Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7401894B2 - Target preparation time notification device for corrugated sheet box making machine - Google Patents
[go: Go Back, main page]

JP7401894B2 - Target preparation time notification device for corrugated sheet box making machine - Google Patents

Target preparation time notification device for corrugated sheet box making machine Download PDF

Info

Publication number
JP7401894B2
JP7401894B2 JP2019182232A JP2019182232A JP7401894B2 JP 7401894 B2 JP7401894 B2 JP 7401894B2 JP 2019182232 A JP2019182232 A JP 2019182232A JP 2019182232 A JP2019182232 A JP 2019182232A JP 7401894 B2 JP7401894 B2 JP 7401894B2
Authority
JP
Japan
Prior art keywords
time
order
target preparation
printing
preparation time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019182232A
Other languages
Japanese (ja)
Other versions
JP2021054028A (en
Inventor
純一 児玉
佳道 高橋
純也 安田
誠孟 北川
Original Assignee
株式会社Isowa
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社Isowa filed Critical 株式会社Isowa
Priority to JP2019182232A priority Critical patent/JP7401894B2/en
Publication of JP2021054028A publication Critical patent/JP2021054028A/en
Application granted granted Critical
Publication of JP7401894B2 publication Critical patent/JP7401894B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Inking, Control Or Cleaning Of Printing Machines (AREA)
  • General Factory Administration (AREA)
  • Making Paper Articles (AREA)

Description

本発明は、段ボールシート製函機の目標準備時間報知装置に係わり、特に、製函機による段ボール箱の生産のオーダチェンジ時に必要な作業内容に応じた目標準備時間を算出して作業者に報知する段ボールシート製函機の目標準備時間報知装置に関する。 The present invention relates to a target preparation time notification device for a corrugated sheet box making machine, and in particular, it calculates a target preparation time according to the work content required at the time of an order change in the production of corrugated boxes by a box making machine, and notifies the operator of the target preparation time. The present invention relates to a target preparation time notification device for a corrugated sheet box making machine.

従来、段ボールシートに印刷、溝切り、打ち抜きを施すと共に複数の罫線を施し、これらの各罫線の位置で折り曲げて接合することにより段ボール箱を生産する製函機が知られている。ここで、近年、産業界全体における他品種少量生産の製品に対応すべく、段ボール箱にも他品種少量生産が求められている。このような状況下、製函機により段ボール箱を生産する工場では、客先から受けたオーダを次々に切り替えながら、多いときには一日に100以上の多数のオーダに係る段ボール箱を生産している。 BACKGROUND ART Box-making machines are conventionally known that produce corrugated boxes by printing, grooving, punching, and providing a plurality of ruled lines on corrugated cardboard sheets, and then bending and joining the sheets at the positions of these ruled lines. In recent years, in order to respond to the demand for small-volume production of other types of cardboard boxes in the industry as a whole, there has been a demand for the production of other types of cardboard boxes in small quantities. Under these circumstances, factories that use box-making machines to produce cardboard boxes are switching orders one after another from customers, producing cardboard boxes for a large number of orders, sometimes more than 100 per day. .

ここで、例えば、特許文献1には、産業機械による作業の進捗状況を作業者が知ることができるように、産業機械の作業に要した時間を計数し、産業機械の所定の作業に要した時間が、許容される最大作業時間に到達するまでの時間の情報を報知する作業時間の報知装置が開示されている。具体的には、特許文献1の発明では、最大印刷準備時間が設定され、印刷準備全体に要した時間が最大印刷準備時間を超えた場合に、印刷準備超過情報を報知するようにしている。 Here, for example, in Patent Document 1, in order to enable the worker to know the progress status of the work performed by the industrial machine, the time required for the work of the industrial machine is counted, and the time required for the predetermined work of the industrial machine is calculated. A work time notification device is disclosed that reports information on the time until the time reaches the maximum allowable work time. Specifically, in the invention of Patent Document 1, a maximum print preparation time is set, and when the time required for the entire print preparation exceeds the maximum print preparation time, print preparation excess information is notified.

また、特許文献2には、作業者の作業時間のばらつきを考慮して、各印刷品に必要な作業に合った総作業時間(工数)を設定する工数設計支援装置が開示されている。具体的には、特許文献2の発明では、印刷品目毎に必要な作業を、段取り作業として定めた紐付けパターンデータと、その段取り作業を構成する作業要素について作業者毎の作業時間を定めた作業要素データとに基づいて、各印刷品目を印刷するための、作業者毎の版替や色替などの段取り作業の総作業時間を算出するようにしている。 Further, Patent Document 2 discloses a man-hour design support device that takes into account variations in the work time of workers and sets a total work time (man-hour) suitable for the work required for each printed item. Specifically, in the invention of Patent Document 2, the work required for each printing item is determined as setup work by linking pattern data, and the work time for each worker is determined for the work elements that make up the setup work. Based on the work element data, the total work time for setup work such as plate change and color change for each worker to print each print item is calculated.

特開2010-120273号公報Japanese Patent Application Publication No. 2010-120273 特開2015-069323号公報Japanese Patent Application Publication No. 2015-069323

ここで、上述したように、製函機により段ボール箱を生産する工場では、客先から受けたオーダを次々に切り替えながら多数のオーダに係る段ボール箱を生産する。従って、各オーダに係る段ボール箱を生産する際には、段ボールシートを連続給紙して生産を開始する前に、そのオーダに係る段ボール箱の仕様に合わせる準備作業を伴うオーダチェンジが、1日に何度も行われる。 Here, as described above, in a factory that produces cardboard boxes using a box-making machine, orders received from customers are switched one after another to produce cardboard boxes for a large number of orders. Therefore, when producing corrugated boxes for each order, before continuous feeding of corrugated sheets and starting production, order changes involving preparation work to match the specifications of the corrugated boxes for that order are carried out within one day. It is done many times.

このような状況下、この何度も行われるオーダチェンジにおいて、次のオーダに係る仕様の段ボール箱を生産するための製函機の準備に要する時間(準備時間)を短縮できれば、一日の全体の生産時間を短縮することができ、生産効率を向上させることができる。
ここで、製函機における、オーダチェンジに要する多くの作業は自動化されている。しかしながら、印版交換、打ち抜きダイ(木型)交換、試し加工、検品や調整などの作業は、作業者の人手が必要であり、これらの作業は、作業者の熟練度や、部品(印版、木型、検品や調整に必要な工具等)の配置によって、作業時間(準備時間)にばらつきが生じる。また、各回のオーダチェンジによって、作業者が行う作業内容は変化する。
Under these circumstances, in order changes that occur many times, if the time required to prepare the box making machine (preparation time) to produce cardboard boxes with specifications related to the next order can be shortened, the entire day can be reduced. production time can be shortened and production efficiency can be improved.
Here, many operations required for order changes in the box making machine are automated. However, tasks such as printing plate replacement, punching die (wooden pattern) replacement, trial processing, inspection, and adjustment require human labor, and these tasks depend on the skill level of the worker and the parts (printing plate). The work time (preparation time) will vary depending on the arrangement of the tools (such as , wooden molds, tools necessary for inspection and adjustment, etc.). Furthermore, the content of the work performed by the worker changes with each order change.

ここで、特許文献1における最大印刷準備時間は、一定値に設定され、各回のオーダチェンジに対して共通の目標準備時間が設定されるので、作業が少ないオーダチェンジの場合、作業が非効率的であっても目標準備時間を達成できてしまい、作業の段取りや部品の配置の見直しに繋がらない。反対に、作業が多いオーダチェンジの場合、段取りを工夫して効率的に作業しても目標準備時間を達成できず、作業者のモチベーションが低下してしまう。 Here, the maximum print preparation time in Patent Document 1 is set to a constant value, and a common target preparation time is set for each order change, so if the order change involves less work, the work may be inefficient. Even so, the target preparation time is achieved, and this does not lead to a review of work setups or parts placement. On the other hand, in the case of an order change that requires a lot of work, even if the setup is devised and work is done efficiently, the target preparation time cannot be achieved and the motivation of the workers decreases.

また、特許文献2においては、印刷品目と段取り作業とが一対一の関係で定められており、前のオーダに係る印刷品目を考慮していないので、たとえば、前のオーダに係る印刷品目と同一の版や色を用いる場合、その段取り作業には、次の印刷品目で変更する必要の無い版や色までも変更するものと仮定した段取り作業が含まれることとなる。また、特許文献2においては、作業者毎に、段取り作業時間が設定されるので、その作業者の作業が非効率的であっても目標準備時間を達成できてしまい、ベテランの作業者の作業効率に近づけるよう、段取り作業を見直すことに繋がらない。 Furthermore, in Patent Document 2, the printing item and the setup work are defined in a one-to-one relationship, and the printing item related to the previous order is not taken into consideration. When using the same plates and colors, the setup work includes setup work that assumes that even plates and colors that do not need to be changed will be changed for the next printing item. In addition, in Patent Document 2, the setup work time is set for each worker, so even if that worker's work is inefficient, the target preparation time can be achieved, and the work of veteran workers This does not lead to reviewing the setup work in order to get closer to efficiency.

そこで、本発明は、オーダチェンジの作業内容に応じた目標準備時間を設定すると共に作業者に報知して、オーダチェンジ時の準備時間における作業の段取りや作業に必要な物品の配置を見直すなど作業の効率化を図ることができる段ボールシート製函機の目標準備時間報知装置を提供することを目的とする。 Therefore, the present invention sets a target preparation time according to the work content of an order change, and notifies the operator of the target preparation time, so that the worker can review the work setup and the arrangement of items necessary for the work during the preparation time at the time of the order change. An object of the present invention is to provide a target preparation time notification device for a corrugated sheet box making machine that can improve efficiency.

上記の目的を達成するために本発明は、製函機による段ボール箱の生産のオーダチェンジ時に必要な作業内容に応じた目標準備時間を算出して作業者に報知する段ボールシート製函機の目標準備時間報知装置であって、段ボール箱の予め定められた各オーダの生産順と、それらの段ボール箱の各オーダ情報とを記憶する記憶部と、各オーダの生産順に従って、所定のオーダチェンジ時の前に生産されるオーダの前オーダ情報および後に生産される後オーダ情報の両方に基づいて、それらの前オーダと後オーダとの間のオーダチェンジ時に後オーダの生産のために必要な準備作業をオーダチェンジパターンとして予め特定するオーダチェンジパターン特定部と、特定されたオーダチェンジパターンに基づいて、全ての準備作業を完了させるべき所定の時間である目標準備時間を予め算出する目標準備時間算出部と、所定のオーダチェンジ時および/または所定のオーダチェンジの開始前に算出された目標準備時間を作業者に報知するための報知指令部と、を有し、準備作業は、作業者により行われる試し加工された段ボール箱の検品を含み、オーダチェンジパターン特定部は、オーダチェンジ後の後オーダ情報に基づいて、その後オーダで印刷に使用する色の数を、段ボール箱の印刷部を検品する色の数として特定し、目標準備時間算出部は、特定された色の数に基づいて、検品する色の数が多いほど目標準備時間を長く算出する、ことを特徴としている。 In order to achieve the above object, the present invention provides a corrugated sheet box making machine that calculates a target preparation time according to the work required at the time of an order change in the production of corrugated boxes by a box making machine and notifies the operator of the target preparation time. The preparation time notification device includes a storage unit that stores a predetermined production order of each order of cardboard boxes and each order information of the cardboard boxes, and a storage unit that stores a predetermined production order of each order of cardboard boxes, and a predetermined order change time according to the production order of each order. Based on both the previous order information of the order produced before and the information of the subsequent order produced after, the preparation work required for the production of the subsequent order at the time of an order change between those previous orders and the subsequent order. an order change pattern identification unit that specifies in advance an order change pattern, and a target preparation time calculation unit that calculates in advance a target preparation time, which is a predetermined time in which all preparation work should be completed, based on the specified order change pattern. and a notification command unit for notifying a worker of the target preparation time calculated at the time of a predetermined order change and/or before the start of a predetermined order change , and the preparation work is performed by the worker. The order change pattern identification unit includes the inspection of the trial-processed cardboard box, and the order change pattern identification unit determines the number of colors to be used for printing in subsequent orders based on the post-order information after the order change, and the number of colors to be used for inspection of the printed part of the cardboard box. Based on the number of specified colors, the target preparation time calculation unit calculates a longer target preparation time as the number of colors to be inspected increases .

このように構成された本発明によれば、オーダチェンジ前後の前オーダ情報および後オーダ情報の両方に基づいて、オーダチェンジ毎に異なる準備作業内容に応じた目標準備時間を作業者に報知するので、作業者に、目標準備時間内に作業を完了させようというモチベーションを維持させつつ、目標準備時間に対して実際にかかった準備作業時間を把握させることができる。それにより、作業者に、準備作業の段取りや準備作業に必要な所定の交換部品や工具などの物品の配置の見直しなどを行う必要性を認識させ、作業者が見直しなどを実行することにより、オーダチェンジ時の準備作業の効率化を図ることができる。
また、このように構成された本発明によれば、オーダチェンジ後の後オーダで印刷に使用する色の数に基づいて目標準備時間を算出する。ここで、例えば、オーダで使用する色の数が多い場合、作業者が試し加工品の検品に要する時間が長くなり、それに応じて、オーダチェンジ時に必要な作業を全て完了させるのに要する時間も長くなる。従って、本発明によれば、色の数が多いほど目標準備時間を長く算出するので、報知する目標準備時間が適切なものとなる。
また、上記の目的を達成するために本発明は、製函機による段ボール箱の生産のオーダチェンジ時に必要な作業内容に応じた目標準備時間を算出して作業者に報知する段ボールシート製函機の目標準備時間報知装置であって、段ボール箱の予め定められた各オーダの生産順と、それらの段ボール箱の各オーダ情報とを記憶する記憶部と、各オーダの生産順に従って、所定のオーダチェンジ時の前に生産されるオーダの前オーダ情報および後に生産される後オーダ情報の両方に基づいて、それらの前オーダと後オーダとの間のオーダチェンジ時に後オーダの生産のために必要な準備作業をオーダチェンジパターンとして予め特定するオーダチェンジパターン特定部と、特定されたオーダチェンジパターンに基づいて、全ての準備作業を完了させるべき所定の時間である目標準備時間を予め算出する目標準備時間算出部と、所定のオーダチェンジ時および/または所定のオーダチェンジの開始前に算出された目標準備時間を作業者に報知するための報知指令部と、を有し、記憶部は、さらに、過去に生産したオーダ情報を記憶しており、オーダチェンジパターン特定部は、さらに、記憶部の過去に生産したオーダ情報を参照して、所定のオーダチェンジ後に生産される後オーダのオーダ情報が、過去に生産したオーダ情報に含まれるか否かを特定し、目標準備時間算出部は、オーダチェンジ後の後オーダ情報が、過去に生産したオーダ情報に含まれない新規オーダである場合、新規オーダでない場合よりも目標準備時間を長く算出する、ことを特徴としている。
このように構成された本発明によれば、オーダチェンジ前後の前オーダ情報および後オーダ情報の両方に基づいて、オーダチェンジ毎に異なる準備作業内容に応じた目標準備時間を作業者に報知するので、作業者に、目標準備時間内に作業を完了させようというモチベーションを維持させつつ、目標準備時間に対して実際にかかった準備作業時間を把握させることができる。それにより、作業者に、準備作業の段取りや準備作業に必要な所定の交換部品や工具などの物品の配置の見直しなどを行う必要性を認識させ、作業者が見直しなどを実行することにより、オーダチェンジ時の準備作業の効率化を図ることができる。
また、このように構成された本発明によれば、オーダチェンジ後の後オーダが新規オーダか否かに応じて目標準備時間を算出するので、より一層、目標準備時間が実際のオーダチェンジの作業内容に即したものとなる。ここで、新規のオーダでは、新規ではないオーダよりも、新規である分、検品などにより時間をかける必要が想定される。従って、本発明によれば、新規オーダである場合、新規オーダでない場合よりも目標準備時間を長く算出するので、より効果的かつより適切に、目標準備時間を算出することができる
According to the present invention configured in this manner, the target preparation time corresponding to the content of preparation work that differs for each order change is notified to the worker based on both the previous order information and the subsequent order information before and after the order change. , it is possible to make the worker understand the actual preparation work time relative to the target preparation time while maintaining motivation to complete the work within the target preparation time. As a result, workers are made aware of the need to review the arrangements for preparatory work and the arrangement of items such as prescribed replacement parts and tools necessary for preparatory work, and when workers carry out such reviews, Preparation work at the time of order change can be made more efficient.
Further, according to the present invention configured as described above, the target preparation time is calculated based on the number of colors to be used for printing in the subsequent order after the order change. For example, if a large number of colors are used in an order, it will take longer for the operator to inspect the sample processed product, and accordingly, the time required to complete all the necessary work when changing orders will also increase. become longer. Therefore, according to the present invention, the target preparation time is calculated longer as the number of colors increases, so that the target preparation time to be notified becomes more appropriate.
Furthermore, in order to achieve the above object, the present invention provides a corrugated sheet box making machine that calculates a target preparation time according to the work content required when changing orders for the production of corrugated boxes by a box making machine and notifies the operator of the target preparation time. The target preparation time notification device includes a storage unit that stores a predetermined production order of each order of cardboard boxes and each order information of the cardboard boxes, and a storage unit that stores a predetermined production order of each order of cardboard boxes, and a storage unit that stores a predetermined production order of each order. Based on both the previous order information of the order produced before the time of the change and the information of the subsequent order produced later, the necessary information for the production of the subsequent order at the time of an order change between those previous orders and the subsequent order is determined. an order change pattern identification unit that identifies preparatory work as an order change pattern; and a target preparation time that preliminarily calculates a target preparation time, which is a predetermined time in which all preparatory work should be completed, based on the identified order change pattern. It has a calculation unit and a notification command unit for notifying the operator of the calculated target preparation time at the time of a predetermined order change and/or before the start of the predetermined order change, and the storage unit further includes a past The order change pattern specifying section further refers to the order information produced in the past in the storage section to determine whether the order information of subsequent orders produced after a predetermined order change is past order information. If the subsequent order information after the order change is a new order that is not included in the order information produced in the past, the target preparation time calculation unit determines whether the order information after the order change is a new order that is not included in the order information produced in the past. The feature is that the target preparation time is calculated longer than the case.
According to the present invention configured in this manner, the target preparation time corresponding to the content of preparation work that differs for each order change is notified to the worker based on both the previous order information and the subsequent order information before and after the order change. , it is possible to make the worker understand the actual preparation work time relative to the target preparation time while maintaining motivation to complete the work within the target preparation time. This will make workers aware of the need to review the arrangements for preparatory work and the arrangement of items such as prescribed replacement parts and tools necessary for preparatory work. Preparation work at the time of order change can be made more efficient.
Furthermore, according to the present invention configured as described above, the target preparation time is calculated depending on whether or not the subsequent order after the order change is a new order. Be consistent with the content. Here, it is assumed that a new order requires more time for inspection than an order that is not new. Therefore, according to the present invention, if the order is a new one, the target preparation time is calculated longer than if it is not a new order, so the target preparation time can be calculated more effectively and more appropriately..

本発明において、好ましくは、記憶部が記憶する各オーダ情報は、各印刷ユニットを印刷に使用するか否かの情報を含み、オーダチェンジパターン特定部は、オーダチェンジ前後の前オーダ情報および後オーダ情報の両方に基づいて、印刷ユニット毎にオーダチェンジ時に印版交換が必要か否かを特定し、かつ、印刷ユニット全体でオーダチェンジ時に必要な作業者が行う印版交換の回数を特定し、目標準備時間算出部は、特定された印版交換の回数に基づいて、印版交換の回数が多いほど目標準備時間を長く算出する。
このように構成された本発明によれば、オーダチェンジ時の印版交換の回数に基づいて目標準備時間を算出するので、目標準備時間が実際のオーダチェンジの作業内容に即したものとなる。ここで、例えば、印版交換の回数が多い場合、作業者が、印版交換を全て完了するのに要する時間が長くなり、それに応じて、オーダチェンジの時に必要な作業を全て完了させるのに要する準備時間も長くなる。従って、本発明によれば、印版交換の回数が多いほど目標準備時間を長く算出するので、作業者に、適切な目標準備時間を報知することができ、これにより、報知された目標準備時間内に準備作業を完了させようというモチベーションを維持させることができる。
In the present invention, preferably, each order information stored in the storage section includes information as to whether each printing unit is used for printing, and the order change pattern specifying section preferably includes information on previous orders before and after the order change, and information on subsequent orders. Based on both of the information, it is determined for each printing unit whether or not a printing plate needs to be replaced at the time of an order change, and the number of times that a necessary operator performs printing plate replacement at the time of an order change for the entire printing unit is determined. The target preparation time calculation unit calculates a longer target preparation time based on the specified number of printing plate exchanges, as the number of printing plate exchanges increases.
According to the present invention configured in this manner, the target preparation time is calculated based on the number of printing plate exchanges at the time of order change, so that the target preparation time corresponds to the actual work content of order change. For example, if the number of printing plate changes is large, the time required for the operator to complete all printing plate changes will be longer, and the time required for the operator to complete all the necessary work at the time of order change will be longer. The preparation time required also increases. Therefore, according to the present invention, the target preparation time is calculated to be longer as the number of printing plate exchanges increases, so that it is possible to notify the operator of an appropriate target preparation time. You can maintain your motivation to complete the preparation work within the day.

本発明において、好ましくは、製函機は、オーダチェンジ時に、所定の可動部材の位置決めを自動で実行し、目標準備時間は、オーダチェンジ時に印版交換を行わないと仮定した場合の、前オーダの生産が終了してから製函機の所定の可動部材の位置決めが完了するまでの第1の設定時間(ロット終了・機械セット時間(無地から無地))と、オーダチェンジ時に印版交換を行うと仮定した場合の、前オーダの生産が終了してから、後オーダ用の印版交換が完了するまでの時間と、第1の設定時間との差である第2の設定時間(機械セット加算時間(印版交換))と、所定の可動部材の位置決めおよび印版交換の両方が完了してから、段ボールシートのセット完了後に製函機が起動するまでの第3の設定時間(シートセット加算時間)と、製函機が起動してから段ボール箱の試し加工が開始されるまでの第4の設定時間(給紙準備時間)と、オーダチェンジ後の後オーダで印刷を行わないと仮定した場合の、段ボール箱の試し加工を開始してから、試し加工された段ボール箱を検品し、後オーダの段ボール箱の連続給紙による生産を開始するまでの第5の設定時間(試し加工・検品時間(無地))と、オーダチェンジ後の後オーダで印刷を行うと仮定した場合の、段ボール箱の試し加工を開始してから、試し加工された段ボール箱を検品し、後オーダの生産を開始するまでの時間と、第5の設定時間との差である第6の設定時間(検品加算時間(印刷))との合計時間である。
このように構成された本発明によれば、オーダチェンジ毎に異なる、印版交換や試し加工された段ボール箱の検品の作業内容に応じて目標準備時間を算出するので、より効果的に、目標準備時間を実際の作業内容に即した時間として算出することができる。
In the present invention, preferably, the box making machine automatically positions a predetermined movable member at the time of an order change, and the target preparation time is the same as that of the previous order, assuming that the printing plate is not replaced at the time of the order change. The first set time (lot end/machine set time (plain to plain)) from the end of production to the completion of positioning of the specified movable parts of the box making machine, and the printing plate exchange at the time of order change. Assuming that, the second setting time (machine set addition time (print plate exchange)) and the third set time (sheet set addition time), the fourth set time (paper feeding preparation time) from the start of the box making machine to the start of trial processing of the cardboard box, and the assumption that printing will not be performed on subsequent orders after the order change. 5th set time (trial processing/inspection) from the start of trial processing of a cardboard box to the time when the trial processing of the cardboard box is inspected and the production of subsequent orders of cardboard boxes by continuous paper feeding is started. (plain color)) and assuming that printing will be performed on the subsequent order after the order change, start trial processing of the cardboard box, inspect the trial-processed cardboard box, and start production of the subsequent order. This is the total time of the time required to complete the process and the sixth set time (inspection additional time (printing)), which is the difference between the fifth set time.
According to the present invention configured in this way, the target preparation time is calculated according to the work contents such as printing plate exchange and inspection of test-processed cardboard boxes, which differ for each order change, so that the target preparation time can be calculated more effectively. The preparation time can be calculated as a time that corresponds to the actual work content.

本発明において、好ましくは、目標準備時間は、製函機の印刷装置のインキを交換する色替時間の設定時間を含み、目標準備時間算出部は、第1乃至第3の設定時間の合計時間より色替時間の設定時間が長い場合、第1乃至第3の設定時間に代えて色替時間の設定時間を設定する。
このように構成された本発明によれば、より効果的かつより適切に、目標準備時間を算出することができる。
In the present invention, preferably, the target preparation time includes a set time for a color change time for replacing the ink of the printing device of the box making machine, and the target preparation time calculation section calculates the total time of the first to third set times. If the set time of the color change time is longer, the set time of the color change time is set instead of the first to third set times.
According to the present invention configured in this way, the target preparation time can be calculated more effectively and more appropriately.

本発明において、好ましくは、オーダチェンジパターンは、前オーダ情報および後オーダ情報によって規定される、製函機の印刷装置の印版交換のパターンと、前オーダ情報および後オーダ情報によって規定される、製函機のダイカッタの打ち抜きダイの木型交換のパターンとを含み、オーダチェンジパターン特定部は、これらの印版交換のパターンと木型交換のパターンとを含むオーダチェンジパターンを特定し、記憶部は、この特定されたオーダチェンジパターンと、目標準備時間算出部が算出した目標準備時間とを関連付けたデータとして記憶し、報知指令部は、このオーダチェンジパターンに関連付けて記憶された目標準備時間を作業者に報知する。
このように構成された本発明によれば、作業者に、より効果的かつより適切な目標準備時間を報知することができる。
In the present invention, preferably, the order change pattern is defined by a printing plate exchange pattern of the printing device of the box making machine, which is defined by the previous order information and the subsequent order information, and the order change pattern is defined by the previous order information and the subsequent order information. The order change pattern specifying unit specifies the order change pattern including the pattern for changing the printing plate and the pattern for changing the wooden pattern, and stores the order change pattern in the storage unit. stores the identified order change pattern and the target preparation time calculated by the target preparation time calculation unit as data, and the notification command unit stores the target preparation time stored in association with this order change pattern. Notify workers.
According to the present invention configured in this way, it is possible to notify the worker of the target preparation time more effectively and more appropriately.

本発明において、好ましくは、準備作業は、製函機が自動で実行する所定の可動部材の位置決めと、作業者により行われる印版交換、木型交換および試し加工された段ボール箱の検品とを含み、記憶部は、製函機が自動で実行する準備作業の実測値に基づいて予め設定された、所定の可動部材の位置決めの設定時間と、各作業に熟練した作業者による準備作業の実測値に基づいて予め設定された、作業者により実行される印版交換、木型交換および試し加工された段ボール箱の検品の設定時間とのデータを記憶し、オーダチェンジパターンに関連付けて記憶された目標準備時間は、記憶された製函機が自動で実行する所定の可動部材の位置決めの設定時間と、作業者により実行される印版交換、木型交換および試し加工された段ボール箱の検品の設定時間とを含むデータに基づいて設定される。
このように構成された本発明によれば、より適切に、目標準備時間を算出することができる。より詳細には、目標準備時間が、製函機が自動で実行する準備作業の実測値および各作業に熟練した作業者による準備作業の実測値に基づいて設定されるので、全ての準備作業を完了させるべき所定の時間である目標準備時間をより適切な時間に設定することができる。
In the present invention, preferably, the preparatory work includes positioning of predetermined movable members automatically performed by the box-making machine, replacing printing plates, replacing wooden molds, and inspecting trial-processed cardboard boxes performed by the operator. The storage unit stores the set time for positioning a predetermined movable member, which is preset based on the actual measured value of the preparatory work automatically performed by the box making machine, and the actual measurement of the preparatory work performed by an operator skilled in each work. The data is stored in advance based on the value and the set times for stamp exchange, wooden mold exchange, and inspection of trial-processed cardboard boxes to be executed by the operator, and are stored in association with the order change pattern. The target preparation time is the set time for the memorized positioning of predetermined movable parts that is automatically executed by the box making machine, and the time for changing the printing plate, replacing the wooden mold, and inspecting the trial-processed cardboard boxes that are executed by the operator. The settings are based on data including the setting time.
According to the present invention configured in this way, the target preparation time can be calculated more appropriately. More specifically, the target preparation time is set based on the actual measurements of the preparation work automatically performed by the box making machine and the actual measurements of the preparation work performed by workers skilled in each task. The target preparation time, which is the predetermined time for completion, can be set to a more appropriate time.

本発明において、好ましくは、段ボールシート製函機は、段ボールシートを1枚ずつ供給する給紙装置、段ボールシートに印刷を施す印刷装置、段ボールシートに罫線を入れ、溝を切り、継ぎ代を形成するクリーザスロッタ、段ボールシートに所定形状の打ち抜き部分を形成するダイカッタ、継ぎ代に接着剤を供給し、段ボールシートを罫線に沿って折り曲げ、箱状に接合するフォルダグルア、および、箱状に接合された段ボールシートを計数し、結束枚数分のシート枚数のバッチを形成して送り出すカウンタエジェクタを含む。 In the present invention, preferably, the corrugated sheet box making machine includes a paper feeding device that feeds the corrugated sheets one by one, a printing device that prints on the corrugated sheets, and a device that adds ruled lines to the corrugated sheets, cuts grooves, and forms joint allowances. A creaser slotter that forms punched parts in a predetermined shape on a corrugated sheet, a die cutter that supplies adhesive to the seam allowance, bends the corrugated sheet along the ruled lines, and joins the corrugated sheet into a box shape; It includes a counter ejector that counts the number of corrugated cardboard sheets, forms a batch of sheets equal to the number of bundled sheets, and sends out the batch.

本発明の段ボールシート製函機の目標準備時間報知装置によれば、オーダチェンジの作業内容に応じた目標準備時間を設定すると共に作業者に報知して、オーダチェンジ時の準備時間における作業の段取りや作業に必要な物品の配置を見直すなど作業の効率化を図ることができる。 According to the target preparation time notification device for a corrugated sheet box making machine of the present invention, the target preparation time is set according to the work contents of an order change, and the worker is notified of the target preparation time, so that the operator can prepare the work during the preparation time at the time of the order change. It is possible to improve the efficiency of work by reviewing the arrangement of items necessary for work.

本発明の実施形態による段ボールシート製函機の目標準備時間報知装置が適用される製函機の全体構成を示す概略側面図である。1 is a schematic side view showing the overall configuration of a box making machine to which a target preparation time notification device for a corrugated sheet box making machine according to an embodiment of the present invention is applied. 本発明の実施形態による段ボールシート製函機の目標準備時間報知装置およびそのシステムで用いられるオーダ1サイクルにおける段ボール箱の生産の流れおよび生産時間の概念を説明するための製函機の基本動作を示すタイムチャートである。The target preparation time notification device for a corrugated sheet box making machine according to an embodiment of the present invention and the basic operation of the box making machine will be explained below to explain the production flow of corrugated boxes in one order cycle and the concept of production time used in the system. FIG. 図2に示すタイムチャートの生産時間のうちの準備時間において、目標準備時間を算出するための準備時間の概念を説明するためのタイムチャートである。3 is a time chart for explaining the concept of preparation time for calculating the target preparation time in the preparation time of the production time in the time chart shown in FIG. 2. FIG. 本実施形態による、印刷シリンダが昇降する印刷装置を備える製函機の目標準備時間報知装置における目標準備時間を算出するためのオーダチェンジパターン別目標準備時間データを示す図表である。7 is a chart showing target preparation time data for each order change pattern for calculating a target preparation time in a target preparation time notification device of a box making machine equipped with a printing device in which a printing cylinder moves up and down according to the present embodiment. 本実施形態による印刷シリンダが昇降しない印刷装置を備える製函機の目標準備時間報知装置における目標準備時間を算出するためのオーダチェンジパターン別目標準備時間データを示す図表である。It is a chart showing target preparation time data by order change pattern for calculating a target preparation time in a target preparation time notification device of a box making machine equipped with a printing device in which a printing cylinder does not move up and down according to the present embodiment. 本実施形態によるオーダチェンジパターン別目標準備時間データを定める基準となる作業別設定時間データを示す図表である。7 is a chart showing set time data for each job, which is a standard for determining target preparation time data for each order change pattern according to the present embodiment. 本実施形態による第1~第3の準備段階における目標準備時間の設定方法を説明するための概念図である。FIG. 3 is a conceptual diagram for explaining a method of setting target preparation times in first to third preparation stages according to the present embodiment. 本実施形態による第1~第2の準備段階における目標準備時間の設定方法を説明するための概念図である。FIG. 2 is a conceptual diagram for explaining a method of setting target preparation times in first and second preparation stages according to the present embodiment. 本実施形態による第1~第2の準備段階における目標準備時間の設定方法を説明するための概念図である。FIG. 2 is a conceptual diagram for explaining a method of setting target preparation times in first and second preparation stages according to the present embodiment. 本実施形態による第3の準備段階における目標準備時間の設定方法を説明するための概念図である。It is a conceptual diagram for explaining the setting method of the target preparation time in the 3rd preparation stage by this embodiment. 本実施形態による目標準備時間報知装置およびそのシステムの概略構成を示すブロック図である。1 is a block diagram showing a schematic configuration of a target preparation time notification device and its system according to the present embodiment. FIG. 本実施形態による目標準備時間報知装置およびそのシステムで用いられるオーダの基本情報の一例を示す図表である。2 is a chart showing an example of basic information on orders used in the target preparation time notification device and the system according to the present embodiment. 本実施形態による目標準備時間報知装置における各所要時間の集計方法の一例を示す図表である。It is a chart showing an example of a method of counting each required time in the target preparation time notification device according to the present embodiment. 本実施形態による目標準備時間報知装置における各所要時間の集計方法の一例を示す図表である。It is a chart showing an example of a method of counting each required time in the target preparation time notification device according to the present embodiment. 本実施形態による目標準備時間報知装置におけるオーダチェンジパターンを特定するための情報の一例を示す図表である。7 is a chart showing an example of information for specifying an order change pattern in the target preparation time notification device according to the present embodiment. 本実施形態による目標準備時間報知装置におけるオーダチェンジパターン毎の実績情報の一例を示す図表である。It is a chart showing an example of performance information for each order change pattern in the target preparation time notification device according to the present embodiment. 本実施形態による目標準備時間報知装置およびそのシステムにおける作業別時間毎の分析情報の一例を示す図表である。2 is a chart showing an example of analysis information for each task and time in the target preparation time notification device and its system according to the present embodiment. 本実施形態による目標準備時間報知装置およびそのシステムにおける作業別時間毎の比較情報の一例を示す図表である。2 is a chart showing an example of comparative information for each task and time in the target preparation time notification device and its system according to the present embodiment. 本実施形態の目標準備時間報知装置で実行される制御内容を示すフローチャートである。It is a flowchart which shows the control content performed by the target preparation time notification apparatus of this embodiment. 図17Aと共に示す、本実施形態の目標準備時間報知装置で実行される制御内容を示すフローチャートである。17A is a flowchart showing control details executed by the target preparation time notification device of the present embodiment, shown together with FIG. 17A. 本実施形態の目標準備時間報知装置のオーダチェンジパターン特定部で実行される第1の制御内容を示すフローチャートである。It is a flowchart which shows the 1st control content performed by the order change pattern identification part of the target preparation time notification apparatus of this embodiment. 本実施形態の目標準備時間報知装置のオーダチェンジパターン特定部で実行される第2の制御内容を示すフローチャートである。It is a flowchart which shows the 2nd control content performed by the order change pattern identification part of the target preparation time notification apparatus of this embodiment. 本実施形態の目標準備時間報知装置のオーダチェンジパターン特定部で実行される第3の制御内容を示すフローチャートである。It is a flowchart which shows the 3rd control content performed by the order change pattern identification part of the target preparation time notification apparatus of this embodiment. 図20Aと共に示す、本実施形態の目標準備時間報知装置のオーダチェンジパターン特定部で実行される第3の制御内容を示すフローチャートである。It is a flowchart which shows the 3rd control content performed by the order change pattern identification part of the target preparation time notification apparatus of this embodiment shown with FIG. 20A. 本発明の実施形態の変形例によるオーダチェンジパターン別目標準備時間データを定める基準となる作業別設定時間データを示す図表である。12 is a chart showing set time data for each task, which is a standard for determining target preparation time data for each order change pattern according to a modified example of the embodiment of the present invention. 本発明の実施形態の変形例による第3の準備段階における目標準備時間の設定方法を説明するための概念図である。It is a conceptual diagram for explaining the setting method of the target preparation time in the 3rd preparation stage by the modification of embodiment of this invention.

まず、図1を参照して、本発明の実施形態による段ボールシート製函機の目標準備時間報知装置およびそのシステムが適用される段ボールシート製函機の全体構成について説明する。図1は、本発明の実施形態による段ボールシート製函機の目標準備時間報知装置およびそのシステムが適用される段ボールシート製函機の全体構成を示す概略側面図である。
図1に示すように、符号1は、段ボールシート製函機を示し、この段ボールシート製函機1は、段ボールシートSを1枚ずつ供給するシート給紙装置2と、段ボールシートSに印刷を施す印刷装置3と、段ボールシートSに罫線を入れ、溝を切り、継ぎ代を形成するクリーザスロッタ4と、段ボールシートSに所定形状の打ち抜き部分を形成するダイカッタ5と、継ぎ代に接着剤を供給し、段ボールシートSを罫線に沿って折り曲げ、箱状に接合するフォルダグルア6と、箱状に接合された段ボールシートSを計数し、所定シート枚数のバッチを形成して送り出すカウンタエジェクタ8と、を備える。符号7は、1枚の段ボールシートを複数枚の小型の段ボールシートに切断するオーダの場合にシート分離動作を行うシート分離装置を示し、このシート分離装置7は、一般的には搭載されない特殊な装置である。符号9は、バッチを束ねる結束機を示し、この結束機9は、製函機1に付帯して設けられる設備である。
First, with reference to FIG. 1, a target preparation time notification device for a corrugated sheet box making machine according to an embodiment of the present invention and the overall configuration of the corrugated sheet box making machine to which the system is applied will be described. FIG. 1 is a schematic side view showing the overall configuration of a corrugated sheet box making machine to which a target preparation time notification device and the system are applied for a corrugated sheet box making machine according to an embodiment of the present invention.
As shown in FIG. 1, reference numeral 1 indicates a corrugated cardboard sheet box making machine, and this corrugated sheet box making machine 1 includes a sheet feeder 2 that feeds corrugated cardboard sheets S one by one, and a sheet feeding device 2 that prints on the corrugated cardboard sheets S. a creaser slotter 4 that adds ruled lines to the corrugated cardboard sheet S, cuts grooves, and forms a seam allowance; a die cutter 5 that forms punched portions of a predetermined shape on the corrugated cardboard sheet S; and a printing device 3 that applies adhesive to the seam allowance. A folder gluer 6 that supplies the corrugated cardboard sheets S along ruled lines and joins them into a box shape, and a counter ejector 8 that counts the corrugated cardboard sheets S joined in the box shape and forms a batch of a predetermined number of sheets and sends them out. , is provided. Reference numeral 7 indicates a sheet separation device that performs sheet separation operation when an order is to cut one corrugated sheet into multiple small corrugated sheets. It is a device. Reference numeral 9 indicates a binding machine for bundling batches, and this binding machine 9 is equipment provided incidentally to the box making machine 1.

まず、製函機1のシート給紙装置2を説明する。
給紙装置2は、サクションボックス20を有し、このサクションボックス20の上面を形成するテーブル21上には、フロントゲート22およびバックガイド23が設けられている。これらのフロントゲート22およびバックガイド23の間には、コルゲータ(図示せず)により製造された複数の段ボールシートSが積載される。フロントゲート22は、テーブル21とフロントゲート22との間隙から1枚ずつ段ボールシートSが送り出されるように配置される。バックガイド23は、送り出し方向(シート搬送方向)FDに平行な方向に移動可能に構成され、これにより、フロントゲート22とバックガイド23との間に、シート搬送方向長さが異なる段ボールシートSを積載できるようになっている。また、サクションボックス20の下部には、サクションボックス20内の空気を吸引する吸引装置24が取り付けられている。
First, the sheet feeding device 2 of the box making machine 1 will be explained.
The paper feeder 2 has a suction box 20, and a front gate 22 and a back guide 23 are provided on a table 21 forming the upper surface of the suction box 20. A plurality of corrugated cardboard sheets S manufactured by a corrugator (not shown) are stacked between the front gate 22 and the back guide 23. The front gate 22 is arranged so that the corrugated cardboard sheets S are sent out one by one from the gap between the table 21 and the front gate 22. The back guide 23 is configured to be movable in a direction parallel to the feed direction (sheet conveyance direction) FD, and thereby, between the front gate 22 and the back guide 23, corrugated sheets S having different lengths in the sheet conveyance direction are arranged. It is ready for loading. Further, a suction device 24 is attached to the lower part of the suction box 20 for sucking the air inside the suction box 20.

さらに、シート給紙装置2は、送り出し方向FD及びこれに直交する方向に沿ってそれぞれ並列に配置される複数の給紙ローラ25と、これらの給紙ローラ25の間で延び、給紙ローラ25に対して昇降可能な板状部材であるグレイト26とを有する。給紙ローラ25の外周面には、シートSとの間で摩擦力を生じさせてシートSのグリップ力を高めるためのウレタン部材が設けられる。
給紙ローラ25による連続給紙は、グレイト26を給紙ローラ25よりも下降させ、積載された段ボールシートSのうち最も下側にあるシートSを給紙ローラ25に接触させることで行われる。このとき、給紙ローラ25の回転が最も下側のシートSに伝達されて、シートSが一枚ずつ、前方のフィードロール27に向けて送り出される。一方、グレイト26を給紙ローラ25よりも上昇させると、給紙ローラ25が段ボールシートSと非接触状態となって、給紙ローラ25の回転がシートSに伝達されなくなり、給紙が停止される。
Further, the sheet feeding device 2 includes a plurality of sheet feeding rollers 25 arranged in parallel along the feeding direction FD and a direction perpendicular thereto, and a plurality of sheet feeding rollers 25 extending between these sheet feeding rollers 25 . It has a grate 26 which is a plate-like member that can be moved up and down relative to the main body. A urethane member is provided on the outer circumferential surface of the paper feed roller 25 to generate frictional force with the sheet S to increase the gripping force of the sheet S.
Continuous paper feeding by the paper feeding roller 25 is performed by lowering the grate 26 below the paper feeding roller 25 and bringing the lowest sheet S among the stacked cardboard sheets S into contact with the paper feeding roller 25. At this time, the rotation of the paper feed roller 25 is transmitted to the lowermost sheet S, and the sheets S are sent out one by one toward the feed roll 27 in front. On the other hand, when the grate 26 is raised higher than the paper feed roller 25, the paper feed roller 25 comes out of contact with the corrugated sheet S, the rotation of the paper feed roller 25 is no longer transmitted to the sheet S, and paper feeding is stopped. Ru.

フィードロール27に到達したシートSは、フィードロール27の回転により印刷装置3へ送り出される。フィードロール27の外周面には、シートSとの間で摩擦力を生じさせてシートSのグリップ力を高めるためのゴム部材が設けられる。上下一対のフィードロール27は、シートSの厚さに応じて、それらの上下方向の隙間が調整できるよう構成されている。
また、シート給紙装置2には、フロントゲート22より下流側で、フィードロール27より上流側に配置された生産枚数計数センサ28が設けられている。この生産枚数計数センサ28は、シート給紙装置2から1枚ずつ送り出されたシートSを検出する光電センサであり、生産枚数(実際に給紙して箱に加工したシート枚数)を計数する。後述するカウンタエジェクタ8に設けられた光電センサ(図示せず)の検出信号を用いて生産枚数を計数してもよい。
The sheet S that has reached the feed roll 27 is sent out to the printing device 3 by rotation of the feed roll 27. A rubber member is provided on the outer circumferential surface of the feed roll 27 to generate a frictional force with the sheet S to increase the grip force of the sheet S. The pair of upper and lower feed rolls 27 are configured such that the vertical gap between them can be adjusted according to the thickness of the sheet S.
Further, the sheet feeding device 2 is provided with a production number counting sensor 28 disposed downstream of the front gate 22 and upstream of the feed roll 27. The production number counting sensor 28 is a photoelectric sensor that detects the sheets S sent out one by one from the sheet feeding device 2, and counts the production number (the number of sheets actually fed and processed into boxes). The number of produced sheets may be counted using a detection signal from a photoelectric sensor (not shown) provided in the counter ejector 8, which will be described later.

次に、印刷装置3を説明する。
印刷装置3は、段ボールシートを搬送する搬送装置と、搬送される段ボールシートに印刷を施す複数の印刷ユニットを備える。段ボールシートSに印刷を施す複数の印刷ユニット30、32は、印刷シリンダ34、36を備え、それらの外周面には印版38が取り付けられる。これらの印刷シリンダ34、36の近傍には、それぞれ、インキ缶31から供給されるインキを印版38に転移させるアニロックスロール33と、アニロックスロール33の表面から余分なインキを取り除くためのドクターロール35が設けられている。
印刷シリンダ34、36の下方にはプレスロール37が配置される。プレスロール37は上下動可能であり、シートSの厚さに応じて、印刷シリンダ34、36との間の隙間が調整できるよう構成されている。
Next, the printing device 3 will be explained.
The printing device 3 includes a conveyance device that conveys a corrugated cardboard sheet, and a plurality of printing units that print on the conveyed corrugated sheet. The plurality of printing units 30, 32 that print on the corrugated paperboard sheets S are equipped with printing cylinders 34, 36, and a printing plate 38 is attached to the outer peripheral surfaces of the printing cylinders 34, 36. Near these printing cylinders 34 and 36 are an anilox roll 33 for transferring ink supplied from an ink can 31 onto a printing plate 38, and a doctor roll 35 for removing excess ink from the surface of the anilox roll 33. is provided.
A press roll 37 is arranged below the printing cylinders 34, 36. The press roll 37 is movable up and down, and is configured so that the gap between it and the printing cylinders 34 and 36 can be adjusted according to the thickness of the sheet S.

この印刷装置3では、印刷シリンダ34、36が段ボールシートSの搬送速度に合わせて(基本的に同期して)1回転すると、それらの印版38により、段ボールシートSの所定の位置に所定の色/デザインが印刷されることになる。印刷されたシートSはクリーザスロッタ4に供給される。 In this printing device 3, when the printing cylinders 34 and 36 rotate once in accordance with the conveyance speed of the corrugated paperboard sheet S (basically synchronously), their printing plates 38 cause the corrugated paperboard sheet S to be placed in a predetermined position at a predetermined position. The color/design will be printed. The printed sheet S is supplied to the creaser slotter 4.

ここで、印刷装置3における印版38の交換作業と印刷シリンダの2つの形式(タイプ)について説明する。
印版38は、オーダチェンジの際、作業者によって、オーダの仕様に応じた印版と交換可能である。
作業者は、前オーダの生産中(後述する印刷シリンダ34、36が上下方向に昇降可能なタイプ)またはオーダチェンジ中に、各印刷ユニット30、32の印刷シリンダ34、36に装着されている前オーダ用の印版38を取り外した後、後オーダ用の印版38を装着する印版交換を行う。印版38は、各オーダの各インキ色に合せたものが使用される。
Here, the replacement work of the printing plate 38 in the printing device 3 and the two types of printing cylinders will be explained.
The printing plate 38 can be replaced by a printing plate according to the specifications of the order by the operator when an order is changed.
During the production of the previous order (printing cylinders 34, 36 of the type that can be moved up and down in the vertical direction, which will be described later) or during an order change, the operator After removing the printing plate 38 for ordering, the printing plate is replaced with a printing plate 38 for subsequent ordering. The printing plate 38 used is one that matches each ink color of each order.

ここで、印刷装置3には、印刷シリンダ34、36が上下方向に昇降可能なタイプ(図1)と、印刷シリンダ34、36が固定位置にあり、製函機1に対して上下方向に昇降しないタイプとが存在し、製函機1の仕様に応じて、どちらかのタイプが設定される。 Here, the printing device 3 includes a type in which the printing cylinders 34 and 36 can be moved up and down in the vertical direction (FIG. 1), and a type in which the printing cylinders 34 and 36 are in fixed positions, and the printing cylinders 34 and 36 are in a fixed position and cannot be moved up and down in the up and down direction with respect to the box making machine 1. There is a type that does not, and one type is set depending on the specifications of the box making machine 1.

印刷シリンダが昇降するタイプの場合、印刷シリンダ34、36と、アニロックスロール33などのインキ供給機構とを支持するフレーム(図示せず)とが、昇降可能な昇降ユニットとして構成される。
この昇降可能なタイプの印刷装置3では、段ボール箱を生産するオーダ中においても、印刷に使用しない印刷シリンダ34、36を上昇位置に固定させて、作業者が、次のオーダの印版38に交換可能になっている。
In the case of the type in which the printing cylinders are raised and lowered, a frame (not shown) that supports the printing cylinders 34 and 36 and an ink supply mechanism such as the anilox roll 33 is configured as a lifting unit that can be raised and lowered.
In this type of printing device 3 that can be raised and lowered, even during an order to produce a cardboard box, the printing cylinders 34 and 36 that are not used for printing are fixed in the raised position, and the operator can move the printing plate 38 for the next order. It is replaceable.

複数の印刷ユニットのうち、生産中に印刷に使用する印刷ユニット(30、32)は、昇降ユニットを下降させて、印刷シリンダ(34、36)をプレスロール(37)に接近させる。この状態で、印刷シリンダが回転し、印刷シリンダに装着された印版(38)とプレスロール(37)との間で段ボールシートを挟んで搬送しながら印刷を行う。一方、生産中に印刷に使用しない印刷ユニット(30、32)は、昇降ユニットを上昇させて、印刷シリンダ(34、36)をプレスロール(37)から離隔させる。このタイプの印刷装置は、サクション装置等を用いて段ボールシートを搬送するので、印刷シリンダをプレスロールから離隔させることができる。 Among the plurality of printing units, the printing unit (30, 32) used for printing during production lowers the elevating unit to bring the printing cylinder (34, 36) closer to the press roll (37). In this state, the printing cylinder rotates, and printing is performed while conveying the corrugated cardboard sheet between the printing plate (38) mounted on the printing cylinder and the press roll (37). On the other hand, in the printing units (30, 32) that are not used for printing during production, the elevating unit is raised to separate the printing cylinders (34, 36) from the press roll (37). This type of printing device uses a suction device or the like to convey the corrugated cardboard sheet, so the printing cylinder can be separated from the press roll.

印刷シリンダが昇降しないタイプの場合、オーダの生産中は必ず、全ての印刷シリンダ(34、36)を段ボールシートの搬送に使用する。
そして、複数の印刷ユニット(30、32)のうち、段ボール箱の生産中、印刷に使用するユニットは、印刷シリンダに印版(38)を装着し、印刷シリンダが回転して、印版(38)とプレスロール(37)の間で段ボールシートを挟んで搬送しながら印刷する。
一方、生産中に印刷に使用しないユニットは、印刷シリンダに送り版(図示しない搬送専用の版)を装着し、その印刷シリンダを回転させて、送り版とプレスロールの間で段ボールシートを挟んで搬送する。このような送り版にはインキが供給されず、段ボールシートに接触しても印刷が施されないので、複数のオーダで送り版を使い回しすることができる。
この印刷シリンダが昇降しないタイプの印刷装置3では、段ボール箱のオーダの生産中(連続給紙中)には、印刷は交換できない。作業者は、オーダチェンジ中に、印刷ユニットのフレームをスライドさせてフレームとフレームの間に入って印版交換を行い、交換後にフレームの外に出てフレームを閉じる。
In the case of the type in which the printing cylinders do not move up and down, all the printing cylinders (34, 36) are always used for transporting corrugated sheets during production of an order.
Among the plurality of printing units (30, 32), the unit used for printing during the production of cardboard boxes has a printing plate (38) attached to a printing cylinder, and the printing cylinder rotates to print the printing plate (38). ) and a press roll (37) to print while conveying the corrugated cardboard sheet between them.
On the other hand, for units that are not used for printing during production, a feeding plate (a plate exclusively used for conveyance, not shown) is attached to the printing cylinder, the printing cylinder is rotated, and the cardboard sheet is sandwiched between the feeding plate and the press roll. transport. Since such a feeding plate is not supplied with ink and no printing is performed even if it comes into contact with a corrugated board sheet, the feeding plate can be reused for multiple orders.
In this type of printing device 3 in which the printing cylinder does not move up and down, the printing cannot be replaced during production of a cardboard box order (during continuous paper feeding). During an order change, the operator slides the frame of the printing unit, enters between the frames and exchanges the printing plate, and after the exchange, moves out of the frame and closes the frame.

次に、印刷装置3におけるインキ交換(色替)について説明する。
製函機1において、オーダに係る段ボール箱を生産するとき、複数の印刷ユニット(30、32)を、そのオーダの印刷に必要な色の数(インキの数)に応じて、選択的に使用して印刷する。上述した印刷シリンダが昇降できるタイプでも、昇降できないタイプでも、インキ交換を段ボール箱の生産中に行うことができる。
Next, ink replacement (color change) in the printing device 3 will be explained.
In the box making machine 1, when producing cardboard boxes related to an order, a plurality of printing units (30, 32) are selectively used depending on the number of colors (number of inks) required for printing the order. and print. Regardless of whether the above-mentioned printing cylinder can be moved up and down or not, ink can be replaced during the production of cardboard boxes.

各印刷ユニットには、インキ缶31を2つセットできるようになっており、作業者は、前オーダの生産中に、後オーダで使用するインキ缶31を予めセットすることができる。これにより、印刷ユニット30、32を前オーダで印刷に使用しない場合は、前オーダの生産中に自動的にインキ交換が行われる。一方、前オーダで印刷に使用する場合は、オーダチェンジ中に自動的にインキ交換が行われる。 Two ink cans 31 can be set in each printing unit, and the operator can set the ink cans 31 to be used in a subsequent order in advance during production of the previous order. As a result, if the printing units 30 and 32 are not used for printing in the previous order, ink replacement is automatically performed during production of the previous order. On the other hand, if the ink is used for printing on a previous order, the ink will be replaced automatically during the order change.

次に、クリーザスロッタ4を説明する。
クリーザスロッタ4は、クリーザユニット40と、スロッタユニット42とを備える。クリーザユニット40は、シートSの所定の位置に罫線加工を施すために、シートSの搬送方向に対して横方向に移動して位置決めされる、上下一対の罫線ローラを備える。 また、スロッタユニット42は、上部スロッタと、下部スロッタとを備える。上部スロッタには、シートSの所定の位置に溝切り加工を施すために、シートSの搬送方向に対して横方向に移動して位置決めされるスロッタ刃43が取り付けられる。下部スロッタには、スロッタ刃43と嵌合可能な溝が形成される。
クリーザスロッタ4は、これらのクリーザユニット40およびスロッタユニット42により、段ボールシートSに罫線および溝切り加工を施し、継ぎ代を形成し、これらの加工が施された段ボールシートSをダイカッタ5に供給する。
Next, the creaser slotter 4 will be explained.
The creaser slotter 4 includes a creaser unit 40 and a slotter unit 42. The creaser unit 40 includes a pair of upper and lower ruled line rollers that are moved and positioned in a transverse direction with respect to the conveyance direction of the sheet S in order to perform a ruled line process on a predetermined position of the sheet S. Further, the slotter unit 42 includes an upper slotter and a lower slotter. A slotter blade 43 is attached to the upper slotter and is positioned by moving in a transverse direction with respect to the conveying direction of the sheet S in order to perform grooving at a predetermined position of the sheet S. A groove into which the slotter blade 43 can fit is formed in the lower slotter.
The creaser slotter 4 uses the creaser unit 40 and the slotter unit 42 to apply creasing and grooving to the corrugated cardboard sheet S to form a seam allowance, and supplies the corrugated cardboard sheet S subjected to these processes to the die cutter 5. .

次に、ダイカッタ5を説明する。
ダイカッタ5は、ダイシリンダ50と、アンビルシリンダ52とを備える。段ボールシートSを打ち抜くための打ち抜きダイを備える合板ベニヤなどの木型54が、ダイシリンダ50の外周面に取り付けられる。打ち抜きダイ(54)は、連続して搬送される段ボールシートSの所望の位置に打ち抜き加工を施す。打ち抜きダイ(54)は、オーダ変更の際に、作業者により、オーダに応じた打ち抜きパターンの打ち抜きダイと交換可能である。
Next, the die cutter 5 will be explained.
The die cutter 5 includes a die cylinder 50 and an anvil cylinder 52. A wooden mold 54, such as a plywood veneer, equipped with a punching die for punching out the corrugated cardboard sheet S is attached to the outer peripheral surface of the die cylinder 50. The punching die (54) performs a punching process on a desired position of the corrugated cardboard sheet S that is continuously conveyed. The punching die (54) can be replaced by a punching die with a punching pattern corresponding to the order by the operator when changing the order.

ここで、打ち抜き加工があるオーダの場合は、ダイシリンダ50に、段ボールシートSを打ち抜くための木型54を装着する。木型には、シートS全体の形状を打ち抜く大型の木型(大型木型)と、手掛用の穴を加工するものなど小型の木型(小型木型)があり、各オーダに合せた木型が使用される。
一方、打ち抜き加工がないオーダの場合は、ダイシリンダに送り木型(搬送専用の木型)を装着する。そして、ダイシリンダ50が回転すると、送り木型とアンビルシリンダ52の間でシートSを挟んで搬送するようになっている。送り木型は、打ち抜き刃を備えず、段ボールシートに接触しても加工が施されないので、複数のオーダで送り木型を使い回しすることができる。
作業者は、オーダチェンジ中に木型交換が必要な場合、ダイシリンダ50に装着されている前オーダ用の木型を取り外した後、後オーダ用の木型を装着する木型交換を行う。このオーダチェンジ中の作業では、作業者は、ダイカッタのフレームをスライドさせて、フレームとフレームの間に入って木型交換を行い、交換後にフレームの外に出てフレームを閉じる。
Here, if the order requires punching, a wooden mold 54 for punching out the corrugated cardboard sheet S is attached to the die cylinder 50. There are two types of wooden molds: large wooden molds that punch out the entire shape of the sheet S (large wooden molds), and small wooden molds that punch out holes for handholds (small wooden molds). A wooden mold is used.
On the other hand, if the order does not require punching, a feed die (a die exclusively used for transportation) is attached to the die cylinder. When the die cylinder 50 rotates, the sheet S is sandwiched between the feed die and the anvil cylinder 52 and conveyed. The feeding die is not equipped with a punching blade and is not processed even if it comes into contact with the corrugated cardboard sheet, so the feeding die can be reused for multiple orders.
If a mold needs to be replaced during an order change, the operator removes the previous order mold attached to the die cylinder 50, and then replaces the mold by attaching a later order mold. During this order change operation, the worker slides the frame of the die cutter, enters between the frames and exchanges the wooden pattern, and after exchanging the die cutter moves out of the frame and closes the frame.

次に、フォルダグルア6を説明する。
フォルダグルア6は、段ボールシートSの搬送方向に沿ってガイドレール60を備える。ガイドレール60の上方には、シート搬送方向に平行な方向に並べられた2本の環状の搬送ベルト62が設けられる。これらの搬送ベルト62の表面素材は、シートSとの間で摩擦力を生じさせてシートSのグリップ力を高めるためにゴム製となっている。フォルダグルア6には、さらに、ガイドレール60および搬送ベルト62に沿って、接着剤供給装置64、折り畳みバー66、および、折り畳みベルト68が設けられる。
フォルダグルア6は、罫線および継ぎ代が形成された段ボールシートSを、ガイドレール60および搬送ベルト62により支持して搬送する。フォルダグルア6は、シートSの搬送中に、接着剤供給装置64により継ぎ代に接着剤を塗布し、折り畳みバー66によりシートSを折り畳む。さらに、フォルダグルア6は、折り曲げられたシートSを、折り畳みベルト68により折り畳み、継ぎ代を接着することで、折り畳まれた状態の箱状の段ボールシートSを製作する。
Next, the folder gluer 6 will be explained.
The folder gluer 6 includes a guide rail 60 along the conveyance direction of the corrugated cardboard sheet S. Two annular conveyance belts 62 are provided above the guide rail 60 and are arranged in a direction parallel to the sheet conveyance direction. The surface material of these conveyor belts 62 is made of rubber in order to generate frictional force with the sheet S and increase the gripping force of the sheet S. The folder gluer 6 is further provided with an adhesive supply device 64 , a folding bar 66 , and a folding belt 68 along the guide rail 60 and the conveyor belt 62 .
The folder gluer 6 supports and conveys the corrugated cardboard sheet S on which ruled lines and seam allowances are formed, using a guide rail 60 and a conveyor belt 62. While the sheet S is being conveyed, the folder gluer 6 applies adhesive to the splicing margin using an adhesive supply device 64, and folds the sheet S using a folding bar 66. Furthermore, the folder gluer 6 folds the folded sheet S using a folding belt 68 and glues the seam, thereby producing a box-shaped corrugated cardboard sheet S in a folded state.

次に、カウンタエジェクタ8を説明する。
カウンタエジェクタ8は、シート分離装置7から順次供給される箱状の段ボールシートSを計数し、所定シート枚数(結束枚数)のバッチBTを形成する。形成されたバッチBTは、下部コンベア80により、製函機1の下流側に接続された結束機9に向けて送り出され、結束機9は、この搬送されたバッチBTを、輸送のために束ねる。カウンタエジェクタ8は、搬送される段ボールシートSの枚数を計数するために光電センサ(図示せず)を備える。
Next, the counter ejector 8 will be explained.
The counter ejector 8 counts the box-shaped corrugated cardboard sheets S sequentially supplied from the sheet separating device 7, and forms a batch BT of a predetermined number of sheets (number of bundled sheets). The formed batch BT is sent out by the lower conveyor 80 toward the binding machine 9 connected to the downstream side of the box making machine 1, and the binding machine 9 bundles the transported batch BT for transportation. . The counter ejector 8 includes a photoelectric sensor (not shown) for counting the number of corrugated cardboard sheets S being conveyed.

次に、図2により、本発明の実施形態による段ボールシート製函機によるオーダ1サイクルの段ボール箱の生産の流れおよび生産時間の概念を説明する。図2は、本発明の実施形態による段ボールシート製函機の目標準備時間報知装置およびそのシステムで用いられるオーダ1サイクルにおける段ボール箱の生産の流れおよび生産時間の概念を説明するための製函機の基本動作を示すタイムチャートである。
まず、図2に示すように、本実施形態では、製函機1により、オーダ毎に異なる仕様および予定枚数(客先からの注文量)の段ボール箱を生産する際、前のオーダに係る生産が終了した時点を現在のオーダに係る生産の開始の時点と同一と捉える。同様に、現在のオーダに係る生産終了時点は次のオーダに係る生産開始時点である。
Next, with reference to FIG. 2, the concept of the production flow and production time of a corrugated box in one order cycle by the corrugated sheet box making machine according to the embodiment of the present invention will be explained. FIG. 2 shows a target preparation time notification device for a corrugated sheet box making machine according to an embodiment of the present invention, and a box making machine for explaining the production flow of corrugated boxes in one order cycle and the concept of production time used in the system. 3 is a time chart showing the basic operation of the .
First, as shown in FIG. 2, in this embodiment, when the box making machine 1 produces cardboard boxes with different specifications and planned numbers (order quantities from customers) for each order, the production of the previous order is The point in time when the process ends is considered to be the same as the point in time when production for the current order starts. Similarly, the production end point for the current order is the production start point for the next order.

ここで、本実施形態において、「生産時間」とは、段ボール箱の生産に関連する時間全体を指しており、図2で示すオーダ1サイクルの時間は、そのオーダの生産時間に相当する。この生産時間は、段ボールシートSを連続給紙して段ボール箱に加工している段階の「運転時間」と、連続給紙が停止しており、かつ、オーダチェンジ作業(位置決め、印版等の交換、試し加工、検品や調整)が行われている段階の「準備時間」と、連続給紙が停止しており、かつ、オーダチェンジ作業が行われていない段階の「停止時間」との3つに大別される。 Here, in this embodiment, "production time" refers to the entire time related to the production of cardboard boxes, and the time for one cycle of an order shown in FIG. 2 corresponds to the production time of that order. This production time includes "operating time" when corrugated paperboard sheets S are continuously fed and processed into cardboard boxes, and when continuous paper feeding is stopped and order change work (positioning, printing plate, etc.) ``preparation time'' during which paper replacement, trial processing, inspection, and adjustment are being performed, and ``stop time'' during which continuous paper feeding is stopped and order change operations are not being performed. It is broadly divided into

図2に示すように、本実施形態では、まず、準備段階に入った時点が、あるオーダの生産開始時点となる。この準備段階では、本実施形態では、第1に、給紙装置2による段ボールシートSの給紙を停止させた後、製函機1の可動部材(機械部品)の位置決め、例えば、フィードロール隙間の調整やスリッタなどの加工具の位置決めを機械に自動で行わせ、第2に、作業者による印版交換や木型交換などの作業を行い、第3に、試し加工を行う。 As shown in FIG. 2, in this embodiment, the time when the preparation stage first begins is the time when production of a certain order starts. In this preparatory stage, in this embodiment, firstly, after stopping the paper feeding of the corrugated cardboard sheets S by the paper feeding device 2, the positioning of the movable members (mechanical parts) of the box making machine 1 is performed, for example, by adjusting the feed roll gap. Second, the operator performs tasks such as replacing printing plates and wooden molds, and thirdly, performs trial processing.

まず、第1の準備段階(第1のオーダチェンジ作業)は、基本的に、ロット終了スイッチを予めオンにしておくことで行われ、これにより、オーダの生産終了からオーダチェンジ時の各ユニットの位置決めまでの一連の動作が機械で自動で行われる。オーダの連続給紙中にロット終了スイッチをオンにしておくと、給紙テーブル上に段ボールシートがなくなった時点で生産終了となり、自動で連続給紙が停止し、自動で主モータがオフになって機械が減速し、自動で可動部材の位置決めが開始される。
ここで、後述するように、給紙停止から位置決め開始までの一連の動作(後述する「ロット終了動作」)は、作業者が、給紙停止スイッチ、主モータスイッチ、オーダチェンジスイッチなどを手動で操作することによっても行うことができるが、効率的に作業を進めるために、ロット終了スイッチを利用して機械に自動で行わせることが多い。
インキ交換は、給紙停止後に開始し、機械の減速や位置決めと並行して自動で行われる。
First, the first preparation stage (first order change work) is basically carried out by turning on the lot end switch in advance. A series of operations up to positioning are performed automatically by the machine. If you turn on the lot end switch during continuous paper feeding of orders, production will end when there are no cardboard sheets on the paper feed table, continuous paper feeding will stop automatically, and the main motor will automatically turn off. The machine decelerates and automatically starts positioning the movable member.
As described later, the series of operations from paper feeding stop to positioning start ("lot end operation" described later) is performed by the operator manually by operating the paper feed stop switch, main motor switch, order change switch, etc. Although this can be done manually, in order to proceed with the work efficiently, the lot end switch is often used to have the machine do it automatically.
Ink replacement starts after paper feeding stops, and is automatically performed in parallel with machine deceleration and positioning.

次に、第2の準備段階(第2のオーダチェンジ作業)は、第1の準備段階のロット終了動作後、または、第1の準備段階と並行して行われる段階であり、この段階では、作業者が、オーダチェンジの直前と直後のオーダの仕様に応じて必要な作業を行う。作業者が行う作業は、主に印版交換、木型交換、シートセットである。
たとえば、作業者が行う準備作業は、印刷装置3の複数の印刷ユニット30、32の各印刷シリンダ34、36にすでに装着されている印版を取り外した後に、現在のオーダの印刷模様に合った印版を装着する作業、印版交換と同様に、ダイカッタ5のダイシリンダ50に現在のオーダの打ち抜き形状に合った打ち抜きダイの木型54を装着する作業などである。また、次の第3の準備段階のために、シートSを給紙装置2にセットする。
このような印版交換、木型交換、シートセットの作業は、複数人で作業を分担して同時並行で行うことができるが、通常は、印版や木型の交換作業が全て完了した後に、シートセットを完了させることが多い。
各印刷ユニット30、32に供給するインキを現在のオーダの印刷色に合ったインキに交換する作業(色替)は、基本的には、製函機1により自動的に行われる。
Next, the second preparation stage (second order change operation) is a stage that is performed after the lot completion operation of the first preparation stage or in parallel with the first preparation stage, and in this stage, A worker performs necessary work according to the specifications of the orders immediately before and after the order change. The main tasks performed by workers are changing printing plates, changing wooden molds, and setting sheets.
For example, the preparatory work performed by the operator is to remove the printing plates already installed in each of the printing cylinders 34 and 36 of the plurality of printing units 30 and 32 of the printing device 3, and then remove the printing plates that match the printing pattern of the current order. Similar to the work of installing a printing plate and replacing the printing plate, the work includes the work of installing a wooden pattern 54 of a punching die that matches the punching shape of the current order onto the die cylinder 50 of the die cutter 5. Further, the sheet S is set in the paper feeder 2 for the next third preparation stage.
The work of replacing printing plates, replacing wooden molds, and setting sheets can be done simultaneously by multiple people, but usually they are done after all the work of replacing printing plates and wooden molds is completed. , often completes the sheet set.
The work of replacing the ink supplied to each printing unit 30, 32 with an ink that matches the printing color of the current order (color change) is basically automatically performed by the box making machine 1.

次に、第3の準備段階(第3のオーダチェンジ作業/試し加工段階)は、第1および第2の準備段階の完了後に行われる段階であり、この段階では、作業者が、主モータスイッチを手動でオンにして製函機1を起動し、各スイッチやタッチパネル式ディスプレイで、作業者が運転速度(シート搬送速度)を設定する。そして、給紙テーブル21上に積んだシートSを一枚だけ給紙する一枚給紙スイッチなどを操作して、シートを試し加工し、出来上がった段ボール箱を検品する。
検品の結果、不具合があれば、機械の調整を行い、再び試し加工と検品を行う。そして、良品が安定して得られる運転速度に調整する。
検品が終わると、全ての準備段階が完了し、作業者は、給紙開始スイッチなどを操作して、段ボールシートを連続給紙して段ボール箱を生産する運転段階に入る。
Next, the third preparation stage (third order change work/trial machining stage) is a stage that is performed after the first and second preparation stages are completed, and in this stage, the operator switches the main motor switch. is manually turned on to start the box making machine 1, and the operator sets the operating speed (sheet conveyance speed) using each switch or touch panel display. Then, by operating a single sheet feed switch that feeds only one sheet S stacked on the sheet feed table 21, the sheet is processed on a trial basis, and the finished cardboard box is inspected.
If there are any defects as a result of the inspection, we will make adjustments to the machine and perform trial processing and inspection again. Then, the operating speed is adjusted so that good products can be stably obtained.
Once the inspection is complete, all the preparation stages are completed, and the operator operates the paper feed start switch to enter the operation stage in which corrugated sheets are continuously fed to produce corrugated boxes.

次に、運転段階は、この準備段階が完了すると行われる段階である。この運転段階では、作業者が、給紙テーブル21上に積載されたシートSを一枚ずつ連続給紙する給紙開始スイッチを操作し、調整された運転速度での連続給紙による生産を開始する。
その後、オーダの注文量に基づいて設定した生産枚数分の段ボール箱の生産が終わると、連続給紙を停止する給紙停止スイッチを操作して、シートの給紙を止めて製函機1を停止させる。または、予め作業者が操作パネルを用いて給紙停止枚数を入力しておき、設定した給紙停止枚数分のシートSの給紙が終了すると、自動で連続給紙が停止するようにする。
Next, the operating phase is the phase that takes place once this preparatory phase has been completed. In this operation stage, the operator operates a paper feed start switch that continuously feeds the sheets S loaded on the paper feed table 21 one by one, and starts production by continuous paper feeding at the adjusted operating speed. do.
After that, when the production of the set number of cardboard boxes based on the order quantity is completed, operate the paper feed stop switch that stops continuous paper feeding, stop the sheet feeding, and turn on the box making machine 1. make it stop. Alternatively, the operator may input the number of sheets to stop feeding in advance using the operation panel, and when the set number of sheets S to stop feeding is completed, continuous sheet feeding is automatically stopped.

この生産枚数分の段ボール箱の生産が終わって連続給紙が停止した時点が、上述した準備段階の開始時点であり、上述したように、次のオーダ(後オーダ)に係る段ボール箱を生産するための製函機1の準備作業が開始される。このとき、作業者が主モータスイッチをオフにし、さらに、オーダチェンジスイッチを押すと、次のオーダに係る製函機の可動部材の位置決めが開始される。または、上述したように、現在のオーダに係る連続給紙中にロット終了スイッチを予めオンにしておくと、給紙テーブル21上にシートがなくなった時点で、自動で連続給紙が停止し、自動で主モータがオフになり、自動で可動部材の位置決めが開始される。 The point at which the continuous paper feeding stops after the production of this number of corrugated boxes is finished is the start point of the preparation stage described above, and as described above, the corrugated boxes for the next order (subsequent order) are produced. Preparation work for the box making machine 1 for this purpose is started. At this time, when the operator turns off the main motor switch and presses the order change switch, positioning of the movable member of the box making machine for the next order is started. Alternatively, as described above, if the lot end switch is turned on in advance during continuous sheet feeding for the current order, continuous sheet feeding will automatically stop when there are no more sheets on the sheet feeding table 21. The main motor is automatically turned off and positioning of the movable member is automatically started.

次に、図3により、本発明の実施形態による段ボールシート製函機の目標準備時間報知装置における、目標準備時間を算出するための準備時間の概念を説明する。図3は、図2に示すタイムチャートの生産時間のうちの準備時間において、目標準備時間を算出するための準備時間の概念を説明するためのタイムチャートである。
本実施形態では、図3に示すように、目標準備時間を算出するための準備時間の概念として、上述した第1~第3の準備段階を、「ロット終了・機械セット時間(無地から無地)」、「機械セット加算時間(印版交換/木型交換)」、「シートセット加算時間」、「給紙準備時間」、「試し加工・検品時間(無地)」、「検品加算時間(印刷/打抜)」の概念に細分化し、さらに、場合によっては「色替時間」の概念も考慮する。
Next, the concept of the preparation time for calculating the target preparation time in the target preparation time notification device for the corrugated sheet box making machine according to the embodiment of the present invention will be explained with reference to FIG. FIG. 3 is a time chart for explaining the concept of preparation time for calculating the target preparation time in the preparation time of the production time shown in the time chart shown in FIG.
In this embodiment, as shown in FIG. 3, as a concept of preparation time for calculating the target preparation time, the first to third preparation stages described above are defined as "lot end/machine set time (from plain to plain)". ”, “Machine set additional time (print plate exchange/wooden pattern exchange)”, “Sheet set additional time”, “Paper feeding preparation time”, “Trial processing/inspection time (plain)”, “Inspection additional time (printing/ In addition, in some cases, the concept of "color change time" is also considered.

まず、図3に示すように、準備時間の開始直後に設定する「ロット終了・機械セット時間(無地から無地)」について説明する。
この「ロット終了・機械セット時間(無地から無地)」は、上述した第1の準備段階における目標準備時間の一つであり、達成すべき目標値である第1の目標準備時間である。この第1の目標準備時間は、オーダチェンジ時に印版交換や木型交換を行わないと仮定した場合の、前オーダの生産の給紙が停止した時点から、製函機1の所定の自動位置決めが完了する時点までの時間である。前オーダの生産の給紙が停止した時点は、オーダチェンジ時(準備時間開始時)のロット終了動作が開始した時点と一致するものとする。
なお、印版交換とは、印刷装置3の印版38の交換であり、以下では、「印版交換」と称する。ここで、1つの印刷シリンダに対して、作業者が、前オーダ用の印版38を取り外し、後オーダ用の印版38を装着する作業を、印版交換回数の1回と考える。
また、木型交換とは、ダイカッタ5の打ち抜きダイを備える木型54の木型交換であり、以下では、「木型交換」と称する。
また、「無地から無地」における「無地」とは、印刷無しかつ打ち抜き無しの基本オーダを想定した概念である。
また、製函機1の所定の自動位置決めは、次に生産が行われる後オーダの基本情報に基づいて自動で実行される、たとえば、バックガイド23の位置決め、フィードロール27間の上下方向の隙間調整、プレスロール37と印刷シリンダ34、36の間の3上下方向の隙間調整、スロッタユニット42のスロッタ刃43の横方向(シートSの搬送方向と直交する方向)の位置決めなどが含まれる。
First, as shown in FIG. 3, the "lot end/machine set time (from plain color to plain color)" that is set immediately after the start of the preparation time will be explained.
This "lot completion/machine set time (plain to plain)" is one of the target preparation times in the first preparation stage described above, and is the first target preparation time that is the target value to be achieved. This first target preparation time is based on the predetermined automatic positioning of the box making machine 1 from the time when paper feeding for the production of the previous order is stopped, assuming that no printing plates or wooden molds are exchanged at the time of order change. is the time until completion. It is assumed that the time when the paper feeding for the production of the previous order is stopped coincides with the time when the lot finishing operation at the time of order change (start of preparation time) starts.
Note that the printing plate exchange refers to replacing the printing plate 38 of the printing device 3, and is hereinafter referred to as "printing plate replacement." Here, the work in which the operator removes the printing plate 38 for the previous order and attaches the printing plate 38 for the subsequent order to one printing cylinder is considered to be one printing plate exchange count.
Moreover, the wooden pattern exchange is the wooden pattern exchange of the wooden pattern 54 provided with the punching die of the die cutter 5, and is hereinafter referred to as "wooden pattern exchange".
Furthermore, "plain" in "plain to plain" is a concept assuming a basic order without printing and without punching.
Further, the predetermined automatic positioning of the box making machine 1 is automatically executed based on the basic information of the next order to be produced, for example, the positioning of the back guide 23, the vertical gap between the feed rolls 27, etc. This includes adjusting the three vertical gaps between the press roll 37 and the printing cylinders 34 and 36, and positioning the slotter blade 43 of the slotter unit 42 in the lateral direction (direction perpendicular to the conveying direction of the sheet S).

ここで、ロット終了動作は、ロット終了スイッチを使用して自動で行う方法と、基本的に一日のうちで最初のオーダの生産を開始するときなどに使用されるオーダチェンジスイッチを使用して手動で行う方法があるが、ここではロット終了スイッチを使用して効率的に行うことを想定している。
この第1の目標準備時間は、実際に製函機1を所定のオーダで作動させた実測値に基づいて予め設定される。より具体的には、製函機1が自動で給紙停止(準備時間の開始時点)してから、自動で主モータオフし、平均的な運転速度(製函機1の機械速度)から減速し、製函機1の上述した所定の自動位置決めが完了するまでの実測値に基づいて、後述するオーダチェンジパターンに応じたデータとして予め設定される。
ここで、本実施形態では、給紙停止から位置決め開始までの一連の動作を「ロット終了動作」と定義し、その後の上述した自動位置調整を「自動機械セット」と定義する。図3には、それらの「ロット終了・機械セット時間(無地から無地)」を示す。
Here, the lot end operation can be performed automatically using a lot end switch, or by using an order change switch, which is basically used when starting production of the first order in a day. There is a way to do it manually, but here we assume that it will be done efficiently using a lot end switch.
This first target preparation time is set in advance based on actual measurements when the box making machine 1 is actually operated in a predetermined order. More specifically, after the box making machine 1 automatically stops paper feeding (at the start of the preparation time), the main motor is automatically turned off and the machine speed is reduced from the average operating speed (mechanical speed of the box making machine 1). , is preset as data corresponding to an order change pattern to be described later, based on actual measured values until the above-mentioned predetermined automatic positioning of the box making machine 1 is completed.
Here, in this embodiment, a series of operations from stopping paper feeding to starting positioning is defined as a "lot end operation," and the subsequent automatic position adjustment described above is defined as an "automatic machine set." FIG. 3 shows their "lot end/machine set time (from plain color to plain color)".

次に、図3に示すように、第1の目標準備時間の後の時間として設定する「機械セット加算時間(印版交換/木型交換)」について説明する。
この「機械セット加算時間(印版交換/木型交換)」は、上述した第2の準備段階における目標準備時間の一つであり、達成すべき目標値である第2の目標準備時間である。具体的には、この第2の目標準備時間は、オーダチェンジ時に印版交換や木型交換を行う場合の、準備時間の開始時点(第1の目標準備時間の開始時点)から、作業者による印版交換や木型交換が完了するまでの時間と、上述した「ロット終了・機械セット時間(無地から無地)」との差の時間である。
本実施形態では、作業者による印版交換や木型交換は、製函機の可動部材(上述したフィードロール27など)の自動位置決め動作と並行して行うことを想定している。また、第1の目標準備時間である「ロット終了・機械セット時間(無地から無地)」が経過した時点では、まだ、作業者による交換作業が完了していないこと想定している。本実施形態では、このような差を加算する概念として、「機械セット加算時間(印版交換/木型交換)」としている。
Next, as shown in FIG. 3, the "machine set additional time (print plate exchange/wooden pattern exchange)" which is set as the time after the first target preparation time will be explained.
This "machine set additional time (print plate exchange/wooden pattern exchange)" is one of the target preparation times in the second preparation stage mentioned above, and is the second target preparation time that is the target value to be achieved. . Specifically, this second target preparation time is calculated by the operator from the start of the preparation time (the start of the first target preparation time) when exchanging printing plates and molds at the time of order change. This is the time difference between the time required to complete printing plate exchange and wooden mold exchange and the above-mentioned "lot completion/machine set time (from plain color to plain color)".
In this embodiment, it is assumed that the printing plate exchange and the wooden mold exchange by the operator are performed in parallel with the automatic positioning operation of the movable members of the box making machine (such as the feed roll 27 described above). Furthermore, it is assumed that the replacement work by the operator has not yet been completed when the first target preparation time, ``lot end/machine set time (plain to blank),'' has elapsed. In this embodiment, the concept of adding such a difference is "machine set addition time (print plate exchange/wooden pattern exchange)".

この第2の目標準備時間は、各作業に熟練した作業者(ベテラン作業者)が作業したときの実測値に基づいて、後述するオーダチェンジパターンに応じたデータとして予め設定される。
本実施形態においては、後述する、製函機の印刷装置が「印刷シリンダが昇降するタイプ」である場合であって、オーダチェンジ時に印版交換を行う場合を想定し、この場合、交換作業完了後に昇降ユニットを下降させる必要があるので、昇降ユニット下降時間を含めた時間を考慮した機械セット加算(印版交換)時間が設定される。
一方、後述する、製函機の印刷装置が「印刷シリンダが昇降しないタイプ」である場合には、第2の目標準備時間に昇降ユニット下降時間を含めない。
ここで、本実施形態では、第2の準備段階における作業者の印版や木型の交換作業を「作業者機械セット」と定義する。また、上述した第1の準備段階における「自動機械セット」とこの第2の準備段階における「作業者機械セット」の両方を含む概念を「機械セット」と定義する。図3には、それらの「自動機械セット」および「作業者機械セット」を「機械セット」として示している。
This second target preparation time is preset as data corresponding to an order change pattern described later, based on actual measurements when a worker skilled in each task (veteran worker) performs the task.
In this embodiment, it is assumed that the printing device of the box making machine is of a type in which the printing cylinder moves up and down, which will be described later, and the printing plate is replaced at the time of an order change.In this case, the replacement work is completed. Since it is necessary to lower the elevating unit later, the machine set addition (printing plate exchange) time is set in consideration of the time including the elevating unit lowering time.
On the other hand, if the printing device of the box-making machine is of a type in which the printing cylinder does not move up and down, as will be described later, the second target preparation time does not include the lifting unit lowering time.
Here, in this embodiment, the work of replacing printing plates and wooden molds by the worker in the second preparation stage is defined as "worker machine set." Furthermore, a concept that includes both the "automatic machine set" in the first preparation stage described above and the "worker machine set" in the second preparation stage is defined as a "machine set". In FIG. 3, the "automatic machine set" and the "worker machine set" are shown as a "machine set".

次に、図3に示すように、第2の目標準備時間の後の時間として設定する「シートセット加算時間」について説明する。
この「シートセット加算時間」は、上述した第2の準備段階における目標準備時間の一つであり、達成すべき目標値である第3の目標準備時間である。具体的には、この第3の目標準備時間は、「機械セット(自動位置決めおよび作業者の交換作業)が全て完了してから、作業者によるシートセットが完了して主モータをオンするまでの時間である。
本実施形態では、作業者によるシートセットは、「機械セット」と並行して行い、「機械セット」が全て完了した時点では、まだシートセットが完了していないことを想定している。本実施形態では、このような時間差を加算する概念として、「シートセット加算時間」としている。
Next, as shown in FIG. 3, the "sheet set addition time" that is set as the time after the second target preparation time will be explained.
This "sheet set addition time" is one of the target preparation times in the second preparation stage described above, and is the third target preparation time which is the target value to be achieved. Specifically, this third target preparation time is defined as "the time from when all machine set-up (automatic positioning and operator replacement work) is completed until the time when the operator completes sheet setting and turns on the main motor."It's time.
In this embodiment, it is assumed that the sheet setting by the operator is performed in parallel with the "machine setting", and that the sheet setting is not yet completed when all the "machine setting" is completed. In this embodiment, the concept of adding such a time difference is referred to as "sheet set addition time."

この第3の目標準備時間は、各作業に熟練した作業者が作業したときの実測値に基づいて、後述するオーダチェンジパターンに応じたデータとして予め設定される。一方、第3の目標準備時間は、自動でシートセットするオートフィーダ装置を備える製函機の場合は、オートフィーダ装置の実測値に基づいて、後述するオーダチェンジパターンに応じたデータとして予め設定される。
なお、本実施形態においては、オーダチェンジ時に木型交換を行う場合、および/または、後述する「印刷シリンダが昇降しないタイプ」においてオーダチェンジ時に印版交換を行う場合を想定したとき、木型や印版の交換作業の完了後にフレームを閉じる必要があるので、フレーム閉時間を考慮したシートセット時間が設定される。一方、後述する「印刷シリンダが昇降するタイプ」においては、第3の目標準備時間にフレーム閉時間を含めない。
This third target preparation time is preset as data corresponding to an order change pattern to be described later, based on actual measurements when a worker skilled in each task performs the task. On the other hand, in the case of a box making machine equipped with an auto feeder device that automatically sets sheets, the third target preparation time is preset as data corresponding to the order change pattern described later, based on the actual measurement value of the auto feeder device. Ru.
In addition, in this embodiment, when it is assumed that the wooden mold is replaced at the time of order change, and/or when the printing plate is replaced at the time of order change in "a type in which the printing cylinder does not go up and down", which will be described later, the wooden mold and Since it is necessary to close the frame after the printing plate replacement work is completed, the sheet setting time is set in consideration of the frame closing time. On the other hand, in the "type in which the printing cylinder moves up and down", which will be described later, the frame closing time is not included in the third target preparation time.

次に、図3に示すように、第1~第3の目標準備時間と並行するように設定する「色替時間」について説明する。
この「色替時間」は、準備時間の開始時点(第1の目標準備時間の開始時点)からインキ交換が完了するまでの時間である。インキ交換は、予めインキ缶をセットしておき、生産が終了して給紙停止すると、自動的に複数の印刷ユニットで同時に開始し、同時に終了することを想定している。
「色替時間」の設定値は、インキ交換を行う印刷ユニットの数に関わらず一つの値であり、機械のインキ交換の実測値に基づいて、予め設定される。なお、本実施形態では、この「色替時間」は、第1~第3の準備段階における目標準備時間に含めない概念としているが、予め設定された色替時間が、上述した第1~第3の目標準備時間の合計より長い場合には、上述した第1~第3の目標準備時間に代えて、この予め設定された色替時間が設定される。
Next, as shown in FIG. 3, the "color change time" that is set to be parallel to the first to third target preparation times will be explained.
This "color change time" is the time from the start of the preparation time (the start of the first target preparation time) until the ink replacement is completed. It is assumed that ink replacement is performed by setting ink cans in advance, and when production ends and paper feeding is stopped, ink replacement automatically starts and ends at the same time in multiple printing units.
The setting value of "color change time" is one value regardless of the number of printing units that perform ink replacement, and is set in advance based on the actual value of ink replacement of the machine. In addition, in this embodiment, this "color change time" is not included in the target preparation time in the first to third preparation stages, but the preset color change time does not include the above-mentioned first to third preparation stages. If the color change time is longer than the total of the three target preparation times, this preset color change time is set instead of the first to third target preparation times described above.

次に、図3に示すように、第3の目標準備時間の後の時間として設定する「給紙準備時間」について説明する。
この「給紙準備時間」は、上述した第3の準備段階における目標準備時間の一つであり、達成すべき目標値である第4の目標準備時間である。具体的には、この第4の目標準備時間は、「機械セット」が全て完了して、作業者により主モータスイッチがオンされてから、一枚給紙を行うまでの時間である。
本実施形態では、主モータをオンした後、すぐに機械を増速させて一枚給紙を行うことを想定している。
「給紙準備時間」の設定値は、機械が平均的な運転速度まで増速する時間の実測値に基づいて、後述するオーダチェンジパターンに応じたデータとして予め設定される。
ここで、本実施形態では、主モータがオンされてから一枚給紙が行われるまでの動作を「給紙準備」と定義する。
Next, as shown in FIG. 3, the "sheet feeding preparation time" that is set as the time after the third target preparation time will be explained.
This "paper feeding preparation time" is one of the target preparation times in the third preparation stage described above, and is the fourth target preparation time which is the target value to be achieved. Specifically, the fourth target preparation time is the time from when all the "machine sets" are completed and the main motor switch is turned on by the operator until one sheet is fed.
In this embodiment, it is assumed that after turning on the main motor, the speed of the machine is immediately increased to feed one sheet of paper.
The set value of the "sheet feeding preparation time" is preset as data corresponding to an order change pattern described later, based on the actual value of the time taken for the machine to speed up to an average operating speed.
In this embodiment, the operation from when the main motor is turned on until one sheet is fed is defined as "sheet feeding preparation."

次に、図3に示すように、第4の目標準備時間の後の時間として設定する「試し加工・検品時間(無地)」について説明する。
この「試し加工・検品時間(無地)」は、上述した第3の準備段階における目標準備時間の一つであり、達成すべき目標値である第5の目標準備時間である。具体的には、この第5の目標準備時間は、オーダチェンジ直後に、オーダで印刷や打ち抜き加工を行わないと仮定した場合(上述した「無地」の場合)の、一枚給紙してから、検品が完了して次のオーダの生産を開始(連続給紙)するまでの時間である。
本実施形態では、一回の検品で合格し、機械の調整や2回目の試し加工を行わない場合を想定している。
「試し加工・検品時間(無地)」の設定値は、各作業に熟練した作業者が、印刷や打ち抜きのない、無地の段ボール箱の品質(箱の寸法や接合精度など)を検品する実測値に基づいて、後述するオーダチェンジパターンに応じたデータとして予め設定される。
本実施形態では、一枚給紙が行われてから連続給紙が開始するまでの動作を「試し加工・検品」と定義する。
Next, as shown in FIG. 3, the "trial processing/inspection time (plain)" that is set as the time after the fourth target preparation time will be described.
This "trial processing/inspection time (plain)" is one of the target preparation times in the third preparation stage described above, and is the fifth target preparation time which is the target value to be achieved. Specifically, this fifth target preparation time is the time from feeding one sheet immediately after the order change, assuming that no printing or punching is performed on the order (in the case of "plain color" described above). This is the time from the completion of inspection to the start of production of the next order (continuous paper feeding).
In this embodiment, it is assumed that the product passes the inspection once and does not adjust the machine or perform a second trial process.
The setting value for "Trial processing/inspection time (plain)" is the actual value measured by a worker skilled in each task inspecting the quality (box dimensions, joining accuracy, etc.) of a plain cardboard box without printing or punching. Based on this, data is set in advance as data corresponding to an order change pattern, which will be described later.
In this embodiment, the operation from when one sheet is fed to when continuous sheet feeding starts is defined as "trial processing/inspection."

次に、図3に示すように、第5の目標準備時間の後の時間として設定する「検品加算時間(印刷/打抜)」について説明する。
この「検品加算時間(印刷/打抜)」は、上述した第3の準備段階における目標準備時間の一つであり、達成すべき目標値である第6の目標準備時間である。具体的には、この第6の目標準備時間は、オーダチェンジ後の後オーダで印刷や打ち抜き加工を行う場合において、一枚給紙してから、検品が完了して次のオーダの生産を開始するまでの時間と、上述した「試し加工・検品時間(無地)」との差の時間である。
本実施形態では、検品は、各色の印刷や打ち抜きの品質を一つずつ順番に検査することを想定している。本実施形態では、「無地」の場合に対し、このような検品に要する時間の差を加算する概念として、「検品加算時間(印刷/打抜)」としている。
「検品加算時間(印刷/打抜)」の設定値は、各作業に熟練した作業者が作業したときの実測値に基づいて、後述するオーダチェンジパターンに応じたデータとして予め設定される。
ここで、上述したように、本実施形態では、一枚給紙が行われてから連続給紙が開始するまでの動作を「試し加工・検品」と定義する。
Next, as shown in FIG. 3, the "inspection additional time (printing/punching)" that is set as the time after the fifth target preparation time will be explained.
This "inspection additional time (printing/punching)" is one of the target preparation times in the third preparation stage described above, and is the sixth target preparation time which is the target value to be achieved. Specifically, this sixth target preparation time is when printing or punching is performed on a subsequent order after an order change, after feeding one sheet, completing inspection, and starting production for the next order. This is the difference between the time it takes to complete the process and the above-mentioned "trial processing/inspection time (plain)".
In this embodiment, it is assumed that the quality of printing and punching of each color is sequentially inspected one by one. In the present embodiment, the concept of adding the difference in time required for inspection to the case of "plain color" is defined as "inspection additional time (printing/punching)."
The set value of the "inspection additional time (printing/punching)" is preset as data corresponding to an order change pattern described later, based on the actual measurement value when an operator skilled in each work performs the work.
Here, as described above, in this embodiment, the operation from when one sheet is fed to when continuous sheet feeding starts is defined as "trial processing/inspection."

次に、図4乃至図6により、本発明の実施形態による段ボールシート製函機の目標準備時間報知装置における、上述した第1~第6の目標準備時間および色替時間に基づき目標準備時間を算出するためのオーダチェンジパターン別目標準備時間データおよび作業別設定時間データについて説明する。図4は、本実施形態による、印刷シリンダが昇降する印刷装置を備える製函機の目標準備時間報知装置における目標準備時間を算出するためのオーダチェンジパターン別目標準備時間データを示す図表であり、図5は、本実施形態による印刷シリンダが昇降しない印刷装置を備える製函機の目標準備時間報知装置における目標準備時間を算出するためのオーダチェンジパターン別目標準備時間データを示す図表であり、図6は、本実施形態によるオーダチェンジパターン別目標準備時間データを定める基準となる作業別設定時間データを示す図表である。 Next, referring to FIGS. 4 to 6, the target preparation time is calculated based on the first to sixth target preparation times and color change times described above in the target preparation time notification device for the corrugated sheet box making machine according to the embodiment of the present invention. The target preparation time data by order change pattern and the set time data by work to be calculated will be explained. FIG. 4 is a chart showing target preparation time data by order change pattern for calculating a target preparation time in a target preparation time notification device of a box making machine equipped with a printing device in which a printing cylinder moves up and down, according to the present embodiment, FIG. 5 is a chart showing target preparation time data by order change pattern for calculating the target preparation time in the target preparation time notification device of the box making machine equipped with the printing device in which the printing cylinder does not move up and down according to the present embodiment. 6 is a chart showing set time data for each job, which is a standard for determining target preparation time data for each order change pattern according to the present embodiment.

本実施形態では、図4および図5に示すように、オーダチェンジパターンとして、前オーダと後オーダのそれぞれの基本情報(後述する図11参照)に基づいて設定される、印刷パターンと木型パターンの組み合わせに応じて、上述した第1~第6の目標準備時間を合計した目標準備時間が予め設定される。また、目標準備時間を予め設定する際、場合によっては、色替時間も考慮される。
ここで、図4および図5に示すように、印刷パターン「□■色替」の定義として、「□」の数値は、オーダチェンジ中に印版交換する回数を示し、「■」の数値は、オーダチェンジの後オーダで使用する色の数を示し、「色替」は、少なくとも1つの印刷ユニットでオーダチェンジ中にインキ交換を行うことを示し、また、木型パターン「□■」の定義として、「□」は、オーダチェンジの前オーダで使用される木型を示し、「■」は、オーダチェンジの後オーダで使用される木型を示し、それらの木型は、「送」が、送り木型を示し、「大」が、大型木型を示し、「小」が、小型木型を示す。
In this embodiment, as shown in FIGS. 4 and 5, a printing pattern and a wooden pattern are set as order change patterns based on the basic information of the previous order and the subsequent order (see FIG. 11 described later). A target preparation time that is the sum of the first to sixth target preparation times described above is set in advance according to the combination. Furthermore, when setting the target preparation time in advance, the color change time is also taken into consideration in some cases.
Here, as shown in Figures 4 and 5, as the definition of the printing pattern "□■Color change", the value of "□" indicates the number of times the printing plate is replaced during order change, and the value of "■" , indicates the number of colors to be used in the order after the order change, "color change" indicates that ink is replaced during the order change in at least one printing unit, and the definition of the wooden pattern "□■" , "□" indicates the pattern used in the order before the order change, and "■" indicates the pattern used in the order after the order change. , indicates a feeding pattern, "large" indicates a large pattern, and "small" indicates a small pattern.

たとえば、図4において、印刷パターンが、オーダチェンジ中に印版交換する回数が1回であり、かつ、オーダチェンジの後オーダで使用する色の数が2色であり、さらに、少なくとも1つの印刷シリンダにおいてオーダチェンジ中にインキ交換をする「12色替」パターンであり、かつ、木型パターンが、大型木型から送り木型に交換される「大送」パターンである場合の目標準備時間(上述した第1~第6の目標準備時間の合計値)は、370秒である。このような値は、後述するように図6に示す作業別設定時間データを基に設定される。
また、図5においても、各目標準備時間の数値を省略しているが、図4と同様に、後述する図6に示す作業別設定時間データを基準として設定される。
For example, in FIG. 4, the printing pattern has one printing plate exchange during an order change, two colors to be used in the order after the order change, and at least one printing pattern. The target preparation time ( The total value of the first to sixth target preparation times described above is 370 seconds. Such a value is set based on the work-specific setting time data shown in FIG. 6, as described later.
Further, although the numerical values of each target preparation time are omitted in FIG. 5 as well, similar to FIG. 4, they are set based on the set time data for each task shown in FIG. 6, which will be described later.

本実施形態においては、基本的に、印版交換の「印版」という用語は、印刷に使用するための「印版」と、印刷をせず段ボールシートSを送るための「送り版」とを含む用語として定義する。 In this embodiment, the term "printing plate" for printing plate exchange basically refers to the "printing plate" used for printing and the "feeding plate" used to send the corrugated cardboard sheet S without printing. Defined as a term that includes.

ここで、印刷シリンダが昇降する印刷装置を備える製函機(図4に示すデータが用いられる製函機)では、印刷をしない印刷シリンダがシートSに接触しないように、印刷シリンダを上方位置で待機させるので、送り版を使用しない。すなわち、図4に示す印刷パターンの「印版」は、印刷に使用する印版のみを示す。 Here, in a box-making machine equipped with a printing device in which the printing cylinder moves up and down (a box-making machine in which the data shown in FIG. Do not use the feed version as it will make you wait. That is, the "printing plate" in the printing pattern shown in FIG. 4 indicates only the printing plate used for printing.

たとえば、図4のデータの一例として、「12色替」パターンでは、オーダチェンジ中(準備時間中)に印版を1回交換し、後オーダで2つの印刷ユニット(印刷シリンダ)で2色を印刷し、さらに、少なくとも1つの印刷シリンダにおいて、オーダチェンジ中にインキ交換をすることを示している。 For example, as an example of the data in Figure 4, in the "12 color change" pattern, the printing plate is changed once during the order change (during preparation time), and in the subsequent order, two colors are changed using two printing units (printing cylinders). It is shown that printing is performed and that ink is replaced during an order change in at least one printing cylinder.

この場合、後オーダで2色を印刷するのに対し、オーダチェンジ中に印版を1回しか交換しないのは、後オーダの2色分のうち、1色の印版を前オーダの段ボール箱の生産中に交換していることを意味する。より具体的には、印刷シリンダが昇降可能な製函機において、前オーダの生産中に印刷に使用しない印刷シリンダを上昇位置に待機させ、作業者が、その前オーダの生産中にその使用しない印刷シリンダにおいて、後オーダの2色分のうち1色の印版を交換することを前提としているのである。
このように、図4において、たとえば「01」、「23」などのパターンは、前オーダの生産中に印版交換しているパターンを示すので、印刷シリンダが昇降する印刷装置を備える製函機にのみ用いられるパターンである。
In this case, while two colors are printed in the subsequent order, the printing plates are only changed once during the order change because one of the two colors in the subsequent order is printed on the cardboard box of the previous order. This means that they are being replaced during production. More specifically, in a box-making machine in which the printing cylinder can be raised and lowered, the printing cylinder that is not used for printing during the production of the previous order is placed on standby in the raised position, and the operator is able to move the printing cylinder that will not be used during the production of the previous order. This is based on the premise that the printing cylinder for one of the two colors ordered later is to be replaced in the printing cylinder.
In this way, in FIG. 4, for example, patterns such as "01" and "23" indicate patterns in which printing plates are replaced during production of the previous order. This pattern is used only for

このように、本発明の実施形態における「目標準備時間」は、たとえば、オーダチェンジ中(準備時間中)に交換する印版などの部品であっても、前オーダの生産中に交換可能であれば交換する、というように、全ての作業を効率よく行うことを前提とした、目標準備時間として設定される。
また、上述した第1~第6の目標準備時間のように、それらの目標準備時間は、各作業に熟練しており、印版の用意や治具の用意を適切に行え、かつ、印版や木型の交換作業も効率良く行える各作業に熟練した作業者の作業の実測値に基づいており、この点でも、本発明の実施形態の図4における「目標準備時間」は、全ての作業を効率よく行うことを前提とした、第1~第3の準備時間の目標準備時間として設定される。
In this way, the "target preparation time" in the embodiment of the present invention refers to, for example, parts such as printing plates that are replaced during an order change (preparation time), or parts that can be replaced during production of a previous order. It is set as a target preparation time based on the premise that all tasks are performed efficiently, such as replacing or replacing items.
In addition, like the first to sixth target preparation times mentioned above, those target preparation times are for people who are skilled at each task, who can properly prepare the printing plates and jigs, and who are able to prepare the printing plates and jigs appropriately. It is based on the actual measurement of the work of a skilled worker who can efficiently perform the work of replacing wooden molds and wooden molds.In this respect as well, the "target preparation time" in FIG. 4 of the embodiment of the present invention is This is set as the target preparation time for the first to third preparation times on the premise that the preparation time is efficiently performed.

他方、印刷シリンダが昇降しない印刷装置を備える製函機(図5に示すデータが用いられる製函機)では、作業者が、オーダチェンジ中に、後オーダで印刷をしない印刷シリンダに送り版を取り付けることを前提としている。すなわち、図5に示す印刷パターンの「印版」には、送り版も含まれる。 On the other hand, in a box-making machine equipped with a printing device in which the printing cylinder does not move up and down (a box-making machine in which the data shown in Figure 5 is used), during an order change, a worker places a feeding plate on a printing cylinder that will not be used for printing in a later order. It is assumed that it will be installed. That is, the "printing plate" of the printing pattern shown in FIG. 5 also includes the feeding plate.

たとえば、図5のデータの一例を説明すると、「21色替」パターンでは、オーダチェンジ中(準備時間中)に印版を2回交換し、後オーダで1つの印刷ユニット(印刷シリンダ)で1色を印刷することを示している。また、少なくとも1つの印刷シリンダにおいて、オーダチェンジ中にインキ交換をすることを示している。
この場合、後オーダで1色を印刷するのに対し、オーダチェンジ中に印版を2回交換しているのは、その2回のうち、1回は、送り版へ交換していることを意味している。
このように、図5において、たとえば「10」、「32」などのパターンは、印刷シリンダが昇降しない印刷装置を備える製函機にのみ用いられるパターンである。
For example, to explain an example of the data in FIG. 5, in the "21 color change" pattern, the printing plate is replaced twice during the order change (during preparation time), and one printing unit (printing cylinder) is replaced once in the subsequent order. Indicates that the color will be printed. It also indicates that ink is replaced during the order change in at least one printing cylinder.
In this case, one color is printed in the later order, but the printing plate is changed twice during the order change, meaning that one of the two times the printing plate is changed to the forwarding plate. It means.
As described above, in FIG. 5, patterns such as "10" and "32" are patterns used only for box making machines equipped with a printing device in which the printing cylinder does not move up and down.

また、この図5における目標準備時間も、上述した図4と同様に、印版や木型の交換作業に熟練した作業者による各作業の実測値に基づいており、この点でも、本発明の実施形態の図5における「目標準備時間」は、全ての作業を最も効率よく行うことを前提とした、第1~第3の準備時間の目標準備時間として設定される。 In addition, the target preparation time in FIG. 5 is also based on actual measurements of each task performed by an operator skilled in replacing printing plates and wooden molds, as in FIG. 4 described above. The "target preparation time" in FIG. 5 of the embodiment is set as the target preparation time of the first to third preparation times on the premise that all tasks are performed most efficiently.

次に、図6に示す作業別設定時間表を説明する。
図6に示す作業別設定時間データは、図4または図5に示すオーダチェンジパターン別目標準備時間表の各目標準備時間を定めるために用いる基準データである。
この図6に示すデータは、上述した第1の目標準備時間「ロット終了・機械セット時間(無地~無地)」、第2の目標準備時間「機械セット加算時間(印版交換/木型交換)」、第3の目標準備時間「シートセット加算時間」、第4の目標準備時間「給紙準備時間」、第5の目標準備時間「試し加工・検品時間(無地)」、第6の目標準備時間「検品加算時間(印刷/打抜)」および「色替時間」をそれぞれ定めている。
図6に示すデータは、効率的にオーダチェンジ作業を進めた場合を想定して設定された基準データ/初期設定データであり、本実施形態では、上述したような、作業も効率良く行える3人の各作業に熟練した作業者が第1~第3の準備段階の各作業を実行したときの実測値を基に設定されている。
なお、図4乃至図6に示すようなデータは、後述する上位管理装置/目標準備時間報知装置122の記憶部152に記憶される。
Next, the work-specific setting time table shown in FIG. 6 will be explained.
The set time data for each task shown in FIG. 6 is reference data used to determine each target preparation time in the target preparation time table for each order change pattern shown in FIG. 4 or 5.
The data shown in FIG. 6 are the above-mentioned first target preparation time "lot completion/machine set time (plain color to plain color)" and second target preparation time "additional machine set time (print plate exchange/wooden pattern exchange)". ", 3rd target preparation time "Sheet set addition time", 4th target preparation time "Paper feeding preparation time", 5th target preparation time "Trial processing/inspection time (plain)", 6th target preparation time The time "inspection additional time (printing/punching)" and "color change time" are determined respectively.
The data shown in FIG. 6 is standard data/initial setting data set on the assumption that the order change work will be carried out efficiently.In this embodiment, the data shown in FIG. These settings are based on actual measurements taken when a skilled worker performs each of the first to third preparation steps.
Note that the data shown in FIGS. 4 to 6 are stored in the storage unit 152 of the higher-level management device/target preparation time notification device 122, which will be described later.

ここで、たとえば図4のオーダチェンジパターンが「12」「大送」の組み合わせの場合の、図6を用いた目標準備時間(図4または図5)の算出例を説明する。
このオーダチェンジパターンの場合、図6に示すデータに基づいて、「ロット終了・機械セット(無地→無地)時間」である75秒に、オーダチェンジ中に印版を1回交換するとともに、大型木型から送り木型へ交換するので、「機械セット加算(1色印版交換)時間」である30秒と、「機械セット加算(大型←→送り)時間」である150秒とのうち、時間が長い方の150秒が加算される。さらに、木型交換後にダイカッタのフレームを閉じるので、「シートセット加算(フレーム閉考慮)時間」である40秒、「給紙準備時間」である20秒、および、「試し加工・検品(無地)時間」である30秒が加算される。さらに、後オーダで2色を印刷するので「検品加算(2色)時間」である20秒が加算される。
また、製函機がオートフィーダを備え、それを使用する場合には、オートフィーダの仕様に応じて、「シートセット加算」および「シートセット加算(フレーム閉考慮)時間」の値が、自動的に、所定値に変更される。
また、後述するように、第1~第2の準備段階において、インキ交換時間に関して予め設定される「色替時間」が、予め設定される第1~第3の目標準備時間の合計より長くなる場合は、第1~第3の目標準備時間に代えて、図6に示す「色替時間」を第1~第2の準備段階での目標準備時間に設定する。なお、「色替時間」は、インキ塗布機構の仕様によって変更される。
Here, an example of calculating the target preparation time (FIG. 4 or FIG. 5) using FIG. 6 will be described, for example, when the order change pattern in FIG. 4 is a combination of "12" and "large transfer".
In the case of this order change pattern, based on the data shown in Figure 6, the printing plate is replaced once during the order change, and the printing plate is replaced once during the order change at 75 seconds, which is the "lot end/machine set time (plain color → plain color)". Since the mold is replaced with a feeding wooden mold, the time is 30 seconds which is the "machine set addition time (one color printing plate exchange)" and 150 seconds which is the "machine set addition time (large size ← → feed) time". The longer 150 seconds will be added. Furthermore, since the frame of the die cutter is closed after replacing the wooden mold, 40 seconds is the "additional sheet set time (considering frame closing)", 20 seconds is the "paper feeding preparation time", and 20 seconds is the "trial processing/inspection (plain)" time. 30 seconds is added. Furthermore, since two colors are printed in the subsequent order, 20 seconds, which is the "inspection addition (two colors) time", is added.
In addition, if the box making machine is equipped with an auto feeder and you use it, the values of "Sheet set addition" and "Sheet set addition (frame closing consideration) time" will be automatically set depending on the specifications of the auto feeder. is changed to a predetermined value.
Furthermore, as will be described later, in the first and second preparation stages, the "color change time" preset regarding the ink replacement time becomes longer than the sum of the first to third target preparation times set in advance. In this case, instead of the first to third target preparation times, the "color change time" shown in FIG. 6 is set as the target preparation time for the first to second preparation stages. Note that the "color change time" is changed depending on the specifications of the ink application mechanism.

なお、この図6に示すデータは、実際の第1~第3の準備段階における作業者の人数が、基本となる3人に対して増減した場合に、作業者の所定のパネルへの入力により自動的に所定値分だけ増減するように変更される。本実施形態では、図6に示すデータを、後述する製函機の上位管理装置122の記憶部152に記憶された所定値を用いて補正して、そのような補正値に基づいて、図4または図5に示すような目標準備時間を補正するようにしている。
なお、図4~図6に示すような各データを作業人数に応じてそれぞれ設定し、それらを、後述する上位管理装置122の記憶部152に記憶するようにしてもよい。
Note that the data shown in FIG. 6 is based on input by workers to a predetermined panel when the number of workers in the actual first to third preparation stages increases or decreases from the basic three. It is automatically changed to increase or decrease by a predetermined value. In this embodiment, the data shown in FIG. 6 is corrected using a predetermined value stored in the storage unit 152 of the upper management device 122 of the box making machine, which will be described later, and based on such correction value, the data shown in FIG. Alternatively, the target preparation time as shown in FIG. 5 is corrected.
Note that each data shown in FIGS. 4 to 6 may be set according to the number of workers and stored in the storage unit 152 of the upper management device 122, which will be described later.

また、「機械セット加算時間」、「シートセット加算時間」、「試し加工・検品時間(無地)」、および、「検品加算時間(印刷/打抜)」の各設定値は、作業者の所定のパネルへの入力により変更できる。
これにより、たとえば、新人作業者の場合は、「機械セット加算時間」、「シートセット加算時間」を長めに設定するなど、作業者の熟練度に応じて変更できる。すなわち、新人作業者の場合、その準備段階における実際の作業時間が、各作業に熟練した作業者の作業時間を目標にした目標値とかけ離れ過ぎるので、本実施形態では、適切な目標値に設定できるのである。
また、工場のスペースの制約により、作業に必要な物の用意に時間を要する場合は長めに設定するなど、作業環境に応じて設定時間を変更することもできる。
これらにより、本実施形態では、作業者の熟練度や工場の実情に合ったより適切な達成すべき目標準備時間の報知ができるようになる。
また、たとえば、段ボール箱に厳しい品質水準が求められる場合は、「試し加工・検品時間(無地)」や「検品加算時間(印刷/打抜)」の目標準備時間を長めに設定すれば、作業者による、より慎重な試し加工やより時間をかけた検品作業などを可能とする、実情に合った適切な達成すべき目標準備時間の報知ができるようになる。
In addition, the settings for "machine set additional time", "sheet set additional time", "trial processing/inspection time (plain)", and "inspection additional time (printing/punching)" are set by the operator. It can be changed by inputting it into the panel.
As a result, for example, in the case of a new worker, the "additional machine setting time" and "additional sheet setting time" can be set to be longer, and changes can be made according to the skill level of the worker. In other words, in the case of a new worker, the actual work time during the preparation stage is too far from the target value of the work time of a skilled worker in each task, so in this embodiment, the actual work time is set to an appropriate target value. It can be done.
Furthermore, the set time can be changed depending on the work environment, such as setting a longer time if it takes time to prepare the items necessary for the work due to space constraints in the factory.
As a result, in this embodiment, it becomes possible to notify the target preparation time to be achieved more appropriately in accordance with the skill level of the worker and the actual situation of the factory.
For example, if strict quality standards are required for cardboard boxes, setting longer target preparation times for "trial processing/inspection time (plain)" and "additional inspection time (printing/punching)" will reduce the It becomes possible to notify the appropriate target preparation time to be achieved in accordance with the actual situation, which enables more careful trial processing and more time-consuming inspection work by the operator.

次に、図7、図8A、図8B、図9により、図6の作業別設定時間表を用いた、図4または図5に示すオーダチェンジパターン別目標準備時間表の各目標準備時間の設定方法をより詳細に説明する。図7は、本実施形態による第1~第3の準備段階における目標準備時間の設定方法を説明するための概念図であり、図8Aおよび図8Bは、本実施形態による第1~第2の準備段階における目標準備時間の設定方法を説明するための概念図であり、図9は、本実施形態による第3の準備段階における目標準備時間の設定方法を説明するための概念図である。 Next, according to FIGS. 7, 8A, 8B, and 9, each target preparation time of the target preparation time table for each order change pattern shown in FIG. 4 or 5 is set using the set time table for each task shown in FIG. The method will be explained in more detail. FIG. 7 is a conceptual diagram for explaining a method for setting target preparation times in the first to third preparation stages according to this embodiment, and FIGS. 8A and 8B are FIG. 9 is a conceptual diagram for explaining a method for setting a target preparation time in a preparation stage, and FIG. 9 is a conceptual diagram for explaining a method for setting a target preparation time in a third preparation stage according to the present embodiment.

まず、図7に示す例のように、印版交換を行わない場合(図7(a))に対して、印版交換を行う場合(図7(b))は、印版交換の準備時間および色の検品の準備時間が必要となる分、第2の目標準備時間および第6の目標準備時間が長く設定される。具体的には、図6の「機械セット加算(1色交換)時間」の設定時間(30秒/図6参照)、および、「検品加算(1色)時間」の設定時間(10秒/図6参照)がそれぞれ加算される。
このように決定される設定時間を基準として、図4または図5のオーダチェンジパターン別目標準備時間表の各目標準備時間の値が適宜設定される。
First, as in the example shown in Fig. 7, the preparation time for printing plate replacement is The second target preparation time and the sixth target preparation time are set longer by the amount of preparation time required for color inspection. Specifically, the setting time for "machine set addition (one color replacement) time" in Figure 6 (30 seconds/see Figure 6) and the setting time for "inspection addition (one color) time" (10 seconds/see Figure 6). 6) are added respectively.
Based on the setting time determined in this way, the value of each target preparation time in the target preparation time table for each order change pattern shown in FIG. 4 or 5 is set as appropriate.

次に、図8A(a)に、オーダチェンジ中に印版交換あるいは木型交換のどちらかを行う場合の例を示す。たとえば、図8A(a)に示すように、印版交換のみを行う場合には、オーダチェンジ中に印版交換する回数に応じた「機械セット加算(1色印版交換)時間」の設定時間(30秒/図6参照)を第2の目標準備時間の基準とし、図4または図5のオーダチェンジパターン別目標準備時間表の各目標準備時間の値が適宜設定される。この場合、「機械セット加算(木型)時間」に関する設定時間は考慮しない。木型交換のみを行う場合には、木型交換の組み合わせに応じた設定時間(図6参照)を、機械セット加算時間(第2の目標準備時間)の設定時間とする。 Next, FIG. 8A(a) shows an example of a case where either a printing plate or a wooden pattern is exchanged during an order change. For example, as shown in Fig. 8A(a), when only printing plates are replaced, the set time for "machine set addition (one color printing plate replacement) time" is set according to the number of times printing plates are replaced during order change. (30 seconds/see FIG. 6) is used as a reference for the second target preparation time, and the value of each target preparation time in the target preparation time table for each order change pattern in FIG. 4 or 5 is set as appropriate. In this case, the setting time regarding "machine set addition (wooden pattern) time" is not considered. In the case where only the wooden mold exchange is performed, the set time corresponding to the combination of wooden mold exchanges (see FIG. 6) is set as the set time for the machine set addition time (second target preparation time).

次に、図8A(b)に、オーダチェンジ中に印版交換および木型交換の両方を行う場合の例を示す。この場合、図8A(a)のパターンにならって、「機械セット加算(印版交換)時間」と、「機械セット加算(木型交換)時間」をそれぞれ求めた後、両者を比較して、長い方を「機械セット加算時間(第2の目標準備時間)」の設定時間とする。
すなわち、印版交換および木型交換の両方を行う場合において、印版交換の準備作業時間と、木型交換の準備作業時間とを比較するのは、複数人で準備作業を並行に行い(印版交換と木型交換を並行に行い)、より効率的な作業を行った場合の目標準備時間を設定する本実施形態の基本概念に基づくものである。
ここで、図8A(b)のように、1色の印版交換の準備時間より、送り木型を取り外してから大型木型を取り付ける木型交換の準備時間が長くなることは、上述したような熟練作業者の作業の実測値から得られる。この場合、「機械セット加算(1色印版交換)時間」の設定時間(30秒/図6参照)ではなく、「機械セット加算(大型←→送り)時間」の設定時間(150秒/図6参照)が、第2の目標準備時間の基準として設定される。一方、図示しないが、印版交換の準備時間の方が長くなる場合(たとえば3色など複数の印版交換を行う場合)は、印版交換の設定時間(図6)が第2の目標準備時間の基準として設定される。
Next, FIG. 8A(b) shows an example in which both printing plates and wooden patterns are exchanged during an order change. In this case, following the pattern in Fig. 8A(a), calculate the "machine set addition (print plate exchange) time" and the "machine set addition (wooden pattern exchange) time" respectively, and then compare the two. The longer one is set as the "machine set additional time (second target preparation time)".
In other words, when both printing plates and wood molds are replaced, the preparatory work time for printing plate replacement and the preparatory work time for wood mold replacement are compared because multiple people are doing the preparation work in parallel (printing This is based on the basic concept of the present embodiment, which sets a target preparation time for more efficient work by performing plate exchange and wooden pattern exchange in parallel).
As mentioned above, as shown in Fig. 8A(b), the preparation time for replacing a printing mold after removing the feeding mold and attaching a large mold is longer than the preparation time for replacing a single color printing plate. It is obtained from actual measurements of the work of highly skilled workers. In this case, the set time for "machine set addition (large size ←→ feed) time" (150 seconds/see figure 6) is not used for "machine set addition (one color printing plate exchange) time" (30 seconds/see Figure 6). 6) is set as the standard for the second target preparation time. On the other hand, although not shown in the figure, if the preparation time for printing plate replacement is longer (for example, when replacing multiple printing plates such as three colors), the set time for printing plate replacement (Fig. 6) is longer than the second target preparation time. Set as a time standard.

次に、図8B(a)に、インキ交換を行う場合の例を示す。この場合は、「ロット終了・機械セット時間(無地から無地)」、「機械セット加算(印版交換/木型交換)時間」、および、「シートセット加算時間」との合計時間と、「色替時間」とを比較して、長い方の時間を第1および第2の準備段階の時間として設定する。
たとえば、インキ交換の準備時間が、第1~第2の準備段階の他の準備時間(上述した「ロット終了・機械セット時間(無地から無地)」など)の合計より長くなる場合には、インキ交換に関する図6の「色替時間」の設定時間を基準とし、図4または図5のオーダチェンジパターン別目標準備時間表の各目標準備時間の値が適宜設定される。すなわち、第1~第2の準備段階の目標準備時間の基準が、「色替時間」の設定時間となる。この場合、図4または図5のように設定される目標準備時間は、第1~第3の目標準備時間が「色替時間」に置き換えられた数値を含むものとなる。一方、インキ交換の準備時間が短い場合は、図6の「色替時間」の設定時間は考慮されない。
このように比較を行うのは、ロット終了動作が開始(給紙停止)すると、製函機の運転速度の減速や機械セットと並行して、インキ交換が行われることを想定しているためである。
Next, FIG. 8B(a) shows an example in which ink is replaced. In this case, the total time of "lot completion/machine set time (plain color to plain color)", "machine set addition time (print plate exchange/wooden pattern exchange) time", and "sheet set addition time", and "color The longer time is set as the time for the first and second preparation stages.
For example, if the preparation time for ink replacement is longer than the sum of other preparation times in the first and second preparation stages (such as the above-mentioned "lot end/machine set time (plain to plain)"), ink replacement The value of each target preparation time in the target preparation time table for each order change pattern in FIG. 4 or 5 is set as appropriate based on the set time of "color change time" in FIG. 6 related to exchange. That is, the reference of the target preparation time for the first and second preparation stages is the set time of the "color change time". In this case, the target preparation time set as shown in FIG. 4 or 5 includes the numerical value in which the first to third target preparation times are replaced with "color change time." On the other hand, if the preparation time for ink replacement is short, the setting time of "color change time" in FIG. 6 is not taken into consideration.
This comparison is made because it is assumed that when the lot end operation starts (paper feeding stops), the ink will be replaced at the same time as the box making machine's operating speed is reduced and the machine is set. be.

次に、図8B(b)に、オーダチェンジ中に木型交換を行う場合、および/または、印刷シリンダが昇降しない製函機においてオーダチェンジ中に印版交換を行う場合の例を示す。この場合は、木型や印版の交換が完了した後に、ダイカッタにおける木型交換のためにスライド可能なフレームを閉じ、および/または、印刷ユニットにおける印版交換のためにスライド可能なフレームを閉じる必要があるので、フレーム閉時間を考慮したシートセット時間を、第3の目標準備時間としての設定時間とする。 Next, FIG. 8B(b) shows an example in which a wooden mold is replaced during an order change and/or a printing plate is replaced during an order change in a box making machine in which the printing cylinder does not go up and down. In this case, after the change of the pattern or printing plate is completed, the slidable frame is closed for changing the pattern in the die cutter and/or the slidable frame is closed for changing the printing plate in the printing unit. Since this is necessary, the sheet setting time in consideration of the frame closing time is set as the third target preparation time.

次に、図9に、後オーダで印刷および/または打ち抜き加工を行う場合の例を示す。
まず、図9(a)に示すように、後オーダで、打ち抜き加工はせず、1色の印刷のみを行う場合、後オーダで使用する色数に応じた検品加算時間の設定時間(この場合、「検品加算(1色)時間の設定時間である10秒/図6参照)を、第6の目標準備時間の基準とし、図4または図5のオーダチェンジパターン別目標準備時間表の各目標準備時間の値が適宜設定される。
ここで、段ボール箱の印刷部の検品は、1色ずつ検査するので、後オーダで使用する色数(印刷のために使用する印刷シリンダの数)が増えるほど、検品時間が長く設定される(図6参照)。
一方、図示しないが、後オーダで、印刷はせず、打ち抜き加工のみを行う場合は、後オーダで使用する木型の種類に応じた検品加算時間の設定時間(図6)が第6の目標準備時間の基準となる。
Next, FIG. 9 shows an example in which printing and/or punching is performed in a subsequent order.
First, as shown in Figure 9(a), when printing only one color without punching in the subsequent order, the inspection additional time is set according to the number of colors used in the subsequent order (in this case , ``10 seconds, which is the set time for inspection addition (one color) time/see Figure 6), is used as the standard for the sixth target preparation time, and each target in the target preparation time table for each order change pattern in Figure 4 or Figure 5. The value of the preparation time is set appropriately.
Here, since the printing part of the cardboard box is inspected one color at a time, the longer the inspection time is set as the number of colors used in subsequent orders (the number of printing cylinders used for printing) increases ( (See Figure 6).
On the other hand, although not shown in the figure, when only punching is performed without printing in a subsequent order, the additional inspection time set according to the type of wooden pattern used in the subsequent order (Figure 6) is the sixth goal. This is the standard for preparation time.

次に、図9(b)に示すように、後オーダで印刷と打ち抜きの両方を行う場合は、段ボール箱の印刷部の検品時間と、段ボール箱の打ち抜き部分の検品時間とを合計した時間を「検品加算時間(色刷、打抜)」の設定時間(この場合、「検品加算(2色)時間」の設定時間である20秒と、「検品加算(大型打抜)時間」の設定時間である20秒との合計時間である40秒)とすると共に、その設定時間を第6の目標準備時間の基準とし、図4または図5のオーダチェンジパターン別目標準備時間表の各目標準備時間の値が適宜設定される。これは、段ボール箱の印刷部の検品と、打ち抜き部の検品とは同時並行で行わず、一つずつ順番に行うことを想定しているためである。 Next, as shown in Figure 9(b), when both printing and punching are performed in a subsequent order, the total inspection time for the printed part of the cardboard box and the inspection time for the punched part of the cardboard box is required. The set time for "Inspection additional time (color printing, punching)" (in this case, 20 seconds, which is the set time for "Inspection additional time (2 colors)", and the set time for "Inspection additional time (large size punching)") 40 seconds, which is the total time with a certain 20 seconds), and use that set time as the standard for the sixth target preparation time, and set each target preparation time in the target preparation time table by order change pattern in Figure 4 or Figure 5. The value is set appropriately. This is because it is assumed that the inspection of the printed part and the punched part of the cardboard box are not carried out simultaneously, but are carried out one by one in sequence.

次に、図10乃至図16により、本実施形態による段ボールシート製函機の目標準備時間報知装置およびそのシステムの概略構成および扱われる情報について説明する。図10は、本実施形態による目標準備時間報知装置およびそのシステムの概略構成を示すブロック図であり、図11は、本実施形態による目標準備時間報知装置およびそのシステムで用いられるオーダの基本情報の一例を示す図表であり、図12Aおよび図12Bは、本実施形態による目標準備時間報知装置における各所要時間の集計方法の一例を示す図表であり、図13は、本実施形態による目標準備時間報知装置におけるオーダチェンジパターンを特定するための情報の一例を示す図表であり、図14は、本実施形態による目標準備時間報知装置におけるオーダチェンジパターン毎の実績情報の一例を示す図表であり、図15は、本実施形態による目標準備時間報知装置およびそのシステムにおける作業別時間毎の分析情報の一例を示す図表であり、図16は、本実施形態による目標準備時間報知装置およびそのシステムにおける作業別時間毎の比較情報の一例を示す図表である。 Next, with reference to FIGS. 10 to 16, a description will be given of the target preparation time notification device for the corrugated sheet box making machine according to this embodiment, the schematic configuration of the system, and the information handled. FIG. 10 is a block diagram showing a schematic configuration of the target preparation time notification device and its system according to the present embodiment, and FIG. 11 is a block diagram showing the basic information of the order used in the target preparation time notification device and its system according to the present embodiment. FIG. 12A and FIG. 12B are charts showing an example of a method for aggregating each required time in the target preparation time notification device according to the present embodiment, and FIG. 14 is a chart showing an example of information for specifying an order change pattern in the device; FIG. 14 is a chart showing an example of performance information for each order change pattern in the target preparation time notification device according to the present embodiment; FIG. 16 is a chart showing an example of analysis information for each work time in the target preparation time notification device and its system according to the present embodiment, and FIG. 3 is a chart showing an example of comparative information for each case.

まず、図10に示すように、符号100は、本実施形態による製函機1の目標準備時間報知装置およびそのシステムを示し、この製函機1の目標準備時間報知装置およびそのシステム100は、製函機1のユーザ側(製函機で段ボール箱を生産する生産者側)に設けられ、製函機1の各機械を制御し且つ製函機1の生産管理を行う生産管理装置110と、メーカ側(製函機の製造者側)に設けられ、外部との通信を行うと共に所定のデータを蓄積したデータベース(記憶装置)を備えるサーバ装置112と、このサーバ装置112に接続される分析装置114と、を備える。なお、サーバ装置112による外部との通信は、インターネットやクラウドサービス、または、社内LANなどにより行われる。 First, as shown in FIG. 10, reference numeral 100 indicates a target preparation time notification device and its system for the box making machine 1 according to the present embodiment. A production control device 110 that is provided on the user side of the box making machine 1 (on the producer side that produces cardboard boxes with the box making machine), controls each machine of the box making machine 1, and performs production management of the box making machine 1. , a server device 112 that is provided on the manufacturer side (manufacturer side of the box making machine) and is equipped with a database (storage device) that communicates with the outside and stores predetermined data; and an analysis device that is connected to this server device 112. A device 114 is provided. Note that the server device 112 communicates with the outside through the Internet, a cloud service, an in-house LAN, or the like.

生産管理装置110は、製函機1に接続され、図11に示すようなオーダ毎の基本情報に従って製函機1の各機械を制御するための下位管理装置120と、製函機1における生産を全般的に管理するための上位管理装置122とを有する。この上位管理装置122は、本発明の実施形態による段ボールシート製函機の目標準備時間報知装置122に相当する。以下では、上位管理装置122を目標準備時間報知装置122と称して説明する。本実施形態では、下位管理装置120は製函機1に組み込まれ、目標準備時間報知装置122は、製函機1と別体に設けられる。 The production control device 110 is connected to the box making machine 1, and includes a lower management device 120 for controlling each machine of the box making machine 1 according to basic information for each order as shown in FIG. and an upper management device 122 for overall management. This upper management device 122 corresponds to the target preparation time notification device 122 of the corrugated sheet box making machine according to the embodiment of the present invention. In the following description, the upper management device 122 will be referred to as a target preparation time notification device 122. In this embodiment, the lower management device 120 is incorporated into the box making machine 1, and the target preparation time notification device 122 is provided separately from the box making machine 1.

ここで、本実施形態において、図11に一例を示すように、基本情報とは、製函機1で各オーダに係る段ボール箱を生産するためのオーダ情報であり、この基本情報(オーダ情報)には、品名や段ボール箱の仕様などのほか、使用する印刷ユニット、使用するインキ、使用する木型などに関する情報が含まれる。 Here, in this embodiment, as an example is shown in FIG. 11, the basic information is order information for producing cardboard boxes for each order with the box making machine 1, and this basic information (order information) includes information such as the product name and specifications of the cardboard box, as well as the printing unit used, the ink used, the wooden mold used, etc.

次に、図10および図11により、本実施形態による生産管理装置110の下位管理装置120を説明する。
本実施形態による下位管理装置120は、目標準備時間報知装置(上位管理装置)122から受け取ったオーダ毎の基本情報に従って、製函機1の各ユニット2~6、8の動作を制御する装置である。そのため、図10に示すように、下位管理装置120には、製函機1の各ユニット2~6、8を制御する制御装置124と、各スイッチやタッチパネル式ディスプレイを含む操作パネル126と、生産枚数計数センサ28およびシート有無検出センサ29とが接続される。
Next, the lower management device 120 of the production management device 110 according to this embodiment will be explained with reference to FIGS. 10 and 11.
The lower management device 120 according to the present embodiment is a device that controls the operation of each unit 2 to 6 and 8 of the box making machine 1 according to basic information for each order received from the target preparation time notification device (upper management device) 122. be. Therefore, as shown in FIG. 10, the lower management device 120 includes a control device 124 that controls each unit 2 to 6 and 8 of the box making machine 1, an operation panel 126 including various switches and a touch panel display, and a production A sheet number counting sensor 28 and a sheet presence/absence detection sensor 29 are connected.

次に、下位管理装置120は、目標準備時間報知装置122との間でデータ(情報)を送受信する入出力部130と、生産枚数計数センサ28の検出信号に基づいてリアルタイムで生産枚数を計数する生産枚数計数部132と、各ユニット2~6、8の動作、例えば、シートSの搬送や加工に必要な動作や、オーダチェンジ時の位置決め動作などをオーダ毎に制御するよう制御装置124に信号を送る各ユニット制御部134とを有する。生産枚数計数部132による計数結果は、リアルタイムで目標準備時間報知装置122に送られる。
下位管理装置120は、さらに、記憶部136を有し、この記憶部136は、目標準備時間報知装置122から受け取ったオーダ毎の基本情報(図11)および後述するオーダ順(図13)を一時的に記憶すると共に、生産枚数計数部132による計数結果を一時的に記憶する。また、記憶部136には、オーダチェンジ信号を目標準備時間報知装置122との間で送受信するタイミングに関するデータを記憶している。
Next, the lower management device 120 counts the number of pieces produced in real time based on the detection signal of the input/output unit 130 that transmits and receives data (information) to and from the target preparation time notification device 122 and the number of produced pieces counting sensor 28. A signal is sent to the control device 124 to control the operations of the production sheet counting section 132 and each of the units 2 to 6 and 8, such as operations necessary for transporting and processing the sheet S, positioning operations during order changes, etc., for each order. and each unit control section 134 that sends the information. The counting result by the production quantity counting section 132 is sent to the target preparation time notification device 122 in real time.
The lower management device 120 further includes a storage unit 136, which temporarily stores basic information for each order (FIG. 11) received from the target preparation time notification device 122 and the order order (FIG. 13) to be described later. At the same time, the counting result by the production number counting section 132 is temporarily stored. The storage unit 136 also stores data regarding the timing of transmitting and receiving the order change signal to and from the target preparation time notification device 122.

下位管理装置120は、現在のオーダの生産が終了すると、目標準備時間報知装置122にオーダチェンジ信号を送る。目標準備時間報知装置122がこのオーダチェンジ信号を受信すると、後述するように、目標準備時間報知装置122は、下位管理装置120に次のオーダの基本情報(図11参照)を送る。このオーダチェンジ信号は、ロット終了スイッチがオンの場合に給紙テーブル21上にシートSが無くなった時、または、手動でオーダチェンジスイッチを押した時に送られる。 When the production of the current order is completed, the subordinate management device 120 sends an order change signal to the target preparation time notification device 122. When the target preparation time notification device 122 receives this order change signal, the target preparation time notification device 122 sends the basic information of the next order (see FIG. 11) to the subordinate management device 120, as described later. This order change signal is sent when the lot end switch is on and there are no more sheets S on the paper feed table 21, or when the order change switch is manually pressed.

次に、図10乃至図14により、本実施形態による生産管理装置110の目標準備時間報知装置/上位管理装置122を説明する。
本実施形態による目標準備時間報知装置122は、作業者が視認可能な目標準備時間を、オーダチェンジ開始と同時に、下位管理装置の操作パネル126および/または目標準備時間報知装置122に表示させるための装置であり、かつ、多数のオーダに係る段ボール箱の生産を、予め決められた順序で、製函機1に実行させるための装置である。
なお、製函機1の操作パネル126および/または目標準備時間報知装置122の操作パネル154には、前オーダおよび/またはオーダチェンジの後オーダに係るオーダ情報(図11)なども表示される。
Next, the target preparation time notification device/superior management device 122 of the production management device 110 according to this embodiment will be explained with reference to FIGS. 10 to 14.
The target preparation time notification device 122 according to the present embodiment is configured to display the target preparation time that is visible to the operator on the operation panel 126 of the lower-level management device and/or the target preparation time notification device 122 at the same time as the start of an order change. This is a device for causing the box making machine 1 to produce cardboard boxes for a large number of orders in a predetermined order.
Note that the operation panel 126 of the box making machine 1 and/or the operation panel 154 of the target preparation time notification device 122 also displays order information (FIG. 11) regarding the previous order and/or the order after the order change.

図10に示すように、目標準備時間報知装置122は、下位管理装置120およびサーバ装置112との間でデータ(情報)を送受信する入出力部140と、下位管理装置120からオーダチェンジ信号と生産枚数の計数結果をリアルタイムで取得する信号取得部142と、この信号取得部142が取得した信号に基づいて製函機の運転/停止/準備の各状態を特定する状態特定部144と、この状態特定部144が特定した運転/停止/準備の各状態が継続した時間をリアルタイムで集計する所要時間集計部146と、を有する。 As shown in FIG. 10, the target preparation time notification device 122 includes an input/output unit 140 that transmits and receives data (information) between the lower management device 120 and the server device 112, and an input/output unit 140 that receives and receives order change signals from the lower management device 120. A signal acquisition unit 142 that acquires the counting result of the number of sheets in real time, a status identification unit 144 that identifies each state of operation/stop/preparation of the box making machine based on the signal acquired by this signal acquisition unit 142, and It includes a required time totaling unit 146 that totals in real time the duration of each operation/stop/preparation state identified by the identifying unit 144.

より詳細には、信号取得部142は、下位管理装置120から、オーダチェンジ信号、生産枚数の計数結果、主モータオン信号、各機械セット完了信号を取得する。
ここで、オーダチェンジ信号は、ロット終了スイッチがオンの場合に、給紙テーブルの上に段ボールシートがなくなった時、または手動でオーダチェンジスイッチを押したときに送られる。
また、生産枚数計数部132において、生産枚数計数センサ28の検出信号に基づいて計数された生産枚数の計数結果を取得する。
なお、主モータオン信号は、作業者が主モータスイッチを手動でオンにしたときに送られ、機械セット完了信号は、第1および第2の準備段階における、各機械セットの完了を示す信号である。
More specifically, the signal acquisition unit 142 acquires the order change signal, the counting result of the number of produced sheets, the main motor ON signal, and each machine set completion signal from the lower management device 120.
Here, the order change signal is sent when the lot end switch is on and there are no more corrugated sheets on the sheet feeding table, or when the order change switch is manually pressed.
In addition, the production number counting section 132 obtains the result of counting the number of produced products counted based on the detection signal of the production number counting sensor 28 .
The main motor on signal is sent when the worker manually turns on the main motor switch, and the machine set completion signal is a signal indicating the completion of each machine set in the first and second preparation stages. .

ここで、位置決め完了時に、自動で位置決め完了信号が出力され、作業者が印版交換後に印版交換完了スイッチを押した時に、印版交換完了信号が出力され、作業者が木型交換後に木型交換完了スイッチを押した時に、木型交換完了信号が出力される。
位置決め完了信号は、給紙装置2、印刷装置3、クリーザスロッタ4、フォルダグルア6、カウンタエジェクタ8の位置決めが全て完了した時に出される。
製函機1が、印刷シリンダが昇降する印刷装置を備えるタイプでは、昇降ユニットの下降動作も位置決め項目に含まれるので、作業者が印版交換完了スイッチを押して、昇降ユニットが下降した後に、印刷装置の位置決めが完了する。
一方、製函機1が、印刷シリンダが昇降しない印刷装置を備えるタイプやダイカッタでは、印版や木型の交換作業の進捗と関係なく、印刷装置3やダイカッタ5の位置決めが完了する。
Here, when positioning is completed, a positioning completion signal is automatically output, and when the operator presses the printing plate replacement completion switch after replacing the printing plate, a printing plate replacement completion signal is output, and the operator When the mold exchange completion switch is pressed, a wooden mold exchange completion signal is output.
The positioning completion signal is issued when the positioning of the paper feeding device 2, printing device 3, creaser slotter 4, folder gluer 6, and counter ejector 8 is all completed.
If the box making machine 1 is equipped with a printing device in which the printing cylinder moves up and down, the lowering operation of the elevating unit is also included in the positioning items, so the operator presses the printing plate change completion switch and the elevating unit descends, then the printing starts. Device positioning is complete.
On the other hand, if the box-making machine 1 is a die cutter or a type equipped with a printing device in which the printing cylinder does not move up and down, the positioning of the printing device 3 and the die cutter 5 is completed regardless of the progress of the printing plate or wooden mold replacement work.

また、状態特定部144は、信号取得部142が取得した、オーダチェンジ信号および生産枚数の計数結果に基づいて「運転時間」、「停止時間」、「準備時間(第1~第3の準備段階)」のうち、製函機1がどの状態かを特定し、所要時間集計部146が、その各状態の所要時間を集計する。
また、状態特定部144は、信号取得部142が取得した各機械セット完了信号に基づいて、完了した機械セット(位置決め、印版交換、木型交換)を特定する。
また、状態特定部144は、信号取得部142が取得した、主モータオン信号や生産枚数の計数結果に基づいて、給紙準備動作、試し加工・検品動作の状態を特定する。
In addition, the state specifying unit 144 determines “operating time,” “stopping time,” and “preparation time (first to third preparation stages) based on the order change signal and the result of counting the number of produced sheets, which are acquired by the signal acquisition unit 142. )", which state the box making machine 1 is in is specified, and the required time totaling unit 146 totals the required time for each state.
Further, the status identifying unit 144 identifies completed machine sets (positioning, printing plate exchange, wooden mold exchange) based on each machine set completion signal acquired by the signal acquisition unit 142.
Further, the state specifying section 144 specifies the state of the sheet feeding preparation operation and the trial processing/inspection operation based on the main motor ON signal and the result of counting the number of sheets produced, which are acquired by the signal acquisition section 142.

ここで、状態特定部144および所要時間集計部146による運転時間の算出は、詳細な説明は省略するが、図12Aおよび図12Bに示すような条件で実行される。
たとえば、図12Aにおいて、状態特定部144は、オーダチェンジ信号を受信した時点を準備時間の開始とする。そして、この準備時間の終了は、上述した運転時間の開始の時点と同一の時点である。なお、作業者が給紙停止スイッチを操作した時点を運転時間の終了時点、かつ、準備時間の開始時点としても良い。
また、準備時間の集計開始時点は、機械のロット終了動作が開始した時点(給紙停止した時点)と同じ時点である、と捉えることができる。
なお、給紙開始スイッチON信号、主モータスイッチON信号、一枚給紙スイッチON信号、印版交換完了スイッチON信号、木型交換完了スイッチON信号は、作業者がスイッチを操作した時に送られる。
Here, calculation of the driving time by the state specifying unit 144 and the required time totaling unit 146 is performed under conditions as shown in FIGS. 12A and 12B, although detailed explanation will be omitted.
For example, in FIG. 12A, the state specifying unit 144 sets the time when the order change signal is received as the start of the preparation time. The end of this preparation time is the same time as the start of the operation time described above. Note that the time when the operator operates the paper feed stop switch may be the end of the operating time and the start of the preparation time.
Furthermore, the start point of aggregation of the preparation time can be considered to be the same point in time as the point in time when the lot finishing operation of the machine starts (the point in time when paper feeding is stopped).
Note that the paper feed start switch ON signal, main motor switch ON signal, single sheet feed switch ON signal, printing plate exchange completion switch ON signal, and wood pattern exchange completion switch ON signal are sent when the operator operates the switch. .

また、所要時間集計部146は、状態特定部144が特定した、「準備状態/第1~3の準備段階全体」が継続した時間を集計する。
また、所要時間集計部146は、このような準備時間の集計と並行して、準備状態が開始してから、各機械セットが完了するまでの時間である、「位置決め完了時間」、「印版交換完了時間」、および、「木型交換完了時間」を集計する。
また、所要時間集計部146は、準備時間の集計と並行して、給紙準備動作が継続した時間である「給紙準備時間」と、試し加工・検品動作が継続した時間である「試し加工・検品時間」とを集計する。
Further, the required time totaling unit 146 totals the duration of the “preparation state/entire first to third preparation stages” specified by the state specifying unit 144.
Further, in parallel with such aggregation of the preparation time, the required time aggregation unit 146 calculates the "positioning completion time" and "printing plate time", which are the times from the start of the preparation state until the completion of each machine set. "Replacement completion time" and "Wood pattern replacement completion time" are totaled.
In addition to counting the preparation time, the required time aggregation unit 146 also calculates the "paper feeding preparation time", which is the time during which the paper feeding preparation operation continued, and the "trial processing time", which is the time during which the trial processing/inspection operation continued.・Inspection time".

次に、図10に示すように、目標準備時間報知装置122は、オーダチェンジパターン特定部156と、目標準備時間算出部157と、報知指令部158と、を有する。
ここで、後述する記憶部(データベース)152には、図13に示すようなオーダチェンジパターンを特定するための情報が記憶されている。
オーダチェンジパターン特定部156は、この記憶されているオーダチェンジパターンを特定するための情報に基づいて、所定のオーダチェンジ(たとえば、図13の生産順の「2」と「3」との間に行われるオーダチェンジ/準備段階)の前オーダ(図13の生産順「2」のオーダ)と後オーダ(図13の生産順「3」のオーダ)の、それぞれの、使用する印刷ユニットとインキ、使用する木型の情報に基づいて、オーダチェンジ時に必要となる作業を特定し、作業内容を表すオーダチェンジパターンを特定する。このオーダチェンジパターンの具体的な特定方法は後述する(図18、図19、図20A、図20B参照)。このオーダチェンジパターンの特定には、図4および図5に示される印刷パターンの特定、および、木型パターンの特定が含まれる。
Next, as shown in FIG. 10, the target preparation time notification device 122 includes an order change pattern identification section 156, a target preparation time calculation section 157, and a notification command section 158.
Here, information for specifying an order change pattern as shown in FIG. 13 is stored in a storage unit (database) 152, which will be described later.
The order change pattern specifying unit 156 determines a predetermined order change (for example, between "2" and "3" in the production order in FIG. 13) based on the stored information for specifying the order change pattern. The printing unit and ink to be used for each of the previous order (the order in the production order "2" in FIG. 13) and the subsequent order (the order in the production order "3" in FIG. 13) of the order change/preparation stage) Based on the information on the wooden pattern to be used, the work required at the time of order change is specified, and the order change pattern representing the work content is specified. A specific method for identifying this order change pattern will be described later (see FIGS. 18, 19, 20A, and 20B). The specification of this order change pattern includes the specification of the printing pattern shown in FIGS. 4 and 5, and the specification of the wooden pattern.

次に、目標準備時間算出部157は、オーダチェンジパターン特定部156が特定したオーダチェンジパターンに基づいて、第1~第3の準備段階(図3)における作業を効率良く達成すべき目標準備時間を算出する。
ここで、記憶部152には、製函機1のタイプ毎(上述した印刷シリンダの昇降可能の有無など)に応じて、図4または図5のような「オーダチェンジパターン別目標準備時間表」のデータが記憶されている。
目標準備時間算出部157は、オーダチェンジパターン特定部156で特定されたオーダチェンジパターンに基づき、記憶部152に記憶された図4または図5のようなデータを参照して、目標準備時間を算出する。たとえば、図4を参照し、オーダチェンジパターン特定部156で特定された印刷パターンが「11」であり、かつ、木型パターンが「大送」である場合には、目標準備時間が325秒に設定される。
Next, the target preparation time calculation unit 157 determines the target preparation time for efficiently accomplishing the work in the first to third preparation stages (FIG. 3) based on the order change pattern identified by the order change pattern identification unit 156. Calculate.
Here, the storage unit 152 stores a "target preparation time table for each order change pattern" as shown in FIG. 4 or FIG. data is stored.
The target preparation time calculating section 157 calculates the target preparation time based on the order change pattern specified by the order change pattern specifying section 156, with reference to data as shown in FIG. 4 or 5 stored in the storage section 152. do. For example, referring to FIG. 4, if the printing pattern specified by the order change pattern specifying unit 156 is "11" and the wood pattern is "large feed", the target preparation time is 325 seconds. Set.

次に、報知指令部158は、状態特定部144が、製函機1を準備状態と特定している間、操作パネル154(および/または下位管理装置120の操作パネル126)のディスプレイに、目標準備時間算出部157が算出した目標準備時間を表示する(図示は省略する)。
このディスプレイでの目標準備時間の表示は、準備段階の開始時点(図3参照)に開始され、その後、実際の準備段階(準備時間)の各作業が進むにつれて、算出された目標準備時間から時間が減算された、目標準備時間までの残り時間として表示され(カウントダウン表示/残り時間表示)、その後、実際の準備時間が目標準備時間に到達して残り時間が0となった後は、目標準備時間を超過した時間をマイナス表示として表示する(オーバー表示/超過時間表示)。
なお、変形例として、オーダチェンジが開始する前に、目標準備時間を表示するようにしても良い。例えば、オーダチェンジの前のオーダ生産中に、オーダ生産終了後に行われるオーダチェンジの目標準備時間を表示することにより、作業者は前もって目標準備時間を把握することができる。
Next, while the status specifying unit 144 specifies that the box making machine 1 is in the preparation state, the notification command unit 158 displays the target on the display of the operation panel 154 (and/or the operation panel 126 of the lower-level management device 120). The target preparation time calculated by the preparation time calculation unit 157 is displayed (not shown).
The display of the target preparation time on this display starts at the beginning of the preparation phase (see Figure 3), and then, as each task in the actual preparation phase (preparation time) progresses, the calculated target preparation time increases. is subtracted and displayed as the remaining time until the target preparation time (countdown display/remaining time display), and after the actual preparation time reaches the target preparation time and the remaining time becomes 0, the target preparation time is Displays the time that exceeds the time as a minus display (overtime display/excess time display).
As a modification, the target preparation time may be displayed before the order change starts. For example, by displaying the target preparation time for the order change to be performed after the order production is completed during order production before the order change, the operator can grasp the target preparation time in advance.

次に、図10に示すように、目標準備時間報知装置122は、実績情報生成部/情報送信指令部148と、生産管理部150と、記憶部(データベース)152と、を有する。
まず、実績情報生成部/情報送信指令部148は、所要時間集計部146が集計した各実績時間と、オーダチェンジパターン特定部156が特定したオーダチェンジパターンに基づき、図14に示すような実績情報を生成すると共に、その生成した実績情報を記憶部に記憶させる。
図14に示すように、実績情報は、実行された各回のオーダチェンジの実績情報であり、オーダチェンジパターンと、実際の作業者の作業による準備時間の実績合計値、および、その内訳の各実績時間(準備時間、位置決め完了時間、印版交換完了時間、木型交換完了時間、給紙準備時間、試し加工・検品時間)を含む。
記憶された実績情報は、所定のタイミングで、入出力部140を介してサーバ装置112に送られる。
Next, as shown in FIG. 10, the target preparation time notification device 122 includes a performance information generation section/information transmission command section 148, a production management section 150, and a storage section (database) 152.
First, the track record information generation unit/information transmission command unit 148 generates track record information as shown in FIG. At the same time, the generated performance information is stored in the storage unit.
As shown in FIG. 14, the performance information is the performance information of each executed order change, and includes the order change pattern, the total actual value of preparation time due to the work of actual workers, and each result of the breakdown. Includes time (preparation time, positioning completion time, printing plate replacement completion time, wood pattern replacement completion time, paper feeding preparation time, trial processing/inspection time).
The stored performance information is sent to the server device 112 via the input/output unit 140 at a predetermined timing.

次に、生産管理部150は、下位管理装置120からオーダチェンジ信号を受け取ったとき、記憶部152に記憶された、図13に示すようなオーダチェンジパターンを特定するための情報を含む生産管理計画から次のオーダの基本情報(図11参照)を読み出し、読み出した次のオーダの基本情報を下位管理装置120に送る。 Next, when the production management unit 150 receives the order change signal from the lower management device 120, the production management unit 150 generates a production management plan that is stored in the storage unit 152 and includes information for specifying an order change pattern as shown in FIG. The basic information of the next order (see FIG. 11) is read from , and the read basic information of the next order is sent to the lower management device 120.

次に、記憶部152には、各オーダの基本情報(図11)を含む生産管理計画データが記憶される。また、記憶部152は、図4または図5に示すような「オーダチェンジパターン別目標準備時間表」と、図6に示すような「作業別設定時間表」と、実績情報生成部148が生成した実績情報などを記憶する。 Next, the storage unit 152 stores production management plan data including basic information (FIG. 11) for each order. The storage unit 152 also stores a “target preparation time table for each order change pattern” as shown in FIG. 4 or 5, a “set time table for each task” as shown in FIG. Stores performance information, etc.

また、目標準備時間報知装置122は、キーボードとタッチパネル形式のディスプレイを備えた操作パネル154を備える。
上述したように、報知指令部158からの指令によって、操作パネル154のディスプレイに目標準備時間が表示される。
また、作業者は、操作パネル154のキーボードやタッチパネルなどを操作することにより図6に示すような「作業別設定時間表」の設定時間の変更ができる。さらに、作業者は、準備段階で作業する人数を入力することにより、上述したように、「作業別設定時間表」の設定時間の変更ができる。さらに、作業者は、操作パネル154により、オーダの順番変更や、オーダの追加や削除、各オーダの生産基本情報の変更などのオーダの生産管理を行うことができる。
The target preparation time notification device 122 also includes an operation panel 154 that includes a keyboard and a touch panel display.
As described above, the target preparation time is displayed on the display of the operation panel 154 in response to a command from the notification command unit 158.
Further, by operating the keyboard, touch panel, etc. of the operation panel 154, the worker can change the set time of the "set time table for each task" as shown in FIG. Furthermore, by inputting the number of people working at the preparation stage, the worker can change the set time in the "set timetable for each task" as described above. Furthermore, the operator can use the operation panel 154 to perform production management of orders, such as changing the order of orders, adding or deleting orders, and changing basic production information for each order.

次に、本実施形態による目標準備時間報知装置およびそのシステムの分析装置114を説明する。
本実施形態による分析装置114は、サーバ装置112を介して種々の情報(図4~図6に示すような作業別時間表などのデータ、図11に示すような基本情報、図13に示すようなオーダチェンジパターンを特定するための情報、図14に示すような実績情報)を入出力するための入出力部160と、この入出力部160を介して種々の情報を取得する情報取得部162と、実際の作業者による準備時間に関する実績情報を分析する分析情報生成部172と、実績情報を目標準備時間と比較して所定の比較情報を生成する比較情報生成部174と、情報送信指令部176と、実績情報や分析情報などを記憶する記憶部(データベース)178と、を有する。
Next, the target preparation time notification device and the analysis device 114 of the system according to this embodiment will be explained.
The analysis device 114 according to the present embodiment receives various information (data such as work timetables as shown in FIGS. 4 to 6, basic information as shown in FIG. 11, and data as shown in FIG. 13) via the server device 112. an input/output unit 160 for inputting/outputting information for specifying order change patterns, track record information as shown in FIG. 14), and an information acquisition unit 162 for acquiring various information via this input/output unit 160 , an analysis information generation section 172 that analyzes performance information regarding the preparation time by actual workers, a comparison information generation section 174 that compares the performance information with the target preparation time and generates predetermined comparison information, and an information transmission command section. 176, and a storage unit (database) 178 that stores performance information, analysis information, and the like.

まず、分析装置114では、情報取得部162が、図14に示すような実績情報を取得し、分析情報生成部172は、その実績情報に基づいて、図15に示すような分析情報を生成する。この分析情報は、主に、実績情報に含まれるオーダチェンジパターン毎の実績時間を「作業別設定時間表」(図6)に対応する実績時間に換算したデータである。
より詳細には、図15は、「作業別設定時間表」(図6)の各作業別に細分化した「目標準備時間(作業別)」を示すと共に、その目標数値データと比較するための実績データとして、「作業別設定時間表」(図6)の各作業に対応する「実績時間(オーダチェンジパターン別)」を示す。ここで、本実施形態においては、「目標準備時間(作業別)」は、図6の各作業の設定時間に基づき、上述したように、たとえば作業人数に応じてそれらの設定時間を適宜調整し、最終的に決定された目標準備時間(図4または図5)を、作業別に細分化した作業別目標準備時間を意味する。
First, in the analysis device 114, the information acquisition unit 162 acquires performance information as shown in FIG. 14, and the analysis information generation unit 172 generates analysis information as shown in FIG. 15 based on the performance information. . This analysis information is mainly data obtained by converting the actual time for each order change pattern included in the actual performance information into the actual time corresponding to the "set time table for each job" (FIG. 6).
More specifically, Figure 15 shows the "target preparation time (by work)" subdivided by each work in the "set time table for each work" (Fig. 6), as well as the actual results for comparison with the target numerical data. As data, "actual time (by order change pattern)" corresponding to each task in the "set time table by task" (FIG. 6) is shown. Here, in this embodiment, the "target preparation time (by work)" is based on the set time of each work in FIG. , means the target preparation time for each task, which is obtained by subdividing the finally determined target preparation time (FIG. 4 or 5) by task.

なお、各実績時間から「作業別設定時間表」に対応する実績時間を求める換算は、以下の(1)~(11)に列記する計算式などにより行われる。ここで、各計算式において、左辺は「作業別設定時間表」に対応する実績時間を、右辺は図14に示すような所要時間集計部146の集計結果などに基づく各実績時間を示している。 Note that the conversion to obtain the actual time corresponding to the "set timetable for each task" from each actual time is performed using the calculation formulas listed in (1) to (11) below. Here, in each calculation formula, the left side indicates the actual time corresponding to the "set time table for each task", and the right side indicates each actual time based on the aggregated results of the required time aggregating unit 146 as shown in FIG. 14. .

(1)ロット終了・機械セット時間(無地→無地)時間=オーダチェンジ時に印版交換や木型交換を行わない場合の位置決め完了時間
(2)機械セット加算時間(印版交換)=印刷シリンダが昇降するタイプにおいてオーダチェンジ時に印版交換を行う場合の位置決め完了時間-(過去の分析情報の平均値の)ロット終了・機械セット時間(無地から無地)時間
(なお、機械セット加算時間(印版交換)には、昇降ユニットの下降時間が含まれる。)
(3)機械セット加算時間(印版交換)=印刷シリンダが昇降しないタイプにおいてオーダチェンジ時に印版交換を行う場合の印版交換完了時間-(過去の分析情報の平均値の)ロット終了・機械セット時間(無地から無地)時間
(4)機械セット加算時間(木型交換)=オーダチェンジ時に木型交換を行う場合の
木型交換完了時間-(過去の分析情報の平均値の)ロット終了・機械セット時間(無地から無地)
(5)色替時間は集計しない。
(6)シートセット加算時間=準備時間-位置決め完了時間、印版交換完了時間、木型交換完了時間のうち最も長い時間-給紙準備時間-試し加工・検品時間
(7)給紙準備時間=給紙準備時間
(8)試し加工・検品時間(無地)=オーダチェンジ時に印版交換や木型交換を行わない場合の試し加工・検品時間
(9)検品加算時間(色)=オーダチェンジ後の後オーダで印刷を行う場合の試し加工・検品時間-(過去の分析情報の平均値の)試し加工・検品時間(無地)
(10)検品加算時間(打抜)=オーダチェンジ後の後オーダで打ち抜き加工のみを行う場合の試し加工・検品時間-(過去の分析情報の平均値の)試し加工・検品(無地)
(11)検品加算時間(打抜)=オーダチェンジ直後のオーダで印刷と打ち抜き加工を両方行う場合の試し加工・検品時間-(過去の分析情報の平均値の)試し加工・検品時間(無地)-(過去の分析情報の平均値の)検品加算時間(色)
(1) Lot completion/machine set time (plain color → plain color) time = positioning completion time when printing plate or wood pattern is not replaced at order change (2) Additional machine setting time (print plate replacement) = printing cylinder Positioning completion time when changing printing plates at the time of order change for a type that moves up and down - (average value of past analysis information) lot completion time and machine setting time (plain to plain) time (Additional machine setting time (printing plate) (replacement) includes the lowering time of the lifting unit.)
(3) Added machine set time (print plate replacement) = Time to complete printing plate replacement when printing plates are replaced at the time of order change in a type where the printing cylinder does not go up and down - (average value of past analysis information) lot end/machine Set time (plain to plain) time (4) Machine set additional time (wooden pattern exchange) = Wooden pattern exchange completion time when wood pattern exchange is performed at order change - (average value of past analysis information) Lot end/ Machine set time (plain to plain)
(5) Color change time is not counted.
(6) Added sheet set time = Preparation time - Longest time of positioning completion time, printing plate replacement completion time, wooden pattern replacement completion time - Paper feeding preparation time - Trial processing/inspection time (7) Paper feeding preparation time = Paper feeding preparation time (8) Trial processing/inspection time (plain color) = Trial processing/inspection time when printing plates or wood molds are not replaced at order change (9) Inspection additional time (color) = After order change Trial processing/inspection time when printing on a later order - Trial processing/inspection time (of average value of past analysis information) (plain)
(10) Inspection additional time (punching) = Trial machining/inspection time when only punching is performed in the subsequent order after an order change - (average value of past analysis information) Trial machining/inspection (plain)
(11) Inspection additional time (punching) = Trial processing/inspection time when both printing and punching are performed on an order immediately after an order change - Trial processing/inspection time (of the average value of past analysis information) (plain) - Inspection addition time (of average value of past analysis information) (color)

分析装置114では、さらに、比較情報生成部174が、図16に示すような比較情報を生成する。図16は、図15と同様の「目標準備時間(作業別)」を示すと共に、その目標数値データと比較するための実績データの例として所定の月毎の実績時間の平均値を示す。比較情報生成部174は、一か月分の分析情報に基づき、分析した各実績時間の平均を算出する。そして、比較情報生成部174は、月毎の実績平均時間と、「作業別設定時間表」における各目標準備時間とを比較できる比較情報(図16)を生成する。製函機のユーザ(作業者)は、サーバ装置112を介して送られた比較情報を見ることにより、オーダチェンジ時のどの作業が、設定時間と比べて時間がかかっているのかを把握でき、改善すべき作業を把握しやすくなる。 In the analysis device 114, a comparison information generation unit 174 further generates comparison information as shown in FIG. FIG. 16 shows the "target preparation time (by work)" similar to FIG. 15, and also shows the average value of the actual time for each predetermined month as an example of actual performance data for comparison with the target numerical data. The comparison information generation unit 174 calculates the average of each analyzed performance time based on one month's worth of analysis information. Then, the comparison information generation unit 174 generates comparison information (FIG. 16) that allows comparison of the monthly actual average time and each target preparation time in the "set time table for each task". By viewing the comparison information sent via the server device 112, the user (operator) of the box making machine can understand which work at the time of order change is taking longer than the set time. It becomes easier to understand the work that needs to be improved.

次に、図17Aおよび図17Bにより、本発明の実施形態による段ボールシート製函機の目標準備時間報知装置(上位管理装置)で実行される制御内容について説明する。
図17Aおよび図17Bは、本実施形態の目標準備時間報知装置で実行される制御内容を示すフローチャートである。Sは、各処理のステップを示す。
まず、S1(図17A)において、工場での生産の一日の始まりに製函機の電源がオンにされると、信号取得部142が、オーダチェンジ信号または1オーダサイクル中における生産枚数の計数結果を取得する。次に、S2において、オーダチェンジ信号を取得したか否かを判定し、取得していれば、S3に進み、生産管理部150が、次のオーダの基本情報を下位管理装置120に送る。
次に、S4において、オーダチェンジ信号を受け取った(S1)ことに基づき、状態特定部144が、製函機1が準備状態(準備時間)の開始時点であると特定し、次に、S5において、所要時間集計部146が、準備時間の集計を開始し、記憶部152に記憶させる。
Next, with reference to FIGS. 17A and 17B, a description will be given of the control contents executed by the target preparation time notification device (upper management device) of the corrugated sheet box making machine according to the embodiment of the present invention.
FIGS. 17A and 17B are flowcharts showing control details executed by the target preparation time notification device of this embodiment. S indicates each processing step.
First, in S1 (FIG. 17A), when the power of the box making machine is turned on at the beginning of a production day at the factory, the signal acquisition unit 142 receives an order change signal or counts the number of sheets produced during one order cycle. Get results. Next, in S2, it is determined whether or not an order change signal has been acquired, and if so, the process proceeds to S3, where the production management section 150 sends the basic information of the next order to the lower level management device 120.
Next, in S4, based on the receipt of the order change signal (S1), the state identifying unit 144 identifies that the box making machine 1 is at the start of the preparation state (preparation time), and then in S5 , the required time aggregation unit 146 starts aggregating the preparation time and stores it in the storage unit 152.

次に、S6において、オーダチェンジパターン特定部156が、現在、準備状態であるオーダチェンジの前オーダと後オーダのそれぞれの基本情報(オーダ情報)に基づき、オーダチェンジパターンを特定する。このS6におけるオーダチェンジパターンを特定するための特定フローについては、図18、図19、図20A、図20Bを用いて後述する。 Next, in S6, the order change pattern specifying unit 156 specifies an order change pattern based on the basic information (order information) of the order before and after the order change that is currently in the preparation state. The specific flow for specifying the order change pattern in S6 will be described later using FIGS. 18, 19, 20A, and 20B.

次に、S7において、目標準備時間算出部157が、記憶部152に記憶されている「オーダチェンジパターン別目標準備時間表」(図4または図5)を参照し、S6で特定されたオーダチェンジパターン(印刷パターンおよび木型パターン)に基づいて目標準備時間を算出する。 Next, in S7, the target preparation time calculation unit 157 refers to the “target preparation time table by order change pattern” (FIG. 4 or 5) stored in the storage unit 152, and calculates the order change specified in S6. The target preparation time is calculated based on the pattern (print pattern and wooden pattern).

次に、S8において、報知指令部158が、S7で目標準備時間算出部157が算出した目標準備時間を操作パネル154のディスプレイに表示する。その表示内容は、上述した報知指令部158の機能である、カウントダウン表示およびオーバー表示である。 Next, in S8, the notification command section 158 displays the target preparation time calculated by the target preparation time calculation section 157 in S7 on the display of the operation panel 154. The display contents are a countdown display and an over display, which are the functions of the notification command section 158 described above.

次に、S9において、所要時間集計部146が、各機械セット(位置決め、印版交換、木型交換)が完了するまでの時間の集計を開始し、次に、S10において、信号取得部142が、各機械セット完了信号(位置決め完了信号、印版交換完了信号、木型交換完了信号)を取得する。次に、S11において、状態特定部144が、信号取得部142が取得した機械セット完了信号に基づいて、完了した機械セットを特定し、次に、S12において、所要時間集計部146が、完了した機械セットの時間の集計を終了し、集計された時間が記憶部152に記憶される。
なお、オーダチェンジ中に複数の印版交換を行う場合は、S10、S11において、最後の印版交換完了信号を取得した時に、印版交換が完了したと判断する。
Next, in S9, the required time totaling unit 146 starts counting the time required to complete each machine set (positioning, printing plate exchange, wood pattern exchange), and then, in S10, the signal acquisition unit 142 , obtain each machine set completion signal (positioning completion signal, printing plate exchange completion signal, wood pattern exchange completion signal). Next, in S11, the state identification unit 144 identifies the completed machine set based on the machine set completion signal acquired by the signal acquisition unit 142, and then in S12, the required time totaling unit 146 identifies the completed machine set. The time totaling for the machine set is completed, and the total time is stored in the storage unit 152.
If a plurality of printing plates are exchanged during the order change, it is determined that the printing plate exchange is completed when the last printing plate exchange completion signal is obtained in S10 and S11.

次に、S13に進み、機械セットやシートセットが完了し、作業者が主モータスイッチをオン操作したか否か、すなわち、第1~第2の準備段階が終了したか否かを判定する。この判定は、信号取得部142が、主モータオン信号を取得したか否かで判定される。S13において、第1~第2の準備段階が終了したと判定されるまで、S10~S12の処理が繰り返される。 Next, the process proceeds to S13, where it is determined whether the machine setting and sheet setting have been completed and the operator has turned on the main motor switch, that is, whether the first and second preparation stages have been completed. This determination is made based on whether the signal acquisition unit 142 has acquired the main motor ON signal. The processes of S10 to S12 are repeated until it is determined in S13 that the first and second preparation stages are completed.

S13で、第1~第2の準備段階が終了したと判定されると、S14(図17B)に進む。S14では、主モータオン信号を受け取ったことに基づき、状態特定部144が、給紙準備時間が開始したと特定し、所要時間集計部146が、給紙準備時間の集計を開始する。
そして、作業者が一枚給紙スイッチなどを操作して試し加工が行われると、S15において、信号取得部142が生産枚数計数結果を取得し、次に、S16において、状態特定部144が、生産枚数計数結果を受け取ったことに基づいて給紙準備時間が終了したと特定し、所要時間集計部146は給紙準備時間の集計を終了し、集計された給紙準備時間が記憶部152に記憶される。
If it is determined in S13 that the first and second preparation stages have been completed, the process advances to S14 (FIG. 17B). In S14, based on the reception of the main motor ON signal, the state specifying unit 144 specifies that the paper feeding preparation time has started, and the required time totaling unit 146 starts counting the paper feeding preparation time.
Then, when the operator operates the single-sheet paper feed switch and performs trial processing, the signal acquisition unit 142 acquires the result of counting the number of produced sheets in S15, and then in S16, the state identification unit 144 Based on the receipt of the production sheet count result, it is determined that the paper feeding preparation time has ended, and the required time totaling unit 146 finishes counting the paper feeding preparation time, and stores the total paper feeding preparation time in the storage unit 152. be remembered.

次に、S17に進み、生産枚数計数センサ28(図1)により、シート給紙装置2から1枚ずつ送り出されるシートSが、4秒間に2枚以上計数されたか否かを判定する。
シートSが4秒間に2枚以上計数されない場合は、S18に進み、状態特定部144が、試し加工・検品時間が開始したと特定し、所要時間集計部146が、試し加工・検品時間の集計を開始する。そして、作業者が再び一枚給紙スイッチを操作するか、あるいは給紙開始スイッチを操作すると、S19において、信号取得部142が生産枚数計数結果を取得する。次に、S20において、シートSが4秒間に2枚以上計数されるまで、S19の処理を繰り返し、シートSが4秒間に2枚以上計数されると(S20でYES)、状態特定部144は、準備状態が終了したと特定する。
Next, the process proceeds to S17, in which the production sheet counting sensor 28 (FIG. 1) determines whether or not two or more sheets S fed out one by one from the sheet feeding device 2 have been counted in four seconds.
If two or more sheets S are not counted in 4 seconds, the process proceeds to S18, where the status identification unit 144 identifies that the trial processing/inspection time has started, and the required time totaling unit 146 totalizes the trial processing/inspection time. Start. Then, when the operator operates the single sheet feed switch or the sheet feed start switch again, the signal acquisition unit 142 acquires the production sheet count result in S19. Next, in S20, the process of S19 is repeated until two or more sheets S are counted in four seconds, and when two or more sheets S are counted in four seconds (YES in S20), the state identification unit 144 , to identify that the ready state has ended.

次に、S21に進み、所要時間集計部146が、試し加工・検品の時間集計を終了し、集計された時間が記憶部152に記憶され、次に、S22において、第1~第3の準備段階が終了したものとして、所要時間集計部146が、準備時間の集計を終了する。このとき、記憶部152には、第1~第3の準備段階の各準備時間が記憶されている。 Next, the process proceeds to S21, where the required time totaling unit 146 finishes counting the time for trial processing and inspection, and the totaled time is stored in the storage unit 152. Next, in S22, the first to third preparations are completed. Assuming that the stage has ended, the required time totaling unit 146 ends the totaling of the preparation time. At this time, the storage unit 152 stores each preparation time of the first to third preparation stages.

次に、S23に進み、第1~第3の準備段階の終了に伴い、報知指令部158は、S8で開始された作業者への報知(カウントダウン表示、オーバー表示)を停止し、次に、S24において、シートSが4秒間に2枚以上計数されたことに基づき、状態特定部144が、製函機1の運転が運転時間の状態であると特定し、S1(図17A)に戻る。 Next, the process proceeds to S23, and upon completion of the first to third preparation stages, the notification command unit 158 stops the notification (countdown display, over display) to the worker that was started in S8, and then, In S24, based on the fact that two or more sheets S are counted in 4 seconds, the state specifying unit 144 specifies that the box making machine 1 is in the operating time state, and returns to S1 (FIG. 17A).

一方、S2において、オーダチェンジ信号の取得(S1)はしないが、生産枚数の計数結果を取得した場合(S2でNO)、S25に進み、S17と同様に、シートSが4秒間に2枚以上計数されたか否かを判定する。S25において、シートSが4秒間に2枚以上が計数されていないと判定された場合には、S26に進み、状態特定部144が、製函機1の運転が停止時間の状態であると特定し、次に、S27において、目標準備時間報知装置/上位管理装置122の電源スイッチが切られるなど一日の生産が終了したか否かを判定する。 On the other hand, in S2, if the order change signal is not acquired (S1), but the counting result of the number of produced sheets is acquired (NO in S2), the process proceeds to S25, and as in S17, the number of sheets S is 2 or more in 4 seconds. Determine whether or not it has been counted. In S25, if it is determined that two or more sheets S are not counted in 4 seconds, the process proceeds to S26, where the state identification unit 144 identifies that the operation of the box making machine 1 is in the stop time state. Next, in S27, it is determined whether the day's production has ended, such as by turning off the power switch of the target preparation time notification device/superior management device 122.

S27において、電源スイッチがオフとされた場合など一日の生産が終了したとみなすことができる場合には、S28に進み、情報送信指令部148が、生産が終了した所定数のオーダチェンジの実績情報を記憶部152から読み出し、サーバ装置112に送る。
一方、S27において、一日の生産が終了したとみなされない場合には、S1に戻り、上述した処理を繰り返す。
In S27, if the day's production can be considered to have ended, such as when the power switch is turned off, the process proceeds to S28, where the information transmission command unit 148 records the results of a predetermined number of order changes for which production has ended. The information is read from the storage unit 152 and sent to the server device 112.
On the other hand, if it is determined in S27 that one day's production is not deemed to have ended, the process returns to S1 and the above-described process is repeated.

一方、製函機が連続給紙中の運転状態である場合には、S1において、オーダチェンジ信号を受け取らないので、図17AのS1、S2、S25、および、図17BのS24の処理が繰り返される。
また、現在のオーダの最終枚目が給紙され、連続給紙が停止されると、次のオーダを実行するために、下位管理装置120から新たなオーダチェンジ信号が送られるので、S1~S24が再度実行される。
On the other hand, when the box making machine is in continuous paper feeding mode, no order change signal is received in S1, so the processes of S1, S2, S25 in FIG. 17A and S24 in FIG. 17B are repeated. .
Furthermore, when the last sheet of the current order is fed and continuous sheet feeding is stopped, a new order change signal is sent from the subordinate management device 120 in order to execute the next order. is executed again.

次に、図18、図19、図20A、図20Bにより、オーダチェンジパターン特定部156により、図17AのS6で実行されるオーダチェンジパターンを特定するための処理内容について説明する。図18は、本実施形態の目標準備時間報知装置のオーダチェンジパターン特定部で実行される第1の制御内容を示すフローチャートであり、図19は、本実施形態の目標準備時間報知装置のオーダチェンジパターン特定部で実行される第2の制御内容を示すフローチャートであり、図20Aおよび図20Bは、本実施形態の目標準備時間報知装置のオーダチェンジパターン特定部で実行される第3の制御内容を示すフローチャートである。Sは、各処理のステップを示す。 Next, with reference to FIGS. 18, 19, 20A, and 20B, the contents of the process for identifying an order change pattern executed in S6 of FIG. 17A by the order change pattern identifying unit 156 will be described. FIG. 18 is a flowchart showing the first control content executed by the order change pattern specifying unit of the target preparation time notification device of this embodiment, and FIG. 20A and 20B are flowcharts showing the second control content executed by the pattern specifying unit, and FIGS. 20A and 20B show the third control content executed by the order change pattern specifying unit of the target preparation time notification device of this embodiment. FIG. S indicates each processing step.

まず、図18により、製函機が印版シリンダが昇降する印刷装置を備えるタイプにおける、印刷パターンの特定方法(第1の制御内容)を説明する。
まず、オーダチェンジパターン特定部156は、S1において、印刷ユニット識別番号X=1として、1色目印刷ユニットの作業の特定を開始する。
次に、S2において、1色目印刷ユニットを、後オーダで印刷に使用するか否か判定する。後オーダで使用しない場合(S2でNO)、S3に進む。この場合、印版の交換作業が不要なので、オーダチェンジパターンの印刷パターン(以下では、「印刷パターン」と称する)を「00」と特定する(印刷パターンの「■□」の各数値の定義は、図4を参照)。なお、印刷シリンダが昇降するタイプの場合であって、印刷に使用しないユニットが存在する場合、最も効率が良いのは、オーダチェンジ中は前オーダの印版を装着したままにし、後オーダの生産中に印刷シリンダを上昇位置に固定して印版交換するという、オーダチェンジ中に印版の交換作業が不要な状態であり、本実施形態では、これを前提とする。
First, with reference to FIG. 18, a method for specifying a printing pattern (first control content) in a case where the box making machine is equipped with a printing device in which a printing plate cylinder moves up and down will be explained.
First, in S1, the order change pattern identifying unit 156 sets the printing unit identification number X=1 and starts identifying the work of the first color printing unit.
Next, in S2, it is determined whether the first color printing unit will be used for printing in a subsequent order. If it is not to be used in a later order (NO in S2), proceed to S3. In this case, since there is no need to replace the printing plate, the printing pattern of the order change pattern (hereinafter referred to as the "printing pattern") is specified as "00" (the definition of each numerical value of "■□" in the printing pattern is , see Figure 4). If the printing cylinder is of the type that moves up and down, and there are units that are not used for printing, the most efficient method is to leave the printing plate of the previous order attached during the order change, and then proceed with the production of the subsequent order. This is a state in which the printing cylinder is fixed in the raised position and the printing plate is replaced, so that there is no need to replace the printing plate during the order change, and this embodiment is based on this condition.

一方、1色目印刷ユニットを後オーダで使用する場合(S2でYES)、S4に進み、前オーダが1色目印刷ユニットを使用するオーダであったか否かを判定する。前オーダが1色目印刷ユニットを使用しないオーダの場合(S4でNO)、S5に進む。この場合、前オーダ生産中に印版交換できるので、印刷パターンを「01」と特定する。すなわち、印刷に使用されないシリンダは上昇位置に固定されているので、生産中であっても、作業者は、印版を交換できる。これにより、より効率が良い作業を行う場合の目標準備時間を設定できる。 On the other hand, if the first color printing unit is to be used in a subsequent order (YES in S2), the process proceeds to S4, where it is determined whether the previous order was an order that uses the first color printing unit. If the previous order is an order that does not use the first color printing unit (NO in S4), the process advances to S5. In this case, since the printing plate can be replaced during production of the previous order, the printing pattern is specified as "01". That is, since cylinders that are not used for printing are fixed in a raised position, an operator can replace printing plates even during production. This allows you to set a target preparation time for more efficient work.

一方、1色目印刷ユニットを前オーダで使用する場合(S4でYES)、S6に進み、1色目印刷ユニットにおいて、前オーダと後オーダとで使用するインキ種類が同じか否かを判定する。すなわち、1色目印刷ユニットを前後オーダで同じインキを連続使用するか否かを判定する。
前後オーダでインキの種類が異なる場合(S6でNO)、S7に進み、オーダチェンジ中に印版交換およびインキ交換を行うので、印刷パターンを「11色替」と特定する。
一方、前後オーダでインキの種類が同じ場合(S6でYES)は、S8に進み、この場合、オーダチェンジ中に印版交換のみ行うので、印刷パターンを「11」と特定する。
On the other hand, if the first color printing unit is to be used in the previous order (YES in S4), the process proceeds to S6, where it is determined whether the type of ink used in the first color printing unit is the same in the previous order and the subsequent order. That is, it is determined whether or not the same ink is to be used continuously in the first color printing unit in the previous and subsequent orders.
If the types of ink are different between the previous and subsequent orders (NO in S6), the process proceeds to S7, and since printing plates and inks are exchanged during the order change, the printing pattern is specified as "11 color change".
On the other hand, if the type of ink is the same in the previous and previous orders (YES in S6), the process advances to S8, and in this case, since only the printing plate is replaced during the order change, the printing pattern is specified as "11".

以上のS2~S8の処理において印刷パターンが特定されるので、S9では、それまでに特定した、(Xが複数の)印刷ユニットの印刷パターンを合算する。たとえば、製函機が4色目印刷ユニットまでを備える場合(Xが最大で4となる)、X=1~4においてそれぞれ特定された印刷パターンが、たとえば、「00」(1色目)、「11色替」(2色目)、「01」(3色目)、「11」(4色目)の場合、その合算として、印刷パターンが「23色替」となる。 Since the printing pattern is specified in the above processing of S2 to S8, in S9, the printing patterns of the printing units (X is plural) that have been specified so far are added up. For example, if the box making machine is equipped with up to the fourth color printing unit (X is 4 at most), the printing patterns specified for X = 1 to 4 are, for example, "00" (first color), "11 In the case of "color change" (second color), "01" (third color), and "11" (fourth color), the print pattern becomes "23 color change" as a total.

次に、S10に進み、印刷ユニット識別番号Xが、製函機の印刷ユニット数と同じか否かを判定する。すなわち、S10では、製函機1の印刷ユニット数の全てに対して考慮した印刷パターンを特定するために、このような判定を行う。
S10において、印刷ユニット識別番号Xが製函機の印刷ユニット数より少ない場合は、S11に進み、識別番号を、前の識別番号に1を足した番号にする。たとえば、製函機が4色目印刷ユニットまでを備える場合、上述の説明では、1色目印刷ユニットまでしか印刷パターンを特定していないので、この場合、S11、および、S2以降の処理により、2色目印刷ユニットの印刷パターンの特定を進める。なお、製函機が備える印刷ユニットの数(一般的に2~4)は、予め記憶部に記憶されている。
その後、S10において、印刷ユニット識別番号Xが製函機の印刷ユニット数と同じと判定されるまで、2色目以降の印刷ユニットについて、それぞれ、S2~S8により印刷パターンを特定すると共に、S9における印刷パターンの合算を繰り返す。
S10において、印刷ユニット識別番号Xが製函機の印刷ユニット数と同じと判定された場合、S9において合算した印刷パターンを、最終的なオーダチェンジパターンの印刷パターンとして特定する。
Next, the process proceeds to S10, and it is determined whether the printing unit identification number X is the same as the number of printing units of the box making machine. That is, in S10, such a determination is performed in order to specify a printing pattern that takes into account all the printing units of the box making machine 1.
In S10, if the printing unit identification number X is less than the number of printing units of the box making machine, the process proceeds to S11 and the identification number is set to the previous identification number plus 1. For example, if the box making machine is equipped with up to the fourth color printing unit, in the above explanation, the printing pattern is specified only up to the first color printing unit, so in this case, the process from S11 and S2 onwards specifies the second color printing pattern. Proceed with identifying the printing pattern of the printing unit. Note that the number of printing units (generally 2 to 4) included in the box making machine is stored in advance in the storage section.
Thereafter, in S10, until it is determined that the printing unit identification number Repeat the summation of the pattern.
If it is determined in S10 that the printing unit identification number X is the same as the number of printing units of the box making machine, then in S9 the summed printing pattern is specified as the printing pattern of the final order change pattern.

なお、印刷ユニット数が2の場合の例をいくつか説明すると、1色目の印刷パターンが「01」、2色目の印刷パターンが「11」の場合、合算した印刷パターンは「12」(オーダチェンジ中に印版交換1回、後オーダで2色印刷)となる。また、1色目の印刷パターンが「01」、2色目の印刷パターンが「11色替」の場合、合算した印刷パターンは「12色替」(オーダチェンジ中に印版交換1回、後オーダで2色印刷、オーダチェンジ中にインキ交換あり)となる。 To explain some examples when the number of printing units is 2, if the printing pattern of the first color is "01" and the printing pattern of the second color is "11", the total printing pattern is "12" (order change The printing plate will be replaced once during the printing process, and 2-color printing will be performed on subsequent orders). In addition, if the printing pattern for the first color is "01" and the printing pattern for the second color is "11 color change", the total printing pattern is "12 color change" (one plate change during order change, one printing plate change during order change, (2-color printing, ink change required during order change).

次に、図19により、製函機が印版シリンダが昇降しない印刷装置を備えるタイプにおける、印刷パターンの特定方法(第2の制御内容)を説明する。
なお、印版シリンダのタイプにより、オーダチェンジパターン特定部156は、上述した第1の制御内容またはこの第2の制御内容のいずれかを実行する。
Next, with reference to FIG. 19, a method for specifying a printing pattern (second control content) in a case where the box making machine is equipped with a printing device in which the printing plate cylinder does not move up and down will be explained.
Note that, depending on the type of printing plate cylinder, the order change pattern specifying unit 156 executes either the above-described first control content or this second control content.

まず、オーダチェンジパターン特定部156は、S1において、印刷ユニット識別番号X=1として、1色目印刷ユニットの作業の特定を開始する。
次に、S2において、1色目印刷ユニットを、後オーダで印刷に使用するか否か判定する。後オーダで使用しない場合(S2でNO)、S3に進み、前オーダが1色目印刷ユニットを使用するオーダであったか否かを判定する。
前オーダが1色目印刷ユニットを使用するオーダであった場合(S3でYES)、S4に進み、この場合、1色目印刷ユニットにおいて、オーダチェンジ中に、1色目の印版から送り版に交換する必要があるので、印刷パターンを「10」と特定する(印刷パターンの「■□」の各数値の定義は図5を参照)。すなわち、上述したように、本実施形態では、送り版は印版に含まれる概念としているので、オーダチェンジ中の印版交換回数は1となる。
一方、前オーダが1色目印刷ユニットを使用しないオーダであった場合(S3でNOであり、送り版を使用している場合)、S5に進み、前後オーダで送り版を連続使用でき、交換作業が不要となるため、印刷パターンを「00」と特定する。
First, in S1, the order change pattern identifying unit 156 sets the printing unit identification number X=1 and starts identifying the work of the first color printing unit.
Next, in S2, it is determined whether the first color printing unit will be used for printing in a subsequent order. If it is not used in the subsequent order (NO in S2), the process proceeds to S3, where it is determined whether the previous order was an order that uses the first color printing unit.
If the previous order was an order to use the first color printing unit (YES in S3), proceed to S4, and in this case, in the first color printing unit, during the order change, the first color printing plate is replaced with a feeding plate. Since this is necessary, the print pattern is specified as "10" (see FIG. 5 for the definition of each numerical value of "■□" in the print pattern). That is, as described above, in this embodiment, since the feeding plate is considered to be included in the printing plate, the number of printing plate exchanges during an order change is 1.
On the other hand, if the previous order is an order that does not use the first color printing unit (NO in S3 and a feeding plate is used), the process proceeds to S5, where the feeding plate can be used continuously in the previous and previous orders, and replacement work is performed. Since this becomes unnecessary, the print pattern is specified as "00".

次に、S2において、1色目印刷ユニットを後オーダで使用すると判定された場合(S2でYES)、S6に進み、前オーダが1色目印刷ユニットを使用するオーダであったか否かを判定する。前オーダで使用しないと判定された場合(S6でNO)、S7に進み、オーダチェンジ中に送り版から印版に交換する必要があるので、印刷パターンを「11」と特定する。 Next, in S2, if it is determined that the first color printing unit will be used in the subsequent order (YES in S2), the process proceeds to S6, and it is determined whether the previous order was an order that uses the first color printing unit. If it is determined that the print pattern will not be used in the previous order (NO in S6), the process proceeds to S7, where the printing pattern is specified as "11" since it is necessary to replace the feeding plate with a printing plate during the order change.

S6において、前オーダが1色目印刷ユニットを使用するオーダであると判定された場合(S6でYES)、S8に進み、1色目印刷ユニットを前後オーダで同じインキを連続使用するか否かを判定する。
前後オーダでインキの種類が異なる場合(S8でNO)、S9に進み、オーダチェンジ中に印版から印版に交換し、かつ、インキ交換を行う必要があるので、印刷パターンを「11色替」と特定する。
一方、前後オーダでインキの種類が同じ場合(S8でYES)、S10に進み、この場合、オーダチェンジ中に印版から印版への交換を行い、インキ交換は行わないので、印刷パターンを「11」と特定する。
In S6, if it is determined that the previous order is an order that uses the first color printing unit (YES in S6), the process proceeds to S8, and it is determined whether or not the same ink is to be used continuously in the first color printing unit in the previous and previous orders. do.
If the types of ink are different between the previous and previous orders (NO at S8), proceed to S9, and change the printing pattern from one printing plate to another during the order change, as well as ink replacement. ”.
On the other hand, if the type of ink is the same in the previous and previous orders (YES in S8), the process advances to S10, and in this case, the printing plate is changed from printing plate to printing plate during the order change, and the ink is not changed, so the printing pattern is changed to " 11”.

以上のS2~S10の処理において印刷パターンが特定されるので、S11では、それまでに特定した、(Xが複数の)印刷ユニットの印刷パターンを合算する。
次に、S12に進み、印刷ユニット識別番号Xが、製函機の印刷ユニット数と同じか否かを判定し、S12において、印刷ユニット識別番号Xが製函機の印刷ユニット数より少ない場合は、S13に進み、識別番号を、前の識別番号に1を足した番号にする。
たとえば、製函機が4色目印刷ユニットまでを備える場合、上述の説明では、1色目印刷ユニットまでしか印刷パターンを特定していないので、この場合、S13に進む。その後、S12において、印刷ユニット識別番号Xが製函機の印刷ユニット数と同じと判定されるまで、2色目以降の印刷ユニットについて、それぞれ、S2~S10により印刷パターンを特定すると共に、S11における印刷パターンの合算を繰り返す。
S13において、印刷ユニット識別番号Xが製函機の印刷ユニット数と同じと判定された場合、S11において合算した印刷パターンを、最終的なオーダチェンジパターンの印刷パターンとして特定する。
Since the printing pattern is specified in the above processing of S2 to S10, in S11, the printing patterns of the printing units (where X is plural) that have been specified so far are added up.
Next, the process proceeds to S12, and it is determined whether or not the printing unit identification number X is the same as the number of printing units of the box making machine. In S12, if the printing unit identification number , proceed to S13, and set the identification number to the previous identification number plus 1.
For example, if the box making machine is equipped with up to the fourth color printing unit, in the above description, the printing pattern is specified only up to the first color printing unit, so in this case, the process advances to S13. Thereafter, until it is determined in S12 that the printing unit identification number Repeat the summation of the pattern.
If it is determined in S13 that the printing unit identification number X is the same as the number of printing units of the box making machine, the printing pattern added up in S11 is specified as the printing pattern of the final order change pattern.

次に、図20Aおよび図20Bにより、ダイカッタの木型交換における、木型パターンの特定方法(第3の制御内容)を説明する。
なお、この第3の制御内容は、製函機1がダイカッタ5を備えていない場合は、実行されない。
Next, with reference to FIGS. 20A and 20B, a method for specifying a pattern pattern (third control content) in exchanging a die cutter pattern will be described.
Note that this third control content is not executed if the box making machine 1 is not equipped with the die cutter 5.

まず、オーダチェンジパターン特定部156は、S1(図20A)において、前後オーダの少なくともどちらかで、ダイカッタを打ち抜き加工(以後、「加工」とする)に使用するか否かを判定する。
前後オーダともにダイカッタを加工に使用しない場合(S1でNO)、S2に進み、前後オーダで送り木型を連続使用でき、交換作業が不要となるので、オーダチェンジパターンの木型パターン(以下では、「木型パターン」と称する)を「送送」と特定する(木型パターンの「■□」の「送」、「大」、「小」のそれぞれの定義は、図4および図5を参照)。木型の場合、木型パターンが、S2、S5、S6、S9、S10、S13、S14、S16、または、S17において、1度特定されると、それぞれ、処理を終了する。
First, in S1 (FIG. 20A), the order change pattern specifying unit 156 determines whether a die cutter is used for punching (hereinafter referred to as "processing") for at least one of the previous and next orders.
If the die cutter is not used for processing for both the front and rear orders (NO in S1), proceed to S2, and the feed mold can be used continuously for the front and rear orders, eliminating the need for replacement work. (referred to as "wooden pattern") is specified as "feeding" (see Figures 4 and 5 for the definitions of "feeding", "large", and "small" of "■□" in the wooden pattern). ). In the case of a wooden pattern, once the wooden pattern is specified in S2, S5, S6, S9, S10, S13, S14, S16, or S17, the processing ends.

一方、ダイカッタを前後オーダのどちらかで加工に使用する場合(S1でYES)、S3に進み、ダイカッタを後オーダで加工に使用するか否かを判定する。後オーダで加工に使用しない場合(S3でNO)、S4に進み、この場合、ダイカッタを前オーダでのみ加工に使用することになるので、前オーダが大型木型を使用するオーダか否かを判定する。
前オーダで大型木型を使用する場合(S4でYES)、S5に進み、木型パターンを「大送」と特定する。
一方、前オーダで大型木型を使用しない場合(S4でNO)、S6に進み、この場合、前オーダが小型木型を使用するオーダということになるので、木型パターンを「小送」と特定する。
On the other hand, if the die cutter is to be used for machining either the previous order or the previous order (YES in S1), the process proceeds to S3, and it is determined whether the die cutter is to be used for machining the subsequent order. If the die cutter will not be used for processing in the subsequent order (NO in S3), proceed to S4. In this case, the die cutter will be used for processing only in the previous order, so check whether the previous order uses a large wooden mold or not. judge.
If a large wooden pattern is to be used in the previous order (YES at S4), the process proceeds to S5 and the wooden pattern is specified as "large delivery".
On the other hand, if the previous order does not use a large pattern (NO in S4), the process proceeds to S6. Identify.

S3において、ダイカッタを後オーダで加工に使用すると判定された場合(S3でYES)、S7(図20B)に進み、ダイカッタを前オーダでも加工に使用するか否かを判定する。
前オーダで加工に使用しない場合(S7でNO)、S8に進み、この場合、ダイカッタを後オーダでのみ加工に使用することになるので、後オーダで大型木型を使用するか否かを判定する。
後オーダで大型木型を使用する場合(S8でYES)、S9に進み、木型パターンを「送大」と特定する。
一方、後オーダで大型木型を使用しない場合(S8でNO)、S10に進み、この場合、後オーダで小型木型を使用することになるので、オーダチェンジパターンを「送小」と特定する。
If it is determined in S3 that the die cutter is to be used for processing in the subsequent order (YES in S3), the process proceeds to S7 (FIG. 20B), and it is determined whether the die cutter is to be used in processing in the previous order as well.
If the die cutter is not used for processing in the previous order (NO in S7), proceed to S8, and in this case, the die cutter will be used for processing only in the subsequent order, so it is determined whether or not to use the large wooden pattern in the subsequent order. do.
If a large wooden pattern is to be used in the subsequent order (YES at S8), the process proceeds to S9, and the wooden pattern is specified as "large size".
On the other hand, if a large wooden mold is not to be used in the subsequent order (NO in S8), the process proceeds to S10, and in this case, a small wooden mold will be used in the subsequent order, so the order change pattern is specified as "Send small". .

S7において、ダイカッタを前オーダでも加工に使用すると判定された場合(S7でYES)、S11に進み、この場合、ダイカッタを前後オーダで加工に使用することになるので、後オーダで大型木型を使用するか否かを判定する。
後オーダで大型木型を使用しない場合(S11でNO)、後オーダで小型木型を使用することになるので、S12に進み、前オーダで大型木型を使用するか否かを判定する。前オーダで大型木型を使用する場合(S12でYES)、S13に進み、木型パターンを「大小」と特定する。
一方、前オーダで大型木型を使用しない場合(S12)、S14に進み、木型パターンを「小小」と特定する。
In S7, if it is determined that the die cutter will be used for processing in the previous order as well (YES in S7), the process proceeds to S11. Determine whether to use it.
If a large wooden mold is not used in the subsequent order (NO in S11), a small wooden mold will be used in the subsequent order, so the process advances to S12 and it is determined whether or not a large wooden mold is to be used in the previous order. If a large wooden pattern is to be used in the previous order (YES at S12), the process proceeds to S13, where the wooden pattern is specified as "large and small."
On the other hand, if a large wooden pattern is not used in the previous order (S12), the process proceeds to S14 and the wooden pattern is specified as "small and small."

S11において、後オーダで大型木型を使用すると判定された場合(S11でYES)、S15に進み、前オーダで大型木型を使用するか否かを判定する。
前オーダで大型木型を使用する場合(S15でYES)、S16に進み、木型パターンを「大大」と特定する。
一方、前オーダで大型木型を使用しない場合(S15でNO)、S17に進み、この場合、前オーダで小型木型を使用することになるので、オーダチェンジパターンを「小大」と特定する。
If it is determined in S11 that a large wooden mold is to be used in the subsequent order (YES in S11), the process proceeds to S15, and it is determined whether or not a large wooden mold is to be used in the previous order.
If a large wooden pattern is to be used in the previous order (YES at S15), the process proceeds to S16 and the wooden pattern is specified as "large and large."
On the other hand, if a large mold is not used in the previous order (NO in S15), the process proceeds to S17, and in this case, since a small mold will be used in the previous order, the order change pattern is specified as "small-large". .

次に、主に図21および図22により、上述した本発明の実施形態の段ボールシート製函機の目標準備時間報知装置の変形例を説明する。図21は、図6と同様に示す、本発明の実施形態の変形例によるオーダチェンジパターン別目標準備時間データを定める基準となる作業別設定時間データを示す図表であり、図22は、図9と同様に示す、本発明の実施形態の変形例による第3の準備段階における目標準備時間の設定方法を説明するための概念図である。以下では、基本的に、上述した実施形態と異なる事項について説明する。 Next, a modification of the target preparation time notification device for the corrugated sheet box making machine according to the embodiment of the present invention described above will be described mainly with reference to FIGS. 21 and 22. FIG. 21 is a chart similar to FIG. 6 showing set time data for each task, which is a standard for determining target preparation time data for each order change pattern according to a modified example of the embodiment of the present invention, and FIG. It is a conceptual diagram for demonstrating the setting method of the target preparation time in the 3rd preparation stage by the modification of embodiment of this invention shown similarly. In the following, basically the differences from the above-described embodiment will be explained.

本実施形態の変形例においては、上述したように、オーダチェンジパターン特定部156(図10)は、オーダチェンジパターンを特定する。
さらに、本変形例では、オーダチェンジパターン特定部156は、オーダチェンジ後の後オーダについて、その後オーダの基本情報に含まれる品名コード(図11参照)を、記憶部152(図10)に記憶されているオーダ情報(図6に示すような基本情報)の品名コードと照合し、その後オーダが、過去に生産したことのある「リピートオーダ」か、または、過去に生産したことのない「新規オーダ」のいずれであるかを特定する。なお、品名コードとは、段ボール箱の仕様を示すコードであり、同じ段ボール箱の仕様には同じ品名コードを使用する。
本変形例においては、上述した記憶部152は、過去に生産したオーダの基本情報(オーダ情報)、および、それらのオーダにおいて、段ボール箱の検品に合格し、良品の段ボール箱を生産したときの製函機の各可動部材の最終調整位置を記憶している。
In the modified example of this embodiment, as described above, the order change pattern specifying unit 156 (FIG. 10) specifies the order change pattern.
Furthermore, in this modification, the order change pattern identifying unit 156 stores the product name code (see FIG. 11) included in the basic information of the subsequent order in the storage unit 152 (FIG. 10) for the subsequent order after the order change. The product name code in the order information (basic information as shown in Figure 6) is checked against the product name code, and then the order is determined to be either a "repeat order" that has been produced in the past, or a "new order" that has not been produced in the past. ”. Note that the product name code is a code that indicates the specifications of the cardboard box, and the same product name code is used for the specifications of the same cardboard box.
In this modification, the storage unit 152 described above stores basic information (order information) of orders produced in the past, as well as information about when the cardboard boxes of those orders have passed inspection and have been produced in good quality. The final adjustment position of each movable member of the box making machine is memorized.

次に、図21により、作業別時間表の変形例を説明する。
次に、図21に示す本変形例による作業別設定時間表のデータは、上述した実施形態の図6に対し、オーダチェンジ後の後オーダが、過去に生産したことがあるリピートオーダか、または、過去に生産したことがない新規オーダなのかを区別して、基準となる各設定時間を設定するデータである。
図21に示すように、本変形例では、図6に対し、作業項目として、「試し加工・検品時間(無地・新規オーダ)」、および、「検品加算時間(色刷/打抜・新規オーダ)」が追加されている。
そして、本変形例でも、上述した実施形態と同様に、図21における各設定時間を基準として、図4または図5のオーダチェンジパターン別目標準備時間表の各目標準備時間の値が適宜設定される。
Next, a modified example of the work-specific time table will be described with reference to FIG. 21.
Next, the data of the set time table for each work according to the present modification shown in FIG. 21 differs from FIG. 6 in the above-described embodiment in that the subsequent order after the order change is a repeat order that has been produced in the past, or This is data for distinguishing whether it is a new order that has not been produced in the past and setting each setting time that serves as a reference.
As shown in FIG. 21, in this modification, in contrast to FIG. 6, the work items are "trial processing/inspection time (plain color/new order)" and "inspection additional time (color printing/punching/new order)". ' has been added.
In this modification as well, similarly to the embodiment described above, the value of each target preparation time in the target preparation time table for each order change pattern in FIG. 4 or 5 is set as appropriate based on each set time in FIG. 21. Ru.

まず、作業項目である「試し加工・検品時間(無地)」の設定時間について説明する。なお、この「試し加工・検品時間(無地)」自体の項目は図6にも存在する。
本変形例において、この「試し加工・検品時間(無地)」の設定時間は、オーダチェンジ後の後オーダがリピートオーダの場合に、1回の検品で合格し、機械の調整や2回目の試し加工を行わないことを想定した設定時間である。これは、リピートオーダの場合、製函機の各可動部材が、過去のオーダ(前オーダより以前のオーダ)において、良品を生産したときと同じ調整位置に自動位置決めされる(同じ位置が再現される)ので、各可動部材を調整することなく良品を生産できると考えられるためである。
First, the setting time for the work item "trial processing/inspection time (plain)" will be explained. Note that the item "trial processing/inspection time (plain)" itself also exists in FIG.
In this modification, the setting time of this "trial processing/inspection time (plain)" is such that if the subsequent order after an order change is a repeat order, the product will pass the inspection once, and the machine adjustment and second trial will be required. This is a set time assuming that no processing will be performed. This means that in the case of repeat orders, each movable member of the box making machine is automatically positioned at the same adjustment position as when producing good products in the past order (orders before the previous order) (the same position is not reproduced). This is because it is thought that good products can be produced without adjusting each movable member.

ここで、本変形例では、その過去のオーダに関連付けて、良品を生産したときの各可動部材の調整後の位置情報を記憶部152に記憶するようにしている。より具体的には、その過去のオーダにおいて、作業者による検品作業において、段ボール箱が検品に合格するまで、製函機の各可動部材の位置の微調整と試し加工が行われることを想定している。そして、微調整の結果、検品に合格して、段ボール箱の生産運転が実行されたときの各可動部材の調整後の位置情報が記憶部152に記憶されるのである。 Here, in this modification, the adjusted position information of each movable member when a non-defective item was produced is stored in the storage unit 152 in association with the past order. More specifically, in the past order, it is assumed that during the inspection work by the worker, the position of each movable member of the box making machine will be finely adjusted and trial processing will be performed until the cardboard box passes the inspection. ing. Then, as a result of the fine adjustment, the adjusted position information of each movable member is stored in the storage unit 152 when the inspection is passed and the production operation of the cardboard box is executed.

そして、上述した準備段階の「ロット終了・機械セット時間(無地から無地)」における製函機の各可動部材の自動位置決めは、リピートオーダの場合、記憶部152に記憶された各可動部材の最終位置情報を参照し、良品を生産したときと同じ状態を再現するよう行われる。
一方、新規オーダの場合は、記憶部152に記憶された各オーダの基本設定値/初期設定値に基づいて、各可動部材の自動位置決めが行われる。
ここで、参照する記憶部152のデータが異なっていても、最終調整位置と基本設定値への自動調整においては、ほぼ同一の時間で各可動部材の自動位置決めが行われる。従って、本変形例においては、図21に示す「ロット終了・機械セット(無地→無地)時間」の設定時間(75秒)は、リピートオーダと新規オーダとで共通する値としている。
Then, in the case of a repeat order, the automatic positioning of each movable member of the box making machine at the "lot end/machine set time (plain to plain)" in the preparation stage described above is performed according to the final position of each movable member stored in the storage unit 152. This is done by referring to location information and reproducing the same condition as when the good product was produced.
On the other hand, in the case of a new order, automatic positioning of each movable member is performed based on the basic setting value/initial setting value of each order stored in the storage section 152.
Here, even if the data in the storage unit 152 to be referred to is different, the automatic positioning of each movable member is performed in approximately the same time in the automatic adjustment to the final adjustment position and the basic setting value. Therefore, in this modification, the setting time (75 seconds) of "lot end/machine set (plain color→plain color) time" shown in FIG. 21 is set to be a common value for repeat orders and new orders.

次に、作業項目である「試し加工・検品時間(無地・新規オーダ)」の設定時間について説明する。
本変形例では、図21に示すように、上述した実施形態に対し、「試し加工・検品時間(無地・新規オーダ)」の設定時間が追加されている。本変形例では、オーダチェンジの後オーダが新規オーダの場合に、1回目の検品後、機械の微調整や2回目の試し加工を行うことを想定しているためである。
Next, the setting time of the work item "trial processing/inspection time (plain color/new order)" will be explained.
In this modification, as shown in FIG. 21, a setting time for "trial processing/inspection time (plain color/new order)" is added to the above-described embodiment. This is because, in this modification, if the order after the order change is a new order, it is assumed that after the first inspection, fine adjustment of the machine and second trial processing will be performed.

たとえば、新規オーダの場合、製函機の可動部材は初期位値に位置決めされるが、初期位置の状態で一枚給紙すると検品で不合格となることが多く、作業者は、1回目の検品で見つかった不具合を修正するために、機械の調整や2回目の試し加工を行うと考えられる。具体的には、段ボール箱の不具合として、スロッタ溝の位置ズレ、折り曲げ位置ズレなどが生じる。
その不具合を無くすための機械の微調整として、スロッタ溝の位置ズレに対してはフィードロールの隙間調整やスロッタナイフの位置調整などを行い、折り曲げ位置ズレに対してはフォルダグルアの折り畳みバーの位置調整などを行う。
このように、本変形例での「試し加工・検品時間(無地・新規オーダ)」の設定時間(第5の目標準備時間)は、その機械の微調整や2回目の試し加工の分、上述した実施形態の「試し加工・検品時間(無地)」より準備時間が長くなることを想定しているのである。
For example, in the case of a new order, the movable parts of the box making machine are positioned at the initial position, but if a single sheet is fed in the initial position, it will often fail the inspection, and the operator will It is thought that the machine will be adjusted and a second trial processing will be carried out to correct any defects found during inspection. Specifically, defects in the cardboard box include misalignment of the slotter groove and misalignment of the folding position.
Fine adjustments to the machine to eliminate this problem include adjusting the feed roll gap and slotter knife position to correct the positional deviation of the slotter groove, and adjust the position of the folding bar of the folder gluer to correct the bending position deviation. Make adjustments, etc.
In this way, the set time (fifth target preparation time) for "trial machining/inspection time (plain color/new order)" in this modification example is the same as the above-mentioned time for fine adjustment of the machine and second trial machining. It is assumed that the preparation time will be longer than the "trial processing/inspection time (plain)" in the embodiment described above.

次に、作業項目である「検品加算時間(色刷・新規オーダ)」の設定時間、および、「検品加算時間(打抜・新規オーダ)」の設定時間について説明する。
本変形例では、図21に示すように、上述した実施形態に対し、色数に応じた「検品加算時間(色刷・新規オーダ)」、および、木型の種類に応じた「検品加算時間(打抜・新規オーダ)」の設定時間が追加されている。
Next, the setting time of the work item "inspection additional time (color printing/new order)" and the setting time of "inspection additional time (punching/new order)" will be explained.
In this modification, as shown in FIG. 21, in addition to the above-described embodiment, "inspection additional time (color printing/new order)" is set according to the number of colors, and "inspection additional time (new order)" is set according to the type of wood pattern. A setting time has been added for "Punching/New Order)".

ここで、上述した実施形態と同様の「検品加算(印刷/打抜)時間」は、本変形例では、オーダチェンジ後の後オーダがリピートオーダであり、かつ、印刷や打ち抜き加工を行うと仮定した場合の、一枚給紙してから、検品が完了して後オーダの生産を開始するまでの時間と、「試し加工・検品(無地)時間」との差の時間である。これは、上述したように、リピートオーダでは、最適な各可動部材の最適な位置決めが行われており、1回の検品で合格し、機械の調整や2回目の試し加工を行わないことを想定している。 Here, the "inspection addition (printing/punching) time" similar to the above-described embodiment is based on the assumption that the subsequent order after the order change is a repeat order and that printing and punching processing will be performed in this modification. In this case, this is the time difference between the time from feeding one sheet until inspection is completed and production of subsequent orders starts, and the "trial processing/inspection (plain) time". As mentioned above, this assumes that for repeat orders, the optimal positioning of each movable part is carried out, the product passes the inspection once, and there is no need to adjust the machine or perform a second trial process. are doing.

次に、「検品加算(印刷/打抜・新規オーダ)時間」は、オーダチェンジ後の後オーダが新規オーダであり、かつ、印刷や打ち抜き加工を行うと仮定した場合の、一枚給紙してから、検品が完了して後オーダの生産を開始するまでの時間と、「試し加工・検品(無地・新規オーダ)時間」との差の時間である。これは、1回の検品後、機械の微調整や2回目の試し加工を行う事を想定している。具体的には、不具合として、スロッタ溝の位置ズレ、折り曲げ位置ズレに加えて、印刷位置ズレ、打ち抜き位置ズレなどが生じる。
その不具合を無くすための機械の微調整としては、スロッタ溝の位置ズレや折り曲げ位置ズレに対しては上述した通りである。さらに、機械の微調整としては、印刷位置ズレに対しては印刷シリンダの位置調整を行い、打ち抜き位置ズレに対してはダイシリンダの位置調整を行う。
Next, the "inspection addition time (printing/punching/new order)" is calculated based on the assumption that the subsequent order after the order change is a new order, and that printing and punching processing will be performed. This is the time difference between the time from when the inspection is completed until the production of the subsequent order starts, and the "trial processing/inspection (plain color/new order) time". This assumes that after one inspection, the machine will be fine-tuned and a second trial process will be performed. Specifically, in addition to the positional deviation of the slotter groove and the bending position, the defects include printing positional deviation, punching positional deviation, and the like.
Fine adjustment of the machine to eliminate this problem is as described above for the positional deviation of the slotter groove and the bending positional deviation. Furthermore, as fine adjustments to the machine, the position of the printing cylinder is adjusted for misalignment of the printing position, and the position of the die cylinder is adjusted for the misalignment of the punching position.

次に、設定時間に関するさらなる変形例を説明する。
ここで、印刷や打ち抜き加工がある場合、無地の場合と比べて機械の調整箇所が増える。すなわち、たとえば、フィードロールやスロッタなどの調整に加えて、印刷シリンダやダイシリンダの調整が必要になる。従って、その分、機械の調整に要する時間は長くなると考えられる。しかしながら、本変形例では、無地の場合と印刷や打ち抜き加工がある場合とでは、印刷シリンダやダイシリンダの調整時間は微小であると捉え、機械の調整に要する時間を同じとみなしている。このような本変形例の場合、「検品加算時間(印刷/打抜・新規オーダ)」は、「検品加算時間(印刷/打抜)」と実質的に同じと捉えて、省略することで、図21に示す作業別設定時間表はシンプルになる。
Next, a further modification regarding the setting time will be explained.
Here, if there is printing or punching, the number of machine adjustments will increase compared to when printing or punching. That is, for example, in addition to adjusting the feed roll and slotter, it is necessary to adjust the print cylinder and die cylinder. Therefore, it is thought that the time required for adjusting the machine increases accordingly. However, in this modification, the time required for adjusting the printing cylinder and die cylinder is considered to be minute, and the time required for adjusting the machine is considered to be the same in the case of plain color and the case of printing or punching. In the case of this modification, the "inspection additional time (printing/punching/new order)" is considered to be substantially the same as the "inspection additional time (printing/punching)" and can be omitted. The set time table for each task shown in FIG. 21 is simple.

次に、図22により、本発明の実施形態の変形例による第3の準備段階における目標準備時間の設定方法を説明する。
まず、図22(a)に示すように、後オーダがリピートオーダである場合、第3の準備段階の時間は、「給紙準備期間」と、「試し加工・検品時間(無地)」と、「検品加算時間(印刷/打抜)」の各設定時間(図21参照)を加算した合計時間として算出する。
ここで、「試し加工・検品時間(無地)」、「検品加算時間(印刷/打抜)」のそれぞれの設定時間(図21参照)は、オーダチェンジの後オーダが新規オーダかリピートオーダかに応じて、異なるように設定されている。
従って、図22(b)に示すように、後オーダが新規オーダである場合は、図22(a)の例に対して、「試し加工・検品時間(無地)」の設定時間(30秒/図21参照)を用いず、「試し加工・検品時間(無地・新規オーダ)」の設定時間(60秒/図21参照)を用いると共に、「検品加算時間(1色)」の設定時間(10秒/図21参照)を用いず、「検品加算時間(1色・新規オーダ)」の設定時間(15秒/図21参照)を用いる。
Next, a method for setting the target preparation time in the third preparation stage according to a modification of the embodiment of the present invention will be described with reference to FIG. 22.
First, as shown in FIG. 22(a), if the subsequent order is a repeat order, the time of the third preparation stage is divided into the "paper feeding preparation period", the "trial processing/inspection time (plain)", It is calculated as the total time obtained by adding each setting time (see FIG. 21) of "inspection additional time (printing/punching)".
Here, the set times for "trial processing/inspection time (plain)" and "inspection additional time (printing/punching)" (see Figure 21) are determined depending on whether the order is a new order or a repeat order after an order change. Depending on the settings, they are configured differently.
Therefore, as shown in FIG. 22(b), if the subsequent order is a new order, the setting time (30 seconds/ (see Figure 21), use the set time (60 seconds/see Figure 21) for "Trial processing/inspection time (plain color/new order)" and use the set time (10 seconds/see Figure 21) for "Inspection additional time (1 color)". seconds/see Figure 21), but use the set time (15 seconds/see Figure 21) of the "inspection additional time (one color/new order)".

なお、さらなる変形例として、上述したように、後オーダが新規オーダであり、無地の場合と印刷や打ち抜き加工がある場合とで、機械の調整に要する時間を同じとみなした場合は、「試し加工・検品(無地・新規オーダ)時間」(図21参照)を用いるとともに、「検品加算時間(印刷/打抜・新規オーダ)」ではなく「検品加算時間(印刷/打抜)」(図21参照)を用いればよい。この場合、図22(b)における「検品・調整(1色)」の第6の目標準備時間は、「検品(1色)」の第6の目標準備時間となり、短い時間となる。 As a further modification, as mentioned above, if the subsequent order is a new order and the time required to adjust the machine is considered to be the same for a plain color and a case that involves printing or punching, the "trial" In addition to using "processing/inspection (plain color/new order) time" (see Figure 21), "inspection additional time (printing/punching)" (see Figure 21) instead of "inspection additional time (printing/punching/new order)" ) can be used. In this case, the sixth target preparation time for "inspection/adjustment (one color)" in FIG. 22(b) becomes the sixth target preparation time for "inspection (one color)", which is a short time.

また、上述した本発明の実施形態および変形例では、第2の準備段階における第2の目標準備時間の設定において、印版交換および木型交換のみを考慮し、クリーザスロッタ4における継刃の着脱作業を考慮していないが、さらなる変形例として、これを考慮してもよい。
ここで、継刃は、上部スロッタのスロッタ刃43に連結して使用する刃物である。作業者は、オーダに応じたシートSの溝切り加工寸法に対して、スロッタ刃43の刃物長さが不足する場合に、刃物長さを延長するために、スロッタ刃43に継刃を取り付ける作業を行う。反対に、オーダに応じたシートSの溝切り加工寸法に対して、スロッタ刃43の刃物長さが長すぎる場合には、作業者は、スロッタ刃43に連結されている継刃を取り外す作業を行う。
この変形例において、オーダチェンジパターン特定部156は、後オーダの基本情報に含まれるシートSの溝切り加工寸法の情報と、上部スロッタに取り付けられたスロッタ刃43の刃物長さの情報とを比較することにより、オーダチェンジ中に継刃の着脱作業が必要か否かを特定する。さらに、この変形例において、図6に示す作業別設定時間データには、第2の目標準備時間の「機械セット加算(印版交換/木型交換)時間」に加えて、「機械セット加算(継刃着脱)時間」が追加され、上述した実施形態と同様に、この追加した「機械セット加算(継刃着脱)時間」も適宜参照し、図4または図5に示すオーダチェンジパターン別目標準備時間表の値を設定する。なお、スロッタ刃の刃物長さの情報を取得する方法については説明を省略する。スロッタ刃の刃物長さの情報を取得する方法は、たとえば、特開2018-103535号公報に記載されている。
In addition, in the embodiments and modifications of the present invention described above, in setting the second target preparation time in the second preparation stage, only the printing plate exchange and the wooden mold exchange are taken into consideration, and the attachment and detachment of the joint blade in the creaser slotter 4 is performed. Although work is not considered, this may be considered as a further variation.
Here, the joint blade is a blade used in connection with the slotter blade 43 of the upper slotter. When the blade length of the slotter blade 43 is insufficient for the grooving dimensions of the sheet S according to the order, the operator attaches a joint blade to the slotter blade 43 in order to extend the blade length. I do. On the other hand, if the length of the slotter blade 43 is too long for the grooving dimensions of the sheet S according to the order, the operator must remove the joint blade connected to the slotter blade 43. conduct.
In this modification, the order change pattern identification unit 156 compares the information on the grooving dimensions of the sheet S included in the basic information of the subsequent order with the information on the blade length of the slotter blade 43 attached to the upper slotter. By doing so, it is possible to determine whether or not it is necessary to attach and detach the joint blade during order change. Furthermore, in this modification, the set time data for each job shown in FIG. Similarly to the embodiment described above, this added "machine set addition (joint blade attachment/detachment) time" is added as appropriate, and target preparation for each order change pattern shown in FIG. 4 or 5 is performed. Set timetable values. Note that a description of the method for acquiring the information on the length of the slotter blade will be omitted. A method for acquiring information on the blade length of a slotter blade is described in, for example, Japanese Patent Application Publication No. 2018-103535.

次に、本発明の実施形態およびその変形例による段ボールシート製函機の目標準備時間報知装置の主な作用効果を説明する。
まず、本実施形態およびその変形例による段ボールシート製函機の目標準備時間報知装置122では、段ボール箱の予め定められた各オーダの生産順(図13)と、それらの段ボール箱の各オーダ情報(図11)とを記憶する記憶部152と、各オーダの生産順に従って、所定のオーダチェンジ時の前に生産されるオーダの前オーダ情報および後に生産される後オーダ情報の両方に基づいて、それらの前オーダと後オーダとの間のオーダチェンジ時に後オーダの生産のために必要な準備作業をオーダチェンジパターンとして予め特定するオーダチェンジパターン特定部156と、特定されたオーダチェンジパターンに基づいて、全ての準備作業を完了させるべき所定の時間である目標準備時間(図4~図6)を予め算出する目標準備時間算出部157と、所定のオーダチェンジ時および/または所定のオーダチェンジの開始前に算出された目標準備時間を作業者に報知するための報知指令部158と、を有する。
従って、オーダチェンジ前後の前オーダ情報および後オーダ情報の両方に基づいて、オーダチェンジ毎に異なる準備作業内容に応じた目標準備時間を作業者に報知するので、作業者に、目標準備時間内に作業を完了させようというモチベーションを維持させつつ、目標準備時間に対して実際にかかった準備作業時間を把握させることができる。それにより、作業者に、準備作業の段取りや準備作業に必要な所定の交換部品や工具などの物品の配置の見直しなどを行う必要性を認識させ、作業者が見直しなどを実行することにより、オーダチェンジ時の準備作業の効率化を図ることができる。
Next, the main effects of the target preparation time notification device for a corrugated sheet box making machine according to the embodiment of the present invention and its modification will be explained.
First, in the target preparation time notification device 122 of the corrugated sheet box making machine according to the present embodiment and its modification, the production order of each predetermined order of corrugated boxes (FIG. 13) and each order information of those corrugated boxes are displayed. (FIG. 11), and based on both the previous order information of the order produced before the predetermined order change time and the subsequent order information produced after the time of the predetermined order change, according to the production order of each order. An order change pattern identification unit 156 that specifies in advance the preparatory work required for production of the subsequent order as an order change pattern at the time of an order change between the previous order and the subsequent order; , a target preparation time calculation unit 157 that calculates in advance a target preparation time (FIGS. 4 to 6), which is a predetermined time in which all preparation work should be completed, and a predetermined order change time and/or the start of a predetermined order change. and a notification command unit 158 for notifying the worker of the previously calculated target preparation time.
Therefore, based on both the previous order information and subsequent order information before and after the order change, the operator is informed of the target preparation time according to the content of the preparation work that differs for each order change. While maintaining the motivation to complete the work, it is possible to grasp the actual preparation work time compared to the target preparation time. This will make workers aware of the need to review the arrangements for preparatory work and the arrangement of items such as prescribed replacement parts and tools necessary for preparatory work. Preparation work at the time of order change can be made more efficient.

また、本実施形態およびその変形例では、記憶部152が記憶する各オーダ情報(図11)は、各印刷ユニットを印刷に使用するか否かの情報を含み、オーダチェンジパターン特定部156は、オーダチェンジ前後の前オーダ情報および後オーダ情報の両方に基づいて、印刷ユニット(30、32)毎にオーダチェンジ時に印版(38)の交換が必要か否かを特定し、かつ、印刷ユニット全体でオーダチェンジ時に必要な作業者が行う印版交換の回数を特定し、目標準備時間算出部157は、特定された印版交換の回数に基づいて、印版交換の回数が多いほど目標準備時間を長く算出する。
従って、オーダチェンジ時の印版交換の回数に基づいて目標準備時間を算出するので、目標準備時間が実際のオーダチェンジの作業内容に即したものとなる。ここで、例えば、印版交換の回数が多い場合、作業者が、印版交換を全て完了するのに要する時間が長くなり、それに応じて、オーダチェンジの時に必要な作業を全て完了させるのに要する準備時間も長くなる。従って、本発明によれば、印版交換の回数が多いほど目標準備時間を長く算出するので、作業者に、適切な目標準備時間を報知することができ、これにより、報知された目標準備時間内に準備作業を完了させようというモチベーションを維持させることができる。
Furthermore, in the present embodiment and its modified examples, each order information (FIG. 11) stored in the storage unit 152 includes information as to whether each printing unit is used for printing, and the order change pattern identification unit 156 Based on both the previous order information and subsequent order information before and after the order change, it is determined for each printing unit (30, 32) whether or not the printing plate (38) needs to be replaced at the time of order change, and the entire printing unit is The target preparation time calculating unit 157 determines the target preparation time as the number of printing plate changes increases, based on the specified number of printing plate changes. Calculate for a long time.
Therefore, since the target preparation time is calculated based on the number of printing plate exchanges at the time of an order change, the target preparation time corresponds to the actual work contents of the order change. For example, if the number of printing plate changes is large, the time required for the operator to complete all printing plate changes will be longer, and the time required for the operator to complete all the necessary work at the time of order change will be longer. The preparation time required also increases. Therefore, according to the present invention, the target preparation time is calculated to be longer as the number of printing plate exchanges increases, so that it is possible to notify the operator of an appropriate target preparation time. You can maintain your motivation to complete the preparation work within the day.

また、本実施形態およびその変形例では、オーダチェンジパターン特定部156は、オーダチェンジ後の後オーダ情報に基づいて、その後オーダで印刷に使用する色の数を特定し、目標準備時間算出部157は、特定された色の数に基づいて、色の数が多いほど目標準備時間を長く算出する。ここで、例えば、オーダで使用する色の数が多い場合、作業者が試し加工品の検品に要する時間が長くなり、それに応じて、オーダチェンジ時に必要な作業を全て完了させるのに要する時間も長くなる。従って、色の数が多いほど目標準備時間を長くに算出するので、報知する目標準備時間が適切なものとなる。 Furthermore, in the present embodiment and its modifications, the order change pattern identifying unit 156 identifies the number of colors to be used for printing in subsequent orders based on the post-order information after the order change, and the target preparation time calculating unit 157 Based on the number of specified colors, the target preparation time is calculated to be longer as the number of colors increases. For example, if a large number of colors are used in an order, it will take longer for the operator to inspect the sample processed product, and accordingly, the time required to complete all the necessary work when changing orders will also increase. become longer. Therefore, the larger the number of colors, the longer the target preparation time is calculated, so the target preparation time to be notified becomes more appropriate.

また、本実施形態およびその変形例では、製函機1は、オーダチェンジ時に、所定の可動部材の位置決めを自動で実行し、目標準備時間(図4~図6)は、オーダチェンジ時に印版交換を行わないと仮定した場合の、前オーダの生産が終了してから製函機の所定の可動部材の位置決めが完了するまでの第1の設定時間(ロット終了・機械セット時間(無地から無地))と、オーダチェンジ時に印版交換を行うと仮定した場合の、前オーダの生産が終了してから、後オーダ用の印版交換が完了するまでの時間と、第1の設定時間との差である第2の設定時間(機械セット加算時間(印版交換))と、所定の可動部材の位置決めおよび印版交換の両方が完了してから、段ボールシートのセット完了後に製函機が起動するまでの第3の設定時間(シートセット加算時間)と、製函機が起動してから段ボール箱の試し加工が開始されるまでの第4の設定時間(給紙準備時間)と、オーダチェンジ後の後オーダで印刷を行わないと仮定した場合の、段ボール箱の試し加工を開始してから、試し加工された段ボール箱を検品し、後オーダの段ボール箱の連続給紙による生産を開始するまでの第5の設定時間(試し加工・検品時間(無地))と、オーダチェンジ後の後オーダで印刷を行うと仮定した場合の、段ボール箱の試し加工を開始してから、試し加工された段ボール箱を検品し、後オーダの生産を開始するまでの時間と、第5の設定時間との差である第6の設定時間(検品加算時間(印刷))との合計時間である。
このように、本実施形態およびその変形例では、オーダチェンジ毎に異なる、印版交換や試し加工された段ボール箱の検品の作業内容に応じて目標準備時間を算出するので、より効果的に、目標準備時間を実際の作業内容に即した時間として算出することができる。
Furthermore, in this embodiment and its modifications, the box making machine 1 automatically positions predetermined movable members at the time of order change, and the target preparation time (FIGS. 4 to 6) Assuming that no replacement is performed, the first set time (lot end/machine set time (from plain to plain )), the time from the end of production of the previous order until the completion of the printing plate exchange for the subsequent order, assuming that the printing plate is replaced at the time of order change, and the first set time. After the difference in the second set time (additional machine set time (print plate exchange)), the positioning of the predetermined movable member, and the plate exchange are completed, the box making machine starts after the corrugated sheet is set. The third setting time (sheet set addition time) until the box making machine starts and the fourth setting time (paper feeding preparation time) from when the box making machine starts until trial processing of the cardboard box starts, and the order change time. Assuming that printing will not be performed in the subsequent post-order, start trial processing of the cardboard box, inspect the trial-processed cardboard box, and start production of the post-order cardboard box by continuous paper feeding. The fifth setting time (trial processing/inspection time (plain color)) up to and including the trial processing time after starting trial processing of a cardboard box, assuming that printing will be performed on a subsequent order after an order change. This is the total time of the time from when the cardboard box is inspected to the start of production of the subsequent order, and the sixth set time (inspection additional time (printing)), which is the difference from the fifth set time.
In this way, in this embodiment and its modified examples, the target preparation time is calculated according to the work contents of printing plate exchange and inspection of trial-processed cardboard boxes, which differ for each order change. The target preparation time can be calculated as a time that matches the actual work content.

また、本実施形態およびその変形例では、目標準備時間は、製函機の印刷装置のインキを交換する色替時間の設定時間を含み、目標準備時間算出部157は、第1~第3の設定時間の合計時間より色替時間の設定時間が長い場合、第1~第3の設定時間に代えて色替時間の設定時間を設定するので、より効果的かつより適切に、目標準備時間を算出することができる。 Further, in the present embodiment and its modified examples, the target preparation time includes the setting time of the color change time for replacing the ink of the printing device of the box making machine, and the target preparation time calculation unit 157 If the color change time setting time is longer than the total set time, the color change time setting time is set instead of the first to third setting times, so you can set the target preparation time more effectively and more appropriately. It can be calculated.

また、本実施形態の変形例では、記憶部152は、さらに、過去に生産したオーダ情報(図11)を記憶しており、オーダチェンジパターン特定部156は、さらに、記憶部の過去に生産したオーダ情報を参照して、所定のオーダチェンジ後に生産される後オーダのオーダ情報が、過去に生産したオーダ情報に含まれるか否かを特定し、目標準備時間算出部157は、オーダチェンジ後の後オーダ情報が、過去に生産したオーダ情報に含まれない新規オーダである場合、新規オーダではない場合(リピートオーダである場合)よりも目標準備時間を長く算出する。
このように、本変形例では、オーダチェンジの後オーダが新規オーダか否かに応じて目標準備時間を算出するので、より一層、目標準備時間が実際のオーダチェンジの作業内容に即したものとなる。たとえば、オーダチェンジ直後のオーダが新規オーダの場合、試し加工品の検品後に機械の調整が必要になることが一般的であり、過去に生産したことのあるリピートオーダの場合に比べて、試し加工してからオーダの生産が開始するまでの時間が長くなる。ここで、新規のオーダでは、新規ではないオーダ(リピートオーダ)よりも、新規である分、検品などにより時間をかける必要が想定される。従って、本変形例によれば、新規オーダである場合、リピートオーダである場合よりも目標準備時間を長く算出するので、より効果的かつより適切に、目標準備時間を算出することができる。そして、本変形では、機械の調整に要する時間を考慮した時間に設定することにより、新規オーダの場合でも目標準備時間を達成することが可能となり、作業者の目標準備時間内に準備作業を完了させようというモチベーションを維持することができる。
In the modification of the present embodiment, the storage unit 152 further stores past produced order information (FIG. 11), and the order change pattern identification unit 156 further stores past produced order information (FIG. 11) in the storage unit. Referring to the order information, the target preparation time calculation unit 157 specifies whether or not the order information of the subsequent order produced after the predetermined order change is included in the order information produced in the past. If the subsequent order information is a new order that is not included in the order information produced in the past, the target preparation time is calculated to be longer than if it is not a new order (if it is a repeat order).
In this way, in this modified example, the target preparation time is calculated depending on whether the order after the order change is a new order, so the target preparation time is more closely aligned with the actual order change work content. Become. For example, if the order immediately after an order change is a new order, it is common that the machine needs to be adjusted after inspecting the trial processed product, and compared to the case of a repeat order that has been produced in the past, the trial processing It takes a long time from when the order starts to be produced. Here, it is assumed that new orders require more time for inspection than orders that are not new (repeat orders). Therefore, according to this modification, since the target preparation time is calculated longer for a new order than for a repeat order, it is possible to calculate the target preparation time more effectively and more appropriately. In this modification, by setting the time to take into account the time required for machine adjustment, it is possible to achieve the target preparation time even for new orders, and the preparation work can be completed within the operator's target preparation time. You can maintain your motivation to do so.

また、本実施形態およびその変形例では、オーダチェンジパターンは、前オーダ情報および後オーダ情報によって規定される印版交換のパターン(図4、図5)と、前オーダ情報および後オーダ情報によって規定される打ち抜きダイの木型交換のパターン(図4、図5)とを含み、オーダチェンジパターン特定部156は、これらの印版交換のパターンと木型交換のパターンとを含むオーダチェンジパターンを特定し(図4~図6)、記憶部152は、この特定されたオーダチェンジパターンと、目標準備時間算出部が算出した目標準備時間とを関連付けたデータ(図4、図5)として記憶し、報知指令部は158、このオーダチェンジパターンに関連付けて記憶された目標準備時間を作業者に報知する。従って、作業者に、より効果的かつより適切な目標準備時間を報知することができる。 Furthermore, in the present embodiment and its modified examples, the order change pattern is defined by the printing plate exchange pattern (FIGS. 4 and 5) defined by the previous order information and the subsequent order information, and by the previous order information and the subsequent order information. The order change pattern specifying unit 156 specifies the order change pattern including the pattern for changing the printing plate and the pattern for changing the wood pattern (FIGS. 4 and 5). (FIGS. 4 to 6), and the storage unit 152 stores the identified order change pattern and the target preparation time calculated by the target preparation time calculation unit as data (FIGS. 4 and 5), The notification command unit 158 notifies the operator of the target preparation time stored in association with this order change pattern. Therefore, it is possible to notify the worker of the target preparation time more effectively and more appropriately.

また、本実施形態およびその変形例では、準備作業は、製函機が自動で実行する所定の可動部材の位置決めと、作業者により行われる印版交換、木型交換および試し加工された段ボール箱の検品とを含み、記憶部152は、製函機1が自動で実行する準備作業の実測値に基づいて予め設定された、所定の可動部材の位置決めの設定時間と、各作業に熟練した作業者による準備作業の実測値に基づいて予め設定された、作業者により実行される印版交換、木型交換および試し加工された段ボール箱の検品の設定時間とのデータを記憶し、オーダチェンジパターンに関連付けて記憶された目標準備時間(図4、図5)は、記憶された製函機が自動で実行する所定の可動部材の位置決めの設定時間と、作業者により実行される印版交換、木型交換および試し加工された段ボール箱の検品の設定時間とを含むデータに基づいて設定される。
従って、より適切に、目標準備時間を算出することができる。より詳細には、目標準備時間が、製函機が自動で実行する準備作業の実測値および各作業に熟練した作業者による準備作業の実測値に基づいて設定されるので、全ての準備作業を完了させるべき所定の時間である目標準備時間(図4~図6)をより適切な時間に設定することができる。
In addition, in this embodiment and its variations, the preparatory work includes positioning of predetermined movable members automatically performed by the box making machine, exchanging printing plates and exchanging wooden molds performed by the operator, and preparing the cardboard box after trial processing. The storage unit 152 stores the set time for positioning a predetermined movable member, which is preset based on the actual measurement value of the preparatory work automatically executed by the box making machine 1, and the skilled worker for each work. The data is stored in advance based on the actual measurements of the preparatory work performed by the operator, and the set times for stamp exchange, wooden mold exchange, and inspection of trial-processed cardboard boxes are stored, and order change patterns are created. The target preparation time (FIGS. 4 and 5) stored in association with the stored setting time for positioning a predetermined movable member automatically executed by the box making machine, printing plate exchange executed by the operator, It is set based on data including the set time for replacing the wooden mold and inspecting the trial-processed cardboard box.
Therefore, the target preparation time can be calculated more appropriately. More specifically, the target preparation time is set based on the actual measurements of the preparation work automatically performed by the box making machine and the actual measurements of the preparation work performed by workers skilled in each task. The target preparation time (FIGS. 4 to 6), which is the predetermined time for completion, can be set to a more appropriate time.

S 段ボールシート
FD シート送り出し方向/シート搬送方向
1 段ボールシート製函機
2 給紙装置
3 印刷装置
4 クリーザスロッタ
5 ダイカッタ
6 フォルダグルア
7 シート分離装置
8 カウンタエジェクタ
9 結束機
27 フィードロール
28 生産枚数計数センサ
31 インキ缶
33 アニロックスロール
34、36 印刷シリンダ
37 プレスロール
38 印版
54 打ち抜きダイ(木型)
100 製函機の目標準備時間報知装置を含むシステム
110 製函機の生産管理装置
120 下位管理装置
122 上位管理装置/目標準備時間報知装置
156 オーダチェンジパターン特定部
157 目標準備時間算出部
158 報知指令部
S Corrugated sheet FD Sheet feeding direction/sheet conveying direction 1 Corrugated sheet box making machine 2 Paper feeding device 3 Printing device 4 Creaser slotter 5 Die cutter 6 Folder gluer 7 Sheet separating device 8 Counter ejector 9 Binding device 27 Feed roll 28 Production number counting sensor 31 Ink can 33 Anilox rolls 34, 36 Printing cylinder 37 Press roll 38 Printing plate 54 Punching die (wooden pattern)
100 System including target preparation time notification device for box making machine 110 Production control device for box making machine 120 Lower management device 122 Upper management device/target preparation time notification device 156 Order change pattern identification unit 157 Target preparation time calculation unit 158 Notification command Department

Claims (8)

製函機による段ボール箱の生産のオーダチェンジ時に必要な作業内容に応じた目標準備時間を算出して作業者に報知する段ボールシート製函機の目標準備時間報知装置であって、
段ボール箱の予め定められた各オーダの生産順と、それらの段ボール箱の各オーダ情報とを記憶する記憶部と、
上記各オーダの生産順に従って、所定のオーダチェンジ時の前に生産されるオーダの前オーダ情報および後に生産される後オーダ情報の両方に基づいて、それらの前オーダと後オーダとの間のオーダチェンジ時に後オーダの生産のために必要な準備作業をオーダチェンジパターンとして予め特定するオーダチェンジパターン特定部と、
上記特定されたオーダチェンジパターンに基づいて、上記全ての準備作業を完了させるべき所定の時間である目標準備時間を予め算出する目標準備時間算出部と、
所定のオーダチェンジ時および/または所定のオーダチェンジの開始前に上記算出された目標準備時間を作業者に報知するための報知指令部と、を有し、
上記準備作業は、作業者により行われる試し加工された段ボール箱の検品を含み、
上記オーダチェンジパターン特定部は、オーダチェンジ後の後オーダ情報に基づいて、その後オーダで印刷に使用する色の数を、段ボール箱の印刷部を検品する色の数として特定し、
上記目標準備時間算出部は、上記特定された色の数に基づいて、上記検品する色の数が多いほど上記目標準備時間を長く算出する、ことを特徴とする段ボールシート製函機の目標準備時間報知装置。
A target preparation time notification device for a corrugated sheet box making machine that calculates a target preparation time according to the work content required at the time of an order change in the production of corrugated boxes by the box making machine and notifies a worker of the calculated target preparation time,
a storage unit that stores the production order of each predetermined order of cardboard boxes and each order information of those cardboard boxes;
According to the production order of each order above, based on both the previous order information of the order produced before the predetermined order change time and the subsequent order information produced after, orders between those previous orders and subsequent orders are determined. an order change pattern identification unit that identifies in advance preparatory work necessary for production of a subsequent order at the time of change as an order change pattern;
a target preparation time calculation unit that calculates in advance a target preparation time, which is a predetermined time in which all of the preparation work should be completed, based on the identified order change pattern;
and a notification command unit for notifying the operator of the calculated target preparation time at the time of a predetermined order change and/or before the start of a predetermined order change ,
The above preparatory work includes inspection of the trial-processed cardboard box carried out by the worker,
The order change pattern identification unit identifies the number of colors to be used for printing in subsequent orders as the number of colors for inspecting the printed part of the cardboard box, based on the post-order information after the order change,
The target preparation time calculation unit calculates the target preparation time to be longer as the number of colors to be inspected increases based on the number of specified colors. Time notification device.
製函機による段ボール箱の生産のオーダチェンジ時に必要な作業内容に応じた目標準備時間を算出して作業者に報知する段ボールシート製函機の目標準備時間報知装置であって、
段ボール箱の予め定められた各オーダの生産順と、それらの段ボール箱の各オーダ情報とを記憶する記憶部と、
上記各オーダの生産順に従って、所定のオーダチェンジ時の前に生産されるオーダの前オーダ情報および後に生産される後オーダ情報の両方に基づいて、それらの前オーダと後オーダとの間のオーダチェンジ時に後オーダの生産のために必要な準備作業をオーダチェンジパターンとして予め特定するオーダチェンジパターン特定部と、
上記特定されたオーダチェンジパターンに基づいて、上記全ての準備作業を完了させるべき所定の時間である目標準備時間を予め算出する目標準備時間算出部と、
所定のオーダチェンジ時および/または所定のオーダチェンジの開始前に上記算出された目標準備時間を作業者に報知するための報知指令部と、を有し、
上記記憶部は、さらに、過去に生産したオーダ情報を記憶しており、
上記オーダチェンジパターン特定部は、さらに、上記記憶部の過去に生産したオーダ情報を参照して、所定のオーダチェンジ後に生産される後オーダのオーダ情報が、過去に生産したオーダ情報に含まれるか否かを特定し、
上記目標準備時間算出部は、上記オーダチェンジ後の後オーダ情報が、過去に生産したオーダ情報に含まれない新規オーダである場合、新規オーダでない場合よりも上記目標準備時間を長く算出する、ことを特徴とする段ボールシート製函機の目標準備時間報知装置。
A target preparation time notification device for a corrugated sheet box making machine that calculates a target preparation time according to the work content required at the time of an order change in the production of corrugated boxes by the box making machine and notifies a worker of the calculated target preparation time,
a storage unit that stores the production order of each predetermined order of cardboard boxes and each order information of those cardboard boxes;
According to the production order of each order above, based on both the previous order information of the order produced before the predetermined order change time and the subsequent order information produced after, orders between those previous orders and subsequent orders are determined. an order change pattern identification unit that identifies in advance preparatory work necessary for production of a subsequent order at the time of change as an order change pattern;
a target preparation time calculation unit that calculates in advance a target preparation time, which is a predetermined time in which all of the preparation work should be completed, based on the identified order change pattern;
and a notification command unit for notifying the operator of the calculated target preparation time at the time of a predetermined order change and/or before the start of a predetermined order change ,
The storage unit further stores order information produced in the past,
The order change pattern identifying section further refers to the order information produced in the past in the storage section, and determines whether the order information of the subsequent order produced after the predetermined order change is included in the order information produced in the past. identify whether or not;
The target preparation time calculation unit calculates the target preparation time to be longer when the subsequent order information after the order change is a new order that is not included in the order information produced in the past than when the order is not a new order. A target preparation time notification device for a corrugated sheet box making machine, characterized by:
上記記憶部が記憶する各オーダ情報は、各印刷ユニットを印刷に使用するか否かの情報を含み、
上記オーダチェンジパターン特定部は、オーダチェンジ前後の前オーダ情報および後オーダ情報の両方に基づいて、印刷ユニット毎にオーダチェンジ時に印版交換が必要か否かを特定し、かつ、印刷ユニット全体でオーダチェンジ時に必要な作業者が行う印版交換の回数を特定し、
上記目標準備時間算出部は、上記特定された印版交換の回数に基づいて、印版交換の回数が多いほど上記目標準備時間を長く算出する、請求項1または請求項2に記載の段ボールシート製函機の目標準備時間報知装置。
Each order information stored in the storage unit includes information as to whether each printing unit is used for printing,
The order change pattern identification section specifies whether or not a printing plate needs to be replaced at the time of an order change for each printing unit based on both the previous order information before and after the order change and the subsequent order information, and also Identify the number of stamp changes required by operators when changing orders,
The cardboard sheet according to claim 1 or 2 , wherein the target preparation time calculation unit calculates the target preparation time to be longer as the number of times the printing plate is replaced is larger, based on the specified number of times the printing plate is replaced. Target preparation time notification device for box making machine.
製函機は、オーダチェンジ時に、所定の可動部材の位置決めを自動で実行し、
上記目標準備時間は、
オーダチェンジ時に印版交換を行わないと仮定した場合の、前オーダの生産が終了してから製函機の上記所定の可動部材の位置決めが完了するまでの第1の設定時間と、
オーダチェンジ時に印版交換を行うと仮定した場合の、前オーダの生産が終了してから、後オーダ用の印版交換が完了するまでの時間と、上記第1の設定時間との差である第2の設定時間と、
上記所定の可動部材の位置決めおよび上記印版交換の両方が完了してから、段ボールシートのセット完了後に製函機が起動するまでの第3の設定時間と、
上記製函機が起動してから段ボール箱の試し加工が開始されるまでの第4の設定時間と、
オーダチェンジ後の後オーダで印刷を行わないと仮定した場合の、段ボール箱の試し加工を開始してから、試し加工された段ボール箱を検品し、後オーダの段ボール箱の連続給紙による生産を開始するまでの第5の設定時間と、
オーダチェンジ後の後オーダで印刷を行うと仮定した場合の、段ボール箱の試し加工を開始してから、試し加工された段ボール箱を検品し、後オーダの生産を開始するまでの時間と、上記第5の設定時間との差である第6の設定時間との合計時間である、請求項1乃至3のいずれか1項に記載のボールシート製函機の目標準備時間報知装置。
The box making machine automatically positions predetermined movable parts when changing orders.
The target preparation time above is
A first set time from the end of production of the previous order until the positioning of the predetermined movable member of the box making machine is completed, assuming that the printing plate is not replaced at the time of order change;
This is the difference between the time from the end of the production of the previous order until the completion of the printing plate exchange for the subsequent order and the above first set time, assuming that the printing plate is replaced at the time of order change. a second setting time;
a third set time from when both the positioning of the predetermined movable member and the stamp exchange are completed until the box making machine is started after the setting of the corrugated cardboard sheet is completed;
a fourth set time from when the box making machine starts up until trial processing of the cardboard box starts;
Assuming that printing will not be performed on subsequent orders after an order change, we will start trial processing of corrugated boxes, inspect the trial processed corrugated boxes, and start production of subsequent orders using continuous paper feeding. a fifth setting time until the start;
Assuming that printing will be performed on a subsequent order after an order change, the time from starting trial processing of a cardboard box to inspecting the trial processed cardboard box and starting production of the subsequent order, and the above The target preparation time notification device for a ball sheet box making machine according to any one of claims 1 to 3 , wherein the total time is a total time including a sixth set time that is a difference from the fifth set time.
上記目標準備時間は、製函機の印刷装置のインキを交換する色替時間の設定時間を含み、
上記目標準備時間算出部は、上記第1乃至第3の設定時間の合計時間より上記色替時間の設定時間が長い場合、上記第1乃至第3の設定時間に代えて上記色替時間の設定時間を設定する、請求項4に記載のボールシート製函機の目標準備時間報知装置。
The above target preparation time includes the setting time of color change time to replace the ink of the printing device of the box making machine,
If the set time of the color change time is longer than the total time of the first to third set times, the target preparation time calculation unit sets the color change time instead of the first to third set times. The target preparation time notification device for a ball sheet box making machine according to claim 4, which sets a time.
上記オーダチェンジパターンは、前オーダ情報および後オーダ情報によって規定される、製函機の印刷装置の印版交換のパターンと、前オーダ情報および後オーダ情報によって規定される、製函機のダイカッタの打ち抜きダイの木型交換のパターンとを含み、
上記オーダチェンジパターン特定部は、これらの印版交換のパターンと木型交換のパターンとを含むオーダチェンジパターンを特定し、
上記記憶部は、この特定されたオーダチェンジパターンと、上記目標準備時間算出部が算出した目標準備時間とを関連付けたデータとして記憶し、
上記報知指令部は、このオーダチェンジパターンに関連付けて記憶された目標準備時間を作業者に報知する、請求項1乃至のいずれか1項に記載の段ボールシート製函機の目標準備時間報知装置。
The above-mentioned order change pattern is the printing plate exchange pattern of the printing device of the box making machine, which is defined by the previous order information and the subsequent order information, and the pattern of the die cutter of the box making machine, which is defined by the previous order information and the subsequent order information. including a pattern for changing the pattern of the punching die;
The order change pattern specifying unit specifies an order change pattern including the printing plate exchange pattern and the wood pattern exchange pattern,
The storage unit stores the identified order change pattern and the target preparation time calculated by the target preparation time calculation unit as data in association with each other,
The target preparation time notification device for a corrugated sheet box making machine according to any one of claims 1 to 5 , wherein the notification command unit notifies the operator of the target preparation time stored in association with the order change pattern. .
上記準備作業は、製函機が自動で実行する所定の可動部材の位置決めと、作業者により行われる印版交換、木型交換および試し加工された段ボール箱の検品とを含み、
上記記憶部は、製函機が自動で実行する準備作業の実測値に基づいて予め設定された、所定の可動部材の位置決めの設定時間と、各作業に熟練した作業者による準備作業の実測値に基づいて予め設定された、作業者により実行される印版交換、木型交換および試し加工された段ボール箱の検品の設定時間とのデータを記憶し、
上記オーダチェンジパターンに関連付けて記憶された目標準備時間は、上記記憶された上記製函機が自動で実行する所定の可動部材の位置決めの設定時間と、作業者により実行される印版交換、木型交換および試し加工された段ボール箱の検品の設定時間とを含むデータに基づいて設定される、請求項に記載の段ボールシート製函機の目標準備時間報知装置。
The above preparatory work includes the positioning of predetermined movable members automatically performed by the box making machine, the printing plate exchange, the wooden mold exchange, and the inspection of the trial-processed cardboard box performed by the operator,
The above storage section stores the set time for positioning a predetermined movable member, which is preset based on the actual measured value of the preparatory work automatically executed by the box making machine, and the actual measured value of the preparatory work performed by an operator skilled in each work. Stores data on preset times for printing plate exchange, wooden mold exchange, and inspection of trial-processed cardboard boxes to be executed by the operator, which are preset based on
The target preparation time stored in association with the order change pattern is the set time for positioning a predetermined movable member automatically executed by the box making machine, the printing plate exchange executed by the operator, and the 7. The target preparation time notification device for a corrugated sheet box making machine according to claim 6 , wherein the target preparation time notification device for a corrugated sheet box making machine is set based on data including a set time for mold exchange and inspection of a trial-processed corrugated box.
上記段ボールシート製函機は、段ボールシートを1枚ずつ供給する給紙装置、段ボールシートに印刷を施す印刷装置、段ボールシートに罫線を入れ、溝を切り、継ぎ代を形成するクリーザスロッタ、段ボールシートに所定形状の打ち抜き部分を形成するダイカッタ、継ぎ代に接着剤を供給し、段ボールシートを罫線に沿って折り曲げ、箱状に接合するフォルダグルア、および、箱状に接合された段ボールシートを計数し、結束枚数分のシート枚数のバッチを形成して送り出すカウンタエジェクタを含む、請求項1乃至のいずれか1項に記載の段ボールシート製函機の目標準備時間報知装置。 The above corrugated sheet box making machine consists of a paper feeding device that feeds corrugated sheets one by one, a printing device that prints on the corrugated sheets, a creaser slotter that adds ruled lines to the corrugated sheets, cuts grooves, and forms seams, and corrugated sheets. A die cutter that forms a punched part in a predetermined shape, a folder gluer that supplies adhesive to the seam, bends the corrugated sheets along the ruled lines, and joins them into a box shape, and a machine that counts the corrugated sheets that have been joined into the box shape. The target preparation time notification device for a corrugated sheet box making machine according to any one of claims 1 to 7 , further comprising a counter ejector that forms and sends out a batch of sheets equal to the number of bundled sheets.
JP2019182232A 2019-10-02 2019-10-02 Target preparation time notification device for corrugated sheet box making machine Active JP7401894B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019182232A JP7401894B2 (en) 2019-10-02 2019-10-02 Target preparation time notification device for corrugated sheet box making machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019182232A JP7401894B2 (en) 2019-10-02 2019-10-02 Target preparation time notification device for corrugated sheet box making machine

Publications (2)

Publication Number Publication Date
JP2021054028A JP2021054028A (en) 2021-04-08
JP7401894B2 true JP7401894B2 (en) 2023-12-20

Family

ID=75269424

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019182232A Active JP7401894B2 (en) 2019-10-02 2019-10-02 Target preparation time notification device for corrugated sheet box making machine

Country Status (1)

Country Link
JP (1) JP7401894B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7610257B2 (en) * 2021-05-13 2025-01-08 株式会社Isowa Corrugated board sheet printing device and corrugated board sheet box making machine

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007042058A (en) 2005-07-04 2007-02-15 Sharp Corp Model switching setup time calculation system, model switching setup time calculation method, model switching setup time calculation program, and recording medium storing this model switching setup time calculation program
WO2019064398A1 (en) 2017-09-27 2019-04-04 三菱重工機械システム株式会社 Device and method for analyzing setup time in paper processing machine

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05225204A (en) * 1992-02-13 1993-09-03 Dainippon Printing Co Ltd Running schedule planning device for production machine
JPH07296060A (en) * 1994-04-28 1995-11-10 Tec Corp Work instruction book issuing device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007042058A (en) 2005-07-04 2007-02-15 Sharp Corp Model switching setup time calculation system, model switching setup time calculation method, model switching setup time calculation program, and recording medium storing this model switching setup time calculation program
WO2019064398A1 (en) 2017-09-27 2019-04-04 三菱重工機械システム株式会社 Device and method for analyzing setup time in paper processing machine

Also Published As

Publication number Publication date
JP2021054028A (en) 2021-04-08

Similar Documents

Publication Publication Date Title
US9802330B2 (en) Document production system and method with automated die exchange
US20210086467A1 (en) Corrugated sheet processing apparatus
EP3526029B1 (en) Controls for paper, sheet, and box manufacturing systems
CN101112801B (en) Sheet cutting and creasing press with registration alignment and method for operating such a press
US7073444B2 (en) Method for checking the quality of flat workpieces and device for carrying out said method
KR20130025402A (en) Carton former, inspection device, and print register control method for carton former
US8337376B2 (en) Post-press apparatus and a method to accomplish hot foil stamping, die-cutting and blank separation in a single pass
US20080092705A1 (en) Flatbed diecutting machine
WO2018074362A1 (en) Sheet folding device and box-making machine
US20140195038A1 (en) Die-cutting machine and method for adjusting a pressing force in a die-cutting machine
JP6704069B2 (en) Apparatus and method for analyzing preparatory work time in paper machine
JP2020123284A (en) Inspection support device and method
US11164123B2 (en) System and device for evaluating operation result of corrugated paperboard box making machine
KR20190004776A (en) Devices with variable tools for processing workpiece sheets
JP7012670B2 (en) How to adjust the processing position of the box making machine and corrugated cardboard sheet
JP7401894B2 (en) Target preparation time notification device for corrugated sheet box making machine
JP7301335B2 (en) Operation performance evaluation system and operation performance evaluation device for cardboard sheet box making machine
US20090013884A1 (en) Sheet punching and embossing machine and method for orienting the sheets
WO2025191686A1 (en) Box making machine
JP2002036388A (en) Creaser for corrugated sheet box making machine
HK1111944A (en) Sheet punching and embossing machine with register orienting and method for operating a sheet punching and embossing machine
US20080110313A1 (en) Flat-bed sheet punching machine
HK1236166A1 (en) Corrugator process control system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220906

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230524

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230605

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230803

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20231101

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20231201

R150 Certificate of patent or registration of utility model

Ref document number: 7401894

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150