JP7522020B2 - Concrete supply distributor - Google Patents
Concrete supply distributor Download PDFInfo
- Publication number
- JP7522020B2 JP7522020B2 JP2020204715A JP2020204715A JP7522020B2 JP 7522020 B2 JP7522020 B2 JP 7522020B2 JP 2020204715 A JP2020204715 A JP 2020204715A JP 2020204715 A JP2020204715 A JP 2020204715A JP 7522020 B2 JP7522020 B2 JP 7522020B2
- Authority
- JP
- Japan
- Prior art keywords
- base
- boom
- frame
- bearing
- outrigger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004567 concrete Substances 0.000 title claims description 32
- 239000004519 grease Substances 0.000 description 62
- 238000003780 insertion Methods 0.000 description 40
- 230000037431 insertion Effects 0.000 description 40
- 238000003860 storage Methods 0.000 description 27
- 238000000034 method Methods 0.000 description 26
- 230000008569 process Effects 0.000 description 21
- 238000009826 distribution Methods 0.000 description 11
- 230000007246 mechanism Effects 0.000 description 6
- 238000011144 upstream manufacturing Methods 0.000 description 6
- 238000003466 welding Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 238000002347 injection Methods 0.000 description 5
- 239000007924 injection Substances 0.000 description 5
- 238000009434 installation Methods 0.000 description 5
- 239000000725 suspension Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 238000005266 casting Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 238000005086 pumping Methods 0.000 description 3
- 230000000087 stabilizing effect Effects 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 238000003754 machining Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 230000008707 rearrangement Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 238000007664 blowing Methods 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 230000001629 suppression Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/04—Devices for both conveying and distributing
- E04G21/0418—Devices for both conveying and distributing with distribution hose
- E04G21/0427—Devices for both conveying and distributing with distribution hose on a static support, e.g. crane
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Description
本発明は、ベース装置と、このベース装置上に起立状態で支持されるマスト装置と、そのマスト装置上に搭載されるブーム装置とを備えたコンクリート供給用デストリビュータに関する。 The present invention relates to a concrete supply distributor that includes a base device, a mast device supported in an upright position on the base device, and a boom device mounted on the mast device.
上記コンクリート供給用デストリビュータのベース装置が、矩形状の上、下フレーム、及びその上、下フレーム間を結合する縦フレームを含むフレーム枠と、そのフレーム枠に軸支されて格納位置及び展開位置間で回動可能な複数のアウトリガとを備え、そのアウトリガを展開位置に保持することで、ベース装置、延いてはマスト装置及びブーム装置の支持を安定させる技術が、例えば特許文献1に開示されるように従来公知である。 The base device of the concrete supply distributor is equipped with a frame including rectangular upper and lower frames and a vertical frame connecting the upper and lower frames, and a number of outriggers that are pivotally supported by the frame and can rotate between a stored position and an deployed position. A technology for stabilizing support of the base device, and therefore the mast device and boom device, by holding the outriggers in the deployed position is known in the art, as disclosed in Patent Document 1, for example.
ところが特許文献1のデストリビュータのベース主要部をなす基台10A(上記フレーム枠)では、上、下フレーム間を結合し且つ鉛直方向に延びる縦フレームの外側にブラケット10aが外向きに突設され、このブラケット10aに支持脚10B(アウトリガ)の基部を回動可能に軸支している。 However, in the base 10A (above frame) that forms the main part of the base of the distributor in Patent Document 1, a bracket 10a is provided that protrudes outward from the outside of the vertical frame that connects the upper and lower frames and extends vertically, and the base of the support leg 10B (outrigger) is rotatably supported by this bracket 10a.
そのため、上記縦フレームよりも外側でブラケット10aに旋回軸を支持し、その旋回軸回りに支持脚10Bが回動することから、支持脚10Bは、これが格納位置に在っても上記した上、下フレームや縦フレームを含むフレーム枠(即ち基台10A)よりも外側に少なからず張り出してしまい、比較的広い占有スペースを必要とする不都合がある。 Because the pivot shaft is supported on the bracket 10a outside the vertical frame, and the support leg 10B rotates around the pivot shaft, even when the support leg 10B is in the stored position, it protrudes somewhat outside the frame (i.e., the base 10A) including the upper and lower frames and vertical frame, which is inconvenient as it requires a relatively large occupying space.
本発明は、上記に鑑み提案されたもので、従来構造の問題を簡単な構造で解決可能としたコンクリート供給用デストリビュータを提供することを目的とする。 The present invention was proposed in light of the above, and aims to provide a distributor for supplying concrete that can solve the problems of conventional structures with a simple structure.
前記目的を達成するために、本発明は、ベース装置と、このベース装置上に起立状態で支持されるマスト装置と、そのマスト装置上に搭載されるブーム装置とを備えたコンクリート供給用デストリビュータにおいて、前記ベース装置は、ベースフレームと、そのベースフレームに固定され且つ該ベースフレームを取り囲むように配列される複数の上フレームと、平面視で隣り合う前記上フレームの長手方向に沿う外側面相互の交点よりも内方側又は該外側面の延長線相互の交点よりも内方側に少なくとも一部が位置し、且つ該隣り合う上フレームの隣接端部に各々結合される上部軸受と、前記ベースフレームに固定され且つ複数の上フレームにそれぞれ対応して該上フレーム直下に間隔をおいて配列される複数の下フレームと、平面視で隣り合う前記下フレームの長手方向に沿う外側面相互の交点よりも内方側又は該外側面の延長線相互の交点よりも内方側に少なくとも一部が位置し、且つ該隣り合う下フレームの隣接端部に各々結合される下部軸受と、各々の基部に軸受筒部を有し且つその各軸受筒部が対応する前記上部軸受と前記下部軸受間に配置される複数のアウトリガと、同一軸線上に存する前記上部軸受、前記軸受筒部及び前記下部軸受に嵌挿される回動支軸とを備え、前記アウトリガは、前記上フレーム及び前記下フレームに沿う格納位置と、その格納位置より外方に張出す展開位置との間を前記回動支軸回りに回動可能であることを第1の特徴とする。 In order to achieve the above object, the present invention provides a concrete supply distributor having a base device, a mast device supported in an upright position on the base device, and a boom device mounted on the mast device, the base device comprising a base frame, a plurality of upper frames fixed to the base frame and arranged to surround the base frame, upper bearings each having at least a portion located on the inner side of the intersection of the outer side surfaces of adjacent upper frames along the longitudinal direction in a plan view or on the inner side of the intersection of the extension lines of the outer sides and connected to the adjacent ends of the adjacent upper frames, and upper bearings each having at least a portion located on the inner side of the intersection of the outer side surfaces of adjacent upper frames along the longitudinal direction in a plan view and connected to the adjacent ends of the adjacent upper frames, and upper bearings each having at least a portion located on the inner side of the intersection of the outer side surfaces of adjacent upper frames along the longitudinal direction in a plan view, the ... The first feature of the system is that it comprises a plurality of lower frames arranged at a distance from each other, a lower bearing that is at least partially located on the inner side of the intersection of the outer side surfaces of adjacent lower frames along the longitudinal direction in a plan view or on the inner side of the intersection of the extension lines of the outer sides and is respectively connected to the adjacent ends of the adjacent lower frames, a plurality of outriggers each having a bearing cylinder portion at its base and disposed between the corresponding upper bearing and lower bearing, and a rotating support shaft that is inserted into the upper bearing, the bearing cylinder portion, and the lower bearing that are on the same axis, and the outriggers are rotatable about the rotating support shaft between a stored position along the upper frame and the lower frame and a deployed position that projects outward from the stored position.
また本発明は、第1の特徴に加えて、前記上部軸受及び前記下部軸受は、円筒状の軸受本体と、その軸受本体の外周を囲繞する囲い枠とを各々備えており、前記囲い枠は、前記上フレーム又は前記下フレームの長手方向と直交する平坦な取付面を有していて、該取付面に前記上フレーム又は前記下フレームの端面が当接、固着されることを第2の特徴とする。 In addition to the first feature, the present invention has a second feature in that the upper bearing and the lower bearing each have a cylindrical bearing body and a surrounding frame that surrounds the outer periphery of the bearing body, the surrounding frame has a flat mounting surface that is perpendicular to the longitudinal direction of the upper frame or the lower frame, and the end face of the upper frame or the lower frame abuts against and is fixed to the mounting surface.
また本発明は、第2の特徴に加えて、前記取付面とこれに対応する前記上フレーム又は前記下フレームとの当接面は、該取付面を有する前記囲い枠が囲繞する前記上部軸受又は前記下部軸受の中心線を通り且つ前記対応する前記上フレーム又は前記下フレームの軸線と平行な仮想鉛直面よりも外側に配置されることを第3の特徴とする。 In addition to the second feature, the third feature of the present invention is that the contact surface between the mounting surface and the corresponding upper frame or lower frame is located outside a virtual vertical plane that passes through the center line of the upper bearing or lower bearing surrounded by the enclosure frame having the mounting surface and is parallel to the axis of the corresponding upper frame or lower frame.
また本発明は、第1~第3の何れかの特徴に加えて、各々の前記アウトリガは、これの格納時に対応する前記上フレーム及び前記下フレームとの間の空間に進入できるように、前記上フレーム及び前記下フレームの相対向面の相互間隔よりも小さい上下方向最大幅、並びに前記格納時の該アウトリガの先部が隣接する他のアウトリガの前記基部と干渉しない水平方向長さに設定されることを第4の特徴とする。 In addition to any of the first to third features, the fourth feature of the present invention is that each outrigger is set to a maximum vertical width that is smaller than the mutual distance between the opposing faces of the upper frame and the lower frame so that it can enter the space between the corresponding upper frame and lower frame when stored, and a horizontal length such that the tip of the outrigger when stored does not interfere with the base of the adjacent outrigger.
本発明によれば、ベース装置は、ベースフレームに固定され且つこれを取り囲むように配列される複数の上フレームと、平面視で隣り合う上フレームの長手方向に沿う外側面相互の交点よりも内方側又は該外側面の延長線相互の交点よりも内方側に少なくとも一部が位置し、且つ隣り合う上フレームの隣接端部に各々結合される上部軸受と、ベースフレームに固定され且つ複数の上フレームにそれぞれ対応して上フレーム直下に配列される複数の下フレームと、平面視で隣り合う下フレームの長手方向に沿う外側面相互の交点よりも内方側又は該外側面の延長線相互の交点よりも内方側に少なくとも一部が位置し、且つ隣り合う下フレームの隣接端部に各々結合される下部軸受と、各々の基部に軸受筒部を有し且つその各軸受筒部が対応する上部軸受と下部軸受間に配置される複数のアウトリガと、同一軸線上に存する上部軸受、軸受筒部及び下部軸受に嵌挿される回動支軸とを備える。これにより、アウトリガの基部が、隣り合う上フレームの隣接端部にベースフレームの内方寄りで結合される上部軸受と、隣り合う下フレームの隣接端部にベースフレームの内方寄りで結合される下部軸受との間の空間に配置されることとなって、格納時におけるベースフレームや上,下フレームを含むフレーム枠外側へのアウトリガの張出しを効果的に抑制可能となるため、ベース装置の小型化が図られ、占有スペースが小さくできる。その結果、ベース装置を建設現場の狭小な空間(例えば床スラブを上下に貫通する貫通孔等)を無理なく移動可能となって、作業性が良好となる。 According to the present invention, the base device comprises a plurality of upper frames fixed to the base frame and arranged to surround it; upper bearings, at least a portion of which is located inward of the intersection of the outer side surfaces of adjacent upper frames along the longitudinal direction in a plan view or inward of the intersection of the extension lines of the outer sides, and which are respectively connected to the adjacent ends of the adjacent upper frames; a plurality of lower frames fixed to the base frame and arranged directly below the upper frames corresponding to the plurality of upper frames; lower bearings, at least a portion of which is located inward of the intersection of the outer side surfaces of adjacent lower frames along the longitudinal direction in a plan view or inward of the intersection of the extension lines of the outer sides, and which are respectively connected to the adjacent ends of the adjacent lower frames; a plurality of outriggers each having a bearing tube portion at its base and each of which is arranged between a corresponding upper bearing and lower bearing; and a rotating support shaft inserted into the upper bearing, bearing tube portion, and lower bearing, which are on the same axis. This allows the base of the outrigger to be positioned in the space between the upper bearing, which is connected to the adjacent end of the adjacent upper frame on the inner side of the base frame, and the lower bearing, which is connected to the adjacent end of the adjacent lower frame on the inner side of the base frame, effectively preventing the outrigger from protruding outward from the frame including the base frame and the upper and lower frames during storage, making the base device smaller and reducing the space it occupies. As a result, the base device can be moved effortlessly through small spaces at construction sites (such as through holes that penetrate the floor slab from top to bottom), improving workability.
また第2の特徴によれば、上部軸受及び下部軸受は、円筒状の軸受本体と、その軸受本体の外周を囲繞する囲い枠とを各々備え、囲い枠は、上フレーム又は下フレームの長手方向と直交する平坦な取付面を有していて、取付面に上フレーム又は下フレームの端面が当接、固着される。これにより、軸受本体が円筒状であっても、軸受本体外周面と上,下フレーム端面との間に上記囲い壁が介在することで、軸受本体と上,下フレーム間で荷重を片寄りなく略均等に伝達可能となるため、耐久性向上に寄与することができる。 According to the second feature, the upper bearing and the lower bearing each have a cylindrical bearing body and an enclosure frame surrounding the outer periphery of the bearing body, and the enclosure frame has a flat mounting surface perpendicular to the longitudinal direction of the upper frame or the lower frame, and the end face of the upper frame or the lower frame abuts and is fixed to the mounting surface. As a result, even if the bearing body is cylindrical, the above-mentioned enclosure wall is interposed between the outer periphery of the bearing body and the end faces of the upper and lower frames, making it possible to transmit the load between the bearing body and the upper and lower frames approximately evenly without bias, which contributes to improving durability.
また第3の特徴によれば、囲い壁の前記取付面とこれに対応する上フレーム又は下フレームとの当接面は、該取付面を有する囲い枠が囲繞する上部軸受又は下部軸受の中心線を通り且つ前記対応する上フレーム又は下フレームの軸線と平行な仮想鉛直面よりも外側に配置される。これにより、上,下フレームによる上,下部軸受に対する支持スパンを広く確保できるため、上,下部軸受に対する支持剛性を高めることができる。 According to the third feature, the contact surface between the mounting surface of the surrounding wall and the corresponding upper or lower frame is positioned outside a virtual vertical plane that passes through the center line of the upper or lower bearing surrounded by the surrounding frame having the mounting surface and is parallel to the axis of the corresponding upper or lower frame. This ensures a wide support span for the upper and lower bearings by the upper and lower frames, thereby increasing the support rigidity for the upper and lower bearings.
また第4の特徴によれば、各々のアウトリガは、これの格納時に対応する上フレーム及び下フレームとの間の空間に進入できるように、上フレーム及び下フレームの相対向面の相互間隔よりも小さい上下方向最大幅、並びに格納時のアウトリガの先部が隣接する他のアウトリガの前記基部と干渉しない水平方向長さに設定される。これにより、アウトリガの、軸受筒部を含む基部と、これに隣接する他のアウトリガの先部との干渉を回避しながら、上,下フレーム間の空間を、格納時のアウトリガの収納空間として十分に活用可能となるため、格納時におけるアウトリガの上記フレーム枠外側への張出しを一層効果的に抑制可能となる。 According to the fourth feature, each outrigger is set to a maximum vertical width smaller than the mutual distance between the opposing faces of the upper and lower frames so that it can enter the space between the corresponding upper and lower frames when stored, and a horizontal length such that the tip of the outrigger when stored does not interfere with the base of the adjacent outrigger. This makes it possible to fully utilize the space between the upper and lower frames as storage space for the outrigger when stored, while avoiding interference between the base of the outrigger, including the bearing tube portion, and the tip of the adjacent outrigger, and therefore makes it possible to more effectively prevent the outrigger from protruding outside the frame when stored.
本発明の実施形態を、添付図面により以下に具体的に説明する。 Embodiments of the present invention are described in detail below with reference to the accompanying drawings.
コンクリート供給用デストリビュータDは、例えばビル等の建設現場において構造物の躯体各所(例えば床スラブや各壁体等)を構築するための生コンクリートを、現場の地上に置かれた不図示のコンクリートポンプから受け取り、高所に在る打設現場の随所に供給するために使用される。その使用例を図1に示す。 The concrete supply distributor D is used to receive ready mixed concrete for constructing various parts of a structure (such as floor slabs and walls) at a construction site such as a building from a concrete pump (not shown) placed on the ground at the site, and supply it to various parts of a casting site located at an elevated position. An example of its use is shown in Figure 1.
このデストリビュータDは、土台となるベース装置10と、このベース装置10上に起立状態で支持される高さ調節可能なマスト装置20と、そのマスト装置20上に搭載されるブーム装置30とを備えている。次にその各装置10,20,30の一例について、図2~図13を併せて参照して、順に説明する。 This distributor D comprises a base device 10 that serves as a foundation, a height-adjustable mast device 20 that is supported in an upright position on the base device 10, and a boom device 30 that is mounted on the mast device 20. Next, examples of each of the devices 10, 20, and 30 will be described in order with reference to Figures 2 to 13.
先ず、図2~図7によりベース装置10について説明すると、それは、ベース本体10mと、そのベース本体10mに基部16bが回動支軸17を介して回動可能に支持されるアウトリガ16とを有する。アウトリガ16は、ベース本体10m内に収まる格納位置16Bと、その格納位置16Bより外方(即ちベース本体10mの外側)に張出す所定の展開位置16Aとの間を回動操作可能となっている。ベース本体10mは、複数の金属製フレームを枠組みして構成される剛体枠で構成される。 First, the base device 10 will be described with reference to Figures 2 to 7. It has a base body 10m and an outrigger 16 whose base portion 16b is rotatably supported on the base body 10m via a pivot shaft 17. The outrigger 16 can be rotated between a storage position 16B that fits within the base body 10m and a predetermined deployed position 16A that projects outward from the storage position 16B (i.e., outside the base body 10m). The base body 10m is made up of a rigid frame formed by a number of metal frames.
即ち、ベース本体10mは、中央の骨格体となるベースフレーム11を備え、このベースフレーム11は、横断面矩形状に形成されて上下方向に延びる角筒部11bと、この角筒部11bの前後左右の頂部より放射状に延びる4個の鉛直壁部11aとを一体に有する。各鉛直壁部11aは、図2~図7で明らかなように複雑な三次元形態を有するため、複数の壁要素相互を一体的に結合(例えば溶接、ボルト止め等)されて構成される。尚、各鉛直壁部11aの上部には、ベース装置10をクレーンで単独で吊り下げる場合(例えば図14(A)参照)に吊り下げ用ワイヤの下端部を係止させるための係止孔付きブラケット11abが固着(例えば溶接等)される。 That is, the base body 10m is provided with a base frame 11 that serves as a central skeleton, and this base frame 11 is integrally provided with a square tube section 11b that is formed in a rectangular cross section and extends vertically, and four vertical walls 11a that extend radially from the tops of the square tube section 11b on the front, back, left and right. As each vertical wall section 11a has a complex three-dimensional shape as is clear from Figures 2 to 7, it is constructed by integrally connecting (for example, by welding, bolting, etc.) multiple wall elements to each other. In addition, a bracket 11ab with a locking hole is fixed (for example, by welding, etc.) to the upper part of each vertical wall section 11a in order to lock the lower end of the suspension wire when the base device 10 is suspended independently by a crane (for example, see Figure 14 (A)).
また特に実施形態の角筒部11bは、マスト装置20の後述するマストMと略同一の横断面形状を有しており、この角筒部11bの上端部外周には複数の結合用ブロック21が間隔をおいて固定される。これらの結合用ブロック21と、最下部のマストMの下端部外周に固定の複数の結合用ブロック21′とを用いて、後述するように最下部のマストMと角筒部11b(従ってベース本体10m)とが互いに結合される。 In particular, the square tube portion 11b in this embodiment has a cross-sectional shape that is approximately the same as that of the mast M of the mast device 20, which will be described later, and multiple connecting blocks 21 are fixed at intervals to the outer periphery of the upper end of this square tube portion 11b. Using these connecting blocks 21 and multiple connecting blocks 21' fixed to the outer periphery of the lower end of the lowest mast M, the lowest mast M and the square tube portion 11b (and therefore the base body 10m) are connected to each other, as will be described later.
またベース本体10mは、上記したベースフレーム11と、ベースフレーム11に固定され且つベースフレーム11を取り囲むように配列される複数(図示例は4個)の上フレーム12と、隣り合う上フレーム12の隣接端部間を各々結合する上部軸受14と、ベースフレーム11に固定され且つ複数の上フレーム12にそれぞれ対応して上フレーム12直下に間隔をおいて配列される複数の下フレーム13と、隣り合う下フレーム13の隣接端部間を各々結合する下部軸受15とを備える。上部軸受14及び下部軸受15は、円筒状の軸受本体14b,15bと、その軸受本体14b,15bに固定(例えば溶接)されてその外周を囲繞する囲い枠14k,15kとを各々備える。下フレーム13の下面には、接地可能な複数の支持脚13aが突設される。 The base body 10m also includes the above-mentioned base frame 11, a plurality of upper frames 12 (four in the illustrated example) fixed to the base frame 11 and arranged to surround the base frame 11, an upper bearing 14 connecting adjacent ends of adjacent upper frames 12, a plurality of lower frames 13 fixed to the base frame 11 and arranged at intervals directly below the upper frames 12 corresponding to the plurality of upper frames 12, and a lower bearing 15 connecting adjacent ends of adjacent lower frames 13. The upper bearing 14 and the lower bearing 15 each include a cylindrical bearing body 14b, 15b and a surrounding frame 14k, 15k fixed (for example, welded) to the bearing body 14b, 15b and surrounding the outer periphery. A plurality of support legs 13a that can be grounded are protruded from the lower surface of the lower frame 13.
而して、上部軸受14は、これを隣り合う上フレーム12の隣接端部にその間を繋ぐよう結合する構造としたことで、平面視で隣り合う上フレーム12の長手方向に沿う外側面の延長線相互の交点Oよりも内方側(即ち角筒部11b側、換言すればベース本体10mの中心側)に上部軸受14の少なくとも一部が位置するように、上フレーム12の隣接端部に上部軸受14が結合されることとなる。一方、下部軸受15は、これを隣り合う下フレーム13の隣接端部にその間を繋ぐよう結合する構造としたことで、平面視で隣り合う下フレーム13の長手方向に沿う外側面の延長線相互の交点Oよりも内方側(即ち角筒部11b側、換言すればベース本体10mの中心側)に下部軸受15の少なくとも一部が位置するように、隣り合う下フレーム13の隣接端部に下部軸受15が結合されることとなる。 The upper bearing 14 is connected to the adjacent ends of the adjacent upper frames 12 so that at least a part of the upper bearing 14 is located inside the intersection O of the extension lines of the outer surfaces of the adjacent upper frames 12 along the longitudinal direction in a plan view (i.e., the square tube portion 11b side, in other words, the center side of the base body 10m) by having the structure of connecting the upper bearing 14 to the adjacent ends of the adjacent upper frames 12. On the other hand, the lower bearing 15 is connected to the adjacent ends of the adjacent lower frames 13 so that at least a part of the lower bearing 15 is located inside the intersection O of the extension lines of the outer surfaces of the adjacent lower frames 13 along the longitudinal direction in a plan view (i.e., the square tube portion 11b side, in other words, the center side of the base body 10m).
これにより、上部軸受14と下部軸受15間に配置されるアウトリガ基部16bが、隣り合う上フレーム12の隣接端部にベースフレーム11の内方寄り(即ち角筒部11b寄り、換言すればベース本体10mの中心寄り)で結合される上部軸受14と、隣り合う下フレーム13の隣接端部にベースフレーム11の内方寄り(即ち角筒部11b寄り、換言すればベース本体10mの中心寄り)で結合される下部軸受15との間の空間に配置されるレイアウトとなる。このため、格納時におけるベース本体10m(即ちベースフレーム11や上,下フレーム12,13を含むフレーム枠)外側へのアウトリガ16の張出しを効果的に抑制可能となるから、ベース装置10の小型化が図られ、占有スペースを小さくできる。その結果、ベース装置10を建設現場の狭小な空間(例えば床スラブを上下に貫通する貫通孔等)を無理なく移動通過可能となって、作業性が良好となる。 As a result, the outrigger base 16b arranged between the upper bearing 14 and the lower bearing 15 is arranged in the space between the upper bearing 14, which is connected to the adjacent end of the adjacent upper frame 12 near the inside of the base frame 11 (i.e., near the square tube portion 11b, in other words, near the center of the base body 10m), and the lower bearing 15, which is connected to the adjacent end of the adjacent lower frame 13 near the inside of the base frame 11 (i.e., near the square tube portion 11b, in other words, near the center of the base body 10m). Therefore, the outrigger 16 can be effectively prevented from protruding outward from the base body 10m (i.e., the frame including the base frame 11 and the upper and lower frames 12 and 13) during storage, so that the base device 10 can be made smaller and the occupied space can be reduced. As a result, the base device 10 can be moved through a narrow space at the construction site (for example, a through hole that penetrates a floor slab vertically) without difficulty, improving workability.
また、上記した囲い枠14k,15kは、軸受本体14b,15bを環状の空隙を挟んで囲繞する板状の囲い枠本体140,150と、囲い枠本体140,150を上下より挟むようにして囲い枠本体140,150の上下端にそれぞれ固定(例えば突き合わせ溶接)される上下各一対の第1,第2支持板部141,142;151,152とを有する。そして、上下各一対の第1,第2支持板部141,142;151,152と、これを貫通する上部軸受14又は下部軸受15とが固定(例えば溶接)される。 The above-mentioned enclosure frames 14k, 15k have plate-shaped enclosure frame bodies 140, 150 that surround the bearing bodies 14b, 15b with an annular gap therebetween, and upper and lower pairs of first and second support plate parts 141, 142; 151, 152 that are fixed (e.g., butt-welded) to the upper and lower ends of the enclosure frame body 140, 150 so as to sandwich the enclosure frame body 140, 150 from above and below. The upper and lower pairs of first and second support plate parts 141, 142; 151, 152 are then fixed (e.g., welded) to the upper bearing 14 or lower bearing 15 that passes through them.
特に実施形態の囲い枠本体140,150は、上フレーム12又は下フレーム13との対向面に、それら上,下フレーム12,13の長手方向中心線と直交する平坦な取付面14kf,15kfをそれぞれ有する。これら取付面14kf,15kfには、上フレーム12又は下フレーム13の端面12e,13eが固定(実施形態は突き合わせ溶接)される。これにより、軸受本体14b,15bが円筒状であっても、それの外周面と上,下フレーム端面12e,13eとの間に囲い枠14k,15kが介在することで、軸受本体14b,15bと上,下フレーム12,13間で荷重を片寄りなく略均等に伝達可能となり、それだけ各部の荷重負担が軽減されるから、耐久性が高められる。 In particular, the enclosing frame main body 140, 150 of the embodiment has flat mounting surfaces 14kf, 15kf on the surface facing the upper frame 12 or the lower frame 13, which are perpendicular to the longitudinal center line of the upper and lower frames 12, 13. The end faces 12e, 13e of the upper frame 12 or the lower frame 13 are fixed to these mounting surfaces 14kf, 15kf (butt welding in the embodiment). As a result, even if the bearing main body 14b, 15b is cylindrical, the enclosing frame 14k, 15k is interposed between the outer circumferential surface of the bearing main body 14b, 15b and the upper and lower frames 12, 13e, so that the load can be transmitted approximately evenly between the bearing main body 14b, 15b and the upper and lower frames 12, 13 without bias, and the load burden on each part is reduced, thereby improving durability.
尚、本実施形態では、上側で対をなす第1,第2支持板部141,142のうちの何れか一方(142)と、下側で対をなす第1,第2支持板部151,152のうちの何れか一方(151)とが、ベースフレーム11の対応する鉛直壁部11aの一部と一体に形成されるが、これを別体に形成して後付けで鉛直壁部11aの先部に固定(例えば溶接、ボルト止め等)してもよい。 In this embodiment, one (142) of the pair of first and second support plate portions 141, 142 on the upper side and one (151) of the pair of first and second support plate portions 151, 152 on the lower side are formed integrally with a part of the corresponding vertical wall portion 11a of the base frame 11, but they may be formed separately and then fixed (for example, by welding, bolting, etc.) to the tip of the vertical wall portion 11a later.
またベースフレーム11における各鉛直壁部11aの外側縁部には、対応する上部軸受14と下部軸受15との中間において、内方側(即ち角筒部11b側)に円弧状に凹んだ凹曲部18が形成される。 In addition, the outer edge of each vertical wall portion 11a of the base frame 11 is formed with a concave curved portion 18 that is recessed in an arc shape on the inward side (i.e., toward the square tube portion 11b) between the corresponding upper bearing 14 and lower bearing 15.
囲い枠本体140,150の上記した取付面14kf,15kfと、これに対応する上フレーム12又は下フレーム13との当接面は、図4で明らかなように、取付面14kf,15kfを有する囲い枠14k,15kが囲繞する上部軸受14又は下部軸受15の中心軸線を通り且つ対応する上フレーム12又は下フレーム13の長手方向中心線と平行な仮想鉛直面Xよりも外側に配置される。これにより、上,下フレーム12,13による上,下部軸受14,15に対する支持スパンを広く確保可能となるため、上,下部軸受14,15に対する支持剛性を高めることができる。 As is clear from FIG. 4, the contact surfaces between the above-mentioned mounting surfaces 14kf, 15kf of the enclosure frame main body 140, 150 and the corresponding upper frame 12 or lower frame 13 are located outside the imaginary vertical plane X that passes through the central axis of the upper bearing 14 or lower bearing 15 surrounded by the enclosure frame 14k, 15k having the mounting surfaces 14kf, 15kf and is parallel to the longitudinal center line of the corresponding upper frame 12 or lower frame 13. This makes it possible to ensure a wide support span for the upper and lower bearings 14, 15 by the upper and lower frames 12, 13, thereby increasing the support rigidity for the upper and lower bearings 14, 15.
その上、各々のアウトリガ16は、これの格納時に対応する上,下フレーム12,13との間の空間に進入できるように、上,下フレーム12,13の相対向面の相互間隔よりも小さい上下方向最大幅L1(図6(c)を参照)、並びに格納時のアウトリガ16の先部16aが隣接する他のアウトリガ16の基部16bと干渉しない長手方向長さL2(図6(a)を参照)に設定されている。これにより、各アウトリガ16の、軸受筒部16baを含む基部16bと、これに隣接する他のアウトリガ16の先部16aとの相互干渉を回避しながら、上,下フレーム12,13間の空間を、格納時のアウトリガ16の収納空間として十分に活用可能となり、従って、格納時におけるアウトリガ16のベース本体10m外側への張出しを一層効果的に抑制可能となる。 Furthermore, each outrigger 16 is set to a maximum vertical width L1 (see FIG. 6(c)) smaller than the mutual distance between the opposing faces of the upper and lower frames 12 and 13 so that it can enter the space between the corresponding upper and lower frames 12 and 13 when stored, and a longitudinal length L2 (see FIG. 6(a)) such that the tip 16a of the outrigger 16 when stored does not interfere with the base 16b of the adjacent outrigger 16. This makes it possible to fully utilize the space between the upper and lower frames 12 and 13 as storage space for the outrigger 16 when stored, while avoiding mutual interference between the base 16b, including the bearing cylinder portion 16ba, of each outrigger 16 and the tip 16a of the adjacent outrigger 16, and therefore makes it possible to more effectively prevent the outrigger 16 from protruding outward from the base body 10m when stored.
各々のアウトリガ16の主要部をなすアウトリガ本体16mは、横断面が扁平矩形状の頑丈な中空閉断面構造とされた金属製フレーム枠で構成され、側面視で横長の長方形状に形成される。そのアウトリガ16は、各々の基部16bに上下方向に延びる軸受筒部16baを一体に有しており、その各軸受筒部16baが、対応する上部軸受14と下部軸受15間に配置される。そして、各アウトリガ16をベース本体10mにセットした状態では、同一の鉛直軸線上に並ぶ上部軸受14、軸受筒部16ba及び下部軸受15に回動支軸17が相対回動可能に嵌挿される。これにより、アウトリガ16は、上フレーム12及び下フレーム13に沿う格納位置16Bと、その格納位置16Bより外方に張出す展開位置16Aとの間を回動支軸17回りに回動可能である。 The outrigger body 16m, which is the main part of each outrigger 16, is made of a metal frame with a sturdy hollow closed cross-section structure with a flat rectangular cross section, and is formed into a horizontally long rectangle in side view. Each outrigger 16 has a bearing tube 16ba extending vertically integrally with its base 16b, and each bearing tube 16ba is disposed between the corresponding upper bearing 14 and lower bearing 15. When each outrigger 16 is set on the base body 10m, the pivot shaft 17 is inserted into the upper bearing 14, bearing tube 16ba, and lower bearing 15, which are aligned on the same vertical axis, so that they can rotate relatively. As a result, the outrigger 16 can rotate around the pivot shaft 17 between a storage position 16B along the upper frame 12 and lower frame 13 and a deployment position 16A extending outward from the storage position 16B.
尚、回動支軸17と上部軸受14(又は下部軸受15)との間には、回動支軸17の抜け出しを阻止する抜け止め手段19が、上部軸受14(又は下部軸受15)に対し着脱可能として介装される。 Between the pivot shaft 17 and the upper bearing 14 (or the lower bearing 15), a retaining means 19 that prevents the pivot shaft 17 from coming out is interposed and is detachable from the upper bearing 14 (or the lower bearing 15).
図3でも明らかなように、実施形態ではアウトリガ16の展開位置16Aとして、平面視で鉛直壁部11aの延長方向に延びる主展開位置16A0と、上,下部軸受14,15を挟んで一方側及び他方側の上,下フレーム12,13の各延長方向に延びる第1,第2副展開位置16A1,16A2とが選択的に設定可能である。 As is clear from FIG. 3, in this embodiment, the outrigger 16 can be selectively deployed in one of two positions 16A: a main deployed position 16A0 extending in the extension direction of the vertical wall 11a in a plan view, and first and second secondary deployed positions 16A1, 16A2 extending in the extension directions of the upper and lower frames 12, 13 on one side and the other side, sandwiching the upper and lower bearings 14, 15.
また実施形態では、アウトリガ16が少なくとも展開位置16Aにあるときに(本実施形態では格納位置16Bにあるときにも)アウトリガ16をベース本体10mに固定可能な結合ピンP1,P2を抜差可能に挿入させるピン挿入孔16h0,16h1~16h3;10h0,10h1,10h2が、それらアウトリガ16及びベース本体10mの各々に設けられる。それらピン挿入孔16h0,16h1~16h3;10h0,10h1,10h2の内径は同一径に設定され、上下の結合ピンP1,P2の外径は、上記内径よりも僅かに小さい同一径に設定される。 In addition, in this embodiment, the outriggers 16 and the base body 10m are each provided with pin insertion holes 16h0, 16h1-16h3; 10h0, 10h1, 10h2 into which the connecting pins P1, P2 that can fix the outrigger 16 to the base body 10m can be removably inserted when the outrigger 16 is at least in the deployed position 16A (also in this embodiment when it is in the stored position 16B). The inner diameters of the pin insertion holes 16h0, 16h1-16h3; 10h0, 10h1, 10h2 are set to the same diameter, and the outer diameters of the upper and lower connecting pins P1, P2 are set to the same diameter that is slightly smaller than the inner diameters.
本実施形態において、上側の結合ピンP1は、作業性向上や紛失防止のために各上部軸受14の上部にワイヤを介して連結され、また下側の結合ピンP2は、作業性向上や紛失防止のために各アウトリガ16の基部16b外面にワイヤを介して連結される。尚、このような形で結合ピンP1,P2をベース本体10mに付設しないで、作業員が現場の適所に保管しておき、必要な場合に随時取り出して使用してもよい。 In this embodiment, the upper connecting pin P1 is connected to the top of each upper bearing 14 via a wire to improve workability and prevent loss, and the lower connecting pin P2 is connected to the outer surface of the base 16b of each outrigger 16 via a wire to improve workability and prevent loss. It is also possible for the workers to store the connecting pins P1 and P2 in an appropriate location on-site without attaching them to the base body 10m in this manner, and to take them out and use them whenever necessary.
次に各々のピン挿入孔の構造を図4~図6を併せて参照して、具体的に説明する。矩形断面のアウトリガ本体16mの上、下壁161,162は、アウトリガ本体16mの上下中間部の平面形態よりもやや幅広に形成される。これら上、下壁161,162の、アウトリガ本体16mの上下中間壁より各々外方に張り出した上下の延出部161f,162fには、特にアウトリガ16の基部16b側において、展開位置固定用の3つのアウトリガ16側のピン挿入孔16h1~16h3が周方向に間隔をあけて設けられる。この展開位置固定用のピン挿入孔16h1~16h3は、アウトリガ16の前記した3つの展開位置16A(即ち主展開位置16A0および第1,第2副展開位置16A1,16A2)に対応して、図6(a)で明らかなように3箇所に分散配置される。また、アウトリガ16の先部16aの上側の延出部161fには、格納位置固定用のピン挿入孔16h0が設けられる。 Next, the structure of each pin insertion hole will be specifically described with reference to Figures 4 to 6. The upper and lower walls 161, 162 of the outrigger body 16m, which has a rectangular cross section, are formed slightly wider than the planar shape of the upper and lower intermediate parts of the outrigger body 16m. The upper and lower extension parts 161f, 162f of these upper and lower walls 161, 162, which protrude outward from the upper and lower intermediate walls of the outrigger body 16m, respectively, are provided with three pin insertion holes 16h1 to 16h3 on the outrigger 16 side for fixing the deployed position, spaced apart in the circumferential direction, particularly on the base part 16b side of the outrigger 16. These pin insertion holes 16h1 to 16h3 for fixing the deployed position are distributed and arranged in three places, as is clear from Figure 6(a), corresponding to the three deployed positions 16A of the outrigger 16 (i.e., the main deployed position 16A0 and the first and second secondary deployed positions 16A1, 16A2). Additionally, the upper extension 161f of the tip 16a of the outrigger 16 is provided with a pin insertion hole 16h0 for fixing the storage position.
尚、アウトリガ16側に設けられるピン挿入孔16h0,16h1~16h3は、それらの少なくとも1つを、上下の延出部161f,162fに設ける代わりにアウトリガ本体16mの主体部分、例えばアウトリガ本体16mの閉断面を構成する壁部分を孔明け加工して設けてもよい。 In addition, at least one of the pin insertion holes 16h0, 16h1 to 16h3 on the outrigger 16 side may be provided by drilling a hole in the main part of the outrigger body 16m, for example, in the wall part that constitutes the closed cross section of the outrigger body 16m, instead of providing it in the upper and lower extensions 161f, 162f.
一方、ベース本体10mは、アウトリガ16の先部16a側のピン挿入孔16h0及び上側の結合ピンP1と協働してアウトリガ16を格納位置16Bに固定するためのベース本体10m側の第1のピン挿入孔10h0を有しており、この第1のピン挿入孔10h0は、上フレーム12の中間部に固定のブラケット12bに配設される。 On the other hand, the base body 10m has a pin insertion hole 16h0 on the tip 16a side of the outrigger 16 and a first pin insertion hole 10h0 on the base body 10m side for fixing the outrigger 16 to the storage position 16B in cooperation with the upper connecting pin P1, and this first pin insertion hole 10h0 is disposed in a fixed bracket 12b in the middle part of the upper frame 12.
またベース本体10m、特に上,下部軸受14,15を各々上下より挟着する囲い枠14k,15kの上下の支持板部141,142;151,152は、アウトリガ16の基部16b側の上下のピン挿入孔16h1~16h3と協働してアウトリガ16を前記3つの展開位置16A0,16A1,16A2にそれぞれ固定するためのベース本体10m側の複数(図示例は2つ)の第2のピン挿入孔10h1,10h2を有する。 The base body 10m, particularly the upper and lower support plate portions 141, 142; 151, 152 of the enclosing frames 14k, 15k that clamp the upper and lower bearings 14, 15 from above and below, respectively, have multiple (two in the illustrated example) second pin insertion holes 10h1, 10h2 on the base body 10m side to cooperate with the upper and lower pin insertion holes 16h1-16h3 on the base portion 16b side of the outrigger 16 to fix the outrigger 16 to the three deployed positions 16A0, 16A1, 16A2, respectively.
而して、複数の第2のピン挿入孔10h1,10h2のうちの一部(特に下部軸受15の囲い枠15kの上下の支持板部151,152に設けたピン挿入孔10h1)は、図5(A)で明らかなように、アウトリガ16の基部16b側のピン挿入孔16h1~16h3の1つ(図示例は下側のピン挿入孔16h2)と共に下側の結合ピンP2に挿入されることで、アウトリガ16を格納位置16Bに固定可能である。 As is clear from FIG. 5(A), some of the multiple second pin insertion holes 10h1, 10h2 (particularly the pin insertion hole 10h1 provided in the upper and lower support plate portions 151, 152 of the surrounding frame 15k of the lower bearing 15) can be inserted into the lower connecting pin P2 together with one of the pin insertion holes 16h1-16h3 on the base 16b side of the outrigger 16 (the lower pin insertion hole 16h2 in the illustrated example), thereby fixing the outrigger 16 in the storage position 16B.
図8には、実施形態におけるアウトリガ16を各作動位置(即ち格納位置16B,3つの展開位置16A0,16A1,16A2)に固定するために使用すべき上下の結合ピンP1,P2とピン挿入孔16h0,16h1~16h3;10h0,10h1,10h2との互いの挿入関係がどのように変化するかを判り易く説明した図である。 Figure 8 clearly explains how the insertion relationship between the upper and lower connecting pins P1 and P2, which are used to fix the outrigger 16 in each operating position (i.e., the stored position 16B and the three deployed positions 16A0, 16A1, and 16A2) in this embodiment, and the pin insertion holes 16h0, 16h1 to 16h3; 10h0, 10h1, and 10h2 changes.
この図8において、太めの黒点は、アウトリガ16を当該作動位置(16B,16A0,16A1,16A2)に固定するために選択された結合ピンP1,P2を示しており、また括弧内のピン挿入孔の参照符号は、その選択された結合ピンP1,P2が挿入されるピン挿入孔を示している。 In this Figure 8, the thick black dots indicate the connecting pins P1 and P2 selected to fix the outrigger 16 in the corresponding operating position (16B, 16A0, 16A1, 16A2), and the reference numbers of the pin insertion holes in parentheses indicate the pin insertion holes into which the selected connecting pins P1 and P2 are inserted.
このように本実施形態では、アウトリガ16が格納位置16B又は展開位置16Aにあるときにアウトリガ16及びベース本体10mの各ピン挿入孔16h1~16h3,10h1,10h2に結合ピンP1,P2を挿入することで、ベース本体10mに対しアウトリガ16を格納位置16B又は展開位置16Aに各々確実に固定可能となり、ベース装置10の支持、延いてはデストリビュータDの支持を安定させることができる。 In this manner, in this embodiment, when the outrigger 16 is in the storage position 16B or the deployed position 16A, the connecting pins P1 and P2 are inserted into the pin insertion holes 16h1-16h3, 10h1, and 10h2 of the outrigger 16 and the base body 10m, respectively, so that the outrigger 16 can be securely fixed to the storage position 16B or the deployed position 16A relative to the base body 10m, thereby stabilizing support for the base device 10 and, in turn, support for the distributor D.
しかも実施形態のアウトリガ16は、アウトリガ本体16mと、そのアウトリガ本体16mに固着されてアウトリガ本体16mの外面より外方に延びる延出部161f,162fとを有していて、その延出部161f,162fにアウトリガ16側のピン挿入孔16h0,16h1~16h3が設けられる。このため、アウトリガ本体16mの断面形状に影響を与えることなくアウトリガ16(特に延出部161f,162f)にピン挿入孔16h0,16h1~16h3を高い自由度を以て配設可能となるばかりか、ピン挿入孔16h0,16h1~16h3の特設に伴いアウトリガ16に応力集中部(延いては脆弱部)が生じるのを回避でき、アウトリガ16に十分な強度を確保可能となる。 Moreover, the outrigger 16 of the embodiment has an outrigger main body 16m and extensions 161f, 162f that are fixed to the outrigger main body 16m and extend outward from the outer surface of the outrigger main body 16m, and the pin insertion holes 16h0, 16h1-16h3 on the outrigger 16 side are provided in the extensions 161f, 162f. This not only allows the pin insertion holes 16h0, 16h1-16h3 to be arranged with a high degree of freedom in the outrigger 16 (particularly the extensions 161f, 162f) without affecting the cross-sectional shape of the outrigger main body 16m, but also prevents stress concentration areas (and thus weak areas) from occurring in the outrigger 16 due to the special provision of the pin insertion holes 16h0, 16h1-16h3, ensuring sufficient strength for the outrigger 16.
また実施形態のアウトリガ16は、これの先部16a及び基部16bにアウトリガ16側のピン挿入孔16h0,16h1~16h3をそれぞれ有しており、一方、ベース本体10mは、アウトリガ16の先部16a側のピン挿入孔16h0と協働してアウトリガ16を格納位置16Bに固定するためのベース本体10m側の第1のピン挿入孔10h0と、アウトリガ16の基部16b側の3つのピン挿入孔16h1~16h3と協働してアウトリガ16を展開位置16A(より具体的には主展開位置16A0、第1,第2副展開位置16A1,16A2)に固定するためのベース本体10m側の2つの第2のピン挿入孔10h1,10h2とを有する。そして、第2のピン挿入孔10h1,10h2のうちの一部(下側のピン挿入孔10h1)は、アウトリガ16の基部16b側のピン挿入孔16h1~16h3の1つ(下側のピン挿入孔16h2)と共に下側の結合ピンP2に挿入されることで、アウトリガ16を格納位置16Bに固定可能である。これにより、ベース本体10m側の2つの第2のピン挿入孔10h1,10h2のうちの一部10h1と、アウトリガ基部16b側の3つのピン挿入孔16h1~16h3の1つ16h2と、下側の結合ピンP2とを、アウトリガ16の展開位置16Aの固定のみならず格納位置16Bの固定にも流用可能となり、それだけ固定構造の簡素化、延いてはコスト節減に寄与することができる。 In addition, the outrigger 16 in this embodiment has pin insertion holes 16h0, 16h1-16h3 on the outrigger 16 side at its tip 16a and base 16b, respectively, while the base body 10m has a first pin insertion hole 10h0 on the base body 10m side for cooperating with the pin insertion hole 16h0 on the tip 16a side of the outrigger 16 to fix the outrigger 16 in the storage position 16B, and two second pin insertion holes 10h1, 10h2 on the base body 10m side for cooperating with the three pin insertion holes 16h1-16h3 on the base 16b side of the outrigger 16 to fix the outrigger 16 in the deployed position 16A (more specifically, the main deployed position 16A0, and the first and second secondary deployed positions 16A1, 16A2). Then, a part of the second pin insertion holes 10h1, 10h2 (the lower pin insertion hole 10h1) can be inserted into the lower connecting pin P2 together with one of the pin insertion holes 16h1-16h3 (the lower pin insertion hole 16h2) on the base 16b side of the outrigger 16, thereby fixing the outrigger 16 in the storage position 16B. This allows the part 10h1 of the two second pin insertion holes 10h1, 10h2 on the base body 10m side, one 16h2 of the three pin insertion holes 16h1-16h3 on the outrigger base 16b side, and the lower connecting pin P2 to be used not only to fix the outrigger 16 in the deployed position 16A but also to fix it in the storage position 16B, which contributes to simplifying the fixing structure and thus reducing costs.
ところで上記実施形態では、アウトリガ16を格納位置16Bに固定するために、上下の2個の結合ピンP1,P2をアウトリガ16の先部16a側と基部16b側の二カ所でベース本体10m側の2つのピン挿入孔10h0,10h1に挿入するものを示したが、アウトリガ16を格納位置16Bに固定するために1個の結合ピン(例えば上側の結合ピンP1)だけを使用してもよい。 In the above embodiment, two upper and lower connecting pins P1, P2 are inserted into two pin insertion holes 10h0, 10h1 on the base body 10m at two locations on the tip 16a and base 16b sides of the outrigger 16 to fix the outrigger 16 in the storage position 16B, but only one connecting pin (for example, the upper connecting pin P1) may be used to fix the outrigger 16 in the storage position 16B.
この場合は、例えば、アウトリガ16の展開時に第2のピン挿入孔10h1,10h2の一つ10h1に挿入される上側の結合ピンP1を、アウトリガ16の格納時に第1のピン挿入孔10h0に挿入してアウトリガ16を格納位置16Bに固定すればよい。これにより、単一の結合ピンP1だけでアウトリガ16を格納位置16Bに固定する場合でも、その結合ピンP1でアウトリガ16を展開位置16Aの固定に流用可能となるから、それだけ固定構造の簡素化、延いてはコスト節減が図られる。 In this case, for example, the upper connecting pin P1, which is inserted into one of the second pin insertion holes 10h1, 10h2 10h1 when the outrigger 16 is deployed, can be inserted into the first pin insertion hole 10h0 when the outrigger 16 is stored to fix the outrigger 16 to the storage position 16B. This makes it possible to use only a single connecting pin P1 to fix the outrigger 16 to the storage position 16B, and therefore simplifies the fixing structure and reduces costs.
尚、図示はしないが、アウトリガ16の格納位置16Bと展開位置16Aの固定を各々専用の結合ピンで行うようにしてもよい。その場合、例えば格納位置16Bと展開位置16Aの固定は各1本の専用ピンでも可能であるが、格納位置16Bの固定のためにアウトリガ16に設けられる孔はアウトリガ16の先部に配置され、また展開位置16Aの固定のためにアウトリガ16に設けられる孔はアウトリガ16の基部に配置される。 Although not shown, the outrigger 16 may be fixed in the storage position 16B and the deployed position 16A with a dedicated connecting pin. In that case, for example, the storage position 16B and the deployed position 16A can be fixed with one dedicated pin each, but the hole provided in the outrigger 16 for fixing the storage position 16B is located at the tip of the outrigger 16, and the hole provided in the outrigger 16 for fixing the deployed position 16A is located at the base of the outrigger 16.
次に図9,図10を併せて参照して、マスト装置20の一例を説明する。 Next, an example of a mast device 20 will be described with reference to Figures 9 and 10.
マスト装置20は、ベース装置10上に起立状態で支持され且つ互いに縦列状態で結合される複数のマストMより分割構成されており、そのマストMの接続個数を増やすことでマスト装置20の全長(従って全高)を長く(高く)することができる。そして、マスト装置20の上部(即ち最上位のマストMの上部)にブーム装置30が搭載される。 The mast assembly 20 is divided into multiple masts M that are supported upright on the base assembly 10 and connected to each other in a vertical row, and the overall length (and therefore the overall height) of the mast assembly 20 can be increased (higher) by increasing the number of connections between the masts M. The boom assembly 30 is mounted on the top of the mast assembly 20 (i.e., on the top of the topmost mast M).
それらマストMは、基本的に同一構造であり、横断面矩形状の頑丈な閉断面構造となっている。各々のマストMの外周面には、作業員がマスト装置20に沿って昇降するための梯子23が固定され、また最上位のマストMの上部には、そこで作業員が各種作業を安全に行うための作業台24が固定され、それらの固定作業は、例えば不図示の固定手段(例えばボルト止め、ピン止め、カシメ等)でマスト装置20をベース装置10上に据え付ける前に予め行われる。尚、作業台24上の上記した各種作業には、例えば、デストリビュータDの後述する[組立工程]でマスト装置20とブーム装置30間を結合する作業や、各種配管を接続する作業が含まれ、またブーム支持台BS各部の点検整備、給油等のメンテナンス作業も含まれる。 These masts M are basically of the same structure, and have a sturdy closed cross-sectional structure with a rectangular cross section. A ladder 23 is fixed to the outer periphery of each mast M so that workers can ascend and descend along the mast device 20, and a work platform 24 is fixed to the top of the highest mast M so that workers can safely perform various tasks there. These fixing operations are performed in advance, for example, by a fixing means (e.g., bolting, pinning, riveting, etc.) not shown, before the mast device 20 is installed on the base device 10. The various operations on the work platform 24 include, for example, the operation of connecting the mast device 20 and the boom device 30 in the [assembly process] of the distributor D described below, the operation of connecting various pipes, and also maintenance operations such as inspection and maintenance of each part of the boom support base BS and refueling.
さらに各々のマストMの外周には、不図示のコンクリートポンプから延びるコンクリート圧送管に接続可能であってマストMに沿って縦列配置状態で延びる接続配管28がそれぞれ固定され、隣り合う接続配管28相互は適当なジョイントで液密に接続可能となっている。接続配管28の長さは、実施形態では1本のマストMの長さの1/2に設定され、例えば全長4mのマストMに対して、2mの接続配管28を2本直列に接続して使用される。 Furthermore, a connecting pipe 28 is fixed to the outer periphery of each mast M, which can be connected to a concrete pumping pipe extending from a concrete pump (not shown) and extends in a vertical arrangement along the mast M, and adjacent connecting pipes 28 can be connected liquid-tightly to each other with an appropriate joint. In this embodiment, the length of the connecting pipe 28 is set to 1/2 the length of one mast M, and for example, two 2 m connecting pipes 28 are connected in series for a mast M with a total length of 4 m.
また各々のマストMの上端部及び下端部の各外周には、その両端部で周方向位置を同じくして周方向に互いに間隔をおいて並ぶ複数の結合用ブロック21,21′がそれぞれ固定(例えば溶接)される。而して、隣り合う一対のマストMの、互いに隣接した端部外周にそれぞれ固定の結合用ブロック21,21′は、その両マストMを上下に縦列配置した状態で相互が当接する。その当接面22,22′の一方(即ち上向きの当接面)に少なくとも1つの凸部22tが設けられ、またその当接面22,22′の他方(即ち下向きの当接面)に少なくとも1つの凹部22dが設けられる。そして、これら凸部22t及び凹部22dは、隣り合う一対のマストM相互を正しく位置決めし且つ当接面22,22′に沿う方向の一対のマストM相互の周方向及び径方向の位置ずれを抑制し得るように互いに係合する。 A number of connecting blocks 21, 21' are fixed (e.g., welded) to the outer circumference of the upper and lower ends of each mast M, arranged at the same circumferential position at both ends and spaced apart from each other in the circumferential direction. The connecting blocks 21, 21' fixed to the outer circumferences of the adjacent ends of a pair of adjacent masts M abut against each other with the masts M vertically arranged. At least one convex portion 22t is provided on one of the abutment surfaces 22, 22' (i.e., the abutment surface facing upward), and at least one concave portion 22d is provided on the other abutment surface 22, 22' (i.e., the abutment surface facing downward). These convex portions 22t and concave portions 22d engage with each other so as to correctly position the pair of adjacent masts M relative to each other and to suppress circumferential and radial positional deviations between the pair of masts M in the directions along the abutment surfaces 22, 22'.
そして、上記した互いに当接する結合用ブロック21,21′の対は、その両結合用ブロック21,21′を貫通する複数のボルト25で相互間が一体的に結合され、その結合により、結合用ブロック21,21′相互の当接、従って凸部22t及び凹部22d相互の係合が維持される。この場合、ボルト25による当接面の締付け効果と、凹凸係合部の噛み合わせ効果とが相俟って(即ち結合用ブロック21,21′及びボルト25の協働により)、隣り合う一対のマストM相互の位置ずれを確実に阻止しつつ両マストM間を緊密、強固に結合可能となる。 The pair of abutting connecting blocks 21, 21' are integrally connected to each other by a number of bolts 25 that pass through both connecting blocks 21, 21', and this connection maintains the mutual abutment of the connecting blocks 21, 21', and therefore the mutual engagement of the convex portions 22t and concave portions 22d. In this case, the tightening effect of the abutting surfaces by the bolts 25 and the interlocking effect of the concave-convex engaging portions (i.e., the cooperation of the connecting blocks 21, 21' and the bolts 25) work together to reliably prevent the pair of adjacent masts M from shifting position relative to each other, making it possible to tightly and firmly connect the two masts M.
また特に実施形態のボルト25には、図10(A)(B)で明らかなように、凸部22tの先端面と該先端面に当接する凹部22dの底面とを貫通する第1のボルト25と、凸部22tの一側で両結合用ブロック21,21′相互の当接面22,22′を貫通する第2のボルト25と、凸部22tの他側で両結合用ブロック21,21′相互の当接面22,22′を貫通する第3のボルト25とが含まれる。これにより、第1~第3のボルトによる当接面相互の締付け効果が、凸部及び凹部相互の係合部及びその周辺部でより強力に発揮されるため、その凹凸係合部の噛み合わせ効果が増強されて、隣り合う一対のマスト相互の位置ずれを一層確実に阻止しつつ両マスト間を強固に結合可能となる。 As shown in Figs. 10(A) and 10(B), the bolts 25 of the embodiment include a first bolt 25 that penetrates the tip surface of the convex portion 22t and the bottom surface of the concave portion 22d that abuts against the tip surface, a second bolt 25 that penetrates the abutment surfaces 22, 22' of the connecting blocks 21, 21' on one side of the convex portion 22t, and a third bolt 25 that penetrates the abutment surfaces 22, 22' of the connecting blocks 21, 21' on the other side of the convex portion 22t. As a result, the tightening effect of the abutment surfaces by the first to third bolts is more strongly exerted at the engagement parts between the convex portions and the concave portions and their surrounding areas, and the meshing effect of the concave-convex engagement parts is strengthened, making it possible to firmly connect the two masts while more reliably preventing the positional deviation of the pair of adjacent masts.
尚、上記した第1~第3のボルト25の使用に代えて、凸部22t・凹部22dを貫通する上記第1のボルト25のみを使用しても両マストM,M間の結合は可能である。また凸部22t・凹部22dの両側を貫通する上記第2,第3のボルト25を使用しても両マストM,M間の結合は可能である。 In addition, instead of using the first to third bolts 25 described above, it is possible to connect the two masts M, M using only the first bolt 25 that penetrates the convex portion 22t and the concave portion 22d. It is also possible to connect the two masts M, M using the second and third bolts 25 that penetrate both sides of the convex portion 22t and the concave portion 22d.
また図(B)(C)で明らかなように、本実施形態の結合用ブロック21,21′は、これが端部外周に固定されるマストMの端面より当接面22,22′がそれぞれ張り出すように配置される。これにより、隣り合うマストMの相対向する端面間には多少のクリアランス29が存する。これにより、マストMの端面の加工誤差に影響されずに結合用ブロック21,21′相互を的確に当接させることができるから、マストMの加工コストの節減を図りつつ隣り合うマストM相互が的確に結合可能となる。 As is clear from Figures (B) and (C), the connecting blocks 21, 21' in this embodiment are positioned so that the abutment surfaces 22, 22' each protrude beyond the end face of the mast M to which they are fixed on the outer periphery of the end. This leaves a small amount of clearance 29 between the opposing end faces of adjacent masts M. This allows the connecting blocks 21, 21' to abut against each other accurately without being affected by machining errors in the end faces of the masts M, making it possible to accurately connect adjacent masts M while reducing the machining costs of the masts M.
尚、上記クリアランス29を省略して、隣り合うマストMの相対向する端面相互を直接接触させてもよい。 The clearance 29 may be omitted and the opposing end faces of adjacent masts M may be brought into direct contact with each other.
かくして、上記した結合用ブロック21,21′相互の当接面の凹凸係合により、隣り合う一対のマストM相互を容易に位置決めでき、しかもその当接面に沿う方向の一対のマストM相互の位置ずれを上記凹凸係合により確実に阻止することができるから、マストM相互の結合作業を迅速且つ的確に行うことができ、作業効率が大幅に向上する。 Thus, the concave-convex engagement of the contact surfaces of the connecting blocks 21, 21' described above makes it easy to position a pair of adjacent masts M relative to each other, and the concave-convex engagement reliably prevents the pair of masts M from shifting relative to each other in the direction along the contact surfaces, so the work of connecting the masts M to each other can be done quickly and accurately, greatly improving work efficiency.
また各々の結合用ブロック21,21′の背面、即ちマストM外周との対向面26には、結合用ブロック21,21′が接するマストMの端部に設けた支持孔27に嵌合する突起21tが一体に設けられる。そして、この突起21tが支持孔27に嵌合されることで各結合用ブロック21,21′のマストMの端部への設置部位が簡単且つ的確に位置決め可能となる。しかもその突起21tと支持孔27との嵌合部が溶接されると共に、結合用ブロック21,21′の上記対向面26の外周部がマストM外面に対し周方向に広範囲に溶接されることで、全体として溶接領域が増やすことができ、これにより、全体として各結合用ブロック21,21′とマストMとの結合強度が効果的に高められる。 In addition, the back surface of each of the connecting blocks 21, 21', i.e., the surface 26 facing the outer periphery of the mast M, is integrally provided with a protrusion 21t that fits into a support hole 27 provided at the end of the mast M where the connecting blocks 21, 21' contact. Then, by fitting this protrusion 21t into the support hole 27, the installation site of each connecting block 21, 21' at the end of the mast M can be easily and accurately positioned. Moreover, the fitting portion between the protrusion 21t and the support hole 27 is welded, and the outer periphery of the facing surface 26 of the connecting blocks 21, 21' is welded over a wide area in the circumferential direction to the outer surface of the mast M, so that the welding area can be increased overall, and as a result, the connection strength between each connecting block 21, 21' and the mast M can be effectively increased overall.
尚、結合用ブロック21,21′の背面とマストM外周との相対向面において、上記突起21t及び支持孔27による凹凸係合部を省略してもよく、その場合は、各々を平坦面とした上記相対向面の相互を直接、平面接触させて溶接する。 The projections 21t and the support holes 27 may be omitted from the opposing surfaces of the backs of the connecting blocks 21, 21' and the outer periphery of the mast M. In that case, the opposing surfaces, each of which is a flat surface, are welded directly in planar contact with each other.
尚、本実施形態では、結合用ブロック21,21′相互の当接面の凹凸係合構造として、当接面の一方及び他方に各々設けられる凸部22t及び凹部22dをステップ状の凹凸面としたものを例示したが、凹凸係合構造は実施形態に限定されず、例えば、互いに嵌合する突起及び凹孔を、凸部及び凹部としてもよい。 In this embodiment, the projections 22t and recesses 22d on one and the other of the contact surfaces of the joining blocks 21, 21' are used as step-shaped projections and recesses, but the projections and recesses are not limited to the embodiment. For example, the projections and recesses may be fitted together.
ところでベース装置10の前記したベースフレーム11の構造説明において、マストMと略同一の横断面形状である角筒部11bの上端部外周に複数の結合用ブロック21が間隔をおいて固定される説明をしたが、この角筒部11bの結合用ブロック21は、マストMの上端側の結合用ブロック21と同一構造であり、且つ角筒部11bに対するブロック固定構造も、マストMに対する結合用ブロック21,21′の固定構造と同様である。即ち、角筒部11bの結合用ブロック21と、最下部のマストMの下端部に固定の結合用ブロック21′との結合手法は、上記した隣り合うマストM間の結合用ブロック21,21′相互の結合手法と同じである。 In the above description of the structure of the base frame 11 of the base device 10, it was explained that multiple connecting blocks 21 are fixed at intervals to the outer periphery of the upper end of the square tube portion 11b, which has a cross-sectional shape that is approximately the same as that of the mast M. The connecting blocks 21 of the square tube portion 11b have the same structure as the connecting blocks 21 on the upper end side of the mast M, and the structure for fixing the blocks to the square tube portion 11b is also the same as the structure for fixing the connecting blocks 21, 21' to the mast M. In other words, the method for connecting the connecting block 21 of the square tube portion 11b to the connecting block 21' fixed to the lower end of the lowest mast M is the same as the method for connecting the connecting blocks 21, 21' between adjacent masts M described above.
次に図11~13,15を併せて参照して、ブーム装置30の一例を説明する。 Next, an example of the boom device 30 will be described with reference to Figures 11 to 13 and 15.
ブーム装置30は、互いに直列に配列され且つ相互間が屈折揺動可能に枢支連結される複数のブームB1~B4よりなるブーム列BTと、マスト装置20の上部(具体的には最上位のマストMの上端部)に取付けられてブーム列BTにおける最も基端側の第1ブームB1を枢軸J1を介して起伏回動可能に支持するブーム支持台BSとを備える。 The boom device 30 comprises a boom train BT consisting of multiple booms B1-B4 arranged in series and pivotally connected to each other so that they can bend and swing, and a boom support base BS that is attached to the top of the mast device 20 (specifically, the upper end of the top mast M) and supports the first boom B1, which is the most proximal end of the boom train BT, via a pivot J1 so that it can be raised and lowered.
ブーム支持台BSは、マスト装置20の上部に固定される固定台31と、その固定台31に鉛直方向の旋回軸J5を介して旋回可能に支持される旋回台32とを備えており、旋回軸J5の上部は、これが旋回台32に一体的に回転するよう連結される。 The boom support base BS comprises a fixed base 31 that is fixed to the upper part of the mast device 20, and a swivel base 32 that is supported on the fixed base 31 so as to be rotatable via a vertical swivel axis J5, and the upper part of the swivel axis J5 is connected to the swivel base 32 so that it rotates integrally with the swivel base 32.
固定台31内には、旋回軸J5を軸方向相対移動不能で且つ相対回転可能に嵌合、支持する複数の旋回軸受31bが固定されている。旋回軸J5と、固定台31内の不図示の旋回用アクチュエータとの間には、該アクチュエータに連動して旋回軸J5(従って旋回台32)を鉛直軸線回りに強制回動させる不図示の連動連結機構が介設される。尚、この旋回用アクチュエータおよび連動連結機構の構造は、多段ブーム付きのクレーン装置の技術分野において従来周知であるので、固定台31に連設されてアクチュエータおよび連動連結機構を被覆するカバー体31cを図12,図13に図示するにとどめ、これ以上の説明を省略する。 In the fixed base 31, a plurality of swivel bearings 31b are fixed, which engage and support the swivel shaft J5 so that it cannot move axially relative to the fixed base 31 but can rotate relative to the fixed base 31. Between the swivel shaft J5 and a swivel actuator (not shown) in the fixed base 31, an interlocking mechanism (not shown) is provided, which forcibly rotates the swivel shaft J5 (and therefore the swivel base 32) around the vertical axis in conjunction with the actuator. The structure of the swivel actuator and the interlocking mechanism are well known in the technical field of crane devices with multi-stage booms, so the cover body 31c connected to the fixed base 31 and covering the actuator and the interlocking mechanism is only illustrated in Figures 12 and 13, and further explanation will be omitted.
固定台31の下端部外周には、マストMの下端部に固定したのと同一構造の複数の結合用ブロック21′が固定され、この固定台31側の結合用ブロック21′と、最上部のマストMの上端側の結合用ブロック21とを当接させ且つその相互間をボルト25で締結することで、固定台31と最上部のマストM間が結合される。即ち、固定台31側の結合用ブロック21′と、最上部のマストMの上端側の結合用ブロック21との結合手法は、隣り合うマストM間の結合用ブロック21,21′相互の結合手法と同じである。 A number of connecting blocks 21' of the same structure as those fixed to the lower end of the mast M are fixed to the outer periphery of the lower end of the fixed base 31, and the connecting block 21' on the fixed base 31 side and the connecting block 21 on the upper end side of the uppermost mast M are abutted and fastened to each other with bolts 25, thereby connecting the fixed base 31 and the uppermost mast M. In other words, the method of connecting the connecting block 21' on the fixed base 31 side and the connecting block 21 on the upper end side of the uppermost mast M is the same as the method of connecting the connecting blocks 21, 21' between adjacent masts M.
旋回台32は、旋回軸J5の上端部を固定する旋回台本体32mと、その旋回台本体32mの上面に一体に立設された左右一対の起立壁部32sとを備え、その両起立壁部32s間は複数の連結壁32cで結合される。一方、第1ブームB1の基部は、両起立壁部32sを左右両側から挟むよう横断面コ字状に形成される。 The swivel base 32 comprises a swivel base main body 32m to which the upper end of the swivel shaft J5 is fixed, and a pair of left and right standing wall portions 32s integrally erected on the upper surface of the swivel base main body 32m, with the two standing wall portions 32s connected by a number of connecting walls 32c. On the other hand, the base of the first boom B1 is formed in a U-shape in cross section so as to sandwich the two standing wall portions 32s from both the left and right sides.
そして、その第1ブームB1基部の左右一対の側壁部35と、その各々に隣接する旋回台32の起立壁部32sとが、左右一対の短円筒状の枢軸J1を介して相対回動可能に連結される。かくして、第1ブームB1が旋回台32に枢軸J1回りに起伏回動可能に支持される。従って、枢軸J1は、第1ブームB1を旋回台32に起伏回動可能に軸支する回動軸支部を構成する。 The pair of left and right side wall portions 35 of the base of the first boom B1 and the adjacent upright wall portions 32s of the swivel base 32 are connected to each other via a pair of left and right short cylindrical pivots J1 so that they can rotate relative to each other. Thus, the first boom B1 is supported on the swivel base 32 so that it can be raised and lowered around the pivots J1. Therefore, the pivots J1 form a pivot support part that supports the first boom B1 on the swivel base 32 so that it can be raised and lowered.
ところで旋回軸J5は、鉛直方向に延びる円筒状に形成され、その中空部には、固定台31に保持されて固定台31の内外を通る第1中継管38の途中が挿通される。この第1中継管38の上流端(即ち下端部)は、前記した最上部のマストMに沿設した接続配管28の下流端(即ち上端部)にジョイントを介して液密に接続される。一方、第1中継管38の、旋回軸J5よりも下流側部分(上部)は、左右一方の枢軸J1内を経由して第1ブームB1の外側に引き出され、その引き出し端すなわち下流端が、ブーム列BT側に配した後述の第2中継管39に液密に接続される。 The pivot axis J5 is formed in a cylindrical shape extending vertically, and the first relay pipe 38, which is held by the fixed base 31 and passes through the inside and outside of the fixed base 31, is inserted into its hollow portion. The upstream end (i.e., the lower end) of this first relay pipe 38 is liquid-tightly connected via a joint to the downstream end (i.e., the upper end) of the connection pipe 28 installed along the uppermost mast M described above. Meanwhile, the portion (upper part) of the first relay pipe 38 downstream of the pivot axis J5 is pulled out to the outside of the first boom B1 via one of the left and right pivot axes J1, and the pulled-out end, i.e., the downstream end, is liquid-tightly connected to the second relay pipe 39 described below, which is arranged on the boom row BT side.
またブーム列BTにおいて、第1ブームB1とブーム支持台BS(特に後述する旋回台32の起立壁部32s)間には、第1ブームB1をブーム支持台BSに対し強制的に起伏揺動させる油圧シリンダC1が介装される。またブーム列BTの相隣なるブーム相互間(即ち基端側の第1ブームB1と次の第2ブームB2間、第2ブームB2と次の第3ブームB3間、並びに第3ブームB3と最も先端側の第4ブームB4間)には、その相互間を強制的に屈折揺動させる油圧シリンダC2~C4が直接、又はリンク機構を介してそれぞれ介装される。 In the boom row BT, a hydraulic cylinder C1 is interposed between the first boom B1 and the boom support base BS (particularly the upright wall portion 32s of the swivel base 32 described later), which forcibly raises and lowers the first boom B1 relative to the boom support base BS. Hydraulic cylinders C2 to C4 are interposed directly or via a link mechanism between adjacent booms in the boom row BT (i.e., between the first boom B1 at the base end and the next second boom B2, between the second boom B2 and the next third boom B3, and between the third boom B3 and the fourth boom B4 at the most distal end).
また各々の油圧シリンダC1~C4には、ブーム支持台BS(特に後述する固定台31)に設置した油圧供給装置(例えば油タンク・油圧ポンプ・制御弁等を含む)が、ブーム列BTに沿って取り回される不図示の油圧配管を介して接続される。この油圧供給装置と各油圧シリンダC1~C4との間での作動油圧の給排制御は、作業員の操作に基づいて行われる。その油圧制御系の構成もまた、多段ブーム付きクレーン装置の技術分野において従来周知である。 A hydraulic supply system (including, for example, an oil tank, hydraulic pump, control valve, etc.) installed on the boom support base BS (particularly the fixed base 31 described below) is connected to each of the hydraulic cylinders C1 to C4 via hydraulic piping (not shown) routed along the boom row BT. The supply and discharge of hydraulic pressure between this hydraulic supply system and each of the hydraulic cylinders C1 to C4 is controlled based on the operation of the operator. The configuration of the hydraulic control system is also well known in the technical field of multi-boom crane equipment.
また第4ブームB4の先部には、可撓性を有して生コンクリートを先部から吹出可能な吹出チューブ37が取付けられる。この吹出チューブ37の基端と、マストMに沿設された前述の接続配管28の下流端とは、ブーム支持台BSに設けた前記第1中継管38と、ブーム列BTの各ブームB1~B4に支持されて各ブームB1~B4に沿うよう配置された第2中継管39とを介して接続される。 A flexible blow-out tube 37 capable of blowing out ready-mixed concrete from its tip is attached to the tip of the fourth boom B4. The base end of this blow-out tube 37 and the downstream end of the aforementioned connection pipe 28 installed along the mast M are connected via the first relay pipe 38 installed on the boom support base BS and the second relay pipe 39 supported by each boom B1 to B4 of the boom row BT and arranged along each boom B1 to B4.
その第2中継管39は、隣り合うブームB1,B2;B2,B3;B3,B4相互の枢支連結部となる中空の枢軸J2~J4内を貫通する折返し部を途中に有して屈曲し、且つ隣り合うブームB1~B4に沿って取り回される。 The second relay pipe 39 is bent at a folded portion that passes through the hollow pivots J2 to J4 that serve as the pivotal connections between the adjacent booms B1, B2; B2, B3; B3, B4, and is routed along the adjacent booms B1 to B4.
しかも第2中継管39の上流端と前記第1中継管38の下流端との間は、相互間を枢軸J1の軸線回りに相対回動可能に接続する継ぎ手を介して接続される。また第2中継管39の途中、特に上記した各折返し部の近傍において、上流管部と下流管部を相対回動可能に接続する継ぎ手がそれぞれ介設される。従って、それらの継ぎ手により、第1ブームB1の起伏回動、並びに隣り合うブームB1,B2;B2,B3;B3,B4相互の屈折揺動の際に、それら起伏回動及び屈折揺動に対し第2中継管39が無理なく追従できるようになっている。 The upstream end of the second relay pipe 39 and the downstream end of the first relay pipe 38 are connected via a joint that connects them to be relatively rotatable around the axis of the pivot J1. Also, joints that connect the upstream pipe section and the downstream pipe section to be relatively rotatable are provided midway along the second relay pipe 39, particularly near each of the turnback sections. Therefore, these joints allow the second relay pipe 39 to smoothly follow the elevation and rotation of the first boom B1 and the bending and swinging of the adjacent booms B1, B2; B2, B3; B3, B4 relative to each other.
ところで固定台31には、ブーム列BTが折り畳まれて横向き姿勢(図15参照)又は縦向き姿勢(図17参照)にある状態でブーム装置30をクレーンで第1索条W1を介して吊り上げる際に使用され且つ第1索条W1に連結可能な複数の第1取付部T1が設置される。各々の第1取付部T1に連結される第1索条W1は、本実施形態では両端部に目玉状の被連結部51aを各々有する1条のワイヤ51(図15参照)で構成される。尚、ブーム装置30を吊り上げるクレーンは従来周知であるので、実施形態ではクレーン本体は図示せず、クレーム本体のブーム先部よりワイヤを介して懸吊されるクレーンフック80のみを示す。 Meanwhile, the fixed base 31 is provided with a plurality of first attachment parts T1 that are used when the boom train BT is folded and in a horizontal position (see FIG. 15) or a vertical position (see FIG. 17) to lift the boom device 30 via the first ropes W1 with a crane and can be connected to the first ropes W1. In this embodiment, the first ropes W1 connected to each of the first attachment parts T1 are composed of a single wire 51 (see FIG. 15) each having an eye-shaped connected part 51a at both ends. Note that, since cranes that lift the boom device 30 are well known, the crane body is not shown in the embodiment, and only the crane hook 80 that is suspended from the boom tip of the crane body via a wire is shown.
また特に本実施形態では、第1ブームB1基部の枢軸J1の軸線に沿う所定方向(以下、単にブーム列BTの幅方向という)で間隔をおいて並ぶ一対の第1取付部T1の組が固定台31に、上記幅方向と直交する水平方向に間隔をおいて2組(即ち固定台31の前後左右の都合4カ所に)配設される。尚、上記一対の第1取付部T1の組は、3組以上設けてもよい。 In particular, in this embodiment, a pair of first mounting parts T1 arranged at intervals in a predetermined direction (hereinafter simply referred to as the width direction of the boom row BT) along the axis of the pivot J1 of the base of the first boom B1 are arranged on the fixed base 31 in two sets spaced apart in a horizontal direction perpendicular to the width direction (i.e., four places in total on the front, back, left and right sides of the fixed base 31). Note that three or more sets of pairs of first mounting parts T1 may be provided.
而して、ブーム列BTを縦向き姿勢としてブーム装置30をクレーンで第1索条W1を介して吊り上げる場合に、ブーム支持台BSを、相互に間隔をおいて少なくとも3箇所以上に分散する第1取付部T1を介して同数の第1索条W1で吊り上げるようにすれば、ブーム装置30を極力安定した鉛直姿勢で吊り上げ可能となる。 When the boom row BT is in a vertical position and the boom device 30 is lifted by a crane via the first ropes W1, if the boom support base BS is lifted by the same number of first ropes W1 via the first attachment parts T1 that are distributed at least in three or more places at intervals from each other, the boom device 30 can be lifted in a vertical position that is as stable as possible.
また各々の第1取付部T1は、例えば固定台31に各々固着した4つの支持ブラケット41に設けた支持孔42付きの支持壁41wと、この支持壁41wに着脱可能に連結される連結具40とを備えており、その連結具40は、支持壁41wを挟む一対の腕部43aを有するU字状の連結フック43と、両腕部43a及び支持壁41wの支持孔42を相対回動可能に貫通する取付軸44とを有する。その取付軸44の一端部には、一方の腕部43aに係合するストッパ兼用の撮み44aが一体に連設されており、また取付軸44の他端部には、他方の腕部43aに係合する抜け止め部材45(例えば割りピン)が係脱可能に係止される。 Each first mounting portion T1 is provided with a support wall 41w with a support hole 42 provided in four support brackets 41 each fixed to the fixed base 31, and a connector 40 detachably connected to the support wall 41w. The connector 40 has a U-shaped connecting hook 43 with a pair of arms 43a that sandwich the support wall 41w, and a mounting shaft 44 that passes through both arms 43a and the support hole 42 of the support wall 41w so as to be relatively rotatable. A knob 44a that also serves as a stopper and engages with one arm 43a is integrally connected to one end of the mounting shaft 44, and a stopper member 45 (e.g., a split pin) that engages with the other arm 43a is detachably engaged with the other end of the mounting shaft 44.
而して、第1取付部T1に第1索条W1の目玉状の被連結部51aを取付けるには、例えば割りピン45を外して取付軸44を支持壁41wより引き抜くことにより連結フック43を支持ブラケット41から取り出し、これを第1索条W1の被連結部51aに連結(挿通)してから、連結フック43を先刻とは逆の手順で、取付軸44を介して支持ブラケット41に再度、取付ければよい。この場合、取付軸44は、これが連結フック43にセットされた状態で連結フック43の両腕部43a間の隙間を閉じるロック部材の機能を果たし、これにより、連結フック43(従って第1取付部T1)と、第1索条W1端部の被連結部51aとの連結状態を確実に保持する。 To attach the eye-shaped connected portion 51a of the first rope W1 to the first attachment portion T1, for example, the split pin 45 is removed and the attachment shaft 44 is pulled out of the support wall 41w to remove the connecting hook 43 from the support bracket 41, and then the connecting hook 43 is connected (inserted) to the connected portion 51a of the first rope W1, and then the connecting hook 43 is reattached to the support bracket 41 via the attachment shaft 44 in the reverse order to the previous procedure. In this case, the attachment shaft 44 functions as a locking member that closes the gap between both arms 43a of the connecting hook 43 when it is set on the connecting hook 43, thereby reliably maintaining the connection between the connecting hook 43 (and therefore the first attachment portion T1) and the connected portion 51a at the end of the first rope W1.
尚、第1取付部T1に第1索条W1の被連結部51aを連結する連結具40の構造は、実施形態に限定されず、少なくとも固定台31(支持ブラケット41)に取付けられて第1索条W1の被連結部51aに対し随時に着脱可能な連結構造であればよい。例えば、連結具40の不図示のバリエーションとして、フック開口部が常時開放状態にある鉤状の連結フックや、或いは、フック本体に、フック開口部を開閉可能な外れ止め用ストッパ片を軸支し且つこのストッパ片を、フック開口部を閉じる位置に常時弾発付勢したストッパ片付きフックを連結具として用いてもよい。 The structure of the connector 40 that connects the connected portion 51a of the first rope W1 to the first mounting portion T1 is not limited to the embodiment, and may be any connector structure that is attached to at least the fixed base 31 (support bracket 41) and can be attached and detached at any time to the connected portion 51a of the first rope W1. For example, as a variation of the connector 40 (not shown), a hook-shaped connector hook whose hook opening is always open, or a hook with a stopper piece that supports a stopper piece that can open and close the hook opening on the hook body and is always resiliently biased to a position that closes the hook opening, may be used as the connector.
ところで以上説明した第1取付部T1は、ブーム支持台BSの特に固定台31に支持ブラケット41を介して設けられるが、固定台31に直接設けてもよい。また第1取付部T1を、固定台31に設ける代わりに、旋回台32に直接又はブラケット等の支持部材を介して設けてもよい。 The first mounting part T1 described above is provided on the boom support base BS, particularly the fixed base 31, via the support bracket 41, but it may also be provided directly on the fixed base 31. Also, instead of providing the first mounting part T1 on the fixed base 31, it may be provided on the swivel base 32 directly or via a support member such as a bracket.
また第1ブームB1の途中には、ブーム列BTが横向き姿勢にある状態でブーム装置30をクレーンで第2索条W2を介して吊り上げる際に使用され且つ第2索条W2に連結可能な第2取付部T2が設けられる。尚、第2取付部T2に連結される第2索条W2は、第1索条W1と同様、両端部に目玉状の被連結部52aを有する1条のワイヤ52(図15参照)で構成される。 In addition, a second attachment part T2 is provided midway along the first boom B1, which is used when lifting the boom device 30 with a crane via the second rope W2 while the boom row BT is in a horizontal position and can be connected to the second rope W2. The second rope W2 connected to the second attachment part T2 is composed of a single wire 52 (see FIG. 15) having eye-shaped connected parts 52a at both ends, similar to the first rope W1.
第2取付部T2の設置部位は、ブーム列BTの横向き姿勢でブーム装置30をクレーンで第1,第2索条W1,W2を介して吊り上げる際に、ブーム装置30全体の重心位置(図15の参照符号Gを参照)が、ブーム列BTの長手方向で第1,第2取付部T1,T2の中間位置なるような部位に設定される。 The installation location of the second mounting part T2 is set at a location such that when the boom device 30 is lifted by a crane via the first and second ropes W1 and W2 with the boom row BT in a horizontal position, the center of gravity of the entire boom device 30 (see reference symbol G in Figure 15) is midway between the first and second mounting parts T1 and T2 in the longitudinal direction of the boom row BT.
また第2取付部T2は、例えば第1ブームB1の中間部を上方より跨ぐ連結アーム46と、その連結アーム46の上部支持壁46wに着脱可能に連結した連結具40とを備えており、連結アーム46の二股状をなす一対の脚部46aは、第1ブームB1の左右側壁にそれぞれ回動可能に軸支46pされる。連結具40は、前記した第1取付部T1の連結具40と同一構造であり、即ち、上部支持壁46wに設けた支持孔に取付軸44を介してU字状の連結フック43が回動可能に支持される。 The second mounting part T2 also includes a connecting arm 46 that straddles the middle part of the first boom B1 from above, and a connector 40 that is detachably connected to the upper support wall 46w of the connecting arm 46, and a pair of bifurcated legs 46a of the connecting arm 46 are rotatably supported by shafts 46p on the left and right side walls of the first boom B1. The connector 40 has the same structure as the connector 40 of the first mounting part T1 described above, that is, a U-shaped connecting hook 43 is rotatably supported by a mounting shaft 44 in a support hole provided in the upper support wall 46w.
そして、取付軸44を取り外して連結フック43を上部支持壁46wより分離した状態で、その連結フック43を第2索条W2の目玉状の被連結部51aに係止させてから取付軸44を介して上部支持壁46wに再び取付けるようにすれば、第2索条W2を連結具40及び連結アーム46を介して第1ブームB1の上部支持壁46wに着脱可能に連結することができる。尚、第2取付部T2の連結具40は、第1取付部T1と同様、実施形態に限定されず、例えば、第1取付部T1で説明した不図示のバリエーションも採用可能である。 Then, by removing the mounting shaft 44 and separating the connecting hook 43 from the upper support wall 46w, the connecting hook 43 is engaged with the eye-shaped connected portion 51a of the second rope W2 and then reattached to the upper support wall 46w via the mounting shaft 44, so that the second rope W2 can be detachably connected to the upper support wall 46w of the first boom B1 via the connector 40 and the connecting arm 46. Note that the connector 40 of the second mounting part T2, like the first mounting part T1, is not limited to the embodiment, and for example, variations not shown in the figures described for the first mounting part T1 can also be adopted.
而して、図15で明らかなように、ブーム列BTが横向き姿勢にある状態でブーム装置30をクレーンで第1,第2索条W1,W2を介して吊り上げる際に、本実施形態では、第1索条W1が側面視でブーム支持台BSの第1ブームB1に対する回動軸支部(枢軸J1)の軸線よりも第1ブームB1の先部側を通るように、ブーム支持台BSに対する第1取付部T1の配設位置が設定される。この場合、図15の図示例では、第1索条W1を第1ブームB1の先部側(図15で右側)の第1取付部T1に連結しているが、その反対側(図15で左側)の第1取付部T1に連結してもよい。 As is clear from Fig. 15, when the boom device 30 is hoisted by a crane via the first and second ropes W1 and W2 with the boom row BT in a horizontal position, in this embodiment, the position of the first attachment part T1 relative to the boom support base BS is set so that the first rope W1 passes closer to the tip of the first boom B1 than the axis of the pivot support part (pivot J1) of the boom support base BS relative to the first boom B1 in a side view. In this case, in the illustrated example of Fig. 15, the first rope W1 is connected to the first attachment part T1 on the tip side of the first boom B1 (right side in Fig. 15), but it may also be connected to the first attachment part T1 on the opposite side (left side in Fig. 15).
尚、第1取付部T1の上記した配設位置の設定は、後述するように上記横向き姿勢でブーム装置30を吊り上げる際にブーム支持台BSに対しブーム列BTが開き揺動するのを効果的に抑制する観点から定められるが、そのような抑制効果を重視しない場合は、第1索条W1が側面視で上記回動軸支部(枢軸J1)よりも外側、即ち図15で左側を通るように、ブーム支持台BSに対する第1取付部T1の配設位置を設定してもよい。 The above-mentioned installation position of the first mounting part T1 is determined from the viewpoint of effectively preventing the boom row BT from opening and swinging relative to the boom support base BS when the boom device 30 is hoisted in the above-mentioned horizontal position as described below. However, if such a suppression effect is not important, the installation position of the first mounting part T1 relative to the boom support base BS may be set so that the first rope W1 passes outside the above-mentioned pivot support part (pivot J1) in a side view, i.e., on the left side in Figure 15.
さらに第1ブームB1の基部には、不使用時の第2索条W2を第2取付部T2と協働して第1ブームB1に保持するための第3取付部T3がそれぞれ設けられる。その第3取付部T3は、例えば第1ブームB1の基部上面に突設された支持孔48付きの上部支持壁49と、その上部支持壁49に着脱可能に連結した連結具40とを備える。この連結具40もまた、前記した第1取付部T1の連結具40と同一構造であり、即ち、上部支持壁49wに設けた支持孔に取付軸44を介してU字状の連結フック43が回動可能に支持される。尚、第3取付部T3の連結具40もまた実施形態に限定されず、例えば第1取付部T1で説明した不図示のバリエーションを採用可能である。 Furthermore, the base of the first boom B1 is provided with a third attachment part T3 for holding the second rope W2 on the first boom B1 in cooperation with the second attachment part T2 when not in use. The third attachment part T3 includes, for example, an upper support wall 49 with a support hole 48 protruding from the upper surface of the base of the first boom B1, and a connector 40 detachably connected to the upper support wall 49. This connector 40 also has the same structure as the connector 40 of the first attachment part T1 described above, that is, a U-shaped connecting hook 43 is rotatably supported via a mounting shaft 44 in a support hole provided in the upper support wall 49w. The connector 40 of the third attachment part T3 is also not limited to the embodiment, and for example, a variation not shown in the figure described for the first attachment part T1 can be adopted.
尚また、上記した第3取付部T3は、省略可能である。その場合、コンクリート打設作業時には不要となる第2索条W2を第2取付部T2(第1ブームB1)から取り外しておき、またデストリビュータDの組立・解体時には第2索条W2を第2取付部T2に取付けて使用すればよい。 Furthermore, the third mounting part T3 described above can be omitted. In that case, the second rope W2, which is not required during concrete pouring work, can be removed from the second mounting part T2 (first boom B1), and the second rope W2 can be attached to the second mounting part T2 when assembling and dismantling the distributor D.
次に本実施形態のコンクリート供給用デストリビュータDを使用して、ブーム列BTが縦向き姿勢にある状態でブーム装置30をクレーンで複数の第1索条W1を介して吊り上げる際に使用可能なブーム装置吊り上げ用補助装置の一例について、図17,図18を参照して説明する。 Next, an example of a boom device lifting auxiliary device that can be used when lifting the boom device 30 with a crane via multiple first ropes W1 while the boom row BT is in a vertical position using the concrete supply distributor D of this embodiment will be described with reference to Figures 17 and 18.
即ち、補助装置は、図17で示すように全ての第1取付部T1に各々第1索条W1を連結し且つそれら第1索条W1を介して縦向き姿勢でブーム装置30をクレーンで吊り上げる際に、前記した少なくとも1つの組の一対の第1索条W1の途中に両端部が着脱可能に連結される吊り棒50を備える。この吊り棒50は、ブーム列BTの、所定方向の最大幅よりも長く形成されて剛性を有する棒状体で構成される。また吊り棒50の第1索条W1との連結位置は、吊り棒50が縦向き姿勢のブーム装置30の上端近くでブーム装置30を跨ぎ得る高さ位置となるよう設定される。吊り棒50の両端部には、一対の三角状支持板55が固定(例えば溶接)され、支持板55には、一対の支持孔56が互いに間隔をおいて設けられる。 That is, as shown in FIG. 17, the auxiliary device is provided with a hanging rod 50 whose both ends are detachably connected to at least one pair of the first ropes W1 when the first ropes W1 are connected to all the first attachment parts T1 and the boom device 30 is hoisted by a crane in a vertical position via the first ropes W1. The hanging rod 50 is formed as a rod-shaped body having a length greater than the maximum width of the boom row BT in a predetermined direction and has rigidity. The connection position of the hanging rod 50 to the first ropes W1 is set so that the hanging rod 50 can straddle the boom device 30 near the top end of the boom device 30 in a vertical position. A pair of triangular support plates 55 are fixed (for example, welded) to both ends of the hanging rod 50, and a pair of support holes 56 are provided at intervals on the support plates 55.
また第1索条W1は、吊り棒50よりも上側の第1索条部分W1uと、下側の第2索条部分W1dとに分割構成される。それら第1,第2索条部分W1u,W1dの被連結部51aは、対応する支持板55に上下一対の連結具40を介して各々着脱可能に連結される。その上下一対の連結具40は、前記した第1取付部T1の連結具40と各々同一構造であり、即ち、支持板55の一対の支持孔56に取付軸44を介してU字状の連結フック43が回動可能に支持される。従って、この吊り棒50に用いる連結具40の着脱操作も、第1取付部T1の連結具40と同様である。 The first rope W1 is divided into a first rope portion W1u above the hanging rod 50 and a second rope portion W1d below. The connected portions 51a of the first and second rope portions W1u and W1d are each detachably connected to the corresponding support plate 55 via a pair of upper and lower connectors 40. The pair of upper and lower connectors 40 each have the same structure as the connector 40 of the first mounting part T1 described above, that is, a U-shaped connecting hook 43 is rotatably supported by a pair of support holes 56 of the support plate 55 via a mounting shaft 44. Therefore, the attachment and detachment operation of the connector 40 used for this hanging rod 50 is also the same as that of the connector 40 of the first mounting part T1.
尚、この吊り棒50に用いる連結具40の構造もまた、実施形態に限定されず、例えば第1取付部T1で説明した不図示のバリエーションを採用可能である。 The structure of the connector 40 used with the hanging rod 50 is also not limited to the embodiment, and can be, for example, a variation (not shown) described for the first attachment portion T1.
更に補助装置は、上記したようにブーム列BTが縦向き姿勢にある状態でブーム装置30をクレーンで複数の第1索条W1を介して吊り上げる際に、上下方向で吊り棒50と第1取付部T1との間で少なくとも2本の第1索条W1の途中(図示例ではブーム装置30の上端寄りの位置)に着脱可能に連結され且つ全ての第1索条W1及びブーム列BTを囲繞する環状支持体60を備える。 Furthermore, when the boom device 30 is hoisted by a crane via a plurality of first ropes W1 with the boom row BT in a vertical position as described above, the auxiliary device includes an annular support 60 that is detachably connected to at least two of the first ropes W1 in the vertical direction between the lifting rod 50 and the first mounting portion T1 in the middle (in the illustrated example, at a position near the upper end of the boom device 30) and surrounds all of the first ropes W1 and the boom row BT.
この環状支持体60は、ブーム列BTの縦向き姿勢でブーム装置30を複数の第1索条W1を介して吊り上げる際に、第1取付部T1を傾動支点としてブーム列BTが所定角度以上、傾動するのを抑制するためのものである。環状支持体60は、可撓性を有し且つ頑丈な環状体(例えば、無端状のワイヤロープ、チェーン等)で構成され、それの途中には、少なくとも2本の第1索条W1の途中(吊り棒50寄りの部位)に各々固定(例えばカシメ結合、溶接、ボルト止め等)された連結部材61が連結具40を介して着脱可能に連結される。 This annular support 60 is intended to prevent the boom row BT from tilting more than a predetermined angle with the first attachment part T1 as the tilting fulcrum when the boom device 30 is lifted via the multiple first ropes W1 with the boom row BT in a vertical position. The annular support 60 is composed of a flexible and sturdy ring-shaped body (e.g., an endless wire rope, chain, etc.), and in the middle of it, connecting members 61 are fixed (e.g., crimped, welded, bolted, etc.) to at least two of the first ropes W1 in the middle (parts close to the suspension rod 50) and detachably connected via connectors 40.
環状支持体60の連結に用いる連結具40は、前記した第1取付部T1の連結具40と同一構造であり、即ち、連結部材61の支持孔62に取付軸44を介してU字状の連結フック43が回動可能に支持される。従って、この環状支持体60の連結に用いる連結具40の着脱操作も、第1取付部T1の連結具40と同様である。尚、環状支持体60に用いる連結具40の構造もまた、実施形態に限定されず、例えば第1取付部T1で説明した不図示のバリエーションを採用可能である。 The connector 40 used to connect the annular support 60 has the same structure as the connector 40 of the first mounting part T1 described above, that is, a U-shaped connecting hook 43 is rotatably supported in the support hole 62 of the connecting member 61 via the mounting shaft 44. Therefore, the attachment and detachment operation of the connector 40 used to connect the annular support 60 is also the same as that of the connector 40 of the first mounting part T1. The structure of the connector 40 used for the annular support 60 is also not limited to the embodiment, and for example, the variation not shown described for the first mounting part T1 can be adopted.
ところでブーム支持台BSの固定台31には、グリス注入部としてのグリスポンプGiと、このグリスポンプGiに単一のグリス基部配管GL0を介して接続される分配弁Vdと、グリス基部配管GL0(従ってグリスポンプGi)に分配弁Vdを介して並列に接続される複数のグリス配管即ち第1~第4グリス配管GL1~GL4とが固定、支持される。グリスポンプGiは、例えば所定量のグリスを貯溜可能なグリス保持部と、そのグリス保持部内の貯溜グリスを手動でグリス基部配管GL0に圧送可能なピストン等のグリス押込手段とを備えており、その構造は従来周知である。また分配弁Vdは、これに流入したグリスを第1~第4グリス配管GL1~GL4に等容量で分配するもので、その構造も従来周知である。 Meanwhile, a grease pump Gi as a grease injection section, a distribution valve Vd connected to the grease pump Gi via a single grease base pipe GL0, and a plurality of grease pipes, i.e., the first to fourth grease pipes GL1 to GL4, connected in parallel to the grease base pipe GL0 (and therefore the grease pump Gi) via the distribution valve Vd, are fixed and supported on the fixed base 31 of the boom support base BS. The grease pump Gi is equipped with, for example, a grease holding section capable of storing a predetermined amount of grease, and a grease pushing means such as a piston capable of manually pumping the stored grease in the grease holding section to the grease base pipe GL0, and its structure is conventionally known. The distribution valve Vd distributes the grease that flows into it to the first to fourth grease pipes GL1 to GL4 in equal volumes, and its structure is also conventionally known.
第1~第4グリス配管GL1~GL4は大部分が可撓性を有しており、且つそれらの途中部分は相互に束ねられて固定台31の外側を上方に延び、更に旋回台32内および第1ブームB1の基部内を通る。その基部内から第1ブームB1の外側に出た第1~第4グリス配管GL1~GL4のうち、特に第1グリス配管GL1は、第1ブームB1の回動軸支部としての枢軸J1近傍まで延びて、その枢軸J1周辺の被潤滑部(例えば枢軸J1外周と軸受との嵌合部、並びに枢軸J1内周と前記第2中継管39との嵌合部)にグリスを供給可能である。 The first to fourth grease pipes GL1 to GL4 are mostly flexible, and their intermediate portions are bundled together and extend upward outside the fixed base 31, and then pass through the rotating base 32 and the base of the first boom B1. Of the first to fourth grease pipes GL1 to GL4 that extend from the base to the outside of the first boom B1, the first grease pipe GL1 in particular extends to the vicinity of the pivot J1 that serves as the pivot support for the first boom B1, and can supply grease to the parts to be lubricated around the pivot J1 (for example, the fitting portion between the outer periphery of the pivot J1 and the bearing, and the fitting portion between the inner periphery of the pivot J1 and the second relay pipe 39).
また第1ブームB1の外側に出た第2~第4グリス配管GL2~GL4は、第1ブームB1に沿って固定されて第1ブームB1の先部まで延びる。そして、第1ブームB1の先部では、第2~第4グリス配管GL2~GL4のうち特に第2グリス配管GL2は、第1,第2ブームB1,B2の枢支連結部となる枢軸J2近傍まで延びて、その枢軸J2周辺の被潤滑部(例えば枢軸J2外周と軸受との嵌合部、並びに枢軸J2内周と前記第2中継管39との嵌合部)にグリスを供給可能である。一方、第3,第4グリス配管GL3,GL4は、第2ブームB2に沿って固定されて第2ブームB2の先部まで延びる。 The second to fourth grease pipes GL2 to GL4 protruding from the first boom B1 are fixed along the first boom B1 and extend to the tip of the first boom B1. At the tip of the first boom B1, the second grease pipe GL2 of the second to fourth grease pipes GL2 to GL4 extends to the vicinity of the pivot J2 that is the pivotal connection part of the first and second booms B1 and B2, and can supply grease to the lubricated parts around the pivot J2 (for example, the fitting part between the outer periphery of the pivot J2 and the bearing, and the fitting part between the inner periphery of the pivot J2 and the second relay pipe 39). On the other hand, the third and fourth grease pipes GL3 and GL4 are fixed along the second boom B2 and extend to the tip of the second boom B2.
そして、第2ブームB2の先部では、その第3,第4グリス配管GL3,GL4のうち特に第3グリス配管GL3は、第2,第3ブームB2,B3の枢支連結部となる枢軸J3近傍まで延びて、その枢軸J3周辺の被潤滑部(例えば枢軸J3外周と軸受との嵌合部、並びに枢軸J3内周と前記第2中継管39との嵌合部)にグリスを供給可能である。一方、第4グリス配管GL4は、第3ブームB3に沿って固定されて第3ブームB3の先部まで延びる。 At the tip of the second boom B2, the third and fourth grease pipes GL3, GL4, especially the third grease pipe GL3, extend to the vicinity of the pivot J3 that is the pivotal connection part of the second and third booms B2, B3, and can supply grease to the lubricated parts around the pivot J3 (for example, the fitting part between the outer periphery of the pivot J3 and the bearing, and the fitting part between the inner periphery of the pivot J3 and the second relay pipe 39). On the other hand, the fourth grease pipe GL4 is fixed along the third boom B3 and extends to the tip of the third boom B3.
また第3ブームB3の先部では、第4グリス配管GL4が第3,第4ブームB3,B4の枢支連結部となる枢軸J4近傍まで延びて、その枢軸J4周辺の被潤滑部(例えば枢軸J4外周と軸受との嵌合部、並びに枢軸J4内周と前記第2中継管39との嵌合部)にグリスを供給可能である。 In addition, at the tip of the third boom B3, the fourth grease pipe GL4 extends to the vicinity of the pivot J4, which is the pivot connection part of the third and fourth booms B3 and B4, and can supply grease to the lubricated parts around the pivot J4 (for example, the fitting part between the outer periphery of the pivot J4 and the bearing, and the fitting part between the inner periphery of the pivot J4 and the second relay pipe 39).
かくして、第1~第4GL1~GL4は、ブーム列BTの複数のブームB1~B4の各被潤滑部までそれぞれ延びて、それら被潤滑部にグリスを供給する。 Thus, the first to fourth GL1 to GL4 extend to each of the lubricated parts of the multiple booms B1 to B4 of the boom row BT, respectively, and supply grease to those lubricated parts.
ところで図12及び図21でも明らかなように、第1~第4グリス配管GL1~GL4の途中からは、第1~第4バックアップ配管GE1~GE4が個別に分岐している。それらバックアップ配管GE1~GE4は、対応するバックアップ配管GE1~GE4にグリスを個別に注入可能なバックアップ用グリス注入部としてのグリス注入口GEi1~GEi4を有する。各々のグリス注入口GEi1~GEi4には、これを平時は閉塞する手動式の栓体が付設され、各栓体は、グリス注入口GEi1~GEi4を随時に開閉可能である。また第1~第4グリス配管GL1~GL4には、それらグリス配管GL1~GL4の、バックアップ配管GE1~GE4が分岐する分岐部と分配弁Vdとの間で、グリス配管GL1~GL4から分配弁Vdへのグリス逆流を阻止する逆止弁Vcが配設される。 As is clear from FIG. 12 and FIG. 21, the first to fourth backup pipes GE1 to GE4 branch off from the first to fourth grease pipes GL1 to GL4. These backup pipes GE1 to GE4 have grease injection ports GEi1 to GEi4 as backup grease injection sections that can individually inject grease into the corresponding backup pipes GE1 to GE4. Each grease injection port GEi1 to GEi4 is provided with a manual plug that normally closes it, and each plug can open and close the grease injection port GEi1 to GEi4 at any time. In addition, the first to fourth grease pipes GL1 to GL4 are provided with a check valve Vc between the branching section of the grease pipes GL1 to GL4 where the backup pipes GE1 to GE4 branch off and the distribution valve Vd to prevent grease from flowing back from the grease pipes GL1 to GL4 to the distribution valve Vd.
尚、図21に鎖線で示すようにグリス基部配管GL0の途中(逆止弁Vcと分配弁Vdとの間)からグリス補給用のバックアップ配管GE0を分岐させてもよく、そのバックアップ配管GE0には、平時は閉塞する手動開閉式の栓体が付設される。而して、このバックアップ配管GE0を使用すれば、グリスポンプGiの故障時でもグリス基部配管GL0にグリス補給が可能となる。 As shown by the dashed line in FIG. 21, a backup pipe GE0 for grease supply may be branched off from the grease base pipe GL0 (between the check valve Vc and the distribution valve Vd), and a manually opened and closed plug that normally closes is attached to the backup pipe GE0. Thus, by using this backup pipe GE0, grease can be supplied to the grease base pipe GL0 even if the grease pump Gi breaks down.
尚また、以上説明したグリス供給系統において、バックアップ系統(バックアップ配管GE0,GE1~GE4や逆止弁Vc)を省略してもよい。 Furthermore, in the grease supply system described above, the backup system (backup pipes GE0, GE1 to GE4 and check valve Vc) may be omitted.
而して、本実施形態の上記したグリス供給構造によれば、共通1個のグリスポンプGiより分配弁Vdを介して複数のグリス配管GL1~GL4に一斉にグリスを供給可能となる。これにより、ブーム列BTをブーム支持台BS上に取付けたままの状態でも(即ち各ブームB1~B4を降ろさなくても)、ブーム列BTにおける複数のブームB1~B4の被潤滑部に対しグリスを迅速且つ容易に補給できるため、グリス補給のための作業時間の短縮や作業工数の低減が図られる。また、このようにグリス補給が容易化されることで、グリス補給されないで放置される事態を効果的に回避できるため、ブーム装置30の故障抑制や耐久性低下を図る上でも有効である。 According to the grease supply structure of this embodiment, grease can be supplied simultaneously to the multiple grease pipes GL1 to GL4 from a single common grease pump Gi via a distribution valve Vd. This allows grease to be quickly and easily replenished to the lubricated parts of the multiple booms B1 to B4 in the boom row BT even when the boom row BT is still attached to the boom support base BS (i.e., without lowering the booms B1 to B4), thereby shortening the work time and reducing the number of steps required for grease replenishment. Furthermore, by making grease replenishment easier in this way, it is possible to effectively avoid situations where the booms are left without grease replenishment, which is also effective in preventing failures and reduced durability of the boom device 30.
さらにグリス配管には、それらグリス配管GL1~GL4の、バックアップ配管GE1~GE4が分岐する分岐部と分配弁Vdとの間において、分配弁Vd側へのグリス逆流を阻止する逆止弁Vcが配設されるので、分配弁Vdの故障等に伴いバックアップ配管GE1~GE4からグリス補給を行う際に、その補給されたグリスが分配弁Vd側に逆流してブームB1~B4の被潤滑部に届かなくなる事態を確実に回避可能となる。 In addition, a check valve Vc is provided in the grease pipes GL1 to GL4 between the branching point of the backup pipes GE1 to GE4 and the distribution valve Vd to prevent grease from flowing back toward the distribution valve Vd. This makes it possible to reliably prevent a situation in which, when grease is replenished from the backup pipes GE1 to GE4 due to a breakdown in the distribution valve Vd, the replenished grease flows back toward the distribution valve Vd and fails to reach the parts of the booms B1 to B4 that need to be lubricated.
次に図14~図19を併せて参照して、実施形態の作用を説明する。 Next, the operation of the embodiment will be explained with reference to Figures 14 to 19.
本実施形態のデストリビュータDを例えばビルの建設現場で使用する場合には、最下層(例えば1階)の鉄筋コンクリート製床スラブFS1を予め構築しておき、床スラブFS1は、これの上下の空間を連通させる貫通孔Hを有する。そして、床スラブFS1上にデストリビュータDを組立てて据え付ける組立工程と、その据え付けたデストリビュータDを用いて行う生コンクリートの打設作業に基づいて、上側の床スラブ及びこれに付随する壁体を構築する工程とを順次行う。 When the distributor D of this embodiment is used, for example, at a building construction site, a reinforced concrete floor slab FS1 of the lowest level (e.g., the first floor) is constructed in advance, and the floor slab FS1 has through holes H that connect the spaces above and below it. Then, an assembly process is carried out in which the distributor D is assembled and installed on the floor slab FS1, and a process is carried out in which the upper floor slab and associated walls are constructed based on the pouring of ready mixed concrete using the installed distributor D.
このようにして上層の床スラブFS2,FS3等が構築されると、更に上層の床スラブ等を構築するためにデストリビュータD全体を、上層の床スラブ上に載せ替える工程(この工程を現場では「盛替え」と呼ぶ)を行う。そこで、上記したデストリビュータDの組立工程と盛替え工程について、順に説明する。
[組立工程]
先ず、図14(A)で例示したように、デストリビュータDのベース装置10をクレーンで懸吊して床スラブFS1と略同一レベルまで降ろすと共に、展開位置16Aのアウトリガ16を床スラブFS1上に載置し、このアウトリガ16を従来周知の固定手段(例えば、アウトリガ16を貫通するアンカボルト等)で固定する。
Once the upper floor slabs FS2, FS3, etc. have been constructed in this manner, a process is carried out in which the distributor D as a whole is placed on the upper floor slab (this process is called "re-laying" on-site) in order to construct the upper floor slabs, etc. The above-mentioned assembly process and re-laying process of the distributor D will now be described in order.
[Assembly process]
First, as illustrated in Figure 14 (A), the base device 10 of the distributor D is suspended by a crane and lowered to approximately the same level as the floor slab FS1, and the outrigger 16 in the deployed position 16A is placed on the floor slab FS1 and fixed with conventional fixing means (for example, an anchor bolt passing through the outrigger 16).
次いで図14(B)で例示したように、予め別の場所で、梯子23、接続配管28及び作業台24を1又は2以上のマストMと共に一纏めに組立てたマスト装置20をクレーンで懸吊して、ベース装置10(ベースフレーム11の角筒部11b上)に載せ、結合用ブロック21,21′やボルト25を介してベース装置10に結合する。 Next, as shown in FIG. 14(B), the mast device 20, which is previously assembled at another location together with the ladder 23, connecting pipes 28, and work platform 24 and one or more masts M, is suspended by a crane and placed on the base device 10 (on the square tube portion 11b of the base frame 11), and connected to the base device 10 via the connecting blocks 21, 21' and bolts 25.
次いで、図14(C)で示すように、予め別の場所でブーム列BT及びブーム支持台BSの組立体として予め組立てたブーム装置30を、折り畳んだブーム列BTを略水平の横向き姿勢とした状態で、固定台31及び第1ブームB1上の第1,第2取付部T1,T2に第1,第2索条W1,W2の下端の被連結部51aをそれぞれ連結する。そして、それら第1,第2索条W1,W2の上部をクレーンで吊り上げて、図14(D)に示すようにマスト装置20の最上部のマストMの上端部に載せ、結合用ブロック21,21′やボルト25を介して最上部のマストMに結合する。尚、この結合作業は、作業台24上に登った作業員がクレーンの操作員と連係して行う。 Next, as shown in FIG. 14(C), the boom device 30, which has been assembled in advance as an assembly of the boom row BT and the boom support base BS at a different location, is folded up and placed in a substantially horizontal, sideways position, and the connected parts 51a at the lower ends of the first and second ropes W1, W2 are respectively connected to the fixed base 31 and the first and second mounting parts T1, T2 on the first boom B1. Then, the upper parts of the first and second ropes W1, W2 are lifted up by a crane and placed on the upper end of the top mast M of the mast device 20 as shown in FIG. 14(D), and connected to the top mast M via the connecting blocks 21, 21' and bolts 25. This connecting work is performed by a worker on the work platform 24 in cooperation with the crane operator.
その後、第1索条W1はクレーンフック80及び第1取付部T1より取外して別の保管場所に保管する。また第2索条W2は、これの上端側をクレーンから取外して第3取付部T3に付け替え、また下端側は第2取付部T2に連結状態のままとしておく。 Then, the first rope W1 is removed from the crane hook 80 and the first mounting part T1 and stored in a separate storage location. The upper end of the second rope W2 is removed from the crane and attached to the third mounting part T3, while the lower end is left connected to the second mounting part T2.
また、マストMに固定の接続配管28の下流端(上端)は、固定台31側の第1中継管38の上流端(下端)にジョイントを介して液密に接続され、その接続作業も作業台24上の作業員が行う。一方、接続配管28の上流端(下端)は、図示はしないが外部のコンクリートポンプから延びるコンクリート圧送管にジョイントを介して液密に接続される。これにより、コンクリートポンプからの生コンクリートを、接続配管28、第1,第2中継管38,39及び吹出チューブ37に順次、圧送供給できるようになる。 The downstream end (upper end) of the connection pipe 28 fixed to the mast M is liquid-tightly connected to the upstream end (lower end) of the first relay pipe 38 on the fixed base 31 side via a joint, and this connection work is also performed by a worker on the workbench 24. Meanwhile, the upstream end (lower end) of the connection pipe 28 is liquid-tightly connected via a joint to a concrete pressure pipe extending from an external concrete pump (not shown). This makes it possible to pressure-feed and supply fresh concrete from the concrete pump to the connection pipe 28, the first and second relay pipes 38, 39, and the blow-out tube 37 in sequence.
かくして、最下層の床スラブFS1上へのデストリビュータDの設置が終了するので、この状態からデストリビュータDは、ブーム列BTのブームB1~B4相互を適宜屈折させ且つ旋回台32(従ってブーム列BT)を旋回させることで、ブーム列BT先部の吹出チューブ37から生コンクリートを所望の打設場所に供給可能となる。これにより、次の階層の床スラブFS2や壁体、さらには次の階層の床スラブFS3や壁体を順次に構築可能となる。 Thus, the installation of the distributor D on the floor slab FS1 of the lowest level is completed, and from this state the distributor D can supply ready mixed concrete to the desired casting location from the blow-out tube 37 at the end of the boom row BT by appropriately bending the booms B1 to B4 of the boom row BT relative to each other and rotating the swivel base 32 (and therefore the boom row BT). This makes it possible to sequentially build the floor slab FS2 and walls of the next level, and then the floor slab FS3 and walls of the next level.
このようにして上層の床スラブFS2,FS3や壁体が積み上がると、更に上層の床スラブFS4等を構築するためにデストリビュータD全体を、例えば床スラブFS2上に載せ替える次の盛替え工程に移行する。
[盛替え工程]
本工程では、例えば、マストMに固定の接続配管28を前記コンクリートポンプに連なるコンクリート圧送管より切り離すと共に、アウトリガ16の床スラブFS1への固定を解除する。そして、図16(E)に示すように、折り畳んだブーム列BTを略鉛直の縦向き姿勢になるまで起立揺動させ、この状態のままブーム支持台BS(固定台31)の4つの第1取付部T1に4条の第1索条W1の下端の被連結部51aをそれぞれ連結する。そして、それら第1索条W1の上端の被連結部51aをクレーンフック80に係止させて、クレーンでデストリビュータD全体を吊り上げる。
Once the upper floor slabs FS2, FS3 and wall bodies have been built in this manner, the next re-laying process is performed in which the entire distributor D is placed, for example, on the floor slab FS2 in order to construct the upper floor slab FS4, etc.
[Refilling process]
In this step, for example, the connection pipe 28 fixed to the mast M is disconnected from the concrete pump-connected concrete pumping pipe, and the outriggers 16 are released from the floor slab FS1. Then, as shown in Fig. 16(E), the folded boom row BT is raised and swung up until it is in a substantially vertical position, and in this state, the connected parts 51a at the lower ends of the four first ropes W1 are respectively connected to the four first mounting parts T1 of the boom support base BS (fixed base 31). Then, the connected parts 51a at the upper ends of the first ropes W1 are engaged with the crane hook 80, and the entire distributor D is lifted by a crane.
次いで、図16(F)に示すように、アウトリガ16を格納位置16Bまで回動させ、これにより、デストリビュータDの上昇時に、階上の床スラブFS2の貫通孔H周辺部にアウトリガ16が干渉しないようにする。そして、ベース装置10が階上の床スラブFS2と略同一レベルとなるまで、デストリビュータD全体をクレーンで吊り上げ、上昇させる。 Next, as shown in FIG. 16(F), the outriggers 16 are rotated to the storage position 16B so that the outriggers 16 do not interfere with the periphery of the through-hole H in the floor slab FS2 of the upper floor when the distributor D is raised. Then, the entire distributor D is lifted and raised by a crane until the base device 10 is at approximately the same level as the floor slab FS2 of the upper floor.
その上昇後は、図16(G)に示すように、アウトリガ16を再び展開位置16Aまで展開させた後、階上の床スラブFS2上に載置、固定する。次いで、全部の第1索条W1の下端を固定台31の第1取付部T1より取り外して、別の保管場所に保管しておく。またマストMに固定の接続配管28の上流端(下端)には、下方に延びる延長配管28′の上端を接続、固定し、その延長配管28′の途中は、階下の床スラブ(例えば床スラブFS2)の貫通孔H周辺の梁部等に固定手段81を介して支持される。そして、延長配管28′の下端に、前記コンクリートポンプに連なるコンクリート圧送管を接続すれば、生コンクリートを接続配管28、第1,第2中継管38,39及び吹出チューブ37に順次、圧送供給できるようになる。 After the ascent, as shown in FIG. 16(G), the outriggers 16 are deployed again to the deployment position 16A, and then placed and fixed on the floor slab FS2 of the upper floor. Next, the lower ends of all the first ropes W1 are removed from the first mounting parts T1 of the fixing base 31 and stored in another storage location. The upper end of the extension pipe 28' extending downward is connected and fixed to the upstream end (lower end) of the connection pipe 28 fixed to the mast M, and the middle of the extension pipe 28' is supported by a beam or the like around the through hole H of the floor slab (for example, floor slab FS2) of the lower floor via a fixing means 81. Then, if a concrete pressure pipe connected to the concrete pump is connected to the lower end of the extension pipe 28', it becomes possible to pressure-feed and supply ready-mixed concrete to the connection pipe 28, the first and second relay pipes 38, 39, and the blow-out tube 37 in sequence.
かくして、デストリビュータDの上層階への盛り替え作業が終了するので、この状態からデストリビュータDは、ブーム列BTの第1ブームB1を伏倒させつつブームB1~B4相互を適宜屈折させ且つ旋回台32(従ってブーム列BT)を旋回させることで、ブーム列BT先部の吹出チューブ37から生コンクリートを上層階での所望の打設場所に供給可能となる。これにより、上層階の床スラブFS4や壁体を構築可能となる。 Thus, the distributor D's work of transferring concrete to the upper floors is completed, and from this state the distributor D can lay down the first boom B1 of the boom row BT, bend the booms B1 to B4 relative to each other as appropriate, and rotate the swivel base 32 (and therefore the boom row BT), thereby supplying ready mixed concrete from the blow-out tube 37 at the end of the boom row BT to the desired casting location on the upper floors. This makes it possible to construct the floor slab FS4 and walls on the upper floors.
而して、上記したような盛り替え工程を床スラブFSの階層が上がるのに応じて順次行うことで、同じデストリビュータDを用いて中層のビルや、高層のビルを無理なく建設可能となる。 By carrying out the above-mentioned replacement process in sequence as the floor slab FS increases in level, it becomes possible to easily construct mid-rise and high-rise buildings using the same distributor D.
以上説明した本実施形態によれば、折り畳んだブーム列BTが横向き姿勢又は縦向き姿勢にある状態でブーム装置30をクレーンで第1索条W1を介して吊り上げる際に使用されて第1索条W1に連結可能な第1取付部T1が、ブーム支持台BS(図示例では固定台31)に設けられるので、ブーム列BTとブーム支持台BSとを一纏めに組立てた組立体の状態でブーム装置30をクレーンで第1索条W1を介して吊り上げ可能となる。これにより、従来のように高いマスト装置20上でブーム装置30を組立てる作業を行う必要はなくなり、それだけブーム装置30の組立作業性が良好となる。 According to the present embodiment described above, the first mounting portion T1, which is used when lifting the boom device 30 via the first rope W1 with a crane while the folded boom row BT is in a horizontal or vertical position and can be connected to the first rope W1, is provided on the boom support base BS (fixed base 31 in the illustrated example), so that the boom device 30 can be lifted via the first rope W1 with a crane in the state where the boom row BT and the boom support base BS are assembled together. This eliminates the need to assemble the boom device 30 on a high mast device 20 as in the conventional case, and thus improves the ease of assembly of the boom device 30.
また特にブーム列BTが縦向き姿勢の状態でブーム装置30を吊り上げる所謂盛り替え作業時には、ブーム支持台BSの複数の第1取付部T1及び複数の第1索条W1を介してブーム装置30全体が、特にブーム支持台BSにおいて吊り上げられるため、その吊り上げの際のブーム列BTの基端部(第1ブームB1基部)とブーム支持台BSとの接続部の荷重負担を、従来のようにブーム列BTで吊り上げる場合と比べ効果的に軽減できる。これにより、その接続部の構造簡素化、延いてはコスト節減が図られる。 In particular, during so-called rearrangement work in which the boom device 30 is lifted with the boom row BT in a vertical position, the entire boom device 30 is lifted, particularly at the boom support base BS, via the multiple first mounting parts T1 and multiple first ropes W1 of the boom support base BS, so the load on the connection between the base end of the boom row BT (base of the first boom B1) and the boom support base BS during lifting can be effectively reduced compared to when lifting with the boom row BT as in the past. This simplifies the structure of the connection and ultimately reduces costs.
また実施形態のブーム支持台BSは、マスト装置20の上部に固定される固定台31と、第1ブームB1の基部を起伏回動可能に軸支する固定台31に旋回軸J5回りに旋回可能に支持される旋回台32とを備え、そのうち固定台31に第1取付部T1が設けられる。これにより、ブーム支持台BSのうち特に固定台31を第1索条W1で吊り上げる形となるため、旋回台32を第1索条W1で吊り上げる場合と比べ、固定台31を旋回台32に旋回可能に支持する旋回機構(即ち旋回軸J5、旋回軸受31b等)の荷重負担が軽減され、それだけ旋回機構の構造簡素化、延いてはコスト節減が図られる。 The boom support base BS of the embodiment includes a fixed base 31 fixed to the upper part of the mast device 20, and a swivel base 32 supported rotatably around a swivel axis J5 on the fixed base 31, which supports the base of the first boom B1 so that it can be raised and lowered. The first mounting part T1 is provided on the fixed base 31. As a result, the fixed base 31 of the boom support base BS in particular is lifted by the first rope W1, and therefore the load on the swivel mechanism (i.e., the swivel axis J5, swivel bearing 31b, etc.) that rotatably supports the fixed base 31 on the swivel base 32 is reduced compared to the case where the swivel base 32 is lifted by the first rope W1, which simplifies the structure of the swivel mechanism and reduces costs.
また実施形態では、ブーム列BTが特に横向き姿勢にある状態でブーム装置30をクレーンで第2索条W2を介して吊り上げる際に使用されて第2索条W2に連結可能な第2取付部T2が、第1ブームB1の途中に設けられる。これにより、ブーム列BTが横向き姿勢にある状態でブーム装置30をクレーンで第1,第2索条W1,W2を介して(従って水平方向に長い支持スパンを以て)吊り上げ可能となるため、吊り上げ支持の安定が図られ、作業性が良好となる。 In the embodiment, a second attachment portion T2 that can be connected to the second rope W2 and is used when lifting the boom device 30 with a crane via the second rope W2 when the boom row BT is in a particularly horizontal position is provided midway on the first boom B1. This makes it possible to lift the boom device 30 with a crane via the first and second ropes W1, W2 (and therefore with a long horizontal support span) when the boom row BT is in a horizontal position, thereby stabilizing the lifting support and improving workability.
更に実施形態では、ブーム列BTが横向き姿勢にある状態でブーム装置30をクレーンで第1,第2索条W1,W2を介して吊り上げる際に、側面視でブーム支持台BSの第1ブームB1に対する回動軸支部(即ち枢軸J1)の軸線よりも第1ブームB1の先部側を第1索条W1が通るように、ブーム支持台BSに対する第1取付部T1の配設位置が設定される。これにより、ブーム列BTが横向き姿勢にあるブーム装置30の吊り上げ過程で、第1索条W1が第1取付部T1を経てブーム支持台BSに加わる吊り上げ荷重がブーム支持台BSに及ぼすモーメントを以て、ブーム支持台BSに対しブーム列BTが開き揺動するのを効果的に抑制できるため、上記吊り上げ荷重を利用した簡単な開き抑制構造で作業の安全性向上が図られる。 Furthermore, in the embodiment, when the boom device 30 is hoisted by a crane via the first and second ropes W1 and W2 with the boom row BT in a horizontal position, the position of the first attachment part T1 relative to the boom support base BS is set so that the first rope W1 passes through the tip side of the first boom B1 rather than the axis of the pivot support part (i.e., pivot J1) of the boom support base BS relative to the first boom B1 in a side view. As a result, during the process of hoisting the boom device 30 with the boom row BT in a horizontal position, the boom row BT can be effectively prevented from opening and swinging relative to the boom support base BS by the moment exerted on the boom support base BS by the lifting load applied to the boom support base BS by the first rope W1 via the first attachment part T1, and therefore the simple opening prevention structure utilizing the lifting load improves the safety of the work.
また第1ブームB1の基部には、不使用時の第2索条W2を第2取付部T2と協働して第1ブームB1に保持するための第3取付部T3がそれぞれ設けられる。これにより、第2索条W2の不使用時にこれの一端を第2取付部T2に連結したままにしても、第2索条W2の他端側を第3取付部T3に連結保持させることにより、第2索条が打設作業の邪魔になるのを回避しながら第2索条を第1ブームに保持しておくことができる。しかも、次に第2索条W2を使用する際に、これの一端を第2取付部T2に連結する手間が省かれ、それだけ作業能率アップが図られる。 In addition, a third attachment part T3 is provided at the base of the first boom B1 for holding the second rope W2 on the first boom B1 in cooperation with the second attachment part T2 when not in use. As a result, even if one end of the second rope W2 remains connected to the second attachment part T2 when not in use, the other end of the second rope W2 can be connected and held to the third attachment part T3, thereby preventing the second rope W2 from interfering with the concrete pouring work and holding the second rope on the first boom. Moreover, the next time the second rope W2 is used, the effort of connecting one end of the second rope W2 to the second attachment part T2 is eliminated, thereby improving work efficiency.
また特に前記盛り替え作業を行うために、ブーム列BTが縦向き姿勢にある状態で全ての第1取付部T1に各々第1索条W1を連結し且つそれら第1索条W1を介して縦向き姿勢のブーム装置30をクレーンで吊り上げる際に、ブーム列BTの幅方向に並ぶ一対の第1索条W1の途中(特にブーム列BTの上端部よりも上位)に、幅方向でブーム列の最大幅より長い吊り棒50の両端部を連結することが望ましい。この場合、吊り棒50の両端部が途中に連結された一対の第1索条W1は、その両第1索条W1間に介在する吊り棒50の突っ張り作用を受けることにより、その両第1索条W1の、ブーム列BTへの過度の干渉が確実に防止される。 In particular, when performing the above-mentioned rearrangement work, when the boom row BT is in a vertical position and the first ropes W1 are connected to all of the first mounting parts T1 and the boom device 30 in the vertical position is hoisted by a crane via these first ropes W1, it is desirable to connect both ends of a suspension rod 50 that is longer in the width direction than the maximum width of the boom row BT to the middle of a pair of first ropes W1 aligned in the width direction of the boom row BT (particularly above the upper end of the boom row BT). In this case, the pair of first ropes W1 with both ends of the suspension rod 50 connected in the middle are subjected to the tensioning action of the suspension rod 50 interposed between the two first ropes W1, thereby reliably preventing excessive interference of the two first ropes W1 with the boom row BT.
また上記盛り替え作業のために、第1索条W1を介して縦向き姿勢のブーム装置30をクレーンで吊り上げる際に、上下方向で吊り棒50と第1取付部T1との間で少なくとも1本の第1索条W1の途中(特に吊り棒50寄り部位)に、全ての第1索条W1及びブーム列BTを囲繞する環状支持体60を連結することが望ましい。この場合、環状支持体60は、第1取付部T1を傾動支点としてブーム列BTが過度に(即ち所定角度以上)傾動するのを抑制できるため、ブーム装置30の吊り上げの際にブーム列BTが傾き過ぎて転倒するのを効果的に防止可能となる。 When lifting the boom device 30 in a vertical position via the first ropes W1 with a crane for the above-mentioned reloading work, it is desirable to connect an annular support 60 surrounding all of the first ropes W1 and the boom row BT to the middle of at least one of the first ropes W1 between the lifting rod 50 and the first mounting part T1 in the vertical direction (particularly the part close to the lifting rod 50). In this case, the annular support 60 can suppress the boom row BT from tilting excessively (i.e., more than a predetermined angle) with the first mounting part T1 as the tilting fulcrum, so that it is possible to effectively prevent the boom row BT from tilting too much and tipping over when lifting the boom device 30.
尚、以上説明した縦向き姿勢のブーム装置30をクレーンで吊り上げる際に、吊り棒50及び環状支持体60の両方の使用を省略してもよい。また環状支持体60は使用しないで吊り棒50のみを使用することも可能である。更に吊り棒50は使用しないで環状支持体60のみを使用することも可能であり、この場合、例えばブーム支持台BS側の1つの第1取付部T1を介して1本の第1索条W1だけで縦向き姿勢のブーム装置30を吊り、その際に第1索条W1に連結した環状支持体60でブーム装置30の倒れを阻止するようなことも可能である。 When the boom device 30 in the vertical position described above is hoisted by a crane, the use of both the hoisting rod 50 and the annular support 60 may be omitted. It is also possible to use only the hoisting rod 50 without using the annular support 60. It is also possible to use only the annular support 60 without using the hoisting rod 50. In this case, for example, it is possible to hoist the boom device 30 in the vertical position with only one first rope W1 via one first mounting part T1 on the boom support base BS side, and at that time, the annular support 60 connected to the first rope W1 can be used to prevent the boom device 30 from falling over.
尚また、前記[盛替え工程]の実行に当たり、実施例では図16に示すように第1索条W1を介して縦向き姿勢のブーム装置30をクレーンで吊り上げるようにした作業形態を示した。しかしブーム装置30を横向き姿勢のまま第1,第2索条W1,W2を介して吊り上げても、構築済みの構造物(例えば上層の床スラブ等)とブーム装置30が干渉しなければ、ブーム装置30を横向き姿勢のまま盛り替え作業を行うようにしてもよい。 In addition, in carrying out the [Reloading Process], in the embodiment, the boom device 30 in the vertical position is lifted by a crane via the first rope W1 as shown in Figure 16. However, even if the boom device 30 is lifted via the first and second ropes W1 and W2 while in the horizontal position, the reloading work may be carried out with the boom device 30 in the horizontal position, as long as the boom device 30 does not interfere with the already constructed structure (e.g., the floor slab of the upper layer, etc.).
以上、本発明の実施形態について説明したが、本発明はその実施形態に限定されることなく、本発明の範囲内で種々の実施形態を実施可能である。 Although an embodiment of the present invention has been described above, the present invention is not limited to this embodiment, and various embodiments can be implemented within the scope of the present invention.
たとえば、実施形態では、縦列配置されて相互に結合される2個のマストMでマスト装置20を構成し、そのマスト装置20及びベース装置10ごとブーム装置30の盛替え作業を行うものを示したが、マストMの長さや現場の作業態様によっては、1個のマストMでマスト装置20を構成してもよく、或いは3個以上のマストMを縦列状態で結合してマスト装置20を構成してもよい。 For example, in the embodiment, the mast assembly 20 is formed of two masts M arranged in a vertical line and connected to each other, and the boom assembly 30 is replaced together with the mast assembly 20 and the base assembly 10. However, depending on the length of the masts M and the work conditions at the site, the mast assembly 20 may be formed of one mast M, or the mast assembly 20 may be formed by connecting three or more masts M in a vertical line.
また前記実施形態では、相隣なるマストMの隣接端部外周に周方向に互いに間隔をおいて固定した各複数の結合用ブロック21,21′相互を上下に隣接させて上下方向に対面、当接させ、その当接面相互をボルト25で結合するものを示したが、その結合手段としては、ボルト以外の結合手段(例えば溶接、カシメ、ピン止め等)も実施可能である。また結合用ブロック21,21′相互をマストMの周方向に隣接させて周方向に対面、当接させ、その当接面相互をボルト25その他の結合手段で結合してもよく、この場合に当接面相互を結合するボルト又は固定ピンとしては、横向きの(即ち周方向を向く)ボルト又は固定ピンが使用される。 In the above embodiment, the connecting blocks 21, 21' are fixed to the outer periphery of the adjacent ends of the adjacent masts M at intervals in the circumferential direction, and are vertically adjacent to each other, facing and abutting in the vertical direction, and the abutting surfaces are connected to each other with bolts 25. However, other connecting means (e.g., welding, riveting, pinning, etc.) than bolts can be used as the connecting means. Also, the connecting blocks 21, 21' may be adjacent to each other in the circumferential direction of the masts M, facing and abutting in the circumferential direction, and the abutting surfaces may be connected to each other with bolts 25 or other connecting means. In this case, the bolts or fixing pins that connect the abutting surfaces to each other are horizontal (i.e., facing in the circumferential direction).
また実施形態では、ベース装置10におけるアウトリガ16の展開位置16Aを3パターンの展開位置16A0,16A1,16A2の何れにも設定できるようにしたものを示したが、アウトリガ16の展開位置16Aは、1パターンでもよく、或いは2パターン又は4パターン以上であってもよい。尚、展開位置16Aを実施形態の3パターンよりも少ない1又は2パターンとした場合には、アウトリガ16の基部側に設けられるピン挿入孔の個数を実施形態よりも少なく(即ち1又は2個に)することができる。 In the embodiment, the deployed position 16A of the outrigger 16 in the base device 10 can be set to any of three deployed positions 16A0, 16A1, and 16A2, but the deployed position 16A of the outrigger 16 may be one pattern, or two patterns, or four or more patterns. If the deployed position 16A is set to one or two patterns, which is fewer than the three patterns of the embodiment, the number of pin insertion holes provided on the base side of the outrigger 16 can be less than that of the embodiment (i.e., one or two).
また前記実施形態では、格納位置16Bと展開位置16Aとの間でのアウトリガ16の回動を手動で行うものを例示したが、アウトリガ16の回動を、アウトリガ16とベース本体10m間に設けた不図示のアクチュエータにより自動で行うようにしてもよい。 In the above embodiment, the outriggers 16 are manually rotated between the storage position 16B and the deployment position 16A, but the outriggers 16 may be rotated automatically by an actuator (not shown) provided between the outriggers 16 and the base body 10m.
また前記実施形態では、ブーム装置30におけるブーム列BTを、直列配置されて相互に屈折揺動可能な第1~第4ブームB1~B4で構成したものを示したが、ブーム列BTは、少なくとも2本のブームを繋げればよく、実施形態のブーム数に限定されない。 In the above embodiment, the boom train BT in the boom device 30 is shown to be composed of first to fourth booms B1 to B4 arranged in series and capable of pivoting relative to one another, but the boom train BT only needs to have at least two booms connected together and is not limited to the number of booms in the embodiment.
また前記実施形態では、第1,第2索条W1,W2に関し、従来周知のチェーンブロック等の長さ調整補助具を使用していないが、そのような長さ調整補助具を用いて第1,第2索条W1,W2の少なくとも一部を、長さ調整可能としつつ第1,第2取付部T1,T2の少なくとも一部に連結してもよい。 In addition, in the above embodiment, the first and second ropes W1 and W2 do not use a length adjustment aid such as a conventionally known chain block, but such a length adjustment aid may be used to connect at least a portion of the first and second ropes W1 and W2 to at least a portion of the first and second mounting parts T1 and T2 while making the length adjustable.
また前記実施形態では、ベースフレーム11に上,下フレーム12,13が上,下部軸受14,15の囲い枠14k,15kを介して結合するものを示したが、ベースフレーム11に上,下フレーム12,13を直接結合するもの、或いは囲い枠14k,15kとは別個独立した他部材を介して結合するようにしてもよい。 In the above embodiment, the upper and lower frames 12, 13 are connected to the base frame 11 via the surrounding frames 14k, 15k of the upper and lower bearings 14, 15. However, the upper and lower frames 12, 13 may be directly connected to the base frame 11, or may be connected via other members that are separate and independent from the surrounding frames 14k, 15k.
また前記実施形態では、上,下部軸受14,15を、軸受本体14b,15bとこれに結合される囲い枠14k,15kとで構成して、囲い枠14k,15kを介して上,下フレーム12,13に軸受本体14b,15bを結合するものを示したが、囲い枠14k,15kを省略して、軸受本体14b,15bの外側部に設けた取付面に上,下フレーム12,13を直接(即ち囲い枠14k,15kを介さずに)結合してもよい。 In the above embodiment, the upper and lower bearings 14, 15 are composed of the bearing bodies 14b, 15b and the surrounding frames 14k, 15k connected thereto, and the bearing bodies 14b, 15b are connected to the upper and lower frames 12, 13 via the surrounding frames 14k, 15k. However, the surrounding frames 14k, 15k may be omitted, and the upper and lower frames 12, 13 may be connected directly (i.e., without the surrounding frames 14k, 15k) to the mounting surfaces provided on the outer sides of the bearing bodies 14b, 15b.
また前記実施形態では、デストリビュータDの[組立工程]において、図14(A)~(D)に示すようにベース装置10及びマスト装置20を現場に設置後、ブーム列BTが横向き状態のブーム装置30のブーム列BT(実施形態では第1ブームB1)と、ブーム旋回台BS(実施形態では固定台31)とを、クレーンで第1,第2索条W1,W2及び第1,第2取付部T1,T2を介して吊り下げ、その吊り上げ状態で固定台31と最上部のマストMとを結合するものを示した。これに対し、デストリビュータDの[組立工程]において、図14(A)(B)⇒図19(C′)(D′)に示す流れのように、ベース装置10及びマスト装置20を現場に設置後、ブーム列BTが縦向き状態のブーム装置30の固定台31をクレーンで4条の第1索条W1及び第1取付部T1を介して吊り下げ、その吊り下げ状態で固定台31と最上部のマストMとを結合するようにしてもよい。 In the above embodiment, in the [assembly process] of the distributor D, after the base device 10 and mast device 20 are installed at the site as shown in Figures 14 (A) to (D), the boom row BT (in this embodiment, the first boom B1) of the boom device 30 with the boom row BT in a horizontal position and the boom rotation base BS (in this embodiment, the fixed base 31) are suspended by a crane via the first and second ropes W1, W2 and the first and second mounting parts T1, T2, and the fixed base 31 is connected to the uppermost mast M in this suspended state. In contrast, in the [assembly process] of distributor D, as shown in the flow from Figure 14 (A) (B) to Figure 19 (C') (D'), after the base device 10 and mast device 20 are installed on-site, the fixed base 31 of the boom device 30 with the boom row BT in the vertical position can be suspended by a crane via the four first ropes W1 and the first mounting part T1, and the fixed base 31 can be connected to the uppermost mast M in this suspended state.
また前記実施形態では、デストリビュータDの[組立工程]において、図14(A)~(D)に示すように、ベース装置10を先ず現場の最下層(例えば地下又は一階)の床スラブFS1上に設置してから、その後のマスト装置20の構築や、その上のブーム装置30の組付けを行うようにしたものを示したが、デストリビュータDの[組立工程]よりも以前に(従ってデストリビュータDを使用しないで)、最下層より多少上位の低層(例えば実施形態でいう床スラブFS2又はFS3)をも構築した後で、その上位の床スラブFS2又はFS3上にベース装置10を最初に設置して[組立工程]を開始するようにしてもよい。 In the above embodiment, in the [assembly process] of the distributor D, as shown in Figures 14 (A) to (D), the base device 10 is first installed on the floor slab FS1 of the lowest level of the site (for example, the basement or first floor), and then the mast device 20 is constructed and the boom device 30 is attached above it. However, prior to the [assembly process] of the distributor D (and therefore without using the distributor D), a lower level slightly above the lowest level (for example, the floor slab FS2 or FS3 in the embodiment) may also be constructed, and the base device 10 may first be installed on the upper floor slab FS2 or FS3 to start the [assembly process].
また前記実施形態のベース装置10のベース本体10mでは、図20(A)(B)に簡略的に示す如く、平面視で隣り合う上フレーム12の長手方向に沿う外側面の延長線相互の交点Oよりも内方側に上部軸受14の少なくとも一部が位置するように、隣り合う上フレーム12の隣接端部に上部軸受14を結合する構造とし、また平面視で隣り合う下フレーム13の長手方向に沿う外側面の延長線相互の交点Oよりも内方側に下部軸受15の少なくとも一部が位置するように、隣り合う下フレーム13の隣接端部に下部軸受15を結合する構造としたものを示した。これに対し、本発明の別の実施形態として、図20(C)(D)に簡略的に示すように、平面視で隣り合う上フレーム12の長手方向に沿う外側面相互の交点O′よりも内方側(即ち角筒部11b側、換言すればベース本体10mの中心側)に上部軸受14の少なくとも一部が位置するように、隣り合う上フレーム12の隣接端部に上部軸受14を各々結合する構造とし、また平面視で隣り合う下フレーム13の長手方向に沿う外側面相互の交点O′よりも内方側(即ち角筒部11b側、換言すればベース本体10mの中心側)に下部軸受15の少なくとも一部が位置するように、隣り合う下フレーム13の隣接端部に下部軸受15を各々結合する構造としてもよい。 In addition, in the base body 10m of the base device 10 of the above embodiment, as shown simply in Figures 20 (A) and (B), the upper bearings 14 are connected to the adjacent ends of adjacent upper frames 12 so that at least a part of the upper bearings 14 is located inward of the intersection O of the extension lines of the outer surfaces of adjacent upper frames 12 along the longitudinal direction in a planar view, and the lower bearings 15 are connected to the adjacent ends of adjacent lower frames 13 so that at least a part of the lower bearings 15 is located inward of the intersection O of the extension lines of the outer surfaces of adjacent lower frames 13 along the longitudinal direction in a planar view. In contrast, as another embodiment of the present invention, as shown simply in Figures 20(C) and (D), the upper bearings 14 are connected to the adjacent ends of the adjacent upper frames 12 so that at least a portion of the upper bearings 14 is located inside the intersection O' between the outer sides of the adjacent upper frames 12 along the longitudinal direction in a plan view (i.e., the square tube portion 11b side, in other words, the center side of the base body 10m), and the lower bearings 15 are connected to the adjacent ends of the adjacent lower frames 13 so that at least a portion of the lower bearings 15 is located inside the intersection O' between the outer sides of the adjacent lower frames 13 along the longitudinal direction in a plan view (i.e., the square tube portion 11b side, in other words, the center side of the base body 10m).
この別の実施形態の場合、例えば、隣り合う上フレーム12の隣接端部相互は直接固定(例えば溶接、ボルト止め等)され且つその上フレーム12の隣接端部の下面に上部軸受14の上部が固定(例えば溶接、ボルト止め等)される。また隣り合う下フレーム13の隣接端部相互は直接固定(例えば溶接、ボルト止め等)され且つその下フレーム13の隣接端部の上面に下部軸受15の上部が固定(例えば溶接、ボルト止め等)される。 In this alternative embodiment, for example, adjacent ends of adjacent upper frames 12 are directly fixed to each other (e.g., welded, bolted, etc.), and the upper part of the upper bearing 14 is fixed to the lower surface of the adjacent end of the upper frame 12 (e.g., welded, bolted, etc.). Also, adjacent ends of adjacent lower frames 13 are directly fixed to each other (e.g., welded, bolted, etc.), and the upper part of the lower bearing 15 is fixed to the upper surface of the adjacent end of the lower frame 13 (e.g., welded, bolted, etc.).
尚、この別の実施形態のベース装置10においても、前記した実施形態のベース装置10と基本的に同様の作用効果を達成可能である。 Furthermore, the base device 10 of this alternative embodiment can achieve essentially the same effects as the base device 10 of the previously described embodiment.
D・・・・・・デストリビュータ
L1,L2・・上下方向最大幅、長手方向長さ
O,O′・・・交点
X・・・・・・仮想鉛直面
10・・・・・ベース装置
11・・・・・ベースフレーム
12,13・・上フレーム、下フレーム
12e,13e・・端面
14,15・・上部軸受、下部軸受
14b,15b・・軸受本体
14k,15k・・囲い枠
14kf,15kf・・取付面
16・・・・・アウトリガ
16A,16B・・展開位置、格納位置
16ba・・・軸受筒部
17・・・・・回動支軸
20・・・・・マスト装置
30・・・・・ブーム装置
D: Distributors L1, L2: Maximum width in the vertical direction, length in the longitudinal direction O, O': Intersection X: Imaginary vertical plane 10: Base device 11: Base frame 12, 13: Upper frame, lower frame 12e, 13e: End surface 14, 15: Upper bearing, lower bearing 14b, 15b: Bearing body 14k, 15k: Enclosure frame 14kf, 15kf: Mounting surface 16: Outriggers 16A, 16B: Deployed position, stored position 16ba: Bearing cylinder portion 17: Rotating support shaft 20: Mast device 30: Boom device
Claims (4)
前記ベース装置(10)は、ベースフレーム(11)と、そのベースフレーム(11)に固定され且つ該ベースフレーム(11)を取り囲むように配列される複数の上フレーム(12)と、平面視で隣り合う前記上フレーム(12)の長手方向に沿う外側面相互の交点(O′)よりも内方側又は該外側面の延長線相互の交点(O)よりも内方側に少なくとも一部が位置し、且つ該隣り合う上フレーム(12)の隣接端部に各々結合される上部軸受(14)と、前記ベースフレーム(11)に固定され且つ複数の上フレーム(12)にそれぞれ対応して該上フレーム(12)直下に間隔をおいて配列される複数の下フレーム(13)と、平面視で隣り合う前記下フレーム(13)の長手方向に沿う外側面相互の交点(O′)よりも内方側又は該外側面の延長線相互の交点(O)よりも内方側に少なくとも一部が位置し、且つ該隣り合う下フレーム(13)の隣接端部に各々結合される下部軸受(15)と、各々の基部(16b)に軸受筒部(16ba)を有し且つその各軸受筒部(16ba)が対応する前記上部軸受(14)と前記下部軸受(15)間に配置される複数のアウトリガ(16)と、同一軸線上に存する前記上部軸受(14)、前記軸受筒部(16ba)及び前記下部軸受(15)に嵌挿される回動支軸(17)とを備え、
前記アウトリガ(16)は、前記上フレーム(12)及び前記下フレーム(13)に沿う格納位置(16B)と、その格納位置(16B)より外方に張出す展開位置(16A)との間を前記回動支軸(17)回りに回動可能であることを特徴とする、コンクリート供給用デストリビュータ。 A concrete supply distributor including a base device (10), a mast device (20) supported in an upright position on the base device (10), and a boom device (30) mounted on the mast device (20),
The base device (10) comprises a base frame (11), a plurality of upper frames (12) fixed to the base frame (11) and arranged so as to surround the base frame (11), upper bearings (14) each having at least a portion located on the inner side of an intersection (O') between outer side surfaces along the longitudinal direction of adjacent upper frames (12) in a plan view or on the inner side of an intersection (O) between extension lines of the outer sides and each connected to adjacent ends of the adjacent upper frames (12), and a plurality of lower frames (12) fixed to the base frame (11) and arranged at intervals directly below the upper frames (12) in correspondence with the respective upper frames (12). the lower frame (13), at least a portion of which is located inward of an intersection (O') between outer side surfaces along the longitudinal direction of adjacent lower frames (13) in a plan view or inward of an intersection (O) between extension lines of the outer side surfaces, and which is coupled to adjacent ends of the adjacent lower frames (13); a plurality of outriggers (16) each having a bearing cylinder portion (16ba) at a base portion (16b) and each bearing cylinder portion (16ba) is disposed between the corresponding upper bearing (14) and lower bearing (15); and a rotating support shaft (17) inserted into the upper bearing (14), the bearing cylinder portion (16ba), and the lower bearing (15), which are coaxially aligned;
A concrete supply distributor, characterized in that the outrigger (16) is rotatable around the pivot shaft (17) between a stored position (16B) along the upper frame (12) and the lower frame (13) and a deployed position (16A) extending outward from the stored position (16B).
前記囲い枠(14k,15k)は、前記上フレーム(12)又は前記下フレーム(13)の長手方向と直交する平坦な取付面(14kf,15kf)を有していて、該取付面(14kf,15kf)に前記上フレーム(12)又は前記下フレーム(13)の端面(12e,13e)が当接、固着されることを特徴とする、請求項1に記載のコンクリート供給用デストリビュータ。 The upper bearing (14) and the lower bearing (15) each include a cylindrical bearing body (14b, 15b) and a surrounding frame (14k, 15k) surrounding the outer periphery of the bearing body (14b, 15b),
A concrete supply distributor as described in claim 1, characterized in that the enclosing frame (14k, 15k) has a flat mounting surface (14kf, 15kf) perpendicular to the longitudinal direction of the upper frame (12) or the lower frame (13), and the end surface (12e, 13e) of the upper frame (12) or the lower frame (13) abuts and is fixed to the mounting surface (14kf, 15kf).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2020204715A JP7522020B2 (en) | 2020-12-10 | 2020-12-10 | Concrete supply distributor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2020204715A JP7522020B2 (en) | 2020-12-10 | 2020-12-10 | Concrete supply distributor |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2022092125A JP2022092125A (en) | 2022-06-22 |
| JP7522020B2 true JP7522020B2 (en) | 2024-07-24 |
Family
ID=82067957
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2020204715A Active JP7522020B2 (en) | 2020-12-10 | 2020-12-10 | Concrete supply distributor |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7522020B2 (en) |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110469117A (en) | 2019-08-15 | 2019-11-19 | 广东博智林机器人有限公司 | A kind of hoistway is from climb concrete distributing system structure and its installation method |
-
2020
- 2020-12-10 JP JP2020204715A patent/JP7522020B2/en active Active
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110469117A (en) | 2019-08-15 | 2019-11-19 | 广东博智林机器人有限公司 | A kind of hoistway is from climb concrete distributing system structure and its installation method |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2022092125A (en) | 2022-06-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP7498100B2 (en) | Concrete supply distributor | |
| RU2532204C2 (en) | Lifting crane guys expander and method of its adjustment | |
| US11180352B2 (en) | Crane comprising first mast with tiltable first mast upper part | |
| EP2165965B1 (en) | Carbody connection system and crane using same | |
| US6213318B1 (en) | Rotatable connection system for crane boom sections | |
| AU2005242210A1 (en) | Inspection scaffold of large component for boiler and building method thereof | |
| KR102061753B1 (en) | Cranes with gantry and boom forces that effectively match in superstructures | |
| CN107299755A (en) | The hydraulic lifting steel platform of outer mould bases and the overall and local jacking of steel platform can be achieved | |
| JP7522020B2 (en) | Concrete supply distributor | |
| JP7535447B2 (en) | Concrete supply distributor and boom device lifting auxiliary device | |
| JP7645068B2 (en) | Concrete supply distributor | |
| US20170073201A1 (en) | Adjustable length tensioning member | |
| JPH10102823A (en) | Derrick device for replacing arm of power transmission tower and method of replacing arm using this | |
| JP7602578B1 (en) | Jacket structure system, gangway installation method, and transition piece system | |
| JP7727380B2 (en) | Concrete supply distributor | |
| JP6830513B2 (en) | Auxiliary lifting device and hydraulic cylinder | |
| JP7586701B2 (en) | Distributor boom device carrier | |
| CN115818417A (en) | Construction method of steel cage hoisting | |
| CN215439252U (en) | Hoisting mechanism for pipe gallery | |
| JP2024137386A (en) | Concrete supply distributor | |
| CN108221702A (en) | A kind of integral lifting apparatus of introversion formula steel case arch rib | |
| JP2024137385A (en) | Concrete supply distributor | |
| CN115535878A (en) | Construction method for converting in-situ of large movable arm tower crane of super high-rise building from external hanging into internal climbing | |
| RU2225345C2 (en) | Tower crane and method of its mounting | |
| GB1572440A (en) | Working platform for cranes |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20231017 |
|
| RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20231101 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20240408 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20240501 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20240613 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20240626 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20240711 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7522020 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |