Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7499199B2 - Equipment for separating geomaterials - Google Patents
[go: Go Back, main page]

JP7499199B2 - Equipment for separating geomaterials - Google Patents

Equipment for separating geomaterials Download PDF

Info

Publication number
JP7499199B2
JP7499199B2 JP2021028772A JP2021028772A JP7499199B2 JP 7499199 B2 JP7499199 B2 JP 7499199B2 JP 2021028772 A JP2021028772 A JP 2021028772A JP 2021028772 A JP2021028772 A JP 2021028772A JP 7499199 B2 JP7499199 B2 JP 7499199B2
Authority
JP
Japan
Prior art keywords
ground material
opening
main body
belt conveyor
fractionation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021028772A
Other languages
Japanese (ja)
Other versions
JP2022129903A (en
Inventor
喬之 石井
智宏 西
博之 新井
悠馬 増村
敬信 平出
三郎 片山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2021028772A priority Critical patent/JP7499199B2/en
Publication of JP2022129903A publication Critical patent/JP2022129903A/en
Application granted granted Critical
Publication of JP7499199B2 publication Critical patent/JP7499199B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)

Description

本発明は、地盤材料の分取装置に関する。 The present invention relates to an apparatus for separating geological materials.

ダム等を建設する工事において、工事現場付近から調達した様々な粒径の粒状材が混在する地盤材料を、そのままあるいは適度に粉砕してコンクリートの製造に用いることがある。ダム等の建設においてコンクリートを製造する工程では、バッチャープラントやCSG(Cemented Sand and Gravel)混合プラントなどが用いられている。
これらのプラントでは、コンクリートの品質管理上、地盤材料の粒度分布を把握する必要がある。そこで、搬送される地盤材料を撮影し、その撮影結果に基づいて地盤材料の粒度分布を測定することが提案されている(例えば、特許文献1参照)。
In construction of dams, etc., ground materials containing a mixture of granular materials of various particle sizes procured from near the construction site are sometimes used to manufacture concrete, either as is or after being crushed appropriately. Batcher plants and CSG (Cemented Sand and Gravel) mixing plants are used in the process of manufacturing concrete in the construction of dams, etc.
In these plants, it is necessary to know the particle size distribution of the ground material for quality control of concrete. Therefore, it has been proposed to photograph the transported ground material and measure the particle size distribution of the ground material based on the photographed results (for example, see Patent Document 1).

特開2016-200518号公報JP 2016-200518 A

地盤材料の粒度分布を測定する際には、搬送される地盤材料を撮影して得られた画像が解析される。
しかしながら、工事に使用するために搬送される地盤材料の全量を用いて解析することは、解析対象が多くなり過ぎて困難である。このため、搬送される地盤材料の一部を解析に必要な量だけ効率良く分取することが好ましい。
本発明は、前記した課題を解決し、搬送される地盤材料の一部を解析用に効率良く分取できる地盤材料の分取装置を提供することを課題とする。
When measuring the particle size distribution of ground material, images of the transported ground material are photographed and analyzed.
However, it is difficult to analyze the entire amount of ground material transported for use in construction work because the number of analysis targets is too large. Therefore, it is preferable to efficiently separate a portion of the transported ground material in the amount required for analysis.
The present invention has an object to solve the above-mentioned problems and to provide a ground material fractionation device that can efficiently fractionate a portion of the transported ground material for analysis.

前記課題を解決するために、本発明は、ベルトコンベア上を搬送される地盤材料の分取装置である。この地盤材料の分取装置は、前記ベルトコンベアから投下される前記地盤材料を取り込む開口部を有する筒状の本体部と、前記本体部の内部に上向きに突になるように配置された楔状の第一分取部と、を備える。前記開口部に取り込まれ前記本体部内を通過した前記地盤材料が、前記第一分取部の上に落下して、分取用の搬送装置上と、本流用の搬送装置上と、に二分される。
本発明では、ベルトコンベアから投下される地盤材料が、本体部の開口部に取り込まれて該本体部内を通過し、上向きに突になるように配置された楔状の第一分取部の上に落下する。第一分取部の上に落下した地盤材料は、分取用の搬送装置上と、本流用の搬送装置上とに二分される。分取用の搬送装置で搬送される地盤材料は解析に使用され、本流用の搬送装置で搬送される地盤材料は工事に使用されることになる。
これにより、ベルトコンベア上を搬送される地盤材料から解析に必要な量を分取することが可能となる。したがって、本発明によれば、搬送される地盤材料の一部を解析用に効率良く分取できる地盤材料の分取装置を提供することができる。
In order to solve the above problems, the present invention provides a device for separating ground material transported on a belt conveyor. This device for separating ground material comprises a cylindrical main body having an opening for taking in the ground material dropped from the belt conveyor, and a wedge-shaped first separation section arranged so as to protrude upward inside the main body . The ground material taken in at the opening and passing through the main body falls onto the first separation section and is divided into two parts, one on the conveyor for separation and the other on the conveyor for the main flow.
In the present invention, the ground material dropped from the belt conveyor is taken into the opening of the main body, passes through the main body, and falls onto the first fractional section, which is a wedge-shaped section that protrudes upward. The ground material that falls onto the first fractional section is divided into two parts, one on the conveying device for fractional collection and the other on the conveying device for the main flow. The ground material transported by the conveying device for fractional collection is used for analysis, and the ground material transported by the conveying device for the main flow is used for construction work.
This makes it possible to separate the amount of ground material required for analysis from the ground material being transported on the belt conveyor. Therefore, according to the present invention, it is possible to provide a ground material separation device that can efficiently separate a portion of the transported ground material for analysis.

前記した地盤材料の分取装置において、前記第一分取部は、前記地盤材料が二分される方向に沿って移動可能であることが好ましい。
この構成では、分取用の搬送装置上に導かれる地盤材料の量と、本流用の搬送装置上に導かれる地盤材料の量との割合を調整できる。これにより、解析用により適した量の地盤材料を効率良く分取することが可能となる。
In the above-mentioned ground material fractionating device, it is preferable that the first fractionating section is movable along a direction in which the ground material is divided into two.
In this configuration, the ratio of the amount of ground material guided onto the transport device for fractionation and the amount of ground material guided onto the transport device for the main flow can be adjusted, making it possible to efficiently separate an amount of ground material suitable for analysis.

前記した地盤材料の分取装置において、前記本体部の内部には、仕切板が設けられていることが好ましい。この場合、前記開口部は、前記仕切板を境界として、前記ベルトコンベアの上流側から見て奥側に位置する奥側開口部と手前側に位置する手前側開口部とに二分される。前記奥側開口部は、前記手前側開口部よりも開口面積が小さく、前記地盤材料の一部を取り込む第二分取部を構成している。
この構成では、奥側開口部として構成される第二分取部を通して、地盤材料の一部が取り込まれる。これにより、解析用に分取される地盤材料の量を絞ることができる。
In the above-mentioned ground material separation device, it is preferable that a partition plate is provided inside the main body. In this case, the opening is divided into a rear opening located on the rear side as viewed from the upstream side of the belt conveyor and a front opening located on the front side, with the partition plate as a boundary. The rear opening has an opening area smaller than that of the front opening, and constitutes a second separation section that takes in a part of the ground material.
In this configuration, a portion of the ground material is taken through the second collection section configured as the rear opening, thereby making it possible to limit the amount of ground material taken for analysis.

前記した地盤材料の分取装置において、前記奥側開口部の前記ベルトコンベアの上流側から見て左側及び右側に、前記本体部内の通路の一部を閉塞する左側閉塞部材及び右側閉塞部材がそれぞれ設けられていることが好ましい。この場合、前記第二分取部は、前記左側閉塞部材と前記右側閉塞部材との間に形成されている。
この構成では、本体部内の通路の一部を閉塞する左側閉塞部材及び右側閉塞部材を設けることで、適宜な開口面積を持つ第二分取部を容易に形成することができる。また、左側閉塞部材と右側閉塞部材との間を通過して、地盤材料の一部が効率良く取り込まれる。
In the above-mentioned ground material separation device, it is preferable that a left blocking member and a right blocking member for blocking a part of the passage in the main body are provided on the left and right sides of the rear opening as viewed from the upstream side of the belt conveyor, respectively. In this case, the second separation section is formed between the left blocking member and the right blocking member.
In this configuration, the left and right blocking members that block part of the passage in the main body are provided to easily form the second collection section with an appropriate opening area. Also, part of the ground material is efficiently taken in by passing between the left and right blocking members.

前記した地盤材料の分取装置において、前記手前側開口部には、該手前側開口部の一部を閉塞する板状部材が設けられていることが好ましい。
ベルトコンベアから投下される地盤材料のうち、粒径が大きく重量の大きい粗粒材はベルトコンベアの上流側から見て遠方の奥側に落下し、粒径が小さく重量の小さい細粒材は手前側に落下する傾向がある。板状部材で手前側開口部の一部を閉塞することで、手前側に落下しやすい細粒材を板状部材上でバウンドさせて奥側開口部として構成される第二分取部へ導くことができる。このため、奥側開口部として構成される第二分取部に取り込まれる地盤材料は、粗粒材と細粒材とを適度に混合させたものとなる。したがって、分取されて解析に使用される地盤材料の粒度分布と、工事に使用される地盤材料の粒度分布との差異を低減できる。これにより、分取された地盤材料を使用した解析の信頼性が向上する。
In the above-mentioned ground material fractionating apparatus, it is preferable that the front opening is provided with a plate-shaped member that closes a portion of the front opening.
Among the ground materials dropped from the belt conveyor, coarse granular materials with large particle size and heavy weight tend to fall farther from the upstream side of the belt conveyor, while fine granular materials with small particle size and light weight tend to fall toward the front side. By blocking a part of the front opening with a plate-shaped member, the fine granular materials that tend to fall toward the front side can be bounced on the plate-shaped member and guided to the second collection section configured as the rear opening. Therefore, the ground material taken into the second collection section configured as the rear opening is a moderate mixture of coarse granular materials and fine granular materials. Therefore, the difference between the particle size distribution of the ground material that is separated and used for analysis and the particle size distribution of the ground material used for construction can be reduced. This improves the reliability of the analysis using the separated ground material.

本発明によれば、搬送される地盤材料の一部を解析用に効率良く分取できる地盤材料の分取装置を提供できる。 According to the present invention, a geological material sampling device can be provided that can efficiently sample a portion of the transported geological material for analysis.

本発明の実施形態に係る地盤材料の分取装置を概略で示す側面図である。1 is a side view showing an outline of a ground material separation device according to an embodiment of the present invention. 図1に示される地盤材料の分取装置の一次分流シュートを概略で示す斜視図である。FIG. 2 is a perspective view showing a schematic diagram of a primary diversion chute of the geomaterial separation device shown in FIG. 1 . 図2に示される一次分流シュートを概略で示す平面図である。FIG. 3 is a schematic plan view of the primary diversion chute shown in FIG. 2 . 図2に示される一次分流シュートを概略で示す奥側から見た図である。FIG. 3 is a schematic view of the primary diversion chute shown in FIG. 2 as seen from the rear side. 本発明の実施形態に係る地盤材料の分取方法の内容を示すフローチャートである。1 is a flowchart showing the details of a method for separating ground material according to an embodiment of the present invention.

以下、本発明の実施形態について適宜図面を参照して説明する。なお、以下に示す図面において、同一または同種の部材については、同一の参照符号を付し、重複した説明を適宜省略する。また、部材のサイズ及び形状は、説明の便宜のため、変形または誇張して模式的に表す場合がある。
図1は、本発明の実施形態に係る地盤材料の分取装置(以下、単に「分取装置」ともいう)100を概略で示す側面図である。本実施形態に係る分取装置100は、主にダムの工事現場付近から調達した様々な粒径の粒状材が混在する地盤材料102の中から粒度分布の解析に使用する地盤材料102を分取する装置である。
図1に示すように、分取装置100は、ベルトコンベア101上をA方向に搬送される地盤材料102の分取装置である。この分取装置100は、本体部1と、第一分取部2とを備えている。本体部1は、筒状を呈しており、ベルトコンベア101から投下される地盤材料102を取り込む開口部3を有している。本体部1は、一次分流シュート10と、二次分流シュート30と、接続用シュート40と、本流シュート50とを備えている。
Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the drawings shown below, the same or similar components are given the same reference numerals, and duplicated descriptions are omitted. In addition, the size and shape of the components may be deformed or exaggerated to be schematic for the convenience of explanation.
1 is a side view showing an outline of a ground material fractionation device (hereinafter, simply referred to as "fractionation device") 100 according to an embodiment of the present invention. The fractionation device 100 according to this embodiment is a device that fractionates ground material 102 to be used for particle size distribution analysis from ground material 102, which is a mixture of granular materials of various particle sizes procured mainly from near a dam construction site.
As shown in Figure 1, the fractionation device 100 is a fractionation device for ground material 102 transported in direction A on a belt conveyor 101. This fractionation device 100 comprises a main body 1 and a first fractionation section 2. The main body 1 is cylindrical and has an opening 3 for taking in the ground material 102 dropped from the belt conveyor 101. The main body 1 comprises a primary diversion chute 10, a secondary diversion chute 30, a connecting chute 40, and a main chute 50.

開口部3は、一次分流シュート10に形成されている。二次分流シュート30は、一次分流シュート10の下方にベルトコンベア101の上流側から見て奥側(以下、単に「奥側」ともいう)に配置されている。二次分流シュート30の下方の奥側には、接続用シュート40が接続されている。本流シュート50は、一次分流シュート10の下方にベルトコンベア101の上流側から見て手前側(以下、単に「手前側」ともいう)に配置されている。 The opening 3 is formed in the primary diversion chute 10. The secondary diversion chute 30 is disposed below the primary diversion chute 10 on the rear side (hereinafter simply referred to as the "rear side") when viewed from the upstream side of the belt conveyor 101. A connecting chute 40 is connected to the rear side below the secondary diversion chute 30. The main stream chute 50 is disposed below the primary diversion chute 10 on the near side (hereinafter simply referred to as the "front side") when viewed from the upstream side of the belt conveyor 101.

第一分取部2は、楔状を呈しており、本体部1の二次分流シュート30の内部に、上向きに突(凸)になるように配置されている。第一分取部2は、具体的には、稜線2aが水平方向に延在する三角屋根形状を呈している。第一分取部2の稜線2aは、上方から見て地盤材料102がベルトコンベア101上を搬送される方向に直交している。第一分取部2は、稜線2aから奥側に向かって下方に傾斜する分流側傾斜面2bと、稜線2aから手前側に向かって下方に傾斜する本流側傾斜面2cとを備えている。
地盤材料102が第一分取部2の上に落下すると、稜線2aの奥側に落下した地盤材料102は、分流側傾斜面2b上を滑り落ちて、接続用シュート40を通って分取用の搬送装置103上に導かれる。一方、稜線2aの手前側に落下した地盤材料102は、本流側傾斜面2c上を滑り落ちて、二次分流シュート30と本流シュート50との境界に位置する仕切板に形成された開口(図示省略)を通って本流シュート50に入る。本流シュート50を通った地盤材料102は、本流用の搬送装置104上に導かれる。つまり、開口部3の奥側開口部4に取り込まれ本体部1内を通過した地盤材料102が、第一分取部2の上に落下して、分取用の搬送装置103上と、本流用の搬送装置104上と、に二分されるように構成されている。
The first sorting section 2 is wedge-shaped and is arranged inside the secondary diversion chute 30 of the main body 1 so as to protrude upward. Specifically, the first sorting section 2 has a triangular roof shape with a ridgeline 2a extending horizontally. The ridgeline 2a of the first sorting section 2 is perpendicular to the direction in which the ground material 102 is transported on the belt conveyor 101 when viewed from above. The first sorting section 2 has a diversion-side inclined surface 2b that slopes downward from the ridgeline 2a toward the back side, and a main-side inclined surface 2c that slopes downward from the ridgeline 2a toward the front side.
When the ground material 102 falls onto the first fractionation section 2, the ground material 102 that falls on the back side of the ridge 2a slides down on the diversion side inclined surface 2b and is guided to the fractionation conveying device 103 through the connection chute 40. On the other hand, the ground material 102 that falls on the front side of the ridge 2a slides down on the main stream side inclined surface 2c and enters the main stream chute 50 through an opening (not shown) formed in a partition plate located at the boundary between the secondary diversion chute 30 and the main stream chute 50. The ground material 102 that passes through the main stream chute 50 is guided onto the main stream conveying device 104. In other words, the ground material 102 that is taken into the back side opening 4 of the opening 3 and passes through the main body 1 falls onto the first fractionation section 2 and is divided into two parts, the part on the parting conveying device 103 and the part on the main stream conveying device 104.

第一分取部2は、地盤材料102が二分される方向、すなわち上方から見て地盤材料102がベルトコンベア101上を搬送される方向に平行な水平方向(図1に示すB方向)に沿って移動可能である。第一分取部2は、例えばモータやシリンダ装置等の駆動手段によって移動させられるが、手動で移動させられてもよい。分取用の搬送装置103や本流用の搬送装置104として、ここではベルトコンベアが使用されるが、これに限定されるものではなく、例えば搬送用車両等の他の搬送装置が使用されてもよい。なお、本流用の搬送装置104として使用されるベルトコンベアは、ここでは図1の紙面に直交する方向に延びている。 The first fractionation section 2 is movable along the direction in which the ground material 102 is divided, i.e., along a horizontal direction (direction B in FIG. 1) parallel to the direction in which the ground material 102 is transported on the belt conveyor 101 when viewed from above. The first fractionation section 2 is moved by a driving means such as a motor or a cylinder device, but may also be moved manually. A belt conveyor is used here as the fractionation transport device 103 and the main stream transport device 104, but this is not limited thereto, and other transport devices such as a transport vehicle may also be used. The belt conveyor used as the main stream transport device 104 here extends in a direction perpendicular to the plane of the paper in FIG. 1.

また、分取装置100は、本体部1に打撃振動等の各種の振動を与える振動体6を備えている。振動体6は、ここでは二次分流シュート30に設置されているが、設置個所は特に限定されるものではなく、例えば一次分流シュート10等の本体部1の他の箇所に設置され得る。 The fractionation device 100 also includes a vibrator 6 that applies various types of vibrations, such as impact vibrations, to the main body 1. Here, the vibrator 6 is installed in the secondary diversion chute 30, but the location where it is installed is not particularly limited, and it may be installed in another location on the main body 1, such as the primary diversion chute 10.

図2は、図1に示される分取装置100の一次分流シュート10を概略で示す斜視図である。図3は、図2に示される一次分流シュート10を概略で示す平面図である。図4は、図2に示される一次分流シュート10を概略で示す奥側から見た図である。
図1、図2に示すように、本体部1の一次分流シュート10の内部には、仕切板11が設けられている。仕切板11は、上方から見て地盤材料102がベルトコンベア101上を搬送される方向に直交する鉛直面に沿うように設けられている。開口部3は、仕切板11を境界として、奥側に位置する奥側開口部4と、手前側に位置する手前側開口部5とに二分される。
Fig. 2 is a perspective view showing the primary flow diversion chute 10 of the fraction collection device 100 shown in Fig. 1. Fig. 3 is a plan view showing the primary flow diversion chute 10 shown in Fig. 2. Fig. 4 is a view showing the primary flow diversion chute 10 shown in Fig. 2 as viewed from the rear side.
As shown in Figures 1 and 2, a partition plate 11 is provided inside the primary diversion chute 10 of the main body 1. The partition plate 11 is provided along a vertical plane perpendicular to the direction in which the ground material 102 is transported on the belt conveyor 101 when viewed from above. The opening 3 is divided into a rear opening 4 located on the rear side and a front opening 5 located on the front side by the partition plate 11.

図2~図4に示すように、一次分流シュート10は、略四角筒形状を呈しており、奥側に位置する奥側面12及び手前側に位置する手前側面13を備えている。また、一次分流シュート10は、ベルトコンベア101(図1参照、以下同様)の上流側から見て左側及び右側(以下、単に「左側」「右側」ともいう)にそれぞれ位置する左側面14及び右側面15を備えている。仕切板11の左右両端は、左側面14及び右側面15にそれぞれ固定されている。 As shown in Figures 2 to 4, the primary diversion chute 10 has a generally rectangular cylindrical shape and includes a rear side surface 12 located at the rear side and a front side surface 13 located at the front side. The primary diversion chute 10 also includes a left side surface 14 and a right side surface 15 located on the left and right sides (hereinafter simply referred to as "left side" and "right side"), respectively, when viewed from the upstream side of the belt conveyor 101 (see Figure 1, and the same below). The left and right ends of the partition plate 11 are fixed to the left side surface 14 and the right side surface 15, respectively.

奥側開口部4は、手前側開口部5よりも開口面積が小さく、地盤材料102の一部を取り込む第二分取部を構成している。奥側開口部4の左側及び右側に、本体部1内の通路の一部を閉塞する左側閉塞部材16及び右側閉塞部材17がそれぞれ設けられている。左側閉塞部材16及び右側閉塞部材17は、本実施形態では水平に配置された板材である。奥側開口部4として構成される第二分取部は、左側閉塞部材16と右側閉塞部材17との間に形成されている。第一分取部2(図1参照)は、仕切板11で仕切られた二つの空間のうちの奥側の空間において、奥側開口部4として構成される第二分取部の下方に配置されている。 The rear opening 4 has a smaller opening area than the front opening 5, and constitutes a second collection section that takes in a portion of the ground material 102. A left blocking member 16 and a right blocking member 17 that block a portion of the passage in the main body 1 are provided on the left and right sides of the rear opening 4, respectively. In this embodiment, the left blocking member 16 and the right blocking member 17 are horizontally arranged plate materials. The second collection section that constitutes the rear opening 4 is formed between the left blocking member 16 and the right blocking member 17. The first collection section 2 (see Figure 1) is located below the second collection section that constitutes the rear opening 4 in the rear space of the two spaces separated by the partition plate 11.

手前側開口部5には、該手前側開口部5の一部を閉塞する板状部材18が設けられている。板状部材18は、奥側開口部4の手前側に、上方から見て地盤材料102(図1参照、以下同様)がベルトコンベア101上を搬送される方向に沿って手前側開口部5に装架されるように設けられている。板状部材18は、仕切板11に向かって下方に傾斜している。板状部材18は、ここでは矩形の板が使用されているが、形状や大きさは特に限定されるものではない。 A plate-like member 18 is provided at the front opening 5 to close a portion of the front opening 5. The plate-like member 18 is provided at the front side of the rear opening 4 so that it is mounted at the front opening 5 along the direction in which the ground material 102 (see FIG. 1, and the same below) is transported on the belt conveyor 101 when viewed from above. The plate-like member 18 is inclined downward toward the partition plate 11. A rectangular plate is used here as the plate-like member 18, but the shape and size are not particularly limited.

左側閉塞部材16及び右側閉塞部材17の奥側開口部4側、すなわち中央寄りの両端縁には、側板19,19がそれぞれ対向するように立設されている。つまり、奥側開口部4として構成される第二分取部は、具体的には、対向する二つの側板19,19の間に形成されている。側板19は、略直角三角形を呈しており、その斜辺に相当する傾斜端面19aは、奥側から仕切板11に向かって下方に傾斜している。 On the rear opening 4 side of the left blocking member 16 and the right blocking member 17, i.e., on both ends near the center, side plates 19, 19 are erected so as to face each other. In other words, the second collection section configured as the rear opening 4 is specifically formed between the two opposing side plates 19, 19. The side plate 19 is in the shape of a roughly right-angled triangle, and the inclined end surface 19a, which corresponds to the hypotenuse, is inclined downward from the rear side toward the partition plate 11.

側板19、左側面14(右側面15)、奥側面12及び左側閉塞部材16(右側閉塞部材17)に囲まれた空間は、デッドストック部20を形成している。デッドストック部20に堆積した地盤材料102によって、その後に投下される地盤材料102の落下の衝撃が緩和される。デッドストック部20に堆積した地盤材料102の上に投下される地盤材料102は、主として手前側開口部5の方へ流れ込む。手前側開口部5から取り込まれた地盤材料102は、本流シュート50を通って、本流用の搬送装置104上に落下する。側板19の傾斜端面19aには、地盤材料102の落下の衝撃から保護するために、補強用部材(図示省略)が取り付けられることが望ましい。
側板19の傾斜端面19aは、上方から見て地盤材料102がベルトコンベア101上を搬送される方向に平行に配置されている。一方、側板19の略直角の角部19bは、上方から見て傾斜端面19aよりも外側、すなわち互いに対向する側板19から離れる側に位置される。つまり、対向する二つの側板19,19の間の距離は、奥側下方において若干広くなっている。これに応じて、左側閉塞部材16及び右側閉塞部材17は、ここでは台形を呈しており、両者間の距離も奥側の方が手前側よりも広くなっている。
The space surrounded by the side plate 19, the left side surface 14 (right side surface 15), the rear side surface 12, and the left blocking member 16 (right blocking member 17) forms the dead stock section 20. The ground material 102 piled up in the dead stock section 20 cushions the impact of the ground material 102 being dropped thereafter. The ground material 102 dropped onto the ground material 102 piled up in the dead stock section 20 mainly flows toward the front opening 5. The ground material 102 taken in from the front opening 5 passes through the main stream chute 50 and falls onto the main stream conveying device 104. It is desirable to attach a reinforcing member (not shown) to the inclined end surface 19a of the side plate 19 to protect it from the impact of the ground material 102 falling.
The inclined end surface 19a of the side plate 19 is arranged parallel to the direction in which the ground material 102 is transported on the belt conveyor 101 when viewed from above. On the other hand, the approximately right-angled corner 19b of the side plate 19 is located outside the inclined end surface 19a when viewed from above, that is, on the side away from the opposing side plate 19. In other words, the distance between the two opposing side plates 19, 19 is slightly wider at the bottom rear side. Accordingly, the left blocking member 16 and the right blocking member 17 here are trapezoidal, and the distance between them is wider at the rear side than at the front side.

次に、このように構成された分取装置100を用いた地盤材料102の分取方法について説明する。
図5は、本発明の実施形態に係る地盤材料の分取方法の内容を示すフローチャートである。図5に示すように、本実施形態に係る地盤材料の分取方法は、取込ステップS1と、一部取込(一次分取)ステップS2と、落下ステップS3と、二分(二次分取)ステップS4と、搬送ステップS5とを含む。
取込ステップS1では、ベルトコンベア101から投下される地盤材料102が、筒状の本体部1に備えられた開口部3に取り込まれる。
一部取込(一次分取)ステップS2では、奥側開口部4として構成される第二分取部を通して、投下された地盤材料102の一部が取り込まれる。
落下ステップS3では、開口部3の奥側開口部4に取り込まれ本体部1内を通過した地盤材料102が本体部1の内部に上向きに突になるように配置された楔状の第一分取部2の上に落下する。
二分(二次分取)ステップS4では、第一分取部2の上に落下した地盤材料102が、分取用の搬送装置103上と、本流用の搬送装置104上と、に二分される。
搬送ステップS5では、分取用の搬送装置103上に導かれた地盤材料102が、解析用に分取されたものとして、解析装置(図示省略)に向けて搬送される。一方、本流用の搬送装置104上に導かれた地盤材料102は、工事用に使用されるために、ストックヤード(図示省略)等の所定場所に向けて搬送される。
Next, a method for extracting ground material 102 using the thus configured extraction device 100 will be described.
Fig. 5 is a flow chart showing the contents of the method for separating ground material according to the embodiment of the present invention. As shown in Fig. 5, the method for separating ground material according to the embodiment of the present invention includes an intake step S1, a partial intake (first separation) step S2, a dropping step S3, a bisection (second separation) step S4, and a transport step S5.
In the intake step S1, ground material 102 dropped from a belt conveyor 101 is taken into an opening 3 provided in a cylindrical main body 1.
In the partial collection (primary collection) step S2, a portion of the dropped ground material 102 is collected through the second collection section configured as the rear opening 4.
In the falling step S3, the ground material 102 that is taken into the rear opening 4 of the opening 3 and passes through the main body 1 falls onto the wedge-shaped first fractionation section 2 that is arranged so as to protrude upward inside the main body 1.
In the bifurcating (secondary collection) step S4, the ground material 102 that has fallen onto the first collection section 2 is divided into two parts, onto a transport device 103 for collection and onto a transport device 104 for the main flow.
In the transport step S5, the ground material 102 guided onto the transport device 103 for fractionation is transported to an analysis device (not shown) as a fraction for analysis. On the other hand, the ground material 102 guided onto the transport device 104 for the main flow is transported to a predetermined location such as a stockyard (not shown) for use in construction work.

前記したように、本実施形態に係る分取装置100は、ベルトコンベア101上を搬送される地盤材料102の分取装置である。この分取装置100は、ベルトコンベア101から投下される地盤材料102を取り込む開口部3を有する筒状の本体部1と、本体部1の内部に上向きに突になるように配置された楔状の第一分取部2とを備える。開口部3に取り込まれ本体部1内を通過した地盤材料102が、第一分取部2の上に落下して、分取用の搬送装置103上と、本流用の搬送装置104上と、に二分される。
本実施形態では、ベルトコンベア101から投下される地盤材料102が、本体部1の開口部3に取り込まれて該本体部1内を通過し、上向きに突になるように配置された楔状の第一分取部2の上に落下する。第一分取部2の上に落下した地盤材料102は、分取用の搬送装置103上と、本流用の搬送装置104上とに二分される。分取用の搬送装置103で搬送される地盤材料102は解析に使用され、本流用の搬送装置104で搬送される地盤材料102は工事に使用されることになる。
これにより、ベルトコンベア101上を搬送される地盤材料102から解析に必要な量を分取することが可能となる。したがって、本実施形態によれば、搬送される地盤材料102の一部を解析用に効率良く分取できる地盤材料の分取装置100を提供することができる。
As described above, the fractionation device 100 according to this embodiment is a fractionation device for ground material 102 transported on a belt conveyor 101. This fractionation device 100 comprises a cylindrical main body 1 having an opening 3 for taking in ground material 102 dropped from the belt conveyor 101, and a wedge-shaped first fractionation section 2 arranged so as to protrude upward inside the main body 1. The ground material 102 taken in at the opening 3 and passing through the main body 1 falls onto the first fractionation section 2 and is divided into two parts, one on a conveying device 103 for fractionation and the other on a conveying device 104 for the main flow.
In this embodiment, ground material 102 dropped from a belt conveyor 101 is taken into the opening 3 of the main body 1, passes through the main body 1, and falls onto a wedge-shaped first fractionation section 2 arranged so as to protrude upward. The ground material 102 that falls onto the first fractionation section 2 is divided into two parts, one on a conveying device 103 for fractionation and the other on a conveying device 104 for the main flow. The ground material 102 transported by the conveying device 103 for fractionation is used for analysis, and the ground material 102 transported by the conveying device 104 for the main flow is used for construction work.
This makes it possible to extract the amount required for analysis from the ground material 102 transported on the belt conveyor 101. Therefore, according to this embodiment, it is possible to provide a ground material extraction device 100 that can efficiently extract a portion of the transported ground material 102 for analysis.

また、本実施形態では、第一分取部2は、地盤材料102が二分される方向に沿って移動可能である。この構成では、分取用の搬送装置103上に導かれる地盤材料102の量と、本流用の搬送装置104上に導かれる地盤材料102の量との割合を調整できる。これにより、解析用により適した量の地盤材料102を効率良く分取することが可能となる。 In addition, in this embodiment, the first fractionation section 2 can move along the direction in which the ground material 102 is divided in two. In this configuration, the ratio between the amount of ground material 102 guided onto the fractionation conveying device 103 and the amount of ground material 102 guided onto the main flow conveying device 104 can be adjusted. This makes it possible to efficiently separate an amount of ground material 102 that is more suitable for analysis.

また、本実施形態では、本体部1の内部には、仕切板11が設けられている。この場合、開口部3は、仕切板11を境界として、ベルトコンベア101の上流側から見て奥側に位置する奥側開口部4と手前側に位置する手前側開口部5とに二分される。奥側開口部4は、手前側開口部5よりも開口面積が小さく、地盤材料102の一部を取り込む第二分取部を構成している。この構成では、奥側開口部4として構成される第二分取部を通して、地盤材料102の一部が取り込まれる。これにより、解析用に分取される地盤材料102の量を絞ることができる。 In addition, in this embodiment, a partition plate 11 is provided inside the main body 1. In this case, the opening 3 is divided into a rear opening 4 located on the rear side when viewed from the upstream side of the belt conveyor 101, and a front opening 5 located on the front side, with the partition plate 11 as a boundary. The rear opening 4 has a smaller opening area than the front opening 5, and constitutes a second separation section that takes in a portion of the ground material 102. In this configuration, a portion of the ground material 102 is taken in through the second separation section configured as the rear opening 4. This makes it possible to narrow down the amount of ground material 102 that is separated for analysis.

また、本実施形態では、奥側開口部4の左側及び右側に、本体部1内の通路の一部を閉塞する左側閉塞部材16及び右側閉塞部材17がそれぞれ設けられている。この場合、奥側開口部4として構成される第二分取部は、左側閉塞部材16と右側閉塞部材17との間に形成されている。本体部1内の通路の一部を閉塞する左側閉塞部材16及び右側閉塞部材17を設けることで、適宜な開口面積を持つ第二分取部を容易に形成することができる。また、左側閉塞部材16と右側閉塞部材17との間を通過して、地盤材料102の一部が効率良く取り込まれる。 In addition, in this embodiment, a left blocking member 16 and a right blocking member 17 that block part of the passage in the main body 1 are provided on the left and right sides of the rear opening 4, respectively. In this case, the second collection section configured as the rear opening 4 is formed between the left blocking member 16 and the right blocking member 17. By providing the left blocking member 16 and the right blocking member 17 that block part of the passage in the main body 1, a second collection section with an appropriate opening area can be easily formed. Also, a part of the ground material 102 is efficiently taken in by passing between the left blocking member 16 and the right blocking member 17.

また、本実施形態では、手前側開口部5には、該手前側開口部5の一部を閉塞する板状部材18が設けられている。ベルトコンベア101から投下される地盤材料102のうち、粒径が大きく重量の大きい粗粒材は、図1のC矢印に沿うように落下し、仕切版11よりも遠方に至り、粒径が小さく重量の小さい細粒材は、図1のD矢印に沿うように落下し、仕切版11の手前側に至る傾向がある。板状部材18で手前側開口部5の一部を閉塞することで、手前側に落下しやすい細粒材を板状部材18上でバウンドさせて奥側開口部4として構成される第二分取部へ導くことができる。このため、奥側開口部4として構成される第二分取部に取り込まれる地盤材料102は、粗粒材と細粒材とを適度に混合させたものとなる。したがって、分取されて解析に使用される地盤材料102の粒度分布と、工事に使用される地盤材料102の粒度分布との差異を低減できる。これにより、分取された地盤材料102を使用した解析の信頼性が向上する。 In addition, in this embodiment, the front opening 5 is provided with a plate-like member 18 that blocks a part of the front opening 5. Of the ground material 102 dropped from the belt conveyor 101, the coarse grains with a large grain size and a large weight tend to fall along the C arrow in FIG. 1 and reach a distance farther than the partition plate 11, while the fine grains with a small grain size and a small weight tend to fall along the D arrow in FIG. 1 and reach the front side of the partition plate 11. By blocking a part of the front opening 5 with the plate-like member 18, the fine grains that tend to fall to the front side can be bound on the plate-like member 18 and guided to the second separation section configured as the rear opening 4. Therefore, the ground material 102 taken into the second separation section configured as the rear opening 4 is a moderate mixture of coarse grains and fine grains. Therefore, the difference between the grain size distribution of the ground material 102 that is separated and used for analysis and the grain size distribution of the ground material 102 used for construction can be reduced. This improves the reliability of analysis using the collected ground material 102.

また、本実施形態では、板状部材18は、奥側開口部4の手前側に、上方から見て地盤材料102がベルトコンベア101上を搬送される方向に沿って設けられている。この構成では、ベルトコンベア101から投下される地盤材料102のうち、手前側に落下しやすい細粒材は、板状部材18上でバウンドして奥側開口部4として構成される第二分取部へ導かれやすくなる。これにより、第二分取部に取り込まれる細粒材の量を増やすことができる。
また、本実施形態では、板状部材18は、仕切板11に向かって下方に傾斜している。この構成では、ベルトコンベア101から投下される地盤材料102のうち、手前側に落下しやすい細粒材は、板状部材18に衝突した後に、奥側開口部4として構成される第二分取部の方へ跳ね返りやすくなる。これにより、第二分取部に取り込まれる細粒材の量を増やすことができる。
In this embodiment, the plate-like member 18 is provided on the front side of the rear opening 4 along the direction in which the ground material 102 is transported on the belt conveyor 101 as viewed from above. In this configuration, of the ground material 102 dropped from the belt conveyor 101, fine granular material that tends to fall to the front side tends to bounce on the plate-like member 18 and be guided to the second collection section configured as the rear opening 4. This makes it possible to increase the amount of fine granular material taken into the second collection section.
In this embodiment, the plate-like member 18 is inclined downward toward the partition plate 11. In this configuration, of the ground material 102 dropped from the belt conveyor 101, the fine granular material that tends to fall toward the front side tends to bounce back toward the second collection section configured as the rear opening 4 after colliding with the plate-like member 18. This makes it possible to increase the amount of fine granular material taken into the second collection section.

また、本実施形態では、第一分取部2は、仕切板11で仕切られた二つの空間のうち、ベルトコンベア101の上流側から見て奥側の空間において、奥側開口部4として構成される第二分取部の下方に配置されている。この構成では、まず奥側開口部4として構成される第二分取部によって地盤材料102の量を絞ることで一次分取を行った後に、第一分取部2によって解析に必要な量を調整することで二次分取を行うことができる。これにより、第一分取部2及び奥側開口部4として構成される第二分取部の各々にかかる負担を軽減できるとともに、分取を二段階に分けることで、より適した量の分取が可能となる。 In addition, in this embodiment, the first fractionation section 2 is disposed below the second fractionation section configured as the rear opening 4 in the space at the rear end as viewed from the upstream side of the belt conveyor 101, of the two spaces separated by the partition plate 11. In this configuration, the second fractionation section configured as the rear opening 4 first reduces the amount of ground material 102 to perform a primary fractionation, and then the first fractionation section 2 adjusts the amount required for analysis to perform a secondary fractionation. This reduces the burden on both the first fractionation section 2 and the second fractionation section configured as the rear opening 4, and by dividing the fractionation into two stages, a more appropriate amount can be fractionated.

また、本実施形態では、手前側開口部5から取り込まれた地盤材料102は、本流用の搬送装置104上に落下する。この構成では、奥側開口部4として構成される第二分取部に取り込まれずに解析に使用されないこととなった地盤材料102を、工事に使用されるものとして本流用の搬送装置104で速やかに搬送することができる。 In addition, in this embodiment, the ground material 102 taken in from the front opening 5 falls onto the main stream conveying device 104. In this configuration, the ground material 102 that is not taken in the second collection section configured as the rear opening 4 and is not used for analysis can be quickly transported by the main stream conveying device 104 for use in construction work.

また、本実施形態は、本体部1に振動を与える振動体6を備えている。地盤材料102の分取を行う部分は、地盤材料102の一部を取り分ける必要があるため、構造上複雑化する。そのため、地盤材料102が流れる部分に地盤材料102との接触箇所が多く存在し、地盤材料102の付着による閉塞が起こる可能性がある。振動体6を備えることによって、地盤材料102が接触する部分に振動を加えることができ、地盤材料102が付着しにくくなる。これにより、地盤材料102が流れる部分における地盤材料102の付着による閉塞を抑制でき、分取装置100のメンテナンス性が向上する。 This embodiment also includes a vibrating body 6 that applies vibrations to the main body 1. The portion where the ground material 102 is separated is structurally complex because it is necessary to separate a portion of the ground material 102. As a result, there are many contact points with the ground material 102 in the portion where the ground material 102 flows, and there is a possibility that blockages will occur due to the adhesion of the ground material 102. By including the vibrating body 6, vibrations can be applied to the portion where the ground material 102 comes into contact, making it difficult for the ground material 102 to adhere. This makes it possible to suppress blockages due to the adhesion of the ground material 102 in the portion where the ground material 102 flows, improving the maintainability of the separation device 100.

以上、本発明の実施形態について説明したが、本発明は前記実施形態に限定されることなく、その趣旨を逸脱しない範囲で適宜に変更が可能である。
例えば、前記実施形態では、左側閉塞部材16及び右側閉塞部材17が水平に配置されていて、その上にデッドストック部20が形成されているが、これに限定されるものではない。左側閉塞部材16及び右側閉塞部材17は、仕切板11に向かって下方に傾斜して設けられてもよい。この場合、側板19及びデッドストック部20は省略され得る。
Although the embodiment of the present invention has been described above, the present invention is not limited to the above embodiment, and can be appropriately modified without departing from the spirit of the present invention.
For example, in the above embodiment, the left blocking member 16 and the right blocking member 17 are arranged horizontally and the dead stock portion 20 is formed thereon, but this is not limited thereto. The left blocking member 16 and the right blocking member 17 may be provided inclined downward toward the partition plate 11. In this case, the side plate 19 and the dead stock portion 20 may be omitted.

1 本体部
2 第一分取部
3 開口部
4 奥側開口部(第二分取部)
5 手前側開口部
6 振動体
11 仕切板
16 左側閉塞部材
17 右側閉塞部材
18 板状部材
100 分取装置
101 ベルトコンベア
102 地盤材料
103 分取用の搬送装置
104 本流用の搬送装置
1 Main body 2 First fraction collection section 3 Opening 4 Back opening (second fraction collection section)
5 Front opening 6 Vibration body 11 Partition plate 16 Left blocking member 17 Right blocking member 18 Plate-shaped member 100 Fraction collection device 101 Belt conveyor 102 Ground material 103 Conveyor device for fraction collection 104 Conveyor device for main flow

Claims (4)

ベルトコンベア上を搬送される地盤材料の分取装置であって、
前記ベルトコンベアから投下される前記地盤材料を取り込む開口部を有する筒状の本体部と、
前記本体部の内部に上向きに突になるように配置された楔状の第一分取部と、を備え、
前記第一分取部は、前記地盤材料が二分される方向に沿って移動可能であり、
前記開口部に取り込まれ前記本体部内を通過した前記地盤材料が、前記第一分取部の上に落下して、分取用の搬送装置上と、本流用の搬送装置上と、に二分されること、
を特徴とする地盤材料の分取装置。
A device for separating ground materials transported on a belt conveyor,
A cylindrical main body having an opening for taking in the ground material dropped from the belt conveyor;
A wedge-shaped first fractionating portion is disposed inside the main body portion so as to protrude upward,
The first fractionating section is movable along a direction in which the ground material is divided into two,
The ground material taken into the opening and passing through the main body falls onto the first fractionation section and is divided into two parts, one on a conveying device for fractionation and the other on a conveying device for the main flow.
A geomaterial separation device characterized by:
ベルトコンベア上を搬送される地盤材料の分取装置であって、
前記ベルトコンベアから投下される前記地盤材料を取り込む開口部を有する筒状の本体部と、
前記本体部の内部に上向きに突になるように配置された楔状の第一分取部と、を備え、
前記本体部の内部には、仕切板が設けられ、
前記開口部は、前記仕切板を境界として、前記ベルトコンベアの上流側から見て奥側に位置する奥側開口部と手前側に位置する手前側開口部とに二分され、
前記奥側開口部は、前記手前側開口部よりも開口面積が小さく、前記地盤材料の一部を取り込む第二分取部を構成していて、
前記開口部に取り込まれ前記本体部内を通過した前記地盤材料が、前記第一分取部の上に落下して、分取用の搬送装置上と、本流用の搬送装置上と、に二分されること、
を特徴とする地盤材料の分取装置。
A device for separating ground materials transported on a belt conveyor,
A cylindrical main body having an opening for taking in the ground material dropped from the belt conveyor;
A wedge-shaped first fractionating portion is disposed inside the main body portion so as to protrude upward,
A partition plate is provided inside the main body,
The opening is divided into two by the partition plate, a rear opening located on the rear side as viewed from the upstream side of the belt conveyor, and a front opening located on the front side,
The rear opening has an opening area smaller than that of the front opening and constitutes a second fractionating section that takes in a portion of the ground material,
The ground material taken into the opening and passing through the main body falls onto the first fractionation section and is divided into two parts, one on a conveying device for fractionation and the other on a conveying device for the main flow.
A geomaterial separation device characterized by:
前記奥側開口部の前記ベルトコンベアの上流側から見て左側及び右側に、前記本体部内の通路の一部を閉塞する左側閉塞部材及び右側閉塞部材がそれぞれ設けられ、
前記第二分取部は、前記左側閉塞部材と前記右側閉塞部材との間に形成されていること、
を特徴とする請求項に記載の地盤材料の分取装置。
a left blocking member and a right blocking member that block a part of a passage in the main body are provided on the left and right sides of the rear opening as viewed from the upstream side of the belt conveyor,
the second sorting portion is formed between the left blocking member and the right blocking member;
The apparatus for separating geological materials according to claim 2 .
前記手前側開口部には、該手前側開口部の一部を閉塞する板状部材が設けられていること、
を特徴とする請求項または請求項に記載の地盤材料の分取装置。
a plate-like member is provided at the front opening to close a portion of the front opening;
4. The apparatus for separating geological materials according to claim 2 or 3 .
JP2021028772A 2021-02-25 2021-02-25 Equipment for separating geomaterials Active JP7499199B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021028772A JP7499199B2 (en) 2021-02-25 2021-02-25 Equipment for separating geomaterials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021028772A JP7499199B2 (en) 2021-02-25 2021-02-25 Equipment for separating geomaterials

Publications (2)

Publication Number Publication Date
JP2022129903A JP2022129903A (en) 2022-09-06
JP7499199B2 true JP7499199B2 (en) 2024-06-13

Family

ID=83151092

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021028772A Active JP7499199B2 (en) 2021-02-25 2021-02-25 Equipment for separating geomaterials

Country Status (1)

Country Link
JP (1) JP7499199B2 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011098297A (en) 2009-11-06 2011-05-19 Sumitomo Metal Mining Co Ltd Device and method of sorting soil, and soil cleaning facilities

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53162106U (en) * 1977-05-26 1978-12-19
JPS57146045U (en) * 1981-03-09 1982-09-13
DE68928730D1 (en) * 1988-05-06 1998-08-13 Sprout Matador As METHOD AND SYSTEM FOR TREATING PATTERN MATERIAL, e.g. FOR MIXING PLANTS FOR CENTRAL ANALYSIS OF THE PATTERN

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011098297A (en) 2009-11-06 2011-05-19 Sumitomo Metal Mining Co Ltd Device and method of sorting soil, and soil cleaning facilities

Also Published As

Publication number Publication date
JP2022129903A (en) 2022-09-06

Similar Documents

Publication Publication Date Title
US3439800A (en) Aggregate size testing apparatus and process
US20080314803A1 (en) Asphalt recycling plant
CN102917797A (en) Separating device
US5699918A (en) Screen for vibrating material sorting apparatus
JPH04504078A (en) Methods and devices for recovering valuable substances mainly from construction site waste
WO2018019285A1 (en) Material flow shaping device
US2864561A (en) Materials handling process and apparatus
US3752315A (en) Combination scalper cleaner
JP7499199B2 (en) Equipment for separating geomaterials
AU2019305683B2 (en) Sizing and separating granular particles
US3388797A (en) Material classifying apparatus
EP1663521B1 (en) Sorting device and method
US2738679A (en) Solids sampling apparatus
US4304661A (en) Machines for concentrating ore
US5564823A (en) Method and apparatus for separation and volume measurement of components for lightweight concrete
CN208661755U (en) A resistance screening device
AU2023362458A1 (en) Device for crushing paving stones and/or kerb stones
CN115970805A (en) Concrete aggregate regeneration system
TWM612740U (en) Screw selecting machine
KR101461579B1 (en) Processing apparatus for raw material and the method thereof
RU107970U1 (en) CRUSHING AND SORTING INSTALLATION OF ORE MINING
CN223276662U (en) Sand and stone screening device
JPH1133489A (en) Bivalve sorting equipment
DE4434748C2 (en) Method and device for separating a bulk material mixture
EP0337822A1 (en) Screening apparatus for bulk material

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230322

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20231031

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20231107

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20231211

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240220

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240401

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240507

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240603

R150 Certificate of patent or registration of utility model

Ref document number: 7499199

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150