal power transmission system 30 by the protection relay RY is realized in any operation.

図8を参照して、ステップS100において、上位計算機35の制御によって図1の多端子送電系統30は、3端子運用中である。すなわち、開閉器SW1,SW2は閉状態であり、開閉器SW3は開状態である。 Referring to FIG. 8, in step S100, multi-terminal power transmission system 30 of FIG. 1 is in three-terminal operation under the control of host computer 35. That is, switches SW1 and SW2 are in a closed state, and switch SW3 is in an open state.

次のステップS105において、上位計算機35は、3端子運用から2号線のπ引き込み運用に切り替えるために、まず保護リレーRY5に対して遮断器CB5の切断指令を出力する。ステップS300において、通信路49または59を介して遮断器CB5の切断指令を受信した保護リレーRY5は、遮断器CB5を切断するための制御信号を遮断器CB5に出力する。 In the next step S105, the host computer 35 first outputs a command to disconnect the circuit breaker CB5 to the protection relay RY5 in order to switch from the three-terminal operation to the π pull-in operation of line 2. In step S300, protection relay RY5, which has received the command to disconnect circuit breaker CB5 via communication path 49 or 59, outputs a control signal for disconnecting circuit breaker CB5 to circuit breaker CB5.

その次のステップS110において、上位計算機35は、開閉器制御装置SWCUに対して開閉器SW1の切断指令を出力する。ステップS200において、通信路49または59を介して開閉器SW1の切断指令を受信した開閉器制御装置SWCUは、開閉器SW1を切断するための制御信号を開閉器SW1に出力する。 In the next step S110, the host computer 35 outputs a command to disconnect the switch SW1 to the switch control device SWCU. In step S200, the switch control device SWCU, which has received the command to disconnect the switch SW1 via the communication path 49 or 59, outputs a control signal for disconnecting the switch SW1 to the switch SW1.

その次のステップS115において、上位計算機35は、保護リレーRY2に対して遮断器CB2の切断指令を出力する。ステップS305において、通信路49または59を介して遮断器CB2の切断指令を受信した保護リレーRY2は、遮断器CB2を切断するための制御信号を遮断器CB2に出力する。 In the next step S115, the host computer 35 outputs a command to disconnect the circuit breaker CB2 to the protection relay RY2. In step S305, protection relay RY2, which has received the command to disconnect circuit breaker CB2 via communication path 49 or 59, outputs a control signal for disconnecting circuit breaker CB2 to circuit breaker CB2.

その次のステップS120において、上位計算機35は、開閉器制御装置SWCUに対して開閉器SW2の切断指令を出力する。ステップS205において、通信路49または59を介して開閉器SW2の切断指令を受信した開閉器制御装置SWCUは、開閉器SW2を切断するための制御信号を開閉器SW2に出力する。 In the next step S120, the host computer 35 outputs a command to disconnect the switch SW2 to the switch control device SWCU. In step S205, the switch control device SWCU, which has received the command to disconnect the switch SW2 via the communication path 49 or 59, outputs a control signal for disconnecting the switch SW2 to the switch SW2.

その次のステップS125において、上位計算機35は、開閉器制御装置SWCUに対して開閉器SW3の投入指令を出力する。ステップS210において、通信路49または59を介して開閉器SW3の投入指令を受信した開閉器制御装置SWCUは、開閉器SW3を投入するための制御信号を開閉器SW3に出力する。 In the next step S125, the host computer 35 outputs a closing command for the switch SW3 to the switch control device SWCU. In step S210, the switch control device SWCU, which has received the command to close the switch SW3 via the communication path 49 or 59, outputs a control signal for closing the switch SW3 to the switch SW3.

その次のステップS310において、各保護リレーRYは、上記の遮断器CB2,CB5および開閉器SW1~SW3の各々の投入または切断の順序が予め定められた順番に従っているか否かを判定する。これによって、運用方式の切替えが正当なものであるか否かが検証される。各保護リレーRYは、遮断器CBおよび開閉器SWの各々の投入または切断の順序が予め定められた順番に従っていない場合には(ステップS310でNO)、上位計算機35に対して異常を報知して処理を中断する。一方、各保護リレーRYは、遮断器CBおよび開閉器SWの各々の投入または切断の順序が予め定められた順番に従っている場合には(ステップS310でYES)、次のステップS315に処理を進める。 In the next step S310, each protection relay RY determines whether the order of closing or disconnecting the circuit breakers CB2, CB5 and switches SW1 to SW3 is in accordance with a predetermined order. This verifies whether the switching of the operation method is valid. Each protective relay RY notifies the host computer 35 of an abnormality if the order of closing or disconnecting the circuit breaker CB and the switch SW does not follow the predetermined order (NO in step S310). Interrupt processing. On the other hand, in each protection relay RY, when the order of closing or disconnecting the circuit breaker CB and the switch SW follows a predetermined order (YES in step S310), the process proceeds to the next step S315.

ステップS315において、各保護リレーRYの保護区間特定部62(図7を参照)は、2号線のπ引き込み運用に対応する保護区間を特定する。その次のステップS320において、各保護リレーRYはリレー動作をロックする。その次のステップS325において、各保護リレーRYのサンプリング同期制御部61は、特定した保護区間を構成する他の保護リレーRYと通信することによって、自端子と他端子との間で電流のサンプリングタイミングを同期させる。 In step S315, the protection section specifying unit 62 (see FIG. 7) of each protection relay RY specifies the protection section corresponding to the π pull-in operation of Line 2. In the next step S320, each protection relay RY locks its relay operation. In the next step S325, the sampling synchronization control unit 61 of each protection relay RY communicates with other protection relays RY constituting the specified protection interval to adjust the current sampling timing between its own terminal and other terminals. synchronize.

その次のステップS330において、各保護リレーRYは、差動リレー演算の演算式をπ引き込み運用の保護区間に対応したものに変更する。その次のステップS335において、各保護リレーRYはリレー動作のロックを解除する。以上によって、各保護リレーRYによる保護区間の切り替えが完了する。 In the next step S330, each protection relay RY changes the calculation formula for differential relay calculation to one corresponding to the protection section of the π pull-in operation. In the next step S335, each protection relay RY unlocks its relay operation. With the above steps, switching of protection sections by each protection relay RY is completed.

次のステップS130において、上位計算機35は、保護リレーRY5に対して遮断器CB5の投入指令を出力する。ステップS340において、通信路49または59を介して遮断器CB5の投入指令を受信した保護リレーRY5は、遮断器CB5を投入するための制御信号を遮断器CB5に出力する。 In the next step S130, host computer 35 outputs a closing command for circuit breaker CB5 to protection relay RY5. In step S340, protection relay RY5, which has received the closing command for circuit breaker CB5 via communication path 49 or 59, outputs a control signal for closing circuit breaker CB5 to circuit breaker CB5.

その次のステップS135において、上位計算機35は、保護リレーRY2に対して遮断器CB2の投入指令を出力する。ステップS345において、通信路49または59を介して遮断器CB2の投入指令を受信した保護リレーRY2は、遮断器CB2を投入するための制御信号を遮断器CB2に出力する。以上によって、3端子運用から2号線のπ引き込み運用への切り替えが完了する。 In the next step S135, the host computer 35 outputs a closing command for the circuit breaker CB2 to the protective relay RY2. In step S345, protection relay RY2, which has received the closing command for circuit breaker CB2 via communication path 49 or 59, outputs a control signal for closing circuit breaker CB2 to circuit breaker CB2. With the above steps, the switch from the 3-terminal operation to the π pull-in operation of Line 2 is completed.

図9を参照して、ステップS150において、上位計算機35の制御によって図1の多端子送電系統30は、2号線のπ引き込み運用中である。すなわち、開閉器SW1,SW2は開状態であり、開閉器SW3は閉状態である。 Referring to FIG. 9, in step S150, under the control of host computer 35, multi-terminal power transmission system 30 of FIG. That is, switches SW1 and SW2 are in an open state, and switch SW3 is in a closed state.

次のステップS155において、上位計算機35は、2号線のπ引き込み運用から3端子運用に切り替えるために、まず、保護リレーRY2に対して遮断器CB2の切断指令を出力する。ステップS350において、通信路49または59を介して遮断器CB2の切断指令を受信した保護リレーRY2は、遮断器CB2を切断するための制御信号を遮断器CB2に出力する。 In the next step S155, the host computer 35 first outputs a command to disconnect the circuit breaker CB2 to the protection relay RY2 in order to switch from the π pull-in operation to the 3-terminal operation of line 2. In step S350, protection relay RY2, which has received the command to disconnect circuit breaker CB2 via communication path 49 or 59, outputs a control signal for disconnecting circuit breaker CB2 to circuit breaker CB2.

その次のステップS160において、上位計算機35は、保護リレーRY5に対して遮断器CB5の切断指令を出力する。ステップS355において、通信路49または59を介して遮断器CB5の切断指令を受信した保護リレーRY5は、遮断器CB5を切断するための制御信号を遮断器CB5に出力する。 In the next step S160, host computer 35 outputs a command to disconnect circuit breaker CB5 to protection relay RY5. In step S355, protection relay RY5, which has received the command to disconnect circuit breaker CB5 via communication path 49 or 59, outputs a control signal for disconnecting circuit breaker CB5 to circuit breaker CB5.

その次のステップS165において、上位計算機35は、開閉器制御装置SWCUに対して開閉器SW3の切断指令を出力する。ステップS250において、通信路49または59を介して開閉器SW3の切断指令を受信した開閉器制御装置SWCUは、開閉器SW3を切断するための制御信号を開閉器SW3に出力する。 In the next step S165, the host computer 35 outputs a command to disconnect the switch SW3 to the switch control device SWCU. In step S250, the switch control device SWCU, which has received the command to disconnect the switch SW3 via the communication path 49 or 59, outputs a control signal for disconnecting the switch SW3 to the switch SW3.

その次のステップS170において、上位計算機35は、開閉器制御装置SWCUに対して開閉器SW2の投入指令を出力する。ステップS255において、通信路49または59を介して開閉器SW2の投入指令を受信した開閉器制御装置SWCUは、開閉器SW2を投入するための制御信号を開閉器SW2に出力する。 In the next step S170, the host computer 35 outputs a command to close the switch SW2 to the switch control device SWCU. In step S255, the switch control device SWCU, which has received the command to close the switch SW2 via the communication path 49 or 59, outputs a control signal for closing the switch SW2 to the switch SW2.

その次のステップS175において、上位計算機35は、開閉器制御装置SWCUに対して開閉器SW1の投入指令を出力する。ステップS260において、通信路49または59を介して開閉器SW1の投入指令を受信した開閉器制御装置SWCUは、開閉器SW1を投入するための制御信号を開閉器SW1に出力する。 In the next step S175, the host computer 35 outputs a command to close the switch SW1 to the switch control device SWCU. In step S260, the switch control device SWCU, which has received the command to close the switch SW1 via the communication path 49 or 59, outputs a control signal for closing the switch SW1 to the switch SW1.

その次のステップS360において、各保護リレーRYは、上記の遮断器CB2,CB5および開閉器SW1~SW3の各々の投入または切断の順序が予め定められた順番に従っているか否かを判定する。これによって、運用方式の切替えが正当なものであるか否かが検証される。各保護リレーRYは、遮断器CBおよび開閉器SWの各々の投入または切断の順序が予め定められた順番に従っていない場合には(ステップS360でNO)、上位計算機35に対して異常を報知して処理を中断する。一方、各保護リレーRYは、遮断器CBおよび開閉器SWの各々の投入または切断の順序が予め定められた順番に従っている場合には(ステップS360でYES)、次のステップS365に処理を進める。 In the next step S360, each protection relay RY determines whether the order of closing or disconnecting the circuit breakers CB2, CB5 and switches SW1 to SW3 is in accordance with a predetermined order. This verifies whether the switching of the operation method is valid. Each protective relay RY notifies the host computer 35 of an abnormality if the order of closing or disconnecting the circuit breaker CB and the switch SW does not follow the predetermined order (NO in step S360). Interrupt processing. On the other hand, in each protection relay RY, when the order of closing or disconnecting the circuit breaker CB and the switch SW follows a predetermined order (YES in step S360), the process proceeds to the next step S365.

ステップS365において、各保護リレーRYの保護区間特定部62(図7を参照)は、3端子運用に対応する保護区間を特定する。その次のステップS370において、各保護リレーRYはリレー動作をロックする。その次のステップS375において、各保護リレーRYのサンプリング同期制御部61は、特定した保護区間を構成する他の保護リレーRYと通信することによって、自端子と他端子との間で電流のサンプリングタイミングを同期させる。 In step S365, the protection section specifying unit 62 (see FIG. 7) of each protection relay RY specifies a protection section corresponding to three-terminal operation. In the next step S370, each protection relay RY locks relay operation. In the next step S375, the sampling synchronization control unit 61 of each protection relay RY communicates with other protection relays RY constituting the specified protection interval to adjust the current sampling timing between its own terminal and other terminals. synchronize.

その次のステップS380において、各保護リレーRYは、差動リレー演算の演算式を3端子運用の保護区間に対応したものに変更する。その次のステップS385において、各保護リレーRYはリレー動作のロックを解除する。以上によって、各保護リレーRYによる保護区間の切り替えが完了する。 In the next step S380, each protection relay RY changes the calculation formula for differential relay calculation to one corresponding to the protection section of three-terminal operation. In the next step S385, each protection relay RY unlocks its relay operation. With the above steps, switching of protection sections by each protection relay RY is completed.

その次のステップS180において、上位計算機35は、保護リレーRY2に対して遮断器CB2の投入指令を出力する。ステップS390において、通信路49または59を介して遮断器CB2の投入指令を受信した保護リレーRY2は、遮断器CB2を投入するための制御信号を遮断器CB2に出力する。 In the next step S180, host computer 35 outputs a closing command for circuit breaker CB2 to protection relay RY2. In step S390, protection relay RY2, which has received the command to close circuit breaker CB2 via communication path 49 or 59, outputs a control signal for closing circuit breaker CB2 to circuit breaker CB2.

次のステップS185において、上位計算機35は、保護リレーRY5に対して遮断器CB5の投入指令を出力する。ステップS395において、通信路49または59を介して遮断器CB5の投入指令を受信した保護リレーRY5は、遮断器CB5を投入するための制御信号を遮断器CB5に出力する。以上によって、2号線のπ引き込み運用から3端子運用への切り替えが完了する。 In the next step S185, host computer 35 outputs a closing command for circuit breaker CB5 to protection relay RY5. In step S395, protection relay RY5, which has received the closing command for circuit breaker CB5 via communication path 49 or 59, outputs a control signal for closing circuit breaker CB5 to circuit breaker CB5. With the above steps, the switching from the π lead-in operation to the 3-terminal operation of Line 2 is completed.

[実施の形態1の効果]
上記のとおり、多端子送電系統30を保護する保護システムにおいて、各保護リレーRYは、複数の開閉器の開閉状態の情報を取得し、複数の開閉器の開閉状態が変更されたときに、変更後の開閉状態に対応する保護区間を自動的に特定する。そして、各保護リレーRYは、変更後の保護区間の各端子における電流のサンプリングタイミングを同期させる。さらに、各保護リレーRYは、電流差動方式による演算対象の電流値を変更後の保護区間に対応するように自動的に変更する。これにより、開閉器の開閉状態の変更後の多端子送電系統30に対しても、電流差動方式による保護を継続することができる。
[Effects of Embodiment 1]
As described above, in the protection system that protects the multi-terminal power transmission system 30, each protection relay RY acquires information on the open/close states of multiple switches, and when the open/close states of multiple switches are changed, Automatically identify the protection zone corresponding to the subsequent opening/closing state. Then, each protection relay RY synchronizes the sampling timing of the current at each terminal of the changed protection section. Further, each protection relay RY automatically changes the current value to be calculated by the current differential method so as to correspond to the changed protection interval. Thereby, protection by the current differential method can be continued even for the multi-terminal power transmission system 30 after changing the open/close state of the switch.

また、上位計算機35は、複数の開閉器の開閉状態を変更するために少なくとも1つの保護リレーRYに対して対応する遮断器CBの開放指令を出力した後に、複数の開閉器SWの各々の投入指令または開放指令を出力する。その後、上位計算機35は、開放指令を出力した上記少なくとも1つの保護リレーRYに対して、対応する遮断器CBの投入指令を出力する。各保護リレーRYは、上位計算機35から出力された上記の遮断器CBの開放指令および各開閉器SWの投入指令および開放指令の出力順が予め定められた順番に従っているか否かを判定する。そして、各保護リレーRYは、各指令の出力順が予め定められた順番に従っている場合に、複数の開閉器SWの変更後の開閉状態に対応する保護区間に対して電流差動方式による保護を実行する。これによって、多端子送電系統30をより確実に保護することができる。 In addition, after outputting a command to open the corresponding circuit breaker CB to at least one protective relay RY in order to change the open/close states of the multiple switches, the host computer 35 closes each of the multiple switches SW. Output command or open command. Thereafter, the host computer 35 outputs a closing command for the corresponding circuit breaker CB to the at least one protection relay RY that has output the opening command. Each protection relay RY determines whether the output order of the above-mentioned opening command for circuit breaker CB and closing command and opening command for each switch SW outputted from host computer 35 follows a predetermined order. When the output order of each command follows a predetermined order, each protection relay RY provides protection using the current differential method for the protection section corresponding to the changed open/close state of the multiple switches SW. Execute. Thereby, the multi-terminal power transmission system 30 can be protected more reliably.

実施の形態2.
実施の形態2では、各保護リレーRYは保護リレー演算を実行せずに、上位計算機35が保護区間ごとの保護リレー演算をまとめて実行する場合について説明する。この場合、図7の演算処理部120には、保護リレー演算部63は設けられていない。各保護リレーRYは、A/D変換後の電流データを、通信路49または59を介して上位計算機35に送信する。
Embodiment 2.
In the second embodiment, a case will be described in which each protection relay RY does not execute protection relay calculations, but the host computer 35 collectively executes protection relay calculations for each protection section. In this case, the protection relay calculation unit 63 is not provided in the calculation processing unit 120 in FIG. Each protection relay RY transmits the current data after A/D conversion to the host computer 35 via the communication path 49 or 59.

図10は、実施の形態2による上位計算機の演算処理部の動作を示す機能ブロック図である。図10では、上位計算機35に接続されるネットワークスイッチ40,50と、上位計算機35を構成する通信回路311,312も併せて示されている。 FIG. 10 is a functional block diagram showing the operation of the arithmetic processing section of the host computer according to the second embodiment. In FIG. 10, network switches 40 and 50 connected to the host computer 35 and communication circuits 311 and 312 forming the host computer 35 are also shown.

図10を参照して、機能的に見ると演算処理部300は、保護区間特定部66と、保護リレー演算部67と、ロジック演算部68とを含む。これらの各機能は、CPU301がプログラムを実行することによって実現される。 Referring to FIG. 10, when viewed functionally, the arithmetic processing section 300 includes a protection section specifying section 66, a protection relay arithmetic section 67, and a logic arithmetic section 68. Each of these functions is realized by the CPU 301 executing a program.

保護区間特定部66は、開閉器SW1~SW3の開閉状態を変更することにより運用方式を切り替えたときに、切り替え後の運用方式に対応する全ての保護区間を特定する。たとえば、開閉器SW1~SW3の開閉状態のパターンと各パターンに対応する全ての保護区間との対応関係を表す情報がメモリ(ROM303、不揮発性メモリ304)に予め格納されている。保護区間特定部66は、この対応関係を表す情報に基づいて、開閉器SW1~SW3の開閉状態に対応する全ての保護区間を特定する。 When the operation mode is switched by changing the open/closed state of the switches SW1 to SW3, the protection zone specifying unit 66 specifies all the protection zones corresponding to the switched operation mode. For example, information representing the correspondence between the open/close state patterns of the switches SW1 to SW3 and all the protection intervals corresponding to each pattern is stored in advance in the memory (ROM 303, nonvolatile memory 304). The protection section specifying unit 66 specifies all the protection sections corresponding to the open/closed states of the switches SW1 to SW3 based on the information representing this correspondence.

保護リレー演算部67は、保護リレーRY1~RY6の各々によってサンプリングされた電流データを受信する。保護リレー演算部67は、受信した電流データに基づいて、保護区間ごとに電流差動方式によるリレー演算を実行する。 Protection relay calculation unit 67 receives current data sampled by each of protection relays RY1 to RY6. The protection relay calculation unit 67 performs relay calculation using a current differential method for each protection section based on the received current data.

ロジック演算部68は、保護区間ごとの保護リレー演算結果に基づいて内部事故が発生している保護区間があった場合には、当該事故区間を多端子送電系統30から分離するために、当該事故区間に対応する各保護リレーRYに対して遮断器CBの開放指令を出力する。 If there is a protection section in which an internal accident has occurred based on the protection relay calculation result for each protection section, the logic calculation unit 68 is configured to detect the accident in order to separate the fault section from the multi-terminal power transmission system 30. A circuit breaker CB opening command is output to each protective relay RY corresponding to the section.

[実施の形態2の変形例]
保護リレーRY1~RY6のうちいずれか1つが全部の保護リレー演算をまとめて実行するように構成されていてもよい。たとえば、保護リレーRY1が全部の保護リレー演算をまとめて実行する場合には、保護リレーRY2~RY6の各々の演算処理部120には、保護リレー演算部63は設けられていない。保護リレーRY2~RY6の各々は、A/D変換後の電流データを、通信路49または59を介して保護リレーRY1に送信する。
[Modification of Embodiment 2]
Any one of protection relays RY1 to RY6 may be configured to execute all protection relay calculations at once. For example, when protection relay RY1 executes all protection relay calculations at once, protection relay calculation unit 63 is not provided in calculation processing unit 120 of each of protection relays RY2 to RY6. Each of protection relays RY2 to RY6 transmits the current data after A/D conversion to protection relay RY1 via communication path 49 or 59.

保護リレーRY1の保護区間特定部62は、開閉器SW1~SW3の開閉状態が変更されたときには、変更後の開閉器SW1~SW3の開閉状態に対応する全ての保護区間を特定する。開閉器SW1~SW3の開閉状態のパターンと各パターンに対応する全ての保護区間との対応関係を表す情報がメモリ(ROM123、不揮発性メモリ124)に予め格納されている。保護区間特定部62は、この対応関係を表す情報に基づいて、開閉器SW1~SW3の開閉状態に対応する全ての保護区間を特定する。 When the open/close states of the switches SW1 to SW3 are changed, the protection section specifying unit 62 of the protection relay RY1 specifies all the protection sections corresponding to the changed open/close states of the switches SW1 to SW3. Information representing the correspondence between the open/close state patterns of the switches SW1 to SW3 and all the protection intervals corresponding to each pattern is stored in advance in the memory (ROM 123, nonvolatile memory 124). The protection section specifying unit 62 specifies all the protection sections corresponding to the open/closed states of the switches SW1 to SW3 based on the information representing this correspondence relationship.

保護リレー演算部63は、保護リレーRY2~RY6の各々によってサンプリングされた電流データを受信する。保護リレー演算部63は、自らがサンプリングした自端の電流データと受信した電流データとに基づいて、保護区間ごとに電流差動方式によるリレー演算を実行する。 Protection relay calculation unit 63 receives current data sampled by each of protection relays RY2 to RY6. The protection relay calculation section 63 performs relay calculation using a current differential method for each protection section based on the current data of the own end sampled by itself and the received current data.

ロジック演算部64は、保護区間ごとの保護リレー演算結果に基づいて内部事故が発生している保護区間があった場合には、当該事故区間を多端子送電系統30から分離するために、当該事故区間に対応する各保護リレーRYに対して遮断器CBの開放指令を出力する。自端子が事故区間に含まれている場合には、ロジック演算部64は、対応する遮断器CB1に対してトリップ信号を出力する。 If there is a protection section in which an internal accident has occurred based on the protection relay calculation result for each protection section, the logic calculation unit 64 is configured to detect the accident in order to separate the fault section from the multi-terminal power transmission system 30. A circuit breaker CB opening command is output to each protective relay RY corresponding to the section. When the own terminal is included in the fault section, the logic calculation unit 64 outputs a trip signal to the corresponding circuit breaker CB1.

実施の形態3.
実施の形態3では、同一の変電所に設けられた保護リレーRYが共通のユニットとして構成されている場合において、保護リレーユニット間のネットワーク構成を説明する。
Embodiment 3.
In Embodiment 3, a network configuration between protection relay units will be described in a case where protection relays RY provided in the same substation are configured as a common unit.

図11は、実施の形態3の保護システムにおいて、イーサネットによる通信路の構成例を示す図である。図11に示すように、変電所31において、保護リレー要素RY1,RY2は共通の保護リレーユニットRY1&RY2として設けられる。変電所32において、保護リレー要素RY3,RY4は共通の保護リレーユニットRY3&RY4として設けられる。変電所33において、保護リレー要素RY5,RY6は共通の保護リレーユニットRY5&RY6として設けられる。 FIG. 11 is a diagram showing a configuration example of a communication path using Ethernet in the protection system of the third embodiment. As shown in FIG. 11, in the substation 31, the protection relay elements RY1 and RY2 are provided as a common protection relay unit RY1 & RY2. In the substation 32, the protection relay elements RY3, RY4 are provided as a common protection relay unit RY3&RY4. In the substation 33, the protection relay elements RY5, RY6 are provided as a common protection relay unit RY5&RY6.

保護リレーユニットRY1&RY2は、ネットワークスイッチ41,51の各々と接続される。すなわち、保護リレー要素RY1,RY2は、図4の通信回路131,132を共有化している。同様に、保護リレーユニットRY3&RY4はネットワークスイッチ45,55の各々と接続され、保護リレーユニットRY5&RY6はネットワークスイッチ43,53と接続される。 Protection relay units RY1 & RY2 are connected to each of network switches 41 and 51. That is, the protection relay elements RY1 and RY2 share the communication circuits 131 and 132 in FIG. 4. Similarly, protection relay units RY3 & RY4 are connected to each of network switches 45, 55, and protection relay units RY5 & RY6 are connected to network switches 43, 53.

ネットワークスイッチ40,41,43,45,47が光ファイバ39を介して接続されることによって、上位計算機35、保護リレーユニットRY1&RY2、保護リレーユニットRY5&RY6、保護リレーユニットRY3&RY4、および開閉器制御装置SWCUを接続する第1の通信路49が構成される。同様に、ネットワークスイッチ50,51,53,55,57が光ファイバ39を介して接続されることによって、上位計算機35、保護リレーユニットRY1&RY2、保護リレーユニットRY5&RY6、保護リレーユニットRY3&RY4、および開閉器制御装置SWCUを接続する第2の通信路59が構成される。 By connecting network switches 40, 41, 43, 45, and 47 via optical fiber 39, host computer 35, protection relay units RY1 & RY2, protection relay units RY5 & RY6, protection relay units RY3 & RY4, and switch control device SWCU are connected. A first communication path 49 to be connected is configured. Similarly, network switches 50, 51, 53, 55, and 57 are connected via optical fiber 39, thereby controlling host computer 35, protection relay units RY1 & RY2, protection relay units RY5 & RY6, protection relay units RY3 & RY4, and switch control. A second communication path 59 is configured to connect the devices SWCU.

上記の構成によれば、ネットワークスイッチの個数を削減することができる。なお、実施の形態3は、実施の形態2およびその変形例と組み合わせることができる。 According to the above configuration, the number of network switches can be reduced. Note that Embodiment 3 can be combined with Embodiment 2 and its modifications.

実施の形態4.
実施の形態4では、全ての送電線の全端子において、最初にサンプリングタイミングの同期を確立する場合について説明する。各保護リレーRYが光ファイバまたは複数の通信装置経由で接続されることにより、全保護リレー間で同一のサンプリング同期を実現できる。また、GPS信号を利用して保護リレーRYごとに内蔵の時計を同期化することより全端子におけるサンプリング同期を行ってもよい。
Embodiment 4.
In Embodiment 4, a case will be described in which sampling timing synchronization is first established at all terminals of all power transmission lines. By connecting each protection relay RY via an optical fiber or a plurality of communication devices, it is possible to achieve the same sampling synchronization among all protection relays. Alternatively, sampling synchronization at all terminals may be performed by synchronizing the built-in clock of each protection relay RY using a GPS signal.

図12および図13は、実施の形態4による多端子送電系統の保護システムの動作の一例を示すフローチャートである。図12のフローチャートは、3端子運用から2号線のπ引き込み運用に切り替わる際の手順を示し、図13のローチャートは、2号線のπ引き込み運用から3端子運用に切り替わる際の手順を示す。図12および図13のフローチャートは、図8および図9のフローチャートにそれぞれ対応している。以下では、図8および図9のフローチャートと共通するステップについては、同一の参照符号を付すことにより基本的に説明を繰り返さない。 12 and 13 are flowcharts illustrating an example of the operation of the multi-terminal power transmission system protection system according to the fourth embodiment. The flowchart in FIG. 12 shows the procedure when switching from 3-terminal operation to π-pulling operation of Line 2, and the flowchart in FIG. 13 shows the procedure when switching from π-pulling operation of Line 2 to 3-terminal operation. The flowcharts in FIGS. 12 and 13 correspond to the flowcharts in FIGS. 8 and 9, respectively. Hereinafter, steps common to those in the flowcharts of FIGS. 8 and 9 will be given the same reference numerals and the description will not be repeated.

図12を参照して、全保護リレーRYは、サンプリング同期を確立済みである(ステップS3000)。本方式では、開閉器の切り替えに伴う保護区間の変更によらず、各々の保護区間で必要とされる差動電流リレー演算を、各保護リレーRYが常に計算できる。この結果、保護区間が変更されても、出力すべき保護リレー演算結果を切り替えるだけよいので、リレー動作のロックおよびロック解除を実行する必要がない。 Referring to FIG. 12, all-protection relay RY has established sampling synchronization (step S3000). In this method, each protection relay RY can always calculate the differential current relay calculation required for each protection section, regardless of changes in protection sections due to switch switching. As a result, even if the protection interval is changed, it is only necessary to switch the protection relay calculation result to be output, so there is no need to lock and unlock the relay operation.

その後のステップS100~S125、ステップS200~S210、およびステップS300~S310までは、図8のフローチャートと同様の手順であるので説明を繰り返さない。 The subsequent steps S100 to S125, steps S200 to S210, and steps S300 to S310 are the same procedures as in the flowchart of FIG. 8, so the description will not be repeated.

次のステップS315において、各保護リレーRYの保護区間特定部62(図7を参照)は、2号線のπ引き込み運用に対応する保護区間を特定する。その次のステップS330において、各保護リレーRYは、差動リレー演算の演算式をπ引き込み運用の保護区間に対応したものに変更する。 In the next step S315, the protection section specifying unit 62 (see FIG. 7) of each protection relay RY specifies the protection section corresponding to the π pull-in operation of Line 2. In the next step S330, each protection relay RY changes the calculation formula for differential relay calculation to one corresponding to the protection section of the π pull-in operation.

図8の場合には、各保護リレーRYのリレー動作をロックするステップS320と、特定した保護区間内の各端子におけるサンプリング同期を確立するステップS325と、リレー動作のロックを解除するステップS335とが必要であった。しかしながら、図12の場合にはこれらのステップS320,S325,S335は必要でない。全端子についてのサンプリング同期は確立済みであり、さらに、遮断器CBの開放によって、保護区間の変更に関係する電流変成器CTには電流が流れていないので、リレー動作を停止する必要はない。どのような保護区間に変更されても即座に電流差動リレー方式に従う演算を実行し、演算結果を出力できる。 In the case of FIG. 8, step S320 locks the relay operation of each protection relay RY, step S325 establishes sampling synchronization at each terminal within the specified protection interval, and step S335 unlocks the relay operation. It was necessary. However, in the case of FIG. 12, these steps S320, S325, and S335 are not necessary. Sampling synchronization for all terminals has been established, and furthermore, with the opening of the circuit breaker CB, no current flows through the current transformer CT involved in changing the protection zone, so there is no need to stop the relay operation. No matter what protection interval is changed, calculations according to the current differential relay system can be executed immediately and the calculation results can be output.

その後、上位計算機35からの投入指令(ステップS130,S135)に基づいて、遮断器CB5および遮断器CB2が投入される(ステップS340,S345)ことによって、3端子運用から2号線のπ引き込み運用への切り替えが完了する。 Thereafter, based on the closing command from the host computer 35 (steps S130, S135), circuit breaker CB5 and circuit breaker CB2 are closed (steps S340, S345), thereby changing the 3-terminal operation to the π pull-in operation of Line 2. The switching is completed.

図13を参照して、全保護リレーは、サンプリング同期を確立済みである(ステップS3500)。その後のステップS150~S175、ステップS250~S260、およびステップS350~S360までは、図9のフローチャートと同様の手順であるので説明を繰り返さない。 Referring to FIG. 13, all protection relays have established sampling synchronization (step S3500). The subsequent steps S150 to S175, steps S250 to S260, and steps S350 to S360 are the same procedures as in the flowchart of FIG. 9, so the description will not be repeated.

次のステップS365において、各保護リレーRYの保護区間特定部62(図7を参照)は、3端子運用に対応する保護区間を特定する。その次のステップS380において、各保護リレーRYは、差動リレー演算の演算式を3端子運用の保護区間に対応したものに変更する。 In the next step S365, the protection section specifying unit 62 (see FIG. 7) of each protection relay RY specifies a protection section corresponding to three-terminal operation. In the next step S380, each protection relay RY changes the calculation formula for differential relay calculation to one corresponding to the protection section of three-terminal operation.

図13の場合には、図9の場合と異なり、各保護リレーRYのリレー動作をロックするステップS370と、特定した保護区間内の各端子におけるサンプリング同期を確立するステップS375と、リレー動作のロックを解除するステップS385とを必要としない。図12で説明したように、全端子についてのサンプリング同期は確立済みであり、さらに、遮断器CBの開放によって、保護区間の変更に関係する電流変成器CTには電流が流れていないので、リレー動作を停止する必要はないからである。 In the case of FIG. 13, unlike the case of FIG. 9, there are a step S370 of locking the relay operation of each protection relay RY, a step S375 of establishing sampling synchronization at each terminal within the specified protection interval, and a step S375 of locking the relay operation. Step S385 for canceling is not necessary. As explained in Fig. 12, sampling synchronization for all terminals has been established, and furthermore, due to the opening of circuit breaker CB, no current flows through the current transformer CT related to the protection interval change, so the relay This is because there is no need to stop the operation.

その後、上位計算機35からの投入指令(ステップS180,S185)に基づいて、遮断器CB2および遮断器CB5が投入される(ステップS390,S395)ことによって、2号線のπ引き込み運用から3端子運用への切り替えが完了する。 Thereafter, based on the closing command from the host computer 35 (steps S180, S185), circuit breaker CB2 and circuit breaker CB5 are closed (steps S390, S395), thereby changing the line 2 from π pull-in operation to 3-terminal operation. The switching is completed.

[実施の形態1~4の変形例]
図4~図6において、保護リレーRY、開閉器制御装置SWCU、および上位計算機35のハードウェア構成例を示したが、他の構成であっても構わない。たとえば、CPUは複数設けられていてもよい。演算処理部120,200,300は、ASIC(Application Specific Integrated Circuit)などの専用の回路として構成されていてもよいし、FPGA(Field Programmable Gate Array)を利用して構成されていてもよい。もしくは、演算処理部120,200,300は、CPU、ASIC、FPGAのうちの少なくとも2つを適宜組み合わせることによって構成されていてもよい。また、上位計算機35は、複数のサーバ装置によって構成されていてもよい。
[Modifications of Embodiments 1 to 4]
In FIGS. 4 to 6, examples of the hardware configuration of the protection relay RY, the switch control device SWCU, and the host computer 35 are shown, but other configurations may be used. For example, a plurality of CPUs may be provided. The arithmetic processing units 120, 200, and 300 may be configured as a dedicated circuit such as an ASIC (Application Specific Integrated Circuit), or may be configured using an FPGA (Field Programmable Gate Array). Alternatively, the arithmetic processing units 120, 200, and 300 may be configured by appropriately combining at least two of a CPU, an ASIC, and an FPGA. Further, the host computer 35 may be configured by a plurality of server devices.

今回開示された実施の形態はすべての点で例示であって制限的なものでないと考えられるべきである。この出願の範囲は上記した説明ではなくて請求の範囲によって示され、請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。 The embodiments disclosed this time should be considered to be illustrative in all respects and not restrictive. The scope of this application is indicated by the claims rather than the above description, and it is intended that all changes within the meaning and range equivalent to the claims are included.

1L,2L 送電線、30 多端子送電系統、31~33 変電所、34 制御所、35 上位計算機、40~47,50~57 ネットワークスイッチ、49,59 通信路、61 サンプリング同期制御部、62,66 保護区間特定部、63,67 保護リレー演算部、64,68 ロジック演算部、120,200,300 演算処理部、CB 遮断器、CT 電流変成器、RY 保護リレー、SW 開閉器、SWCU 開閉器制御装置。 1L, 2L power transmission line, 30 multi-terminal power transmission system, 31-33 substation, 34 control center, 35 host computer, 40-47, 50-57 network switch, 49, 59 communication path, 61 sampling synchronization control unit, 62, 66 protection zone identification unit, 63, 67 protection relay calculation unit, 64, 68 logic calculation unit, 120, 200, 300 calculation processing unit, CB circuit breaker, CT current transformer, RY protection relay, SW switch, SWCU switch Control device.

Claims (9)

多端子送電系統の保護システムであって、
前記多端子送電系統は、3箇所以上の変電所間を接続する複数の送電線を含み、
前記複数の送電線の各々は、前記3箇所以上の変電所のうちいずれか1つの変電所と他の1つ以上の変電所との間を接続し、
前記多端子送電系統は、さらに、
1つ以上の送電線および送電線間に設けられた複数の開閉器と、
各前記送電線の端子に隣接して個別に設けられた複数の遮断器とを含み、
前記保護システムは、前記複数の送電線の各端子に対応して個別に設けられ、互いに通信路を介して接続された複数の保護リレーを備え、
前記複数の保護リレーの各々は、
前記複数の開閉器の開閉状態が変更されたときに、前記複数の開閉器の変更後の開閉状態の情報に基づいて対応する送電線の自端子に電気的に接続される全ての他端子を特定することによって、電流差動方式を用いて保護すべき保護区間を特定する保護区間特定部と、
自端子でサンプリングされた電流値と前記特定された各他端子でサンプリングされた電流値とに基づいて、電流差動方式によるリレー演算を行う保護リレー演算部とを備える、多端子送電系統の保護システム。
A protection system for a multi-terminal power transmission system, comprising:
The multi-terminal power transmission system includes a plurality of power transmission lines connecting three or more substations,
Each of the plurality of power transmission lines connects any one substation among the three or more substations and one or more other substations,
The multi-terminal power transmission system further includes:
one or more power transmission lines and a plurality of switches provided between the power transmission lines;
a plurality of circuit breakers individually provided adjacent to the terminals of each of the power transmission lines;
The protection system includes a plurality of protection relays provided individually corresponding to each terminal of the plurality of power transmission lines and connected to each other via a communication path,
Each of the plurality of protection relays includes:
When the open/close states of the plurality of switches are changed, all other terminals electrically connected to the own terminal of the corresponding power transmission line are connected based on information on the changed open/close states of the plurality of switches. a protection area identification unit that identifies a protection area to be protected using a current differential method by specifying the protection area;
Protection of a multi-terminal power transmission system, comprising a protective relay calculation unit that performs relay calculation using a current differential method based on a current value sampled at the own terminal and a current value sampled at each of the specified other terminals. system.
前記複数の保護リレーの各々は、
前記複数の開閉器の開閉状態が変更されたときに、前記自端子における電流のサンプリングタイミングと、前記特定された各他端子における電流のサンプリングタイミングとを同期させるサンプリング同期制御部をさらに備える、請求項1に記載の多端子送電系統の保護システム。
Each of the plurality of protection relays includes:
The present invention further comprises a sampling synchronization control unit that synchronizes the sampling timing of the current at the own terminal and the sampling timing of the current at each of the specified other terminals when the open/close states of the plurality of switches are changed. A protection system for a multi-terminal power transmission system according to item 1.
前記複数の保護リレーの各々は、
前記自端子における電流のサンプリングタイミングと、前記自端子を除く前記複数の送電線の全ての端子における電流のサンプリングタイミングとを同期させるサンプリング同期制御部をさらに備える、請求項1に記載の多端子送電系統の保護システム。
Each of the plurality of protection relays includes:
The multi-terminal power transmission according to claim 1, further comprising a sampling synchronization control unit that synchronizes sampling timing of current at the own terminal and sampling timing of current at all terminals of the plurality of power transmission lines except the own terminal. Grid protection system.
前記複数の保護リレーの各々は、前記複数の開閉器の開閉状態のパターンと各パターンに対応する保護区間との対応関係を表す情報を格納するメモリを備え、
前記保護区間特定部は、前記対応関係を表す情報に基づいて、前記複数の開閉器の変更後の開閉状態に対応する保護区間を特定する、請求項1~3のいずれか1項に記載の多端子送電系統の保護システム。
Each of the plurality of protection relays includes a memory that stores information representing a correspondence relationship between open/closed state patterns of the plurality of switches and protection intervals corresponding to each pattern,
4. The protection area specifying unit identifies a protection area corresponding to a changed open/closed state of the plurality of switches based on information representing the correspondence relationship. Protection systems for multi-terminal power transmission systems.
前記保護システムは、さらに、
前記通信路に接続され、前記複数の開閉器の開閉状態を制御する開閉器制御装置と、
前記通信路に接続され、前記複数の開閉器の各々の投入指令または開放指令を前記開閉器制御装置に出力する上位計算機とを備え、
前記上位計算機は、前記複数の開閉器の開閉状態を変更するために少なくとも1つの保護リレーに対して、対応する端子に隣接して設けられた遮断器の開放指令を出力した後に、前記複数の開閉器の各々の投入指令または開放指令を出力し、その後、前記開放指令の出力先である前記少なくとも1つの保護リレーに対して、対応する遮断器の投入指令を出力する、請求項1~4のいずれか1項に記載の多端子送電系統の保護システム。
The protection system further comprises:
a switch control device connected to the communication path and controlling the open/close states of the plurality of switches;
a host computer connected to the communication path and outputting a closing command or opening command for each of the plurality of switches to the switch control device;
The host computer outputs a command to open a circuit breaker provided adjacent to a corresponding terminal to at least one protection relay in order to change the open/close state of the plurality of switches, and then Claims 1 to 4, wherein a closing command or opening command for each of the switches is output, and then a closing command for the corresponding circuit breaker is output to the at least one protection relay to which the opening command is output. A protection system for a multi-terminal power transmission system according to any one of the above.
前記複数の保護リレーの各々は、前記少なくとも1つの保護リレーに対して出力された対応する遮断器の開放指令ならびに前記複数の開閉器の各々の投入指令または開放指令の出力順が予め定められた順番に従っているか否かを判定する、請求項5に記載の多端子送電系統の保護システム。 Each of the plurality of protection relays has a predetermined output order of the opening command of the corresponding circuit breaker outputted to the at least one protection relay and the closing command or opening command of each of the plurality of switches. The protection system for a multi-terminal power transmission system according to claim 5, which determines whether or not the order is followed. 前記複数の保護リレーの各々は、前記出力順が予め定められた順番に従っている場合に、前記複数の開閉器の変更後の開閉状態に対応する保護区間に対して電流差動方式による保護を実行する、請求項6に記載の多端子送電系統の保護システム。 Each of the plurality of protection relays performs protection using a current differential method for a protection section corresponding to a changed open/closed state of the plurality of switches when the output order follows a predetermined order. The protection system for a multi-terminal power transmission system according to claim 6. 多端子送電系統の保護システムであって、
前記多端子送電系統は、3箇所以上の変電所間を接続する複数の送電線を含み、
前記複数の送電線の各々は、前記3箇所以上の変電所のうちいずれか1つの変電所と他の1つ以上の変電所との間を接続し、
前記多端子送電系統は、さらに、
1つ以上の送電線および送電線間に設けられた複数の開閉器と、
各前記送電線の端子に隣接して個別に設けられた複数の遮断器とを含み、
前記保護システムは、
前記複数の送電線の各端子に対応して個別に設けられ、互いに通信路を介して接続された複数の保護リレーと、
前記通信路を介して前記複数の保護リレーに接続された上位計算機とを備え、
前記上位計算機は、
前記複数の開閉器の開閉状態が変更されたときに、前記複数の開閉器の変更後の開閉状態の情報に基づいて電流差動方式を用いて保護すべき全ての保護区間を特定する保護区間特定部と、
前記全ての保護区間の各々について、各端子でサンプリングされた電流値に基づいて電流差動方式によるリレー演算を行う保護リレー演算部とを含む、多端子送電系統の保護システム。
A protection system for a multi-terminal power transmission system, comprising:
The multi-terminal power transmission system includes a plurality of power transmission lines connecting three or more substations,
Each of the plurality of power transmission lines connects any one substation among the three or more substations and one or more other substations,
The multi-terminal power transmission system further includes:
one or more power transmission lines and a plurality of switches provided between the power transmission lines;
a plurality of circuit breakers individually provided adjacent to the terminals of each of the power transmission lines;
The protection system includes:
a plurality of protection relays provided individually corresponding to each terminal of the plurality of power transmission lines and connected to each other via a communication path;
and a host computer connected to the plurality of protection relays via the communication path,
The upper level computer is
A protection interval that identifies all protection intervals to be protected using a current differential method based on information on the changed open/close states of the plurality of switches when the open/close states of the plurality of switches are changed. A specific part,
A protection system for a multi-terminal power transmission system, comprising: a protection relay calculation unit that performs relay calculation using a current differential method based on current values sampled at each terminal for each of all of the protection intervals.
多端子送電系統の保護システムであって、
前記多端子送電系統は、3箇所以上の変電所間を接続する複数の送電線を含み、
前記複数の送電線の各々は、前記3箇所以上の変電所のうちいずれか1つの変電所と他の1つ以上の変電所との間を接続し、
前記多端子送電系統は、さらに、
1つ以上の送電線および送電線間に設けられた複数の開閉器と、
各前記送電線の端子に隣接して個別に設けられた複数の遮断器とを含み、
前記保護システムは、
前記複数の送電線の各端子に対応して個別に設けられ、互いに通信路を介して接続された複数の保護リレーを備え、
前記複数の保護リレーのうちの第1の保護リレーは、
前記複数の開閉器の開閉状態が変更されたときに、前記複数の開閉器の変更後の開閉状態の情報に基づいて電流差動方式を用いて保護すべき全ての保護区間を特定する保護区間特定部と、
前記全ての保護区間の各々について、各端子でサンプリングされた電流値に基づいて電流差動方式によるリレー演算を行う保護リレー演算部とを含む、多端子送電系統の保護システム。
A protection system for a multi-terminal power transmission system, comprising:
The multi-terminal power transmission system includes a plurality of power transmission lines connecting three or more substations,
Each of the plurality of power transmission lines connects any one substation among the three or more substations and one or more other substations,
The multi-terminal power transmission system further includes:
one or more power transmission lines and a plurality of switches provided between the power transmission lines;
a plurality of circuit breakers individually provided adjacent to the terminals of each of the power transmission lines;
The protection system includes:
comprising a plurality of protection relays individually provided corresponding to each terminal of the plurality of power transmission lines and connected to each other via a communication path,
The first protection relay among the plurality of protection relays is
A protection interval that identifies all protection intervals to be protected using a current differential method based on information on the changed open/close states of the plurality of switches when the open/close states of the plurality of switches are changed. A specific part,
A protection system for a multi-terminal power transmission system, comprising: a protection relay calculation unit that performs relay calculation using a current differential method based on current values sampled at each terminal for each of all of the protection intervals.
JP2020028568A 2020-02-21 2020-02-21 Protection systems for multi-terminal power transmission systems Active JP7390926B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020028568A JP7390926B2 (en) 2020-02-21 2020-02-21 Protection systems for multi-terminal power transmission systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020028568A JP7390926B2 (en) 2020-02-21 2020-02-21 Protection systems for multi-terminal power transmission systems

Publications (2)

Publication Number Publication Date
JP2021136707A JP2021136707A (en) 2021-09-13
JP7390926B2 true JP7390926B2 (en) 2023-12-04

Family

ID=77661849

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020028568A Active JP7390926B2 (en) 2020-02-21 2020-02-21 Protection systems for multi-terminal power transmission systems

Country Status (1)

Country Link
JP (1) JP7390926B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7692854B2 (en) * 2022-02-02 2025-06-16 三菱電機株式会社 Protection Relay System

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000050532A (en) 1998-07-27 2000-02-18 Hitachi Ltd Power system monitoring and control system
JP2019068561A (en) 2017-09-29 2019-04-25 株式会社日立製作所 Communications system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3556044B2 (en) * 1996-04-24 2004-08-18 東京電力株式会社 Current differential relay
JPH1042463A (en) * 1996-07-22 1998-02-13 Meidensha Corp Current differential protective relay system
JP3452751B2 (en) * 1997-03-13 2003-09-29 三菱電機株式会社 Power system protection relay

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000050532A (en) 1998-07-27 2000-02-18 Hitachi Ltd Power system monitoring and control system
JP2019068561A (en) 2017-09-29 2019-04-25 株式会社日立製作所 Communications system

Also Published As

Publication number Publication date
JP2021136707A (en) 2021-09-13

Similar Documents

Publication Publication Date Title
Miller et al. Modern line current differential protection solutions
CN103117537B (en) Power distribution network area protection method and system
CA1139415A (en) Multi-terminal protective relay system
JP5466092B2 (en) Multi-terminal power line protection relay system
KR20080023155A (en) System to protect, control and monitor the transmission of power energy
CN108616111B (en) Multi-end T-connection power transmission line optical fiber differential protection method based on interpolation synchronization
EP2206208B1 (en) Differential protection method, system and device
JP5020421B1 (en) Protection control device
CN104319905B (en) A kind of rapidly self-healing system of distribution network
JP7390926B2 (en) Protection systems for multi-terminal power transmission systems
JP6186978B2 (en) Protection monitoring control system
JP5507025B1 (en) Current differential relay
JP2001045645A (en) Power system wide area protection system and method, and program recording medium
CN106329492B (en) A kind of simple bus bar protecting method based on system topological
JP2013115869A (en) Power transmission line protection relay device
CN110932244B (en) Relay protection method for no-switching of all-station protection outlet pressure plates of transformer substation
JP6570476B2 (en) Current differential protection relay device
US11079436B2 (en) Multiple merging unit testing system
JP2008259327A (en) Reclosing system
CN117791524A (en) Multi-zone protection system for distribution network
JP2025024987A (en) Control device
CN201282358Y (en) Standby power supply self-casting device based on optical fibre communication
JP7531387B2 (en) Protection and Control System
Atienza et al. Improving breaker failure clearing times
JP2026042391A (en) Multi-terminal transmission system protection system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230116

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20231006

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20231024

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20231121

R150 Certificate of patent or registration of utility model

Ref document number: 7390926

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150