JP7516964B2 - Pouring management system, program or method - Google Patents

Pouring management system, program or method Download PDF

Info

Publication number
JP7516964B2
JP7516964B2 JP2020132208A JP2020132208A JP7516964B2 JP 7516964 B2 JP7516964 B2 JP 7516964B2 JP 2020132208 A JP2020132208 A JP 2020132208A JP 2020132208 A JP2020132208 A JP 2020132208A JP 7516964 B2 JP7516964 B2 JP 7516964B2
Authority
JP
Japan
Prior art keywords
pouring
time
concrete
mesh
compaction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020132208A
Other languages
Japanese (ja)
Other versions
JP2022029084A (en
Inventor
広弥 国島
哲志 山中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2020132208A priority Critical patent/JP7516964B2/en
Publication of JP2022029084A publication Critical patent/JP2022029084A/en
Application granted granted Critical
Publication of JP7516964B2 publication Critical patent/JP7516964B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は打設管理システム、プログラムまたは方法に関する。 The present invention relates to a pouring management system, program, or method.

従来技術として、コンクリート打設時における締固め状況を把握するシステムが提供されている(特許文献1)。 As a conventional technology, a system is provided that monitors the compaction status during concrete pouring (Patent Document 1).

特許第6183684号公報Patent No. 6183684

従来技術においては、システム上でコンクリートの締固めが完了した時刻や締固めの適否、品質データを把握することが可能であるものの、コンクリートの打重ね時間を管理することは考慮されていなかった。 In conventional technology, it is possible to obtain the time when concrete compaction is completed, whether compaction is adequate, and quality data on the system, but no consideration was given to managing the time for pouring concrete.

上記課題に鑑み、本発明は、コンクリートの打重ね時間を管理することのできる打設管理システム、プログラムまたは方法を提供することである。 In view of the above problems, the present invention provides a pouring management system, program, or method that can manage the time required for pouring concrete.

上記課題を解決するため、本発明は一態様として、1以上のコンクリートの打設区画の情報を記憶する記憶部、及び制御部を備え、前記制御部は、前記打設区画におけるコンクリートの締固めの完了時刻を計測する計時処理と、前記打設区画に対するコンクリートの打重ね時刻を取得する取得処理と、前記完了時刻から前記打重ね時刻までの時間を、前記打設区画の打重ね時間として算出する処理と、を実行する打設管理システムを提供する。 In order to solve the above problems, one aspect of the present invention provides a concrete pouring management system that includes a memory unit that stores information about one or more concrete pouring sections, and a control unit, and the control unit executes a timing process that measures the completion time of concrete compaction in the pouring section, an acquisition process that acquires the time when concrete is poured into the pouring section, and a process that calculates the time from the completion time to the pouring time as the pouring time for the pouring section.

また、本発明は一態様として、1以上のコンクリートの打設区画の情報を記憶する記憶部を備えたコンピュータに対して、前記打設区画におけるコンクリートの締固めの完了時刻を計測する計時処理と、前記打設区画に対するコンクリートの打重ね時刻を取得する処理と、前記完了時刻から前記打重ね時刻までの時間を、前記打設区画の打重ね時間として算出する処理と、を実行させる打設管理プログラムを提供する。 In one aspect, the present invention provides a pouring management program that causes a computer having a memory unit that stores information about one or more concrete pouring sections to execute a timing process that measures the completion time of compaction of the concrete in the pouring section, a process that acquires the time when concrete is poured into the pouring section, and a process that calculates the time from the completion time to the pouring time as the pouring time for the pouring section.

また、本発明は一態様として、1以上のコンクリートの打設区画の情報を記憶する記憶部を備えたコンピュータに対して、前記打設区画における前記打設区画におけるコンクリートの締固めの完了時刻を計測する計時処理と、前記打設区画に対するコンクリートの打重ね時刻を取得する処理と、前記完了時刻から前記打重ね時刻までの時間を、前記打設区画の打重ね時間として算出する処理と、を実行させる打設管理方法を提供する。 In one aspect, the present invention provides a pouring management method that causes a computer having a memory unit that stores information on one or more concrete pouring sections to execute a timing process that measures the completion time of compaction of concrete in the pouring section, a process that acquires the time of pouring concrete into the pouring section, and a process that calculates the time from the completion time to the pouring time as the pouring time for the pouring section.

本発明によれば、コンクリートの打重ね時間を管理することのできる、打設管理システム、プログラムまたは方法を提供することができる。 The present invention provides a pouring management system, program, or method that can manage the time required to pour concrete.

本実施形態に係る管理システムの概要を示すである。1 shows an overview of a management system according to an embodiment of the present invention. 本実施形態に係る管理システムのネットワーク構成を示すである。1 shows a network configuration of a management system according to an embodiment of the present invention. 本実施形態に係る情報処理装置のハードウェア構成を示す図である。FIG. 1 is a diagram illustrating a hardware configuration of an information processing device according to an embodiment of the present invention. 本実施形態に係る管理装置の機能構成を示す図である。FIG. 2 is a diagram illustrating a functional configuration of a management device according to the present embodiment. 本実施形態に係る打設計画情報の一例を示す図である。FIG. 2 is a diagram showing an example of hitting plan information according to the present embodiment. 本実施形態に係る工事区域と、工事区域のメッシュ分割の一例を示す図である。FIG. 2 is a diagram showing a construction area according to the present embodiment and an example of mesh division of the construction area. 本実施形態に係る第2層目のメッシュ分割を示す平面図である。FIG. 11 is a plan view showing mesh division of a second layer according to the embodiment. 本実施形態に係る打設・締固め情報の一例を示す図である。FIG. 13 is a diagram showing an example of pouring and compaction information according to this embodiment. 本実施形態に係る表示方法情報の一例を示す図である。FIG. 11 is a diagram showing an example of display method information according to the embodiment. 本実施形態に係る工事の管理処理のフローチャートである。10 is a flowchart of a construction management process according to the present embodiment. 本実施形態に係る打設管理処理の詳細を示すフローチャートである。13 is a flowchart showing details of the pouring management process according to this embodiment. 本実施形態に係る締固め管理処理の詳細を示すフローチャートである。4 is a flowchart showing details of the compaction management process according to the present embodiment. 本実施形態に係る表示処理の詳細を示すフローチャートである。6 is a flowchart showing details of a display process according to the embodiment. 本実施形態に係る表示処理によって表示される画面の一例である。11 is an example of a screen displayed by the display process according to the embodiment. 本実施形態に係る表示処理によって表示される画面の一例である。11 is an example of a screen displayed by the display process according to the embodiment.

本明細書および添付図面の記載により、少なくとも以下の事項が明らかとなる。以下、本発明をその一実施形態に即して添付図面を参照しつつ説明する。 At least the following points become clear from the description in this specification and the accompanying drawings. The present invention will be described below in accordance with one embodiment with reference to the accompanying drawings.

図1及び図2に本発明の一実施形態に係る管理システム1の構成を示す。管理システム1は、管理装置10、バケット20、一つ以上のユーザ装置30、及びバイブレータ40及びバッチャープラント50を含む。管理装置10、バケット20、ユーザ装置30、バイブレータ40、及びバッチャープラント50は、通信ネットワーク5を介して互いにデータの送受信が可能となるように接続されている。 Figures 1 and 2 show the configuration of a management system 1 according to one embodiment of the present invention. The management system 1 includes a management device 10, a bucket 20, one or more user devices 30, a vibrator 40, and a batcher plant 50. The management device 10, the bucket 20, the user devices 30, the vibrator 40, and the batcher plant 50 are connected to each other via a communication network 5 so that they can send and receive data to each other.

通信ネットワーク5は、無線方式または有線方式の通信手段であり、例えば、インターネット、WAN(Wide Area Network)、LAN(Local Area Network)、公衆通信網、専用線等である。 The communication network 5 is a wireless or wired communication means, such as the Internet, a WAN (Wide Area Network), a LAN (Local Area Network), a public communication network, a dedicated line, etc.

なお、本実施形態による管理システム1は上記複数の情報管理装置によって構成されているが、本発明はこれらの装置の数を限定するものではない。そのため、管理システム1は、以下のような機能を備えるものであれば、1以上の装置によって構成することができる。 Note that although the management system 1 according to this embodiment is configured from the multiple information management devices described above, the present invention does not limit the number of these devices. Therefore, the management system 1 can be configured from one or more devices as long as they have the following functions:

バケット20は、クレーンなどの運搬装置と接続されてコンクリートを打設する装置である。バケット20は、通信ネットワーク5を介して、その位置情報や、開閉状態を送信する機能を備える。バケット20は、本発明における打設装置の一例であり、一般的には、工区の状況、打設量及び工法等に応じて、様々な種類の打設装置が選択される。打設装置の具体的な例としては、コンクリートミキサー車や、圧送管などがある。 The bucket 20 is a device that is connected to a transport device such as a crane to pour concrete. The bucket 20 has a function of transmitting its position information and open/closed state via the communication network 5. The bucket 20 is an example of a pouring device in the present invention, and generally, various types of pouring devices are selected depending on the conditions of the work area, the pouring amount, the construction method, etc. Specific examples of pouring devices include a concrete mixer truck and a pressure pipe.

バイブレータ40は、打設されたコンクリートの締固めを行う装置である。バイブレータ40は、大規模な工事においてはバックホーに取り付けられて使用される場合もある(全体でバイバックと呼称される)。バイブレータ40は、通信ネットワーク5を介して、その位置情報や、駆動状態を送信する機能を備える。バイブレータ40は、本発明における締固め装置の一例である。 The vibrator 40 is a device that compacts poured concrete. In large-scale construction work, the vibrator 40 may be attached to a backhoe (collectively referred to as a backhoe). The vibrator 40 has the function of transmitting its position information and operating status via the communication network 5. The vibrator 40 is an example of a compaction device in the present invention.

バッチャープラント50は、コンクリートの製造プラントであり、通信ネットワーク5を介して、コンクリートの出荷番号や配合、品質データに関する情報を送信する機能を備える。 The batcher plant 50 is a concrete manufacturing plant and has the function of transmitting information regarding the concrete shipping number, mix, and quality data via the communication network 5.

ユーザ装置30は、ユーザによって操作される情報処理装置であり、例えば、スマートフォン、タブレット、携帯電話機、パーソナルコンピュータ等である。ユーザ装置は、工事事務所におけるユーザ端末として打設計画の作成に供されたり、クレーンのオペレータや打設当番などの作業員によって、工事に関する情報を共有するために使用される(図1)。 The user device 30 is an information processing device operated by a user, such as a smartphone, tablet, mobile phone, or personal computer. The user device is used as a user terminal in a construction office to create pouring plans, or to share information about the construction by crane operators, workers on pouring duty, and other workers (Figure 1).

管理装置10は、ユーザ装置30に通信ネットワーク5を介して業務負荷予測などの各種サービスを提供する情報処理装置である。管理装置10は、コンクリート打設などの土木建築工事に関する各種情報の情報処理サービスをユーザに提供する。 The management device 10 is an information processing device that provides various services, such as workload prediction, to the user device 30 via the communication network 5. The management device 10 provides users with information processing services for various information related to civil engineering and construction work, such as pouring concrete.

図3は、管理装置10、ユーザ装置30の実現に用いるハードウェア(以下、「情報処理装置100」と称する。)の一例である。同図に示すように、情報処理装置100は、プロセッサ101、主記憶装置102、補助記憶装置103、入力装置104、出力装置105、および通信装置106を備える。これらは図示しないバス等の通信手段を介して互いに通信可能に接続されている。 Figure 3 shows an example of hardware (hereinafter referred to as "information processing device 100") used to realize the management device 10 and the user device 30. As shown in the figure, the information processing device 100 includes a processor 101, a main memory device 102, an auxiliary memory device 103, an input device 104, an output device 105, and a communication device 106. These are connected to each other so that they can communicate with each other via communication means such as a bus (not shown).

尚、情報処理装置100は、その全ての構成が必ずしもハードウェアで実現されている必要はなく、構成の全部又は一部が、例えば、クラウドシステム(cloud system)のクラウドサーバ(cloud server)のような仮想的な資源によって実現されていてもよい。 In addition, the information processing device 100 does not necessarily need to have all of its configuration realized in hardware, and all or part of its configuration may be realized by virtual resources such as a cloud server in a cloud system.

プロセッサ101は、CPU(Central Processing Unit)、MPU(Micro Processing Unit)等を用いて構成される。プロセッサ101が、主記憶装置102に格納されているプログラムを読み出して実行することにより、管理装置10やユーザ装置30の機能が実現される。プロセッサ101は本発明における制御部の一例である。 The processor 101 is configured using a CPU (Central Processing Unit), an MPU (Micro Processing Unit), etc. The processor 101 reads and executes a program stored in the main memory device 102, thereby realizing the functions of the management device 10 and the user device 30. The processor 101 is an example of a control unit in the present invention.

主記憶装置102は、プログラムやデータを記憶する装置であり、ROM(Read Only Memory)、RAM(Random Access Memory)、不揮発性半導体メモリ(NVRAM(Non Volatile RAM))等である。 The main memory device 102 is a device that stores programs and data, and may be a ROM (Read Only Memory), a RAM (Random Access Memory), a non-volatile semiconductor memory (NVRAM (Non Volatile RAM)), etc.

補助記憶装置103は、例えば、SSD(Solid State Drive)、SDメモリカード等の各種不揮発性メモリ(NVRAM:Non-volatile memory)、ハードディスクドライブ、光学式記憶装置(CD(Compact Disc)、DVD(Digital Versatile Disc)等)、クラウドサーバの記憶領域等である。補助記憶装置103に格納されているプログラムやデータは主記憶装置102に随時読み込まれる。 The auxiliary storage device 103 may be, for example, various non-volatile memories (NVRAM: Non-volatile memory) such as SSDs (Solid State Drives) and SD memory cards, hard disk drives, optical storage devices (CDs (Compact Discs), DVDs (Digital Versatile Discs), etc.), storage areas of cloud servers, etc. Programs and data stored in the auxiliary storage device 103 are loaded into the main storage device 102 as needed.

入力装置104は、情報の入力を受け付けるインタフェースであり、例えば、キーボード、マウス、タッチパネル、カードリーダ、音声入力装置(マイクロフォン等)、音声認識装置等である。情報処理装置100が通信装置106を介して他の装置との間で情報の入力を受け付ける構成としてもよい。 The input device 104 is an interface that accepts the input of information, and is, for example, a keyboard, a mouse, a touch panel, a card reader, a voice input device (such as a microphone), a voice recognition device, etc. The information processing device 100 may be configured to accept the input of information between itself and other devices via the communication device 106.

出力装置105は、各種の情報を出力するインタフェースであり、例えば、画面表示装置(液晶モニタ、LCD(Liquid Crystal Display)、グラフィックカード等)、印字装置等)、音声出力装置(スピーカ等)、音声合成装置等である。情報処理装置100が通信装置106を介して他の装置との間で情報の出力を行う構成としてもよい。出力装置105は、通信ネットワーク5などを介して情報処理装置100の他の装置と接続される構成としてもよい。出力装置105は、本発明における出力部の一例である。 The output device 105 is an interface that outputs various types of information, such as a screen display device (liquid crystal monitor, LCD (Liquid Crystal Display), graphic card, etc.), a printer, etc.), an audio output device (speaker, etc.), a voice synthesizer, etc. The information processing device 100 may be configured to output information between it and other devices via the communication device 106. The output device 105 may be configured to be connected to other devices of the information processing device 100 via the communication network 5, etc. The output device 105 is an example of an output unit in the present invention.

通信装置106は、通信ネットワーク5を介した他の装置との間の通信を実現する有線方式又は無線方式の通信インタフェースであり、例えば、NIC(Network Interface Card)、無線通信モジュール、USB(Universal Serial Interface)モジュール、シリアル通信モジュール等である。 The communication device 106 is a wired or wireless communication interface that realizes communication with other devices via the communication network 5, and is, for example, a NIC (Network Interface Card), a wireless communication module, a USB (Universal Serial Interface) module, a serial communication module, etc.

管理装置10が備える主な機能(ソフトウェア構成)を図4に示す。管理装置10は、記憶部111、及び管理部112の各機能を備える。これらの機能は、管理装置10のプロセッサ101が管理装置10の主記憶装置102に格納されているプログラムを読み出して実行することにより実現される。また管理装置10は、上記の機能に加えて、オペレーティングシステム、ファイルシステム、デバイスドライバ、DBMS(DataBase Management System)等の機能を備える。 The main functions (software configuration) of the management device 10 are shown in FIG. 4. The management device 10 has the functions of a memory unit 111 and a management unit 112. These functions are realized by the processor 101 of the management device 10 reading and executing a program stored in the main memory unit 102 of the management device 10. In addition to the above functions, the management device 10 also has functions such as an operating system, a file system, a device driver, and a DBMS (DataBase Management System).

上記の機能のうち、記憶部111は、打設計画情報151、打設・締固め情報152、及び表示方法情報153の各情報を記憶する。記憶部111は、これらの情報を、例えば、データベースのテーブルや、ファイルシステムによって管理されるファイル等として記憶する。 Of the above functions, the memory unit 111 stores each piece of information, namely pouring plan information 151, pouring and compaction information 152, and display method information 153. The memory unit 111 stores this information, for example, as a database table or a file managed by a file system.

また、管理部112は、打設計画情報151、打設・締固め情報152、及び表示方法情報153に対する参照、書き込みを実行する。また、管理部112は、バケット20、バイブレータ40、及びバッチャープラント50からの情報を取得する機能を備える。 The management unit 112 also references and writes pouring plan information 151, pouring and compaction information 152, and display method information 153. The management unit 112 also has a function of acquiring information from the bucket 20, the vibrator 40, and the batcher plant 50.

詳細には、管理部112は、バケット20の位置情報、及びバケット20の稼働状態を取得する機能を備える。バケット20の位置情報は、打設計画情報151と同様に、バケット20の座標、すなわち緯度と経度、または基準点からの距離によって管理される。緯度と経度は、GNSS(Global Navigation Satellite System)などを用いて取得される。例えば、バケット20がクレーンに運搬されるバケットであった場合、管理部112は、バケット20またはクレーン先端部の位置情報、及びバケット20の開閉状態を、リアルタイムに取得する。また、クレーンが打設計画情報151及び打設・締固め情報152を参照し、自動運転によりバケット20を操作し、コンクリートの打設を実行する構成としてもよい。 In detail, the management unit 112 has a function of acquiring position information of the bucket 20 and the operating status of the bucket 20. Like the pouring plan information 151, the position information of the bucket 20 is managed by the coordinates of the bucket 20, that is, the latitude and longitude, or the distance from a reference point. The latitude and longitude are acquired using a Global Navigation Satellite System (GNSS) or the like. For example, if the bucket 20 is a bucket transported by a crane, the management unit 112 acquires the position information of the bucket 20 or the tip of the crane, and the open/closed status of the bucket 20 in real time. In addition, the crane may be configured to refer to the pouring plan information 151 and the pouring/compaction information 152, operate the bucket 20 by automatic driving, and pour the concrete.

管理部112は、バイブレータ40の位置情報及び駆動状態を取得する機能を備える。例えば、バイブレータ40が、バックホーの先端に取り付けられたバイブレータであった場合、管理部112は、バイブレータ40またはバックホー先端部の位置情報、及びバイブレータ40の駆動状態をそれぞれバイブレータ40の位置情報及び駆動状態として、リアルタイムに取得する。 The management unit 112 has a function of acquiring the position information and driving status of the vibrator 40. For example, if the vibrator 40 is a vibrator attached to the tip of a backhoe, the management unit 112 acquires the position information of the vibrator 40 or the tip of the backhoe, and the driving status of the vibrator 40 in real time as the position information and driving status of the vibrator 40, respectively.

管理部112がバッチャープラント50から取得する情報には、コンクリートの出荷番号、コンクリートの配合、出荷数量、出荷時間が含まれる。 The information that the management unit 112 obtains from the batcher plant 50 includes the concrete shipping number, concrete mix, shipping quantity, and shipping time.

打設計画情報151の一例を図5から図7に示す。打設計画情報151は、工事区域、及びコンクリート打設に用いるメッシュに関する情報である。メッシュとは、コンクリート打設が行われる空間の一単位であり、本発明における「打設区画」の一例である。 An example of pouring plan information 151 is shown in Figs. 5 to 7. Pouring plan information 151 is information about the construction area and the mesh used for pouring concrete. A mesh is a unit of space in which concrete is poured, and is an example of a "pouring area" in the present invention.

図5~図7に示すように、打設計画情報151では、コンクリートの打設を行う工事区域Aにおける、メッシュ分割を示す図面と、メッシュ番号N、及び各メッシュを構成する頂点の座標(通常8点)とが、互いに関連付けられた状態で保持される。 As shown in Figures 5 to 7, the pouring plan information 151 holds a drawing showing the mesh division of the construction area A where concrete is poured, the mesh number N, and the coordinates of the vertices that make up each mesh (usually eight points) in a mutually associated state.

図5の例では、メッシュの座標は、直方体形状のメッシュにおける8つの頂点における座標値を記憶することによって管理される。なお、図5では、3つの頂点までの表示とし、残る部分の図示を省略している。座標値は、緯度、経度、標高によって定義されているが、例えば、工事区域Aにおいて基準点を定め、この基準点からの東西、南北、及び上下方向への距離として定義されてもよい。本実施形態ではメッシュ番号Nは、第1層において1-1、1-2、第2層において2-1、2-2のように、層番号とメッシュ名の組合せで定義される。 In the example of Figure 5, mesh coordinates are managed by storing the coordinate values of eight vertices in a rectangular parallelepiped mesh. Note that Figure 5 shows up to three vertices, with the remaining parts not shown. Coordinate values are defined by latitude, longitude, and altitude, but for example, a reference point may be set in construction area A and the coordinate values may be defined as the distance in the east-west, north-south, and up-down directions from this reference point. In this embodiment, the mesh number N is defined as a combination of the layer number and mesh name, such as 1-1, 1-2 in the first layer, and 2-1, 2-2 in the second layer.

打設計画情報151におけるメッシュ配置及び形状は、ユーザによって設計図書から工事区域Aを分割することによって決定される。メッシュ分割の一例を図6及び図7に示す。一般的に、コンクリート打設用のバケット1杯分の容量で打設可能な範囲を基準として、メッシュの大きさは決定される。図6及び図7に示すように、本実施形態において、メッシュは上下2層にわたって形成される。なお、図7では、第2層におけるメッシュ分割を、メッシュ番号N(層番号を省略して図示する)とともに表示している。 The mesh arrangement and shape in the pouring plan information 151 are determined by the user dividing the construction area A from the design documents. An example of mesh division is shown in Figs. 6 and 7. Generally, the size of the mesh is determined based on the range that can be poured with the capacity of one concrete pouring bucket. As shown in Figs. 6 and 7, in this embodiment, the mesh is formed in two layers, upper and lower. Note that in Fig. 7, the mesh division in the second layer is shown together with the mesh number N (the layer number is omitted in the illustration).

打設・締固め情報152には、それぞれのメッシュにおけるコンクリートの計画配合、打設順、出荷番号、打設配合、荷卸時刻(すなわち打設の開始時刻)、締固め開始時刻、締固め完了時刻が保存される。 Pouring and compaction information 152 stores the planned concrete mix for each mesh, pouring order, shipping number, pouring mix, unloading time (i.e., the start time of pouring), compaction start time, and compaction completion time.

図8に示す打設・締固め情報152の例では、1番メッシュにおいて、9時に荷卸しが実施され、9時5分に締固めが開始され、9時10分に完了したことを示している。2番、3番のメッシュに示すように、開始されていない工程には時刻が記録されておらず、そのため-(ハイフン)が表示されている。 In the example of pouring and compaction information 152 shown in Figure 8, in mesh number 1, unloading was carried out at 9:00, compaction started at 9:05, and was completed at 9:10. As shown in meshes number 2 and 3, no time is recorded for processes that have not started, and therefore a - (hyphen) is displayed.

表示方法情報153は、表示処理(後述)において、メッシュの表示方法の決定に用いられる情報である。表示方法情報153の一例を図9に示す。図9において、表示方法情報153は、打設・締固め情報152の保存内容によって、メッシュの状態を7つに分類し、それぞれの分類に対する表示態様を設定している。 The display method information 153 is information used to determine the display method of the mesh in the display process (described later). An example of the display method information 153 is shown in FIG. 9. In FIG. 9, the display method information 153 classifies the mesh state into seven categories based on the stored contents of the pouring and compaction information 152, and sets the display mode for each category.

メッシュは、記録状態、選択メッシュの種別、及び経過時間の3つの基準によって分類される。記録状態とは、メッシュの打設及び締固めに関する基準を示すものである。選択メッシュの種別は、メッシュに対する打重ねが打設計画において必要かどうかを判断基準として設定される。 Meshes are classified according to three criteria: recording status, type of selected mesh, and elapsed time. The recording status indicates the criteria for pouring and compacting the mesh. The type of selected mesh is set as a criterion to determine whether or not over-pouring of the mesh is required in the pouring plan.

経過時間は、打重ねが必要なメッシュにおける、締固め完了時刻からの経過時間を示すものである。打重ねまでの制限時間は、施工基準等によって厳格に定められているため、経過時間は、打重ねまでの猶予を判断するための重要な指標となる。 The elapsed time indicates the time that has elapsed since the completion of compaction for meshes that require overlaying. The time limit until overlaying is strictly regulated by construction standards, etc., so the elapsed time is an important indicator for determining the time allowed until overlaying.

〔工事管理〕
管理システム1において行われる工事管理処理について説明する。図10は、管理装置10がコンクリート工事管理を行う際の処理を説明するフローチャートである。以下、同図とともに工事管理処理について説明する。処理は、ユーザ装置30からユーザが管理装置10に開始を指示することによって開始される。
[Construction Management]
The construction management process performed in the management system 1 will be described. Fig. 10 is a flow chart for explaining the process performed by the management device 10 in managing concrete construction. The construction management process will be described below with reference to the same figure. The process is started when the user instructs the management device 10 to start the process from the user device 30.

処理は、打設計画(S1)、打設管理(S2)、締固め管理(S3)、及び記録出力(S4)の各処理によって構成される。 The process consists of pouring planning (S1), pouring management (S2), compaction management (S3), and record output (S4).

打設計画(S1)において、ユーザは、CADなどの図面管理ソフトウェアを用いて、工事区域Aにおけるコンクリート打設に用いるメッシュ割を設定する。メッシュは、メッシュ番号、各メッシュを構成するメッシュの座標(通常8箇所)によって定義される。また、各メッシュに打設すべきコンクリート配合とメッシュの打設順が設定され、打設計画情報151及び打設・締固め情報152に保存される(図5)。 In the pouring plan (S1), the user uses drawing management software such as CAD to set the mesh division to be used for pouring concrete in the construction area A. The meshes are defined by the mesh number and the coordinates of the meshes that make up each mesh (usually eight locations). In addition, the concrete mix to be poured into each mesh and the pouring order of the meshes are set, and saved in the pouring plan information 151 and the pouring and compaction information 152 (Figure 5).

コンクリート工事が開始されると、管理部112は、打設管理(S2)及び締固め管理(S3)を実行する。これらの処理では、コンクリートの打設状況を取得し、さらに、打設・締固め情報152などに取得した情報を保存する処理が行われる。打設管理(S2)及び締固め管理(S3)の詳細な内容は後述する。 When concrete work begins, the management unit 112 executes pouring management (S2) and compaction management (S3). In these processes, the concrete pouring status is acquired, and the acquired information is stored in pouring/compaction information 152, etc. The details of pouring management (S2) and compaction management (S3) will be described later.

コンクリート工事の完了後において、記録出力(S4)が行われ、主に施工記録の出力が行われる。打設計画情報151からユーザが所望する情報が選択され、出力装置105を介して、選択された情報が、紙や画面などの媒体に出力される。 After the concrete work is completed, record output (S4) is performed, mainly outputting the construction record. The user selects the desired information from the pouring plan information 151, and the selected information is output to a medium such as paper or a screen via the output device 105.

〔打設管理〕
打設管理(S2)の詳細な処理フローを、図11を用いて説明する。まず、管理部112はステップS21において、プラントからコンクリートが新たに出荷されるまでプラントからの情報を参照し、コンクリートが出荷されたかどうか確認する(S21:NO)。
[Pouring management]
A detailed process flow of the concrete pouring management (S2) will be described with reference to Fig. 11. First, in step S21, the management unit 112 refers to information from the plant until new concrete is shipped from the plant, and checks whether concrete has been shipped (S21: NO).

プラントからの出荷が確認された場合(S21:YES)、管理部112は、プラントの出荷情報より、出荷されたコンクリートの配合及び出荷番号を取得する(S22)。コンクリートの配合及び出荷番号に関する情報は、ユーザ装置30などを介して、作業員やクレーンオペレーターなどに共有される。これにより、打設箇所の確認やコンクリートの品質確認などが行われる。 When shipment from the plant is confirmed (S21: YES), the management unit 112 obtains the mix ratio and shipping number of the shipped concrete from the plant's shipping information (S22). Information on the mix ratio and shipping number of the concrete is shared with workers, crane operators, etc. via the user device 30, etc. This allows confirmation of the pouring location and the quality of the concrete, etc.

次に管理部112は、バケット20の開閉状態を確認する(S23)。バケット20が閉鎖された状態は、バケットに貯蔵されたコンクリートがまだ荷卸し(すなわち打設)されていないことを意味する。そのため、バケット20が閉鎖状態であるとき(S23:NO)、バケット20の開閉状態の監視を継続する。 Next, the management unit 112 checks whether the bucket 20 is open or closed (S23). When the bucket 20 is closed, this means that the concrete stored in the bucket has not yet been unloaded (i.e., poured). Therefore, when the bucket 20 is closed (S23: NO), the management unit 112 continues to monitor the open or closed state of the bucket 20.

バケット20が開放された状態となったとき(S23:YES)、バケットに貯蔵されたコンクリートが荷卸しされたことが分かる。そのため管理部112は、荷卸しが確認された時刻、及び、荷卸しされたメッシュを特定する(S24)。詳細には、管理部112は、バケット20が開放された時刻を荷卸時刻とする。また管理部112は、荷卸時刻において、バケット20と位置が重複するメッシュを、打設されたメッシュと判断する。 When the bucket 20 is in an open state (S23: YES), it is known that the concrete stored in the bucket has been unloaded. Therefore, the management unit 112 identifies the time when the unloading was confirmed and the mesh that was unloaded (S24). In detail, the management unit 112 determines the time when the bucket 20 was opened as the unloading time. Furthermore, the management unit 112 determines that the mesh whose position overlaps with the bucket 20 at the unloading time is a cast mesh.

複数のメッシュが上下に重複している場合、管理部112は、打設・締固め情報152を参照し、荷卸し時刻の記録がないメッシュのうち最下層のものを、荷卸しが行われたメッシュと判断する。 When multiple meshes overlap vertically, the management unit 112 refers to the pouring and compaction information 152 and determines that the lowest mesh among those for which there is no record of the unloading time is the mesh in which unloading was performed.

管理部112は、取得された情報を打設・締固め情報152に書き込み、情報の更新を行う(S25)。すなわち管理部112は、打設されたメッシュに関連付けて、コンクリートの配合、出荷番号、荷卸時刻を打設・締固め情報152に入力する。 The management unit 112 writes the acquired information into the pouring and compaction information 152 and updates the information (S25). That is, the management unit 112 inputs the concrete mix, shipping number, and unloading time into the pouring and compaction information 152 in association with the poured mesh.

ステップS26において、管理部112は、打設が計画された全てのメッシュに対して、コンクリートの荷卸しが完了したかどうかを確認する。荷卸しが完了していない場合(S26:NO)、管理部112は、処理をステップS21に戻し、打設管理の処理を継続する。 In step S26, the management unit 112 checks whether the unloading of concrete has been completed for all meshes for which pouring is planned. If the unloading has not been completed (S26: NO), the management unit 112 returns the process to step S21 and continues the pouring management process.

打設が計画された全メッシュに対するコンクリートの荷卸しが完了したと判断した場合(S26:YES)、管理部112は、打設管理の処理を終了させる。 If it is determined that unloading of concrete for all meshes for which pouring is planned has been completed (S26: YES), the management unit 112 ends the pouring management process.

〔締固め管理〕
締固め管理(S3)の詳細な処理フローを、図12を用いて説明する。まず、管理部112はステップS31において、バイブレータ40の駆動状態を確認する(S31)。バイブレータ40の駆動が停止している間は、コンクリートの締固め作業が行われていない。そのため、バイブレータ40が停止状態であるとき(S31:NO)、バイブレータ40の駆動状態の監視を継続する。
[Compaction management]
A detailed process flow of compaction management (S3) will be described with reference to Fig. 12. First, in step S31, the management unit 112 checks the driving state of the vibrator 40 (S31). While the driving of the vibrator 40 is stopped, concrete compaction work is not performed. Therefore, when the vibrator 40 is stopped (S31: NO), monitoring of the driving state of the vibrator 40 is continued.

バイブレータ40が駆動している場合(S31:YES)、管理部112は、締固め作業が開始したと判断し、作業が行われているメッシュの位置を特定する(S32)。詳細には、管理部112はバイブレータ40の位置座標を取得し、バイブレータ40と位置が重複するメッシュを、締固め作業の行われているメッシュと判断する。 If the vibrator 40 is activated (S31: YES), the management unit 112 determines that compaction work has started and identifies the position of the mesh where work is being performed (S32). In detail, the management unit 112 acquires the position coordinates of the vibrator 40, and determines that the mesh whose position overlaps with the vibrator 40 is the mesh where compaction work is being performed.

複数のメッシュが上下に重複している場合、管理部112は、打設・締固め情報152を参照し、荷卸し時刻の記録があるメッシュのうち最上層のものを、締固め作業の行われているメッシュと判断する。 When multiple meshes overlap vertically, the management unit 112 refers to the pouring and compaction information 152 and determines that the topmost mesh among those with a recorded unloading time is the mesh on which compaction work is being carried out.

管理部112は打設・締固め情報152を参照し、締固め作業の行われているメッシュにおける、締固め作業の開始時刻を入力し、情報を更新する(S33)。 The management unit 112 refers to the pouring/compaction information 152, inputs the start time of the compaction work in the mesh where the compaction work is being performed, and updates the information (S33).

次に、管理部112は、ステップS37においてバイブレータ40の状態を確認する。バイブレータ40が駆動し、かつ、位置情報からメッシュ間の移動を行っていないと判断されるとき(S34:NO)、管理部112は、バイブレータ40の状態の監視を継続する。 Next, in step S37, the management unit 112 checks the state of the vibrator 40. When it is determined that the vibrator 40 is driven and is not moving between meshes based on the position information (S34: NO), the management unit 112 continues to monitor the state of the vibrator 40.

管理部112は、バイブレータ40が締固め作業が完了したと判断した際(S34:YES)、管理部112は、締固め作業の完了時刻を、作業が行われたメッシュに関連付けて打設・締固め情報152に入力し、情報を更新する(S35)。 When the management unit 112 determines that the vibrator 40 has completed the compaction work (S34: YES), the management unit 112 enters the completion time of the compaction work into the pouring/compaction information 152 in association with the mesh on which the work was performed, and updates the information (S35).

ステップS36において、管理部112は、打設が計画される全てのメッシュに対して、コンクリートの締固め作業が完了したかどうかを確認する。作業が完了していない場合(S36:NO)、管理部112は、処理をステップS31に戻し、締固め管理を継続する。 In step S36, the management unit 112 checks whether the concrete compaction work has been completed for all meshes for which pouring is planned. If the work has not been completed (S36: NO), the management unit 112 returns the process to step S31 and continues compaction management.

打設が計画された全メッシュに対するコンクリートの締固めが完了したと判断した場合(S36:YES)、管理部112は、締固め管理を終了させる。 If it is determined that concrete compaction for all meshes planned for pouring has been completed (S36: YES), the management unit 112 ends compaction management.

〔表示処理〕
ユーザは、ユーザ装置30、または管理装置10などを用いて表示処理を実行し、打設計画、工事の進行状況、または作業結果を確認することができる。例えばクレーンのオペレータや、現場に待機する打設当番などの各作業者が、ユーザ装置30を介して打設計画及び打設状況を確認できる。関係者間での情報の共有が容易であり、打設場所間違いや、打重ね時間の制限時間超過などの品質事故を防止することが可能となる。
[Display Processing]
A user can execute display processing using the user device 30 or the management device 10 to check the pouring plan, the progress of construction, or the work results. For example, each worker, such as a crane operator or a worker on duty waiting at the site, can check the pouring plan and the pouring status via the user device 30. It is easy to share information among the relevant parties, and it is possible to prevent quality accidents such as pouring in the wrong place or exceeding the time limit for pouring.

以下に、図13及び図14を用いて、表示処理の詳細を説明する。なお、表示処理は、コンクリートの打設作業中に限らず、打設前、及び打設後においても実行可能である。また表示処理は、ステップS1~S4の各処理と並行して実行可能である。 The display process will be described in detail below with reference to Figures 13 and 14. Note that the display process can be performed not only during the concrete pouring operation, but also before and after pouring. The display process can also be performed in parallel with each of the processes in steps S1 to S4.

表示処理は、管理部112がユーザからの表示指示を受け付けることによって、開始される。表示処理において、管理部112は、メッシュを一つ選択し(S51)、打設・締固め情報152を参照して、選択されたメッシュ(選択メッシュ)と、選択メッシュ直下のメッシュに関する情報を取得する(S52)。 The display process is started when the management unit 112 receives a display instruction from the user. In the display process, the management unit 112 selects one mesh (S51) and acquires information on the selected mesh (selected mesh) and the mesh immediately below the selected mesh by referring to the pouring and compaction information 152 (S52).

ステップS53において、管理部112は、表示方法情報153(図9)に基づいて、選択メッシュそれぞれの表示態様を決定する。図9に示すように、選択メッシュの表示方法は、打設記録の状態、選択メッシュの種別、及び締固め完了からの経過時間によって判断される。 In step S53, the management unit 112 determines the display mode for each selected mesh based on the display method information 153 (Figure 9). As shown in Figure 9, the display method for the selected mesh is determined based on the state of the pouring record, the type of the selected mesh, and the elapsed time since compaction was completed.

管理部112は、打設・締固め情報152における記録状態を確認し、選択メッシュを「打設前」、「荷卸」、「締固め」、「注意」、「警告」のいずれかに分類する。さらに管理部112は、それらの分類ごとに、表示態様を変更する。 The management unit 112 checks the recording status in the pouring/compaction information 152 and classifies the selected mesh into one of "before pouring," "unloading," "compaction," "caution," and "warning." Furthermore, the management unit 112 changes the display mode for each of these classifications.

分類の前提として、管理部112は、選択メッシュが打重ねの対象かどうかを判断する。具体的には、管理部112は打設・締固め情報152を参照し、選択メッシュとその直下のメッシュとが、同一の打設計画における打設対象となっているかを確認する。直下のメッシュが同じ計画内での打設対象である場合、選択メッシュは直下のメッシュに対する打重ね対象メッシュであると判断される。以下、打重ね対象メッシュを上層メッシュといい、その直下のメッシュを下層メッシュと称する場合がある。換言すれば、上層メッシュにコンクリートを打設することによって、下層メッシュに対する打重ねが行われる。 As a premise for classification, the management unit 112 judges whether the selected mesh is a target for pouring. Specifically, the management unit 112 refers to the pouring/compaction information 152 and checks whether the selected mesh and the mesh immediately below are targets for pouring in the same pouring plan. If the mesh immediately below is a target for pouring in the same plan, the selected mesh is determined to be a mesh to be poured over the mesh immediately below. Hereinafter, the mesh to be poured over may be referred to as the upper mesh, and the mesh immediately below it may be referred to as the lower mesh. In other words, pouring concrete into the upper mesh results in pouring over the lower mesh.

打設・締固め情報152において、選択メッシュに対して打設記録がなく、その選択メッシュが打重ねの上層メッシュにも該当しない場合、管理部112は表示態様を「打設前」とし、計画上の配合に基づいた表示態様を選択する(図9、分類1)。 In the pouring and compaction information 152, if there is no pouring record for the selected mesh and the selected mesh does not correspond to an upper layer mesh of the pouring, the management unit 112 sets the display mode to "before pouring" and selects the display mode based on the planned mix (Figure 9, category 1).

打設記録のない選択メッシュであって、選択メッシュが上層メッシュに該当する場合、図9に示すように、下層メッシュの締固め完了時刻からの経過時間に基づく表示態様が選択される。例えば、経過時間が60分未満である場合、管理部112は表示態様を「打設前」とし、計画上の配合に基づいた表示態様を選択する(図9、分類2)。 When a selected mesh has no pouring record and corresponds to an upper mesh, as shown in FIG. 9, a display mode based on the elapsed time from the compaction completion time of the lower mesh is selected. For example, if the elapsed time is less than 60 minutes, the management unit 112 sets the display mode to "before pouring" and selects a display mode based on the planned mix (FIG. 9, category 2).

選択メッシュが上層メッシュであり、経過時間が60分以上90分以内である場合、管理部112は表示態様を「注意」とし、経過時間が90分を超える場合には、表示態様を「警告」とする(図9、分類3および4)。「注意」、「警告」表示には、さらに経過時間が表示される。なお、選択メッシュに対して下層メッシュが複数ある場合、経過時間は、最先の締固め時刻を基準として計測される。 If the selected mesh is an upper mesh and the elapsed time is between 60 and 90 minutes, the management unit 112 displays the "Caution" state, and if the elapsed time exceeds 90 minutes, the display state is "Warning" (Figure 9, categories 3 and 4). The "Caution" and "Warning" displays also display the elapsed time. Note that if there are multiple lower meshes for the selected mesh, the elapsed time is measured based on the earliest compaction time.

打設・締固め情報152において、選択メッシュに対する荷卸時刻の記録があり、締固め以降の記録がない場合、管理部112は、このメッシュはコンクリートの打設中であると判断し、「荷卸」という表示態様とする(図9、分類5)。さらに、選択メッシュが打重ねの上層メッシュに該当する場合には、管理部112は、分類5の表示態様に加えて、打重ね時間を追加表示する態様とする(図9、分類6)。 If the pouring and compaction information 152 contains a record of the unloading time for the selected mesh, but no record after compaction, the management unit 112 determines that this mesh is in the process of pouring concrete, and displays it as "unloading" (Figure 9, category 5). Furthermore, if the selected mesh is an upper layer mesh of pouring, the management unit 112 displays the pouring time in addition to the display category 5 (Figure 9, category 6).

打重ね時間は、下層メッシュの締固め完了時刻から、その上層メッシュ(選択メッシュ)の荷卸時刻までに経過した時間を計算することによって得られる。なお下層メッシュに対して上層メッシュが複数ある場合、打重ね時間は、それらの上層メッシュ全てにおいて荷卸が完了した時刻(打重ね時刻ともいう)を基準として計算する。また、上層メッシュに対して下層メッシュが複数ある場合、打重ね時間は、最先の締固め完了時刻から、上層メッシュの荷卸時刻までに経過した時間として計算される。 The overlay time is obtained by calculating the time that has elapsed from the compaction completion time of the lower mesh to the unloading time of the upper mesh (selected mesh). If there are multiple upper meshes for a given lower mesh, the overlay time is calculated based on the time that unloading is completed for all of those upper meshes (also called the overlay time). If there are multiple lower meshes for a given upper mesh, the overlay time is calculated as the time that has elapsed from the compaction completion time of the earliest mesh to the unloading time of the upper mesh.

打設・締固め情報152において、選択メッシュに対して締固め完了時刻までの記録がある場合、管理部112は「締固め」という表示態様を選択する(図9、分類7)。さらに、選択メッシュが打重ねの上層メッシュに該当する場合には、管理部112は、分類7の表示態様に加えて、打重ね時間を追加表示する態様とする(図9、分類8)。 In the pouring and compaction information 152, if the selected mesh has records up to the compaction completion time, the management unit 112 selects the display mode of "compaction" (Figure 9, category 7). Furthermore, if the selected mesh corresponds to an upper mesh of pouring, the management unit 112 selects a mode that additionally displays the pouring time in addition to the display mode of category 7 (Figure 9, category 8).

図13におけるステップS51~S53の処理は、表示すべきメッシュがすべて選択されるまで(S54:NO)、繰り返して行われる。表示対象のメッシュがすべて選択された場合(S54:YES)、報知及び表示が行われる(S55)。 The processing of steps S51 to S53 in FIG. 13 is repeated until all meshes to be displayed are selected (S54: NO). When all meshes to be displayed are selected (S54: YES), notification and display are performed (S55).

表示処理による報知及び表示の一例を図14及び図15に示す。報知及び表示は、例えば出力装置105を介して、画面や紙などの媒体に対して行われる。 An example of notification and display by the display process is shown in Fig. 14 and Fig. 15. The notification and display are performed, for example, via the output device 105 on a medium such as a screen or paper.

メッシュの表示態様は、図14の凡例として示すように、ステップS53において決定された分類1~8の表示態様に基づく。分類1及び2のメッシュに対しては、コンクリートの計画配合に基づいて、色及び模様が設定される。分類3、4、5、7のメッシュに対しては、「注意」、「警告」などの各分類に設定された表示態様が用いられる。なお、文字、色、模様だけでなく、アイコンやメッシュの形状、音声などの手段を用いて、分類ごとに表示する構成としてもよい。 The display mode of the mesh is based on the display mode of categories 1 to 8 determined in step S53, as shown in the legend in FIG. 14. For the mesh of categories 1 and 2, the color and pattern are set based on the planned concrete mix. For the mesh of categories 3, 4, 5, and 7, the display mode set for each category, such as "Caution" or "Warning," is used. Note that the display for each category may be configured to use not only characters, colors, and patterns, but also icons, mesh shapes, sounds, and other means.

また分類6と、分類8では、「荷卸」及び「締固め」それぞれの表示態様として設定された色及び模様で表示されるともに、打重ね時間が追加表示される。打重ね時間が表示されるため、ユーザは、計画及び施工状況の把握を容易に行うことができる。また、施工記録を容易に作成することができる。例えば図14では、55番のメッシュにおいて、打重ね時間が1時間30分であったことが読み取れる。 In addition, for categories 6 and 8, "unloading" and "compaction" are displayed in the colors and patterns set as the display modes, respectively, and the pouring time is additionally displayed. Since the pouring time is displayed, the user can easily understand the plan and construction status. In addition, construction records can be easily created. For example, in Figure 14, it can be seen that the pouring time was 1 hour and 30 minutes for mesh number 55.

工事中においても表示処理は逐次実行され、表示内容は打設・締固め情報152とともに、リアルタイムに更新される。計画、施工状況に応じて各メッシュが色分け、または模様分け表示されるため、ユーザは、計画及び施工状況の把握を容易に行うことができる。 The display process is executed sequentially even during construction, and the displayed contents are updated in real time along with pouring and compaction information 152. Each mesh is displayed in a different color or pattern according to the plan and construction status, so the user can easily grasp the plan and construction status.

また、表示処理の結果に基づいて、メッシュごとの打重ね時間を表形式などで、紙や出力装置105に出力することも可能である。例えば、打設計画に係る工事が完了した後の出力・保存処理(S4)の段階で表示処理を行った場合、図15のように、各メッシュの打重ね時間などを含めた状態で施工記録を記録、出力できるため、ユーザは容易に施工記録を作成できる。 Based on the results of the display process, it is also possible to output the pouring time for each mesh in a table format or the like to paper or the output device 105. For example, if the display process is performed at the output/save process (S4) stage after the construction related to the pouring plan has been completed, the construction record can be recorded and output including the pouring time for each mesh, as shown in Figure 15, so the user can easily create a construction record.

<効果>
本実施形態において、管理システム1は、1以上のコンクリートの打設メッシュの情報を記憶する記憶装置102、103(または記憶部111)、及びプロセッサ101(または管理部112)を備えている。プロセッサ101は、メッシュにおけるコンクリートの締固め完了時刻を計測する計時処理(S32~S35)と、メッシュにおけるコンクリートの打重ねの開始時刻を取得する取得処理(S23~S25)と、締固め完了時刻から打重ね開始時刻までの時間を、メッシュの打重ね時間として算出する処理(S53)と、を実行する。
<Effects>
In this embodiment, the management system 1 includes storage devices 102, 103 (or storage unit 111) that store information on one or more concrete pouring meshes, and a processor 101 (or management unit 112). The processor 101 executes a timing process (S32 to S35) for measuring the time when concrete compaction in the mesh is completed, an acquisition process (S23 to S25) for acquiring the start time of concrete pouring in the mesh, and a process (S53) for calculating the time from the compaction completion time to the start time of pouring as the pouring time of the mesh.

プロセッサ101は、締固め完了時刻からの経過時間を報知する報知処理(S55)をさらに実行する。 The processor 101 further executes a notification process (S55) to notify the user of the time that has elapsed since compaction completion time.

締固め完了時刻からの経過時間にしたがって「注意」、「警告」と表示態様を変えて報知することによって、プロセッサ101は、ユーザに対して、作業の緊急性や作業の優先順位を正しく認識させることができる。 By changing the display format to "Caution" or "Warning" depending on the time that has elapsed since compaction completion, the processor 101 allows the user to correctly recognize the urgency and priority of the work.

管理システム1は、出力装置105をさらに備える。プロセッサ101は、報知処理(S55)において、メッシュの表示態様を経過時間に応じて変化させて、前記表示部に表示させる。 The management system 1 further includes an output device 105. In the notification process (S55), the processor 101 changes the display mode of the mesh according to the elapsed time and displays it on the display unit.

メッシュの色及び模様を用いて報知が実行されるため、ユーザは容易に、作業の緊急性や作業の優先順位を認識できる。 Notifications are made using the color and pattern of the mesh, so users can easily recognize the urgency and priority of the work.

本実施形態において、プロセッサ101は、取得処理において、バケット20の駆動状態に基づいて、メッシュにコンクリートが打重ねされた時刻を取得する(S23、S24)。 In this embodiment, in the acquisition process, the processor 101 acquires the time when concrete was poured onto the mesh based on the drive state of the bucket 20 (S23, S24).

本実施形態において、プロセッサ101は、計時処理において、バイブレータ40の状態に基づいて、締固め完了時刻を計測する(S34、S35)。 In this embodiment, in the timing process, the processor 101 measures the compaction completion time based on the state of the vibrator 40 (S34, S35).

本実施形態において、バケット20またはバイブレータ40の状態から、作業状態が自動的に取得されるため、ユーザは容易に作業状態を把握し、施工管理を行うことができる。 In this embodiment, the work status is automatically obtained from the state of the bucket 20 or vibrator 40, allowing the user to easily understand the work status and manage construction.

以上、本発明を実施するための形態について説明したが、上記実施形態は本発明の理解を容易にするためのものであり、本発明を限定して解釈するためのものではない。また、本発明はその趣旨を逸脱することなく変更、改良され得るとともに、本発明にはその等価物も含まれる。 The above describes the form for carrying out the present invention, but the above embodiment is intended to facilitate understanding of the present invention and is not intended to limit the interpretation of the present invention. Furthermore, the present invention may be modified or improved without departing from its spirit, and equivalents are also included in the present invention.

上記実施形態において、技術上の定義に基づき、打重ね時間を下層メッシュの締固め完了時刻から、上層メッシュの荷卸時刻としていた。しかし本発明では管理上、さらに厳しい設定とすることも可能である。具体的には、管理システム1において、打重ね時間を下層メッシュの締固め完了時刻から、上層メッシュの締固め完了時刻までと設定することも可能である。管理システム1は、上層メッシュにおける締固め完了時刻を打重ね時刻として管理する。 In the above embodiment, based on the technical definition, the pouring time was set from the compaction completion time of the lower mesh to the unloading time of the upper mesh. However, in the present invention, it is possible to set it even stricter from the viewpoint of management. Specifically, in the management system 1, it is also possible to set the pouring time from the compaction completion time of the lower mesh to the compaction completion time of the upper mesh. The management system 1 manages the compaction completion time of the upper mesh as the pouring time.

上記のような管理を実施した場合、打重ねの制限時間は、締固めの作業時間分だけ実質的に短くなる。そのため、より保守的な打重ねの時間管理を行うことが可能となる。 When the above-mentioned management is implemented, the time limit for pouring is effectively shortened by the amount of time required for compaction work. This makes it possible to carry out more conservative time management for pouring.

1 管理システム
10 管理装置
20 バケット
30 ユーザ装置
40 バイブレータ
50 バッチャープラント
1 Management system 10 Management device 20 Bucket 30 User device 40 Vibrator 50 Batcher plant

Claims (6)

1以上のコンクリートの打設区画の情報を記憶する記憶部、及び制御部を備え、
前記制御部は、
前記打設区画におけるコンクリートの締固めの完了時刻を計測する計時処理と、
前記打設区画に対するコンクリートの打重ね時刻を、コンクリートの打設装置の駆動状態に基づいて取得する取得処理と、
前記締固め完了時刻から前記打重ね時刻までの時間を、前記打設区画の打重ね時間として算出する処理と、を実行する打設管理システム。
A memory unit that stores information on one or more concrete pouring sections, and a control unit;
The control unit is
A timing process for measuring the completion time of compaction of concrete in the casting section;
An acquisition process for acquiring a concrete pouring time for the pouring section based on a driving state of a concrete pouring device ;
A concrete pouring management system that executes a process of calculating the time from the compaction completion time to the pouring time as the pouring time of the concrete pouring section.
前記制御部は、
前記完了時刻からの経過時間を報知する報知処理をさらに実行する、請求項1に記載の打設管理システム。
The control unit is
The concrete pouring management system according to claim 1 , further comprising a notification process for notifying an elapsed time from the completion time.
出力部をさらに備え、
前記制御部は、前記報知処理において、
前記打設区画の表示態様を前記経過時間に応じて変化させて、前記出力部に表示させる、請求項2に記載の打設管理システム。
An output unit is further provided,
The control unit, in the notification process,
A concrete pouring management system as described in claim 2, wherein the display mode of the concrete pouring section is changed according to the elapsed time and displayed on the output unit.
前記制御部は、前記計時処理において、
締固め装置の作業状態に基づいて前記完了時刻を計測する、請求項1から3のいずれか1項に記載の打設管理システム。
The control unit, in the timekeeping process,
A concrete pouring management system according to any one of claims 1 to 3 , wherein the completion time is measured based on the working status of a compaction device.
1以上のコンクリートの打設区画の情報を記憶する記憶部を備えたコンピュータに対して、
前記打設区画におけるコンクリートの締固めの完了時刻を計測する計時処理と、
前記打設区画に対するコンクリートの打重ね時刻を、コンクリートの打設装置の駆動状態に基づいて取得する処理と、
前記完了時刻から前記打重ね時刻までの時間を、前記打設区画の打重ね時間として算出する処理と、を実行させる打設管理プログラム。
A computer having a memory unit that stores information on one or more concrete pouring sections,
A timing process for measuring the completion time of compaction of concrete in the casting section;
A process of acquiring a concrete pouring time for the pouring section based on a driving state of a concrete pouring device ;
A pouring management program that executes a process of calculating the time from the completion time to the pouring time as the pouring time of the pouring section.
1以上のコンクリートの打設区画の情報を記憶する記憶部を備えたコンピュータに対して、
前記打設区画における前記打設区画におけるコンクリートの締固めの完了時刻を計測する計時処理と、
前記打設区画に対するコンクリートの打重ね時刻を、コンクリートの打設装置の駆動状態に基づいて取得する処理と、
前記完了時刻から前記打重ね時刻までの時間を、前記打設区画の打重ね時間として算出する処理と、を実行させる打設管理方法。
A computer having a memory unit that stores information on one or more concrete pouring sections,
A timing process for measuring the completion time of compaction of concrete in the casting section;
A process of acquiring a concrete pouring time for the pouring section based on a driving state of a concrete pouring device ;
A pouring management method that executes a process of calculating the time from the completion time to the pouring time as the pouring time for the pouring section.
JP2020132208A 2020-08-04 2020-08-04 Pouring management system, program or method Active JP7516964B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020132208A JP7516964B2 (en) 2020-08-04 2020-08-04 Pouring management system, program or method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020132208A JP7516964B2 (en) 2020-08-04 2020-08-04 Pouring management system, program or method

Publications (2)

Publication Number Publication Date
JP2022029084A JP2022029084A (en) 2022-02-17
JP7516964B2 true JP7516964B2 (en) 2024-07-17

Family

ID=80271457

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020132208A Active JP7516964B2 (en) 2020-08-04 2020-08-04 Pouring management system, program or method

Country Status (1)

Country Link
JP (1) JP7516964B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2024064817A (en) * 2022-10-28 2024-05-14 株式会社奥村組 data structure
JP7685472B2 (en) * 2022-10-28 2025-05-29 株式会社奥村組 Concrete pouring management system
JP2024066559A (en) * 2022-11-02 2024-05-16 西松建設株式会社 Green cutting device, work system and program
JP2025007267A (en) * 2023-06-30 2025-01-17 東急建設株式会社 Concrete pouring management support device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005234664A (en) 2004-02-17 2005-09-02 Takenaka Komuten Co Ltd Concrete work management support apparatus, concrete work management support system, concrete work management support method and concrete work management support program
JP2018035626A (en) 2016-09-01 2018-03-08 株式会社大林組 Placement management system, placement management method, and placement management program
JP2018159245A (en) 2017-03-23 2018-10-11 株式会社熊谷組 Management method of concrete placement

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005234664A (en) 2004-02-17 2005-09-02 Takenaka Komuten Co Ltd Concrete work management support apparatus, concrete work management support system, concrete work management support method and concrete work management support program
JP2018035626A (en) 2016-09-01 2018-03-08 株式会社大林組 Placement management system, placement management method, and placement management program
JP2018159245A (en) 2017-03-23 2018-10-11 株式会社熊谷組 Management method of concrete placement

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
猪俣 日向,外3名,「ICTを活用したコンクリート締固め管理システムのケーソン製作工事での現場活用」,令和2年度土木学会全国大会第75回年次学術講演会講演概要集,土木学会,2020年08月01日,VI-813
石川 麻衣,外4名,「現場打ちコンクリートの新しい打重ね時間管理システム」,[online],2018年,[2024年4月4日検索],<http://library.jsce.or.jp/jsce/open/00035/2018/73-06/73-06-0648.pdf>
秋山 哲治,「締固め作業を可視化する施工管理技術「コンクリートAI締固め管理システム」」,[online],2023年11月20日,[2024年4月4日検索],<https://www.cgr.mlit.go.jp/ctc/pdf-document-years/2023/yamaguchi_06.pdf>

Also Published As

Publication number Publication date
JP2022029084A (en) 2022-02-17

Similar Documents

Publication Publication Date Title
JP7516964B2 (en) Pouring management system, program or method
CN102968680B (en) Remote progressing asset microfluid analysis
US9298803B2 (en) System and method for asset management
US9753970B2 (en) Limiting access to asset management information
US9928477B2 (en) Externally augmented asset management
CN105229678B (en) Process modeling and interface
US9111234B2 (en) Enabling notifications pertaining to an asset
US9519876B2 (en) Method for providing maintenance to an asset
US8965841B2 (en) Method for automatic asset classification
US9041561B2 (en) Method for controlling power usage of a reporting device
US8255358B2 (en) System and method for providing asset management information to a customer
US7898403B2 (en) Detecting construction equipment process failure
US20080086391A1 (en) Impromptu asset tracking
JP4486375B2 (en) Concrete construction management support device, concrete construction management support system, and concrete construction management support program
KR101675034B1 (en) Method, appratus and computer-readable recording medium for supporting real-time construction supervision
US11961051B1 (en) Integrated system for producing procedural data change sets communicated to client devices
CN115147062B (en) Railway Engineering Management Methods and Systems
CN114077946A (en) Site survey monitoring system and method
JP2018072980A (en) Information service system, information service system control method and program
JP2022135523A (en) Embankment construction management support system
JP5103456B2 (en) Block arrangement support system and program for block arrangement support system
JP2025044507A (en) Construction management system, construction management method, and construction management program
US20170108875A1 (en) Vehicle Control System
JPH11188583A (en) Lot number display device, lot number display method, and storage medium
JP7580097B1 (en) Method, program and information processing system for providing information associated with a geographic region

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230720

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240326

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240416

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240513

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240604

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240617

R150 Certificate of patent or registration of utility model

Ref document number: 7516964

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150