JP7465775B2 - Inter-building bridge construction method - Google Patents
[go: Go Back, main page]

JP7465775B2 - Inter-building bridge construction method - Google Patents

Inter-building bridge construction method Download PDF

Info

Publication number
JP7465775B2
JP7465775B2 JP2020161153A JP2020161153A JP7465775B2 JP 7465775 B2 JP7465775 B2 JP 7465775B2 JP 2020161153 A JP2020161153 A JP 2020161153A JP 2020161153 A JP2020161153 A JP 2020161153A JP 7465775 B2 JP7465775 B2 JP 7465775B2
Authority
JP
Japan
Prior art keywords
building
bridge
blocks
gallery
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020161153A
Other languages
Japanese (ja)
Other versions
JP2022054133A (en
Inventor
逸人 土井
和幸 棟口
幸隆 町田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP2020161153A priority Critical patent/JP7465775B2/en
Publication of JP2022054133A publication Critical patent/JP2022054133A/en
Application granted granted Critical
Publication of JP7465775B2 publication Critical patent/JP7465775B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Bridges Or Land Bridges (AREA)

Description

本発明は、棟と棟の間にブリッジを架設する工法に関する。 This invention relates to a construction method for erecting a bridge between ridges.

例えば、火力発電プラントにおいて、バンカに蓄えられた石炭は、ベルトコンベアによりミルに搬送される。搬送された石炭はミルにより微粉炭に粉砕され、ボイラによって燃焼される。電力需要の増加等の理由により、既存のプラント内にボイラ建屋を増設する場合がある。この際、既設のボイラ建屋から石炭を新設するボイラ建屋に搬送するために、ボイラ建屋間にブリッジ(燃料搬送ギャラリー)を架設する場合がある。 For example, in a thermal power plant, coal stored in a bunker is transported to a mill by a conveyer belt. The transported coal is pulverized into pulverized coal by the mill and burned in a boiler. Due to an increase in electricity demand or other reasons, a boiler building may be added to an existing plant. In such cases, a bridge (fuel transport gallery) may be erected between the boiler buildings to transport coal from the existing boiler building to the new boiler building.

ボイラ建屋などの棟間にブリッジを架設する工法として、例えば特許文献1には、「第1の棟にブリッジを配置し、第1の棟に隣接する第2の棟側にブリッジを片持ち支持しつつ送り出し、ブリッジを第1の棟および第2の棟に架設する工法であって、ブリッジを、送り出し方向で複数のブロックに分割し、送り出し方向の先端となるブロックを吊り上げて第1の棟に予め配置した前手延べ機に接続し、先端のブロックを前手延べ機とともに送り出し方向に移動させつつ、残りのブロックを先端側から順に吊り上げてブロック同士を繋ぎ合わせることにより、前手延べ機を第1の棟と第2の棟の間となる位置に浮かせた状態でブリッジを組み上げる工法」が記載されている(要約参照)。 For example, Patent Document 1 describes a method for erecting a bridge between buildings such as boiler buildings, which "is a method of erecting a bridge between the first and second buildings by placing a bridge in a first building and sending it out while supporting it at one end on the side of a second building adjacent to the first building, dividing the bridge into multiple blocks in the sending direction, lifting the block at the tip in the sending direction and connecting it to a front stretching machine that has been placed in advance in the first building, and moving the tip block together with the front stretching machine in the sending direction while lifting the remaining blocks in order from the tip side and connecting the blocks together, thereby assembling the bridge with the front stretching machine floating in a position between the first and second buildings" (see abstract).

特開2014-047525号公報JP 2014-047525 A

特許文献1に記載の工法では、前手延べ機を準備する必要があるうえ、ブリッジを片持ち支持するため、ブリッジのたわみ量の管理が必要となる。そのため、特許文献1に記載の工法では、ブリッジの架設工事が大掛かりで複雑になるといった課題がある。また、ブリッジの重量次第では、大型のクレーンを別途準備する必要があるが、既設のプラントのスペースの関係上、大型のクレーンの設置が困難な場合もある。そのため、ブリッジの架設工事を容易に行える工法が求められている。 The construction method described in Patent Document 1 requires the preparation of a front-hand stretching machine, and because the bridge is supported by a cantilever, the amount of deflection of the bridge needs to be managed. Therefore, the construction method described in Patent Document 1 has the problem that the bridge erection work is large-scale and complicated. Also, depending on the weight of the bridge, it may be necessary to prepare a large crane separately, but due to space constraints in existing plants, it may be difficult to install a large crane. Therefore, a construction method that makes it easy to erect the bridge is required.

本発明は、このような実情に鑑みてなされたもので、その目的は、棟間にブリッジを架設する工事を容易に行えるブリッジの架設工法を提供することにある。 The present invention was made in consideration of the above-mentioned circumstances, and its purpose is to provide a bridge construction method that makes it easy to erect a bridge between buildings.

上記目的を達成するために、代表的な本発明は、第1の棟と第2の棟との間にブリッジを架設する棟間ブリッジ架設工法であって、前記第1の棟に設置された第1のジャッキ装置により前記ブリッジの一端側を吊り、前記第2の棟に設置された第2のジャッキ装置により前記ブリッジの他端側を吊り、前記第1のジャッキ装置と前記第2のジャッキ装置とを同時に用いて前記ブリッジを所定の高さまで吊り上げる第1の工程と、前記所定の高さまで吊り上げられた前記ブリッジを、前記第1の棟と前記第2の棟との間に固定する第2の工程と、を含み、前記ブリッジは複数のブロックで構成され、前記棟間ブリッジ架設工法は、前記第1の工程の前に、前記各ブロックを接続して前記ブリッジを組み立てる第3の工程をさらに含み、前記各ブロックは地上に載置され、前記第1の棟と前記第2の棟との間に、前記所定の高さより低い建物が設置され、前記棟間ブリッジ架設工法は、前記第3の工程の前に、地上に載置された前記各ブロックをクレーンにより前記建物の屋上に吊り上げ、第1の位置に仮置きする第4の工程と、前記第1の位置に仮置きされた前記各ブロックを、前記第3の工程を行うために前記建物の屋上の第2の位置に移動する第5の工程と、をさらに含むことを特徴とする。 In order to achieve the above object, a representative embodiment of the present invention is an inter-building bridge construction method for erecting a bridge between a first building and a second building, the method including: a first step of suspending one end of the bridge with a first jack device installed on the first building, suspending the other end of the bridge with a second jack device installed on the second building, and hoisting the bridge to a predetermined height using the first jack device and the second jack device simultaneously; and a second step of fixing the bridge hoisted to the predetermined height between the first building and the second building , the bridge being composed of a plurality of blocks, The inter-building bridge erection method further includes a third step of connecting the blocks to assemble the bridge before the first step, wherein the blocks are placed on the ground and a building lower than the specified height is installed between the first building and the second building, and the inter-building bridge erection method further includes a fourth step of hoisting the blocks placed on the ground onto the roof of the building by a crane and temporarily placing them in a first position before the third step, and a fifth step of moving the blocks temporarily placed at the first position to a second position on the roof of the building to perform the third step .

本発明によれば、棟間にブリッジを架設する工事を容易に行える。なお、上記した以外の課題、構成および効果は、以下の実施形態の説明により明らかにされる。 According to the present invention, construction work for erecting a bridge between buildings can be easily carried out. Problems, configurations, and effects other than those described above will become clear from the explanation of the embodiment below.

ボイラ周辺のエリア配置図。Layout of the area around the boiler. 図1に示す電気室の屋上の平面図。FIG. 2 is a plan view of the roof of the electrical room shown in FIG. 1 . 図1のA矢視図。FIG. 2 is a view taken along the arrow A in FIG. 燃料搬送ギャラリーの架設工事の作業手順を示すフローチャート。A flowchart showing the work procedures for erecting the fuel transport gallery.

以下、本発明の実施形態について、図面を参照して説明する。 The following describes an embodiment of the present invention with reference to the drawings.

図1は火力発電プラントにおけるボイラ周辺のエリア配置図である。図1において、ボイラ1、バンカ鉄骨21、および電気室3は既設の設備である。この設備において、ボイラ2およびバンカ鉄骨22を増設することに伴って、燃料搬送ギャラリー7(ブリッジ)をバンカ鉄骨21(第1の棟)とバンカ鉄骨22(第2の棟)との間に架設する工事を行う必要がある。なお、燃料搬送ギャラリー7は、内部にベルトコンベア等の搬送装置が設けられており、この搬送装置を駆動することで燃料である石炭を搬送する。また、バンカ鉄骨21,22は、石炭を蓄えるためのバンカ23,24を支持するための鉄骨構造物である(図3参照)。 Figure 1 is a layout diagram of the area around a boiler in a thermal power plant. In Figure 1, boiler 1, bunker steel frame 21, and electrical room 3 are existing facilities. In this facility, as boiler 2 and bunker steel frame 22 are added, construction work is required to erect a fuel transport gallery 7 (bridge) between bunker steel frame 21 (first building) and bunker steel frame 22 (second building). The fuel transport gallery 7 is equipped with a transport device such as a belt conveyor inside, and coal, which is fuel, is transported by driving this transport device. The bunker steel frames 21 and 22 are also steel structures for supporting bunkers 23 and 24 for storing coal (see Figure 3).

図1に示すように、ボイラ1およびバンカ鉄骨21と、ボイラ2およびバンカ鉄骨22との間には低層の建物である電気室3が設置されており、電気室3の近傍にはクレーン5が設置されている。クレーン5の近傍には、地上の空きスペースである作業場50が確保されており、この作業場50には、燃料搬送ギャラリー7を構成するギャラリーブロック7A,7B,7C(ブロック)が載置されている。 As shown in FIG. 1, an electrical room 3, which is a low-rise building, is installed between the boiler 1 and bunker steel frame 21 and the boiler 2 and bunker steel frame 22, and a crane 5 is installed near the electrical room 3. A workshop 50, which is an open space on the ground, is secured near the crane 5, and the gallery blocks 7A, 7B, and 7C (blocks) that make up the fuel transport gallery 7 are placed in this workshop 50.

電気室3の屋上には、ギャラリーブロック7A,7B,7Cを移動させる移動装置の一例であるレール10,11が設置されている。なお、移動装置はレール10,11以外のものであっても良い。 On the roof of the electrical room 3, rails 10 and 11 are installed, which are an example of a moving device for moving the gallery blocks 7A, 7B, and 7C. Note that the moving device may be something other than the rails 10 and 11.

図2は電気室3の屋上の平面図である。図2に示すように、電気室3の屋上には、横レール10と、横レール10の端部において横レール10と直交する縦レール11と、が敷設されている。なお、図示しないが、横レール10および縦レール11は、電気室3に設置された土台(レール用基礎)に設置されている。横レール10および縦レール11は、ギャラリーブロック7A,7B,7Cの移動が可能な程度のレール幅を有している。 Figure 2 is a plan view of the roof of the electrical room 3. As shown in Figure 2, a horizontal rail 10 and a vertical rail 11 that is perpendicular to the horizontal rail 10 at the end of the horizontal rail 10 are laid on the roof of the electrical room 3. Although not shown, the horizontal rail 10 and the vertical rail 11 are installed on a base (rail foundation) installed in the electrical room 3. The horizontal rail 10 and the vertical rail 11 have a rail width that allows the gallery blocks 7A, 7B, and 7C to move.

なお、図2において、横レール10の一端側は、ギャラリーブロック7A,7B,7Cを仮置きする仮置き場15(第1の位置)であり、縦レール11はギャラリーブロック7A,7B,7Cを組み立てるための組立場16(第2の位置)である。 In FIG. 2, one end of the horizontal rail 10 is a temporary storage area 15 (first position) for temporarily storing the gallery blocks 7A, 7B, and 7C, and the vertical rail 11 is an assembly area 16 (second position) for assembling the gallery blocks 7A, 7B, and 7C.

図3は図1に示す設備をA方向から見た矢視図である。図3に示すように、左右に一対のバンカ鉄骨21,22が設置されており、両者の間に電気室3が設置されている。そして、電気室3の屋上で組み立てられた燃料搬送ギャラリー7は、電気室3の屋上から所定の高さまで吊り上げられ、バンカ鉄骨21,22の頂部の取合部25,26に固定される。 Figure 3 is a view of the equipment shown in Figure 1 as seen from the direction A. As shown in Figure 3, a pair of bunker steel frames 21, 22 are installed on the left and right, and the electrical room 3 is installed between them. The fuel transport gallery 7 assembled on the roof of the electrical room 3 is then lifted up to a specified height from the roof of the electrical room 3 and fixed to the joints 25, 26 at the tops of the bunker steel frames 21, 22.

次に、燃料搬送ギャラリー7の架設工法の詳細について、図4を参照しつつ、図1~図3も適宜用いて説明する。図4は燃料搬送ギャラリー7の架設工事の作業手順を示すフローチャートである。図4に示すように、燃料搬送ギャラリー7の架設工事は、作業場50での作業と、電気室3の屋上での作業と、バンカ鉄骨21,22の頂部での作業とに分かれて行われる。 Next, the details of the construction method for the fuel transport gallery 7 will be explained with reference to Figure 4, and also with reference to Figures 1 to 3 as appropriate. Figure 4 is a flowchart showing the work procedure for the construction work of the fuel transport gallery 7. As shown in Figure 4, the construction work for the fuel transport gallery 7 is divided into work in the workshop 50, work on the roof of the electrical room 3, and work on the top of the bunker steel frames 21 and 22.

作業者は、作業場50(地上)において、燃料搬送ギャラリー7を構成するギャラリーブロック7A,7B,7Cを組み立てる(作業1)。なお、本実施形態において、ギャラリーブロック7A,7B,7Cの数は3つであるが、この数は任意で良い。 In the work area 50 (on the ground), a worker assembles the gallery blocks 7A, 7B, and 7C that make up the fuel transport gallery 7 (Work 1). Note that in this embodiment, the number of gallery blocks 7A, 7B, and 7C is three, but this number can be any number.

作業者は、電気室3の屋上に、横レール10および縦レール11を載置するための土台(図示せず)を設置する(作業2)。 The worker installs a foundation (not shown) on the roof of the electrical room 3 for placing the horizontal rails 10 and vertical rails 11 (task 2).

作業者は、縦レール11を支持するための架構ブロック41,42を電気室3の左右の側壁に設置する(作業3)。なお、電気室3の屋上が十分に広く、縦レール11の全長を電気室3の屋上に設置できる場合には、架構ブロック41,42を設置しなくても良い。 The worker installs structural blocks 41, 42 to support the vertical rail 11 on the left and right side walls of the electrical room 3 (task 3). Note that if the roof of the electrical room 3 is sufficiently large so that the entire length of the vertical rail 11 can be installed on the roof of the electrical room 3, it is not necessary to install the structural blocks 41, 42.

作業者は、横レール10および縦レール11を土台の上に設置する(作業4)。 The worker installs the horizontal rails 10 and vertical rails 11 on the foundation (task 4).

作業者は、既設のクレーン5を用いて、作業場50に載置してあるギャラリーブロック7Aを吊り上げて、図1の矢印W1,W2の方向に移動させ、電気室3の仮置き場15に仮置きする(作業5/第4の工程)。そして、作業者は、横レール10を用いてギャラリーブロック7Aを図1の矢印W3の方向に移動させた後、縦レール11を用いて矢印W4の方向に移動させる。こうして、ギャラリーブロック7Aを組立場16に配置する(作業6/第5の工程)。この作業をギャラリーブロック7B,7Cについても同様に行う(作業7)。 Using the existing crane 5, the worker lifts the gallery block 7A placed in the work area 50, moves it in the directions of the arrows W1 and W2 in FIG. 1, and temporarily places it in the temporary storage area 15 in the electrical room 3 (operation 5/fourth step). The worker then uses the horizontal rails 10 to move the gallery block 7A in the direction of the arrow W3 in FIG. 1, and then uses the vertical rails 11 to move it in the direction of the arrow W4. In this way, the gallery block 7A is placed in the assembly area 16 (operation 6/fifth step). This operation is similarly performed for gallery blocks 7B and 7C (operation 7).

なお、作業7において、作業者は、ギャラリーブロック7Cを矢印W5の方向に移動させ、ギャラリーブロック7Bをギャラリーブロック7Aとギャラリーブロック7Cの間に移動させる。そうすると、組立場16である縦レール11上に、ギャラリーブロック7A、ギャラリーブロック7B、ギャラリーブロック7Cが一列に並ぶ。 In addition, in task 7, the worker moves gallery block 7C in the direction of arrow W5, and moves gallery block 7B between gallery blocks 7A and 7C. As a result, gallery block 7A, gallery block 7B, and gallery block 7C are lined up in a row on vertical rails 11, which is assembly area 16.

この状態で、作業者は、ギャラリーブロックAとギャラリーブロックBとギャラリーブロックCとを接続し、外壁を取り付けて燃料搬送ギャラリー7を組み立てる(作業8/第3の工程)。 In this state, the worker connects gallery block A, gallery block B, and gallery block C, attaches the outer wall, and assembles the fuel transport gallery 7 (operation 8/third step).

作業者は、図3に示すように、バンカ鉄骨21,22の頂部に、ジャッキ装置35,36(第1のジャッキ装置、第2のジャッキ装置)を取り付けるための仮設リフティングビーム31,32を設置する(作業9)。 As shown in Figure 3, the worker sets up temporary lifting beams 31, 32 on the top of the bunker steel frames 21, 22 to attach the jack devices 35, 36 (first jack device, second jack device) (Task 9).

作業者は、仮設リフティングビーム31,32にジャッキ装置35,36を設置し、バンカ鉄骨21,22の頂部に燃料搬送ギャラリー7を取り付けるための取合部25,26を設置する(作業10)。 The workers install jacking devices 35, 36 on the temporary lifting beams 31, 32, and install the joints 25, 26 for attaching the fuel transport gallery 7 to the top of the bunker steel frames 21, 22 (task 10).

作業者は、ジャッキ装置35のワイヤ37を下降させて、燃料搬送ギャラリー7の一端部に固定し、ジャッキ装置36のワイヤ38を下降させて、燃料搬送ギャラリー7の他端部に固定する。そして、作業者は、燃料搬送ギャラリー7の水平状態を保持しながら、ジャッキ装置35とジャッキ装置36とを同時に駆動して、燃料搬送ギャラリー7を電気室3の屋上からバンカ鉄骨21,22の頂部へとゆっくり吊り上げる(作業11/第1の工程)。次いで、作業者は、燃料搬送ギャラリー7の両端部を取合部25,26にそれぞれ固定し、バンカ鉄骨21,22間の燃料搬送ギャラリー7の架設工事が完了する(作業11/第2の工程)。 The worker lowers the wire 37 of the jack device 35 and secures it to one end of the fuel transfer gallery 7, and lowers the wire 38 of the jack device 36 and secures it to the other end of the fuel transfer gallery 7. Then, while keeping the fuel transfer gallery 7 horizontal, the worker simultaneously drives the jack devices 35 and 36 to slowly lift the fuel transfer gallery 7 from the roof of the electrical room 3 to the top of the bunker steel frames 21 and 22 (operation 11/first step). Next, the worker secures both ends of the fuel transfer gallery 7 to the joints 25 and 26, respectively, completing the erection of the fuel transfer gallery 7 between the bunker steel frames 21 and 22 (operation 11/second step).

以上説明したように、本実施形態に係る燃料搬送ギャラリー7の架設工法によれば、以下の作用効果を奏する。 As described above, the construction method for erecting the fuel transport gallery 7 according to this embodiment provides the following effects:

(1)ジャッキ装置35,36を用いて燃料搬送ギャラリー7を吊り上げる工法であるため、別途、大型のクレーンを準備する必要がない。そのため、大掛かりな架設工事は不要である。 (1) Because this method uses jack devices 35 and 36 to lift the fuel transport gallery 7, there is no need to prepare a separate large crane. Therefore, there is no need for large-scale construction work.

(2)ジャッキ装置35,36を用いて燃料搬送ギャラリー7を吊り上げる工法であるため、特許文献1に記載の工法のように燃料搬送ギャラリー7を片持ちする必要がない。そのため、架設工事が容易である。 (2) Because this method uses jack devices 35, 36 to lift the fuel transport gallery 7, there is no need to cantilever the fuel transport gallery 7 as in the method described in Patent Document 1. This makes the installation work easier.

(3)作業場50でギャラリーブロック7A,7B,7Cをブロック単位で組み立てる工法であるため、既設のクレーン5でギャラリーブロック7A,7B,7Cの吊り上げが可能となり、架設工事が容易である。 (3) Because this construction method involves assembling the gallery blocks 7A, 7B, and 7C block by block in the work area 50, the gallery blocks 7A, 7B, and 7C can be lifted using the existing crane 5, making the erection work easy.

(4)電気室3の屋上のスペースを使用して燃料搬送ギャラリー7を組み立てる工法であるため、地上に燃料搬送ギャラリー7を組み立てるための大きなスペースを確保する必要がない。そのため、本実施形態に係る工法は、既設のプラントにボイラ建屋を増設する場合に特に使い勝手が良い。 (4) Because this construction method uses the space on the roof of the electrical room 3 to assemble the fuel transport gallery 7, there is no need to secure a large space on the ground to assemble the fuel transport gallery 7. Therefore, the construction method according to this embodiment is particularly convenient when adding a boiler building to an existing plant.

(5)電気室3の屋上に設置されたレール10,11を用いてギャラリーブロック7A,7B,7Cを移動できるため、作業効率が向上する。 (5) Gallery blocks 7A, 7B, and 7C can be moved using rails 10 and 11 installed on the roof of electrical room 3, improving work efficiency.

なお、本発明は上記実施形態に限定されず、本発明の要旨を逸脱しない範囲で種々の変形が可能であり、特許請求の範囲に記載された技術思想に含まれる技術的事項の全てが本発明の対象となる。前記実施形態は、好適な例を示したものであるが、当業者ならば、本明細書に開示の内容から、各種の代替例、修正例、変形例あるいは改良例を実現することができ、これらは添付の特許請求の範囲に記載された技術的範囲に含まれる。 The present invention is not limited to the above-described embodiment, and various modifications are possible without departing from the gist of the present invention. All technical matters included in the technical ideas described in the claims are the subject of the present invention. The above-described embodiment shows a preferred example, but a person skilled in the art can realize various alternatives, modifications, variations, or improvements from the contents disclosed in this specification, and these are included in the technical scope described in the attached claims.

例えば、電気室3がバンカ鉄骨21,22間に設置されていない場合や、バンカ鉄骨21,22間に燃料搬送ギャラリー7を組み立てるスペースが十分に確保されている場合には、そのスペースにおいて、ギャラリーブロック7A,7B,7Cを接続して燃料搬送ギャラリー7を組み立て、外壁を取り付けた後、ジャッキ装置35,36により燃料搬送ギャラリー7を吊り上げる工法を採用しても良い。 For example, if the electrical room 3 is not installed between the bunker steel frames 21, 22, or if there is sufficient space between the bunker steel frames 21, 22 to assemble the fuel transport gallery 7, a construction method may be used in which the gallery blocks 7A, 7B, and 7C are connected in that space to assemble the fuel transport gallery 7, the outer walls are attached, and then the fuel transport gallery 7 is hoisted by the jack devices 35 and 36.

1,2 ボイラ
3 電気室(建物)
5 クレーン
7 燃料搬送ギャラリー(ブリッジ)
7A,7B,7C ギャラリーブロック(ブロック)
10 横レール(移動装置)
11 縦レール(移動装置)
15 仮置き場(第1の位置)
16 組立場(第2の位置)
21,22 バンカ鉄骨(第1の棟、第2の棟)
23,24 バンカ
25,26 取合部
31,32 仮設リフティングビーム
35,36 ジャッキ装置(第1のジャッキ装置、第2のジャッキ装置)
37,38 ワイヤ
41,42 架構ブロック
50 作業場
1, 2 Boiler 3 Electric room (building)
5 Crane 7 Fuel transport gallery (bridge)
7A, 7B, 7C Gallery Blocks (Blocks)
10 Horizontal rail (moving device)
11 Vertical rail (movement device)
15 Temporary storage area (first location)
16 Assembly area (second location)
21, 22 Banka Steel Frame (1st Building, 2nd Building)
23, 24 Bunker 25, 26 Joint 31, 32 Temporary lifting beam 35, 36 Jack device (first jack device, second jack device)
37, 38 Wire 41, 42 Structural block 50 Work place

Claims (3)

第1の棟と第2の棟との間にブリッジを架設する棟間ブリッジ架設工法であって、
前記第1の棟に設置された第1のジャッキ装置により前記ブリッジの一端側を吊り、前記第2の棟に設置された第2のジャッキ装置により前記ブリッジの他端側を吊り、前記第1のジャッキ装置と前記第2のジャッキ装置とを同時に用いて前記ブリッジを所定の高さまで吊り上げる第1の工程と、
前記所定の高さまで吊り上げられた前記ブリッジを、前記第1の棟と前記第2の棟との間に固定する第2の工程と、
を含み、
前記ブリッジは複数のブロックで構成され、
前記棟間ブリッジ架設工法は、前記第1の工程の前に、前記各ブロックを接続して前記ブリッジを組み立てる第3の工程をさらに含み、
前記各ブロックは地上に載置され、
前記第1の棟と前記第2の棟との間に、前記所定の高さより低い建物が設置され、
前記棟間ブリッジ架設工法は、
前記第3の工程の前に、地上に載置された前記各ブロックをクレーンにより前記建物の屋上に吊り上げ、第1の位置に仮置きする第4の工程と、
前記第1の位置に仮置きされた前記各ブロックを、前記第3の工程を行うために前記建物の屋上の第2の位置に移動する第5の工程と、
をさらに含むことを特徴とする棟間ブリッジ架設工法。
A method for erecting a bridge between a first building and a second building, comprising the steps of:
a first step of suspending one end of the bridge by a first jack device installed on the first building, suspending the other end of the bridge by a second jack device installed on the second building, and suspending the bridge to a predetermined height by simultaneously using the first jack device and the second jack device;
a second step of fixing the bridge, which has been lifted to the predetermined height, between the first and second towers;
Including,
The bridge is composed of a plurality of blocks,
The inter-building bridge construction method further includes a third step of connecting the blocks to assemble the bridge before the first step,
Each of the blocks is placed on the ground,
a building lower than the predetermined height is installed between the first building and the second building;
The above-mentioned inter-building bridge construction method is as follows:
a fourth step of lifting each of the blocks placed on the ground to the roof of the building by a crane and temporarily placing the blocks in the first position before the third step;
a fifth step of moving each of the blocks temporarily placed at the first position to a second position on the roof of the building in order to carry out the third step;
The method for erecting a bridge between buildings further comprises :
請求項に記載の棟間ブリッジ架設工法において、
前記建物の屋上には、前記各ブロックを移動させるための移動装置が設置され、
前記第5の工程では、前記移動装置を用いて前記第1の位置から前記第2の位置まで前記各ブロックを移動させることを特徴とする棟間ブリッジ架設工法。
In the inter-building bridge construction method according to claim 1 ,
A moving device for moving each of the blocks is installed on the roof of the building,
An inter-building bridge erection method, characterized in that in the fifth step, each of the blocks is moved from the first position to the second position using the moving device.
請求項に記載の棟間ブリッジ架設工法において、
前記第1の棟および前記第2の棟は、それぞれ石炭を蓄えるバンカを設置するための鉄骨構造物であり、
前記ブリッジは、前記石炭を搬送するための搬送装置を備えた燃料搬送ギャラリーであり、
前記建物は、電気室であり、
前記移動装置は、レールである、
ことを特徴とする棟間ブリッジ架設工法。
In the inter-building bridge construction method according to claim 2 ,
The first building and the second building are each a steel frame structure for installing a bunker for storing coal,
the bridge being a fuel transport gallery equipped with a transport device for transporting the coal;
the building is an electrical room,
The moving device is a rail.
This is a construction method for erecting bridges between buildings.
JP2020161153A 2020-09-25 2020-09-25 Inter-building bridge construction method Active JP7465775B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020161153A JP7465775B2 (en) 2020-09-25 2020-09-25 Inter-building bridge construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020161153A JP7465775B2 (en) 2020-09-25 2020-09-25 Inter-building bridge construction method

Publications (2)

Publication Number Publication Date
JP2022054133A JP2022054133A (en) 2022-04-06
JP7465775B2 true JP7465775B2 (en) 2024-04-11

Family

ID=80996940

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020161153A Active JP7465775B2 (en) 2020-09-25 2020-09-25 Inter-building bridge construction method

Country Status (1)

Country Link
JP (1) JP7465775B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014047525A (en) 2012-08-31 2014-03-17 Hitachi Ltd Method for erecting bridge between building ridges
JP2017197960A (en) 2016-04-27 2017-11-02 清水建設株式会社 Construction method of suspended steel frame for suspended ceiling

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59163240A (en) * 1983-03-02 1984-09-14 Hitachi Plant Eng & Constr Co Ltd Rainproof cover for rainy day unloading of unloader
JP2882541B2 (en) * 1990-08-01 1999-04-12 東急建設株式会社 A method of mounting a lifting device and a method of joining frame members in a frame material lift-up method
JP2913216B2 (en) * 1991-01-28 1999-06-28 清水建設株式会社 Building construction method
JPH0868206A (en) * 1994-08-31 1996-03-12 Taisei Corp How to build a building
JPH10280327A (en) * 1997-04-07 1998-10-20 Nkk Corp Elevation bridge construction method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014047525A (en) 2012-08-31 2014-03-17 Hitachi Ltd Method for erecting bridge between building ridges
JP2017197960A (en) 2016-04-27 2017-11-02 清水建設株式会社 Construction method of suspended steel frame for suspended ceiling

Also Published As

Publication number Publication date
JP2022054133A (en) 2022-04-06

Similar Documents

Publication Publication Date Title
CN102213033B (en) Construction method of wind turbine hybrid tower
JP4701047B2 (en) Wind power tower construction method
CN109607399B (en) Hoisting process for installing roof net rack
EP2563994B1 (en) Method for assembling a wind turbine tower on an erection foundation and a device
JP2025023312A (en) Transition piece system and monopile structure system
JP7465775B2 (en) Inter-building bridge construction method
KR102052680B1 (en) Construction method of standing module for building
CN216811161U (en) Modular structure of airport terminal corridor
JP5701490B2 (en) Roof repair method and structure
JPH11211003A (en) Boiler and assembling method thereof
CN110965808A (en) Construction method of externally hung stair and packway of fabricated building
CA2081644C (en) Method for erection of absorber towers using jacking system
JP2018199933A (en) Structure body and construction method of structure constructed on top of tower-like building
JP2019163672A (en) Climbing-type telpher and demolition method of building
JP5761595B2 (en) Module structure, module construction method
JP6926028B2 (en) Temporary pedestal row and method of constructing temporary scaffolding using it
JP5039304B2 (en) Construction method of boiler frame
JP2020204263A (en) Superstructure member conveyance facility and superstructure member conveyance method
CN223281770U (en) Integral lifting house structure of steel structure industrial factory building roof
CN117166813B (en) Construction method for building curtain wall reconstruction external protection system
KR102275469B1 (en) Temporary bents for a railway catenary and construction methods thereof
JP2008222416A (en) Steel tower and assembling construction method of this steel tower
CN116970410A (en) A side material transportation system and transportation system construction method for continuous row coke oven overhaul machine
JPH06101348A (en) How to build a tower
JP6798527B2 (en) Superstructure material transportation equipment and superstructure material transportation method

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20220113

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20220217

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230608

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20231208

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20231212

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240206

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240305

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240401

R150 Certificate of patent or registration of utility model

Ref document number: 7465775

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150