JP7521272B2 - Resin sealing method and resin sealing mold - Google Patents
[go: Go Back, main page]

JP7521272B2 - Resin sealing method and resin sealing mold - Google Patents

Resin sealing method and resin sealing mold Download PDF

Info

Publication number
JP7521272B2
JP7521272B2 JP2020106222A JP2020106222A JP7521272B2 JP 7521272 B2 JP7521272 B2 JP 7521272B2 JP 2020106222 A JP2020106222 A JP 2020106222A JP 2020106222 A JP2020106222 A JP 2020106222A JP 7521272 B2 JP7521272 B2 JP 7521272B2
Authority
JP
Japan
Prior art keywords
temperature
cull
molding operation
heating
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020106222A
Other languages
Japanese (ja)
Other versions
JP2021093512A (en
Inventor
耕作 益田
教雅 中原
俊嗣 西村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
I Pex Inc
Original Assignee
Dai Ichi Seiko Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dai Ichi Seiko Co Ltd filed Critical Dai Ichi Seiko Co Ltd
Priority to CN202080063083.2A priority Critical patent/CN114364502B/en
Priority to PCT/JP2020/033342 priority patent/WO2021054126A1/en
Publication of JP2021093512A publication Critical patent/JP2021093512A/en
Application granted granted Critical
Publication of JP7521272B2 publication Critical patent/JP7521272B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Moulds For Moulding Plastics Or The Like (AREA)
  • Injection Moulding Of Plastics Or The Like (AREA)
  • Encapsulation Of And Coatings For Semiconductor Or Solid State Devices (AREA)

Description

開示の実施形態は、樹脂封止方法及び樹脂封止金型に関する。 The disclosed embodiments relate to a resin sealing method and a resin sealing mold.

各種半導体パッケージ等を製造する樹脂封止方法において、1回の樹脂封止から取り出す半導体パッケージの個数の増加又は半導体パッケージの大型化等の要望から、大量の樹脂を使用する樹脂封止が行われている。 In the resin sealing method used to manufacture various semiconductor packages, etc., a large amount of resin is used for resin sealing due to demands such as an increase in the number of semiconductor packages that can be removed from one resin sealing or larger semiconductor packages.

そこで、樹脂を充分に溶融させて、樹脂の未充填等を抑止することを試みた樹脂封止装置として、例えば、特許文献1に記載された樹脂封止装置がある。 As an example of a resin sealing device that attempts to prevent resin from being left unfilled by sufficiently melting the resin, there is a resin sealing device described in Patent Document 1.

この特許文献1に記載された樹脂封止装置は、固定型又は可動型のいずれか一方の型に所要数のポットを設け、他方の型にポットと対向して配置された樹脂の供給経路であるカルを形成する窪みで構成されたカル部を備えており、ポット及びカル部に専用の加熱手段を配設している。 The resin sealing device described in Patent Document 1 has a required number of pots in either a fixed or movable mold, and a cull section consisting of a recess that forms a cull, which is a resin supply path, arranged opposite the pots in the other mold, and dedicated heating means are provided for the pots and the cull section.

実開平2-31130号公報Japanese Utility Model Application Publication No. 2-31130

ここで、特許文献1に記載された樹脂封止装置では、1回の樹脂封止に用いる樹脂の量が多い場合の温度制御についての担保が充分になされておらず、ポットへ大量の樹脂を投入し、カル部を介してキャビティに樹脂を注入した際にカルブロック周辺の熱が樹脂に奪われ、金型温度が低下してしまうことが懸念される。 Here, the resin sealing device described in Patent Document 1 does not adequately guarantee temperature control when a large amount of resin is used in one resin sealing, and there is a concern that when a large amount of resin is poured into the pot and injected into the cavity through the cull section, the heat around the cull block will be taken away by the resin, causing a drop in the mold temperature.

例えば、樹脂に対して、硬化に必要な充分な熱が与えられないため、樹脂を充分に溶融させて樹脂の未充填等を抑止する、また、キャビティに注入した後の樹脂を充分に硬化させるという効果が得られず、成形不良に繋がるおそれがあった。 For example, if the resin is not given enough heat to harden, the effect of preventing resin underfilling by sufficiently melting the resin and sufficiently hardening the resin after injection into the cavity cannot be achieved, which may lead to molding defects.

また、従来の樹脂封止装置には、ダイセット内に配置したヒーターとセンサーにて金型の温度制御を行うものもあるが、一般にダイセット内のセンサーから、カルブロック又はキャビティブロックまでの距離が遠いため、各ブロックにおける温度の低下を検知することが困難であった。 In addition, some conventional resin sealing devices use heaters and sensors placed inside the die set to control the temperature of the mold, but because the sensor in the die set is generally far from the cull block or cavity block, it is difficult to detect a drop in temperature in each block.

また、仮に、センサーでカルブロック又はキャビティブロックにおける温度の低下を検知できたとしても、温度の低下の発生と、検知との間にはタイムラグが生じていた。そのため、リアルタイムで各ブロック周辺の温度制御を行うことができなかった。 Even if the sensor could detect a drop in temperature in the cull block or cavity block, there would be a time lag between the occurrence of the drop in temperature and its detection. As a result, it was not possible to control the temperature around each block in real time.

さらに、カルブロック又はキャビティブロックにおける温度の低下を検知して、金型を加温する対応を取るとしても、検知後の加温では、再度、金型の温度が上昇するまでに相応の時間を要する。そのため、樹脂が充分に溶融しない、又は、キャビティに注入した後の樹脂が硬化しないという問題を充分に解消することが困難であった。 Furthermore, even if a drop in temperature in the cull block or cavity block is detected and the mold is heated, it takes a considerable amount of time for the mold temperature to rise again when heating is started after detection. This makes it difficult to fully resolve the problem of the resin not melting sufficiently or not hardening after being injected into the cavity.

実施形態の一態様は、上記に鑑みてなされたものであって、金型で樹脂封止を行う際に、金型の温度制御を高い精度で行うことが可能な樹脂封止方法及び樹脂封止金型を提供することを目的とする。 One aspect of the embodiment has been made in consideration of the above, and aims to provide a resin sealing method and a resin sealing mold that can control the temperature of the mold with high precision when resin sealing is performed with the mold.

実施形態の一態様に係る樹脂封止方法は、樹脂の供給経路であるカルを形成する窪みで構成されたカル部を有するカルブロック及びキャビティを形成するキャビティブロックが設けられた金型本体と、カルブロック及びキャビティブロックの少なくとも一方の温度を測定する温度測定手段と、カルブロック及びキャビティブロックの少なくとも一方を加温する加温手段と、を有する樹脂封止金型で、基材に載置された半導体素子を樹脂封止する動作を1回の成形動作として、繰り返して複数回の成形動作を行う樹脂封止方法であって、複数回の成形動作の各々の成形動作におけるカルブロック及びキャビティブロックの少なくとも一方の温度変化の情報を温度測定手段によって取得する取得工程と、複数回の成形動作のうち前回以前の成形動作において取得工程で取得された温度変化の情報に基づいて、前回よりも後の成形動作が実行されるまでの間に加温手段による1回分の成形動作における加温の調整内容を算出する算出工程と、算出工程で算出された調整内容によって前回よりも後の成形動作における加温手段による加温を実行する実行工程とを含む。 The resin sealing method according to one aspect of the embodiment is a resin sealing method that performs multiple molding operations by repeating an operation of resin sealing a semiconductor element placed on a substrate as one molding operation using a resin sealing mold having a mold body provided with a cull block having a cull portion composed of a recess that forms a cull, which is a resin supply path, and a cavity block that forms a cavity, a temperature measuring means that measures the temperature of at least one of the cull block and the cavity block, and a heating means that heats at least one of the cull block and the cavity block, and includes an acquisition step of acquiring information on temperature changes of at least one of the cull block and the cavity block in each molding operation of the multiple molding operations by the temperature measuring means, a calculation step of calculating the adjustment content of heating in one molding operation by the heating means until a molding operation subsequent to the previous one is performed based on the information on temperature changes acquired in the acquisition step in a molding operation prior to the previous one among the multiple molding operations, and an execution step of performing heating by the heating means in a molding operation subsequent to the previous one based on the adjustment content calculated in the calculation step.

ここで、温度測定手段が、カルブロック及びキャビティブロックの少なくとも一方の温度を測定することによって、半導体素子を樹脂封止する際の、カルブロックにおける温度変化の情報や、キャビティブロックにおける温度変化の情報を取得することができる。なお、ここでいうカルブロックの温度、又は、キャビティブロックの温度とは、カルブロック又はキャビティブロックにおける、温度測定手段の周囲(近傍)を測定した際の温度を意味する。 Here, the temperature measuring means measures the temperature of at least one of the cull block and the cavity block, thereby making it possible to obtain information on the temperature change in the cull block and information on the temperature change in the cavity block when the semiconductor element is resin-encapsulated. Note that the temperature of the cull block or the cavity block here refers to the temperature when the cull block or the cavity block is measured around (near) the temperature measuring means.

また、算出工程が、前回以前の成形動作で温度測定手段が測定した温度変化の情報に基づいて、前回よりも後の成形動作が実行されるまでの間に加温手段による1回分の成形動作における加温の調整内容を算出し、算出された調整内容によって前回よりも後の成形動作における加温手段による加温を実行することによって、カルブロック及びキャビティブロックの少なくとも一方における温度変化から、カルブロック及びキャビティブロックの少なくとも一方の温度が所望の温度となるように、加温手段による加温を調整することができる。これにより、樹脂封止の際に、金型本体の温度制御を高い精度で行うことができる。なお、加温手段によるカルブロック及びキャビティブロックの少なくとも一方の加温とは、カルブロック及びキャビティブロックの少なくとも一方を加温手段で加熱して、熱が金型本体内を伝達することで、各ブロックの表面近傍の温度が上昇することを含むものである。また、ここでいう前回以前の成形動作とは、前回の成形動作を含み、前回の成形動作だけを対象とするものではなく、2回以上前の成形動作を含んでいてもよい。また、前回の成形動作を基準としたとき、その1回前の成形動作や、その2回前の成形動作が該当してもよい。 In addition, the calculation step calculates the adjustment content of heating in one molding operation by the heating means until the molding operation after the previous one is performed based on the information of the temperature change measured by the temperature measurement means in the molding operation before the previous one, and performs heating by the heating means in the molding operation after the previous one according to the calculated adjustment content, so that the temperature of at least one of the cull block and the cavity block can be adjusted to the desired temperature based on the temperature change in at least one of the cull block and the cavity block. This allows the temperature control of the mold body with high accuracy during resin sealing. Note that heating at least one of the cull block and the cavity block by the heating means includes heating at least one of the cull block and the cavity block with the heating means, and the heat is transmitted inside the mold body, thereby increasing the temperature near the surface of each block. In addition, the molding operation before the previous one includes the previous molding operation, and does not only refer to the previous molding operation, but may also include molding operations two or more times before. Also, when the previous molding operation is used as the reference, the molding operation one operation before that or the molding operation two operations before that may be applicable.

また、実行工程は、前回よりも後の成形動作において温度測定手段で測定される温度の情報を用いずに、算出工程で算出された調整内容によって、前回よりも後の成形動作において加温手段による加温を実行することができる。 In addition, the execution process can perform heating by the heating means in a molding operation subsequent to the previous one based on the adjustment content calculated in the calculation process, without using information on the temperature measured by the temperature measurement means in a molding operation subsequent to the previous one.

また、算出工程は、調整内容として、加温手段による加温の出力、時間及び時機の少なくとも1つを算出する。 The calculation process also calculates at least one of the heating output, time, and timing of the heating by the heating means as the adjustment contents.

また、算出工程は、前回以前の成形動作において取得工程で取得された温度変化の情報である温度変化情報を入力とし且つ加温手段による加温の調整内容の情報である調整内容情報を出力とする計算モデルであって機械学習によって生成された計算モデルを用いて、加温手段による加温の調整内容を算出する。これにより、樹脂封止の際に、金型本体の温度制御を高い精度で行うことができる。 The calculation process uses a calculation model generated by machine learning that takes as input temperature change information, which is information on the temperature change acquired in the acquisition process in the previous or previous molding operation, and outputs adjustment content information, which is information on the adjustment content of the heating by the heating means. This allows the temperature of the mold body to be controlled with high precision during resin sealing.

また、本樹脂封止方法は、温度変化情報と調整内容情報とに基づいて、計算モデルを生成する学習工程をさらに含む。これにより、成形動作を行いながら、計算モデルを生成及び更新することができる。 In addition, this resin sealing method further includes a learning process for generating a calculation model based on the temperature change information and the adjustment content information. This allows the calculation model to be generated and updated while the molding operation is being performed.

また、カルブロック及びキャビティブロックには、温度測定手段による温度測定及び、加温手段による加温を個別に行うことが可能な複数の温度調整領域が設定され、算出工程は、前回よりも後の成形動作において温度調整領域ごとに加温手段による加温の出力、時間及び時機を算出する。これにより、カルブロック及びキャビティブロックを複数の温度調整領域に分けて、温度調整領域ごとに、加温手段による温度の調整を行うことができる。 In addition, the cull block and cavity block are provided with multiple temperature control areas where temperature measurement by the temperature measurement means and heating by the heating means can be performed individually, and the calculation process calculates the heating output, time, and timing by the heating means for each temperature control area in a molding operation after the previous one. This allows the cull block and cavity block to be divided into multiple temperature control areas, and the temperature can be adjusted by the heating means for each temperature control area.

また、複数の温度調整領域は、少なくとも第1の温度調整領域と、第1の温度調整領域とは異なる第2の温度調整領域とを含み、算出工程が、前回以前の成形動作における第1の温度調整領域と第2の温度調整領域との相対温度の情報及び、第1の温度調整領域の温度変化の情報に基づいて、前回よりも後の成形動作における第2の温度調整領域に対応する加温手段による加温の出力、時間及び時機を算出する。この場合、前回よりも後の成形動作において第1の温度調整領域及び第2の温度調整領域が所望の温度となるように、加温手段による加温の出力、時間及び時機を算出することができる。 The multiple temperature adjustment regions include at least a first temperature adjustment region and a second temperature adjustment region different from the first temperature adjustment region, and the calculation step calculates the heating output, time, and timing by the heating means corresponding to the second temperature adjustment region in the molding operation after the previous one based on information on the relative temperatures between the first temperature adjustment region and the second temperature adjustment region in the molding operation before the previous one and information on the temperature change in the first temperature adjustment region. In this case, the heating output, time, and timing by the heating means can be calculated so that the first temperature adjustment region and the second temperature adjustment region are at the desired temperatures in the molding operation after the previous one.

また、算出工程が、複数の温度調整領域の各々に対して、温度変化の情報に基づいて前回よりも後の成形動作における加温手段による加温の出力、時間及び時機を算出する。これにより、複数の温度調整領域の各々に対して、前回よりも後の成形動作における個々の温度調整領域の温度が所望の温度となるように、加温手段による加温の出力、時間及び時機を調整することができる。 The calculation step also calculates the heating output, time, and timing by the heating means in the molding operation after the previous one for each of the multiple temperature adjustment regions based on the temperature change information. This allows the heating output, time, and timing by the heating means to be adjusted so that the temperature of each temperature adjustment region in the molding operation after the previous one for each of the multiple temperature adjustment regions becomes the desired temperature.

また、カルブロックは、カル部が複数形成されており、温度測定手段は、カルブロックのうち複数のカル部間の温度を測定するセンサーを含む。これにより、例えば、複数のカル部の温度を一度に測定することができる。 The cull block is formed with multiple cull sections, and the temperature measurement means includes a sensor that measures the temperature between the multiple cull sections of the cull block. This makes it possible to measure the temperatures of multiple cull sections at once, for example.

実施形態の一態様に係る樹脂封止金型は、樹脂の供給経路であるカルを形成するカルブロック及びキャビティを形成するキャビティブロックが設けられた金型本体と、カルブロック及びキャビティブロックの少なくとも一方の温度を測定する温度測定手段と、カルブロック及びキャビティブロックの少なくとも一方を加温する加温手段と、加温手段による加温を実行する実行部と、を有し、基材に載置された半導体素子を樹脂封止する動作を1回の成形動作として、繰り返して複数回の成形動作を行う樹脂封止金型であって、温度測定手段は、複数回の成形動作の各々におけるカルブロック及びキャビティブロックの少なくとも一方の温度変化の情報を取得し、実行部は、複数回の成形動作のうち前回以前の成形動作において温度測定手段で取得された温度変化の情報に基づいて、前回よりも後の成形動作が実行されるまでの間に、加温手段による1回分の成形動作における加温の調整内容を算出する算出部と、算出部で算出された調整内容によって前回よりも後の成形動作において加温手段による加温を実行する加温実行部とを備える。 The resin sealing mold according to one embodiment has a mold body provided with a cull block that forms a cull, which is a resin supply path, and a cavity block that forms a cavity, a temperature measuring means that measures the temperature of at least one of the cull block and the cavity block, a heating means that heats at least one of the cull block and the cavity block, and an execution unit that executes heating by the heating means, and is a resin sealing mold that performs multiple molding operations by repeating an operation of resin sealing a semiconductor element placed on a substrate as one molding operation, in which the temperature measuring means acquires information on temperature changes of at least one of the cull block and the cavity block in each of the multiple molding operations, and the execution unit includes a calculation unit that calculates adjustments to heating by the heating means in one molding operation by the heating means based on information on temperature changes acquired by the temperature measuring means in a molding operation prior to the previous one among the multiple molding operations, until a molding operation subsequent to the previous one is performed, and a heating execution unit that executes heating by the heating means in a molding operation subsequent to the previous one based on the adjustments calculated by the calculation unit.

ここで、樹脂封止金型が、加温手段による加温を実行する実行部を有することによって、樹脂封止の際に、カルブロック及びキャビティブロックの少なくとも一方の温度を調整することができる。 Here, the resin sealing mold has an execution section that performs heating using a heating means, so that the temperature of at least one of the cull block and the cavity block can be adjusted during resin sealing.

また、実行部が、前回の成形動作で温度測定手段が測定した温度変化の情報に基づいて、加温手段による加温を実行することによって、カルブロック及びキャビティブロックの少なくとも一方における温度変化の情報から、カルブロック及びキャビティブロックの少なくとも一方の温度が所望の温度となるように、加温手段による加温を実行することができる。 In addition, the execution unit executes heating by the heating means based on information on temperature changes measured by the temperature measurement means during the previous molding operation, and thus, based on information on temperature changes in at least one of the cull block and the cavity block, heating by the heating means can be executed so that the temperature of at least one of the cull block and the cavity block becomes the desired temperature.

実施形態の一態様によれば、金型で樹脂封止を行う際に、金型の温度制御を高い精度で行うことが可能な樹脂封止方法及び樹脂封止金型を提供することができる。 According to one aspect of the embodiment, it is possible to provide a resin sealing method and a resin sealing die that can control the temperature of the die with high precision when performing resin sealing with the die.

図1は、実施形態に係る樹脂封止金型の一例である樹脂封止金型を含む樹脂封止装置を示す概略説明図である。FIG. 1 is a schematic explanatory diagram showing a resin sealing apparatus including a resin sealing die which is an example of a resin sealing die according to an embodiment. 図2(a)は、上型チェスにおける上カル部センサーと上カル部ヒーター及び上キャビティセンサーと上キャビティヒーターの配置を示す概略図であり、図2(b)は、下型チェスにおける下カル部センサーと下カル部ヒーター及び下キャビティセンサーと下キャビティヒーターの配置を示す概略図であり、図2(c)は、上金型の概略正面図であり、図2(d)は、下金型の概略正面図である。Figure 2(a) is a schematic diagram showing the arrangement of the upper cull section sensor and upper cull section heater, as well as the upper cavity sensor and upper cavity heater in the upper die chess, Figure 2(b) is a schematic diagram showing the arrangement of the lower cull section sensor and lower cull section heater, as well as the lower cavity sensor and lower cavity heater in the lower die chess, Figure 2(c) is a schematic front view of the upper die, and Figure 2(d) is a schematic front view of the lower die. 図3(a)は、上型ダイセットにおける上ダイセットセンサー及び上ダイセットヒーターの配置を示す概略図であり、図3(b)は、下型ダイセットにおける下ダイセットセンサー及び下ダイセットヒーターの配置を示す概略図である。FIG. 3(a) is a schematic diagram showing the arrangement of an upper die set sensor and an upper die set heater in an upper die set, and FIG. 3(b) is a schematic diagram showing the arrangement of a lower die set sensor and a lower die set heater in a lower die set. 図4(a)は、上型チェスにおける上カル部センサーと上カル部ヒーター及び上キャビティセンサーと上キャビティヒーターの配置の他の例を示す概略図であり、図4(b)は、下型チェスにおける下カル部センサーと下カル部ヒーター及び下キャビティセンサーと下キャビティヒーターの配置の他の例を示す概略図である。Figure 4(a) is a schematic diagram showing another example of the arrangement of the upper cull section sensor and upper cull section heater, and the upper cavity sensor and upper cavity heater in the upper chess, and Figure 4(b) is a schematic diagram showing another example of the arrangement of the lower cull section sensor and lower cull section heater, and the lower cavity sensor and lower cavity heater in the lower chess. 図5(a)は、上型チェスにおける上カル部センサーと上カル部ヒーター及び上キャビティセンサーと上キャビティヒーターの配置のさらに他の例を示す概略図であり、図5(b)は、下型チェスにおける下カル部センサーと下カル部ヒーター及び下キャビティセンサーと下キャビティヒーターの配置のさらに他の例を示す概略図である。Figure 5(a) is a schematic diagram showing yet another example of the arrangement of an upper cull section sensor and upper cull section heater, and an upper cavity sensor and upper cavity heater in an upper chess, and Figure 5(b) is a schematic diagram showing yet another example of the arrangement of a lower cull section sensor and lower cull section heater, and a lower cavity sensor and lower cavity heater in a lower chess. 図6は、実施の形態1にかかる制御部の構成の一例を示す図である。FIG. 6 is a diagram illustrating an example of a configuration of the control unit according to the first embodiment. 図7は、上カルブロックを予測制御する際の事前成形方法に関する説明図であり、図7(a)は、通常成形から各種パラメーターの数値を算出する流れを示すフロー図、図7(b)は、各種パラメーターの数値を上カル部ヒーターのON/OFF制御に反映させた状態の概念図である。Figure 7 is an explanatory diagram of the pre-forming method when predicting and controlling the upper cull block, where Figure 7(a) is a flow chart showing the process of calculating the values of various parameters from normal forming, and Figure 7(b) is a conceptual diagram of the state in which the values of various parameters are reflected in the ON/OFF control of the upper cull section heater. 図8(a)は、カルブロックにカル部センサー及びカル部ヒーターを設けた樹脂封止装置において、成形動作を行った際の、上カルブロックの温度変化の情報をカル部センサーで測定した結果の第1の例を示すグラフであり、図8(b)は、図8(a)に示す上カルブロックの温度変化に基づいて算出される各種パラメーターの一例を示す図である。Figure 8(a) is a graph showing a first example of the results of measuring information on temperature change in the upper cull block by a cull section sensor when a molding operation is performed in a resin sealing device in which a cull section sensor and a cull section heater are provided in the cull block, and Figure 8(b) is a diagram showing an example of various parameters calculated based on the temperature change in the upper cull block shown in Figure 8(a). 図9(a)は、カルブロックにカル部センサー及びカル部ヒーターを設けた樹脂封止装置において、成形動作を行った際の、上カルブロックの温度変化の情報をカル部センサーで測定した結果の第2の例を示すグラフであり、図9(b)は、図9(a)に示す上カルブロックの温度変化に基づいて算出される各種パラメーターの一例を示す図である。Figure 9(a) is a graph showing a second example of the results of measuring information on temperature change in the upper cull block by a cull section sensor when a molding operation is performed in a resin sealing device in which a cull section sensor and a cull section heater are provided in the cull block, and Figure 9(b) is a diagram showing an example of various parameters calculated based on the temperature change in the upper cull block shown in Figure 9(a). 図10(a)は、カルブロックにカル部センサー及びカル部ヒーターを設けた樹脂封止装置において、成形動作を行った際の、上カルブロックの温度変化の情報をカル部センサーで測定した結果の第3の例を示すグラフであり、図10(b)は、図10(a)に示す上カルブロックの温度変化に基づいて算出される各種パラメーターの一例を示す図である。Figure 10(a) is a graph showing a third example of the results of measuring information on temperature change of the upper cull block by a cull section sensor when a molding operation is performed in a resin sealing device in which a cull section sensor and a cull section heater are provided in the cull block, and Figure 10(b) is a diagram showing an example of various parameters calculated based on the temperature change of the upper cull block shown in Figure 10(a). 図11(a)は、カルブロックにカル部センサー及びカル部ヒーターを設けた樹脂封止装置において、成形動作を行った際の、上カルブロックの温度変化の情報をカル部センサーで測定した結果の第4の例を示すグラフであり、図11(b)は、図11(a)に示す上カルブロックの温度変化に基づいて算出される各種パラメーターの一例を示す図である。Figure 11(a) is a graph showing a fourth example of the results of measuring information on temperature change in the upper cull block by a cull section sensor when a molding operation is performed in a resin sealing device in which a cull section sensor and a cull section heater are provided in the cull block, and Figure 11(b) is a diagram showing an example of various parameters calculated based on the temperature change in the upper cull block shown in Figure 11(a). 図12は、カルブロックにカル部センサー及びカル部ヒーターを設けた樹脂封止装置において、成形動作を行った際の、カル部の温度変化の情報をカル部センサーで測定した結果を示すグラフであり、図12(a)は、予測制御をせずに1回目の成形動作を行った結果、図12(b)は、1回目の温度変化の情報に基づき、予測制御をして2回目の成形動作を行った結果、図12(c)は、2回目の温度変化の情報に基づき、予測制御をして3回目の成形動作を行った結果である。Figure 12 is a graph showing the results of measuring information on temperature changes in the cull section using a cull section sensor when a molding operation is performed in a resin sealing device in which a cull section sensor and a cull section heater are provided in the cull block. Figure 12(a) shows the result of a first molding operation performed without predictive control, Figure 12(b) shows the result of a second molding operation performed with predictive control based on information on the first temperature change, and Figure 12(c) shows the result of a third molding operation performed with predictive control based on information on the second temperature change. 図13は、カルブロックにカル部センサー及びカル部ヒーターを設けた樹脂封止装置において、繰り返し成形動作を行った際の、各成形動作においてカル部センサーで測定される上カルブロックの温度のうち最も低い温度と最も高い温度とを結ぶグラフの一例である。Figure 13 is an example of a graph connecting the lowest and highest temperatures of the upper cull block measured by the cull section sensor during each molding operation when repeated molding operations are performed in a resin sealing device in which a cull section sensor and a cull section heater are provided in the cull block. 図14(a)は、各温度調整領域を個別のヒーター制御で予測制御する成形動作の流れを示すフロー図であり、図14(b)は、上型チェスに設定した温度調整領域A1~A9を示す概略図である。FIG. 14(a) is a flow diagram showing the flow of the molding operation in which each temperature control area is predictively controlled by individual heater control, and FIG. 14(b) is a schematic diagram showing the temperature control areas A1 to A9 set in the upper die chest. 図15(a)は、温度調整領域Aをヒーター制御で予測制御すると共に、その他の温度調整領域を、温度調整領域Aにおけるカル部ヒーターの出力の割合を変化させて制御する成形動作の流れを示すフロー図であり、図15(b)は、上型チェスに設定した温度調整領域A及びB1~B8を示す概略図である。Figure 15(a) is a flow diagram showing the flow of molding operations in which temperature control area A is predictively controlled by heater control, and other temperature control areas are controlled by changing the output ratio of the cull section heater in temperature control area A, and Figure 15(b) is a schematic diagram showing temperature control areas A and B1 to B8 set in the upper die chest.

以下、添付図面を参照して、本願の開示する樹脂封止方法及び樹脂封止金型の実施形態を詳細に説明する。なお、以下に示す実施形態によりこの発明が限定されるものではない。 Below, the embodiments of the resin sealing method and resin sealing mold disclosed in the present application will be described in detail with reference to the attached drawings. Note that the present invention is not limited to the embodiments shown below.

図1、図2及び図3を参照して、本発明に係る樹脂封止金型の一例を含む樹脂封止装置の構造の概略を説明する。樹脂封止装置Sは、本発明に係る樹脂封止金型の一例である樹脂封止金型Mを備えている(図1参照)。この樹脂封止金型Mは、一対の上金型1及び下金型2を有している。樹脂封止装置Sは、上金型1と下金型2を型締めして、リードフレーム等の基材に載置された半導体素子(図示省略)を樹脂封止する装置である。かかる樹脂封止装置Sは、基材に載置された半導体素子を樹脂封止する動作を1回の成形動作として繰り返して複数回の成形動作を行う。各回の成形動作で、基材に載置された半導体素子が樹脂封止された成形品が生成される。 With reference to Figures 1, 2 and 3, the structure of a resin sealing device including an example of a resin sealing mold according to the present invention will be outlined. The resin sealing device S is equipped with a resin sealing mold M, which is an example of a resin sealing mold according to the present invention (see Figure 1). This resin sealing mold M has a pair of upper and lower molds 1 and 2. The resin sealing device S is a device that clamps the upper and lower molds 1 and 2 together to resin seal a semiconductor element (not shown) placed on a substrate such as a lead frame. The resin sealing device S performs multiple molding operations by repeating the operation of resin sealing the semiconductor element placed on the substrate as one molding operation. In each molding operation, a molded product is produced in which the semiconductor element placed on the substrate is resin sealed.

なお、以下の説明においては、図1を基準に、上金型1に対する下金型2の位置を「下」又は「下側」と呼び、下金型2に対する上金型1の位置を「上」又は「上側」と呼ぶこととする。また、図1を基準に、同図の紙面における左方を「左」又は「左側」と呼び、同図の紙面における右方を「右」又は「右側」と呼ぶこととする。また、図1を基準に、上カルブロック120に対する上キャビティブロック121の位置を「外」又は「外側」と呼び、上キャビティブロック121に対する上カルブロック120の位置を「内」又は「内側」と呼ぶこととする。さらに、図2(a)を基準に、同図の紙面における下方を「前」又は「前側」と呼び、同図の紙面における上方を「後」又は「後側」と呼ぶこととする。 In the following description, the position of the lower die 2 relative to the upper die 1 will be referred to as "lower" or "lower side" and the position of the upper die 1 relative to the lower die 2 will be referred to as "upper" or "upper side" based on FIG. 1. Furthermore, the left side of the paper in FIG. 1 will be referred to as "left" or "left side" and the right side of the paper in FIG. 1 will be referred to as "right" or "right side". Furthermore, the position of the upper cavity block 121 relative to the upper cull block 120 will be referred to as "outside" or "outside" and the position of the upper cull block 120 relative to the upper cavity block 121 will be referred to as "inside" or "inside". Furthermore, based on FIG. 2(a), the lower side of the paper in FIG. 2 will be referred to as "front" or "front side" and the upper side of the paper in FIG. 2 will be referred to as "rear" or "rear side".

ここで、上金型1は、上型ダイセット11及び上型チェス12で構成されている(図1及び図2(c)参照)。また、下金型2は、下型ダイセット21及び下型チェス22で構成されている(図1及び図2(d)参照)。 Here, the upper mold 1 is composed of an upper die set 11 and an upper die chess 12 (see Figures 1 and 2(c)). The lower mold 2 is composed of a lower die set 21 and a lower die chess 22 (see Figures 1 and 2(d)).

また、上型ダイセット11は、図示しないサポートピラーを介して上型チェス12を支持する枠体である。サポートピラーは、上型ダイセット11及び上型チェス12に接続され、上型チェス12を支持する支持部材である。 The upper die set 11 is a frame that supports the upper chess piece 12 via a support pillar (not shown). The support pillar is a support member that is connected to the upper die set 11 and the upper chess piece 12 and supports the upper chess piece 12.

また、上型チェス12は、型締めした際に、下型チェス22と共に、樹脂の供給経路であるカルを形成する窪みで構成されたカル部124(図2(a)参照)及び樹脂の成形部であるキャビティ(符号省略)を形成する部材である。 When the mold is closed, the upper die chess 12, together with the lower die chess 22, is a member that forms the cull portion 124 (see FIG. 2(a)), which is a recess that forms a cull that is a resin supply path, and the cavity (reference number omitted), which is the resin molding portion.

また、下型ダイセット21は、図示しないサポートピラーを介して下型チェス22を支持する枠体である。サポートピラーは、下型ダイセット21及び下型チェス22に接続され、下型チェス22を支持する支持部材である。 The lower die set 21 is a frame that supports the lower die chest 22 via a support pillar (not shown). The support pillar is a support member that is connected to the lower die set 21 and the lower die chest 22 and supports the lower die chest 22.

また、上型チェス12は、上カルブロック120と、上キャビティブロック121と、第1の上ホルダーベース122と、第2の上ホルダーベース123を有している(図1及び図2(c)参照)。 The upper die chess piece 12 also has an upper cull block 120, an upper cavity block 121, a first upper holder base 122, and a second upper holder base 123 (see Figures 1 and 2(c)).

また、上カルブロック120は、型締めした際に、後述する下カルブロック220と共にカル部124を形成する部材である。また、上キャビティブロック121は、型締めした際に、後述する下キャビティブロック221と共に、キャビティを形成する部材である。 The upper cull block 120 is a member that, together with the lower cull block 220 (described later), forms the cull portion 124 when the mold is closed. The upper cavity block 121 is a member that, together with the lower cavity block 221 (described later), forms the cavity when the mold is closed.

また、第1の上ホルダーベース122及び第2の上ホルダーベース123は、図示しないサポートピラーで支持される部材である。サポートピラーは、上型ダイセット11と、第1の上ホルダーベース122及び第2の上ホルダーベース123に接続され、上型チェス12を支持する支持部材である。 The first upper holder base 122 and the second upper holder base 123 are members supported by support pillars (not shown). The support pillars are connected to the upper die set 11, the first upper holder base 122, and the second upper holder base 123, and are support members that support the upper die set 12.

また、上カルブロック120には、上カル部センサー130が設けられている(図1及び図2(c)参照)。また、第1の上ホルダーベース122と第2の上ホルダーベース123の間、かつ、上カルブロック120の上部には、上カル部ヒーター140が設けられている。 In addition, the upper cull block 120 is provided with an upper cull section sensor 130 (see Figures 1 and 2 (c)). In addition, an upper cull section heater 140 is provided between the first upper holder base 122 and the second upper holder base 123, and on the top of the upper cull block 120.

また、上カル部センサー130は、上カルブロック120の温度と、時間の変化に伴う温度変化の情報を測定する温度測定手段である。 The upper cull section sensor 130 is a temperature measuring means that measures the temperature of the upper cull block 120 and information on temperature changes over time.

また、上カル部ヒーター140は、上カルブロック120を加温する加温手段である。上カル部ヒーター140は、出力の調整、加温する時間の調整、及び、加温を始めるタイミングの調整を行うことにより、上カルブロック120の温度を調整することができる。なお、ここでいう加温を始めるタイミングとは、本願請求項における加温手段による加温の時機に該当する。 The upper cull section heater 140 is a heating means for heating the upper cull block 120. The upper cull section heater 140 can adjust the temperature of the upper cull block 120 by adjusting the output, the heating time, and the timing for starting heating. The timing for starting heating here corresponds to the timing of heating by the heating means in the claims of this application.

また、図2(a)には、上型チェス12における上カル部センサー130と、上カル部ヒーター140の配置を示している。上カル部センサー130は、上型チェス12の前側、かつ、中央付近に1つ設けられている(図1及び図2(c)参照)。 Figure 2(a) also shows the arrangement of the upper cull sensor 130 and the upper cull heater 140 in the upper chess plate 12. One upper cull sensor 130 is provided on the front side of the upper chess plate 12, near the center (see Figures 1 and 2(c)).

また、上カル部センサー130は、図2(a)の符号Pで示す領域の拡大図に示すように、上カルブロック120の両側にあるカル部124の間を通すようにして配置されている。 The upper cull sensor 130 is positioned so that it passes between the cull sections 124 on both sides of the upper cull block 120, as shown in the enlarged view of the area indicated by the symbol P in Figure 2(a).

また、上カル部ヒーター140は、上型チェス12の中央付近に、左右方向へ3つ並べて配置されている(図2(a)参照)。また、上カル部ヒーター140は、その長手方向が、上型チェス12の前後方向と平行な向きに設けられている。 The upper cull heaters 140 are arranged in three rows in the left-right direction near the center of the upper chess plate 12 (see FIG. 2(a)). The upper cull heaters 140 are also arranged so that their longitudinal direction is parallel to the front-to-rear direction of the upper chess plate 12.

また、上カルブロック120に対して左右に配置されている上キャビティブロック121(以下、左右の上キャビティブロック121と記載する)には、それぞれ上キャビティセンサー131が設けられている(図1及び図2(c)参照)。また、第1の上ホルダーベース122と第2の上ホルダーベース123の間、かつ、左右の上キャビティブロック121の上部には、それぞれ上キャビティヒーター141が設けられている(図1参照)。 In addition, the upper cavity blocks 121 (hereinafter referred to as the left and right upper cavity blocks 121) arranged on the left and right of the upper cull block 120 are each provided with an upper cavity sensor 131 (see Figures 1 and 2(c)). In addition, between the first upper holder base 122 and the second upper holder base 123, and on the tops of the left and right upper cavity blocks 121, upper cavity heaters 141 are each provided (see Figure 1).

また、上キャビティセンサー131は、左右の上キャビティブロック121の温度と、時間の変化に伴う温度変化の情報を測定する温度測定手段である。 The upper cavity sensor 131 is a temperature measuring means that measures the temperature of the left and right upper cavity blocks 121 and information on temperature changes over time.

また、上キャビティヒーター141は、左右の上キャビティブロック121を加温する加温手段である。上キャビティヒーター141は、出力の調整、加温する時間の調整、及び、加温を始めるタイミングの調整を行うことにより、左右の上キャビティブロック121の温度を調整することができる。 The upper cavity heater 141 is a heating means for heating the left and right upper cavity blocks 121. The upper cavity heater 141 can adjust the temperature of the left and right upper cavity blocks 121 by adjusting the output, the heating time, and the timing for starting heating.

なお、上カル部ヒーター140及び上キャビティヒーター141における出力の調整には、各ヒーターのON/OFFの切り替えが含まれている。 Adjusting the output of the upper culvert heater 140 and the upper cavity heater 141 includes switching each heater on and off.

また、図2(a)には、上型チェス12における上キャビティセンサー131と、上キャビティヒーター141の配置を示している。上キャビティセンサー131は、左右の上キャビティブロック121のそれぞれに、前後方向へ3つ並べて設けられている。 Figure 2(a) also shows the arrangement of the upper cavity sensor 131 and the upper cavity heater 141 in the upper die chess 12. Three upper cavity sensors 131 are arranged in the front-to-rear direction in each of the left and right upper cavity blocks 121.

また、上キャビティヒーター141は、左右方向において、上カル部ヒーター140を挟んで両側に、それぞれ1つずつ並べて配置されている(図2(a)参照)。また、上キャビティヒーター141は、その長手方向が、上型チェス12の前後方向と平行な向きに設けられている。 The upper cavity heaters 141 are arranged side by side, one on each side of the upper cull heater 140 in the left-right direction (see FIG. 2(a)). The upper cavity heaters 141 are also arranged so that their longitudinal direction is parallel to the front-to-rear direction of the upper die chess 12.

ここで、必ずしも、上型チェス12に、上カル部センサー130及び上キャビティセンサー131が設けられる必要はなく、いずれか1つのセンサーのみが設けられた構造が採用されてもよい。但し、1つのセンサーのみを設ける構造に比べて、上カルブロック120、及び、左右の上キャビティブロック121で、温度と温度変化の情報が取得でき、上金型1の中でもより細かい範囲で、温度変化が把握可能となり、各ヒーター140、141による加温の調整が行いやすくなる点から、上型チェス12に、上カル部センサー130及び上キャビティセンサー131が設けられることが好ましい。 Here, it is not necessary to provide the upper cull portion sensor 130 and the upper cavity sensor 131 in the upper die chest 12, and a structure in which only one of the sensors is provided may be adopted. However, compared to a structure in which only one sensor is provided, it is preferable to provide the upper cull portion sensor 130 and the upper cavity sensor 131 in the upper die chest 12, because this allows temperature and temperature change information to be obtained in the upper cull block 120 and the left and right upper cavity blocks 121, makes it possible to grasp temperature changes in a finer range within the upper die 1, and makes it easier to adjust the heating by each heater 140, 141.

また、必ずしも、上カル部センサー130が1つ設けられる必要はなく、その数は特に限定されるものではない。また、上カル部センサー130の配置位置も適宜変更することができる。 Furthermore, it is not necessary to provide only one upper cull section sensor 130, and the number is not particularly limited. Furthermore, the position of the upper cull section sensor 130 can also be changed as appropriate.

また、必ずしも、上キャビティセンサー131が3つ設けられる必要はなく、その数は特に限定されるものではない。また、上キャビティセンサー131の配置位置も適宜変更することができる。 In addition, it is not necessary to provide three upper cavity sensors 131, and the number is not particularly limited. In addition, the position of the upper cavity sensor 131 can also be changed as appropriate.

また、必ずしも、上型チェス12に、上カル部ヒーター140及び上キャビティヒーター141が設けられる必要はなく、いずれか1つのヒーターのみが設けられた構造が採用されてもよい。但し、1つのヒーターのみを設ける構造に比べて、上カルブロック120、及び、左右の上キャビティブロック121を加温することができ、上金型1の中でもより細かい範囲で温度制御が可能となり、上金型1の全体で温度を安定化させやすくなる点から、上型チェス12に、上カル部ヒーター140及び上キャビティヒーター141が設けられることが好ましい。 In addition, it is not necessary to provide the upper cull portion heater 140 and the upper cavity heater 141 in the upper die chest 12, and a structure in which only one of the heaters is provided may be adopted. However, compared to a structure in which only one heater is provided, it is possible to heat the upper cull block 120 and the left and right upper cavity blocks 121, making it possible to control the temperature in a finer range within the upper die 1, and making it easier to stabilize the temperature throughout the entire upper die 1, so it is preferable to provide the upper cull portion heater 140 and the upper cavity heater 141 in the upper die chest 12.

また、必ずしも、上カル部ヒーター140が3つ設けられる必要はなく、その数は特に限定されるものではない。また、上カル部ヒーター140の配置位置も適宜変更することができる。 In addition, it is not necessary to provide three upper cull heaters 140, and the number is not particularly limited. In addition, the position of the upper cull heaters 140 can also be changed as appropriate.

また、必ずしも、上キャビティヒーター141が2つ設けられる必要はなく、その数は特に限定されるものではない。また、上キャビティヒーター141の配置位置も適宜変更することができる。 In addition, it is not necessary to provide two upper cavity heaters 141, and the number is not particularly limited. In addition, the position of the upper cavity heater 141 can also be changed as appropriate.

ここで、下型チェス22は、型締めした際に、上型チェス12と共にカル部124及びキャビティ(符号省略)を形成する部材である。 Here, the lower die chess 22 is a member that, together with the upper die chess 12, forms the cull portion 124 and the cavity (symbol omitted) when the die is clamped.

また、下型チェス22は、下カルブロック220と、下キャビティブロック221と、第1の下ホルダーベース222と、第2の下ホルダーベース223を有している(図1及び図2(d)参照)。 The lower die chess 22 also has a lower cal block 220, a lower cavity block 221, a first lower holder base 222, and a second lower holder base 223 (see Figures 1 and 2(d)).

また、下カルブロック220は、型締めした際に、上カルブロック120と共にカル部124を形成する部材である。また、下キャビティブロック221は、型締めした際に、上キャビティブロック121と共に、キャビティを形成する部材である。 The lower cull block 220 is a member that, together with the upper cull block 120, forms the cull portion 124 when the mold is closed. The lower cavity block 221 is a member that, together with the upper cavity block 121, forms the cavity when the mold is closed.

また、第1の下ホルダーベース222及び第2の下ホルダーベース223は、図示しないサポートピラーで支持される部材である。サポートピラーは、下型ダイセット21と、第1の下ホルダーベース222及び第2の下ホルダーベース223に接続され、下型チェス22を支持する支持部材である。 The first lower holder base 222 and the second lower holder base 223 are members supported by support pillars (not shown). The support pillars are connected to the lower die set 21, the first lower holder base 222, and the second lower holder base 223, and are support members that support the lower die set 22.

また、下カルブロック220には、下カル部センサー230が設けられている(図1及び図2(d)参照)。また、第1の下ホルダーベース222と第2の下ホルダーベース223の間、かつ、下カルブロック220の下部には、下カル部ヒーター240が設けられている。 In addition, the lower cull block 220 is provided with a lower cull section sensor 230 (see Figures 1 and 2(d)). In addition, a lower cull section heater 240 is provided between the first lower holder base 222 and the second lower holder base 223, and below the lower cull block 220.

また、下カル部センサー230は、下カルブロック220の温度と、時間の変化に伴う温度変化の情報を測定する温度測定手段である。 The lower cull section sensor 230 is a temperature measuring means that measures the temperature of the lower cull block 220 and information on temperature changes over time.

また、下カル部ヒーター240は、下カルブロック220を加温する加温手段である。下カル部ヒーター240は、出力の調整、加温する時間の調整、及び、加温を始めるタイミングの調整を行うことにより、下カルブロック220の温度を調整することができる。 The lower cull section heater 240 is a heating means for heating the lower cull block 220. The lower cull section heater 240 can adjust the temperature of the lower cull block 220 by adjusting the output, the heating time, and the timing for starting heating.

また、図2(b)には、下型チェス22における下カル部センサー230と、下カル部ヒーター240の配置を示している。下カル部センサー230は、下型チェス22の前側、かつ、中央付近に1つ設けられている。 Figure 2(b) also shows the arrangement of the lower cull sensor 230 and the lower cull heater 240 in the lower chess plate 22. The lower cull sensor 230 is provided on the front side of the lower chess plate 22, near the center.

また、下カル部ヒーター240は、左右方向における、下型チェス22の中央付近に1つ配置されている(図2(b)参照)。また、下カル部ヒーター240は、その長手方向が、下型チェス22の前後方向と平行な向きに設けられている。 The lower cull heater 240 is disposed near the center of the lower chess plate 22 in the left-right direction (see FIG. 2(b)). The lower cull heater 240 is disposed such that its longitudinal direction is parallel to the front-rear direction of the lower chess plate 22.

また、下カルブロック220に対して左右に配置されている下キャビティブロック221(以下、左右の下キャビティブロック221と記載する)には、それぞれ下キャビティセンサー231が設けられている(図1及び図2(d)参照)。また、第1の下ホルダーベース222と第2の下ホルダーベース223の間、かつ、左右の下キャビティブロック221の下部には、それぞれ下キャビティヒーター241が設けられている。 In addition, the lower cavity blocks 221 (hereinafter referred to as the left and right lower cavity blocks 221) arranged on the left and right of the lower cal block 220 are each provided with a lower cavity sensor 231 (see Figures 1 and 2(d)). In addition, lower cavity heaters 241 are provided between the first lower holder base 222 and the second lower holder base 223, and below the left and right lower cavity blocks 221, respectively.

また、下キャビティセンサー231は、左右の下キャビティブロック221の温度と、時間の変化に伴う温度変化の情報を測定する温度測定手段である。 The lower cavity sensor 231 is a temperature measuring means that measures the temperature of the left and right lower cavity blocks 221 and information on temperature changes over time.

また、下キャビティヒーター241は、左右の下キャビティブロック221を加温する加温手段である。下キャビティヒーター241は、出力の調整、加温する時間の調整、及び、加温を始めるタイミングの調整を行うことにより、左右の下キャビティブロック221の温度を調整することができる。 The lower cavity heater 241 is a heating means for heating the left and right lower cavity blocks 221. The lower cavity heater 241 can adjust the temperature of the left and right lower cavity blocks 221 by adjusting the output, the heating time, and the timing for starting heating.

なお、下カル部ヒーター240及び下キャビティヒーター241における出力の調整には、各ヒーターのON/OFFの切り替えが含まれている。 Adjusting the output of the lower culvert heater 240 and the lower cavity heater 241 involves switching each heater on and off.

また、図2(b)には、下型チェス22における下キャビティセンサー231と、下キャビティヒーター241の配置を示している。下キャビティセンサー231は、左右の下キャビティブロック221のそれぞれに、前後方向へ3つ並べて設けられている。 Figure 2 (b) also shows the arrangement of the lower cavity sensor 231 and the lower cavity heater 241 in the lower die chess 22. Three lower cavity sensors 231 are arranged in the front-to-rear direction in each of the left and right lower cavity blocks 221.

また、下キャビティヒーター241は、左右方向において、下カル部ヒーター240を挟んで両側に、それぞれ1つずつ並べて配置されている(図2(b)参照)。また、下キャビティヒーター241は、その長手方向が、下型チェス22の前後方向と平行な向きに設けられている。 The lower cavity heaters 241 are arranged side by side, one on each side of the lower cull heater 240 in the left-right direction (see FIG. 2(b)). The lower cavity heaters 241 are also arranged so that their longitudinal direction is parallel to the front-to-rear direction of the lower die chess 22.

ここで、必ずしも、下型チェス22に、下カル部センサー230及び下キャビティセンサー231が設けられる必要はなく、いずれか1つのセンサーのみが設けられた構造が採用されてもよい。但し、1つのセンサーのみを設ける構造に比べて、下カルブロック220、及び、左右の下キャビティブロック221で、温度と温度変化の情報が取得でき、下金型2の中でもより細かい範囲で、温度変化が把握可能となり、各ヒーター240、241による加温の調整が行いやすくなる点から、下型チェス22に、下カル部センサー230及び下キャビティセンサー231が設けられることが好ましい。 Here, it is not necessary to provide the lower cull portion sensor 230 and the lower cavity sensor 231 in the lower die chest 22, and a structure in which only one of the sensors is provided may be adopted. However, compared to a structure in which only one sensor is provided, it is preferable to provide the lower cull portion sensor 230 and the lower cavity sensor 231 in the lower die chest 22, because temperature and temperature change information can be obtained in the lower cull block 220 and the left and right lower cavity blocks 221, temperature changes can be grasped in a finer range within the lower die 2, and it is easier to adjust the heating by each heater 240, 241.

また、必ずしも、下カル部センサー230が1つ設けられる必要はなく、その数は特に限定されるものではない。また、下カル部センサー230の配置位置も適宜変更することができる。 Furthermore, it is not necessary to provide one lower cull section sensor 230, and the number is not particularly limited. Furthermore, the position of the lower cull section sensor 230 can also be changed as appropriate.

また、必ずしも、下キャビティセンサー231が、左右の下キャビティブロック221のそれぞれに3つ設けられる必要はなく、その数は特に限定されるものではない。また、下キャビティセンサー231の配置位置も適宜変更することができる。 Furthermore, it is not necessarily required that three lower cavity sensors 231 are provided in each of the left and right lower cavity blocks 221, and the number is not particularly limited. Furthermore, the position of the lower cavity sensors 231 can also be changed as appropriate.

また、必ずしも、下型チェス22に、下カル部ヒーター240及び下キャビティヒーター241が設けられる必要はなく、いずれか1つのヒーターのみが設けられた構造が採用されてもよい。但し、1つのヒーターのみを設ける構造に比べて、下カルブロック220、及び、左右の下キャビティブロック221を加温することができ、下金型2の中でもより細かい範囲で温度制御が可能となり、下金型2の全体で温度を安定化させやすくなる点から、下型チェス22に、下カル部ヒーター240及び下キャビティヒーター241が設けられることが好ましい。 In addition, it is not necessary to provide the lower cull section heater 240 and the lower cavity heater 241 in the lower die chest 22, and a structure in which only one of the heaters is provided may be adopted. However, compared to a structure in which only one heater is provided, it is possible to heat the lower cull block 220 and the left and right lower cavity blocks 221, making it possible to control the temperature in a finer range within the lower die 2, and making it easier to stabilize the temperature throughout the entire lower die 2, so it is preferable to provide the lower cull section heater 240 and the lower cavity heater 241 in the lower die chest 22.

また、必ずしも、下カル部ヒーター240が1つ設けられる必要はなく、その数は特に限定されるものではない。また、下カル部ヒーター240の配置位置も適宜変更することができる。 In addition, it is not necessary to provide one lower cull heater 240, and the number is not particularly limited. In addition, the position of the lower cull heater 240 can also be changed as appropriate.

また、必ずしも、下キャビティヒーター241が2つ設けられる必要はなく、その数は特に限定されるものではない。また、下キャビティヒーター241の配置位置も適宜変更することができる。 Furthermore, it is not necessarily necessary to provide two lower cavity heaters 241, and the number is not particularly limited. Furthermore, the position of the lower cavity heater 241 can also be changed as appropriate.

ここで、上型ダイセット11には、上型チェス12を加温する上ダイセットヒーター111と、上ダイセットセンサー110が設けられている(図1及び図3(a)参照)。また、下型ダイセット21には、下型チェス22を加温する下ダイセットヒーター211と、下ダイセットセンサー210が設けられている(図1及び図3(b)参照)。 Here, the upper die set 11 is provided with an upper die set heater 111 for heating the upper die chess 12, and an upper die set sensor 110 (see Figures 1 and 3(a)). Also, the lower die set 21 is provided with a lower die set heater 211 for heating the lower die chess 22, and a lower die set sensor 210 (see Figures 1 and 3(b)).

また、上ダイセットセンサー110は、上型ダイセット11の温度を測定する温度測定手段である。また、下ダイセットセンサー210は、下型ダイセット21の温度を測定する温度測定手段である。 The upper die set sensor 110 is a temperature measuring means for measuring the temperature of the upper die set 11. The lower die set sensor 210 is a temperature measuring means for measuring the temperature of the lower die set 21.

樹脂封止装置Sが大型の成形品を製造する樹脂封止装置である場合、例えば、図4(a)及び図4(b)又は図5(a)及び図5(b)に示すように、上カル部センサー130、上キャビティセンサー131、上カル部ヒーター140、下カル部センサー230、下キャビティセンサー231、及び下カル部ヒーター240を配置することができる。 When the resin sealing device S is a resin sealing device that produces large molded products, for example, the upper cull section sensor 130, the upper cavity sensor 131, the upper cull section heater 140, the lower cull section sensor 230, the lower cavity sensor 231, and the lower cull section heater 240 can be arranged as shown in Figures 4(a) and 4(b) or Figures 5(a) and 5(b).

図4(a)及び図5(a)に示す上金型1では、上型チェス12の上カルブロック120において、左右方向に並べて3つの上カル部ヒーター140が配置されており、各上カル部ヒーター140は、その長手方向が、上カルブロック120の前後方向と平行な向きに設けられている。3つの上カル部ヒーター140のうち左右方向の中央に位置する上カル部ヒーター140は左右方向に2列で配置されたカル部124間に位置する。カル部124間に位置するとは、上下方向から見た場合に、カル部124間に位置することを含む。 In the upper mold 1 shown in Figures 4(a) and 5(a), three upper cull section heaters 140 are arranged in a row in the left-right direction in the upper cull block 120 of the upper mold chess 12, and each upper cull section heater 140 is arranged with its longitudinal direction parallel to the front-to-rear direction of the upper cull block 120. Of the three upper cull section heaters 140, the upper cull section heater 140 located in the center in the left-right direction is located between the cull sections 124 arranged in two rows in the left-right direction. Being located between the cull sections 124 includes being located between the cull sections 124 when viewed from the top-to-bottom direction.

また、図4(a)に示す上金型1では、上カルブロック120において、カル部124の上方には、上カル部センサー130が配置され、上キャビティブロック121における各キャビティの上方には、上キャビティセンサー131が配置されている。 In the upper mold 1 shown in FIG. 4(a), an upper cull portion sensor 130 is disposed above the cull portion 124 in the upper cull block 120, and an upper cavity sensor 131 is disposed above each cavity in the upper cavity block 121.

また、図5(a)に示す上金型1では、上カルブロック120において、カル部124の上方には、1つの上カル部センサー130が配置され、上キャビティブロック121における各キャビティの上方には、前側と後側に各々上キャビティセンサー131が配置されている。 In the upper mold 1 shown in FIG. 5(a), one upper cull portion sensor 130 is arranged above the cull portion 124 in the upper cull block 120, and upper cavity sensors 131 are arranged on the front and rear sides above each cavity in the upper cavity block 121.

また、図4(b)及び図5(b)に示す下金型2では、下カルブロック220における左右方向の中央付近に1つの下カル部ヒーター240が配置されている。下カル部ヒーター240は、その長手方向が、下カルブロック220の前後方向と平行な向きに設けられている。 In the lower mold 2 shown in Figures 4(b) and 5(b), one lower cull section heater 240 is disposed near the center in the left-right direction of the lower cull block 220. The lower cull section heater 240 is disposed such that its longitudinal direction is parallel to the front-rear direction of the lower cull block 220.

また、図4(b)及び図5(b)に示す下金型2では、下型チェス22の下カルブロック220において、下カル部センサー230は、下カルブロック220の前側、かつ、中央付近に1つ設けられ、下カルブロック220の後側、かつ、中央付近に1つ設けられる。また、図4(b)及び図5(b)に示す下金型2では、下カルブロック220において、樹脂タブレットなどの樹脂部材が各々投入される複数のポット250が形成されている。上述した複数のカル部124の各々は、複数のポット250のうち互いに組み合わせが異なる2つのポット250に対応して設けられ、これら2つのポット250から各カル部124に樹脂部材が供給される。左右方向で対向するポット250間には、上述した下カル部ヒーター240が配置される。 In the lower mold 2 shown in Fig. 4(b) and Fig. 5(b), in the lower cull block 220 of the lower die chess 22, one lower cull section sensor 230 is provided on the front side of the lower cull block 220 near the center, and one is provided on the rear side of the lower cull block 220 near the center. In the lower mold 2 shown in Fig. 4(b) and Fig. 5(b), the lower cull block 220 has a plurality of pots 250 into which resin materials such as resin tablets are respectively poured. Each of the above-mentioned plurality of cull sections 124 is provided corresponding to two pots 250 of the plurality of pots 250 having different combinations, and resin materials are supplied to each cull section 124 from these two pots 250. Between the pots 250 facing each other in the left-right direction, the above-mentioned lower cull section heater 240 is arranged.

樹脂封止装置Sの樹脂封止金型Mは制御部を備えており、制御部内には温度を制御する温度制御エリアを有している。この温度制御エリアを温度制御部という。 The resin sealing mold M of the resin sealing device S is equipped with a control unit, and the control unit has a temperature control area that controls the temperature. This temperature control area is called the temperature control unit.

図6に示すように、制御部30は、加温手段による加温を実行する実行部31を備える。実行部31は、算出部32と、加温実行部33とを備える。算出部32は、前回以前の成形動作において温度測定手段で取得された温度変化の情報に基づいて、前回よりも後の成形動作が実行されるまでの間に、加温手段による1回分の成形動作における加温の調整内容を算出する。加温実行部33は、算出部32で算出された調整内容によって前回よりも後の成形動作において加温手段による加温を実行する。加温実行部33は、温度制御部34と、加温手段による加温の調整内容を温度制御部34に指示する加温指示部35とを備える。 As shown in FIG. 6, the control unit 30 includes an execution unit 31 that executes heating by the heating means. The execution unit 31 includes a calculation unit 32 and a heating execution unit 33. The calculation unit 32 calculates the heating adjustment content for one molding operation by the heating means until the molding operation after the previous one is executed based on information on temperature changes acquired by the temperature measurement means in the molding operation before the previous one. The heating execution unit 33 executes heating by the heating means in the molding operation after the previous one based on the adjustment content calculated by the calculation unit 32. The heating execution unit 33 includes a temperature control unit 34 and a heating instruction unit 35 that instructs the temperature control unit 34 on the adjustment content of heating by the heating means.

また、樹脂封止金型Mには温度調整領域が設定されている。この温度調整領域にはセンサー及びヒーターが設けられている。なお、ここでいうセンサーとは、上述した上ダイセットセンサー110、上カル部センサー130、上キャビティセンサー131、下ダイセットセンサー210、下カル部センサー230、下キャビティセンサー231のいずれかが該当する。また、ここでいうヒーターとは、上述した上ダイセットヒーター111、上カル部ヒーター140、上キャビティヒーター141、下ダイセットヒーター211、下カル部ヒーター240、下キャビティヒーター241のいずれかが該当する。 A temperature control area is also set in the resin sealing mold M. A sensor and a heater are provided in this temperature control area. The sensor here refers to any one of the upper die set sensor 110, upper cull section sensor 130, upper cavity sensor 131, lower die set sensor 210, lower cull section sensor 230, and lower cavity sensor 231 described above. The heater here refers to any one of the upper die set heater 111, upper cull section heater 140, upper cavity heater 141, lower die set heater 211, lower cull section heater 240, and lower cavity heater 241 described above.

この温度調整領域に設けられているセンサー及びヒーターは、図6に示す温度制御部34に接続されている。温度制御部34は、樹脂封止装置Sが半導体素子を樹脂封止する成形動作の際に、温度調整領域に設けられたセンサーから温度調整領域における温度変化の情報を取得する。ここで、1回の成形動作は、樹脂封止装置Sにおいて、上金型1と下金型2とで被成形品をクランプしてから、上金型1と下金型2とによる成形品のクランプが解除されるまでの動作である。被成形品は、樹脂封止装置Sによる樹脂封止前の部材、即ち、樹脂封止されていない半導体素子が基材に載置された部材である。また、成形品は、樹脂封止装置Sによる樹脂封止後の部材、即ち、樹脂封止された半導体素子が基材に載置された部材である。 The sensor and heater installed in this temperature adjustment area are connected to the temperature control unit 34 shown in FIG. 6. The temperature control unit 34 acquires information on temperature changes in the temperature adjustment area from the sensor installed in the temperature adjustment area during the molding operation in which the resin sealing device S resin seals the semiconductor element. Here, one molding operation is the operation from when the molded product is clamped by the upper mold 1 and the lower mold 2 in the resin sealing device S to when the clamping of the molded product by the upper mold 1 and the lower mold 2 is released. The molded product is a member before resin sealing by the resin sealing device S, that is, a member in which a semiconductor element that has not been resin sealed is placed on a substrate. Also, the molded product is a member after resin sealing by the resin sealing device S, that is, a member in which a resin-sealed semiconductor element is placed on a substrate.

また、図6に示す実行部31の算出部32は、加温実行部33の温度制御部34を介して、温度調整領域に設けられたセンサーから温度調整領域における温度変化の情報を取得する。 The calculation unit 32 of the execution unit 31 shown in FIG. 6 also acquires information on temperature changes in the temperature adjustment area from a sensor installed in the temperature adjustment area via the temperature control unit 34 of the heating execution unit 33.

そして、算出部32は、成形動作によってセンサーが取得した、温度調整領域の温度変化の情報から、次の成形動作を行う際の、その温度調整領域における温度変化を予測して、各種パラメーターの数値の算出を行う。この各種パラメーターとは、温度調整領域が、所望の温度となるように、ヒーターによる加温を調整するための各種情報であり、例えば上カル部ヒーター140のON/OFF制御を行う情報が含まれる。かかる各種パラメーターは、加温手段による1回分の成形動作における加温の調整内容の一例である。以下において、算出部32で算出されるパラメーターの数値を単にパラメーターと記載する場合がある。 The calculation unit 32 predicts the temperature change in the temperature adjustment area when the next molding operation is performed from the information on the temperature change in the temperature adjustment area acquired by the sensor during the molding operation, and calculates the numerical values of various parameters. These various parameters are various information for adjusting the heating by the heater so that the temperature adjustment area reaches the desired temperature, and include, for example, information for controlling the ON/OFF of the upper cull heater 140. These various parameters are an example of the adjustment contents of the heating in one molding operation by the heating means. Below, the numerical values of the parameters calculated by the calculation unit 32 may be simply referred to as parameters.

なお、ここでいう所望の温度とは、樹脂封止金型の種類、基材の種類及び樹脂の種類等によって、適宜設定される温度を意味する。また、ヒーターによる加温に関する各種パラメーターの詳細については後述する。 The desired temperature here means a temperature that is set appropriately depending on the type of resin sealing mold, the type of base material, the type of resin, etc. Details of the various parameters related to heating by the heater will be described later.

また、加温実行部33の加温指示部35は、算出部32で算出された各種パラメーターの数値を温度制御部34に指示する。温度制御部34は、加温指示部35から指示された各種パラメーターに基づきヒーターを制御する。 The heating instruction unit 35 of the heating execution unit 33 instructs the temperature control unit 34 on the values of the various parameters calculated by the calculation unit 32. The temperature control unit 34 controls the heater based on the various parameters instructed by the heating instruction unit 35.

より詳しくは、温度制御部34は、加温指示部35から指示された各種パラメーターに基づき、温度調整領域を加温するヒーターについて、出力の調整、加温する時間の調整、及び、加温を始めるタイミングの調整を行い、その温度調整領域が所望の温度となるように予測制御を行う。 More specifically, the temperature control unit 34 adjusts the output of the heater that heats the temperature adjustment area, adjusts the heating time, and adjusts the timing at which heating starts based on various parameters instructed by the heating instruction unit 35, and performs predictive control so that the temperature adjustment area reaches the desired temperature.

なお、ここでいう予測制御とは、以下のように定義される。まず、前提として、樹脂封止金型に、成形動作における基準の温度が設定されている。そして、事前に測定された温度調整領域の温度変化の情報から、どのくらいの熱量を与えれば(又は、熱量を抑えれば)、その温度調整領域において、基準の温度との温度差を小さくすることができるかを計算して、温度調整領域を加温するヒーターについて、出力、加温する時間、及び、加温を始める時機の変更等を行う。このようにして、事前に測定された温度変化の情報を基に、それより後に行われる成形動作における加温に関する各種パラメーターを変更することで、次の成形動作の際に、温度調整領域の温度と、基準の温度との温度差が小さくなるようにヒーターの加温を制御することを予測制御とする。 Note that predictive control is defined as follows. First, a reference temperature for the molding operation is set in the resin sealing mold. Then, based on information on the temperature change in the temperature adjustment area measured in advance, it is calculated how much heat (or how little heat) should be applied to reduce the temperature difference between the reference temperature in that temperature adjustment area, and changes are made to the output, heating time, and timing of starting heating for the heater that heats the temperature adjustment area. In this way, predictive control is achieved by changing various parameters related to heating in subsequent molding operations based on information on the temperature change measured in advance, thereby controlling the heating of the heater so that the temperature difference between the temperature adjustment area and the reference temperature is reduced during the next molding operation.

ここで、制御部30において、温度制御部34が設定される数は1つに限定されるものではなく、複数の温度制御部34を設定することができる。 Here, the number of temperature control units 34 set in the control unit 30 is not limited to one, and multiple temperature control units 34 can be set.

続いて、上述した樹脂封止装置Sを用いて行う樹脂封止方法について説明する。なお、以下の内容は、本発明に係る樹脂封止方法の一例である。 Next, we will explain the resin sealing method performed using the above-mentioned resin sealing device S. Note that the following content is an example of the resin sealing method according to the present invention.

[予測制御に用いる各種パラメーターの算出]
まず、樹脂封止装置Sを用いた樹脂封止方法では、図7(a)に示す事前成形方法により、図6に示す制御部30の実行部31が次の成形動作のための各種パラメーターを算出する。
[Calculation of various parameters used in predictive control]
First, in the resin sealing method using the resin sealing apparatus S, the execution unit 31 of the control unit 30 shown in FIG. 6 calculates various parameters for the next molding operation by the pre-molding method shown in FIG. 7(a).

なお、ここでは、上カルブロック120を予測制御する温度調整領域として設定した場合を例に説明する。即ち、制御部30の実行部31が上カル部ヒーター140をコントロールして予測制御を行う際に必要となる、各種パラメーターの算出方法について説明する。 Here, we will explain an example in which the upper cull block 120 is set as the temperature adjustment area for predictive control. That is, we will explain how to calculate various parameters that are required when the execution unit 31 of the control unit 30 controls the upper cull part heater 140 to perform predictive control.

この事前成形方法では、樹脂封止装置Sに樹脂封止の対象となる基材及び樹脂を供給して、半導体素子を樹脂封止する通常成形を行う(図7(a)参照)。また、この通常成形では、上カル部ヒーター140を任意の時間ONにして、成形動作を行う(ステップS1)。上カル部センサー130は、ステップS1の成形動作を実行する期間における上カルブロック120の温度変化の情報を取得する取得工程を実行する。 In this pre-molding method, the substrate and resin to be encapsulated are supplied to the resin encapsulation device S, and normal molding is performed to encapsulate the semiconductor element (see FIG. 7(a)). In this normal molding, the upper cull section heater 140 is turned on for a given period of time to perform the molding operation (step S1). The upper cull section sensor 130 executes an acquisition process to acquire information on the temperature change of the upper cull block 120 during the period in which the molding operation of step S1 is performed.

次に、上述した通常成形の結果から、実行部31の算出部32が、次の成形動作を行う際の、上カルブロック120が所望の温度となるような上カル部ヒーター140の加温に関する各種パラメーターを算出する(ステップS2)。即ち、通常成形の際に、上カル部センサー130が取得した上カルブロック120の温度変化の情報から、次の成形動作を行う際の、上カルブロック120における温度変化を予測して、各種パラメーターの算出を行う。このように、ステップS2の処理は、前回以前の成形動作において上カル部センサー130で測定された温度変化の情報に基づいて、次の成形動作の実行工程で行われる加温手段による1回分の成形動作における加温の調整内容を算出する算出工程を含む。次の成形動作は、前回の成形動作に続いて、前回の成形動作より後に行われる成形動作であり、以下において今回の成形動作と記載する場合がある。 Next, from the results of the normal molding described above, the calculation unit 32 of the execution unit 31 calculates various parameters related to heating of the upper cull heater 140 so that the upper cull block 120 will reach the desired temperature when the next molding operation is performed (step S2). That is, from the information on the temperature change in the upper cull block 120 acquired by the upper cull sensor 130 during normal molding, the temperature change in the upper cull block 120 when the next molding operation is performed is predicted, and various parameters are calculated. In this way, the processing of step S2 includes a calculation process that calculates the heating adjustment content for one molding operation by the heating means performed in the execution process of the next molding operation based on the information on the temperature change measured by the upper cull sensor 130 in the molding operation before the previous one. The next molding operation is a molding operation that follows the previous molding operation and is performed after the previous molding operation, and may be referred to as the current molding operation below.

ここで、算出部32が算出する各種パラメーターには、例えば、上カル部ヒーター140のON/OFF制御を行う情報が含まれる。なお、図7(b)には、各種パラメーターを上カル部ヒーター140のON/OFF制御に反映させた状態の概念図を示している。 Here, the various parameters calculated by the calculation unit 32 include, for example, information for controlling the ON/OFF of the upper cull section heater 140. Note that FIG. 7(b) shows a conceptual diagram of the state in which the various parameters are reflected in the ON/OFF control of the upper cull section heater 140.

具体的には、成形動作の開始時から上カル部ヒーター140をONにするまでの時間である「ヒーターON前ディレー(X0)」、上カル部ヒーター140をONにして、最終的にOFFにするまでの時間である「ヒーターON/OFFの合計時間(Xall)」の情報がある。 Specifically, there is information on the "delay before heater ON (X0)," which is the time from the start of the molding operation until the upper cull heater 140 is turned ON, and the "total heater ON/OFF time (Xall)," which is the time from turning the upper cull heater 140 ON until it is finally turned OFF.

また、上カル部ヒーター140をONにして、最終的にOFFにするまでの間に、上カル部ヒーター140のONとOFFを切り替える場合での、1回の上カル部ヒーター140をONにしている1回分の時間(X1~X4)の情報がある。 In addition, when the upper cull section heater 140 is switched ON and OFF between when it is turned ON and when it is finally turned OFF, there is information on the time (X1 to X4) that the upper cull section heater 140 is turned ON each time.

さらに、図7(b)中に符号を付して示さないが、1回の上カル部ヒーター140のOFFの時間、上カル部ヒーター140のONとOFFを切り替える回数の情報も各種パラメーターの情報となる。 In addition, although not indicated by symbols in FIG. 7(b), the time for which the upper cull section heater 140 is turned OFF and the number of times the upper cull section heater 140 is switched ON and OFF are also included as information on various parameters.

このように、樹脂封止装置Sで通常成形を行って、その成形動作の際に取得した上カルブロック120の温度変化の情報に基づき、次の成形動作を行う際の上カル部ヒーター140のON/OFF制御を行う各種パラメーター(X0、X1、X2、X3、X4等)を、実行部31の算出部32で自動的に算出することができる。加温実行部33は、次の成形動作において、算出部32で算出された各種パラメーター(X0~X4等)の数値に基づいて、上カル部ヒーター140による加温を実行する実行工程を実行する。 In this way, normal molding is performed with the resin sealing device S, and based on the information on the temperature change of the upper cull block 120 acquired during the molding operation, the calculation unit 32 of the execution unit 31 can automatically calculate various parameters (X0, X1, X2, X3, X4, etc.) that control the ON/OFF of the upper cull section heater 140 when performing the next molding operation based on the information on the temperature change of the upper cull block 120 acquired during the molding operation. The heating execution unit 33 executes an execution process that performs heating by the upper cull section heater 140 during the next molding operation based on the numerical values of the various parameters (X0 to X4, etc.) calculated by the calculation unit 32.

なお、加温開始時間(X0)を算出し、これを基準とすることで、成形動作の開始時間に対する加温の始まりのタイミングを様々に調整することができる。また、ヒーターON/OFFの合計時間(Xall)を算出することで、加温をする時間の長さを様々に調整することができる。 By calculating the heating start time (X0) and using this as a reference, it is possible to adjust the timing of the start of heating relative to the start of the molding operation in various ways. Also, by calculating the total heater ON/OFF time (Xall), it is possible to adjust the length of time for heating in various ways.

また、ここで述べた各種パラメーターの種類はあくまで一例であり、上カル部ヒーター140のON/OFF制御に関わるパラメーターの内容はこれに限定されるものではない。例えば、上カル部ヒーター140のON/OFF制御の回数は、4回に限られず、3回未満であってもよく、また、5回以上であってもよい。また、制御部30の実行部31は、前回以前の成形動作において上カル部センサー130で測定された温度変化の情報に基づいて、上カル部ヒーター140のON/OFF制御の回数を変更することもできる。 The types of parameters described here are merely examples, and the contents of the parameters related to the ON/OFF control of the upper cull heater 140 are not limited to these. For example, the number of ON/OFF controls of the upper cull heater 140 is not limited to four times, but may be less than three times, or may be five times or more. The execution unit 31 of the control unit 30 can also change the number of ON/OFF controls of the upper cull heater 140 based on information on the temperature change measured by the upper cull sensor 130 in the molding operation prior to the previous one.

ここで、図8~図11を用いて、上カルブロック120の温度の調整方法についてさらに具体的に説明する。図8~図11において、「t1」は、1回の成形動作の開始時刻であり、上金型1と下金型2とで被成形品をクランプする時刻である。「t10」は、1回の成形動作の終了時刻であり、上金型1と下金型2とによる成形品のクランプを解除する時刻である。「Tmax」は、所要の温度の上限値(以下、上限温度と記載する)であり、「Tmin」は、所要の温度の下限値(以下、下限温度と記載する)である。なお、以下において、説明の便宜上、図8~図11に示す温度変化の測定対象となった成形動作を前回の成形動作と記載する。また、図8~図11では、説明の便宜上、前回の成形動作において用いられたパラメーターを前回の成形動作で用いられたパラメーター(X01~4~X41~4)とし、次の成形動作において用いられるパラメーターを次の1回の成形動作で用いるパラメーター(X01~4’~X41~4’)とする。さらに前回の成形動作におけるヒーターON/OFFの合計時間を前回のヒーターON/OFFの合計時間(Xall~Xall)とし、次の成形動作におけるヒーターON/OFFの合計時間を次のヒーターON/OFFの合計時間(Xall’~Xall’)としている。 Here, the method of adjusting the temperature of the upper cull block 120 will be described in more detail with reference to Figures 8 to 11. In Figures 8 to 11, "t1" is the start time of one molding operation, and is the time when the molded product is clamped between the upper mold 1 and the lower mold 2. "t10" is the end time of one molding operation, and is the time when the clamping of the molded product by the upper mold 1 and the lower mold 2 is released. "Tmax" is the upper limit of the required temperature (hereinafter referred to as the upper limit temperature), and "Tmin" is the lower limit of the required temperature (hereinafter referred to as the lower limit temperature). For ease of explanation, the molding operation that was the subject of the measurement of the temperature changes shown in Figures 8 to 11 will be referred to as the previous molding operation. 8 to 11, for ease of explanation, the parameters used in the previous molding operation are referred to as the parameters used in the previous molding operation (X0 1-4 to X4 1-4 ), and the parameters used in the next molding operation are referred to as the parameters to be used in the next molding operation (X0 1-4 ' to X4 1-4 '). Furthermore, the total heater ON/OFF time in the previous molding operation is referred to as the previous heater ON/OFF total time (Xall 1 to Xall 4 ), and the total heater ON/OFF time in the next molding operation is referred to as the next heater ON/OFF total time (Xall 1 ' to Xall 4 ').

図8(a)に示す第1の例では、前回の1回の成形動作において、上カルブロック120の温度は、時刻t2から時刻t3にかけて一旦下降した後上昇し、時刻t4で上限温度Tmaxを上回り、終了時刻t10まで上限温度Tmaxを上回る状態が継続している。上カルブロック120が図8(a)に示すように温度変化するのは、主に、上カル部ヒーター140のON時間が過大となっているためである。 In the first example shown in FIG. 8(a), in the previous molding operation, the temperature of the upper cull block 120 drops from time t2 to time t3, then rises, exceeds the upper limit temperature Tmax at time t4, and continues to exceed the upper limit temperature Tmax until the end time t10. The temperature of the upper cull block 120 changes as shown in FIG. 8(a) mainly because the upper cull section heater 140 is turned on for an excessively long time.

そのため、図6に示す実行部31の算出部32は、次の1回の成形動作において上カル部ヒーター140のON時間が前回の成形動作よりも短くなるように、各種パラメーターを算出する。具体的には、算出部32は、上カル部ヒーター140をONにしている合計時間が前回の成形動作よりも短くなるように、次の1回の成形動作で用いるパラメーター(X1’~X4’)を算出する。そして、実行部31の加温実行部33は、次の1回の成形動作で用いるパラメーター(X1’~X4’)を用いて、次の1回の成形動作においてカル部ヒーター140のON/OFFを制御する。カル部ヒーター140のON/OFFは、加温手段による加温の一例である。 Therefore, the calculation unit 32 of the execution unit 31 shown in Fig. 6 calculates various parameters so that the ON time of the upper cull portion heater 140 in the next molding operation is shorter than that in the previous molding operation. Specifically, the calculation unit 32 calculates parameters ( X11 ' to X41') to be used in the next molding operation so that the total time that the upper cull portion heater 140 is ON is shorter than that in the previous molding operation. Then, the heating execution unit 33 of the execution unit 31 controls the ON/OFF of the cull portion heater 140 in the next molding operation using the parameters ( X11 ' to X44 ') to be used in the next molding operation. The ON/OFF of the cull portion heater 140 is an example of heating by a heating means.

例えば、図8(b)に示す例では、算出部32は、上カル部ヒーター140をONにしている合計時間が前回の成形動作よりも短くなるように、次の1回の成形動作で用いるパラメーター(X1’~X4’)を算出する。この場合、算出部32は、次の1回の成形動作で用いるパラメーター(X4’)の数値をゼロにすることで、次の1回の成形動作で用いるパラメーター(X4’)を削除することができる。また、算出部32は、さらに、次の1回の成形動作において成形動作の開始時から上カル部ヒーター140をONにするまでの時間が前回の成形動作よりも短くなるように、次の1回の成形動作で用いるパラメーター(X0’)を算出することもできる。 For example, in the example shown in FIG. 8(b), the calculation unit 32 calculates the parameters (X1 1 ' to X4 1 ') to be used in the next molding operation so that the total time that the upper cull portion heater 140 is turned on is shorter than that of the previous molding operation. In this case, the calculation unit 32 can delete the parameter (X4 1 ') to be used in the next molding operation by setting the value of the parameter (X4 1 ') to be used in the next molding operation to zero. The calculation unit 32 can also calculate the parameter (X0 1 ') to be used in the next molding operation so that the time from the start of the molding operation to turning on the upper cull portion heater 140 in the next molding operation is shorter than that of the previous molding operation.

図9(a)に示す第2の例では、前回の1回の成形動作において、上カルブロック120の温度は、下降して、時刻t3で下限温度Tminを下回り、終了時刻t10まで下限温度Tminを下回る状態が継続している。上カルブロック120が図9(a)に示すように温度変化するのは、主に、上カル部ヒーター140のON時間が過少となっているためである。 In the second example shown in FIG. 9(a), in the previous molding operation, the temperature of the upper cull block 120 drops, falls below the lower limit temperature Tmin at time t3, and remains below the lower limit temperature Tmin until the end time t10. The temperature of the upper cull block 120 changes as shown in FIG. 9(a) mainly because the upper cull section heater 140 is turned on for too short a time.

そのため、図6に示す実行部31の算出部32は、次の1回の成形動作において上カル部ヒーター140のON時間が前回の成形動作よりも長くなるように、各種パラメーターを算出する。具体的には、算出部32は、上カル部ヒーター140をONにしている合計時間が前回の成形動作よりも長くなるように、次の1回の成形動作で用いるパラメーター(X1’~X4’)を算出する。そして、実行部31の加温実行部33は、次の1回の成形動作で用いるパラメーター(X1’~X4’)を用いて、次の1回の成形動作においてカル部ヒーター140のON/OFFを制御する。 Therefore, the calculation unit 32 of the execution unit 31 shown in Fig. 6 calculates various parameters so that the ON time of the upper cull portion heater 140 in the next molding operation is longer than in the previous molding operation. Specifically, the calculation unit 32 calculates parameters (X1 2 ' to X4 2') to be used in the next molding operation so that the total time that the upper cull portion heater 140 is ON is longer than in the previous molding operation. Then, the heating execution unit 33 of the execution unit 31 controls the ON/OFF of the cull portion heater 140 in the next molding operation using the parameters (X1 2 ' to X4 2 ') to be used in the next molding operation.

例えば、図9(b)に示す例では、算出部32は、上カル部ヒーター140をONにしている合計時間が前回の成形動作よりも長くなるように、次の1回の成形動作で用いるパラメーター(X1~X4’)を算出する。この場合、算出部32は、次の1回の成形動作で用いるパラメーター(X5’)を追加することができる。次の1回の成形動作で用いるパラメーター(X5’)は、5回目の上カル部ヒーター140のONの時間を示すパラメーターである。また、算出部32は、さらに、次の1回の成形動作において成形動作の開始時から上カル部ヒーター140をONにするまでの時間が前回の成形動作よりも長くなるように、次の1回の成形動作で用いるパラメーター(X0’)を算出することもできる。 For example, in the example shown in FIG. 9(b), the calculation unit 32 calculates parameters (X1 2 to X4 2 ') to be used in the next molding operation so that the total time that the upper cull portion heater 140 is turned on is longer than in the previous molding operation. In this case, the calculation unit 32 can add a parameter (X5 2 ') to be used in the next molding operation. The parameter (X5 2 ') to be used in the next molding operation is a parameter indicating the time that the upper cull portion heater 140 is turned on for the fifth time. The calculation unit 32 can also calculate a parameter (X0 2 ') to be used in the next molding operation so that the time from the start of the molding operation to turning on the upper cull portion heater 140 in the next molding operation is longer than in the previous molding operation.

図10(a)に示す第3の例では、前回の1回の成形動作において、上カルブロック120の温度は、上昇して、時刻t4で上限温度Tmaxを一旦上回り、時刻t5で上限温度Tmaxを下回って終了時刻t10まで所要の温度が継続している。上カルブロック120が図10(a)に示すように温度変化するのは、主に、成形動作の開始時から上カル部ヒーター140をONにするまでの時間が短いためである。 In the third example shown in FIG. 10(a), in the previous molding operation, the temperature of the upper cull block 120 rises, exceeds the upper limit temperature Tmax at time t4, falls below the upper limit temperature Tmax at time t5, and remains at the required temperature until the end time t10. The reason why the temperature of the upper cull block 120 changes as shown in FIG. 10(a) is mainly because the time from the start of the molding operation to turning on the upper cull section heater 140 is short.

そのため、図6に示す実行部31の算出部32は、図10(b)に示すように、次の1回の成形動作において成形動作の開始時から上カル部ヒーター140をONにするまでの時間が前回の成形動作よりも長くなるように、次の1回の成形動作で用いるパラメーター(X0’)を算出する。そして、実行部31の加温実行部33は、次の1回の成形動作で用いるパラメーター(X0’,X1’~X4’)を用いて、次の1回の成形動作においてカル部ヒーター140のON/OFFを制御する。次の1回の成形動作で用いるパラメーター(X1’~X4’)は、前回の成形動作において用いられたパラメーター(X1~X4)と同じであってもよく、前回の成形動作において用いられたパラメーター(X1~X4)と異なっていてもよい。例えば、算出部32は、さらに、上カル部ヒーター140をONにしている合計時間が前回の成形動作よりも短くなるように、次の1回の成形動作で用いるパラメーター(X1’~X4’)を算出することもできる。 Therefore, as shown in Fig. 10(b), the calculation unit 32 of the execution unit 31 shown in Fig. 6 calculates the parameters (X0 3 ') to be used in the next molding operation so that the time from the start of the molding operation to turning on the upper cull portion heater 140 in the next molding operation is longer than that in the previous molding operation. Then, the heating execution unit 33 of the execution unit 31 controls the ON/OFF of the cull portion heater 140 in the next molding operation using the parameters (X0 3 ', X1 3 ' to X4 3 ') to be used in the next molding operation. The parameters (X1 3 ' to X4 3 ') to be used in the next molding operation may be the same as the parameters (X1 3 to X4 3 ) used in the previous molding operation , or may be different from the parameters (X1 3 to X4 3 ) used in the previous molding operation. For example, the calculation unit 32 can further calculate parameters (X1 3 ' to X4 3 ') to be used in the next molding operation so that the total time that the upper cullet heater 140 is turned on is shorter than that of the previous molding operation.

図11(a)に示す第4の例では、前回の1回の成形動作において、上カルブロック120の温度は、下降して、時刻t6で下限温度Tminを一旦下回り、その後時刻t7で下限温度Tminを上回って終了時刻t10まで所要の温度が継続している。上カルブロック120が図11(a)に示すように温度変化するのは、主に、成形動作の開始時から上カル部ヒーター140をONにするまでの時間が長いためである。 In the fourth example shown in FIG. 11(a), in the previous molding operation, the temperature of the upper cull block 120 drops, falls below the lower limit temperature Tmin at time t6, then exceeds the lower limit temperature Tmin at time t7, and remains at the required temperature until the end time t10. The reason why the temperature of the upper cull block 120 changes as shown in FIG. 11(a) is mainly because it takes a long time from the start of the molding operation to turning on the upper cull section heater 140.

そのため、図6に示す実行部31の算出部32は、図11(b)に示すように、次の1回の成形動作において成形動作の開始時から上カル部ヒーター140をONにするまでの時間が前回の成形動作よりも短くなるように、次の1回の成形動作で用いるパラメーター(X0’)を算出する。そして、実行部31の加温実行部33は、次の1回の成形動作で用いるパラメーター(X0’,X1’~X4’)を用いて、次の1回の成形動作においてカル部ヒーター140のON/OFFを制御する。次の1回の成形動作で用いるパラメーター(X1’~X4’)は、前回の成形動作において用いられたパラメーター(X1~X4)と同じであってもよく、前回の成形動作において用いられたパラメーター(X1~X4)と異なっていてもよい。例えば、算出部32は、さらに、上カル部ヒーター140をONにしている合計時間が前回の成形動作よりも長くなるように、次の1回の成形動作で用いるパラメーター(X1’~X4’)を算出することもできる。 Therefore, as shown in Fig. 11(b), the calculation unit 32 of the execution unit 31 shown in Fig. 6 calculates a parameter (X0 4 ') to be used in the next molding operation so that the time from the start of the molding operation to turning on the upper cull portion heater 140 in the next molding operation is shorter than that in the previous molding operation. Then, the heating execution unit 33 of the execution unit 31 controls the ON/OFF of the cull portion heater 140 in the next molding operation using the parameters (X0 4 ', X1 4 ' to X4 4 ') to be used in the next molding operation. The parameters (X1 4 ' to X4 4 ') to be used in the next molding operation may be the same as the parameters (X1 4 to X4 4 ) used in the previous molding operation , or may be different from the parameters (X1 4 to X4 4 ) used in the previous molding operation. For example, the calculation unit 32 can further calculate parameters (X1 4 ' to X4 4 ') to be used in the next molding operation so that the total time that the upper cullet heater 140 is turned on is longer than that of the previous molding operation.

なお、算出部32は、予め設定された回数の成形動作を行うごとに、下限温度Tminを上げ、上限温度Tmaxを下げて各種パラメータ(X0~X4等)を算出することもできる。これにより、樹脂封止装置Sでは、成形動作を繰り返して行うことで、今回の成形動作において上カルブロック120の温度変化を小さくしていくことができる。 The calculation unit 32 can also calculate various parameters (X0 to X4, etc.) by raising the lower limit temperature Tmin and lowering the upper limit temperature Tmax each time a preset number of molding operations are performed. This allows the resin sealing device S to reduce the temperature change of the upper cull block 120 during the current molding operation by repeatedly performing the molding operation.

上述した例では、算出部32は、上限温度Tmaxを上回ったり、下限温度Tminを下回ったりした場合に、パラメーター(X0~X4等)を変更するが、かかる例に限定されない。 In the above example, the calculation unit 32 changes the parameters (X0 to X4, etc.) when the temperature exceeds the upper limit temperature Tmax or falls below the lower limit temperature Tmin, but is not limited to this example.

例えば、算出部32は、機械学習によって生成された計算モデルを用いて次の成形動作で用いる各種のパラメーターの数値を算出することもできる。機械学習によって生成された計算モデルは、畳み込みニューラルネットワークなどのニューラルネットワークである。 For example, the calculation unit 32 can calculate the numerical values of various parameters to be used in the next molding operation using a computational model generated by machine learning. The computational model generated by machine learning is a neural network such as a convolutional neural network.

かかる計算モデルは、例えば、1回の成形動作において上カル部センサー130で測定された上カルブロック120の温度変化の情報を入力とし、パラメーター(X0~X4等)の数値を出力とする計算モデルである。算出部32は、次回の1回の成形動作を行う前に、計算モデルを用いて、パラメーター(X0~X4等)の数値を算出する。具体的には、算出部32は、次回の1回の成形動作を行う前に、前回の成形動作において上カル部センサー130で測定された上カルブロック120の温度変化の情報を計算モデルに入力することで、算出結果として計算モデルから出力されるパラメーター(X0~X4等)の数値を取得する。加温指示部35は、次回の1回の成形動作において、算出部32において計算モデルによって算出されたパラメーター(X0~X4等)の数値を温度制御部34に指示する。 Such a calculation model is, for example, a calculation model that inputs information on the temperature change of the upper cull block 120 measured by the upper cull sensor 130 during one molding operation and outputs numerical values of parameters (X0 to X4, etc.). Before performing the next molding operation, the calculation unit 32 uses the calculation model to calculate the numerical values of the parameters (X0 to X4, etc.). Specifically, before performing the next molding operation, the calculation unit 32 inputs information on the temperature change of the upper cull block 120 measured by the upper cull sensor 130 during the previous molding operation into the calculation model, thereby obtaining the numerical values of the parameters (X0 to X4, etc.) output from the calculation model as the calculation results. The heating instruction unit 35 instructs the temperature control unit 34 on the numerical values of the parameters (X0 to X4, etc.) calculated by the calculation model in the calculation unit 32 during the next molding operation.

また、制御部30は、機械学習によって計算モデルを生成する学習部を含んでいてもよい。この場合、学習部は、前回以前で用いられた各種パラメーターの数値と前回以前に上カル部センサー130で測定された上カルブロック120の温度変化の情報に基づいて、機械学習によって計算モデルを生成することもできる。例えば、学習部は、上カル部センサー130で測定された上カルブロック120の温度変化が予め設定された温度範囲内である成形動作を学習用成形動作として判定する。そして、学習部は、学習用成形動作において上カル部センサー130で測定された上カルブロック120の温度変化と学習用成形動作における実行工程で用いられたパラメーター(X0,X1~X4)との組み合わせを学習用成形動作ごとに含むデータセットを用いて、計算モデルを生成する。 The control unit 30 may also include a learning unit that generates a computational model by machine learning. In this case, the learning unit may generate a computational model by machine learning based on the values of various parameters used in the previous or previous operation and information on the temperature change of the upper cull block 120 measured by the upper cull section sensor 130 in the previous or previous operation. For example, the learning unit determines a molding operation in which the temperature change of the upper cull block 120 measured by the upper cull section sensor 130 is within a preset temperature range as a learning molding operation. Then, the learning unit generates a computational model using a data set that includes, for each learning molding operation, a combination of the temperature change of the upper cull block 120 measured by the upper cull section sensor 130 in the learning molding operation and the parameters (X0, X1 to X4) used in the execution process in the learning molding operation.

例えば、学習部は、学習用成形動作において上カル部センサー130で測定された上カルブロック120の温度変化の情報を計算モデルに入力して得られるパラメーター(X0,X1~X4)の数値と学習用成形動作における実行工程で用いられたパラメーター(X0,X1~X4)の数値との差の合計が最小になるように計算モデルを生成する。 For example, the learning unit generates a calculation model so that the sum of the differences between the numerical values of the parameters (X0, X1 to X4) obtained by inputting information on the temperature change of the upper cull block 120 measured by the upper cull sensor 130 during the learning molding operation into the calculation model and the numerical values of the parameters (X0, X1 to X4) used in the execution process of the learning molding operation is minimized.

学習用成形動作における温度範囲の条件となる予め設定された温度範囲は、例えば、上限温度Tmaxから下限温度Tminまでの温度範囲であるが、上限温度Tmaxよりも低い温度から下限温度Tminよりも高い温度までの温度範囲であってもよい。また学習部は、すべての成形動作を学習用成形動作として判定することもできる。 The preset temperature range that is the condition for the temperature range in the learning molding operation is, for example, a temperature range from an upper limit temperature Tmax to a lower limit temperature Tmin, but it may also be a temperature range from a temperature lower than the upper limit temperature Tmax to a temperature higher than the lower limit temperature Tmin. The learning unit can also determine all molding operations as learning molding operations.

また、計算モデルは、畳み込みニューラルネットワークに代えて、リカレントニューラルネットワークであってもよい。この場合、リカレントニューラルネットワークで構成される計算モデルは、例えば、連続する複数回の成形動作において各々上カル部センサー130で測定された上カルブロック120の温度変化の情報を入力とし、パラメーター(X0~X4等)の数値を出力とする計算モデルである。算出部32は、次回の1回の成形動作を行う前に、前回以前の連続する複数回の成形動作において各々上カル部センサー130で測定された上カルブロック120の温度変化の情報を計算モデルに入力し、演算処理により計算モデルから出力されるパラメーター(X0~X4等)の数値を取得する。加温指示部35は、次回の1回の成形動作において、算出部32において計算モデルによって算出されたパラメーター(X0~X4等)の数値を温度制御部34に指示する。学習部は、畳み込みニューラルネットワークで構成される計算モデルと同様に、前回以前で用いられた各種パラメーターの数値と前回以前に上カル部センサー130で測定された上カルブロック120の温度変化の情報に基づいて、機械学習によってリカレントニューラルネットワークで構成される計算モデルを生成することもできる。 The calculation model may be a recurrent neural network instead of a convolutional neural network. In this case, the calculation model configured with a recurrent neural network is, for example, a calculation model that inputs information on the temperature change of the upper cull block 120 measured by the upper cull portion sensor 130 in each of multiple consecutive molding operations and outputs numerical values of parameters (X0 to X4, etc.). Before performing the next molding operation, the calculation unit 32 inputs information on the temperature change of the upper cull block 120 measured by the upper cull portion sensor 130 in each of multiple consecutive molding operations before the previous one into the calculation model, and obtains the numerical values of the parameters (X0 to X4, etc.) output from the calculation model by arithmetic processing. The heating instruction unit 35 instructs the temperature control unit 34 on the numerical values of the parameters (X0 to X4, etc.) calculated by the calculation model in the calculation unit 32 in the next molding operation. Similar to the computational model composed of a convolutional neural network, the learning unit can also generate a computational model composed of a recurrent neural network by machine learning based on the values of various parameters used in the previous or previous time and information on the temperature change of the upper cull block 120 measured by the upper cull sensor 130 in the previous or previous time.

機械学習によって生成される計算モデルは、ニューラルネットワークに限定されず、例えば、線形回帰、又はロジスティック回帰などの学習アルゴリズムで生成される計算モデルであってもよく、サポートベクターマシンなどの計算モデルであってもよい。 The computational model generated by machine learning is not limited to a neural network, but may be, for example, a computational model generated by a learning algorithm such as linear regression or logistic regression, or may be a computational model such as a support vector machine.

上述した例では、今回の成形動作において上カル部センサー130で測定されるカルブロックの温度の情報を用いずに、算出工程で算出された調整内容に基づいて、今回の成形動作において加温手段による加温を調整するが、加温手段による加温の調整方法は、かかる例に限定されない。加温実行部33の温度制御部34は、今回の成形動作において上カル部センサー130で測定されるカルブロックの温度の情報に基づいて算出工程で算出された調整内容を補正し、補正した調整内容に基づいて、今回の成形動作において加温手段による加温を実行する実行工程を実行することもできる。上カル部センサー130で測定されるカルブロックの温度の情報は、上カル部センサー130で測定されるカルブロックの温度の瞬時値の情報であるが、前回以前の成形動作において上カル部センサー130で測定されるカルブロックの温度変化の情報であってもよい。 In the above example, the heating by the heating means in the current molding operation is adjusted based on the adjustment content calculated in the calculation process without using information on the temperature of the cull block measured by the upper cull part sensor 130 in the current molding operation, but the method of adjusting the heating by the heating means is not limited to this example. The temperature control unit 34 of the heating execution unit 33 can also correct the adjustment content calculated in the calculation process based on information on the temperature of the cull block measured by the upper cull part sensor 130 in the current molding operation, and execute an execution process to perform heating by the heating means in the current molding operation based on the corrected adjustment content. The information on the temperature of the cull block measured by the upper cull part sensor 130 is information on the instantaneous value of the temperature of the cull block measured by the upper cull part sensor 130, but it may also be information on the temperature change of the cull block measured by the upper cull part sensor 130 in the molding operation before the previous one.

例えば、制御部30の実行部31は、前回以前の成形動作において上カル部センサー130で測定された温度の情報に基づいてパラメーター(X0~X4等)を算出し、次の1回の成形動作において、算出したパラメーター(X0~X4等)の数値で上カル部センサー130を制御しつつ、上カル部センサー130で測定される上カルブロック120の温度が予め定められた条件を満たす場合には、パラメーター(X0~X4等)の数値をリアルタイムで補正することができる。予め定められた条件は、例えば、単位時間当りの温度変化が予め設定された値を超える場合、又は予め設定された範囲外になる場合などである。 For example, the execution unit 31 of the control unit 30 calculates parameters (X0 to X4, etc.) based on the temperature information measured by the upper cull section sensor 130 in the previous or previous molding operation, and in the next molding operation, while controlling the upper cull section sensor 130 with the calculated parameter values (X0 to X4, etc.), if the temperature of the upper cull block 120 measured by the upper cull section sensor 130 satisfies a predetermined condition, the parameter values (X0 to X4, etc.) can be corrected in real time. The predetermined condition is, for example, when the temperature change per unit time exceeds a predetermined value or falls outside a predetermined range.

[予測制御の有効性について]
続いて、図6に示す制御部30の実行部31が、算出部32で算出した各種パラメーターを用いて、上カルブロック120の温度を予測制御することにつき、その有効性を、以下図12及び図13を参照して説明する。
[On the effectiveness of predictive control]
Next, the effectiveness of the execution unit 31 of the control unit 30 shown in Figure 6 predicting and controlling the temperature of the upper cullet block 120 using various parameters calculated by the calculation unit 32 will be explained with reference to Figures 12 and 13 below.

ここでは、樹脂封止装置Sで半導体素子を樹脂封止する成形動作について、連続成形を行い、予測制御を行わない成形動作(成形1回目)(図12(a))、予測制御を行う成形動作(成形2回目)(図12(b))及び、予測制御を行う成形動作(成形3回目)(図12(c))の結果を比較した。 Here, we performed continuous molding operations to resin-encapsulate semiconductor elements using resin encapsulation device S, and compared the results of molding operations without predictive control (first molding) (Figure 12(a)), molding operations with predictive control (second molding) (Figure 12(b)), and molding operations with predictive control (third molding) (Figure 12(c)).

なお、成形2回目は、実行部31により成形1回目の成形動作から各種パラメーターを算出して予測制御を行っている。また、成形3回目は、実行部31により成形2回目の成形動作から各種パラメーターを算出して予測制御を行っている。 In addition, for the second molding, the execution unit 31 calculates various parameters from the molding operation of the first molding and performs predictive control. In addition, for the third molding, the execution unit 31 calculates various parameters from the molding operation of the second molding and performs predictive control.

各成形動作での、上カルブロック120の温度変化のグラフを図12(a)~図12(c)に示す。なお、図12(a)は成形1回目、図12(b)は成形2回目、図12(c)は成形3回目の結果を示している。また、金型の設定温度は182℃に設定した。 Graphs of the temperature change of the upper cull block 120 during each molding operation are shown in Figures 12(a) to 12(c). Note that Figure 12(a) shows the results of the first molding run, Figure 12(b) shows the results of the second molding run, and Figure 12(c) shows the results of the third molding run. The mold temperature was set to 182°C.

図12(a)に示すように、予測制御を行わない成形動作(成形1回目)では、上カルブロック120の温度が、一番低くなったところで、金型の設定温度である182℃から約5.3℃低下していた。また、樹脂封止の完了後、上カルブロック120の温度は、金型の設定温度である182℃から約6.9℃上昇していた。 As shown in FIG. 12(a), in a molding operation without predictive control (first molding), the temperature of the upper cull block 120 was at its lowest, approximately 5.3°C lower than the mold set temperature of 182°C. In addition, after the resin sealing was completed, the temperature of the upper cull block 120 was approximately 6.9°C higher than the mold set temperature of 182°C.

また、図12(b)に示すように、予測制御を行う成形動作(成形2回目)では、上カルブロック120の温度が、一番低くなったところで、金型の設定温度である182℃から約4℃低下していた。また、樹脂封止の完了後、上カルブロック120の温度は、金型の設定温度である182℃から約1.5℃上昇していた。 Also, as shown in FIG. 12(b), in the molding operation (second molding) using predictive control, the temperature of the upper cull block 120 was at its lowest, about 4°C lower than the mold set temperature of 182°C. Also, after the resin sealing was completed, the temperature of the upper cull block 120 was about 1.5°C higher than the mold set temperature of 182°C.

また、図12(c)に示すように、予測制御を行う成形動作(成形3回目)では、上カルブロック120の温度が、一番低くなったところで、金型の設定温度である182℃から約3.6℃低下していた。また、樹脂封止の完了後、上カルブロック120の温度は、金型の設定温度である182℃から約2℃上昇していた。 Also, as shown in FIG. 12(c), in the molding operation (third molding) with predictive control, the temperature of the upper cull block 120 was at its lowest, approximately 3.6°C lower than the mold set temperature of 182°C. Also, after the resin sealing was completed, the temperature of the upper cull block 120 was approximately 2°C higher than the mold set temperature of 182°C.

図12(a)と図12(b)の結果を比べると、予測制御を行わない成形動作(成形1回目)に対して、予測制御を行う成形動作(成形2回目)では、樹脂封止後の上カルブロック120の温度が低下する傾向が緩和されていた。 Comparing the results of Figure 12(a) and Figure 12(b), the tendency for the temperature of the upper cull block 120 to decrease after resin sealing was mitigated in the molding operation with predictive control (second molding) compared to the molding operation without predictive control (first molding).

また、図12(b)と図12(c)の結果を比べると、予測制御を行う成形動作(成形2回目)に対して、予測制御を行う成形動作(成形3回目)では、樹脂封止後の上カルブロック120の温度が低下する傾向がさらに緩和されていた。 In addition, when comparing the results of Figure 12 (b) and Figure 12 (c), the tendency for the temperature of the upper cull block 120 to decrease after resin sealing was further mitigated in the molding operation with predictive control (third molding) compared to the molding operation with predictive control (second molding).

また、図12(a)と、図12(b)及び図12(c)の結果を比べると、予測制御を行わない成形動作(成形1回目)に対して、予測制御を行う成形動作(成形2回目及び成形3回目)では、樹脂封止後の上カルブロック120の温度が上昇する傾向が緩和されていた。 Comparing the results of FIG. 12(a) with those of FIG. 12(b) and FIG. 12(c), the tendency for the temperature of the upper cull block 120 to rise after resin sealing was mitigated in the molding operations with predictive control (second and third moldings) compared to the molding operation without predictive control (first molding).

4回目以降の成形動作においても、実行部31により前回の成形動作から各種パラメーターが算出されて予測制御が行われる。図13に示すグラフは、各回の成形動作において、上カルブロック120の温度のうち最も低い温度と最も高い温度とがプロットされ、プロットされた位置を結んで得られるグラフである。図13において、横軸は時間[sec]を示し、縦軸は温度[℃]を示す。図13に示すように、4回目以降の成形動作では、3回目以前の成形動作に比べて、上カルブロック120の温度変化が小さくなっている。なお、図13に示す例では、上限温度が180℃で下限温度が170℃である場合の例を示している。 In the fourth and subsequent molding operations, the execution unit 31 calculates various parameters from the previous molding operation and performs predictive control. The graph shown in FIG. 13 is a graph obtained by plotting the lowest and highest temperatures of the upper cull block 120 in each molding operation and connecting the plotted positions. In FIG. 13, the horizontal axis indicates time [sec] and the vertical axis indicates temperature [°C]. As shown in FIG. 13, in the fourth and subsequent molding operations, the temperature change of the upper cull block 120 is smaller than in the molding operations before the third. Note that the example shown in FIG. 13 shows a case where the upper limit temperature is 180°C and the lower limit temperature is 170°C.

このように、図12(a)~図12(c)及び図13に示す結果から明らかなように、上カルブロック120の温度について、前の成形動作における、その温度変化の情報に基づき、図6に示す実行部31は、算出部32で算出した各種パラメーターを用いて、次の1回の成形動作で、温度制御部34が上カル部ヒーター140をコントロールすることで、上カルブロック120の温度について、温度制御を高い精度で行うことが可能となる。即ち、制御部30における算出部32で算出された各種パラメーターを用いて予測制御を行うことにつき、その有効性を確認することができた。カルブロックの温度について予測制御を行うことで、カル部周辺の金型温度が低下して、カル部内の樹脂が金型(カル部)に貼り付くことを抑止できる。 As is clear from the results shown in Figures 12(a) to 12(c) and 13, the execution unit 31 shown in Figure 6 uses various parameters calculated by the calculation unit 32 based on information about the temperature change of the upper cull block 120 in the previous molding operation, and the temperature control unit 34 controls the upper cull portion heater 140 in the next molding operation, making it possible to control the temperature of the upper cull block 120 with high accuracy. In other words, the effectiveness of predictive control using various parameters calculated by the calculation unit 32 in the control unit 30 was confirmed. By predictive control of the cull block temperature, the mold temperature around the cull portion decreases, preventing the resin in the cull portion from sticking to the mold (cull portion).

なお、図6に示す温度制御部34は、成形1回目の成形動作において、予め設定された各種パラメーター(以下、初期パラメーターと記載する)を用いて、上カルブロック120の温度を制御する。初期パラメーターは、例えば、同一又は類似の成形品を生産する樹脂封止装置Sで実行される成形1回目の成形動作で用いられる各種パラメーターの数値と同じにすることができる。これにより、初期パラメーターの設定を容易に行うことができる。 The temperature control unit 34 shown in FIG. 6 controls the temperature of the upper cull block 120 in the first molding operation using various preset parameters (hereinafter referred to as initial parameters). The initial parameters can be set to the same values as the various parameters used in the first molding operation performed by the resin sealing device S that produces the same or similar molded product, for example. This makes it easy to set the initial parameters.

また、算出部32は、樹脂封止装置Sが1日単位で稼働される場合、前日における成形1回目の成形動作における上カルブロック120の温度変化と、当日の成形1回目の成形動作における上カルブロック120の温度変化との差を算出することができる。算出部32は、上カルブロック120の温度変化との差が予め設定された範囲内である場合、前日における成形2回目の成形動作で用いた各種パラメーターを、当日の成形2回目の成形動作で用いる各種パラメーターとすることができる。また、算出部32は、上カルブロック120の温度変化との差が予め設定された範囲内でない場合、前日における成形2回目の成形動作で用いられた各種パラメーターを上カルブロック120の温度変化との差に基づいて調整することで、当日の成形2回目の成形動作で用いる各種パラメーターを算出することができる。算出部32は、成形3回目の成形動作で用いる各種パラメーターについても、成形2回目の成形動作で用いる各種パラメーターと同様の方法で算出することができる。 In addition, when the resin sealing device S is operated on a daily basis, the calculation unit 32 can calculate the difference between the temperature change of the upper cull block 120 in the first molding operation on the previous day and the temperature change of the upper cull block 120 in the first molding operation on the current day. When the difference from the temperature change of the upper cull block 120 is within a preset range, the calculation unit 32 can set the various parameters used in the second molding operation on the previous day as the various parameters used in the second molding operation on the current day. In addition, when the difference from the temperature change of the upper cull block 120 is not within a preset range, the calculation unit 32 can calculate the various parameters used in the second molding operation on the current day by adjusting the various parameters used in the second molding operation on the previous day based on the difference from the temperature change of the upper cull block 120. The calculation unit 32 can also calculate the various parameters used in the third molding operation in the same manner as the various parameters used in the second molding operation.

また、上述した例では、制御部30の実行部31は、上カル部センサー130が取得した上カルブロック120の温度変化の情報から、上カル部ヒーター140を制御するが、カルブロックの温度調整は、かかる例に限定されない。実行部31は、上カル部センサー130及び下カル部センサー230の少なくとも1つが取得した温度変化の情報から、上カル部ヒーター140、上キャビティヒーター141、下カル部ヒーター240及び下キャビティヒーター241の少なくとも1つを制御することで、カルブロックの温度調整を行うことができる。 In addition, in the above-mentioned example, the execution unit 31 of the control unit 30 controls the upper cull section heater 140 based on information on temperature changes in the upper cull block 120 acquired by the upper cull section sensor 130, but temperature adjustment of the cull block is not limited to such an example. The execution unit 31 can adjust the temperature of the cull block by controlling at least one of the upper cull section heater 140, the upper cavity heater 141, the lower cull section heater 240, and the lower cavity heater 241 based on information on temperature changes acquired by at least one of the upper cull section sensor 130 and the lower cull section sensor 230.

また、上述した例では、カルブロックの温度調整を行う例を説明したが、制御部30の実行部31は、カルブロックの温度調整に加え又は代えて、キャビティブロックの温度調整を行うこともできる。例えば、実行部31は、上カル部ヒーター140、上キャビティヒーター141、下カル部ヒーター240及び下キャビティヒーター241の少なくとも1つを制御することで、キャビティブロックの温度調整を行うことができる。 In the above example, an example of adjusting the temperature of the cull block was described, but the execution unit 31 of the control unit 30 can also adjust the temperature of the cavity block in addition to or instead of adjusting the temperature of the cull block. For example, the execution unit 31 can adjust the temperature of the cavity block by controlling at least one of the upper cull section heater 140, the upper cavity heater 141, the lower cull section heater 240, and the lower cavity heater 241.

続いて、樹脂封止金型の温度制御を行う方法の一例について説明する。 Next, we will explain an example of a method for controlling the temperature of a resin sealing mold.

図14(a)及び図14(b)を用いて、樹脂封止装置Sについて、制御部30に複数の温度制御部34を設定して、樹脂封止金型の温度制御を行う方法を説明する。 Using Figures 14(a) and 14(b), we will explain a method for controlling the temperature of a resin sealing mold by setting multiple temperature control units 34 in the control unit 30 for the resin sealing device S.

本方法では、上金型1における上カルブロック120及び左右の上キャビティブロック121に合計9つの温度調整領域A1~A9を設定する(図14(b)参照)。 In this method, a total of nine temperature control areas A1 to A9 are set in the upper cull block 120 and the left and right upper cavity blocks 121 of the upper mold 1 (see Figure 14 (b)).

より詳細には、上カルブロック120では、前後方向において、A4、A5及びA6の3つの温度調整領域を設定する。また、左右の上キャビティブロック121については、左右のそれぞれに、前後方向において、A1、A2及びA3と、A7、A8及びA9の3つずつの温度調整領域を設定する。 More specifically, in the upper cavity block 120, three temperature control areas, A4, A5, and A6, are set in the front-to-rear direction. In addition, in the upper cavity blocks 121 on the left and right, three temperature control areas, A1, A2, and A3, and A7, A8, and A9, are set on each side in the front-to-rear direction.

また、温度調整領域A4~A6には、上カル部センサー130が配置されている。また、温度調整領域A1~A3及び温度調整領域A7~A9には、上キャビティセンサー131が配置されている。 In addition, an upper cull sensor 130 is disposed in the temperature adjustment areas A4 to A6. In addition, an upper cavity sensor 131 is disposed in the temperature adjustment areas A1 to A3 and the temperature adjustment areas A7 to A9.

また、図示しないが、制御部30には複数の温度制御部34が設定されている。また、1つの温度制御部34は、1つの温度調整領域に設けられたセンサー及びヒーターに接続され、温度制御部34は、制御部30の加温指示部35から指示され各種パラメーターの情報に基づき、接続されたヒーターをコントロールする。 Although not shown, the control unit 30 is configured with a plurality of temperature control units 34. Each temperature control unit 34 is connected to a sensor and a heater provided in one temperature adjustment area, and the temperature control unit 34 controls the connected heater based on information on various parameters instructed by the heating instruction unit 35 of the control unit 30.

本方法では、上述した上カルブロック120における事前成形方法(図12(a)参照)と同様に、樹脂封止装置Sで、半導体素子を樹脂封止する通常成形を行う。そして、温度調整領域A1~A9について、上カル部センサー130及び上キャビティセンサー131で、その温度変化の情報を取得する。また、制御部30の算出部32は温度制御部34を介して、その温度変化の情報を取得し、温度調整領域A1~A9における各種パラメーターを算出する。 In this method, similar to the above-mentioned pre-molding method for the upper cull block 120 (see FIG. 12(a)), normal molding is performed to resin-encapsulate the semiconductor element using a resin encapsulation device S. Then, for the temperature adjustment areas A1 to A9, the upper cull sensor 130 and the upper cavity sensor 131 acquire information on the temperature changes. The calculation unit 32 of the control unit 30 acquires the information on the temperature changes via the temperature control unit 34 and calculates various parameters for the temperature adjustment areas A1 to A9.

そして、通常成形から算出された温度調整領域A1~A9における各種パラメーター情報に基づき、温度調整領域A1~A9において、個別に予測制御を行う成形動作(1回目)を実行する(ステップS1)。このステップS1の成形動作の際に、温度調整領域A1~A9について、上カル部センサー130及び上キャビティセンサー131で、その温度変化の情報を取得する取得工程が行われる。 Then, based on the various parameter information for the temperature adjustment areas A1 to A9 calculated from normal molding, a molding operation (first time) is performed in which predictive control is performed individually for the temperature adjustment areas A1 to A9 (step S1). During the molding operation of step S1, an acquisition process is performed to acquire information on temperature changes in the temperature adjustment areas A1 to A9 using the upper cull portion sensor 130 and the upper cavity sensor 131.

続いて、ステップS1の1回目の成形動作で取得された各々の温度調整領域A1~A9の温度変化の情報に基づき、算出部32が1回分の成形動作における各々の各種パラメーターの内容を算出する。そして、ステップS1の成形動作で予測制御に用いた各種パラメーターの内容を、算出部32が算出した内容へと変更し、加温指示部35が、変更された各種パラメーターの内容を各々の温度制御部34に指示する(ステップS2)。これにより、2回目以降の成形動作における各々の温度調整領域A1~A9の温度について、更なる安定化を図る。各種パラメーターの内容を算出する工程は、次の成形動作の実行工程で実行される加温手段による1回分の成形動作における加温の調整内容を算出する算出工程の一例である。 Next, based on the information on the temperature change of each of the temperature adjustment areas A1 to A9 acquired in the first molding operation in step S1, the calculation unit 32 calculates the contents of each of the various parameters in one molding operation. The contents of the various parameters used for predictive control in the molding operation in step S1 are then changed to the contents calculated by the calculation unit 32, and the heating instruction unit 35 instructs each of the temperature control units 34 on the contents of the changed various parameters (step S2). This aims to further stabilize the temperature of each of the temperature adjustment areas A1 to A9 in the second and subsequent molding operations. The process of calculating the contents of the various parameters is an example of a calculation process that calculates the adjustment contents of heating in one molding operation by the heating means executed in the execution process of the next molding operation.

次に、ステップS2で算出部32が算出した1回分の成形動作における各種パラメーターの内容に基づき、加温指示部35の指示を受けた各々の温度制御部34が、接続されたヒーターをコントロールして、温度調整領域A1~A9において予測制御を行う成形動作(2回目以降)を実行する(ステップS3)。ステップS3における温度制御部34の処理は、算出工程で算出された加温手段による加温の調整内容に基づいて、温度調整領域A1~A9に対する加温を実行する実行工程の一例である。 Next, based on the contents of the various parameters for one molding operation calculated by the calculation unit 32 in step S2, each temperature control unit 34, which has received instructions from the heating instruction unit 35, controls the connected heaters to perform a molding operation (second or later) that performs predictive control in the temperature adjustment areas A1 to A9 (step S3). The processing of the temperature control unit 34 in step S3 is an example of an execution process that performs heating for the temperature adjustment areas A1 to A9 based on the adjustment contents of heating by the heating means calculated in the calculation process.

ステップS3の後、次の成形動作が「有り」の場合には、再度、ステップS2に戻り、算出部32は、前の成形動作で取得された各々の温度調整領域A1~A9の温度変化の情報に基づき、各々の温度調整領域に関する各種パラメーターを算出する。そして、加温指示部35は、算出部32で算出された内容で各種パラメーターを変化させ、各々の温度制御部34に指示する。即ち、各種パラメーターの算出と、この算出に基づく温度制御部34による各ヒーターのコントロールが繰り返し行われる。 After step S3, if the next molding operation is "yes", the process returns to step S2 again, and the calculation unit 32 calculates various parameters for each temperature adjustment area based on the information on the temperature change in each temperature adjustment area A1 to A9 acquired in the previous molding operation. The heating instruction unit 35 then changes the various parameters based on the content calculated by the calculation unit 32 and instructs each temperature control unit 34. In other words, the calculation of various parameters and the control of each heater by the temperature control unit 34 based on this calculation are repeated.

また、ステップS3の後、次の成形動作が「無し」の場合には、一連の工程が終了する(ステップS5)。 Also, after step S3, if there is no next molding operation, the series of steps ends (step S5).

このように、成形動作を連続的に行う際に、前の成形動作で得られた温度調整領域A1~A9の温度変化の情報に基づき、次の成形動作の予測制御に用いる各種パラメーターの内容を修正することで、温度調整領域A1~A9が、所望の温度に近づくように、温度制御を高い精度で行うことができる。 In this way, when molding operations are performed continuously, the contents of various parameters used for predictive control of the next molding operation can be modified based on the information on the temperature changes in temperature adjustment areas A1 to A9 obtained in the previous molding operation, allowing for highly accurate temperature control so that the temperature adjustment areas A1 to A9 approach the desired temperature.

また、本方法では、制御部30に複数の温度制御部34が設定され、1つの温度制御部34が、1つの温度調整領域に設けられたセンサー及びヒーターに接続されていることから、各温度調整領域における温度変化に合わせて、温度制御部34によってヒーターによる加温を調整することができる。これにより、上金型1の全体として、より一層、温度制御を高い精度で行うことが可能になる。 In addition, in this method, multiple temperature control units 34 are set in the control unit 30, and one temperature control unit 34 is connected to a sensor and heater provided in one temperature adjustment area, so that the temperature control unit 34 can adjust the heating by the heater in accordance with temperature changes in each temperature adjustment area. This makes it possible to perform temperature control with even higher precision for the entire upper mold 1.

ここで、上金型1における上カルブロック120及び左右の上キャビティブロック121に設定する温度調整領域の数は9つに限定されるものではなく、適宜変更することが可能である。 Here, the number of temperature control regions set in the upper cull block 120 and the left and right upper cavity blocks 121 in the upper mold 1 is not limited to nine, and can be changed as appropriate.

また、必ずしも、上金型1に、複数の温度調整領域を設定する構造に限定されるものではなく、下金型2に複数の温度調整領域を設定することも可能である。さらに、上金型1及び下金型2の両方に、複数の温度調整領域を設定することも可能である。 In addition, the structure is not necessarily limited to one in which multiple temperature control regions are set in the upper mold 1, and multiple temperature control regions can also be set in the lower mold 2. Furthermore, multiple temperature control regions can also be set in both the upper mold 1 and the lower mold 2.

続いて、図15(a)及び図15(b)を用いて、樹脂封止装置Sについて、制御部30に1つの温度制御部34を設定して、樹脂封止金型の温度制御を行う方法を説明する。 Next, using Figures 15(a) and 15(b), we will explain a method for controlling the temperature of the resin sealing mold by setting one temperature control unit 34 in the control unit 30 for the resin sealing device S.

本方法では、上金型1における上カルブロック120及び左右の上キャビティブロック121に、温度調整領域Aと、温度調整領域B1~B8の、合計9つの温度調整領域を設定する(図15(b)参照)。 In this method, a total of nine temperature control areas, including temperature control area A and temperature control areas B1 to B8, are set in the upper cull block 120 and the left and right upper cavity blocks 121 of the upper mold 1 (see Figure 15 (b)).

より詳細には、上カルブロック120では、前後方向において、温度調整領域A及び温度調整領域B4、B5の3つの温度調整領域を設定する。また、左右の上キャビティブロック121については、左右のそれぞれに、前後方向において、B1、B2及びB3と、B6、B7及びB8の3つずつの温度調整領域を設定する。 More specifically, in the upper cavity block 120, three temperature adjustment areas are set in the front-to-rear direction: temperature adjustment area A and temperature adjustment areas B4 and B5. In addition, in the left and right upper cavity blocks 121, three temperature adjustment areas are set on each side in the front-to-rear direction: B1, B2, and B3, and B6, B7, and B8.

また、温度調整領域A及び温度調整領域B4、B5には、上カル部センサー130が配置されている。また、温度調整領域B1~B3及び温度調整領域B6~B8には、上キャビティセンサー131が配置されている。 In addition, an upper cull sensor 130 is disposed in temperature adjustment area A and temperature adjustment areas B4 and B5. In addition, an upper cavity sensor 131 is disposed in temperature adjustment areas B1 to B3 and temperature adjustment areas B6 to B8.

また、図示しないが、制御部30には1つの温度制御部34が設定されている。この温度制御部34は、温度調整領域Aに設けられた上カル部センサー130及び上カル部ヒーター140に接続されている。また、温度制御部34は、加温指示部35から指示された各種パラメーターの情報に基づき、接続された上カル部ヒーター140をコントロールする。 Although not shown, the control unit 30 is also configured with one temperature control unit 34. This temperature control unit 34 is connected to the upper cull portion sensor 130 and the upper cull portion heater 140 provided in the temperature adjustment area A. The temperature control unit 34 also controls the connected upper cull portion heater 140 based on information on various parameters instructed by the heating instruction unit 35.

また、図示しないが、制御部30には温度調整領域B1~B8に設けられた各センサー及び各ヒーターが接続されている。また、温度調整領域B1~B8に設けられた各ヒーターは、制御部30によって各ヒーターの出力の割合を変更可能に構成されている。 Although not shown, the control unit 30 is connected to each sensor and heater provided in the temperature adjustment areas B1 to B8. The control unit 30 is also configured to change the output ratio of each heater provided in the temperature adjustment areas B1 to B8.

本方法では、上述した上カルブロック120における事前成形方法(図7(a)参照)と同様に、樹脂封止装置Sで、半導体素子を樹脂封止する通常成形を行う。そして、温度調整領域Aについて、上カル部センサー130で、温度変化の情報を取得する。また、制御部30の算出部32は、温度制御部34を介して、その温度変化の情報を取得し、各種パラメーターを算出する。 In this method, similar to the above-mentioned pre-molding method for the upper cull block 120 (see FIG. 7(a)), normal molding is performed to resin-encapsulate the semiconductor element using a resin encapsulation device S. Then, for the temperature adjustment area A, the upper cull sensor 130 acquires information on temperature changes. The calculation unit 32 of the control unit 30 acquires the information on the temperature changes via the temperature control unit 34 and calculates various parameters.

そして、通常成形から算出された温度調整領域Aにおける各種パラメーター情報に基づき、温度調整領域A及び温度調整領域B1~B8において、予測制御を行う成形動作(1回目)を実行する(ステップS1)。このステップS1の成形動作では、温度調整領域B1~B8の各ヒーターの出力を、温度調整領域Aのヒーターと同じ出力にして、ヒーターによる加温を行う。 Then, based on the various parameter information in temperature adjustment area A calculated from normal molding, a molding operation (first time) is performed in which predictive control is performed in temperature adjustment area A and temperature adjustment areas B1 to B8 (step S1). In this molding operation in step S1, the output of each heater in temperature adjustment areas B1 to B8 is set to the same output as the heater in temperature adjustment area A, and heating is performed by the heaters.

このステップS1の成形動作の際に、温度調整領域Aについて、上カル部センサー130で、温度変化の情報と各種パラメーターの情報を取得する。また、温度調整領域B1~B8について、上カル部センサー130及び上キャビティセンサー131で、温度変化の情報を取得する取得工程が行われる。 During the molding operation of step S1, the upper cull sensor 130 acquires information on temperature changes and various parameters for temperature adjustment area A. In addition, an acquisition process is performed for temperature adjustment areas B1 to B8, in which the upper cull sensor 130 and upper cavity sensor 131 acquire information on temperature changes.

続いて、図示しないが、ステップS1の成形動作で取得された温度調整領域Aの温度変化の情報に基づき、算出部32が各種パラメーターの内容を算出する。そして、算出部32が算出した内容で各種パラメーターを変化させ、算出部32が変化させた各種パラメーターを加温指示部35が温度制御部34に指示する。これにより、温度調整領域Aの温度について、更なる安定化を図る。各種パラメーターの内容を算出する工程は、次の成形動作の実行工程で実行される加温手段による1回分の成形動作における加温の調整内容を算出する算出工程の一例である。 Next, although not shown, the calculation unit 32 calculates the contents of various parameters based on the information on the temperature change in the temperature adjustment area A acquired in the molding operation of step S1. The calculation unit 32 then changes the various parameters based on the contents calculated, and the heating instruction unit 35 instructs the temperature control unit 34 on the various parameters changed by the calculation unit 32. This aims to further stabilize the temperature in the temperature adjustment area A. The process of calculating the contents of various parameters is an example of a calculation process that calculates the adjustment contents of heating in one molding operation by the heating means executed in the execution process of the next molding operation.

また、ステップS1の成形動作で取得された、温度調整領域A及びB1~B8の温度変化の情報に基づき、算出部32が、温度調整領域Aの温度と、温度調整領域B1~B8の温度について、それぞれの温度差を算出する(ステップS2)。そして、算出部32は、この温度差の情報と、加温指示部35が温度制御部34に指示した上カル部ヒーター140の出力の情報に基づき、温度調整領域B1~B8の各ヒーターの出力の割合が変化するように、温度調整領域B1~B8の各ヒーターの出力、時間及び時機を算出する。加温指示部35は、算出部32によって算出された温度調整領域B1~B8の各ヒーターの出力、時間及び時機を温度制御部34に指示する。これにより、温度調整領域Aの温度と、温度調整領域B1~B8の温度について、温度調整領域B1~B8に温度が調整される。 Based on the information on the temperature changes in temperature adjustment areas A and B1 to B8 acquired during the molding operation in step S1, the calculation unit 32 calculates the temperature difference between the temperature of temperature adjustment area A and the temperatures of temperature adjustment areas B1 to B8 (step S2). Based on this temperature difference information and the information on the output of the upper cull heater 140 instructed by the heating instruction unit 35 to the temperature control unit 34, the calculation unit 32 calculates the output, time, and timing of each heater in temperature adjustment areas B1 to B8 so that the ratio of the output of each heater in temperature adjustment areas B1 to B8 changes. The heating instruction unit 35 instructs the temperature control unit 34 on the output, time, and timing of each heater in temperature adjustment areas B1 to B8 calculated by the calculation unit 32. As a result, the temperature of temperature adjustment area A and the temperature of temperature adjustment areas B1 to B8 are adjusted to the temperature adjustment areas B1 to B8.

例えば、算出部32は、温度調整領域Aの温度と、温度調整領域B1の温度で、温度調整領域B1の温度の方が高くなっている場合には、その温度差の内容に基づき、温度調整領域B1のヒーターの出力の割合を小さくする。 For example, when the temperature of temperature adjustment area B1 is higher than the temperature of temperature adjustment area A, the calculation unit 32 reduces the proportion of heater output for temperature adjustment area B1 based on the temperature difference.

より詳細には、算出部32は、各温度調整領域の温度差の内容に基づき、加温指示部35が温度制御部34に指示した上カル部ヒーター140の出力の割合を小さく変化させて、温度調整領域B1に設けられた上キャビティヒーター141の出力の値として設定する。 More specifically, the calculation unit 32 makes a small change to the output ratio of the upper culvert heater 140 instructed by the heating instruction unit 35 to the temperature control unit 34 based on the temperature difference between the temperature adjustment areas, and sets this as the output value of the upper cavity heater 141 provided in the temperature adjustment area B1.

これにより、次の成形動作において、温度調整領域Aの温度と、温度調整領域B1~B8の温度との温度差を少なくして、温度調整領域B1~B8の温度の安定化を図る。 This reduces the temperature difference between temperature control area A and temperature control areas B1 to B8 in the next molding operation, stabilizing the temperature in temperature control areas B1 to B8.

次に、実行部31は、ステップS2で設定した各ヒーターの出力の割合を用いて、温度調整領域A及びB1~B8において、予測制御を行う成形動作(2回目以降)を実行する(ステップS3)。ステップS3における温度制御部34の処理は、算出工程で算出された加温手段による加温の調整内容に基づいて、温度調整領域A及びB1~B8に対する加温を実行する実行工程の一例である。 Next, the execution unit 31 executes a molding operation (from the second time onward) that performs predictive control in the temperature adjustment areas A and B1 to B8 using the output ratio of each heater set in step S2 (step S3). The processing of the temperature control unit 34 in step S3 is an example of an execution process that executes heating for the temperature adjustment areas A and B1 to B8 based on the adjustment content of heating by the heating means calculated in the calculation process.

ステップS3の後、次の成形動作が「有り」の場合には、再度、ステップS2に戻り、前の成形動作で取得された温度調整領域Aの温度変化の情報に基づき、算出部32が、各種パラメーターの内容を算出する。そして、加温指示部35は、算出部32で算出された内容で各種パラメーターを変化させ、温度制御部34に指示する。即ち、温度調整領域Aに対しては、各種パラメーターの算出と、この算出に基づく温度制御部34による上カル部ヒーター140のコントロールが繰り返し行われる。 After step S3, if the next molding operation is "yes", the process returns to step S2 again, and the calculation unit 32 calculates the contents of various parameters based on the information on the temperature change in temperature adjustment area A acquired in the previous molding operation. The heating instruction unit 35 then changes the various parameters based on the contents calculated by the calculation unit 32 and instructs the temperature control unit 34. That is, for temperature adjustment area A, the calculation of various parameters and the control of the upper cull heater 140 by the temperature control unit 34 based on this calculation are repeatedly performed.

また、算出部32は、前の成形動作で取得された、温度調整領域A及びB1~B8の温度変化の情報と、加温指示部35が温度制御部34に指示した上カル部ヒーター140の出力の情報に基づき、温度調整領域B1~B8の各ヒーターの出力の割合を変化させる。即ち、温度調整領域B1~B8に対しては、温度調整領域B1~B8と温度調整領域Aとの温度差に基づく、各ヒーターにおける出力の割合の変更と、この変更に基づく温度制御部34による各ヒーターのコントロールが繰り返し行われる。 The calculation unit 32 also changes the output ratio of each heater in the temperature adjustment areas B1 to B8 based on the information on the temperature changes in the temperature adjustment areas A and B1 to B8 acquired in the previous molding operation and the information on the output of the upper cull heater 140 instructed by the heating instruction unit 35 to the temperature control unit 34. That is, for the temperature adjustment areas B1 to B8, the output ratio of each heater is changed based on the temperature difference between the temperature adjustment areas B1 to B8 and the temperature adjustment area A, and the temperature control unit 34 controls each heater based on this change, repeatedly.

また、ステップS3の後、次の成形動作が「無し」の場合には、一連の工程が終了する(ステップS5)。 Also, after step S3, if there is no next molding operation, the series of steps ends (step S5).

このように、本方法では、成形動作を連続的に行う際に、前の成形動作で得られた温度調整領域A及びB1~B8の温度変化の情報に基づき、温度調整領域B1~B8の各ヒーターの出力の割合を補正することで、温度調整領域A及びB1~B8が、所望の温度に近づくように、温度制御を高い精度で行うことができる。 In this way, when molding operations are performed continuously, this method allows for highly accurate temperature control by correcting the output ratio of each heater in temperature adjustment areas B1 to B8 based on the information on the temperature changes in temperature adjustment areas A and B1 to B8 obtained in the previous molding operation, so that temperature adjustment areas A and B1 to B8 approach the desired temperature.

また、本方法では、温度調整領域B1~B8の温度制御を行うにあたって、制御部30に温度制御部34を1つ設定して、温度調整領域Aにおける温度変化を予測すれば足りる。そのため、制御部30に複数の温度制御部34を設定する構造に比べて、簡易な構造で、上金型1の温度について、温度制御を高い精度で行うことができる。 In addition, in this method, when controlling the temperatures of the temperature adjustment regions B1 to B8, it is sufficient to set one temperature control unit 34 in the control unit 30 and predict the temperature change in the temperature adjustment region A. Therefore, compared to a structure in which multiple temperature control units 34 are set in the control unit 30, this method allows for highly accurate temperature control of the temperature of the upper mold 1 with a simpler structure.

ここで、必ずしも、温度調整領域Aに設けられたセンサー及びヒーターが温度制御部34に接続される必要はなく、別の温度調整領域に設けられたセンサー及びヒーターが温度制御部34に接続される構造も採用しうる。また、必ずしも、制御部30に設定される温度制御部34の数が1つに限定される必要はなく、必要に応じて、制御部30に2つ以上の温度制御部34が設定されてもよい。 Here, the sensor and heater provided in the temperature adjustment area A do not necessarily need to be connected to the temperature control unit 34, and a structure in which a sensor and heater provided in another temperature adjustment area are connected to the temperature control unit 34 may also be adopted. In addition, the number of temperature control units 34 set in the control unit 30 does not necessarily need to be limited to one, and two or more temperature control units 34 may be set in the control unit 30 as necessary.

また、上金型1における上カルブロック120及び左右の上キャビティブロック121に設定する温度調整領域の数は9つに限定されるものではなく、適宜変更することが可能である。 In addition, the number of temperature control regions set in the upper cull block 120 and the left and right upper cavity blocks 121 in the upper mold 1 is not limited to nine, and can be changed as appropriate.

また、必ずしも、上金型1に、複数の温度調整領域を設定する構造に限定されるものではなく、下金型2に複数の温度調整領域を設定することも可能である。さらに、上金型1及び下金型2の両方に、複数の温度調整領域を設定することも可能である。 In addition, the structure is not necessarily limited to one in which multiple temperature control regions are set in the upper mold 1, and multiple temperature control regions can also be set in the lower mold 2. Furthermore, multiple temperature control regions can also be set in both the upper mold 1 and the lower mold 2.

以上のように、本発明における第1の実施の形態の樹脂封止方法は、基材に載置された半導体素子の樹脂封止を行う際に、金型の温度制御を高い精度で行うことが可能なものとなっている。また、本発明における第1の実施の形態の樹脂封止金型は、基材に載置された半導体素子の樹脂封止を行う際に、金型の温度制御を高い精度で行うことが可能なものとなっている。 As described above, the resin sealing method of the first embodiment of the present invention makes it possible to control the temperature of the mold with high precision when sealing a semiconductor element placed on a substrate with resin. Furthermore, the resin sealing mold of the first embodiment of the present invention makes it possible to control the temperature of the mold with high precision when sealing a semiconductor element placed on a substrate with resin.

本明細書及び特許請求の範囲で使用している用語と表現は、あくまでも説明上のものであって、なんら限定的なものではなく、本明細書及び特許請求の範囲に記述された特徴及びその一部と等価の用語や表現を除外する意図はない。また、本発明の技術思想の範囲内で、種々の変形態様が可能であるということは言うまでもない。 The terms and expressions used in this specification and claims are merely explanatory and are not limiting in any way, and are not intended to exclude terms and expressions equivalent to the features described in this specification and claims or parts thereof. It goes without saying that various modifications are possible within the scope of the technical concept of the present invention.

S 樹脂封止装置
M 樹脂封止金型
1 上金型
30 制御部
31 実行部
32 算出部
33 加温実行部
34 温度制御部
35 加温指示部
11 上型ダイセット
110 上ダイセットセンサー
111 上ダイセットヒーター
12 上型チェス
120 上カルブロック
121 上キャビティブロック
122 第1の上ホルダーベース
123 第2の上ホルダーベース
124 カル部
130 上カル部センサー
131 上キャビティセンサー
140 上カル部ヒーター
141 上キャビティヒーター
2 下金型
21 下型ダイセット
210 下ダイセットセンサー
211 下ダイセットヒーター
22 下型チェス
220 下カルブロック
221 下キャビティブロック
222 第1の下ホルダーベース
223 第2の下ホルダーベース
230 下カル部センサー
231 下キャビティセンサー
240 下カル部ヒーター
241 下キャビティヒーター
S Resin sealing device M Resin sealing mold 1 Upper mold 30 Control unit 31 Execution unit 32 Calculation unit 33 Heating execution unit 34 Temperature control unit 35 Heating instruction unit 11 Upper mold die set 110 Upper die set sensor 111 Upper die set heater 12 Upper mold chess 120 Upper cull block 121 Upper cavity block 122 First upper holder base 123 Second upper holder base 124 Cull unit 130 Upper cull unit sensor 131 Upper cavity sensor 140 Upper cull unit heater 141 Upper cavity heater 2 Lower mold 21 Lower mold die set 210 Lower die set sensor 211 Lower die set heater 22 Lower mold chess 220 Lower cull block 221 Lower cavity block 222 First lower holder base 223 Second lower holder base 230 Lower cull section sensor 231 Lower cavity sensor 240 Lower cull section heater 241 Lower cavity heater

Claims (10)

樹脂の供給経路であるカルを形成する窪みで構成されたカル部を有するカルブロック及びキャビティを形成するキャビティブロックが設けられた金型本体と、前記カルブロック及び前記キャビティブロックの少なくとも一方の温度を測定する温度測定手段と、前記カルブロック及び前記キャビティブロックの少なくとも一方を加温する加温手段と、を有する樹脂封止金型で、基材に載置された半導体素子を樹脂封止する動作を1回の成形動作として、繰り返して複数回の成形動作を行う樹脂封止方法であって、
前記複数回の成形動作の各々の成形動作における前記カルブロック及び前記キャビティブロックの少なくとも一方の温度変化の情報を前記温度測定手段によって取得する取得工程と、
前記複数回の成形動作のうち前回以前の成形動作において前記取得工程で取得された前記温度変化の情報に基づいて、前記前回よりも後の成形動作が実行されるまでの間に前記加温手段による1回分の成形動作における加温の調整内容を算出する算出工程と、
前記算出工程で算出された前記調整内容によって前記前回よりも後の成形動作における前記加温手段による加温を実行する実行工程と、を含む
ことを特徴とする樹脂封止方法。
A resin sealing method for performing a resin sealing operation multiple times using a resin sealing mold having a mold body provided with a cull block having a cull portion configured with a depression that forms a cull, which is a resin supply path, and a cavity block that forms a cavity, a temperature measuring means that measures the temperature of at least one of the cull block and the cavity block, and a heating means that heats at least one of the cull block and the cavity block, the method comprising the steps of:
an acquiring step of acquiring information on a temperature change of at least one of the cull block and the cavity block during each of the plurality of molding operations by the temperature measuring means;
a calculation step of calculating an adjustment content of heating in one molding operation by the heating means until a molding operation subsequent to the previous molding operation is performed, based on the information of the temperature change acquired in the acquisition step in the molding operation prior to the previous molding operation among the plurality of molding operations;
an execution step of executing heating by the heating means in a molding operation subsequent to the previous molding operation based on the adjustment content calculated in the calculation step.
前記実行工程は、
前記前回よりも後の成形動作において前記温度測定手段で測定される前記温度の情報を用いずに、前記算出工程で算出された前記調整内容によって前記前回よりも後の成形動作において前記加温手段による加温を実行する
ことを特徴とする請求項1に記載の樹脂封止方法。
The execution step includes:
The resin sealing method according to claim 1, characterized in that heating is performed by the heating means in the molding operation subsequent to the previous one based on the adjustment content calculated in the calculation process, without using information on the temperature measured by the temperature measuring means in the molding operation subsequent to the previous one.
前記算出工程は、
前記調整内容として、前記加温手段による加温の出力、時間及び時機の少なくとも1つを算出する
ことを特徴とする請求項1または2に記載の樹脂封止方法。
The calculation step includes:
3. The resin sealing method according to claim 1, wherein at least one of an output, a time, and a timing of heating by the heating means is calculated as the adjustment.
前記算出工程は、
前記前回以前の成形動作において前記取得工程で取得された前記温度変化の情報である温度変化情報を入力とし且つ前記加温手段による加温の調整内容の情報である調整内容情報を出力とする計算モデルであって機械学習によって生成された計算モデルを用いて、前記加温手段による加温の調整内容を算出する
ことを特徴とする請求項1~3のいずれか1つに記載の樹脂封止方法。
The calculation step includes:
The resin sealing method according to any one of claims 1 to 3, characterized in that the adjustment content of the heating by the heating means is calculated using a computational model generated by machine learning, the computational model having as input temperature change information, which is information on the temperature change acquired in the acquisition process in the molding operation before the previous one, and having as output adjustment content information, which is information on the adjustment content of the heating by the heating means.
前記温度変化情報と前記調整内容情報とに基づいて、前記計算モデルを生成する学習工程をさらに含む
ことを特徴とする請求項4に記載の樹脂封止方法。
The resin sealing method according to claim 4 , further comprising a learning step of generating the calculation model based on the temperature change information and the adjustment content information.
前記カルブロック及び前記キャビティブロックには、
前記温度測定手段による温度測定及び、前記加温手段による加温を個別に行うことが可能な複数の温度調整領域が設定され、
前記算出工程は、
前記複数の温度調整領域の各々に対して前記加温手段による加温の出力、時間及び時機を算出する
ことを特徴とする請求項1~5のいずれか1つに記載の樹脂封止方法。
The cull block and the cavity block have:
A plurality of temperature control regions are set in which the temperature measurement means and the heating means can individually perform temperature measurement and heating,
The calculation step includes:
6. The resin sealing method according to claim 1, further comprising calculating an output, time and timing of heating by said heating means for each of said plurality of temperature adjustment regions.
前記複数の温度調整領域は、少なくとも第1の温度調整領域と、前記第1の温度調整領域とは異なる第2の温度調整領域とを含み、
前記算出工程は、
前記前回以前の成形動作における前記第1の温度調整領域と前記第2の温度調整領域との相対温度の情報及び、前記第1の温度調整領域の前記温度変化の情報に基づいて、前記第2の温度調整領域に対応する前記加温手段による加温の出力、時間及び時機を算出する
ことを特徴とする請求項6に記載の樹脂封止方法。
the plurality of temperature adjustment regions include at least a first temperature adjustment region and a second temperature adjustment region different from the first temperature adjustment region,
The calculation step includes:
The resin sealing method according to claim 6, characterized in that the heating output, time and timing by the heating means corresponding to the second temperature control area are calculated based on information on the relative temperatures of the first temperature control area and the second temperature control area in the molding operation before the previous one and information on the temperature change of the first temperature control area.
前記算出工程は、
前記複数の温度調整領域の各々に対して、前記温度変化の情報に基づいて前記前回よりも後の成形動作における前記加温手段による加温の出力、時間及び時機を算出する
ことを特徴とする請求項6に記載の樹脂封止方法。
The calculation step includes:
The resin sealing method according to claim 6, further comprising the step of calculating, for each of the plurality of temperature adjustment regions, a heating output, a time and a timing of the heating by the heating means in the molding operation subsequent to the previous molding operation, based on the information on the temperature change.
前記カルブロックは、
前記カル部が複数形成されており、
前記温度測定手段は、
前記カルブロックのうち複数の前記カル部間の温度を測定するセンサーを含む
ことを特徴とする請求項1~8のいずれか1つに記載の樹脂封止方法。
The said Calblock is
A plurality of the cull portions are formed,
The temperature measuring means is
The resin sealing method according to any one of claims 1 to 8, further comprising a sensor for measuring a temperature between a plurality of the cull portions of the cull block.
樹脂の供給経路であるカルを形成する窪みで構成されたカル部を有するカルブロック及びキャビティを形成するキャビティブロックが設けられた金型本体と、前記カルブロック及び前記キャビティブロックの少なくとも一方の温度を測定する温度測定手段と、前記カルブロック及び前記キャビティブロックの少なくとも一方を加温する加温手段と、前記加温手段による加温を実行する実行部と、を有し、基材に載置された半導体素子を樹脂封止する動作を1回の成形動作として、繰り返して複数回の成形動作を行う樹脂封止金型であって、
前記温度測定手段は、
前記複数回の成形動作の各々における前記カルブロック及び前記キャビティブロックの少なくとも一方の温度変化の情報を取得し、
前記実行部は、
前記複数回の成形動作のうち前回以前の成形動作において前記温度測定手段で取得された前記温度変化の情報に基づいて、前記前回よりも後の成形動作が実行されるまでの間に、前記加温手段による1回分の成形動作における加温の調整内容を算出する算出部と、前記算出部で算出された前記調整内容によって前記前回よりも後の成形動作における前記加温手段による加温を実行する加温実行部と、を備える
ことを特徴とする樹脂封止金型。
A resin sealing mold comprising: a mold body provided with a cull block having a cull portion configured with a depression that forms a cull, which is a resin supply path, and a cavity block that forms a cavity; a temperature measuring means for measuring the temperature of at least one of the cull block and the cavity block; a heating means for heating at least one of the cull block and the cavity block; and an execution unit for executing heating by the heating means, wherein an operation of resin-sealing a semiconductor element placed on a substrate is counted as one molding operation, and the mold body performs multiple molding operations by repeating the operation,
The temperature measuring means is
acquiring information on temperature changes of at least one of the cull block and the cavity block during each of the multiple molding operations;
The execution unit is
a calculation unit that calculates adjustments to heating in one molding operation by the heating means based on information on temperature changes acquired by the temperature measurement means in a molding operation prior to the previous one among the multiple molding operations, until a molding operation subsequent to the previous one is performed, and a heating execution unit that executes heating by the heating means in the molding operation subsequent to the previous one based on the adjustments calculated by the calculation unit.
JP2020106222A 2019-09-17 2020-06-19 Resin sealing method and resin sealing mold Active JP7521272B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202080063083.2A CN114364502B (en) 2019-09-17 2020-09-02 Resin sealing method and resin sealing mold
PCT/JP2020/033342 WO2021054126A1 (en) 2019-09-17 2020-09-02 Resin sealing method and resin sealing die

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2019168237 2019-09-17
JP2019168237 2019-09-17
JP2019219958 2019-12-04
JP2019219958 2019-12-04

Publications (2)

Publication Number Publication Date
JP2021093512A JP2021093512A (en) 2021-06-17
JP7521272B2 true JP7521272B2 (en) 2024-07-24

Family

ID=76312786

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020106222A Active JP7521272B2 (en) 2019-09-17 2020-06-19 Resin sealing method and resin sealing mold

Country Status (1)

Country Link
JP (1) JP7521272B2 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017132260A (en) 2017-03-17 2017-08-03 ファナック株式会社 System capable of calculating optimum operating conditions in injection molding

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6219418A (en) * 1985-07-19 1987-01-28 Hitachi Ltd Molding equipment
JPH0231130U (en) * 1988-08-22 1990-02-27
JP5906527B2 (en) * 2011-06-28 2016-04-20 アピックヤマダ株式会社 Mold and resin molding apparatus provided with the same
JP6514622B2 (en) * 2015-10-30 2019-05-15 日精樹脂工業株式会社 Molding support method for injection molding machine
JP6532845B2 (en) * 2016-07-26 2019-06-19 双葉電子工業株式会社 Measuring device, measuring method, program

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017132260A (en) 2017-03-17 2017-08-03 ファナック株式会社 System capable of calculating optimum operating conditions in injection molding

Also Published As

Publication number Publication date
JP2021093512A (en) 2021-06-17

Similar Documents

Publication Publication Date Title
EP0748680B1 (en) Temperature regulating system, method and apparatus
JP7047073B2 (en) Systems and methods for automatic tuning of PID control in injection molding machines
JP2020049929A (en) Molding condition determination support device and injection molding machine
JP7521272B2 (en) Resin sealing method and resin sealing mold
JP2000052396A (en) Device and method for controlling injection molding
CN1880045B (en) Mold clamping device for injection molding machine and method for adjusting effective length of tie rod
JP6591303B2 (en) Injection molding machine
CN114364502B (en) Resin sealing method and resin sealing mold
CN113286687B (en) Resin encapsulation method, resin encapsulation metal mold, and resin encapsulation device
JP7205261B2 (en) Resin sealing method and resin sealing apparatus
KR20160064141A (en) Molding machine
JPH10323872A5 (en)
JP4767192B2 (en) Injection molding apparatus and injection molding method
TWI626143B (en) Injection molding machine
JP5809337B1 (en) Resin temperature control method in injection nozzle
JPS62249723A (en) Injection molding machine heating cylinder temperature control device
JP7139192B2 (en) Resin molding die and molding method
CN101500778B (en) Die for molding optical component and method for manufacturing optical component
JP5747548B2 (en) Temperature control device for injection mold
JP2001300997A (en) Method and apparatus for injection molding
KR102419758B1 (en) Resin molding apparatus and manufacturing method of resin molded product
JPH09220745A (en) Injection compression molding machine
JP2003112348A (en) Method for injection molding
JP3282436B2 (en) Injection compression molding method and injection compression molding apparatus
CN113261085B (en) Resin molding die and resin molding method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230412

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240611

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240624

R150 Certificate of patent or registration of utility model

Ref document number: 7521272

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150