Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7521261B2 - Lifting support system, lifting support method, and lifting support program - Google Patents
[go: Go Back, main page]

JP7521261B2 - Lifting support system, lifting support method, and lifting support program - Google Patents

Lifting support system, lifting support method, and lifting support program Download PDF

Info

Publication number
JP7521261B2
JP7521261B2 JP2020093367A JP2020093367A JP7521261B2 JP 7521261 B2 JP7521261 B2 JP 7521261B2 JP 2020093367 A JP2020093367 A JP 2020093367A JP 2020093367 A JP2020093367 A JP 2020093367A JP 7521261 B2 JP7521261 B2 JP 7521261B2
Authority
JP
Japan
Prior art keywords
lifting
control unit
lifted object
transport
lifting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020093367A
Other languages
Japanese (ja)
Other versions
JP2021187604A (en
Inventor
大介 笹原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2020093367A priority Critical patent/JP7521261B2/en
Publication of JP2021187604A publication Critical patent/JP2021187604A/en
Application granted granted Critical
Publication of JP7521261B2 publication Critical patent/JP7521261B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control And Safety Of Cranes (AREA)
  • Jib Cranes (AREA)

Description

本発明は、クレーン等の揚重装置において、揚重作業を支援する揚重支援システム、揚重支援方法及び揚重支援プログラムに関する。 The present invention relates to a lifting support system, a lifting support method, and a lifting support program that support lifting operations in lifting devices such as cranes.

資機材を運搬する場合に、タワークレーン等の揚重装置を用いることがある。この揚重装置においては、吊り荷をワイヤで吊った状態で搬送するので、吊り荷に振れが生じることがある。例えば、ジブの旋回操作や起伏操作において移動の開始時や方向の変更時には、慣性の法則で吊り荷が揺動することになる。また、風等の外力により振れることもある。このため、振れを抑制する技術も検討されている(例えば、特許文献1参照。)。この文献に開示された技術では、タワークレーンにおいてジブ先端位置計測装置によりジブ先端位置をリアルタイムで計測する。また、吊り荷振れ幅計測装置により吊り荷の振れをリアルタイムで計測する。自動運転制御装置は、吊り荷の移動をリアルタイムで計測されたジブ先端位置及び吊り荷の振れに基づいてフィードバック制御及びファジィ制御を行なう。 When transporting materials and equipment, lifting devices such as tower cranes are sometimes used. In these lifting devices, the load is transported while suspended by a wire, which can cause the load to sway. For example, when the jib is rotated or raised and lowered, the load will sway due to the law of inertia when the movement starts or the direction is changed. The load can also sway due to external forces such as wind. For this reason, technology to suppress the swaying is being considered (see, for example, Patent Document 1). In the technology disclosed in this document, the jib tip position is measured in real time by a jib tip position measuring device in a tower crane. The swing of the load is also measured in real time by a load swing width measuring device. The automatic operation control device performs feedback control and fuzzy control of the movement of the load based on the jib tip position and the swing of the load measured in real time.

特開平10-258989号公報Japanese Patent Application Publication No. 10-258989

しかしながら、振れを抑制するために減速していたのでは、揚重作業の効率化を実現することができない。 However, slowing down to suppress vibrations would not improve the efficiency of lifting operations.

上記課題を解決するための揚重支援システムは、揚重物の揺動状態情報を取得する情報取得部及び揚重装置と通信を行なう制御部を備える。そして、前記制御部が、前記情報取得部が取得した揺動状態情報を用いて、前記揚重装置の揚重部から吊り下げた揚重物の位置を特定し、前記揚重物の位置において揺動を検知した場合、前記揺動の振れ幅及び周期を特定し、前記周期に応じた前記振れ幅で、前記揚重部を前記揚重物の上方に配置するための操作を、前記揚重装置において行なう。 The lifting support system for solving the above problem includes an information acquisition unit that acquires information on the swaying state of the lifted object, and a control unit that communicates with the lifting device. The control unit uses the swaying state information acquired by the information acquisition unit to identify the position of the lifted object suspended from the lifting unit of the lifting device, and when swaying is detected at the position of the lifted object, identifies the amplitude and period of the swaying, and performs an operation on the lifting device to position the lifting unit above the lifted object with the amplitude corresponding to the period.

本発明によれば、揚重作業において、効率的かつ的確な搬送を支援することができる。 The present invention can assist in efficient and accurate transportation during lifting operations.

実施形態のシステムの説明図。FIG. 1 is an explanatory diagram of a system according to an embodiment. 実施形態のタワークレーンの説明図。FIG. 1 is an explanatory diagram of a tower crane according to an embodiment. 実施形態のハードウェア構成の説明図。FIG. 2 is an explanatory diagram of a hardware configuration of the embodiment. 実施形態の揚重情報記憶部に記録されたデータの説明図。FIG. 4 is an explanatory diagram of data recorded in a lifting information storage unit of the embodiment. 実施形態の処理手順の説明図。FIG. 実施形態の撮影画像における画像認識の説明図。5A to 5C are explanatory diagrams of image recognition in a captured image according to an embodiment. 実施形態の撮影画像における揺動の説明図。5A to 5C are explanatory diagrams for explaining a swing in a photographed image according to an embodiment. 実施形態の揺動の抑制の説明図であって、(a)は揺動がない場合、(b)は揺動が生じた場合、(c)は最大振れ位置となった場合、(d)は旋回操作を行なった場合の説明図。10A is an explanatory diagram of the suppression of swaying in an embodiment, where (a) is an explanatory diagram when there is no swaying, (b) is an explanatory diagram when swaying occurs, (c) is an explanatory diagram when the maximum swing position is reached, and (d) is an explanatory diagram when a turning operation is performed.

以下、図1~図8に従って、揚重支援システム、揚重支援方法及び揚重支援プログラムの一実施形態を説明する。本実施形態では、建築現場において、揚重装置(タワークレーン)を利用する場合に用いる揚重支援システムとして説明する。 Below, an embodiment of a lifting support system, a lifting support method, and a lifting support program will be described with reference to Figures 1 to 8. In this embodiment, the lifting support system will be described as being used when a lifting device (tower crane) is used at a construction site.

本実施形態では、図1に示すように、制御ユニット10、支援サーバ20、管理端末30を用いる。制御ユニット10は、揚重装置としてのタワークレーンC1に設けられる。
図2に示すように、タワークレーンC1のマストC10の上には、旋回フレームC11が載置されており、旋回フレームC11に運転席C12が設けられている。オペレータの操作によって揚重作業を行なう場合には、タワークレーンC1の運転席C12で、旋回フレームC11の旋回操作やジブC13(ブーム)の起伏(傾斜角)操作、フックC14の上下操作を行なう。そして、ジブC13の揚重部C130からワイヤで吊下げられたフックC14に固定された吊り荷C15を搬送する。なお、遠隔操作や自動運転操作により、オペレータの操作を行なうことも可能である。また、制御ユニット10はタワークレーンC1に設けられている。
1, the present embodiment uses a control unit 10, a support server 20, and a management terminal 30. The control unit 10 is provided in a tower crane C1 serving as a lifting device.
As shown in FIG. 2, a revolving frame C11 is placed on the mast C10 of the tower crane C1, and a driver's seat C12 is provided on the revolving frame C11. When lifting work is performed by an operator, the operator uses the driver's seat C12 of the tower crane C1 to perform revolving operation of the revolving frame C11, raising and lowering (tilt angle) operation of the jib C13 (boom), and raising and lowering operation of the hook C14. Then, a load C15 fixed to the hook C14 suspended by a wire from the lifting part C130 of the jib C13 is transported. The operator can also operate the tower crane C1 by remote control or automatic driving. The control unit 10 is provided on the tower crane C1.

(ハードウェア構成の説明)
図3を用いて、制御ユニット10、支援サーバ20、管理端末30を構成する情報処理装置H10のハードウェア構成を説明する。情報処理装置H10は、通信装置H11、入力装置H12、表示装置H13、記憶部H14、プロセッサH15を備える。なお、このハードウェア構成は一例であり、他のハードウェアにより実現することも可能である。
(Hardware configuration description)
3, the hardware configuration of the information processing device H10 constituting the control unit 10, the support server 20, and the management terminal 30 will be described. The information processing device H10 includes a communication device H11, an input device H12, a display device H13, a storage unit H14, and a processor H15. Note that this hardware configuration is an example, and it is also possible to realize it using other hardware.

通信装置H11は、他の装置との間で通信ルートを確立して、データの送受信を実行するインタフェースであり、例えばネットワークインタフェースや無線インタフェース等である。 The communication device H11 is an interface that establishes a communication route between other devices and transmits and receives data, such as a network interface or a wireless interface.

入力装置H12は、各種情報の入力を受け付ける装置であり、例えばマウスやキーボード等である。表示装置H13は、各種情報を表示するディスプレイ等である。
記憶部H14は、制御ユニット10、支援サーバ20、管理端末30の各種機能を実行するためのデータや各種プログラムを格納する記憶装置である。記憶部H14の一例としては、ROM、RAM、ハードディスク等がある。
The input device H12 is a device that accepts input of various information, such as a mouse, a keyboard, etc. The display device H13 is a display or the like that displays various information.
The memory unit H14 is a storage device that stores data and various programs for executing various functions of the control unit 10, the support server 20, and the management terminal 30. Examples of the memory unit H14 include ROM, RAM, and a hard disk.

プロセッサH15は、記憶部H14に記憶されるプログラムやデータを用いて、制御ユニット10、支援サーバ20、管理端末30における各処理を制御する。プロセッサH15の一例としては、例えばCPUやMPU等がある。このプロセッサH15は、ROM等に記憶されるプログラムをRAMに展開して、各処理のための各種プロセスを実行する。 The processor H15 uses the programs and data stored in the memory unit H14 to control each process in the control unit 10, the support server 20, and the management terminal 30. Examples of the processor H15 include a CPU and an MPU. The processor H15 expands the programs stored in the ROM, etc., into the RAM and executes various processes for each process.

プロセッサH15は、自身が実行するすべての処理についてソフトウェア処理を行なうものに限られない。例えば、プロセッサH15は、自身が実行する処理の少なくとも一部についてハードウェア処理を行なう専用のハードウェア回路(例えば、特定用途向け集積回路:ASIC)を備えてもよい。すなわち、プロセッサH15は、〔1〕コンピュータプログラム(ソフトウェア)に従って動作する1つ以上のプロセッサ、〔2〕各種処理のうち少なくとも一部の処理を実行する1つ以上の専用のハードウェア回路、或いは〔3〕それらの組み合わせ、を含む回路(circuitry)として構成し得る。プロセッサは、CPU並びに、RAM及びROM等のメモリを含み、メモリは、処理をCPUに実行させるように構成されたプログラムコード又は指令を格納している。メモリすなわちコンピュータ可読媒体は、汎用又は専用のコンピュータでアクセスできるあらゆる利用可能な媒体を含む。 The processor H15 is not limited to performing software processing for all of the processes it executes. For example, the processor H15 may be equipped with a dedicated hardware circuit (e.g., an application specific integrated circuit: ASIC) that performs hardware processing for at least some of the processes it executes. That is, the processor H15 may be configured as a circuit including: (1) one or more processors that operate according to a computer program (software); (2) one or more dedicated hardware circuits that execute at least some of the various processes; or (3) a combination thereof. The processor includes a CPU and memory such as RAM and ROM, and the memory stores program code or instructions configured to cause the CPU to execute processes. The memory, i.e., computer-readable medium, includes any available medium that can be accessed by a general-purpose or dedicated computer.

(システム構成)
次に、図1を用いて、揚重支援システムの各機能を説明する。
タワークレーンC1に設けられる制御ユニット10は、撮像装置11及び駆動制御部12を備える。
(System configuration)
Next, each function of the lifting support system will be described with reference to FIG.
The control unit 10 provided on the tower crane C1 includes an imaging device 11 and a drive control unit 12.

撮像装置11は、タワークレーンC1のジブC13の先端に設けられて、下方の揚重物CL1の動画を撮影する。本実施形態では、ジブC13によって吊り下げられる物を揚重物CL1と呼び、フックC14、吊り荷C15が含まれるが、いずれか一方でもよい。
駆動制御部12は、旋回フレームC11の旋回操作、ジブC13の起伏操作、フックC14の上下操作に応じた駆動制御を行なう。
そして、制御ユニット10は、撮像装置11による動画、駆動制御部12の駆動情報を支援サーバ20に送信する。
The imaging device 11 is provided at the tip of the jib C13 of the tower crane C1 and captures a video of the lifted object CL1 below. In this embodiment, the object suspended by the jib C13 is called the lifted object CL1, and includes the hook C14 and the suspended load C15, but may be either one of them.
The drive control unit 12 performs drive control in response to the rotation operation of the rotating frame C11, the raising and lowering operation of the jib C13, and the up and down operation of the hook C14.
Then, the control unit 10 transmits the video captured by the imaging device 11 and the drive information of the drive control unit 12 to the support server 20 .

支援サーバ20は、制御ユニット10から取得した情報を用いて、揚重作業を支援するコンピュータシステムである。この支援サーバ20は、制御部21、揚重情報記憶部22を備える。 The support server 20 is a computer system that supports lifting operations using information acquired from the control unit 10. The support server 20 includes a control unit 21 and a lifting information storage unit 22.

制御部21は、後述する処理(情報取得段階、認識段階、揺動制御段階、揚重管理段階等を含む処理)を行なう。このための各処理のためのプログラムを実行することにより、制御部21は、情報取得部211、認識部212、揺動制御部213、搬送管理部214等として機能する。 The control unit 21 performs the processes described below (processing including an information acquisition stage, a recognition stage, a swing control stage, a lifting management stage, etc.). By executing programs for each process for this purpose, the control unit 21 functions as an information acquisition unit 211, a recognition unit 212, a swing control unit 213, a transport management unit 214, etc.

情報取得部211は、制御ユニット10、管理端末30から各種情報を取得する。本実施形態では、制御ユニット10からジブC13先端の下方の撮影画像(動画)を、揺動状態情報として取得して仮記憶する。この撮影画像により、吊り荷C15の状態を確認することができる。更に、情報取得部211は、制御ユニット10から、フックC14を吊下げているワイヤの上下操作情報を取得する。この上下操作情報により、ジブC13先端からフックC14までのワイヤの長さ(吊下げ長さL)を特定することができる。また、管理端末30から、管理者によって入力された各種指示情報を取得する。 The information acquisition unit 211 acquires various information from the control unit 10 and the management terminal 30. In this embodiment, a captured image (video) of the area below the tip of the jib C13 is acquired from the control unit 10 as swing state information and temporarily stored. This captured image makes it possible to check the state of the suspended load C15. Furthermore, the information acquisition unit 211 acquires from the control unit 10 up-down operation information of the wire suspending the hook C14. This up-down operation information makes it possible to identify the length of the wire from the tip of the jib C13 to the hook C14 (suspending length L). In addition, various instruction information input by the administrator is acquired from the management terminal 30.

認識部212は、撮影画像において、被写体を認識する処理を実行する。本実施形態では、画像認識処理を用いて、撮影画像においてフックC14を認識する。例えば、フックC14を上方から撮影した撮影画像を教師情報として用いた機械学習により、フックC14を特定する予測モデルを生成して、認識部212に保持させておく。この教師情報においては、フックC14の下方の背景には、吊り荷C15や地上物等を含めた多様な画像を用いることができる。 The recognition unit 212 executes a process for recognizing a subject in the captured image. In this embodiment, image recognition processing is used to recognize the hook C14 in the captured image. For example, a predictive model for identifying the hook C14 is generated by machine learning using an image captured from above of the hook C14 as training information, and the model is stored in the recognition unit 212. In this training information, a variety of images including the suspended load C15 and objects on the ground can be used in the background below the hook C14.

揺動制御部213は、フックC14及び吊り荷C15の揺動を静止させる処理を実行する。本実施形態では、フックC14の揺動状態に応じて、揺動を静止させるための旋回フレームC11の旋回操作やジブC13の起伏操作の調整量を算出する。この揺動制御部213は、揺動の抑制操作の要否を判断するための基準距離に関する情報を保持している。
更に、揺動制御部213は、記憶している下記の周期算出式により、周期Tを算出する。ここでは、吊下げ長さLに対して振幅が十分に小さい場合を想定する。
周期T=2π√〔吊下げ長さL〕/〔重力加速度g〕
なお、周期は、上記算出式を用いて算出する場合に限定されない。例えば、撮影画像からフックC14の振れの方向を観察して周期を計測してもよいし、周期算出式による周期と計測周期とを併用して、両者の統計値を算出してもよい。
The swing control unit 213 executes a process for stopping the swing of the hook C14 and the suspended load C15. In this embodiment, the adjustment amount of the swing operation of the revolving frame C11 and the raising and lowering operation of the jib C13 for stopping the swing is calculated according to the swing state of the hook C14. This swing control unit 213 holds information on a reference distance for determining whether or not a swing suppression operation is required.
Furthermore, the swing control unit 213 calculates the period T by the following stored period calculation formula: Here, it is assumed that the amplitude is sufficiently small compared to the hanging length L.
Period T = 2π√ [hanging length L] / [gravitational acceleration g]
The period is not limited to being calculated using the above-mentioned formula. For example, the period may be measured by observing the swing direction of the hook C14 from the captured image, or the period calculated by the period calculation formula and the measured period may be used together to calculate the statistical values of both.

搬送管理部214は、搬送ルートにより、タワークレーンC1を動作させる。この搬送管理部214は、吊り荷のサイズ(寸法や重量)に応じて、搬送速度(通常速度)を決定するための速度決定テーブルを備える。この速度決定テーブルにおいては、吊り荷C15のサイズが大きい程、遅い搬送速度が設定されている。 The transport management unit 214 operates the tower crane C1 according to the transport route. This transport management unit 214 has a speed determination table for determining the transport speed (normal speed) according to the size (dimensions and weight) of the suspended load. In this speed determination table, the larger the size of the suspended load C15, the slower the transport speed is set.

図4に示すように、揚重情報記憶部22には、制御ユニット10の吊り荷に関する揚重管理データ220が記録される。この揚重管理データ220は、管理端末30から、各種情報を取得した場合に記録される。揚重管理データ220は、作業ID、クレーンID、吊上げ位置、吊下し位置、搬送物に関する情報を含んで構成される。 As shown in FIG. 4, the lifting information storage unit 22 records lifting management data 220 related to the load suspended by the control unit 10. This lifting management data 220 is recorded when various information is acquired from the management terminal 30. The lifting management data 220 includes information related to the work ID, crane ID, lifting position, lowering position, and transported object.

作業IDは、各揚重作業を特定するための識別子に関する情報である。
クレーンIDは、この各揚重作業において用いるタワークレーンC1を特定するための識別子に関する情報である。
The work ID is information regarding an identifier for identifying each lifting work.
The crane ID is information regarding an identifier for identifying the tower crane C1 used in each lifting operation.

吊上げ位置情報、吊下し位置情報は、管理者によって指定された吊上げ位置(搬送開始位置)、吊下し位置(搬送目標位置)に関する情報である。
搬送物情報は、揚重対象の資機材を特定するための識別子やサイズに関する情報である。
The lifting position information and the hanging position information are information relating to the lifting position (transport start position) and the hanging position (transport target position) designated by the manager.
The transported goods information is information regarding an identifier for identifying the equipment or materials to be lifted and their size.

揚重管理データ220には、予定ルート情報221及び実績ルート情報222が関連付けられている。予定ルート情報221は、ルート生成を行なった場合に記録される。実績ルート情報222は、揚重を終了した後で記録される。
予定ルート情報221は、搬送ルートに関する情報である。この予定ルート情報221には、搬送開始位置~搬送目標位置までの搬送ルートのために行なわれるジブC13の起伏操作、旋回フレームC11の旋回操作の操作タイミング及び操作量に関する情報が含まれる。
The lifting management data 220 is associated with planned route information 221 and actual route information 222. The planned route information 221 is recorded when a route is generated. The actual route information 222 is recorded after the lifting is completed.
The planned route information 221 is information about a transportation route. The planned route information 221 includes information about the operation timing and operation amount of the raising and lowering operation of the jib C13 and the turning operation of the turning frame C11 performed for the transportation route from the transportation start position to the transportation target position.

実績ルート情報222は、旋回フレームC11の旋回操作やジブC13の起伏操作、フックC14の上下操作の操作に基づいて、吊り荷C15が通過した実績ルートに関する情報である。 The actual route information 222 is information about the actual route traveled by the suspended load C15 based on the rotation operation of the rotating frame C11, the raising and lowering operation of the jib C13, and the up and down operation of the hook C14.

図1に示す管理端末30は、建築現場の管理者が用いるコンピュータ端末である。本実施形態では、管理者は、運転席C12のオペレータによる操作の代わりに、管理端末30を用いて、建築現場におけるタワークレーンC1を遠隔操作して揚重作業を指示する。 The management terminal 30 shown in FIG. 1 is a computer terminal used by the manager of the construction site. In this embodiment, the manager uses the management terminal 30 to remotely operate the tower crane C1 at the construction site and instruct the lifting work, instead of the operation by the operator in the cab C12.

(揚重支援処理)
次に、図5を用いて、上記のように構成された支援サーバ20において、揚重作業時に行なわれる揚重支援方法の処理手順を説明する。
(Lifting support processing)
Next, a procedure of a lifting support method performed during a lifting operation in the support server 20 configured as above will be described with reference to FIG.

まず、支援サーバ20の制御部21は、搬送ルートの設定処理を実行する(ステップS101)。具体的には、制御部21の情報取得部211は、タワークレーンC1の周囲の構造物が搬送の障害にならない搬送高さを取得する。この搬送高さは、管理端末30を用いての手動により取得することができる。また、制御部21が、建築現場におけるBIM情報や、カメラや3次元センサによる検知情報を取得し、取得した情報に基づいて特定された障害物の高さに対して余裕高さを加算することにより、搬送高さを算出することも可能である。
更に、情報取得部211は、管理端末30に搬送入力画面を出力し、クレーンID、搬送開始位置、搬送目標位置、搬送物に関する情報を取得する。そして、情報取得部211は、作業IDを付与し、管理画面から取得した搬送物情報を含めた揚重管理データ220を揚重情報記憶部22に記録する。
First, the control unit 21 of the support server 20 executes a process for setting a transport route (step S101). Specifically, the information acquisition unit 211 of the control unit 21 acquires a transport height at which structures around the tower crane C1 do not impede transport. This transport height can be acquired manually using the management terminal 30. The control unit 21 can also acquire BIM information at the construction site and detection information by cameras and three-dimensional sensors, and calculate the transport height by adding a margin height to the height of the obstacle identified based on the acquired information.
Furthermore, the information acquisition unit 211 outputs a transport input screen to the management terminal 30 and acquires information related to the crane ID, the transport start position, the transport target position, and the transported object. Then, the information acquisition unit 211 assigns a job ID and records the lifting management data 220 including the transported object information acquired from the management screen in the lifting information storage unit 22.

そして、情報取得部211は、搬送高さにおける搬送可能エリアにおいて、搬送開始位置~搬送目標位置の搬送ルートを算出する。この搬送ルートの算出には、公知のルート探索アルゴリズムを用いる。このルート探索アルゴリズムとしては、例えば、「A*(A-star)探索アルゴリズム」を用いることができる。このA*探索アルゴリズムは、移動開始位置→搬送開始位置→搬送目標位置までのパスを見つけるグラフ探索問題において、探索の道標となるコスト関数を用いる。コスト関数では、搬送可能エリアを構成する部分領域毎に付与されたコスト(評価値)を用いる。例えば、障害物に近い場合や障害物の重要度が高い場合、評価値を高く設定しておく。そして、スタートからn地点までのコストと、n地点からゴールまでの予想される評価値の合計が低い運搬ルートを特定する。
そして、情報取得部211は、生成した搬送ルートを、予定ルート情報221として、揚重管理データ220に関連付けて揚重情報記憶部22に記録する。
Then, the information acquisition unit 211 calculates a transport route from the transport start position to the transport target position in the transportable area at the transport height. A known route search algorithm is used to calculate this transport route. For example, the "A* (A-star) search algorithm" can be used as this route search algorithm. This A* search algorithm uses a cost function that serves as a guidepost for the search in a graph search problem that finds a path from the movement start position → the transport start position → the transport target position. The cost function uses a cost (evaluation value) assigned to each partial area that constitutes the transportable area. For example, if the obstacle is close or the obstacle is of high importance, the evaluation value is set high. Then, a transport route is identified that has a low total cost from the start to the nth point and a low estimated evaluation value from the nth point to the goal.
Then, the information acquisition unit 211 records the generated transport route as planned route information 221 in the lifting information storage unit 22 in association with the lifting management data 220 .

制御部21の搬送管理部214は、管理端末30から搬送開始指示を取得した場合、タワークレーンC1の制御ユニット10の駆動制御部12に対して、搬送開始を指示する。この場合、搬送管理部214は、吊り荷C15のサイズに応じて、速度決定テーブルに記録された搬送速度での搬送を指示する。 When the transport management unit 214 of the control unit 21 receives a transport start instruction from the management terminal 30, it instructs the drive control unit 12 of the control unit 10 of the tower crane C1 to start transport. In this case, the transport management unit 214 instructs transport at the transport speed recorded in the speed determination table according to the size of the suspended load C15.

そして、搬送中には、ステップS102~S109の揺動抑制処理を実行する。
この場合、支援サーバ20の制御部21は、画像取得処理を実行する(ステップS102)。具体的には、制御部21の情報取得部211は、タワークレーンC1の制御ユニット10から、撮像装置11で撮影した撮影画像を取得する。
During the transport, the shaking suppression process of steps S102 to S109 is executed.
In this case, the control unit 21 of the support server 20 executes an image acquisition process (step S102). Specifically, the information acquisition unit 211 of the control unit 21 acquires the image captured by the imaging device 11 from the control unit 10 of the tower crane C1.

次に、支援サーバ20の制御部21は、揚重位置の特定処理を実行する(ステップS103)。具体的には、制御部21の認識部212は、制御ユニット10から取得した撮影画像(動画の各フレーム画像)において、予測モデルを用いて、フックC14を特定する。そして、フックC14の位置により、その直下の吊り荷C15を特定できる。
図6に示すように、撮像装置11から取得した撮影画像500において、フックC14を特定する。このフックC14の直下に吊り荷C15が存在する。
Next, the control unit 21 of the support server 20 executes a process for identifying the lifting position (step S103). Specifically, the recognition unit 212 of the control unit 21 identifies the hook C14 using a prediction model in the captured image (each frame image of the video) acquired from the control unit 10. Then, the position of the hook C14 can be used to identify the suspended load C15 directly below it.
6, a hook C14 is identified in a photographed image 500 acquired by the imaging device 11. A suspended load C15 is present directly below this hook C14.

次に、支援サーバ20の制御部21は、振れが許容範囲外かどうかについての判定処理を実行する(ステップS104)。具体的には、制御部21の揺動制御部213は、フックC14の位置が、ジブC13の先端の下方で、直下位置から基準距離内に収まっている場合には、許容範囲内と判定する。 Next, the control unit 21 of the support server 20 executes a process of determining whether the swing is outside the allowable range (step S104). Specifically, the swing control unit 213 of the control unit 21 determines that the swing is within the allowable range when the position of the hook C14 is below the tip of the jib C13 and within a reference distance from the directly below position.

フックC14の位置が基準距離内に収まっておらず、振れが許容範囲外と判定した場合(ステップS104において「YES」の場合)、支援サーバ20の制御部21は、振幅の特定処理を実行する(ステップS105)。具体的には、制御部21の揺動制御部213は、撮影画像において、振幅を特定する。ここでは、所定時間の動画において揺動を監視し、ジブC13の先端の吊り下げの直下位置から、揺動の最大ずれ位置までの距離(最大振れ幅)を振幅として特定する。 If the position of the hook C14 is not within the reference distance and it is determined that the swing is outside the allowable range (if "YES" in step S104), the control unit 21 of the support server 20 executes an amplitude determination process (step S105). Specifically, the swing control unit 213 of the control unit 21 determines the amplitude in the captured image. Here, the swing is monitored in a video for a predetermined time, and the distance from the position directly below the hanging position of the tip of the jib C13 to the maximum deviation position of the swing (maximum swing width) is determined as the amplitude.

ここでは、旋回方向の振幅及び旋回方向に対する径方向の振幅を算出する。
図7に示すように、振幅SW1は、旋回方向の振幅を示しており、振幅SW2は、径方向の振幅を示している。
Here, the amplitude in the turning direction and the amplitude in the radial direction relative to the turning direction are calculated.
As shown in FIG. 7, an amplitude SW1 indicates the amplitude in the rotational direction, and an amplitude SW2 indicates the amplitude in the radial direction.

次に、支援サーバ20の制御部21は、周期の特定処理を実行する(ステップS106)。具体的には、制御部21の情報取得部211は、制御ユニット10から、吊下げ長さLを取得し、周期算出式を用いて周期Tを算出する。なお、上述の通り、撮影画像からフックC14のゆれの方向を観察して周期を計測してもよいし、周期算出式による周期と計測周期とを併用して、両者の統計値を算出してもよい。 Next, the control unit 21 of the support server 20 executes a process for identifying the period (step S106). Specifically, the information acquisition unit 211 of the control unit 21 acquires the hanging length L from the control unit 10, and calculates the period T using the period calculation formula. As described above, the period may be measured by observing the direction of the sway of the hook C14 from the captured image, or the period calculated by the period calculation formula and the measured period may be used together to calculate the statistical values of both.

次に、支援サーバ20の制御部21は、最大振れ前かどうかについての判定処理を実行する(ステップS107)。具体的には、制御部21の揺動制御部213は、揚重情報記憶部22に記録された予定ルート情報221に基づいて搬送方向(旋回方向又は起伏方向)を特定する。そして、揺動制御部213は、搬送方向と一致するとともに、撮影画像からフックC14を観察し、振れ方向が変わる時点を最大振れ幅になるタイミングとして特定する。そして、揺動制御部213は、直前タイミングが到来したかどうかを確認する。なお、フックC14が楕円軌道で揺動している場合には、旋回方向の直前タイミングと、径方向の直前タイミングとを個別に判定する。 Next, the control unit 21 of the support server 20 executes a process for determining whether or not the maximum swing has occurred (step S107). Specifically, the swing control unit 213 of the control unit 21 identifies the conveying direction (rotation direction or elevation direction) based on the planned route information 221 recorded in the lifting information storage unit 22. The swing control unit 213 then observes the hook C14 from the captured image, which matches the conveying direction, and identifies the point in time when the swing direction changes as the timing of the maximum swing width. The swing control unit 213 then checks whether the immediate timing has arrived. Note that when the hook C14 is swinging on an elliptical orbit, the immediate timing in the rotation direction and the immediate timing in the radial direction are determined separately.

最大振れ前でないと判定した場合(ステップS107において「NO」の場合)、支援サーバ20の制御部21は、待機処理を実行する(ステップS108)。具体的には、制御部21の揺動制御部213は、直前タイミングまで待機する。この場合、現在の搬送速度を維持しながら待機する。そして、支援サーバ20の制御部21は、最大振れ前かどうかについての判定処理(ステップS107)以降を繰り返す。 If it is determined that the maximum swing is not yet reached (if "NO" in step S107), the control unit 21 of the support server 20 executes a standby process (step S108). Specifically, the swing control unit 213 of the control unit 21 waits until the immediately preceding timing. In this case, it waits while maintaining the current conveying speed. Then, the control unit 21 of the support server 20 repeats the process of determining whether the maximum swing is yet reached (step S107) and subsequent steps.

一方、直前タイミングが到来し、最大振れ前と判定した場合(ステップS107において「YES」の場合)、支援サーバ20の制御部21は、振れ位置まで加速移動処理を実行する(ステップS109)。具体的には、制御部21の揺動制御部213は、ジブC13の先端が、最大振れ位置の上方になるように、旋回フレームC11の旋回操作やジブC13の起伏操作の調整量を算出する。そして、揺動制御部213は、搬送管理部214に対して、この調整量で、速やかでスムーズな旋回フレームC11の旋回操作やジブC13の起伏操作を指示する。この場合、吊り荷C15が最大振れの位置になるタイミングで、ジブC13の先端が上方に位置するように操作を指示する。なお、この操作は、搬送方向と一致させる場合に限定されるものではなく、運動エネルギが「0」になる最大振れ位置まで、ジブC13の先端を移動させる操作を行なえば、少なくとも揺動を抑制することができる。また、旋回方向の直前タイミングと径方向の直前タイミングとが異なる場合には、旋回操作や起伏操作を個別に行なう。 On the other hand, when the immediate timing arrives and it is determined that the maximum swing is not yet reached (YES in step S107), the control unit 21 of the support server 20 executes an accelerated movement process to the swing position (step S109). Specifically, the swing control unit 213 of the control unit 21 calculates the adjustment amount for the rotation operation of the rotating frame C11 and the raising and lowering operation of the jib C13 so that the tip of the jib C13 is above the maximum swing position. The swing control unit 213 then instructs the transport management unit 214 to perform a fast and smooth rotation operation of the rotating frame C11 and the raising and lowering operation of the jib C13 with this adjustment amount. In this case, the operation is instructed so that the tip of the jib C13 is positioned upward at the timing when the load C15 reaches the maximum swing position. This operation is not limited to being aligned with the conveying direction, and the swinging can at least be suppressed by moving the tip of the jib C13 to the maximum swing position where the kinetic energy becomes "0". Also, if the timing immediately before the rotation direction differs from the timing immediately before the radial direction, the rotation operation and the hoisting operation are performed separately.

図8(a)に示すように、搬送方向D0において、吊り荷に揺動がない場合には、ジブC13においてワイヤを支持する揚重部C130の直下方向D1に、揚重物CL1(フックC14、吊り荷C15)が存在する。
図8(b)に示すように、揺動が生じた場合、直下方向D1からずれることになる。この場合、揚重物CL1(フックC14、吊り荷C15)は、直下方向D1を中心として振動する。
As shown in Figure 8 (a), when the load does not sway in the conveying direction D0, the lifted object CL1 (hook C14, load C15) is located in a direction D1 directly below the lifting section C130 that supports the wire in the jib C13.
8B, when a swing occurs, the lifted object CL1 (hook C14, suspended load C15) deviates from the vertically downward direction D1. In this case, the lifted object CL1 (hook C14, suspended load C15) vibrates around the vertically downward direction D1.

そして、図8(c)に示すように、例えば、搬送ルートの旋回方向で最大振れ位置D2となった場合、図8(d)に示すように、揚重物CL1(フックC14、吊り荷C15)の直上に揚重部C130が配置されるように、加速してジブC13の旋回操作(加速移動操作)を行なう。この場合、ワイヤが鉛直方向になる位置で、円滑に吊り荷C15の搬送速度になるように、旋回操作の速度(加速及び減速)を調整する。これにより、最大振れ位置D2において、直下方向D1が垂直方向に一致し、フックC14、吊り荷C15の振れがなくなり、揺動を静止させることができる。なお、旋回方向だけではなく、径方向についても、同様に、ジブC13の起伏操作により、揺動を抑制する。 As shown in FIG. 8(c), for example, when the maximum swing position D2 is reached in the rotation direction of the transport route, the jib C13 is accelerated and rotated (accelerated movement) so that the lifting section C130 is positioned directly above the lifted object CL1 (hook C14, load C15) as shown in FIG. 8(d). In this case, the speed of the rotation operation (acceleration and deceleration) is adjusted so that the transport speed of the load C15 is smoothly adjusted at the position where the wire is vertical. As a result, at the maximum swing position D2, the directly downward direction D1 coincides with the vertical direction, and the swing of the hook C14 and load C15 disappears, and the swing can be stopped. Note that the swing is suppressed not only in the rotation direction but also in the radial direction by the raising and lowering operation of the jib C13.

振れが許容範囲内と判定した場合(ステップS104において「NO」の場合)、支援サーバ20の制御部21は、振幅の特定処理(ステップS105)~振れ位置まで加速移動処理(ステップS109)をスキップする。
次に、支援サーバ20の制御部21は、旋回、起伏操作の終了かどうかについての判定処理を実行する(ステップS110)。具体的には、制御部21の搬送管理部214は、制御ユニット10から駆動情報を取得し、ジブC13の先端が搬送目標位置の上方に到着した場合には旋回、起伏操作の終了を判定する。
If it is determined that the vibration is within the allowable range ("NO" in step S104), the control unit 21 of the support server 20 skips the process from the amplitude specification process (step S105) to the accelerated movement process to the vibration position (step S109).
Next, the control unit 21 of the support server 20 executes a process of determining whether the turning and hoisting operation is completed (step S110). Specifically, the transport management unit 214 of the control unit 21 acquires driving information from the control unit 10, and determines the end of the turning and hoisting operation when the tip of the jib C13 arrives above the transport target position.

旋回、起伏操作の終了でないと判定した場合(ステップS110において「NO」の場合)、支援サーバ20の制御部21は、画像取得処理(ステップS102)以降を繰り返す。 If it is determined that the turning and elevation operation has not ended (if "NO" in step S110), the control unit 21 of the support server 20 repeats the image acquisition process (step S102) and subsequent steps.

一方、旋回、起伏操作の終了と判定した場合(ステップS110において「YES」の場合)、支援サーバ20の制御部21は、荷下ろし処理を実行する(ステップS111)。具体的には、制御部21の搬送管理部214は、搬送目標位置に吊り荷C15が着地するまで、フックC14の降下操作を行なう。そして、搬送管理部214は、旋回フレームC11の旋回操作、ジブC13の起伏操作、フックC14の上下操作に応じて、実際に揚重物CL1(フックC14、吊り荷C15)が通過したルートに関する実績ルート情報222を生成し、揚重管理データ220に関連付けて揚重情報記憶部22に記録する。更に、この実績ルート情報222には、旋回フレームC11の旋回操作、ジブC13の起伏操作、フックC14の上下操作の操作情報を含める。 On the other hand, if it is determined that the rotation and hoisting operations have ended (YES in step S110), the control unit 21 of the support server 20 executes the unloading process (step S111). Specifically, the transport management unit 214 of the control unit 21 performs the lowering operation of the hook C14 until the load C15 lands at the transport target position. Then, the transport management unit 214 generates actual route information 222 regarding the route that the lifted object CL1 (hook C14, load C15) actually passed according to the rotation operation of the rotating frame C11, the hoisting operation of the jib C13, and the up and down operation of the hook C14, and records this in the lifting information storage unit 22 in association with the lifting management data 220. Furthermore, this actual route information 222 includes operation information of the rotation operation of the rotating frame C11, the hoisting operation of the jib C13, and the up and down operation of the hook C14.

本実施形態によれば、以下のような効果を得ることができる。
(1)本実施形態では、支援サーバ20の制御部21は、画像取得処理(ステップS102)、揚重位置の特定処理(ステップS103)を実行する。これにより、効率的に吊り荷C15を特定することができる。
According to this embodiment, the following effects can be obtained.
(1) In this embodiment, the control unit 21 of the support server 20 executes an image acquisition process (step S102) and a lifting position identification process (step S103), thereby making it possible to efficiently identify the suspended load C15.

(2)本実施形態では、支援サーバ20の制御部21は、振れが許容範囲外かどうかについての判定処理を実行する(ステップS104)。これにより、搬送中に生じる大きな揺動を認識することができる。 (2) In this embodiment, the control unit 21 of the support server 20 executes a process of determining whether the vibration is outside the allowable range (step S104). This makes it possible to recognize large vibrations that occur during transport.

(3)本実施形態では、支援サーバ20の制御部21は、振幅の特定処理(ステップS105)、周期の特定処理(ステップS106)を実行する。これにより、吊り荷C15の揺動状態を特定し、振幅及び周期により直近の振れ状態を予測することができる。 (3) In this embodiment, the control unit 21 of the support server 20 executes an amplitude identification process (step S105) and a period identification process (step S106). This makes it possible to identify the swaying state of the suspended load C15 and predict the immediate swing state based on the amplitude and period.

(4)本実施形態では、支援サーバ20の制御部21は、周期の特定処理(ステップS106)において、吊下げ長さLを用いる。これにより、周期算出式を用いて、迅速に周期を計算することができる。 (4) In this embodiment, the control unit 21 of the support server 20 uses the hanging length L in the period determination process (step S106). This allows the period to be calculated quickly using the period calculation formula.

(5)本実施形態では、揚重情報記憶部22には、予定ルート情報221が記録される。これにより、最大振れ前かどうかについての判定処理(ステップS107)において、搬送方向に基づいて直前タイミングを特定することができる。 (5) In this embodiment, the lifting information storage unit 22 records the planned route information 221. This makes it possible to identify the immediate timing based on the conveying direction in the process of determining whether or not the maximum swing has occurred (step S107).

(6)本実施形態では、直前タイミングが到来し、最大振れ前と判定した場合(ステップS107において「YES」の場合)、支援サーバ20の制御部21は、振れ位置まで加速移動処理を実行する(ステップS109)。これにより、最大振れ位置におけるポテンシャルエネルギを低下させ、揺動を抑制することができる。 (6) In this embodiment, when the immediate timing arrives and it is determined that the maximum swing is not yet reached (YES in step S107), the control unit 21 of the support server 20 executes an accelerated movement process to the swing position (step S109). This reduces the potential energy at the maximum swing position, and suppresses the swing.

本実施形態は、以下のように変更して実施することができる。本実施形態及び以下の変更例は、技術的に矛盾しない範囲で互いに組み合わせて実施することができる。 This embodiment can be modified as follows. This embodiment and the following modifications can be combined to the extent that they are not technically inconsistent.

・上記実施形態では、揚重装置としてタワークレーンを想定したが、揚重において荷振れが生じる揚重装置であれば、タワークレーンに限定されるものではない。
・上記実施形態では、駆動制御部12は、旋回フレームC11の旋回操作、ジブC13の起伏操作、フックC14の上下操作に応じた駆動制御を行なう。人手による楊重作業においても、支援サーバ20の制御部21が、ステップS102~S109の揺動抑制処理を行なうようにしてもよい。
・上記実施形態では、支援サーバ20の制御部21は、搬送ルートの設定処理を実行する(ステップS101)。搬送ルートの設定は、支援サーバ20が行なう場合に限定されるものではなく、手動で行なうようにしてもよい。この場合には、管理端末30において設定された搬送ルートを、揚重情報記憶部22に記録する。
In the above embodiment, a tower crane is assumed as the lifting device. However, the lifting device is not limited to a tower crane as long as it generates load swing during lifting.
In the above embodiment, the drive control unit 12 performs drive control in response to the rotation operation of the rotating frame C11, the raising and lowering operation of the jib C13, and the up and down operation of the hook C14. Even in manual lifting work, the control unit 21 of the support server 20 may perform the sway suppression process of steps S102 to S109.
In the above embodiment, the control unit 21 of the support server 20 executes a process for setting a transport route (step S101). The transport route setting is not limited to being performed by the support server 20, but may be performed manually. In this case, the transport route set in the management terminal 30 is recorded in the lifting information storage unit 22.

・上記実施形態では、支援サーバ20の制御部21は、揚重位置の特定処理を実行する(ステップS103)。吊り荷位置の特定は、フックC14の画像認識を用いる場合に限定されるものではない。例えば、フックC14に加速度センサを付加し、支援サーバ20の制御部21が、この加速度センサから揺動情報を取得するようにしてもよい。また、フックC14に、例えばGNSS(Global Navigation Satellite System)の位置情報取得装置を付加してもよい。また、フックC14ではなく、吊り荷C15の位置を特定するようにしてもよい。 - In the above embodiment, the control unit 21 of the support server 20 executes a process for identifying the lifting position (step S103). Identifying the position of the suspended load is not limited to using image recognition of the hook C14. For example, an acceleration sensor may be added to the hook C14, and the control unit 21 of the support server 20 may acquire sway information from the acceleration sensor. Also, a position information acquisition device, for example, a Global Navigation Satellite System (GNSS), may be added to the hook C14. Also, the position of the suspended load C15 may be identified instead of the hook C14.

・上記実施形態では支援サーバ20の制御部21は、振幅の特定処理を実行する(ステップS105)。振幅の特定には、所定期間の撮影画像を用いる。振幅の特定方法は、これに限定されるものではない。例えば、所定位置(直下位置)における加速度を計測し、この加速度に基づいて、振幅を算出するようにしてもよい。この場合には、加速度に応じた運動エネルギに対応したポテンシャルエネルギの最大振れ幅(振幅)を算出する。 - In the above embodiment, the control unit 21 of the support server 20 executes an amplitude determination process (step S105). Images captured over a predetermined period are used to determine the amplitude. The method of determining the amplitude is not limited to this. For example, the acceleration at a predetermined position (directly below) may be measured, and the amplitude may be calculated based on this acceleration. In this case, the maximum amplitude of the potential energy corresponding to the kinetic energy according to the acceleration is calculated.

・上記実施形態では、支援サーバ20の制御部21は、周期の特定処理を実行する(ステップS106)。周期の特定には、吊下げ長さ、撮影画像における振れの方向の観察を用いるが、これらに限定されるものではない。
・上記実施形態では、撮像装置11を、タワークレーンC1のジブC13の先端に設けた。揚重物CL1の振れを観察できる場所であれば、ジブC13の先端に限定されるものではない。
In the above embodiment, the control unit 21 of the support server 20 executes a process of identifying the period (step S106). The period is identified by observing the suspension length and the direction of the vibration in the captured image, but is not limited to these.
In the above embodiment, the imaging device 11 is provided at the tip of the jib C13 of the tower crane C1. However, the imaging device 11 is not limited to being provided at the tip of the jib C13, but may be provided at any location where the swing of the lifted object CL1 can be observed.

・上記実施形態では、直前タイミングが到来し、最大振れ前と判定した場合(ステップS107において「YES」の場合)、支援サーバ20の制御部21は、振れ位置まで加速移動処理を実行する(ステップS109)。ここでは、揺動抑制処理は、搬送中に継続的に行なう。揺動抑制処理の実行期間は、これに限定されるものではなく、荷下ろしの所定期間前のみに実行してもよい。 - In the above embodiment, when the immediate timing arrives and it is determined that the maximum swing is not yet reached (YES in step S107), the control unit 21 of the support server 20 executes an accelerated movement process to the swing position (step S109). Here, the swing suppression process is performed continuously during transport. The execution period of the swing suppression process is not limited to this, and may be performed only a predetermined period before unloading.

・上記実施形態では、支援サーバ20の制御部21は、振れが許容範囲外かどうかについての判定処理を実行する(ステップS104)。ここでは、ジブC13の先端の下方で、直下位置から基準距離内に存在する場合には、許容範囲内と判定する。この基準距離を状況に応じて変更してもよい。例えば、ルート設定時に用いたルートの各位置における評価値により、基準距離を変更してもよい。この場合には、評価値が高い場合に、基準距離を短くしておく。また、搬送目標位置に近い場合には、基準距離を短くしておく。これにより、障害物に近い場所や、搬送目標位置に近い場所において、揺動抑制を促進することができる。 - In the above embodiment, the control unit 21 of the support server 20 executes a process of determining whether the vibration is outside the acceptable range (step S104). Here, if the vibration is present below the tip of the jib C13 and within a reference distance from the directly below position, it is determined to be within the acceptable range. This reference distance may be changed depending on the situation. For example, the reference distance may be changed based on the evaluation value at each position of the route used when setting the route. In this case, the reference distance is shortened when the evaluation value is high. Also, the reference distance is shortened when the transport target position is close. This can promote sway suppression in places close to obstacles or close to the transport target position.

次に、上記実施形態及び別例から把握できる技術的思想について以下に追記する。
(a)前記制御部が、前記情報取得部において、前記揚重部から吊り下げた揚重物の撮影画像を取得し、前記撮影画像の画像認識により、前記揚重物の位置を特定することを特徴とする請求項1に記載の揚重支援システム。
Next, the technical ideas that can be understood from the above-described embodiment and other examples will be described below.
(a) The lifting support system described in claim 1, characterized in that the control unit acquires a photographed image of the object suspended from the lifting unit in the information acquisition unit, and identifies the position of the object by image recognition of the photographed image.

(b)前記制御部が、前記揚重装置の揚重部から前記揚重物を吊り下げたワイヤの長さ情報を取得し、前記長さ情報に基づいて周期を算出することを特徴とする請求項1又は(a)に記載の揚重支援システム。 (b) The lifting support system according to claim 1 or (a), characterized in that the control unit acquires length information of the wire that suspends the lifted object from the lifting unit of the lifting device, and calculates the period based on the length information.

(c)前記揚重装置は、前記揚重部を第1軸方向と第2軸方向で揚重物を搬送し、前記制御部が、検知した揺動を前記第1軸方向及び前記第2軸方向に分解し、前記第1軸方向及び前記第2軸方向で操作を行なうことを特徴とする(b)に記載の揚重支援システム。 (c) The lifting device is characterized in that the lifting section transports the lifted object in a first axial direction and a second axial direction, and the control section resolves the detected rocking motion into the first axial direction and the second axial direction, and performs operations in the first axial direction and the second axial direction. The lifting support system described in (b).

(d)前記第1軸方向の操作を前記揚重部の旋回操作で制御し、前記第2軸方向の操作を前記揚重部の起伏操作で制御することを特徴とする請求項1、(a)~(c)の何れか一項に記載の揚重支援システム。 (d) A lifting support system as described in any one of (a) to (c) of claim 1, characterized in that the operation in the first axis direction is controlled by a rotation operation of the lifting unit, and the operation in the second axis direction is controlled by a raising and lowering operation of the lifting unit.

A1…搬送可能領域、C1…タワークレーン、C10…マスト、C11…旋回フレーム、C12…運転席、C13…ジブ、C130…揚重部、C14…フック、C15…吊り荷、CL1…揚重物、10…制御ユニット、11…撮像装置、12…駆動制御部、20…支援サーバ、21…制御部、211…情報取得部、212…認識部、213…揺動制御部、214…搬送管理部、22…揚重情報記憶部、30…管理端末。 A1...transportable area, C1...tower crane, C10...mast, C11...rotating frame, C12...driver's seat, C13...jib, C130...lifting section, C14...hook, C15...suspended load, CL1...lifted object, 10...control unit, 11...imaging device, 12...drive control section, 20...support server, 21...control section, 211...information acquisition section, 212...recognition section, 213...swing control section, 214...transportation management section, 22...lifting information storage section, 30...management terminal.

Claims (3)

揚重物の揺動状態情報を取得する情報取得部及び揚重装置と通信を行なう制御部を備えた揚重支援システムであって、
前記制御部が、
前記揚重装置の周囲に存在する障害物に応じて、前記揚重物の搬送開始位置から搬送目標位置の搬送ルートを算出し、
前記情報取得部が取得した揺動状態情報を用いて、前記揚重装置の揚重部から吊り下げた揚重物の位置を特定し、
前記揚重物の位置において揺動を検知した場合、前記揺動の振れ幅及び周期を特定し、
前記搬送ルートの搬送方向と一致するとともに、振れ方向が変わる時点を最大振れ幅になるタイミングとして特定し、
前記タイミングで、前記揚重部を前記揚重物の上方に配置するための加速移動操作を、前記揚重装置において行なうことを特徴とする揚重支援システム。
A lifting support system including an information acquisition unit that acquires information on the swing state of a lifted object and a control unit that communicates with a lifting device,
The control unit:
Calculating a transport route from a transport start position of the lifted object to a transport target position according to obstacles present around the lifting device;
Using the swing state information acquired by the information acquisition unit, a position of the lifted object suspended from the lifting unit of the lifting device is identified;
When a rocking motion is detected at the position of the lifted object, the amplitude and period of the rocking motion are identified;
The time when the direction of the deflection coincides with the conveying direction of the conveying route and the deflection direction changes is identified as the timing of the maximum deflection width;
A lifting support system characterized in that, at the timing , an accelerated movement operation is performed in the lifting device to position the lifting section above the lifted object.
揚重物の揺動状態情報を取得する情報取得部及び揚重装置と通信を行なう制御部を備えた揚重支援システムを用いて揚重支援を行なう方法であって、
前記制御部が、
前記揚重装置の周囲に存在する障害物に応じて、前記揚重物の搬送開始位置から搬送目標位置の搬送ルートを算出し、
前記情報取得部が取得した揺動状態情報を用いて、前記揚重装置の揚重部から吊り下げた揚重物の位置を特定し、
前記揚重物の位置において揺動を検知した場合、前記揺動の振れ幅及び周期を特定し、
前記搬送ルートの搬送方向と一致するとともに、振れ方向が変わる時点を最大振れ幅になるタイミングとして特定し、
前記タイミングで、前記揚重部を前記揚重物の上方に配置するための加速移動操作を、前記揚重装置において行なうことを特徴とする揚重支援方法。
A method for performing lifting assistance using a lifting assistance system including an information acquisition unit that acquires swaying state information of a lifted object and a control unit that communicates with a lifting device,
The control unit:
Calculating a transport route from a transport start position of the lifted object to a transport target position according to obstacles present around the lifting device;
Using the swing state information acquired by the information acquisition unit, a position of the lifted object suspended from the lifting unit of the lifting device is identified;
When a rocking motion is detected at the position of the lifted object, the amplitude and period of the rocking motion are identified;
The time when the direction of the deflection coincides with the conveying direction of the conveying route and the deflection direction changes is identified as the timing of the maximum deflection width;
A lifting assistance method characterized in that, at the timing , an accelerated movement operation is performed in the lifting device to position the lifting section above the lifted object.
揚重物の揺動状態情報を取得する情報取得部及び揚重装置と通信を行なう制御部を備えた揚重支援システムを用いて揚重支援を行なうためのプログラムであって、
前記制御部を、
前記揚重装置の周囲に存在する障害物に応じて、前記揚重物の搬送開始位置から搬送目標位置の搬送ルートを算出し、
前記情報取得部が取得した揺動状態情報を用いて、前記揚重装置の揚重部から吊り下げた揚重物の位置を特定し、
前記揚重物の位置において揺動を検知した場合、前記揺動の振れ幅及び周期を特定し、
前記搬送ルートの搬送方向と一致するとともに、振れ方向が変わる時点を最大振れ幅になるタイミングとして特定し、
前記タイミングで、前記揚重部を前記揚重物の上方に配置するための加速移動操作を、前記揚重装置において行なう手段として機能させることを特徴とする揚重支援プログラム。
A program for performing lifting assistance using a lifting assistance system including an information acquisition unit that acquires swaying state information of a lifted object and a control unit that communicates with a lifting device,
The control unit,
Calculating a transport route from a transport start position of the lifted object to a transport target position according to obstacles present around the lifting device;
Using the swing state information acquired by the information acquisition unit, a position of the lifted object suspended from the lifting unit of the lifting device is identified;
When a rocking motion is detected at the position of the lifted object, the amplitude and period of the rocking motion are identified;
The time when the direction of the deflection coincides with the conveying direction of the conveying route and the deflection direction changes is identified as the timing of the maximum deflection width;
A lifting assistance program characterized by functioning as a means for performing an accelerated movement operation in the lifting device to position the lifting section above the lifted object at the timing .
JP2020093367A 2020-05-28 2020-05-28 Lifting support system, lifting support method, and lifting support program Active JP7521261B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020093367A JP7521261B2 (en) 2020-05-28 2020-05-28 Lifting support system, lifting support method, and lifting support program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020093367A JP7521261B2 (en) 2020-05-28 2020-05-28 Lifting support system, lifting support method, and lifting support program

Publications (2)

Publication Number Publication Date
JP2021187604A JP2021187604A (en) 2021-12-13
JP7521261B2 true JP7521261B2 (en) 2024-07-24

Family

ID=78848086

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020093367A Active JP7521261B2 (en) 2020-05-28 2020-05-28 Lifting support system, lifting support method, and lifting support program

Country Status (1)

Country Link
JP (1) JP7521261B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023128041A (en) * 2022-03-02 2023-09-14 古河ユニック株式会社 Load swing suppression device, crane equipped with load swing suppression device
WO2023190842A1 (en) 2022-03-31 2023-10-05 住友重機械工業株式会社 Work machine
JP2024061463A (en) * 2022-10-21 2024-05-07 住友重機械工業株式会社 crane

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004161460A (en) 2002-11-14 2004-06-10 Ishikawajima Transport Machinery Co Ltd Sway control method for suspended load of swing crane
JP2015068019A (en) 2013-09-27 2015-04-13 株式会社日立製作所 Transport route calculation system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2523212B2 (en) * 1990-06-29 1996-08-07 鹿島建設株式会社 Crane automatic driving method
JP2850305B2 (en) * 1997-03-17 1999-01-27 西松建設株式会社 Automatic crane driving equipment

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004161460A (en) 2002-11-14 2004-06-10 Ishikawajima Transport Machinery Co Ltd Sway control method for suspended load of swing crane
JP2015068019A (en) 2013-09-27 2015-04-13 株式会社日立製作所 Transport route calculation system

Also Published As

Publication number Publication date
JP2021187604A (en) 2021-12-13

Similar Documents

Publication Publication Date Title
JP7521261B2 (en) Lifting support system, lifting support method, and lifting support program
EP3915928B1 (en) Crane
US20210206605A1 (en) System and method for transporting a swaying hoisted load
US12134545B2 (en) Crane inspection system and crane
CN111819148B (en) Crane and control method thereof
CN117864959A (en) A hoisting posture control system and control method
CN117105097B (en) Intelligent tower crane control system, method and control equipment
JP7467872B2 (en) Alarm system, alarm method, and alarm program
JP2009166939A (en) Elevator control operation device
CN112368229A (en) Crane with a movable crane
US12180042B2 (en) Crane control method and crane
CN109179228A (en) A kind of construction crane machine anticollision system
JP7515570B2 (en) Crane, crane body and program
CN112912332B (en) Crane device
CN112399959A (en) Crane and control method thereof
CN113003415A (en) Self-stabilization control method and system for tower crane
US11034556B2 (en) Method of monitoring at least one crane
CN115010001A (en) Tower crane auxiliary control method and device, electronic equipment and readable storage medium
US20230087971A1 (en) Control device, terminal and calculation method
JP5087853B2 (en) Elevator equipment
US12515926B2 (en) Control device, crane, and method for controlling crane
JP6838781B2 (en) Steering method for suspended loads and cranes
JP7639352B2 (en) Lifting support system, lifting support method, and lifting support program
CN110872057A (en) Swing reducing system for crane load
JP2022109644A (en) Lifting support system, lifting support method, and lifting support program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230406

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240220

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240228

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240419

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240611

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240624

R150 Certificate of patent or registration of utility model

Ref document number: 7521261

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150