JP7430466B2 - Structure jacking equipment - Google Patents
Structure jacking equipment Download PDFInfo
- Publication number
- JP7430466B2 JP7430466B2 JP2021014101A JP2021014101A JP7430466B2 JP 7430466 B2 JP7430466 B2 JP 7430466B2 JP 2021014101 A JP2021014101 A JP 2021014101A JP 2021014101 A JP2021014101 A JP 2021014101A JP 7430466 B2 JP7430466 B2 JP 7430466B2
- Authority
- JP
- Japan
- Prior art keywords
- bolt insertion
- vertical
- insertion holes
- support member
- jack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000003780 insertion Methods 0.000 claims description 226
- 230000037431 insertion Effects 0.000 claims description 226
- 239000011295 pitch Substances 0.000 claims description 66
- 239000000463 material Substances 0.000 claims description 42
- 238000010276 construction Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 8
- 230000001965 increasing effect Effects 0.000 description 7
- 238000000034 method Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- 230000003028 elevating effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Bridges Or Land Bridges (AREA)
Description
本発明は、工作物や建築物の上屋架構等の構造物の構築において、組み上がった上屋架構等を支える仮設支持点に設置するジャッキダウン装置に関する。 TECHNICAL FIELD The present invention relates to a jack-down device installed at a temporary support point for supporting an assembled shed frame or the like in constructing a structure such as a workpiece or a shed frame of a building.
例えば、図1に図示するように、スライド工法により、ワイヤーロープ巻取り装置7、7、…によりスライドレール6、6上をスライド移動して、所定位置にて仮受け状態で一体的に組み上がった上屋架構1全体を一斉にジャッキダウンして、基礎柱4、4、…に柱5、5、…を載置する場合、支保工2、2、…の頂部に設置された仮設支持点3、3、…で支持された上屋架構1が長大であれば、その仮設支持点3、3、…の数は非常に多くなるので、その全てに油圧ジャッキ等の装置ユニットを設置することは多くのコストがかかる。
For example, as shown in Fig. 1, using the slide construction method, the wire rope is slid on the
そこで、一体化された長大な上屋架構1を、図2に図示のように、いくつかのブロック1a~1fに分け、これらのブロックを順番にジャッキダウンすれば、油圧ジャッキ等の装置ユニットを繰り返し使用することが可能になり、経済的である。
Therefore, if the long integrated
しかし、その方法では、ジャッキダウンしたブロックに隣接するジャッキダウン前のブロックとの高さにギャップが生じるため、1回分のジャッキダウン量が大き過ぎれば、屋根架構1が弾性範囲(損傷しない変形限界)を超える可能性がある。
However, with this method, a gap is created in the height of the jacked-down block and the adjacent block before being jacked down, so if the amount of one jackdown is too large, the
そのような大きな変形を回避するためには、1回分のジャッキダウン量を少なくし、何回かに分けて全ブロックを順番に少しずつ下げていく必要がある。 In order to avoid such a large deformation, it is necessary to reduce the amount of jacking in one go and gradually lower all the blocks in sequence over several times.
その場合、1つのブロックのジャッキダウンが1回完了する毎に、油圧ジャッキ等の装置ユニットを撤去し移設することになるが、その時に、屋根架構1を所定高さに保持するための仮受け手段が必要であり、その仮受け時の所定高さを確実に保持し、隣接ブロックとの高さギャップを一定寸法に管理することが求められる。 In that case, each time the jacking down of one block is completed, equipment units such as hydraulic jacks will be removed and relocated. A means is required to reliably maintain a predetermined height when temporarily receiving the block, and to control the height gap between adjacent blocks to a constant dimension.
ジャッキダウン方法に関する先行技術としては、例えば、特許文献1記載の発明がある。
As a prior art related to the jack-down method, for example, there is an invention described in
特許文献1記載の発明は、既存の鉄道橋や道路橋を拡張や高架化する場合に、それらの橋桁を扛上または扛下させ更には横移動させる工法と、それに使用する扛上機およびベント部材に関する技術であり、橋桁と地上との間に配設される複数段の単位ベント部材と、地上に設置される一対の扛上機とを使用し、一対の前記扛上機により前記複数段のベント部材を下から支持した状態で、更にその下に単位ベント部材を継ぎ足しあるいは取り外しできるようになっており、前記継ぎ足しと上昇あるいは前記取り外しと下降を順次繰り返して、橋桁をベント部材と共に扛上させ、あるいはベント部材と共に扛下させるものである。
The invention described in
また、特許文献1記載の発明は、前記のように、一対の前記扛上機により前記複数段のベント部材を下から支持した状態で、前記一対の前記扛上機の下に橋桁幅方向と平行に配設された水平ガイドレール上を横移動できるように、横移動装置を設けることも開示されている。
Further, the invention described in
前記扛上機にはスクリュージャッキが組み込まれており、そのスクリュージャッキを昇降用モータによりスクリューロッドを回転させることで、前記複数段のベント部材と共に橋桁の上げ下げが可能になり、地上で橋桁の扛上もしくは扛下作業を行うことができ、高所の狭い場所での作業が不要となり、作業の効率がよいとしている。 The lifting machine has a built-in screw jack, and by rotating the screw rod using the lifting motor of the screw jack, the bridge girder can be raised and lowered together with the multi-stage bent members, and the bridge girder can be lifted on the ground. It is said to be able to perform lifting or lowering work, eliminating the need to work in narrow spaces at heights, and improving work efficiency.
この工法は、鉄道橋や道路橋の橋桁のような大型の重量構造物に適用することを想定しており、構造物を上げ下げする装置が大掛かりとなるため、本発明の対象とする仮設支持点が多数必要となる長大な工作物や建築物の上屋架構等の架設工法としては適用困難である。また、一体化して組み上がった上屋架構等を、複数のブロックに分けて順番にジャッキダウンする場合に問題となる上屋架構等への損傷回避の方法に関して、示唆する記述も皆無である。 This construction method is intended to be applied to large heavy structures such as bridge girders of railway bridges and road bridges, and the equipment required to raise and lower the structure is large-scale. It is difficult to apply this method to constructing long structures or building shed frames, which require a large number of structures. Further, there is no description that suggests how to avoid damage to the shed frame, etc., which is a problem when the shed frame etc., which have been assembled as one, is divided into a plurality of blocks and jacked down in sequence.
本発明は、一体化して組み上がった工作物や建築物の上屋架構等(以下、上屋架構等と略称する。)を、複数のブロックに分けて順番にジャッキダウンする場合において、1つのブロックのジャッキダウン(以下、単に降下と称す。)が1回完了する毎に、そのブロックを支持するために設置されていた油圧ジャッキ等の装置ユニットを撤去し移設する際に、隣接ブロックとの高さギャップが一定寸法になるように、前記上屋根架構等を確実に仮受けして所定高さに保持できる、簡易なジャッキダウン装置を提供するものである。 The present invention provides a method for jacking down a workpiece or a building's shed frame (hereinafter abbreviated as "shelf frame") that has been assembled into a plurality of blocks in order. Each time a block is jacked down (hereinafter simply referred to as lowering), when removing and relocating equipment units such as hydraulic jacks that were installed to support the block, it is necessary to The present invention provides a simple jack-down device that can reliably temporarily support the upper roof frame and hold it at a predetermined height so that the height gap becomes a constant size.
前記課題を解決するための本発明の第1手段は、構造物のジャッキダウンに用いられるジャッキダウン装置であって、その構造物の仮設支持点1箇所当り、少なくとも1台のジャッキと、前記ジャッキの支持力が解除されている時に、前記ジャッキに代わって前記構造物を支持する摺動式支持部とから成り、前記摺動式支持部は、
1)前記構造物の仮設支持点に取り付けられた上支持材と、その上支持材に一定範囲が重なるように下方から立設された下支持材とから成る。
2)前記上支持材および下支持材には、鉛直のゲージラインに合わせて等間隔の鉛直方向
孔ピッチPで開けられたボルト挿通孔の鉛直列が少なくとも2列以上設けられ、前記上支
持材および下支持材の前記鉛直のゲージラインは相互に重なるようになっており、前記上支
持材および下支持材が重なった範囲の前記鉛直列のボルト挿通孔の内、少なくとも1列の
鉛直列のボルト挿通孔同士が重なって、前記上下支持材を貫通してボルトを挿通できるよ
うになっている。
3)前記上支持材または下支持材のどちらか一方に開けられた前記ボルト挿通孔の鉛直方
向配置は、隣接する前記鉛直列の前記ボルト挿通孔と同じ高さである。
4)もう一方の前記上支持材または下支持材に開けられたボルト挿通孔の鉛直方向配置は
、相隣接する前記鉛直列のボルト挿通孔に対して、等間隔配置の前記ボルト挿通孔の鉛直
方向孔ピッチPを、鉛直方向孔ピッチPだけ前記構造物を降下するのに要する降下回数m
で除した値P/mの寸法分だけ、上もしくは下方向に1段ずつ順次ずらして開けられてい
る。
5)前記上支持材および下支持材に開けられたボルト挿通孔の鉛直列の列数は、前記降下
回数mと同数以上である。
6)以上のような前記上支持材と下支持材を対として、1対もしくは2対以上が、前記構
造物の仮設支持点全てに設置されている。
以上のような構成から成ることを特徴とするジャッキダウン装置である。
A first means of the present invention for solving the above problem is a jack-down device used for jacking down a structure, which includes at least one jack per temporary support point of the structure, and the jack a sliding support part that supports the structure in place of the jack when the supporting force of the structure is released, the sliding support part comprising:
1) Consists of an upper support member attached to a temporary support point of the structure, and a lower support member erected from below so as to overlap a certain area with the upper support member.
2) The upper support material and the lower support material are provided with at least two or more vertical rows of bolt insertion holes that are equally spaced at a vertical hole pitch P in accordance with the vertical gauge line, and the upper support material and the vertical gauge lines of the lower support material overlap each other, and at least one row of the vertical row bolt insertion holes in the range where the upper support material and the lower support material overlap. The bolt insertion holes overlap each other so that the bolt can be inserted through the upper and lower support members.
3) The vertical arrangement of the bolt insertion holes formed in either the upper support member or the lower support member is at the same height as the bolt insertion holes in the adjacent vertical row.
4) The vertical arrangement of the bolt insertion holes drilled in the other upper support member or lower support member is such that the bolt insertion holes are arranged at equal intervals with respect to the bolt insertion holes in the adjacent vertical row. The number of descents m required to lower the structure by the vertical hole pitch P with the directional hole pitch P
The openings are sequentially shifted upward or downward one step at a time by the size of the value P/m divided by P/m.
5) The number of vertical rows of bolt insertion holes drilled in the upper support member and the lower support member is equal to or greater than the number of descents m.
6) One or more pairs of the upper support material and lower support material as described above are installed at all temporary support points of the structure.
This is a jack-down device characterized by having the configuration as described above.
本発明の第1手段は以上のような構成なので、前記ジャッキにて前記構造物が支持されている時に、前記上支持材および下支持材が重なった範囲で、前記上下両支持材を貫通できるボルト挿通孔に必要本数のボルトを挿通して前記上支持材と下支持材とを接続し、その後、前記ジャッキの支持力を解除して前記構造物の重量を前記ボルトに移すことにより、前記構造物が所定高さに保持される。 Since the first means of the present invention has the above-described configuration, when the structure is supported by the jack, it is possible to penetrate both the upper and lower supporting members within the range where the upper and lower supporting members overlap. By inserting a required number of bolts into the bolt insertion holes to connect the upper support member and the lower support member, and then releasing the supporting force of the jack and transferring the weight of the structure to the bolts, The structure is held at a predetermined height.
なお第1手段では、前記上下両支持材のボルト挿通孔が重なる鉛直列は、1回の降下毎に隣接の鉛直列に移動し、かつその鉛直列の前記上支持材および下支持材が重なった範囲のボルト孔全てが重なる特徴がある。 In the first means, the vertical row in which the bolt insertion holes of both the upper and lower supporting members overlap moves to an adjacent vertical row each time the vertical row is lowered, and the upper supporting member and the lower supporting member in the vertical row overlap. The feature is that all the bolt holes in the range overlap.
次に前記構造物を降下させる時は、前記ジャッキにて前記構造物を再度支持して前記構造物の重量を負担し、前記上支持材および下支持材が重なった範囲の前記ボルト挿通孔に挿通された前記ボルトを全て抜き取って、その後、前記ジャッキで前記構造物を支持しながら、前記上下両支持材のボルト挿通孔が重なる次の所定高さまで降下させる。 Next, when lowering the structure, the jack supports the structure again to bear the weight of the structure, and the bolt insertion hole is inserted into the bolt insertion hole in the area where the upper support member and the lower support member overlap. All the inserted bolts are removed, and then, while supporting the structure with the jack, it is lowered to the next predetermined height where the bolt insertion holes of both the upper and lower supporting members overlap.
以上のように、「ジャッキによる支持、ボルト挿入、ジャッキ支持解除」と「ジャッキによる支持、ボルト抜き取り、ジャッキ支持による降下」を、前記構造物の全てのブロックについて、必要回数だけ順次繰り返す。 As described above, "support by jack, bolt insertion, release of jack support" and "support by jack, bolt removal, and lowering by jack support" are sequentially repeated as many times as necessary for all blocks of the structure.
前記構造物の全ブロックにおいて、最終回の「ジャッキによる支持、ボルト抜き取り、ジャッキ支持による降下」により、前記構造物の本設の全支持部(柱脚)が基礎柱等に載置されれば、前記構造物のジャッキダウンは全て完了となる。 In all the blocks of the structure, if all the permanent supporting parts (column bases) of the structure are placed on the foundation columns etc. by the final step of "supporting with jacks, removing bolts, and lowering by supporting with jacks", the above-mentioned All jacking down of structures has been completed.
また、本発明の第2手段は、構造物のジャッキダウンに用いられるジャッキダウン装置であって、その構造物の仮設支持点1箇所当り、少なくとも1台のジャッキと、前記ジャッキの支持力が解除されている時に、前記ジャッキに代わって前記構造物を支持する摺動式支持部とから成り、前記摺動式支持部は、
1)前記構造物の仮設支持点に取り付けられた上支持材と、その上支持材に一定範囲が重なるように下方から立設された下支持材とから成る。
2)前記上支持材および下支持材には、それぞれ鉛直のゲージラインに合わせて等間隔に開けられた上部および下部ボルト挿通孔の鉛直列が、1列もしくは2列以上設けられており、前記上支持材および下支持材の前記鉛直のゲージラインは、相互に重なるようになっている。
3)前記上部および下部ボルト挿通孔の前記鉛直列の鉛直方向孔ピッチは相互に異なり、前記上支持材および下支持材が重なった範囲において、少なくとも1列の前記鉛直列の前記上部および下部ボルト挿通孔同士は、それぞれの前記鉛直方向孔ピッチの最小公倍数に対応する位置毎に重なって、前記上下両支持材を貫通してボルトが挿通できるようになっている。
4)前記上支持材および下支持材に開けられたボルト挿通孔の鉛直列が重なり合う範囲において、前記構造物を1回だけ降下させる降下単位寸法をpとする時、前記上部および下部ボルト挿通孔同士が少なくとも1つ以上重なった状態で、前記上部ボルト挿通孔とその下方に位置する最寄の下部ボルト挿通孔との最小距離がn×p(n:1以上の自然数)であり、かつ前記上部および下部ボルト挿通孔の鉛直列の列数NがN≧nである。
5)以上のような前記上支持材と下支持材とを対として、1対もしくは2対以上が、前記構造物の仮設支持点に設置されている。
以上のような構成から成ることを特徴とするジャッキダウン装置である。
A second means of the present invention is a jack-down device used for jacking down a structure, which includes at least one jack per temporary support point of the structure, and the supporting force of the jack is released. a sliding support part that supports the structure in place of the jack when the structure is
1) Consists of an upper support member attached to a temporary support point of the structure, and a lower support member erected from below so as to overlap a certain area with the upper support member.
2) The upper support member and the lower support member are each provided with one or more vertical rows of upper and lower bolt insertion holes opened at equal intervals in accordance with the vertical gauge line; The vertical gauge lines of the upper and lower supports are arranged to overlap each other.
3) The vertical hole pitches of the vertical rows of the upper and lower bolt insertion holes are different from each other, and in the range where the upper support member and the lower support member overlap, at least one row of the upper and lower bolts of the vertical row The insertion holes overlap each other at positions corresponding to the least common multiple of the respective vertical hole pitches, so that bolts can be inserted through both the upper and lower supporting members.
4) In the range where the vertical rows of bolt insertion holes drilled in the upper support material and the lower support material overlap, when p is the descending unit dimension in which the structure is lowered only once, the upper and lower bolt insertion holes the minimum distance between the upper bolt insertion hole and the nearest lower bolt insertion hole located below the upper bolt insertion hole is n×p (n: a natural number of 1 or more), and the The number N of vertical rows of the upper and lower bolt insertion holes satisfies N≧n.
5) One or more pairs of the upper support member and lower support member as described above are installed at a temporary support point of the structure.
This is a jack-down device characterized by having the configuration as described above.
また、前記第2手段において、前記上支持材および下支持材に、それぞれ鉛直のゲージラインに合わせて等間隔に開けられた前記上部および下部ボルト挿通孔の鉛直列が2列以上設けられている場合であって、
1)前記上部または下部ボルト挿通孔のどちらか一方の鉛直方向配置は、隣接する前記鉛直列の前記上部および下部ボルト挿通孔と同じ高さである。
2)もう一方の前記上部または下部ボルト挿通孔の鉛直方向配置は、どれか1列の鉛直列のボルト挿通孔に対して、その1列の鉛直列に隣接する鉛直列のボルト挿通孔の鉛直方向位置が、前記降下単位寸法pの寸法分ずつ上または下に順次ずれている。
3)以上のような前記上支持材と下支持材を対として、1対もしくは2対以上が、前記構造物の仮設支持点に設置されている。
以上のような構成から成ることを特徴とするジャッキダウン装置である。
Further, in the second means, two or more vertical rows of the upper and lower bolt insertion holes are provided in the upper support member and the lower support member, respectively, and are formed at equal intervals in accordance with a vertical gauge line. In case,
1) The vertical arrangement of either the upper or lower bolt holes is at the same height as the upper and lower bolt holes of the adjacent vertical row.
2) The vertical arrangement of the other upper or lower bolt insertion holes is the vertical arrangement of the bolt insertion holes in the vertical row adjacent to any one vertical row of bolt insertion holes. The directional position is sequentially shifted upward or downward by the descending unit dimension p.
3) One or more pairs of the above-mentioned upper support member and lower support member are installed at a temporary support point of the structure.
This is a jack-down device characterized by having the configuration as described above.
本発明の第2手段は以上のような構成なので、前記上部および下部ボルト挿通孔の鉛直のゲージラインが重なる鉛直列が1 列の場合は、その鉛直列の上部および下部ボルト挿通孔は少なくとも1つ以上は必ず重なる。 Since the second means of the present invention has the above configuration, when there is one vertical row in which the vertical gauge lines of the upper and lower bolt insertion holes overlap, there are at least one row of upper and lower bolt insertion holes in the vertical row. Two or more always overlap.
前記上部および下部ボルト挿通孔の鉛直のゲージラインが重なる鉛直列が2以上のN列である場合は、重なるボルト挿通孔が、1回の降下毎に何れかの鉛直列に必ず生じ、かつ前記上部および下部ボルト挿通孔のどちらか大きい方の鉛直方向ピッチ分に対応する降下回数毎に、全鉛直列におけるボルト挿通孔の重なり配置状態が一巡する特徴がある。 If the number of vertical rows in which the vertical gauge lines of the upper and lower bolt insertion holes overlap is two or more N rows, the overlapping bolt insertion holes are sure to occur in one of the vertical rows for each descent, and the above-mentioned There is a feature that the overlapping arrangement of the bolt insertion holes in all the vertical rows goes through one cycle every time the upper and lower bolt insertion holes are lowered, which corresponds to the vertical pitch of the larger one.
よって、前記ジャッキにて前記構造物が支持されている時に、前記上支持材および下支持材が重なった範囲で、前記上下両支持材を貫通できるボルト挿通孔に必要本数のボルトを挿通して、前記上支持材と下支持材とを接続し、その後、前記ジャッキの支持力を解除して前記構造物の重量を前記ボルトに移すことにより、前記構造物が所定高さに保持される。 Therefore, when the structure is supported by the jack, the necessary number of bolts are inserted into bolt insertion holes that can penetrate both the upper and lower supports in the area where the upper and lower supports overlap. , the structure is held at a predetermined height by connecting the upper and lower supports and then releasing the supporting force of the jack to transfer the weight of the structure to the bolts.
次に前記構造物を降下させる時は、前記ジャッキにて再度前記構造物を支持して前記構造物の重量を負担し、前記上支持材および下支持材が重なった範囲の前記ボルト挿通孔に挿通された前記ボルトを全て抜き取って、その後、前記ジャッキで前記構造物を支持しながら、前記上部および下部ボルト挿通孔が重なる次の所定高さまで降下させる。 Next, when lowering the structure, the jack supports the structure again to bear the weight of the structure, and the bolt insertion hole is inserted into the bolt insertion hole in the area where the upper support member and the lower support member overlap. All the inserted bolts are removed, and then, while supporting the structure with the jack, it is lowered to the next predetermined height where the upper and lower bolt insertion holes overlap.
以上のように、「ジャッキによる支持、ボルト挿入、ジャッキ支持解除」と「ジャッキによる支持、ボルト抜き取り、ジャッキ支持による降下」を、前記構造物の全てのブロックについて、必要回数だけ順次繰り返す。 As described above, "support by jack, bolt insertion, release of jack support" and "support by jack, bolt removal, and lowering by jack support" are sequentially repeated as many times as necessary for all blocks of the structure.
前記構造物の全ブロックにおいて、最終回の「ジャッキによる支持、ボルト抜き取り、ジャッキ支持による降下」により、前記構造物の本設の全支持部(柱脚)が基礎柱等に載置されれば、前記構造物のジャッキダウンは全て完了となる。 In all the blocks of the structure, if all the permanent supporting parts (column bases) of the structure are placed on the foundation columns etc. by the final step of "supporting with jacks, removing bolts, and lowering by supporting with jacks", the above-mentioned All jacking down of structures has been completed.
また、本発明の第3手段は、構造物のジャッキダウンに用いられるジャッキダウン装置であって、その構造物の仮設支持点1箇所当り、少なくとも1台のジャッキと、前記ジャッキの支持力が解除されている時に、前記ジャッキに代わって前記構造物を支持する摺動式支持部とから成り、前記摺動式支持部は、
1)前記構造物の仮設支持点に取り付けられた上支持材と、その上支持材に一定範囲が重なるように下方から立設された下支持材とから成る。
2)前記上支持材および下支持材には、鉛直のゲージラインに合わせて等間隔に開けられた上部および下部ボルト挿通孔の鉛直列が、それぞれ2列設けられており、前記上支持材および下支持材のボルト挿通孔の鉛直のゲージラインは、相互に重なるようになっている。
3)前記上部および下部ボルト挿通孔の鉛直列の鉛直方向孔ピッチは相互に異なり、前記上支持材および下支持材が重なった範囲の前記鉛直列2列のどちらか一方に属する上部および下部ボルト挿通孔同士が、それぞれの前記鉛直方向孔ピッチの最小公倍数に対応する位置毎に重なるようになっており、前記上下両支持材を貫通してボルトを挿通することが可能である。
4)前記上部または下部ボルト挿通孔のどちらか一方の鉛直方向配置は、隣接する前記鉛直列の前記ボルト挿通孔と同じ高さである。
5)もう一方の前記上部または下部ボルト挿通孔の鉛直方向配置は、前記鉛直列2列のどちらか一方のボルト挿通孔の鉛直方向位置が、他方の鉛直列のボルト挿通孔に対して、前記構造物を1回降下させる際の降下単位寸法p分だけ上または下にずれており、どちらか一方の鉛直列の上部および下部ボルト挿通孔に重なりがある時に、他方の鉛直列の上部ボルト挿通孔の内、少なくとも1つ以上は、その下方に位置する最寄の下部ボルト挿通孔との最小距離がpである。
6)以上のような前記上支持材と下支持材を対として、1対もしくは2対以上が、前記構造物の仮設支持点に設置されている。
以上のような構成から成ることを特徴とするジャッキダウン装置である。
Further, a third means of the present invention is a jack-down device used for jacking down a structure, which includes at least one jack per temporary support point of the structure, and the supporting force of the jack is released. a sliding support part that supports the structure in place of the jack when the structure is
1) Consists of an upper support member attached to a temporary support point of the structure, and a lower support member erected from below so as to overlap a certain area with the upper support member.
2) The upper support material and the lower support material are each provided with two vertical rows of upper and lower bolt insertion holes that are equally spaced along the vertical gauge line, and the upper support material and the lower support material The vertical gauge lines of the bolt insertion holes of the lower support member are arranged to overlap each other.
3) The vertical hole pitches of the vertical rows of the upper and lower bolt insertion holes are different from each other, and the upper and lower bolts belong to either one of the two vertical rows in the range where the upper support material and the lower support material overlap. The insertion holes overlap each other at positions corresponding to the least common multiple of the respective vertical hole pitches, and it is possible to insert the bolt through both the upper and lower supporting members.
4) The vertical arrangement of either the upper or lower bolt holes is at the same height as the bolt holes in the adjacent vertical row.
5) The vertical position of the other upper or lower bolt insertion hole is such that the vertical position of the bolt insertion hole in either one of the two vertical rows is set as above with respect to the bolt insertion hole in the other vertical row. When the structure is shifted upward or downward by the descent unit dimension p when lowering the structure once, and when the upper and lower bolt insertion holes of either vertical row overlap, the upper bolt insertion of the other vertical row At least one of the holes has a minimum distance p from the nearest lower bolt insertion hole located below it.
6) One or more pairs of the upper support member and lower support member as described above are installed at a temporary support point of the structure.
This is a jack-down device characterized by having the configuration as described above.
本発明の第3手段は以上のような構成なので、前記上下両支持材のボルト挿通孔の2列の鉛直列において、どちらか一方の鉛直列の上部および下部ボルト挿通孔に重なりがある時は、他方の鉛直列の上部および下部ボルト挿通孔は重なることはなく、その次の降下時には、ボルト挿通孔の重なりが発生する鉛直列が入れ替わる。即ち、ボルト挿通孔の重なりの発生が、1回の降下毎に交互に入れ替わって、かつ前記上部および下部ボルト挿通孔のどちらか大きい方の鉛直方向ピッチ分に対応する降下回数毎に、ボルト挿通孔の重なり配置状態が一巡する特徴がある。 Since the third means of the present invention has the above-described configuration, in the two vertical rows of bolt insertion holes in both the upper and lower supporting members, when the upper and lower bolt insertion holes in one of the vertical rows overlap, , the upper and lower bolt insertion holes of the other vertical row do not overlap, and during the next descent, the vertical rows in which the bolt insertion holes overlap are swapped. In other words, the occurrence of overlapping of the bolt insertion holes is alternated for each descent, and the bolt insertion is performed every number of descents corresponding to the vertical pitch of the larger of the upper and lower bolt insertion holes. It has the characteristic that the overlapping arrangement of holes goes around once.
よって、前記ジャッキにて前記構造物が支持されている時に、前記上支持材および下支持材が重なった範囲で、前記鉛直列2列の内どちらかにおいて、前記上下両支持材を貫通できるボルト挿通孔に必要本数のボルトを挿通して、前記上支持材と下支持材とを接続し、その後、前記ジャッキの支持力を解除して前記構造物の重量を前記ボルトに移すことにより、前記構造物が所定高さに保持される。 Therefore, when the structure is supported by the jack, bolts that can penetrate both the upper and lower supporting members in either of the two vertical rows within the range where the upper supporting member and the lower supporting member overlap. By inserting a required number of bolts into the insertion holes to connect the upper support member and the lower support member, and then releasing the supporting force of the jack and transferring the weight of the structure to the bolts, The structure is held at a predetermined height.
次に前記構造物を降下させる時は、前記ジャッキにて再度前記構造物を支持して前記構造物の重量を負担し、前記上支持材および下支持材が重なった範囲の前記ボルト挿通孔に挿通された前記ボルトを全て抜き取って、その後、前記ジャッキで前記構造物を支持しながら、前記鉛直列2列のもう一方において、前記上部および下部ボルト挿通孔が重なる次の所定高さまで降下させる。 Next, when lowering the structure, the jack supports the structure again to bear the weight of the structure, and the bolt insertion hole is inserted into the bolt insertion hole in the area where the upper support member and the lower support member overlap. All the inserted bolts are removed, and then, while supporting the structure with the jack, it is lowered to the next predetermined height where the upper and lower bolt insertion holes overlap in the other of the two vertical rows.
以上のように、「ジャッキによる支持、ボルト挿入、ジャッキ支持解除」と「ジャッキによる支持、ボルト抜き取り、ジャッキ支持による降下」を、前記構造物の全てのブロックについて、必要回数だけ順次繰り返す。 As described above, "support by jack, bolt insertion, release of jack support" and "support by jack, bolt removal, and lowering by jack support" are sequentially repeated as many times as necessary for all blocks of the structure.
前記構造物の全ブロックにおいて、最終回の「ジャッキによる支持、ボルト抜き取り、ジャッキ支持による降下」により、前記構造物の本設の全支持部(柱脚)が基礎柱等に載置されれば、前記構造物のジャッキダウンは全て完了となる。 In all the blocks of the structure, if all the permanent supporting parts (column bases) of the structure are placed on the foundation columns etc. by the final step of "supporting with jacks, removing bolts, and lowering by supporting with jacks", the above-mentioned All jacking down of structures has been completed.
本発明は、以上のような手段によるジャッキダウン装置であるので、仮設支持点数が非常に多い長大な屋根架構や鉄道駅の長いプラットホーム上屋等の工事において、一体的に組み上がった構造物をジャッキダウンする場合、次のような効果が得られる。
(1)一体的に組み上がった構造物を、ブロック毎に順次ジャッキダウンする工法を実施する際に、組み上がった構造物の損傷を確実に回避できる。
(2)架構全体の同時ジャッキダウン工法の場合では、全ての仮設支持点に、例えば油圧式のジャッキ等の装置ユニットを設置するため、多額のコストが必要だが、本発明では、1つのブロックの降下1回毎に一定高さを保持して仮支持出来るので、前記ジャッキ等を撤去して次のブロックへの移設が可能になり、全体コストを抑制できる。
(3)ジャッキが外れている間、構造物を仮支持するための上下支持材から成る摺動式支持部は簡易なものであり、製作費用も少なくて済む。
Since the present invention is a jack-down device using the above-described means, it can be used to construct integrally assembled structures such as long roof structures with a large number of temporary support points and long platform sheds at railway stations. When jacking down, the following effects can be obtained.
(1) Damage to the assembled structure can be reliably avoided when implementing a construction method in which the assembled structure is sequentially jacked down block by block.
(2) In the case of the simultaneous jacking down construction method of the entire structure, a large amount of cost is required because equipment units such as hydraulic jacks are installed at all temporary support points, but in the present invention, one block Since a fixed height can be maintained and temporarily supported each time the block is lowered, the jack etc. can be removed and moved to the next block, thereby reducing the overall cost.
(3) The sliding support section consisting of upper and lower support members for temporarily supporting the structure while the jack is removed is simple and requires less manufacturing cost.
本発明に係るジャッキダウン装置の実施例を以下に述べる。図3は、ジャッキダウン装置の実施形態の1例を示し、例えば鉄道駅ホーム上屋のような長大な構造物を構成する上屋架構1において、その上屋架構1の梁部10を支持する仮設支持点3に、仮支承部11を介して取り付けられた上支持材12、12、…と、その上支持材12、12、…に一定範囲が重なるように下方(支保工2の頂部)から立設された下支持材13、13とから成り、上支持材12、12、…および下支持材13、13には、鉛直のゲージラインに合わせて等間隔に開けられたボルト挿通孔14、14、…の鉛直列が、それぞれ複数列設けられている。
Examples of the jack-down device according to the present invention will be described below. FIG. 3 shows an example of an embodiment of a jack-down device, which supports a
図3(c)に図示のように、平面視で長方形配置に、前記上支持材12、12、…および下支持材13、13が設けられ、4本のL形断面の上支持材12が2本のH形断面の下支持材13の内側両端入隅部に沿って一定範囲で重なり、その重なったL形断面およびH形断面の2面(A部およびB部)において、上下支持材12、13のボルト挿通孔14、14、…がいくつか重なってボルトを挿通できるように、ボルト挿通孔14、14、…の鉛直列が設けられている。前記下支持材13、13は構造物の支保工2側に固定され、梁部10側の上支持材12、12、…は上屋架構1の降下に伴い下方向に摺動可能である。
As shown in FIG. 3(c), the
本発明の第1手段におけるジャッキダウン装置の第1実施例は、上支持材12、12、…および下支持材13、13に等間隔に開けられたボルト挿通孔14、14、…が以下のように形成された場合である。 In the first embodiment of the jack-down device according to the first means of the present invention, the bolt insertion holes 14, 14, . This is the case when it is formed like this.
図4は、上支持材12および下支持材13の1つの面(図3のA部またはB部に対応)を示すが、その1つの面には4列の鉛直ゲージラインA1~A4に合わせてボルト挿通孔14、14、…が鉛直方向孔ピッチP(図4では4cm)で等間隔に開けられており、上支持材12および下支持材13のボルト挿通孔14、14、…の鉛直ゲージラインA1~A4は、相互に重なるようになっている。ここで、破線の四角が上支持材12を、実線の四角が下支持材13を表している。
FIG. 4 shows one surface (corresponding to section A or B in FIG. 3) of the
図4に図示の「0回目」は、降下直前の状態であって、上下支持材(12、13)が重なっている範囲の鉛直ゲージラインA1のボルト挿通孔14、14、…は、孔番号1~4で重なっている(●表示)ので、上下支持材(12、13)を貫通して、上屋架構1の支持に必要な本数(「0回目」では最大4本)のボルトを挿通できる。
The "0th time" shown in FIG. 4 is the state immediately before descending, and the bolt insertion holes 14, 14, ... on the vertical gauge line A1 in the range where the upper and lower support members (12, 13) overlap are the hole numbers. 1 to 4 overlap (indicated by ●), so pass through the upper and lower support members (12, 13) and insert the number of bolts required to support shed frame 1 (
上支持材12に開けられたボルト挿通孔14、14、…は、4列の鉛直ゲージラインA1~A4とも、隣接ゲージラインのボルト挿通孔14、14、…と同じ高さである。
The bolt insertion holes 14, 14, . . . drilled in the
上記のような上支持材12に相対する、もう一方の下支持材13に開けられたボルト挿通孔14、14、…の鉛直方向配置は、等間隔配置のボルト挿通孔14、14、…の鉛直方向孔ピッチP(4cm)を、上屋架構1を鉛直方向孔ピッチPだけ降下するのに要する降下回数m(図4では4)で除したP/m=1cmだけ、鉛直ゲージラインA1に対してA2~A4の順に1段ずつ下方向にずらして開けられている。以下、実施例においては、上屋架構1を1回降下させる降下単位寸法pは1cmとして説明するが、その寸法(p)は、上屋架構1が弾性範囲(損傷しない変形限界)に留まる範囲で設定すればよい。
The vertical arrangement of the bolt insertion holes 14, 14, . The vertical hole pitch P (4 cm) is divided by the number of descents m (4 in Fig. 4) required to lower the
本発明第1手段の第1実施例は、以上のようにボルト挿通孔14、14、…が配置された上下で対を成す面(図3のA部およびB部に対応)が、図3に図示のように、上支持材12のL形断面2面および下支持材13のH形断面片端入隅部2面として、平面視で長方形配置の四隅に組み込まれたジャッキダウン装置である。
In the first embodiment of the first means of the present invention, the upper and lower pairs of surfaces (corresponding to sections A and B in FIG. 3) on which the bolt insertion holes 14, 14, ... are arranged as described above (corresponding to sections A and B in FIG. 3) are As shown in the figure, the jack-down device is built into the four corners of a rectangular arrangement in plan view, with two L-shaped cross-section surfaces of the
上記の第1実施例では、前記ボルト挿通孔14、14、…の鉛直方向孔ピッチ(4cm)分だけ、前記上屋架構1を降下させる場合、降下単位寸法pが1cmなので、4回の降下が必要になる。重なるボルト挿通孔14、14、…の位置(●表示)は、「0回目」でA1列の孔番号1~4である時、「1回目」の降下により、図4に図示のように、「0回目」において上支持材12のボルト挿通孔14、14、…の直下1cmにあった下支持材13のボルト挿通孔14、14、…であるA2列の孔番号1~4に移動する(破線矢印参照)。
In the first embodiment described above, when the
以下同様に、1cmずつの降下を実行すると、図4に図示のように、孔の重なる鉛直列は隣に移動し、「4回目」には、孔の重なる鉛直列がA1列に回帰する(「0回目」に対応)。 In the same way, when descending 1 cm at a time, the vertical row of overlapping holes moves to the next one, as shown in Figure 4, and in the "4th time", the vertical row of overlapping holes returns to row A1 ( (corresponds to “0th time”).
以上のように、本第1実施例では、毎回の降下時におけるボルト挿通孔14、14、…へのボルト挿入位置の予見性が明快である。しかし、4cm分を降下するためには、ボルト挿通孔14、14、…の鉛直列を4列確保できる上下支持材(12、13)の幅が必要であり、装置のコンパクト化の点にやや問題がある。 As described above, in the first embodiment, the position where the bolts will be inserted into the bolt insertion holes 14, 14, . However, in order to descend 4 cm, the width of the upper and lower support members (12, 13) must be sufficient to secure four vertical rows of bolt insertion holes 14, 14, ..., which makes it difficult to make the device more compact. There's a problem.
本発明の第1手段におけるジャッキダウン装置の第2実施例は、前記第1実施例の課題であった装置のコンパクト化を解決するものであって、ボルト挿通孔14、14、…の鉛直列の配置を、図5にて説明する。 The second embodiment of the jack-down device according to the first means of the present invention solves the problem of making the device more compact, which was the problem of the first embodiment, and the bolt insertion holes 14, 14, . . . are vertically arranged. The arrangement will be explained with reference to FIG.
図5は、前記第1実施例と同様、図3のA部またはB部に対応する面を示すが、その1つの面には2列の鉛直ゲージラインA1~A2に合わせてボルト挿通孔14、14、…が鉛直方向孔ピッチP(図5では2cm)で等間隔に開けられており、上支持材12および下支持材13のボルト挿通孔14、14、…の鉛直ゲージラインA1~A2は、相互に重なるようになっている。
Similar to the first embodiment, FIG. 5 shows a surface corresponding to section A or B in FIG. , 14, ... are equally spaced at a vertical hole pitch P (2 cm in FIG. 5), and the vertical gauge lines A1 to A2 of the bolt insertion holes 14, 14, ... of the
図5に図示の「0回目」は、降下直前の状態であって、上下両支持材が重なっている範囲の鉛直ゲージラインA1のボルト挿通孔14、14、…は、孔番号1~4で重なっているので(●表示)、上下支持材(12、13)を貫通して、上屋架構1の支持に必要な本数(「0回目」では最大4本)のボルトを挿通できる。
The "0th time" shown in FIG. 5 is the state immediately before the descent, and the bolt insertion holes 14, 14, ... of the vertical gauge line A1 in the range where both the upper and lower support members overlap are
上支持材12に開けられたボルト挿通孔14、14、…は、前記2列の鉛直ゲージラインA1~A2とも、隣接ゲージラインのボルト挿通孔14、14、…と同じ高さである。
The bolt insertion holes 14, 14, . . . drilled in the
上記のような上支持材12に相対する、もう一方の下支持材13に開けられたボルト挿通孔14、14、…の鉛直方向配置は、等間隔配置のボルト挿通孔14、14、…の鉛直方向孔ピッチP(2cm)を、上屋架構1を鉛直方向孔ピッチPだけ降下するのに要する降下回数m(図5では2)で除したP/m=1cmだけ、鉛直ゲージラインA1に対してA2を下方向にずらして開けられている。
The vertical arrangement of the bolt insertion holes 14, 14, . The vertical hole pitch P (2 cm) is divided by the number of descents m (2 in Fig. 5) required to lower the
本第2実施例では、ボルト挿通孔14、14、…の鉛直方向孔ピッチP(2cm)分だけ、上屋架構1を降下させる場合、降下単位寸法pが1cmなので、2回の降下が必要になる。重なるボルト挿通孔14、14、…の位置(●表示)は、「0回目」でA1列の孔番号1~4である時、「1回目」の降下により、図5に図示のように、「0回目」において上支持材12のボルト挿通孔14、14、…の直下1cmにあった下支持材13のボルト挿通孔14、14、…であるA2列の孔番号1~4に移動する(破線矢印参照)。
In this second embodiment, when lowering the
以下同様に、1cmずつの降下を実行すると、図5に図示の「2回目」および「4回目」のように(実線矢印参照)、孔の重なる鉛直列は、A1列に回帰する(「0回目」に対応)。つまり、2回の降下毎に上下支持材(12、13)のボルト挿通孔14、14、…の重なる鉛直列が入れ替わることになる。 In the same manner, when descending 1 cm at a time, the vertical rows of overlapping holes regress to the A1 row ("0 ). In other words, the overlapping vertical rows of the bolt insertion holes 14, 14, .
以上のように、本第2実施例では、第1実施例と同様、毎回の降下時におけるボルト挿通孔14、14、…へのボルト挿入位置の予見性が明快であり、かつ、ボルト挿通孔14、14、…の鉛直列が最低2列確保できればよいので、第1実施例よりも上下支持材(12、13)の幅が狭くて済み、ジャッキダウン装置がコンパクトになる。 As described above, in the second embodiment, as in the first embodiment, the position of bolt insertion into the bolt insertion holes 14, 14, . . . can be clearly predicted during each descent, and Since it is sufficient to secure at least two vertical rows of 14, 14, .
但し、鉛直方向孔ピッチPは、挿通するボルト径に対応して、強度上の必要から最小寸法が決まるので、図5に図示のように、2cmピッチで問題ないボルトはかなり細いものになる。よって、降下時に支持する鉛直荷重を大きくできない点が問題である。 However, since the minimum dimension of the vertical hole pitch P is determined by the need for strength in accordance with the diameter of the bolt to be inserted, the bolts that can be used at a pitch of 2 cm are quite thin, as shown in FIG. Therefore, the problem is that the vertical load supported during descent cannot be increased.
次に、本発明の第2手段における実施例を以下に示す。第2手段は、上下支持材(12、13)のボルト挿通孔14、14、…の鉛直方向孔ピッチPが異なる場合である。 Next, an example of the second means of the present invention will be shown below. The second means is when the vertical hole pitches P of the bolt insertion holes 14, 14, . . . of the upper and lower supporting members (12, 13) are different.
表1は、下支持材13の下部ボルト挿通孔Lと上支持材12の上部ボルト挿通孔Uとの孔ピッチ寸法の組合せを示し、上下両孔ピッチの最小公倍数が20cm以下の場合(6ケース)である。
Table 1 shows the combinations of the hole pitch dimensions of the lower bolt insertion hole L of the
上下両孔ピッチの最小公倍数が大き過ぎると上下支持材(12、13)の重ねるべき範囲が長くなるので、ジャッキダウン装置の高さが高くなることを避けるために、以下の実施例では仮に20cm以下に限定した。勿論、実際の工事では、状況に合わせて上下支持材(12、13)の重なる範囲の長さを設定すればよいことは言うまでもない。 If the least common multiple of the pitch of both the upper and lower holes is too large, the range in which the upper and lower support members (12, 13) should overlap becomes longer, so in order to avoid increasing the height of the jack-down device, in the following example, it is temporarily set to 20 cm. Limited to the following. Of course, in actual construction, it goes without saying that the length of the overlapping range of the upper and lower supporting members (12, 13) may be set according to the situation.
第2手段の第1~3実施例は、下部ボルト挿通孔Lの孔ピッチを3cmとした場合である。先ず、第1実施例は、図6(a)に図示のように、上下両孔ピッチの組合せ(L、U)=(3cm、4cm)、最小公倍数=12の場合である。実際の上下支持材(12、13)のボルト挿通孔14、14、…の鉛直ゲージラインは重なるが、ここでは分かり易くするために並列で表示しており、×印が下部ボルト挿通孔L、●印が上部ボルト挿通孔Uを示す。これらの印が付いた位置番号が一致していれば、孔が重なっていることを表している。 In the first to third embodiments of the second means, the pitch of the lower bolt insertion holes L is 3 cm. First, in the first embodiment, as shown in FIG. 6(a), the combination of the pitches of the upper and lower holes (L, U)=(3 cm, 4 cm), and the least common multiple=12. Although the vertical gauge lines of the bolt insertion holes 14, 14, etc. of the actual upper and lower support members (12, 13) overlap, they are shown in parallel here for ease of understanding, and the × mark indicates the lower bolt insertion hole L, The ● mark indicates the upper bolt insertion hole U. If the position numbers with these marks match, it means that the holes overlap.
図6(a)に図示した第1実施例の場合、上部および下部ボルト挿通孔(L、U)の1つが孔番号0番で一致した状態の時、最小公倍数である12番でも重なる。この状態を基準として、上支持材12が降下単位寸法p=1cmずつ降下する場合、最小公倍数の範囲にある0番、4番、8番および12番、16番、20番の上部ボルト挿通孔Uが次に下部ボルト挿通孔Lと重なる迄の降下回数iは、それぞれ3回、2回、1回であることが分かる。つまり、上支持材12が降下単位寸法p=1cm降下する毎に、4つの前記上部ボルト挿通孔Uの内、どれかは必ず下部ボルト挿通孔Lと重なることになる。
In the case of the first embodiment shown in FIG. 6(a), when one of the upper and lower bolt insertion holes (L, U) coincides with
よって、上部および下部ボルト挿通孔(U、L)が次に重なる迄の降下回数iの最小値である1を、上部および下部ボルト挿通孔(U、L)の鉛直列の列数として最低確保すれば、上下支持材(12、13)を貫通するボルトの挿通が可能となる。そして、支持すべき上屋架構1の重量に応じて、1回の降下毎に確保すべきボルト挿通孔14の総数が不足の時は、ボルト挿通孔14、14、…の鉛直列を、例えば2列に増やして確保すればよい。
Therefore, 1, which is the minimum number of descents i until the upper and lower bolt insertion holes (U, L) overlap next time, is ensured as the minimum number of vertical rows of the upper and lower bolt insertion holes (U, L). This allows the bolt to be inserted through the upper and lower support members (12, 13). When the total number of bolt insertion holes 14 to be secured for each descent is insufficient depending on the weight of the
次に、第2手段における第2実施例は、図6(b)に図示のように、上下ボルト挿通孔ピッチの組合せ(L、U)=(3cm、5cm)、最小公倍数=15の場合である。 Next, in the second embodiment of the second means, as shown in FIG. 6(b), the combination of upper and lower bolt insertion hole pitches (L, U) = (3 cm, 5 cm), and the least common multiple = 15. be.
この第2実施例の場合、上部および下部ボルト挿通孔(L、U)の1つが孔番号0番で一致した状態の時、最小公倍数である15番でも重なる。この状態を基準として、上支持材12が降下単位寸法p=1cmずつ降下する場合、最小公倍数の範囲にある0番、5番、10番および15番の上部ボルト挿通孔Uが次に下部ボルト挿通孔Lと重なる迄の降下回数iは、それぞれ3回、1回、2回、3回であることが分かる。つまり、上支持材12が降下単位寸法p=1cm降下する毎に、4つの前記上部ボルト挿通孔Uの内、どれかは必ず下部ボルト挿通孔Lと重なることになる。
In the case of this second embodiment, when one of the upper and lower bolt insertion holes (L, U) matches with
よって、上部および下部ボルト挿通孔(U、L)が次に重なる迄の降下回数iの最小値である1を、上部および下部ボルト挿通孔(U、L)の鉛直列の列数として最低確保すれば、上下支持材(12、13)を貫通するボルトの挿通が可能となる。そして、支持すべき上屋架構1の重量に応じて、1回の降下毎に確保すべきボルト挿通孔14の総数が不足の時は、ボルト挿通孔14、14、…の鉛直列を、例えば2列に増やして確保すればよい。
Therefore, 1, which is the minimum number of descents i until the upper and lower bolt insertion holes (U, L) overlap next time, is ensured as the minimum number of vertical rows of the upper and lower bolt insertion holes (U, L). This allows the bolt to be inserted through the upper and lower support members (12, 13). When the total number of bolt insertion holes 14 to be secured for each descent is insufficient depending on the weight of the
次に、第2手段における第3実施例は、図6(c)に図示のように、上下ボルト挿通孔ピッチの組合せ(L、U)=(3cm、6cm)、最小公倍数=6の場合である。 Next, in the third embodiment of the second means, as shown in FIG. 6(c), the combination of upper and lower bolt insertion hole pitches (L, U) = (3 cm, 6 cm), and the least common multiple = 6. be.
この第3実施例の場合、上部および下部ボルト挿通孔(L、U)の1つが孔番号0番で一致した状態の時、最小公倍数6に対応する6番の他に、6の倍数の12番、18番でも重なる。この状態を基準として、上支持材12が降下単位寸法p=1cmずつ降下する場合、最小公倍数の範囲にある0番、6番および12番、18番の上部ボルト挿通孔Uが次に下部ボルト挿通孔Lと重なる迄の降下回数iは、それぞれ3回であることが分かる。つまり、上支持材12が降下単位寸法p=1cmずつ降下する場合、4つの前記上部ボルト挿通孔Uが下部ボルト挿通孔Lと次に重なる迄に3回待つ必要があることになる。
In the case of this third embodiment, when one of the upper and lower bolt insertion holes (L, U) matches
よって、上部および下部ボルト挿通孔(U、L)が次に重なる迄の降下回数iの最小値である3を、上部および下部ボルト挿通孔(U、L)の鉛直列の列数として最低限確保する必要がある。 Therefore, 3, which is the minimum number of descents i until the upper and lower bolt insertion holes (U, L) overlap next time, is set as the minimum number of vertical rows of the upper and lower bolt insertion holes (U, L). It is necessary to secure it.
本第3実施例では、最小公倍数が6と小さいので、前記鉛直列の長さ20cmの区間において、前記鉛直列を3列設けた場合、その内の1列で必ず上部および下部ボルト挿通孔(U、L)の重なりを3~4箇所確保できる。 In the third embodiment, the least common multiple is as small as 6, so if three vertical rows are provided in a section with a length of 20 cm, one of the vertical rows will always have upper and lower bolt insertion holes ( U, L) can be overlapped in 3 to 4 places.
前記第2手段の第1~3実施例は、下部ボルト挿通孔Lのピッチが3cmの場合であるが、使用するボルト径と支持する上屋架構1の重量に対して、強度的に必要な最小孔ピッチを満たしているのであれば、どの上下ボルト挿通孔ピッチの組合せ(L、U)でも問題ない。 In the first to third embodiments of the second means, the pitch of the lower bolt insertion holes L is 3 cm. However, the pitch of the lower bolt insertion holes L is 3 cm. As long as the minimum hole pitch is met, there is no problem with any combination of upper and lower bolt insertion hole pitches (L, U).
但し、上下支持材(12、13)の幅を抑えることを優先する場合は、最小鉛直列数が1列でよい第1または第2実施例のどちらかとなるが、上下支持材(12、13)の高さ抑制の点も考慮すると、最小公倍数がより小さい第1実施例(図6(a))の(L、U)=(3cm、4cm)が有利である。 However, if priority is given to suppressing the width of the upper and lower support members (12, 13), either the first or second embodiment, in which the minimum number of vertical rows is one, will be used; ) in the first embodiment (FIG. 6(a)) where the least common multiple is smaller (L, U)=(3 cm, 4 cm) is advantageous.
図7は、第2手段の第1実施例(L、U)=(3cm、4cm)のボルト挿通孔14、14、…を上下支持材(12、13)の1面(図3のA部またはB部に対応)に配置した場合の具体例を示す。図7では、ボルト挿通孔14、14、…の鉛直列1列だけでも、重なる孔数を2~3箇所を確保できるが(●で表示)、常時4~5箇所の重なりを確保する場合を想定して、ボルト挿通孔14、14、…の鉛直列を2列としている。ここで、破線の四角が上支持材12を、実線の四角が下支持材13を表している。
FIG. 7 shows bolt insertion holes 14, 14, . A specific example is shown below. In Fig. 7, even if there is only one vertical row of bolt insertion holes 14, 14, ..., it is possible to secure 2 to 3 overlapping holes (indicated by ●), but when ensuring 4 to 5 overlapping holes at all times, It is assumed that the bolt insertion holes 14, 14, . . . are arranged vertically in two rows. Here, the broken line square represents the
下支持材13の鉛直方向孔ピッチPを3cm、上支持材12の鉛直方向孔ピッチPを4cmとして、上下の孔ピッチpに1cmの差をつけている。上支持材12の鉛直列A1の各ボルト挿通孔14、14、…は、隣接A2列のものと同じ高さであるが、下支持材13では、図7に図示のように、A1列に対しA2列は降下単位寸法p=1cmだけ下にずれた配置である。A2列をずらした理由は、重なる孔の高さ位置にA1列とA2列とで上下に差を付けて離すことで、孔に挿入したボルトを締め付ける際に、工具操作に必要な空間を広くするためである。
The vertical hole pitch P of the
上屋架構1の降下単位寸法pを1cmとすると、下支持材13の鉛直方向孔ピッチPの3cm分だけ降下させるためには、3回の降下が必要である。図7にて説明すると、「0回目」のA1列に注目して、本第1実施例の孔配置では、上下支持材(12、13)の孔ピッチ4cmと3cmの最小公倍数12cmに対応する位置にある孔番号1、5、9の孔に重なり(●表示)が生じることになる。A2列では、同様に孔番号2、6の孔に重なりが生じる。孔番号10は、上下支持材(12、13)の重なり範囲から外れているので無効である。
Assuming that the descending unit dimension p of the
上支持材12を1cmだけ降下させた「1回目」で重なるボルト挿通孔14、14、…は、「0回目」において上部ボルト挿通孔Uの直下1cmに下部ボルト挿通孔Lがある場合なので、A1列の孔番号4、8、およびA2列の孔番号は1、5、9となる。
The bolt insertion holes 14, 14, ... that overlap in the "first time" when the
「2回目」以降も同様のパターンで孔が重なるが、「4回目」の孔の重なりパターンは、「0回目」と同じになっている。これは、上支持材12の孔ピッチが4cmなので、1cmずつ4回の降下で一巡するためである。
The holes overlap in the same pattern from the "second time" onwards, but the overlapping pattern of the holes in the "fourth time" is the same as that in the "zero time". This is because the hole pitch of the
以上の第2手段の第1~3実施例は、下部ボルト挿通孔Uの孔ピッチが3cmだが、支持荷重がより重くなると、使用するボルト径をもっと太くして孔の支圧強度と、孔ピッチを更に広げて孔間の断面強度を確保する必要がある。 In the first to third embodiments of the second means described above, the hole pitch of the lower bolt insertion holes U is 3 cm, but when the supporting load becomes heavier, the diameter of the bolt used is increased to improve the bearing pressure strength of the hole and the hole pitch. It is necessary to further widen the pitch to ensure cross-sectional strength between the holes.
そこで、以下に示す本発明第2手段の第4~6実施例は、下部ボルト挿通孔Uの孔ピッチを4cmとした場合の孔配置とした。 Therefore, in the fourth to sixth embodiments of the second means of the present invention shown below, the hole arrangement is such that the hole pitch of the lower bolt insertion holes U is 4 cm.
第2手段における第4実施例は、図8(a)に図示のように、上下孔ボルト挿通孔ピッチの組合せ(L、U)=(4cm、5cm)、最小公倍数=20の場合である。実際の上下支持材(12、13)のボルト挿通孔14、14、…の鉛直ゲージラインは重なるが、ここでは分かり易くするために並列で表示しており、×印が下部ボルト挿通孔L、●印が上部ボルト挿通孔Uを示す。これらの印が付いた位置番号が一致していれば、孔が重なっていることを表している。 The fourth example of the second means is a case where the combination of the bolt insertion hole pitches of the upper and lower holes (L, U)=(4 cm, 5 cm) and the least common multiple=20, as shown in FIG. 8(a). Although the vertical gauge lines of the bolt insertion holes 14, 14, ... of the actual upper and lower support members (12, 13) overlap, they are shown in parallel here to make it easier to understand. The ● mark indicates the upper bolt insertion hole U. If the position numbers with these marks match, it means that the holes overlap.
この第4実施例の場合、上部および下部ボルト挿通孔(L、U)の1つが孔番号0番で一致した状態の時、最小公倍数である20番でも重なる。この状態を基準として、上支持材12が降下単位寸法p=1cmずつ降下する場合、最小公倍数の範囲にある0番、5番、10番および15番の上部ボルト挿通孔Uが次に下部ボルト挿通孔Lと重なる迄の降下回数iは、それぞれ4回、3回、2回、1回であることが分かる。つまり、上支持材12が降下単位寸法p=1cm降下する毎に、4つの前記上部ボルト挿通孔Uの内、どれかは必ず下部ボルト挿通孔Lと重なることになる。
In the case of this fourth embodiment, when one of the upper and lower bolt insertion holes (L, U) matches the
よって、上部および下部ボルト挿通孔(U、L)が次に重なる迄の降下回数iの最小値である1を、上部および下部ボルト挿通孔(U、L)の鉛直列の列数として最低確保すれば、上下支持材を貫通するボルトの挿通が可能となる。そして、支持すべき上屋架構1の重量に応じて、1回の降下毎に確保すべきボルト挿通孔14の総数が不足の時は、ボルト挿通孔14、14、…の鉛直列を、例えば2列に増やして確保すればよい。
Therefore, 1, which is the minimum number of descents i until the upper and lower bolt insertion holes (U, L) overlap next time, is ensured as the minimum number of vertical rows of the upper and lower bolt insertion holes (U, L). This allows the bolt to be inserted through the upper and lower support members. When the total number of bolt insertion holes 14 to be secured for each descent is insufficient depending on the weight of the
次に、第2手段における第5実施例は、図8(b)に図示のように、上下ボルト挿通孔ピッチの組合せ(L、U)=(4cm、6cm)、最小公倍数=12の場合である。 Next, in the fifth embodiment of the second means, as shown in FIG. 8(b), the combination of upper and lower bolt insertion hole pitches (L, U) = (4 cm, 6 cm), and the least common multiple = 12. be.
この第5実施例の場合、上部および下部ボルト挿通孔(L、U)の1つが孔番号0番で一致した状態の時、最小公倍数である12番でも重なる。この状態を基準として、上支持材12が降下単位寸法p=1cmずつ降下する場合、最小公倍数に対応する位置にある0番、6番および12番、18番の上部ボルト挿通孔Uが次に下部ボルト挿通孔Lと重なる迄の降下回数iは、それぞれ4回、2回であることが分かる。つまり、上支持材12が降下単位寸法p=1cmずつ降下する場合、4つの前記上部ボルト挿通孔Uが下部ボルト挿通孔Lと次に重なる迄に2回待つ必要があることになる。
In the case of this fifth embodiment, when one of the upper and lower bolt insertion holes (L, U) matches the
よって、上部および下部ボルト挿通孔(U、L)が次に重なる迄の降下回数iの最小値である2を、上部および下部ボルト挿通孔(U、L)の鉛直列の列数として最低限確保が必要となる。 Therefore, 2, which is the minimum number of descents i until the upper and lower bolt insertion holes (U, L) overlap next time, is set as the minimum number of vertical rows of the upper and lower bolt insertion holes (U, L). It is necessary to secure it.
次に、第2手段における第6実施例は、図8(c)に図示のように、上下ボルト挿通孔ピッチの組合せ(L、U)=(4cm、8cm)、最小公倍数=8の場合である。 Next, in the sixth embodiment of the second means, as shown in FIG. 8(c), the combination of upper and lower bolt insertion hole pitches (L, U) = (4 cm, 8 cm), and the least common multiple = 8. be.
この第6実施例の場合、上部および下部ボルト挿通孔(L、U)の1つが孔番号0番で一致した状態の時、最小公倍数である8番でも重なる。更に最小公倍数8の倍数の16番でも重なる。この状態を基準として、上支持材Uが降下単位寸法p=1cmずつ降下する場合、最小公倍数に対応する位置にある0番、8番、そして16番の上部ボルト挿通孔Uが次に下部ボルト挿通孔Lと重なる迄の降下回数iは、それぞれ4回であることが分かる。つまり、上支持材12が降下単位寸法p=1cmずつ降下する場合、4つの前記上部ボルト挿通孔Uが下部ボルト挿通孔Lと次に重なる迄に4回待つ必要があることになる。
In the case of this sixth embodiment, when one of the upper and lower bolt insertion holes (L, U) matches the
よって、上部および下部ボルト挿通孔(U、L)が次に重なる迄の降下回数iの最小値である4を、上部および下部ボルト挿通孔(U、L)の鉛直列の列数として最低限確保する必要がある。 Therefore, 4, which is the minimum number of descents i until the upper and lower bolt insertion holes (U, L) overlap next time, is the minimum number of vertical rows of the upper and lower bolt insertion holes (U, L). It is necessary to secure it.
前記第2手段の第4~6実施例は、下部ボルト挿通孔Lのピッチが4cmの場合であるので、使用するボルト径と支持する上屋架構1の重量に対して、前記第2手段の第1~3実施例の場合よりも有利であり、何れの上下ボルト挿通孔ピッチの組合せ(L、U)でも問題ない。 In the fourth to sixth embodiments of the second means, the pitch of the lower bolt insertion holes L is 4 cm. This is more advantageous than the first to third embodiments, and there is no problem with any combination of upper and lower bolt insertion hole pitches (L, U).
但し、上下支持材(12、13)の幅および高さを抑えることを考慮する場合は、第4実施例は鉛直列が1列でも可なので幅はよいが最小公倍数が20cmと大きく、第6実施例は最小公倍数が8cmと最も小さいので高さはよいが鉛直列が4列必要で幅が広くなる。従って、両者の中間である第5実施例(図8(b))の(L、U)=(4cm、6cm)が実用的である。 However, when considering reducing the width and height of the upper and lower support members (12, 13), the fourth embodiment allows for one vertical row, so the width is good, but the least common multiple is as large as 20 cm, and the sixth embodiment In this embodiment, the lowest common multiple is 8 cm, which is the smallest, so the height is good, but four vertical rows are required, which increases the width. Therefore, (L, U)=(4 cm, 6 cm) in the fifth embodiment (FIG. 8(b)), which is between the two, is practical.
図9は、第2手段の第5実施例(L、U)=(4cm、6cm)のボルト挿通孔14、14、…を上下支持材(12、13)の1面(図3のA部またはB部に対応)に配置した場合の具体例を示す。降下単位寸法p=1cmの時、ボルト挿通孔14、14、…の鉛直列を2列確保することで、毎回の降下時に必ずどちらかの鉛直列で重なる孔(●で表示)が2箇所は確保される。ここで、破線の四角が上支持材12を、実線の四角が下支持材13を表している。
FIG. 9 shows bolt insertion holes 14, 14, . A specific example is shown below. When the descending unit dimension p = 1 cm, by ensuring two vertical rows of bolt insertion holes 14, 14, ..., there are two holes (indicated by ●) that always overlap in one of the vertical rows during each descent. Secured. Here, the broken line square represents the
上屋架構1の降下単位寸法pが1cmなので、下支持材13の鉛直方向孔ピッチUの4cm分だけ降下させるためには、4回の降下が必要である。図9にて説明すると、「0回目」ではA1列の孔番号1と4が重なっているが、本第5実施例の孔配置では、上部および下部ボルト挿通孔(U、L)の孔ピッチである6cmと4cmの最小公倍数12cmに対応する位置にある孔に重なりが生じることになる。
Since the descending unit dimension p of the
1cmだけ降下させた「1回目」で重なる孔は、「0回目」において上部ボルト挿通孔Uの直下1cmに下部ボルト挿通孔Lがある場合なので、A1列より1段(1cm)低いA2列の孔番号1と4となり、A1列の孔の重なりはない。次の「2回目」では、「1回目」において上部ボルト挿通孔Uの直下1cmに下部ボルト挿通孔LがあったA1列の孔番号3と6となり、A2列の孔の重なりはない。 The holes that overlap in the "1st time" when lowered by 1 cm are the cases where the lower bolt insertion hole L is located 1 cm directly below the upper bolt insertion hole U in the "0th time", so the hole in the A2 row that is one step (1 cm) lower than the A1 row. The hole numbers are 1 and 4, and the holes in row A1 do not overlap. In the next "second time", the holes numbered 3 and 6 in the A1 row, where the lower bolt insertion hole L was located 1 cm directly below the upper bolt insertion hole U in the "first time", and the holes in the A2 row do not overlap.
「3回目」以降も同様のパターンで孔が重なるが、「6回目」の孔の重なりパターンは、「0回目」と同じになっている。これは、上部ボルト挿通孔Uの孔ピッチが6cmなので、1cmずつ6回の降下で一巡するためである。 The holes overlap in the same pattern after the "3rd time", but the overlapping pattern of the holes in the "6th time" is the same as that in the "0th time". This is because the hole pitch of the upper bolt insertion hole U is 6 cm, so the bolt goes around by descending 1 cm each six times.
ジャッキダウン装置の実施形態例を示す図3に図示のA部は、本発明第2手段の第5実施例に対応し、上下支持材(12、13)のボルト挿通孔14、14、…の鉛直列を2列配置とした場合である。この上下の2列配置を対として、上支持材12のL形断面2面および下支持材13のH形断面片端入隅部2面を対として、平面視で長方形の四隅に配置して、4本の上支持材12を内筒、2本の下支持材13、13を外筒とするボックス状の構造体を形成している。
Part A shown in FIG. 3 showing an embodiment of the jack-down device corresponds to the fifth embodiment of the second means of the present invention, and corresponds to the fifth embodiment of the second means of the present invention. This is a case where two vertical rows are arranged. The two upper and lower rows are arranged as a pair, and the two sides of the L-shaped cross section of the
このジャッキダウン装置を使用するには、図3を参照して、上屋架構1の梁部10を支持する全ての仮設支持点3において、仮支承部11を介して上支持材12を取り付け、下支持材13は支保工2の頂部に固定し、仮支承部11の直下にジャッキ15を設置し、いくつかの支承ブロック16、16、…を介して上屋架構1の荷重がジャッキ15に伝達できるように配置する。
To use this jack-down device, referring to FIG. 3, attach the
上屋架構1を支持するジャッキ15のラム15aを、少なくとも一回の降下で必要とする寸法に伸ばした状態にして据付け、降下の最初に、上下支持材(12、13)のボルト挿通孔14、14、…に挿通されたボルトにより支えられた上屋架構1の荷重を、ジャッキ15のラム15aを上に少し伸ばしてジャッキ15に全て支持させ、前記ボルトを全て抜き取り、ジャッキ15が前記荷重を支えながらラム15aを降下単位寸法pだけ下げ、上下支持材(12、13)のボルト挿通孔14、14、…が一致する箇所に再度ボルトを挿入した後、ジャッキ15のラム15aを下げて支持を解除して、門型架1構の重量を前記ボルトに移動させる。
The
この時、ラム15aの下げ代が足りなくなった場合は、上屋架構1の荷重を前記ボルトが支持している時に、高さ調整プレート17、17、…を必要枚数抜き取るか、支承ブロック16、16、…を1個ずつ撤去して、ラム15を伸ばすことのできる上部空間を確保すればよい。
At this time, if there is not enough room for lowering the
以上の操作を、ジャッキダウンを行う上屋架構1の1つのブロックを支える全ての仮設支持点3、3、…について行い、1回分の降下が完了する。この操作を上屋架構1の全ブロックについて順番に実施し、上屋架構1の本設の全支持部(柱脚部)が、基礎柱2、2、…等に載置されるまで繰り返す。
The above operation is performed for all the
図10は、本発明第2手段の第5実施例である上部および下部ボルト挿通孔14、14、…の鉛直列を、図3に図示のA部およびB部に1対ずつそれぞれ施した場合を示す。A部には、図9に図示のボルト挿通孔14、14、…の鉛直列と同じ配列を、B部には、A部とはボルト挿通孔14、14、…の高さ方向位置を少しかえて配置したものであり、6回目までの降下ステップを表す。1回の降下毎に、孔の重なり(●印)の位置がA1(B2)列とA2(B1)列とで交互に入れ替わることが分かる。 FIG. 10 shows a case where one pair of upper and lower bolt insertion holes 14, 14, . shows. Part A has the same vertical arrangement of the bolt insertion holes 14, 14, . . . as shown in Fig. 9, and part B has the bolt insertion holes 14, 14, . It is placed on the contrary, and represents the descending steps up to the sixth time. It can be seen that the position of the overlapping holes (● marks) alternates between the A1 (B2) column and the A2 (B1) column each time it descends.
上屋架構1の本設の全支持部(柱脚部)が、アンカーボルト等により基礎柱2、2、…等に定着されて自立すれば、支保工2、2、…は全て解体できる。
If all the permanent supporting parts (column bases) of the
なお、本発明の各実施例では、上屋架構1の降下単位寸法pを1cmとしたが、ジャッキダウン対象とする架構の特性により、降下単位寸法pは1cmに限定されないことは当然である。
In each embodiment of the present invention, the descending unit dimension p of the
また、上部および下部ボルト挿通孔(L、U)の孔ピッチの組合せは、表1に限定されるものではなく、また、孔ピッチ寸法の大小が上下入れ替わっても効果は同じことは言うまでもない。 Further, the combination of the hole pitches of the upper and lower bolt insertion holes (L, U) is not limited to those shown in Table 1, and it goes without saying that the effect will be the same even if the hole pitch dimensions are reversed.
本発明は、仮設支持点数が非常に多い長大な屋根架構や鉄道駅の長いプラットホーム上屋等の建方において、一体的に組み上がった全架構をジャッキダウンする場合に、全体を同時にジャッキダウンする工法ではなく、全架構をいくつかのブロックに分けてブロック毎に順次ジャッキダウンする工法を対象としており、一体的に組み上がった構造物の損傷を確実に回避できる簡易なジャッキダウン装置を提供すると共に、コストも抑制できる。 The present invention is capable of jacking down the entire structure at the same time when jacking down the entire structure that has been assembled as one in the construction of a long roof structure with a large number of temporary support points or a long platform shed at a railway station. The target is not a construction method, but a construction method in which the entire frame is divided into several blocks and sequentially jacked down each block, and provides a simple jackdown device that can reliably avoid damage to an integrated structure. At the same time, costs can also be reduced.
1:上屋架構
1a、1b、…、1f:上屋架構のブロック
2:支保工
3:仮設支持点
4:基礎柱
5:柱
6:スライドレール
7:ワイヤーロープ巻取り装置
10:梁部
11:仮支承部
12:上支持材
13:下支持材
14:ボルト挿通孔
15:ジャッキ
15a:ラム
16:支承ブロック
17:高さ調整プレート
L:下部ボルト挿通孔
U:上部ボルト挿通孔
1: Shed
Claims (4)
1)前記構造物の仮設支持点に取り付けられた上支持材と、その上支持材に一定範囲が重なるように下方から立設された下支持材とから成る。
2)前記上支持材および下支持材には、鉛直のゲージラインに合わせて等間隔の鉛直方向孔ピッチPで開けられたボルト挿通孔の鉛直列が少なくとも2列以上設けられ、前記上支持材および下支持材の前記鉛直のゲージラインは相互に重なるようになっており、前記上支持材および下支持材が重なった範囲の前記鉛直列のボルト挿通孔の内、少なくとも1列の鉛直列のボルト挿通孔同士が重なって、前記上下支持材を貫通してボルトを挿通できるようになっている。
3)前記上支持材または下支持材のどちらか一方に開けられた前記ボルト挿通孔の鉛直方向配置は、隣接する前記鉛直列の前記ボルト挿通孔と同じ高さである。
4)もう一方の前記上支持材または下支持材に開けられたボルト挿通孔の鉛直方向配置は、相隣接する前記鉛直列のボルト挿通孔に対して、等間隔配置の前記ボルト挿通孔の鉛直方向孔ピッチPを、鉛直方向孔ピッチPだけ前記構造物を降下するのに要する降下回数mで除した値P/mの寸法分だけ、上もしくは下方向に1段ずつ順次ずらして開けられている。
5)前記上支持材および下支持材開けられたボルト挿通孔の鉛直列の列数は、前記降下回数mと同数以上である。
6)以上のような前記上支持材と下支持材を対として、1対もしくは2対以上が、前記構造物の仮設支持点全てに設置されている。
以上のような構成から成ることを特徴とするジャッキダウン装置。 A jack-down device used for jacking down a structure, comprising at least one jack per temporary support point of the structure, and a jack-down device that replaces the jack when the supporting force of the jack is released. a sliding support part that supports the structure, the sliding support part comprising:
1) Consists of an upper support member attached to a temporary support point of the structure, and a lower support member erected from below so as to overlap a certain area with the upper support member.
2) The upper support material and the lower support material are provided with at least two or more vertical rows of bolt insertion holes that are equally spaced at a vertical hole pitch P in accordance with the vertical gauge line, and the upper support material and the vertical gauge lines of the lower support material overlap each other, and at least one row of the vertical row bolt insertion holes in the range where the upper support material and the lower support material overlap. The bolt insertion holes overlap each other so that the bolt can be inserted through the upper and lower support members.
3) The vertical arrangement of the bolt insertion holes formed in either the upper support member or the lower support member is at the same height as the bolt insertion holes in the adjacent vertical row.
4) The vertical arrangement of the bolt insertion holes drilled in the other upper support member or lower support member is such that the bolt insertion holes are arranged at equal intervals with respect to the bolt insertion holes in the adjacent vertical row. The openings are sequentially shifted one step at a time upward or downward by the dimension P/m, which is the directional hole pitch P divided by the number of descents m required to lower the structure by the vertical hole pitch P. There is.
5) The number of vertical rows of bolt insertion holes drilled in the upper support member and the lower support member is equal to or greater than the number of descents m.
6) One or more pairs of the upper support material and lower support material as described above are installed at all temporary support points of the structure.
A jack-down device characterized by having the above configuration.
1)前記構造物の仮設支持点に取り付けられた上支持材と、その上支持材に一定範囲が重なるように下方から立設された下支持材とから成る。
2)前記上支持材および下支持材には、それぞれ鉛直のゲージラインに合わせて等間隔に開けられた上部および下部ボルト挿通孔の鉛直列が、1列もしくは2列以上設けられており、前記上支持材および下支持材の前記鉛直のゲージラインは、相互に重なるようになっている。
3)前記上部および下部ボルト挿通孔の前記鉛直列の鉛直方向孔ピッチは相互に異なり、前記上支持材および下支持材が重なった範囲において、少なくとも1列の前記鉛直列の前記上部および下部ボルト挿通孔同士は、それぞれの前記鉛直方向孔ピッチの最小公倍数に対応する位置毎に重なって、前記上下両支持材を貫通してボルトが挿通できるようになっている。
4)前記上支持材および下支持材に開けられたボルト挿通孔の鉛直列が重なり合う範囲において、前記構造物を1回だけ降下させる降下単位寸法をpとする時、前記上部および下部ボルト挿通孔同士が少なくとも1つ以上重なった状態で、前記上部ボルト挿通孔とその下方に位置する最寄の下部ボルト挿通孔との最小距離がn×p(n:1以上の自然数)であり、かつ前記上部および下部ボルト挿通孔の鉛直列の列数NがN≧nである。
5)以上のような前記上支持材と下支持材とを対として、1対もしくは2対以上が、前記構造物の仮設支持点に設置されている。
以上のような構成から成ることを特徴とするジャッキダウン装置。 A jack-down device used for jacking down a structure, comprising at least one jack per temporary support point of the structure, and a jack-down device that replaces the jack when the supporting force of the jack is released. a sliding support part that supports the structure, the sliding support part comprising:
1) Consists of an upper support member attached to a temporary support point of the structure, and a lower support member erected from below so as to overlap a certain area with the upper support member.
2) The upper support member and the lower support member are each provided with one or more vertical rows of upper and lower bolt insertion holes opened at equal intervals in accordance with the vertical gauge line; The vertical gauge lines of the upper and lower supports are arranged to overlap each other.
3) The vertical hole pitches of the vertical rows of the upper and lower bolt insertion holes are different from each other, and in the range where the upper support member and the lower support member overlap, at least one row of the upper and lower bolts of the vertical row The insertion holes overlap each other at positions corresponding to the least common multiple of the respective vertical hole pitches, so that bolts can be inserted through both the upper and lower supporting members.
4) In the range where the vertical rows of bolt insertion holes drilled in the upper support material and the lower support material overlap, when p is the descending unit dimension in which the structure is lowered only once, the upper and lower bolt insertion holes the minimum distance between the upper bolt insertion hole and the nearest lower bolt insertion hole located below the upper bolt insertion hole is n×p (n: a natural number of 1 or more), and the The number N of vertical rows of the upper and lower bolt insertion holes satisfies N≧n.
5) One or more pairs of the upper support member and lower support member as described above are installed at a temporary support point of the structure.
A jack-down device characterized by having the above configuration .
1)前記上部または下部ボルト挿通孔のどちらか一方の鉛直方向配置は、隣接する前記鉛直列の前記上部および下部ボルト挿通孔と同じ高さである。
2)もう一方の前記上部または下部ボルト挿通孔の鉛直方向配置は、どれか1列の鉛直列のボルト挿通孔に対して、その1列の鉛直列に隣接する鉛直列のボルト挿通孔の鉛直方向位置が、前記降下単位寸法pの寸法分ずつ上または下に順次ずれている。
3)以上のような前記上支持材と下支持材を対として、1対もしくは2対以上が、前記構造物の仮設支持点に設置されている。
以上のような構成から成ることを特徴とするジャッキダウン装置。 In claim 2, the upper support member and the lower support member are provided with two or more vertical rows of the upper and lower bolt insertion holes opened at equal intervals in accordance with a vertical gauge line, respectively. hand ,
1) The vertical arrangement of either the upper or lower bolt holes is at the same height as the upper and lower bolt holes of the adjacent vertical row.
2) The vertical arrangement of the other upper or lower bolt insertion holes is the vertical arrangement of the bolt insertion holes in the vertical row adjacent to any one vertical row of bolt insertion holes. The directional position is sequentially shifted upward or downward by the descending unit dimension p .
3) One or more pairs of the above-mentioned upper support member and lower support member are installed at a temporary support point of the structure.
A jack-down device characterized by having the above configuration.
1)前記構造物の仮設支持点に取り付けられた上支持材と、その上支持材に一定範囲が重なるように下方から立設された下支持材とから成る。
2)前記上支持材および下支持材には、鉛直のゲージラインに合わせて等間隔に開けられた上部および下部ボルト挿通孔の鉛直列が、それぞれ2列設けられており、前記上支持材および下支持材のボルト挿通孔の鉛直のゲージラインは、相互に重なるようになっている。
3)前記上部および下部ボルト挿通孔の鉛直列の鉛直方向孔ピッチは相互に異なり、前記上支持材および下支持材が重なった範囲の前記鉛直列2列のどちらか一方に属する上部および下部ボルト挿通孔同士が、それぞれの前記鉛直方向孔ピッチの最小公倍数に対応する位置毎に重なるようになっており、前記上下両支持材を貫通してボルトを挿通することが可能である。
4)前記上部または下部ボルト挿通孔のどちらか一方の鉛直方向配置は、隣接する前記鉛直列の前記ボルト挿通孔と同じ高さである。
5)もう一方の前記上部または下部ボルト挿通孔の鉛直方向配置は、前記鉛直列2列のどちらか一方のボルト挿通孔の鉛直方向位置が、他方の鉛直列のボルト挿通孔に対して、前記構造物を1回降下させる際の降下単位寸法p分だけ上または下にずれており、どちらか一方の鉛直列の上部および下部ボルト挿通孔に重なりがある時に、他方の鉛直列の上部ボルト挿通孔の内、少なくとも1つ以上は、その下方に位置する最寄の下部ボルト挿通孔との最小距離がpである。
6)以上のような前記上支持材と下支持材を対として、1対もしくは2対以上が、前記構造物の仮設支持点に設置されている。
以上のような構成から成ることを特徴とするジャッキダウン装置。 A jack-down device used for jacking down a structure, comprising at least one jack per temporary support point of the structure, and a jack-down device that replaces the jack when the supporting force of the jack is released. and a sliding support section that supports the structure, the sliding support section comprising:
1) Consists of an upper support member attached to a temporary support point of the structure, and a lower support member erected from below so as to overlap a certain area with the upper support member.
2) The upper support material and the lower support material are each provided with two vertical rows of upper and lower bolt insertion holes that are equally spaced along the vertical gauge line, and the upper support material and the lower support material The vertical gauge lines of the bolt insertion holes of the lower support material are arranged to overlap each other.
3) The vertical hole pitches of the vertical rows of the upper and lower bolt insertion holes are different from each other, and the upper and lower bolts belong to either one of the two vertical rows in the range where the upper support material and the lower support material overlap. The insertion holes overlap each other at positions corresponding to the least common multiple of the respective vertical hole pitches, and it is possible to insert the bolt through both the upper and lower supporting members.
4) The vertical arrangement of either the upper or lower bolt holes is at the same height as the bolt holes in the adjacent vertical row.
5) The vertical position of the other upper or lower bolt insertion hole is such that the vertical position of the bolt insertion hole in either one of the two vertical rows is set as above with respect to the bolt insertion hole in the other vertical row. When the structure is shifted upward or downward by the descent unit dimension p when lowering the structure once, and when the upper and lower bolt insertion holes of either vertical row overlap, the upper bolt insertion of the other vertical row At least one of the holes has a minimum distance p from the nearest lower bolt insertion hole located below it.
6) One or more pairs of the upper support member and lower support member as described above are installed at a temporary support point of the structure.
A jack-down device characterized by having the above configuration.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021014101A JP7430466B2 (en) | 2021-02-01 | 2021-02-01 | Structure jacking equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021014101A JP7430466B2 (en) | 2021-02-01 | 2021-02-01 | Structure jacking equipment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2022117552A JP2022117552A (en) | 2022-08-12 |
| JP7430466B2 true JP7430466B2 (en) | 2024-02-13 |
Family
ID=82750316
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2021014101A Active JP7430466B2 (en) | 2021-02-01 | 2021-02-01 | Structure jacking equipment |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7430466B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119800883B (en) * | 2025-01-22 | 2026-04-21 | 中铁三局集团有限公司 | A top-mounted beam portal frame structure and a method for modifying the top beam of cast-in-place beams. |
| JP7739649B1 (en) * | 2025-03-24 | 2025-09-16 | 鹿島建設株式会社 | Steel frame construction method |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2017137697A (en) | 2016-02-03 | 2017-08-10 | 野村 恭三 | Column or beam structure |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS4838927Y1 (en) * | 1970-01-17 | 1973-11-16 | ||
| JPS5022625U (en) * | 1973-06-20 | 1975-03-13 | ||
| JPS5116730A (en) * | 1974-08-02 | 1976-02-10 | Nippon Kokan Kk | KOJUHOHO |
| JPS5440643U (en) * | 1977-08-26 | 1979-03-17 |
-
2021
- 2021-02-01 JP JP2021014101A patent/JP7430466B2/en active Active
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2017137697A (en) | 2016-02-03 | 2017-08-10 | 野村 恭三 | Column or beam structure |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2022117552A (en) | 2022-08-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP4563413B2 (en) | Bridge girder construction method | |
| EP0654571B1 (en) | Zone module construction method of steel structure construction | |
| JP5394334B2 (en) | Construction method of work floor for work at height | |
| JP7430466B2 (en) | Structure jacking equipment | |
| CN104805907A (en) | Jacking method and device of steel structure module | |
| JP6917948B2 (en) | Lifting device for heavy objects and lifting method | |
| US3726053A (en) | Method and apparatus for erecting modular high-rise building | |
| CN103343626B (en) | The T-shaped support slide installation method of template Elements of Space Grid Truss and structure thereof | |
| JP5839164B2 (en) | Building construction method | |
| JP3732586B2 (en) | Method and apparatus for constructing steel structure | |
| CN114737773A (en) | Jacking method for steel structure roof sliding jig frame | |
| EP2415704A1 (en) | Self-lifting support structure for building. | |
| US3631648A (en) | Method of erection of high-rise building structure formed of modular units | |
| JP2020133264A (en) | Concrete column form construction device and concrete column form construction method using the same | |
| CN112609701B (en) | Method for dismantling inner support of deep foundation pit | |
| JP5039304B2 (en) | Construction method of boiler frame | |
| CN222729407U (en) | Large equipment lifting mechanism | |
| CN111809885A (en) | Large-span steel truss hydraulic jacking system and construction method thereof | |
| US3880293A (en) | Apparatus for lifting and lateral shifting of heavy constructions | |
| CN104675140B (en) | Newly-increased load-bearing pillar is installed and roof truss load transfer method | |
| CN115387586B (en) | Lifting platform for foundation pit reverse construction and construction method | |
| CN118850985B (en) | Prefabricated floor slab installation device and installation method | |
| JPH06101348A (en) | How to build a tower | |
| JP7510227B1 (en) | Wall installation scaffolding and wall installation method | |
| DE1534890B1 (en) | Procedure for erecting multi-storey buildings |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20230119 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20231227 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20240109 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20240111 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20240130 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20240130 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7430466 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |