Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7504237B2 - Bracket fixing member, shock absorber, and method of manufacturing shock absorber - Google Patents
[go: Go Back, main page]

JP7504237B2 - Bracket fixing member, shock absorber, and method of manufacturing shock absorber - Google Patents

Bracket fixing member, shock absorber, and method of manufacturing shock absorber Download PDF

Info

Publication number
JP7504237B2
JP7504237B2 JP2022579522A JP2022579522A JP7504237B2 JP 7504237 B2 JP7504237 B2 JP 7504237B2 JP 2022579522 A JP2022579522 A JP 2022579522A JP 2022579522 A JP2022579522 A JP 2022579522A JP 7504237 B2 JP7504237 B2 JP 7504237B2
Authority
JP
Japan
Prior art keywords
bracket
arc
shaped portion
shock absorber
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022579522A
Other languages
Japanese (ja)
Other versions
JPWO2022168779A1 (en
JPWO2022168779A5 (en
Inventor
豊 黒田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Astemo Ltd
Original Assignee
Hitachi Astemo Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Astemo Ltd filed Critical Hitachi Astemo Ltd
Publication of JPWO2022168779A1 publication Critical patent/JPWO2022168779A1/ja
Publication of JPWO2022168779A5 publication Critical patent/JPWO2022168779A5/ja
Application granted granted Critical
Publication of JP7504237B2 publication Critical patent/JP7504237B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60GVEHICLE SUSPENSION ARRANGEMENTS
    • B60G15/00Resilient suspensions characterised by arrangement, location or type of combined spring and vibration damper, e.g. telescopic type
    • B60G15/02Resilient suspensions characterised by arrangement, location or type of combined spring and vibration damper, e.g. telescopic type having mechanical spring
    • B60G15/06Resilient suspensions characterised by arrangement, location or type of combined spring and vibration damper, e.g. telescopic type having mechanical spring and fluid damper
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60GVEHICLE SUSPENSION ARRANGEMENTS
    • B60G7/00Pivoted suspension arms; Accessories thereof
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16FSPRINGS; SHOCK-ABSORBERS; MEANS FOR DAMPING VIBRATION
    • F16F9/00Springs, vibration-dampers, shock-absorbers, or similarly-constructed movement-dampers using a fluid or the equivalent as damping medium
    • F16F9/32Details
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16FSPRINGS; SHOCK-ABSORBERS; MEANS FOR DAMPING VIBRATION
    • F16F9/00Springs, vibration-dampers, shock-absorbers, or similarly-constructed movement-dampers using a fluid or the equivalent as damping medium
    • F16F9/32Details
    • F16F9/54Arrangements for attachment

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Fluid-Damping Devices (AREA)
  • Vehicle Body Suspensions (AREA)

Description

本発明は、ブラケット固定部材、緩衝器および緩衝器の製造方法に関する。
本願は、2021年2月2日に、日本に出願された特願2021-014842号に基づき優先権を主張し、その内容をここに援用する。
The present invention relates to a bracket fixing member, a shock absorber, and a method for manufacturing a shock absorber.
This application claims priority based on Japanese Patent Application No. 2021-014842, filed on February 2, 2021, the contents of which are incorporated herein by reference.

ブラケットを取り付けた緩衝器がある(例えば、特許文献1,2参照)。 There are shock absorbers with brackets attached (see, for example, Patent Documents 1 and 2).

特開2001-182772号公報JP 2001-182772 A 特開2002-283993号公報JP 2002-283993 A

ブラケットをベース部材に抵抗溶接により取り付けることが行われる場合がある。このような取り付け構造において溶接品質の低下を抑制することが望まれている。 In some cases, brackets are attached to a base member by resistance welding. It is desirable to prevent deterioration of welding quality in such attachment structures.

本発明は、溶接品質の低下を抑制することが可能なブラケット固定部材、緩衝器および緩衝器の製造方法を提供する。 The present invention provides a bracket fixing member, a shock absorber, and a method for manufacturing a shock absorber that can suppress deterioration in welding quality.

本発明の第一の態様によれば、ブラケット固定部材は、筒状または円弧状のベース部材と、前記ベース部材の円周方向に複数設けられる固定部を有すると共に、該ベース部材の外周側と重なり合うように配置されて該ベース部材に前記固定部が抵抗溶接にて固定され、少なくとも複数の前記固定部間の湾曲よりも円周方向外側部位の湾曲の方が、外径方向に広がるよう形成されている円弧状部を備えるブラケットと、を有する。According to a first aspect of the present invention, the bracket fixing member comprises a cylindrical or arc-shaped base member, and a bracket having a plurality of fixing portions arranged in the circumferential direction of the base member, the fixing portions being arranged so as to overlap with the outer periphery of the base member and fixed to the base member by resistance welding, the bracket having an arc-shaped portion formed so that the curvature of the circumferential outer portion is wider in the outer diameter direction than the curvature between at least the plurality of the fixing portions.

本発明の第二態様の態様によれば、緩衝器は、円筒状のシリンダを備える。この緩衝器は、板材を前記シリンダの外周側の少なくとも一部を覆うように成型して形成され、前記シリンダに固定される第1ブラケットと、第2ブラケットと、を有する。第2ブラケットは、別部材を保持する保持部と、前記シリンダまたは前記第1ブラケットからなるベース部材の円周方向に複数の固定部を有すると共に、該ベース部材の外周側と重なり合うように配置されて該ベース部材に前記固定部が抵抗溶接にて固定され、少なくとも複数の前記固定部間の湾曲よりも円周方向外側部位の湾曲の方が、外径方向に広がるよう形成されている円弧状部と、を備える。According to a second aspect of the present invention, the shock absorber includes a cylindrical cylinder. The shock absorber includes a first bracket and a second bracket that are formed by molding a plate material to cover at least a portion of the outer periphery of the cylinder and are fixed to the cylinder. The second bracket includes a holding portion that holds a separate member, and an arc-shaped portion that has a plurality of fixing portions in the circumferential direction of a base member that is the cylinder or the first bracket, is arranged to overlap with the outer periphery of the base member, and is fixed to the base member by resistance welding, and is formed so that the curvature of the outer circumferential portion is wider in the outer diameter direction than the curvature between at least the plurality of fixing portions.

本発明の第三の態様によれば、円筒状のシリンダを備えた緩衝器の製造方法は、少なくとも一部が円弧状に形成された第1ブラケットと、第2ブラケットであって、少なくとも一部が円弧状に形成された第1円弧状部とされ、該第1円弧状部の内周側に突出する複数の突出部と、前記第1円弧状部の円周方向外側にあって、前記第1円弧状部よりも外径方向に広がるよう形成された第2円弧状部とを有する第2ブラケットと、を準備する工程と、前記第1ブラケットを前記シリンダに固定する工程と、前記シリンダまたは前記第1ブラケットからなるベース部材の外周に前記突出部が当接するよう前記第2ブラケットを配置する工程と、前記ベース部材と前記突出部との間に電流を通電して抵抗溶接する工程と、を含む。According to a third aspect of the present invention, a method for manufacturing a shock absorber having a cylindrical cylinder includes the steps of preparing a first bracket, at least a portion of which is formed in an arc shape, and a second bracket, the second bracket having a first arc-shaped portion at least a portion of which is formed in an arc shape and having a plurality of protrusions protruding from the inner periphery of the first arc-shaped portion and a second arc-shaped portion that is circumferentially outward of the first arc-shaped portion and is formed to extend radially outward beyond the first arc-shaped portion; fixing the first bracket to the cylinder; positioning the second bracket such that the protrusions abut against the outer periphery of a base member formed of the cylinder or the first bracket; and resistance welding by passing an electric current between the base member and the protrusions.

上記した緩衝器及び緩衝器の製造方法によれば、溶接品質の低下を抑制することが可能となる。 The above-mentioned shock absorber and shock absorber manufacturing method make it possible to suppress deterioration in welding quality.

本発明の第1実施形態に係る緩衝器を示す断面図である。1 is a cross-sectional view showing a shock absorber according to a first embodiment of the present invention. 本発明の第1実施形態に係る緩衝器の要部を示す側面図である。1 is a side view showing a main part of a shock absorber according to a first embodiment of the present invention; 本発明の第1実施形態に係る緩衝器の要部を示す図2におけるIII-III断面矢視図である。3 is a cross-sectional view taken along the line III-III in FIG. 2, showing a main portion of the shock absorber according to the first embodiment of the present invention. 本発明の第1実施形態に係る緩衝器の要部を示す第2ブラケット配置工程後、第2ブラケット溶接工程前の断面図である。4 is a cross-sectional view showing a main portion of the shock absorber according to the first embodiment of the present invention after a second bracket arrangement step and before a second bracket welding step. FIG. 本発明の第2実施形態に係る緩衝器の要部を示す断面図である。FIG. 6 is a cross-sectional view showing a main part of a shock absorber according to a second embodiment of the present invention. 本発明の第3実施形態に係る緩衝器の要部を示す断面図である。FIG. 11 is a cross-sectional view showing a main part of a shock absorber according to a third embodiment of the present invention. 本発明の第1実施形態に係る緩衝器の変形例の要部を示す断面図である。10 is a cross-sectional view showing a main part of a modified example of the shock absorber according to the first embodiment of the present invention. FIG.

[第1実施形態]
本発明の第1実施形態を図1~図4を参照しつつ以下に説明する。
[First embodiment]
A first embodiment of the present invention will be described below with reference to FIGS.

図1に、第1実施形態の緩衝器11(ブラケット固定部材)を示す。緩衝器11は、自動車や鉄道車両等の車両のサスペンション装置に用いられる。具体的には自動車のストラット型サスペンションに用いられる緩衝器である。緩衝器11は、円筒状の内筒12と、有底円筒状の外筒14と、第1ブラケット15(ベース部材)と、図2に示すように第1ブラケット15の外周側に溶接により取り付けられる第2ブラケット16(ブラケット)と、を有している。外筒14は、内筒12よりも大径である。外筒14は、内筒12の外周側に設けられて、内筒12との間にリザーバ室13を形成する。第1ブラケット15は、外筒14の外周側に溶接により取り付けられる。図1に示す内筒12と外筒14とが円筒状のシリンダ17を構成している。 Figure 1 shows a shock absorber 11 (bracket fixing member) of the first embodiment. The shock absorber 11 is used in suspension devices for vehicles such as automobiles and railroad cars. Specifically, it is a shock absorber used in strut-type suspensions for automobiles. The shock absorber 11 has a cylindrical inner tube 12, a cylindrical outer tube 14 with a bottom, a first bracket 15 (base member), and a second bracket 16 (bracket) attached by welding to the outer periphery of the first bracket 15 as shown in Figure 2. The outer tube 14 has a larger diameter than the inner tube 12. The outer tube 14 is provided on the outer periphery of the inner tube 12 to form a reservoir chamber 13 between the inner tube 12 and the outer tube 14. The first bracket 15 is attached by welding to the outer periphery of the outer tube 14. The inner tube 12 and the outer tube 14 shown in Figure 1 form a cylindrical cylinder 17.

外筒14は、金属製の一部材からなる一体成形品である。外筒14は、円筒状の側壁部21と、側壁部21の軸方向の一端側を閉塞する底部22と、側壁部21の底部22とは反対側の開口部23とを有している。The outer cylinder 14 is a one-piece molded product made of a single piece of metal. The outer cylinder 14 has a cylindrical side wall 21, a bottom 22 that closes one axial end of the side wall 21, and an opening 23 on the side of the side wall 21 opposite the bottom 22.

緩衝器11は、内筒12の軸方向の一端部に取り付けられる円環状のボディ部材30と、内筒12の軸方向の他端部に取り付けられる円環状のロッドガイド31と、を有している。内筒12は、ボディ部材30を介して外筒14の底部22に嵌合している。また、内筒12は、ロッドガイド31を介して外筒14の側壁部21の開口部23側に嵌合している。この状態で、内筒12は、外筒14に対して径方向および軸方向に位置決めされている。The shock absorber 11 has an annular body member 30 attached to one axial end of the inner cylinder 12, and an annular rod guide 31 attached to the other axial end of the inner cylinder 12. The inner cylinder 12 fits into the bottom 22 of the outer cylinder 14 via the body member 30. The inner cylinder 12 also fits into the opening 23 of the side wall 21 of the outer cylinder 14 via the rod guide 31. In this state, the inner cylinder 12 is positioned radially and axially relative to the outer cylinder 14.

緩衝器11は、ロッドガイド31に対して底部22とは反対側に、円環状のシール部材33を有している。このシール部材33は、側壁部21の開口部23側の内周部に嵌合されている。側壁部21の底部22とは反対の端部には、係止部34が形成されている。係止部34は、カール加工によって径方向内方に塑性変形させて形成されている。シール部材33は、係止部34とロッドガイド31とに挟持されている。 The shock absorber 11 has an annular seal member 33 on the opposite side of the rod guide 31 from the bottom 22. This seal member 33 is fitted into the inner periphery of the opening 23 side of the side wall 21. A locking portion 34 is formed on the end of the side wall 21 opposite the bottom 22. The locking portion 34 is formed by plastically deforming radially inward by curling. The seal member 33 is sandwiched between the locking portion 34 and the rod guide 31.

緩衝器11は、内筒12内に摺動可能に嵌装されるピストン35を有している。ピストン35は、内筒12内に第1室38と第2室39とを画成している。第1室38は、内筒12内のピストン35とロッドガイド31との間に設けられている。第2室39は、内筒12内のピストン35とボディ部材30との間に設けられている。内筒12内の第2室39は、ボディ部材30によってリザーバ室13と画成されている。内筒12内の第1室38および第2室39には作動流体である油液が充填されている。内筒12と外筒14との間のリザーバ室13には作動流体であるガスと油液とが充填されている。 The shock absorber 11 has a piston 35 slidably fitted in the inner cylinder 12. The piston 35 defines a first chamber 38 and a second chamber 39 in the inner cylinder 12. The first chamber 38 is provided between the piston 35 and the rod guide 31 in the inner cylinder 12. The second chamber 39 is provided between the piston 35 and the body member 30 in the inner cylinder 12. The second chamber 39 in the inner cylinder 12 is defined as a reservoir chamber 13 by the body member 30. The first chamber 38 and the second chamber 39 in the inner cylinder 12 are filled with oil liquid, which is a working fluid. The reservoir chamber 13 between the inner cylinder 12 and the outer cylinder 14 is filled with gas and oil liquid, which are working fluids.

緩衝器11は、ピストンロッド41を有している。ピストンロッド41の一側は、ピストン35に結合される。ピストンロッド41の他側は、外筒14から開口部23を介して外部に延出する。ピストンロッド41には、ピストン35がナット43によって連結されている。ピストンロッド41は、ロッドガイド31およびシール部材33を通って内筒12および外筒14から外部へと延出している。ピストンロッド41は、外筒14から外部に延出する部分が車体側に連結される。ピストンロッド41は、ロッドガイド31に案内されて、内筒12および外筒14に対して、ピストン35と一体に軸方向に移動する。シール部材33は、外筒14とピストンロッド41との間を閉塞して、内筒12内の油液と、リザーバ室13内のガスおよび油液とが外部に漏出するのを規制する。The shock absorber 11 has a piston rod 41. One side of the piston rod 41 is connected to the piston 35. The other side of the piston rod 41 extends from the outer cylinder 14 to the outside through the opening 23. The piston 35 is connected to the piston rod 41 by a nut 43. The piston rod 41 extends from the inner cylinder 12 and the outer cylinder 14 to the outside through the rod guide 31 and the seal member 33. The part of the piston rod 41 that extends from the outer cylinder 14 to the outside is connected to the vehicle body side. The piston rod 41 is guided by the rod guide 31 and moves axially together with the piston 35 relative to the inner cylinder 12 and the outer cylinder 14. The seal member 33 closes the gap between the outer cylinder 14 and the piston rod 41 to restrict the oil in the inner cylinder 12 and the gas and oil in the reservoir chamber 13 from leaking out to the outside.

ピストン35には、軸方向に貫通する通路44および通路45が形成されている。通路44,45は、第1室38と第2室39とを連通可能である。緩衝器11は、円環状のディスクバルブ46を、ピストン35の軸方向の底部22とは反対側に有している。ディスクバルブ46は、ピストン35に当接することで、通路44を閉塞可能である。また、緩衝器11は、円環状のディスクバルブ47を、ピストン35の軸方向の底部22側に有している。ディスクバルブ47は、ピストン35に当接することで通路45を閉塞可能である。The piston 35 is formed with passages 44 and 45 that penetrate in the axial direction. The passages 44 and 45 can connect the first chamber 38 and the second chamber 39. The shock absorber 11 has an annular disc valve 46 on the side opposite the bottom 22 of the piston 35 in the axial direction. The disc valve 46 can close the passage 44 by abutting against the piston 35. The shock absorber 11 also has an annular disc valve 47 on the side of the bottom 22 of the piston 35 in the axial direction. The disc valve 47 can close the passage 45 by abutting against the piston 35.

ディスクバルブ46は、縮み側の減衰バルブである。すなわち、ピストンロッド41が内筒12および外筒14内への進入量を増やす縮み側に移動し、ピストン35が第2室39を狭める方向に移動して、第2室39の圧力が第1室38の圧力よりも所定値以上高くなると、ディスクバルブ46は通路44を開く。ディスクバルブ46が通路44を開いた際、減衰力が発生する。ピストン35およびディスクバルブ46のうちの少なくとも一方には、ディスクバルブ46が通路44を最も閉塞した状態でも通路44を介して第1室38と第2室39とを連通させる図示略の固定オリフィスが形成されている。The disc valve 46 is a damping valve on the compression side. That is, when the piston rod 41 moves to the compression side to increase the amount of penetration into the inner cylinder 12 and the outer cylinder 14, and the piston 35 moves in a direction to narrow the second chamber 39, and the pressure in the second chamber 39 becomes higher than the pressure in the first chamber 38 by a predetermined value or more, the disc valve 46 opens the passage 44. When the disc valve 46 opens the passage 44, a damping force is generated. At least one of the piston 35 and the disc valve 46 has a fixed orifice (not shown) that communicates between the first chamber 38 and the second chamber 39 through the passage 44 even when the disc valve 46 is in the state where the passage 44 is most blocked.

ディスクバルブ47は、伸び側の減衰バルブである。すなわち、ピストンロッド41が内筒12および外筒14からの突出量を増やす伸び側に移動し、ピストン35が第1室38を狭める方向に移動して、第1室38の圧力が第2室39の圧力よりも所定値以上高くなると、ディスクバルブ47は通路45を開く。ディスクバルブ47が通路45を開く際に、減衰力が発生する。ピストン35およびディスクバルブ47のうちの少なくとも一方には、ディスクバルブ47が通路45を最も閉塞した状態でも通路45を介して第1室38と第2室39とを連通させる図示略の固定オリフィスが形成されている。The disc valve 47 is an extension damping valve. That is, when the piston rod 41 moves to the extension side to increase the amount of protrusion from the inner cylinder 12 and the outer cylinder 14, and the piston 35 moves in a direction narrowing the first chamber 38, and the pressure in the first chamber 38 becomes higher than the pressure in the second chamber 39 by a predetermined value or more, the disc valve 47 opens the passage 45. When the disc valve 47 opens the passage 45, a damping force is generated. At least one of the piston 35 and the disc valve 47 has a fixed orifice (not shown) that communicates the first chamber 38 and the second chamber 39 through the passage 45 even when the disc valve 47 is in the most closed state of the passage 45.

ボディ部材30には、軸方向に貫通する通路52および通路53が形成されている。通路52,53は第2室39とリザーバ室13とを連通可能である。ボディ部材30の軸方向の底部22側に、円環状のディスクバルブ55が備えられている。ボディ部材30の軸方向の底部22とは反対側に、円環状のディスクバルブ56が備えられている。ディスクバルブ55は、ボディ部材30に当接することで通路52を閉塞可能である。ディスクバルブ56は、ボディ部材30に当接することで通路53を閉塞可能である。 Passages 52 and 53 are formed in the body member 30, which penetrate in the axial direction. Passages 52, 53 can connect the second chamber 39 and the reservoir chamber 13. An annular disk valve 55 is provided on the bottom 22 side of the body member 30 in the axial direction. An annular disk valve 56 is provided on the side of the body member 30 opposite the bottom 22 in the axial direction. The disk valve 55 can close the passage 52 by abutting against the body member 30. The disk valve 56 can close the passage 53 by abutting against the body member 30.

ディスクバルブ55は、縮み側の減衰バルブである。すなわち、ピストンロッド41が縮み側に移動し、ピストン35が第2室39を狭める方向に移動して、第2室39の圧力がリザーバ室13の圧力よりも所定値以上高くなると、ディスクバルブ55が通路52を開く。ディスクバルブ55が通路52を開く際に減衰力が発生する。ディスクバルブ56は、サクションバルブである。すなわち、ピストンロッド41が伸び側に移動し、ピストン35が第1室38側に移動して、第2室39の圧力がリザーバ室13の圧力より低下すると通路53を開く。その際に、ディスクバルブ56は、リザーバ室13から第2室39内に実質的に減衰力を発生させずに作動液体を流す。The disc valve 55 is a damping valve on the compression side. That is, when the piston rod 41 moves to the compression side, the piston 35 moves in a direction narrowing the second chamber 39, and the pressure in the second chamber 39 becomes higher than the pressure in the reservoir chamber 13 by a predetermined value or more, the disc valve 55 opens the passage 52. When the disc valve 55 opens the passage 52, a damping force is generated. The disc valve 56 is a suction valve. That is, when the piston rod 41 moves to the extension side, the piston 35 moves to the first chamber 38 side, and the pressure in the second chamber 39 becomes lower than the pressure in the reservoir chamber 13, the disc valve 56 opens the passage 53. At that time, the disc valve 56 allows the hydraulic fluid to flow from the reservoir chamber 13 into the second chamber 39 without generating a substantial damping force.

第1ブラケット15は、金属製である。第1ブラケット15は、外筒14の軸方向の中央位置よりも底部22側の側壁部21に嵌合され溶接されて固定されている。第1ブラケット15は、図2および図3に示すように、円筒の一部の形状をなして側壁部21の外周部に嵌合する嵌合部60と、嵌合部60から互いに略平行をなして嵌合部60の径方向外側に同方向に延出する一対の略平板状の第1延出部61および第2延出部62とを有している。第1ブラケット15は、その少なくとも一部である嵌合部60が円弧状に形成されている。第1延出部61および第2延出部62には、それぞれ2箇所の取付穴63が形成されている。第1ブラケット15は、これら取付穴63に挿入される締結具(図示せず)で車輪側に連結される。The first bracket 15 is made of metal. The first bracket 15 is fitted to the side wall 21 on the bottom 22 side of the axial center position of the outer cylinder 14, and welded and fixed. As shown in Figs. 2 and 3, the first bracket 15 has a fitting portion 60 that is shaped like a part of a cylinder and fits into the outer periphery of the side wall 21, and a pair of substantially flat first and second extension portions 61 and 62 that extend from the fitting portion 60 in the same direction radially outward from the fitting portion 60 in approximately parallel relation to each other. The fitting portion 60, which is at least a part of the first bracket 15, is formed in an arc shape. The first and second extension portions 61 and 62 each have two mounting holes 63. The first bracket 15 is connected to the wheel side by fasteners (not shown) inserted into these mounting holes 63.

嵌合部60には、その円周方向における一対の第1延出部61および第2延出部62とは反対側に、嵌合部60を嵌合部60の径方向に貫通する抜き穴65が形成されている。抜き穴65は、図1に示すように、嵌合部60の軸方向における中間位置に形成されている。A hole 65 is formed in the fitting portion 60 on the opposite side of the fitting portion 60 in the circumferential direction from the pair of first extension portion 61 and second extension portion 62. The hole 65 is formed in the middle of the fitting portion 60 in the axial direction, as shown in FIG.

嵌合部60は、シリンダ17の軸方向における抜き穴65よりも底部22とは反対側の部分が、円弧状の第1主嵌合部71となっている。第1主嵌合部71は、外筒14の側壁部21の外周面21aを半周以上連続して覆っている。また、嵌合部60は、シリンダ17の軸方向における抜き穴65よりも底部22側の部分が、円弧状の第2主嵌合部72となっている。第2主嵌合部72は、外筒14の側壁部21の外周面21aを半周以上連続して覆っている。The fitting portion 60 has an arc-shaped first main fitting portion 71 on the side opposite the bottom portion 22 from the punching hole 65 in the axial direction of the cylinder 17. The first main fitting portion 71 continuously covers the outer peripheral surface 21a of the side wall portion 21 of the outer tube 14 for more than half the circumference. In addition, the fitting portion 60 has an arc-shaped second main fitting portion 72 on the side opposite the bottom portion 22 from the punching hole 65 in the axial direction of the cylinder 17. The second main fitting portion 72 continuously covers the outer peripheral surface 21a of the side wall portion 21 of the outer tube 14 for more than half the circumference.

また、嵌合部60は、シリンダ17の軸方向における第1主嵌合部71と第2主嵌合部72との間が、図3に示すように一対の円弧状の第1挟持部75および第2挟持部76となっている。第1挟持部75は、外筒14の側壁部21の外周面21aを半周未満の範囲で連続して覆う円弧状である。第2挟持部76も、外筒14の側壁部21の外周面21aを半周未満の範囲で連続して覆う円弧状である。図2に示す第1主嵌合部71および第2主嵌合部72と、図3に示す第1挟持部75および第2挟持部76とは、同一の円筒の一部をそれぞれが形成している。 In addition, the fitting portion 60 has a pair of arc-shaped first and second clamping portions 75 and 76 between the first main fitting portion 71 and the second main fitting portion 72 in the axial direction of the cylinder 17, as shown in FIG. 3. The first clamping portion 75 is an arc-shaped portion that continuously covers the outer peripheral surface 21a of the side wall portion 21 of the outer cylinder 14 over a range less than half the circumference. The second clamping portion 76 is also an arc-shaped portion that continuously covers the outer peripheral surface 21a of the side wall portion 21 of the outer cylinder 14 over a range less than half the circumference. The first main fitting portion 71 and the second main fitting portion 72 shown in FIG. 2 and the first clamping portion 75 and the second clamping portion 76 shown in FIG. 3 each form a part of the same cylinder.

第1主嵌合部71および第2主嵌合部72がそれぞれ外筒14の側壁部21の外周部に嵌合し、第1挟持部75および第2挟持部76が外筒14の側壁部21の外周部を径方向の反対側から挟持する。The first main fitting portion 71 and the second main fitting portion 72 each fit into the outer periphery of the side wall portion 21 of the outer tube 14, and the first clamping portion 75 and the second clamping portion 76 clamp the outer periphery of the side wall portion 21 of the outer tube 14 from opposite radial sides.

図2に示すように、第1延出部61は、第1挟持部75の抜き穴65とは反対側の端縁部と、その両側に近接する第1主嵌合部71の端縁部および第2主嵌合部72の端縁部とから、第1挟持部75、第1主嵌合部71および第2主嵌合部72の径方向における外側に延出している。第1延出部61は、嵌合部60の中心軸線に平行に広がっている。2, the first extension portion 61 extends radially outward from the edge of the first clamping portion 75 opposite the hole 65 and from the edge of the first main fitting portion 71 and the edge of the second main fitting portion 72 adjacent to both sides of the edge of the first clamping portion 75. The first extension portion 61 extends parallel to the central axis of the fitting portion 60.

図3に示す第2延出部62は、第2挟持部76の抜き穴65とは反対側の端縁部と、その両側に近接する第1主嵌合部71の端縁部および第2主嵌合部72の端縁部とから、第2挟持部76、第1主嵌合部71および第2主嵌合部72の径方向における外側に延出している。第2延出部62は、嵌合部60の中心軸線に平行に広がっている。3 extends radially outward from the edge of the second clamping portion 76 opposite the hole 65 and from the edge of the first main fitting portion 71 and the edge of the second main fitting portion 72 adjacent to both sides of the edge of the second clamping portion 76 radially outward from the first main fitting portion 71 and the second main fitting portion 72. The second extension portion 62 extends parallel to the central axis of the fitting portion 60.

第1ブラケット15は、一枚の平板状の板材から上記形状にプレス加工による成型で形成される。第2主嵌合部72がシリンダ17の軸方向における底部22側の側壁部21に嵌合する状態とされる。第1主嵌合部71が第2主嵌合部72よりもシリンダ17の軸方向における底部22とは反対側の側壁部21に嵌合される状態とされる。第1挟持部75および第2挟持部76が側壁部21を挟持する状態とされる。 The first bracket 15 is formed into the above shape by pressing a single flat plate material. The second main fitting portion 72 is fitted into the side wall portion 21 on the bottom 22 side in the axial direction of the cylinder 17. The first main fitting portion 71 is fitted into the side wall portion 21 on the opposite side of the bottom 22 in the axial direction of the cylinder 17 from the second main fitting portion 72. The first clamping portion 75 and the second clamping portion 76 are in a state of clamping the side wall portion 21.

この状態で、第1ブラケット15は、溶接によって外筒14に固定される。すると、第1ブラケット15は、嵌合部60において外筒14の側壁部21の外周面21a、すなわちシリンダ17の外周面21aを覆い、一対の略平板状の第1延出部61および第2延出部62が嵌合部60から互いに略平行をなして外筒14すなわちシリンダ17の径方向の外方に延出する状態になる。よって、第1ブラケット15は、板材をシリンダ17の外周側の少なくとも一部を覆うように成型して形成されると共に、シリンダ17に固定される。In this state, the first bracket 15 is fixed to the outer tube 14 by welding. Then, the first bracket 15 covers the outer peripheral surface 21a of the side wall portion 21 of the outer tube 14, i.e., the outer peripheral surface 21a of the cylinder 17, at the fitting portion 60, and a pair of substantially flat first extension portions 61 and second extension portions 62 extend radially outward from the fitting portion 60 in parallel with each other from the outer tube 14, i.e., the cylinder 17. Thus, the first bracket 15 is formed by molding a plate material so as to cover at least a portion of the outer peripheral side of the cylinder 17, and is fixed to the cylinder 17.

ここで、図3に示すように、第1挟持部75の抜き穴65側の端縁部には、第1挟持部75の径方向外側(湾曲凸側)となる外周側に、第1挟持部75の径方向外側の外周面75aよりも径方向外方に突出する突状部81が、第1ブラケット15の出来によっては形成されることがある。この突状部81は、プレス加工により抜き穴65を形成する際に生じるバリあるいはカエリである。なお、第1挟持部75の径方向内側(湾曲凹側)となる内周側に、第1挟持部75の径方向内側の内周面75bから径方向内方にバリあるいはカエリが突出すると、この突出部分が外筒14への嵌合時に干渉してしまう。このため、第1ブラケット15の素材である板材が平板状の状態で行われる抜き穴65のプレス加工による打ち抜き方向に合わせて、その後、湾曲加工による嵌合部60の形成を、例え突状部81が生じても、この突状部81が外周面75aから径方向外方に突出する状態となるように行う。3, depending on the finish of the first bracket 15, a protrusion 81 that protrudes radially outward from the outer peripheral surface 75a of the first clamping portion 75 may be formed on the outer peripheral side, which is the radially outer side (curved convex side) of the first clamping portion 75, at the edge portion on the side of the punching hole 65. This protrusion 81 is a burr or burr that occurs when forming the punching hole 65 by press working. If a burr or burr protrudes radially inward from the inner peripheral surface 75b of the radially inner side of the first clamping portion 75, which is the radially inner side (curved concave side) of the first clamping portion 75, this protruding portion will interfere when fitting into the outer tube 14. For this reason, the plate material that is the material of the first bracket 15 is in a flat state, and the punching direction of the press processing for the hole 65 is aligned with this, and then the formation of the fitting portion 60 by bending processing is performed so that even if a protrusion 81 is generated, this protrusion 81 protrudes radially outward from the outer circumferential surface 75a.

第1ブラケット15は、一対の第1延出部61および第2延出部62が車輪側のナックル(図示略)に連結される。すなわち、第1ブラケット15は、ナックルに連結されるナックルブラケットである。The first bracket 15 has a pair of first extensions 61 and second extensions 62 that are connected to a knuckle (not shown) on the wheel side. In other words, the first bracket 15 is a knuckle bracket that is connected to the knuckle.

第2ブラケット16は、全体的に円弧状をなして第1ブラケット15に固定される円弧状部91と、円弧状部91から延出して別部材を保持する保持部92とを有している。The second bracket 16 has an arc-shaped portion 91 that is generally arc-shaped and is fixed to the first bracket 15, and a retaining portion 92 that extends from the arc-shaped portion 91 and retains a separate component.

円弧状部91は、円筒の一部の形状をなす第1円弧状部101と、円筒の一部の形状をなす第2円弧状部102と、第1円弧状部101と第2円弧状部102とを繋ぐ平板状の連結部103と、を有している。第1円弧状部101の円周方向の一端縁部から第1円弧状部101を略延長する方向へ連結部103が延出している。連結部103の第1円弧状部101とは反対側の端縁部から連結部103を略延長する方向へ第2円弧状部102が延出している。円弧状部91は、第1円弧状部101において第1ブラケット15の第1挟持部75の外周面75aに固定される。The arc-shaped portion 91 has a first arc-shaped portion 101 having a shape of a part of a cylinder, a second arc-shaped portion 102 having a shape of a part of a cylinder, and a flat connecting portion 103 connecting the first arc-shaped portion 101 and the second arc-shaped portion 102. The connecting portion 103 extends from one circumferential end edge of the first arc-shaped portion 101 in a direction substantially extending the first arc-shaped portion 101. The second arc-shaped portion 102 extends from an end edge of the connecting portion 103 opposite the first arc-shaped portion 101 in a direction substantially extending the connecting portion 103. The arc-shaped portion 91 is fixed to the outer peripheral surface 75a of the first clamping portion 75 of the first bracket 15 at the first arc-shaped portion 101.

第2ブラケット16は、図4に示すように、第1ブラケット15に取り付けられる前の状態で、第1円弧状部101の径方向内側(湾曲凹側)の内周面101aから径方向内方に突出する突出部111を、第1円弧状部101の円周方向に間隔をあけて複数、具体的には2つ有している。複数の突出部111は、第1円弧状部101の軸方向における位置を合わせている。As shown in Fig. 4, before being attached to the first bracket 15, the second bracket 16 has a plurality of protrusions 111, specifically two protrusions, which protrude radially inward from the inner circumferential surface 101a on the radially inner side (curved concave side) of the first arc-shaped portion 101 at intervals in the circumferential direction of the first arc-shaped portion 101. The plurality of protrusions 111 are aligned in the axial direction of the first arc-shaped portion 101.

第1円弧状部101には、凹部112が突出部111と第1円弧状部101の軸方向および円周方向の位置を合わせて形成されている。凹部112は、径方向外側(湾曲凸側)の外周面101bよりも径方向内方に凹んでいる。凹部112は、板状の素材に突出部111を塑性変形により形成するために副次的に形成された部分である。よって、第2ブラケット16は、凹部112を、第1円弧状部101の円周方向に間隔をあけて突出部111と同じ複数、具体的には2つ有している。In the first arc-shaped portion 101, recesses 112 are formed so as to align with the protrusions 111 in the axial and circumferential positions of the first arc-shaped portion 101. The recesses 112 are recessed radially inward from the outer peripheral surface 101b on the radially outer side (the curved convex side). The recesses 112 are secondarily formed in order to form the protrusions 111 by plastic deformation in the plate-shaped material. Thus, the second bracket 16 has a plurality of recesses 112, specifically two, spaced apart in the circumferential direction of the first arc-shaped portion 101, the same number as the protrusions 111.

第2円弧状部102は、複数の突出部111が形成された第1円弧状部101の円周方向外側にあって、第1円弧状部101よりも外径方向に広がるよう形成されている。第2円弧状部102は、径方向の厚さが第1円弧状部101と同等である。第2円弧状部102は、第1円弧状部101と同軸で第1円弧状部101よりも外径が大径であり、内径も大径である。言い換えれば、第1円弧状部101の内周面101aよりも、第2円弧状部102の径方向内側(湾曲凹側)の内周面102aの方が大径である。第1円弧状部101の外周面101bよりも、第2円弧状部102の径方向外側(湾曲凸側)の外周面102bの方が大径である。The second arc-shaped portion 102 is formed so as to be located circumferentially outside the first arc-shaped portion 101 on which the multiple protrusions 111 are formed, and to be wider in the outer diameter direction than the first arc-shaped portion 101. The second arc-shaped portion 102 has a radial thickness equivalent to that of the first arc-shaped portion 101. The second arc-shaped portion 102 is coaxial with the first arc-shaped portion 101, has a larger outer diameter than the first arc-shaped portion 101, and also has a larger inner diameter. In other words, the inner circumferential surface 102a on the radially inner side (curved concave side) of the second arc-shaped portion 102 is larger in diameter than the inner circumferential surface 101a of the first arc-shaped portion 101. The outer circumferential surface 102b on the radially outer side (curved convex side) of the second arc-shaped portion 102 is larger in diameter than the outer circumferential surface 101b of the first arc-shaped portion 101.

連結部103は、第1円弧状部101の円周方向における第2円弧状部102側の端縁部から、第2円弧状部102の方向に延出して第2円弧状部102の円周方向における第1円弧状部101側の端縁部に繋がっている。連結部103は、連結面103aと、連結面103bとを有している。連結面103aは、第1円弧状部101の内周面101aと第2円弧状部102の内周面102aとを繋ぐ。連結面103bは、第1円弧状部101の外周面101bと第2円弧状部102の外周面102bとを繋ぐ。連結部103は、第1円弧状部101および第2円弧状部102の円周方向において、第1円弧状部101から第2円弧状部102に近づくほど、第1円弧状部101および第2円弧状部102の径方向において外側に位置するように延出している。第1円弧状部101と連結部103と第2円弧状部102とを有する円弧状部91は、段付きの円弧状である。The connecting portion 103 extends from the edge of the first arc-shaped portion 101 on the second arc-shaped portion 102 side in the circumferential direction toward the second arc-shaped portion 102 and connects to the edge of the second arc-shaped portion 102 on the first arc-shaped portion 101 side in the circumferential direction. The connecting portion 103 has a connecting surface 103a and a connecting surface 103b. The connecting surface 103a connects the inner peripheral surface 101a of the first arc-shaped portion 101 and the inner peripheral surface 102a of the second arc-shaped portion 102. The connecting surface 103b connects the outer peripheral surface 101b of the first arc-shaped portion 101 and the outer peripheral surface 102b of the second arc-shaped portion 102. The connecting portion 103 extends in the circumferential direction of the first arc-shaped portion 101 and the second arc-shaped portion 102 so as to be positioned more outward in the radial direction of the first arc-shaped portion 101 and the second arc-shaped portion 102 as it approaches the second arc-shaped portion 102 from the first arc-shaped portion 101. The arc-shaped portion 91, which has the first arc-shaped portion 101, the connecting portion 103, and the second arc-shaped portion 102, is a stepped arc.

第2ブラケット16は、一枚の板材から上記形状にプレス加工による成型で形成される。第2ブラケット16は、第1円弧状部101が第1ブラケット15の第1挟持部75の外周面75aを覆うように配置されて複数の突出部111において第1挟持部75の外周面75aに当接する。その際に、第1円弧状部101の内周面101aおよび外周面101bと、第2円弧状部102の内周面101aおよび外周面102bとが、第1挟持部75の外周面75aと略同軸状に配置され、複数の突出部111が、第1挟持部75の軸方向における位置を合わせ、第1挟持部75の円周方向に離間するように配置される。The second bracket 16 is formed into the above-mentioned shape from a single plate material by pressing. The first arc-shaped portion 101 of the second bracket 16 is arranged to cover the outer peripheral surface 75a of the first clamping portion 75 of the first bracket 15, and the multiple protrusions 111 abut against the outer peripheral surface 75a of the first clamping portion 75. At that time, the inner peripheral surface 101a and the outer peripheral surface 101b of the first arc-shaped portion 101 and the inner peripheral surface 101a and the outer peripheral surface 102b of the second arc-shaped portion 102 are arranged approximately coaxially with the outer peripheral surface 75a of the first clamping portion 75, and the multiple protrusions 111 are arranged so as to align the position in the axial direction of the first clamping portion 75 and to be spaced apart in the circumferential direction of the first clamping portion 75.

このとき、第2ブラケット16は、複数の突出部111と、第2円弧状部102とを有する。突出部111の少なくとも一部は、円弧状に形成された第1円弧状部101とされる。複数の突出部111は、第1円弧状部101の内周側に突出する。第2円弧状部102は、第1円弧状部101の円周方向外側に配置される。第2円弧状部102は、第1円弧状部101よりも外径方向に広がるよう形成される。At this time, the second bracket 16 has a plurality of protruding portions 111 and a second arc-shaped portion 102. At least a portion of the protruding portions 111 is the first arc-shaped portion 101 formed in an arc shape. The plurality of protruding portions 111 protrude toward the inner periphery of the first arc-shaped portion 101. The second arc-shaped portion 102 is disposed circumferentially outside the first arc-shaped portion 101. The second arc-shaped portion 102 is formed to extend radially outward beyond the first arc-shaped portion 101.

この状態で、複数の突出部111が第1挟持部75にプロジェクション溶接等の抵抗溶接により固定される。すると、第2ブラケット16の複数の突出部111と、第1ブラケット15の第1挟持部75における各突出部111への当接部分とが、それぞれ溶融し一体化して、図3に示す複数の固定部121となる。複数の固定部121は、いずれも第1円弧状部101から第1挟持部75まで設けられており、第1円弧状部101を第1挟持部75に接合している。この状態で、第2ブラケット16は、第1円弧状部101の内周面101aおよび外周面101bと、第2円弧状部102の内周面102aおよび外周面102bとが、第1挟持部75の外周面75aに、溶接前よりも近づいて外周面75aと略同軸状に配置される。In this state, the multiple protrusions 111 are fixed to the first clamping portion 75 by resistance welding such as projection welding. Then, the multiple protrusions 111 of the second bracket 16 and the abutting portions of the first clamping portion 75 of the first bracket 15 against the respective protrusions 111 are melted and integrated, respectively, to become the multiple fixing portions 121 shown in FIG. 3. The multiple fixing portions 121 are all provided from the first arc-shaped portion 101 to the first clamping portion 75, and join the first arc-shaped portion 101 to the first clamping portion 75. In this state, the inner peripheral surface 101a and the outer peripheral surface 101b of the first arc-shaped portion 101 and the inner peripheral surface 102a and the outer peripheral surface 102b of the second arc-shaped portion 102 of the second bracket 16 are arranged closer to the outer peripheral surface 75a of the first clamping portion 75 than before welding, and are arranged approximately coaxially with the outer peripheral surface 75a.

このように第1ブラケット15に固定された状態の第2ブラケット16は、円弧状部91が、第1ブラケット15の円周方向に複数設けられる固定部121を有すると共に、第1ブラケット15の外周側と重なり合うように配置されている。また、第2ブラケット16は、第1ブラケット15に固定部121が抵抗溶接にて固定されている。この状態で、円弧状部91は、少なくとも第1円弧状部101の固定部121と固定部121との間の湾曲よりも円周方向外側部位である第2円弧状部102の湾曲の方が、外径方向に広がるよう形成されている。また、円弧状部91は、第1円弧状部101が第1ブラケット15に接合される一方、連結部103の第2円弧状部102側の部分と第2円弧状部102とが第1ブラケット15から離間している。In this manner, the second bracket 16 fixed to the first bracket 15 has a circular arc-shaped portion 91 having a plurality of fixing portions 121 provided in the circumferential direction of the first bracket 15, and is arranged so as to overlap with the outer periphery of the first bracket 15. The fixing portions 121 of the second bracket 16 are fixed to the first bracket 15 by resistance welding. In this state, the circular arc-shaped portion 91 is formed so that the curvature of the second circular arc-shaped portion 102, which is the outer circumferential portion, is wider in the outer diameter direction than at least the curvature between the fixing portions 121 of the first circular arc-shaped portion 101. In addition, the first circular arc-shaped portion 101 of the circular arc-shaped portion 91 is joined to the first bracket 15, while the portion of the connecting portion 103 on the second circular arc-shaped portion 102 side and the second circular arc-shaped portion 102 are separated from the first bracket 15.

円弧状部91は、連結部103の第2円弧状部102側の部分と第2円弧状部102とが、第1挟持部75の抜き穴65側の端縁部から第1挟持部75の径方向における外側に離間している。ここで、上記したように、第1ブラケット15の出来によっては、第1挟持部75の抜き穴65側の端縁部には、第1挟持部75の外周面75aよりも径方向外方に突出する突状部81が形成されることがある。円弧状部91は、連結部103の第2円弧状部102側の部分あるいは第2円弧状部102が突状部81と第1挟持部75の円周方向における位置を重ね合わせる。そして、円弧状部91は、連結部103の第2円弧状部102側の部分と第2円弧状部102とが、突状部81から第1挟持部75の径方向における外側に離間している。第2ブラケット16は、第1ブラケット15の突状部81には一切接触せず、突状部81から完全に離間している。The arc-shaped portion 91 is spaced from the edge of the first clamping portion 75 on the side of the hole 65 of the first clamping portion 75 to the outside in the radial direction of the first clamping portion 75, where the portion of the second arc-shaped portion 102 of the connecting portion 103 and the second arc-shaped portion 102 are spaced from the edge of the first clamping portion 75 on the side of the hole 65 of the first clamping portion 75. Here, as described above, depending on the construction of the first bracket 15, a protrusion 81 that protrudes radially outward from the outer circumferential surface 75a of the first clamping portion 75 may be formed. The arc-shaped portion 91 is a portion of the connecting portion 103 on the side of the second arc-shaped portion 102 or the second arc-shaped portion 102 that overlaps the protrusion 81 with the circumferential position of the first clamping portion 75. In addition, the arc-shaped portion 91 is spaced apart from the protruding portion 81 to the outside in the radial direction of the first clamping portion 75, at the portion of the connecting portion 103 on the second arc-shaped portion 102 side and the second arc-shaped portion 102. The second bracket 16 does not come into contact with the protruding portion 81 of the first bracket 15 at all, and is completely spaced apart from the protruding portion 81.

なお、第1ブラケット15への溶接後に、第2ブラケット16は、第1円弧状部101の固定部121の周辺が第1ブラケット15の第1挟持部75と当接しても構わない。ただし、例え第1挟持部75に突状部81があっても、第2ブラケット16は、突状部81に当接することはない。すなわち、第2ブラケット16は、組み付け相手部品である第1ブラケット15に当接する突出部111の着座面積の減少を抑制しつつ、突出部111以外の部分の第1ブラケット15とのクリアランスを確保する構造となっている。After welding to the first bracket 15, the periphery of the fixed portion 121 of the first arc-shaped portion 101 of the second bracket 16 may abut against the first clamping portion 75 of the first bracket 15. However, even if the first clamping portion 75 has a protruding portion 81, the second bracket 16 will not abut against the protruding portion 81. In other words, the second bracket 16 is structured to ensure clearance with the first bracket 15 in the portion other than the protruding portion 111 while suppressing a reduction in the seating area of the protruding portion 111 that abuts against the first bracket 15, which is the mating part to be assembled.

保持部92は、第2円弧状部102の円周方向における連結部103とは反対側の端縁部から、連結部103とは反対方向に延出している。保持部92は、第2円弧状部102よりも第2円弧状部102の外径方向に延出するよう形成されている。保持部92にホース類を保持する場合、第2ブラケット16はホースブラケットとなる。保持部92にハーネス類を保持する場合、第2ブラケット16はハーネスブラケットとなる。The holding portion 92 extends in the opposite direction to the connecting portion 103 from the edge of the second arc-shaped portion 102 on the opposite side of the circumferential direction from the connecting portion 103. The holding portion 92 is formed to extend further in the outer diameter direction of the second arc-shaped portion 102 than the second arc-shaped portion 102. When hoses are held in the holding portion 92, the second bracket 16 becomes a hose bracket. When harnesses are held in the holding portion 92, the second bracket 16 becomes a harness bracket.

第1実施形態の緩衝器11の製造方法は、少なくとも一部である嵌合部60が円弧状に形成された第1ブラケット15を準備する第1ブラケット準備工程を含んでいる。The manufacturing method of the shock absorber 11 of the first embodiment includes a first bracket preparation process for preparing a first bracket 15, at least a part of which, the fitting portion 60, is formed in an arc shape.

第1実施形態の緩衝器11の製造方法は、複数の突出部111と、第2円弧状部102とを有する第2ブラケット16を準備する第2ブラケット準備工程を含んでいる。突出部111の少なくともその一部は、円弧状に形成された第1円弧状部101とされる。突出部111は、第1円弧状部101の内周側に突出する。第2円弧状部102は、第1円弧状部101の円周方向外側に配置される。第2円弧状部102は、第1円弧状部101よりも外径方向に広がるよう形成される。The manufacturing method of the shock absorber 11 of the first embodiment includes a second bracket preparation process for preparing a second bracket 16 having a plurality of protrusions 111 and a second arc-shaped portion 102. At least a portion of the protrusion 111 is the first arc-shaped portion 101 formed in an arc shape. The protrusion 111 protrudes toward the inner periphery of the first arc-shaped portion 101. The second arc-shaped portion 102 is disposed circumferentially outside the first arc-shaped portion 101. The second arc-shaped portion 102 is formed to extend radially outward beyond the first arc-shaped portion 101.

第1実施形態の緩衝器11の製造方法は、第1ブラケット準備工程で準備された第1ブラケット15をシリンダ17に固定する第1ブラケット溶接工程を含んでいる。この第1ブラケット溶接工程では、第1ブラケット15を、第2主嵌合部72がシリンダ17の軸方向における底部22側の側壁部21の外周面21aに嵌合し、第1主嵌合部71が第2主嵌合部72よりもシリンダ17の軸方向における底部22とは反対側の側壁部21の外周面21aに嵌合し、第1挟持部75および第2挟持部76が側壁部21の外周面21aに当接する状態とする。そして、第1ブラケット溶接工程では、この状態で、第1ブラケット15を、シリンダ17の外筒14に溶接により固定する。The manufacturing method of the shock absorber 11 of the first embodiment includes a first bracket welding process for fixing the first bracket 15 prepared in the first bracket preparation process to the cylinder 17. In this first bracket welding process, the first bracket 15 is in a state in which the second main fitting portion 72 fits into the outer peripheral surface 21a of the side wall portion 21 on the bottom 22 side in the axial direction of the cylinder 17, the first main fitting portion 71 fits into the outer peripheral surface 21a of the side wall portion 21 on the opposite side of the bottom 22 in the axial direction of the cylinder 17 from the second main fitting portion 72, and the first clamping portion 75 and the second clamping portion 76 abut against the outer peripheral surface 21a of the side wall portion 21. Then, in the first bracket welding process, the first bracket 15 is fixed to the outer tube 14 of the cylinder 17 by welding in this state.

第1実施形態の緩衝器11の製造方法は、第2ブラケット準備工程で準備された第2ブラケット16を、第1ブラケット15の外周に突出部111が当接するよう配置する第2ブラケット配置工程を含んでいる。この第2ブラケット配置工程では、第2ブラケット16を、第1円弧状部101が第1ブラケット15の第1挟持部75の外周面75aを覆うように配置して、複数の突出部111を第1挟持部75の外周面75aに当接させる。その際に、第2ブラケット16を、第1円弧状部101の中心軸線および第2円弧状部102の中心軸線が第1挟持部75の中心軸線と平行に配置され、複数の突出部111が、第1挟持部75の軸方向における位置を合わせて第1挟持部75の円周方向に離間するように配置する。第2ブラケット配置工程では、第2ブラケット16が、2箇所の突出部111のみにおいて第1ブラケット15に当接する。例え第1ブラケット15に突状部81があっても、第2ブラケット16が突状部81に当接することはない。The manufacturing method of the shock absorber 11 of the first embodiment includes a second bracket arrangement process in which the second bracket 16 prepared in the second bracket preparation process is arranged so that the protruding portion 111 abuts against the outer periphery of the first bracket 15. In this second bracket arrangement process, the second bracket 16 is arranged so that the first arc-shaped portion 101 covers the outer periphery 75a of the first clamping portion 75 of the first bracket 15, and the multiple protruding portions 111 abut against the outer periphery 75a of the first clamping portion 75. At that time, the second bracket 16 is arranged so that the central axis of the first arc-shaped portion 101 and the central axis of the second arc-shaped portion 102 are parallel to the central axis of the first clamping portion 75, and the multiple protruding portions 111 are arranged so that they are spaced apart in the circumferential direction of the first clamping portion 75 with their positions in the axial direction of the first clamping portion 75 aligned. In the second bracket arrangement step, the second bracket 16 abuts against the first bracket 15 only at the two protruding portions 111. Even if the first bracket 15 has a protruding portion 81, the second bracket 16 will not abut against the protruding portion 81.

第1実施形態の緩衝器11の製造方法は、第2ブラケット配置工程で第1ブラケット15の外周に複数の突出部111において当接するよう配置された第2ブラケット16の複数の突出部111と、第1ブラケット15との間に電流を通電してプロジェクション溶接等の抵抗溶接を行う第2ブラケット溶接工程を含んでいる。この第2ブラケット溶接工程によって、第2ブラケット16の2つの突出部111と、第1ブラケット15の第1挟持部75における各突出部111への当接部分とが、それぞれ溶融し一体化して、2箇所の固定部121となる。第2ブラケット溶接工程においては、2つの突出部111が溶融して円弧状部91が第1挟持部75に近づくが、例え第1ブラケット15に突状部81があっても、第2ブラケット16が突状部81に当接することはない。The manufacturing method of the shock absorber 11 of the first embodiment includes a second bracket welding process in which a current is passed between the first bracket 15 and the multiple protrusions 111 of the second bracket 16 arranged in the second bracket arrangement process so as to abut against the outer periphery of the first bracket 15 at the multiple protrusions 111. This second bracket welding process melts and integrates the two protrusions 111 of the second bracket 16 and the abutting portions of the first clamping portion 75 of the first bracket 15 against the respective protrusions 111 to form two fixed portions 121. In the second bracket welding process, the two protrusions 111 melt and the arc-shaped portion 91 approaches the first clamping portion 75, but even if the first bracket 15 has a protrusion 81, the second bracket 16 does not abut against the protrusion 81.

なお、第2ブラケット配置工程の後に第2ブラケット溶接工程を行うことになるが、第1ブラケット溶接工程は、第2ブラケット配置工程の前に行っても良く、第2ブラケット溶接工程の後に行っても良い。 Although the second bracket welding process will be performed after the second bracket placement process, the first bracket welding process may be performed before the second bracket placement process or after the second bracket welding process.

特許文献1,2には、緩衝器にブラケットを取り付けることが開示されている。ところで、ブラケットをベース部材に抵抗溶接により取り付ける場合があるが、このような取り付け構造において溶接品質の低下を抑制することが望まれている。抵抗溶接の溶接品質の低下の原因としては、溶接対象以外の部位に電流が流れる分流を生じてしまうことがあげられる。 Patent Documents 1 and 2 disclose attaching a bracket to a shock absorber. The bracket may be attached to a base member by resistance welding, and it is desirable to suppress deterioration in welding quality in such an attachment structure. One cause of deterioration in welding quality in resistance welding is the occurrence of shunt current, which causes current to flow to areas other than the object to be welded.

これに対して、第1実施形態の緩衝器11は、円弧状のベース部材である第1ブラケット15、及び、第1ブラケット15の円周方向に複数設けられる固定部121と、円弧状部91と、を備える第2ブラケット16を有する。固定部121は、第1ブラケット15の外周側と重なり合うように配置される。固定部121は、第1ブラケット15に抵抗溶接にて固定される。円弧状部91は、少なくとも固定部121と固定部121との間の第1円弧状部101の湾曲よりも、固定部121と固定部121との間の第1円弧状部101に対する円周方向外側部位である第2円弧状部102の湾曲の方が、外径方向に広がるよう形成されている。In contrast, the shock absorber 11 of the first embodiment has a first bracket 15 which is an arc-shaped base member, and a second bracket 16 which includes a plurality of fixing portions 121 provided in the circumferential direction of the first bracket 15, and an arc-shaped portion 91. The fixing portions 121 are arranged so as to overlap with the outer periphery of the first bracket 15. The fixing portions 121 are fixed to the first bracket 15 by resistance welding. The arc-shaped portion 91 is formed so that the curvature of the second arc-shaped portion 102, which is the outer circumferential portion relative to the first arc-shaped portion 101 between the fixing portions 121 and 121, is wider in the outer diameter direction than the curvature of at least the first arc-shaped portion 101 between the fixing portions 121 and 121.

より具体的に、第1実施形態の緩衝器11は、板材をシリンダ17の外周側の少なくとも一部を覆うように成型して形成され、シリンダ17に固定される第1ブラケット15を有している。また、緩衝器11は、別部材を保持する保持部92と、第1ブラケット15の円周方向に複数の固定部121と、円弧状部91と、を備える第2ブラケット16を有する。固定部121は、第1ブラケット15の外周側と重なり合うように配置される。固定部121は、第1ブラケット15に抵抗溶接にて固定される。円弧状部91は、少なくとも固定部121と固定部121との間の第1円弧状部101の湾曲よりも、固定部121と固定部121との間の第1円弧状部101に対する円周方向外側部位である第2円弧状部102の湾曲の方が、外径方向に広がるよう形成されている。More specifically, the shock absorber 11 of the first embodiment has a first bracket 15 formed by molding a plate material so as to cover at least a part of the outer periphery of the cylinder 17 and fixed to the cylinder 17. The shock absorber 11 also has a second bracket 16 including a holding portion 92 for holding a separate member, a plurality of fixing portions 121 in the circumferential direction of the first bracket 15, and an arc-shaped portion 91. The fixing portions 121 are arranged so as to overlap with the outer periphery of the first bracket 15. The fixing portions 121 are fixed to the first bracket 15 by resistance welding. The arc-shaped portion 91 is formed so that the curvature of the second arc-shaped portion 102, which is the outer circumferential portion relative to the first arc-shaped portion 101 between the fixing portions 121 and 121, is wider in the outer diameter direction than the curvature of the first arc-shaped portion 101 between the fixing portions 121 and 121.

第1実施形態の緩衝器11の製造方法は、第1ブラケット準備工程と、第2ブラケット工程と、を含んでいる。第1ブラケット準備工程では、少なくとも一部である嵌合部60が円弧状に形成された第1ブラケット15を準備する。第2ブラケット準備工程では、少なくとも一部が円弧状に形成された第1円弧状部101とされ、第1円弧状部101の内周側に突出する複数の突出部111と、第1円弧状部101の円周方向外側にあって、第1円弧状部101よりも外径方向に広がるよう形成された第2円弧状部102とを有する第2ブラケット16を準備する。The manufacturing method of the shock absorber 11 of the first embodiment includes a first bracket preparation process and a second bracket process. In the first bracket preparation process, a first bracket 15 is prepared, in which at least a portion of the fitting portion 60 is formed in an arc shape. In the second bracket preparation process, a second bracket 16 is prepared, in which a first arc-shaped portion 101 is formed at least in a portion in an arc shape, and the second bracket 16 has a plurality of protruding portions 111 protruding on the inner circumferential side of the first arc-shaped portion 101, and a second arc-shaped portion 102 that is located circumferentially outside the first arc-shaped portion 101 and is formed to expand in the outer radial direction more than the first arc-shaped portion 101.

また、第1実施形態の緩衝器11の製造方法は、第1ブラケット準備工程で準備された第1ブラケット15をシリンダ17に固定する第1ブラケット溶接工程と、第2ブラケット準備工程で準備された第2ブラケット16を、第1ブラケット15の外周に突出部111が当接するよう配置する第2ブラケット配置工程と、第1ブラケット15と複数の突出部111との間に電流を通電して抵抗溶接を行う第2ブラケット溶接工程と、を含んでいる。 The manufacturing method of the shock absorber 11 of the first embodiment includes a first bracket welding process for fixing the first bracket 15 prepared in the first bracket preparation process to the cylinder 17, a second bracket arrangement process for arranging the second bracket 16 prepared in the second bracket preparation process so that the protrusion 111 abuts against the outer periphery of the first bracket 15, and a second bracket welding process for passing an electric current between the first bracket 15 and the multiple protrusions 111 to perform resistance welding.

以上の第1実施形態によれば、第2ブラケット16の第1ブラケット15への溶接において、溶接対象である複数の突出部111以外の部位に電流が流れる分流を抑制することができる。このため、溶接品質の低下を抑制することが可能となる。また、分流を防ぐために高い精度が要求されていた第2ブラケット16および第1ブラケット15の精度を落とすことが可能となり、生産性を向上させることができる。また、第2ブラケット16を第1ブラケット15に溶接する際の径方向の加圧時に第2ブラケット16に若干の倒れが生じても分流を抑制することができる。また、分流によりレイアウトに制限があった第2ブラケット16および第1ブラケット15のレイアウトの自由度を増すことができる。また、分流対策のための設計規制および工程規制を緩めることができ、設計および工程の自由度を増すことができる。According to the first embodiment described above, in welding the second bracket 16 to the first bracket 15, it is possible to suppress the shunting of current flowing to parts other than the multiple protrusions 111 to be welded. This makes it possible to suppress the deterioration of welding quality. In addition, it is possible to reduce the precision of the second bracket 16 and the first bracket 15, which required high precision to prevent shunting, and to improve productivity. In addition, even if the second bracket 16 is slightly tilted when radial pressure is applied when welding the second bracket 16 to the first bracket 15, it is possible to suppress shunting. In addition, it is possible to increase the degree of freedom in the layout of the second bracket 16 and the first bracket 15, which had limitations on the layout due to shunting. In addition, it is possible to relax design and process restrictions for shunting countermeasures, and to increase the degree of freedom in design and process.

特に、第1ブラケット15には、その出来によっては、第1挟持部75の抜き穴65側の端縁部に、第1挟持部75の外周面75aよりも径方向外方に突出する突状部81が形成されることがある。このため、第2ブラケット16の円弧状部91が一定の湾曲形状をなしていると、溶接対象である複数の突出部111以外の部位である円弧状部91の突状部81に対向する部位が、突状部81に近接してしまい分流を生じてしまう可能性がある。これに対し、第1実施形態では、円弧状部91が、第1円弧状部101よりも外径方向に広がるよう形成された第2円弧状部102を有することにより、突状部81から離間する形状となっている。よって、溶接対象である複数の突出部111以外の部位である円弧状部91の突状部81に対向する部位が、突状部81に近接して分流を生じてしまうことを抑制できる。したがって、溶接対象である複数の突出部111以外の部位に電流が流れる分流を抑制することができる。このため、溶接品質の低下を抑制することが可能となる。In particular, depending on the finish, the first bracket 15 may have a protruding portion 81 formed at the edge of the first clamping portion 75 on the side of the punch hole 65, which protrudes radially outward from the outer circumferential surface 75a of the first clamping portion 75. For this reason, if the arc-shaped portion 91 of the second bracket 16 has a certain curved shape, the portion of the arc-shaped portion 91 that faces the protruding portion 81, which is a portion other than the multiple protruding portions 111 to be welded, may come close to the protruding portion 81 and cause a branching flow. In contrast, in the first embodiment, the arc-shaped portion 91 has a second arc-shaped portion 102 that is formed to be wider in the outer diameter direction than the first arc-shaped portion 101, so that it is shaped to be separated from the protruding portion 81. Therefore, it is possible to prevent the portion of the arc-shaped portion 91 that faces the protruding portion 81, which is a portion other than the multiple protruding portions 111 to be welded, from coming close to the protruding portion 81 and causing a branching flow. This makes it possible to prevent current from flowing to other parts than the projections 111 that are the welding targets, thereby making it possible to prevent deterioration in welding quality.

また、第2ブラケット16は、固定部121と固定部121との間の第1円弧状部101に対する円周方向外側部位である第2円弧状部102が、ベース部材である第1ブラケット15から離間している。よって、溶接対象である複数の突出部111以外の部位に電流が流れる分流をさらに抑制することができるため、溶接品質の低下をさらに抑制することが可能となる。In addition, the second bracket 16 has a second arc-shaped portion 102, which is a circumferentially outer portion of the first arc-shaped portion 101 between the fixing portions 121, spaced apart from the first bracket 15, which is the base member. This further reduces current shunting to portions other than the multiple protrusions 111 to be welded, thereby further reducing deterioration in welding quality.

[第2実施形態]
本発明の第2実施形態を主に図5に基づいて第1実施形態との相違部分を中心に説明する。なお、第1実施形態と共通する部位については、同一称呼、同一の符号で表す。
[Second embodiment]
A second embodiment of the present invention will be described with a focus on differences from the first embodiment, mainly based on Fig. 5. Note that parts common to the first embodiment will be designated by the same names and reference numerals.

第2実施形態の緩衝器11A(ブラケット固定部材)には、第2ブラケット16Aが、第1実施形態の第2ブラケット16に代えて設けられている。In the second embodiment, the shock absorber 11A (bracket fixing member) is provided with a second bracket 16A instead of the second bracket 16 in the first embodiment.

第2ブラケット16Aは、円弧状部91とは一部異なる円弧状部91Aと、第1実施形態と同様の保持部92とを有している。円弧状部91Aも全体的に円弧状をなしている。第2ブラケット16Aは、円弧状部91Aにおいて第1ブラケット15に固定される。The second bracket 16A has an arc-shaped portion 91A that is partially different from the arc-shaped portion 91, and a retaining portion 92 similar to that of the first embodiment. The arc-shaped portion 91A also has an overall arc shape. The second bracket 16A is fixed to the first bracket 15 at the arc-shaped portion 91A.

円弧状部91Aは、第1実施形態と同様の第1円弧状部101と、第2円弧状部102とは一部異なる第2円弧状部102Aと、を有している。第1円弧状部101の円周方向の一端縁部から第1円弧状部101を延長する方向へ第2円弧状部102Aが延出している。円弧状部91Aは、第1円弧状部101において第1ブラケット15の第1挟持部75の外周面75aに固定される。The arc-shaped portion 91A has a first arc-shaped portion 101 similar to that of the first embodiment, and a second arc-shaped portion 102A that is partially different from the second arc-shaped portion 102. The second arc-shaped portion 102A extends from one circumferential end edge of the first arc-shaped portion 101 in a direction extending the first arc-shaped portion 101. The arc-shaped portion 91A is fixed to the outer peripheral surface 75a of the first clamping portion 75 of the first bracket 15 at the first arc-shaped portion 101.

第2円弧状部102Aは、径方向外側(湾曲凸側)の外周面102Abが、第1円弧状部101の外周面101bと同一円筒面に配置されている。言い換えれば、第1円弧状部101の外周面101bと第2円弧状部102Aの外周面102Abとは、同軸同径で連続している。第2円弧状部102Aは、径方向内側(湾曲凹側)の内周面102Aaが、第1円弧状部101の内周面101aよりも径方向外方に凹んでいる。これにより、第2円弧状部102Aは、その内周面102Aaが、第1円弧状部101の内周面101aよりも円周方向外側にあって、第1円弧状部101の内周面101aよりも外径方向に広がるよう形成されている。第2円弧状部102Aの内周面102Aaは湾曲面である。第2円弧状部102Aは、径方向の厚さが円周方向の中間部に向かって薄くなっており、最も径方向に厚い部分の厚さが第1円弧状部101と同等の厚さになっている。The second arc-shaped portion 102A has an outer peripheral surface 102Ab on the radially outer side (convex curved side) arranged on the same cylindrical surface as the outer peripheral surface 101b of the first arc-shaped portion 101. In other words, the outer peripheral surface 101b of the first arc-shaped portion 101 and the outer peripheral surface 102Ab of the second arc-shaped portion 102A are continuous with each other coaxially and with the same diameter. The second arc-shaped portion 102A has an inner peripheral surface 102Aa on the radially inner side (concave curved side) that is recessed radially outward from the inner peripheral surface 101a of the first arc-shaped portion 101. As a result, the second arc-shaped portion 102A is formed so that its inner peripheral surface 102Aa is located circumferentially outside the inner peripheral surface 101a of the first arc-shaped portion 101 and is wider in the outer radial direction than the inner peripheral surface 101a of the first arc-shaped portion 101. The inner circumferential surface 102Aa of the second arc-shaped portion 102A is a curved surface. The second arc-shaped portion 102A has a radial thickness that becomes thinner toward a circumferential middle portion, and the thickness of the second arc-shaped portion 102A at its thickest radial portion is equal to the thickness of the first arc-shaped portion 101.

第2ブラケット16Aは、一枚の板材から上記形状にプレス加工による成型で形成される。そして、第2ブラケット16Aは、第1円弧状部101が第1ブラケット15の第1挟持部75の外周面75aを覆うように配置されて複数の突出部111(図4参照)において第1挟持部75の外周面75aに当接する。その際に、第2ブラケット16Aは、第1円弧状部101の内周面101aおよび外周面101bと、第2円弧状部102Aの外周面102Abとが第1挟持部75と略同軸状に配置され、複数の突出部111(図4参照)が、第1挟持部75の軸方向における位置を合わせ、第1挟持部75の円周方向に離間するように配置される。The second bracket 16A is formed into the above-mentioned shape from a single plate material by pressing. The first arc-shaped portion 101 of the second bracket 16A is arranged to cover the outer peripheral surface 75a of the first clamping portion 75 of the first bracket 15, and the multiple protrusions 111 (see FIG. 4) abut against the outer peripheral surface 75a of the first clamping portion 75. At that time, the inner peripheral surface 101a and the outer peripheral surface 101b of the first arc-shaped portion 101 and the outer peripheral surface 102Ab of the second arc-shaped portion 102A of the second bracket 16A are arranged approximately coaxially with the first clamping portion 75, and the multiple protrusions 111 (see FIG. 4) are arranged so as to align the position in the axial direction of the first clamping portion 75 and to be spaced apart in the circumferential direction of the first clamping portion 75.

このとき、第2ブラケット16Aは、複数の突出部111(図4参照)と、第2円弧状部102Aとを有する。突出部111の少なくとも一部は、円弧状に形成された第1円弧状部101とされる。突出部111は、第1円弧状部101の内周側に突出する。第2円弧状部102Aは、第1円弧状部101の内周面101aよりも円周方向外側に配置される。第2円弧状部102Aは、第1円弧状部101の内周面101aよりも外径方向に広がるよう形成された内周面102Aaを備える。At this time, the second bracket 16A has a plurality of protruding portions 111 (see FIG. 4) and a second arc-shaped portion 102A. At least a portion of the protruding portions 111 is the first arc-shaped portion 101 formed in an arc shape. The protruding portions 111 protrude toward the inner circumference of the first arc-shaped portion 101. The second arc-shaped portion 102A is disposed circumferentially outward from the inner circumference surface 101a of the first arc-shaped portion 101. The second arc-shaped portion 102A has an inner circumference surface 102Aa formed to expand in the outer diameter direction more than the inner circumference surface 101a of the first arc-shaped portion 101.

そして、この状態で、複数の突出部111(図4参照)が第1挟持部75にプロジェクション溶接等の抵抗溶接により固定される。すると、第2ブラケット16Aの複数の突出部111(図4参照)と、第1ブラケット15の第1挟持部75における各突出部111(図4参照)への当接部分とが、それぞれ溶融し一体化して複数の固定部121となる。この状態で、第2ブラケット16Aは、第1円弧状部101の内周面101aおよび外周面101bと、第2円弧状部102Aの外周面102Abとが第1挟持部75の外周面75aに溶接前よりも近づいて外周面75aと略同軸状に配置される。In this state, the multiple protrusions 111 (see FIG. 4) are fixed to the first clamping portion 75 by resistance welding such as projection welding. Then, the multiple protrusions 111 (see FIG. 4) of the second bracket 16A and the abutting portions of the first clamping portion 75 of the first bracket 15 against the respective protrusions 111 (see FIG. 4) are melted and integrated to form multiple fixed portions 121. In this state, the inner peripheral surface 101a and the outer peripheral surface 101b of the first arc-shaped portion 101 and the outer peripheral surface 102Ab of the second arc-shaped portion 102A of the second bracket 16A are disposed closer to the outer peripheral surface 75a of the first clamping portion 75 than before welding, and are arranged substantially coaxially with the outer peripheral surface 75a.

このように第1ブラケット15に固定された状態の第2ブラケット16Aは、円弧状部91Aが、第1ブラケット15の円周方向に複数設けられる固定部121を有すると共に、第1ブラケット15の外周側と重なり合うように配置されて第1ブラケット15に固定部121が抵抗溶接にて固定されている。この状態で、円弧状部91Aは、少なくとも第1円弧状部101の内周面101aの固定部121と固定部121との間の湾曲よりも円周方向外側部位である第2円弧状部102Aの内周面102Aaの湾曲の方が、外径方向に広がるよう形成されている。また、円弧状部91Aは、第1円弧状部101が第1ブラケット15に当接する一方、第2円弧状部102Aが第1ブラケット15から離間している。In this manner, the second bracket 16A fixed to the first bracket 15 has a circular arc portion 91A having a plurality of fixing portions 121 arranged in the circumferential direction of the first bracket 15, and is arranged so as to overlap with the outer periphery of the first bracket 15, and the fixing portions 121 are fixed to the first bracket 15 by resistance welding. In this state, the circular arc portion 91A is formed so that the curvature of the inner circumferential surface 102Aa of the second circular arc portion 102A, which is the outer circumferential portion, is wider in the outer diameter direction than at least the curvature between the fixing portions 121 of the inner circumferential surface 101a of the first circular arc portion 101. In addition, the first circular arc portion 101 of the circular arc portion 91A abuts against the first bracket 15, while the second circular arc portion 102A is separated from the first bracket 15.

この状態で、円弧状部91Aは、第2円弧状部102Aの内周面102Aaが、第1挟持部75の抜き穴65側の端縁部から第1挟持部75の径方向における外側に離間している。ここで、上記したように、第1ブラケット15の出来によっては、第1挟持部75の抜き穴65側の端縁部には、第1挟持部75の外周面75aよりも径方向外方に突出する突状部81が形成されることがある。円弧状部91Aは、この突状部81と第2円弧状部102Aとが第1挟持部75の円周方向における位置を重ね合わせる。そして、円弧状部91Aは、第2円弧状部102Aが、内周面102Aaの凹形状によって、突状部81から第1挟持部75の径方向における外側に離間している。第2ブラケット16Aは第1ブラケット15の突状部81に一切接触せず、突状部81から完全に離間している。In this state, the inner peripheral surface 102Aa of the second arc-shaped portion 102A of the arc-shaped portion 91A is spaced from the edge of the first clamping portion 75 on the side of the punching hole 65 to the outside in the radial direction of the first clamping portion 75. Here, as described above, depending on the construction of the first bracket 15, a protrusion 81 that protrudes radially outward from the outer peripheral surface 75a of the first clamping portion 75 may be formed on the edge of the first clamping portion 75 on the side of the punching hole 65. The arc-shaped portion 91A overlaps the protrusion 81 and the second arc-shaped portion 102A in the circumferential direction of the first clamping portion 75. The second arc-shaped portion 102A of the arc-shaped portion 91A is spaced from the protrusion 81 to the outside in the radial direction of the first clamping portion 75 due to the concave shape of the inner peripheral surface 102Aa. The second bracket 16A does not come into contact with the protruding portion 81 of the first bracket 15 at all, and is completely separated from the protruding portion 81.

なお、第1ブラケット15への溶接後に、第2ブラケット16Aは、第1円弧状部101の固定部121の周辺が第1ブラケット15と当接してもよい。ただし、例え第1挟持部75に突状部81があっても、第2ブラケット16Aは、突状部81に当接することはない。すなわち、第2ブラケット16Aは、組み付け相手部品である第1ブラケット15に当接する突出部111(図4参照)の着座面積の減少を抑制しつつ、突出部111(図4参照)以外の部分の第1ブラケット15とのクリアランスを確保する構造となっている。After welding to the first bracket 15, the periphery of the fixed portion 121 of the first arc-shaped portion 101 of the second bracket 16A may abut against the first bracket 15. However, even if the first clamping portion 75 has a protrusion 81, the second bracket 16A will not abut against the protrusion 81. In other words, the second bracket 16A is structured to ensure clearance with the first bracket 15 in the portion other than the protrusion 111 (see FIG. 4), while suppressing a reduction in the seating area of the protrusion 111 (see FIG. 4) that abuts against the first bracket 15, which is the mating part to be assembled.

保持部92は、第2円弧状部102Aの円周方向における第1円弧状部101とは反対側の端縁部から、第1円弧状部101とは反対方向に延出している。保持部92は、第2円弧状部102Aよりも第2円弧状部102Aの外径方向に延出するよう形成されている。The retaining portion 92 extends from an edge of the second arc-shaped portion 102A on the opposite side of the first arc-shaped portion 101 in the circumferential direction of the second arc-shaped portion 102A in the opposite direction to the first arc-shaped portion 101. The retaining portion 92 is formed to extend in the outer diameter direction of the second arc-shaped portion 102A further than the second arc-shaped portion 102A.

第2実施形態の緩衝器11Aの製造方法は、第1ブラケット15を準備する第1ブラケット準備工程と、第2ブラケット16Aを準備する第2ブラケット準備工程と、第1実施形態と同様の第1ブラケット溶接工程と、を含んでいる。The manufacturing method of the shock absorber 11A of the second embodiment includes a first bracket preparation process for preparing a first bracket 15, a second bracket preparation process for preparing a second bracket 16A, and a first bracket welding process similar to that of the first embodiment.

また、第2実施形態の緩衝器11Aの製造方法は、第2ブラケット準備工程で準備された第2ブラケット16Aを、第1ブラケット15の外周に突出部111(図4参照)が当接するよう配置する第2ブラケット配置工程を含んでいる。この第2ブラケット配置工程では、第2ブラケット16Aが、2箇所の突出部111(図4参照)のみにおいて第1ブラケット15に当接する。例え第1ブラケット15に突状部81があっても、第2ブラケット16Aが突状部81に当接することはない。 The manufacturing method of the shock absorber 11A of the second embodiment also includes a second bracket arrangement process in which the second bracket 16A prepared in the second bracket preparation process is arranged so that the protrusions 111 (see FIG. 4) abut against the outer periphery of the first bracket 15. In this second bracket arrangement process, the second bracket 16A abuts against the first bracket 15 only at the two protrusions 111 (see FIG. 4). Even if the first bracket 15 has a protrusion 81, the second bracket 16A will not abut against the protrusion 81.

また、第2実施形態の緩衝器11Aの製造方法は、第2ブラケット配置工程で第1ブラケット15の外周に複数の突出部111(図4参照)において当接するよう配置された第2ブラケット16Aの複数の突出部111(図4参照)と、第1ブラケット15との間に電流を通電してプロジェクション溶接等の抵抗溶接を行う第2ブラケット溶接工程を含んでいる。この第2ブラケット溶接工程によって、第2ブラケット16Aの2つの突出部111(図4参照)と、第1ブラケット15の第1挟持部75における各突出部111(図4参照)への当接部分とが、それぞれ溶融し一体化して、2箇所の固定部121となる。例え第1ブラケット15に突状部81があっても、第2ブラケット溶接工程において第2ブラケット16Aが突状部81に当接することはない。 The manufacturing method of the shock absorber 11A of the second embodiment also includes a second bracket welding process in which a current is passed between the first bracket 15 and the multiple protrusions 111 (see FIG. 4) of the second bracket 16A arranged so as to abut the outer periphery of the first bracket 15 at the multiple protrusions 111 (see FIG. 4) in the second bracket arrangement process. The second bracket welding process melts and integrates the two protrusions 111 (see FIG. 4) of the second bracket 16A and the abutting portions of the first clamping portion 75 of the first bracket 15 against the respective protrusions 111 (see FIG. 4) to form two fixed portions 121. Even if the first bracket 15 has a protrusion 81, the second bracket 16A does not abut against the protrusion 81 in the second bracket welding process.

なお、第2実施形態の緩衝器11Aの製造方法においても、第1ブラケット溶接工程は、第2ブラケット配置工程の前に行っても良く、第2ブラケット溶接工程の後に行っても良い。 In addition, in the manufacturing method of the shock absorber 11A of the second embodiment, the first bracket welding process may be performed before the second bracket placement process or after the second bracket welding process.

第2実施形態の緩衝器11Aは、円弧状のベース部材である第1ブラケット15、及び、第1ブラケット15の円周方向に複数設けられる固定部121と、円弧状部91Aと、を備える第2ブラケット16Aを有する。固定部121は、第1ブラケット15の外周側と重なり合うように配置される。固定部121は、第1ブラケット15に抵抗溶接にて固定される。円弧状部91Aは、少なくとも固定部121と固定部121との間の第1円弧状部101の内周面101aの湾曲よりも、固定部121と固定部121との間の第1円弧状部101に対する円周方向外側部位である第2円弧状部102Aの内周面102Aaの湾曲の方が、外径方向に広がるよう形成されている。The shock absorber 11A of the second embodiment has a first bracket 15 which is an arc-shaped base member, and a second bracket 16A which includes a plurality of fixing portions 121 provided in the circumferential direction of the first bracket 15, and an arc-shaped portion 91A. The fixing portions 121 are arranged so as to overlap with the outer circumferential side of the first bracket 15. The fixing portions 121 are fixed to the first bracket 15 by resistance welding. The arc-shaped portion 91A is formed so that the curvature of the inner circumferential surface 102Aa of the second arc-shaped portion 102A, which is the outer circumferential portion relative to the first arc-shaped portion 101 between the fixing portions 121 and 121, is wider in the outer diameter direction than the curvature of the inner circumferential surface 101a of the first arc-shaped portion 101 between the fixing portions 121 and 121.

より具体的に、第2実施形態の緩衝器11Aは、板材をシリンダ17の外周側の少なくとも一部を覆うように成型して形成され、シリンダ17に固定される第1ブラケット15を有する。また、緩衝器11Aは、別部材を保持する保持部92と、第1ブラケット15の円周方向に複数の固定部121と、円弧状部91Aと、を備える第2ブラケット16Aを有する。円弧状部91Aは、第1ブラケット15の外周側と重なり合うように配置されて第1ブラケット15に固定部121が抵抗溶接にて固定される。円弧状部91Aは、少なくとも固定部121と固定部121との間の第1円弧状部101の内周面101aの湾曲よりも、固定部121と固定部121との間の第1円弧状部101に対する円周方向外側部位である第2円弧状部102Aの内周面102Aaの湾曲の方が、外径方向に広がるよう形成されている。More specifically, the shock absorber 11A of the second embodiment has a first bracket 15 formed by molding a plate material so as to cover at least a portion of the outer periphery of the cylinder 17 and fixed to the cylinder 17. The shock absorber 11A also has a second bracket 16A including a holding portion 92 that holds a separate member, a plurality of fixing portions 121 in the circumferential direction of the first bracket 15, and an arc-shaped portion 91A. The arc-shaped portion 91A is disposed so as to overlap the outer periphery of the first bracket 15, and the fixing portion 121 is fixed to the first bracket 15 by resistance welding. The arc-shaped portion 91A is formed so that the curvature of the inner surface 102Aa of the second arc-shaped portion 102A, which is the circumferentially outer portion relative to the first arc-shaped portion 101 between the fixed portions 121 and 121, is wider in the outward diameter direction than the curvature of the inner surface 101a of the first arc-shaped portion 101 between the fixed portions 121 and 121.

第2実施形態の緩衝器11Aの製造方法は、少なくとも一部である嵌合部60が円弧状に形成された第1ブラケット15を準備する第1ブラケット準備工程を含んでいる。また、第2実施形態の緩衝器11Aの製造方法は、第2ブラケット準備工程を含んでいる。第2ブラケット準備工程では、第2ブラケット16Aを準備する。第2ブラケット16Aは、複数の突出部111(図4参照)と、第2円弧状部102Aとを備える。突出部111は、少なくとも一部が円弧状に形成された第1円弧状部101とされ、第1円弧状部101の内周側に突出する。円弧状部102Aは、第1円弧状部101の円周方向外側にあって、第1円弧状部101の内周面101aよりも外径方向に広がるよう形成された内周面102Aaを有する。また、第2実施形態の緩衝器11Aの製造方法は、第1ブラケット準備工程で準備された第1ブラケット15をシリンダ17に固定する第1ブラケット溶接工程と、第2ブラケット準備工程で準備された第2ブラケット16Aを、第1ブラケット15の外周に突出部111(図4参照)が当接するよう配置する第2ブラケット配置工程と、第1ブラケット15と複数の突出部111(図4参照)との間に電流を通電して抵抗溶接を行う第2ブラケット溶接工程と、を含んでいる。The manufacturing method of the shock absorber 11A of the second embodiment includes a first bracket preparation step of preparing a first bracket 15 in which at least a part of the fitting portion 60 is formed in an arc shape. The manufacturing method of the shock absorber 11A of the second embodiment also includes a second bracket preparation step. In the second bracket preparation step, a second bracket 16A is prepared. The second bracket 16A has a plurality of protrusions 111 (see FIG. 4) and a second arc-shaped portion 102A. The protrusions 111 are the first arc-shaped portion 101, at least a part of which is formed in an arc shape, and protrude toward the inner periphery of the first arc-shaped portion 101. The arc-shaped portion 102A is located circumferentially outside the first arc-shaped portion 101 and has an inner periphery 102Aa formed to expand in the outer diameter direction more than the inner periphery 101a of the first arc-shaped portion 101. In addition, the manufacturing method of the shock absorber 11A of the second embodiment includes a first bracket welding process of fixing the first bracket 15 prepared in the first bracket preparation process to the cylinder 17, a second bracket positioning process of positioning the second bracket 16A prepared in the second bracket preparation process so that the protrusion 111 (see Figure 4) abuts the outer periphery of the first bracket 15, and a second bracket welding process of passing an electric current between the first bracket 15 and the multiple protrusions 111 (see Figure 4) to perform resistance welding.

以上の第2実施形態によれば、第1実施形態と同様、第2ブラケット16Aの第1ブラケット15への溶接において、溶接対象である複数の突出部111(図4参照)以外の部位に電流が流れる分流を抑制することができる。このため、溶接品質の低下を抑制することが可能となる。According to the second embodiment described above, as in the first embodiment, when welding the second bracket 16A to the first bracket 15, it is possible to suppress current shunting to areas other than the multiple protrusions 111 (see FIG. 4) that are the welding targets. This makes it possible to suppress deterioration of welding quality.

[第3実施形態]
本発明の第3実施形態を主に図6に基づいて第1実施形態との相違部分を中心に説明する。なお、第1実施形態と共通する部位については、同一称呼、同一の符号で表す。
[Third embodiment]
A third embodiment of the present invention will be described with a focus on differences from the first embodiment, mainly with reference to Fig. 6. Note that parts common to the first embodiment will be designated by the same names and reference numerals.

第3実施形態の緩衝器11B(ブラケット固定部材)においては、第1ブラケット15と第2ブラケット16との間に、絶縁材131が設けられている。絶縁材131は、第2ブラケット16が第1ブラケット15の第1挟持部75を覆う範囲であって、複数の突出部111を除く範囲の全体に設けられている。絶縁材131は、複数の突出部111の位置が穴部132とされたシート状に形成されている。絶縁材131は、第1挟持部75の外周面75aに貼り付けられている。なお、絶縁性の液剤を、複数の突出部111が当接する位置を除いて第1挟持部75の外周面75aに塗布して硬化させることにより絶縁材131を形成してもよい。In the shock absorber 11B (bracket fixing member) of the third embodiment, an insulating material 131 is provided between the first bracket 15 and the second bracket 16. The insulating material 131 is provided in the entire range where the second bracket 16 covers the first clamping portion 75 of the first bracket 15, excluding the multiple protrusions 111. The insulating material 131 is formed in a sheet shape with holes 132 at the positions of the multiple protrusions 111. The insulating material 131 is attached to the outer peripheral surface 75a of the first clamping portion 75. Note that the insulating material 131 may be formed by applying an insulating liquid agent to the outer peripheral surface 75a of the first clamping portion 75 except for the positions where the multiple protrusions 111 abut, and then curing it.

第2ブラケット16は、複数の突出部111が、絶縁材131のそれぞれ対応する穴部132を通って第1ブラケット15の第1挟持部75の外周面75aに当接する。この状態で、複数の突出部111が第1挟持部75にプロジェクション溶接等の抵抗溶接により固定される。すると、第2ブラケット16の2つの突出部111と、第1ブラケット15の第1挟持部75における各突出部111への当接部分とが、それぞれ溶融し一体化して固定部121Bとなる。 The second bracket 16 has multiple protrusions 111 that pass through corresponding holes 132 in the insulating material 131 and abut against the outer circumferential surface 75a of the first clamping portion 75 of the first bracket 15. In this state, the multiple protrusions 111 are fixed to the first clamping portion 75 by resistance welding such as projection welding. Then, the two protrusions 111 of the second bracket 16 and the abutting portions of the first clamping portion 75 of the first bracket 15 against the respective protrusions 111 are melted and integrated to form the fixed portion 121B.

第3実施形態の緩衝器11Bの製造方法は、第1ブラケット15を準備する第1ブラケット準備工程と、第2ブラケット16Aを準備する第2ブラケット準備工程と、第1実施形態と同様の第1ブラケット溶接工程と、を含んでいる。第1ブラケット準備工程は、第1ブラケット15の第1挟持部75の外周面75aに絶縁材131を配置する工程を含んでいる。The manufacturing method of the shock absorber 11B of the third embodiment includes a first bracket preparation step of preparing the first bracket 15, a second bracket preparation step of preparing the second bracket 16A, and a first bracket welding step similar to the first embodiment. The first bracket preparation step includes a step of arranging an insulating material 131 on the outer peripheral surface 75a of the first clamping portion 75 of the first bracket 15.

また、第3実施形態の緩衝器11Bの製造方法は、第2ブラケット準備工程で準備された第2ブラケット16を、第1ブラケット15の外周に突出部111が当接するよう配置する第2ブラケット配置工程を含んでいる。この第2ブラケット配置工程において、第2ブラケット16は、2箇所の突出部111が、絶縁材131のそれぞれ対応する穴部132を通って第1挟持部75の外周面75aに当接する。第2ブラケット配置工程において、第2ブラケット16は、これら2箇所の突出部111のみにおいて第1ブラケット15に当接する。例え第1ブラケット15に突状部81があっても、第2ブラケット16が突状部81に当接することはない。 The manufacturing method of the shock absorber 11B of the third embodiment also includes a second bracket arrangement process in which the second bracket 16 prepared in the second bracket preparation process is arranged so that the protrusions 111 abut against the outer periphery of the first bracket 15. In this second bracket arrangement process, the two protrusions 111 of the second bracket 16 abut against the outer periphery 75a of the first clamping portion 75 through the corresponding holes 132 of the insulating material 131. In the second bracket arrangement process, the second bracket 16 abuts against the first bracket 15 only at these two protrusions 111. Even if the first bracket 15 has a protrusion 81, the second bracket 16 does not abut against the protrusion 81.

また、第3実施形態の緩衝器11Bの製造方法は、第2ブラケット配置工程で第1ブラケット15の外周に複数の突出部111において当接するよう配置された第2ブラケット16の複数の突出部111と、第1ブラケット15との間に電流を通電してプロジェクション溶接等の抵抗溶接を行う第2ブラケット溶接工程を含んでいる。この第2ブラケット溶接工程によって、第2ブラケット16の2つの突出部111と、第1ブラケット15の第1挟持部75における各突出部111への当接部分とが、それぞれ溶融し一体化して、2箇所の固定部121Bとなる。例え第1ブラケット15に突状部81があっても、第2ブラケット溶接工程において第2ブラケット16が突状部81に当接することはない。 The manufacturing method of the shock absorber 11B of the third embodiment also includes a second bracket welding process in which current is passed between the first bracket 15 and the multiple protrusions 111 of the second bracket 16, which are arranged in the second bracket arrangement process so that the multiple protrusions 111 abut against the outer periphery of the first bracket 15, and the multiple protrusions 111. This second bracket welding process melts and integrates the two protrusions 111 of the second bracket 16 and the abutting portions of the first clamping portion 75 of the first bracket 15 against the respective protrusions 111, to form two fixed portions 121B. Even if the first bracket 15 has a protrusion 81, the second bracket 16 does not abut against the protrusion 81 in the second bracket welding process.

なお、第3実施形態の緩衝器11Bの製造方法においても、第1ブラケット溶接工程は、第2ブラケット配置工程の前に行っても良く、第2ブラケット溶接工程の後に行っても良い。 In addition, in the manufacturing method of the shock absorber 11B of the third embodiment, the first bracket welding process may be performed before the second bracket placement process or after the second bracket welding process.

第3実施形態の緩衝器11Bは、第1ブラケット15と第2ブラケット16との間の突出部111以外の位置に絶縁材131が設けられている。よって、第2ブラケット16の第1ブラケット15への溶接において、溶接対象である複数の突出部111以外の部位に電流が流れる分流をさらに抑制することができる。このため、溶接品質の低下をさらに抑制することが可能となる。In the shock absorber 11B of the third embodiment, an insulating material 131 is provided at a position other than the protrusion 111 between the first bracket 15 and the second bracket 16. Therefore, when welding the second bracket 16 to the first bracket 15, it is possible to further suppress the shunting of current flowing to areas other than the multiple protrusions 111 that are the welding targets. This makes it possible to further suppress the deterioration of welding quality.

以上に述べた第1~第3実施形態では、第2ブラケット16,16Aを円弧状のベース部材としての第1ブラケット15に溶接する場合を例にとり説明したが、例えば、図7に示す緩衝器11C(ブラケット固定部材)のように、第1実施形態を変形して第2ブラケット16の複数の突出部111を円筒状のシリンダ17の外筒14の側壁部21に当接させて直接溶接する等、第2ブラケット16,16Aを第1ブラケット15ではなく円筒状のシリンダ17に直接溶接する場合にも適用可能である。第3実施形態を変更する場合、絶縁材131は外筒14の側壁部21の第1円弧状部101で覆われる部分に設けられる。In the above-described first to third embodiments, the second bracket 16, 16A is welded to the first bracket 15 as an arc-shaped base member, but the present invention can also be applied to a case where the second bracket 16, 16A is directly welded to the cylindrical cylinder 17 instead of the first bracket 15, such as by modifying the first embodiment and directly welding the multiple protrusions 111 of the second bracket 16 to the side wall portion 21 of the outer tube 14 of the cylindrical cylinder 17, as in the shock absorber 11C (bracket fixing member) shown in FIG. 7. When modifying the third embodiment, the insulating material 131 is provided in the portion covered by the first arc-shaped portion 101 of the side wall portion 21 of the outer tube 14.

また、緩衝器11,11A~11Cでは、第2ブラケット16,16Aを第1ブラケット15あるいはシリンダ17に溶接により取り付ける場合を例にとり説明したが、緩衝器以外においてブラケットをベース部材に溶接により取り付ける場合に本発明を適用することも可能である。すなわち、筒状または円弧状のベース部材にブラケットを溶接する場合に、ブラケットを、ベース部材の円周方向に複数設けられる固定部を有すると共に、ベース部材の外周側と重なり合うように配置されてベース部材に固定部が抵抗溶接にて固定され、少なくとも複数の固定部間の湾曲よりも円周方向外側部位の湾曲の方が、外径方向に広がるよう形成されている円弧状部を備える構造とすれば良い。 In addition, in the shock absorbers 11, 11A to 11C, the second bracket 16, 16A is attached to the first bracket 15 or cylinder 17 by welding, but the present invention can also be applied to cases where a bracket is attached to a base member by welding in a device other than a shock absorber. That is, when welding a bracket to a cylindrical or arc-shaped base member, the bracket can be structured so that it has multiple fixing parts provided in the circumferential direction of the base member, is arranged so as to overlap with the outer periphery of the base member, and the fixing parts are fixed to the base member by resistance welding, and has an arc-shaped part formed so that the curvature of the outer circumferential portion is wider in the outer diameter direction than the curvature between at least the multiple fixing parts.

以上に述べた実施形態の第1の態様のブラケット固定部材は、筒状または円弧状のベース部材と、前記ベース部材の円周方向に複数設けられる固定部を有すると共に、該ベース部材の外周側と重なり合うように配置されて該ベース部材に前記固定部が抵抗溶接にて固定され、少なくとも複数の前記固定部間の湾曲よりも円周方向外側部位の湾曲の方が、外径方向に広がるよう形成されている円弧状部を備えるブラケットと、を有する。これにより、溶接品質の低下を抑制することが可能となる。The bracket fixing member of the first aspect of the embodiment described above has a cylindrical or arc-shaped base member, and a bracket having a plurality of fixing parts provided in the circumferential direction of the base member, which are arranged so as to overlap with the outer periphery of the base member and are fixed to the base member by resistance welding, and which has an arc-shaped part formed so that the curvature of the outer circumferential portion is wider in the outer diameter direction than the curvature between at least the plurality of fixing parts. This makes it possible to suppress deterioration of welding quality.

実施形態の第2の態様のブラケット固定部材は、第1の態様のブラケット固定部材であり、前記ブラケットは、前記円周方向外側部位が、前記ベース部材から離間している。The bracket fixing member of the second aspect of the embodiment is the bracket fixing member of the first aspect, wherein the circumferential outer portion of the bracket is spaced apart from the base member.

実施形態の第3の態様の緩衝器は、円筒状のシリンダを備えた緩衝器であって、第1ブラケットと、第2ブラケットと、を有する。第1ブラケットは、板材を前記シリンダの外周側の少なくとも一部を覆うように成型して形成される。第1ブラケットは、前記シリンダに固定される。第2ブラケットは、保持部と、複数の固定部と、円弧状部と、を備える。保持部は、別部材を保持する。固定部は、前記シリンダまたは前記第1ブラケットからなるベース部材の円周方向に設けられる。固定部は、該ベース部材の外周側と重なり合うように配置されて該ベース部材に抵抗溶接にて固定される。円弧状部は、少なくとも複数の前記固定部間の湾曲よりも円周方向外側部位の湾曲の方が、外径方向に広がるよう形成されている。これにより、溶接品質の低下を抑制することが可能となる。 The shock absorber of the third aspect of the embodiment is a shock absorber equipped with a cylindrical cylinder, and has a first bracket and a second bracket. The first bracket is formed by molding a plate material so as to cover at least a part of the outer periphery of the cylinder. The first bracket is fixed to the cylinder. The second bracket has a holding portion, a plurality of fixing portions, and an arc-shaped portion. The holding portion holds a separate member. The fixing portion is provided in the circumferential direction of a base member consisting of the cylinder or the first bracket. The fixing portion is disposed so as to overlap with the outer periphery of the base member and is fixed to the base member by resistance welding. The arc-shaped portion is formed so that the curvature of the circumferential outer portion is wider in the outer diameter direction than the curvature between at least the plurality of the fixing portions. This makes it possible to suppress a deterioration in welding quality.

実施形態の第4の態様の緩衝器は、第3の態様の緩衝器であり、前記第2ブラケットは、前記円周方向外側部位が、前記ベース部材から離間している。A shock absorber in a fourth aspect of the embodiment is the shock absorber in the third aspect, wherein the second bracket has an outer circumferential portion spaced apart from the base member.

実施形態の第5の態様の緩衝器の製造方法は、円筒状のシリンダを備えた緩衝器の製造方法であって、少なくとも一部が円弧状に形成された第1ブラケットと、第2ブラケットであって、少なくとも一部が円弧状に形成された第1円弧状部とされ、該第1円弧状部の内周側に突出する複数の突出部と、前記第1円弧状部の円周方向外側にあって、前記第1円弧状部よりも外径方向に広がるよう円弧状に形成された第2円弧状部とを有する第2ブラケットと、を準備する工程と、前記第1ブラケットを前記シリンダに固定する工程と、前記シリンダまたは前記第1ブラケットからなるベース部材の外周に前記突出部が当接するよう前記第2ブラケットを配置する工程と、前記ベース部材と前記突出部との間に電流を通電して抵抗溶接する工程と、を含む。これにより、溶接品質の低下を抑制することが可能となる。 The manufacturing method of a shock absorber according to the fifth aspect of the embodiment is a manufacturing method of a shock absorber having a cylindrical cylinder, and includes the steps of preparing a first bracket having at least a portion formed in an arc shape, and a second bracket having a first arc-shaped portion having at least a portion formed in an arc shape, a plurality of protrusions protruding from the inner circumferential side of the first arc-shaped portion, and a second arc-shaped portion that is located circumferentially outside the first arc-shaped portion and is formed in an arc shape so as to expand in the outer radial direction more than the first arc-shaped portion, a step of fixing the first bracket to the cylinder, a step of arranging the second bracket so that the protrusions abut against the outer periphery of a base member made of the cylinder or the first bracket, and a step of resistance welding by passing an electric current between the base member and the protrusions. This makes it possible to suppress deterioration of welding quality.

上記した緩衝器及び緩衝器の製造方法によれば、溶接品質の低下を抑制することが可能となる。 The above-mentioned shock absorber and shock absorber manufacturing method make it possible to suppress deterioration in welding quality.

11,11A,11B,11C 緩衝器(ブラケット固定部材)
15 第1ブラケット(ベース部材)
16,16A 第2ブラケット(ブラケット)
17 シリンダ(ベース部材)
91,91A 円弧状部
92 保持部
101 第1円弧状部
102,102A 第2円弧状部(円周方向外側部位)
111 突出部
121 固定部
11, 11A, 11B, 11C Shock absorber (bracket fixing member)
15 First bracket (base member)
16, 16A Second bracket (bracket)
17 Cylinder (base member)
91, 91A: Arc-shaped portion 92: Holding portion 101: First arc-shaped portion 102, 102A: Second arc-shaped portion (outer portion in the circumferential direction)
111 Protruding portion 121 Fixing portion

Claims (5)

筒状または円弧状のベース部材と、
固定部と、円弧状部と、を備えるブラケットと、
を備え、
前記固定部は、前記ベース部材の円周方向に複数設けられ、該ベース部材の外周側と重なり合うように配置されて該ベース部材に前記固定部が抵抗溶接にて固定され、
前記円弧状部は、複数の前記固定部間に形成される第1円弧状部と、前記第1円弧状部よりも大径であり円周方向外側に配置される第2円弧状部と、前記第1円弧状部と前記第2円弧状部とを連結する連結部が形成されている
ブラケット固定部材。
A cylindrical or arc-shaped base member;
A bracket including a fixing portion and an arc-shaped portion;
Equipped with
the fixing portion is provided in a plurality of parts in a circumferential direction of the base member, the fixing portion is arranged so as to overlap with an outer circumferential side of the base member, and the fixing portion is fixed to the base member by resistance welding;
A bracket fixing member in which the arc-shaped portion includes a first arc-shaped portion formed between a plurality of the fixing portions, a second arc-shaped portion having a larger diameter than the first arc-shaped portion and positioned circumferentially outward, and a connecting portion connecting the first arc-shaped portion and the second arc-shaped portion .
請求項1に記載のブラケット固定部材であって、
前記ブラケットは、前記第2円弧状部が、前記ベース部材から離間している
ブラケット固定部材。
The bracket fixing member according to claim 1,
The bracket fixing member, wherein the second arcuate portion of the bracket is spaced apart from the base member.
円筒状のシリンダを備えた緩衝器であって、
板材を前記シリンダの外周側の少なくとも一部を覆うように成型して形成され、前記シリンダに固定される第1ブラケットと、
第2ブラケットと、
を有し、
前記第2ブラケットは、
別部材を保持する保持部と、
前記シリンダまたは前記第1ブラケットからなるベース部材の円周方向に複数の固定部と、
少なくとも複数の前記固定部間の第1円弧状部と、前記第1円弧状部よりも大径であり円周方向外側に配置される第2円弧状部と、前記第1円弧状部と前記第2円弧状部とを連結する連結部が形成されている円弧状部と、
を備え
前記固定部は、該ベース部材の外周側と重なり合うように配置されて該ベース部材に抵抗溶接にて固定される
緩衝器。
A shock absorber having a cylindrical cylinder,
a first bracket formed by molding a plate material so as to cover at least a portion of an outer circumferential side of the cylinder and fixed to the cylinder;
A second bracket;
having
The second bracket is
A holding portion for holding a separate member;
A plurality of fixing portions in a circumferential direction of a base member formed of the cylinder or the first bracket;
a first arc-shaped portion between at least a plurality of the fixing portions, a second arc-shaped portion having a larger diameter than the first arc-shaped portion and disposed circumferentially outward, and a connecting portion that connects the first arc-shaped portion and the second arc-shaped portion is formed in the arc-shaped portion;
the fixing portion is disposed so as to overlap an outer circumferential side of the base member and is fixed to the base member by resistance welding.
請求項3に記載の緩衝器であり、
前記第2ブラケットは、前記第2円弧状部が、前記ベース部材から離間している
緩衝器。
The shock absorber according to claim 3,
The second bracket has a second arcuate portion spaced apart from the base member.
円筒状のシリンダを備えた緩衝器の製造方法であって、
少なくとも一部が円弧状に形成された第1ブラケットと、
少なくとも一部が円弧状に形成された第1円弧状部とされ、該第1円弧状部の内周側に突出する複数の突出部と、前記第1円弧状部の円周方向外側にあって、前記第1円弧状部よりも大径であり外径方向に広がるよう円弧状に形成された第2円弧状部と、前記第1円弧状部と前記第2円弧状部とを連結する連結部とを有する第2ブラケットと、
を準備する工程と、
前記第1ブラケットを前記シリンダに固定する工程と、
前記シリンダまたは前記第1ブラケットからなるベース部材の外周に前記突出部が当接するよう前記第2ブラケットを配置する工程と、
前記ベース部材と前記突出部との間に電流を通電して抵抗溶接する工程と、
を含む緩衝器の製造方法。
A method for manufacturing a shock absorber having a cylindrical cylinder, comprising the steps of:
A first bracket having at least a portion formed in an arc shape;
a second bracket having a first arc-shaped portion at least a portion of which is formed in an arc shape, the second bracket having a plurality of protrusions protruding toward an inner circumferential side of the first arc-shaped portion, a second arc-shaped portion located circumferentially outside the first arc-shaped portion, the second arc-shaped portion having a larger diameter than the first arc-shaped portion and formed in an arc shape so as to expand in an outer diametrical direction , and a connecting portion connecting the first arc-shaped portion and the second arc-shaped portion ;
and preparing
fixing the first bracket to the cylinder;
a step of disposing the second bracket so that the protrusion abuts against an outer periphery of a base member formed of the cylinder or the first bracket;
A step of passing an electric current between the base member and the protrusion to perform resistance welding;
A method for manufacturing a shock absorber comprising the steps of:
JP2022579522A 2021-02-02 2022-01-31 Bracket fixing member, shock absorber, and method of manufacturing shock absorber Active JP7504237B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2021014842 2021-02-02
JP2021014842 2021-02-02
PCT/JP2022/003557 WO2022168779A1 (en) 2021-02-02 2022-01-31 Bracket fixing member, buffer, and manufacturing method for buffer

Publications (3)

Publication Number Publication Date
JPWO2022168779A1 JPWO2022168779A1 (en) 2022-08-11
JPWO2022168779A5 JPWO2022168779A5 (en) 2023-07-28
JP7504237B2 true JP7504237B2 (en) 2024-06-21

Family

ID=82741418

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022579522A Active JP7504237B2 (en) 2021-02-02 2022-01-31 Bracket fixing member, shock absorber, and method of manufacturing shock absorber

Country Status (3)

Country Link
JP (1) JP7504237B2 (en)
CN (1) CN116848338A (en)
WO (1) WO2022168779A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102022203398B4 (en) 2022-04-06 2023-11-16 Zf Friedrichshafen Ag Fastening arrangement for fastening a vibration damper to a wheel carrier of a motor vehicle.

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001182772A (en) 1999-10-15 2001-07-06 Showa Corp Inverted hydraulic shock absorber
JP2002283993A (en) 2001-03-29 2002-10-03 Kayaba Ind Co Ltd Hose bracket mounting device
JP2014000928A (en) 2012-06-21 2014-01-09 Hitachi Automotive Systems Kyushu Ltd Propeller shaft

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07259914A (en) * 1994-03-18 1995-10-13 Tokico Ltd Cylinder device
JP3695726B2 (en) * 1996-10-16 2005-09-14 カヤバ工業株式会社 Connecting structure of stabilizer bracket to hydraulic shock absorber

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001182772A (en) 1999-10-15 2001-07-06 Showa Corp Inverted hydraulic shock absorber
JP2002283993A (en) 2001-03-29 2002-10-03 Kayaba Ind Co Ltd Hose bracket mounting device
JP2014000928A (en) 2012-06-21 2014-01-09 Hitachi Automotive Systems Kyushu Ltd Propeller shaft

Also Published As

Publication number Publication date
JPWO2022168779A1 (en) 2022-08-11
CN116848338A (en) 2023-10-03
WO2022168779A1 (en) 2022-08-11

Similar Documents

Publication Publication Date Title
JP7324288B2 (en) Diffuser and inflator assembly, airbag module, and method for installing the assembly
JP7504237B2 (en) Bracket fixing member, shock absorber, and method of manufacturing shock absorber
KR102522852B1 (en) Joint and method of manufacturing the joint
US20020141817A1 (en) Knuckle bracket for a strut-type shock absorber
WO2020137218A1 (en) Buffer
EP3816473B1 (en) A bracket for attachment with a hydraulic damper assembly and a method of joining a bracket and a hydraulic damper assembly
EP1010915B1 (en) Liquid- sealed vibration insulator and method for producing the same
CN111386407A (en) Disk brake and piston protection cover
JP7738760B2 (en) Bumper Caps and Shock Absorbers
JP7275061B2 (en) Cylinder device
US6622994B2 (en) Partition member of liquid filled vibration isolating device
JP7805197B2 (en) Cylinder Device
CN114658792B (en) Hydraulic bushing with bearing points and method for producing such a bushing
EP3379102B1 (en) Bump stopper and buffer
JP7766516B2 (en) Cylinder Device
KR20200020706A (en) Method for manufacturing vehicle parts and vehicle parts manufactured according to the method
JP7584366B2 (en) Welding parts and shock absorbers
JP7834004B2 (en) Buffer and method for manufacturing a buffer
US20240221986A1 (en) Solenoid, solenoid valve, suspension device, and method of assembling solenoid
JP7229380B2 (en) Rod manufacturing method
JP7814532B2 (en) Shock absorber and method for manufacturing the same
JP7648571B2 (en) Upper mount and method for assembling the upper mount
CN119404025A (en) Buffer, method for manufacturing buffer, valve, and method for manufacturing valve
JP2024154066A (en) Shock absorber
WO2024201696A1 (en) Shock absorbing device and suspension device

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230511

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230511

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240220

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240514

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240611

R150 Certificate of patent or registration of utility model

Ref document number: 7504237

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150