JP7517178B2 - Building - Google Patents
Building Download PDFInfo
- Publication number
- JP7517178B2 JP7517178B2 JP2021013173A JP2021013173A JP7517178B2 JP 7517178 B2 JP7517178 B2 JP 7517178B2 JP 2021013173 A JP2021013173 A JP 2021013173A JP 2021013173 A JP2021013173 A JP 2021013173A JP 7517178 B2 JP7517178 B2 JP 7517178B2
- Authority
- JP
- Japan
- Prior art keywords
- airtight
- insulating material
- airtight member
- building
- gap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Building Environments (AREA)
Description
本発明は、建築物に関する。 The present invention relates to buildings.
従来、壁部材と、壁部材との間に隙間が形成された状態で壁部材の上に設けられた梁と、を備え、気密部材によって壁部材および当該隙間における気密を図る建築物がある(例えば特許文献1)。 Conventionally, there is a building that includes a wall member and a beam that is provided on the wall member with a gap formed between the wall member and the beam, and that uses an airtight member to ensure airtightness between the wall member and the gap (for example, Patent Document 1).
具体的に、当該建築物の壁部材は第1気密部材と、第1気密部材の室外側に設けられた第1断熱材と、を有する。また、当該建築物は、隙間を塞ぐように側面視で梁から壁部材に亘って設けられているとともに、第1気密部材に接続された第2気密部材と、側面視において隙間と重なる位置において第2気密部材の室内側または室外側に設けられた第2断熱材と、を有する。これら第1気密部材および第2気密部材によって壁部材および隙間における気密が図られている。 Specifically, the wall member of the building has a first airtight member and a first insulating material provided on the outdoor side of the first airtight member. The building also has a second airtight member that is provided from the beam to the wall member in a side view to close the gap, and is connected to the first airtight member, and a second insulating material that is provided on the indoor side or outdoor side of the second airtight member at a position that overlaps with the gap in a side view. The first airtight member and the second airtight member ensure airtightness in the wall member and the gap.
しかし、特許文献1に記載の建築物では、壁部材に設けられた第1気密部材が室内の温度環境に置かれている。そのため、夏季において室内側の冷房によって冷却された第1気密部材の室外側の面で、外部から壁部材に侵入した湿度の高い空気が冷却され、壁部材において結露が生じるおそれがある。また、建築物では、壁部材だけでなく、壁部材と梁との隙間においても結露の防止が求められている。 However, in the building described in Patent Document 1, the first airtight member provided in the wall member is placed in an indoor temperature environment. Therefore, in summer, the humid air that has entered the wall member from the outside is cooled on the outdoor surface of the first airtight member that is cooled by indoor air conditioning, and there is a risk of condensation forming in the wall member. Furthermore, in buildings, it is necessary to prevent condensation not only in the wall members, but also in the gaps between the wall members and the beams.
本発明は、このような問題に鑑みてなされたものであり、壁部材および壁部材と梁との間の隙間における結露の発生を抑制することができる建築物を提供することを目的とする。 The present invention was made in consideration of these problems, and aims to provide a building that can suppress the occurrence of condensation in wall members and in gaps between wall members and beams.
本発明者らは、種々検討した結果、上記目的は、以下の発明により達成されることを見出した。 After extensive investigation, the inventors have discovered that the above object can be achieved by the following invention.
本発明の一局面に係る建築物は、第1気密部材と、前記第1気密部材の室内側に設けられた第1断熱材と、前記第1断熱材の室内側に設けられた第2気密部材と、前記第1気密部材の室外側に設けられた第2断熱材と、を有する壁部材と、前記壁部材との間に隙間が形成された状態で前記壁部材の上に設けられた梁と、前記隙間を塞ぐように側面視で前記梁から前記壁部材に亘って設けられているとともに前記第1気密部材に対して気密を確保した状態で接続された第3気密部材と、側面視において前記隙間と重なる位置において前記第3気密部材の室内側に設けられた第3断熱材と、前記第3断熱材の室内側において前記隙間を塞ぐように側面視において前記梁から前記壁部材に亘って設けられているとともに前記第2気密部材に対して気密を確保した状態で接続された第4気密部材と、側面視において前記隙間と重なる位置において前記第3気密部材の室外側に設けられた第4断熱材と、を有する。 The building according to one aspect of the present invention has a wall member having a first airtight member, a first insulating material provided on the indoor side of the first airtight member, a second airtight member provided on the indoor side of the first airtight member, and a second insulating material provided on the outdoor side of the first airtight member, a beam provided on the wall member with a gap formed between the beam and the wall member, a third airtight member provided from the beam to the wall member in a side view so as to close the gap and connected to the first airtight member in a state of ensuring airtightness, a third insulating material provided on the indoor side of the third airtight member at a position overlapping with the gap in a side view, a fourth airtight member provided from the beam to the wall member in a side view so as to close the gap on the indoor side of the third insulating material and connected to the second airtight member in a state of ensuring airtightness, and a fourth insulating material provided on the outdoor side of the third airtight member at a position overlapping with the gap in a side view.
本発明にかかる建築物によれば、壁部材から壁部材と梁との間の隙間(以下単に「隙間」ともいう。)に亘り結露の発生を抑制することができる。具体的に、上記の建築物では、第1気密部材と第3気密部材とが気密を確保した状態で接続され、第2気密部材と第4気密部材とが気密を確保した状態で接続されている。これにより、壁部材から隙間に亘って室外側には第1気密部材と第3気密部材により気密ライン(以下「外側気密ライン」という。)が形成され、室内側には第2気密部材と第4気密部材により別の気密ライン(以下「内側気密ライン」という。)が形成される。これらの2本の気密ラインにより、壁部材および隙間における気密を図ることができる。 According to the building of the present invention, it is possible to suppress the occurrence of condensation from the wall member to the gap between the wall member and the beam (hereinafter simply referred to as the "gap"). Specifically, in the above building, the first airtight member and the third airtight member are connected in a state in which airtightness is ensured, and the second airtight member and the fourth airtight member are connected in a state in which airtightness is ensured. As a result, an airtight line (hereinafter referred to as the "outer airtight line") is formed by the first airtight member and the third airtight member on the outside of the room from the wall member to the gap, and another airtight line (hereinafter referred to as the "inner airtight line") is formed by the second airtight member and the fourth airtight member on the inside of the room. These two airtight lines can ensure airtightness in the wall member and the gap.
この明細書において、二つの部材が「気密を確保した状態で接続される」とは、二つの部材が直接的に接続され且つ気密が確保されている状態、および、二つの部材が別の部材を介して間接的に接続され且つ二つの部材の部材の間での気密が確保されている状態をいう。 In this specification, when two components are "connected in an airtight manner," this refers to a state in which the two components are directly connected and airtightness is ensured, and a state in which the two components are indirectly connected via another component and airtightness is ensured between the two components.
また、外側気密ラインと内側気密ラインとの間には、壁部材および隙間に第1断熱材および第3断熱材(以下「内側断熱材」と総称する。)が設けられており、外側気密ラインの室外側には、壁部材および隙間に第2断熱材および第4断熱材(以下「外側断熱材」と総称する。)が設けられている。 In addition, between the outer airtight line and the inner airtight line, a first insulating material and a third insulating material (hereinafter collectively referred to as "inner insulating materials") are provided in the wall members and gaps, and on the outdoor side of the outer airtight line, a second insulating material and a fourth insulating material (hereinafter collectively referred to as "outer insulating materials") are provided in the wall members and gaps.
そのため、上記の建築物では、夏季には、外側気密ラインによって、湿度の高い外気が外側気密ラインと内側気密ラインとの間の空間に侵入するのを抑制することができ、かつ内側断熱材によって室内側の冷房による外側気密ラインの冷却が抑制される。そのため、夏季において、壁部材から隙間に亘り結露の発生を抑制することができ、結露による内側断熱材の劣化を抑制することができる。 Therefore, in the summer, in the above-mentioned building, the outer airtight line can prevent humid outside air from entering the space between the outer airtight line and the inner airtight line, and the inner insulation prevents the outer airtight line from being cooled by indoor air conditioning. Therefore, in the summer, the occurrence of condensation from the wall member to the gap can be prevented, and deterioration of the inner insulation due to condensation can be prevented.
さらに、冬季には、内側気密ラインによって、室内から湿度の高い空気が内側気密ラインと外側気密ラインとの間の空間に侵入するのを抑制することができ、かつ内側断熱材および外側断熱材によって、低温の外気による内側気密ラインの冷却が抑制される。そのため、冬季において、壁部材から隙間に亘り結露の発生を抑制することができ、かつ結露による内側断熱材および外側断熱材の劣化を抑制することができる。 Furthermore, in winter, the inner airtight line can prevent humid air from entering the space between the inner airtight line and the outer airtight line from inside the room, and the inner and outer insulation materials prevent the inner airtight line from being cooled by the low-temperature outside air. Therefore, in winter, it is possible to prevent condensation from forming in the gaps from the wall members, and to prevent deterioration of the inner and outer insulation materials due to condensation.
また、寒冷地においては、内外気密ライン間に存在している微小の湿度が外気によって冷却されて結露することが問題となるが、上記の建築物では、外側断熱材により外側気密ラインの冷却を抑制することができるため、内外気密ライン間における結露も有効に抑制することができる。 In cold regions, the minute amounts of moisture present between the inside and outside airtight lines can be cooled by the outside air and cause condensation, but in the above-mentioned building, the outside insulation can prevent the outside airtight lines from cooling, so condensation between the inside and outside airtight lines can also be effectively prevented.
上記の建築物において、前記第3気密部材は、前記梁に取り付けられた被取付部と、前記第1気密部材に対して気密を確保した状態で接続された被接続部と、前記被取付部と前記被接続部とを連結する連結部と、を備えていてもよい。 In the above-mentioned building, the third airtight member may include an attachment portion attached to the beam, a connection portion connected to the first airtight member while ensuring airtightness, and a connecting portion connecting the attachment portion and the connection portion.
この態様では、第3気密部材において、被取付部と被接続部とが連結されており、被取付部の下に第3断熱材または第4断熱材を配置するための空間を区画することができる。 In this embodiment, the attachment portion and the connection portion are connected in the third airtight member, and a space can be defined below the attachment portion for placing the third insulating material or the fourth insulating material.
上記の建築物において、前記連結部は、前記被取付部から下に延びる第1延出部と、前記第1延出部の先端部から室内側または室外側に延びるとともに、前記梁の下面と対向する第2延出部と、を有していてもよい。 In the above-mentioned building, the connecting portion may have a first extension portion extending downward from the mounting portion, and a second extension portion extending from the tip of the first extension portion toward the inside or outside of the room and facing the underside of the beam.
この態様では、梁と第2延出部との間に第3断熱材または第4断熱材をはめ込むことにより第3断熱材または第4断熱材を安定して配置することが可能である。 In this embodiment, the third insulating material or the fourth insulating material can be stably positioned by fitting the third insulating material or the fourth insulating material between the beam and the second extension portion.
上記の建築物において、前記被接続部は、前記被取付部および前記連結部と比較して大きな弾性を有する材質により形成されていてもよい。 In the above-mentioned building, the connected portion may be formed from a material having greater elasticity than the attached portion and the connecting portion.
この態様では、梁と壁部材との間の隙間に寸法誤差が生じても、当該寸法誤差を被接続部の弾性変形によって吸収することができるため、第1気密部材に対して第3気密部材をより確実に接続することができる。 In this configuration, even if a dimensional error occurs in the gap between the beam and the wall member, the dimensional error can be absorbed by the elastic deformation of the connected portion, so that the third airtight member can be more reliably connected to the first airtight member.
上記の建築物において、前記梁は、上下方向に対向する一対のフランジと、前記両フランジ同士を内外方向の中間位置で互いに連結するウェブと、を有し、前記建築物は、前記被取付部および前記フランジを挟み込むことにより前記梁に対して前記被取付部を拘束する拘束部材をさらに備えていてもよい。 In the above-mentioned building, the beam has a pair of flanges facing each other in the vertical direction and a web that connects the flanges to each other at a midpoint in the inward and outward directions, and the building may further include a restraining member that restrains the attached portion to the beam by sandwiching the attached portion and the flanges.
この態様では、拘束部材を用いることによって、梁のフランジに対し、第3気密部材の被取付部を容易に取り付けることができる。 In this embodiment, the attachment portion of the third airtight member can be easily attached to the flange of the beam by using the restraining member.
上記の建築物は、前記梁の室内側に設けられた第5断熱材をさらに備えていてもよい。 The above-mentioned building may further include a fifth insulating material provided on the interior side of the beam.
この態様では、夏季において、梁によって、湿度の高い外気が梁の室内側に侵入するのを抑制することができ、かつ第5断熱材によって室内側の冷房による梁の冷却を抑制することができるため、梁の室外側の面における結露の発生を抑制することができる。 In this configuration, in the summer, the beams can prevent humid outside air from entering the interior of the room, and the fifth insulation material can prevent the beams from being cooled by air conditioning on the interior side, thereby preventing condensation from forming on the exterior side of the beams.
上記の建築物は、前記梁により前記梁上に支持された梁上部材をさらに備え、前記第4気密部材は、前記第5断熱材の室内側において前記第5断熱材を覆うとともに、前記梁上部材に接続されていてもよい。 The above-mentioned building may further include a beam member supported on the beam by the beam, and the fourth airtight member may cover the fifth insulating material on the indoor side of the fifth insulating material and be connected to the beam member.
この態様では、冬季において、第4気密部材によって、室内から、梁と第4気密部材との間の空間に湿度の高い空気が侵入するのを抑制し、かつ、第5断熱材により第4気密部材の冷却を抑制することができるため、冬季における第4気密部材での結露の発生および結露による第5断熱材の劣化を抑制することができる。 In this embodiment, in winter, the fourth airtight member prevents humid air from entering the space between the beam and the fourth airtight member from inside the room, and the fifth insulating material prevents the fourth airtight member from cooling, thereby preventing condensation on the fourth airtight member in winter and deterioration of the fifth insulating material due to condensation.
上記の建築物は、前記梁の室外側に設けられた第6断熱材をさらに備えていてもよい。 The above-mentioned building may further include a sixth insulating material provided on the exterior side of the beam.
この態様では、寒冷地においては、梁と第4気密部材との間の空間に存在している微小の湿度が外気によって冷却されて結露することが問題となるが、上記の建築物では、第6断熱材により梁の冷却を抑制することができるため、梁と第4気密部材との間における結露も有効に抑制することができる。 In this embodiment, in cold regions, a problem occurs in that the minute amount of humidity present in the space between the beam and the fourth airtight member is cooled by the outside air and condenses. However, in the above-mentioned building, the sixth insulation material can suppress cooling of the beam, so condensation between the beam and the fourth airtight member can also be effectively suppressed.
本発明によれば、外気に対して室内の気密を図るだけでなく、結露の発生を抑制することができる建築物を提供することができる。 The present invention makes it possible to provide a building that not only keeps the interior airtight from outside air, but also prevents condensation from forming.
以下、本発明の一実施形態に係る建築物について図面に基づいて説明する。 Below, a building according to one embodiment of the present invention is described with reference to the drawings.
(建築物の構成)
図1は、本実施形態に係る建築物の壁部材および梁上部材の周辺の部分断面図であり、図2は、図1のII-II線での断面図である。図3は、第2気密部材の側面図であり、図4は拘束部材の側面図である。建築物1は、柱6と、壁部材10と、梁20と、梁上部材5と、第3気密部材30と、第3断熱材40と、第4気密部材50と、第4断熱材60と、拘束部材70と、第5断熱材81と、第6断熱材82と、野縁3と、天井パネル4と、を有する。
(Building Composition)
Fig. 1 is a partial cross-sectional view of the wall member and the beam member of the building according to the present embodiment, and Fig. 2 is a cross-sectional view taken along line II-II in Fig. 1. Fig. 3 is a side view of the second airtight member, and Fig. 4 is a side view of the restraining member. The building 1 has a column 6, a wall member 10, a beam 20, a beam member 5, a third airtight member 30, a third insulating material 40, a fourth airtight member 50, a fourth insulating material 60, a restraining member 70, a fifth insulating material 81, a sixth insulating material 82, a joist 3, and a ceiling panel 4.
次に、建築物1を構成する各要素について説明する。 Next, we will explain each element that makes up Building 1.
柱6は、水平方向に間隔を空けて複数設けられ(図2では1本のみ示す。)、その上端が梁20の下面よりも下に配置された状態で梁20の下で直立している。柱6は、H型鋼からなり、ウェブが壁部材10と平行に配置されている。 The columns 6 are provided at intervals in the horizontal direction (only one is shown in FIG. 2 ), and stand upright under the beam 20 with their upper ends positioned below the underside of the beam 20. The columns 6 are made of H-shaped steel, and their webs are positioned parallel to the wall member 10.
図1および図2に示すように、壁部材10は、第1気密部材11と、第1気密部材11の室内側に設けられた第1断熱材12と、第1断熱材12の室内側に設けられた第2気密部材13と、第1気密部材11の室外側に設けられた第2断熱材14と、第2気密部材13の室内側に設けられた内壁パネル15と、第1断熱材12の上下面および側面を囲む枠体16と、を有する。 As shown in Figures 1 and 2, the wall member 10 has a first airtight member 11, a first insulating material 12 provided on the indoor side of the first airtight member 11, a second airtight member 13 provided on the indoor side of the first insulating material 12, a second insulating material 14 provided on the outdoor side of the first airtight member 11, an inner wall panel 15 provided on the indoor side of the second airtight member 13, and a frame body 16 that surrounds the top, bottom and side surfaces of the first insulating material 12.
第2断熱材14は、複数の断熱材片からなり、隣接する2本の柱6の間および各柱6の周囲に設けられている。第2断熱材14を構成する断熱材片は、押出発泡ポリスチレン等からなる硬質の断熱材(以下、単に「硬質断熱材」ともいう)である。第2断熱材14を構成する断熱材片は、セルロースファイバー、ロックウール、グラスウール等からなる軟質の繊維系断熱材(以下、単に「軟質断熱材」ともいう。)であってもよい。また、第2断熱材14を構成する断熱材片は、硬質断熱材と軟質断熱材とを組み合わせて使用してもよい。 The second insulation material 14 is made up of a number of insulation pieces, and is provided between two adjacent columns 6 and around each column 6. The insulation pieces constituting the second insulation material 14 are hard insulation materials made of extruded polystyrene foam or the like (hereinafter simply referred to as "hard insulation materials"). The insulation pieces constituting the second insulation material 14 may also be soft fiber-based insulation materials made of cellulose fiber, rock wool, glass wool or the like (hereinafter simply referred to as "soft insulation materials"). The insulation pieces constituting the second insulation material 14 may also be a combination of hard insulation materials and soft insulation materials.
第1気密部材11は、第2断熱材14を内側から覆った状態で枠体16の外面に固定されている。また、第1気密部材11の上端部は、柱6および第2断熱材14の上端部の内側面と枠体16の上部の横材との間に挟まれている。第1気密部材11は樹脂製のシートである。 The first airtight member 11 is fixed to the outer surface of the frame body 16 while covering the second insulating material 14 from the inside. The upper end of the first airtight member 11 is sandwiched between the inner surfaces of the pillars 6 and the upper end of the second insulating material 14 and the cross member at the top of the frame body 16. The first airtight member 11 is a resin sheet.
枠体16は、不図示の固定部材を介して梁20および不図示の床板材に固定されている。具体的に、枠体16は、左右方向に延びるとともに上下方向に対向する一対の横材と、横材の右端部同士および左端部同士を接続するように上下方向に延びるとともに左右方向に対向する一対の縦材と、を有する。 The frame body 16 is fixed to the beams 20 and floorboard material (not shown) via fixing members (not shown). Specifically, the frame body 16 has a pair of horizontal members that extend in the left-right direction and face each other in the up-down direction, and a pair of vertical members that extend in the up-down direction and face each other in the left-right direction so as to connect the right ends and left ends of the horizontal members.
第1断熱材12は、枠体16の内側にはめ込まれている。第1断熱材12は、軟質断熱材である。第1断熱材12は、硬質断熱材であってもよく、硬質断熱材および軟質断熱材の両方を使用してもよい。 The first insulating material 12 is fitted inside the frame body 16. The first insulating material 12 is a soft insulating material. The first insulating material 12 may be a hard insulating material, or both hard and soft insulating materials may be used.
第2気密部材13は、第1断熱材12を内側から覆った状態で枠体16の内面に固定されている。具体的に、第2気密部材13は、枠体16と内壁パネル15との間、枠体16と天井パネル4との間、および、枠体16と野縁3との間に挟まれている。第2気密部材13は、樹脂製のシートである。 The second airtight member 13 is fixed to the inner surface of the frame body 16 while covering the first insulating material 12 from the inside. Specifically, the second airtight member 13 is sandwiched between the frame body 16 and the inner wall panel 15, between the frame body 16 and the ceiling panel 4, and between the frame body 16 and the rafters 3. The second airtight member 13 is a resin sheet.
野縁3は、不図示の野縁受けを介して不図示の梁に固定されている。天井パネル4は、野縁3の下面に釘または木ねじ等の固定部材によって固定されている。天井パネル4は、石膏ボード等の板材である。 The rafters 3 are fixed to beams (not shown) via rafter supports (not shown). The ceiling panels 4 are fixed to the underside of the rafters 3 with fixing members such as nails or wood screws. The ceiling panels 4 are made of a board material such as gypsum board.
内壁パネル15は、天井パネル4の下において枠体16および第1断熱材12との間で第2気密部材13を挟んだ状態で枠体16に固定されている。内壁パネル15は、石膏ボード等の板材である。 The inner wall panel 15 is fixed to the frame 16 under the ceiling panel 4 with the second airtight member 13 sandwiched between the frame 16 and the first insulating material 12. The inner wall panel 15 is a plate material such as gypsum board.
梁20は、壁部材10との間に隙間2が形成された状態で壁部材10の上に設けられている。梁20は、H型鋼からなり、上下方向に対向する一対のフランジ22、23と、両フランジ22、23同士を内外方向の中間位置で互いに連結するウェブ21と、を有する。 The beam 20 is provided on the wall member 10 with a gap 2 formed between the beam 20 and the wall member 10. The beam 20 is made of H-shaped steel and has a pair of flanges 22, 23 that face each other in the vertical direction, and a web 21 that connects the flanges 22, 23 to each other at a midpoint in the inward and outward directions.
梁上部材5は、梁20によって当該梁20上に支持されたものである。梁上部材5としては、例えば、屋根や上層階の床材が挙げられる。本実施形態では、梁上部材5として陸屋根を例示する。具体的に、梁上部材5は、ALC(Autoclaved Lightweight Aerated Concrete;オートクレーブ養生した軽量気泡コンクリート)等からなる板状の部材である。 The beam member 5 is supported by the beam 20 on the beam 20. Examples of the beam member 5 include a roof and flooring for the upper floors. In this embodiment, a flat roof is used as the beam member 5. Specifically, the beam member 5 is a plate-shaped member made of ALC (Autoclaved Lightweight Aerated Concrete) or the like.
第3気密部材30は、隙間2を塞ぐように建築物1の側面視(図1における左右方向から見て)で梁20から壁部材10に亘って設けられているとともに第1気密部材11に対して気密を確保した状態で直接的に接続されている。これにより、第3気密部材30は、第1気密部材11および梁20とともに、外側気密ラインを形成する。 The third airtight member 30 is provided from the beam 20 to the wall member 10 in a side view of the building 1 (viewed from the left and right direction in FIG. 1) so as to close the gap 2, and is directly connected to the first airtight member 11 while ensuring airtightness. As a result, the third airtight member 30, together with the first airtight member 11 and the beam 20, forms an outer airtight line.
第3気密部材30は、図1および図3に示すように、梁20に取り付けられた被取付部31と、第1気密部材11に対して気密を確保した状態で直接的に接続された被接続部32と、被取付部31が被接続部32の室外側に位置するように被取付部31と被接続部32とを連結する連結部33と、被取付部31の上面に設けられた粘着テープ31aと、を備えている。 As shown in Figures 1 and 3, the third airtight member 30 comprises an attachment portion 31 attached to the beam 20, a connection portion 32 directly connected to the first airtight member 11 while ensuring airtightness, a connecting portion 33 connecting the attachment portion 31 and the connection portion 32 so that the attachment portion 31 is located on the outdoor side of the connection portion 32, and an adhesive tape 31a provided on the upper surface of the attachment portion 31.
被取付部31は、梁20の下面に沿って延びるとともに梁20の下面に取り付けられている。具体的に、被取付部31は、後述の連結部33から室内側に延びている。本実施形態において、被取付部31は、粘着テープ31aを介して梁20の下面に取り付けられている。 The mounting portion 31 extends along the underside of the beam 20 and is attached to the underside of the beam 20. Specifically, the mounting portion 31 extends from the connecting portion 33 described below toward the inside of the room. In this embodiment, the mounting portion 31 is attached to the underside of the beam 20 via adhesive tape 31a.
連結部33は、被取付部31の外側の端部から下に延びる第1延出部33aと、第1延出部33aの下端部から室内側に延びるとともに、梁20の下側のフランジ22の下面と対向する第2延出部33bと、を有する。このような構成を有することにより、梁20と壁部材10との間の隙間2は、第3断熱材40をはめ込むために内側に開く空間と、第4断熱材60を設けるための第1延出部33aの外側の空間と、に区画されている。なお、本実施形態に係る建築物1において、第1延出部33aは、梁20のウェブ21の真下の位置でウェブ21と平行に配置されている。 The connecting portion 33 has a first extension portion 33a extending downward from the outer end of the mounting portion 31, and a second extension portion 33b extending from the lower end of the first extension portion 33a toward the interior of the room and facing the lower surface of the flange 22 on the lower side of the beam 20. With this configuration, the gap 2 between the beam 20 and the wall member 10 is divided into a space that opens inward to fit the third insulating material 40, and a space outside the first extension portion 33a to provide the fourth insulating material 60. In the building 1 according to this embodiment, the first extension portion 33a is disposed directly below the web 21 of the beam 20 and parallel to the web 21.
被接続部32は、第2断熱材14および柱6と枠体16の上部の横材との間に挟まれた第1気密部材11の上端部に対して上から密着している。また、被接続部32は、被取付部31および連結部33と比較して大きな弾性を有する材質により形成されている。具体的に、被取付部31および連結部33は成形された鉄板からなり、被接続部32は、当該鉄板よりも大きな弾性を有する発泡樹脂により形成されている。 The connected portion 32 is in close contact from above with the upper end of the first airtight member 11, which is sandwiched between the second insulating material 14 and the column 6 and the upper cross member of the frame body 16. The connected portion 32 is formed from a material that has greater elasticity than the attached portion 31 and the connecting portion 33. Specifically, the attached portion 31 and the connecting portion 33 are made of a molded iron plate, and the connected portion 32 is formed from a foamed resin that has greater elasticity than the iron plate.
拘束部材70は、第3気密部材30の被取付部31および梁20の下側のフランジ22におけるウェブ21の室内側に延びる部分22aを挟み込むことにより梁20に対して被取付部31を拘束する。拘束部材70は、梁20および被取付部31の長手方向(水平方向)の複数箇所に設けられている。 The restraining member 70 restrains the attachment portion 31 to the beam 20 by clamping the attachment portion 31 of the third airtight member 30 and the portion 22a of the lower flange 22 of the beam 20 that extends toward the room side of the web 21. The restraining member 70 is provided at multiple points in the longitudinal direction (horizontal direction) of the beam 20 and the attachment portion 31.
拘束部材70は、図4に示すように、第3気密部材30の被取付部31に対向する下側部71と、フランジ22の室内側に延びる部分22aの上面に対向する上側部72と、下側部71と上側部72との間の距離がフランジ22と被取付部31との合計厚み寸法よりも小さくなるように下側部71と上側部72とを連結する連結部73と、を有する。本実施形態の拘束部材70は、成形された金属板からなる。 As shown in FIG. 4, the restraining member 70 has a lower portion 71 that faces the attachment portion 31 of the third airtight member 30, an upper portion 72 that faces the upper surface of the portion 22a of the flange 22 that extends toward the indoor side, and a connecting portion 73 that connects the lower portion 71 and the upper portion 72 so that the distance between the lower portion 71 and the upper portion 72 is smaller than the total thickness dimension of the flange 22 and the attachment portion 31. The restraining member 70 of this embodiment is made of a formed metal plate.
下側部71は、連結部73の下端から垂直に延びる垂直部71aと、連結部73から離れるに従って上側部72から離れる方向に垂直部71aの先端部から延びる誘い込み部71bと、を有する。上側部72は、連結部73から離れるに従い下側部71に近づく方向に向けて連結部73の上端部から延びる近接部72aと、連結部73から離れるに従い下側部71から離れる方向に向けて近接部72aの先端部から延びる誘い込み部72bと、を有する。拘束部材70は、両誘い込み部71b、72bの表面に沿ってフランジ22および被取付部31を下側部71と上側部72との間に案内することができる。また、垂直部71aと近接部72aとの間の距離は、フランジ22と被取付部31との合計厚み寸法よりも小さく設定されている。そのため、上記のようにフランジ22および被取付部31を下側部71と上側部72との間に導くことにより拘束部材70の弾性力によってフランジ22および被取付部31を挟持することができる。 The lower part 71 has a vertical part 71a extending vertically from the lower end of the connecting part 73, and an induction part 71b extending from the tip of the vertical part 71a in a direction away from the upper part 72 as it moves away from the connecting part 73. The upper part 72 has a proximity part 72a extending from the upper end of the connecting part 73 in a direction toward the lower part 71 as it moves away from the connecting part 73, and an induction part 72b extending from the tip of the proximity part 72a in a direction away from the lower part 71 as it moves away from the connecting part 73. The restraining member 70 can guide the flange 22 and the attached part 31 between the lower part 71 and the upper part 72 along the surfaces of both induction parts 71b and 72b. In addition, the distance between the vertical part 71a and the proximity part 72a is set to be smaller than the total thickness dimension of the flange 22 and the attached part 31. Therefore, by guiding the flange 22 and the mounting portion 31 between the lower portion 71 and the upper portion 72 as described above, the flange 22 and the mounting portion 31 can be clamped by the elastic force of the restraining member 70.
第3断熱材40は、建築物1の側面視において、隙間2と重なる位置において第3気密部材30の室内側に設けられている。具体的に、第3断熱材40は、第3気密部材30の被取付部31およびフランジ22と第2延出部33bとの間にはめ込まれている。第3断熱材40は、第2断熱材14と同様に、硬質断熱材からなる。第3断熱材40は、軟質断熱材であってもよく、また、断熱性能を有する耐火被覆材であってもよい。また、第3断熱材40は、硬質断熱材、軟質断熱材および耐火被覆材の2つ以上を使用してもよい。 The third insulating material 40 is provided on the indoor side of the third airtight member 30 at a position overlapping the gap 2 in a side view of the building 1. Specifically, the third insulating material 40 is fitted between the mounting portion 31 and the flange 22 of the third airtight member 30 and the second extension portion 33b. The third insulating material 40 is made of a hard insulating material, similar to the second insulating material 14. The third insulating material 40 may be a soft insulating material, or may be a fire-resistant coating material having insulating properties. The third insulating material 40 may also use two or more of a hard insulating material, a soft insulating material, and a fire-resistant coating material.
第4気密部材50は、第3断熱材40の室内側において隙間2を塞ぐように建築物1の側面視において梁20から壁部材10に亘って設けられているとともに第2気密部材13に対して気密を確保した状態で直接的に接続されている。これにより、第4気密部材50は、第2気密部材13とともに、内側気密ラインを形成する。さらに、第4気密部材50は、後述する第5断熱材81の室内側において第5断熱材81を覆うとともに、梁上部材5に接続されている。第4気密部材50は、板状の防湿部材からなるものであってもよく、シート状の防湿部材からなるものであってもよい。さらに、第4気密部材50は、吹き付けによって形成された発泡ウレタンからなるものであってもよい。 The fourth airtight member 50 is provided from the beam 20 to the wall member 10 in a side view of the building 1 so as to close the gap 2 on the indoor side of the third insulating material 40, and is directly connected to the second airtight member 13 while ensuring airtightness. As a result, the fourth airtight member 50 forms an inner airtight line together with the second airtight member 13. Furthermore, the fourth airtight member 50 covers the fifth insulating material 81 on the indoor side of the fifth insulating material 81 described later, and is connected to the beam member 5. The fourth airtight member 50 may be made of a plate-shaped moisture-proof member or a sheet-shaped moisture-proof member. Furthermore, the fourth airtight member 50 may be made of urethane foam formed by spraying.
第4断熱材60は、建築物1の側面視において隙間2と重なる位置において第3気密部材30の室外側に設けられている。具体的に、第4断熱材60は、第3気密部材30の第1延出部33aの室外側において、梁20の下面と第2断熱材14の上面とをつなぐように配置されている。第4断熱材60は、第2断熱材14と同様に、硬質断熱材からなる。第4断熱材60は、軟質断熱材であってもよく、また、断熱性能を有する耐火被覆材であってもよい。さらに、硬質断熱材、軟質断熱材および耐火被覆材の2つ以上を使用してもよい。 The fourth insulating material 60 is provided on the outdoor side of the third airtight member 30 at a position overlapping with the gap 2 in a side view of the building 1. Specifically, the fourth insulating material 60 is arranged on the outdoor side of the first extension portion 33a of the third airtight member 30 so as to connect the lower surface of the beam 20 and the upper surface of the second insulating material 14. The fourth insulating material 60 is made of a hard insulating material, like the second insulating material 14. The fourth insulating material 60 may be a soft insulating material, or may be a fire-resistant coating material with insulating properties. Furthermore, two or more of the hard insulating material, the soft insulating material, and the fire-resistant coating material may be used.
第5断熱材81は、梁20の室内側に設けられている。具体的に、第5断熱材81は、第4気密部材50と梁20と梁上部材5と第3断熱材40とによって囲まれた空間に配置されている。 The fifth insulating material 81 is provided on the indoor side of the beam 20. Specifically, the fifth insulating material 81 is disposed in a space surrounded by the fourth airtight member 50, the beam 20, the beam member 5, and the third insulating material 40.
第6断熱材82は、梁20の室外側に設けられている。具体的に、第6断熱材82は、梁20のウェブ21の室外側に配置されている。 The sixth insulation material 82 is provided on the outdoor side of the beam 20. Specifically, the sixth insulation material 82 is disposed on the outdoor side of the web 21 of the beam 20.
第5断熱材81および第6断熱材82は、第1断熱材12と同様に、軟質断熱材からなる。第5断熱材81および第6断熱材82は、硬質断熱材であってもよく、また、断熱性能を有する耐火被覆材であってもよい。さらに、硬質断熱材、軟質断熱材および耐火被覆材の2つ以上を使用してもよい。 The fifth insulating material 81 and the sixth insulating material 82 are made of soft insulating materials, similar to the first insulating material 12. The fifth insulating material 81 and the sixth insulating material 82 may be hard insulating materials or may be fire-resistant coating materials with thermal insulation properties. Furthermore, two or more of hard insulating materials, soft insulating materials, and fire-resistant coating materials may be used.
(作用、効果)
本実施形態に係る建築物1では、壁部材10から隙間2に亘り結露の発生を抑制することができる。具体的に、建築物1では、第1気密部材11と第3気密部材30と梁20とが気密を確保した状態で直接的に接続され、第2気密部材13と第4気密部材50とが気密を確保した状態で直接的に接続されている。これにより、壁部材10から隙間2に亘って室外側には第1気密部材11と第3気密部材30と梁20により外側気密ラインが形成され、室内側には第2気密部材13と第4気密部材50により内側気密ラインが形成される。これらの2本の気密ラインにより、壁部材10および隙間2における気密を図ることができる。
(Action, Effect)
In the building 1 according to this embodiment, the occurrence of condensation can be suppressed from the wall member 10 to the gap 2. Specifically, in the building 1, the first airtight member 11, the third airtight member 30, and the beam 20 are directly connected in a state in which airtightness is ensured, and the second airtight member 13 and the fourth airtight member 50 are directly connected in a state in which airtightness is ensured. As a result, an outer airtight line is formed on the outdoor side from the wall member 10 to the gap 2 by the first airtight member 11, the third airtight member 30, and the beam 20, and an inner airtight line is formed on the indoor side by the second airtight member 13 and the fourth airtight member 50. These two airtight lines can ensure airtightness in the wall member 10 and the gap 2.
また、外側気密ラインと内側気密ラインとの間には、壁部材10および隙間2に第1断熱材12および第3断熱材40(以下「内側断熱材」と総称する。)が設けられており、外側気密ラインの室外側には、壁部材10および隙間2に第2断熱材14および第4断熱材60(以下「外側断熱材」と総称する。)が設けられている。 In addition, between the outer airtight line and the inner airtight line, a first insulating material 12 and a third insulating material 40 (hereinafter collectively referred to as "inner insulating materials") are provided in the wall member 10 and the gap 2, and on the outdoor side of the outer airtight line, a second insulating material 14 and a fourth insulating material 60 (hereinafter collectively referred to as "outer insulating materials") are provided in the wall member 10 and the gap 2.
そのため、建築物1では、夏季には、外側気密ラインによって、湿度の高い外気が外側気密ラインと内側気密ラインとの間の空間に侵入するのを抑制することができ、かつ内側断熱材によって室内側の冷房による外側気密ラインの冷却が抑制される。そのため、夏季において、壁部材10から隙間2に亘り結露の発生を抑制することができ、結露による内側断熱材の劣化を抑制することができる。 Therefore, in the summer, in the building 1, the outer airtight line can prevent humid outside air from entering the space between the outer airtight line and the inner airtight line, and the inner insulation can prevent the outer airtight line from being cooled by indoor air conditioning. Therefore, in the summer, the occurrence of condensation from the wall member 10 to the gap 2 can be prevented, and deterioration of the inner insulation due to condensation can be prevented.
さらに、冬季には、内側気密ラインによって、室内から湿度の高い空気が内側気密ラインと外側気密ラインとの間の空間に侵入するのを抑制することができ、かつ内側断熱材および外側断熱材によって、低温の外気による内側気密ラインの冷却が抑制される。そのため、冬季において、壁部材10から隙間2に亘り結露の発生を抑制することができ、かつ結露による内側断熱材および外側断熱材の劣化を抑制することができる。 Furthermore, in winter, the inner airtight line can prevent humid air from entering the space between the inner airtight line and the outer airtight line from inside the room, and the inner and outer insulation materials prevent the inner airtight line from being cooled by the low-temperature outside air. Therefore, in winter, the occurrence of condensation from the wall member 10 to the gap 2 can be prevented, and deterioration of the inner and outer insulation materials due to condensation can be prevented.
また、寒冷地においては、内外気密ライン間に存在している微小の湿度が外気によって冷却されて結露することが問題となるが、建築物1では、外側断熱材により外側気密ラインの冷却を抑制することができるため、内外気密ライン間における結露も有効に抑制することができる。 In addition, in cold regions, the minute amounts of humidity present between the inside and outside airtight lines can be cooled by the outside air and cause condensation, but in Building 1, the outside insulation material can prevent the outside airtight lines from cooling, so condensation between the inside and outside airtight lines can also be effectively prevented.
建築物1では、第3気密部材30において、被取付部31が被接続部32の室外側に位置するように被取付部31と被接続部32とが連結されており、被取付部31の下の室内側に第3断熱材40を配置するための空間を区画することができる。そのため、第3気密部材30が第1気密部材11の上に垂直に延びる場合と比較して、第3断熱材40が室内の空間に与える影響を抑えた状態で第3断熱材40を配置することができる。 In the building 1, the third airtight member 30 is connected to the attachment portion 31 and the connection portion 32 such that the attachment portion 31 is located on the outdoor side of the connection portion 32, and a space can be defined on the indoor side below the attachment portion 31 for placing the third insulating material 40. Therefore, compared to when the third airtight member 30 extends vertically above the first airtight member 11, the third insulating material 40 can be placed with reduced impact on the indoor space.
建築物1では、第3気密部材30の連結部33は、被取付部31から下に延びる第1延出部33aと、第1延出部33aの先端部から室内側に延びるとともに梁20の下面と対向する第2延出部33bとを有する。そのため、梁20と第2延出部33bとの間に第3断熱材40をはめ込むことにより第3断熱材40を安定して配置することが可能である。 In the building 1, the connecting portion 33 of the third airtight member 30 has a first extending portion 33a extending downward from the mounting portion 31, and a second extending portion 33b extending from the tip of the first extending portion 33a toward the interior of the room and facing the underside of the beam 20. Therefore, the third insulating material 40 can be stably positioned by fitting the third insulating material 40 between the beam 20 and the second extending portion 33b.
建築物1では、第3気密部材30の被接続部32は、被取付部31および連結部33と比較して大きな弾性を有する材質により形成されている。そのため、梁20と壁部材10との間の隙間2に寸法誤差が生じても、当該寸法誤差を被接続部32の弾性変形によって吸収することができるため、第1気密部材11に対して第3気密部材30をより確実に接続することができる。 In the building 1, the connected portion 32 of the third airtight member 30 is formed from a material that has greater elasticity than the attached portion 31 and the connecting portion 33. Therefore, even if a dimensional error occurs in the gap 2 between the beam 20 and the wall member 10, the dimensional error can be absorbed by the elastic deformation of the connected portion 32, so that the third airtight member 30 can be more reliably connected to the first airtight member 11.
建築物1では、拘束部材70を用いることによって、梁20のフランジ22におけるウェブ21の室内側に延びる部分22aに対し、室内側から第3気密部材30の被取付部31を容易に取り付けることができる。 In the building 1, the use of the restraining member 70 makes it easy to attach the mounting portion 31 of the third airtight member 30 from the indoor side to the portion 22a of the web 21 of the flange 22 of the beam 20 that extends indoors.
建築物1では、夏季において、梁20によって、湿度の高い外気が梁20の室内側に侵入するのを抑制することができ、かつ第5断熱材81によって室内側の冷房による梁20の冷却を抑制することができるため、梁20の室外側の面における結露の発生を抑制することができる。 In the building 1, in the summer, the beams 20 can prevent humid outside air from entering the interior side of the beams 20, and the fifth insulation material 81 can prevent the beams 20 from being cooled by air conditioning on the interior side, thereby preventing condensation from forming on the exterior side of the beams 20.
また、冬季において、第4気密部材50によって、室内から、梁20と第4気密部材50との間の空間に湿度の高い空気が侵入するのを抑制し、かつ、第5断熱材81により第4気密部材50の冷却を抑制することができるため、冬季における第4気密部材50での結露の発生および結露による第5断熱材81の劣化を抑制することができる。 In addition, in winter, the fourth airtight member 50 prevents humid air from entering the space between the beam 20 and the fourth airtight member 50 from inside the room, and the fifth insulating material 81 prevents the fourth airtight member 50 from cooling, thereby preventing condensation on the fourth airtight member 50 and deterioration of the fifth insulating material 81 due to condensation in winter.
さらに、寒冷地においては、梁20と第4気密部材50との間の空間に存在している湿度が外気によって冷却されて結露することが問題となるが、建築物1では、第6断熱材82により梁20の冷却を抑制することができるため、梁20と第4気密部材50との間における結露も有効に抑制することができる。 Furthermore, in cold regions, the humidity in the space between the beam 20 and the fourth airtight member 50 can be cooled by the outside air, causing condensation, but in the building 1, the sixth insulation material 82 can suppress the cooling of the beam 20, so condensation between the beam 20 and the fourth airtight member 50 can also be effectively suppressed.
(変型例)
本実施形態に係る建築物1では、第3気密部材30の第1延出部33aは、梁20のウェブ21の真下に位置するように配置される場合について説明したが、第1延出部33aの位置はこれに限られず、ウェブ21の室内側または室外側に位置してもよく、フランジ22の室外側に位置してもよい。
(Example of variation)
In the building 1 of this embodiment, the first extension portion 33a of the third airtight member 30 is described as being positioned directly below the web 21 of the beam 20, but the position of the first extension portion 33a is not limited to this and may be positioned on the indoor side or outdoor side of the web 21, or on the outdoor side of the flange 22.
また、第1気密部材11と第3気密部材30の被接続部32、および第2気密部材13と第4気密部材50が、それぞれ気密を確保した状態で直接的に接続される場合について説明したが、これらは気密を確保した状態で間接的に接続されてもよい。 In addition, although the above description has been given of the case where the connected portions 32 of the first airtight member 11 and the third airtight member 30, and the second airtight member 13 and the fourth airtight member 50 are directly connected while maintaining airtightness, they may also be indirectly connected while maintaining airtightness.
例えば、第3気密部材30の被接続部32は、第1気密部材11に直接的に接続されず、枠体16の上部の横材に接続されるものとしてもよい。この場合、枠体16は、木材等、気密性、防湿性を有する素材からなるため、被接続部32は、枠体16を介して、第1気密部材11に対して気密を確保した状態で間接的に接続される。 For example, the connected portion 32 of the third airtight member 30 may not be directly connected to the first airtight member 11, but may be connected to a cross member at the top of the frame body 16. In this case, since the frame body 16 is made of a material that is airtight and moisture-proof, such as wood, the connected portion 32 is indirectly connected to the first airtight member 11 via the frame body 16 while ensuring airtightness.
さらに、例えば、第4気密部材50は、第2気密部材13に直接的に接続されず、枠体16の上部の横材に接続されるものとしてもよい。この場合、第4気密部材50は、枠体16を介して、第2気密部材13に対して気密を確保した状態で間接的に接続される。 Furthermore, for example, the fourth airtight member 50 may not be directly connected to the second airtight member 13, but may be connected to a cross member at the top of the frame body 16. In this case, the fourth airtight member 50 is indirectly connected to the second airtight member 13 via the frame body 16 while ensuring airtightness.
また、壁部材10の仕様に応じて変化する第1気密部材11の位置に応じて、第3気密部材30の形状を適宜変更することができる。具体的に、第3気密部材30は、図5(a)~(c)に示す変型例に係る態様、形状を有していてもよい。 The shape of the third airtight member 30 can be changed as appropriate according to the position of the first airtight member 11, which changes according to the specifications of the wall member 10. Specifically, the third airtight member 30 may have the configurations and shapes according to the modified examples shown in Figures 5(a) to (c).
図5(a)に示す第1の変型例に係る第3気密部材310は、梁20に取り付けられる被取付部311と、被取付部311に対向するとともに第1気密部材11に対して気密を確保した状態で接続される被接続部312と、被取付部311と被接続部312とを連結する連結部313と、被取付部311の上面に設けられた粘着テープ311aと、を備えている。連結部313は、被取付部311の内側の端部から下に延びる第1延出部313aと、第1延出部33aの下端部から室外側に延びる第2延出部313bと、を有する。第3断熱材40は第1延出部313aの室内側、第4断熱材60は第1延出部313aの室外側に配置される。このとき、第4断熱材60を被取付部311と第2延出部313bとの間にはめ込むことができる。一方、第3気密部材310を図5(a)に示す向きとは内外反対に配置することもできる。 5(a) shows a third airtight member 310 according to a first modified example, which includes a mounting portion 311 attached to the beam 20, a connecting portion 312 facing the mounting portion 311 and connected to the first airtight member 11 while ensuring airtightness, a connecting portion 313 connecting the mounting portion 311 and the connecting portion 312, and an adhesive tape 311a provided on the upper surface of the mounting portion 311. The connecting portion 313 has a first extension portion 313a extending downward from the inner end of the mounting portion 311, and a second extension portion 313b extending from the lower end of the first extension portion 313a to the outside of the room. The third insulating material 40 is disposed on the indoor side of the first extension portion 313a, and the fourth insulating material 60 is disposed on the outdoor side of the first extension portion 313a. At this time, the fourth insulating material 60 can be fitted between the mounting portion 311 and the second extending portion 313b. On the other hand, the third airtight member 310 can also be arranged with the inside and outside facing in the opposite direction to that shown in FIG. 5(a).
図5(b)に示す第2の変型例に係る第3気密部材320は、梁20に取り付けられる被取付部321と、第1気密部材11に対して気密を確保した状態で接続される被接続部322と、被取付部321と被接続部322とを連結する連結部323と、被取付部321の上面に設けられた粘着テープ321aと、を備えている。連結部323は、被取付部321の内側の端部から下に延びる第1延出部323aと、第1延出部33aの下端部から室内側に延びる第2延出部323bと、を有する。第3断熱材40は第1延出部323aの室内側、第4断熱材60は第1延出部323aの室外側に配置される。また、第2延出部323bをフランジ22と対向する位置に配置した場合、第2延出部323bとフランジ22との間に第3断熱材40をはめ込むことができる。 5B shows a third airtight member 320 according to a second modified example, which includes a mounting portion 321 attached to the beam 20, a connecting portion 322 connected to the first airtight member 11 while maintaining airtightness, a connecting portion 323 connecting the mounting portion 321 and the connecting portion 322, and an adhesive tape 321a provided on the upper surface of the mounting portion 321. The connecting portion 323 has a first extension portion 323a extending downward from the inner end of the mounting portion 321, and a second extension portion 323b extending from the lower end of the first extension portion 323a to the indoor side. The third insulating material 40 is disposed on the indoor side of the first extension portion 323a, and the fourth insulating material 60 is disposed on the outdoor side of the first extension portion 323a. Furthermore, when the second extension portion 323b is positioned opposite the flange 22, the third insulating material 40 can be fitted between the second extension portion 323b and the flange 22.
図5(c)に示す第3の変型例に係る第3気密部材330は、梁20に取り付けられる被取付部331と、第1気密部材11に対して気密を確保した状態で接続される被接続部332と、被取付部331と被接続部332とを連結する連結部333と、被取付部331の上面に設けられた粘着テープ331aと、を備えている。連結部333は、被取付部331の外側の端部から下に延びる第1延出部333aと、第1延出部333aの下端部から室外側に延びる第2延出部333bと、を有する。第3断熱材40は第1延出部333aの室内側、第4断熱材60は第1延出部333aの室外側に配置される。第2延出部333bをフランジ22と対向する位置に配置した場合、第2延出部333bとフランジ22との間に第4断熱材60をはめ込むことができる。なお、第3の変型例に係る第3気密部材330は、第2の変型例に係る第3気密部材320を、室内側と室外側を逆にして配置したものである。 5(c) shows a third modified example of a third airtight member 330, which includes a mounting portion 331 attached to the beam 20, a connecting portion 332 connected to the first airtight member 11 while maintaining airtightness, a connecting portion 333 connecting the mounting portion 331 and the connecting portion 332, and an adhesive tape 331a provided on the upper surface of the mounting portion 331. The connecting portion 333 has a first extending portion 333a extending downward from the outer end of the mounting portion 331, and a second extending portion 333b extending from the lower end of the first extending portion 333a to the outside of the room. The third insulating material 40 is disposed on the indoor side of the first extending portion 333a, and the fourth insulating material 60 is disposed on the outdoor side of the first extending portion 333a. When the second extension portion 333b is positioned opposite the flange 22, the fourth insulating material 60 can be fitted between the second extension portion 333b and the flange 22. The third airtight member 330 of the third modified example is the third airtight member 320 of the second modified example, which is arranged with the indoor side and the outdoor side reversed.
拘束部材70を用いて第3気密部材310、320、330を梁20に拘束する場合、第1変型例に係る第3気密部材310および第2変型例に係る第3気密部材320は、室外側から被取付部311、321および梁20の下側のフランジ22におけるウェブ21の室外側に延びる部分を挟み込むことにより梁20に対して被取付部311、321を拘束することができる。第3変型例に係る第3気密部材330は、室内側から被取付部311、321および梁20の下側のフランジ22におけるウェブ21の室内側に延びる部分22aを挟み込むことにより梁20に対して被取付部331を拘束することができる。なお、上述の実施形態を含め、第3気密部材を梁20に取り付ける際に、拘束部材70を使用しなくてもよい。 When the third airtight members 310, 320, 330 are restrained to the beam 20 using the restraining member 70, the third airtight member 310 according to the first variant and the third airtight member 320 according to the second variant can restrain the attached portions 311, 321 to the beam 20 by sandwiching the attached portions 311, 321 and the portion of the web 21 on the lower flange 22 of the beam 20 that extends to the outside of the room from the outside of the room. The third airtight member 330 according to the third variant can restrain the attached portion 331 to the beam 20 by sandwiching the attached portions 311, 321 and the portion 22a of the web 21 on the lower flange 22 of the beam 20 that extends to the inside of the room from the inside of the room. It should be noted that the restraining member 70 does not have to be used when attaching the third airtight member to the beam 20, including the above-mentioned embodiment.
壁部材10と梁20との位置関係や、梁20に対する第3気密部材310、320、330の取付位置によっては、被接続部312、322、332を第1気密部材11に対して直接的に接続するのが困難である場合がある。このような場合であっても、被接続部312、322、332は、第1気密部材11に対して気密状態を確保した状態で間接的に接続することができる。 Depending on the positional relationship between the wall member 10 and the beam 20 and the mounting position of the third airtight members 310, 320, 330 relative to the beam 20, it may be difficult to directly connect the connected parts 312, 322, 332 to the first airtight member 11. Even in such cases, the connected parts 312, 322, 332 can be indirectly connected to the first airtight member 11 while maintaining an airtight state.
例えば、図5(a)、(c)に示すように、第6気密部材18を被接続部312、332と第1気密部材11との間に介在させることにより、被接続部312、332を第1気密部材11に対して気密を確保した状態で間接的に接続することができる。これにより、第1気密部材11と第6気密部材18と第3気密部材310、330とによって外側気密ラインを形成することができる。 For example, as shown in Figures 5(a) and (c), by interposing the sixth airtight member 18 between the connected parts 312, 332 and the first airtight member 11, the connected parts 312, 332 can be indirectly connected to the first airtight member 11 while ensuring airtightness. This allows the first airtight member 11, the sixth airtight member 18, and the third airtight members 310, 330 to form an outer airtight line.
一方、図5(b)に示すように、第3気密部材320の被接続部322が第1気密部材11に対して気密を確保した状態で直接的に接続されている場合には、第6気密部材18を介在させる必要はない。なお、図5(b)では、被取付部321が下側のフランジ22におけるウェブ21の室外側に延びる部分に取り付けられた場合が想定されている。 On the other hand, as shown in FIG. 5(b), when the connected portion 322 of the third airtight member 320 is directly connected to the first airtight member 11 while ensuring airtightness, there is no need to interpose the sixth airtight member 18. Note that FIG. 5(b) assumes that the attached portion 321 is attached to the portion of the lower flange 22 that extends to the outside of the web 21.
第3気密部材30において、被取付部31および連結部33を成形された鉄板からなるものとしたが、例えば樹脂のように柔軟性を有する素材からなるものであってもよい。この場合も、被接続部32は、被取付部31および連結部33と比較して大きな弾性を有することが好ましい。 In the third airtight member 30, the attached portion 31 and the connecting portion 33 are made of molded iron plate, but they may be made of a flexible material such as resin. In this case, too, it is preferable that the connected portion 32 has a greater elasticity than the attached portion 31 and the connecting portion 33.
また、建築物1では、第6断熱材82は設けなくてもよく、建築物1で要求される断熱性能に応じて設ければよい。 Furthermore, the sixth insulation material 82 does not need to be provided in the building 1, and it is sufficient to provide it according to the insulation performance required for the building 1.
1 建築物
2 隙間
5 梁上部材
10 壁部材
11 第1気密部材
12 第1断熱材
13 第2気密部材
14 第2断熱材
20 梁
21 ウェブ
22 下側のフランジ
23 上側のフランジ
30、310、320、330 第3気密部材
31、311、321、331 被取付部
32、312、322、332 被接続部
33、313、323、333 連結部
33a、313a、323a、333a 第1延出部
33b、313b、323b、333b 第2延出部
40 第3断熱材
50 第4気密部材
60 第4断熱材
70 拘束部材
81 第5断熱材
82 第6断熱材
REFERENCE SIGNS LIST 1 Building 2 Gap 5 Beam member 10 Wall member 11 First airtight member 12 First insulating material 13 Second airtight member 14 Second insulating material 20 Beam 21 Web 22 Lower flange 23 Upper flange 30, 310, 320, 330 Third airtight member 31, 311, 321, 331 Attached portion 32, 312, 322, 332 Connected portion 33, 313, 323, 333 Connecting portion 33a, 313a, 323a, 333a First extension portion 33b, 313b, 323b, 333b Second extension portion 40 Third insulating material 50 Fourth airtight member 60 Fourth insulating material 70 Restraint member 81 Fifth insulating material 82 Sixth insulating material
Claims (8)
第1気密部材と、前記第1気密部材の室内側に設けられた第1断熱材と、前記第1断熱材の室内側に設けられた第2気密部材と、前記第1気密部材の室外側に設けられた第2断熱材と、を有する壁部材と、
前記壁部材との間に隙間が形成された状態で前記壁部材の上に設けられた梁と、
前記隙間を塞ぐように側面視で前記梁から前記壁部材に亘って設けられているとともに前記第1気密部材に対して気密を確保した状態で接続された第3気密部材と、
側面視において前記隙間と重なる位置において前記第3気密部材の室内側に設けられた第3断熱材と、
前記第3断熱材の室内側において前記隙間を塞ぐように側面視において前記梁から前記壁部材に亘って設けられているとともに前記第2気密部材に対して気密を確保した状態で接続された第4気密部材と、
側面視において前記隙間と重なる位置において前記第3気密部材の室外側に設けられた第4断熱材と、を有する建築物。 A building,
a wall member including a first airtight member, a first insulating material provided on the indoor side of the first airtight member, a second airtight member provided on the indoor side of the first insulating material, and a second insulating material provided on the outdoor side of the first airtight member;
a beam provided on the wall member with a gap formed between the beam and the wall member;
a third airtight member provided across the beam and the wall member in a side view so as to close the gap and connected to the first airtight member in a state in which airtightness is ensured;
A third insulating material is provided on the indoor side of the third airtight member at a position overlapping with the gap in a side view;
a fourth airtight member provided from the beam to the wall member in a side view so as to close the gap on the indoor side of the third insulating material and connected to the second airtight member in a state in which airtightness is ensured;
A fourth insulating material is provided on the outdoor side of the third airtight member at a position that overlaps with the gap in a side view.
前記建築物は、前記被取付部および前記フランジを挟み込むことにより前記梁に対して前記被取付部を拘束する拘束部材をさらに備えている、請求項2から請求項4のいずれか1項に記載の建築物。 The beam has a pair of flanges facing each other in the vertical direction and a web connecting the flanges to each other at a middle position in the inward/outward direction,
The building according to claim 2 , further comprising a restraining member that restrains the attached portion to the beam by sandwiching the attached portion and the flange.
前記第4気密部材は、前記第5断熱材の室内側において前記第5断熱材を覆うとともに、前記梁上部材に接続されている、請求項6に記載の建築物。 The building further includes a beam member supported on the beam by the beam,
The building according to claim 6 , wherein the fourth airtight member covers the fifth insulation material on the indoor side of the fifth insulation material and is connected to the beam member.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021013173A JP7517178B2 (en) | 2021-01-29 | 2021-01-29 | Building |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021013173A JP7517178B2 (en) | 2021-01-29 | 2021-01-29 | Building |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2022116801A JP2022116801A (en) | 2022-08-10 |
| JP7517178B2 true JP7517178B2 (en) | 2024-07-17 |
Family
ID=82749457
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2021013173A Active JP7517178B2 (en) | 2021-01-29 | 2021-01-29 | Building |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7517178B2 (en) |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000303576A (en) | 1999-04-21 | 2000-10-31 | Matsushita Electric Works Ltd | Moisture condensation proof structure |
| JP2000352130A (en) | 1999-06-14 | 2000-12-19 | Asahi Fiber Glass Co Ltd | Insulation |
| JP2002013220A (en) | 2000-06-30 | 2002-01-18 | Sekisui House Ltd | Airtight structure in the shed |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3609235B2 (en) * | 1997-03-26 | 2005-01-12 | 積水ハウス株式会社 | Thermal insulation construction structure of ramen pillar |
| US6205729B1 (en) * | 1998-11-18 | 2001-03-27 | William H. Porter | Asymmetric structural insulated panel |
-
2021
- 2021-01-29 JP JP2021013173A patent/JP7517178B2/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000303576A (en) | 1999-04-21 | 2000-10-31 | Matsushita Electric Works Ltd | Moisture condensation proof structure |
| JP2000352130A (en) | 1999-06-14 | 2000-12-19 | Asahi Fiber Glass Co Ltd | Insulation |
| JP2002013220A (en) | 2000-06-30 | 2002-01-18 | Sekisui House Ltd | Airtight structure in the shed |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2022116801A (en) | 2022-08-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9909303B2 (en) | Building exterior insulation structure | |
| JP7652213B2 (en) | Buildings | |
| JP7348363B2 (en) | Insulated structures and buildings | |
| JP7517178B2 (en) | Building | |
| JPH10169016A (en) | Building unit connecting structure | |
| JP7602234B1 (en) | Heat insulation material fixing brackets and heat insulation structure of steel frame building | |
| JP7521439B2 (en) | Wall and building equipped with same | |
| JP6778136B2 (en) | Fireproof coating structure of channel steel | |
| JP7115922B2 (en) | Insulated structures and buildings | |
| JP2002155588A (en) | Exterior insulation structure of building | |
| JP7747087B2 (en) | Airtight structure of buildings | |
| JP7517173B2 (en) | Building | |
| JP7743887B2 (en) | Building and method for installing connected airtight members in the building | |
| JP7743886B2 (en) | Heat-insulating and airtight structure and construction method for heat-insulating and airtight structure | |
| JP6403555B2 (en) | Airtight structure of buildings | |
| JP4026180B2 (en) | Support bracket for insulation and surface material in wooden buildings | |
| JP3729671B2 (en) | Insulation structure of ceiling part of frame wall construction method building | |
| JP6491534B2 (en) | Thermal insulation structure of building | |
| JP7823404B2 (en) | building | |
| JP2025118053A (en) | Airtight structure of buildings | |
| JP2024108655A (en) | Roof panel and building equipped with said roof panel | |
| JPH11222968A (en) | Building | |
| JP2025112465A (en) | Airtight component, building using the same, and construction method | |
| JP4121677B2 (en) | Thermal insulation panel and wall structure | |
| JP2025063567A (en) | Insulation structure of steel frame building |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20230825 |
|
| TRDD | Decision of grant or rejection written | ||
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20240529 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20240604 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20240617 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7517178 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |