JP7454401B2 - Risk assessment methods and risk management methods - Google Patents
Risk assessment methods and risk management methods Download PDFInfo
- Publication number
- JP7454401B2 JP7454401B2 JP2020026880A JP2020026880A JP7454401B2 JP 7454401 B2 JP7454401 B2 JP 7454401B2 JP 2020026880 A JP2020026880 A JP 2020026880A JP 2020026880 A JP2020026880 A JP 2020026880A JP 7454401 B2 JP7454401 B2 JP 7454401B2
- Authority
- JP
- Japan
- Prior art keywords
- risk
- line
- scenarios
- equal
- scenario
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本発明は、事業や施設、システム、製品等に存在するリスクを低減する安全対策の検討材料を提供するためにリスクを定量化するリスク評価方法およびそれを利用したリスク管理方法に関し、リスクシナリオをリスクの大きさに応じて段階的なレベルに区分し、得られたリスクレベルに基づいて各リスクシナリオのリスクを可視化するのに適したリスク評価方法およびリスク管理方法に関するものである。 The present invention relates to a risk assessment method for quantifying risks and a risk management method using the same in order to provide materials for considering safety measures to reduce risks existing in businesses, facilities, systems, products, etc. The present invention relates to a risk evaluation method and a risk management method suitable for classifying risks into graded levels according to the size of the risks and visualizing the risks of each risk scenario based on the obtained risk levels.
従来、事業や施設等に存在するリスクを評価する技術として、リスクシナリオを時系列的に追いかけるイベントツリー解析法が知られている(例えば特許文献1、2参照)。しかし、イベントツリー解析法によるリスク評価が適していない事業や施設、システム、製品もある。
一方、リスクシナリオの危害の程度(災害の大きさ)と発生頻度をパラメータとし、マトリックスを活用してリスクの大きさを評価するR-Map手法が知られている(例えば非特許文献1参照)。
2. Description of the Related Art Conventionally, an event tree analysis method that follows risk scenarios in chronological order has been known as a technique for evaluating risks existing in businesses, facilities, etc. (see, for example,
On the other hand, the R-Map method is known, which uses the degree of harm (size of disaster) and frequency of occurrence of a risk scenario as parameters, and uses a matrix to evaluate the magnitude of risk (for example, see Non-Patent Document 1). .
R-Map手法では、リスクを、「許容できないリスク領域」と「許容されるリスク領域」と「安全領域」等の任意の複数の領域に区分して評価している。そのため、各リスクの大きさを段階的に把握することができるという利点がある。しかし、例えば、リスク評価手法として広く用いられているALARPの原則では、「許容できないリスク領域」(危険領域)と「許容されるリスク領域」とを分けるリスク基準Aと、「許容されるリスク領域」と「安全領域」とを分けるリスク基準Bを決定することがリスク評価の前提となっている。また、ALARPの原則に基づかなくとも、リスク分析の結果を許容できるか、できないかを判断するためには、まず、第一にリスク基準を設定してから、リスクを評価するという手順が原則となる。しかし、日本社会においては、特に災害が人命にかかわるものである場合、一企業においてリスク基準を意思決定すること自体が非常に困難であるという課題がある。 In the R-Map method, risks are evaluated by dividing them into multiple arbitrary areas such as "unacceptable risk areas," "acceptable risk areas," and "safety areas." Therefore, there is an advantage that the magnitude of each risk can be grasped step by step. However, for example, in the principles of ALARP, which is widely used as a risk assessment method, there is a risk standard A that separates "unacceptable risk areas" (danger areas) and "acceptable risk areas", and "acceptable risk areas". The premise of risk assessment is to determine the risk criterion B that separates the ``safety area'' from the ``safety area''. In addition, even if it is not based on the ALARP principle, in order to judge whether the results of risk analysis are acceptable or not, the basic procedure is to first set risk standards and then evaluate the risks. Become. However, in Japanese society, there is a problem in that it is extremely difficult for a single company to decide on risk standards, especially when disasters involve human lives.
そのため、R-Map手法を使用してリスクを可視化したとしてもリスク分析の結果をリスク基準と比較するという、ISO 31000やJIS Q 31000に示されるような国際規格や国内規格に基づいた手法でリスクを評価することは実質的には困難であることが多い。
また、R-Map手法におけるマトリックスは、リスクの大きさを評価する際には役立つものの、どのリスクレベルにどの程度のリスクが存在しているのかを直感的に把握することが困難であるという課題がある。
Therefore, even if risks are visualized using the R-Map method, risks can be visualized using methods based on international and domestic standards such as ISO 31000 and JIS Q 31000, which involve comparing the results of risk analysis with risk standards. is often practically difficult to evaluate.
In addition, although the matrix in the R-Map method is useful when evaluating the magnitude of risk, it is difficult to intuitively understand how much risk exists at which risk level. There is.
この発明は上記のような背景のもとになされたものでその目的とするところは、リスク基準に関わらず、リスクシナリオをリスクの大きさに応じて段階的なレベルに区分し、得られたリスクレベルに基づいて各リスクシナリオのリスクレベルを可視化することができるリスク評価方法およびそれを利用したリスク管理方法を提供することにある。
この発明の他の目的は、各リスクシナリオのリスクレベルを直感的に認識することができるリスクマップを作成可能であり、それによりリスクマネジメントにおいてリスクが低減する様子を把握することができるリスク評価方法およびリスク管理方法を提供することにある。
This invention was made against the above background, and its purpose is to classify risk scenarios into stepwise levels according to the magnitude of risk, regardless of risk standards, and to An object of the present invention is to provide a risk evaluation method that can visualize the risk level of each risk scenario based on the risk level, and a risk management method using the same.
Another object of the present invention is to create a risk map that can intuitively recognize the risk level of each risk scenario, thereby making it possible to understand how risks are reduced in risk management. and risk management methods.
前記課題を解決するために、本発明は、
評価対象において過去に発生した事故について予め設定された複数のリスクシナリオごとに発生頻度と被害規模を集計したリスク分析データに基づいて、コンピュータによって各リスクシナリオのリスクレベルを決定するリスク評価方法において、
前記リスク分析データに含まれる前記複数のリスクシナリオのそれぞれのリスクを、被害規模と発生頻度をそれぞれX軸とY軸とする仮想グラフ上にプロットする第1ステップと、
前記複数のリスクシナリオのうち最もリスク値(発生頻度と被害規模との積)の高いリスクシナリオを通る等リスク線を最大等リスク線として前記仮想グラフに描画する第2ステップと、
前記複数のリスクシナリオのうち最もリスク値の小さいリスクシナリオを通る等リスク線を最小等リスク線として前記仮想グラフに描画し、前記最大等リスク線と前記最小等リスク線との間を任意の数で等分割する第3ステップと、
等分割された複数の領域のそれぞれに属するリスクシナリオに対して、前記複数の領域のリスク値の大小関係に基づいてリスクレベルを付与する第4ステップと、
前記第4ステップで付与されたリスクレベルに応じて、リスク対策を実施する優先順位を決定する第5ステップと、を含むようにしたものである。
In order to solve the above problems, the present invention has the following features:
A risk assessment method in which the risk level of each risk scenario is determined by a computer based on risk analysis data that aggregates the frequency of occurrence and damage scale for each of multiple risk scenarios set in advance for accidents that have occurred in the past in the evaluation target.
a first step of plotting each risk of the plurality of risk scenarios included in the risk analysis data on a virtual graph with damage scale and occurrence frequency as the X-axis and Y-axis, respectively;
a second step of drawing an equal risk line passing through a risk scenario with the highest risk value (product of occurrence frequency and damage scale) among the plurality of risk scenarios as a maximum equal risk line on the virtual graph;
An iso-risk line that passes through the risk scenario with the smallest risk value among the plurality of risk scenarios is drawn on the virtual graph as a minimum iso-risk line, and an arbitrary number of lines are drawn between the maximum iso-risk line and the minimum iso-risk line. The third step is to equally divide the
a fourth step of assigning a risk level to the risk scenarios belonging to each of the plurality of equally divided areas based on the magnitude relationship of the risk values of the plurality of areas;
The method includes a fifth step of determining a priority order for implementing risk countermeasures according to the risk level assigned in the fourth step.
上記のようなリスク評価方法によれば、リスク基準に関わらず、複数のリスクシナリオをリスクの大きさに応じて段階的なレベルに区分することができる。その結果、得られたリスクレベルを例えば表またはグラフに記載することで可視化することができる、つまり各リスクシナリオのリスクレベルを直感的に認識することができるリスクマップを作成することができる。また、リスク基準を意思決定するのは困難であるが、最大等リスク線Rmaxと最小等リスク線Rminであれば、誰でも簡単に引くことができるとともに、誰が行なっても同一の線を引くことができる。 According to the above-described risk evaluation method, multiple risk scenarios can be classified into graded levels according to the magnitude of risk, regardless of risk standards. As a result, it is possible to visualize the obtained risk level by describing it in a table or graph, for example, and to create a risk map that allows the risk level of each risk scenario to be intuitively recognized. Also, although it is difficult to decide on risk standards, anyone can easily draw the maximum equal risk line Rmax and the minimum equal risk line Rmin, and no matter who does it, the same line can be drawn. I can do it .
また、上記方法によれば、最小等リスク線よりもリスクの小さい領域のリスクについては考える必要がないので、リスク評価をする者の負担を軽減することができる。 Further, according to the above method, there is no need to consider risks in areas where the risk is smaller than the minimum iso-risk line, so the burden on the person conducting the risk evaluation can be reduced.
また、望ましくは、前記仮想グラフは、X軸とY軸をそれぞれ対数表示した両対数グラフであり、
前記等リスク線は、a,bを係数として、次式
Log
10
y=alog10x+b
で表される直線であるようにする。
かかる方法によれば、リスクマップを対数グラフで表わすことができるため、例えば鉄道事業のように、被害規模が小さいものから非常に大きなものまで広範囲にわたるような対象に適用した場合に、リスクマップ上で各リスクシナリオを示すドット間が間延びせず、リスク全体の状況を把握し易くすることができる。なお、対数グラフでなく、通常のグラフで表示する場合には、等リスク線は曲線となる。
Further, preferably, the virtual graph is a logarithmic graph in which the X axis and the Y axis are each expressed logarithmically,
The above equal risk line is calculated by the following formula, using a and b as coefficients:
Log 10 y = alog 10 x + b
Let it be a straight line represented by .
According to this method, the risk map can be expressed as a logarithmic graph, so when applied to a wide range of targets, such as railway projects, where the scale of damage ranges from small to extremely large, the risk map can be expressed as a logarithmic graph. The dots indicating each risk scenario do not get too long, making it easier to understand the overall risk situation. Note that when displayed in a normal graph instead of a logarithmic graph, the equal risk line becomes a curved line.
さらに、望ましくは、前記第5ステップの後、前記第4ステップで付与されたリスクレベルを、前記複数のリスクシナリオごとに発生頻度と被害規模を集計したリストのリスクレベル欄に記入した表を作成して出力するステップを含むようにする。
上記方法によれば、リスクシナリオごとに発生頻度と被害規模を集計したリストにリスクレベルが記入された表が出力されるため、着目するリスクシナリオのリスクレベルを直ちに把握することができる。
Furthermore, preferably, after the fifth step, a table is created in which the risk level assigned in the fourth step is entered in the risk level column of a list that aggregates the frequency of occurrence and scale of damage for each of the plurality of risk scenarios. Include a step that outputs the output.
According to the above method, a table is output in which the risk level is entered in a list that aggregates the frequency of occurrence and scale of damage for each risk scenario, so the risk level of the risk scenario of interest can be immediately grasped.
また、望ましくは、前記第5ステップの後、前記第3ステップで実行された等分割の境界を表わす等リスク線を描画したグラフを作成して出力するステップを含むようにする。
かかる方法によれば、リスクマップ上で等リスク線で挟まれている同一レベルのリスクシナリオが多いか少ないかや、評価対象の事業などに存在するリスクの傾向を直感的に把握することができる。
Preferably, the method further includes, after the fifth step, a step of creating and outputting a graph in which equal risk lines representing the boundaries of the equal division performed in the third step are drawn.
According to this method, it is possible to intuitively understand whether there are many or few risk scenarios of the same level between the equal risk lines on the risk map, and the trends in risks that exist in the business to be evaluated. .
また、本出願に係る他の発明であるリスク管理方法は、
上記のような手順により決定された優先順位に従ってリスク対策を実施した後、新たに発生した事故のデータを収集して予め設定された複数のリスクシナリオごとに発生頻度と被害規模を集計したリスク分析データを作成し、作成されたリスク分析データに基づいて再度前記リスク評価方法を実行することを繰り返すようにしたものである。
上記方法によれば、リスク評価と優先順位に従ったリスク対策の実施を繰り返すプロセスの循環によって、リスクを可能な限り低減させ続けることができる。
In addition, the risk management method, which is another invention related to this application, is
After implementing risk countermeasures according to the priority order determined by the above procedure, we collect data on newly occurring accidents and perform risk analysis that aggregates the frequency of occurrence and scale of damage for each of multiple preset risk scenarios. This method repeatedly creates data and executes the risk evaluation method again based on the created risk analysis data.
According to the above method, risks can be continued to be reduced as much as possible by repeating the process of repeating risk assessment and implementation of risk countermeasures according to priorities.
本発明のリスク評価方法によれば、リスク基準に関わらずリスクシナリオをリスクの大きさに応じて段階的なレベルに区分し、各リスクシナリオのリスクレベルを直感的に認識することができるリスクマップを作成可能であり、それによりリスクマネジメントにおいてリスクが低減する様子を把握することができるという効果がある。 According to the risk assessment method of the present invention, risk maps are divided into graded levels according to the size of risk, regardless of risk standards, and the risk map allows the risk level of each risk scenario to be intuitively recognized. This has the effect of making it possible to understand how risks are being reduced in risk management.
以下、図面を参照しつつ、本発明に係るリスク評価方法の一実施形態を、鉄道事業において発生するリスクの評価に適用した場合を例にとって説明する。なお、鉄道事業においては、車両、運転・操縦、駅・構内作業、指令業務、線路、信号・通信など異なる要素で発生するリスクがあり、これらの要素で発生するすべてのリスクをまとめて扱うことも可能であるが、そのようにするとリスクシナリオの数が膨大になり、グラフや表が煩雑になって把握が困難になるので、要素ごとにリスク分析とリスク評価を行うことが望ましい。また、例えば、首都圏と地方といったように自然環境や社会環境といった地域性が異なると、対象となるリスクの性質も異なるので、路線ごとあるいは事業エリアごとにリスク分析とリスク評価を行うことが望ましい。以下の説明では、1つの事業エリアにおいて、要素の一つである「車両」で発生するリスクの評価に、本発明を適用した場合を例にとって説明する。 DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a risk evaluation method according to the present invention will be described below with reference to the drawings, taking as an example a case in which it is applied to evaluation of risks occurring in a railway business. In the railway business, there are risks arising from different elements such as rolling stock, operation/operation, station/yard work, command operations, tracks, signals/communications, etc., and all risks arising from these elements must be treated together. Although it is possible to do so, the number of risk scenarios will be enormous and the graphs and tables will become complicated and difficult to understand, so it is desirable to perform risk analysis and risk evaluation for each element. In addition, the nature of the risks to be targeted will also differ depending on the regional nature of the natural and social environment, such as the metropolitan area and rural areas, so it is desirable to conduct risk analysis and evaluation for each route or business area. . In the following explanation, an example will be explained in which the present invention is applied to the evaluation of risks occurring in "vehicles", which are one of the elements, in one business area.
図1は、本実施形態のリスク評価方法を適用したリスク評価装置の一構成例を示すブロック図である。
図1に示すように、本実施形態におけるリスク評価装置10は、通常のコンピュータシステムと同様な構成を有しており、マイクロプロセッサ(CPU)のような演算処理装置11、RAMやROM、キーボードやマウスなどの入力装置12、ハードディスクドライバなどの記憶装置13、液晶パネルのような表示装置14、印字装置(プリンタ)15、これらの機能ブロック間を接続するバス16などを備えたデータ処理装置により構成されている。通信装置を備え、通信ネットワークを介して受信したリスク分析データを評価するようにしても良い。
FIG. 1 is a block diagram showing an example of the configuration of a risk evaluation device to which the risk evaluation method of this embodiment is applied.
As shown in FIG. 1, the
記憶装置13には、本発明に係るリスク評価方法を実行するプログラムの他、評価対象としての分析結果データが格納されている。なお、分析結果データは、予め対象となる要素(例えば車両)ごとに、例えば「乗客が列車走行中に車内で転倒する」など一般化したリスクシナリオを作成し、適用対象の事業エリアにおいて発生した事故のデータを要素に分類し、対象要素のリスクシナリオごとに発生頻度と被害規模(例えば死傷者数)を集計したものである。
The
図2(A)には、評価対象としての分析結果データの一例を表形式で表したものが示されている。図2(A)において、一番左側の項目はシナリオ番号、次の項目は例えば「乗客が列車走行中に車内で転倒する」といった一般化リスクシナリオの内容、次の項目は発生頻度(年平均件数、)次の項目は被害規模(1件当たりの平均死傷者数)、次の項目はリスク値、次の項目は評価結果であるリスクレベル、次の項目はリスク対策を実施すべき優先順位である。なお、図2(A)の表は、評価前のデータであるため、リスクレベルと優先順位の欄は空白となっている。 FIG. 2A shows an example of analysis result data to be evaluated in a tabular format. In Figure 2 (A), the leftmost item is the scenario number, the next item is the content of the generalized risk scenario such as "a passenger falls inside the train while it is running," and the next item is the frequency of occurrence (yearly average The next item is the scale of damage (average number of casualties per incident), the next item is the risk value, the next item is the risk level which is the evaluation result, and the next item is the priority for implementing risk countermeasures. It is. Note that the table in FIG. 2(A) contains data before evaluation, so the columns for risk level and priority are blank.
次に、上記リスク評価装置10(図1)を利用した本実施形態のリスク評価方法の処理手順の一例について、図3のフローチャートを用いて説明する。図3のフローチャートに従った処理は、横軸(X軸)に被害規模、縦軸(Y軸)に発生頻度をとって各一般化リスクシナリオのリスクの分布を表わす対数グラフを作成し、作成した対数グラフを利用してリスク対策の優先順位を決定することを主な内容とするもので、リスク評価装置10を構成する演算処理装置11が、記憶装置13内に記憶されているリスク評価プログラムを実行することで実施される。なお、以下に説明する処理手順は一例であって、これに限定されるものでない。 Next, an example of the processing procedure of the risk evaluation method of this embodiment using the risk evaluation device 10 (FIG. 1) will be described using the flowchart of FIG. 3. The process according to the flowchart in Figure 3 involves creating a logarithmic graph that represents the risk distribution of each generalized risk scenario, with the scale of damage on the horizontal axis (X-axis) and the frequency of occurrence on the vertical axis (Y-axis). The main content of this program is to determine the priority of risk countermeasures using a logarithmic graph obtained by using a logarithmic graph. It is implemented by executing. Note that the processing procedure described below is an example and is not limited thereto.
図3のリスク評価処理においては、先ず記憶装置13内に記憶されている事故データの分析結果データの中から評価対象の要素の分析結果データを読み込む(ステップS1)。続いて、横軸に被害規模、縦軸に発生頻度をとった対数グラフ上に、図4に示すように、各一般化リスクシナリオをプロットする(ステップS2)。なお、上記グラフは、実際に表示装置14の画面上に表示される必要はなく、演算処理装置11内部で仮想的に生成される。
In the risk evaluation process shown in FIG. 3, first, analysis result data of an element to be evaluated is read from analysis result data of accident data stored in the storage device 13 (step S1). Next, as shown in FIG. 4, each generalized risk scenario is plotted on a logarithmic graph with the scale of damage on the horizontal axis and the frequency of occurrence on the vertical axis (step S2). Note that the above graph does not need to be actually displayed on the screen of the
次に、対数グラフ上にプロットされた複数のリスクシナリオの中から、リスク値の最も大きなリスクシナリオとリスク値の最も小さなリスクシナリオに着目する。ここで、リスク値は被害規模と発生頻度の積で表される値であり、この値が大きいほど、リスクが高いシナリオであることを意味する。 Next, attention is paid to the risk scenario with the largest risk value and the risk scenario with the smallest risk value from among the multiple risk scenarios plotted on the logarithmic graph. Here, the risk value is a value expressed as the product of damage scale and occurrence frequency, and the larger this value, the higher the risk of the scenario.
次に、リスクシナリオのデータ(被害規模の値と発生頻度の値)から、式Log 10 y=alog10x+bのxとyにそれぞれ被害規模の値と発生頻度の値を代入するとともに、リスク値が等しいことを表わすxi×yi=xk×ykなる条件式から、上記式内の係数aと係数bの値を算出する(ステップS3,S4)。ここで、係数aは上記対数グラフ上における等リスク線の傾きを表わし、係数bは上記対数グラフ上における等リスク線の縦軸(発生頻度の値)の切片の大きさを表わしている。また、xiおよびyiはリスクシナリオが示す座標から、ykは任意に選んだxkとリスク値xi×yiから定まる。 Next, from the risk scenario data (damage scale value and occurrence frequency value), substitute the damage scale value and occurrence frequency value for x and y in the formula Log 10 y = alog 10 x + b, respectively, and calculate the risk value. The values of coefficient a and coefficient b in the above formula are calculated from the conditional formula xi×yi=xk×yk, which indicates that the values are equal (steps S3 and S4). Here, the coefficient a represents the slope of the equal risk line on the logarithmic graph, and the coefficient b represents the size of the intercept of the vertical axis (value of occurrence frequency) of the equal risk line on the logarithmic graph. Furthermore, xi and yi are determined from the coordinates indicated by the risk scenario, and yk is determined from arbitrarily selected xk and risk value xi×yi.
次に、上記対数グラフ上における全てのリスクシナリオの中から最もリスク値の大きなシナリオと最もリスク値の小さなシナリオを見つけ、図5に示すように、最もリスク値の大きな等リスク線を最大等リスク線Rmaxとして描画し、最もリスク値の小さな等リスク線を最小等リスク線Rminとして描画する(ステップS5)。具体的には、例えば全てのリスクシナリオをそれぞれ通る等リスク線の切片の値bを算出し、全ての切片bのうち最もbの値が大きい等リスク線を最大等リスク線Rmaxとし、最もbの値が小さい等リスク線を最小等リスク線Rminとする。 Next, find the scenario with the largest risk value and the scenario with the smallest risk value among all the risk scenarios on the logarithmic graph above, and as shown in Figure 5, the iso-risk line with the largest risk value is The line Rmax is drawn, and the equal risk line with the smallest risk value is drawn as the minimum equal risk line Rmin (step S5). Specifically, for example, calculate the value b of the intercept of the iso-risk line that passes through all the risk scenarios, set the iso-risk line with the largest value of b among all the intercepts b as the maximum iso-risk line Rmax, and The iso-risk line for which the value of is small is defined as the minimum iso-risk line Rmin.
そして、最大等リスク線Rmaxと最小等リスク線Rminとによって挟まれた領域をN等分し、図6に示すように、最大等リスク線Rmaxと最小等リスク線Rminとの間に等リスク線を描画する(ステップS6)。ここで、Nは2以上の整数であり、例えば10~20の間の任意の数を選択する。図6には、一例として10等分した場合のグラフが示されている。その後、最大等リスク線Rmaxとその一つ下の等リスク線Rmax-1とで挟まれた領域に存在するリスクシナリオを見つけ、それらのリスクシナリオに、最大リスクレベルRmaxを付与する(ステップS7)。 Then, the area sandwiched between the maximum equal risk line Rmax and the minimum equal risk line Rmin is divided into N equal parts, and as shown in FIG. 6, an equal risk line is drawn between the maximum equal risk line Rmax and the minimum equal risk line Rmin. is drawn (step S6). Here, N is an integer of 2 or more, and is selected as an arbitrary number between 10 and 20, for example. FIG. 6 shows, as an example, a graph when the image is divided into 10 equal parts. After that, risk scenarios that exist in the area between the maximum equal risk line Rmax and the equal risk line one below it Rmax-1 are found, and the maximum risk level Rmax is assigned to these risk scenarios (step S7). .
次に、等リスク線Rmax-1とその1つ下の等リスク線Rmax-2とで挟まれた領域に存在するリスクシナリオを見つけ、それらのリスクシナリオに、2番目のリスクレベルRmax-1を付与する(ステップS8)。そして、最小リスクレベルRminになったか否か判定し(ステップS9)、最小リスクレベルRminでないときはステップS8へ戻り最小リスクレベルRminになるまで上記処理を繰り返す。 Next, find the risk scenarios that exist in the area between the equal-risk line Rmax-1 and the equal-risk line Rmax-2 that is one level below it, and set the second risk level Rmax-1 to those risk scenarios. (Step S8). Then, it is determined whether or not the minimum risk level Rmin has been reached (step S9), and if it is not the minimum risk level Rmin, the process returns to step S8 and the above process is repeated until the minimum risk level Rmin is reached.
上記ステップS9で、最小リスクレベルRminに達した(Yes)と判定すると、ステップS10へ進み、同一リスクレベル内のリスクシナリオに対して、リスク対策の優先順位を決定する。具体的には、リスクレベルが異なる場合には、リスクレベルの大きいものからリスク対策を実施するように優先順位を決定する。また、同一リスクレベル内での優先順位も決定する。なお、同一リスクレベル内での優先順位の決定の仕方は任意であり、評価対象の要素の特性(一般化する場合には、評価対象の事業、施設、システム、製品の特性)に応じて、例えば被害規模の大きい順、あるいはリスク対策に要するコストの小さい順、発生頻度の大きい順、リスク値の大きい順に優先度を付与しても良い。 If it is determined in step S9 that the minimum risk level Rmin has been reached (Yes), the process proceeds to step S10, and the priority order of risk countermeasures is determined for risk scenarios within the same risk level. Specifically, when the risk levels are different, priority is determined so that risk countermeasures are implemented starting from the one with the highest risk level. It also determines priorities within the same risk level. The method of determining priorities within the same risk level is arbitrary, and depends on the characteristics of the elements to be evaluated (in general, the characteristics of the business, facility, system, or product to be evaluated). For example, priority may be given in order of increasing scale of damage, decreasing cost required for risk countermeasures, increasing frequency of occurrence, or increasing risk value.
その後、ステップS11へ進み、表またはグラフの出力要求があったか否か判定し、表の出力要求があった場合には、ステップS12へ進んで、図2(B)に示すように、各リスクシナリオの「リスクレベル」と「優先順位」の欄にそれぞれ上記ステップで決定したリスクレベルの値と優先順位の値を記入した表を作成して、表示装置14に表示する。一方、グラフの出力要求があった場合には、ステップS13へ進んで、図6に示す対数グラフを表示する。
After that, the process proceeds to step S11, and it is determined whether or not there is a request to output a table or a graph. If there is a request to output a table, the process proceeds to step S12, and as shown in FIG. 2(B), each risk scenario is A table is created in which the risk level values and priority values determined in the above steps are entered in the "risk level" and "priority" columns, respectively, and is displayed on the
以上説明したように、上記実施形態のリスク評価方法によれば、リスク基準に関わらず、リスクシナリオをリスクの大きさに応じて段階的なレベルに区分し、得られたリスクレベルを表やグラフによって可視化することができる。
また、各リスクシナリオのリスクの大きさを直感的に認識することができるリスクマップを作成可能であり、リスクマップを対数グラフで表示することによって、鉄道事業のように、被害規模が小さいものから非常に大きなものまで広範囲にわたるような分野に適用した場合に、リスクマップ上で各リスクシナリオを示すドットの間隔が間延びせず、リスク全体の状況を把握し易くすることができる。
As explained above, according to the risk evaluation method of the above embodiment, risk scenarios are divided into graded levels according to the magnitude of risk, regardless of risk standards, and the obtained risk levels are displayed in tables and graphs. It can be visualized by
In addition, it is possible to create a risk map that allows you to intuitively recognize the magnitude of the risk of each risk scenario, and by displaying the risk map in a logarithmic graph, it is possible to create a risk map that allows you to intuitively recognize the magnitude of the risk of each risk scenario. When applied to a wide range of fields, including very large ones, the intervals between dots indicating each risk scenario on the risk map do not become too long, making it easier to understand the overall risk situation.
さらに、例えばリスクマップを対数グラフで表示し、最小リスク値のリスクシナリオを通る等リスク線を最小等リスク線Rminとして引く代わりに、原点を通り、他の等リスク線と平行な直線を最小等リスク線とみなして、最大等リスク線Rmaxとみなし最小等リスク線との間の領域を等分割することも考えられる。しかし、この場合には、図6の最小等リスク線Rminよりも原点側の領域(原点と最小等リスク線Rminで囲まれる領域)を含めてリスクレベルを決定することとなってしまう。この時、最小等リスク線Rminよりも原点側の領域には、リスクシナリオはプロットされないので、この領域を含めてリスクレベルを決定してしまうと、不必要な領域を含めてリスクを評価することとなり、リスク評価の精度が低下することが考えられる。 Furthermore, for example, instead of displaying the risk map as a logarithmic graph and drawing the iso-risk line that passes through the risk scenario with the minimum risk value as the minimum iso-risk line Rmin, a straight line that passes through the origin and is parallel to other iso-risk lines is drawn as the minimum iso-risk line. It is also conceivable to regard this as a risk line and equally divide the area between the maximum equal risk line Rmax and the deemed minimum equal risk line. However, in this case, the risk level will be determined by including the region closer to the origin than the minimum equal risk line Rmin in FIG. 6 (the region surrounded by the origin and the minimum equal risk line Rmin). At this time, the risk scenario is not plotted in the area closer to the origin than the minimum iso-risk line Rmin, so if the risk level is determined by including this area, the risk will be evaluated by including unnecessary areas. Therefore, the accuracy of risk assessment may decrease.
これに対し、上記実施形態では、最もリスク値の大きな等リスク線を最大等リスク線Rmax、また最もリスク値の小さな等リスク線を最小等リスク線Rminとして、それらの間を等分割してリスクレベルを設定しているため、リスクがプロットされていない領域はリスク評価の対象領域とされず、リスク評価の精度を向上させることができる。 On the other hand, in the above embodiment, the iso-risk line with the largest risk value is defined as the maximum iso-risk line Rmax, and the iso-risk line with the smallest risk value is defined as the minimum iso-risk line Rmin, and the iso-risk line with the smallest risk value is defined as the minimum iso-risk line Rmin. Since the level is set, areas where risks are not plotted are not considered as target areas for risk evaluation, and the accuracy of risk evaluation can be improved.
次に、図3のフローチャートのリスク評価方法の処理手順に従って優先順位を決定した後の処理について、図7のフローチャートを用いて説明する。
図3のフローチャートのリスク評価方法に従って優先順位を決定した後は、決定した優先順位に従って、予め設定されているリスク対策を実施する(図7のステップS21)。ここで、「リスク対策」とは、リスクを修正するために、1つ以上の選択肢を選び出すこと及びそれらの選択肢を実践することである。
Next, the process after determining the priority order according to the process procedure of the risk evaluation method shown in the flowchart of FIG. 3 will be described using the flowchart of FIG. 7.
After determining the priorities according to the risk evaluation method shown in the flowchart of FIG. 3, preset risk countermeasures are implemented according to the determined priorities (step S21 in FIG. 7). Here, "risk countermeasures" refers to selecting one or more options and implementing those options in order to modify risks.
また、「選択肢」としては、例えばリスクを生じさせる活動を開始又は継続しないと決定することによってリスクを回避すること、ある機会を追求するためにリスクを取る又は増加させること、リスク源を除去すること、リスクシナリオの起こりやすさを変えること、結果(被害規模)を変えること、一つ以上の他者とリスクを共有すること、情報に基づいた意思決定によってリスクを保有すること、などがある。 Options include, for example, avoiding a risk by deciding not to start or continue the activity that gives rise to the risk, taking or increasing the risk in order to pursue an opportunity, and eliminating the source of the risk. changing the likelihood of a risk scenario, changing the outcome (scale of damage), sharing the risk with one or more others, and retaining the risk through informed decision-making. .
前述した優先順位に従ってリスクレベルの高いものからリスク対策を実施した場合、図8(A),(B)に示すように、原点から遠いリスクシナリオから先にリスクが低下して最大等リスク線が原点へ近づく方向へ移動するとともに、リスク領域の幅が狭くなる。ただし、例えば鉄道事業では列車を運行する限りリスクはゼロになることはなく、リスク対策を実施することで他のリスクが発生したり、事故の風化によって再びリスクが増加したりすることもある。 If risk countermeasures are implemented from those with the highest risk level according to the priority order described above, as shown in Figures 8 (A) and (B), the risk will decrease first from the risk scenario farthest from the origin, and the maximum iso-risk line will be reached. As it moves closer to the origin, the width of the risk area becomes narrower. However, in the railway business, for example, as long as trains are operated, risks will never be reduced to zero; implementing risk countermeasures may generate other risks, or risks may increase again as accidents fade.
そこで、リスク対策を実施した後は、リスク対策を実施した評価対象について、所定期間、監視(モニタリング)ないしは観察(レビュー)を実施してデータを収集する(ステップS22)。その後、得られたデータからリスクを特定し(ステップS23)、リスクを分析して例えば図2(A)に示すような分析結果を示す表を作成する(ステップS24)。そして、分析結果に基づいて再度上述したようなリスク評価(図3)を実施するというように、上述したリスクマネジメントプロセスを循環させる。 Therefore, after implementing risk countermeasures, monitoring or observation (review) is performed for a predetermined period of time to collect data on the evaluation target for which risk countermeasures have been implemented (step S22). Thereafter, risks are identified from the obtained data (step S23), the risks are analyzed, and a table showing the analysis results as shown in FIG. 2(A), for example, is created (step S24). Then, the risk management process described above is repeated, such as performing the above-described risk assessment (FIG. 3) again based on the analysis results.
上記のようなプロセスの循環によって、リスクを可能な限り低減させ続けることができる。
そして、リスク評価を実施する際に、図6に示すようなリスクマップ(対数グラフ)を表示することにより、リスクマネジメントにおいてリスクが低減する様子を把握することができる。
By cycling the process as described above, it is possible to continue to reduce risks as much as possible.
By displaying a risk map (logarithmic graph) as shown in FIG. 6 when performing risk evaluation, it is possible to understand how risks are reduced in risk management.
以上、本発明を実施例に基づいて説明したが、本発明は上記実施例に限定されるものではない。例えば前記実施例では、対数グラフを用いて各リスクシナリオのリスクレベルの可視化をしているが、X軸またはY軸の一方を対数表示とした片対数グラフあるいは対数を使用しない通常のグラフを用いてリスクレベルの可視化をしても良い。また、前記実施例では、横軸を被害規模とし縦軸を発生頻度とするグラフとしているが横軸と縦軸が逆でもよく、グラフにおいて、リスク値の最も小さなリスクシナリオを通る等リスク線を最小等リスク線としているが、原点を通り、他の等リスク線と平行な線を最小等リスク線とみなしてリスクレベルの区分を行うようにしても良い。 Although the present invention has been described above based on Examples, the present invention is not limited to the above Examples. For example, in the above embodiment, a logarithmic graph is used to visualize the risk level of each risk scenario, but a semi-logarithmic graph with one of the X-axis or Y-axis displayed as a logarithm, or a normal graph that does not use a logarithm may be used. The risk level can be visualized by In addition, in the above embodiment, the graph is shown in which the horizontal axis is the scale of damage and the vertical axis is the frequency of occurrence, but the horizontal and vertical axes may be reversed.In the graph, the equal risk line passing through the risk scenario with the smallest risk value is Although the minimum equal risk line is used, a line that passes through the origin and is parallel to other equal risk lines may be regarded as the minimum equal risk line to classify risk levels.
さらに、前記実施形態では、被害規模を「死傷者数/件」としているが、「被害金額/件」など他のパラメータをとってリスク評価を行うようにしても良い。
また、前記実施形態では、本発明を鉄道事業におけるリスク要因を評価する場合に適用したものについて説明したが、本発明は、鉄道以外の例えばバス(水上バスを含む)やフェリー、飛行機などを運行する交通事業におけるリスク要因を評価する場合にも適用することができる。
さらに、本発明は、交通事業以外の事業や施設、システム、製品や薬品の製造業におけるリスク評価にも広く利用することができる。
Further, in the embodiment, the scale of damage is expressed as "number of casualties/case", but risk evaluation may be performed using other parameters such as "damage amount/case".
Further, in the above embodiment, the present invention was applied to the case of evaluating risk factors in railway business, but the present invention is applicable to operations other than railways, such as buses (including water buses), ferries, and airplanes. It can also be applied when evaluating risk factors in transportation projects.
Furthermore, the present invention can be widely used for risk evaluation in businesses other than transportation businesses, facilities, systems, products, and drug manufacturing industries.
10 リスク評価装置
11 演算処理装置
12 入力装置
13 記憶装置
14 表示装置
15 印字装置
16 バス
10
Claims (5)
前記リスク分析データに含まれる前記複数のリスクシナリオのそれぞれのリスクを、被害規模と発生頻度をそれぞれX軸とY軸とする仮想グラフ上にプロットする第1ステップと、
前記複数のリスクシナリオのうち最もリスク値の高いリスクシナリオを通る等リスク線を最大等リスク線として前記仮想グラフに描画する第2ステップと、
前記複数のリスクシナリオのうち最もリスク値の小さいリスクシナリオを通る等リスク線を最小等リスク線として前記仮想グラフに描画し、前記最大等リスク線と前記最小等リスク線との間を任意の数で等分割する第3ステップと、
等分割された複数の領域のそれぞれに属するリスクシナリオに対して、前記複数の領域のリスク値の大小関係に基づいてリスクレベルを付与する第4ステップと、
前記第4ステップで付与されたリスクレベルに応じて、リスク対策を実施する優先順位を決定する第5ステップと、
を含むことを特徴とするリスク評価方法。 This is a risk assessment method in which the risk level of each risk scenario is determined by a computer , based on risk analysis data that aggregates the frequency of occurrence and damage scale for multiple risk scenarios set in advance for accidents that have occurred in the past in the subject of evaluation. hand,
a first step of plotting each risk of the plurality of risk scenarios included in the risk analysis data on a virtual graph with damage scale and occurrence frequency as the X-axis and Y-axis, respectively;
a second step of drawing an equal risk line passing through a risk scenario with the highest risk value among the plurality of risk scenarios as a maximum equal risk line on the virtual graph;
An iso-risk line that passes through the risk scenario with the smallest risk value among the plurality of risk scenarios is drawn on the virtual graph as a minimum iso-risk line, and an arbitrary number of lines are drawn between the maximum iso-risk line and the minimum iso-risk line. The third step is to equally divide the
a fourth step of assigning a risk level to the risk scenarios belonging to each of the plurality of equally divided areas based on the magnitude relationship of the risk values of the plurality of areas;
a fifth step of determining a priority for implementing risk countermeasures according to the risk level assigned in the fourth step;
A risk assessment method characterized by comprising:
前記等リスク線は、a,bを係数として、次式
Log 10 y=alog10x+b
で表される直線であることを特徴とする請求項1に記載のリスク評価方法。 The virtual graph is a logarithmic graph in which the X axis and the Y axis are each displayed logarithmically,
The above equal risk line is calculated by the following formula, using a and b as coefficients:
Log 10 y = alog 10 x + b
2. The risk evaluation method according to claim 1 , wherein the risk evaluation method is a straight line represented by .
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2020026880A JP7454401B2 (en) | 2020-02-20 | 2020-02-20 | Risk assessment methods and risk management methods |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2020026880A JP7454401B2 (en) | 2020-02-20 | 2020-02-20 | Risk assessment methods and risk management methods |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2021131744A JP2021131744A (en) | 2021-09-09 |
| JP7454401B2 true JP7454401B2 (en) | 2024-03-22 |
Family
ID=77551051
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2020026880A Active JP7454401B2 (en) | 2020-02-20 | 2020-02-20 | Risk assessment methods and risk management methods |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7454401B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR102460647B1 (en) * | 2021-11-12 | 2022-10-28 | 네모시스 주식회사 | Apparatus for managing breakdown of system and method thereof |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009015483A (en) | 2007-07-03 | 2009-01-22 | Kajima Corp | Seismic performance evaluation program for structures |
| JP2012174125A (en) | 2011-02-23 | 2012-09-10 | Yamaguchi Univ | Disaster prevention plan support system and program of the same |
| JP2019012316A (en) | 2017-06-29 | 2019-01-24 | 株式会社日立プラントサービス | Equipment system risk analysis method and apparatus |
| JP2019207521A (en) | 2018-05-29 | 2019-12-05 | 株式会社日立製作所 | Clinical trial support system, clinical trial support program and clinical trial support method |
-
2020
- 2020-02-20 JP JP2020026880A patent/JP7454401B2/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009015483A (en) | 2007-07-03 | 2009-01-22 | Kajima Corp | Seismic performance evaluation program for structures |
| JP2012174125A (en) | 2011-02-23 | 2012-09-10 | Yamaguchi Univ | Disaster prevention plan support system and program of the same |
| JP2019012316A (en) | 2017-06-29 | 2019-01-24 | 株式会社日立プラントサービス | Equipment system risk analysis method and apparatus |
| JP2019207521A (en) | 2018-05-29 | 2019-12-05 | 株式会社日立製作所 | Clinical trial support system, clinical trial support program and clinical trial support method |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2021131744A (en) | 2021-09-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| McCarthy et al. | What do descriptive statistics tell us | |
| Abdulhafedh | How to detect and remove temporal autocorrelation in vehicular crash data | |
| CA3050951A1 (en) | Factory risk estimation using historical inspection data | |
| CN110738527A (en) | feature importance ranking method, device, equipment and storage medium | |
| CN106777867A (en) | A kind of mine fire risk factors Weight Determination | |
| CN105306438B (en) | Network security situation evaluating method based on fuzzy coarse central | |
| Guinot et al. | Cost consequence of failure in failure mode and effect analysis | |
| Alevizakos et al. | A comparative study on Poisson control charts | |
| JP7454401B2 (en) | Risk assessment methods and risk management methods | |
| Malakoutikhah et al. | The prevalence of unsafe behaviors in Iranian workers: a systematic review and meta-analysis | |
| Uwawunkonye et al. | A comparative study between ridit and modified ridit analysis | |
| Zhou et al. | The risk management using limit theory of statistics on extremes on the big data era | |
| US20210125125A1 (en) | System and method for supporting production management | |
| CN112257995A (en) | An Internet-based product quality risk monitoring sampling method and system | |
| CN114312930A (en) | Train operation abnormity diagnosis method and device based on log data | |
| Miller | Discrete time hazard modeling of large motor carriers' longitudinal safety performance | |
| Deliman et al. | Optimization of process improvement and inspection location for serial manufacturing | |
| CN113673595A (en) | A data processing method, device and equipment | |
| CN114021969B (en) | Agricultural enterprise safety production risk index analysis system | |
| Butsick et al. | Using network screening methods to determine locations with specific safety issues: a design consistency case study | |
| KR102380021B1 (en) | Patent performance indicator output apparatus and method based on statistical inference model | |
| CN114511201A (en) | Method for evaluating enterprise comprehensive capacity | |
| Antić et al. | Novel hybrid model for addressing uncertainty of the road safety composite indicator: integration of DEA and weighted GRA | |
| US20200265521A1 (en) | Multimedia risk summarizer | |
| CN112381431A (en) | Airport runway intrusion risk assessment method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20221130 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20231107 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20231108 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20231219 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20240305 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20240311 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7454401 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |