Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7511883B2 - External formwork for arch structure and method for relocating same - Google Patents
[go: Go Back, main page]

JP7511883B2 - External formwork for arch structure and method for relocating same - Google Patents

External formwork for arch structure and method for relocating same Download PDF

Info

Publication number
JP7511883B2
JP7511883B2 JP2020140230A JP2020140230A JP7511883B2 JP 7511883 B2 JP7511883 B2 JP 7511883B2 JP 2020140230 A JP2020140230 A JP 2020140230A JP 2020140230 A JP2020140230 A JP 2020140230A JP 7511883 B2 JP7511883 B2 JP 7511883B2
Authority
JP
Japan
Prior art keywords
arch structure
formwork
top piece
piece
outer form
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020140230A
Other languages
Japanese (ja)
Other versions
JP2022035720A (en
Inventor
徹 奥平
大輔 佐土原
Original Assignee
テクノプロ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by テクノプロ株式会社 filed Critical テクノプロ株式会社
Priority to JP2020140230A priority Critical patent/JP7511883B2/en
Publication of JP2022035720A publication Critical patent/JP2022035720A/en
Application granted granted Critical
Publication of JP7511883B2 publication Critical patent/JP7511883B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明は、トンネル坑門等のアーチ構造物の成形に用いられる外型枠、及び当該外型枠の移設方法に関する。 The present invention relates to an outer formwork used to mold arch structures such as tunnel portals, and a method for relocating the outer formwork.

山岳トンネルの出入り口には、地山からの落石を防止したり景観をよくしたりするために、アーチ状に形成された突出型や竹割り式等の坑門(アーチ構造物)が多用されている。
例えば、特許文献1に記載されているアーチ構造物は、トンネルの坑口に内型枠と外型枠とを設置し、両型枠の間に生コンクリートを流し込んで所定期間養生した後、型枠を撤去することによって形成されている。
At the entrances and exits of mountain tunnels, arch-shaped protruding or split-bamboo style tunnel portals (arch structures) are often used to prevent rocks from falling from the ground and to improve the scenery.
For example, the arch structure described in Patent Document 1 is formed by installing inner and outer formwork at the entrance to a tunnel, pouring ready-mixed concrete between the two formworks, allowing it to cure for a predetermined period of time, and then removing the formwork.

特許文献1記載の外型枠は、アーチ状に形成された外型枠ブロックをアーチ構造物の延長方向に複数個(例えば4個)並設することにより構成されている。各外型枠ブロックは、アーチ構造物の幅方向の両側に配置される1対の下側外型枠(側部ピース)と、一対の下側外型枠の間に配置される上側外型枠(頂部ピース)とからなる。各外型枠ブロックは、一対の下側外型枠をアーチ構造物の床版に連結した後、各下側外型枠の上端部に上側外型枠の両端部を連結することによって組み立てられる。外型枠は、複数の外型枠ブロックを順番に並べて組み立てつつ隣接する外型枠ブロック同士をボルトで連結することによって構成されている。 The outer formwork described in Patent Document 1 is constructed by arranging multiple (e.g., four) arch-shaped outer formwork blocks side by side in the extension direction of the arch structure. Each outer formwork block consists of a pair of lower outer formworks (side pieces) arranged on both sides of the width direction of the arch structure, and an upper outer formwork (top piece) arranged between the pair of lower outer formworks. Each outer formwork block is assembled by connecting the pair of lower outer formworks to the deck of the arch structure, and then connecting both ends of the upper outer formwork to the upper ends of each lower outer formwork. The outer formwork is constructed by arranging and assembling multiple outer formwork blocks in order, and then connecting adjacent outer formwork blocks to each other with bolts.

特開2010-53574号公報JP 2010-53574 A

以上のような外型枠を用いて、当該外型枠の長さ以上に長いアーチ構造物を成形する場合、外型枠の長さに相当する1区間のアーチ構造物を成形した後、当該外型枠を一旦分解し、成形済みのアーチ構造物に隣接する場所(移設先)で外型枠を再び組み立て、2区間目以降のアーチ構造物を成形する作業が行われる。この場合、外型枠の移設作業は、次のような手順で行われる。
(1)アーチ構造物の延長方向の端部に配置された外型枠ブロックの下側外型枠と上側外型枠との連結を解き、上側外型枠をクレーンで吊り上げて取り外し、地面に仮置きする。
(2)上側外型枠が取り外された一対の下側外型枠を所定の移設先に移設する。
(3)移設済みの一対の下側外型枠に、地面に仮置きしていた上側外型枠を連結し、一の外型枠ブロックを組み立てる。
(4)他の外型枠ブロックも同様の手順(1)~(3)で移設する。
When using the above-mentioned outer form to form an arch structure longer than the length of the outer form, after forming one section of the arch structure corresponding to the length of the outer form, the outer form is temporarily disassembled and reassembled at a location (relocation destination) adjacent to the formed arch structure, and the second and subsequent sections of the arch structure are formed. In this case, the outer form is relocated in the following procedure.
(1) The lower outer form and upper outer form of the outer form block located at the end of the extension direction of the arch structure are disconnected, and the upper outer form is lifted and removed by a crane and temporarily placed on the ground.
(2) The pair of lower outer forms from which the upper outer forms have been removed are moved to a predetermined location.
(3) The upper outer formwork that was temporarily placed on the ground is connected to the pair of lower outer formworks that have already been relocated to assemble one outer formwork block.
(4) The other outer formwork blocks are relocated following the same procedures (1) to (3).

以上の移設作業においては、各外側型枠ブロックの上側外型枠を地面に仮置きする手順が発生する。そのため、作業工程が多くなるとともに仮置きのためのスペースを別途確保する必要があった。 The above relocation work required the procedure of temporarily placing the upper outer formwork of each outer formwork block on the ground. This increased the number of work processes and required the securing of additional space for temporary placement.

本発明は、少ない作業工程で移設作業を行うことができる、アーチ構造物用の外型枠、及び、外型枠の移設方法を提供することを目的とする。 The present invention aims to provide an outer formwork for arch structures and a method for relocating the outer formwork, which allows relocation work to be performed with fewer work steps.

(1) 本発明のアーチ構造物用の外型枠は、
アーチ構造物の延長方向に並べて配置された複数のアーチ状の外型枠ブロックを備え、
前記各外型枠ブロックが、前記アーチ構造物の幅方向の両側に位置する一対の側部ピースと、前記一対の側部ピースの間に位置しかつ前記アーチ構造物の幅方向における端部が前記一対の側部ピースの上端部に連結される頂部ピースとを備え、
前記アーチ構造物の幅方向における前記頂部ピースの端面が、前記側部ピースの上端面よりも前記アーチ構造物の幅方向の中心側に配置されている。
(1) The outer form for an arch structure of the present invention is
A plurality of arch-shaped outer form blocks are arranged in a line in an extension direction of the arch structure,
Each of the outer formwork blocks comprises a pair of side pieces located on both sides of the width direction of the arch structure, and a top piece located between the pair of side pieces and having an end portion in the width direction of the arch structure connected to the upper end portion of the pair of side pieces,
An end face of the top piece in the width direction of the arch structure is disposed closer to the center in the width direction of the arch structure than the upper end faces of the side pieces.

上記構成の外型枠は、アーチ構造物の幅方向における頂部ピースの端面が、側部ピースの上端面よりもアーチ構造物の幅方向における中心側に配置されているので、外型枠を分解して移設する際に、一の外型枠ブロックにおける頂部ピースと側部ピースとの連結を解き、頂部ピースを隣接する他の外型枠ブロックに連結したまま、当該頂部ピースに干渉することなく側部ピースのみをクレーンで吊り上げて取り外し、所定の移設先に移設することができる。そして、頂部ピースを隣接する他の外型枠ブロックから取り外し、すでに移設された側部ピースへ頂部ピースを直接移動させて当該側部ピースに連結することができる。したがって、当該頂部ピースを地面に仮置きする必要がなくなり、少ない作業工程により移設作業を行うことができる。 In the outer formwork of the above configuration, the end face of the top piece in the width direction of the arch structure is positioned closer to the center in the width direction of the arch structure than the upper end faces of the side pieces, so that when disassembling and relocating the outer formwork, the connection between the top piece and the side pieces in one outer formwork block can be released, and while the top piece remains connected to the other adjacent outer formwork block, only the side pieces can be lifted and removed with a crane without interfering with the top piece, and relocated to a specified relocation destination. Then, the top piece can be removed from the other adjacent outer formwork block, and the top piece can be moved directly to the side piece that has already been relocated and connected to it. This eliminates the need to temporarily place the top piece on the ground, and the relocation work can be carried out with fewer work steps.

(2) 好ましくは、前記アーチ構造物の幅方向における前記頂部ピースの端面が、鉛直方向に沿った面である。
このような構成によって、一の外型枠ブロックにおける頂部ピースを隣接する他の外型枠ブロックに連結したまま、当該頂部ピースに干渉することなく側部ピースのみをクレーンで吊り上げて取り外すことができる。
(2) Preferably, an end face of the top piece in the width direction of the arch structure is a surface along the vertical direction.
With this configuration, while the top piece of one outer frame block remains connected to the other adjacent outer frame block, only the side pieces can be lifted and removed by a crane without interfering with the top piece.

(3) 頂部ピースと側部ピースとは直接的に連結してもよいが、他の部材を介して間接的に連結してもよい。この場合、外型枠は、前記側部ピースと前記頂部ピースとを連結する連結部材を備え、前記連結部材が、前記アーチ構造物の幅方向における前記頂部ピースの端面に接触する第1接触面と、前記側部ピースの上端面に接触する第2接触面とを有していることが好ましい。 (3) The top piece and the side pieces may be directly connected, or may be indirectly connected via other members. In this case, it is preferable that the outer formwork is provided with a connecting member that connects the side pieces and the top piece, and that the connecting member has a first contact surface that contacts the end face of the top piece in the width direction of the arch structure, and a second contact surface that contacts the upper end face of the side piece.

このような構成によって、頂部ピースの端面と側部ピースの上端面とを直接接触させることなく連結部材を用いて連結することができ、連結部材を取り外すことで頂部ピースの端面と側部ピースの上端面とを離反させることができるので、側部ピースを吊り上げたときの頂部ピースとの干渉をより少なくすることができる。 This configuration allows the end face of the top piece to be connected to the upper end face of the side piece using the connecting member without direct contact between them, and the end face of the top piece and the upper end face of the side piece can be separated by removing the connecting member, thereby reducing interference with the top piece when the side piece is lifted.

(4) 好ましくは、前記連結部材が、前記頂部ピースの外周面と前記側部ピースの外周面とに渡って配置されかつ前記頂部ピース及び前記側部ピースに連結される連結板と、
前記連結板から前記頂部ピースと前記側部ピースとの間に向けて突出し、前記第1接触面及び前記第2接触面を有する当て具とを有している。
(4) Preferably, the connecting member includes a connecting plate disposed across the outer circumferential surface of the top piece and the outer circumferential surface of the side piece and connected to the top piece and the side piece;
A stopper protrudes from the connecting plate toward between the top piece and the side piece and has the first contact surface and the second contact surface.

(5) 好ましくは、前記当て具が、正面視において前記第1接触面と前記第2接触面とを2辺とする三角形状である。
このような構成によって、連結部材の当て具を、アーチ構造物の外周面に接触させないようにすることができる。そのため、成形済のアーチ構造物の外周面に連結部材が付着することがなく、連結部材を頂部ピース及び側部ピースから容易に取り外すことができる。
(5) Preferably, the contact member has a triangular shape with two sides defined by the first contact surface and the second contact surface when viewed from the front.
With this configuration, the stopper of the connecting member can be prevented from contacting the outer circumferential surface of the arch structure, so that the connecting member does not adhere to the outer circumferential surface of the formed arch structure, and the connecting member can be easily removed from the top piece and the side piece.

(6) 本発明は、一対の側部ピースと頂部ピースとを有するアーチ状の第1外型枠ブロックと、一対の側部ピースと頂部ピースとを有するアーチ状の第2外型枠ブロックとを含み、前記第1外型枠ブロックと前記第2外型枠ブロックとがアーチ構造物の延長方向において隣接しかつ連結されているアーチ構造物用の外型枠の移設方法であって、
前記第1外型枠ブロックにおける前記側部ピースを前記第1外型枠ブロックにおける前記頂部ピース及び前記第2外型枠ブロックから取り外すステップ、
前記第1外型枠ブロックの前記側部ピースを移設するステップ、
前記第1外型枠ブロックの前記頂部ピースを前記第2外型枠ブロックから取り外すステップ、及び
前記第1外型枠ブロックの前記頂部ピースを、すでに移設された前記第1外型枠ブロックの前記側部ピースに連結するステップ、を含む。
(6) The present invention provides a method for transferring an outer form for an arch structure, the method comprising: a first outer form block having an arch shape with a pair of side pieces and a top piece; and a second outer form block having an arch shape with a pair of side pieces and a top piece, the first outer form block and the second outer form block being adjacent to and connected to each other in an extension direction of the arch structure,
removing the side pieces of the first outer form block from the top piece of the first outer form block and from the second outer form block;
Relocating the side pieces of the first outer form block;
removing the top piece of the first outer form block from the second outer form block; and connecting the top piece of the first outer form block to the side piece of the first outer form block that has already been moved.

上記の移設方法によれば、第1外型枠ブロックを構成する頂部ピース及び側部ピースのうち、側部ピースを先に移設し、その後、頂部ピースを移設することによって、頂部スペースを仮置きするための工程が不要になり、移設作業を少ない工程で行うことができる。 According to the above relocation method, of the top and side pieces that make up the first outer formwork block, the side pieces are relocated first, and then the top piece is relocated, eliminating the need for a step to temporarily place the top space, and the relocation work can be completed in fewer steps.

本発明によれば、少ない作業工程で移設作業を行うことができる。 According to the present invention, relocation work can be carried out with fewer work steps.

本発明の実施形態に係るアーチ構造物用の型枠の正面図である。FIG. 2 is a front view of a formwork for an arch structure according to an embodiment of the present invention. 型枠の外型枠の側面図である。FIG. 2 is a side view of the outer formwork of the mold. 外型枠の斜視図である。FIG. 外型枠の外側型枠フレームの斜視図である。FIG. 2 is a perspective view of the outer formwork frame of the outer formwork. 外型枠の外側型枠パネルの斜視図である。FIG. 2 is a perspective view of an outer form panel of the outer form. 外型枠の下部の固定構造を示す断面説明図である。An explanatory cross-sectional view showing the fixing structure of the lower part of the outer formwork. 図1のA部を拡大して示す説明図である。FIG. 2 is an explanatory diagram showing an enlarged view of part A in FIG. 1 . 頂部ピースと側部ピースとの連結を解いた状態を示す説明図である。FIG. 13 is an explanatory diagram showing the top piece and the side pieces when they are disconnected. (a)は、連結部材の正面図、(b)は、連結部材の平面図である。4A is a front view of a connecting member, and FIG. 4B is a plan view of the connecting member. アーチ構造物の施工方法を示す説明図である。FIG. 1 is an explanatory diagram showing a construction method for an arch structure. アーチ構造物の施工方法を示す説明図である。FIG. 1 is an explanatory diagram showing a construction method for an arch structure. アーチ構造物の施工方法を示す説明図である。FIG. 1 is an explanatory diagram showing a construction method for an arch structure. 外型枠の移設方法を示す説明図である。FIG. 13 is an explanatory diagram showing a method of relocating the outer formwork. 外型枠の移設方法を示す説明図である。FIG. 13 is an explanatory diagram showing a method of relocating the outer formwork. 連結部材の変形例を示す正面図である。FIG. 13 is a front view showing a modified example of the connecting member. 連結部材の変形例を示す正面図である。FIG. 13 is a front view showing a modified example of the connecting member.

以下、本発明の実施形態について図面を参照しながら説明する。
図1は、本発明の実施形態に係るアーチ構造物用の型枠10を示す正面図である。図2は、型枠10の外型枠11の側面図である。図3は、外型枠11の斜視図である。
図1に示すように、本実施形態のアーチ構造物用の型枠10は、例えば、アーチ構造物の一例であるトンネル坑門を成形するために用いられる。型枠10は、外型枠11と、内型枠12とを備える。外型枠11は、アーチ構造物の外周面を成形する。内型枠12は、アーチ構造物の内周面を成形する。なお、本実施形態の型枠10は、トンネル坑門を成形する場合、妻側端面がほぼ垂直となっている突出型坑門を成形するものとなる。図1における矢印Xは、型枠10(及びアーチ構造物)の幅方向を示し、図2における矢印Yは、アーチ構造物の内部空間が延びる方向(本明細書では、「アーチ構造物の延長方向」ともいう)を示している。
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
Fig. 1 is a front view showing a formwork 10 for an arch structure according to an embodiment of the present invention. Fig. 2 is a side view of an outer formwork 11 of the formwork 10. Fig. 3 is a perspective view of the outer formwork 11.
As shown in FIG. 1, the formwork 10 for an arch structure of this embodiment is used, for example, to form a tunnel portal, which is an example of an arch structure. The formwork 10 includes an outer formwork 11 and an inner formwork 12. The outer formwork 11 forms the outer peripheral surface of the arch structure. The inner formwork 12 forms the inner peripheral surface of the arch structure. When forming a tunnel portal, the formwork 10 of this embodiment forms a protruding portal whose end face is almost vertical. The arrow X in FIG. 1 indicates the width direction of the formwork 10 (and the arch structure), and the arrow Y in FIG. 2 indicates the direction in which the internal space of the arch structure extends (also referred to as the "extension direction of the arch structure" in this specification).

外型枠11は、外側型枠フレーム21と、外側型枠パネル31とを有する。
外側型枠フレーム21は、正面から見てアーチ状に形成されている。外側型枠フレーム21は、複数の鋼材からなるフレーム部材23,24を枠組みすることによって構成されている。外側型枠パネル31は、外側型枠フレーム21の内側に取り付けられている。外側型枠パネル31は、アーチ構造物の外周面に沿う形状に形成されている。
The outer formwork 11 has an outer formwork frame 21 and an outer formwork panel 31 .
The outer form frame 21 is formed in an arch shape when viewed from the front. The outer form frame 21 is constructed by framing frame members 23, 24 made of a plurality of steel materials. The outer form panel 31 is attached to the inside of the outer form frame 21. The outer form panel 31 is formed in a shape that fits along the outer peripheral surface of the arch structure.

本実施形態の外型枠11は、アーチ状に形成された複数の外型枠ブロック20をアーチ構造物の延長方向Yに並べて配置することにより構成されている。言い換えると、本実施形態の外型枠11は、アーチ構造物の延長方向Yに複数に分割されている。本実施形態では、4個の外型枠ブロック20によって外型枠11が構成されている。互いに隣接する外型枠ブロック20は、ボルト、ナット等の締結具によって連結される。各外型枠ブロック20は、それぞれ外側型枠フレーム21と、外側型枠パネル31とを有する。 The outer formwork 11 of this embodiment is constructed by arranging multiple arch-shaped outer formwork blocks 20 in the extension direction Y of the arch structure. In other words, the outer formwork 11 of this embodiment is divided into multiple parts in the extension direction Y of the arch structure. In this embodiment, the outer formwork 11 is constructed of four outer formwork blocks 20. Adjacent outer formwork blocks 20 are connected by fasteners such as bolts and nuts. Each outer formwork block 20 has an outer formwork frame 21 and an outer formwork panel 31.

内型枠12は、例えば、トンネル内部の覆工コンクリートを成形するためのスライドセントルが代用される。内型枠12は、内側型枠フレーム12Aと、内側型枠パネル12Bとを有する。内側型枠フレーム12Aは、複数の鋼材からなるフレーム部材を枠組みすることによって形成されている。内側型枠フレーム12Aは、アーチ構造物としてのトンネル内に敷設されたレール14上をアーチ構造物の延長方向Yに移動可能である。内側型枠パネル12Bは、内側型枠フレーム12Aの外側に設けられている。内側型枠パネル12Bは、アーチ構造物の内周面に沿う形状に形成されている。 The inner formwork 12 may be substituted by, for example, a slide center for forming the lining concrete inside the tunnel. The inner formwork 12 has an inner formwork frame 12A and an inner formwork panel 12B. The inner formwork frame 12A is formed by framing frame members made of multiple steel materials. The inner formwork frame 12A is movable in the extension direction Y of the arch structure on rails 14 laid inside the tunnel as an arch structure. The inner formwork panel 12B is provided on the outside of the inner formwork frame 12A. The inner formwork panel 12B is formed into a shape that fits along the inner peripheral surface of the arch structure.

外型枠11の外側型枠パネル31と、内型枠12の内側型枠パネル12Bとの間の空間には、鉄筋13が配設されている。アーチ構造物は、外側型枠パネル31と内側型枠パネル12Bとの間に生コンクリートを流し込み、所定期間養生することによって成形される鉄筋コンクリート構造である。 Reinforcement bars 13 are arranged in the space between the outer form panel 31 of the outer form 11 and the inner form panel 12B of the inner form 12. The arch structure is a reinforced concrete structure formed by pouring ready mixed concrete between the outer form panel 31 and the inner form panel 12B and curing it for a predetermined period of time.

(外型枠の具体的構造)
以下、外型枠11の構造をより具体的に説明する。
図4は、外型枠11の外側型枠フレーム21の斜視図である。図1~図4に示すように、外型枠11を構成する各外型枠ブロック20の外側型枠フレーム21は、複数のフレーム部材23,24を格子状に枠組みすることによって構成されている。複数のフレーム部材23,24は、図1に示す正面視でアーチ形状に形成された複数の第1フレーム部材23と、アーチ構造物の延長方向Yに沿って直線状に延びる複数の第2フレーム部材24とを有する。複数の第1フレーム部材23は、アーチ構造物の延長方向Yに間隔をあけて並べて配置されている。複数の第2フレーム部材24は、第1フレーム部材23の外周面に周方向に間隔をあけて配置されている。第1フレーム部材23及び第2フレーム部材24は、H型鋼等の鋼材により構成されている。
(Specific structure of outer formwork)
The structure of the outer form 11 will be described in more detail below.
FIG. 4 is a perspective view of the outer form frame 21 of the outer form 11. As shown in FIGS. 1 to 4, the outer form frame 21 of each outer form block 20 constituting the outer form 11 is formed by framing a plurality of frame members 23, 24 in a lattice shape. The plurality of frame members 23, 24 have a plurality of first frame members 23 formed in an arch shape in a front view shown in FIG. 1, and a plurality of second frame members 24 extending linearly along the extension direction Y of the arch structure. The plurality of first frame members 23 are arranged at intervals in the extension direction Y of the arch structure. The plurality of second frame members 24 are arranged at intervals in the circumferential direction on the outer peripheral surface of the first frame member 23. The first frame member 23 and the second frame member 24 are made of steel such as H-shaped steel.

外側型枠フレーム21は、幅方向X(又は周方向)に3分割されている。外側型枠フレーム21は、幅方向Xの両側に配置される一対の側部ピース21Aと、一対の側部ピース21Aの間に配置される頂部ピース21Bとからなる。 The outer formwork frame 21 is divided into three parts in the width direction X (or circumferential direction). The outer formwork frame 21 consists of a pair of side pieces 21A arranged on both sides in the width direction X, and a top piece 21B arranged between the pair of side pieces 21A.

図6は、外型枠11の下部の固定構造を示す断面説明図である。
図6に示すように、側部ピース21Aは、アーチ構造物の底部に形成されたインバート15に固定されている。インバート15の側面には、2本の埋込ボルト16が上下に並べて埋設されている。側部ピース21Aの外周面には、アーチ構造物の延長方向Yに延びる複数の押さえ部材17が上下に並べて配置されている。埋込ボルト16には、連結ボルト18の一端部に形成された雌ねじ18aが連結され、この連結ボルト18の他端部が上下の押さえ部材17の間に挿入されている。連結ボルト18の他端部に形成された雄ねじ18bには、座金19とナット18cとが取り付けられ、ナット18cは、座金19を押さえ部材17に押し付けている。以上の構成により、側部ピース21Aがインバート15の側面に固定される。
FIG. 6 is an explanatory cross-sectional view showing the fixing structure of the lower part of the outer formwork 11.
As shown in Fig. 6, the side piece 21A is fixed to the invert 15 formed at the bottom of the arch structure. Two embedded bolts 16 are embedded vertically in the side of the invert 15. A plurality of pressing members 17 extending in the extension direction Y of the arch structure are arranged vertically on the outer circumferential surface of the side piece 21A. A female thread 18a formed on one end of a connecting bolt 18 is connected to the embedded bolt 16, and the other end of the connecting bolt 18 is inserted between the upper and lower pressing members 17. A washer 19 and a nut 18c are attached to a male thread 18b formed on the other end of the connecting bolt 18, and the nut 18c presses the washer 19 against the pressing member 17. With the above configuration, the side piece 21A is fixed to the side of the invert 15.

図7(a)は、図1のA部を拡大して示す説明図である。図7に示すように、側部ピース21Aと頂部ピース21Bとは、連結部材26によって連結されている。この連結部材26は、側部ピース21Aにおける第1フレーム部材23と、頂部ピース21Bにおける第1フレーム部材23とに跨って配置されている。 Figure 7 (a) is an explanatory diagram showing an enlarged view of part A in Figure 1. As shown in Figure 7, the side piece 21A and the top piece 21B are connected by a connecting member 26. This connecting member 26 is disposed across the first frame member 23 in the side piece 21A and the first frame member 23 in the top piece 21B.

図8は、頂部ピース21Bと側部ピース21Aとの連結を解いた状態を示す説明図である。図9(a)は、連結部材26の正面図、(b)は、連結部材26の平面図である。
図7~図9に示すように、連結部材26は、連結板26aと、当て具26bとを有する。連結板26aは、第1フレーム部材23の外周面に沿って湾曲している。連結板26aは、側部ピース21A及び頂部ピース21Bに跨って第1フレーム部材23の外周面に接触し、それぞれにボルト及びナットからなる締結具71で側部ピース21A及び頂部ピース21Bに連結されている。連結板26aの外面(上面)には、補強リブ26a1が設けられている。補強リブ26a1は、連結板26aに対して略垂直な姿勢で、第1フレーム部材23の周方向に沿って延びている。連結板26aには、締結具71のボルトを挿通させるための孔26a2が形成されている。側部ピース21A及び頂部ピース21Bにも、当該ボルトを挿通させるための孔が形成されている。
8 is an explanatory diagram showing a state in which the top piece 21B and the side piece 21A are released from each other.
As shown in Figs. 7 to 9, the connecting member 26 has a connecting plate 26a and a stopper 26b. The connecting plate 26a is curved along the outer peripheral surface of the first frame member 23. The connecting plate 26a is in contact with the outer peripheral surface of the first frame member 23 across the side piece 21A and the top piece 21B, and is connected to the side piece 21A and the top piece 21B by fasteners 71 consisting of bolts and nuts. A reinforcing rib 26a1 is provided on the outer surface (upper surface) of the connecting plate 26a. The reinforcing rib 26a1 extends along the circumferential direction of the first frame member 23 in an attitude approximately perpendicular to the connecting plate 26a. A hole 26a2 for inserting the bolt of the fastener 71 is formed in the connecting plate 26a. A hole for inserting the bolt is formed in the side piece 21A and the top piece 21B as well.

当て具26bは、連結板26aの内面(下面)に設けられている。当て具26bは、正面視において三角形状に形成され、その一辺が連結板26aの内面に固定されている。当て具26bの他の2辺は、頂部ピース21Bの端面21B1に接触する第1接触面26b1と、側部ピース21Aの上端面21A1に接触する第2接触面26b2とを構成している。第1接触面26b1と第2接触面26b2との間の角度θは、60°~90°程度に設定されている。 The stopper 26b is provided on the inner surface (lower surface) of the connecting plate 26a. The stopper 26b is formed in a triangular shape when viewed from the front, and one side is fixed to the inner surface of the connecting plate 26a. The other two sides of the stopper 26b form a first contact surface 26b1 that contacts the end surface 21B1 of the top piece 21B, and a second contact surface 26b2 that contacts the upper end surface 21A1 of the side piece 21A. The angle θ between the first contact surface 26b1 and the second contact surface 26b2 is set to approximately 60° to 90°.

頂部ピース21Bの端面21B1は、鉛直方向に沿って配置された平坦面に形成されている。したがって、連結部材26が頂部ピース21B及び側部ピース21Aに取り付けられている状態で、第1接触面26b1も鉛直方向に沿って配置された平坦面に形成されている。また、頂部ピース21Bの端面21B1は、側部ピース21Aの上端面21A1の全体よりもアーチ構造物の幅方向Xの中心CL側(図7における左側)に配置されている。頂部ピース21Bと、当て具26bとは、ボルト及びナットからなる締結具72で締結されている。 The end surface 21B1 of the top piece 21B is formed on a flat surface arranged along the vertical direction. Therefore, when the connecting member 26 is attached to the top piece 21B and the side piece 21A, the first contact surface 26b1 is also formed on a flat surface arranged along the vertical direction. In addition, the end surface 21B1 of the top piece 21B is positioned closer to the center CL of the width direction X of the arch structure (left side in FIG. 7) than the entire upper end surface 21A1 of the side piece 21A. The top piece 21B and the stopper 26b are fastened with a fastener 72 consisting of a bolt and a nut.

側部ピース21Aの上端面21A1は、水平、又は、水平に近い姿勢で配置された平坦面に形成されている。したがって、連結部材26が頂部ピース21B及び側部ピース21Aに取り付けられている状態で、第2接触面26b2も水平、又は、水平に近い姿勢で配置された平坦面に形成されている。側部ピース21Aの上端面21A1は、その全体が頂部ピース21Bの端面21B1よりもアーチ構造物の幅方向Xにおける外側(図7における右側)に配置されている。側部ピース21Aと、当て具26bとは、ボルト及びナットからなる締結具73で締結されている。 The upper end surface 21A1 of the side piece 21A is formed on a flat surface arranged horizontally or in a nearly horizontal position. Therefore, when the connecting member 26 is attached to the top piece 21B and the side piece 21A, the second contact surface 26b2 is also formed on a flat surface arranged horizontally or in a nearly horizontal position. The upper end surface 21A1 of the side piece 21A is entirely disposed on the outer side (right side in FIG. 7) in the width direction X of the arch structure than the end surface 21B1 of the top piece 21B. The side piece 21A and the stopper 26b are fastened with a fastener 73 consisting of a bolt and a nut.

以上の構成により、側部ピース21Aと頂部ピース21Bとが連結部材26を用いて強固に連結される。そのため、頂部ピース21Bが自重や後に詳述する鉄筋13の荷重によって下方に下がってしまうことが抑制される。 With the above configuration, the side pieces 21A and the top piece 21B are firmly connected using the connecting members 26. This prevents the top piece 21B from sagging downward due to its own weight or the load of the reinforcing bars 13, which will be described in detail later.

図5は、外型枠11の外側型枠パネル31の斜視図である。
図1~図5に示すように、外型枠11を構成する各外型枠ブロック20の外側型枠パネル31は、外側型枠フレーム21の内側に設けられている。外側型枠パネル31は、アーチ構造物の外周面に沿う湾曲形状に形成されている。外側型枠パネル31は、木製又は金属製の板材で主に構成されている。外側型枠パネル31が金属製である場合、メタルフォームと呼ばれるリブ付きの鋼製型枠を複数組み合わせることによって構成することができる。外側型枠パネル31は、第1パネル33と、第2パネル34とを有する。第1パネル33は、外側型枠フレーム21の幅方向Xの一方側に配置されている。第2パネル34は、外側型枠フレーム21の幅方向Xの他方側に配置されている。
FIG. 5 is a perspective view of the outer form panel 31 of the outer form 11. As shown in FIG.
As shown in Figs. 1 to 5, the outer form panel 31 of each outer form block 20 constituting the outer form 11 is provided inside the outer form frame 21. The outer form panel 31 is formed in a curved shape that follows the outer peripheral surface of the arch structure. The outer form panel 31 is mainly composed of wooden or metal plate material. When the outer form panel 31 is made of metal, it can be constructed by combining a plurality of ribbed steel forms called metal forms. The outer form panel 31 has a first panel 33 and a second panel 34. The first panel 33 is disposed on one side of the outer form frame 21 in the width direction X. The second panel 34 is disposed on the other side of the outer form frame 21 in the width direction X.

第1パネル33及び第2パネル34は、下部側がほぼ鉛直方向に沿って配置され、上部側が湾曲した形状に形成されている。図5に示すように、第1パネル33と第2パネル34とは、同一の形状に形成されている。つまり、第1パネル33と第2パネル34とは、共通の部品で構成されている。第1パネル33と第2パネル34とは、幅方向Xにおいて互いに逆向きに配置されている。図1に示すように、第1パネル33と第2パネル34とは、正面視において、外型枠11の幅方向Xの中心CLを対称軸として線対称の状態で配置されている。 The first panel 33 and the second panel 34 are arranged so that their lower sides are aligned substantially vertically, and their upper sides are formed in a curved shape. As shown in FIG. 5, the first panel 33 and the second panel 34 are formed in the same shape. In other words, the first panel 33 and the second panel 34 are composed of common parts. The first panel 33 and the second panel 34 are arranged in opposite directions to each other in the width direction X. As shown in FIG. 1, the first panel 33 and the second panel 34 are arranged in line symmetry with respect to the center CL of the width direction X of the outer formwork 11 as an axis of symmetry when viewed from the front.

図5に示すように、第1パネル33と第2パネル34とには、それぞれ複数の開口35が形成されている。これらの開口35は、外型枠11と内型枠12との間に生コンクリートを流し込むために用いられる。開口35は、取り外し可能な蓋によって閉鎖される。蓋は、開口35が生コンクリートの流し込みに用いられるときに取り外される。 As shown in FIG. 5, the first panel 33 and the second panel 34 each have a plurality of openings 35 formed therein. These openings 35 are used to pour ready-mix concrete between the outer formwork 11 and the inner formwork 12. The openings 35 are closed by removable lids. The lids are removed when the openings 35 are used to pour ready-mix concrete.

第1パネル33と第2パネル34とは、幅方向Xに間隔をあけて配置されている。したがって、幅方向Xにおける第1パネル33と第2パネル34との間には、空所(空間)36が形成される。第1パネル33と第2パネル34との間の空所36の幅方向Xの中心と、中心CLとは一致している。言い換えると、空所36は、中心CLを基準として幅方向X両側に均等に形成されている。 The first panel 33 and the second panel 34 are disposed with a gap in the width direction X. Therefore, a void (space) 36 is formed between the first panel 33 and the second panel 34 in the width direction X. The center of the void 36 between the first panel 33 and the second panel 34 in the width direction X coincides with the center CL. In other words, the void 36 is formed evenly on both sides in the width direction X with the center CL as a reference.

第1パネル33と第2パネル34との間の空所36は、アーチ構造物の延長方向Yにおける外型枠11の全体にわたって形成されることになる。この空所36が形成された部分では、外側型枠フレーム21が外側からも内側からも露出されることになるため、格子状の第1フレーム部材23と第2フレーム部材24とに囲まれた領域が、外型枠11を内外に連通させる開口となる。そして、この開口は、外型枠11と内型枠12との間に生コンクリートを流し込むために利用することができる。 The void 36 between the first panel 33 and the second panel 34 is formed over the entire outer formwork 11 in the extension direction Y of the arch structure. In the portion where this void 36 is formed, the outer formwork frame 21 is exposed from both the outside and the inside, so the area surrounded by the lattice-shaped first frame member 23 and second frame member 24 becomes an opening that connects the inside and outside of the outer formwork 11. This opening can then be used to pour ready-mixed concrete between the outer formwork 11 and the inner formwork 12.

図1に示すように、空所36の幅Wは、第1パネル33と第2パネル34との対向面の最大の幅Wに対して、W≦W/2の関係を有する。より好ましくは、W≦W/5の関係を有する。さらに好ましくは、W/6≦W≦W/5の関係を有する。 1, the width W1 of the void 36 and the maximum width W2 of the opposing surfaces of the first panel 33 and the second panel 34 satisfy the relationship W1W2 /2, more preferably W1W2 /5, and even more preferably W2 /6 ≦ W1W2 /5.

空所36の幅Wを、W/6≦W≦W/5の範囲で設定するのは次の理由による。空所36の幅WをW/5以下とするのは、空所36の幅WがW/5を超えると、外側型枠パネル31の存在しない範囲が広くなり、作業者の手作業によってコンクリートの表面を整える(均す)作業が多くなって作業負担が増大するからである。空所36の幅WをW/6以上とするのは、空所36の幅WがW/6未満であると、空所36を利用して生コンクリートを流し込む作業の自由度を高め難くなるからである。 The width W1 of the void 36 is set in the range of W2 /6≦ W1W2 /5 for the following reasons. The width W1 of the void 36 is set to W2 /5 or less because, if the width W1 of the void 36 exceeds W2 /5, the area where the outer form panel 31 is not present becomes wider, and the worker is required to manually smooth (level) the surface of the concrete, which increases the worker's workload. The width W1 of the void 36 is set to W2 /6 or more because, if the width W1 of the void 36 is less than W2 /6, it becomes difficult to increase the degree of freedom in pouring ready-mixed concrete using the void 36.

第1パネル33及び第2パネル34は、外側型枠フレーム21と同様に複数のピースに分割されている。具体的に、第1パネル33及び第2パネル34は、外側型枠フレーム21の側部ピース21Aに取り付けられる側部ピースと、頂部ピース21Bに取り付けられる頂部ピースとに分割されていている。 The first panel 33 and the second panel 34 are divided into multiple pieces, similar to the outer formwork frame 21. Specifically, the first panel 33 and the second panel 34 are divided into a side piece that is attached to the side piece 21A of the outer formwork frame 21, and a top piece that is attached to the top piece 21B.

図1に示すように、外側型枠フレーム21の側部ピース21A及び頂部ピース21Bには、複数のセパレータ(鉄筋取付具)41が取り付けられている。このセパレータ41は、第1フレーム部材23の外周面に固定されている。セパレータ41は、外側型枠パネル31を貫通して、外型枠11と内型枠12との間の空間に突出している。このセパレータ41には、外型枠11と内型枠12との間において組み立てられる鉄筋13が針金などを用いて取り付けられる。したがって、鉄筋13は、セパレータ41を介して外型枠11によって支持される。 As shown in FIG. 1, a number of separators (reinforcing bar mounting fixtures) 41 are attached to the side pieces 21A and top pieces 21B of the outer formwork frame 21. The separators 41 are fixed to the outer peripheral surface of the first frame member 23. The separators 41 penetrate the outer formwork panel 31 and protrude into the space between the outer formwork 11 and the inner formwork 12. The reinforcing bars 13 assembled between the outer formwork 11 and the inner formwork 12 are attached to the separators 41 using wire or the like. Therefore, the reinforcing bars 13 are supported by the outer formwork 11 via the separators 41.

外型枠11には、鉄筋13の荷重が付与される。そのため、特に外側型枠フレーム21における頂部ピース21Bには下方へ大きな荷重が付与される。外側型枠フレーム21の頂部ピース21Bは、側部ピース21Aに連結部材26を用いて連結され、側部ピース21Aに強固に連結されている。そのため、頂部ピース21Bに鉄筋13の荷重が付与されたとしても、頂部ピース21Bが下方に下がるような変形が抑制される。したがって、アーチ構造物の天端(クラウン部)において外側型枠パネル31と内側型枠パネル12Bとの間隔が適切に設定され、アーチ構造物の巻厚を十分に確保することができる。 The load of the reinforcing bars 13 is applied to the outer formwork 11. Therefore, a large load is applied downward, especially to the top piece 21B of the outer formwork frame 21. The top piece 21B of the outer formwork frame 21 is connected to the side piece 21A using a connecting member 26, and is firmly connected to the side piece 21A. Therefore, even if the load of the reinforcing bars 13 is applied to the top piece 21B, deformation such that the top piece 21B drops downward is suppressed. Therefore, the distance between the outer formwork panel 31 and the inner formwork panel 12B at the top end (crown portion) of the arch structure is appropriately set, and the winding thickness of the arch structure can be sufficiently secured.

図1に示すように、第1パネル33と第2パネル34との間の空所36の範囲において、外側型枠フレーム21と内側型枠パネル12Bとの間には、巻厚保持部材42が設けられている。巻厚保持部材42は、伸縮可能な棒材により構成されている。巻厚保持部材42は、外側型枠フレーム21(頂部ピース21B)における第1フレーム部材23に一端が接触し、内側型枠パネル12Bに他端が接触し、外側型枠フレーム21と内側型枠パネル12Bとの間で突っ張っている。本実施形態では、図1の正面視において、第1パネル33の近傍の1箇所と第2パネル34の近傍の1箇所との合計2箇所に巻厚保持部材42が設けられている。また、巻厚保持部材42は、全ての第1フレーム部材23に対して設けられている。 As shown in FIG. 1, a roll thickness retaining member 42 is provided between the outer formwork frame 21 and the inner formwork panel 12B in the range of the gap 36 between the first panel 33 and the second panel 34. The roll thickness retaining member 42 is made of an expandable rod material. One end of the roll thickness retaining member 42 contacts the first frame member 23 in the outer formwork frame 21 (top piece 21B), and the other end contacts the inner formwork panel 12B, and is braced between the outer formwork frame 21 and the inner formwork panel 12B. In this embodiment, in the front view of FIG. 1, the roll thickness retaining member 42 is provided at two locations in total, one near the first panel 33 and one near the second panel 34. In addition, the roll thickness retaining member 42 is provided for all of the first frame members 23.

巻厚保持部材42は、例えば、雄ねじ部を有する第1棒材と、雌ねじ部を有する第2棒材とを有し、第1棒材の雄ねじ部を第2棒材の雌ねじ部にねじ込むことによって第1棒材と第2棒材とを連結し、雌ねじ部に対する雄ねじ部のねじ込み量を調整することによって巻厚保持部材42を伸縮させる構成を採用することができる。 The winding thickness retaining member 42 may have, for example, a first rod material having a male threaded portion and a second rod material having a female threaded portion, and the first and second rod materials are connected by screwing the male threaded portion of the first rod material into the female threaded portion of the second rod material, and the winding thickness retaining member 42 may be expanded or contracted by adjusting the amount of screwing of the male threaded portion into the female threaded portion.

巻厚保持部材42は、第1パネル33と第2パネル34との間の空所36の範囲に配置されるので、図1に示すように、外型枠11と内型枠12とを設置した後に、空所36を利用して簡単に巻厚保持部材42を取り付けることができる。巻厚保持部材42は、外側型枠フレーム21の頂部ピース21Bを内型枠12によって支持し、頂部ピース21Bが下方へ下がるように変形するのを抑制する。これにより、トンネル坑門の天端において外側型枠パネル31と内側型枠パネル12Bとの間隔が適切に設定され、トンネル坑門の巻厚を確保することができる。 The roll thickness retaining member 42 is disposed within the gap 36 between the first panel 33 and the second panel 34, so that after the outer formwork 11 and the inner formwork 12 are installed, the roll thickness retaining member 42 can be easily attached using the gap 36, as shown in FIG. 1. The roll thickness retaining member 42 supports the top piece 21B of the outer formwork frame 21 by the inner formwork 12, and prevents the top piece 21B from deforming downward. This allows the distance between the outer formwork panel 31 and the inner formwork panel 12B at the top end of the tunnel portal to be appropriately set, ensuring the roll thickness of the tunnel portal.

図1に示すように、本実施形態の外型枠11には、足場51が設けられている。本実施形態では、外型枠11の幅方向Xの両側に、それぞれ2つの足場51が設けられている。各足場は、アーチ構造物の延長方向Yに延びている。各足場51は、土台52と、足場板53と、手摺54とを有する。 As shown in FIG. 1, the outer formwork 11 of this embodiment is provided with scaffolding 51. In this embodiment, two scaffoldings 51 are provided on each side of the width direction X of the outer formwork 11. Each scaffolding extends in the extension direction Y of the arch structure. Each scaffolding 51 has a base 52, a scaffolding board 53, and a handrail 54.

図2及び図3に示すように、外型枠11には、地面から足場51に移動するために用いられる梯子61が設けられている。この梯子61は、アーチ構造物の延長方向Yにおける外側型枠フレーム21の端部に配置される第1フレーム部材23と、これに隣接する第1フレーム部材23との間に架設された複数の横桟62を有する。複数の横桟62は、地面から少なくとも上段側の足場51の高さに到るまでの範囲で上下方向に間隔をあけて設けられている。作業者は、横桟62に足をかけて上ることによって足場まで移動することができる。梯子61は、第1フレーム部材23を利用して形成されるので、構造を簡素化することができる。 As shown in Figures 2 and 3, the outer formwork 11 is provided with a ladder 61 used to move from the ground to the scaffolding 51. This ladder 61 has a first frame member 23 arranged at the end of the outer formwork frame 21 in the extension direction Y of the arch structure, and a number of cross bars 62 installed between the first frame member 23 adjacent to it. The multiple cross bars 62 are installed at intervals in the vertical direction from the ground to at least the height of the upper scaffolding 51. A worker can move to the scaffolding by climbing up by putting his/her feet on the cross bars 62. The ladder 61 is formed using the first frame member 23, so the structure can be simplified.

なお、図2及び図3に示す例では、外側型枠フレーム21のアーチ構造物の延長方向Yの両側に梯子61が設けられているが、一方側のみに梯子61が設けられていてもよい。 In the example shown in Figures 2 and 3, ladders 61 are provided on both sides of the outer formwork frame 21 in the extension direction Y of the arch structure, but ladders 61 may be provided on only one side.

(アーチ構造物の施工方法)
図10~図12は、アーチ構造物の施工方法を示す説明図である。
以下、型枠10を用いたアーチ構造物の施工方法について説明する。以下の施工方法において、各外型枠ブロック20における外側型枠フレーム21の側部ピース21A及び頂部ピース21Bは、それぞれ外側型枠パネル31の一部(側部ピース及び頂部ピース)が取り付けられた状態で予め工場で製造されたものである。したがって、以下の説明で、単に側部ピース21A、頂部ピース21Bというときは、それぞれ外側型枠パネル31の一部(側部ピース及び頂部ピース)が取り付けられたものをいう。
(Construction method for arch structures)
10 to 12 are explanatory diagrams showing a construction method for an arch structure.
The following describes a method for constructing an arch structure using the formwork 10. In the following construction method, the side pieces 21A and top pieces 21B of the outer formwork frame 21 in each outer formwork block 20 are prefabricated in a factory with parts of the outer formwork panel 31 (side pieces and top pieces) attached to them. Therefore, in the following description, when the side pieces 21A and top pieces 21B are simply referred to, they each refer to the pieces with parts of the outer formwork panel 31 (side pieces and top pieces) attached to them.

アーチ構造物を施工するには、まず、インバート15用の均しコンクリートの打設を行い、この均しコンクリート上にインバート用型枠を設置し、さらにインバート用鉄筋13aを組み立てる。このインバート用鉄筋13aを組み立てる際に、アーチ構造物の側部に埋設される鉄筋13bも併せて組み立てる。また、図6に示す埋込ボルト16も組み付ける。 To construct an arch structure, first pour the leveling concrete for the invert 15, then install the invert formwork on top of the leveling concrete, and then assemble the invert reinforcing bars 13a. When assembling the invert reinforcing bars 13a, the reinforcing bars 13b that will be embedded in the sides of the arch structure are also assembled. Also, the embedded bolts 16 shown in Figure 6 are installed.

その後、インバート用型枠に生コンクリートを流し込み、インバート15を成形する(図10(a)参照)。インバート15を成形したあと、図6に示す押さえ部材17を設置する。
次いで、図10(b)に示すように、外型枠11の設置が行われる。具体的に、各外型枠ブロック20の側部ピース21Aをインバート15の側部に移動させ、図6に示すように、インバート15に埋め込まれた埋込ボルト16に連結ボルト18を締結する。側部ピース21Aは、予め足場51の土台52(支持ブラケット55)が取り付けられた状態で設置される。側部ピース21Aを設置したあと、セパレータ41を取り付け、インバート15の上側に組み立てられた鉄筋13bをセパレータ41に固定する。
After that, ready-mixed concrete is poured into the invert formwork to form the invert 15 (see FIG. 10(a)). After the invert 15 is formed, the pressing member 17 shown in FIG. 6 is installed.
Next, the outer formwork 11 is installed as shown in Fig. 10(b). Specifically, the side pieces 21A of each outer formwork block 20 are moved to the side of the invert 15, and the connecting bolts 18 are fastened to the embedded bolts 16 embedded in the invert 15 as shown in Fig. 6. The side pieces 21A are installed with the base 52 (support brackets 55) of the scaffolding 51 attached in advance. After the side pieces 21A are installed, the separators 41 are attached, and the reinforcing bars 13b assembled on the upper side of the invert 15 are fixed to the separators 41.

次いで、図11(a)に示すように、図示しないクレーンで外側型枠フレーム21の頂部ピース21Bを吊るし、側部ピース21Aの上方に搬送する。そして、側部ピース21Aの上端に頂部ピース21Bを連結する。具体的に、図7を参照して説明したように、側部ピース21Aと頂部ピース21Bとを締結具25により連結し、連結部材26を側部ピース21A及び頂部ピース21Bに締結具27で連結する。この作業は、側部ピース21Aの近傍に設置された仮設足場を用いて行ってもよい。 Next, as shown in FIG. 11(a), the top piece 21B of the outer formwork frame 21 is hung by a crane (not shown) and transported above the side piece 21A. The top piece 21B is then connected to the upper end of the side piece 21A. Specifically, as described with reference to FIG. 7, the side piece 21A and the top piece 21B are connected with fasteners 25, and the connecting member 26 is connected to the side piece 21A and the top piece 21B with fasteners 27. This work may be performed using temporary scaffolding installed near the side piece 21A.

以上の作業により外型枠11の設置が終了すると、図11(b)に示すように、足場51の土台52に、足場板53及び手摺54を取り付け、足場51を完成させる。作業者は、側部ピース21Aに取り付けた横桟62を有する梯子61により足場51まで上ることができ、足場51を用いて外型枠11上をアーチ構造物の延長方向Yに移動することができる。 When the installation of the outer formwork 11 is completed through the above operations, as shown in FIG. 11(b), scaffolding boards 53 and handrails 54 are attached to the base 52 of the scaffolding 51, completing the scaffolding 51. A worker can climb up to the scaffolding 51 using a ladder 61 having cross bars 62 attached to the side pieces 21A, and use the scaffolding 51 to move on the outer formwork 11 in the extension direction Y of the arch structure.

その後、図1に示すセパレータ41を外型枠11の頂部ピース21Bに取り付け、図11(b)に示すように、頂部ピース21Bの内側に鉄筋13cを組み立ててセパレータ41に固定する。この作業は、外型枠11の内部に移動したシート台車64等を用いて行うことができる。鉄筋13cの荷重(自重)は、セパレータ41を介して頂部ピース21Bに支持されるが、頂部ピース21Bは、連結部材26を用いて側部ピース21Aに強固に連結されているので、頂部ピース21Bで鉄筋13cを確実に支持することができる。 Then, the separator 41 shown in FIG. 1 is attached to the top piece 21B of the outer formwork 11, and as shown in FIG. 11(b), the reinforcing bar 13c is assembled inside the top piece 21B and fixed to the separator 41. This work can be performed using a sheet cart 64 or the like that has been moved inside the outer formwork 11. The load (self-weight) of the reinforcing bar 13c is supported by the top piece 21B via the separator 41, but because the top piece 21B is firmly connected to the side piece 21A using the connecting member 26, the reinforcing bar 13c can be reliably supported by the top piece 21B.

次いで、図12(a)に示すように、内型枠12の設置を行う。鉄筋13の組立に用いられたシート台車64等を撤去し、その代わりに、内型枠12としてのセントルを外型枠11の内側に移動させる。そして、外型枠11と内型枠12との間に巻厚保持部材42を取り付け、外側型枠フレーム21を内型枠12で支持するとともに、外側型枠パネル31と内側型枠パネル12Bとの間隔を調整する。 Next, as shown in FIG. 12(a), the inner formwork 12 is installed. The sheet cart 64 and other parts used to assemble the reinforcing bars 13 are removed, and instead, the center as the inner formwork 12 is moved inside the outer formwork 11. Then, a roll thickness retaining member 42 is attached between the outer formwork 11 and the inner formwork 12, the outer formwork frame 21 is supported by the inner formwork 12, and the distance between the outer formwork panel 31 and the inner formwork panel 12B is adjusted.

内型枠12を設置したあと、外型枠11と内型枠12とのトンネル出口側開放部分を図示しない妻型枠で閉塞し、型枠10の設置作業を完了させる。
次いで、図12(b)に示すように、外型枠11と内型枠12との間に生コンクリートCを流し込む。生コンクリートCを流し込む作業は、外側型枠パネル31に形成された開口35を用いて行われる。
After the inner formwork 12 is installed, the open portions of the outer formwork 11 and the inner formwork 12 on the tunnel exit side are closed with a gable formwork not shown, completing the installation work of the formwork 10.
12(b), ready-mixed concrete C is poured between the outer formwork 11 and the inner formwork 12. The operation of pouring the ready-mixed concrete C is performed using an opening 35 formed in the outer formwork panel 31.

高所から生コンクリートCを流し込む場合は、足場51上で作業が行われる。そして、ある程度の高さまで生コンクリートCが流し込まれると、外型枠11の天端部に形成された第1パネル33と第2パネル34との間の空所36を利用して、生コンクリートCが流し込まれる。この空所36は、外型枠11のアーチ構造物の延長方向Yの全体に渡って形成されるので、アーチ構造物の延長方向Yのどの位置からでも生コンクリートを流し込むことができ、作業の自由度が高められ、効率よく作業を行うことができる。 When pouring ready-mixed concrete C from a high position, work is carried out on scaffolding 51. Then, once ready-mixed concrete C has been poured to a certain height, ready-mixed concrete C is poured using the void 36 between the first panel 33 and the second panel 34 formed at the top end of the outer formwork 11. Since this void 36 is formed over the entire extension direction Y of the arch structure of the outer formwork 11, ready-mixed concrete can be poured from any position in the extension direction Y of the arch structure, which increases the freedom of work and allows work to be carried out more efficiently.

第1パネル33と第2パネル34との間に形成される空所36では、作業者がコテなどを用いて生コンクリートCの形状を整える。
その後、所定期間コンクリートを養生し、養生が済んだら、外型枠11及び内型枠12を取り外し、型枠10の長さに対応したアーチ構造物が完成する。
In the gap 36 formed between the first panel 33 and the second panel 34, a worker uses a trowel or the like to shape the ready-mix concrete C.
Thereafter, the concrete is cured for a prescribed period of time, and once curing is complete, the outer formwork 11 and the inner formwork 12 are removed, completing an arch structure corresponding to the length of the formwork 10.

以上に説明した施工方法では、アーチ構造物の延長方向Yにおける型枠10の長さに対応した1区間のアーチ構造物が成形されるが、さらにアーチ構造物を延長させる場合には、型枠10を延長方向Yに移設しながら、図10~図12で説明した作業を連続して実行する。 In the construction method described above, one section of the arch structure is formed corresponding to the length of the formwork 10 in the extension direction Y of the arch structure, but if the arch structure is to be extended further, the work described in Figures 10 to 12 is carried out continuously while the formwork 10 is moved in the extension direction Y.

図13及び図14は、外型枠11の移設方法を示す説明図である。
以下、型枠10のうちの外型枠11をアーチ構造物の延長方向Yに移設させる方法について説明する。なお、内型枠12は、スライドセントルを用いることができるため、外型枠11を移設した後、その内側に内型枠12を移動させることによって移設が可能となる。
13 and 14 are explanatory views showing a method for relocating the outer formwork 11.
A method for relocating the outer form 11 of the formwork 10 in the extension direction Y of the arch structure will be described below. Since a slide center can be used for the inner formwork 12, the relocation is possible by moving the inner formwork 12 inside the outer formwork 11 after the outer formwork 11 is relocated.

図13(a)には、すでに1区間のアーチ構造物を成形した後の外型枠11と、当該外型枠11の移設先の領域Rとが示されている。図13(a)に示す状態から、外型枠11を矢印D方向に移設するものとする。まず、複数の外型枠ブロック20のうち矢印D方向の後方側(図13の左側)の端部に配置された外型枠ブロック(第1外型枠ブロック)20Aの側部ピース21Aと頂部ピース21Bとの連結を解く。具体的には、図7に示すように、側部ピース21A及び頂部ピース21Bから連結部材26を取り外す。また、外型枠ブロック20Aの側部ピース21Aと、隣接する他の外型枠ブロック(第2外型枠ブロック)20Bの側部ピース21Aとの連結を解く。さらに、図6に示すように、外型枠ブロック20Aの側部ピース21Aをインバート15から取り外す。このとき、頂部ピース21Bは、隣接する外型枠ブロック20Bに連結されたままとなる。 13(a) shows the outer formwork 11 after one section of the arch structure has already been formed, and the area R to which the outer formwork 11 is to be moved. The outer formwork 11 is to be moved in the direction of arrow D from the state shown in FIG. 13(a). First, the side piece 21A and the top piece 21B of the outer formwork block (first outer formwork block) 20A arranged at the end on the rear side (left side of FIG. 13) in the direction of arrow D among the multiple outer formwork blocks 20 are disconnected. Specifically, as shown in FIG. 7, the connecting member 26 is removed from the side piece 21A and the top piece 21B. In addition, the side piece 21A of the outer formwork block 20A is disconnected from the side piece 21A of the other adjacent outer formwork block (second outer formwork block) 20B. Furthermore, as shown in FIG. 6, the side piece 21A of the outer formwork block 20A is removed from the invert 15. At this time, the top piece 21B remains connected to the adjacent outer formwork block 20B.

次いで、外型枠ブロック20Aの側部ピース21Aをクレーンで吊り上げ、図13(b)に示すように、移設先の領域RにおけるD方向の最も後方側(図13の左側)の位置に移動させる。そして、当該側部ピース21Aを、隣接する外型枠ブロック20Dの側部ピース21Aとインバート15とに固定し、移設する。このとき、図8に示すように、頂部ピース21Bの端面21B1は、鉛直方向に沿った面に形成されており、側部ピース21Aの上端面21A1よりもアーチ構造物の幅方向Xの中心CL側に配置されているので、側部ピース21Aを吊り上げたとしても頂部ピース21Bに干渉し難くなる。そのため、頂部ピース21Bよりも先に側部ピース21Aを移設先の領域Rに移動させることができる。 Next, the side piece 21A of the outer frame block 20A is lifted by a crane and moved to the rearmost position in the direction D (left side in FIG. 13) in the destination region R, as shown in FIG. 13(b). The side piece 21A is then fixed to the side piece 21A of the adjacent outer frame block 20D and the invert 15, and moved. At this time, as shown in FIG. 8, the end face 21B1 of the top piece 21B is formed in a surface along the vertical direction and is positioned closer to the center CL of the width direction X of the arch structure than the upper end face 21A1 of the side piece 21A, so that even if the side piece 21A is lifted, it is unlikely to interfere with the top piece 21B. Therefore, the side piece 21A can be moved to the destination region R before the top piece 21B.

次いで、外型枠ブロック20Aの頂部ピース21Bを、隣接する外型枠ブロック20Bの頂部ピース21Bから取り外してクレーンで吊り上げ、図13(c)に示すように、すでに移設した側部ピース21A上に移動させ、当該側部ピース21Aに連結部材26によって連結する。また、外型枠ブロック20Aの頂部ピース21Bを、隣接する外型枠ブロック20Dの頂部ピース21Bにも連結する。これにより1つの外型枠ブロック20Aの移設が完了する。 Next, the top piece 21B of the outer frame block 20A is removed from the top piece 21B of the adjacent outer frame block 20B and lifted by a crane, and as shown in FIG. 13(c), it is moved onto the already relocated side piece 21A and connected to the side piece 21A by a connecting member 26. The top piece 21B of the outer frame block 20A is also connected to the top piece 21B of the adjacent outer frame block 20D. This completes the relocation of one outer frame block 20A.

続けて、図14(a)に示すように、矢印D方向の最も後方側に位置する外型枠ブロック20Bの側部ピース21Aを上記と同様の手順で移設先の領域Rに移設し、図14(b)に示すように、外型枠ブロック20Bの頂部ピース21Bも同様の手順で移設先の領域Rに移設する。その後、他の外型枠ブロック20C,20Dについても同様に移設先の領域Rに移設することによって、外型枠11全体の移設が完了する。 Next, as shown in Figure 14(a), the side piece 21A of the outer form block 20B located at the rearmost side in the direction of arrow D is moved to the destination region R in the same manner as above, and as shown in Figure 14(b), the top piece 21B of the outer form block 20B is also moved to the destination region R in the same manner. After that, the other outer form blocks 20C and 20D are also similarly moved to the destination region R, completing the relocation of the entire outer form 11.

以上のように、各外型枠ブロック20A~20Dにおいて、側部ピース21Aを移設してから頂部ピース21Bを移設することによって、頂部ピース21Bを地面に仮置きすることなく、直接移設することが可能になるので、移設作業の工程を少なくすることができるとともに、頂部ピース21Bを仮置きするスペースも不要となり、広い作業スペースを要することなく移設作業を行うことができる。 As described above, by relocating the side pieces 21A and then the top pieces 21B in each of the outer formwork blocks 20A to 20D, it is possible to relocate the top pieces 21B directly without placing them temporarily on the ground. This reduces the number of steps in the relocation work, and also eliminates the need for space to temporarily place the top pieces 21B, allowing the relocation work to be carried out without requiring a large work space.

(連結部材26の変形例)
図15及び図16は、連結部材26の変形例を示す正面図である。
図15(a)に示す連結部材26では、当て具26bが、正面視において台形状に形成されている。そして、当て具26bは、第1接触面26b1及び第2接触面26b2に加えて、アーチ構造物を成形するための成形面26b3を有している。
(Modifications of the connecting member 26)
15 and 16 are front views showing modified examples of the connecting member 26. FIG.
15A, the contact member 26b is formed in a trapezoidal shape when viewed from the front. The contact member 26b has a first contact surface 26b1, a second contact surface 26b2, and a forming surface 26b3 for forming an arch structure.

この変形例においても、頂部ピース21Bの端面21B1が鉛直方向に沿った面に形成されるため、頂部ピース21Bに干渉することなく側部ピース21Aをクレーンで吊り上げることができる。ただし、本変形例では、当て具26bの成形面26b3がアーチ構造物に接触することになるため、頂部ピース21B及び側部ピース21Aから連結部材26を取り外すときに当て具26bをアーチ構造物の外周面から引き剥がす必要があり、作業が若干困難となる。したがって、連結部材26の取り外しの観点では、図7に示す連結部材26の方が有利である。 Even in this modified example, the end surface 21B1 of the top piece 21B is formed on a surface along the vertical direction, so the side piece 21A can be lifted by a crane without interfering with the top piece 21B. However, in this modified example, the molded surface 26b3 of the stopper 26b comes into contact with the arch structure, so when removing the connecting member 26 from the top piece 21B and the side piece 21A, it is necessary to peel the stopper 26b off the outer peripheral surface of the arch structure, which makes the work somewhat difficult. Therefore, from the perspective of removing the connecting member 26, the connecting member 26 shown in Figure 7 is more advantageous.

図15(b)に示す連結部材26は、図15(a)に示す変形例と同様に、当て具26bが、正面視において台形状に形成されている。ただし、頂部ピース21Bの端面21B1は鉛直方向に沿った面に形成されておらず、上部側ほどアーチ構造物の幅方向Xの外側(図15(b)における右側)に位置するように鉛直方向に対して傾斜している。また、この頂部ピース21Bの端面21B1におけるアーチ構造物の幅方向Xの外側の端部の位置Pは、側部ピース21Aの上端面21A1よりもアーチ構造物の幅方向Xの中心CL側(図15(b)における左側)に配置されている。したがって、このような構成によっても、頂部ピース21Bに干渉することなく側部ピース21Aをクレーンで吊り上げることができる。 In the connecting member 26 shown in FIG. 15(b), the stopper 26b is formed in a trapezoidal shape in front view, similar to the modified example shown in FIG. 15(a). However, the end face 21B1 of the top piece 21B is not formed in a vertical surface, but is inclined with respect to the vertical so that the upper side is located outside the width direction X of the arch structure (right side in FIG. 15(b)). In addition, the position P of the outer end of the end face 21B1 of the top piece 21B in the width direction X of the arch structure is located closer to the center CL of the width direction X of the arch structure (left side in FIG. 15(b)) than the upper end face 21A1 of the side piece 21A. Therefore, even with this configuration, the side piece 21A can be lifted by a crane without interfering with the top piece 21B.

図16(a)に示す連結部材26は、図7に示す連結部材26と同様に正面視において三角形状に形成された当て具26bを備えている。ただし、本変形例では、頂部ピース21Bの端面21B1が鉛直方向に沿った面ではなく、上部側ほどアーチ構造物の幅方向Xの中心CL側(図16(a)における左側)に位置するように鉛直方向に対して傾斜している。また、この頂部ピース21Bの端面21B1におけるアーチ構造物の幅方向Xの外側の端部の位置Pは、側部ピース21Aの上端面21A1よりもアーチ構造物の幅方向Xの中心CL側に配置されている。したがって、このような構成によっても、頂部ピース21Bに干渉することなく側部ピース21Aをクレーンで吊り上げることができる。 The connecting member 26 shown in FIG. 16(a) is provided with a stopper 26b formed in a triangular shape in front view, similar to the connecting member 26 shown in FIG. 7. However, in this modified example, the end face 21B1 of the top piece 21B is not a surface along the vertical direction, but is inclined with respect to the vertical direction so that the upper side is located closer to the center CL of the width direction X of the arch structure (left side in FIG. 16(a)). In addition, the position P of the outer end of the end face 21B1 of the top piece 21B in the width direction X of the arch structure is located closer to the center CL of the width direction X of the arch structure than the upper end face 21A1 of the side piece 21A. Therefore, even with this configuration, the side piece 21A can be lifted by a crane without interfering with the top piece 21B.

図16(b)に示す連結部材26は、図7に示す連結部材26とは異なり、当て具を備えずに連結板26aにより構成されている。そのため、本変形例では、頂部ピース21Bの端面21B1だけでなく、側部ピース21Aの上端面21A1も、鉛直方向に沿った面に形成され、頂部ピース21Bの端面21B1と側部ピース21Aの上端面21A1とがボルト及びナットからなる締結具74で直接連結されている。 The connecting member 26 shown in FIG. 16(b) is different from the connecting member 26 shown in FIG. 7 in that it is composed of a connecting plate 26a without a stopper. Therefore, in this modified example, not only the end surface 21B1 of the top piece 21B but also the upper end surface 21A1 of the side piece 21A is formed in a surface along the vertical direction, and the end surface 21B1 of the top piece 21B and the upper end surface 21A1 of the side piece 21A are directly connected by a fastener 74 consisting of a bolt and a nut.

この変形例においても、頂部ピース21Bの端面21B1は、側部ピース21Aの上端面21A1よりもアーチ構造物の幅方向Xの中心CL側に配置されることになり、頂部ピース21Bに干渉することなく側部ピース21Aをクレーンで吊り上げることができる。ただし、本変形例では、側部ピース21Aを吊り上げるときに、側部ピース21Aの端面21A1と頂部ピース21Bの端面21B1との間で擦れや衝突等が生じやすくなるため、この点では、図7に示す実施形態の方が有利となる。なお、本変形例においては、連結部材26を省略することも可能である。 Even in this modified example, the end surface 21B1 of the top piece 21B is positioned closer to the center CL in the width direction X of the arch structure than the upper end surface 21A1 of the side piece 21A, so the side piece 21A can be lifted by a crane without interfering with the top piece 21B. However, in this modified example, when lifting the side piece 21A, friction or collision is likely to occur between the end surface 21A1 of the side piece 21A and the end surface 21B1 of the top piece 21B, so in this respect the embodiment shown in FIG. 7 is more advantageous. Note that in this modified example, it is also possible to omit the connecting member 26.

本発明は、上記各実施形態に限定されることものではなく、特許請求の範囲に記載された発明の範囲内で適宜変更することができる。
例えば、本発明が適用されるアーチ構造物としては、トンネル坑門に限らず、アーチカルバートやスノーシェルター等を挙げることができる。
The present invention is not limited to the above-described embodiments, and can be modified as appropriate within the scope of the invention described in the claims.
For example, arch structures to which the present invention can be applied are not limited to tunnel portals, but can also include arch culverts and snow shelters.

10 :アーチ構造物用の型枠
11 :外型枠
20 :外型枠ブロック
21A :側部ピース
21A1 :上端面
21B :頂部ピース
21B1 :端面
26 :連結部材
26b :当て具
26b1 :第1接触面
26b2 :第2接触面
CL :中心
X :アーチ構造物の幅方向
Y :アーチ構造物の延長方向
10: Formwork for arch structure 11: Outer formwork 20: Outer formwork block 21A: Side piece 21A1: Upper end surface 21B: Top piece 21B1: End surface 26: Connecting member 26b: Abutment 26b1: First contact surface 26b2: Second contact surface CL: Center X: Width direction of arch structure Y: Extension direction of arch structure

Claims (6)

アーチ構造物の延長方向に並べて配置された複数のアーチ状の外型枠ブロックを備え、
前記各外型枠ブロックが、前記アーチ構造物の幅方向の両側に位置する一対の側部ピースと、前記一対の側部ピースの間に位置しかつ前記アーチ構造物の幅方向における端部が前記一対の側部ピースの上端部に連結される頂部ピースとを備え、
前記アーチ構造物の幅方向における前記頂部ピースの端面が、前記側部ピースの上端面よりも前記アーチ構造物の幅方向の中心側に配置されている、アーチ構造物用の外型枠。
A plurality of arch-shaped outer form blocks are arranged in a line in an extension direction of the arch structure,
Each of the outer formwork blocks comprises a pair of side pieces located on both sides of the width direction of the arch structure, and a top piece located between the pair of side pieces and having an end portion in the width direction of the arch structure connected to the upper end portion of the pair of side pieces,
An outer formwork for an arch structure, wherein the end face of the top piece in the width direction of the arch structure is positioned closer to the center of the width direction of the arch structure than the upper end faces of the side pieces.
前記アーチ構造物の幅方向における前記頂部ピースの端面が、鉛直方向に沿った面である、請求項1に記載のアーチ構造物用の外型枠。 The outer formwork for an arch structure according to claim 1, wherein the end face of the top piece in the width direction of the arch structure is a surface along the vertical direction. 前記側部ピースと前記頂部ピースとを連結する連結部材を備え、
前記連結部材が、前記アーチ構造物の幅方向における前記頂部ピースの端面に接触する第1接触面と、前記側部ピースの上端面に接触する第2接触面とを有している、請求項1又は2に記載のアーチ構造物用の外型枠。
a connecting member connecting the side piece and the top piece;
3. The outer formwork for an arch structure as described in claim 1 or 2, wherein the connecting member has a first contact surface that contacts the end face of the top piece in the width direction of the arch structure, and a second contact surface that contacts the upper end face of the side piece.
前記連結部材が、前記頂部ピースの外周面と前記側部ピースの外周面とに渡って配置されかつ前記頂部ピース及び前記側部ピースに連結される連結板と、
前記連結板から前記頂部ピースと前記側部ピースとの間に向けて突出し、前記第1接触面及び前記第2接触面を有する当て具とを有している、請求項3に記載のアーチ構造物用の外型枠。
the connecting member is disposed across the outer peripheral surface of the top piece and the outer peripheral surface of the side piece, and a connecting plate is connected to the top piece and the side piece;
4. The outer form for an arch structure according to claim 3, further comprising a stopper protruding from said connecting plate toward between said top piece and said side piece and having said first contact surface and said second contact surface.
前記当て具が、正面視において前記第1接触面と前記第2接触面とを2辺とする三角形状である、請求項4に記載のアーチ構造物用の外型枠。 The outer formwork for an arch structure according to claim 4, wherein the contact member has a triangular shape with the first contact surface and the second contact surface as two sides when viewed from the front. 一対の側部ピースと頂部ピースとを有するアーチ状の第1外型枠ブロックと、一対の側部ピースと頂部ピースとを有するアーチ状の第2外型枠ブロックとを含み、前記第1外型枠ブロックと前記第2外型枠ブロックとがアーチ構造物の延長方向において隣接しかつ連結されているアーチ構造物用の外型枠の移設方法であって、
前記第1外型枠ブロックにおける前記側部ピースを前記第1外型枠ブロックにおける前記頂部ピース及び前記第2外型枠ブロックから取り外す第1ステップ、
前記第1ステップの後に、前記第1外型枠ブロックの前記側部ピースを移設する第2ステップ、
前記第2ステップの後に、前記第1外型枠ブロックの前記頂部ピースを前記第2外型枠ブロックから取り外す第3ステップ、及び
前記第3ステップの後に、前記第1外型枠ブロックの前記頂部ピースを、すでに移設された前記第1外型枠ブロックの前記側部ピースに連結する第4ステップ、を含む、アーチ構造物用の外型枠の移設方法。
A method for relocating an outer form for an arch structure, comprising: an arch-shaped first outer form block having a pair of side pieces and a top piece; and an arch-shaped second outer form block having a pair of side pieces and a top piece, the first outer form block and the second outer form block being adjacent to and connected to each other in an extension direction of the arch structure,
a first step of removing the side pieces of the first outer form block from the top piece of the first outer form block and from the second outer form block;
a second step of transferring the side pieces of the first outer form block after the first step ;
a third step , subsequent to the second step, of removing the top piece of the first outer form block from the second outer form block; and
A method for relocating an outer form for an arch structure, comprising a fourth step, after the third step, of connecting the top piece of the first outer form block to the side piece of the first outer form block that has already been relocated.
JP2020140230A 2020-08-21 2020-08-21 External formwork for arch structure and method for relocating same Active JP7511883B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020140230A JP7511883B2 (en) 2020-08-21 2020-08-21 External formwork for arch structure and method for relocating same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020140230A JP7511883B2 (en) 2020-08-21 2020-08-21 External formwork for arch structure and method for relocating same

Publications (2)

Publication Number Publication Date
JP2022035720A JP2022035720A (en) 2022-03-04
JP7511883B2 true JP7511883B2 (en) 2024-07-08

Family

ID=80443571

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020140230A Active JP7511883B2 (en) 2020-08-21 2020-08-21 External formwork for arch structure and method for relocating same

Country Status (1)

Country Link
JP (1) JP7511883B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004353230A (en) 2003-05-28 2004-12-16 Saga Kogyo Kk Form for tunnel work
JP2005273378A (en) 2004-03-26 2005-10-06 Tekken Constr Co Ltd Tunnel lining construction method
JP2010053574A (en) 2008-08-27 2010-03-11 Kajima Corp Construction method for tunnel entrance

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2442040B1 (en) * 2011-01-04 2014-12-10 Peri, S.A. WINDING TO CONCRETE THE INTERNAL TUNNEL COATING.

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004353230A (en) 2003-05-28 2004-12-16 Saga Kogyo Kk Form for tunnel work
JP2005273378A (en) 2004-03-26 2005-10-06 Tekken Constr Co Ltd Tunnel lining construction method
JP2010053574A (en) 2008-08-27 2010-03-11 Kajima Corp Construction method for tunnel entrance

Also Published As

Publication number Publication date
JP2022035720A (en) 2022-03-04

Similar Documents

Publication Publication Date Title
KR101941942B1 (en) Integrated form structure for constructing cantilever slab and protective wall of bridge, and construction method using the same
JP2019526004A (en) Precast concrete formwork, floor system, and construction method
KR20210069209A (en) Precast Concrete Panel for exterior wall and construction method
JP4516585B2 (en) Internal staircase for building and its construction method
KR100433561B1 (en) Wall ascending slab descending concrete casting method
JP7572413B2 (en) How to build a structure
KR101118508B1 (en) Construction method and structure of anchored slabstone on concrete
JP7511883B2 (en) External formwork for arch structure and method for relocating same
EP3470603A1 (en) Method for erecting structural elements of building/construction of monolithic reinforced concrete and technological equipment to implement it
KR100500306B1 (en) assembly type steel frame ladder of reinforcement concrete building and construction method thereof
KR100361047B1 (en) Construction mold
KR102430362B1 (en) Structure for precast construction of inner cone of silo and precast construction method of inner cone of silo using the same
KR102425501B1 (en) Silo construction method using precast and slip foam
KR100452977B1 (en) Joint structure and construction method of RC beam and slab for slim floor system
JPH1129910A (en) How to build a concrete pier
KR102277374B1 (en) Formwork System and Method for Reverse Casting Construction to Apartment Structures
KR100683506B1 (en) Stair assembly and construction method
KR102927403B1 (en) A Method for Construction of PIT Floor of Apartment House Using Deck
KR102121363B1 (en) Functional supporter and constructing method for a protrusion of construction structure using the same, and the construction structure constructed by the method
JP3287816B2 (en) Building interior stairs
KR100785312B1 (en) Steel staircase construction structure
JP2021092049A (en) Form for arch structures and construction methods for arch structures
KR100473612B1 (en) Form system and frame construction method using the same
KR102386983B1 (en) Precast Concrete Panel for exterior wall and construction method
KR930000808B1 (en) Construction method of a high-rise by slide form

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230809

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240222

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240305

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240425

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240604

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240619